Loading...
HomeMy WebLinkAboutContract 44543 (2)CITY SECRETARY � D.O.E. FILE CONTRACTOR'S BONDING �% CONSTRUCTI4N'S COP'Y �LIENT DEPARTMENT F�urr�oK��,� _...,..r,,� - P120JE�'T 1VIAN,tTA�. FOR THE CONSTI2UCTION OF ]Lake Crest Drainage Improvements CITY SECRIE'I°At� CO(d�RRi4CT N0. ���5�„�. City Pxoject No. 01604 D.Q.E. No. 6552 SD-0296 X-21941 �etsy Price Mayor Tom Higgins City Manager Dougias W. �n%iersig, P.E. I)irector, Transportation and Public Works Department Prepared for The City of Fort Worth Storm Water Group March 2013 �---- ---, I � { ,� I �, I, �� j�;?i �\ 1t \ 1:i� � O��ICyAI� R'�+Cti�� �r�r ���� �'� 11��' — � T' ��'��� �, F 7' �t ��p,�,,......,,t�,�-��1 �!� � * � * �� � ....:......................'r... I � JEAN MARIE ALEXANJER � �rPr�:...943�T ;��.� t��G�,c;• I/CENg�4: ��t,4'i � � `� �s� � t������1 (3 37�� Shaeld Engnneera�g Group, PLLC 1200 W Freewav, Suite 300 Fort Worth, TX 76102 817.810.0696 ��C�IVEO �UN 172�13 M&C Review Page 1 of 2 Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA FORT�� COUNCIL ACTION: Approved on 5/21/2013 DATE: 5/21/2013 REFERENCE C-26274 LOG NAME: 20SW LAKE CREST NO.: DRAINAGE CONSTRUCTION CODE: C TYPE: NON- PUBLIC NO CONSENT HEARING: SUBJECT: Authorize Execution of a Contract with CD Builders, Inc., in the Amount of $2,866,980.00 for Lake Crest Drainage Improvements Project and Provide for Contingencies and Construction Services for a Total Project in the Amount of $3,273,580.00 (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council authorize the execution of a contract with CD Builders, Inc., in th� amount of $2,866,980.00 for the Lake Crest Drainage Improvements Project. DISCUSSION: The purpose of this Mayor and Council Communication is to authorize the execution of a contract with CD Builders, Inc., in the amount of $2,866,980.00. The construction of this project will minimize the risk of home and street flooding at various locations in the Lake Crest subdivision. This project was advertised for bid in the Fort Worth Star-Telegram on March 14, 2013 and March 21, 2013. On April 18, 2013 the following bids were received: Bidder Alternative 1 Alternative 2 Time of Com letion CD Builders Inc. $2,866,980.00 $2,840,750.00 RKM Utilit Services Inc. $3,109,108.50 $3,076,939.50 Conatser Construction Tx, LP. $3,263,948.00 $3,235,938.00 �g0 Working Wood Contractors Inc. $3,277,832.00 $3,314,963.00 Days Ark Contractin Services, LLC. $3,973,332.00 $3,975,318.00 William J. Schultz Inc, DBA Circle C $3,983,619.50 $3,917,008.50 Earthbuilders, LP $4,323,836.00 $4,460,038.00 Bid Alternative 1 is based on concrete pipe. Bid Alternative 2 is based on approved HDPE or PPE pipe. Since this project is in proximity to schools, maximizing construction during the summer break is critical. Staff will determine which pipe material can be installed most efficiently based on the field conditions actually encountered as construction begins and the relative procurement times of the two different types of pipe. At this time Staff recommends awarding the contract based on the higher priced alternative so that the City will have the flexibility to make an appropriate decision on the type of pipe to be used once actual field conditions and material procurement times are known. A credit change order based on the bid amounts for Alternative 2 will be applied if approved HDPE or PPE pipe is used. tt is recommended that a contract be awarded in the amount of $2,866,980.00 (Alternative 1) to CD Builders, Inc. A pre-established field order allowance in the amount of $215,000.00 is included in the bid. Costs for the implementation of this project will be funded by the Stormwater Capital Projects Bond Fund. Funding in the amount of $327,000.00 is included in this request for associated construction survey, materials testing, and inspection services. The contingency fund established for this project for possible change orders is $79,600.00. M/WBE Office: CD Builders, Inc., is in compliance with the City's BDE Ordinance by committing to 16 http://www.fortworthgov.org/council_packet/mc_review.asp?ID=18437&councildate=5/2... 5/22/2013 M&C Review percent MBE participation. The City's MBE goal on this project is 15 percent. This project is located in COUNCIL DISTRICT 2, Mapsco 32V and 32Z. Page 2 of 2 FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Stormwater Capital Projects Bond Fund. TO FundlAccount/Centers FROM Fund/AccountlCenters P227 541200 207280160483 $2,866,980.00 _ _ Submitted for City Manager's Office by_ Originating Department Head: Additional Information Contact: Fernando Costa (6122) Douglas W. Wiersig (7801) Vibhuti Pandey (2424) ATTACHMENTS Lake Crest Drainage Map.pdf ��I ` http://www.fortworthgov.org/council_packet/mc_review.asp?ID=18437&councildate=5/2... 5/22/2013 000000-t TABLE OF CONTENTS Page I of 4 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions 00 OS 10 Mayor and Council Communication 00 OS 15 Addenda 00 11 13 Invitation to Bidders 00 21 13 Instructions to Bidders 00 35 13 Conflict of Interest Affidavit 00 41 00 Bid Form 00 42 43 Proposal Form Unit Price 00 43 13 Bid Bond 00 43 37 Vendor Compliance to State Law Nonresident Bidder 00 45 11 Bidders Prequalifications 00 45 12 Prequalification Statement 00 45 13 Bidder Prequalification Application 00 45 26 Contractor Compliance with Workers' Compensation Law 00 45 40 Minority Business Enterprise Goal n�n� n�c �� c.,,,,i� u,,..:,,o�� �.,�o,„,,.:�o r_,,.,i 00 52 43 Agreement 00 61 13 Performance Bond 00 61 14 Payment Bond 00 61 19 Maintenance Bond 00 61 25 Certificate of Insurance 00 72 00 General Conditions 00 73 00 Supplementary Conditions Division O1- General Requirements O1 11 00 Summary of Work O 1 25 00 Substitution Procedures O1 31 19 Preconstruction Meeting n�oz-�—L�9 n.,,,;e„� �,roo*.r�n Ol 32 16 Construction Progress Schedule O1 32 33 Preconstruction Video O1 33 00 Submittals Ol 35 13 Special Project Procedures O1 45 23 Testing and Inspection Services Ol 50 00 Temporary Facilities and Controls O1 55 26 Street Use Permit and Modifications to Traf�c Control O1 57 13 Storm Water Pollution Prevention Plan Ol 58 13 Temporary Project Signage O1 60 00 Product Requirements Ol 66 00 Product Storage and Handling Requirements O1 71 23 Construction Staking O1 70 00 Mobilization and Remobilization O1 74 23 Cleaning O 1 77 19 Closeout Requirements CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Im�„ra�� ���t t:,� - STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Ci'�i {�i ;;t�'� Revised August 20, 2012 000000-a TABLE OF CONTENTS Page 2 of 4 1 2 3 4 5 6 7 S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 O1 78 39 Project Record Documents Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are inctuded in the Project's Contract Documents 33 49 10 Cast-in-Place Manholes and Junction Boxes 33 49 20 Curb and Drop Inlets 33 49 40 Storm Drainage Headwalls and Wingwalls 33 23 50 Permanent Transition Mats 39 00 03 Storm Water Field Order Allowances Technical Speci�ications listed below are included for this Project by reference and can be viewed/downloaded from the City's Buzzsaw site at: htps•U�roiectpoint buzzsaw com/ciiendfortworthgov/Resources/02%20- %20Construction%20Documents/Specifications Division 02 - Existing Conditions 02 41 13 Selective Site Demolition 02 41 14 Utiliry RemovaUAbandonment 02 41 15 Paving Removal Division 03 - Concrete 03 30 00 Cast-In-Place Concrete 03 34 13 Controlled Low Strength Material (CLSM) 03 34 16 Concrete Base Material for Trench Repair 03 80 00 Modiiications to Existing Concrete Structures Division 26 - Electrical �� nc nn r �x> > v tt � r����+�:��� ��-�-�� ,� �;�:�„ � .. ����}�,ste�s Division 31- Earthwork 31 10 00 Site Clearing 31 23 16 Unclassified Excavation 31 23 23 Borrow 31 24 00 Embankments 31 25 00 Erosion and Sediment Control � � �� nn �„t,:,,.,� �-� v 31 37 00 Riprap Division 32 - Exterior Improvements 32 O 1 17 Permanent Asphalt Paving Repair 32 Ol 18 Temporary Asphalt Paving Repair 3Js�.—�r � !` « �o D.,....... Uo.�.�iY �''�'-z'-� �i •�,i u„�o �,,,. � 32 11 29 Lime Treated Base Courses �z-��� � � rr.. „*oa r�„�o r,.,,..�o� CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised August 20, 20 t2 1 2 3 4 5 6 7 8 9 10 I1 12 13 14 15 16 r� 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 000000-3 TABLE OF CONTENTS Page 3 of 4 32 12 16 Asphalt Paving 3�-'r�� n �,.ti.,i+ n.,<>:,,,. r,,,,,,v eo.,i.,.,,� 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 32 16 13 Concrete Curb and Gutters and Valley Gutters 32 17 23 Pavement Markings 32 31 13 Chain Link Fences and Gates 32 31 26 Wire Fences and Gates 32 31 29 Wood Fences and Gates 32 32 13 Cast-in-Place Concrete Retaining Walls 32 91 19 Topsoil Placement and Finishing of Parkways 32 92 13 Hydro-Mulching, Seeding, and Sodding 32 93 43 Trees and Shrubs Division 33 - Utilities 33 O1 30 Sewer and Manhole Testing 33 O1 31 Closed Circuit Television (CCT`V) Inspection 3�-^�� � n �.,..,,�� v,...,..:.,,. ,.��.,;.,�;,,,. co.,.o« c�,�*o.,,r �3 � i n r,.;.,� n,..,a:,,n .,.,a ��o,.,«:,..,� r�,.i.,.;,,,, 33 04 11 Corrosion Control Test Stations 33 04 30 Temporary Water Services 33 04 40 Cleaning and Acceptance Testing of Water Mains 33 OS 10 Utility Trench Excavation, Embedment, and Backfill 33 OS 12 Water Line Lowering 33 OS 13 Frame, Cover and Grade Rings 33 OS 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 33 OS 16 Concrete Water Vaults 33 OS 17 Concrete Collars 33-OT`..29 n,,,.o,. u,,..;,,n ��-lY�-f�..��Tr�'c'ir"a"x�v�rn�iiici Diuco �3-03--� c�oo� r.,�:.,n �;,,o �� c � u.,.,a �r,,,,.,oi:,,n 33-0-�',.L4 r, i� *� ,.�r,.....;o.. v:..o :,, r„�:,,,. „i rr,,,,,,o� r y_�r ptn�o �..�...b ., _ ......... � _ ....., 33 OS 26 Utility Markers/Locators 33 OS 30 Location of Existing Utilities 33 11 10 Ductile Iron Pipe 33 11 11 Ductile Iron Fittings 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type �3-� 1---14 u,,,.;oa �Fo„� n:.,o ,,.,a �;t+.,,rt� 33 12 10 Water Services 1-inch to 2-inch 33 12 20 Resilient Seated Gate Valve �3—��2-� n�xnx� n v„at,o.. co„�ea u,,,+e,.�., t�„�.,n� 33 12 25 Connection to Existing Water Mains 3���o r' �.' +' n•�c�..i.. n ��o.,,ti�;o� �.. v,.�.,�to �x�.,�o« c�,��o„� . .,, .,�......, 33 12 40 Fire Hydrants �3—�� cn �z�„+o,. c,,.,,,,ie c,„*;,,,,� CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Im�Pc��� :�.te �t.; STANDARD CONSTRUCTION SPECIPICATION DOC[JMENTS Ck'�t�( ai �=:;s),'z Revised August 20, 2012 000000-4 TABLE OF CON1'ENTS Page 4 of 4 6 10 11 12 13 14 15 16 1'7 18 19 20 21 22 23 ��� � �rr� r�si-��a��a�o�po-rron� ���T7r�C LITIDL' D' A C«:�..«.. C�o.,.o..� (!`_«.�.,:4�._nn`I A,�r,. TR.,:.,�1 ivv u � 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe ���z� �,,,,:�,,.R> co.,,o.. ct:., i : 3� �3 c.,.,:.,,,.., co.,.o« n:,,o �.,�.,,.�o, o� 33 31 50 Sanitary Sewer Service Connections and Service Line 33 39 10 Cast-in-Place Concrete Manholes 33 39 20 Precast Concrete Manholes 33� �:t,e,.,.i.,.,., �,r,,.,�,,,ia� 3�� � n �xr � ..+� n,,,.o�n n�,,,,,,t,o.. i�x� n r� 33 41 10 Reinforced Concrete Storm Sewer Pipe/Culverts 33 41 11 HDPE Storm Sewer Pipe 33� �i,.,+oa e�,...,,, n«,,;,,n �� n� n� �r,.a,,,.� r�...,:.,� 33 49 10 Cast-in-Place Manholes and Junction Boxes 33 49 20 Curb and Drop Inlets 33 49 40 Storm Drainage Headwalls and Wingwalls 24 Division 34 - Transportation 25 �-^, n > > n �r«„�:,, r:,..,..�n 26 ��1 ^--�rr� A.�w...�.:.,�. T«..Ffi;.. C;..r,�.l�. Z% � i�--r-i-i n A .,1 .. Tll,,...;.,�t:.,., A ��orol,lioQ 28 34 41 30 Aluminum Signs 29 34 71 13 Traffic Control 30 31 Appendix 32 GC-4.01 Availability of Lands 33 . 34 GC-4.04 Underground Facilities 35 . 36 GC-6.06.D Minority and Women Owned Business Enterprise Compliance 37 GC-6.07 Wage Rates 38 GC-6.09 Permits and Utilities 39 GC-6.24 Nondiscrimination 40 GR-Ol 60 00 Product Requirements 41 42 END OF SECTION CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised August 20, 20t2 id f� City of Fort Worth, Texas Transportation & Public Works Department Storm Water Utility ADDENDUM No. 1 To the Specifications and Contract Documents For Lake Crest Drainage Improvements City Project No. 01604 D.O.E. Project No. 6552 Addendum No. 1— Issue Date: March 28, 2013 Bid Receipt Date: April 11, 2013 This Addendum No. 1 forms part of the contract documents referenced above and modifies the original Contract Documents and Plans. Acknowledge receipt of this addendum by signing in the space provided below, attaching it to the Contract Documents (inside) and note receipt of the Addendum on the outer envelope of your bid. Prospective Bidders are hereby notified of the following: The Plans and Specification Documents for the above referenced project are hereby revised and amended as follows: 1. Table of Contents - Addition of Dual Wall Polypropylene Pipe as 33 99 99 2. Bid Proposal Form Section 00 42 43: Revise was 10. 3341.0308 36" HDPE Plpe 12. 3341.0408 48" HDPE Plpe 15. 3341.0501 54" HDPE Plpe revision 10. 3341.0308/339999 36" Dual Wall HDPE or PP Plpe 12. 3341.0408/339999 48" Dual Wall HDPE or PP Plpe 15. 3341.0501/339999 54" Dual Wall HDPE or PP Plpe Note after item 73 (line 86) was see alternate bid below for HDPE pipe revision see alternate bid below for Dual Wall HDPE or PP pipe Addition Bidlist Item No. 125 - Pre-Bid Item - Storm Water Field Order Allowance - line item total = $215,000.00 I/ b t�' Delete from alternate bid: 6aa 9999.34 17a 3341.0605 17aa 3341.0605 21" HDPE Pipe 66" RCP 66" HDPE Pipe ADDENDUM NO. 1 April 01, 2013 Revise from alternate bid was 5aa 3341.0102 7aa 3341.0204 9aa 3341.0301 13aa 3341.0408 14aa 3341.0501 16aa 3341.0601 18" HDPE Pipe, Class III 24" HDPE Pipe, Class III 30" HDPE Pipe, Class III 48" HDPE Pipe , Class III 54" HDPE Pipe, Class III 60" HDPE Pipe, Class III revision 5aa 3399.9935/3341.0102 7aa 3399.9936/3341.0204 9aa 3399.9937/3341.0301 13aa 3399.9938/3341.0408 14aa 3399.9939/3341.0501 16aa 3399.9940/3341.0601 18" Dual Wall HDPE or PP Pipe 24" Dual Wall HDPE or PP Pipe 30" Dual Wall HDPE or PP Pipe 48" Dual Wall HDPE or PP Pipe 54" Dual Wall HDPE or PP Pipe 60" Dual Wall HDPE or PP Pipe Add note below Alternate Bid: *- Minimum cover requirements, backfill requirements per Manufacturer's recommendation/specification Addition **Alternative Bid Pipe Materials Material Proposed Specification No. 3. Technical Specifications - insert 33 99 99 Dual Wall Polypropylene Pipe Specification Notes: New bid form is available on Buzzsaw; replace original bid form with Addendum No 1 bid form New Page 2 of 4 in Table of Contents is available on Buzzsaw, to be replaced in contract documents If ALTERNATE BID is used, include pipe material/specification number in spaces provided below Total Bid New Technical Specification 33 99 99 Dual Wall Polypropylene Pipe Spec uploaded to Buzzsaw; to be placed in contract documents 11 other provisions of the plans, specifications and contract documents for the project which are not expressly amended herein shall remain in full force and effect. The Contractor shall acknowledge receipt of this Addendum (1) in the space provided below, (2) in the proposal and (3) acknowledge receipt on the outer envelope of your bid in upper case letters "RECEIVED & ACKNOWLEDGED ADDENDUM NO. 1". Failure to return a signed copy of the addendum with the Proposal shall be grounds for rendering the bid non-responsive. A signed copy of this addendum shall be placed into the Proposal at the time of submittal. RECEIPT ACKNOWLEDGED: By: � Title: (�,�Ge ' TrCS/cYehT C � 8ui l6%r-5, Znc. TRANSPORTATION AND PUBLIC WORKS By: � �� � Vibhuti Pandey, P.E., Project Manager ADDENDUM NO. 1 April 01, 2013 City of �ort Worth, iex�s Tran�portatlon 8� P�tq1iC W�rfc� p��arf��ry��t Stort� Wat�r Utilfty AD[?�NpUM No. 2 To the Sp�cificattons and Cont�'act pbCum�rits For L�kc Cr�t drainage Improvemeni,, City projeC� No. O�f 6Q4 C1,p.�, proj�ect No, 6562 Adt#endum NO. 2.—is�ue Da#e: April $, 2073 NOiE CMANGE: �id Re�eipt D�#e: April 18, 20i3 Thi� AddQndum 1Vo, � forrns part af fhe contract docum�nts r�f�r�nced �bove and mQdifi�; the origi��► C�ntract Dncument� �nd Pl�ns. Acknowfedge rsceipt of thi� acidendum by signing in the spaoe provided belaw, et��Ghing it ta the Contr��t Do�uments (insld�j $r1d note I�eceipt af the Addendum 011 th� 4uter �nv�lope of yaur bid. �'rospective �idders ar� h�reby natified af the following: The Pfans and Specificatian Dacuments for t.rie �bove referenced proj��t ar� hereby r�v�sed and am�nd�i �s folfOWs: Sp�cific�tipns: 1. The Tabfe af Content has b�en updated to include: 33 89 99.02 �teel Reirrforced F�olyprvpyl�ne Pipe Updated 7able of Conterrts and Specification 3� 99 8g,p2 have be�n up�p�,ded to Buzzs�w. 2. Sectiqn OQ 4� Q0, �id FQrrn, has �een updated ta include: a. (t�m � Prequ�lifications b- 6.3 Evslu�tion of Alt�rriate �id .Items, Revised Ser,t►an OU ��t pp has b�en uplr�aded to f�uzzsaw. 3• Seetipn Od Q.� 43 Proposal Farm has be�n madifieq to the foflowing forr�at: Base Bid - 1n�ludes ifems that are r�quired in hoth �itern�tes 1 and 2; for �xampi�, RC�' under rQadways, t�ox cu(v�rts, headw�lls, etC. AI#�m�five '1 -�nr carnpleting project using I�Gp Alt�mati�e 2- For ca.mpleting proj�ct using pl�atic pip� �i� Tot�ls; Tvtal /�l# 1� RCP � Base Bid + Aftern�tive 4 Tot�l qft 2: Hybrid =�ase B)d + qltarnative 2 i`h� �ity exp�Ct� bids for bottt atternativ�s sa that eifher a(t�rnative cauld be selected; Addandum ►�p � April 8, 2Q93 iV 4. � Q t�qwever, contt actor selectiall will be based on lawest bid fnr e�thsr Alt 1 or A!t 2 tota! bid amount. meet the rsCt��dul� �he efbreuti�e c�ortr A� or sr n�c+ou �ged ta submf ��ids fo bo�ttCt to �!#emativ��, PropQsal �orm Bldlist ltem numbers have been updated, Item numbers herairt refer fo Pr�pqsal Farrn in Addendum No 2. Line liem 3, lJn�lassiiied Exc�vation quantity has been revised Revised from: 1600 CY Revis�i to: 3714 �Y Line ltem 28 4' 2-sided dr(�p ini�t quan#ity has been r�VjSec� ReViSed fPom: $ �q i�evi�ed t�►: 2 EA 7. Lin� ltern 30, S' 4-sfded drop inl�t has b�en added AabEC1: 1 EA B. Line ltem 32 5' 1-sided drop inlet quantity has been r�vised Reuised from: 2 EA R�vised td: � �q 9. Line Item 48, 12' �teel Ga#e quanti#y h�s b�en rEvised Revised from: 3 �q Ftevf��d tp: � �q 1p. Lin� Item 49, �F' Steel G�te quantity has be��t added ADD�Q: � EA 11. Line Ifem 56 updated to in�tud� water pipe rn�t�riai Revfs�ti from: 16" Water t�ins Lawaring R�vised fo: 1G" wat�r �.ine L�wering 1Z. [.ine It�m 57 updaxed tp includ� water pipe materi�I R������ �r��� 16" Wafer Line Low�rtng Revis�d ta�: 96" w�ter �ine Lowering 93. l.in� �tem 77 updated to include s#ru�ture d�scription R�vi$ed f'ram: Rem�vc Misc_ Conc Strupture R�vised to: Remqv� Misc. Conc Siructure 94. l.iry� It�m 78 upda�ted io rn�lude struGture d�s��iptjon R�vised t�, m R�move M sc. Ganc Struct�re 15, Line ltem 80 pt�g size revis�d Revised to m� 66" Storrn Abat�donm�nt Plug 16- Lin� Item 8�! updated to r�vise quantity Revi$ed from: 82s LF R�vised to: 1 �92 L� �7. Line �tem �2 updatsd tQ revise quantity Rewls�d fram: �p� �� Revised #a: � Qg �� 18. Lin� lt�m 88 D�LET�: Metaf Guard Rail 19. Line Item �7 DEL�T�: 324�.�55�p Remr�v� Cuard R�it C?uctiie Iron Pipe �ot1c Cyl Pipe i'8" pipe and �ppurt. 3�" pipe and appurC. Addendum No 2 April $, 2013 �I • I �Q. A r�v�sad bid form has beert �tploaded ta Buzzsaw to r�flect these chang�s, 21. 00 52 43 A�reement revised #p r�{le�t � Nqrrnal InspeCti�n liqu�dated dam�ge amount of $6SD.0� per day, A reviSed A�reement heg b�en upio�ded ta �uzzs�w. Ptans: 1. plarl sheet 44 t�f 93 r�Vised td include updat�d Embedrr�eCtt B�ckfill Detail ior RCP and pl�stic pipe. 2. Modified cirop ir�iet cc�nnectiot� detaif she�t 47 of 93 has been reviseq to sh�w the riser eXtensior�s wili vary_ Se� pl��� fpr dimensf�ns. 3. F�evised Plan she�ts 44 �nd 4� h�ve uploaded t4 Buzzs�w fo re�fect thes� ch�►�ga$. It�ms of Clarific�tion; �• Bore �.og from City pf Fori Wprth Frojeat C-1g9 �p CQntract far IN�ter and Sanit�ry �ewer Lin� Ext�nsian� for t,2�ke �r�st ��tates h�ve been upioad�d to Buzzsav�, 2. Hanson Conta�t: Jof�n Dutschm�r�n 254.8g6,4ppQ (offic�}, 254.715.3637 (ce11), j�hn.du#schmann{�hanson.com 3. detai�ls �he contr�actores ot re�q i�re I�� us� th� Hansonanl� top� a�nd m�y b d the ir�Iet tops as csst�ln-piace, 4, For plastic Pipe, ir�l� will requir� con�rete �ase stru�t��re and will not sit directly an the pt�s6c pipe. 5. We have conf,rnied 54" plastic p(Pe i$ availabl�, tilaref�rc� nq change #o the pl�ns �r�d 3p�cs with regard to 5�}" �ipe_ 6. PeC Ad�endum 7, corltr�ctnr wil! �rovid� p1�5tic pi�� min/max cover �nd badcfi)I requ�rements per rri�nuf�ctur�r's sp�G�fications for review attd approval. Emb���nt m�ier��l is cc�t�sidered subsidi�ry to thQ pipe bid. R�CEIPT ACKNf]UUL�D�ED: �RANSPOE�TATI�7N AND PlJBL1C WCaE�KS � � . Tit1�: U'ce /"r��i�/e� C � � i'/e�P,r-s� .�rt C . ay: � ��� �bt�ub Pandey, P.E., Praj�ct Manager Addentlurn Na � April #, 2093 City of Fort Warth, Texas Tran$portatlon & �ublic wa�rks �epartment Storm w�,tet' Utility AbDENpUM No. 3 To th� �p�clfi�ic►rt� and Gontract documents [�'i; Lake Cresi Drr�ln�ge Improverrtenis �ity PrQjec# Na. 01�04 Cl.O.E. PrpJ��t Nt�. 6552 Add�ndum Na 3— ls�u�: Date: Aprll �1�, 2oy3 gid Receipt bate: April 18, 2t1�1� This Addendum Na. 3 form$ p�rt of th+� contr�ct dacuments referer��ci at�ave �nc! modi�es the original Contr��i DGcuit't�nts and Plans. Ac[cnowledga rec�ipt r�f ihis addendurt'i by signing in th� sp�ce providecE �ef�w, atiaching it t� th� C�+r�fraGt DaGum�t'1fs {in�id�} and nt�te rec�ipt of the Addendum on the tauter �nvetap� of your bid. Prcaspec�ive Bidd�Ys ar� hereby notlfied af th� #ollowing: The Plan� an�i Spec�catiar� Dt,Gum�nts for #h� �bqve referenced proJect are h�r�by revis�d and amertded as follouv�: Speeif�cations: 1. I.ine It�m 62, 1" Water �etvic�� quantii}r h�s b�ert re�ised R�vised fr�m: �3 �A aevised tt�: 32 �A �. Line item ��A, s° �ate Valv� h�s b�n added ADDEd: 2 EA 3. Line ftem 68A, Tempor�ry W�t�r �eroiee qu�ntity h�s bean �dded AC3D�D� 'I LS 4. Line It�m 1'18 updated ta refl�Ct qu�nti� of �Y (�� p� p►�n sheets) I�evi�ed from: LF 4 82 Revised i�a: SY �882 5. A revised bid form has been uplQaded to Buzzs�w t� r�flect these ctlang�s. Reminder: Th� City e�tpecfs bids for �ot#� �Itemstives so that ei�her al#em�tive could be s�l�cted; howev�r, contraetor seiectiar� wil! be based on lowest bid for �!#her AIt 1 or AEt 2 totaf bid �m4unt. The CEt�r reserv�s th� right to use eifher Alt 7 or Al# � for any part �C a!! of fihe prpject to meet th� schedule. Th�refottie, the contractor is �ncourag�ci tn �ubm�t b�ds for both altematives. fi. ap 45 12 h'r�qu�l9fic�tion at�t�m�nt h�s beer� revised #� refl�ct prequafi�tc�tit�n r��uirem�nts shawr� in Bi�i Frarm. Addeadum No 3 April 12, 2��3 Pt�ns: � ,� � i. F'lan sheets 2, 81, 82, 84, 85, 8B, �7, an�i 89 hav� be�n revised, f�evised Pian sh�ets have uplaad�d to Buzzsaw. RLG�fPT ACKNOWL�DGEp: 6 : ,� i'itle: l/��ce ������ c � �3k; ld�,-5,1 �.T, �. �'RANSPORTATIQN AND F�UE�LiC WORKS �Y' � u�c�u� Vibhuti Fandey, P.�., Prpj�ct lNanager A�lder�diun No 3 Apri112. 2013 City of Fort Worth, Texas Transportation & Pu6tic Works Departr�e�t Storm Water iltility ADDENDUM No. 4 To the Specifications and Contract Documents � i..ake Crest Drainage Improvements City Project No. 01604 D.O.�. Project IVo. 6552 Addendum Plo. 4— Issue Date: April 15, 2013 �ic� F�eceipt Date: April 18, 2f�1;3 This Addendum No. 4 forms part of 4he contract documents referenced above and modifies the original Contract Documents and Plans. Acknowledge rec,eipt of this addendum by signing in the space provided below, attaChing it to the Contract Documents (inside) and note receipt of the Add�ndum on the outer envelope of your bid. Pros�ctive �idders are h�reby notifi�d of the following: The Plans and Specification Documents for the above referenced projeci are hereby revised and amended as foflows: Sp�cifications: 1. 00 42 43 Proposal Form has been revised: Line Item 65, 4" Sanitary Sewer Service, 4" clean-out has been revised Revised from: 40 EA Revised to: 44 EA 2. Line Item 66 4" Sanitary Sewer Service Reloc�tion quantity has been revised Revised from: 387 LF Revised to: 426 LF 3. Line Item 63A, 16" Gate Valve w/Vault has been added ADDED: 2 EA 4. Line Item 114, 5" Concrete Driveway, Unit of Measure has been revised Revised from: SF Revised to: SY Note, qu�ntity in proposal forrn (2110) reflects square yards and does not chan�e. For construction, City Specification 32 13 20 shall be revised to show 1.1 B. 1. Deviations - payment for concrete driveways will be per square yard and not square foot. 5. Line Item 128, Pre-Bid Water System �Ilowance h�s been added ADDED: 1 LS $25,000 Line 14em 128 will include but not be limited to water line fittings, blocking, cleaning, acceptance testing, line pigging (incl entries and exiis), flushing, contral of water, disinfection/chlorination, de-chlorination and sampling, and miscellaneous items NOT Addendum No 4 April 15, 2013 1/ �' considered subsidiary to the linear foot pipe bid. lJse of the Line 128 Pre-Bid allowance will require r�otification in writing and approval of the project inspector, consulting er�gin�er, and City of Fort Worth project manager PRIOR to use of the allowance funds. U I_1 6. A revis� bid form has been uploaded to �uzzsaw ta r�ftect thes� changes. Plan�: 1. Plan sheet 84 of 93 revised to include 16" Gate Valves with Vau�ts, pavement repair information. Revised plan sheet has been uplaaded to Buzzsaw to reflect these changes. ttems of Clarific�tion: 1. Based on memorandum fram City of Fort Worth T/PW Department d�ted 11/2/2009, a. Pro�ile wall Thermoplastic pipe used as Storm Drain shall be installed in accordance with all manuf�c4urer's specifi��tions, and shall meef or exceed ASTM D-2321, Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications. With regards to areas in which the specifications and details vary specifications shall tak� place over d�tails. Note that Class I aggre�ate (TP�IV Item 42.2 or NCTCOG Aggregate Grad� 4) shall b� requir�d for pipe embedment, b. All contractors shall be trained and certified by the manufacturer prior to installing HDPE/CPVC pipe. A copy of the traininc� certification and proof of insurance shall be provided to the City before any work commences. 2. Per Addendum 1, contractor will provide plastic pipe miNmax cover and backfill requirements per manufacturer's specifications for review and approval. Embedment material is considered subsiriiary to the pipe bid. RECEIPT ACKNOWLEDGED: By: � Title: � ce - PrCSi��ercT C D 8c�i /air,t-s, 2nc TRANSPORTATION AND PUBLIC WORKS BY: � �,-� �, Vibhuti Pandey, P.E., Project Manager Addendum No 4 April 15, 2013 L_ � U 001113-1 INVITATION TO BIDDERS Page 1 of 2 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 S�CTION 00 11 13 INVITATION TO BIDDERS RECEIPT OF BIDS Sealed bids for the construction of Lake Crest Drainage Improvements Project, CPN 01604 will be received by the City of Fort Worth Purchasing Office: City of Fort Worth Purchasing Division 1000 Throckmorton Street Fort Worth, Texas 76102 until 1:30 P.M. CST, Thursday, April 1 l, 2013, and bids will be opened publicly and read aloud at 2:00 PM CST in the Council Chambers. GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: Storm Drain and associated Water, Sanitary Sewer Improvements: 277 LF 18" RCP, 28 LF 28" RCP, 323 LF 24" RCP, 488 LF 30" RCP, 454 LF 36" RCP, 247 LF 36" HDPE, 455 LF 42" RCP, 1533 LF 48"RCP, 230 LF 48" HDPE, 346 LF 54" RCP,218 LF 54-inch HDP�, 1739 LF 60" RCP, 797 LI' 66" RCP, 487 LF 5'x4' CBC, 5513 LF 7'x4' CBC,762 LF 7'x5' CBC, 211 LF 8'x5' CBC, and 95 LF 9'x6' CBC with associated lateral pipes, headwalls, manholes, junction boxes, drop inlets, 18 utility adjustments, other miscellaneous appurtenances, grading, pavement repair. PREQUALIFICATION The improvements included in this project, which require prequalification, must be performed by a contractor who is prequaliiied by the City at the time of bid opening. The procedures for qualification and prequalification are outlined in the Section 00 21 13 — INSTRUCTIONS TO BIDDERS. DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained on-line by visiting the City of Fort Worth's Purchasing Division website at http://www.fortworth o� v_or�/purchasin�/ and clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site. The Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. Copies of the Bidding and Contract Documents may be purchased frorn Shield Engineering Group which is as follows: 1250 W Freeway, Suite 300 Fort Worth, TX 76102 The cost of Bidding and Contract Documents is: Set of Bidding and Contract Documents with full size drawings: $90 Set of Bidding and Contract Documents with half size (if available) drawings: $40 CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised November 27, 2012 00 11 13 - 2 INV[TATION TO BIDDERS Page 2 of 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 MANDATORY PREBID CONFERENCE A MANDATORY prebid conference may be held as described in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following location, date, and time: DATE: TIME: PLACE: LOCATION: April 3, 2013 1:30 PM 1000 Throckmorton Fort Worth, Texas 76102 T/PW Conference Room 289 CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject bids. INQUIltiES All inquiries relative to this procurement should be addressed to the following: Attn: Vibhuti Pandey, City of Fort Worth Email: vibhuti.pandey@fortworthgov.org Phone: 817.392.2424 AND/OR Attn: Ronda Visintainer, PM - Shield Engineering Group Email: randa@visintainerengineering.cam Phone: 817.992.3214 ADVERTISEMENT DATES March 14, 2013 March 21, 2013 28 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 City of Fort Worth Lake Ceest Drainage Improvements CPN 01604 1 z 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1'7 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 4g SECTION 00 21 13 INSTRUCTIONS TO BIDDERS 1. Defined Terms 00 21 I3 - 1 INSTRUCTIONS TO BIDDERS Page 1 of 9 1.1. Terms used in these INSTRUCTIONS TO BIDDERS, which are defined in Section 00 72 00 - GENERAL CONDITIONS. 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated betow which are applicable to both the singular and pturat thereof. 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents. 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City (on the basis of City's evaluation as hereinafter provided} mal�es an award. 2. Copies of Bidding Documents 2.1. Neither City nor Engineer shall assume any responsibility for errars or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. 2.2. City and Engineer in making copies of Bidding Documents available cto so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license or grant for any other use. 3. Prequali�cation of Bidders (Prime Contractors and Subcontractors) 3.1. All Bidders and their subcontractors are required to be preyualified for the work types requiring prequalification at the time af bidding. Bids received from eontrdctors wha are not prequalified (even if inadvertently opened) shall not be considered. Prequalification requirement work types and documentation are as foilows: 3.1.1. Paving — Requirements document located at; https•//projectpoint buzzsaw com/fortworthgov/Resourcesl02%20- %20Construction%20 Documents/Contractor%20Prequalification/TP W%20Pavin� %20Contractor%20Prequalification%20Pro�ram/PREQUALIFICATION%20REQ UIREMENTS%20FOR%20PAV ING%2000NTRACTORS.PDF?public 3.1.2. Roadway and Pedestrian Lighting — Requirements document tocated at; https•//pro�ectpoint buzzsaw com/fortworthgov/Resources/02%20- %20Construction%20Documents/Contractor%20Prequalification/TP W%20Pavin� %20Contractor%20Prequalification%20Prog,ram/PREQUALIFICATION%20REQ UIREMENTS%20FOR%20PAVING%2000NTRACTORS.PDF?pubtic CITY OF FORT WORTH STANDARD CONS"CRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 City of Fort Worth Drainage Improvements CPN 01604 00 2I 13 - 2 INS'IRUCTIONS TO BIDDERS Page 2 of 9 1 2 313. Water and Sanitary Sewer — Requirements document located at; 3 https•//projectpoint buzzsaw.com/fortworthg;ov/Resources/02%20- 4 %20Construction%20Documents/Contractor%20Prequalification/Water%20and%2 5 OSanitar�/o20Sewer%20Contractor%20Prequalification%20Pro�ram/WSS%20pre 6 qual%20re�uirements.doc?public 7 8 9 3.2. Each Bidder unless cureently prequaiified, must be prepared to submit to City within 10 seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 11 45 1l, BIDDERS PREQUALIFICATI�NS. 12 13 14 15 l6 17 18 19 zo 21 22 23 24 25 26 27 28 29 30 31 3.2. l. Submission of and/or questions related to prequatification should be addressed to the City contact as provided in Paragraph 6.1. 3.3. The City reserves the right to require any pre-qualified contractor who is the apparent low hidder(s} far a project to sabmit such additional informatian as the Gity, in its sale discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedute, to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully compiete projects for the amount bid within the stipulated time frame. Based upon the Ciry's assessment of the submitted. information, a recommendation regarding the award of a contract will be made to the City Council. Fa.ilure ta submit the additional informatian, if requested, may be grounds for rejecting the apparent low bidder as non-responsive. Affected contractors will be notified in writing of a recommendation to the City Council. 3.4. In addition to prequalification, additional requirements for qualificarion may be required within various sections of the Contract Documents. 32 3.5. Special qualifications reqaired for this project include the following: N/A 33 34 4. Examination of Bidding and Coutract Documents, Other Related Data, and Site 35 36 4.1. Before submitting a Bid, each Bidder shall: 37 38 4.1.1. Examine and carefully study the Contract Documents aud other related data 39 identified in Yhe Bidding Documents (including "technical data" referred to in 40 Paragraph 4.2. below). No infor�nation given by City or any representative of the 41 City other than that contained in the Contract Documents and o�cially 42 promulgated addenda thereto, shall be binding upon the City. 43 44 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and 45 site conditions that may affect cost, progress, performance or furnishing of the 46 Work. 47 48 49 50 51 4.1.3. Consider federal, state and local Laws and Regutations that may affect cost, progress, performance or furnishing of the Work. 4.1.4. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 City of Fort Worth Drainage Improvements CPN OI604 aazi i3-s INS"IRUCTIONS TO BIDDERS Page 3 of 9 1 4.1.5. Study all: (i) reports of explorations and tests of subsurface conditions at or 2 contiguous to the Site and all drawings of physical conditions relating to existing 3 surface or subsurface structures at the Site (except Underground Facilities} that 4 have been identified in the Contract Documents as containing reliable "technical 5 data" and (ii} reports and drawings of Hazardous Environmental Conditions, if any, 6 at the Site that have been identified in the Contract Documents as containing 7 reliable "technical data." 9 14 11 12 I3 14 15 16 4.1.6. Be advised that the Contract Documents on file with the City shall constitute all of the information which the City will furnish. All additianal infortnatian and data which the City will supply after promulgation of tl�e formal Contract Documents shall be issued in the form of written addenda and shatl become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. No information given by the City other than thai cantained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 17 18 4.1.7. Perform independent research, investigations, tests, borings, and such other means 1g as may be necessary to gain a complete tcnowledge of the conditions which witl ba 20 encountered during the construction of the project. On request, City may provide 21 each Bidder access to the site to conduct such examinations, investigations, 22 explorations, tests and studies as each Bidder deems necessary for submission of a 23 Bid. Bidder must fll all holes and clean up and restore the site to its former 24 conditions upon completion of such explorations, investigations, tests and studies. 4.1.8. Detertnine the difficulties of the Wark and all attending circumstances affeciing the cost of doing the Work, time required for its completion, and obtain all information required to make a proposal. Bidders shall rely exclusively and sotely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is understood that the submission of a proposal is prima-facie evidence that the Bidder has made the investigation, examinations and tests herein required. Claims for additianal campensation due ta variations between canditians actualty encountered in construction and as indieated in the Contract Documents will not be attowed. 37 4.1.9. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or 3g between the Contract Documents and such other related documents. The Contractor 39 shall not take advantage of any gross error or omission in the Contract Documents, 40 and the City shall be permitted ta make such corrections or interpretations as may 41 be deemed necessaiy for fulfillment of the intent of the Contract Documents. 25 26 27 28 29 30 31 32 33 34 35 36 45 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 46 the site which have been utilized by City in preparation of the Contract Documents. 47 The logs of Soil Borings, if any, on the plans are for general information only. 48 Neither the City nor the Engineer guarantee that the data shown is representative of 49 conditions which actually exist. 50 a2 43 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of: 44 CITY OE FORT WORTH STANDARD CONSTRUC'I'ION SPECIFICATION DOCUMENTS Revised November 27, 20[2 City of Fort Warth Drainage Improvements CPN 01604 00 2I I3 - 4 INSTRUCTIONS TO BIDDERS Page 4 of 9 1 4.2.2. those drawings of physical conditions in or relating to existing surface and 2 subsurface structures (except Underground Facilities) which are at or contiguous to 3 the site that have been utilized by City in preparation of the Cantract Doeuments. 4 5 4.2.3. copies of such reports and drawings will be made available 6y City to any Bidder 6 on request. Those reports and drawings may not be part of the Contract 7 Documents, hut the "technical data" contained therein upon which Bidder is entitled 8 to rely as provided in Paragraph 4.02, of the General Conditions has been identified 9 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 10 responsible for any interpretation or conclusion drawn from any "technical data" or 11 any other data, interpretations, opinions or information. 12 I3 14 15 16 17 18 19 20 Zl 22 23 24 25 4.3. The submission of a Bid will constitute an incontrovertibte representation by Bidder (i) that Bidder has comptied with every requirement of this Paragraph 4, (ii) that without exce�tion the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, (iii) that Bidder has given City written notice of all conflicts, enors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by City are acceptable to Bidder, and when said conflicts, etc., have not been resolved through the interpretations by City as described in Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. 26 4.4. The provisions of this Paragraph 4, inctusive, do not apply to Asbestos, Potychlorinated 27 biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by 28 Paragraph 4.06. of the General Conditions, untess specificatly identified in the Contract 29 Documents. 30 31 5. Availability of Lands for Work, Etc. 32 33 5.1. The lands upon whictt the Work is ta be performed, rights-af-way and easemeitts far 34 access thereto and other lands designated for use by Contractor in performing the Work 35 are identified in the Contract Documents. Atl additional lands and access theeeto 36 required for temporary construction facilities, construction equipment or storage of 37 materials and equipment to be incorporated in the Work are to be obtained and paid for 38 by Contractor. Easements for permanent structures or permanent changes in existing 39 facilities are to be obtained and paid for by City unless otherwise provided in the 40 41 42 43 44 45 46 47 Contract Documents. 5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City are Iisted in Paragraph SC 4A1 of the SupplementarX Conditions. Li the event the necessary right- of-way, easements, and/or permits are not obtained, the City reserves the right to cancel the award of contract at any time before the Bidder begins any construction work on the project. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 24i2 City of Fort Worth Drainage Improvements CPN 01604 1 ? 3 � 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 00 21 13 - 5 INSTRUCTIONS TO BIDDERS Page 5 of 9 5.3. The Bidder shall be prepared to commence construction without all executed right-of- way, easements, and/or permits, and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require permits and/or easements. 6. Interpretations and Addenda 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions received after this day may not be responded to. Interpretatians or clarifications considered necessary by City in response to such questions will be issued by Addenda delivered to all parties recorded by City as having received the Bidding Documents. Only questions answered by formal written Addenda will be binding. Oral and other interpreta.tions or clarifications will be without legal effect. Address questions to: City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Attn: V ibhuti Pandey, StormWater Group Email: vibhuti.pandey@fortworthtexas.gov Phone: 817.392.2424 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by City. Addenda or clarifications may be posted via Buzzsaw at https•//�rojectpoint buzzsaw com/fortworth�ov/Infrastructure Projects/Ol 604 - Lake Crest Drainage Improvements/Bid Package 6.3. A prebid conference may be held at the time and place indicated in the Advertisement or INVITATION TO BIDDERS. Representa.tives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will transmit to all prospective Bidders of record such Addenda as City considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. 7. Bid Secarity 7.1. Each Bid must be accompanied by Bid Bond made payable to City in an amount of five (5) percent of Bidder's maximum Bid price on form attached, issued by a surety meeting the requirements of Paragraphs 5.01 of the General Conditions. CITY OF FORT WORTH STANDAItD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 City of Fort Worth Drainage Improvements CPN 01604 OOZI I3-6 INSTRUCTIONS TO BIDDERS Page 6 of 9 5 6 7.2. The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder fails to execute and deliver the complete Agreement within 10 days after the Notice of Award, City may consider Bidder to be in default, rescind the Notice of Award, and the Bid Bond of that Bidder will be forfeited. Such forfeiture shali be City's exclusive remedy if Bidder defaults. The Bid Bond of all other Bidders whom City believes to have a reasonable chance of receiving the award will be retained by City until finat contract execution. 9 8. Contract Times 10 The number af days within which, or the dates by which, Milestones are to be achieved in 11 accordance.with the General Requiretnents and the Work is to be completed and ready for I2 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 13 attached Bid Form. I4 15 9. Liquidated Damages 16 Provisions for liquidated damages are set forth in the Agreement. 17 18 10. Substitute and "Or-Equal" Items 19 The Contract, if awarded, will be on the basis of materiats and equipment described in the 20 Bidding Documents without consideration of possible substitute or "or-equal" items. 21 Whenever it is indicated or specified in the Bidding Documents that a"substitute" or "or- 22 equal" item of material or equipment may be furnished or used by Contractor if acceptable to 23 City, application for such acceptance will not be considered by City until after the Effective 24 Date of the Agreement. The procedure for submission of any such application by Contractor 25 and consideration by City is set forth in Paragraphs 6.OSA., 6.OSB. and 6.OSC. of the General 26 Conditions and is supplemented in Section Ol 25 00 of the General Reqtiirements. 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 11. Subcontractors, Suppliers and Others 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 12-2011 (as amended), the City has goals for the participation of minority business and/or small business enterprises in City contracts. A copy of the Ordinance can be obtained fram the Office af the City Secretary. The Bidder shatl submit the MBE and SBE Utilization Form, Subcontractor/Supplier Utilization Form, Prime Contractor Waiver Form and/or Good Faith Effort Form with documentation and/or Joint Venture Fortn as appropriate. The Forms including documentation must be received by the City no later than 5:00 P.M. CST, five (5) City business days after the bid opening date. The Bidder shall obtain a receipt from the City as evidence the documentation was received. Failure to comply shall render the bid as non- responsive. I 1.2. No Contractor shal! be reyuired to employ any Subcontractor, Suppiier, other person or organization against whom Contractor has reasonabte objection. 12. Bid Form 12.1. The Bid Form is inc}uded with th� Bidding Dacuments; additional copies may be obtained from the City. CITY OP FORT WORTH City of Fort Worih Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised November 27, 2012 06 21 I3 - 7 INSTRUC'I`IONS TO BIDDERS Page 7 of 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 ZO 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form signed in ink. Erasures or alterations shalt be initialed in ink by the person signing the Bid Farm. A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein. In the case of optional alternatives, the words "No Bid," "No Change," or "Not Appticable" may be entered. Bidder shail state the prices, written in ink in both words and numerals, for which the Bidder proposes to do the work contemptaied or furnish materiats required. All prices shall be written legibly. In case of discrepancy between price in written words and the price in written numerals, the price in written words shall govern. 12.3. Bids by corporations shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal sha11 be aff'�ed. The corporate address and staie of incorporation shall be shown below the signature. 12.4. Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title must appear under the signature accompani�d by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 12.5. Bids by limited liability companies shalt be executed in the name of Che firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. 12.6. 12.7. 12.8. 12.9. Bids by individuals shall show the Bidder's name and official address. Bids by joint ventures shall be executed by each joint venturer in the manner indicated on the Bid Form. T1ie official address of the joint venture shatl 6e shown. All names shall be typed or printed in ink below the signature. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be fiited 'rn on the Bid Form. 12.10. Postai and e-mail addresses and tetephone number for communications regarding the Bid shall be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidd�r in the state of Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance to State Law Non Resident Bidder. 13. Submission of Bids Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, addressed to City Manager of the City, and shail be enclosed in an opayue sealed envelope, marked with the City Project Number, Project title, the name and address of Bidder, and accompanied by the Bid secariry and otker required documents. If the Bid is sent thmergh the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation 'BID ENCLOSED" on the face of it. C[TY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 20I2 City of Eort Worth Drainage Improvements CPN 01604 OOZI i3-8 INSTRUCTIONS TO BIDDERS Page 8 of 9 14. Modification and Withdrawal of Bids 2 3 14.1. Bids addressed to the City Mana�er and filed with the Purchasing OfFice cannot be 4 withdrawn prior to the time set for bid opening. A request for withdrawal must be 5 made in writing by an appropriate document duly executed in the manner that a Bid 6 must be executed and delivered to the place where Bids are to be submitted at any � time prior to the opening of Bids. After all Bids not requested for withdrawal are g opened and publicly read aloud, the Bids for which a withdrawal request has been g properly filed may, at the option of the City, be returned unopened. 10 11 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 12 time set for the ctosing of Bid receipt. 13 14 15. Opening of Bids 15 Bids will be opened and read aloud publicly at the place where Bids are ta be submitted. An 16 abstract of the amounts of the base Bids and major alternates (if any) will be made available 17 to Bidders after the ogening of Bids. 18 19 16. Bids to Remain Subject to Acceptance 20 All Bids will remain subject to acceptance for the time period specified for Notice of Award ZI and execution and delivery of a complete Agreement by Successful Bidder. City may, at 22 City's sole discretion, release any Bid and nullify the Bid security prior to that date. 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 17. Evalnation of Bids and Award of Contract I7.1. City reserves the right to reject any or atl Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualiiied or of doubtful financiat ability or fails to meet any other pertinent standard or criteria established by City. City also reserves the right to waive informalities not involving price, contract time or changes in the Wark with the Successful Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the ir►dicated sum of any column of figures and the coerect sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. 17.1.1. Any or all bids will be rejected if Ciry has reason to believe that collusion exists among the Bidders, Bidder is an interested party to any litigation against City, City or Bidder may have a claim against the other or be engaged in litigation, Bidder is in arrears an any e�cisting contcact or has defautted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uncompleted work which in the judgment of the City witl prevent or hinder the prompt completion of additional work if awarded. C[TY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 20I2 City of Fort Worth Drainage Improvements CPN 01604 00 22 I3 - 9 INSTRUCTIONS TO BIDDERS Page 9 of 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 3& 39 4Q 41 42 43 44 45 46 47 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations must be subtnitted as provided in the Contract Documents or upon the request o€the City. City also may consider the operating cos�s, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 173. Ciry may conduct such investigatians as City deems necessary ta assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to City's satisfaction within the prescribed time. 17.4, Contractor shall perform with his own organization, work of a value not less than 35% of tl�e value efnbraced on the Contract, unless otherwise approved by the City. 17.5. ff the Contract is to be awarded, it witl be awarded to lowest responsibte and responsive Bidder whose evaluation by City indicates that the award will 6e in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award cantract to a Nonresident Bidder unless the Nonresident Bidder's bid is tower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nanresident Bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. 17.7. A contract is not awarded until formal City Council autharization. If the Contract is to he awarded, City will award the Contract within 90 days after the day of the Bid opening unless extended in writing. No other act of City or others will constitute acceptance af a Bid. Upon the cantractar award a Notice of Award witl be issued by the City. 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 18. Signing of Agreement When City issues a Notice of Award to the Successful Bidder, it will be accotnpanied by the required number of unsigned counterparts of the Agreement. �Vithin 14 days thereafter Contractor shall sign and deliver the required number of counterparts of the Agreement to City with the required Bonds, Certificates ofInsurance, and aIl other required documentation. City shall thereafter deliver one fully signed counterpart to Contractor. END OF SECTIQN Ciry of Fort WoRh Drainage Improvements CPN 01604 CITY OF FORT WORTH STANDAIZD CONSTRUCTION SPECIFICATION DOCLIMENTS Revised November 27, 20t2 i� � 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 z� 28 29 30 31 32 33 34 35 36 37 00 35 l3 - 1 CONFLICT OF INTEREST AFFIDAVIT Page l of 1 SECTION 00 3513 CONFLICT OF INTEREST AFFIDAVIT Each biddet•, offeroi•, ot• t•espondent (hereinafter also r•efert•ed to as "you") to a City of Fort Worth (also referred to as "City") procurement are required to complete Conflict of Interest Questionnaire (the attached CIQ Form) and Local Government Officer Conflicts Disclosure Statement (the attached CIS Form) below pursuant to state law. This affidavit will certify that the Bidder has on file with the City Secretary the required documentation and is eligible to bid on City Work. The referenced forms may be downloaded fi�om the website links provided below. 