HomeMy WebLinkAboutContract 46350-FP1 (2)Uepart o �PW Const. Services
TiOE# ��'� at
Project Manager��r��i� � �
Risk Management S. Candav
D.O.E. Brotherton '
CFA Westerman/Scanned ❑
The Proceeding people have beeu Contacted concerning the request
tor final payment & have released t6is project for such payment.
Clearance Conducted By Etta Bacy
TWORTH�
�TION AND PUBLIC WOR%S
F PROJECT COMPLETION
�� �������i�
�tu�'�� �, � :�)z' f I'I
� q��l - �o a3�6
�S -�I �35�
D.O.E. d�: 7312
,-�..� �....,.
Regarding contract 46350 for WATER & SEWER REPLACEMENT CONTRACT 2014 WSM-E PT1 as required
bp the WATER & SEWER as approved by Ciry Council on 12/09/2014 thtough M&C G27121 the director of the
WATER & SEWER upon the recommendation of the Assistant Directox of the Transportation & Public Works
Department has accepted the project as complete.
Original Contract Prices:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Paymeot Due
/ / I ��. _�—�
Recomr'n�nde�c for Acceptance
Asst. Director, TPW - Infrastructure Design and Construction
$1,006,930.00
�0.00 N� 1
$1,006,930.00
$955,901.50
Days @ $210.00/ Day
$0.00
$955,901.50
$908,106.43
�47,795.07
�•ZS• ZolCo
Date
�ii��� (� � ,_-- - -_- --- __- ---___-_ --- � ?_`�� �
Accepted 7 S, Date �
Asst. Director, WATER & SE R
.1— /
� / � 4
Asst. City Manager ' �
Da e
Comments: Fund Acc� P253-608170238683 & P258-7081070238683
��, � � e�+,�,�
� �; ,, �iii3�:'
,�.�.����� �������� �E�o�� S� oa3 8 �
MAR � z ,s �'�� ��c������ f� a
�'e 1����'�y �'�
Iuitt�t,l:�----'' -�- _ � � (� �� i
� .
City Project Numbers 02386
p�l��L��1�j�� `;-:1.1
►; .,
,
�� MAR 2 8 2016 �U��
�
�y--....�.__ __ __�.______�
Contract Name WATER&SEWER REPLACE CONT 2014 WSM-E PT i
Contract Limits
Project Type WATER & SEWER
Project Funding
5�(� 0 � -C OZ3g(�
CS �-�35�
DOE Number 7312
Estimate Number 25
Payment Number 25
I'or Period Ending 2/29/2016
Project Manager Conlon City Secretary Contract Number 46350
Inspectors RODGERS / DUARTE Contract Date 12/9/2014
Contractor CONATSER CONSTRUCTION TxLP Contract Time 230 CD
5327 WICHITA ST Days Charged to Date 227 CD
FORT WOR'CH , TX 76119 Contract is .00OOOU Complete
PO # � �-��
CITY OF FORT WORTH �NVOIC� �., ��..��-� 2=S _
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
1��t(r�l -�U23� ---3 —�,v0 b, u I k 3(��ISI,�y ��1�, �sl, 9S
�� �I(a�7-C���S�l� � ' �v0 a �v� �T,lZ !7, lncL�,_!Z�
WATER DEPARTMENT
ifNEERtNG AND FISCAL SE
Person ��- � <
nt F�rov,�'8tignattye for: �,
6� � '
DEPAR"fMENT CHECK
Wednesday, Mazch 02, 2016
Total Cost of Work Completed
Less % Retained
Net Earned
This Period $47,795.07
This Period $0.00
YES Q Less Liquidated Damages
� Days @ $0.00 / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$955,901.50
$0.00
$955,901.50
$0.00
$0.00
$0.00
$908,106.43
$0.00
$47,795.07
Page 5 of 5
� a� 3-- o a3 � lv
i
FORTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name WATER&SEWER REPLACE CONT 2014 WSM-E PT 1
Contract Limits
Project Type WATER & SEWER
City Project Numbers 02386
DOE Number 7312
