Loading...
HomeMy WebLinkAboutContract 46349-CO2 (2), � -.� �. 5 , � , � ;.r�.. - ���� ��������.�( ` ; �a���►�� ��4 � � "� -�� �* y� FORT WORTH Cit of Fort Worth — -" Y �� ���\ � �— Change Order Request i�� , `' ' SF.` Project Name: Water and Sanitary Sewer Replacement Contract 2010, STM-B City Sec No.: 46349 y��ti�. Project No.(s): P253-603170149583 and P258-703170149583 DOE No. 6630 City Proj. No.: 01495 ` d� `� ..' ;, Pr�ijeot Description: Water and Sanitary Sewer Replacement on Bonnie Drive, Gaston Avenue Overhill Road and Treehaven Road Contractor: Woody Contractors, Inc. Change Order #�2 Date: 9/10/2015 City Project Mgr. Soon Wong City Inspector: Adiltla Cazorla Phone Number: 817-392-8369 Phone Number: 817-223-2282 Dept. � Water � Sewer Original Contract Amount $835,388.00 $627,415.40 Extras to Date $82,303.00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $917,691.00 $627,415,40 Amount of Proposed Change Order $36,100.00 -$3,300.00 Revised Contract Amount $953,791.00 Original Funds Available for Change Orders $25,000.00 $25,000.00 Remaining Funds Available for this CO $25,000,00 Additional Funding (if necessary) $36,100.00 CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTR,4CT MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTR,4CT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Totals Contract Time (Calender days) $1,462,803.40 180 $82,303.00 080 $1,545,106.40 260 $32,800,00 260 7.87°/a $1, 828,504.25 The change ordei• will pi•ovide compensation foi• the following: • The replacement of 1%2 -inch water service lines that were encountered during construction. • The removal and replacement of the existing concrete pavement to allow for the replacement of the 1'/z inch service lines. �• The lowering of a project water main due to conflict with a previously unknown storm drain pipe that was encountered during construction. • Connections to existing sanitaty sewer manholes to avoid replacing manholes that were found , to the in good condition. � � • The deletion of pay item • t�e � o longer needed on the proj�t. — -- - � �� ,:, /���¢�aM � - --- - _ �,,,.�� o ,.0� �&'O,. � �'�L"il.�.lLlA.d UVI�---__._—_� ! �FF�ri���. �E�o��' +� ° � �ITII �ECR� �'/?,i�; ( � � _ ,,, „ �� � � , ,�„ ti,�i • i� , '�� � ' ,�_ � ,, � , � <, `, c It is unde�stood and agreed that ihe accept ��� �:� � payment in full (both time and money) for all coStE Contractor's Company Name Woody Contractors, Inc. ��.��' �W � t.� �� , �i�► S�tary contractor constitutes an accord and satisfaction and represents to, the above Change Order. Name Date Project , �a9�1� 76r r[t� Date E;r , ��,1 �:� ` Council Action M&C Number N/A �tractor Signature �: � , v <, �� �� �> ii � �uperviso (TP Dept) �� Manager M&C Date Approvetl N/A Date ,- - ,.. Date Date '.-l_L; Date . �� ;� FC?RT r1�VORTH City of Fort Worth �— Change Order Additions Project Name Water and Sanitary Sewer Replacement Contract 2010, STM-B City Sec No.: 46349 Project No.(s): P253-603170149583 and P258-703170149583 DOE No. 6630 City Proj. No.: 01495 Project Description Water and Sanitary Sewer Replacement on Bonnie Drive, Gaston Avenue Overhill Road and Treehaven Road Contractor Woody Contractors, Inc. Change Order: �2 Date: 9110/2015 City Project Mgr, Soon Wong City Inspector Adilda Cazorla ADDITIONS ✓ v ✓ ✓ ✓ ✓ � ✓ ✓ F�FT WORTH City of Fort Worth � Change Order Deletions Project Name Water and Sanitary Sewer Replacement Contract 2010, STM-B City Sec No.: 46349 Project No.(s): P253-603170149583 and P258-703170149583 DOE No. 6630 City Proj. No.: 01495 Project Description Water and Sanitary Sewer Replacement on Bonnie Drive, Gaston Avenue Overhill Road and Treehaven Road Contractor Woody Contractors, Inc. Change Order: �2 Date 9110/2015 City Project Mgr. Soon Wong City Inspector: Adilda Cazorla ITEM DESCRIPTION 4 4 FT MH 5 4 FT Drop MH DELETIONS DEPT Qty Unit Unit Cost Total Sewer 4.00 EA $3,300.00 $13,200.00 Sewer 1.00 EA $6,300.00 $6,300.00 Page 3 of 4 Water Sewer $19,500.00 Deletions Sub Total $19,500.00 ✓ ✓ Page 4 of 4