17ttpJ/w_�>>w_.etl�ics.state.tx.us/forms/ClQpdf http://www.ethics.state.tY.us/forms/CIS.pdf � CIQ Form is on file with City Secretaiy XD CIQ Form is being provided to the City Secretaiy 0 CIS Form is on File with City Secretary XD CIS Form is being provided to the City Secretary BIDDER: CD Builders, Inc. Company 411 S. College Dr., Address Keene TX, USA 76059 City/State/Zip �� By: Johnny Pj('ereira (Please Print) Signature: � Title: Vice—President (Please Print) END OF SECTION CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised Maroh 27, 2012 � CONFLICT OF INTEREST QUESTIONNAIRE For vendor or other person doing business with local governmental entity This questionnaire reflects changes made to the law by H.B. 1491, 80th Leg., Regular Session. FORM CIQ OFFICE USE ONLY This questionnaire is being filed in accordance with Chapter 176, Local Government Code Date Received by a person who has a business relationship as defined by Section 176.001(1-a) with a local governmental entity and the person meets requirements under Section 176.006(a). By law this questionnaire must be filed with the records administrator of the local governmental entity not later than the 7th business day after the date the person becomes aware of facts that require the statement to be filed. See Section 176.006, Local Government Code. A person commits an offense if the person knowingly violates Section 176.006, Local Government Code. An offense under this section is a Class C misdemeanor. Name of person who has a business relationship with local governmental entity. �� �� ❑ Check this box if you are filing an update to a previously filed questionnaire. (The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than the 7th business day after the date the originally filed questionnaire becomes incomplete or inaccurate.) Name of local government officer with whom filer has employment or business relationship. '�ON� Name of Officer This section (item 3 including subparts A, B, C& D) must be completed for each officer with whom the filer has an employment or other business relationship as defined by Section 176.001(1-a), Local Government Code. Attach additional pages to this Form CIQ as necessary. A. Is the local government officer named in this section receiving or likely to receive taxable income, other than investment income, from the filer of the questionnaire? � Yes �No B. Is the filer of the questionnaire receiving or likely to receive taxable income, other than investment income, from or at the direction of the local government officer named in this section AND the taxable income is not received from the local governmental entity? �Yes �N C. Is the filer of this questionnaire employed by a corporation or other business entity with respect to which the local government officer serves as an officer or director, or holds an ownership of 10 percent or more? � Yes � No D. Describe each employment or business relationship with the local government officer named in this section. �IONE � ` l. atur erson doing business with the govemmental entity ,1�� ���a Date Adopted 06/29/2007 00 41 00 BID FORM Page 1 of 3 .„ 3ECTIOP100 41 00 BID FORM TO: The City Manager c/o: The Purchasing Department 1000 Throckmorton Strcet City of Fort Worth, Texas 76102 Q�� City Project No.: Units/Sections: N/A 1. Enter I�to Agree�ent Transportation & Public Works Stoim Water Dept Lake Crest Drainage Improvements 01604 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Conh�act Documents. 2. BIDDER Acknowledgements and Certification 21. In submitting ttvs Bid, Bidder accepts all of the terms and wnditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposidon of Bid Bond. 2.2. Bidder is awaze of all costs to provide the required insurance, will do so pending contract award, and wiil provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 23. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed i�dividnal or enqty and is not submitted in conformity with any collusive agreement or rules of any group, associadon, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt pracrice" means the offering, giving, receivi»g, or soliciting of any thing of value litcely to influence the action of a public official in We bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of wtuch is to establish Bid prices at artificial, non-competitive levels. d. "coercive pracdce" means hattning or threatening to harm, directly or indirectly, persons or the'u property to influence their participation in the Uidding precess or affect the execution of the Contract. � � C1TY OP FORT NORTH STANDARD CONSTRUCTION SPECIFI ATION �rT S � Form Revised 20ll0627 �opy o��Uu_00 42 43_00 43 13_00 43 37_Bid Form-Proposal-Bond_Vendor Compliance sort_FOR BUZZSAW 4 3. Prequatification The Bidder acknowledges that We following work types must be performed only by prequalified contractors and subcontractors: a. Storm Drain Collection System, 66" and smaller b. Concrete and Asphalt Con/Recon, less than 18,000 SY c. Water Transmission, Urban/Renewal, 16" & smaller d. Sewer Coliection System, Urban/Renewal, 8" and Smaller 00 41 00 BID PORM Page 2 of 3 4. Time of Comptetion 4.1. The Work will be complete for Final Acceptance within 190 working days after the date ' when the Contract Time commences to run as provided m Paragraph 2.03 of We General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or ' achievement of Milestones} within the times specified iq the Agreement. 5. tLtt�ched to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form b. Requued Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Pazagraph 5.01 of the General Conditions. c. Propasal Form Section d. Vendor Compliance to State Law Non Resident Bidder, Secrion 00 43 37 ' e. MWBE Porrns (optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid .�mount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figiue will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this pmposal that the total bid amount entered below is suUject to verification and/or modification by multiplying the unit bid prices for each pay item by the mspective esrimated quantities shown in this proposal and then totaling all of the extended amounts. � CITY OF FORT WORTH STANDARD CONSTRUCTTON SPECIi7C�1T10N S �orm Revised 20110b27 �-opy o��U 00 42 43_00 43 13_00 43 3%Bid Form-Propasal-Bond_Vendor Compliance sort_FOR BUZZSAW 4 00 41 00 BID FORM Page 3 of 3 6.3. Evaluation of Alternate Bid Items Total Base Bid Altemate 1 Bid Altemate 2 Bid Total Alt 1: RCP = Base Bid + Altemate 1 Total Alt 2: Hybrid = Base Bid + Alternate 2 7. Bid Submittal This Bid is submitted on Respectfully submitted, By: G'i (Signature) Johnny Pereira (Printed Name) Title: Vice President Company: CD Builders, Inc Address: 411 S. College Dr. Keene, TX 76059 State of Incorporation: Puerto Rico Email: johnnyps5l@yahoo.com Phone: 787-469-5633 $2,283,777.00 $553,908.00 $527,678.00 $3,365,363.00 $3,339,133.00 18-Apr-13 by the entity named below. -` M �. v Dµ �Rq�, �, _. ,�� �� iy ' � SEA � �-� 801744109 • 2013 END Or SECTION CITY OP FORT WORTH STANDARD CONSTRUCTION SPECI�I ATION S Forn� Revised 20110627 �opy o�l� 4�1 1�( _00 42 43_00 43 13_00 43 37 Bid Form-Proposal-Bond Vendor Compliance sort_FOR BUZZSAW 4 �� f� r SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID Project Item Informetion naus� Description :m No. 83 3312.3003 8" Gate Valve 83A 3372.3006 16" Gate Valve WI Vault 64 3312.6002 6" Blow Off Valve 85 3331.3102 4" Sewer Service, 2-Way Cleanout 86 3331.3105 4" Sewer Service, Private Relocetion 87 3331.4115 8" Sewer Pipe 68 3339,1001 A' Manhole 88A 3304.0101 Temporaty Water Servlce 69 Remove Existing Blav-Off Valve 70 16"X6" Flanged Outlet 71 3339.1003 4' EMra Depth Manhole 71 Ero9ion Conlrol Inlet Protection 72 Eroslon Conlrol Sediment Logs 73 3471.0001 Treffic Control e allemale btds belmv jor plpe >ubtotal - Storm Drain Im rovements � • • • • •� ' 74 0241.0500 Remave Fence 75 0241.0800 Remove Rip Rap 78 0241.0900 Remove Misc Conc Struclure 77 0241.0900 Remove Misc Conc Struclure _ 78 3305.0108 MiscellaneousSWclureAdjuslment _ 79 02b1.3116 68" Stortn Abendonment Plug _ 80 3231.0122 5' Chain Link, Aluminum __ 81 3231.0132 5' Wroughl Iron Fence _ 82 3231.0412 6' Fences, Wood __ 83 Metal Fence _ 84 Remove/Replace Concrete Footer under Fence _ 85 Remove Wood Retaining Wall _ B6 0241.0700 Remove Mallbox _ 87 0241.0550 Remove Guardrail _ 88 Metal 6uardrall _ __ 89 Tree Prolection 90 Remove 8ushes 91 0241.3403 Remove 6' Slortn Junctlon Box _ 92 0241.34D4 Remove 7' Storm Junction Box _ 93 0241.4201 Remove 4' Drop Inlet _ 94 0241.4401 Remove Headwall/SET __ 95 3110.0108 Remove and 7ransplant 4" Trea _ 98 024l,0660-Remove GuaWrall _ 97 Remove 6" Stortn Line _ 98 Remove 12" Stortn Line _ 99 0241.3011 Remave 15" Stortn Line _____ 100 0241.3013 Remove 18" Slorm Line 101 0241.3014 Remove 21"Stortn Line 102 0241.3015 Remove 24" Storm Line 103 0241.3017 Remove 30" Stortn Line 104 0241.3018 Remove 33" Storm Line 105 0241.3019 Remove 36" Storm Line 106 0241.3023 Remove 48" Slorm Line 107 0241.3024 Remove 54" Storm Line _ 108 Remove 66" Stortn Line 109 0241.3027 Remove 78" Slortn Line __ __ 110 0241.4302 Remove 3' Grale Inlet 111 Remove/Replace Sign 112 0241.3001 Storm Lina GrouUng 113 3201.0201 Asphall Pvmt Repeir Beyond Defined Widlh, Residentiel 114 3213.0400 5" Concrete Driveway 115 3292.0100 Block Sod Plecement 116 3292.0500 Seeding, Soil Relenflon Blanket 117 3201.0400 Temporary Asphall Paving Repair 118 0241.0100 Remove Sidewalk 119 0241.1300 Remove Conc Curb&Gutler 120 Remove/Replace Ges Line Marker crry ot eoxr woxn{ STANDNtD CONSTRUCT70N SPHCIFICA7lON UOCUMh'MS Form Re�i. d 2011 W]'/ '8" Plpe & appurt. �3" Pipe 8 appurt. �Perm Paving Repair Paving 0o a� as mmse�� nm eaoros,u. vn8<z on Bidder's Application aiaaers Proposal pecification Unit of B�d Qunnfity Unil Price Bid Value iec�ion No. Measure 3312 20 EA 1 51,250.00 S1,250.00 331220 EA 2 55,000.00 SI0,000.00 _ 331280 EA 8 $2,100.00 512,600.00 � 3331 50 EA 44 $200,00 58,800.00 � 333150 LF 426 $40.00 517,040.00 33 31 12 LF 874 545.00 539,330.00 ✓' 333910 EA 2 51,750.00 53,500.00 ✓� 330430 LS 1 $10,000.00 SI0,000.00 ✓ 9999 EA 1 5250,00 52So.00 � 9999 EA 4 $650.00 S7b00. `� 333910 VF 17 5100.00 �-'�51,700.00� gggg Eq 68 5100.00 �' S6,s00.00 \ 9999 LF 1,459 $5.00 � 57,295.00 ✓1 347113 MO 9 51,500.00 S13SOo.00 � ci.�ac Fi i nn � I � � I n`� 02 41 13 02 41 13 02 41 13 02 41 13 33 0514 02 41 14 32 31 13 32 31 13 32 31 29 9999 9999 9999 02 41 13 02 41 13 5990.� 9999 9999 02 41 14 02 41 14 02 41 14 02 41 14 31 10 00 02-41- l3 9999 9999 02 41 14 02 41 14 02 41 14 02 41 14 02 41 14 02 41 14 02 41 14 02 41 14 02 41 14 9999 02 41 14 02 41 14 9999 02 41 14 33 01 17 32 13 20 32 92 13 32 92 13 32Ot 18 02 41 13 02 A1 15 9999 SF LS LS EA EA LF LF LF LF LF LF EA LF EF EA EA EA EA �n E3� EA 6F LF LF LF LF LF LF LF LF LF LF LF LF LF EA EA CY SY SY SY SY SY SF LF EA 155 1 1 6 1 1,292 109 110 96 110 235 35 75 7b 41 25 1 1 t 5 39 �44 22 404 213 558 35 599 87 51 176 27 19 61 41 1 10 95 888 2,110 2,835 3,036 4,882 18 34 1 $2.00 S: 54,500.00 $4, $3,500,00 53,�, 5200.0o SI, $2,500.00 52, $12.00 SIS, 518.00 SI, $10.00 St, 570.00 S $6.OD S $2.0o S $50.00 SI, $9.00 5 850.00 Sz $25,00 S 52,300.0o Sz 52,500.00 S2 st,000.00 si 55.00 S2,o20.00 $6.00 51,278.00 57.00 53,906.00 58.00 bze0.o0 $16.00 59,584.00 523.00 SI,541.00 531.00 SI,581.00 538.00 SG,688.00 553.00 $l,431.0C S6D.00 51,140AC 575.00 S4,S75A( $80.00 53,280A( $500.00 5500.0( $200.00 52,000.0( SteO,00 Si�,ioo.a $40.00 535,520.01 $40.00 $84,400.q 53.60 59,922.51 $2.50 S7,S90.a $20.00 597,67oA� 55.00 590.0 55.00 5170.0� $350.00 5350.0 Copyof004100_0042 43 0043 13 W4337IlidFrnm-Roposabl)wd_VcidorComplivxesort_ O ou�asnwa I y ooa2a�o� �� nu�vaoeosn� Pag< 1 of J � T I � I UNIT PRICE BID Description SECTION 00 42 43 PROPOSALPORM Project Item Infomiation 1 3471.0002 Portable Message Sign 2 3110.0101 Sile Cleenng 3 3123.0101 Unclassified Excavation 4 15" RCP, Class III 5 3341.0103 18" RCP, Class III 6 3341.0205 24" RCP, Class III 7 3341.0302 30" RCP, Cless III 8 3341.0309 36" RCP, Class III 9 3341.0308 38" approved HDPE or PP Pipe _ 10 3341.0402 42" RCP, Class III 11 3341.0408 48" approved HDPE or PP Pipe 12 3341.0409 48" RCP, Class III 13 3341.0502 54" RCP, Class III 14 3341.0501 54"approved HDPE or PP Pipe 15 3341.0602 60" RCP, Class III 16 3341.0605 68" RCP, Class III 17 3341.1202 5x4 Box Culvert 18 3341.1402 7x4 Box Culvert _ 19 3341.1403 7x6 Box CulveA 20 3341.1502 8x5 Box Culvert 21 3341.1603 9x6 Box Culvert 22 3349.0002 5' Stortn Junclion Box 23 3349.0003 8' Storm JunGion Box 24 3349.0006 Slortn Junctlon SWcture 25 3349.0102 4' Manhole Riser 26 3349.7001 4' Drop Inlet 27 3349.7001 4' Orop Inlet 28 3349.7001 4' Drop Inlet 29 3349.7001 4' Drop Inlet 30 3349,7002 5' Drop Inlet 31 3349.7002 5' Drop �nlet 32 3349.7002 5' Drop Inlet 33 3349.7003 6' Drop Inlet 34 3349,7003 6' Drop Inlet 35 3349.7003 6' Drop Inlet 36 3349.9001 2' Grate Inlet 37 Sloping Headwall, 36" 38 Sloping Headwall, 30" 39 Sloping Headwall, 24" 40 Sloping Headwall, 18" 41 Modified Sloping Headwall, 18" 42 Sloping Headwall, 15" 43 Sloping Headwall, 12" 44 Headwall With Flared Wings (TxDO� 45 Modified Headwall With Stralght Wings (TxDOT) 46 6' Concrete Flume 47 ScourStop 48 3231.0305 12' Gete, Sleal 49 3231.0301 4' Gate, Steel 50 3213.0301 4" Conc Sidewalk 51 3216.0101 6" Conc Curb and Gulter 52 3312.0001 Fire Hydrant 53 0241.1510 Selvage Fire Hydrant 54 0241.2201 ftemove 4' Sewer Menhole � 55 3305.0003 8" Wateriine Lowering 56 3305.0008 16" Waterline Lowering 57 3305.0006 16" Watedine Lowenng 58 3305.0102 Cethodic P�otec�ion Tesl Slation Adjuslment 59 3305.0107 Manhole AdJustment, Minor 60 3305.0111 ValveBoxAdjusMent 61 3312.2001 1" Water Service, Meter Relocation 62 3312.2003 1" Weter Service 82A 3312.3002 6" (iate Valve CfIY oF FoliT WOIYI}i STAM)ARUCO�STRUCiION SFLCIPICAiION UOCUAfCNIS Fwm Re�is�i 20110627 1-sided 4•slded 2-sided 1-sided 4-sided drop see spec Ductlle Iron Plpe Conc Water Pipe Section No. 34 71 13 31 10 00 31 2316 334110 33 41 10 33 41 10 33 47 10 33 41 10 33 41 11 33 41 10 33 41 11 33 41 10 33 41 10 33 41 11 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 41 10 33 49 10 33 4910 33 49 10 33 49 10 33 49 20 33 49 20 33 49 20 33 49 20 33 48 20 33 49 20 33 49 20 33 49 20 33 49 20 33 49 20 33 49 20 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 9999 32 31 26 32 31 28 9999 321613 33 12 40 02 41 14 02 41 1 A 33 0512 33 0512 33 05 12 33 0514 33 05 14 33 05 14 3312 10 3312 10 3312 20 Copy of 00 41 � 1 WK LS CY LF LF LF LF LF LF LF LF LF LF LF � l,F LF LF LF LF LF LF EA EA LS EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA LF SY EA EA SY LF EA EA EA EA EA EA EA EA EA EA EA EA 0 J1 J3_00 43 I l_ Bidder's Application Biddels Proposel )uentiN Unit Price Bid Velue 1 1 3,714 23 ' 16 32 178 312 247 455 215 521 109 218 42 797 487 513 762 211 96 2 2 3 7 8 7 2 1 1 2 1 1 1 2 36 1 1 7 5 1 3 1 1 1 636 489 1 2 18 34 2 2 1 8 2 2 1 6 4 32 32 2 N143 37 [3id Fw $600.00 5600.00 '� 3,000.00 518,000.00 `� $12.00 544,568.00 � 530.00 5690.00 ✓ 546.00 $73G.00 � $57.00 S1,824.00 � 370.00 $12,460.00 � $87.00 527,144.00 �80.00 SI9,760.00 5110.00 550,050.00 ✓ $115.00 524,725.00 �� 3127.00 566,167.00 �% $155.00 $16,895.001� $140.00 $30,520.00 �/ � $190.00 57,980.00 �'� $212.00 5168,964.00 �y204.00 599,346.00 $300.00 SI53,900.00 �� 5318.00 5242,316.00 i/ $349.00 $73,639.00 i� $375.00 $35,625.00 ✓ 55,149.00 510,298.001� $6,024.00 SI2,048.001� 57,850.00 S23,550.00 �� 51,125.00 57.875.00 " $2,624.00 52Q992.00 � ' 52,624.00 $16,368.00 c� $2,824.00 55,24s.00 �! 52,624.00 $2,624.00 ✓ $3,775.00 53,775.00 � Sa,��S.00 s�,sso.00 ✓/, §3,775.00 §3,775.00 ti 55,175.00 55,175.00 ✓ 55,175.OD 55,175.a0 `� $5,175.00 $10,350.00 ✓ 52,575.00 592,700.00 v� $2,275.00 $2,275.00 �� $1,825.00 $1,825.00 �� $1,225.00 58,575.00 �� $825.00 $4,125.00 '� $875.00 5875.00 .' � $775.00 52.725.00. ` 5750.00 S750.00 �" $8,875.p0 56,675.00 �'1 $6,635.00 56,635.00 � � $32.00 520,352.00 �' � $65.00 S31,785.00 , � S1,OOO.OD 51,000.00 � 550D.00 51,000.00 ` � $31.00 5558.00 ` � $18.00 5612.00 "J 54,050.00 $8,100.00'-'� 5500.00 SI,000.00 �'` 5500.00 $500.00 ✓ $6,310.00 $37,860.00 `� $16,460.00 532,920.00 � 524,500.00 549,000.00 ✓ $1,000.00 SI,Ooo.Oo -� $500.00 $3,000.00 `� 5500.00 S2,000.00 ` �300.00 59,600.00 -� 5640.00 520,480.00 ` $500.00 51,000.00 �� n-NoFwsil-Ibmi_Vendor Compliunce smf_F 7ZSn\V J I . .. 00 42 4313u�.�w f31D PROI'OSAL Pogt 7 of 7 ��i r l UNIT PRICE BID 33 99 99 LF 33 99 99 LF 33 99 99 LF 33 99 99 LF 33 99 99 LF 33 99 99 LF 33 99 99 LF 33 99 99 LF 33A910 EA Tatal Altempfe 2 Project Item Informebon Bidders Proposel Bidlist Description Speciflcation Unit of B�d Quentity Unil Price Bid Value Item No. Section No. Measure 121 Remove/Replace Gravel or Earthen Drive 9999 SY 576 $10.00 55,760.00 122 Remove Bollards 9999 EA 4 $50.00 5200.00 123 Plece/Remove Orange Conslruction Fencing 9999 LF 1186 52.00 52,372.00 124 Adjust Telephone Riser 9999 EA 2 5350.00 5700.00 125 Remove Garden-rype Foot Bridge 9999 EA 1 5500.00 �5o0.00 126 Relocate Shed 9999 EA 1 $1,500.OD SI,500.00 127 Pre-Bid Ilem - Slofm Watef Field Ofder Allowance 9999 LS 1 5215,000.00 5215,OOO.oO 128 Pre-81d Item - Water System Allowance 9999 LS 1 526,000.00 S25,000.00 Subtotal - Demolition, Relocation Re air 5595,166.00 �,/ o - ase sz,iea,�n.00 1 � 1''✓ �' t"7_ - Alte�nete 1 pl,l 3341.0103 IB"RCP,CIasslll 334110 LF 261 46 S12,006.00 Al2 3341.0201 21" RCP Class III 33 41 10 LF 28 $55.00 SI,540.00 A1.3 3341.0205 24" RCP, Class III 3341 70 LF 291 557.00 St6,587.00 A1.4 3341.0302 30" RCP, Class III 33 41 10 LF 310 $70.00 521,700.00 A1.5 3341.0309 36" RCP, Class III 33 41 10 LF 142 $87.00 SI2,354.00 A1.6 3341.0409 48" RCP, Class III 33 41 10 LF 1,028 $127.00 5130,556.00 A1.7 3341.0502 54" RCP, Cless III 33 41 10 LF 237 $155.00 g36,735.00 A1.8 3341.0602 60" RCP, Class ID 33 41 ]0 LP 1697 190 5322,430.00 Tatel Altemate 1 5553.9U8.00 ✓ Alfernate 2 A2.1 3399.9934 18" approved HDPE or PP Pipe + A2.2 9999.9935 21" approved HDPE or PP Pipe A2.3 3399.9936 24" approved HDPE or PP Pipe A2.4 3399.9937 30" approved HDPE or PP Plpe A2.5 3399.9938 36" approved HDPE or PP Pipe A2.6 3399.9939 48" approved HDPE or PP Pipe A2.7 3399.9940 54" approved HDPE or PP Pipe A2.8 3399.9941 60" approved HDPE or PP Pipe A2.9 3349.0002 Junction SWcture @ HDPE/PP to support Drop Inlets "- Mu�imum eover �xqui�xments, beckfill requiremeofs per Mxnufach�rer's recommendetiod apecificetion & p�rovide ENGINEER wilh aupporting documenlnNon .. "" Altemete ➢id 1lfete�ial - show meteriaUspedricafion to match bid i � Materiel proposed 1 Material proposed Material proposed 1 � � Materiel proposed Materipl proposed i I ' Ma�eriel proposed � I' Matenel proposed CIiY OF FORT WOR7}I STANDAND CONSiRUC770N SPCCIFICAi10N DOCLIt�fLNIJ . ' Formlic�isa12011W27 SEC7'ION 00 42 43 PROPOSALFORM Bidder's Application 261 45 SI1.745.00 28 $54.00 51,512.00 291 $56.00 $16,296.00 310 $69.00 521,390.00 142 $80.00 511,360.00 1,028 $115.00 SI18,220.00 237 $140.00 533,180.00 1,697 $175.00 5296,975.00 17 1000 517,000.00 / C5�7.R7A.11(1 V Total Alt 1: RCP= Onse Did+Altemative 1 Totel Alt 2: Hybrid = Bse Bid +AlMrnative 2 Copy of 00 41 0(1 00 42 43_00 43 11 00 4J 37 Total Dase Bid .��}};q5g,pp-- Z 31 '7 �"i l Tolxl Altemnte 1 S553y08.00 `� Total Alternxte 2 S527,678.00 ✓ �7 CA�P� ��� r^i) 53,365,363.00 �. - � I �-� 53,339.133.00 -���t�,n`f��/J•�"' Specification No Specification No Specification No Specification No Craig Barnes From: Johnny Pereira [iohnnyps51 @yahoo.com] Sent: Monday, April 22, 2013 3:45 PM To: Craig Barnes Subject: Fw: Bid Form Texas Attachments: BID FORM TEXAS.pdf From: Johnny Pereira <johnnyps5l@yahoo.com>; To: Craig Barnes <crai�•barnes@se�llc.com>; Subject: Fw: Bid Form Texas Sent: Mon, Apr 22, 2013 8:35:59 PM Hi Craig Please find the revise bid and proposal form as requested. Thank You Johnny Pereira PE Vice President CD Builders, Inc. 787-469-5633 mobile From: Maritza Padilla <ccibca�uas�a,vahoc>.coi�>>; To: J<�hni�y��s51�i)���al�c�o.c�>in <J_ohnnXps51(�r),y��l_�or>,cc�m>; Subject: Bid Form Texas Sent: Mon, Apc 22, 2013 8:14:33 PM Maritza Padilla CD Builders, Inc. 00 41 00 IIID �OtLM Pege I of 3 SEG"N'lON 00 4100 BiD PORM T0; The Ciry Mnnager c%: Tlie �'urchaeing Department ]000'Phrockmorton Street CIty of I'ort Worth, Texas 7GI02 FOR: City Prpjeci I�o.; Units/Sections: N/A 1. �nter Inta Agreemont Transportntion & Public Works Storm Water Dept Lake Crest �rainage Improvemcnts OtdOA The undersigaed �idder proposes and egrees, if this Bid is accepted, ro cntex into an Agreement with City in the form inciuded in the Bidding Documents to perform aud ftu'nisb all Work as specified or indicated in the Contrect Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of die Contrnct Documents. 2, f31DDER Acimowledgemenfs and Certiftcation 2,1. In submitting tlus Bid, Ridder nccepts all of the terms and conditions of die INVTCA7'�ON TO HiDDBRS and INS'I'RUCTIQNS TO HIDDBRS, includ'u�g without limitation thosa dealing wikh the disposition of Bid Bond. 2.2. Bidder is aware a£ali costs to provide the required insurnnce, will do so pend'wg contract sward, nnd will provide a valid insurauce certificate meeting all requirements within 14 days of notificatiaa of award, 2,3. Bidder certifies that ttus Bid is genuine and aot made in the intarast of or on behatf of any undisalosed individuat or entity a��d is not submitteci in conformity with any coltusive agxeement or rutes of any group, association, organization, or corporation. 2.4, Bidder has not directly ar indirectly Induced or soliaited any other Bidder to aubmit a faise or sharn Bid. 2.5. Bidder lias not solicited or induced eny individual or entity to refrain from bidding, 2,6. Hidder has not engaged in corrupt, &audulent, coltusive, or coercive practices in compeNng for the Contrsct. %or the purposes of d�is Parugrapii: a. "corrupt practice" meens the offering, giving, receiving, or soliciting of any thing of value likely io influence the aetion of a public offiaial in the bidcling process. b. "frnudutent practice" means an intentionai misrepresentation of faets made (a) to influe�tce the bidding procees to ihe detruuent oFCity (b) to cstablish Bid pricea nt artificint non-competitive levcls, or (c) to deprive City of the benefits of free and open competition. c. "coilusive practice" meaus a schame or arrangement beriveen two or more Bidders, with or without the knowledge of City, a purpose of whieh is to establish Bid prices at arti�ciai, non�campeiitive levels, d, "ooerciva pracrice" means harcuing or threatening to l�arm, directly or indirecUy, parsons or their property to influence their participation in ti�e bidding process or affect the execution of the Contract. cirY or• xox7' WORTH STATIDARD CON3TAUCTION SFE C1 B S Porm Revised 201/0627 �����g� ��a�00 Q2 43_00 43 13 00 43 37 Bid Form-Proposal-Bond_Vendor Compliance sort FOR BUZZSA W 4 Oo 41 00 DID fOltM Pagc 2 of 3 3. Prec�unlilication The Bidder acknowiedges that the following work types mnat ha performed only by prequalified contractors and subcontractors: a. Stom� Draia Coliection System, 66" and smaller b. Co�tcrete and Asphalt Con/Recon, less dian 18,000 SY c. Water Transmission, Urban/Renewal, 16" & smatler d, Setver Collaction System, Urbar�/�tenewal, $" anJ Sraallez A. Ttme of Completion 4.1. TI►e Woric wi11 be completa for Fuial Acceptance within t90 working days aRer the date wheu the Contract Time commences to nrn os provided in Paragraph 2,03 of the General CondiGons. 4,2. Bidder accepts the provisions of the Agreement as to llquiduted damages in the event of failure to complate the Work {and/or achicvemeat of Milestones} within the ti�nes specified in the Agreement, 5. Attnched to this Bid The following documents are attached to and made a part of this Sid: s, 'I'lus Bid Form b, Required Bid Bond, Section 00 43 13 issued by a sureiy meeting the requirements of Parngrnph SAi of the General Cunditions. c. ProposAl Fonn Section d. Vendor Compliance to State Law Non T2esident Bidder, Section 00 43 37 e. MW�B Forms (optionnl at time of bid) f. Prequalifrcation Statement, Scction 00 45 12 g. Conflict of Interest A�davit, Section 00 35 13 h. Auy additionat documents that may be required Uy Section 12 of the Instructions to Hidders 6. Total Eici Amount 6.1. Bidder will complete the Wozk in accordanca wi�h the Contract Documents for the foilowing bid a�noiutt. In U�e space pxovidecl below, please enter the totui bid attzount for thia project. Only this �gure will be read pUblicly by ihe City st the bid opening. 6.2. Tt is understaod and agreed by the Bidde� in signing this propasal �hat the total bid aznount entereci belaw is sabjeet !o veeification and/or modi�cation by multiplying the unit bid prices for eac6 pay item by the respectiva estimated quantities show�i in this proposal and then totaling nll of the exteaided amomus. Cl'CY OF FORT WOR7'H STAiVDAItD CONSTRUCTION SPA U Fom� Rttisu120110627 ����8� ��00 42 43_00 43 13_00 43 37 Bid Foru�-�'roposal�Bond_Vendor Compliance sort FOR BUZZSAW 4 �41� BID FOIiM Page 3 of 3 6.3. Evatuation ofAttemate Bid Items Totxl Base Bid Aiternate 1 Bid Alternate 2 Bid '1'otal Alt 2; RCP =$ase Bid + Alternate 1 Total Alt 2: Hybrid = Base Bid � Attamate 2 7. Bld Submittal This $id is submittcd on Rrspectfully submitted, � � . By: (signature) Johnny Pereira (Printed Name) Tifle: Vice-President Compauy; CD Buitders, Ittc. Address: 411 S. Cotlege Keene,'I'X 76059 State of Incorporakiou; Puerto Rico EmaiL johnnypsSlQyahoo.com Ahone: 787-469-5633 $2,313,072.00 $553,906.00 $527,678,00 $2,$66,9&0.00 $2,840,750.00 18-Apr-13 Uy the entity namcd below. Receipt is acknowledged of the fol(owin Addenda; Addendum No. 1: Addendum No. 2: Addendum No, 3: Addendum No. 4: �� o�p � R A F ��C� � �1�A� C3 8�� 7 q,q,10g '�N� S���E r�XP� � Q � �ee' �ND Or SECI'[ON CITY OF FORT WQRTH STANbARD CONS'tRUCC10N SPEC (1 I+orm Revised20110b27 ���� ��� _0� 42 43_QO 43 13 00 43 37_Bid Fortn-Proposal-Bond_Vendor Campliance sort FOR BU'L7SAW 4 00 bt 4l lhiwaw OI� PItO!'f)SAI. Ibgo 1 oCI sEcrtory oo a2 os PROPOSAI.nOFtM . lTl'Y f1Y fY1RT tYOIl1H �. s� aNwuu� c�smucvorr srecgrcqtroN nocuemn�rs .. .. }1amRa.is�d10170611 RRV69ft�IX141p1,004Z43 tq4319 OOi)77pM1'mn�Proqamt�0� VeadaCau��tieaeeetit,jORPUTZSAW4 UNIT PRICE BrD B�ddex's Applicatio�n Ob A2 �J lldvsaa• 771U PIIUI'(�At. Payot oC) 9ECTIpN 00 42 43 PROPOSALPORM ' crrr�rrox•rwox�nc srnaronan mtasixnrr[� sri:c.n�cn� nocur.�ris }bnnRcHaa13011Ob27 RiiVLYL�U0041 � 0043 t3„004)13 0043 f?,J3idFwarRqur.i-Uond_VedocCou+pfissxeettt_YORHlJ714AW 4 UNIT PRICE BID Bidder's Appl�catioz� lW d2 4) IlV¢faM �I� PROI'09AL R�ro3of] � � - � �- ' �' Tote1 Att li RCP � 6nse Hld + Altemntiva 1 TaW Alt 2: ElybdJ = Bae HiJ+Altemali�re E *" Alternate Bld hTnterlsl -show matuleVepesfduHon �e m�tc6 b!d M�terial propased Mttetial proposul Matwial Proposad Matuial p�oposrd Matarial proposed Matarial proposed Meterial proposv� S�CTION � 4t 43 PROP03AL I'ORM ClTY � f�flT WOA]H ATANIMR� COH3T4UC1Ytk! Si'EC1F[CA710P! �OCItA1�7I8 Fam Raviaad 2011�17 Bidder's Application TOMI Base Htd t2,313,072,00 Tntal Alternate 1 5933,909.00 Tot�d Altemate 2 S52'l,678.00 S2>Bd6,980,00 52,840,750.00 5pecitica6on No SpecifScaGon No Syeci6cr,6on No Speaficarion No SpecifScntion No Spe�iOcation No 5pecification No REVISTiD 004100 00 9I4.1_00 43 Il 00 4J 11 Did Pann-Proyaml�benA_Veada CarySieiucwA FOR PI1774AW 4 O - �SB t4,313,072.00 apecitic�Hon & provlda BIYCINg�tt with e�g+poning dv�umenteNon 00 4313 BID BOND Page 4 of 10 KNOW ALL BY THESE PRESENTS: That we, (Bidder Name) Company Name Here hereinafter called the Principai, and (Surety Name) • 5�rety Na►ne Here , a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the Cit� hereinafter cailed the Obligee, in the sumof = {SpeliOutNumbersHsre m ___ : -,_ 'and No/100 Dollars ($ ' ��Tumerais Nere: ..00), the payment of which sum will be well and truly made and the said Principai and the said 8urety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, . ' firm by these presents. WHEREAS, the Principal has submitted a proposai to perform work for the following project of the Obligee, identi�ed as City of Fort Worth Lake Crest Drainage Improvements Marine Creek Parkway to Hereford; Bowman Roberts to Bob Hangar NOW, THEREFORE, if the �biigee shall award the Contract for the foregoing project to the Principai, and the Principal shali satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the Obligee in acco�dance with the terms of such proposal, then this bond shall be null and void. lf the Principal fails to execute such Contract in accorda�ce with the terms of such proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal or faiis to satisfy all requirements and conditions required for the execution of the Cont�act in accordance with the proposal, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not to exceed the penaity hereof, and shall be used to compensate Obiigee for the difference between Principal's Total Bid Amount and the next selected Bidders Total Bid Amount. SIGNED this By: .ey. Company Name Here SECTION 00 4313 BID BOND day of , 2012. (Signature and Title of Principal) Surety Name C�ere - - - - - _ (Signature of Attomey-of-Fact) "Attach Power of Attorney (Surety) for Attorney-in-Fact END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION OOCUMENT3 Form Revised 20110627 Impressed Surety Seal Oniy 00 41 00_00 43 13_00 42 43 00 43 37_00 A5 12_00 3513_Bid Proposal Workbook.xls 00 43 37 VENDOR COMPLIANCE TO S7'A'I'E LAW Page 1 of 1 SGCTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the awazd of contracts to nonresident bidders. This law provides that, in order to be awazded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business aze outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresidenYs principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of Statc I Icre or f3lank , our principal place of business, are required to be '% I Icrc percent lowar than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in We State of Puerto Rico , our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our wmpany or our parent company or majority owner is in the State of Texas. ❑ BIDDER: Company: CD Builders, Inc Address: 411 S. College Dr. Keene, TX 76059 0 By: Johnny Pereira (Signature) Title: Vice President Date: /"! 1� 7 d� 3 � 1) � e � CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS ronn Revised 20110627 END OF SECTION 00 41 00_00 42 43_00 47 13_00 43 37_Bid Porm•Proposal-Bond_Vendor Compliunce sort_FOR IIUZZSAW 4 G ooas�i-i B[DDERS PREQUALIFICATIONS Page 1 of 3 2 SECTION 00 45 11 BIDDERS PREQUALIFICATIONS 4 1. Summary. All contractors are required to be prequalified by the City prior to submitting 5 bids. To be eligible to bid the contractor must submit Section 00 45 12, Preyualification 6 Statement for the work type(s) listed with their �id, Any cont-raactor or subcontractor who is 7 not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder 8 Prequalification Application in accordance with the requirements below. 9 10 The prequalification process wil[ establish a bid limit based on a technical evaluation and 11 financial analysis of the contractor. The information must be submitted seven (7) days prior 12 to the date of the opening of bids. For example, a contractor wishing to submit bids on 13 projects to be opened on the �th of April must file the information by the 31 st day of March 14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's 15 Prequalification Application, the following must accompany the submission. 16 a. A complete set of audited or reviewed �nancial statements. 17 (1) Classified Balance Sheet 18 (2) Income Statement 19 (3) Statement of Cash Flows 20 (4) Statement of Retained Earnings 21 (5) Notes to the Financial Statements, if any 22 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 23 of Incorporation, Articles of Organization, Certificate of Formation, LLC 24 Regulations, Certificate of Limited ParMership Agreement). 25 c. A completed Bidder Prequali�cation Application. 26 (1) The firm's Te�s Taxpayer ldentification Number as issued by the Texas 27 Comptroller of Public Accounts. To obtain a Texas T�payer ldentification 28 number visit the Texas Comptroller of Public Accounts online at the 29 following web address www.window.state.tx.us/t�permit/ and fill out the 30 application to apply for your Texas tax ID. 31 (2) The firm's e-mail address and fax number. 32 (3) The firm's DI7NS number as issued by Dun & Bradstreet. This number 33 is used by the City for required reporting on Federal Aid projects. The DUNS 34 number may be obtained at www.dnb.com. 35 d. Resumes reflecting the construction experience of the principles of the firm for firms 36 submitting their initial prequal'rfication. These resumes should include the size and 37 scope of the work performed. 38 e. Other information as requested by the City. 39 40 2. Prequali�icarion Requirements 41 a. Financial Statements. Financial statement submission must be provided in 42 accordance with the following: 43 (1) The City requires that the original Financial Statement or a certified copy 44 be submitted for consideration. CITY OF FORT WORTH CIty of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July I, 201 I 0045 ll -2 BIDDERS PREQUAL[FtCATIONS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues atso require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Staternents must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 1'7 It should: (1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (S) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital= current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequal�cation Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed fmancial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 (2) A minimum of five (5) references of retated work must be provided. 39 (3} Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility to Bid 47 a. The City shall be the sole judge as to a contractor's prequa(ification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 a The City will issue a letter as to the status of the prequalification approval. C[TY OF FORT WORTH CIty of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOC[JMENTS CPN 01604 Revised July 1, 2011 1 2 3 4 5 6 7 8 9 0045 11 -3 B[DDERS PREQUALIFICAT[ONS Page 3 of 3 d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid the prequalified work types until the expiration date stated in the letter. END OF SECTION CITY OF FORT WORTH CIty of Fort Worth Lake Crest Drainage Improveme�ts STANDARD CONSTRUCTION SPECIFICATION DOCUN[EN'I'S CPN 01604 Revised July 1, 2011 � 00 45 l2 - 1 PREQUALIFICATION S'TA"CEMENT Page I oF 1 � � � A. 1 A. 2 A. 3 A. 4 A. 5 A. 6 A. 7 A. 8 A. 9 A. 10 A. 11 A. 12 A. 13 A. 14 A. 15 A. 16 A. 17 A. 18 A. 19 a. zo A. 21 A. 22 A. 23 A. 24 A. 25 A. 26 SECTION 00 4512 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Contractor/Subcontractor Company Name Prequalification Ex iration Date Storm Drain Collection S,�LF ��'2F0/LM S stem, 66" and Smaller Concrete and Asphalt Con/Recon, less than 18,000 � ��j % LLe SY Water Transmission, Urban/Renewal, 16" and S,EL�' �E�2Fo�2N/ smaller Sanitary Sewer Collection System, Urban/Renewal, 8" ,S�LF �E/ZFO%1� and Smaller The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently pregualified for the work types listed. BIDD�It: C� g u�� ��� 2s, �r�c Company y11 S. Cot..t..��,E 1JR. Address K,E � N �,TX '76059 City/State/Zip By: Joh nn �re i r'a. U (Ple se Print) Signature• Title: �� Ge �re 5 i o�� �T (Please Frint) Date: /-� P R� L�1, �( 3 �ND OF SECTION CITY OF FORT WORTH STANDARU CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 City of Fort Worth Lake Crest Dtainage Lnprovements CPN 01604 � t � Y � � ' � F�RT��RTH SECTION 00 4513 BIDDER PREQUALIFICATION APPLICATION Date of Balance Sheet L�ecember 31, 2012 � p Mark only one: Individual ' Limited Partnership CD Builders, Inc. General Partnership Name under which you wish to qualify x Corporation Limited Liability Company HC-02 Box 14740, Gurabo P.R. 00778 Post Office Box City State Zip Code Road 189 Km 3.1 Bo. Rinco�. Gurabo P.R. 00778 Street Address (required) City State Zip Code �787)744-4863 �787�746-2143 cdbuilders@1ive.com Telephone Fax Email 44 09 Texas Taxpayer ldentification No. 66-0591654 Federal Employers Identi�cation No. 029163511 DUNS No. (if applicable) MAIL THIS QUESTIONAIRE ALONG WITH FINANCIAL STATEMENTS TO: CITY OF FORT WORTH TEXAS 1000 THROCKMORTON STREET FORT WORTH, TEXAS 76102-6311 AND MARK THE ENVELOPE: "BIDDER PREQUALIFICATION APPLICATION" 004513-2 BIDDER PREQUALIFICATION APPLICATION Page 2 of 8 „ BUSINESS CLASSIFICATION The following should be completed in order that we may properly classify your fum: (Check the block(s) which are applicable — Block 3 is to be left blank if Block 1 and/or Block 2 is checked) x❑ Has fewer than 100 employees and/or oHas less than $6,000,000.00 in annual gross receipts OR � Does not meet the criteria for being designated a small business as provided in Section 2006.001 of the Texas Government Code. The classification of your firm as a small or large business is not a factor in deternvning eligibiliry to become prequalified. MAJOR WORK CATEGORIES Water Department Augur Boring - 24-inch diameter casing and less Augur Boring - Greater than 24-inch diameter casing and greater Tunneling — 36-Inches — 60 —inches, and 350 LF or less Tunneling - 36-Inches — 60 —inches, and greater than 350 LF Tunneling — 66" and greater, 350 LF and greater Tunneling — 66" and greater, 350 LF or Less Cathodic Protection Water Distribution, Development, 8-inch diameter and smaller Water Distribution, Urban and Renewal, 8-inch diameter and smaller Water Distribution, Development, 12-inch diameter and smaller Water Dishibution, Urban and Renewal, 12-inch diameter and smaller Water Transmission, Development, 24-inches and smaller Water Transmission, Urban/Renewal, 24-inches and smaller Water Transmission, Development, 42-inches and smaller Water Transmission, Urban/Renewal, 42-inches and smaller Water Transmission, Development, All Sizes Water Transmission, Urban/Renewal, All Sizes Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches — 36-inches Sewer Bypass Pumping 42-inches and larger CCTV, 8-inches and smaller CCTV, 12-inches and smaller CCTV, 18-inches and smaller CCTV, 24-inches and smaller CCTV, 42-inches and smaller CCTV, 48-inches and smaller CiTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 (/nscrl Prujec� NumoJ (/nser! Prqjeci ,YumberJ t � � 004513-3 B[DDER PREQUALIFICATION APPLICATION Page 3 of 8 MAJOR WORK CATEGORIES, CONTINUED x Sewer CIPP, 12-inches and smaller X Sewer CIPP, 24-inches and smaller X Sewer CIPP, 42-inches and smaller x Sewer CIPP, All Sizes ' x Sewer Collection System, Development, 8-inches and smaller ' x Sewer Collecrion System, Urban/Renewal, 8-inches and smaller X Sewer Collection System, Development, 12-inches and smaller ' X Sewer Collection System, Urban/Renewal, 12-inches and smaller Sewer Interceptors, Development, 24-inches and smaller Sewer Interceptors, Urban/Renewal, 24-inches and smaller Sewer Interceptors, Development, 42-inches and smaller i Sewer Interceptors, Urban/Renewal, 42-inches and smaller Sewer Interceptors, Development, 48-inches and smaller ; Sewer Interceptors, Urban/Renewal, 48-inches and smaller Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement, All Sizes Sewer Cleaning , 24-inches and smaller Sewer Cleaning , 42-inches and smaller Sewer Cleaning , All Sizes Sewer Cleaning, 8-inches and smaller Sewer Cleaning, 12-inches and smaller Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less , Sewer Siphons All Sizes Transportation Public Works Asphalt Paving Construction/Reconshuction (LESS THAN 10,000 square yards) Asphalt Paving Construction/Reconstruction (10,000 square yards and GREATER) Asphalt Paving Heavy Maintenance (LINDER $1,000,000) Asphalt Paving Heavy Maintenance ($1,000,000 and OVER) X Concrete Paving Construction/Reconstruction (LESS THAN 10,000 square yards) x Concrete Paving Construction/Reconstruction (10,000 square yards and GREATER) Roadway and Pedestrian Lighting CITY OF FORT WORTH (Insrrr Projec� NumeJ STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS �/nsrrt Pr�jrcr ;Vunibe�J Revised December20, 20i2 , 004513-4 BIDDER PREQUALIFICATION APPLICATION Page 4 of 8 List equipment you do not own but which is available by renting DESCRIPTION OF EQUIPMENT NAME AND DETAILED ADDRESS OF OWNER CD Builders, Inc., does no need to rent equipment because it has his own. 2. How many years has your organization been in business as a general contractor under your present name? 1 � �Par� List previous business names: N/A 3. How many years of experience in 12 years construction work has your organization had: (a) As a General Contractor: X (b) As a Sub-Contractor: 4. *What projects has your organization completed in Texas and elsewhere? CLASS LOCATION NAME AND DETAILED CONTRACT OF DATE CITY-COUNTY- ADDRESS OF OFFICIAL TO AMOUNT WORK COMPLETED STATE WHOM YOU REFER m *If requalifying only show work performed since last statement. S.Have you ever failed to complete any work awarded to you? No If so, where and why? N/A 6. Has any officer or owner of your organization ever been an of�cer of another organization that failed to complete a contract? No If so, state the name of the individual, other organization and reason. N/A 7. Has any offcer or owner of your organization ever failed to complete a contract executed in his/her name? No If so, state the name of the individual, name of owner and reason. N/A CITY OF FORT WORTH (7i�sei•i Prqjc�c•� :VuureJ STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS (li�,,cr� Pi•ujec� ,45uiihei/ Revised December 20, 2012 .'' '�� 004513-5 BIDDER PREQUALIFICATION APPLICATION Page 5 of 8 8. In what other lines of business are you financially interested? None 9. Have you ever performed any work for the City? No If so, when and to whom do you refer? N/A 10. State names and detailed addresses of all producers from whom you have purchased principal materials during the last three years. NAME OF FIRM OR COMPANY DETAILED ADDRESS Steel Services & Su lies PO Box 2528 Toa Baja, P.R. 00951-2663 PR Wire Products PO Box 363167 San Juan, P.R. 00936-3167 Mocoroa & Castellanos PO Box 1119 Guaynabo, P.R. 00970-1119 American Petroleum PO Box 2529 Toa Baja, P.R. 00951-2663 EOB Box 1839 Guaynabo, P.R. 00970-1839 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. None 12. What is the construction experience of the principal individuals in your organization? PRESENT MAGTtITUDE POSTTION OR YEARS OF AND TYPE OF IN WHAT NAME OFFICE EXPERIENCE WORK CAPACITY See Attachment "B' for additio al informati n Ismael Carras uil o President Johnn Pereira ice-Presiden 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee, please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the same household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. N/A CITY OF FORT WORTH (/n.��rrt Prujrci :VcuueJ STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS (ln.+•c•r( Projecr ,Vuurbe�j Revised December 20, 2012 � 004513-6 BIDDER PREQUALIFICATION APPLICATION Page 6 of 8 1 � v CORPORATION BLOCK If a corporation: CD Builders, Inc. Date of Incorporation January 2001 Charter/File No. President Ismael Carrasquillo Vice Presidents Johnnv Pereira File No. (if Limited Partnership) General Partners/Officers Secretary Rolando Ramos Treasurer Yamillette Irizarry LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation p„Prt� Ri co Date of organization June 2002 File No. Of�cers or Managers (with titles, if any) �r�......,1 n....�,.-..�.n„-0 11 r, _ Drcairlr�nf !�I � PARTNERSHIP BLOCK If a partnership: State of Organiza.tion Date of organization Is partnership general, limited, or registered limited liabiliry partnership? Partners (if applicable) Individuals authorized to sign for Partnership Egcept for limited partners, the individuals listed in the blocks above are presumed to have full signature authority for your �rm unless otherwise advised. Should you wish to grant signature authority for additional individuals, please attach a certified copy of the corporate resolution, corporate minutes, partnership agreement, power of attorney or other legal documentation which grants this authority. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 /Gtsc�v Projec•I �Vunr�J (lnsri7l'rujec! Narr�br�% , ,, , , ;� � 14. Equipment 004513-7 BIDDER PREQUAL[FICATION APPLICATION Page 7 of 8 $ 142,093.00 TOTAL BALANCESHEET ITEM QUANTITY ITEM DESCRIPTION VALUE 1 4 Backhoe Loader 25,000.00 2 2 Dozers 22,500.00 3 3 Excavators 55 000 00 4 2 Telesco ic Forklift 20 500.00 5 2 Vibrator Com actor 12 6 1 Grader 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Various- TOTAL 42,093.00 Similar iypes of equipment may be lumped together. lf your tirm has more than 3U types of equ�pment, you may show these 30 types and show the remainder as "various". The City, by allowing you to show only 30 types of equiprnent, reserves the right to request a complete, detailed list of all your equipment. The equipment list is a representation of equipment under the control of the firm and which is related to the type of work for which the frm is seeking qualification. In the description include, the manufacturer, model, and general common description of each. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICAT[ON DOCUMENTS Revised December 20, 2012 %l�re'ciY Prujt�rl Num�f /lnseri Pruject;VuniGr�J , , . ,'%� 00 45 13 - 8 BIDDER PREQUALIFICATION APPLICATION Page 8 of 8 BIDDER PREQUALIFICATION AFFIDAVIT STATE OF Puerto Rico COUNTY OF Catano The undersigned hereby declares that the foregoing is a true statement of the �nancial condition of the entity herein first named, as of the date herein �rst given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized to supply each party with any information, while this statement is in force, necessary to verify said statement. Ismael Carrasctuillo Sanchez , being duly sworn, deposes and says that he/she is the President of CD Builders, Inc. , the entity described in and which executed the foregoing statement that he/she is familiar with the books of the said entity showing its financial condition; that the foregoing �nancial statement taken from the books of the said entity as of the date , thereof and that the answers to the questions of the foregoing Bidder Prequalification Application are correct and true as of the date of this affidavit. FirmName: CD Builders, Inc. C�u Signature: I ael Carrasquillo ��. �Il� =�.,, _ _��;�. � �:� ��F:�:��,�,�j , � ;. � , �; � � �:t � .,-�:�/ "��� . � n AFFIDAVIT 3 67 Sworn to before this /' ay f April � ,, Notary Public Notary �ublic must not be an officer, director, or stockholder or relative thereof. 9397 03/25/2013 $5.00 $5 Sello Asistencia legai 51079-2013-0325-55465955 CITY OF FORT WORTH (Grser( Prujc�ct �VonreJ STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS (Gr.serl Projrcr :\4uuhei f Revised December 20, 2012 CD BUILDERS, INC. ATTACHIV�ENT A n S 'e^ w a C d �a � oa �i U d A W F CD BUILDERS,INC. G 1�:��:1���� 1�:3 • 1 • •"• • • • � • 1 • • •�1 HC-02 Box 14740 Tel. (787) 744-4863 ' Gurabo, P.R. 00778 Fax (787) 746-2143 ismael Carrasquillo Sanchez Education * Master in Engineering Management (M.E.M) 1997 —1999 Polytechnic University of Puerto Rico, Hato Rey * Civil Engineerit�g Bachelor Degree (B.S.C.E.) 1984 —1989 Polytechnic University of Puerto Rico, Hato Rey * Planification y Programation of Construction Projects Using CPM & Computers 1998 College of Engineers y Surveyors of Puerto Rico * How to Manage Projects; Seminar 1997 Skillpath, Inc. Seminars San Juan, P.R. * Practice 8 Techniques of Project Supervision; Seminar 1996 Skillpath, Inc. Serninars San Juan, P.R. * How to Manage Time; Seminar 1996 Skillpath, Inc. Seminars San Juan, P.R. Professional 2002 to Present CD Builders, Inc. Gurabo, P.R. ��e� PRESIDENT • Responsible for administration of ail Company activities and for guaranteeing the accompiishment of all Company objectives; Keep the organization viable; Plan for and impiement expansion of the company; Participate actively in bidding preparation negotiation, coordination and construction of projects; Direct financial affairs of the company including banking, financial statements and bonding. • 1994-2002 Del Valle Group, SP Toa Baja, P.R. Senior Project Manager ■ Main Responsibilities include managing capital expenditure projects to time, budget and quality targets. Selecting and managing subcontracto�s. . Preparing tender documents and advising tender board on bids and quotations received. Preparing documentation required to obtain construction pennits. Ensure a safe and healthy wo�ic environment. 1990 - 1994 Caribbean Industrial Construction Rio Piedras, P.R. Project Engineer ■ Main Responsibilities inciude run projects to time, budget and qualiry targets. Subcontractors work coordination and supervision. Preparing materials take-off and purchase orders, cost estimates for change orders and CPM updating. Attend to meetings with owner and A/E for project coordination. Ensure a safe and healthy work environment. Civil Estimator * Main Responsibilities include estimate cost for bidding projects, attend to pre-bids meetings. Preparing submittais, procurements schedules and purchase orders. 1989 —1990 U.S. Small Business Administration (Disaster Assistance — Hurricane Hugo) Carolina, P.R. Construction Anal�/st ■ Main Responsibilities include verify cause and examine damages to structures and estimate the cost of repair or replacement. Determine appropiate construction method techniques and installation of protective / preventive devices. 1988 —1989 Erwin U. Rodriguez & Associates Santurce, P.R. Assistar�t Engineer ■ Main Responsibilities include design of site works such as storm sewer systems, sanitary systems, potable systems, grading plans, lotifications, street, avenues, and retaining walls. Preparing construction specifications, cost estimates take-off and earthwork cross-sections and profiles. Attend to meetings with owner. Skills Proven Project Management Skills " Over 16 years Project Related Experience * Ability to deal with multiple tasks and priorities * Exceilent Communications Skilis * Fully bilingual (Spanish / Engiish) '` computer knowledge; MS Excel, MS Word, Primavera Sure Track * able to work underpressure Disclosure of Professional Experience Ismael Carrasquillo, BSCE, MEM Under CD Builders, Inc. 2002 to present PI'@Sidellt Responsible for administration of all Company activities and for guaranteeing the accomplishment of all Company objectives; Keep the organization viable; Plan for and implement expansion of the company; Participate actively in bidding preparation negotiation, coordination and construction of projects; Direct financial affairs of the company including banking, financial statements and bonding. Under Del Valle Group As Senior Project Manager In Charge Of The Following Four (4) Projects ($43,117,000.00) at the same time: Project: Modernization of EL Prado Housing Owner: Public Housing Administration Contract Amount: $15,715,000.00 Description: Modernization of existing structures which includes the construction of new infrastructure systems including electrical, potable and sanitary. Site work improvements include the construction of new streets, sidewalks and infrastructure like storm sewer, sanitary sewer, potable water, cable N and underground all electrical and telephone system. Project: Modernization of Francisco Vigo Salas Housing Owner: Public Housing Administration Contract Amount: $9,449,000.00 Description: Modernization of existing structures which includes the construction of new infrastructure systems including electrical, potable and sanitary. Site work improvements include the construction of new streets, sidewalks and infrastructure like storm sewer, sanitary sewer, potable water, cable TV and underground all electrical and telephone system. Project: Modernization of Francisco Vega Sanchez Housing Owner: Public Housing Administration Contract Amount: $9,309,000.00 Description: Modernization of existing structures which includes the construction of new infrastructure systems including electrical, potable and sanitary. Site work improvements includes the construction of new streets, sidewalks and infrastructure like storm sewer, sanitary sewer, potable water, cable TV and underground all electrical and telephone system Project: Modernization of EI YUQUIYU Housing Owner: Public Housing Administration Contract Amount: $8,644,000.00 Description: Modernization of existing structures which includes the construction of new infrastructure systems including electrical, potable and sanitary. Site work improvements include the construction of new streets, sidewalks and infrastructure like storm sewer, sanitary sewer, potable water, cable TV and underground all electrical and telephone system. As Project Manager at Del Valle Group Project: Construction of Catano Urban Water Front Owner: Municipality of Catano Contract Amount: $25,491,000.00 Contract Amount to Date: $28,157,350.03 Description: Construction of 1.4 Km fong Urban Water Front in Catano, Puerto Rico, which includes works such as demolition, earthwork, site work, construction of several marine structures such as sea walls, pedestrian bridge, boardwalks, boat ramps, Breakwaters and piers. Also includes the construction of several structures, improvements of streets, sidewalks and infrastructure like storm sewer, sanitary sewer, potable water, cable TV and underground all electrical and telephone system. Project: Improvements to the Barbosa Avenue Owner: Municipality of Catano Contract Amount: $7,969,000.00 ContractAmount to Date: $9,961,250.00 (19/Jan/01) Description: Construction of improvements and underground of all infrastructure systems along 800 linear meters of the Catano town main street named Barbosa Avenue. Works includes the construction of several structures, improvements streets, sidewalks and infrastructure like storm sewer, sanitary sewer, potable water, cable TV and underground all electrical and telephone system. Project: Mejoras Urbanas y a la PR-869 & PR-22 Owner: Municipality of Catano Contract Amount: $2,565,000.00 Description: Construction of improvements to road PR-869 from intersection with PR-5 to intersection with PR-22. Works includes the construction of several structures, improvements streets, sidewalks and infrastructure like storm sewer, sanitary sewer, potable water, cable TV and underground all electrical and telephone system. Project: Improvements to Storm Sewer System at Blay Street Owner: Ports Authority of Puerto Rico Contract Amount: $989,000.00 Description: Construction of a 36" to 48" diam. Storm Sewer System partially supported by concrete piles at the Bechara Industrial Park. Work also includes improvements to the Blay street and the sidewalks. Project: Construccion de Rompe Olas de Isla de Cabras Owner: Fomento Recreativo Contract Amount: $5,459,000.00 Description: Construction of aprox. 