Estimate Number 25 Payment Number 25 For Period Ending 2/29/2016
CD
City Secretary Contract Number 46350 Contract Time 23�D
Contrnct Date 12/9/2014 Days Charged to Date 227
Project Manager Conlon Contract is 95.000 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors RODGERS / DUART'E
Wednesday, March 02, 2016
Page 1 of 5
,,,���/
r
City Project Numbers 02386
Contract Name WATER&SEWER REPLACE CONT 2014 WSM-E PT I
Contract Limits
Project Type WATER & SEWER
Project Funding
Sectiu A- Water Line Improvements
DOE Number 7312
Estimate Number 25
Payment Number 25
For Period Ending 2/29/2016
Item Descriptlon of Items Es6mated Unit Unit Cost Estimated Compieted Completed
No. Quanity Total Quanity Total
1 3311.0241 8" Water Pipe 5708 LF $40.00 $228,320.00 5708 $228,320.00
2 3311.0251 8" DIP Water 38 LF $55.00 $2,090.00
3 3311.0141 6" WaterPipe 62 LF $35.00 $2,170.00 50 $1,750.00
4 3311.0001 Ductile Iron Water Fitting 2 70 $4,500.00 $9,000.00 2 $9,000.00
5 0241.1302 Remove 6" Water Valve 10 EA $200.00 $2,000.00 10 $2,000.00
6 0241.1303 Remove 8" Water Valve 10 EA $300.00 $3,000.00 9 $2,700.00
7 0241.1510 Salvage Fire Hydrant 6 EA $350.00 $2,100.00
8 9999.0000 Temporary Asphalt Pvmt Rep 2012 LF $6.00 $12,072.00 1407 $8,4A2.00
9 3201.0400 Temporary Asphalt Pavement 5412 LF $8.00 $43,296.00 5642 $45,136.00
10 3201.0113 6' R'ide Asphalt Pavement R 308 LF $55.00 $16,940.00 91 $5,005.00
11 3201.0614 Conc Pvmt Repair, Ttesident 80 SY $75.00 $6,000.00 128 $9,600.00
12 9999.0000 Temporary Asphalt Sidewa(k 126 SF $2.00 $252.00
13 9999.00OOTemporatyAsphaltDriveway 180 SF $3.00 $540.00 37 $111.00
14 9999.0000 Temporary Asphalt Cwb and 308 LF $5.00 $1,540.00 363 $1,815.00
IS 3292.0101 Utiliry Service SurFace Re 310 SY $6.00 $1,860.00 310 $1,860.00
16 3304.0101 Temporary Water Services 1 LS $12,000.00 $12,000.00 1 $12,000.00
17 3305.0003 8" Water Line Lowering 2 EA $4,500.00 $9,000.00
18 3305.0103 Exploratory Excavation of 2 EA $500.00 $1,000.00 2 $1,000.00
19 3305.OI09 Trench Safety (Water) 130 LF $2.00 $260.00
20 3312.0001 Fire Aydrant 6 EA $3,000.00 $18,000.00 6$18,000.00
21 3312.O1 l7 Connection to Existing 4"- 12 EA $1,000.00 $12,000.00 10 $10,000.00
22 3312.2001 1" Water Service, Meter Re 149 EA $300.00 $44,700.00 129 $38,700.00
23 3312.20031"VJaterService 155 EA $1,100.00 $170,500.00 159 $174,900.00
24 3312.2004 1" Private Water Service 60 LF $40.00 $2,400.00 60 $2,40Q00
25 0241.1514 Salvage 2" Water Meter 1 EA $300.00 $300.00 1 $300.00
26 3312.2201 2" Water Service, Meter Re 1 EA $500.00 $500.00 1 $500.00
27 3312.2203 2" Water Service 1 EA $3,000.00 $3,000.00 1 $3,000.00
28 33123002 6" Gate Valve 6 EA $1,000.00 $6,000.00 6 $6,000.00
29 33123003 8" Gate Valve 17 Ef1 $1,100.00 $18,700.00 17 $18,700.00
30 3471.0001 Tr�c Control (Water) 3 MO $500.00 $1,500.00 3 $1,500.00
31 3125.0101 SWPPP > 1 acre(Water) 1 LS $300.00 $300.00 1 $300.00
Wednesday, March 02, 2016 Page 2 of 5
City Project Numbers 0238(
Contract Name WATF.R&SEWER REPLACE CONT 2014 WSM-E PT 1
Contract Limits
