HomeMy WebLinkAboutContract 46349-CO1 (2)FO RT WO RT H City of Fort Worth �� � �ry, �o� �
Change Order Request �T��°£ {��A _LLy�'
Project Name: Water and Sanitary Sewer Replacement Contract 2010, STM-B City Sec No.: 46349
Project No.(s): P253-603170149583 and P258-703170149583 DOE No. 6630 City Proj. No.: 01495
Project Description;
Water and sanitrary sewer replacements on Bonnie Drive, Gaston Avenue, Overhill Roatl, and Treehaven Road
Contractor: Woody Contratctors, Inc. Change Order# �1 Date: 6l5/2015
City Project Mgr. Soon Wong City Inspector: Adilida Cazorla
Phone Number: 817-392-8369 Phone Number: 817-223-2282
Dept. � Water � Sewer
Totals I Contract Time
Original Contract Amount $835,388.00 $627,415.40 $1,462,803.40 180
Extras to Date
Credits to Date
Pending Change Ortlers (in M&C Process)
Contract Cost to Date $835,388.00 $627,415.40 $1,462,803.40 180
Amount of Proposed Change Order $82,303.00 $82,303.00
Revised Contract Amount $917,691.00 180
Original Funds Available for Change Orders $25,000.00 $25,000.60
Remaining Funds Available for this CO
Additional Funding (if necessary) $57,303.00 $57,303.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 5.63%
MAXALLOWABLECONTRACTAMOUNT(ORIGINALCONTRACTCOST+25%) $1,828,504.25
JUSTIFICATION (REASONS) FOR CHANGE ORDER
The original contract provided for the replacement of the existing water main on Gaston Avenue fi�om
Fairfax Street to Penrose Avenue. However, during construction, it was determined that the water main on
this segrnent of the road had been previously replaced. This change order will allow for the replacement of
the existing water main on Gaston Avenue from Fairfax Street to Southwest Boulevard which is severely
concurs with the conti•actors request for 30
�
��ye
d°
�ity Se��tary
days on the change order.
$�
o�
��
�
,o��-
;��� ��
�
m
c--9
m
�
m�
�� ��
C__ e �
�
�
0
00
0
�
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name Contractor Name ontFacto T�pature Date
Woody Contratctors, Inc. Troy Woody � / ..
,.�
., ; , , ;
�� 7 . ., ' . . .. .
is ity Attorney
:�.w'�"'`��. �� 1 %���,�ll
M&C Number N/A
Date
G .�s -��
Date
� ^;
� ,�
Council Action
�o�ect Ma er —"" Date
_- b � (s
on tr ction Su ervisor TPW De .t _-. Date
�sistaut.Cit Ma age Date
G 8 iS
;quiretl) -
M&C Date Approved ,�� �._� ,i I� ��;�,�� i« �-,7�i`,-�( �(;r il
' FU R� VVO RT H City of Fort Worth
Change Order Additions
Project Name Water and Sanitary Sewer Replacement Contract 2010, STM-B City Sec No.: 46349
Project No.(s): P253-603170149583 and P258-703170149583 DOE No. 6630 City Proj. No.: 01495
Project
Description
Water and sanitrary sewer replacements on Bonnie Drive, Gaston Avenue, Overhill Road, and Treehaven Road
Contractor Woody Contratctors, Inc. Change Order: �1 Date: 6I5/2015
City Project Mgr. Soon Wong City Inspector Adilida Cazorla
ADDITIONS
Reconnection
17 Ductile Iron Water Fittings
18 Temporary Water Services
19 Temporary Asphalt Paving
25 Remove 6" Water Valve
28 Salvage Fire Hydrant
29 Salvage 3/4" Water Meter
31 Block Sod Placement
33 Traffic Control
Water
Water
Water
Water
Water
Water
Water
Water
Water
Water
Water
Water
Water
14.00
2,00
1,00
25.00
25.00
0.10
0.20
950.00
1.00
1.00
25.00
50.00
1.00
LF
EA
EA
EA
EA
LS
LS
LF
EA
EA
EA
LF
LS
Water
Sewer
$39.00
$1,300.00
$850.00
$275.00
$1,100,00
$7,000,00
$50,000.00
$10.00
$100.00
�� ��
: ��
��� ��
$546.00
$2,600.00
$850.00
$6,875.00
$27,500.00
$700.00
$10,000.00
$9,500.00
$100,00
$300.00
$2,500.00
$400.00
$2.000.00
Page 2 of 4 Additions Sub Total $82,303,00
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Water and Sanitary Sewer Replacement Contract 2010, STM-B
Project No.(s): P253-603170149583 and P258-703170149583 DOE No. 6630
Project Description
City Sec No
City Proj. No
46349
01495
Water and sanitrary sewer replacements on Bonnie Drive, Gaston Avenue, Overhill Road, and Treehaven Road
Contractor Woody Contratctors, Inc. Change Order: �1 Date 6/5/2015
City Project Mgr. Soon Wong City Inspector: Adilida Cazorla
DELETIONS
Previous Change Orders
CO# DATE AMOUNT
Total ' $0.00
Page 4 of 4
M/WBE Breakdown for this Change Order