1 Km of breakwaters and an aprox. 100 linear meter groin at Isla de Cabras, Toa Baja, P.R. Project: Mar Sin Barreras, Luquillo Owner: Puerto Rico Highway Authority Contract Amount: $2,401,000.00 Description: Construction of Facilities to make possible handicapped persons access the Luquillo Beach. Works includes the construction of an Administration Building and several other structures supported by concrete piles. Under Caribbean Industrial Construction Project: New Warehouse Facilities, Guaynabo Owner: Jostoche & Associates Contract Amount: $3,275,000.00 Description: Construction of two buildings; one Pre-engineering Warehouse Building of 120,000 Sq. Ft. and a two story Conventional Building of 45,000 Sq. Ft. Project: Bactroban / Paxil Coating, Cidra, P.R. Owner: Smithkiine Beecham Contract Amount: $1,315,000.00 Description: Remodelation and conversion of a warehouse area into a pharmaceutical clean room type 100. Project: New Rest Room Facilities, Carolina Owner: Warner Lambert, Carolina, P.R. Contract Amount: $145,000.00 Description: Construction of 1,500 Sq. Ft. structure to be used as Men and Women Rest Rooms Project: Pump House Addition Owner: I.C.I. Pharmaceuticals, Guayama, P.R. Contract Amount: $58,700.00 Description: Includes Civil Works only; Construction of the extension of the existing pump station. Project: New Tank Farm Owner: I.C.I. Pharmaceuticals, Guayama, P.R. Contract Amount: $360,000.00 Description: Construction of eight (8) concrete bases for tanks. Project: Owner: Contract Amount: Description: Searle Expansion, Caguas U.C.I., L.T.D. $880,000.00 Construction of one conventional building for warehouse purposes of Searle Pharmaceutical. �, � Project: New Building Remodelation Facilities Owner: Amgen, Juncos, P.R. / Zachary Contract Amount: $1,293,000.00 Description: Remodelation of existing pharmaceutical structure. Works include demolition works, electrical & mechanical works, construction of inezzanines and construction of offices. Project: Balsam Project Owner: U.S. Naval Base, Sabana Seca, P.R. / GTE Contract Amount: $632,000.00 Description: Construction of two radar concrete bases, including the installation of over 3,000 bolts with a maximum permissible margin of error of 1/16". Project: I.V. System Expansion, Aibonito Owner: Baxter, Aibonito, P.R. Contract Amount: $3,100,000.00 Description: Construction of new conventional building for warehouse purposes and the conversion of the existing warehouse to pharmaceutical clean rooms type 1,000 and 100. .TOHNNY PEREIRA CELL: %S%.469.5633 � EMni�: johnnyps5l@yahoo.com ' CONSTRUCTION MANAGER ^� OPERATIONS MANAGER ^� SENIOR PROJECT MANAGER ' LICENSED ENGINEER: TEXAS & PUERTO RICO Highly skilled and results-driven Licensed Engineer with over 30 years of top-level leadership experience managing multiple projects, Project Managers and overall construction company operation. Demonstrated ability to successfully achfeve project goals and objectives. Strong interpersonal skills with ability to develop productive relationships and communicate efJ`'ectively with clients, project teams and key stakeholders. Reliable self-starter and team player, a61e to succeed in fast-paced environments and manage conflrcting priorities and multiple tasks without sacrificing quality or safety. Seeking to utilize my management and engineering expertise in a top management position in t6e procurement and execution of highty profitab/e projects. Setting top safety and quality control standards for continuous cnli backs and excellent reference from clients. AREAS OF EXPERTISE ■ Project Management ■ Operational Efficiency ■ Biitngual: Fluent English & Spanish ■ Strategic Planning ■ Budget Management & Cost Control ■ Key Stakeholder Relationships ■ Project Scheduling ■ Leadership & Team Management ■ Detail Estimaring PROFESSIONAL EXPERIENCE Vice President of Operations EJ SM�TH CoNsrttucT�oN � 2011- Present � Contribute to all aspects of operational ef�ciency, including preparing bids, negotiating contracts, change orders, construction claims, project scheduling, supervision of project management, construction buyouts with suppliers and subcontractors. Supervise mulriple ongoing projects, such as DART Orange Line I-3, five bridges, NTE Rufe Snow and Holiday Lane Bridge, as well as CIP retaining walls, LBJ Bridge #Z, Earthwork, Pipe work, MSE retaining wall drainage ditch, rock riprap and pavement. Design - Construction Services Manager AUSTIN BRIDGE & ROADS � 2010 — 2011 � COtttQCG 214.596.7300 Design Manager for $180M design-build contract for DART-Blue Line Light Rail Train from Garland to Rowlett, Texas. Coordinated design to ensure timeliness and ef�ciency of construction work. Reviewed design drawings for constructability, ensuring all client needs were met within project budget Provided timely engineering support to operation construction team to resoive issues that would divert from the approved design, such as clarification of approved drawings, revision of design due to site conditions, construction oversight, change in construcrion material and design concept to accelerate construction. Coordinated with local agencies and municipalities concerning relocation of utilities, modification to existing terrain, drainage and other matters that may affect or impact facility. Project Manager AUSTIN BRIDGE & ROADS � 2008 — 2010 � COAtQCt: 214.596.7300 Managed several multi-miliion doilar projects: TxDot SH-121, SH-289 and SH-75, North Texas Tollway Authority ' (NTTA) SH-121 and AB&R new Equipment Maintenance Facilities. TxDot and NTTA projects involved the construction of Roads and Bridges and all incidental work, such as: drainage, signs, traffic pavement markings, sidewalks, concrete rip rap, lighting, drilled piers, foundation, columns, Steel Erections, ETC Gantries and Sound Walls. AB&R new equipment maintenance facilities, which involved site development (earthwork and infrastructure consisting of 18" sanitary sewer line, 12" water line, electrical, communicaiaon and a concrete access road) and vertical construction consisting of 27,OOOsf of several buildings for Administrative Of�ces, Equipment Maintenance/Repairs, Wash Bay and Fuel Storage/Island. Project Manager APAC-Sou'rH�s'r, INc. MAJOR PROJECTS GROUP � 2006 - 2008 � CO►itQCt: 770.392.5487 Managed a$40M West Bay Bridge on SR-79 Panama City Beach. Project consisted of construction of a concrete bridge over a waterway. Bridge consisted of 22 piers with footing columns and pier cap constructed over concrete filled steel 30" piling, driven 150' deep. Girders were AASHTO Florida Bulb T-72" and T-78" with average span length of 117'. Main span length of 220', formed by post tensioning five AASHTO T-78" Girders. Oversaw the full administration of CEtt: 787.469.5633 � EMai�: johnnyps5l@yahoo.com J. PEREIRA � PAGE 1 OF 4 construction, including procurement of materials, personnel and equipment to perform all work acriviries. Prepared and followed up on project schedule to ensure completion on time and within budget. Reviewed and modified design of cofferdams and temporary steel support structures. Senior Project Manager TARGET ENGINEERING S.E. � 2004 - 2006 � ContacG 787.257.0416 Managed construction of several multi-million dollar projects located on the south oF the island. Projects included Guanica Waste Water Treatment Plant and Guanica City Hall Site Improvements. 1NWTP construction of several concrete buildings, foundation, steel tanks, pipes, pumping stations, concrete piling, cofferdams, deep excavation and other incidental work. Wastewater Treatment Plant was under bid by 20% due to a plan oversight and had a short timeframe for construction. Tightly managed expenditures and identifying several inconsistencies in the contract drawings, led to change orders and time extensions. Project was subsequently completed without losses. Guanica City Hall Site [mprovements was an ongoing project that was behind schedule when assigned. Relocated all overhead utilities (telephone, electricity and cable) underground. Managed improvements to the sewer, water, streetlights, landscaping, sidewalks, streets and stage area. Reorganized the workforce and successfully corrected construction deficiencies; accelerated construction and closeout of the project without liquidated damages. CONTRACfOR� CONSTRUCTION MANAGEMENT CONSULTANT & PROFESSIONAL ENGINEER � 1998 - 2004 Contractor/ Subconiractor Performed multiple projects of highway and road construction, wastewater treatment plants, earthwork, warehouse buildings, commercial buildings, institurional buildings and incidental work. Construction Management Consultant Prepared project planning schedules (CPM), evaluated, prepared and negotiated construction claims. Managed construction of multiple construction projects, such as marine construction, communicarion towers, foundation, commercial and institutional buildings, roadwork construction, Hurricane George fast track repairs, clean up work and a variety of other projects. Professional Bngineer Served as project designer on several projects. Designed retaining walls, bridges, communication towers, foundations, drainage, warehouses, commercial, schools and sports facilities. Served as consultant on construction disputes and forensic design reviews and recommendations. Project Manager PUBLIC HOUSING MODERNIZATION PROjECT� ISMAEL MELENDEZ CONSTRUCTION INC. S.P. ( 1997 - 1998 � Contact: 787,845.2475 Managed a$15M public housing modernizarion projec�t. Hired to turn around a project that had commenced four month prior and still did not have a payment breakdown or Progress Schedule (CPM). Within 30 days was able to prepare payment breakdown and progress schedule (CPM) and have it submitted and approved. Key Achievement: Implemented an accelerated work schedule and within six months project was back on schedule, all subcontracts were negotiated and in progress, all materials were submitted and approved, and material supplier buyouts were completed. Stayed on a�ter ninth month as a consultant for the CPM review and ongoing construction claims. Contract was satisfactory completed and several claims of time extens�on and differential site conditions were satisfactory negotiated. Highway & Heavy Construction Division Manager DEL VALLE GROUP S.E. � 1995 -1997 � Contact: 787.794.0927 ' Managed four Project Managers and several General Supts. In the performance of multiple projects totaling over $35M in annual revenues. Projects consisted of earthwork, asphalt and concrete pavements, roads, drainage pipes, bridges, piling, pipe work, MSE Walls, etc.. Supervised the planning and management of the projects with the supervisory personnel in acquiring the material, eyuipment, workforce and subcontractors needed to achieve desired construction within budget. Negotiated with project owners to resolve conflicts, claims and change orders. Served as company's representative for joint venture team assembled in pursuit of a Design-Build $100M elevated Light Rail Train (Tren Urbano) projec�t. Actively involved in preparation and submission of documentation for Request for Qualification (RFQ) and Request for Proposal (RFP). Key Achievement: With only 30% of conceptual design, prepared breakdown and estimate for roughly 40�6 of tota! bid package. l enjoyed this work, l was a"Great Experience." Vice President of Operations INABON ENTERPRIS6,1Nc. � 1993 -1995 � Contact: 787.848.1000 Company gross yearly revenues exceeded $60M. Hired by President and Executive Vice President to supervise and manage all operations. Negotiated and coordinated with municipalities, asphatt pavement contractors and suppliers on CELL: 78%.469.5633 � EMai�: johnnyps5l@yahoo.com J. PERB[RA � PAGE 2 OF 4 � material price and work schedules. Handled a broad range of responsibilities, including: handiing union representarives, labor disputes, construction claims, legal counsel, personnel hiring, evaluation and training, preparing estimate and bid packages, pavement design mix, concrete design mix, quality control testing, equipment purchase and maintenance and company's administrative matters. , KeyAchievements: Managed operations that included a concrete pre-cast residential module construction division, ' two concrete plants, four asphalt plants, and two aggregate production plants Each asphalt plant included pavement ' equipment and crew to handle numerous sma11 to large pavement assignments. Managed multiple ongoing highway construction projects consisting of pavement, drainage pipes, bridges and other incidental work that exceeded $40M ' annual revenues. Self-Employed/Professor ENGINEERING DEPARTMENT AT CARIBBEAN UNIVERSiTY, BAYAMON, P.IL � 1992 -1994 Taught courses leading to an Associate and Bachelor Degree in Engineering. Courses included Structural Analysis, Steel and Concrete Design, Geology and Soil Mechanics, Mechanics of Material, Surveying, and Construction Estimating. Contractor, Professional Engineer CONSfRUCf10N MANAGEMENT CONSULTANT � 1989 - 1992 Vice President and General Construction Manager PONCE TRUCK LINE5 AND LEAFAR CONSTRUCf10N INC. � 1982 -1989 � Contact: 787.840.0890 Involved in all administrative duties in the management of the company, including estimaring and preparing bid packages for new projects. Developed numerous Heavy and Highway construction contracts for USACE, PRDOT, PR Water Authority, municipal government and private entities. Prepared esrimates and supporting documents for negotiation of change orders and claims. Met with legal counsel and government officials to discuss construction issues and negotiate claims. Civil Bngineer U.S. ARMY CORPS� ENGINEERS, �AX. DISTRICT, FLotttoa � 1977 -1982 Started as Engineer in Training and worked in several COE deparhnents on engineering structural design, esrimating, construction supervision and construcrion management/quality assurance. Assigned as Project Engineer at a Field Office supervising the inspection of numerous multi-million dollar flood controi projects at the Portugues and Bucana Channel project Supervised several inspectors and engineers, soil and concrete testing at the Laboratory set up by COE. KeyAchievement: Achieved an Outstanding Performance Rating on an annual evaluation report EDUCATION UNIVERSITY OF PUERTO RICO Graduate Studies, Structural Engineering BacHe�o�toFSc�BNCB Civil Engineering,1977 TECHNICAL PROFICiENCIES Microsoft Of�ce Suite, Primavera, Suretrak, Project Planner, SAP 2000, RISA and Auto Cad PROFESSIONAL LICENSES Professional Engineer in the Common Weatth of Puerto Rico License #8149 State of Texas License #108388 CELL: 787.469.5633 � EMat�, johnnyps5l@yahoo.com J. PERE►RA � PAGE 3 OF 4 TRAINING & PROFESSIONAL DEVELOPMENT CONSTRUGTION RELATED COURSES ■ Primavera (P6) Training Advanced Level, Nov. 2012 ■ Construction Safety and Management, September 8, 2007 ' ■ Roof Waterproofing and Energy Saving Coating, April 27, 2004 ■ OSHA Standards for the Construction Industry, 30 Hour Course, March 23, 2004 ■ Hydro-Stop, Waterproo�ng System Installer Certificatian, September, Z003 ■ OSHA Standards for Steel Erecrion, Welding and Cutting in Construction, May 16, 2002 ' ■ State and Federal Labor Laws in Construction, November 29, 2000 ■ Fire and Life Safety Issues of Inspection of Buildings - UBC, February 29, 2000 ■ Fundamentals of Plumbing Inspection - UBC, February 22, 2000 '' ■ Fundamentals of Mechanical [nspecrion - UBC, February 15, 2000 ■ Fundamentals of Building [nspection - UBC, February 8, 2000 ■ [nspection of Concrete Buildings - UBC, September 28,1999 ■ Inspection of Steel Buildings - UBC, August 19,1999 ' ■ Additional construction courses in contract administration, of8ce engineering, earthwork, inspecrion, safety, expiosives, drilling, grouting, planning, management and CPM. ENGINEERING RELATED COURSES ■ Advanced Survey Technologies, December S, 2009 ■ Designing and Construcring as per Florida Building Code, )une 22, 2007 ■ Basic Concept of Reinforced Concrete Design, December 2, 2006 ■ Structurai Analysis with Computers (SAP 2000), November 18, 2006 ■ Requirements for Reinforced Concrete Buildings of Limited Size and Height, May 19, 2006 ■ Changes in ACI-318-05 The Structural Standard, April 27, 2006 ■ New Essential Requirements for the Design of Reinforced Concrete Buildings ■ Fundamentals of Connection Design, September 26, 2002 ■ Design of Shear Walis for Earthquake Resistance, November 3, 2000 ■ Evaluation of Damages of Structures Caused by Earthquake, May 19, 2000 ■ Design of Concrete Buildings for Earthyuake and Wind Forces - UBC, October 13,1999 ■ Design of Steel Buildings for High Wind and Earthquake - UBC, October 7,1999 ■ Wind Provisions of the UBC (ASCE 7), September 21,1999 ■ 1997 UBC Earthquake Regulation Overview and Perspective Part 2, September 14,1999 ■ Wind Load and Flood Resistant Provision of the UBC, September 1999 ■ 1997 UBC Earthquake Regulation Overview and Perspective Part 1, August 31,1999 ■ UBC Overview, August 24,1999 ■ Other engineering courses such as: Auto Cad, CMU reinforcement in earthquake zones, earthquake analysis of bridges and ACI Building Codes. PROFESSIONAL REFERENCES Mike Moore Vice President of Pre-Construction, Odebrecht Construction 214-232-1772 Jose Collazo Senior Estimator of Spinieflo Construction Office 973.808,8383 ( Cell: 973.261.0373 Antonio Rosario P.E. Antonio Rosario-Rosario Consulting Engineers Phone: 787.487.7539 Abimael Melendez, MBA Vice President of Contractor lsmael Melendez Construction, lnc. Phone: 787.390.1706 ' Pablo Vasquez P.E. Resident Engineer for the U.S. Army Crops of Engineers for P.R. and the Virgin Islands ' " Phone:787.399.7956 CELL: 787.469.5633 � EMnm: johnnyps5l@yahoo.com J. PEREIRA � PAGB 4 OF 4 � i�l � •� 1�, ,yl I � 1� �� - �� � ��t �-'i_�!' ��l u.LY�L.U"i%�'' �. � -_.. � r'�.�� `" ' - :+.w�� ' __. : _�c'�+�' _ .�`- .�.. ,y '_' ;"�:� � _ _-'-� .—=--fL __._i:n,;,,'=:•�'��i�l��_.__�___ :—�_;= �.;��. �;� •: `..�^ TEXAS BOARO OF "�, •, �� =""- "'.,,�� � ir:r.� . PROFESSIONAL ENGINEERS BE IT KNOWN THAT Johnny Pe�ei�a-Sost�e HAVING GIVEN SATISFACTORY EVIDENCE OF QUALIFICATIONS REQUIRED UNDER THE TEXAS ENGINEERING PRACTICE ACT, TEXAS CIVIL STATUTES, ARTICLE 3271 a, IS GRANTED THIS LICENSE TO PRACTICE AS A PROFESSIONAL ENGINEER IN THE STATE OF TEXAS PROVIDED THIS LICENSE IS NOT REVOKED AND IS RENEWED ACCORDING TO LAW TEXAS BOARD OF PROFESSIONAL ENGINEERS IN WITNESS WHEREOF, WE HAVE HEREUNTO SET OUR HANDS AND AFFIXED THE SEAL OF 7HE BOARD AT THE CITY OF AUSTIN, THIS 13T" DAY OF MAY 2011, —��{ • � � —.- '-"' BOARD HAIR -� 108388 BOAR SECRETARY SERIAL NUMBER �- 1 � � � � � m� H.� ` � p� � T � O, � O � B' = �� � � D� � YLl � � C = y � � ��'- ��:;; ��:`: ��_:: �s —� t� = _ y V N n ' L� � � � m ("; a � m m � � re;_ V1 O � Vlr; ' .', Q �:. �� . n C 0 ;: � a. �3 a � c� 1, _ ..t m 3 � N � �� � * S. 00 45 26 - 1 CONTRACTOR COMPLIANCE W[TH WORKER'S COMPENSAT[ON LAW Page 1 of 1 � C� �ui lc�e,r4., lnc . By: ohnn �er 'r'C Company (Plea Print) 2 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifes that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. 01604 Contractor further certifies that, pursuant to Texas Labor Code, Section 6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. CONTRACTOR: 10 �� 12 13 14 IS 16 17 18 19 20 `-� l l s. Ca 6� e Dr. Address Keehe, T 7�059 City/State/Zip 21 THE STATE OF TEXAS § 22 23 COUNTY OF TARRANT § 24 Signature: Title: �%/'Ce �r'e�/pel2T (Please Print) 25 BEFORE ME, the undersigned authority, on this day personally appeared 26 o�n �n .� 2� t�:. r� �...- , known ta me to be the person whose name is 27 subscribed to�ego� instrument, and acknowledged to me that he/she executed the same as 28 the act and deed of �� l^,�.,.,,_, �� e, � �- � for the purposes and 29 consideration therein expressed and in the capacity therein stated. 30 31 32 33 34 GNEN UNDER MY HAND AND SEAL OF OFFICE this Iv� �...., , 2013 �' v R- i o ��� � Notary Pub 'c in and for the State oi' Te�s SECTION 00 45 26 3 0 `4"' day of 36 �����Illlllf/���� .�` P� � �qqF'�. 3� `,� �J,.•��aY P e •., s �,� .; � �►O � �i�' '• i 38 � � • � : : � • • • � � � � * .� � * • • � 39 � � �' � � � • �•.� ��TF pF '��+�, •� � s• � �I� '•..FXP�IRti..• h ``� �,��03 �; 8 -20������ ����� END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCT[ON SPECIFICAT[ON DOCCfMENTS Revised Jufy 1, 2011 City of Fort Worth Lake Crest Drainage Improvements [CPN 01604 00 45 40-i MINORITY AND WOMEN BUSINESS ENTERPRISE GOAL Page 1 of 1 SECTION 00 45 40 MINORITY BUSINESS ENTERPRISE GOAL APPLICATION OF POLICY If the total dollar value of the contract is greater than $50,000, then the MBE subcontracting goal may be applicable. If the total dollar value of the contract is $50,000 or less, the MBE subcontracting goal is not applicable. 9 POLICY STATEMENT 10 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority 11 Business Enterprises (MBE) in the procurement of all goods and services. All requirements and 12 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. 13 ia 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 MBE PROJECT GOAL The Ciry's MBE goal on this project is 15% of the total bid (Base bid applies to Parks and Community Services). Note: If both MBE and SBE subcontracting goals are established for this project, then an Offeror must sabmit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. COMPLIANCE TO BID SPECIFICATIONS On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are required to comply with the intent of the Ciry's Business Diversity Ordinance by one of the following: 1. Meet or exceed the above stated MBE goat through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or 3. Good Faith Effort documentation, or; 4. Waiver documentation. Failure to comply with the City's Business Diversity Ordinance shall result in the Bid being considered non-responsive. Any questions, please contact the M/WBE Office at (817) 212-2674. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall deliver the MBE documenta.tion in person to the appropriate employee of the Managing Department and obtain a date/time receipt. Such receipt shall be evidence that the City received the documentation in the time allocated. A faxed co will not be acce ted. 1. Subcontractor Utilization Form, if goal is met received by 5:00 p.m., five (5) City business days after or exceeded: the bid o enin date, exclusive of the bid o ening date. 2, Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form, if participation is less than the bid opening date, exclusive of the bid opening date. stated oal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form, if no MBE artici ation: the bid o enin date, exclusive of the bid o enin date. 4. Prime Contractor Waiver Form, if firtn will received by 5:00 p.m., five (5) City business days after erform all subcontractin su lier work: the bid o enin date, exclusive of the bid o enin date. 5. Joint Venture Form, if utilizing a joint venture received by 5:00 p.m., five (5) City business days after to meet or exceed goal. the bid opening date, exclusive of the bid onenine date. END OF SECTION CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage lmprovements STANDARD CONSTRUCTION SPECIFICATION DOCtTMENTS CPN 01604 Revised September 29, 2012 00 52 43 - 1 Agreement Page i of 4 1 2 3 4 5 6 7 SECTION 00 52 43 AGREEMENT 8 9 THIS AGREEMENT, authorized on May 21, 2013is made by and between the City of Fort Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, ("City"), and CD Builders, Inc., authorized to do business in Texas, acting by and through its duly authorized representative, ("Contractor"). City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: 10 Article 1. WORK 11 12 13 14 IS 16 17 18 19 20 21 Contractor shall complete all Work as speciiied or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: 20SW Lake Crest Draina�e Construction Cit�Project No. 01604 Article 3. CONTRACT TINIE 3.1 Time is of the essence. All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents are of the essence to this Contract. 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within { 190} days after the date when the 24 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 25 3.3 Liguidated damages 26 27 28 29 30 31 32 33 34 35 Contractor recognizes that time is of the essence of this Agreement and that City will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof , Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City Six Hundred Fifty and no/100 Dollars ($650.00� per dav for normal irrspection, for each day that expires after the time specified in Paragraph 3.2 far Final Acceptance until the City issues the Final Letter of Acceptance. Lake Crest Drainage ls�provenrents City Project no. 01604 CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 1 Article 4. CONTRACT PRICE 00 52 43 - 2 Agreement Page 2 of 4 2 City agrees to pay Contractor for performance of the Work in accordance with tha Contract 3 Documents an amount in current funds of Two Million, Eight Hundred Sixty-Six Thousand, Nine 4 Hundred Eighty and no/100, Dollars ($2,866,980.00). 5 Ai•ticle 5. CONTRACT DOCUII�NTS 6 5.1 CONTENTS: 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 A. The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: l. This Agreement. 2. Attachments to this Agreement: a. Bid Form 1) Proposal Form 2) Vendor Compliance to State Law Non-Resident Bidder 3) Prequalification Statement 4) State and Federal documents (project specifrc) b. Current Prevailing Wage Rate Table c. Insurance ACORD Form(s) d. Payment Bond e. Performance Bond £ Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MWBE Commitment Form 3. General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Conri•act Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Lake Crest Drainage Lnprovenients Ciry Project no. 01604 00 52 43 - 3 Agreement Page 3 of 4 2 3 4 5 6 7 8 9 10 11 12 Article 6. INDEMNIFICATION 13 14 15 16 17 18 19 20 21 22 1.2 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification qrovision is snecificallv intended to operate and be effective even if it is alleged or_proven that all or some of the dama�es bein� sou�ht were caused in whole or in part, by any act, omission or ne�ligence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. b.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcoutractors, licensees or invitees under this contract. This indemnifcation provision is specifically intended to operate and be effective even if it is alleged or proven fhaf all or some of the dama�es 6ein� sou�tit were caused, in wlnole or in part, bv anv act, omission or negligence of the citv. Article 7. MISCELLAIV�OUS 23 7.1 Terms. 24 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 25 have the meanings indicated in the General Conditions. 26 7.2 Assignment of Contract. 27 This Agreement, including all of the Contract Documents may not be assigned by the 28 Contractor without the advanced express written consent of the City. 29 7.3 Successors and Assigns. 30 City and Contractor each binds itself, its pai�tners, successors, assigns and legal 31 representatives to the other party hereto, in respect to all covenants, agreements and 32 obligations contained in the Contract Documents. 33 7.4 Severability. 34 Any provision or part of the Contract Documents held to be unconstitutional, void or 35 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 36 remaining provisions shall continue to be valid and binding upon CITY and 37 CONTRACTOR. 38 7.5 Governing Law and Venue. 39 This Agreement, including all of the Contract Documents is performable in the State of 40 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 41 Northern District of Texas, Fort Worth Division. Lake Crest Drainage GnprovemenJs City Project no. 01604 CITY OP FORT WORTH STANDARD CONSTRUCTION SPECIFICAI'ION DOCUMENTS Revised December 20, 2012 00 52 43 - 4 Agreement Page 4 of 4 6 7 8 9 10 11 12 13 7.6 Other Provisions. 2 The Cont�•actor agrees to pay at least minimum wage per hour for all labor as the same is 3 classified, promulgated and set out by the City, a copy of which is attached hereto and 4 made a part hereof the same as if it were copied verbatim herein. 5 7.7 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date"). Contracto • City of Fort Worth C D �u%l�ers, �nc //�/ BY� R�i?C� C.aoi�--• . Fernando Costa B : Assistant City Manager ( gnature) Date G�/7�I � � �, � o � reira A (P ted Name) Title: ��/('e �l'G'� /Q�e Cit"y Secretary � y�/ �'• C6��eAe �r. � � Address: �� � M&C C' Z u� 2 7 �a Date: � 2 c �.3 _ City/State/Zip: e/�e� �'rpd�� Approved as to Form and Legality: � � �I > ���� Date 14 15 16 17 18 19 20 21 22 23 �FFICIAL RECOR� C�'�'Y SECRETAF�� �'T'. WOit'TH, TX (Seal) ��� u�V � 4; �� DOpO �\1 o �," 0 �� 1?; � � G� Gu �.vt • 1c ��- �� -Douglas��: Stac�c �,�-, , � i. r � �� , �K' � Assistant City Attorney APPROVAL RECOMMENDED: � �. � Dougla� W. Wiersig, P.E. DIRE OR, Transportation and Public Works epartment CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Lake Cresl Drainage Improve�nenls Ciry Project �ro. 01604 0061 IA-I 1'AYM�NT AONn Page i of2 t 2 3 � � 6 r�c� s��A7�� or �r�cxAs COUNTY OF TA1�i2A.1VT SECT(ON 00 61 14 P�YMENT Q(_1htI3 Bond no. 1301138000721 4 § KNOW ALL BY TH�SE PR�S�NTS: § 7 ��'h1t W�, CD Buitders, Inc. ��laWtY 9S � w_ , 8 `�Principal" (ierein, and Endurance Reinsurance Corporation of America a ----- --�---__._._..._.._.._.___. , _ _ ...._._......_...____ �..._ 9 Gorporata st�a•ety (su�•eties), duly autho►•izad to do �atisi�ness in the State of Texas, known �s t0 "Surety" herein (v�rheeher oa�e ar rnore), ar� I�e1d ���d firfT�(y baund u�rto the Cit� of Fort W,�rth, a I i municipai corporation crcated pursuant ta the IaFvs ofthe State ofTe,cas, kno�vn as "City°' herein, �� I!1 t�10 �8t3$1 $tllTl UF n°O million eight hundred sixty six thousand nine hundred eighty and 00/(00 UOl�e31'S 13 (�z,866,980.00------------------------- �� lawfiil money of the iJniteci St�tes, to be �aid in Fort Worth, 14 Tarrant Caunty, Texas, for the payment of which sum we11 �nd truly be made, we bind ourselves, 15 arir l�eirs, executors, administrators, successnrs t�ud assigns, jointly and severttlty, fir�t�ly by thrse: t� presents: l 7 �VHER�AS, F►•iaclpal has enfi�red iz�to a certain writxen Contr�ct with City, �w�rdecf the 18 _ 2� dtty nf May , 2013 , whicl� Contract is liereby referred tn and t9 mad� a��trt hereof for all �urposes as if fully set Cortli h�r�in, to fui•nisl� all rnateriais, eyuip�nent, 20 labor and ether access4ries as detined by law, in the prosecutian of the Work as pravicied for in 21 said Contz��ct and designated as City af Fa�•l Worth I',ake Crest Drainage Improvements, CPN 22 Q 160�. 23 NtlW, TH�R�;�'C}12E, THE Ct�NDITI4N t7F THTS tJt�LTGA`T'ION is such that if 24 Principal shall pay alt mpnies �wing to a«y (and all) payment bond t�ene�icia�y (as defined in 25 Chapte►� 2253 c�f the 'T'exas Gavernment Code, as ainetided) in the prosecution of tt�e ��ork under 26 th� Cot�tr�at, fhen this nblig-atiori shat( be un�l beoome null tii�d vdid; otlierwise �rr remain in full 27 fnrce and eFfec�. 28 This bond is madc and executed in com�tiance �vith the provisions of Chapter ?2S3 vfi the 29 'I'exas Gover�tmetat Gpde, as atnended, and afl Ii�biJities ot3 this bond st�all be determin�d in 30 acco►•dxnce rvith ttie provisi�ns nf said statute. 3t C('CY 01� I�QIt'C WOR'PH City at'l�ort t�lroRl� Lake t�rest I)ruinzge Improvamerafs 5TADii>ARD G�NS7'RUCTION SPECIFICATI�N I70CUMEI�TS CPY (t 1604 Itevised.Iuly I,2Ull 0061 14-2 YAYMI�NT AONt) Pagc 2 of 2 1 iN Wl1'NrSS WHPKEOF, the �'cincipal and Surety have eaclY SIGNCD and SEALCD 2 this instrun�ent by duly attth.ari�ed �gents and ot'ficers on this the 23 day of 3 May , ZQ 13 4 PFtINCIPnI,: CD Bui(ders, Inc. ATr�s�r: ���1 ,�„-�� �e�-� (Principal� Sec��etary W1t17C5S fl5 CO l�CI1lC1�)il� ATTEST: �Y. - , i, � �Cll� ' ��� s� na Ure , ,'c��.�.���� Name and Titie �W�� AC�aI'CSS: _HC 2 Box 14740 Guarabo PR 00778-9757 � ��Lu �KS � oPpORq�,' /y v `' SEAL � �' 801744109 . THE STATE OF � TE X P`' � � , � �� (5urety) Sccrc:t�ry I:TY: of f Roberto De Soto Lo�ez - Attomey in Fact Name �nd�Title /�C�aC�55: #333 Westchester Avenue White Plains, New York 10604 ��� �.�%n�.��� Wilttess as to Surety $ C 7 8 c) 10 � t2 T�lephone Number; 787-250-5290 Note.: lf signed by 3n afficeG� aF the Surety, lhea'e must he on file a certified extract from the bylaws shc�wing tl�at this pet•son has autlrorily to sign such nblig�t�io��, i�P Suroty's physiafll address is different from its mailin� �ddress, both must be provided, The d�te of tlie bond sl��(t noti be prior tA ille cllte th� C�mh�aat is aNrar�led. END OF SEC7'IUN GI"1'Y OF FOR'C WC)R'flt C'ity ofl�urt Worth Lakc Crc51 C:)rnina�,c Irnprovcments STANDAAD CONSTRIJCTtON SPEiCIFICKPION DO(:l7MLTITS CPN01604 RC�'isc� July I, 291 I 0061 t3-1 PF,RFf.)RMAN('G t30N1� Nugc 1 of2 I 2 3 4 5 6 7 g 9 10 S�CTION 00 61 13 PEi2rQ[2MANG1�, BUND 1t IZ t� ia IS 1G Bond no. 1301138000721 TH� STAT"E OF' TEXAS � § �{NQW ALL BY THES� PRESENTS; COUN`FY OF TARRANT § `�'hc�t WC, CD Builders, Inc. , kROWit �S "�C1tIC3}��l" Uerein and Endurance Reinsurance Corporation ofAmerica , a corporate surety(�ureties, a� more than oile) duly authorizeci to do �usiness in the State af Te:�as, kndwn �s "Surety" herein {whether one or mnre), are held and firnlly bound u�lto the City of �ort Worth, a municipal corpc�ration cre��teci pursuant to the laws of 1'ex�is. kn�wn as "City" herein, in xlie penal Sum (7�t two million eight hundred sixty siz thousand nine hundred eighry and 00/100 ---------------- D�IIc�CS ($ 2,866,9go.00 --------------------------), Iativful money of the United States, to be paid in Fort War�th, Tarr�nt Caunty, 'Cexas fnr the payment of ��liich sum well and truly to be made, �vc; bind aurselves, t7ur }7e"rrs, executors, admi�iistrators, successc�rs and assigns, jointly anci sever�(ly, tirn�ly by these presents. 17 WHER��iS, tl�e Frincipal has entered inta a certain ��+ritten contract with the City 18 awarded the 21 dAy of May , 2013 , wliich C�i�tr�ct is liereby referred tn �nd t9 macie a part l�ereof fo�• �zll purposes as ifft�lf}= set forth herein, to furnish all materials, eqi�ipme��t 20 �a��ar ax�d c�ther �ccessories defined by lat��, in the proseeution nf the Work, incltiding at�y Cli�n�e 2� Ord�:rs, as �rovided fdr i�� s�id Contracfi desi�,nttted tts Lake Crest t�c�ina�;e Impravem�n#s, CPN 22 f?16t�4, SD-U296 �3 NC3W, 'i'H.�t��FO1tE, the condition of this abli�ation is such th�t iPt1�e said �'rincipal 2�'r silall faithfiilly �crform it o6lig�ti�ns under the C'c�ntract and shall in all respect,� auly and 2S faithfutly perfoi•m the Wark, inGluding Change Orders, under the Cc�ntract, 1CCOrdin� tn th� p(�ns, 26 specificatinns, and cnntract dacuinents therein referreci to, and as well during any period �f 27 cYtensian of the Contcact tha# may be �anted nn tihe part af the City, then this obligation silall be 28 and became nul( �nd void, ��tt�erwise tn re�t��in in fiikl force and effect. z9 P1't()VtD�ll FU�2THEtt, that if any Iegal actinn be filed on this �ond, vernye shall !ie in 3U "I'arrant Gou��ty, '('exas or the United States District C�eirt for the N�rthern District oiTexas, Fort 3 t Wo►•tki Division, i_�ke Crest Grainaga Impravements CPN QlGOA Ci CY Ot� F(7Ri' W(�R'I'ti S'I'fWllAKll CpN5'CRUGTtC1N SPECII�iCA`CION DOCUivtL'NTS Revisecl .tulp I, 2011 Op(1 13-2 PCR�ORMANCE I3QND Page 2 of2 l Tl�is bond is inade and execut�d in campliance with the provisions of Gl�apter 2253 Uf the 2 TexHs Gdvernment Code, as amended, And a(I liabilities on this baad shall be determined iu 3 accordance �vith the provisions of said statu�. 4 IN WITNESS WH�RFOF, the 1'rincipal and the Surety have S1.GNED attd SEALED 5 this instruittent t�y duly authorized ag�nts aiid oiT'ieers on this th� �o day nt ( June Zp 13 7 S 9 ]0 11 12 13 14 1S 16 17 1$ 1 �) 2U 2l az 23 24 2_S 26 z� 2$ 2� so 31 32 33 i4 �s 36 37 38 3h 40 41 L�7 �3 aa ATTEST: �_.Q �����-(_.l'_>" � " � (T'rinoipal) Secretary Wiuiess as to Principal ���L D El�S �aPOqqr' � c� `' SEAL � n 801744109 � THE STATE OF � TFX AS � ��013/ Witnass as to Surety *Note: It'signed by ,rn oi'Ccer of'the Surety Couipany, there itir�s� be ur� file a certitied extcact li•om lhe by-laws sbowiri�; tliat this person has authc�rity ta sign such obli�;atian, If Sureiy's physical address is differeut from its mailin� address, both inust be provided. 'The date oC the band shall nat be prior to the date the Gontract is awarded. PRINCIPAL: 13Y: _..,.._ _ _._ �����-'l__ ���,�� � ' ��,� � i��atuce ��---���� P�.�� N7ma nnd Titl� Addt'OSS: HC 2 Box 14740 Gurabo PR 00778-9757 SURF31'Y: Enduran Reinsttrance Coiporation merica ^ BY: . -- S' uatu oberto De Soto Lopez - Attorney in Fact Name �nd'1'iile �'--_.__._..__..., Address; #333 Westchester Avenue White Plains, •. --.- — •-- New York 10604 Telephone N�nnber: 787-250-5290 CD Builders, Inc. 45 CdTY C)F' F(1RT WqR'1`H I.,�ko Crest Qruinagc Impruvemcnts S"TANI7AR[) C'ONS'I'RUC'PIUN SI?f:CIt�ICAT[ON DOC'tJMIiN'I'S C;PN 01604 Rcvised July 1, 20] 1 1 2 3 4 5 G 7 8 � ]0 11 t2 1,� l4 15 tG t7 18 19 �p 21 22 23 2� zs z� ?� ?� z� �U 31 32 33 34 UO 61 19 -1 iY1t�fN'[7:NANC� BQN[) Page I of3 S�CTiON UO G1 19 MAINTENANC� E30ND Bond no.; 1301138000723 THE STATE ()� T�XAS CUUNTY (JT TARRANT � § KNOW ALL I3�' T��S� PR:�SENT�: § That we CD Builders, inc , knawn �s "PPI17Clj)fl�°' tl�l'Cltl c11lCI Endurance Reinsurance Corporation of America , d COCj701'�t1� Slti'Ciy (suretzes> if mare th�n one) duly ai�thorized ta da business in the State af'1'exas, k��own as "Sttrety" herein (whether one or more), ar� laelci and �rmly bound unto the City nf i�o��t Wortl�, a �ntmicipal corpqrati�n created pursu�ni tu tlie latvs of the Sfiatc of TexaS, k«own �s "City" hei'ein, iCl tflf.'' SU[11 l)1 two million eight hundred sixty six thausend nine hundred eighty and 00/100 µ�Q� �c1PS (� 2,866,9so.00 ------------------------ -}, lawfiil mon�y oFfhe United �tates, to be paicl in Fart Worth, Tarrant C9unty, Tetas, for payment of which �um well and truly be made unta the City and its successors, we binc� oursel��es, our heirs, exe�utars, adn�►inistrators, successars ar�d assigns, jdintty �;nc� se�erally, firmly by ihes� p►•esents. WI-IEREAS, ihe Arincipal has entered into n ce�tain written cantract with the City awarded the 21 d�y n£ May , 20 �3 , �vhich Cantract is hereby referred ta a��d a made part hereof tor all purpos�:s as iCfuily set forth hereir�, t� tiirnish al] materials, equipment labor and other aceessories as defined by taw, in the pras�cution of the Work, including any W�rk resulting fr�m a duly autho►•ized Chxn�s Qrder (coltectively hcreiri, ttle "Work"} as provided for in sAid contract �nd design�ted as City of Furt Warth Lake Greak Drainage Improvements, CPN Ot604 and WH��RFAS, Priz�cipal binds itself to use suctz materials and fo so co�istruct tlie Work in acee�rdance tivith the plans, spe�il7catioz�s and C��ntract Dpcuinents that tlie Wc�rk is and will remain fi•ee fro�n clefects m materiais or r�or4�manship for and during the period of two (2) yea��s after the date of Pin�l Acceptance af the W ork bv il�e City ("Maintenance �eriod"); and WNERFA�, Princ;ipal bi��ds itseff to repair or rec:anst►�uc:i the Wark in wl�ale or in �al�t upon t•ect�iv,in�; ztqtice fram the City af fhe �aeetl theref�r at any tim� wiihin the M�i�it�n�nc� Peric�d. C(i'Y C)P Ft�it'P 1kU12"CI{ City of Hart �Vorih 1.nke Crest. Llraina�e Impr�rements STAN[)A[tD C�NSTRtTCTiON SPGCIFICATION I70Cti4v1EN'1'S CPN O160Q Revisul Ju15� t, 2011 L106t 19-2 �fAtNTL'NA?JCL"• UQND I'n�e 2 of3 � 4 5 G NOW TfIER�F4RE, tlte condition c�f this o6ligation is sueh tl��t yf I�rirtcipal sltttll r�meciy a«y d�fecliv� Work, for �vhich tin�ely notice was prnvid�d by City, to �� completion satisP�etory to �he City, tt�er� this obligation sh�,ll become nall and void, otlierwise to remain i» fi�11 Corce and e('fsct, 7 PROVIDFD, HOWEVER, if Principa( sl�atl tai( sa to r�pair or �•ecanslruct a�7y liinely 3 noticed defective Work, it is a�•eec� that the C'ity �nay cause any and all such defective Wark to 9 be repuired �inrUor reconstructed t�ith all assaCiated G�sts thereof being borne by tha Principal and 10 the Sureey under thi� Mainten�r�ce br�rad; and I 1. �2 PROV,IDED �'U-RTHER, that if any legal action t�e �led on Chis Bc�nct, venue shall lie in 13 Tar�•ant Cut�nty, Texas or the United States District Caurt for the Northe►�n District of "Cexas, Fort 14 Worth Divisi�n; and � iS IG P�tOVIb�D'["URTHF.tt, tl3flt this oUligation sh�il bc continuous in natuce and 1'7 successive re�avaries rt�ay be l�ad hereon f'ar successive breacf�es. I8 19 20 C[TY lJF FORT WUtt'I'[I C;ity ofrort Wurth Luke Crest Urain�+$e Improvemenis �T�NT)ARI) CC�NS'1'ftLlC.'CION SPE?CI PICA'PI<aN I�OCUM[:N'I'S CPN i)16Q4 ftcvise<I July i, 2�11 h� rr � ,. t� � � � � �.� oo�� i��-:3 n�n�N����:rvn�vc�r �aN�� Pttgc 3 of 3 1 I1�C WITNESS WHEREO�', the Principal and the Surety have each 5IUNED and SEAI,ED this 2 instrutneni by duly autl�orized agents and at�icers on this the io ciay �f 3 June � �Q 13 4 5 6 7 8 9 IU 11 t2 13 14 I5 16 17 ia 19 Za ?1 72 23 2+� 2S 26 z� 28 29 30 31 ;32 33 34 35 36 37 38 39 40 �31 A'1"CF;S`f': ��r ^ i`� i � '!�ilrt�� (Priricipal) Secretary V✓itness �s to Princip�t Q U ATTEST, ��DE�S� 'v��pORATF /�n SEAL 8017 44A 09 � THE ST OF TE X P5 � 2p13� (Surety) Sec�•etary ��'?�� �-..... \��itnes� us to Surety 1'KINGIPAL: CD Builders, Inc. ---_ _ _ _ ��: �� ' � ,�� �- � � S gnature _ ���'�?�'�t�� __._�.�, Name and "I'itle Addt'ess: HC 2 Box 14740 Gurabo PR 00778-9757 SiJ�2�TY: Enduranc ^Rei surance Corporation of inerica , E3Y: I _ ' � __.�.._....._�_ Si�mature. Ro rto De Soto Lopez - Attorney in Fact � �iame an�1 Tid� Addt'ess: #333 Westchester Avenue White Plains, ._._..._....___.__..._....----_......, __._.._ _ New York 10604 Telephone Number: 7g7-250-5290 *Nc�te: lf si�;ned by an �afticei• of the Surety Cc�mpany, there must be on ti(e a certitied extract fro_m th� by-IKws shoGving lhat tl�is person ht�s uuthority to si�m such �bli�ation. If Surety's pitysical addr�ss is different t'rom its mailin� address, bath inust be providcd. Tlie date of tlie bond slaatl not be �rior to the date tf�e Coirtract is awa►�ded. Cl7'Y OH FUR'P WCIRTH t:it}� of Po�t 1�orth Lakc Crest 17rainage Improvements S'CANDARI) C'ONSTRUCi'1QN SPI;CfrK'.��'CION vOGUML'•N'1'5 CPN U16U4 Revisui July 1, 2011 OCl 61 2S - 1 CG2TIPlCA'Pt; O�' INS11kANG[; [';�ac I oC 1 1 z 3 4 S � 7 $ 9 t� Il 12 13 l4 j5 16 �7 �� �� 2Q '� ( 22 23 24 SECTIOIY 01l 6125 CERT,IFICA'7'L� O� TNSUTZANCE Ci�SSG�177��C�1": %'(I!' (,`C'111i7'fJCI �[7CXI1f9L'!11 L�.T(i.'11�1(1Y7� !'{?]!1C)UG 1�71S�7C'f��ty (li7f'� ]'G'�1jC(tG' N�1I�1 SfC111C�C717� : tC.`f�I�l) C'el�tiftc�atc.� q��Insa�r�c��tce, fr�r�u.J EIVD U.F' �CCTTON CI'CY' OF I�t)K7' WOft"I'H CCty c�f f��et Worth f,ake (:re.r•t Urainaga Improvem�nts ti'l'AIVC)AR17 CUNS'fRlICT1C>N SYF.'CIFIC`A'flC�N UpC.UMEN1'S CPN Q1604 Reviscd luly i, 20i I ENDURANCE REINSURANCE CORPORATION OF AMERICA fRCA-16-A301 POWER OF ATTORNEY iOto�tV all `.Jt�fen fiy t(tese �PYesent, that ENDURANCE REINSURANCE CORPORATION OF AMERICA, a Delaware corporation (ihe "Corporation7, with offices at 333 ' Weslchester Avenue, While Plains, New York 10604, hasmade, ConstiWted and appointed and by these presents, dces make, constitute and appoint ALEXIS SANGHEZ GEIGEI., IRTHAiI. MORA�ES NIEVES, NORMA L CQLON AVILES, MARLENE �: BRAVO COLON, JOANNE DE JESUS NUNEZ, ROBERTO A. DE SOTO LOPEZ its true and Iawfui Attorney(s)�in-fac�, at SAN JUAN'in ihe State of PUERTO RICO and each of ihem to have tull power to act withoutlhe other or i others, to make, execute and deliver on its behalf, as surety or co-surety; bonds and undertakings given for any and all purposes, aiso to execute and deliver on its behaif as afioresaid renewals, extensions, agreements, waivers, consents or stipulalions relating to such bonds or undertakings provided, however, that no single bond or undertaking so made, executed and delivered shall pbl�g��a'�te Uie�C,�����on tor any poriion of the penal sum thereof in excess of the sum ot TWENTY MILLION Doilars ($20,000,000), � g �� �'� .> � �s� `':. Such bo�ids�a� urLd�if�k�g�%�;�a�d purposes, when duiy executed by said altomey(s)-in•fact, shall be binding upon the Corporation as fuily and to the same exient as if signed by the Presid���f ihe�r�+oration undet 1C5'�qrpof�teseal attested by its Corporate Secretary. � �� ' a.,�" ' Thi��intment is made undgr and by authod�y of certain resoluiions adopted by the Board of Directors oi 1he Corporation by uoanimous written consent on the tst day of Septem6er, ' 20i1�� copy of whic� �p��ar��,�low under th� �eading en6Ued "Certificate°. ���d ��� '� �, This �s�wer of Attorneyls,signed and sealed b,y facsimiie under and by auihority of the following resolution adopted by the 8oard o( Directors of ihe Corporation by unanimous written con'se�il s�n September 1, 2011 and said resglUtion has not since been revoked, amended or repealed: RESOLV���hatin gr��ling powe s of atfbiney pursuank ko cerkain resolutions adopied by the Board of Directors of ihe Corporation by unanimous written consent on September t, 2011, !he signat'ure ofi°s�ch directors and offieels and Ihe seal ot the Corporalion may be a�xed to any such power of atiorney or aoy cerUficate relating thereto by facsimile, and any such power of attorney or ceriifgate be'ario�s�ch f�csimile signature 4r seal Shai1 be valitl and':binding upon the Corporation in the future with respect to any bond or undertaking fo which it is attachedi This Power of Aitorney shall expire and all authority hereunder shali terminate without notice at midnight (Siandard Timer where said attorney(s)-in-fact is authorized lo act.) bECEMBER 31, 2013 IN WITNESS WHEREOF, the Corporation has caused lhese presents to be duiy signed and its corporate seal to be hereunto anxed and attested this 30th day of January, 2013 at White Plains, New Yock. (Corporate Sealy ENDURANCE REINSURANCE CQRPOF2ATION OF AMERICA ATTEST �( BY ���� /s�„ ���U,t.ta�n.�—¢-� t�— , L""�..�/ � .� �.'!'L./C.J MF�RIANNE l. WILBEi2T, Vice President ' SHARON L SIMS, Vice Presidenl STATc OF t�EW YORK ss: WHITE PLAINS COUN1YUFyVE�iGti�ST�R.: � ` On ihe 30ih"day of January; 20t3 before r�e {�rsonaily eame SHARON L. SIMS, Vice Presidentto me known, who being by me duly swom, did depose and say that (s)he resides iri SCQTCH PLAINS„NEW JERSEY that (s)he i� aylCE PRESIDENT of ENDURANCE REINSURANCE CORPORATION OF AMERICA, the Corporation described in and which executed ' the above instrument; that (s)he knows ihe Seal of ssid Corporalion; ihat the seai a�xed to said insirument is such corporate seal; ihat it was so affixed by order of ihe Board o( Directors of said Corporetion, and that(s)he signed his {her) name therelo by like order. {Notatial Seal) � �,-� . ,� �%�� _ �; ANIE IiGARI, Notary Pubiic - My Commission Expires 10i29/2015 `CERTIFICATE ' STATE Of NEW YORK ss: WNITE PLAINS COUNTY OF WESTCHESTER ' I, JAMES G. D'ONOFRIO the EXECUTIVE VICE PRESIDENT of ENDURANCE REINSURANCE CORPORATION OF AMERICA, a Delaware Corporation (ihe °Corporation7, hereby ce�ify: 1. ThaE#he originai power of attorney of which ihe foregoing is a copy was duly ezecuted on behal( of ihe Corporation and has not since been revoked, amended or mo�ified; ihat ifie undersigned has compared the foregoing copy lhereof with tfie oiiginal power of attomey, and that the same is a true and correci copy of the originai power of attomey and of ihe whoie lhereof; 2. The foliowing are resolutions which were adopted by the Board of Directors of the Corporation by unanimous written wnsent on September 1, 2011 and said resolutions have not since been revoked, amende� qc �9dified: '"`��s � € � >'t °RESOLVED th�a��ch oi tfie indiv�du��s3named below is authorized to make, execute, seal and deliver for and on behalf of the Corporation any and ali bonds, underiakings or obligations insuret�r,c�u[��dt��ii��r� �y � � �"a � � , � � ;�' �` �"�� JAMES G. D'ONOFRIO, SHARON L, SIMS, MARiANNE L. WILBERT xy.�s, �YsS_ �aSz £.�°.���� And *� �. w , r: �, _ . RE�Q(£'VEO fURTh�CR, t�at��h of lhe indivit��als named above is authorized to appoint attorneys•in•fact for the purpose of making, executing, sealing and delivering bonds, unde�l2kings or oblig��ops i s�rety or co-suret� for and on behaif o( the Corporation.° ,��.�� ,�s. 3 The'�ndersig�ed furiher certifies �hat the,epoye resolutions are true and correct copies of the resoiutions as so recorded and of ihe whole thereof. �' � � -; , E � ` �� �� ,.,.-- ��� ��� : � . - u: IN WITNE�s� WH�Et�O� I H�ave fiere�njo`sei my hand and affixed ttie eorporate seai this f� day of ��,t� � , 20 ,��5 ?. � , {Corporate SeaO"-� a_ , ,, .,:7� ^ �j /� � :� � JAMES G. D'ONOFRIO, EXEGUTIVE VICE PRESIDENT �This Da�xi�enlls pintad on cdorcd I�onded ufaty paper. Myiep«luc6ons ara wid C "�� � STANDARD GENERAL CONDITION5 OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH STANDARD CONSTRUCTION SPEC[FCATION DOCIJMENT'S Revision: Augai !"7, 20t2 STANDARD GEI�ERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1— Definitions and Terminology ..........................................................................................................1 1.Q1 Defned Terms ...............................................................................................................................1 1.02 Terminology ..................................................................................................................................6 Article2— Preliminary Matters ......................................................................................................................... 7 2.01 Copies of Documents ....................................................................................................................7 2.02 Comcnencement of Contract Time; Notice to Proeeed ................................................................ 7 2.03 Starting the Work ..........................................................................................................................8 2.04 Before Starting Construction ........................................................................................................ 8 2.05 Preconstruction Conference .......................................................................................................... 8 2.06 Puhlic Meeting ..............................................................................................................................8 2.07 Initial Acceptance of Schedules .................................................................................................... 8 Articie 3— Contract Documents: Intent, Amending, Reuse ............................................................................ 8 3 .O 1 Intent .. ........................................ ................................................................ ...... .............................. 8 3.02 Reference Standards ......................................................................................................................9 3.03 Reporting and Resolving Discrepancies ....................................................................................... 