Project Type WATER & SEWER
Project F'unding
DOE Number 7312
Estimate Number 25
Payment Number 25
For Period Endiog 2/29/2016
' Sab-Total of Previous Unit $631,340.00 $603,039.40
Section B- Sanitary Sewer Line Improvements
Item Description of Items �sHmated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 3331.4201 10" Sewer Pipe 109 LF $45.00 $4,905.00 109 $4,905.00
2 3331.4115 8" Sewer Pipe 2900 LF $40.00 $116,000.00 2900 $116,000.00
3 3331.4119 8" DIP Sewer Pipe 267 LF $55.00 $14,685.00 267 $14,685.00
4 3305.0109 Trench Safety (Sanitary Se 3750 LF $3.00 $11,250.00 2901 $8,703.00
5 3301.0001 Pre-CCT'V Inspection 3246 LF $2.50 $8,115.00 1171 $2,927.50
6 3301.0002 Post-CCT'V Inspection 3276 LF $2.00 $6,552.00 3210 $6,420.00
7 3331.3101 4" Sewer Service 98 EA $900.00 $88,200.00 92 $82,800.00
8 3331.3311 4" Sewer Service, Reconnec 96 EA $200.00 $19,200.00 89 $17,800.00
9 3339.1001 4' Manhole 15 EA $3,000.00 $45,000.00 15 $45,000.00
10 3339.1003 4' Extra Depth Manhole 16 VF $185.00 $2,9G0.00 16 $2,960.00
11 3305All2 Concrete Collar 15 EA $400.00 $6,000.00 1 $400.00
12 3301.0101 Manhole Vacuum Testing l5 EA $200.00 $3,000.00 15 $3,000.00
13 9999.0000 Temporary Asphalt Pvmt Rep 925 LF $6.00 $5,550.00 910 $5,460.00
14 3201.0400 Tcmporary Asphalt Paving R 3242 LF $8.00 $25,936.00 3490 $27,920.00
15 3201.0113 6' Wide Asphalt Pavement R 12 LF $50.00 $600.00 12 $600.00
16 3201.0614 Conc Pvmt Repair, Resident 60 SY $75.00 $4,500.00 60 $4,500.00
17 3292.0101 Utility Service Surface Re 490 SY $6.00 $2,940.00 240 $1,440.00
18 9999.0000 Temporary Asphalt Side�valk 816 SF $2.00 $1,632.00 196 $392.00
19 9999.0000 Temporary Asphatt Driveway 240 SF $3.00 $720.00
20 9999.0000 Temporary Asphalt Curb and 309 LF $5.00 $1,545.00 130 $650.00
21 3305.0103 Exploratory Excavation of 3 EA $500.00 $i,S00.00 3 $1,500.00
22 9999.0000 4' x 5' Storm Conflict Box 1 EA $4,000.00 $4,000.00 1 $4,000.00
23 3471.0001 TrafFic Control (Sanitary 2 MO $300.00 $600.00 2 $600.00
24 3125.0101 SVJPPP > I acre (Sanitary 1 LS $200.00 $200.00 1 $200.00
Sub-Total of Previous Unit �375,590.00 $3s2,862.so
Wednesday, Mazch 02, 2016 Page 3 of 5
City Project Numbers 02386
Contract Name WATER&SEWER REPLACE CONT 2014 WSM-E PT 1
Contract Limits
Project Type WATER & SEWER
Project Funding
DO� Number 7312
Estimate Number 25
Payment Number 25
For Period Ending 2/29/2016
Contract Information Summary
Original Contract Amount
Chan�e Orders
Change Order Number 1
_ 5� �-
� ,�� (Y ""—�� Date � � ��
Inspecti n Supervisor
� C%l /��'o'''"'� ^' Date 3 �� �G
Project Manager �
�
ate 3� z8• 1 !P
Asst. '[or/I'PW - In&astructure esign and Construction
� r e 3 Z, �L
r1�U Director / Contracting Departme
r�
$1,006,930.00
$0.00
Total Contract Price $1,006,930.00
Total Cost of Work Completed $955,901.50 /
Less % Retained $0.00
Net Earned $955,901.50
Earned This Period 547,795.07
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Paymeut
Plus Material on Hand Less IS%
Balance Due This Payment
$0.00
$0.00
$0.00
$908,106.43
$0.00
$47,795.07