9 3.04 Amending and Supplementing Contract Documents .................................................................10 3.45 Reuse af Documents ...................................................................................................................10 3.06 Electronic Data ............................................................................................................................ l l Article 4— Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points ...........................................................................................................11 4.01 Availability of Lands ..................................................................................................................11 4.02 Subsurface and Physical Conditions ..........................................................................................12 4.03 Differing Subsurface or Physical Conditions .............................................................................12 4.Q4 Underground Facilities ............................................................................................................... I3 4.05 Reference Points ..........................................................................................:..............................14 4.06 Hazardous Environmental Condition at Site ..............................................................................14 Article5— Bonds and Insurance .....................................................................................................................16 SA1 Licensed Sureties and Insurers ...................................................................................................16 5.02 Performance, Payment, and Maintenance Bonds .......................................................................16 5.03 Certificates of Insurance .............................................................................................................16 5.04 Contractor's Insurance ..................................�...................................................�.........................18 5.05 Acceptance of Bonds and Insurance; Option to Replace ...........................................................19 Article 6 — Contractor's Responsibilities ............ 6.01 Supervision and Superintendence... ..........................................................................................19 ..........................................................................................19 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision: Augmti 17, 20t2 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 6.16 6.17 6.18 6.19 6.20 6.21 6.22 6.23 6.24 Labor; Working Hours ......................................................................... Services, Materials, and Equipment .................................................... ProjectSchedule ................................................................................... Substitutes and "Or-Equals" ................................................................ Concerning Subcontractors, Suppliers, and Others ............................. WageRates ........................................................................................... Patent Fees and Royalties .................................................................... Permitsand Utilities ............................................................................. Laws and Reguiations .......................................................................... Taxes.................................................................................................... Use of Site and Other Areas ................................................................ RecordDocuments ............................................................................... Safetyand Protection ........................................................................... SafetyRepreseniative ........................................................................... Hazard Communication Programs ...................................................... Emergencies and/or Rectification ........................................................ Submittals............................................................................................ Continuingthe Work ..........................................................................., Contractor's General Warranty and Guarantee ................................... Indemniitcation................................................................................. Delegation of Professional Design Services ....................................... Rightto Audit ....................................................................................... Nondiscrimination................................................................................ , ..................................... 20 ..................................... ZO ...................................... 21 ..................................... 21 ..................................... 24 ...................................... 25 ...................................... 26 ...................................... 27 ...................................... 27 ...................................... 28 ...................................... 28 ..............:....................... 29 ...................................... 29 ...................................... 30 ...................................... 30 ...................................... 30 ...................................... 31 ...................................... 32 ...................................... 32 ...................................... 33 ...................................... 34 ...................................... 34 ...................................... 35 Article7- Other Work at the Site ...................................................................................................................35 7.01 Related Work at Site ...................................................................................................................35 7.02 Coordination ................................................................................................................................36 Article8- City's Responsibilities ................................................................................................................... 36 8.01 Communications to Contractor ...................................................................................................36 8.02 Furnish Data ................................................................................................................................36 8.03 Pay When Due ............................................................................................................................36 8.04 Lands and Easements; Reports and Tests ...................................................................................36 8.05 Change Orders .............................................................................................................................36 8.06 Inspections, Tests, and Approvals .............................................................................................. 36 8.07 Limitations on City's Responsibilities ................................... 8.08 Undisclosed Hazardous Environmental Condition ................ $.09 Compliance with Safety Program ........................................... .................................... 37 .................................... 37 .................................... 37 Article 9- City's Observation Status During Construction ...........................................................................37 9.01 City's Project Representative .....................................................................................................37 9.02 Visits to Site ................................................................................................................................ 37 9.03 Authorized Variations in Work ..................................................................................................38 9.04 Rejecting Defective Work ..........................................................................................................38 9.05 Determinations for Work Perfortned ..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work ..................... 38 CITY OF FORT WORTH STANDARD CONSTRUCT[ON SPECIFCAT[ON DOCCJMEN'I'S Revision: August 17, 20t2 Articie 10 - Changes in the Work; Claims; Extra Work ................................................................................ 38 10.01 Authorized Changes in the Work ...............................................................................................38 10.02 Unauthorized Changes in the Work ........................................................................................... 39 10.03 Execution of Change Orders .......................................................................................................39 10.04 Extra Work ..................................................................................................................................39 10.05 Notification to Surety ..................................................................................................................39 10.06 Contract Claims Process ............................................................................................................. 40 Article t 1- Cost of the Work; Atlowances; Unit Price Work; Ptans Quantity Measurement ......................41 11 A 1 Cost of the Work ......................................................................................................................... 41 11.02 Allowances ..................................................................................................................................43 11.03 Unit Price Work ..........................................................................................................................44 11.04 Plans Quantity Measurement ......................................................................................................45 Article 12 - Change of Contract Price; Change of Contract Time ................................................................. 46 12.01 Change of Contract Price ............................................................................................................46 12.02 Change of Contract Time ............................................................................................................ 47 12.03 Delays .......................................................................................................................................... 47 Article 13 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 48 13.01 Notice of Defects ........................................................................................................................ 48 13A2Access to Work ...........................................................................................................................48 13.03 Tests and Inspections .................................................................................................................. 48 13.04 Uncovering Work ........................................................................................................................49 13.05 City May Stop the Work .............................................................................................................49 13.06 Correction or Removai of Defective Work ................................................................................50 13.07 Correction Period ........................................................................................................................ 50 13.08 Acceptance of Defective Work ................................................................................................... 51 13.09 City May Correct Defective Work ............................................................................................. 51 ArticIe 14 - Payments to Contractor and Completion .................................................................................... 52 14.Q1 Schedule of Values ......................................................................................................................52 14.02 Progress Payments ...................................................................................................................... 52 14.03 Coniractor's Warranty of Title ................................................................................................... 54 14.04 Partial Utilization ........................................................................................................................ 55 14.05 Final Inspection ...........................................................................................................................55 �4A6 Final Acceptanee .........................................................................................................................55 14.07 Final Payment ..............................................................................................................................56 14.08 Final Completion Detayed and Partial Retainage Release ........................................................56 14.09 Waiver of Claims ........................................................................................................................ S7 Article 15 - Suspension of Work and Termination ........................................................................................ 57 15.01 City May Suspend Work .............................................................................................................57 15.02 City May `I'erminate for Cause ................................................................................................... 58 15.03 City May Terminate For Convenience .......................................................................................60 Article16 - Dispute Resolution ......................................................................................................................61 16.01 Methods and Procedures ............................................................................................................. 61 C1TY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision: Augmt t7, 2012 Article17 — Misceilaneous .............................................................................................................................. 62 17.01 Giving Notice ..............................................................................................................................62 17.02 Computation of Times ................................................................................................................ 62 17.03 Cumuiative Remedies ................................................................................................................. 62 17.04 Survival of Obligations ............. 17.05 Headings .................................... .......................... ............................... ......................................... 63 ......................................... 63 CITY OF FORT WORTH STANDAIiD CONSTRUCTION SPEC�CATION DOCUMENTS Revision: Aiignt 17, 2012 00 72 00 -1 General Conditions Page 1 of 63 ARTICLE 1— DEFI1vITIONS AND T'ERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and wards denoting gender shall include the masculine, feminine and neuter. Said terms at�e generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Cantract Documents include references to identified articles and paragraphs, and the tittes of other documents ar farms. l. AddendcE--Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements ar the praposed Contract Documents. 2. Agt,eetraent—The written instrument whieh is evidence of the agreement betvveec� City and Contractor eovering the Work. 3. Application for Payment—The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. �lsbestos Any material that contains more than one percent ashestos and is friahle or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award — Authorization by the City Council for the City to enter into an Agreement. 6. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder=The individual or entity who submits a Bid directly to City. 8. Bidding Documents—The Bidding Requirements and the proposed Contract Documents (including alt Addenda). 9. Bidding Requirements—The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any suppletnents. 10. Business Dcry — A business day is deftnecl as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Buzzsaw — City's on-line, electronic document management and coilaboration system. 12. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STANDARD CONSTRUCTION SPEC[FCATION DOCUMENTS Revision: Aug�t 17, 2012 00 72 00 -1 General Conditions Page 2 of 63 13. Change Order A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, de(etion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 14. City-- The City of Fort Worth, Texas, a home-rule municipal corporation, authorized and chartered under the Texas 5tate Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform speciiic duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. I5. Ciry Attorney — The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 16. City Couu�rrcil - The daly elected and qualified governing body of the Ciry of Fart Worth, Texas. 17. Ciry Manager — The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 18. Contract Claim A demand or assertion by City or Contractor seeking an adjustment of Contract Frice or Cantract Time, or both, or other reiief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 19. Contr�act—The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, wheiher written or oral. 20. Contract Documents—Those items so designated in the Agreement. Ali items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price—The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 22. Contract Time—The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance. 23. Contractor—The individual or entity with whom City has entered into the Agreement. 24. Cost of the Work—See Paragraph 11.01 of these General Conditions for definition. CITY OF PORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision: A�iast 17, 2012 00 �z oo - � General Conditions Page 3 of 63 25. Damage Claims — A demand for money or services arising from the Project or Site from a third party, City or Coniractor exclusive of a Contract Ciaim. 2b. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 27. Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or nis duly appointed representative, as,sistant, or agents. 28. Director of Parks and Community Services — The officially appointed Director of the Farks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed ' representative, assistant, or agents. 29. Director of Plannrng and Development — The officially appointed Director of the Planning ' i and Development Department of the Ciiy of Fori Worth, Texas, or his duly appoin�ed representative, assistant, or agents. 30. Director of Transportation Public Works — The officially appointed Director of the Transportation Puhlic Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Director of Water Department — The officially appointed Director of the Water Depar[ment of the City of Fort Worth, Texas, or his duly appointed representative, assistant, ar agents. 32. Dr�awings—That part of the Contract Doeuments prepared or approved by Engineer whieh graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittais are not Drawings as so defined. 33. Effective Date of the Agreement—T'he date indicated in the Agreement on which it becomes effective, but if na such date is indicated, it means the date on which the Agreement is signeri ' and delivered by the last of the two parties to sign and deliver. 34. Engineer The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 35. Ext�a Work — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 36. Field Order—A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. 37. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPEC�'CAT[ON DOC(JMENTS Revision: Aug�t l7, 2012 00 72 00 -1 General Conditions Page 4 of 63 38. Final Inspection — Inspection carried out by the City to verify that the Contractor has compteted the Work, and each and every part or appurtenance thereof, fully, entirety, and in conformance with the Contract Documents. 39. General Requirements—Sectians of Division l of the Contract Documents. 4Q. �azardous Errvironmental Gondition—The presence at the Site of Asbestas, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 41. Hazardous Waste Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42. Laws and Regzrlations—Any and all applicable laws, ru(es, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 43. Liens--Charges, security interests, or encumbrances upon Project funds, reai property, or personal property. 44. Major Item — An Item of wark ineLuded in the Contract Documents that has a total cost equat to or greater than 5% of the original Contract Price or $25,000 whichever is less. 45. Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Finat Acceptance of the Work. 46. Notice of Award—The written notice by City to the Successful Bidder stating that upon timely compliance by the Successfi�l Bidder with the conditions precedent listied therein, City will sign and deliver the Agreement. 47. Notice to Proceed—A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shali start to perform the Work specified in Contract Documents. 48. PCBs—Polychlorinated biphenyls. 49. Petroleurrr—Petroleum, including crude oit or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per syuare inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Waste and crude oils. 50. Plans — See definition of Drawings. CITY OF FORT WORTH STANDARD CONSTRUCTION SPEC�'CAT[ON DOC[JMENT3 Revision: Augiut 17, 2012 OQ 72 00 - } General Conditions Page 5 of G3 51. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the Generai Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 52. Project—The Work to be performed under the Contract Documents. 53. Project Representative—The autharized representative of the City who will be assigned to the Site. 54. Public Meeting — An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55. Radioactive Material—Source, special nuclear, or byproduct material as defined by the Atomic Energy Aci of 1954 (42 USC Section 2411 et seq.} as amended from time to time. 56. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 57. Samples—Physical examples af materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule of Submittals A schedule, prepared and maintained by Contractor, of required submittals and the time requirements tQ support scheduied performance of related construction activities. 59. Schedule of Values—A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractar's Applications for Payment. 64. 5ite—Lands or areas indicated in the Contract Documents as being fitrnished by City upon which the Work is to be performed, including rights-of-way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 61. Specrfrcations—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedurai matters applicable thereto. Specifications may be specifcally made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 62. Subcontractor—An individuai or entity having a direct conri�act with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH STANDAI2D CONSTRUCTION SPECIFCAT[ON DOC[IMEN"I'S Revision: Augst 17, 2012 oa �a oo - � Generel Conditions Page 6 of 63 63. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specificatly prepared or assem6ted by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 64. Successful Bidder—The Bidder submitting the lowest and most responsive Bid to whom Gity makes an Award. 65. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions—That part of the Contract Documents which amends or supplements these General Cor�d'ttions. 67. Supplier A manufaciurer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities—All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnets, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69. UnrtPrrce Wo�k—See Paragraph ll.03 of these General Canditions for definition. 70. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work—The entire construction or the various separately identifiable par�s thereof required to be provided under the Contract Documents. Work includes and is the result of perfoetning or providing alI iabor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph l.02.B through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OP FORT WORTH STANDAEtD CONSTRUCTION SPEC[FCATION DOCUMEN"I'S Revision: Aug�t 17, 2012 00 72 00 -1 General Conditions Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that sach exercise of prafessional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and cvitEi the design concept of the Project as a functioning whofe as shown or indicated in the Contract Documents (unless there is a speciiic statement indicating otherwise). C. De, fective: l. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the reQuirements of any applicable inspection, reference standard, test, or approvaI referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: l. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, ec�uipment, and everything necessary to perform the Work indicated, unless specifically limited in the conte� used. E. Unless stated othecwise in the Contract Documents, words or phrases that have a weIt-known technical or conshuction industry or trade meaning are used in the Contract Documet�ts in accordance with such recognized meaning. ARTICLE 2 — PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and ane (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cast of reprodaction. 2A2 Corrrmencement of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 14 days after the Effective Date of the Agreement. CITY OF FORT WORTH STANDARD CONSTRUCTION SPEC�CATION DOCCIMIIV"I�S Revision: Aug�at 17, 20t2 00 �z ao - � General Conditions Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shatl be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Constyztction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Fublic Meeting Contractor may not mobiIize any eyuipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled hy the City. 2.Q? Inrtial Acceptance of Schedirles No progress payment shall be rnade to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICL� 3— CONTRACT DOCUMENTS: INT�NT, AMENDING, REUSE 3.01 Inter�t A. The Contract Documents are complementary; what is required by one is as binding as if i•equired by all. B. It is the intent of the Contract Docutnents to describe a functionatly complete project (or part thereo fl to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clariiications and interpretations of the Contract Documents sha11 be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shatl," "in conformity with," "as shown," or "as specified" are intentionat in streamtined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDAItD CONSTRUCTION SPECIFCATION DOCLIMEN"I'S Revision: Augint 17, 2012 00 �� oo - � Generat Conditions Page 9 of 63 section. The Contractor shal( not take advantage of any variation of form, format or sryle in making Contract Ctaims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited ta•:' and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shalt be responsibte to caordinate the entire Vt�ork under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations l. Reference to standards, specifcations, manua(s, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by intplication, shall mean the standard, speciftcatian, manual, code, or Laws or Regulattons in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specificatly stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the dut�es or responsihilities of City, Contractor, or any of their subcontractors, consulta.nts, agents, or employees, from those set forth in the Contract Documents. No such pravision or instruction sha11 be effective to assign to City, or any of its officers, directors, members, partners, emptoyees, agents, consultants, or subcontractars, any duty or authority to supervise or direct the performance of the Work or any duty or authority to andertake responsibility ineonsistent with the provisions of the Contract Documents, 3.03 Reporting and Resolving Drscrepancies A. Reporting Discrepancies: 1. Contractor's Revrew of Contract Documents Before Staf°ting Work: Before undertaking each part of tl7e Work, Contractor shall carefully study and compare the Contract Doeuments and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of C'ontract Documents Du�ing Performance of Work: If, during the performance of the Work, Contractor discovers any canflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a} any applicable Law or Regulation ,(b) any standard, specification, manual, or code, or (c� any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENIS Revision: Augt�st 17, 2Qt2 ao �z oo - � General Conditions Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. Contractor shall not i�e liable to City for faiiure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolvrng Discrepancies: Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shali take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not speeifieally incorporated by reference in the Contract Documents). 2. In case of discrepancies, fgured dimensions shall govern over scaled dimensions, Plans shall govern over Specifcations, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shal! govern over those shown i� the proposal. 3.04 Amendrng and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: l. A Field Orcler; 2. City's review of a Submittat (sub3ect to the provisions of Paragraph 6.1 S.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: l. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereo� prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH STANDARD CONS"IRUCT[ON SPECIFCATION L)OC[JMEN'IS Revision: August 17, 2012 oonoo-� Genera( Conditions Page t I of 63 B. The prohibitions of this Paragraph 3.05 will survive ftnal payment, or termination of the Contract. Nothing herein shatl preciude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 EXectronic Data A. Unless otherwise stated in the Supp}ementary Conditions, the data furnished by City or Engine�r to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's Buzzsaw site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusian or information obtained or derived from such electronic fites will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to lang term compatibility, usability, or readability of documents resulting from the use of soflware application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4— AVAILABILITY OF LANDS; SUBSUI2FACE AND PHYSICAL CONDITI�NS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.O I Availabflity of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way andlar easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The P�•oject Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates cemoving and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedute set forth in the Supptementary Conditians. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legat title and legal description of the lands upon which the Wark is to be performed. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOC[1MEN'IS Revision: Aug�st S7, 2012 oonoo-� General Conditions Page 12 of63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Lirrrited Reliance by Cantractor on Technical Dattt Authorized.� Contractor may rety upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Gontractor may not make any Contract Claim against City, or any of th�ir officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawir►gs; or 3. any Contractor interpretation of or conciusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurf'ace or Physical Condztions A. Notice: If Contractor betieves that any subsurface or physical condition that is uncovered or revealed either: 1. is of sueh a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to reyuire a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and cliffers material}y from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OP FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision: August t7, 2012 6El 72 00 - } General Conditions Page 13 of63 then Contractor shall, prornptly after becoming aware thereof and before further disturbing the subsurface or physicai condiiions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A}, notify City in writing about such condition. B. Possible Price and Tzme Adjustments Contractor sha11 not be entit}ed to any adjustment in the Contract Price or Contract Time if 1. Contractor tcnew of the existence of such conditions at the tirne Contractor made a final commitmeni to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such conclition could reasonably have been discovered or revealed as a result of the examination of flie Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated.• The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data. furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditians: I. City and Engineer shali not be responsibte for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c, coordination and adjustment of the Work with the owners af such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resuiting from the Work. B. Not Shown or Indicated: 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated wi�h reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH ' STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revisian: August 17, 2012 00 �a oo - } Generai Conditions Page 14of63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), ideniify the owner of such Undergcound Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utitity companies a minimum of 48 hours in advance of construction including e�cptoratory excavation if necessary. 4.05 Reference Points A. City shat! provide eng'tneering surveys to establish reference points for constructian, vvhich in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide conslruction stakes or other customary method of marking to establish Iine and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings.• The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Lr�nited Reliance by C'ontractor� on T'echnical Data Autho�ized.� Contractar may rely upan the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, pai�tners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONST[tUCTION SPECIFCATION DOCUMENTS Revision: Augiat 17, 20 t2 00 �a oa- � General Conditions Page I S of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn fram any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for an� Hazardous Environmental Condition uncovered or ' revealed at the Site which was not shown or indicated in Drawings ar Specifications or identified in the Contraet Doeuments to be within the scope of ttie Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppiiers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible ereates a Hazarda�s Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptty thereafter confirm such notice in writing). City may consider the necessiry to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Worif in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption Qf Work; or (ii) speeifyi�g any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may arder the portion af the Wark that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemn� and hold harmless City, from and aga2nst all cdaims, costs, losses, and damages (including bui not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or r�lating to a Hazardous Environmental Condztion created by Contractor or by arryone for whom Contractor is responsrble. Nothing in this Paragraph 4.06.G shall oblzgate Contractor to indemn� any individual or eniity from and agairtst the eonsequenees of that rndividual's or entrty's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH STANDARD CONSTItUCT[ON SPEC�CATION DOCUMENTS Revision: Augiat t7, 2012 00 72 00 -1 General Conditions Page 16 of 63 ARTICLE 5— BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the 5upplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successar statute, each in an amount equal to the Contraci Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the V1Tork described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws ar Regulatians, and shall be executed by such sureties as are named in the iist of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each 6ond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the recEuirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days a$er the event giving rise to such notification, provide another bond and surety, both of which shalt comply with the requirements of Paragraphs S.O I and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. l. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on a!1 liabitity potictes. C1TY OP FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMEN'I'S Revision: Auast t7, 20t2 00 �2 00 - � General Conditions Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to ihe City. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, atl insurers must have a minimum rating of A-: VII in the current A. M. Best Key R.ating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, writien approval of City is required. 5. Atl applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights af subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditiar�s 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. '7. If insurance poticies are not written for specified coverage limits, an Umbrelta or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims-made basis, �he retroactive date shatt be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is ciaims-made and the retroactive date. The insurance coverage shail be maintainea for the duration of the Contract anc! for three (3) years following Finai Acceptance provided under the Contract Documents or for the warranty period, whichever is Ionger. An annuai certificate of insurance submitted to the City sha[I evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cast of the premium for sueh additional coverage p}us 1 a%. 14. Any setf-insured retention (SIR), in excess of $ZS,OOO.Q4, af%ciing required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTI i STANDARD CONSTRUCTION SPECIFCATION DOCUMEN'TS Revision: Augiat t7, 2012 oonoo-i General Conditions Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must atso be approved by City. 1 l. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written reauest and without expense, to receive copies of policies and endorsements thereta and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsernents to the reyuirements of the Cantract. Deletians, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. SA4 Contraetor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liabitity as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performec! by Contractor, any Subcontractar or Supplier, or by anyone direct(y or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liab[e: 1. claims under workers' compensation, disability bene�ts, and other similar employee benefit acts; 2. claims for damages because of badily injury, occupatianal sickness or disease, or death af Contractor's employees. B. Commercial General Liabzlity. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personat injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARD CONSTRUCTION SPECII'CATION DOCLJMENTS Revision: August 17, 2012 00 72 00 - } General Conditions Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that wouid aiter of nuliify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may reciuire the contraetor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Autorrrobile Lrabzliry. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non-owned and provide indemnity for ciaims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any af them to perfarm any of the Work, or by anyone for whose acts any of them may be liable. D. Railr�oad Protective Liability. If any of the work or any warranty work is within the limits of ra,ilroad right-of-way, the Contractor shall comply with the requirements identified in the Suppletnentary Conditions. E. Not�cation of PoZicy C'ancellation: Contractor shati immediately notify City upon cancetiation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bo�ds und Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance reguired to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide ta the City such additianal information in respect of insurance pravided as the City may reasonably request. If Contractor does not purchase or maintain ali of the bonds and insurance required by the Contract Documents, the City shaIl notify the Contractor in writing of such failure prior ta the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superzntendence A. Contractor shall supervise, inspect, and direct the Work competently and efftciently, devating such attention thereto and applying such skills and expertise as may be necessary to perform the VVork in accordance with the Contract Documents. Contractor shall be sotety responsibte for the means, methods, techniques, sequences, and procedures of construction. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECiFCATION DOCUMENTS Revision: August 17, 20t2 0o n oo- � General Conditions Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be reptaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent sha(1 be binding on Contractor. C. Contractor shatt notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contraetor shall provide campetent, suitably qtaalifted personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent theretq and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours reauest must be made by noon of the preceding Thursday 3. for tegal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, cr�rd Equipment A. Unless otherwise specified in the Contract Documents, Contractor shal( provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and ail other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications sha[I expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCAT[ON DOC[JMENIS Revision: August 17, 2012 00 7a oo - � General Conditions Page 21 of63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cieaned, and conditioned in accordance with instruciions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the Generat Requirements} proposed adjustments in the Project Schedule that wilt not resutt in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 01 32 16. 3. Proposed adjustments in the Project Schedule thai witl change the Contract Time shali be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or-Equals " A. Whenever an item of material or ec�uipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Un�ess the specification or description contains or is followed by words reading that no like, equivalent, or "or-equal" item or no substitution is permitted, other items of material or ec}uipment of other �uppliers may be submitted tc� City for review under the circumstances described below. 1. "�r-Equal " Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work witl be required, it may be considered by City as an "or-equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. �or the purposes of this Paragraph 6.OS.A.1, a proposed item of material or equipment will be considered functionatly equal to an item so named if: a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; C1TY OP FORT WORTH STANDARD CONSTRUCT[ON SPECIFCATION DOCUMENTS Revision: Auant t7, 2012 oonoo-� General Conditions Page 22 of 63 2} it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Froject as a functioning whote; and 3) it has a proven recard of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed reQuirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not quaIify as an "or-equaI" item under Paragraph 6.OS.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided belaw to allow City to determine if the item of materia( or equipment proposed is essentially equivalent to that named and an acceptabie substitute therefor. Requests for review of proposed substitute items of material or ec�uipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Coniractor seeks to furnish or use. The application sha11 comply with Section O1 25 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, 'rf any, to which the use of the proposed substitute item wili prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in tl�e Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with Ciry for other work on the Project) to adapt the design to the proposed substitute item; CTI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENT'S Revision: August 17, 2012 oo�zoo-� General Conditions Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any ticense fee or royalty; and 3) wiil identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction �Iethads or Procedures: If a specific means, method, technique, sequence, ar procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor sha11 make written apptication to City for review in the same manner as those provided in Paragraph 6.OS.A.2. C. Ciry s Eualuation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.OS.A and 6.OS.B. City may require Contractor to furnish additionat data about ihe proposed substitute. City wilt be the sole judge of acceptability. No "or-equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or-equal." City will ad�ise Contractor in writing of its determination. D. Special Guarantee: City may require Contractar to furnish at Contractor's expense a speciat performance guarantee, warranty, or other surety with respect to any substitute. Cont�•uctor shall indemn� and hold harmless City and arryone directly or indirectly employed by them from and against arry and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. Ciry's Cost Reimbur-sement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.OS.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse eity for the charges for making changes in the Contract Documents (or in the provisions of any other direct cantract with City) resuiting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or-equal" at Contractor's expense. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision: August Yl, 2012 oo�aoa-i Genera( Conditions Page 24 of63 G. Ciry Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time E�ctensions: No additional time wili be granted for substitutions. 6.�6 Concerning Subcontractars, Suppliers, and Other�s A. Contractor shall perform with his own organization, work of a value not less than 35% of the vaiue embraced on the Contrac�, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supptier, or other individual or entity, whether initially or as a replacement, againat whom City may have reasonabie objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasona6le objectian (exctuding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Business Diversity Enteyprise Ordinance Compliance: It is City policy to ensure the futl and equitable participation by Minority and Small Business Enterprises (MBB)(SBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE and/or SBE goal, Contractar is required to comply with the intent of d�e City's Business Diversity Ordinance (as amended) by the following: 1. Contractor shall, upon request by the City, provide complete and accurate information regarding actual work performed by a MBE and/or SBE on the Contract and payment therefor. 2. Contractor wilt not make additions, deietions, or subsritutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the C)rdinance. 3. Contractor sha[I, upon request by City, altow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE and/or SBE. Material misrepresentation of any nature may be grounds for ter�nination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shal( be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities perfortning or furnishing any of the Wark just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: C1TY OF FORT WORTH STANDARD CONSTRUCT[ON SPECIFCATION DOCUMENTS Revision: Aug�mt 17, 2Qt2 00 �a oo- � General Conditions Page 25 of 63 shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractuat relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may atherwise be required by Laws and Regulations. F. Contractor shatl be sole(y responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shalt communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Cantraetor and the Subeontraetar or Supplier which specifieally binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevarling Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Governrnent Code (as amended), including the payrnent af not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Cantractar or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each catendar day or part of the day that the worker is paid less than the prevailing wage rates st�pulated in these contract documents. This penalty sha11 be retained by the City ta offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Vzolations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation accurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amoun�.s claimed by the ctaimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subiracted from successive progress paymen�s pending a final determination of the violation. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOC[IMENTS ' Revision: AuDaat t7, 20f2 0o zz ao - � Generai Conditions Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an af�ecied worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arb'rtrate under this section do not agree on an arb'rtrator before the 11th day after the date that arbitration is required, a district court shatl appoint an arbitrator on the petition of any of the persons. The City is not a parry in the arbitration. The decision and award of the arbitrator is final and bi�ding on all parties and may be enforced in any court of competent jurisdiction. E. Reeords to be Maintazned. The Contractor and each Subcontractor shatl, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and accupation of each worker employed by the Contractar in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Paymerrts. VVith each progress payment or payroll period, whichever is less, the Cantractar shall submit an affidavit stating that the Cantractor has camplied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at al( times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or sha(1 otherwise require alt af its Subcontraetors to comply with Paragraphs A through G above. 6.0$ Patent Fees and Royalties A. Contractor shatl pay all license fees and royalties and assume all costs incident to the use in the performance af the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particuiar invention, design, process, product, or device is specifed in the Contract Dacuments for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemn� and hold harmless City, from artd against adl claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arisirrg out of or relating to any infringement of patent rrghts or copyrights incident to tlie use in the performarrce of the Work or resulting from CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOC[JMENTS Revision: Augtat 17, 2012 oonao-a General Conditions Page 27 of 63 the incorporation in the Work of any ircvention, design, process, product, or device not specified rn the Contract Documents. 6.09 Permits and Utilities A. Contractor obtazned permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supp}e�r►entary Conditions or CQntract Documents. City shalt assist Contractor, when necessary, in obtainittg such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B. City shall pay all charges of utitity owners for connections for providing permanent service to the Work. B. Crty obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's respansihility ta carry out the gmvisions of the permit. If the Contractor initiates changes ta the Contract and the City approves the changes, the Contractor is responsibie for o6taining ciearances and coordinating with the appropriate regulatory agency. The City wiil not reimburse the Contractor for any cost associated with these requirements of any City acc}uired permit. Th� following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding pe�mits and licenses. The City anticipates acquisition of and/or access to permits and licenses. nny outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractar in accordance with the Contract Doctaments must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regutations, the City shali not 6e responsibte for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (inc[uding but not limited to att fees and charges of engineers, architects, attorneys, and other professionals and ali CITY OF FORT WORTH STANDARD CONSTRUCT[ON SPECIFCATION DOCUMEN"1'S Revision: Augus4 t7, 2012 00 �z oo - � General Conditions Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, ii shatl not be Contractor's responsibi(ity to make cec�ain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not reiieve Contractor of Coniractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or Iease a1C materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the t�, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .01 l, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sates Taaz Division Capitol Station Austin, TX 78711; or 2. http://www.window.state.tx.us/taxinfo/taxforms/93-forms.html 6.12 Use of Srte and Other Areus A. Limitation on Use of Site and Other ANeas: l. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construcrian equipment or other materials or equipment. Contractor shall assume fuli responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting frotn the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed ar closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. Ck'f'Y aF FORT WORTH STANDARD CONSTRUCTION SPECII'CATTON DOCUMENTS Revision: A� 17, 2012 00 72 00 - i General Conditions Page 29 of 63 Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contra.ctor shatt promptty attempt to resolve the Damage Ciaim. 4. Pursuant to Paragraph 6.21, Contractor shall indemn� and hold ha�mless City, from and against all claims, costs, lasses, and damages arising out of or relating to arry claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the Job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic cvmmunication), and the costs of such direct action, plus 25 % af such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Priar to Final Acceptance of the Work Contractor shail clean the Site and the Work and make it ready for utilization by City or adjacent property awner. At the completion of the Work Contractor shall remove from the Site all taols, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property distur6ed by the Work. E. Loading Structures: Contractor shall not load nor pertnit any part of any structure to be loaded in any manner that will enc�anger the strueture, nor shall Contractor subjeet any part of the Wark or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a piace designateci by tile Contractar anci approved by the City, one (1) record copy of all Drawings, Specifcations, Addenda, Cha�ige Orders, Field Orders, and written interpretations and clari�cations in good order and annotated to show changes made during construction. These record documents together with ail approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shal} include accurate tocations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Vdork. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCA"I'ION DOC[JMII�TIS Revision: Au�,nat l�, 2012 OQ 72 00 - l General Conditions Pa�e 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: l. ail persons on the Site or who may be affected by the Work; 2. all the Work and materials and equiprnent to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, Iawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safery of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, artd shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue untit such time as alI the Work is completed and City has accepted tE�e Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Comrnunication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in aceordance with Laws or Regulations. 6.17 Emergencies artd/or Rectification A. In emergencies affecting the safety or protection of persons or Che Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant C1TY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMF..N"I'S Revision: Augint 17, 2012 00 72 00 -1 General Conditions Page 31 of63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a resutt thereo£ If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to talce remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identiiied as City may require. 1. Submit number of copies specified in the Gerteral Requirements. 2. Data shown on the Submittats wili be complete with respect to quaniities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submiitals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shali not excuse Contraetor fr�m requirements shown on the Drawings and Speciiications. 5. For-Information-Only submittals upon which the City is not e�cpected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to materia(, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submitta! for the limited purposes required by Paragraph 6,18.C. C1TY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCIJMENTS Revision: Aug�at 17, 2Qt2 00 72 00 -1 General Conditions Page 32 of 63 B. Where a Submittal is rec�uired by the Contract Documents or the Schedule of Submittals, any retated Work performed prior to City's review and acceptance of the pertinent submitta( wili be at the sole expense and responsibi(ity of Contractor. C. City's Review: l. Gity will proviae timely review of required Submittals in aceordance with the 5chedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance witl not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section O1 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. Ciry's review and acceptance sha11 not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation af Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects ar damage caused by: t, abuse, modification, or 'tmproper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOC[JMENTS Revision: Aug�mt l7, 2012 00 72 00 - I General Conditions Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shail be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a cer�ificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acc�ptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction af defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, camplying with the requirements af Aeticle S.OZ.B. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City; its offcers, servants and emnloyees, from and a�ainst any and alt claims arising out of, or aIIeged to arise out of, the work and services to be performed b� the Contractor, its officers, agents, employees, subcontractors, licenses or invitees und�r this Contrac� THiS TNi)F,MNiFICATION PROVISION IS SPECIFICALLY INTENDED TO OP . AT . AND B. FF .CT ..N iT IS Ai. .. T.D �R PRO .N AT Ai, , nR_ S(_)MF, OF THF. DAMAGES BEING SOUGHT WERF CAUSED. IN WHOLE OR IN PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity grovision is intended to include, without limitation, indemnity for costs, expenses and legat fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its off'icers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATIOIV PROVISION iS , CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOC[JMEN'I�S Revision: August f7, 2012 00 �a oo - } Generai Conditions Page 34 of 63 � __�.' � 1 � �� �• � i �. z._ - -- - � � � _' _� � _ % ' � _ � � � .�1 _ 1 - - sl -1 :__U__:. � - i, - - 1 . _ �/-�-_ z _ _1 �\ �l._�_ - �� � '.�' _ : �_� .. 1U1___1 1• .�._ _ . __ � ._ y r 6.22 Delegation of Professronal Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specificaily required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on a11 drawings, calcutations, specif cations, certif cations, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has speciiied to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limitec! purpose of checking far canformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Rrght to Audit A. The Contractor agrees that the City shall, untii the expiration of three (3} years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating ta this Contract. Contractor agrees that the City shail have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compIiance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the cight to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to al( CITY OF FORT WORTH STANDARD CONSTRUCT[ON SPECIPCATION DOCUMENTS Revision: August 17, 20t2 ao �a oo - a General Conditions Page 35 of63 , Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requesteci by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effeet as of the time copying is performed. 6.24 Nondrscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are €unded in part with Federal iinancial assistance awarcled by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Right.s Act of 1964 a.s amended.� Contractor shall comply with the requirements o€ the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7— OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, ox other City contractors, or through other direct contracts therefor, or have other work perform�;d by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each ��ility oumer, and City, if City is performing other work with City's employees or ott�er City contractors, pro�er an�i safe access to i�-ie �ite, �,�ovi�e a reasonablE �p���tunity for �he introduction and storage of materials and equipment and the execution of such other work, and praperly coordinate the Work with theirs. Contractor shall do all cutting, ftting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work wi11 be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Cantractar's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION I?OCCIMENTS Revision: Augt�st t7, 20f2 oonoo-� General Conditions Page 36 of 63 %.�2 COOI"CIIYlC7tlOY1 A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: l. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. th� specific matters to be covered by suc� authority and responsibility wilt be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordinatior�. ARTICLE $ — CI'TY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractar. 8.02 Furnrsh Duta City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easernents; Reports and Tests City's duties with respect to providing lands and easemenis and providing engineering surveys �o establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of expiorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, artd Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph t 3.03. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision: August l7, 2012 00 �a oo - � General Conditions Page 37 of63 g.�% LliYlI�CYt10YlS OYl Cllj�'S RCSj�OYISIbIIIIIeS A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contraetor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Erevironmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall compiy with the specific applicable requirements of Contractar's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9— CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Praject Representative City will provide one or more Project Representative(s) during the constniction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set for�h in the Contract Documents. The Project Representative(s) will be as provided in the Supplementary Conditians. 9.42 Visits to Site A. City's Project Representative wilt make visits to the Site at intervais appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the yuality of the various aspects of Contractor's executed Work. Based on information abtained during such visits and observatians, City's Project Representative will determine, in general, if the Work is proceeding in accardance with the Contract Documents. City's Project Representative witl not be required to make e�austive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIECAT[ON DOCUMEN'I5 Revision: Aug�st 17, 20t2 00 72 00 -1 General Conditions Page 38 of63 9.03 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not invo(ve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Praject as a functioning whale as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptiy. 9.04 Rejectrng Defective Work City will have authority to reject Work which City's Project Representative betieves to be defective, or will not produee a eotn�leted Project that conforms to the Contract Dacuments or that will prejudice the integrity of the design concept of the completed Project as a funetioning whole as indicated by the Contract Documents. City wi11 have authority to conduct speciat inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preIiminary determinations on such matters before rendering a written recommendatian. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. �ity's w�itten decisia� c� th� ��sue c�f�rreu will �� �nal and hl::�i::g �„ thP r�ntr�c+or, sub���t to the provisions of Paragraph 10.06. ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorrzed Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shail promptly proceed with the Work invatved which wilt be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CIT'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOC[JME.NTS Revision: August 17, 20f2 00 �z oo - � General Conditions Page 39 of 63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Ordets covering: l. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.O1.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's corr�;tion , of defective Work under Paragraph 13.09, or (iii} agreed to by the pariies; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, iracl��ding any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the; �� = a- r� �.#f: thereof, and the City insists upon its performance, the Contractor shall proceed witt� k�� :�- after making written request for written orders and shall keep accurate account of �h+_. 4� ,;��r reasonable cast thereof. Cantract Claims regarding Extra Work shall be made purs�uar��: �ta Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the c�� ��; 3. }� Contract Documents as may be necessary to enable the City to prepare for permanent r��;+�:�i ;� eorrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change t�3r{:# � be a fi.�l�, corr��lete ar�' �'tr�a1 ��yme�t �cr all cos� ��ntract�r i��ur� a� a:�s�:?t or relai:h�; �;; �: a���� change or Extra Work, whether said costs are known, unknown, foreseen or unfar��>�{.%�i ��at time, including without limitatian, any costs for delay, extended overhead, ripple c�r ir�-��,�� .; .�, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notifrcation to Surety If the provisions of any bond require notice to be given to a surety of any change affecta�A,�; �t1e general scope of the Work or the provisions of the Contract Documents (including, but nnt ? i_rr� j��d to, Contract Price or Contract Time), the giving of any such notice �vill be Ca���� ,:�,�'s responsibility. The amount of each applicable bond will be adjusted by the Contractor to re���;�� �he effect of any such change. C1TY OF FORT WORTH STANDARD CONSIRUCTION SPECIFCATION DOCCJMEN'CS Revision: Augmt l7, 2012 oa �a oo - � General Conditions Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph I4.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor af any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: l. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractar ta City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shail be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Ciaim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjastment in Contract Time shatl be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shali submit any response to the Contractor within 30 days after receipt of the ciaimant's last submiitai (unless �oniracic altows addiiionai iirine). C. City s Action: City will review each Contract Claim and, within 30 days after receipt af the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. C1TY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMEN'I'S Revision: Augat l7, 2012 00 72 0(} -1 General Conditions Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or ' Contractor invoke the dispute resotution procedure set forih in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11— COST OF THE WORK; ALLOWANCES; U1vIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included.• The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 1 I.OI.B, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall nat include any of the costs itemized in Paragraph 11.O1.B, anci sha�l include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classiiications agreed upon by City and Contractc�r. Such employees shall include, without limitation, superintendents, foremen, and other �S�;rsz�nn�l employed full time on the Work. Payroll costs for employees not employed full irme �n the Work shail 6e apportioned on the basis of their time spent on the Work. FayroIl costs shalt include; a. salaries with a 55% markup, ar h. salaries and wages plus the cost af fringe benefits, which shalt include �r��i�l se���r.i�y contributions, unemployment, excise, and payroll taxes, workers' compensa��:iu��y h���th and retirement benefits, bonuses, sick leave, vacation and holiday pay applica�le thereto. The expenses of performing Woric outside of �Zegular �iaricing riours, Wee�cenci Working Hours, or legal holidays, shall be included in the above to the extent authoY�i�ed by City. 2. Cost of all materials and eQuipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in cotuiection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented &om Contractor or others in accordance with rental agreements approved by City, and Che costs of transportation, loading, unloading, assemlaly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. C1TY OF FORT WORTH STANDARD CONSTRUCT[ON SPECIFCAT[ON DOCL�MEN['S Revision: Augint I7, 2012 00 �a oo -1 General Conditions Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work perfortned by Subcontractors. If required by City, Contractor shall obtain competitive bids from subconiractors acceptabte to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Wark plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph I I.OI . 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services spec�ficaliy related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transpartation, t�•avel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, apptiances, office, and temporary faciIities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. a Sates, consumer, use, and other simiiar ta��es related to the Wor1�, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectty employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directty or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall inc(ude settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities, fuei, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and simitar petty cash items in connection with the Work. CITY OF FORT WORTH STANDARD COhlSTRUCTION SPECIFCATION DOCUMENTS Revision: Augst 17, 2012 00 �� oo - � General Conditions Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is reQuired by the Contract Documents to purchase and maintain. B. �'osts Excluded: The term Cost of the Work shall not include any of the following items: l. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and so}e proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job ciassifications referred to in Paragraph 11.01.A.1 or specifically covered hy Paragraph 11.01.A.4, ali af which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Cantractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may he liable, including but not I limited to, the correction of defective Work, disposal of materials or equipment wrongly � suppIied, and mal�ing good any damage to property. 5. Other overhead or general expense costs of any kind. �; C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value af any Work cov�t•��� ���J � Change Order for an adjustment in Contract Price is determined on the basis of Cost c�i' t�a� Work, Contractor's fee shail be determined as set forth in Paragraph I2.Ol.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined p�arsi��nt tc� Paragraphs 11.Q1.A and 11.QI.B, Contractor will establisn and maintain records thereo� in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shatt cause the Work so covered ta 6e performed for such sums and by such persons or entities as may be acceptable to City. B. Pre-bid Allowances: l. Contractor agrees that: CITY OF FORT WORTH STANDARD CONSTRUCTtON SPECff•CAT[ON DOCUMEN'CS Revision: August 11, 20t2 00 7a oo - � General Conditions Page 44 of 63 a. the pre-bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, Iabor, installation, overhead, profit, and ather expenses contemplated for the pre-bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing witl be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Wo�k A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price wiit be deemed to inciude for ali Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose af camparison af Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Wark described in the Contract Documents, or reasonabiy inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidentat to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragt•aph 12A1 if: l. the quantity of any item of Unit Price Work performed by Contractor differs materia(ly and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quanlities.• The City reserves the right to order Extra Work in accordance with Paragraph 10.01. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMEN'I'S Revision: August 17, 2012 00 72 OQ -1 General Conditions Page 45 of 63 ' 2. If the changes in quantities or alterations significantly change the character of work, the Contract witl be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change �rder in accordance with Article 12. 4. A significant change in the character of wark occurs when: a. the character of work for any Item as altered differs materialIy in kind or nature from that in the Contract or b, a Major Item of work varies by more than ZS% from the original Contract quantity. 5. When the quantity af work to be dane under any Major Item of the Cantract is more �han 125% of the original quantity stated in the Contract, then either party to the Contract ra�ay request an adjustment to the unit price on the portion of the wark that is above 125%. 6. When the quantity of work ta be done under any Major Item of the Contraci is less ti���� '�X`�''% of the original quantiry stated in the Contract, then either party ta ttie Contract may ��c�i��st an adjustment to the unit price. 11.04 Plans Quantity Measuf•ement A. Plans quantities may or may not represent the exact quantity of work performed or ina��.� =6�1 moved, handled, or placed during the execution of the Contract. The estimated bid qu���� k$ � x,� designated as final payment quantities, untess revised by ihe governing Section or this ����.�� t B. If the quantity measured as outlined under "Price and Payment Procedures" varies by �ca��+- �i�:��� 2S% (or as stipulated under "Price and Payment Procedures" for specific Items) fr����� 5=� `�g:i estimated quantity for an individual Item originally shown in the Contract I��ac��ya,=.:.;�s , adjustment may be made to the quantity of autharized work done for payment p���c�•�� :: �a�=�y i� i i� C�«i�ae� r�cuestir�� the adjust�tz«t :-,�i�l p�cv�de feld mea�areme �ts �r�d ��li;�„ ���°..:�� showing the finai quantity for which payment will be made. Payment for revised qua�2t�i;y ��'' � made at the unit price bid for that Item, except as provided for in Article 10. C. When c�uantities are revised by a change in design approved by the City, by Change Ord�i°, k�� a:� � correct an error, or to correct an error on the plans, the plans quantity will be in�g•���s��� =3+ decreased by the amount involved in the change, and the 25% variance wili apply tc� il�� �,r plans quantity. D. If the total Contract quantity multip�ied by the unit price bid for an individual Item is 1�.>t� �;,<:<t $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a���R��=�� quantity Item if the City and Contractor agree in writing to fix the final quantity as a plar�s quantity. CiTY OF FORT WORTH STANDARD CONSTRUCT[ON SPECIFCATION DOCUMEN'IS Revision: Aug+st 17, 2012 oonoo-� Generai Conditions Page 46 of 63 E. For callout work or non-site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order wiil be determined as follows: l. where the Work involved is covered by unit prices cantained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the pravisions of Paragraph 1 I.03); or 2. where the Work invo(ved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12A1.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.O1.B.2, on the basis of the Cost of the Work (cletermined as provided in Paragraph 11.41} plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.O1.C). C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable iixed fee; or 2. if a�:xed fee is nat �gree� ��p�n, ±her. ? f�e b�Pd ��? the foll�w��g pPr��t?g�s of the y�rio«� portions of the Cost of the Work: for costs incurred under Paragraphs 11.O1.A.1, 11.O1.A.2, and 11.O1.A.3, the Contractor's additional fee shall be 15 percent except for: 1} rental fees for Coniractor's own equipment using standard rental raies; 2) bonds and insurance; b. for costs incurred under Paragraph 11.O1.A.4 and 1 l.Ol.A.S, the Contractor's fee shall be five percent (5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.O1.C.2.a and 12.O1.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH STANDAIiD CONSTRUCTION SPECIFCATION DOCUMENTS Revision: Augint 17, 2012 00 72 00 -1 General Conditions Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.01.A. t and 1 LO 1.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; c. no fee shall be payabte on the basis of costs itemized under Paragraphs 11 A1.A.6, and 11.O1.B; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost �Ius a deduction in Contractor's fee by an amount equal to five percent (5%} af such net decrease. 12.02 Change of Contract Tirne A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time wiil be allowed for Extra Work or for claimed delay aantess the Extra Work contemplated or claimed delay is shown to he on the critical path of tll+l �", r j;f.,�,t Schedule or Con�ractar can show by Critical Paih Method analysis how ihe Extra a��1 �� �:Y� claimed delay adversely affects the critical path. 12.03 Uelays A. Where Contractor is reasonably delayed in the performance or compietion of any �c?�•= ��c; Work within t�ae Contract Time due to delay beyond the control of Contractor, the Contr�����+ "9 i<�e may be extended in an amount equal to the time lost due to such delay if a Contr•act ��'��s��� �s made therefor. Delays beyond the control of Contractor shali include, but not be �it��:�: __, F E or neglect by City, acts ar negleet of utility owners or other contractors performing oc���rt �t �, contemptated by Article 7, fires, floods, epidemics, abnormal weather conditions, or ac;�.= ��'�; �. Such an adjustment shall be Contractor's sale and exclusive remedy for the delays cl������;��$:° �.�� this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, cost�, �4�� {� :i� damages (including 6ut not limited to all fees and charges of engineers, architects, attorrq�y��; <�� ��.� other professionals and all court or arbitration or other dispute resolution costs) sust�i�l=;�sj ���� Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitied to an adjustment in Contract Price or Contract Time f�.�� �� £.� � within the eontroi of Contractor. Delays attributabie to and within the control of a Sub�;c�M���=��. r::, or Supplier shall be deemed to be delays within the cont�ol of Gontractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except w�l�;n direct and unavoidable extra cost to the Contractor is caused by the failure of the City to prov►de information or material, if any, which is to be furnished by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATtON DOCtJIv1ENTS Revision: Aug�nt 17, 20t2 007200-] General Conditions Page 48 of 63 ARTICLE 13 — TESTS AND IN5PECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.0 I Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing (aboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safeiy procedures and programs so thai they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body ha�ing jurisdiction reguire any of the Work (or part thereo� to be inspected, tested, or approved, Contractor shall assume full responsi6ility for arranging and obtaining such independent inspectians, tests, retests ar approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvats required for City's acceptance of materials or equipment to be incorporaied in ihe vVork; or accepiance o�ma�e�iais, �nix �iesi�iis, c�e e�uiprr�e«i submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspeetions, tests, re-tests, or approvals shall be perfor�ned by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testin� Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D resuit in a"fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying far any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative resutt and require a retest. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision: August t7, 2012 00 72 00 -1 General Conditions Page 49 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City wi11 forward al( invoices for retests io Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment untit the Testing Lab is paid. E. If any Wot�c (or the work of others) that is to be inspected, tested, or approvec3 is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for o6servation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 B. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contraetor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspect�d or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observatian, inspeetian, or testing as City may require, that partian of the Wark in qttestic�n, furnishing all necessary labor, material, and equipment. If it is found that the uncovered Work is defective, Contractor shall pay ail claims, costs, tosses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionats and all court or other dispute resolution costs� ar��i�� �;��t of or relating to such uncovering, exposure, observation, inspection, and testi���5 <��ici �:�i' satisfactory repIacement or reconstruction (incIuding but not Iirnited to aii costs of repar'r �jr repiacement oz woric of oihers); or Liiy shaii be entiited io accepi dezective vdork in accordance with Paragraph 13.08 in which case Contractor shall still be responsible fc�r a11 costs associated witn exposing, observing, and testing the defective Wark. 2. If the uncovered Work is not found to be defective, Contractor shaii be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to sueh uncovering, exposure, observation, inspection, testing, replacement, and reeonstruction. 13.05 Ciry May Stop the Work If the Work is defective, or Contractor fails to suppty su�cient skitled workers or suitable materials or equipment, or fails to perform the Work in such a way thai the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, unti( the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION I)OCUMENCS Revision: August i7, 2012 00 �2 00 - � General Conditions Page 50 of63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. I3.06 Cor�ection or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installea, or campletec3, or, if the VJork has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and al1 court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removai (including but not limited to atl costs of repair or replacement of work of others}. Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor sha11 take na action that would vaid or otherwise impair City's special wairanty and guarantee, if any, on said Work. �3.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as rrzay be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the Iand or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with VVork that is not defective, and 4, satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptty comply wiih the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or re(ating to such correctian or repair or such remova( and replacetnent (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision: Auo at 17, 2012 00 72 00 - } General Conditions Page S I of 63 , C. In special circumstances where a particular item of equipment is placed in continuous service befare Final Acceptance of all the Work, the correction period for thai item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Wark (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additianal period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in additian to any other obtigation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any appIicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay ali ctaims, costs, Iosses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and �ll court or other dispute resolution costs) attributable to City's evaluation af and deterr��lita�tio�a to accept such defective Work and for the diminished value of the Work to the extent not �th�iw�se paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order wili be issued incorporaiing the necessary revisions in the Contract Documents with respeci to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the cl����inislled value of Work so accepted. 13.09 City May Correct Defective Wor-k A. If Contractor fails within a reasonable time after written notice from City to cor�•ect ��c fe�.t�g�� Work, or to remove and rep(ace rejected Work as required by City in accordance with PaY•agra��h 13.06.A, or if Contractar fails to perform the Wark in accordance with the Contract �o�uin�rtts, or if Contractor fails to comply with any other provision of the Contract Docum�nt�s, t�ity ���y, after seven ('� days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeclitio�sly. In connection with such carrective or remedial action, City may �xr.l?�de Contractor from all or part of the Site, take possession of all or part of the Work and sus�end Contractor's services related thereto, and incorporate in the Work ati materials and equipment incorporated in the Work, stored at the Site or for which Cit� has paid Contractor but w}�ic�i ar� stored elsewhere. Contractor shall allow City, City's representatives, agents, consuitants, emplayees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH STANDARD CONSTRUCT[ON SPECIFCATION DOCUMENI�S Revision: Augiat l7, 20[2 06 72 00 -1 General Conditions Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph I3.09 will be charged against Contractor, and a Change Order wilt be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Sehedule of Yalues The Scheduie of Values for tump sum contrac�s established as provided in Paragraph 2.07 wilt serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units campleted. 14.02 Progress Payments A. Applications for Payments: l. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is reQuired by the Contract Documents. 3. If payment is requested on the basis of materiats and equipment not incorporated in the Work hat deli��er�d a:�� s��:±ab!; �tnrPrl at t�P C�fP �� ?t ar�otj��r lncatiQn �r���l to in writing, the Appiication for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, ail of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amaunt of retainage with respect to progress payments will be as stipulated in the Contract Documents. CI'I'Y OF PORT WORTH STANDARD CONSTRUCT[ON SPECIFCATION DOCUMENTS Revision: Auo�at 17, 2012 00 �a oo - t General Conditions Page 53 of63 B. Review ofApplications: l. CiTy will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's abservations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of City's knowledge: a, the Worle has progressed to the point indicated; b. the quaiity of t%e Work is generally in accordance with ihe Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and ctassiftcations €or Work performed under Paragrap�i 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Wark in progress, or involved detailed inspections of the Wark beyond the responsihilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor, or c. Contractor has comptied with Laws and Regulations applicable to Contractor's performance ofthe Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discQvered evidence or the results of subsequent inspections or tests, and revise or rev€�ke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors, requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH STANDARll CONSTRUCTION SPEC[FCATION DOCUMENTS Revision: A� 17, 20t2 00 72 00 -1 General Conditions Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph I SAZ.A. C. Retainage: 1. For contracts less than $400,�00 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liqurdated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the City. E. Paytnent: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reductron in Payment: 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specifc bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-offagainst the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14AZ.B.4.e ar Paragraph 15.02.A. 2. If City refuses to make payment of the amount rec{uested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remainin� after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractar remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of a(1 Liens. CITY OF FORT WORTH STANDARD CONSTRUCTION SPEC[FCATION DOCUMENCS Revision: Aug�nt 17, 2012 OQ7200-1 General Conditions Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specificaily been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: l. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonabte time after notification as enumerated in Paragraph 14.OS.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization wili not constitute Finai Acceptance by City. 14.05 Finallnspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the �antract Documents: I. within 10 days, City wiii scheduIe a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures zs ar� necessary to complete such Work or remedy such deficiencies. iS�. T�o time ci�aeg� wili ve ir�acie a�aii►s� i ic �vi�i�a�ic�i u�iWccii SaiC�i u1iE vi iiviI�CaiiGii v���i� �i�jr and the date of Final Inspection. Should the City determine that the Work is not ready for �'�nal Inspection, City will notify the Contractor in writing of the reasons and Cantract Time vvi11 resume. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. C1TY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCAT[ON DOCLJMEN'I'S Revision: Augst 17, 20t2 00 �z oo- � General Conditions Page 56 of 63 14.07 Final Payment A. Applicaiion, for Payment: l. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Dacuments. Z. The final Appticafion for Payment shall be accompani�d (�xcept as previously deliver�d} by: a. alt documentation called for in the Contract Documents, inctuding but not limited to the evidence of insurance required by Paragraph 5.03; b. cansent of the surety, if any, to final payment; c. a tist of all pending or released Damage Claims against City that Cantractor believes are unsettled; and d. affidavits of payments and cotnplete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. $. Payment Becomes Due: 1. After Ciry's acceptance of the Application for Payment and accompanying documentation, requested by Cantractor, less previous payments made and any sum City is entitLed, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue tnereafter. 14.08 Finat Completron Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fu(ly completed and accepted. If the remaining balance to be held by Ciry for Wort� not fully completed or corrected is tess than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OP FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENTS Revision: Auoat 17, 20f2 0o n oo - � General Conditions Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Applica�ion for such payment. Such paymeni shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Purtial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other cvnstruction in the Contract Docutnents for all Work locations, the City may retease a portion of the amount retained provided that all other work is completed as determined by the Ciry. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will he retained. 14.09 Waiver of Claims The acceptance of finai payment wi11 constitute a release of the City from a11 claims or Iiabilities under the Contract for anything done or furnished or relating to the wark under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 — SUSPENSION OF WORK AND TERMINATION I 5.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contract�sr shal� res�me the VVork on the date sa fixed. During temporary suspension of the VtFork cavered by these Contract Documents, for any reason, the City will make no extra payment fi�r ;��a����m�y time of construction equipment and/or construction crews. B. 5hould the Contractor not be able to complete a portion of the Project due to caus�� h�yond t!h�; control of and without the fault or negligence of the Contractor, and skould it be cl�r����r:���,F�<1 a-�� mutual conseni of the Contracior and City tl�at a solution to allow construction to pr���s�=-�� +� ���_�t availabie within a reasonable period of time, Contractor may request an extension in C;o�iCract Time, directly attri6utable to any such suspension. C. If it should become n�essary to suspend the Work for an indefinite period, the ContaT�ctor �Ez�ll store all materials in such a manner that they will not obstruct or impede the public unnec;c;ssar. ily nor become damaged in any way, and he shall take every precaution to prevent dama�e or deterioration of the work performed; he shall pravide suitable drainage about the work, and e�re;ct temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and retumirag; �:1�� necessary equipment to the job when it is determined by the City that construction m�ay ��e resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved ta another construction project for the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMENIS Revision: Aug�i 17, 2012 0o za oo - � General Conditions Page 58 of63 15.02 City May 7'erminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: l. Contractor's persistent failure to perform the Work in accordance with the Contract Dacuments (including, but not limited to, failure to supply sufficient sl�illed workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Bt�siness Diversity Enterprise Ordinsnce #20020-12-2pllestablished under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. 5ubstantial indication that the Contractor has made an unauthorized assignment of the Contract ar any funds due therefrom for the benefit af any creditor ar for any ather purpc�se; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise iinancially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a court of competent jurisdiction against the City. �. �f cr�e or m�re cf the even:� :d�ntif�� in Paragraph ? 5.�2A_. ���r, City �ill �rQvici� �yritten notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shatl be held not later than 15 days, ai�er receipt of notice. l. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and farmally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor ar�d Surety have received notice of canference to address Contraetor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF PORT WORTH STANDARD CONSTRUCT[ON SPECIFCATION DOC[JIvIEN"IS Revision: Aug�at 17, 20t2 00 72 00 -1 General Conditions Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take passession of the Work, and all materials and ec�uipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored etsewhere, and itnish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further paytnent until the Work is fmished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Wark, such excess wili 6e paid to Contractor. If such ctaims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City wili be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion there.�f, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the methad used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surery's responsibilities �s provided for in the bond requirements of the Contract Documents or any special guar�rtte;�s provided for under the Contract Documents or any other obligations otherwise presct•ibecl by law. C. Notwithstanding Paragraphs 15A2.B, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its faiIure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor tilen existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions af Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOC[JMENTS Revision: Augtst 11, 20t2 00 �a oo - � General Conditions Page 60 of 63 15.03 Crty May Termznate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shail be effected by mai(ing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becoznes effective. Receipt of the notice shall be deemed conclusively presumed and established when the tetter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. A$er receipt of a natice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract an the date and to the extent specified in the natice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for complerion of such portion of the Work under the Contract as is not terminated; 3. terminate alI orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the tirnes, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the comp[eted, or partially completed plans, drawings, information and other property which, if the Lontract [�ad been compieied, wouici `ave 'v��ii rec�i�i�e� t� ue ��►►is i�� t� the City. 5. complete performance of such Work as shal( not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or ail items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCLJMENTS Revision: Augiat 17, 2012 00 7a oo - � Generai Conditions Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination ciaim to the City in the form and with the certification prescribed by the City. Untess an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, inctuding fair and reasonable sums for overhead and profit on such Wark; 2, expenses s�astaitted prior to the effective date of termination in perfor►ning serviees and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and proft on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the faiIure of the Contractor and Ciry to agree apan the whole amaunt to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall nat be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resut�ing from such termination. ARTICLE 16 — DISPU'I'� RES4LUTION 16.01 Methods and Pr•ocedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes finai and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shali stay the effect of Paragraph 10.Q6.E. S. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a deniai pursuant to Paragraphs 10.06.G3 or 14.06.D shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH STANDARD CONSTRUCT[ON SPECIFCATION DOCUMEN'I'S Revision: August t7, 20f2 00 �a oo - � General Conditions Page 62 of 63 1. etects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17 — NIISCELLANEOUS 17.01 Giuing Notice A. VFJhenever any provision of the Contract Documents requires the giving af written notice, it will be deemed to have been validly given i£ 1. delivered in person to the individual or to a member of the firm or to an officer of the corporatian for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver ofthe notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed su�cient upon confirmation of receipt by the receiving party. I 7.02 Computation of Tzmes When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a S?t�r��y �r S��nc�a�y or on � day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The pravisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFCATION DOCUMEN'I'S Revision: August 17, 2012 00 �2 ao - � General Conditions Page 63 of 63 17.04 Survival of Obligations Ali representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as att continuing obligations indicated in xhr; Contract Documents, will survive final payment, completion, and acceptance of the Wark ar termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts s�if.��i;P;�, General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCT[ON SPECIFCATION L)OCUMEN'I5 Revision: Augtni 17, 2012 007300-1 SUPPLEMENTARY CONDIT[ONS Page 1 of 5 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 �� �� 34 35 36 37 38 39 40 41 42 43 44 45 46 47 SECTION 00 73 00 SUPPLEMENTARY CONDITIONS TO GENERAL CONDITIONS Supplementary Conditions These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisions of the General Conditions which are not so modified or supplemented remain in full force and effect. Defined Terms The terms used in these Supplementaty Conditions which are defined in the General Conditions have the meaning assigned to them in the General Conditions, unless specifically noted herein. Modii►cations and Supplements The following are instructions that modify or supplement specifc paragraphs in the General Conditious �tr+k other Contract Documents. SC-3.03B.2, ��Resotving Discrepancies" Plans govern over Specifications and Specifcations shall govern over standard details. SC-4.OlA Easement limits shown on the Drawing are approximate and were provided to establish a basis for }�is.lu�����. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown o�� i��� Contract Drawings. SC-4.O1A.1., "Availability of Lands" The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of Outstanding Right-Of-Way, and/or Easements to Be Acquired: PARCEL NUMBER OWNER TARGET 1�r� 3 � OF POSSESSI_i��! None The Contractor understands and agrees that the dates listed above are estirnates only, are not guaranteed, and do not bind the City. If Contractor considers the final easements provided to differ materially from the representations on the Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. SC-4.O1A.2, "Availability of Lands" CITY OF FORT WORTH Ciry of Fort Worth Lake Crest Drainage Ire�p���r, �9,�c�a�ts STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CYri J 1 tiO4 Revised (lnser! Revision DafeJ 007300-2 SUPPLEMENTARY CONDITIONS Page 2 of 5 1 2 3 4 5 6 Utilities or obstructions to be removed, adjusted, and/or relocated The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated as of March 7,02013 EXPECTED OWNER AT&T UTILITY AND LOCATION Various 2013 Contact: Bill Roberts AT&T 817.338.6'787 O 817.565.0172 C wr1525 att.com ----�.—�_---__...___._.r_..�_---.------.__._�._._.__-----_.._��.�_�.______.__.—__�__..�.--� -.---.-.---�._..._.._--- ---_______.._ ONCOR Telephone Pole - Bob Hangar at Longhorn March 2013 Contact: Phil Pruente ^ ONCOR `817.215.6602(0) � 817.403.6913(C) phillip.pruente@oncor.com 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. SC-4.02A., "Subsurface and Physical Conditions" The following are reports of explorations and tests of subsurface conditions at the site of the Work: > > > T'he following are drawings of physical conditions in or relating to existing surface and subsurface structures (except Undergound Facilities) which are at or contiguous to the site of the Work: None SC-4.06A., "Hazardous Environmental Conditions at 5ite" The following are reports and drawings of existing hazardous environmental conditions known to the City: None SC-5.03A., "Certi�cates of Insurance" The entities listed below are "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City (2) Consultant: Shield Engineering Group, PLLC (3) Other: None Insurance" The limits of liability for the insurance required by Paragraph GG5.04 shall provide the following coverages for not less than the following amounts or greater where required by laws and regulations: 5.04A. Workers' Compensation, under Paragraph GC-5.04A. Statutoiy limits Employer's liability $100,000 each accident/occurrence CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised (Inser! Revisiort DaleJ TARGET DATE OF ADJUSTMENT City of Fort Worth Lake Crest Drainage Improvements CPN 01604 00 73 00 - 3 SUPPLEMENTARY CONDIT[ONS 1 2 3 4 S 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 3� 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 $100,000 Disease - each employee $500,000 Disease - policy limit Page 3 of 5 SC-5.04B., "Contractor's Insurance" 5.04B. Commercial General Liability, under Paragraph GG5.04B. Contractor's Liability Insurance under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with minimum limits of: $1,000,000 each occurrence $2,000,000 aggregate limit The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. SC 5.04C., "Contractor's Insurance" 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability Insurance under Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: (1) Automobile Liability - a commercial business policy shall provide coverage on °Any Auto", defined as autos owned, hired and non-owned. $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: $250,000 Bodily Injury per person / $500,000 Bodily Injury per accident / $100,000 Property Damage SC-5.04D., "Contractor's Insurance" 1110 LOIILt'aCLOT'S COttS�t`ilCYtUfl �CiiViiieS Wiii �cfjliuG iiS ciil�iOyEcS, a�2iit�, Stiv�GiiliaCiOiS, �tju.p.i.�i,�, ?�TiC� material deliveries to cross railroad properties and tracks: None. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a"Right of Enriy AgreemenY' with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right-of-entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. The Contractual Liability coverage reauired by Paragaph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies sarisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch raiiroad property: (1) General Aggregate: N/A (2) Each Occurrence: N/A CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUIviMENTS CPN 01604 Revised (h�ser! Revision DateJ 007300-4 SUPPLEMENTARY CONDITIONS Page 4 of 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 �� �� 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 _ Required for this Contract X Not required for this Contract With respect to the above outlined insurance requirements, the following shall govern: 1. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one gade separation or at-grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. 2. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights-of-way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. 3. If, in addition to a grade separation or an at-grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at- grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. 4. If no grade separation is involved but other work is proposed on a railroad company's right-of- way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. The insurance specified above must be carried until all Work to be perfortned on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the raitroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. SC-6.04., "Project Schedule" Project schedule shalt be tier 1 for the project. SC-6.07., "Wage Rates" The following is the prevailing wage rate table(s) applicable to this project and is provided in the Appendixes: Buzzsaw tocation, Resources/02-Construction Documents/Construction Specification Book/OS-General and Special Condtions/05.9-Wage Rate M&C_7-8-08.pdf SC-6.09., "Permits and Utilities" SC-6.09A., "Contractor obtained permits and ticenses" The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: Street C(osure Permit Valve Operation Permit Traffic Signal Permit SC-6.09B. "City obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the City: 1. NWP 43 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised (/nser! Revision DaleJ City of Fort Worth Lake Crest Drainage Improvements CPN 01604 007300-5 SUPPLEMEN'I'ARY CONDITIONS Page 5 of S 1 2. Tree Removal Permit 2 3. Urban Forestry Permit 3 4. Mitigation Bank Credits 4 5 SC-6.09C. "Outstanding permits and licenses" 6 7 The following is a list of known outstanding permits and/or licenses to be acauired, if any as of March 8 2013 9 10 Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION None 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3C 31 32 33 34 3S 36 SC-7.02., "Coordination" The individuals or entities listed below have contracts with the City for the performance of other work ai the Site: None SC-8.01, "Communications to Contractor" Rick Martin - Eagle Mountain/Saginaw ISD 817.247.7685 regarding schooUstreet access Riad Nusrallah, City of Fort Worth T/PW riad.nusrallah@fortworthtexas.gov regarding POL activities SC-9.01., "City's Project Representative" The following firm is a consultant to the City responsible for construction management of this Project; Shield Engineering Group, PLLC SC-13.03C., "Tests and Inspections" rla..e SC-16.O1C.1, "Methods and Procedures" None END OF SECTION CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised [/nsert Revision DateJ 011100-I SUMMAI2Y OF WORK Page I of 3 1 2 3 PART1- GENERAL SECTION Ol 1100 Sti�MMARY OF WORK 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to" 10 1. Division 0- Bidding Requirements, Contract Forms, and Conditions of the Contrac� 11 2. Division 1- General Requirements 12 1.2 PRICE ANU PAYMENT PROCEDURES 13 A. Measurement and Payment 14 l. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINLSTRATIVE REQUIREMENTS 18 A. Work Covered by Contract Documents 19 1. Work is to include furnishing all labor, materials, and equipment, and perfonr�i��= 20 all Work necessary for this construction project as detailed in the Drawings �aci 21 Specificatioas. 1� i�. Subsidiary �+Vork 23 l. Any and all Work specifically governed by documentary requirements for the 24 project, such as conditions impased by the Drawings or Contract Documents in 25 which no speciiic item for bid has been provided for in the Proposal and the item i� 26 not a typical unit bid item included on the standard bid item list, then the item shall 27 be considered as a subsidiary item of Work, the cost of which shall be included in 28 the price bid in the Proposal for various bid items. 29 C. Use of Premises 30 1. Coordinate uses of premises under direction of the City. 31 2. Assume full responsibility for protection and safekeeping of materials and 32 equipment stored on the Site. 33 3. Use and occupy anly portions of the public streets and alleys, or other public places 34 or other rights-of-way as provided for in the ordinances of the City, as shown in the 35 Contract Documents, or as may be specifically authorized in writing by the City. 36 a. A reasonable amount of tools, materials, and equipment for construction 37 purposes may be stored in such space, but no more than is necessary to avoid 38 delay in the construction operations. CITY OF FORT WORTH CIty of Fort Worth Lake Crest L?rainage Improvements STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS CPN 01604 Revised Juty 1, 2011 oi�ioo-a SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for a�y purpose without having previously 10 obtained permission from the owner of such properiy. 11 2. Do not stare equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights-of-way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the projeci construction operations. 17 18 19 20 21 22 23 24 2S 26 2'7 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private properly adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utiliry companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, ne�lect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed dw•ing construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work associated with easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH CIty of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised 7uly 1, 2011 011100-3 SUMMARY OF WORK Page 3 of 3 1 1.5 SUSNIITTALS [NOT USED) 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 N7[AINTENANCE MATERIAL SUBNIITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE (NOT USED] 6 L10 DELIVERY, STORAGE, AND HANDLING [NOT USED] ? 1.11 FTELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS (NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 12 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 13 CITY OF FORT WORTH CIty of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 o�asoo-i SUBS7'ITUTION PROCEDURES Page 1 of 4 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0125 00 SUBSTITUTION PROCEDURES 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defned by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor I 1 c. Trade name 12 d. Catalog number 13 2. Substitutions are not "or-equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 l. None. 16 C. Related Specification Sections include, but are not necessarily limited to: 17 l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 18 2. Division 1— General Rec}uirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 l. Work associated with this Item is considered subsidiary to the various items bi�. 22 No separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTI2ATIVE REQUlltEMENTS 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or-equats," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or-equals are unavailable due to strike, discontinued production of products meeting specifted requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH City of Fort Wortfi Lake Crest Draiange Improvements STANDARD CONSTRUCTION SPECIF[CATION DOCUMENTS CPN 01604 Revised July I, 2011 oi as oo - a SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditious stated herein 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 JV 31 32 33 34 35 36 37 38 39 40 41 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance ofproposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements Y� 1p1V�UVL 4A�7G11G11VE a) Location of past projects utilizing product b) Name and tetephone number af persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product S) Samples a) Provide at reyuest of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2} Illustration drawings C. Approval or Rejection a2 l.. Written approvat or rejection of substitution ,given by the City 43 2. City reserves the right to rec�uire proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved, the resulting cost and/or time reduction 4G will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH City of Fort Worth Lake Crest Draiange Improvements STANDARD CONSTRUCTION SPECIF[CATION DOCUMENTS CPN 01604 Revised July 1, 2011 012500-3 SUBST[TUT[ON PROCEDURES Page 3 of 4 1 2 3 4 5 6 7 8 9 4. No additional contract time will be given for substitution. 5. Substitution will be rejected if a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the City's opinion, acceptance will require substantial revision of the original design d. In the City's opinion, substitution will not perform adequately the function consistent with the desrgn intent 1.6 ACTION SUBNIITTALS/1NF'ORMATIONAL S�SNIITTALS [NOT USED] 10 1.7 CLOSEOITT SUBNIITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBNIITTALS [NOT USED] 12 13 14 15 16 17 18 19 20 21 22 23 24 � 26 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS (NOT USED] 1.12 WARRANTY fNOT USED1 27 PART 2- PRODUCTS [NOT USED] 28 PART 3- EXECUTION [NOT USEDJ 29 30 31 _�1 � __ M�� Revision Log DATE NAME SLJNIIvtARY OF CHANGE CITY OF FORT WORTH City of Fort Worth Lake Crest Draiange Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised Juty I, 2011 012500-4 SUBSTfi'UT[ON PROCEDURES Page 4 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 I7 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted _ Recommended ^ Recommended Firm Address Date Telephone Not recommended Received tate By Date Remarks For Use by Ciry: Approved City Date Rejected CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 City of Fort Worth Lake Crest Draiange Improvements CPN 01604 bI3II9-i PRECONSTRUCTION MEETING Page t of 3 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0131 19 PRECONSTRUCTION MEETING 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to � ctarify construction contract administration procedures g B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily Iimited to: 1 t l. Division 0— Bidding Requirements, Contract Forms and Conciitions of the Contract 12 2. Division 1— General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Paymeat 15 l. Work associated with this Item is considered subsidiary to the various items bid. �6 No separate payment will be allawed for t11is Iterrt. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADP�IINISTRATIVE REQUIREMENTS 19 A. Coordination 20 l. Attend preconstruction meeting. 21 2. Representatives of Contractor, subcontractors and suppliers attending meetings LL Sit�ti�[ uc i{ituii�P.0 aiiu ?a1.i��i^vi`iZ."..`�.. t0 .a.C� ^n �h�]f r�f �hP Pntity �ac}� �'��T�SBIIts. 23 3. Meeting administered by City may be tape recorded. 24 a. If recorded, tapes will be used to prepare minutes and retained by City for 25 future reference. 26 27 28 29 3f} 31 32 33 34 35 36 37 38 B. Preconstruction Meeting L A preconstruction meeting witi be heid within 14 days after the execution of the Agreement and before Work is started. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the rr►eeting, prepare the notes of the meeting and distribute copies of same to all participants who so reyuest by fully completing the attendance form to be circulated at the beginning of ihe meeting. 3. Attendance shall include: a. Project Representative b. Contractoe's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Confractor may desire to invite or the City may request CITY OF FORT WORTEI City of Fort Wodh Lake Crest Drainage hnprovements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised August 17, 2012 OI 3I I9 - Z PRECONSTRUCTION MEETING Page 2 oi3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 l8 19 20 2I 22 23 24 25 26 27 2$ 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 e. Other City representatives £ Others as appropriate 4. Construction Schedule a. Prepare haseline canstruction schedule in accordance with Section O1 32 16 and provide at Preconstruction Meeting. b. City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. 5. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project e. SCatus af right-of-way, utilily clearances, easements or other pertinent permit� d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j, Field C?rders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Materiat Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre-Construction Conditions q. Weekend Work Noti�cation r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systerns v. Storm Water Pollution Prevention Ptan w. Coordination with other Loniraciors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. M/WBE or MBE/SBE procedures hh. FinaI Acceptance ii. Final Payrnent jj. Questions or Comments CITY OF FORT WORTH City of Fod Wodh Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised August 17, 20I2 QI 3I 19 - 3 PRECONSTRUCTZON MEETING Page 3 of 3 1 1.5 SUBNIITTALS [NOT USED] 2 1,6 ACTION 5UBMITTALS/INFORMATIONAL SUBMTFTALS [NOT USED} 3 1.7 CLOSEOUT SUBMITTALS [NOT USEIa] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE (NOT USED] 6 1.10 DELIVERY, STORAGE, AND IIANDLING [NOT USED] 7 1.11 FIELD [SITE] CQNDITIONS (NOT ITSED] 8 1.12 WA,RRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NC)T USED} 11 12 END OF SECTION Revision Log DATE NAME SL7MMARY OF CHANGE 13 C[TY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised August 17, 2012 013216-1 CONSTRUCT[ON PROGRESS SCHEDULE Page 1 of 5 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0132 16 CONSTRUCTION PROGRESS SCI-�EDULE 5 A. Section Includes: 6 1. General requirements for the preparation, submittal, updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Speciiic requirements are presented in the City of Fort Worth Schedute Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1— General Requirements 1S 1.2 PRICE AND PAYMENT PROCEDURES 16 A. Measurement and Payment 17 1. Work associated with this Item is considered subsidiary to the various items bid. 18 No separate payment will be allowed for this Item. 19 1.3 REFERENCES 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Definitions 1. Schedule Tiers a. Tier 1- No schedule submittal required by contract. Small, brief duration projects b. Tier 2- No schedule submittal required by contract, but will require some milestone dates. Small, brief duration projects c. Tier 3- Schedule submittal required by contract as described in the Speeification and herein. Majority of City projects, including all bond program projects d. Tier 4- Schedule submittal required by contract as described in the Specification and herein. Large and/or complex projects with long durations 1) Examples: large water pump station project and associated pipeline with interconnection to another governmental entity e. Tier 5- Schedule submittal required by contract as described in the Specification and herein. Large and/or very complex projects with long durations, high public visibility 1) Examples might include a water or wastewater treatrnent plant 2. Baseline Schedule - Initiat sehedule submitted before work begins that will serve as the baseline for measuring progress and departures from the schedule. 3. Progress Schedule - Monthly submittal of a progress schedule documenting progress on the project and any changes anticipated. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 01 32 16 - 2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 5 4. Schedule Narrative - Concise narrative of the schedule including schedu(e changes, expected delays, key schedule issues, critical path items, etc B. Reference Standards 1. City of Fort Worth Schedule Guidance Document 1.4 ADNIINISTRATIVE REQUIREMENTS A. Baseline Schedule 7 1. General 8 a. Prepare a cost-loaded baseline Schedule using approved software and the 9 Critical Path Method (CPM) as required in the City of Fort Worth Schedule 10 Guidance Document. 11 b. Review the draft cost-loaded baseline Schedu(e with the City to demonstrate 12 understanding of the work to be performed and known issues and constraints 13 related to the schedule. 14 c. Designate an authorized representative (Project Scheduler) responsible for 15 developing and updating the schedule and preparing reports. 16 17 18 19 B. Progress 5chedule l, Update the progress Schedule monthly as requxr�d in the City of Fort Worth Schedule Guidance Document. 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 20 3. Change Orders 21 a. Incorporate approved change orders, resulting in a change of contract time, in 22 the baseline Schedule in accordance with City of Fort Worth Schedule 23 24 Guidance Document. C. Responsibility for Schedule Compliance 25 l. Whenever it becomes apparent from the current progress Schedule and CPM Status 26 Report that delays to the critical path have resulted and the Contract completion 27 date will not be met, or when so directed by the City, make some or all of the Zc°� iO�i�o�irg actions at nc addiii0ilai �vSi iG tilc �ii�/ 29 a. Submit a Recovery Plan to the City for approval revised baseline Schedule 30 outlining: 31 1) A written statement of the steps intended to take to remove or arrest the 32 delay to the critical path in the approved schedule 33 2) Increase construction manpower ia such quantities and crafts as will 34 substantially eliminate the backlog of work and return current Schedule to 35 meet projected baseline completion dates 36 3) Increase the number of working hours per shift, shifts per day, working 37 days per week, the amount of construction equipment, or any combination 38 of the foregoing, sufficiently to substantially eliminate the backlog of work 39 4) Reschedule activities to achieve maximum practical concurrency of 40 accomplishment of activities, and comply with the revised schedule 41 2. If no written statement of the steps intended to take is submitted when so requested 42 by the City, the City may direct the Contractor to increase the level of effort in 43 manpower (trades), equipment and work schedule (overtime, weekend and holiday 44 work, etc.) to be employed by the Contraotor in order to remove or arrest the delay 45 to the critical path in the approved schedule. 46 a. No additional cost for such work will be considered. CITY OF FORT WORTH City of Fort Worth La}:e Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1,2011 013216-3 CONS1'[tUCTION PROGRESS SCHEDULE Page 3 of 5 D. The Contract completion time will be adjusted only for causes specified in this 2 Contract. 3 a. Requests for an extension of any Contract completion date must be 4 supplemented with the followin�: 5 1) Furnish justification and supporting evidence as the City may deem 6 necessary to determine whether the requested extension of tirne is entitled 7 under the provisions of this Contract. 8 a) The City will, after receipt of such justification and supporting 9 evidence, make findings of fact and will advise the Contractor, in 10 writing thereof. 11 2) If the City finds that the requested eactension of time is entitled, the City's 12 determination as to the tota! number of days allowed for the extensions 13 shall be based upon the approved total baseline schedule and on all data 14 relevant to the e�ctension. 15 a) Such data shall be included in the next updating of the Progress 16 schedule. 17 b) Actual delays in activities which, according to the Baseiine schedule, 18 do not affect any Contract completion date shown by the critical path �ig 19 the network will not be the basis for a change therein. 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 2. Submit each request for change in Contract completion date to the City within 3O days after the beginning of the delay for which a time extension is requested but before the date of final payment under this Contract. a. No time extension will be granted for requests which are not submitted within the foregoing time limit. b. From time to time, it may be necessary for the Contract schedule or compi�t�+��� time to be adjusted by the City to reflect the effects of job conditions, weatk��,r°, technical difficulties, strikes, unavoidable delays on the part of the City or its representatives, and other unforeseeable conditions which may indicate schedule adjustments or completion time extensions. 1) Under such conditions, the City will direct the Contractor to reschecl�l� i�a � work or Contract completion time to reflect the changed conditions and tt��; i ontracYor shaii revise nis scaeduie accordingiy. a) No additional compensation will be made to the Contractor for sucl� schedule changes except for unavoidable overall conh-act time e�ensions beyond the actual completion of unaffected work, in whi��� case the Contractor shall take all possible action to minimize any time extension and any additional cost to the City. b) Available float time in the Baseline schedule may be used by the Cifiy as well as by the Contractor. 3. Float or slack time is defined as the amount of time between the earliest start date and the latest start date or between the earliest finish date and the latest iinish dat� of a chain of activities on the Baseline Schedule. a. Float or slack time is not for the exclusive use or benefit of either the Contractor or the City. b. Proceed with work according to early start dates, and the City shall have the right to reserve and apportion float time according ta the needs af the project. CiTY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvcn�G ���4 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN Oi60rt Revised Juty l, 20ll 013216-4 CONSTRUCT[ON PROGRESS SCHEDULE Page 4 of 5 1 2 3 a 5 6 7 8 9 10 11 12 13 14 IS 16 17 c. Acknowledge and agree that actual delays, affecting paths of activities containing float time, will not have any effect upon contract completion times, providing that the actual delay does not exceed the float time associated with those activities. E. Coordinating Schedule with Other Contract Schedules L Where work is to be performed under this Contract concurrently with or contingent upon work penformed on the same facilities or area under other contracts, the Baseline Schedute shall be coordinated with the schedules of the other contracts. a. Obtain the schedules of the other appropriate contracts from the City for the preparation and updating of Baseline schedule and make the reqaired changes in his schedule when indicated by changes in conesponding schedules. 2. In case of interference between the operations of different contractors, the City will determine the work priority of each contractor and the sequence of work necessary to expedite the completion of the entire Project. a. In such cases, the decision of the City shall be accepted as final. b. The temporary de(ay of any work dae to such circumstances shall not be considered as justification for claims for additional compensation. 18 1.5 SUBMITTALS 19 A. Baseline Schedule 20 21 22 23 24 25 1. Submit Schedule in native file format and pdf format as required in the City of Fort Worth 5chedule Guidance Document. a. Native file format includes: 1) Primavera (P6 or Primavera Contractor) 2. Submit draft baseline Schedule to City prior to the pre-construction meeting and bring in hard copy to the meeting for review and discussion. 26 B. Progress Schedule 27 1. Submit progress Schedule in native file format and pdf format as required in the 28 City of Fort Worth Schedule Guidance Document. 29 2. Submit progress Schedule monthly no tater than the last day of the month. 30 C. Schedule Narrative 31 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth 32 Schedule Guidance Document. 33 34 2. Submit schedule narrative monthly no (ater than the last day of the month. D. Submittal Process 35 1. The City administers and manages schedules through Buzzsaw. 36 2. Contractor shall submit documents as required in the City of Fort Worth Schedule 37 Guidance Document. 38 3. Once the project has been completed and Final Acceptance has been issued by the 39 City, no fu��ther progress schedules are required. CITY OF FORT WORTI-I City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMEN"I'S CPN 01604 Revised Jufy i, 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 013216-5 CONSTRUCT[ON PROGRESS SCHEDULE Page 5 of 5 1.6 ACTION SUBNIITTALS/INFORMATIONAL SUBNIITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSITRANCE A. The person preparing and revising the construction Progress Schedule shall be experienced in the preparation of schedules of similar complexity. B. Schedule and supporting documents addressed in this Specification shall be prepared, updated and revised to accurately reflect the performance of the construction. C. Contractor is responsible for the quality of all submittals in this section meeting the standard of care �or the construction industry for similar projects. 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD (SITE] CONDITIONS [NOT USED] 1.12 WA,RRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION (NOT USED] END OF SECTION DATE I NAME Revision Log SUMMARY OF CHANGE CITY OF FORT WORTH Ciry of Fort Worth Lake Crest Drainage Improveme��ts STANDAItD CQNSTRUCTION SPECIFICATION DOCUMENTS CPN 0 E Ci(k� Revised Juty l, 2011 013233-I PRECONSTRUCTION VIDEO Page 1 of 2 1 2 3 PART1- GENERAL 4 1.1 SIT112MARY SECTION 0132 33 PRECONSTRUCTION VIDEO 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstruction Videos 8 B. Deviations from this Ciry of Fort Worth Standard Specification 9 l. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1. — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payrnent 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES (NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment, including all areas in the 21 vicinity of and to be af%cted by construction. 22 a. Provide digita( copy of videa upon req_uest by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED) 27 1.7 CLOSEOUT SUBNIITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE (NOT U5ED] 30 1.10 DELIVERY, STORA,GE, AND HANDLING [NOT USEDJ 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WA,RRANTY [NOT USED] 33 PART 2- PRODUCTS [NOT USED] CITY OF FORT WORTH Ciry of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 01 32 33 - 2 PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USEDJ END OF SECTION Revision Log DATE NAME SIJMMARY OF CHANGE CTfY OF FORT WORTH City of Fort WoRh Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMEN'I'S CPN 01604 013300-1 SUBMITTALS Page 1 of 8 1 2 3 PART1- GENERAL 4 1.1 SL�vIlVIARY 5 6 7 8 9 10 11 12 13 14 15 16 SECTION Ol 33 (i0 SUBMITTALS A. Section Inc(udes: l. General methods and requirements of submissions applicable to the following Work-related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 17 1.2 PRICE AND PAYIViENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED) 22 1.4 ADMINISTRATIVE REQUIItEMENTS 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication � Delivery g) Similar sequenced activities c. No extension of time wilt be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH CIty of Fort Worth Lake Crest Draiange Improvements STANDAIZD CONSTRUCTION SPEC[FICATION DOCUMENTS CPN 01604 Revised July 1, 2011 013300-2 SUBMITTALS Page 2 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 l8 19 20 21 22 23 24 25 26 2'1 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering L When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the ne�ct 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the ei�hth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b, Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certiiication Staxement aff'�ed including: a. The Contractor's Company name b. Signature of submittal reviewer a Certification Statement 1) "By this submittal, I hereby represent that I have determined and verified field measurernents, field construction criteria, materials, dimensions, cata(og numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8'/a inches x 11 inches to 8'/s inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data IShop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH CIty of Fort Worth Lake Crest Draiange Lnprovements STANDARD CONSTRUCTION SP$CiF[CATION DOCUMENTS CPN 01604 Revised July 1, 2011 013300-3 SUBMITTALS Page 3 of 8 2 3 4 5 6 2. The Project title and number 3. Contractor identification 4. The names of: a. Gontractor b. Supplier c. Manufacturer 7 5. Identification of the product, with the Specification Section number, page and 8 paragraph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials i l 8. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 16 17 18 19 20 21 22 23 24 25 26 27 28 20 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom-prepared data such as fabrication and erection/instaliation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details u. �vlatio� af t�i� `r'ciTiJu� �?llw iv �iii� iCihfii Yiia�.Iiit3a.iS $i�iu iiii�3 v�i%a� Sl►iiCtiu� b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing-in diagrams and templates 5} Catalog cuts 6) Product photograpUs CITY OF FORT WORTH CIty of Fort Worth Lake Crest Draiange Improvements STANDARD CONSTRUCTION SPECIFICAT[ON DOCUMENTS CPN 01604 Revised July l, 2011 013300-4 SUBMITTALS Page 4 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 7) Standard wiring diagams 8) Printed performance curves and operational-range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare-parts listing and printed product warranties 12) As appticable to the Work H. Samples l. As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work 18 I. Do not start Work requiring a shop drawing, sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 l. Fabrication performed, materials purchased or on-site construction accomplished 21 which does not conform to approved shop drawings and data rs at the Contractor's 22 risk. 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 4S 46 47 2. The City wil( not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution l. Electronic Distribution a. Coniirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shalt submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if reyuired in lieu of electronic distribution) CITY OF FORT WORTH CIty of Fort Worth Lake Crest Draiange Improvements STANDARD CONSTRUCT[ON SPECIEICATION DOCUMENTS CPN 01604 Revised July 1, 201 I 013300-5 SUBMITTALS Page 5 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3i 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies (isted above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously speci�ied. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any deparh�ce from the Contract reyuirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provid�d herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the �l �ll�rient oi i�e ierrrns oi �e i on�ract. a. All risks of enor and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an excaption. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigmed when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH CIty of Fort Wonh Lake Crest Draiange Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 01 33 00 - 6 SUBMCI'TALS Page 6 of 8 1 1) 'BXCEPTIONS NOTED". This code is assigned when a confirmation of 2 the notations and comments IS NOT required by the Contractor. 3 a) The Contractor may release the equipment or material for manufacture; 4 however, all notatians and comments must be incorporated into the 5 final product. c. 10 11 12 13 14 15 16 17 1$ 19 20 21 z2 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 d. Code 3 1) 'BXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or materiat for manufacture; however, atl notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non-conforming items that were noted. c) Resubmittal is to be received by the City within 15 calendar days of the date of the City's transmittal requiring the resubmittal. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as �rst submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractar's risk if not marked b. Submittals for each item will be reviewed no more than twice at the Ciry's expense. 1) All subsequent reviews will be performed at times convenient to the City arid ai i'rie 4onieacior's ex�ense, i�ased on Yhe �iiy's or Ciiy Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. $. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Working Days prior to release for manufacture. CITY OF FORT WORTH CIty of Fort Worth Lake Crest Draiange Improvements STANDARD CONSTRUCTION SPECtFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 O13300-7 SUBM[TTALS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded, will be returned within 30 calendar days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specifed in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications 11 1. If specifically rec�uired in other Sections of these Specifications, submit a P.E. 12 Certification for each item required. 13 14 15 16 17 18 19 20 N. Request for Information (RFI) l. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and reQuest clarification 2. Use the Request for Information (RFI) form provided by the City. 21 3. Numbering of RFI 22 a. Preiuc with "RFI" followed by series number, "-�x", beginning with "O1" and 23 increasing sequentially with each additional transmittal. 24 4. Sufficient information shail be attached to permit a written response without further 25 information. 26 5. The City will log each request and will review the request. 27 a. If review of the project information request indicates that a change to the 28 Contract Documents is reQuired, the City will issue a Field Order or Change ZG i�rder, as appropriate. CITY OF FORT WORTH CIry of Fort Worth Lake Crest Draiange Improvements STANDARD CONSTRUCTION SPECIFICATION DOCIIMENTS CPN 01604 Revised July I, 201 I 013300-8 SUBMITTALS Page 8 of 8 1 1.5 SUBNIITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBNIITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED) 5 1.9 QUALII'Y ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE) CONDIITONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 12 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 13 CITY OF FORT WORTH Clty of Port Worth Lake Crest Draiange Improvements STANDARD CONSTRUCT[ON SPEC[FICAT[ON DOCUMENTS CPN Oi604 Revised July l, 2011 1 2 PARTl- GENERAL 3 1.1 SUI�ZMARY 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 013513-1 SPECIAL PROIECT PROCEDURES Page 1 of 8 SECTION 0135 13 A. Section Includes: 1. The procedures for special project circumstances that includes, but is not limited to: a. Coordination with the Texas Department of Transportation b. Work near High Voltage Lines a Confined Space Entry Pragram d. Air Pollution Watch Days e. Use af Explosives, Drop Weight, Etc. f. Water Department Notification g. Public Notification Prior to Beginning Construction b. Coordination with United States Army Corps of Engineers i. Coordination within Railroad permits areas j. Dust Control k. Employee Parking B. Deviations from this City of Fort Worth Standard Specification 1. None. � 19 C. Related Speciiication Sections include, but are not necessarily limited to: � 20 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Conh�act 21 2. Division 1— General Requirements 22 3. Section 33 12 25 — Connection to Existing Water Mains 23 1.2 PRICE AND PAYMENT PROCEDURES 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 ; A. Measurement and Payment l. Coordination within Railroad permit areas a. Measurement 1) Measurement for this Item will be by lump sum. b. Payment 1) The work performed and materials furnished in accordance with this Item will be paid for at the lump sum price bid for Railroad Coordination. c. The price bid shall include: 1) Mobilization 2) Inspection 3) Safety training 4) Additional insurance 5) Insurance Certificates 6) Other requirements associated with general coordination with Railroad, including additional employees required to protect the right-of-way and property of the Railroad from damage arising out of and/or from the construction of the Project. 2. Railroad Flagmen a. Measurement CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPEC�'ICATION DOCUMENTS CPN 01604 Revised [Insert Revision Date] 013513-2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 2 3 a 5 6 7 8 9 10 11 12 1) Measurement for this Item will be per working day. b. Payment 1) The work performed and materials furnished in accordance with this Item will be paid for each working day that Railroad Flagmen are present at the Site . c. The price bid shall include: 1) Coordination for scheduling flagmen 2) Flagmen 3) Other reyuirements associated with Railroad 3. All other items a. Work associated with these Items is aonsidered subsidiary to the various Items bid. No separate payrnent will be allowed for this Item. 13 1.3 REFERENCES 14 A. Reference Standards 15 l. Reference standards cited in this Specification refer to the current reference 16 standard published at the time of the latest revision date logged at the end of this 17 Specification, unless a date is specifically cited. 18 2. North Central Texas Council of Governments (NCTCOG) — Clean Construction 19 Specification 20 1.4 ADMINISTRATIVE REQUIItEMENTS 21 A. Coordinarion with the Texas Depariment of Transportation 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 When work in the right-of-way which is under the jurisdiction of the Texas Deparhnent of Transportation (T�OT): a. Notify the Texas Department of Transportation prior to commencing any work therein in accordance with the provisions of the permit b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B. Work near High Voltage Lines 1. Warning sign a. Provide sign of sufficient size meeting all OSHA requirements. 2. Equipment operating within 1 � feet of high voltage lines will require the following safety features a. Insulating cage-type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the owner of the high voltage lines 3. Work within 6 feet of high voltage electric lines a. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notificarion coordinate with the power company to: CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDAIiD CONSTRUCTION SPECIF[CATION DOCUMENTS CPN 01604 Revised [Insert Revision Date] 1 2 3 a 5 6 7 8 9 10 I1 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3Q 31 32 33 34 35 36 37 38 01 35 l3 - 3 SPECIAL PROJECT PROCEDURES Page 3 of 8 a) Erect temporary mechanical barriers, de-energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Air Pollution Watch Days 1 � General a. Observe the following guidelines relating to working on City construction sites on days designated as"AIR POLLUTION WATCH DAYS". b. Typical Ozone Season 1) May 1 through October 31. c. Critical Emission Time 1) 6:00 a.m. to 10:00 a.m. Watch Days a. The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather 5ervice, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. b. Requirements 1) Begin work after 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. 2) However, the Contractor may begin work prior to 10:00 a.m. if: a) Use of motorized equipment is less than 1 hour, or b) If equipment is new and certified by EPA as "Low Emitting", or ��ui�r3snt ��::�::y J!+�a T.�:x, Ca�fi�;� Tl;esel �J? Sn;, �ie�ei e::��:ls:�:�s, �r alternative fuels such as CNG. E. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adeauate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section Ol 31 13 F. Water Department Coordination 39 l. During the construction of this project, it will be necessary to deactivate, for a 40 period of time, existing lines. The Contractor shall be required to coordinate with 41 the Water Department to determine the best times for deactivating and activating 42 those lines. 43 2. Coordinate any event thaY will require connecting to or the operation of an existing 44 City water line system with the City's representative. 45 a. Coordination shall be in accordance with Section 33 12 25. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCT[ON SPEC[F[CATION DOCUMENTS CPN 01604 Revised [Insert Revision Date] 01 35 13 - 4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1 b. If needed, abtain a hydrant water meter from the Water Department for use 2 during the life of named project. 3 c. In the event that a water valve on an existing live system be turned off and on a to accommodate the construction of the project is required, coordinate this 5 activity through the appropriate City representative. 6 1) Do not operate water line valves of existing water system. 7 a) Failure to compty will render the Contractor in violation of Texas Penal 8 Cade Title 7, Chapter 28.03 (Criminal Mischie fl and the Contractor 9 will be prosecuted to the full extent of the law. 10 b) In addition, the Contractor will assume all (iabilities and 11 responsibilities as a result of these actions. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 G. Public Notification Prior to Beginning Construction 1. Prior to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post notice or flyer 7 days prior to beginning any construction activity on each block in the project area. 1) Prepare flyer on the Contractor's letterhead and include the following information: a) Name of Project b) Ciry Project No (CPN) c) Scope of Project (i.e. type of construction activity) d) Actual construction duration within the block e) Name of the contractor's foreman and phone number fl Name of the City's inspector and phone number g) City's after-hours phone number 2) A sample of the `pre-construction notification' flyer is attached as Exhibit A. 3) Submit schedule showing the construction start and finish time for each block of the project to the inspector. 4) Deliver flyer to the City v�spector for review prior to distribution. b. No construction will be allowed to begin on any block until the flyer is delivered to atl res'rdents of the block. H. Publie Notification of Temporary Water Service Interruption during Construction 36 1. In the event it becornes necessary to temporarily shut down water service to 37 residents or businesses during construction, prepare and deliver a notice or flyer of 38 the pending interruption to the front door of each affected resident. 39 40 41 42 43 44 45 46 47 48 2. Prepared notice as follows: a. The notification or flyer shall be posted 24 hours prior to the temporary interruption. b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name ofthe project 2) City Project Number 3) Date of the interruption of service 4) Period the interruption will take place S) Name of the contractor's foreman and phone number CITY OF FORT WORTH City ofFort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIF[CATION C�OC[IMENTS CPN 01604 Revised [Insert Revision Datej 013513-5 SPEC[AL PROJECT PROCEDURES Page 5 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 34 31 32 33 34 35 36 37 c. d. e. f. 6) Name of the City's inspector and phone number A sample of the temporary water service interruption notification is attached as E�chibit B. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. I. Coordination with United States Army Corps of Engineers (USACE) 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. J. Coordination within Raitroad Permit Areas 1. At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and properiy of the Railroad Company from damage arising out of and/or frorn the construction c��` the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. 3. Railroad Flagmen ?. S�}�mit r�rPir�tc tn C'i� fi�r vPrifi�r�tic�n rJf wrJr���g �i�; � th�t ra�lro�� fl�gtzzen were personnel were present on Site. K. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cut#ing is performed, capture and properly dispose of siurry. L. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH City of ForC Worth Lake Crest Drainage ImprovemeuPs STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01fiiF4 Revised [Insert Revision Date] O1 35 13 - 6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1.5 SUBMITTALS [NOT US�D] 2 1.6 ACTION SUBNIIITALS/INFORMATIONAL SUBMITTALS (NOT USED] 3 1.7 CLO5EOUT SUBMITTALS [NOT USED] - 4 1.8 MAINTENANCE MATERIAL SUBNIITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 110 DELIVERY, STOR.AGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIUNS [NOT USED] 8 1.12 WAR][2ANTY [NOT USEDJ 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 12 END OF SECTION Revision Log DATE NAME SUMMARY pF CHANGE July 2011 13 CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOC[JMENTS CPN 01604 Rcvised [Insert Rcvision Date] i 1 2 3 4 5 6 7 8 9 10 tt 12 13 14 15 16 17 18 19 20 2I 22 23 24 25 26 27 2$ 29 30 31 32 33 34 35 36 37 O1 3S 13 - 7 SPECIAL PROJECT PROCEDURES Page 7 of 8 EXHIBIT A (To be printed on Contracto�'s Lettefiead) Date: CPN No.: Project Name: Mapsco Location: �imits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILiTY LINES 4N OR AROUND YOtl� PROPERTY. �^vi�0$i'i�ii^vTi i3Ei SP9ii"�.'� o€^vii�i r1P���ni'IRi'�'i'�'ci.7 �ci�'F�iv ^ur"�Y� r'sR^v%'i i"r�'ic �%i � OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL.: Mr. <CONTRACTOR�S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvem�nts STANDARD CONSTRUCTION SPBCIFICA'I`ION POCUMENTS CPN 016(kt Revised [Insert Revision Date] 01 35 13 - 8 SPECIAL PROJECT PROCEDURES Page 8 of 8 1 � �' l: : FORT WORTH � �oe no. xxxx Prolect llame: rI0?IC� OF TEMPORARY W�l?ER SL1�ViCE IrlTERRLtPTIQri DUE TO UTII.TTY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOIJR WATER SERVICE'WILL BE INTER.RUPTED ON BETWEEN THE HOURS �F ATtD 7F YOiJ HAVE QUE3TIONS ABOUT THIS SHUT-OUT, PLEASE CALL: MR. AT (CON'CRACTORS StJPERINTENDEtVT) (TELEPHONE NUMBER) OR MR. AT (C1TY INSPECTOR) (TELEPHONE NiTMBEit) THIS INCONVENTENCE WILL BE AS SHORT AS PO5SiBLE. THANK YOU, .CONTRACTOR 3 4 CITY OF FORT WORTH City of Fart Worth Lake Crest Drainage Improv<�r��er�€s STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN U1tit)�i Revised [Insert Revision Date] 014523-1 TEST[NG AND INSPECTION SERVICES Page ] of 2 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0145 23 TESTING AND INSPECTION SERVICES 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract I 1 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 14 15 16 17 18 19 20 21 22 23 2a 25 1.3 A. Measurement and Payment l. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fai(s, the Contractor is responsible for payment of subsequent Quality Assuran�e testing until a passing test occurs. a) Final acceptance will not be issued by City until all required paymen�� for tP�t�ng t�� (�rJntraCtUr h2yP �JP��2 P21� �n ��1. REFERENCES [NOT USED] 26 1.4 ADNIIl�TISTRATIVE REQUIREMENTS 27 28 29 30 31 32 33 34 35 36 37 38 A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, su�ciently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Conium devetopment of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. CITY OF FORT WORTH Ciry ofFort Worth Lake Crest Drainage Improvr.en€:drts STANDARD CONSTRUCTION SPECIFICATION DOCiJMENTS CPN O l�'104! Revised July l, 201 I 014523-2 TGSTING AND [NSPECTION SERVICES Page 2 of 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material inciuding the following information: a. Name of pit b. Date of delivery c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform wark in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFOItMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED) 21 1.8 MAINTENANCE MATERIAL SUBNIITTALS [NOT USEDj 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 25 26 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WA.ItRANTY [NOT USEb] PART 2 - PRODUCTS [NOT USED] 27 PART 3- EXECUTION [NOT USED] 28 29 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 30 CI'I'1' OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPEC[FtCAT[ON DOCUMENTS CPN 01604 Reviscd July 1, 2011 015000-1 TEMPORARY FACILC['IES AND CONTROLS Page 1 of 4 1 2 SECTION 0150 O(1 TEMPORARY FACII,ITIES AND CONTROLS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 l. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0— Bidding Requirernents, Contract Forms and Conditions of the Con�rac'r 17 2. Division 1— General Rec{uirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 l. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for tltis Item. 22 1.3 REFERENCES [NOT USED] 2J 1�� AY%+�+ai\i1CJ1�`L7T1[1IE��'I��Wl�G�'�1�I11CJ 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regutations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary fc�f� execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as reyuired for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic. consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improve�t�crgts STANDARD CONSTRUCTIQN SPEC[E[CAT[ON DOCUMBN'CS CPN U i irt}�! Revised Ju(y l, 20i 1 oi s000-a TEMPORARY FACILIT[ES AND CONTROLS Page 2 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 z2 23 24 25 26 27 28 �9 30 31 32 33 34 35 36 37 38 39 40 41 0 5. d. Contractor Payment for Construction Water l) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as requireti for Work, including testing of Work. 1) Provide power for lighting, operation of eyuipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. Temporary Heat and Ventitation a. Provide ternporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regu(ations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personne( at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed ftom these facilities. c. Collect and store sewage and waste so as not to cause nuisance or heatth problem. d. Haul sewage and waste off-site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provid� adequately v�ntilat�d, wat�rtight� weath�rproof storag� f��iliti�s witl� #loor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Fina( Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCT[ON SPECIPICATION DOCUMENTS CPN 01604 Revised July 1, 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 IS 16 O15000-3 TEMPORARY FACIL[T[ES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on-call at all times b. Must respond in a timety manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. l.S SUBIVIITTALS [NQT USED] 1.6 AC'I'ION SUBMTITALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBNIITTALS [NOT USED) 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITEj CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS (NOT USED] 17 PART 3- EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 2u 3.3 ��Pt�ti ���l�T �PZC�' J��.L j 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR] / [RESTORATION] 25 3.6 RE-INSTALLATION 26 3.7 FIELD [ox] STTE QUALTTY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIF[CAT[ON DOCUMENTS CPN 01604 Revised July 1, 2011 01 50 00 - 4 TEMF'ORARY CACIL[T[ES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work, to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION [NOT USED] 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACI�IlVIENTS [NOT USED] 6 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 O15526-1 STREET US� PERMP[' AND MODIEICAT[ONS TO'I'RAFPIC CONTROL Page i of 3 1 2 SECTION Ol 55 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART1- GENERAL 4 1.1 SUMIVIARY 5 6 7 8 9 10 11 12 l3 14 15 16 1.2 17 18 19 20 1.3 21 22 23 24 25 A. Section Includes: l. Administrative procedures for: a. Street Use Permit b. Modification of appraved traffic control c. Removal of Street Signs B. Deviations from this Ciry of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 34 7l 13 — Traffic Cantrol PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bici. No separate payment will be allowed for this Item. REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference stand�..rr�� published at the time of the latest revision date logged at the end af this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIltEMENTS 27 A. Tra�c Control 28 l. General 29 a. When traffic control plans are included in the Drawings, provide Traffic 30 Control in accordance with Drawings and Section 34 71 13. 31 b. When traffic control plans are not included in the Drawings, prepare traffic 32 control plans in accordance with Section 34 71 13 and submit to City for 33 review. 34 1) A(low min'rmum 10 working days for review of proposed Traffic Control. 35 B. Street Use Permit 36 1. Prior to installarion of Traffic Control, a City Street Use Permit is required. 37 a. To obtain Street Use Permit, submit Traffic Control Plans to City 38 Transportation and Public Works Department. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improven���ii;, STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS CPN 016(14 Revised Ju(y i, 2011 Ol 55 26 • 2 STREET USE PERM[T AND MODIF[CAT[ONS TO TRAFFIC CONTROL Page 2 of 3 1 2 3 4 5 6 7 8 9 10 11 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Petmit, such that construction is not delayed. C. Modification to Approved Traffic Control 1. Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control pians for Street Use Permit, such that construction is not delayed. 12 D. Removal of Street Sign 13 1. If it is determined that a street sign must be removed for construction, then contact 14 City Transportation and Public Works Department, Signs and Markings Division to 15 remove the sign. 16 17 18 19 20 21 22 23 2a E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MIJTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalted, contact the City Transportation and Public Works Deparhnent, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 25 1. Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOS�OUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBNIITTALS (NOT US�D] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLlNG [NOT USED] 32 33 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WA�ZE2ANTY [NOT USEDJ 34 PART 2- PRODUCTS [NOT USED] 35 PART 3- EXECUTION [NOT USED] 36 END OF SECTION CITY OF FORT WdRTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIF[CAT[ON L�OCUMENTS CPN 01604 Revised July 1, 2011 O15526-3 STREET USE PERM[T AND MOD[F[CATtONS TO TRAFF[C CONTROL Page 3 of 3 2 Revision Log DATE NAME SUMMARY OF CH ANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMEN'CS Revised July 1, 2011 City of Fort Worth L.ake Crest Drainage Improvemes�ts CPN 016U4 O15713-1 STORM WATER POLLUT[ON PREVENT[ON Page 1 of 3 1 2 SECTION Ol 57 13 STORM WATER POLLUTION PREVENTION 3 PART1- GENERAL 4 1.1 SUMIVIARY 5 6 7 8 9 10 11 12 13 14 1.2 15 16 17 18 19 20 21 1.3 A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirernents, Co�tract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 31 25 00 — Erosion and Sediment Control PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than i acre of disturbance a. Work associated with this Item is considered subsidiary to the various Iteans bid. No separate payrnent will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 31 25 00. REFERENCES 22 A. Abbreviations and Acronyms 23 l. Notice of Intent: NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at th� time of the latest revision date logged at the end of this 31 Specifieation, unless a date is specifically cited. 32 2. Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Poltutian Prevention Plan. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improver����i�ts STANDARD CONSTRUCTION SPECIF[CAT[ON DOCUMEN'I`S CPN 0(�iO4 Revised July 1, 2011 01 57 13 - 2 STORM WATER POLLUTION PE2EVENTION Page 2 of 3 B. Construction Activities resulting in: 2 1. Less than 1 acre of disturbance 3 a. Provide erosion and sediment control in accordance with Section 31 25 00 and 4 Drawings. 5 2. 1 to less than 5 acres of disturbance 6 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 7 Permit is required 8 b. Complete SWPPP in accordance with TCEQ requirements 9 1) TCEQ Small Consh-uction Site Notice Required under general permit 10 TXR150000 11 a) Sign and post at job site 12 b) Prior to Preconstruction Meeting, send 1 copy to City Department of 13 Transportation and Public Works, Environmental Division, (817) 392- 14 6088. 15 2) Provide erosion and sediment control in accordance with: 16 a) Section 31 25 00 17 b) The Drawings 18 c) TXR150000 General Permit 19 d) SWPPP 20 e) TCEQ requirements 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 3. 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) Tbe Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 A. SWPPP 42 1. Submit in accordance with Section O1 33 00, except as stated herein. 43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 1) 1 copy to the City Project Manager 46 a) City Project Manager will forward to the City Department of 47 Transportation and Public Works, Environmental Division for review C1TY OF FORT WORTH City of Fort Wortfi Lake Crest Drainage Improvements STANDARD CONSTRUCT[ON SPEC[FICAT[ON DOC[JMEN7'S CPN 01604 Revised July 1, 2011 015713-3 STORM WATER POLLUTION PREVENT[ON Page 3 of 3 1 B. Modified SWPPP 2 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City 3 in accordance with 5ection O1 33 00. 4 1.6 ACTION SUSNIITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMTTTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMI'TTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE, AND SANDLING [NOT USED] 9 1.11 FIELD [SITE] C�NDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2- PRODUCTS [NOT USED) 12 PART 3- EXECUTION [NOT USED] 13 14 DATE NAME 15 END OF SECTION Revision Log SUMMARY OF CHANGE CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvem�nts STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS CPN 01 GG4 Revised July 1, 2011 015813•1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 1 2 3 PART 1- GENERAL 4 5 6 7 8 9 10 il 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 SECTION 015813 TEMPORARY PROJECT SIGNAGE 1.1 SUIVIlVIARY A. Section Includes: 1. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: l. Division 0— Bidding Requirements, Contract Forms and Canditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES (NOT USED] I.4 ADMI1�tISTRATIVE REQUIItEMENTS [NOT USED] 1.S SUBNIITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBNIITTALS [NOT USED] 1.7 CLOSEOITT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [N4T USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 111 FIELD [SITE) CONDITIONS [NOT USED] 1.12 WARRAIVTY [NOT USED] PART 2 - PRODUCTS 27 2.1 OWNER-FURNISHED [oxj OWNER-SUPPLIEDPRODUCTS [NOT USED] 28 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS 29 A. Design Criteria 30 1. Provide free standing Project Designation Sign in accordance with City's Standard 31 Details for project signs. CITY OF FORT WORTH City of Fort Wortfi► Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPEC[FICAT[ON C10CUMENTS CPN 01604 Revised July 1, 20I 1 O1 58 13 - 2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 1 B. Materials 2 1. Sign 3 a. Constructed of 3/a-inch fir plywood, grade A-C (exterior) or better 4 2.3 ACCESSORIES [NOT USED] 5 2.4 SOURCE QUALITY CONTROL [NOT USED] 6 PART 3 - EXECUTION 7 3.1 INSTALLERS [NOT USED] 8 3.2 EXAMINATION [NOT USED] 9 3.3 PREPARATION [NOT USED] l0 3.4 INSTALLATION 11 A. General 12 1. Provide vertical installation at e�ents of project. 13 2. Relocate sign as needed, upon request of the City. 14 B. Mounting optians 15 a. Skids 16 b. Posts 17 c. Barricade t 8 3.5 It�PAIIt / RESTORATION [NOT USED] t 9 3.6 RE-INSTALLATION [NOT USED] 20 3.7 FIELD (ou] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING [NOT USED] 24 3.11 CLOSEOUT ACT`IViTIES [NOT USED] 25 3.12 PROTECTION [NOT USED] 26 3.13 MAINTENANCE 27 A. General 28 1. Maintenance will include painting and repairs as needed or directed by the City. 29 3.14 ATTACHMENTS (NOT USED] 30 31 END OF SECTION C1TY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 20ll 01 58 13 - 3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 1 Revision Log DATE NAME SUMMARY OF CHANGE 2 CITY OF FORT WORTH City of FoR Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 20l I i ���� 016000-1 PRODUCT REQUIREMENTS Page 1 of 2 i 2 3 PART1- GENERAL 4 1.1 SUNIIVIARY SECTION 0160 00 PRODUCT REQUIREMENTS 5 A. Section Includes: 6 l. A listing of the approved products for use in the City 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0— Bidding Requirements, Contract Fonns and Conditions of the ContracY. i i 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USEDJ 13 1.3 REFERENCES [NOT USEDj 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 16 l7 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 A. A list of City approved praducts for use is attached ta this Section. B. Only products specifically included on City's Standard Product List in these Contr��� Documents shall be allowed for use on the Project. 1. Any subseyuently approved products will only be allowed for use upon specific approval by the City. C. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects e`��n though the product is listed on the City's Standard Product List. D. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but nat limited to, thai manufacturer's standard product. E. See Section Ol 33 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMTTTALS/IlVFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.$ MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE (NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH City of Fod Worth Lake Crest Drainage Improvern�;c;t:; STANDARD CONSTRUCTION SPEC[F[CATION DOCUMENTS CPN U1G0�� Revised July l, 20I 1 016000-2 PRODUCT REQUIREMENTS Page 2 of 2 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 112 WA,RRANTY [NOT USED) 3 PART 2- PRODUCTS [NOT USED) 4 FART 3- EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OP CHANGE CITY OF FORT WORTH City of Fort Wortfi Lake Crest Drainage Improvements STANDARD CONSTRUCT[ON SPECIF[CATION DOCUMENTS CPN 01604 Revised July i, 2011 016600-I PRODUCT STORAGE AND HANDLiNG REQUIREMENTS Page 1 of 4 t 2 SECTION O1 66 00 PRODUCT STORAGE AND HAN DLING REQUIREMENTS 3 PART1- GENERAL 4 1.1 SI:fMMARY 5 6 7 8 9 10 11 12 13 14 15 16 A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or har$h environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specifcation Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADNIIl�TISTRATIVE REQUIItEMENTS [NOT USED] 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUBMITTALS/Il�TFORMATIC�NAL SUBNIITTALS [NOT USED] 24 25 26 27 28 29 30 31 32 33 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 110 DELIVERY AND AANDLING A. Delivery Requirements 1. Schedule delivety of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCIJMENTS CPN 01604 Revised July 1, 20ll 01 66 00 - 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 1 2 3 4 5 6 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements $ l. H�ndle products or eQuipm�nt in �ocordanc� with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 11 t2 13 14 IS 16 17 18 19 20 21 22 23 24 25 26 27 28 �9 30 31 32 33 34 35 36 37 38 C. Storage Requirements 1. Store materials in accordance with manufactwer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or e�sting facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Represet�tative. 5. Provide ofF site storage and protection when on-site storage is not adequate. a. Provide addresses of and access to off-site storage locations for inspection by City's �'roject Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers9 unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by Ciry's Project Representative. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCT[ON SPECIF[CATION DOC[JMENTS CPN 01604 Revised July i, 2011 01 G600-3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 t 1.11 FIELD [SITE] CONDI'TIONS [NOT USED] 2 L12 WARRAlVTY [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ER.ECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [oR) SITE QUALITY CONTROL A. Tests and Inspections l. Inspect all praducts or equipment delivered to the site prior to unloading. B. Non-Conforming Work 1. Reject atl products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTITP [NOT USEDj 3.9 ADJUSTING [NOT USED] ��1'V i.LLt'll`i�lr� �1\V1 VULL� 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure ta elements and keep thoroughly dry if reyuired by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH City of Fort Worth L.ake Crest Drainage Improvements STANDARD CONSTRUCT[ON SPECIFICATION DOCtJMENTS CPN 0160�3 Revised July 1, 2011 01 66 00 - 4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE C1TY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIF[CAT[ON DOCUMENTS CPN 01604 Revised July 1, 2011 OI7600-I MOBILIZATION AND REMOBILIZATION Page 1 of 3 1 2 3 PART1- GENERAL 4 1.1 SIIMNIARY 5 6 7 8 9 10 11 12 13 I4 IS 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 SECTION Ol 70 00 MOBILIZATION AND REMOBILIZATION A. Section Includes: 3 � 2. Mobilization and Demobilization a. Mobitizaiion: 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2� Establishment of necessary ganeral facilities for the Contractor's operation at the Site 3} Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another tocation within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from one location to another location on the Site. b. Demobiliza.tion: 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disasse�nbly 2} Site Clean-up 3) Removat of a11 buildings andfor other facilities assembled at ihe Site for thi:� Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. Remobilization a. Remabilizatian for Suspensian of Vtfork specifieal}y required in the Conir��t Documents or as required by City includes: 1) Demobilization: a) Transportation of Contractor's personnel, equipment, and operatin� supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization: a) Transportation of Contractor's personneI, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idie time c) Lost proiits Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCI'ION SPECIFICATION DOCUMENTS CPN 01604 Revised June 7, 20I2 ot �aao-2 MOBILIZATION AND REMOBILIZA"I'lON Page 2 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 t6 17 18 19 20 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor's operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation af Contraetor's personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings ar other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not inctude activities for speciiic items of work for which payment is pravided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from City of Fort Worth Standards 2. None 21 C. ReIated Specification Sections include but are not necessarily Iimited to 22 2. Division 0- Bidding Requirements, Cantract Forms, and ConditiQns of the 23 Contract. 24 1.2 PRICE AND PAYIVIENT PROCEDURES 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 A. Measurement and Payment 2. Mobilization and Demobilization a. Measurement and Payment 1) Work associated wiih this Item is considered subsidiary to tlie various items hid, No s�pa�rate payment will be a(lowed for this item. 3. Remobilization for suspension of Work as speci�cally required in the Contract Documents a. Measurement I) Measurement for this Item shall be per each remobilization preformed. b. Payment 1) The work performed in accordance with this Item will be paid for at the unit price per each "Specified Remobilization" in accordance with Contract Documents. c. The price shall il�clude: 1) Demobilization as described in Section 1.1.A.2.a.1) 2) Remobilization as described in Section 1.1.A.2.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 4. Remobilization for suspension of Work as required by City a. Measurement and Payment l.) This shall be submitted as a Contract Claim in accordance with Article 10 of 00 72 00 General Conditions. CITY OF FORT WORTH City of Eo�t Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised June 7, 20I2 OI7000-3 MOBILIZATION AND REMOBILIZATION Page 3 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 l9 20 21 22 23 24 25 26 27 28 29 30 2) No paycnents will be made for standby, idle titne, or lost profits associated with this Item. 5. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demabilization required by the Contraet Dacuments b. Payment I) The Work performed in accordance with this Item wilt be paid for at the unit price per each "Work Order Mobilization" in accordance with Coniract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1} Mobilization as described in Section l.l.A.3.a.1) 2) Demobilization as described in Section 1.1.A.3.a.2} 3) No payments will be made for standby, idte time, or lost profits associated this Item. 6. Emergency Mobilizations and Demobitizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demob'rlization required by the Contract Documents b. Payment 1) The Work performed in accordance with this Item wilt be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section 1.1.A.4.a} 2) Demobilization as described in Section l.l.A.3.a.2) 3) No payments will be made for standby, idle time, or lost profits asso�;i���<� this Item. � � � .3 �`� � .? 2 �l�tQ'�' �JS�Il�� 32 PART Z- PRODUCTS [NOT USEDJ 33 PART 3- EXECUTION [NOT USED] 34 35 36 END OF SECTION Revision Log � DATE NAME SUMMARY OF CHANGE [201 Q .iAN f}6} CITY OF FORT WORTH City of EoR Worth Lake Crest Drainage ImprnvG,r��ents STANDARD CONSTRUCTION SPECIFiCATION DOCUMENTS CI'N {) i 604 Revised June 7, 20I2 017123-1 CONSTRUCT[ON STAKING Page I of 3 1 2 3 PART1- GENERAL SECTION 017123 CONSTRUCTION STAKING 4 1.1 SUMMARY 5 A. Sectioa inciudes: 6 1. Requurements for construction staking. 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 10 11 12 1.2 C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Coniract 2. Division 1— General Requirements PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTR.ATIVE REQITIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 A. Construction Stakes l. Construction staking will be performed by the City. 2. Coordination a. Contact City's Project Representative at least 2 weeks in advance for sc;nedutirng of �o�ns�trucrion Staking. 3. General a. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. b. Contractor is responsible for preserving and maintaining stakes furnished by City. c. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed or disturbed, by Contractor's neglect such that the contracted Work cannot take place, then the Contractor will be required to pay the City for new staking with a 25 percent markup. 1) The cost for staking will be deducted from the payment due to the Contractor for the Project. 34 i.5 SUBNIITTALS 35 A. Submittals, if required, shall be in accordance with Section O1 33 00. 36 l. All submittals shall be approved by the Engineer or the City prior to delivery. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 , Revised July 1, 2011 01 71 23 - 2 CONSTRUCTION STAKING Page 2 of 3 1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUSMITTALS 2 A. Certificates 3 1. Provide certificate certifying that elevations and lacations of improvements are in 4 conformance or non-conformance with requirements of the Contract Documents. 5 a. Certificate must be sealed by a registered professionalland surveyor in the 6 State of Texas. 7 B. Field Quality Control Submittals 8 l. Documentation verifying accuracy of field engineering work 9 1.7 CLOSEOUT SUBMITTALS [NOT USED] 10 1.8 MAINTENANCE MATERIAL SUBNIITTALS [NOT USED] 11 1.9 QUALITY ASSURANC� 12 A. Use adequate numbers of skilled workmen who are thoroughly trained and experienced 13 in the necessary crafts and who are completely familiar with the specified requirements 14 and the methods needed for proper performance of the Work. 15 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 16 1.11 FIELD [SITE] CONDITIONS [NOT USEDj 17 1.12 WA.RRANTY [NOT USED) 18 PART 2- PRODUCTS [NOT USED] 19 PART 3 - EXECUTION 20 3.1 INSTALLERS [NOT USED] 21 3.� �XAIViII�TAiION (IVOT �JSED] 22 3.3 PREPARATION 23 A, Verify location and protect Control points before commencing Wprk, 24 B. Notify City's Project Representative immediately of any discrepancies discovered. 25 3.4 APPLICATION [NOT USED] 26 3.5 REPAIR / RESTORATION [NOT USED] 27 3.6 RE-INSTALLATTON [NOT USED] 28 3.7 FIELD [orz] SITE QUALITY CONTROL 29 A. Preserve permanent reference points during progress of the Work. 30 B. Do not change or relocate reference points without approval from the City. 31 C. Utilize recognized engineering survey practices. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPEC[FICATION DOC[JMENTS CPN O1604 Revised Ju[y 1, 201I 017123-3 CONSTRUCT[ON STAKING Page 3 of 3 1 3.8 SYSTEM STARTITP [NOT USED) 2 3.9 ADJUSTING [NOT USED] 3 3.10 CLEANING (NOT USED] 4 3.11 CLOSEOUT ACTIVI'TIES [NOT USED] 5 3.12 PROTECTION (NOT USED) 6 3.13 MAINTENANCE [NOT USED] 7 3.14 ATTACffiVIENTS [NOT USED] 8 END OF SECTION � 10 Revision Log DATE NAME SUMMARY OF CHANGE C1TY OF FORT WORTH Ciry of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 1 2 3 PARTl- GENERAL 4 1.1 SUIVIMARY 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 SECTION Ol 74 23 CLEANING 017423-I CLEANING Page 1 of 4 A. Section Includes: l. Intermediate and �nal cleaning for Work not including special cleaning of ctosed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 32 92 13 — HydraMulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this IYem is cansidered subsidiary to the various Items bid. No separate payment witl be allowed for this Item. 1.3 REFERENCES [NOT USED) 1.4 ADNIINISTRATIVE ItEQUIREMENTS 20 A. Scheduling 21 1. Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will nof iail on newiy painied suriaces. 23 2. Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED) 26 1.6 ACTION SUBMITTALS/IlVFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 30 31 32 33 1.9 QUALITY ASSIJRANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. C1TY OF FORT WORTH STANDARD CONSTRUCT[ON SPECIFICATION DOCUMENTS Revised July l, 2011 City of Fort Worth Lake Crest Drainage Improvements CPN 01604 01 74 23 - 2 CLEANING Page 2 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART2- PRODUCTS 4 2.1 OWNER-F'LTRIVISHED [ox] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 A. Cleaning Agents 7 1. Compatible with surface being cleaned 8 2. New and uncontaminated 9 3. For manufactured surfaces 10 a. Material recommended by manufacturer 11 2.3 ACCESSORIES [NOT USED] 12 2.4 SOURCE QUALITY CONTROL [NOT USED] 13 PART 3 - EXECUTION 14 3.1 INSTALLERS [NOT USED) 15 3.2 EXAlVIINATION [NOT USED] 16 3.3 PREPARATION [NOT USED] 17 3.4 APPLICATION [NOT USED] 18 3.5 R�PAIR / RESTORATION [NOT USED] 19 �.G RE-I1�TSTALLA�'ION [NOT USEl)] 20 3.7 FIELD (oR] SITE QUALITY CONTROL [NOT USED] 21 3.8= SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 24 25 26 27 28 29 30 31 32 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safeTy orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegadable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH City of FoR Worth Lake Crest Drainage [mprovemeuts STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Reviscd Ju[y 1, 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 z$ 29 30 31 32 33 34 35 36 37 38 39 40 41 42 O1 74 23 - 3 CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on-site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Conime construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as-needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, whi�.h may become airborne or transported by flowing water during the storm. C. Interior Final Cleaning 1. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and oth�a foreign materials from sight-exposed surfaces. 2. Wipe all lighting fixture reflectars, lenses, lamps and trims clean. 3. Wash and shine glazing and mirrors. 4. Polish glossy surfaces to a clear shine. 5. Ventilating systems a. Clean permanent flters and regIace dispasable filters if unats were operated during construction. b. Clean ducts, blowers and coils if units wer� operated without filters during construction. 6. Replace all burned out lamps. 7. Broom clean process area floors. 8. Mop office and control room floors. D. Exterior (Site or Right of Way) Final Cleaning l. Remove trash and debris containers from site. a. Re-seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. CITY OF FORT WORTH STANDARD CONSTRUCTION SPEC[F[CAT[ON DC)C(JMENTS Revised Ju(y I, 201I City ofFort Wortfi L.ake Crest Drainage Improverncss�:� CPN Qlrilt�i 1 2 3 4 5 6 7 8 9 01 74 23 - 4 CLEANING Page 4 of 4 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE (NOT USED] 314 ATTACffi1�NT5 (NOT USED] END OF SECTION Revision Log DATE NAME SiJMMARY OF CHANGE 10 CITY OF FORT WOR171 City of Fort Worth Lal:e Crest Drainage Improvements STANDARD CONSTRUCI'ION SPEC[FICATION DOC[JMENTS CPN 01604 Revised July 1, 2011 017719-I CLOSEOUT REQU[REMENTS Page i of 3 1 2 3 PART 1- GElV�RAL 4 1.1 StT1V1[MARY SECTION Ol 77 19 CLOSEOUT REQUIREIVIENTS 5 A. Section Includes: 6 1. The procedure for closing out a contract . 7 B. Deviations from this City of Fort Worth Standard Specificarion 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Cont��cti 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIltEMENTS 18 A. Guarantees, Bonds and �davits 19 1. No application for final paym�nt will b� accepted until all guarant�es, bonds, 20 certificates, licenses and affidavits reyuired for Work or equipment as specifie� �,:�� 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for fnal payment will be accepted until satisfactory evidence of 24 release of liens has been submitted ta the City. 25 1.5 SUBMTTTALS 26 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improveme,rsi:> STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN QlC,(;�t Revised July I, 2011 O1 77 19 - 2 C[ASEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3,2 EXAlVIINATION (NOT USED) 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section Ol 78 39 2. Operation and Maintenance Data, if required, in accordance with Section O1 78 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section Ol 74 23. C. FinalInspection 2. �� 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particu(ars in which this inspectian reveals that the Work is defective or incomplete. Upon receiving written notice from the City, immediately undertake the Work required t� rernsdy defici�nci�s and cornpl�te the �J�7ork to the satisfaction of the City. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories reyuired to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adeyuate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPEC[PICATION DOCUMENTS CPN 01604 Revised July 1, 201 I 01 77 19 - 3 CLOSEOUT REQU[REMENTS Page 3 of 3 1 2 3 4 S 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Finat Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance l. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT U5ED] 3.7 FIELD [oxj SITE QUALTTY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USEDJ 3.9 ADJUSTING [NOT USED} 3.10 C`LEANING (NOT USED] 3.11 CLOSEOUT ACT`IVI`I'IES [NOT USED] 3.12 PROTECTION [NOT USED) 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHII�NTS [NOT USED] 27 28 DATE NAME 29 END OF SECTION Revision Log SUMMARY OF CHANGE CITY OF FORT WORTH City of Fort Wortfi Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECI['ICATION DOC[JMENTS CPN 016(k3 Revised July l, 2011 1 2 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1.1 SUMMARY SECTION Ol 78 39 PROJECT RECORD DOCUMENTS 01 78 39 - 1 PROJECT RECORD DOCUMENTS Page 1 of 4 A. Section Includes: 1. Work associated with the docamenting the project and recording changes to project documents, including: a, Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED) 22 1.4 ADIVIINISTRATIVE REQUIItEMENTS [NOT USED] 23 1.S SUBMITTALS 24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBNIITTALS [NOT USED] 27 1.7 CLOSEOUT SUSMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 30 31 32 33 34 35 36 1.9 QUALITY ASSURANCE A. Accuracy af Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specificarions and each sheet of Drawings and other pocuments where such entry is reyuired to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CTI'Y OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STt1NDARD CONSTRUCT[ON SPEC[F[CAT[ON DOC[7MENTS CPN 01604 Revised July 1, 2011 Oi 7839-2 PROJECT RECORD DOCUMENTS Page 2 of 4 1 2 3 4 5 G 7 8 9 10 11 12 13 14 15 16 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modifcation of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 110 STORAGE AND HANDLING A. Storage and Handling Requirements l. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event af loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] 17 PART 2 - PRODUCTS 18 19 20 21 22 23 24 25 26 2.1 OWNER FURNLSHED [ou] OWN�R-SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUIVIENTS A. Job set 1. Promptly fotlowing receipt of the Norice to Proceed, secure from the City, at no charge to the Cantractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. A� a tiene Zea� ing the cofri►pl�tiof� of the Woek aitd �rioY i� r i�ai Inspeciior�, peovide the City 1 comp(ete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES (NOT IISED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3 - EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 31 32 33 34 35 3.2 EXAIVIINATION (NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH City of Port Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICAT[ON DOCUMENT`S CPN 01604 Revised July I, 2011 01 78 39 - 3 PROJECT RECORD DOCUMENTS Page 3 of 4 1 2 3 4 5 6 7 8 9 10 ir 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 2. 3. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to finai Project Record Documents. c. Maintain the job set at the site of work. Coordination with Construction Survey a. At a minimum, in accordance with the intervals set forth in Section O1 71 23, clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a"cloud" drawn around the area or areas affectec�. e. In the event of overlapping changes, use different colors for the overlapping changes. 5. Conversion of schematic layouts a. Iri some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject tc� th�; City's approval. 2) However, design of future modifieations of the facility may require accurate information as to the final physical layout af items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to withu� 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to ilie City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", °'i�� ceiling plenum", "exposed", and the like}. 3) Make all identi�cation sufficiently descriptive that it may be related reliably to the Specifications. c. T'he City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifcally issued in writing by the City. B. Final Project Record Documents 1. Transfer of data to Drawings a. Carefulty transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as rec�uired. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actuat location of items. CI7'Y OF FORT WORTH City of Fort Wortfi Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 Oi 7839-4 PROIECT RECORD DOCUMENTS Page 4 of 4 1 2 3 a 5 6 7 S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ►�.� c. Call attention to each enhy by drawing a"cloud" around the area or areas affected. � d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other pocuments a. If the Documents, ather than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, wilt be accepted as final Record Dacuments. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USEDJ 3.7 FIELD (oR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJU5TING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE (NOT USED] 3.14 ATTAC�IMENTS [NOT USED] Ll� Or SLC 11�IV Revision Log DATE NAME SUMMARY OF CHANGE � C1TY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDAI2D CONSTRUCT[ON SPECIF[CATION DOCUMENTS CPN 01604 Revised Juty I, 2011 33a9io-i CAST-IN-PLACE STORM DRAIN MANHOLES AND NNCTION BOXES Page 1 of 6 1 2 SECTION 33 49 10 CAST-IN-PLACE STORM DRAIN MANHOLES AND JiJNCTION BOXES 3 PART1- GENERAL 4 11 SiJMMARY 5 6 7 8 9 10 11 12 13 14 15 16 17 18 A. Section Includes: l. Storm drain cast-in-place concrete manholes and junction boxes B. Deviations from this City of Fort Worth Standard Specification 1. Large junction structures to be priced per each C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1— General Requirements 3. Division 3 — Concrete 4. Section 03 30 00 — Cast-In-Place Concrete 5. Section 31 23 16 — Unclassiiied Excavation 6. Section 31 50 00 — Excavation Support and Protection 7. Section 33 OS 10 — Utility Trench Excavation, Embedment and Backfill 8. Section 33 OS 13 — Frame, Cover and Grade Rings 19 1.2 PRICE AND PAYMENT PROCEDURES 20 21 22 L"S 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 A. Measurement and Payment 1. Storm Drain Manhole Risers a. Measurement 1 j Measuremeni ior this Item shall be per eacn ivianhole �ciser coYnpleie, op completed to the stage of construction required by Drawings. b. Payment 1) The work performed and materials furnished in accordance with this Item and will be paid for at the unit price bid per each "Manhole Riser" installed for: a) Various Sizes c. The price bid shall include: 1) Mobilization 2) Excavation 3) Hauling 4) Disposal of excess materials 5) Furnishing, placement and compaction of embedment 6) Furnishing, placement and compaction of backfill 7) Manhole construction , 8) Manhole frames � 9) Steps , 10) Ring and Cover 11) Clean-up CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMEN'I'S CPN 01604 Revised 7uly 1, 2011 334910-2 CAST-IN-PLACE STORM DRAIN MANHOLES AND JUNCTION BOXES Page 2 of 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 2. 3. Storm Junction Boxes a. Measurement 1) Measurement for this Item shall be per each Junction Box complete, or completed to the stage of construction required by Drawings. b. Payment 1) The work performed and materials furnished in accordance with this Item will be paid for at the unit price bid per each "Storm Junction Box" installed for: a) Various sizes c. The price bid shall include: 1) Mobilization 2) Excavation 3) Hauling 4) Disposal of excess materials 5) Furnishing, placement and compaction of embedment 6) Furnishing, placement and compaction of back�ll 7) Junction Box construction 8) Junction Box frames 9) Steps 10) Ring and Cover 11) Clean-up Storm Junction Structure a. Measurement 1) Measurement for this Item shall be per each Junction Structure complete, or completed to the stage of construction required by Drawings. b. Payment 1) The work performed and materials furnished in accordance with this Item will be paid for at the (ump sum price bid per each "Storm Junction Structure" location. c. The price bid shall include: 1) Mobilization 2) Excavation 3) Hauling 4) Disposal of excess materials 5) Furnishing, placement and compaction of embedment 6) Furnishing, placement and compaciion of backfill 7) Junction Box construction 8) Junction Box frames 9) Steps 10) Ring and Cover 11) Clean-up 42 1.3 REFERENC�S 43 A. Reference Standards 44 l. Reference standards cited in this Specification refer to the current reference 45 standard published at the time of the latest revision date logged at the end of this 46 Specification, unless a date is specifically cited. 47 2. ASTM International (ASTM): CITY OF FORT WOR"CH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July t, 2011 334910-3 CAST-IN-PLACE STORM DRAIN MANHOLES AND JUNCT[ON BOXES Page 3 of 6 1 a. C478, Standard Specification for Precast Reinforced Concrete Manhole 2 Sections. 3 b. D4101, Standard Specification for Polypropylene Injection and Extrusion 4 Materials. 5 1.4 ADMIlVISTRATIVE REQUIREMENTS [NOT USED] 6 1.5 SUBMITTALS 7 A. Submittals shall be in accordance with Section O1 33 00. ' 8 B. All submittals shall be approved by the City prior to delivery. 9 1.6 ACTION SUBMITTALS/INFORMATION SUBMITTALS 10 A. Certificates 11 1. Furnish manufacturer's certificate of compliance that their product meets the 12 physical testing requirements of this Specification for the materials referenced. 13 1.7 CLOSEOUT SUBMITTALS [NOT USED] 14 1.8 MAINTENANCE MATERIAL SUBMITTALS (NOT USED] 15 1.9 QUALITY ASSURANCE [NOT USED] 16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USEDJ 17 1.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WAP;RANTY [NOT USED] 19 PART 2 - PRODUCTS 20 2.1 OWNER-FIJRNISHED [oRj OWNER-SUPPLIEDPRODUCTS [NOT USED] 21 �,.� �e���r��r�, ��aB��� ���s � r,������,� 22 23 24 25 26 27 28 29 30 31 32 33 34 A. Concrete l. Furnish concrete that conforms to the provisions of Section 03 30 00. B. Reinforcing Steel 1. Furnish reinforcing steel that conforms to the requirements of Section 03 30 00. C. Frames, Grates, Rings, and Covers l. Provide frames, grates, rings and covers that conform to dimensions and materials shown on Drawings and Section 33 OS 13. 2. Ensure that covers and grates fit properly into frames and seat unifortnly and solidly. D. Steps 1. Provide polypropylene supports and steps to the shape and dimensions shown on Drawings that meet the requirements of ASTM D4101 and ASTM C478, Section 16, "Steps and Ladders." CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised Ju(y I, 20L1 334910-4 CAST-IN-PLACE STORM DRAIN MANHOLES AND 7UNCTION BOXES Page 4 of 6 1 2.3 ACCESSORIES [NOT USED] 2 2.4 SOURCE QUALITY CONTROL (NOT USED] 3 PART 3 - EXECUTION 4 3.1 INSTALLERS [NOT USED] 5 3.2 EXAMINATION [NOT USED] 6 7 8 9 10 11 12 13 14 15 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. General 1. Perform all concrete work in accordance with Division 3. 2. Use of forms is required for all concrete walls, except where the nature of the surrounding material is such that it can be trimmed to a smooth vertical face a. Outside form for concrete bases supporting brick walls may be omitted with approval from the Engineer. 3. Cast polypropylene supports and steps into concrete walls when concrete is placed or drilt and grout steps in place after concrete placement. 16 B. Excavation and Embedment 17 1. Conform to the requirements of Section 31 23 16, Section 31 50 00 and Section 33 18 OS 10, where applicable. 19 C. Manholes for Precast Concrete Drain Pipes 20 1. Conshuct manholes for precast concrete pipe drains as soon as is practicable after 21 drain lines into or through the manhole locations are completed. 22 2. Neatly cut all drain pipes at the inside face of the walls of the manhole and point up 23 with mortar. 24 D. Manholes for Monolithic Drain Pipes 25 1. Construct bases for manholes on monolithic drain pipes either monolithically with 26 the drain pipe or after the pipe is constructed. 27 E. Manholes for Box Drains 28 1. Cast bases for manholes for box drains as an integral part of the drainage system. 29 2. Manholes may be constructed prior to backfilling or, if the Contractor so elects, 30 manhole opening may be temporarily covered with timber to facilitate compaction 31 of backfill for the pipe system as a whole with tractor equipment. 32 a. Perform required excavation for manhole, construct manhole and backfill in 33 accordance with Drawings. 34 3. For manholes that are over 5-feet deep, include all manhole steps required in the 35 wall of the box drain. 36 37 F. Junction Structures 1. All structures shall be installed as specified in Drawings. 38 G. Inverts CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised Ju(y 1, 2011 1 2 3 4 5 6 7 8 9 10 ll 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 334910-5 CAST-IN-PLACE STORM DRAIN MANHOLES AND JUNCTION BOXES Page 5 of 6 1. Shape and route floor inverts passing out or through the manhole as shown on the Drawings. 2. Shape by adding and shaping mortar or concrete after the base is cast or by placing the required additional material with the base. H. Curing l. Cure a(I exposed concrete as required in Division 3. I. Finishing 1. Finish all concrete as required in Division 3. J. Form Removal l. Remove concrete form as required in Division 3. K, Placement and Treatment of Castings, Frames, and Fittings 1. Place castings, frames and fittings in positions indicated on Drawings or as directed by Engineer, true to line and correct elevation. 2. Frames or fittings set in new concrete or mortar a. Place and position anchors or bolts before concrete mortar is placed. b. Do not disturb unit until mortar or concrete has set. 3. Frames or fittings placed upon previously constructed masonry a. Bring bearing surface or masonry true to line and grade, and present an even bearing surface, so that entire face or back of unit will come in contact with masonry. b. Set unit in mortar beds or anchor to masonry, as indicated on Drawings or as directed and approved by the Engineer. 4. Ensure that units are set firm and secure. 5. Allow concrete or mortar to harden for a minimum 7 days. 6. Replace and fasten down grates or covers. 3.5 [REPAIR] / [RESTORATIONj [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] Revision Log CITY OF FORT WORTH STANDARD CONSTRUCT[ON SPECIF[CATION DOCUMENTS Revised July 1, 2011 City of Fort Worth Laice Crest Drainage Improverr�e�ats CPN 0 i 61;�# 334910-6 CAST-IN-PLACE STORM DRAIN MANHOLES AND JUNCTION BOXES Page 6 of 6 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 20l I City of Fort Worth Lake Crest Drainage Improvements CPN 01604 334920-I C[7RB AND DROP INLETS Page 1 of 5 1 2 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 �4 SECTION 33 49 20 CURB AND DROP INLETS A. Section Includes: 1. Construction of inlets, cornplete in place or to the stage detailed a. Including furnishing and installing frames, grates, rings and covers B. Deviations from this City of Fort Worth Standard Specification 1. 2' Grate Inlets per spec 3349.9001 will be constructed per this speciiication as drop inlets without grates. Drop Inlets and associated aprons are modifed herein per construction drawings, details. Hanson (or approved equal) will provide steel placement design and engineer's seal. Contractor shall submit shop drawings prior to construction for approval. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contr�c t 2. Division 1— General Requirements 3. Division 3 — Concrete 4. Section 02 41 13 — Selective Site Demolition 5. Section 03 30 00 — Cast-In-Place Concrete 6. Section 03 80 00 — Modifications to Existing Concrete Structures 7. Section 33 OS 10 — Utility Trench Excavation, Embedment and Backfill 8. Section 33 OS 13 — Frame, Cover and Grade Rings 9. Section 33 OS 14 — Adjusting Manholes, Inlets, Valve Boxes and Other Structw•es to Grade 25 1.2 PRICE AND PAYMENT PROCEDURES 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Measurement and Payment l. Measurement a. Measurement for this Item shall be per each inlet complete in place. 2. Payment a. The work performed and the materials furnished in accordance with this Item shall be paid for at the unit price bid per each "Inlet" installed for: 1) Various types 2) Various sizes 3. The price bid shall include: a. Furnishing and installing the specified Inlet b. Mobilization c. Excavation d. Hauling e. Disposal of excess materials £ Furnishing, placement and compaction of embedment CITY OF FORT WORTH Ciry of Fort Worth Lake Crest Drainage Improvern��a�is STANDARD CONSTRUCTION SPECIFICATION DOCIJMENTS CPN 01(>t%f Revised July l, 201 I 334920-2 CURB AND DROP INLETS Page 2 of 5 1 2 3 4 5 6 7 8 9 g. Furnishing, placement and compaction of backfi(1 h. Concrete i. Reinforcing steel j. Mortar k. Aluminum and castings 1. Frames m. Grates n. Rings and covers o. Clean-up 10 1.3 REFERENCES 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. ASTM International (ASTM): a. C478, Standard Specification for Precast Reinforced Concrete Manhole and Inlet Sections. b. D4101, Standard Specification for Polypropylene Injection and Extrusion Materials. c. C309, Standard Speciiication for Liquid Membrane-Forming Compounds for Curing Concrete. 3. Texas Department of Transportation (T�cDOT). a. Departmental Materials Specification (DMS): 1) 7340, Qualification Procedure for Multi-Project Fabrication Plants of Precast Concrete Manholes and Inlets. 26 1.4 ADMINISTRATIVE REQUIREMENT [NOT USEDJ 27 1.5 SUBMITTALS 28 A. Submittals shall be in accordance with Section O1 33 00. 29 B. All submittals shall be approved by the Engineer or the City prior to delivery. 30 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 31 32 33 34 35 36 37 1.7 A. Product Data 1. Precast Concrete Inlet 2. Pipe connections at inlet walls 3. Stubs and stub plugs 4. Admixtures 5. Concrete Mix Design CLOSEOUT SUBMITTALS [NOT USED] 38 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 39 1.9 QUALITY ASSURANCE [NOT USED] 40 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] C[TY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD COPlSTRUCTION SPECIFICATION DOCUMEM"S CPN 01604 Revised July l, 2011 334920-3 CiJItB AND DROP INLETS Page 3 of 5 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY (NOT USED] 3 PART 2 - PRODUCTS 4 2.1 OWNER-FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 EQUIPMENT, PRODUCT TYPES AND MATERIALS 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 A. Materials 1. Concrete a. Furnish concrete that conforms to the provisions of Section 03 30 00. 2. Reinforcing Steel a. Furnish reinforcing steel that conforms to the requirements of Section 03 30 00. 3. Mortar a. Furnish mortar per Section 03 SO 00. 4. Steps a. Provide polypropylene supports and steps conforming to the shape and dimensions shown on the Drawings that meet the requirements of ASTM D4101 and ASTM C478, Section 16, "Steps and Ladders." 5. Curing Materials a. Curing materials shall conform to the provisions of Division 3. 6. Frames, Grates, Rings and Covers a. Provide frames, grates, rings and covers that conform to dimensions and materials shown on Drawings and Section 33 OS 13. b. Ensure that covers and grates fit properly into frames and seat uniformly and solidly. 2.3 ACCESSORIES [NOT USED] 2.4 ��;IJR�E �:.Tti;,i'�' � ��l�T'TR�I. �l�T� � J���y PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USEDJ 3.3 PREPARATION 30 A. Removal 31 1. Remove all or portions of existing structures in accordance with Section 02 41 13. 32 2. Drill, dowel, and grout in accordance with Section 03 30 00. 33 3.4 INSTALLATION 34 A. Interface with Other Work 35 1. All types of inlets may be built either in 1 stage or in 2 stages, described as Stage I 36 and Stage II. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage [mprovements STANDARD CONSTRUCTION SPECIFICATION DOCUMEN'Is CPN 01604 Revised July 1, 201 l 334920-4 CURB AND DROP INLETS Page 4 of 5 1 2 3 4 5 6 7 8 9 10 a. Build inlets designed to match the final roadway surface in stages. 2. Construct the Stage I portion of inlets as shown on the Drawings or as specified in this Section. a. Furnish and install a temporary cover as approved by the Engineer. 3. Construct Stage II after the pavement structure is substantially complete unless otherwise approved by the Engineer. a. For Stage II, construct the remaining wall height and top of inlet and furnish and install any frames, grates, rings and covers, manhole steps, curb beams or collecting basins required. B. Cast-In-Place Inlets I 1 1. Construct cast-in-place inlets in accordance with Section 03 30 00. 12 a. Forms will be required for all concrete walls. 13 b. Outside wall forms for cast-in-place concrete may be omitted with the approval 14 of the Engineer if the surrounding material can be trimmed to a smooth vertical I S face. 16 2. Cast polypropylene steps into the concrete walls when the concrete is placed, or 17 drill and grout steps in place after concrete placement. 18 19 20 21 22 23 24 25 26 27 28 29 30 C. Inlets for Precast Concrete Drain Pipes Construct inlets for precast concrete drain pipes as soon as is practicable after storm drain lines into or through the inlet locations are completed. a. Neatly cut all pipes at the inside face of the walls of the inlet and point up with mortar. D. Inlets for Monolithic Drain Pipes 1. Construct bases for inlets on monolithic drain pipes either monolithically with the storm drain or after the storm drain is constructed. E. Inverts l. Shape and route floor inverts passing out or through the inlet as shown on the Drawings. 2. Shape by adding and shaping mortar or concrete after the base is cast or by placing the required additional material with the base. 31 F. Finishing Complete Inlets 32 1. Complete inlets in accordance with the Drawings. 33 2. Backfill to original ground elevation in accordance with Section 33 OS 10. 34 G. Finishing Stage I Construction 35 l. Complete Stage I construction by constructing the walls to the elevations shown on 36 the Drawings and backfilling to required elevations in accordance with Section 33 37 OS 10. 38 39 40 41 42 43 H. Stage II Construction 1. Construct subgrade and base course or concrete pavement construction over Stage I inlet construction, unless otherwise approved by the Engineer. 2. Excavate to expose the top of Stage I construction and complete the inlet in accordance with the Drawings and these Specifications, including backfill and cleaning of all debris from the bottom of the manhole or inlet. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Lnprovements STANDARD CONSTRUCTION SPECIFICATION DOCUIvfENTS CPN 01604 Revised Juty l, 2011 334920-5 CURB AND DROP INLETS Page 5 of 5 1 I. Form Removal 2 1. Forms used in the construction of "Inlets" which support vertical loads will remain 3 in place at least 24 hours after the concrete is placed. 4 2. Other forms shall remain in place for a minimum time 24 hours after concrete is 5 placed, unless otherwise directed by the Engineer. 6 J. Curing 7 1. Cure all exposed concrete as required in Section 03 30 00. 8 K. Finishing 9 1. Conform to Section 03 30 00. 10 3.5 REPAIR [NOT USED] 11 3.6 RE-INSTALLATION [NOT USED] 12 3.7 FIELD [ox] SITE QUALITY CONTROL [NOT USED] 13 3.8 SYSTEM STARTUP [NOT USED] 14 3.9 ADJUSTING 15 A. Refer to Section 33 OS 14. 16 3.10 CLEANING [NOT USEDJ 17 3.11 CLOSEOUT ACTIVITIES [NOT USED] 18 3.12 PROTECTION [NOT USED) 19 3.13 MAINTENANCE [NOT USED] 20 3.14 ATTACHMENTS [NOT USED) 21 END OF SECTION 22 DATE I NAME 23 Revision Log SUMMARY OF CHANGE CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvcr��ents STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPId �itG04 Revised July 1, 201 I 334940- I STORM DRAIN HEADWALLS, WINGWALLS AND SAFETY END TREATMENTS Page 1 of 5 C, 1 2 SECTION 33 49 40 STORM DRAIN HEADWALLS, WINGWALLS AND SAFETY END TREATMENTS 3 PART1- GENERAL 4 1.1 SITMMARY 5 6 7 8 9 10 11 12 13 14 15 16 17 I8 14 20 21 22 A. Section Includes: 1. Storm drain headwalls, wingwalls, and safety end treatments B. Deviations from this City of Fort Worth Standard Specification 1. Sloping headwalls modified per construction plans, details 2. Headwall with Flared Wings included per T�OT specifications C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1— General Requirements 3. Section 02 41 13 — Selective Site Demolition 4. Section 03 34 00 — Cast-In-Place Concrete 5. Section 31 37 00 — Riprap 6. Section 33 OS 10 — Utility Trench Excavation, Embedment and Backfill 7. Section 33 4I IO — Reinforced Concrete Storm Sewer FipeiCulveris D. Standard Details l. Concrete Headwall - Refer to TXDOT Port Worth District Details 2. Concrete VVingwall - Refer to TXDOT Fort Worth District Deta.ils 3. Safety End Treatment - Refer to TXDOT Fort Worth District Details 23 1.2 PRICE AND PAYMENT PROCEDURES 24 25 26 27 28 29 30 3t 32 33 34 35 36 37 38 39 A. Measurement and Payment 1. Concrete Headwall a. Measurement 1) Measurement for this Item shall be per each "Headwall" satisfactorily completed as specified on the Drawings. b. Payment 1) The wark performed and materials furnished in accordance with this Item will be paid for at the unit price bid per each "Headwall" installed for: a) Various pipe sizes b) Various types c) Various number of pipes c. The price bid shall include: 1) Consh-ucting, furnishing, transporting and installing the Concrete Headwall 2) Connecting to the existing structure 3} Breaking back, removing and disposing of portions of the existuig structure 4) Replacing portions of the existing structure to make connections CITY OF FORT WORTH City of Eod Worth Lake Crest Drainage Improvemes3+rs STANDARD CONSTRUCTION SPECIFICATION DC}CUMENTS Cf'N Oi G4)Q Revised Ju[y 1, 201 I 334940-2 STORM DI2AIN HEADWALLS, WINGWALLS AND SAFETY END TREATMENTS Page 2 of 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 2. 5) Excavation 6) Hauling 7} Disposal of excess material 8) Furnishing, placing and compaction of backfill 9) Concrete, as required by Drawings 10) Reinforcing Steel, if required by Drawings ll) Corrugated metal pipe, if reyuired by Drawings 12) Reinforced canerete pipe, if required by Drawings 13) Ctean-up Safety End Treaiment a. Measurement 1) Measurement for this Item shall be per each "SET" satisfactorily completed as specified on the Drawings. b. Fayment 1) The work performed and materials furnished in accordance with this Item will be paid for at the unit price bid per each "SET" installed for: a) Various types b) Various pipe sizes c) Various number of pipes a The price bid shall include: 1) Constructing, furnishing, transporting and installing the Concrete Headwall 2) Connecting to the e�sting structure 3) Breaking back, removing and disposing of portions of the existing structure 4) Replacing portions of the e�cisting structure to make connections S) Excavation 6) Hauling 7) Disposal of excess materials 8) Furnishing, placing and compaction of backfill 9) Concrete, as required by Drawings 10) Reinforcing Steel, if required by Drawings 11} Corrugated metal pipe, if required by Drawings 12) Reinforced concrete pipe, if required by Drawings 13) Clean-up 34 1.3 REFERENCES 35 36 37 3$ 39 40 41 42 43 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Speciitcation, unless a date is specifically cited. 44 1.4 ADMINISTRATIVE REQITIREMENTS (NOT USED] 45 1.5 SUBMITTALS 46 1. Refer to Sectian 03 3Q 00. A. Definitions 1. Headwatls - all walls, including wings, at the ends of single-barrel and multiple- barrel pipe culvert structures � Z. Wingwalis - att wails at the ends of single-barrel or multiple-barrel box cutvert structures B. Reference Standards C[TY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICAT`ION DOCUMENTS Revised Ju[y I, 20I I City of Fort Worth Lake Crest Drainage [mprovements CPN 01604 334940-3 STOF2M DRAIN HEADWALLS, WINGWALLS AND SAFETY END TREATMENTS Page 3 of S 1 1.6 ACTI4N SUBMITTALSIINFORMATIpN STTBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 L8 MAINTENANCE MATERIAL SUBMTi'TALS [NOT USED] 4 1.9 QUALITY ASSURANC� (NOT USED] 5 1.10 DELIVERY, STORAGE, AND HANDLING A. Delivery and Acceptance Requirements 1. Marking a. Before shipment from the casting or fabrication yard, ciearty mark the foitowing on each precast unit: I ) Date of manufacture 2) Nam� or trademark of the manufacturer 3) Type and size designation 2. �auses for Rejection a. Precast units may be rejected for not meeting any one of the Specification requirements. b. Individual units may also be rejected for fractures or cracks passing through t��; wall or surface defects indicating honeycombed or open texture surfaces. e. Remove rejected units from the project, and replace them with acceptable �anits meeting the requirements of this Section. B. Storage and Handling Requirements 1. Secure and maintain a location to store the material in accordance with Section �9 � 66 00. 2. Store precast units on a level surface. 3. Da nat place any toads an precast cancrete units utrtil design strength is reache:�. 4. Do not ship units until design strength requirements have been met. �.� 1 � li�LL [�1�1 �il �ONB111�Nw� �NQi 1 ���i�%� 1.12 WAI2RANTY [NOT USED) 6 7 8 9 10 11 12 I3 14 15 16 17 18 19 20 22 22 23 24 25 26 27 28 PART 2 - PRODUCTS 29 2.1 OWNER-FURNISFIED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 30 2.2 EQUIl'MENT, PRODUCT TYPES AND MATERIALS 31 32 33 34 3S 36 37 38 A. Materials l. Concrete a. Furnish concrete that conforms to the provisions of Section 03 30 00. Z. Reinforcing S�eel a. Furnish reinforcing steel that conforms to the requirements of Section 03 30 00. B. Fabrication l. Fabricate cast-in-ptace conerete units and precast units in accordance with Section 03 30 00. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised Juiy I, 201 I City of Fod Worth Lake Crest Drainage ImproverraE.�:�t, CPN Oi613�� s3a9aa-a STORM DRAIN HEADWALLS, WINGWALLS AND SAFETY END TREA'I'MENTS Page 4 of 5 1 2 3 4 5 6 7 8 9 10 11 12 13 1) Safety End Treatment will be precast for 30-inch and smaller diameters and cast in place for greater than 30-inch diameters. 2. Fabrication Tolerances a. Lifting Holes 1) For precast units, provide no more than 4lifting holes in each section. 2) Lifting holes cnay be cast, eut into fresh concrete after form removal or drilted. 3} Provide Iifting hotes large enough for adeauate tifting devices based on the size and weight of the section. a} The maximum hole diameter is 3 inches at the inside surface of the watl and 4 inches at the outside surface. b) Do not cut more than 1 longitudinal wire or 2 circumferential wires per layer af reinforcing stee! when locatin� lift holes. 14 2.3 ACCESSORIES [NOT U5ED] 15 2.4 SOURCE QUALITY CONTROL [NOT USED] 16 PART 3 - EXECUTION 17 3.1 INSTALLERS [NOT USED] 18 3.2 EXAlVIINATION [NOT USED] 19 3.3 PR�PARATION 20 A. Removal 21 1. Remove all or portions of existing structures in accordance with Section Q2 41 23. 22 2. Drill, dowel and grout in accordance with Section 03 30 00. 23 3.4 IN5TALLATION 24 A. L-�terface with Jthe: V��ock 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 1. Make connections to new or existing structures in accordance with the details shown on the Drawings. 2. Furnish jointing material in accordance with Section 33 41 10, or as shown on the Drawings. B. Excavation, Shaping, Bedding and Backfill a. Excavate, shape, bed and backfill in accordance with Section 33 OS 10. b. Take special precautions in placing and compacting the backfill to avoid any movement or damage to the units. c. Bed precast units on foundations of firm and stable material accurately shaped to conform to the bases of the units. C. Piacement of Precast Units a. Provide adequate means to lift and place the precast units. 1) Utilize sufficient number of lifting holes to ensure that the units are not damaged during lifting. b. Fill lifting holes with mortar or concrete and cure. 1) Precast concrete or mortar plugs may be used. CPI'Y OF FORT WORTH City of Fod Worth Lake Crest Drainage Improvements STANDAI2D CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised Juty l, 20I I 33Q9A0-5 STORM DRAIN HEADWALLS, WINGWALLS AND SAFETY END TREATMENTS Page 5 of 5 1 3.5 REPAIR 2 A. Occasional imperfections in manufacture or accidenta! damage susta'tned during 3 handling may be repaired. 4 1. The repaired units will be acceptable if they conform to the requirements of this 5 Section and the repairs are sound, properly finished and cured in conformance with 6 pertinent Specifications. 7 B. Repair spalled areas around lifting holes. S 3.6 RE-INSTALLATION [NOT USEDj 9 3.7 FIELD (ax] SITE QUALITY CONTROL [NOT USED] IQ 3.8 SYSTEM STARTUP [NOT USED} t 1 3.9 ADJUS'FIl�FG [NOT USED] 12 3.10 CLEEINING (NOT USED} 13 3.11 CLOSEOUT ACTiVITIES [NQT USED] 14 3.12 PROTECTION [NOT USED} 15 3.13 MAINTENANCE [N�T USED] 16 3.14 ATTACHMENTS [NOT USED] i � END OF SECTION 18 DATE NAME 19 Revision Log SUMMARY 4F CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIPICATION DOCUMENTS Revised July l, 2011 City of Fort Worth Lake Crest Drainage [mprovemenr; CPN O l GG4 1 2 3 I 4 1.1 5 6 7 SECTION 33 23 50 PERMANENT TRANSiTTQN MATS GENERAL SECTION INCLUDES 332350-1 Permanent Transition Mats Page 1 of 6 A. Permanent Transition Mats used in canjunction with integral soi) anchors and the appropriate soil cover(s) provide scour and erosion protection preventing soil and vegetation loss resulting from excessive water flow (velocity and shear stress). 8 1.2 RELATED SECTIONS 9 A. Section 31 10 00 10 B. Section 31 23 16 11 1.3 UNIT PRICES Site Clearing Earthwork 12 A. Method of Measurement: By the square yard (or square meter - as indicated in 13 contract documents) including seams, overlaps, and wastage. 14 B. Basis of Payment: By the square yard (or square meter - as indicated in contract 15 Documents) installed. 16 1.4 REFERENCES 17 A. AMERICAN SOCIETY FOR TESTiNG AND MATERIALS (ASTM): 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 : C 1. D 792, method A- Standard Test Methods for Density and Specific Gravity (Relative Density) of Plastics by Displacement 2. D 4355 - Standard Test Method for Deterioration of Geotextiles by Exposure to Light, Moisture and Heat in a Xenon Are Type Apparatus 3. D 4595 - Standard Test Method for Tensile Properties of Geotextiles by the Wide- Width Strip Method 4. D 6460 - Standard Test Method for Determination of Rol(ed Erosion Control Product (RECP) Performance in Protecting Earthen Channels from StormwaterInduced Erosion 5. D 6525 - Standard Test Method for Measuring Nominal Thickness of Permanent Roiled Erosion Control Products 6. D 6566 - Standard Test Method for Measuring Mass Per Unit Area of Turf Reinforcement Mats 7. D 6818 - Standard Test Method for Ultimate Tensile Properties of Turf Reinforcement Mats Geosynthetic Accreditation Institute (GM) - Laboratory Accreditation Program (LAP). American Association of State Highway and Transportation Officials (AASHTO) ' CITY OF FORT WORTH City of Fort Worth Luke Crest DroinAge Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 33 23 50 -t Permanent Transition Mats Page 2 of 6 1 D. National Transportation Product Evaluation Program (NTPEP). 2 1.5 DEFINITIONS 3 A. Minimum Average Roll Value (MARV): Property value calculated as typical 4 minus two standard deviations. Statistically, it yields a 97.7 percent degree of 5 confidence that any sample taken during quality assurance testing will exceed the 6 value reported. 7 B. Typical Value: Physical property value referred to as average, mean or "target" 8 value. Also referred to as the statistical average value. 9 1.6 SUBMITTALS 10 A. Submit under provisions of Section O1 33 00 Submittals: 11 12 13 14 15 16 17 18 19 20 21 22 23 24 l. Certification: The contractor shall provide to the Engineer a certificate stating the name of the manufachirer, product name, style number, chemical composition of the ftlatnents or other pertinent information to fully describe the Transition Mat (TM). The Certification shall state that the furnished TM meets or exceeds the MARV requirements of the specification as evaluated under the Manufacturer's quality control program. A person having legal authority to bind the Manufacturer shall attest to the Certification. 2. The contractor shall submit five (5) copies of the manufacturer's data, specifications, samples and a list of previous project installations of a TM. 3. The contractor shall submit a manufacturer's certification that the propased material complies with the requirements specified herein and are suitable for the intended purpose. 4. No material shall be shipped to the Project Site until the manufacturer certification is submitted to and approved by the Engineer. 25 5. The contractor and/or the engineer shall meet with a manufacturer's 26 representative on site prior to beginning insiallation. A letter shalt be 27 submitted prior to installation that this meeting has occurred and any concerns 28 about the installation procedures have been addressed. 29 6. Alternative products to be submitted as an equal to the specified product 30 within this specification will require the following minimurn d�cumentation: 31 Performance data (Permissible Velocity and Permissible Shear Stress) for full 32 scale flume testing along with corresponding soil loss data in a day one and 33 iilly vegetated state. Said data must be developed by independent third party 34 testing from a recognized testing facility. For culvert applications, 35 demonstrated prototype culvert outfatl testing with appropriate velocities shall 36 also be provided. A written statement describing any noncompliance items of 37 the alternative product should be included in the submittal. 38 1.7 QUALITY ASSURANCE 39 A. Manufacturer Qualifications: Manufacturer's shall maintain a written Quality 40 Assurance policy / manual and make said policy / manual available to the Engineer 41 at. his request. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 33 23 50 -i Permanent Transition Mats Page 3 of 6 1 1.8 DELIVERY, STORAGE, AND HANDLING ;' 2 A. Product labels shall clearly indicate the manufacturer or supplier name and product 3 name. 4 B. Each TM pallet shall be wrapped with a material covering that will protect the TM 5 from damage due to shipment, sunlight, and storage. 6 C. During storage, TM panels shall be adequately covered to protect them from the 7 following: site construction damage, extended ultraviolet radiation, chemicals that 8 are strong acids or strong bases, flames including welding sparks, excessive 9 temperatures, and any other environmental conditions that may damage the 10 physical property values of the TM. i l 2. PRODUCTS 12 21 MANUFACTURERS 13 A. Leggett & Platt, Inc 14 dba Landmark Earth Solutions Number 1 Leggett Rd. 15 Carthage, MO 64836 16 1-877-997-2687 17 www.scourstop.com 18 B. Substitutions: Manufacturers others than those noted above should be a member of 19 the International Erosion Control Association (IECA) and gain engineer approva( 20 30 days prior to bid date. 21 2.2 MATERIALS 22 A. Transition Mat: 23 1. The TM shall be Scourstop manufactured for the purpose of permanent scour 24 protection and erosion control in high stress or flow areas. The TM shall be 25 made from 100% synthetic material (high density polyethylene) and contain 26 no biodegradable or photodegradable components or materials. The TM shall 27 contain a minimum of 15% ITDPE recycled content as measured by mass per 28 unit area. 29 2. The TM shall be a dimensionally stable and resilient mat providing 30 mechanical protection for soil covers that hold soil particles and sediment in 31 place. The TM shall provide permanent, uniform adherence of the soil covers 32 to the soil profile. It shall have 50% open space available for vegetative 33 establishment. 34 35 36 37 3. The TM shall be a semi-rigid mat which provides impact resistance and high tensile strength. When anchored the TM maintains intimate soil contact while providing a minimum of 401bs of holding capacity per square fbot to resist uplift forces due to high velocity. CITY OF FORT WORTH City of Fort Worth L,ake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 33 23 50 -t Permanent Transition Mats Page 4 of 6 1 2 3. 4 5 6 7 8 9 4. The TM shall meet the requirements of Table 1. Proposed equals must be approved by the engineer a minimum of 30 days prior to bid date. Test results cloct�menting that. the transition mat. has been tested under controlled flow conditions for hydraulic performance characteristics in accordance with ASTM D-6460 must be submitted along with the manufacturer's certification that the TM's design and components meet or exceed all of the requirements set forth in this specification. TABLE I- PERMANENT TRANSITION MAT Propert�� Test ��etliod L?ll1fS �'nlue (1ZAR�' or T�•picnp Pl���sicat Massl`Lhut tlrea AST�'i D G566 lbi,f U.93 TIAR.�' Tluckuess ASTI��i D G5?5 uiclie� 0.=F3? I��IAR�� ��Tide �Vidtli Tensile AST�f D 4S9S lb/i� 260U I�L�RV (IvID,�TD) Percent Open ��ea Calculated °rb ;i0 T}��ic�l DeiisitylSpeciiic 4STI��i D 79� a/c�ii3 0.935 ?��L�R�' Graviry A�tettioci A UV Stabilit � ASTIvi D 4355 �io 9U IvIARV Pei•form�ure Velacity Fhtnle TeStiu� ftisec Day 1 Perforivance �1STA-i D-G=�GO 19.0 Fully �'eaetated 31.0 Shear Fluuie Testin� lUlB` Day 1 Perforin�nce ASTA�1 D-C460 13.0 Fully Veget�tecl 16A C'u1�-ert Outfall Test Proto�e Eti; i�elocity fps ! �� Discliarse cfs 90 ` Acceptable faciGties uiclude Ut� St�te U�ucersity, Colorado St1te Uiuversin> 10 2,3 11 ACCESSORIES A. Anchoring Devices 12 1. The anchoring devices for the T`M are an integral component of the Scow-stop 13 system. The soil anchors shall be a polymer material molded into a bullet tip. 14 It shall be 2 inches long by 1 inch wide with a.0495 inch diameter opening 15 lengthwise through the anchor. The anchors shall be connected with a pre- 16 attached tether extending up to 36 inches. 17 2. Tether strapping material shall be'/2 inch wide polypropylene material with a 18 minimum tensile strength of 700 pounds. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised Ju(y 1, 2011 1 2 3 4 5 ' 6 7 8 9 10 11 12 3.0 ' 13 3.1 33 23 50 -1 Permanent Transition Mats Page 5 of 6 3. Double Lock Washers shall be a flanged bushing type device with a diameter of 2.75 inches. The washer shall be .5 inches in height and fully recess into the TM openings leaving only .125 inches above the transition mat. The washer shall also employ a double lock mechanism that attaches to the tether and bullet anchor. B. Soil Covers l. Soil covers utilized underneath the transition mat shall be in accordance with the soil cover(s) manufacturer's recommendation and shall be appropriately selected for the given application and soil conditions present. Typical soil covers may be turf reinforcement mats, geotextiles, sod or a combination of these materials. EXECUTION PREPARATION 14 A. The installation site shall be prepared by clearing, grubbing, and excavating or 15 filling the area to the design grade. 16 17 18 19 20 21 22 B. The surface to receive the soil cover(s) and TM shall be prepared to relatively smooth conditions free of obstructions, depressions, debris and soft or low den�ia,� pockets of material. The material shall be capable of supporting a vegetative cov�;�°. C. Erosion features such as rills, gullies, etc. must be graded out of the surface before the soil cover(s) and TM deployment. Smooth roll drum compaction may be required befare deploying the soil cover and TM to make sure they maintain intimate contact with the soil. 23 D. Anchor trenches, termination trenches and longitudinal anchor trenches for tlie 24 chosen soil cover material shall be installed per manufacturer's recommendaia�t�.;, 25 E. Where appropriate, use 1' wide transition mat strips for intermediate check sluts .�� 2E 20-25 ft intervals perpendicular to channel flow direction along the soil cover(s) 27 apron past the termination of the TMs. The TM check slot panels should be 28 anchored on 1' centers with the 36" bullet anchors. 29 F. Prior to final placement of the transition mat and soil cover(s) the prepared surfa�;� 30 should be inspected and approved by the Engineer. 31 3.2 INSTALLATION 32 A. Soil cover(s) and TMs are shown on the drawings to depict the locations and 33 portions of the work where they are to be installed. The transition mats shall be 34 placed on the soil cover(s) in such a manner as to produce a relatively planar 35 surface. 36 B. Each transition mat shall be placed longitudinally end to end (overlapped when 37 appropriate) in the configuration specified so as to incur minimal waste. All 38 placement of TM panels shall be in accordance with the manufacturer's 39 recommendations and the Contractor's approved shop drawings unless otherwise 40 specified by the Engineer. CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvemcnis STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 0161}-9 Revised 7uly 1, 2011 33 23 50 -i Permanent Transition Mats Page 6 of 6 1 C. When overlapping successive TM panels, the panels shall be overlapped upstream 2 over downstream, and/or upslope over down slope. Each TM panel shall be secured 3 to the soil cover(s) and ground with bullet anchors driven 12" to 36" deep as per 4 manufacturer's recommendation. 5 D. Install bullet anchors at the recommended rate based upon manufacturer's 6 requirements for engineered hydraulic events and different soil types (cohesive or 7 non cohesive). Always anchor through both panels at the edges when overlapping 8 panels. Additional anchors may be needed to fuliy conform the mats to the soil 9 profile. 10 E. Care shall be taken during installation so as to avoid damage occurring to the soil 11 cover(s) and the TM as a result of the installation process. Should the soil cover(s) 12 material be damaged during installation, a soil cover(s) patch shall be installed 13 extending 3' beyond the perimeter of the damaged area. New TM panels and 14 anchors shall be placed over the damaged area when the damaged TM material 15 cannot be reused. 16 F. The designated soil cover(s) material shall always be installed under the transition 17 mats and may extend downstream of the TM panels the distance and width 18 specified for each location in the p(ans. Soil cover(s) shall be installed both per the 19 manufacturer's specifications and per the transition mat specifications. 20 G. 21 22 H. 23 24 L 2_5 26 J. 27 28 Alternative installation methods must be approved by the Engineer prior to execution. Broadcast seed and fertilizer over and under the soil cover(s) and TMs when appropriate. Apply supplemental water over the area as directed by site personnel during the initial germination stage to help ensure vegetative establishment and cover. The soil cover(s) apron should not be mowed until there is dense vegetation and should be mowed to no less than a 6" depth in the initial growing season. END OF SECTION CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIPICATION DOCUMENTS CPN 01604 Revised 7uly 1, 2011 39 00 03- 1 STORM WATER FIELD ORDER ALLOWANCE Page 1 of 1 1 2 SECTION 39 00 03 STORM WATER FIELD ORDER ALLOWANCE 3 PART1- GENERAL 4 l.I FIELD ORDER ALLOWANCE 5 A. The Field Order Allowance shall consist of miscellaneous adjustments and other non- 6 subsidiary items requested for construction by the City of Fort Worth and at the 7 direction of the Project Engineer. 8 END OF SECTION 9 DATE NAME 10 Revision Log SUIVIIVIARY OF CHANGE CITY OF FORT WORTH Cih� of Fori 6Vorlh Lake Crest Drainage hnprone�iu��rls STANDARD CONSTRUCTION SPECIFICATION I?OCUMENTS CPN Ol (Od APPENDIX GC-4.01 Availability of Lands - Easejrzerrts herei�a GC-4.02 Subsurface and Physical Conditions -f7of7e GC-4.04 Underground Faeilities - SUE sheets inclz�dec� in plcrf� set GC-4.06 Hazardous Environmental Condition at Site -norre GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates -inclaided herein GC-6.09 Permits and Utilities - NWP 43 Urban Forestry Permit Tree Removal Permit GC-6.24 Nondiscrimination - no��e GR-01 60 00 Product Requirements - f�or�e CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCT[ON SPECIFICATION DOCIJMENTS CPN 01604 Revised July 1, 2011 GC-4.01 Availability of Lands THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECtFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 Electranicaitv Recorded Tarrant County Texas OFficial Pubiic Records 1/2/2013 4:21 PM D2130016b8 ��} LAKE CR�S� I�PfE���t(�N�M�NT PRt�.�T � $40.00 PARCEL # 1-IRr��.aufse Garcfa Submitter: ACS DOE # 8552 7120 BAB HANGER ST �� ��.�'$- a�� ��- �j1�r,. LO7- a, BLOCK- G, LAKE CREST ESTA"i�S ���_.a,._.�,� S7'A7� d� "C�XAS COUNTY OF TARRANT § § ifNOW ALL MEN BY THESE PRESENTS § tiLA�/IQ TITLE C����'�if�ati' C(TY O� FORT WORtH C� ..�'� OD�1Do3G� 7�/C -�.5�' pERMANENT DRAINAG� FACILITY �AS�,�fENT /-1 ���� � i b' pAi�: October 1(7, 20I.2 GRAN1'OR: THONEXAY p XAYAVONG AND SISqUK Gh1ANTWAVILAY vGRANT'OR'S MAI�tNG ADDRE5S (includ'rng County); 7120 BC)B HANGER ST FORT WARTH, TARRANT CAUNTY, TX 7�179-3356 GRAN'I'�E: CIiY OF FdRT WORTN GRANT�E'S MAILING ADDRESS (including Gounty): 100U THROCKMaRTON ST. FORT WORTH, iARRAN'T COUNTY, TX 76102 CONSID�RATION: Ten Dallars ($10.00j and ather good and valuable considerafion, the receipt and suftiaiency of whiah is hereby acknowledged. f'ROPERTY: Being a portlon af land loc�ted in Lof 4, Bfock G, Lake Crest Estates an addition fo the Gity of Fort Wnrth, Tarrant County, Tvxas, according to fhe plat recorded In Volume 38&7, Page 38, Plat Records, Tarrant County, Texas, and being mora partir,ular(y described in Exhibits "A" and "B" Grantar, for the consideration paid ia Grantar and atf�er gnod and valuab(e consfderation, hereby grants, selis, and conveys to Grantee, its successors and assigns, an exclusive, p�rpetual easement for the construction, operation, maintenanae, replacement, upgrade, and repair af a Permanent arainage Facifity, hereafter referred to as "Facillty". Th� Facility ir�ciudes all (nr.ldenl�l undergraund and aboveground atfachments, equipm�nt and appu�tenances, incfuding, but nof limited to rnanhales, pipeiines, junction boxes, inlets, flumes, headwalls, wingwalls, slape pavement, gabions, PERMANEN7 URAINAGE FACILITY EASEMENT Rev Q4/1212012 , .. � LAKE CREST DRAINAGE IMPROV�MENT PROJECT PARCEL # 1 -PDFE D�E # 6552 7120 BOB HANGER ST �� ���'� � _ �7��� LOT- 4, B�OCK- G, LAKE CREST ESTATES STATE OF TEXAS COUNTY OF TARRANT § § KNOW ALL MEN BY THESE PRESENTS § ALAi�4 l 1 s�.� GQf��At��Y CITY OF FORT WORTH �� ��-G' ��� -�� �`�� �� S� PERMANENT DRAINAGE FACILITY EASEMENT !�4 ��� �-- i� DATE: October 10, 2012 GRANTOR: THONEXAY P XAYAVONG AND SISOUK CHANTHAVILAY GRANTOR'S MAILING ADDRESS (including County): ` 7120 BOB HANGER ST FORT WORTH, TARRANT COUNTY, TX 76179-3356 GRANTEE: CITY OF FORT WORTN GRANTEE'S MAIL(NG ADDRESS (including County): 1000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Doliars ($1Q.00) and other good and valuabie consideration, the receipt and sufficiency of which is hereby acknowledged. PROPERTY: Being a portion of land located in Lot 4, Block G, Lake Crest Estates an addition to the City of Fo�t Worth, Tarrant County, Texas, according to the plat recorded in Volume 388-T, Page 39, F'lat Records, Tarrant County, Texas, and being more particularly described in Exhibits "A" and "B". Grantor, for the consideratian paid to Grantor and nther good and valuable consideration, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the consiruction, operation, maintenance, replacement, upgrade, and repair of a Permanent Drainage Faciliiy, hereafter referred to as "Facility". The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manholes, pipelines, junction boxes, inlets, flumes, headwalls, wingwalls, slope pavemenf, gabions, PERMANENT nRAINAGE �ACILItY EASEMENT Rev. 04/12/2012 rock rip-rap, drop structures and access ramps, and other erosion controi measures in, upon, under and across a portion of the Property and more fulfy described in Exhibit "A" attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Property, or any part thereof, for the purpose of constnacting, operating, maintaining, replacing, upgrading, and repairing said �'acility. In no event shall Grantor (I) use the Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (Il) erect or permit to be erected within the easement property a permanent structure or building, including, but not limited to, monument sign, po(e sign, billbaard, brick ar masonry fences or walls or other structures that require a building permit, or any structure not requiring � building permit but which may threaten the structural integrity or capacity of the Facility and its appurtenances. Grantee shall be obligated to restore the surface of the Property at Grantee's sole cost and expense, including the restoration of any sidewa�ks, driveways, or similar surface improvements located upon or adjacent to the Easement which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder provided, hawever, that Grantee sha(I not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this Easement. TO HAVE AND TO HOLD the above-described easement, fogether with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successors and assigns to warrant and forever defend all and singular the easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof. Under Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 10`h anniversary of the date of this acquisition to repurchase the property or request certain information about the use and any actual progress made toward the use for which the property was acquired under this deed/easemeni/named instrument, and the repurchase price will be the price the City paid Grantor in this acquisition When the context requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWlNG PAGE] PEf2MANENT DRAINAGE FACILIIY EASEMENT Rev. 04l1212012 GRANTOR: Thonexay P Xayavong and Sisouk Chanthavilay ���1��1�� � '�' L- Thonexay,: X�ng - -r is�_ �L ��., hanthavilay � GRANTE�: Citv of Fort Worth . ernando sta, ssis an C y Manager �� (Z,► APPROVED AS TO FORM AND LEGAI.ITY f � V Assistant City Attorney PERMANENi DRAINAGE FACiLITY EASEMENT Rev. 04/12/2012 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the �dIG State of Texas, on this day personally appeared Fernando Costa, Assistant Ci R�arWoo � Manager of the City of Fort Worth, known to me to be t e same person w ose name is � �.E.i•,� subscribed to the faregoing instrument, and acknowledged to me that the same was the �..� /Z9 act of the Ciry of Fort Worth and that heishe executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL C» OFFICE this ��— day of l� .�•.�.��t � _ �.x�� otary Public in and for the State of Texas .�..a,�. ?�t"`'Y P`�;-: EVONIA D/UVIELS `' 'c MY COMM15510N EXf'IRE5 �'rs,� :�,` July 10, 2013 PERMANENT DRAINAGE fACIL17Y EASEMENT Rev. 04/7 2l2012 cnn�ci � H DRAINAGE EASEMENT LOT 4, BLOCK G, LAKE CREST ESTATES, FORT WORTH, TARRANT GOUNTY, TEXAS Being a strip of land located i� Lot 4, Block G, Lake Crest Estates an addition to the City of Fort Worth, Tarrant County, Texas, according to the plat recorded in Volume 388-7, Page 39, Piat Records, Tarrant Cou�ty, Texas. Said strip of (and being more particulariy desc�ibed as follaws: BEGINNING at a point at the Southwest corner of said Lot 4, lying N00°00'4Q"E, a distance of 390.00 feet from an 1/2" iron rod found at the Southwest corner of Lot 9, Block G, Lake Crest Estates according to said plat of Lake Crest Estates; THENCE N00°00'40"E a distance of 5.00 feet along the West line of said Lot 4 to a point; THENCE S89°59'20"E, a distance of 208.00 feet along a line 5.00 feet north of and parallei with the 5oufh line of said Lot 4 to a paint in the East line of said Lot 4; THENCE S00°00'40"W, a distance of 5.00 feet along said East line to a point at the sautheast corner of said Lot 4; THENCE N89°59'20"W, a distance of 208.00 feet along said South line to the paint of beginning, containing 0.024 acres of land. The bearings recited hereon are oriented to NAD 83 North Central Texas, Grid. SEE 8-1/2"X11" PLAT AT?'ACWED ����.��� Herbe�t S. Beasle i�� Y Registered Professional Land Surveyor 4050 �a' i�#ttittBc_._"?tfi SEE 8-1/2"X11" nESCRIPTION ATTACHED fi t 0 ¢ 0 � � w ca z Q z m 0 m ��.OF,. r� ��•�G ` � R�� ��N �i: Q' ............................. HERBERT S. BEASI.EY .... .....................:... .� aoso �: \U.'�iti.:FE S S � � {O� ���Z��� HERBERT S. BEA REG(STERED PROFESSIONAL LAND SURVEYOR N0. 4050 PREPARED FEBRUARY 15, 012 � /z"�o (coNrna. MON.) 0 40 60 120 SCALE 1'-40' 4 � ES� P��S I.PK� g��C� G 5 � LINE TABLE �INE LENGTN BEARING L1 390,00 N00'00'40'E L.2 5.00 N00'00'40'E L3 208.00 S89'S9'�0'E L4 5,00 S00'00'40'W L5 208,00 N89'59'�0'W 7 REqST�REO PROFESSIONAL SURVEYaR5 ERBERT S. �� �R� �P. EASLEY . �„qND • TOPOGRAPHIC 8 • CQNSTRUCTtON SURVEYING P. 0. BOX 887� 1AETR0 a17-42Q-01�4 FORT WORTH, 7EXAS 76124 FAX 817-446-5489 E�ibit B Drainage Easement located in 9 lot 4, Block G, Lake Crest Estates Fort Worth, Tarrant County, Texas HEREFORD DRIVE r d J C—I�smZd�Q � Encl�ange: AuUarized Users Otdy Document Receipt Information Reference Number: AI.DAL 18 - AT0000036748 - Easement ��� � Instrument Number: D213001558 No of Pages: 7 Recorded Date: 1/2/2013 4:21:28 PM Fee: •• littps: //�i�����v.er.�cl�a►age.coxn/[11/ V iewReceipl. aspx'Docunientld=69 3�i41O Page t ot l t/4/2013 Electronically Recorded Tar�ant County Texas Official Pubiic Recards 1/2/2013 4:21 PM D2130016b9 LAKE CREST��I�����NT PROJE�PS � �40.00 PARC�t� # 1-TCE �ary Louise Garcia Submitter: ACS DOE # 6552 �,� �/��..a'(� � � T�� 7120 BOB HANGER 3T �--°�--.�...e„a.,��.�,� �t?T- 4, BLpCK- Gt LAKE CREST ESTATES CITY U� FORT WOI�TH TEMPORARY CONSTRUCTION EASEMENT ALA�>1� TI7LE CO�����N`( '' DATE: October 1.0, 2012 �� -�T�__,.Gi ,,,C�C�00�3G 7i/G -15,� /�L !��G / dy GaANTQR: THANEXAY P XAYAVONG AND S(SOUK CHANTHAViLAY GRANTQR'S MAILING ADDRESS (includfng County): 7120 BOB HANCEI't ST FORT WORTN, TARRANT COUNTY, TEXAS 76179-3356 GRANT�E: CITY OF FORT WnRiH GRANTEE'S MAILING AODRESS {inciudfng County): 1000 7HRAGKMt?RiQN 5T. FORT W()RTH, TARRANT COUNTY, TX 76102 CQNSIDERA7IAN: 7en Dnllars ($10.Q0) and other good and valuable consideration, the receipt and sufficie�cy of which is hereby acknowledged. PROPERTY: Being a portion nf land lacated in Lot 4, Biock G, Lake Cre�t Estates an addition , to the City of Fart Worth, Ta�rant County, Texas, according ta the plat r�corded in Volume 3$8- 1`, Page 39, Ptat Reaords, Tarrant Gounty, Texas, and being m4re particularly described in Exhibits "A" and "g„ Grantor, far the cansideration paid to G�antar, hereby grant, bargain and canvey unto G�ant�e, ifs successvrs and assigns, the use and passage in, aver, and acrvss, below and along the easement sifuated in Tarrant County, Texas, in acco�d�nce with the legal description h�reto attached as �xhibit "A", and Ingress and egress over Graniar's prvperty to the eas�rn�nt as shr�wn an Exhiblt "B". lt is fu�ther agreed and understood that Grantee wit{ b� permitted fhe use of saic! easement far the purpose af drainage improvements for the Lake Crest Drainage improvement proJect, Upon compietfan of improvements and its acceptance by Grantee, ail rights granted within the described 'Temporary Constn�ction Easement sha{i cease. Tcroporarr Conaruc�i�n Gistu�cnt U I/OJ!?007 { � �� , LAKE CREST DRAINAGE IMPROVEMENT PROJECT PARCEL # 1-TCE DOE # 6552 �� #.�,,,�'�a'� t �.r.0 7120 BOB HANGER ST �, LOT- 4, BIOCK- G, LAKE CREST ESTATES CITY UF FORT WORTH TEMPORARY CONSTRUCTION EASEMENT AL.A�a TI�'�� C��PANY DATE: Octaber 10, 2012 �F �rODnD0�.3G 7�G -.�5,� �� ��� i� GRANTOR: THONEXAY P XAYAVONG AND SlSOUK CHANTHAVILAY GRANTOR'S MAILING RDDRESS (inciuding County): 7120 BOB HANGER ST FORT WORTH, TARRAtdT COUNTY, TEXAS 76179-3356 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (inciuding County): 10p0 THR�CKMORTCJN ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuabie consideration, the receipt and sufficiency of which is he�eby acknowledged. PROPERTY: Being a portion of land located in Lot 4, Block G, Lake Crest Estates an addition to the City of Fort Worth, Tarrant Counry, Texas, according to the plat recorded in Volume 388- T, Page 39, Plat Records, Tarrant County, Texas, and being more particularly described in Exhibits "A" and "B". Grantor, far the cansideration paid ta Grantor, hereby grant, bargain and convey unto Grantee, its successors and assigns, the use and passage in, over, and across, below and alang the easement situated in Tarrant County, Texas, in accordance with the legal description hereto attached as Exhibit "A", and ingress and egress over Grantar's properly ta the easement as shown on Exhibit "B". It is further agreed and understood that Grantee will be permitted the use of said easement for the purposs of drainage improvements for the Lake Cresf Drainage improvement project. Upon completion of improvements and its acceptance by Grantee, alI rights granted within the described Temporary Construction Easement shall cease. ' Tetnporary Constructi<m E�sement 011092007 TO HAVE AND TO HOLD the above described easement, together with, all and singular, the rights and appu�tenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns untii the compietion of construction and acceptance by Grantee. Grantor hereby bind themselves, their heirs, successors, and assigns, to warrant and defend, all and singular, said easement unto Grantee, its successors and assigns, against every person whomsoever lawfuliy claiming or to claim the same, or any part thereof. [SIGNATURES APPEAR ON THE FOLLOWING PAGE) Tcmporary Construc�ion Faxment 0 t /09/2007 GREINTOR: Thonexay P Xayavong and Sisouk Chanthavilay _ �' �-,� honexay avong� '� t�.�.. �` �r��G :y'{ � � Sisouk Chanthavilay GRANTEE: C,�ty oF Fort Worth � City Manager ����'j,, APPROVED AS TO FO AND LEG ITY t � Assistant City Attorney Temporary Conswction Easement 01:09%2007 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Pubiic in and for the State of Texas, on this day persanaliy appeared Thonexay P Xayavong, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknawledged ta me that the same was the act of Thonexay P Xayavong and that he/she executed the same as the act of said Thonexay P Xayavong for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this � day of , 20�.. r.r.....�... d; •*�d SIM NI►HARACK '�' ���' Notery F'ublic, State of Texas � _�� ;�� MyCommission Expires (�JOt lic in an or the State of Texas K':� Oacember 10, 2012 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Sisouk Chanthavilay, known to me ta be the same person whase name is subscribed to the foregoing instrument, and acknowfedged fo me that the same was fhe act of Sisouk Chanthavilay and that he/she executed the same as the act of said Sisouk Chanthaviiay for the purposes and consideration therein expressed and in #he capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this `� day of C/(°� , 20���_..- ��` k ��.r"!!?t, � SIM NINN/�RACK Notary PubliC, State ot Texaa � ��� My Commiscion Expltes o.c«nt�r to, 20�2 Nofa ubl' in and i the State of Texas Temporary Consfn�ttion Easement 01!09!2007 ACKNOWLEDGEMENT STATE OF TEXAS § CUUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, ��dl� on this _day personally appeared Fernando Costa, Assistant Ci Mana er of the City of Fort Worth � r� known to me to be the same person whose name is subscribed to the oregoing instrument, and � acknowledged to me that the same was the act of the City of Fort Worth and that he/she executed the �'k�'1 same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the �-� capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this �� day of , 20 ��-" < �yt-c.�z/d Notary Public in and for he State of Texas r�,.""` �,`e'�`"�, -------__ �� �'_ �'�� ELS DANI ;r�.pt 1�;�= '�Y COMMlSSION EXpIRES �y 10, Zp13 'femporary Consttuction Fasement 01 /09R007 EXNIBIT A TEMPORARY CONSTRUCTION EAS�MENT LOT 4, BLOCK G, LAKE CREST ESTATES, FORT WORTH, TARRANT COUNTY, TEXAS Being a strip of land located in Lot 4, Biock G, Lake Crest Estates an addition tot he City of Fort wortn, Tarrant County, Texas, according to the plat recorded in Volume 388-T, Page 39, Plat Records, Tarrant County, Texas. Said strip of land being more particulariy described as follows: BEGINNING at a point in the East line of said Lot 4 lying NOd°00`40"E, a distance of 5.00 feet from the Southeast corner of said Lot 4, said Southeast comer lying S89°59'20"E, a distance af 208.00 feet N00°00'40"E, a distance of 390.00 feet from an 1!2" iron rod foui�d at the Southwest corner of Lot 9, Block G, Lake Crest Estates according to said plat of Lake Crest Estates; THENCE N89°59'20"W, a disiance of 100.00 feet along a line 5.00 feet North of and parallel with the South iine of said Lot 4 to a point; THENCE N00°00'40"E, a distance of 5.00 feet to a point; THENCE S89°59'20"E, a distance of 100.00 feet along a line 10.00 feet North of and parallel with said Soufh line to a point in said East line; THENCE S00°QO'40"W, a distance of 5.00 feet along said East line to fhe point of beginning, containing 0.011 acres of land. The bearings recited hereon are oriented to NAD 83 North Central Texas, Grid. SEE 8-1/2"X11" PLAT ATTACHED j���� �G�f Herbert S. Beasley ,��" Registered Professional Land Surveyor 4050 � SEE 8-1/2"X11„ I (3ESCRIPTION ATTACHED 0 40 80 120 SCA�E 1�=4�� � N00'00'40"E S89'S9'2Q"E 100.00' 5.00' N89'59'20"W G., ----------.__._._..._._—��_—_.._.__,_...---/ N00'00�40"E 5.00' S00'00' 40"W 5.00' c��s� EG p,�Es 5 �p,K� g�p�K a ¢ 0 � � w t� z ¢ _ m O m � � 0 % w 0 0 �' o 0 0 a a, O r7 O z '� .�.. ..........; �' h�•�G 1 � R�� +�tA �ir �' ..:..................... .:... HERBEt2T S. BEASLEY ..,.. ......................... �0 4050 �r ; \�:7,i:_°e s s; ° •-io�'� /�U�,'"" / � � HEf26ERT 5. BEA5L REG{STEREO f'ROF SIONAL LAND SURVEYOR N0. 4050 PREPARED FEBRUARY 15, : � /2"�� (cow�a MON. ) REqSTEREp PROFESSIONAI. SURVEYORS ERBERT S. �0 SURVEY�ORS L.P. EASLEY . �,qND • 70PdGRAPNIC • GONSTRUCTtON SURV'EYING P. 0. BOX $873 A�tETRO 81T-429—Qi�4 FORT WORTH, TEXA5 78124 FAX !'�17-446-5488 'ra � Exhibit 8 Tsmporary Con9truction Easement located in 9 lot 4, Block G, . Lake C�est Estates Fort Worth, Tarra�t County, Texas 589'59 � 20"E 208.00' HEREFORD ORIVE m:z:: >� . � � , . Er�cl�ange: Authorized Users Only Document Receipt Information Reference Number: ALDAL 18 - AT0000036746 - Easement �� � Instrument Numbe�: D213001559 No of Pages: 7 Recorded Date: i/Z/2013 4:21:28 PM ' Coun arrant Volume: , Page: , Recording Fee: �40.00 I hups://�vt«v.erxchtu�ge.com/UIJVietvReceipt.aspx'lDocumentid=G934� 13 Page ! o£ 1 0 t/4/2U 13 , , EiEctronecallY Recorded TarrarttCauMyTexas f�fticial Pt�lic Records 11/13t2012 4:17 PM D212280298 LAKE CRI� PRA�NEMENT RR��C'T7 ��a� PARCEL � 2- ouise Gar��a 5ubmitter ACS DOE � 6552 t�� 71 Z 6 BOB NANGER ST �� ��--- �`�� _� "�"� �� �OT b, BLOCK• G, �AKE CREST ESTA7ES 57ATE 4F T�XAS COUNTY OF TAi2�2ANT DATE: GRANTOR: § § KPICXW ALL MEN BY T'H�SE PRESENTS � CITY OF FORT WORTH PERRAAMENT DE�1,iNl�GE FACtLtTY EASEMENT KEQ 30UYANAlA AND WIFE, KHAM SC}UVANwA GRANTOR'S MAILIMG ADORESS (including Gounty): 7116 BQS NANGER ST' FURT WORTN, TARRANT COUNTY, TX 7G17�3358 GRAN7EE: CITY l�F FORT WOR7H GF2ANTE�'S MAlLtNG AODRESS (inctuding County}: 100Q THRC}CKM4RTt�N ST. F4RT WORTH, TARRANt COUNTY, TX 76i02 CONSIDERA710N: Ten Da#lacs (5,10.OQy and ott�er gnoc3 and vatuat�te cc�nsitferafion. the reoeipt and sufficiency of which is hereby ackrtawledged. PR4P�RTY: Being a porfian of tand tocateci irr Lot 5, Btoc�C G, E.ak� Crest Estates, an additian ta the Ci#y af Fort WQrih, T�rcant Gounty, Texas, accvrding to the plat rece►-ded in Vatume 388-T. Page 39. Riat Rec:ords. 7arrant County, 7exas, and being moEe particularly described in Exhibifs "A" anci "B". t;ran#rx, fvr ttie consiclerai�o:� p�ict ta Grarstar and ather gc� and va4vat�€e consicisratior�, he�eby grants, selis, and corneys tQ Grat�tee, tts successcars and as�igns, ; an eacc#usive, perpetua{ easemsnt tar !he cc�nstructian, aperati�n, mainte��nce, replar.ement, upgrade, and repair af a Perm�nent nrainage ��atity, hereafter refer�ed to as `Facilit�r". The Fac'riify inGlud�s ali incittet�ial undergro�nd and at�avegrr�und attac�ments, equipment and �ppurtenances, incfuding, b�t rwt lim�ted to m�nholes, pipeliries. jur�ction hoxes, intets. flumes, !�►�adwa!!s, wingwalls. slape pavemertt, gabions. racfc rrp-rap, drop shvctures and access ramps, and other erosion cor�Val measutes in, PEf�`dlWEN7 URA�:A�`„� FA(:!LtFY FASr�ril' Rev !�'Y7111?t1 f t � LAKE CREST DRAINAGE IMPROVEMENT PROJECT PARCEL # 2 -PDFE DO 6 BOB HANGER ST '�E� #'_� ��a "4 a-���� LOT- 5, BLOCK- G, LAKE CREST ESTATES STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS COUNTY OF TARRANT § CITY OF FORT WORTH PERMANENT DRAINAGE FACILITY EASEMENT DATE: GRANTOR: KEO SOUVANNA AND WIFE, KHAM SOUVANNA GRANTOR'S MAILING ADDRESS (inciuding County): 7116 BOB HANGER ST FORT WORTH, TARRANT COUNTY, TX 76179-3356 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAIL.ING ADDRESS (including County): 1000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Doilars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. PROPERTY: Being a portion of land located in Lot 5, Block G, Lake Crest Estates, an addition to the City of Fart Worth, Tarrant County, Texas, according to the p(at recorded in Volume 388-T, Page 39, Plat Records, Tarrant County, Texas, and being more particularly described in Exhibits "A" and "B". Grantor, for the consideration paid to Grantor and other good and valuable consideration, hereby grants, sells, and conveys ta Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, and repair of a Permanent Drainage Facility, hereafter referred to as "Facility". The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manholes, pipelines, junction boxes, inlets, flumes, headwalls, wingwalls, slope pavement, gabions, rock rip-rap, drop structures and access ramps, and other erosion control measures in, PERMANENT DRAINAGE FACILI7Y EASEMENT Rev. OM12/2012 , ;' upon, under and across a portion of the Property and more fully described in Exhibit "A" attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Praperty, or any part thereof, for the purpose of canstructing, operating, maintaining, replacing, upgrading, and repairing said Facility. In no event shall Grantor (I) use the Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (11) erect or permit to be erected within the easement property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, brick vr masonry fences o� walls or other structures that require a building permit, or any structure not requiring a building permit but which may threafen the structural integrity or capacity of the Facility and its appurtenances. Grantee shall be obligated to restore the surface of the Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon ar adjacent to the Easement which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easemeni granted hereunder provided, hawever, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this Easement. TO HAVE AND TO HOLD the above-described easement, together with a!I and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successors and assigns to wa�rant and forever defend all and singular fihe easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof. Under Subchapter E of the Texas Property Code, as amended, the Grantor or fhe Grantor's heirs, successors, or assigns may be entitled before the 10�' anniversary of the date of this acquisition to repurchase the property or request certain information about the use and any actual p�agress made toward the use for which the property was acquired under this deed/easement/named instrument, and the repurchase price will be the price the City paid Granto� in this acquisition When the context requires, singular nouns and pronouns include the plurai. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] PERMANENT DRAINAGE FACILITY EASEMENT Rev. 04/12/2012 GRANTOR: Keo Souvanna and wife, Kham Souvanna �-� � � �."' ��: C�---- �--�-��r� Keo Souvanna � �(��� ' Kha Souvanna GRANTEE: City of Fort Worth �-��,�� �1 Fernando Costa, Assistant City Manager APPROVED AS TO FORM AND LEGALITY r . Assistant City Attorney PERMANENT DRAINAGE FACILITY EASEMENT ' Rev. 04/12/2012 ACKNOWLEDGEMENT STATE OF TEXAS COUNTY OF TARRANT � �v � BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personaIly appeared Keo Souvanna, known to me to be the same persnn whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Keo Souvanna and that he/she executed the same as the act of said Keo Souvanna for the purpases and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this a� day of , 20� ,� JACQUE�.INE DAVILA � � � STa?E �F TiEXAS � My Comm. 6xp. November 14, 2012 ublic in and for the State of Texas ACKNOWLEDGEMENT STATE OF TEXAS COUNTY OF TARRANT � � BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Kham Souvanna, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act af Kham Souvanna and that he/she executed the same as the act of said Kham Souvanna for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL O� OFFICE this _ 5;;� day of 1�1�—�, 20�--. ��� JA�QUELINE DAVILA . �. Notary Public ,� STAT� OF TEXAS My Comm. �xp. November 14, 2012 Public in and for the State of Texas PERMANENT DRAINAGE FACII.ITY EASEMEtYT Rev. 04/12l2012 ACKNOW�EDGEMENT STATE OF TEXAS § COUNTY O� TARRANT § BEFORE ME, the undersigned authority, a Notary Pubiic in and for the State of Texas, on this day personally appeared Fernando Costa, Assistant City Manager of the City of Fo�t Worth, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that he/she executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAN�D AND 5EAL OF OFFICE this � day of �, l,✓i/./ � � , otary Public in and fo the State of Texas .,,:f : °� 'k;'=. EVONfA DANIEtS y�;��, ktY COMMIS5IQN EXPIAES " f�p �,„�' �uiy t0, 2U13 ' PERMANENT DRAINAGE FACILITY EASEMENT Rev. OM12/2012 , EXHIBIT A DRAINAGE EASEMENT LOT 5, BLOCK G, LAKE CREST ESTATES, FORT WORTH, TARRANT COUNTY, TEXAS Being a st�ip of land Iocated in Lot 5, Block G, Lake Crest Estates an addition to the City of Fo�t Worth, Tarrant County, Texas, according to the plat recorded in Volume 388-T, Page 39, Plat Records, Tarrant County, Texas. Said strip of land being more particularly described as follows: BEGINNING at a point at the Northwest corner of said �ot 5, lying N00°00'40"E, a distance of 390.00 feet from an 1/2" iron rad found at the Southwest carner of Lot 9, Block G, Lake Crest Estates according to said plat of Lake Crest Estates; THENCE S89°59'20"E, a distance of 208.00 feet along the North line of said Lot 5 to a point at the Northeast of safd Lot 5; THENCE S00°00'40"W, a distance of 10.00 feet along the East line of said Lot 5 to a point; THENCE N89°59'20"W. a distance of 208.00 feet along a line 10.00 feet South of and Parailei with said North line to a point in the West line of said Lot 5; THENCE N00°00'40"E, a distance of 10.00 feet along said West line to the point vf beginning, containing 0.048 acres of land. The bearings recited hereon are oriented to NAD 83 North Central Texas, G�id. SEE 81/2"X11" PLAT AT7ACHED ��� � Herbert S. Beasiey C%�� Registered Professional Land Surveyor 4050 ,) SEE 8-1/2"X11" OESCRIPTION A7TACHED ; POB �J � a 0 � � w � z a _ m 0 m h' �� � 0 �R p�.�•� ti: �- � ;a ....................:... HER8ERT S. BEAStEY ..�........ ......., .. :A �� v: �:;� F� s s, � {��J ��� �� �� HERBERT S. BEASL REGISTEREO PROFESSIONAL LAND SURVEYOR N0. 4050 PREPARED FEBRUARY 15, : �/z"�� (corirna MON.) 2 0 40 80 120 SCALE 1'=40' S.� E51 A�ES �PKE g� �K G � 5 � �INE TABLE LINE LENGTN BEARING Li 390.00 N00'00'40'E L2 208.00 N89'59'20'W L3 10.00 N00'00'40'E L4 208,00 N89'S9'20'W l.5 10.00 N00'00'40'E REqSTERED PROFESSfONAI. SURVEYqRS ERBERT S. �p ��S �. EASLEY . �,qNQ • TOPOGRAPHIC • CONSTi2UCT10N SURVEYING P. 0. BOX 8873 METRO �1i-429-01Q4 F4RT WORTH, 1EXAS 76124 FAX 8/7-448—S48a 7 �:� Exhibit 8 Draincge Easement located in 9 Lot 5, Block G, Lake Crest Estotes Fort Worth, Tarrant Cou�ty, Texas NEREFORD DR(VE 99988 6-S�wntdwq Erxchange: Authorized Users Only Dacument R�eceipt Information Reterence Number. 6557-02-PDFE - Easement Page 1 of 1 https:Uwww.erxchange.cam/UI/V iewReceipt.aspx?Documentid=6739 i 46 ll/ 14/2012 _ Elect�onically Recorded TarcarrtCountyTexas Official P�lic Records 11/13/2Q12 4:17 PM pj122$QZ87 LAKE CRESI�D��Q��1M1�0i1��MENT PROJ�"1 7 $aa.00 PARCEL. # Z•TCE p�ary ��� Garois Submitter ACS 71 � B B HANGER ST �,�. � �'� �.�.r � °� ✓�C � LOT- 5, BLCICK- G, LAKE CR�ST ESTATES CI�'Y QF FORT WOftTH T�MPORARY CC3NSTFiUCT10N EASEMENT DAT�: GRANTqR: KEt� SQUVANNA AND WiFE, KHAM StyUYANNA GRARtT4R'S M4AiLINC� ApORESS (inciuding Cuuntyj: i116 808 HAIVGER ST �ORT 1t1tQFt'fH� TAt4RANT Gt)UMTY, �'EX�IS 761Tg-3356 GRANTE�: CIT'Y O� FORT WaRTN GRANTEE'S MAIUNG ADORESS (including Caunty}: 10Q0 THROCKMORTt)N 5T. �ORT WQRi'N, TARRANT COUNTY, 7X 76'ta2 GC?NSlOERATION: Ten Eloila►s (�1Q.Q4) and other g4od anci vatuable ccrosideration, tf►e receipf arxf suf%eisncy of which is hereby adcnawfedged. i�RQPERTY: 8ei►ag a portinn af land located in Lat �, Btvck G, Lake Crest �states an addition to the City o# Fort Worth, Tarrant CouMy, Te�s, accc�rding ta the pl�t �ecarded in Volurne 388-�i. Page 39, Piat Records, Tasrant Caunty. Texas, and being more particutarfy tfescribet! in E�it�ts "A° arzd "B''. Grantar, foc f#� cortside�at�an {�id to Grantor, he�reby granL bargai� and convey unia Gra�t#ee, i#s su�cessors and assigns, the use �nd passage ir,; nver, and across, be3ow and atgr►g the �esement situ�ted in T�mant Countp. T�x�s, ir� accardane� eeritkt tt�e let�ai descripiior� hereto atiactted as E�rttibit `A�, a�d ir:gt`ess a�d egress over Gr2�ntor's P�"�t��Y to E� �asetnen� as shown on Exhibit "B". it is ftsrther agreed and ur�dersfiaod that Grantee �vilt t� permiftec! the use of said easement For the purpas� of drainage improvements for fhs t.ake CresE Drain�ge improvement proje�t. Upon comp(e6on of impmveme�ts artid its acceptanc� by Grantee, ai! rights g►anfed witttin the describeti Temparary Con�truction Easement sttalt cease. ictu}xny.y Cntr.7�stn�n I;aar.rrtecl l� t �YKI �'_�ri;7 ,' ��. # �S"S"a� 4 a -Tce CITY OF FORT WORTH TEMPORARY CONSTRUCTION EASEMENT �� LAKE CREST DRAINAGE IMPROVEMENT PROJECT PARCEL # 2-TCE DOE # 6552 7116 BOB HANGER S7 LOT- 5, BLOCK- G, LAKE CREST ESTATES GRANTOR: KEO SOUVANNA AND WIFE, KHAM SOUVANNA GRANTOR'S MAILING ADDRESS (including County): 7116 BOB HANGER ST FURT WORTH, TARRANT COUNTY, TEXAS 76179-3356 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 1000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuabie consideration, the receipt and sufficiency of which is hereby acknowiedged. PROPERTY: Being a portion of land located in Lot 5, Blvck G, Lake Crest Esfates an addifion to the City of Fort Worih, Tarrant Counry, Texas, according to the plat recorded in Volume 388-T, Page 39, Plat Records, Tarrant County, Texas, and being more particularfy described in Exhibits "A" and "B". Grantor, for the consideration paid to Grantor, hereby grant, bargain and convey unto Grantee, its successors and assigns, the use and passage in, over, and across, below and along the easement situated in Tarrant County, Texas, in accordance with the legal description hereto attached as Exhibit "A", and ingress and egress over Grantor's property to the easement as shown on Exhibit NB". It is further agreed and understood that Grantee will be permitted the use of said easement for the purpose of drainage improvements for the Lake Crest Drainage improvement project. Upon completion of improvemenfs and its acceptance by Grantee, all rights granted within the described Temporary Construc#ion Easement shaU cease. Temporary Construccion Fasement 01 /09!2007 TO HAVE AND TO HOLD the above described easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns until the compietion of construction and acceptance by Grantee. Grantor hereby bind themselves, their heirs, successors, and assigns, to warrant and defend, all and singular, said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim fhe same, or any part thereof. [SIGNATURES APPEAR ON THE FOLLOWING PAGEJ Temporary Consuuction Fasement Ol!09/2007 0 GRANTOR: Keo Souvanna and wife, Kham Souvanna � � ��'�� r Keo Souvanna ������ �� v�a GRANTEE; City af Fort Worth Fernando Cnsta, Assistant City Manager APPROVED AS TO FORM ANI7 LEGALITY / . Assistant City Attorney Temporary Conswctioo Easement 01/09/2007 ACKNOWLEDGEMENT STATE OF TEXAS COUNTY OF TARRANT BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personaily appeared Keo Souvanna, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknawledged to me that the same was the act of Keo Souvanna and that he/she executed the same as the act of said Keo Souvanna for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this _�!� day of ♦ ��jl.. � � � JACQUELINE DAVILA � � � Notary Public STAT� OF TEXAS My Comm. Exp. Nnvember 14, 2012 N ry ublic in and for the State of Texas ACKNOWLEDGEMENT STATE OF TEXAS COUNTY OF TARRANT � 0 � � BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Kham Souvanna, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Kham Souvanna and that he/she executed the same as the act of said Kham Souvanna for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this _�, day of � `(���i,.��� �Y�-_ , 20-� �. y JACQUELINE DAVILA , � . Notary Public �TATE OF 7EXAS My Comm. Exp. November 14, 2612 ry Public in an or he tate o exas 'I'emporary Conswetion Easement 01;092007 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY lJF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that he/she executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated, GIVEN UNDER MY HAND AND SEAL OF OFFICE this _� day of �� , 20 / ?-� . �' -- '�, �' � otary Public in and for the State of Texas � ��`4.�.°�`.,�.,,-.-�.� MYCpM�� E?qfylEt,S �'- :��:. , . , �'.!7t�;k r,,,hrl�-��,� MfSSION i =. �..r� : . . .,,,:�,. _. _ ' ' J�Y 10, EXPJR�S , '�_.� ,s..;;' '; „ , -; .. �'. . ,i„r : i 20l3 ty .?3r. :'�.�..�.� �.�.:.:. ,�;.;...,,,.,.-:,_-:..,.,-�.� �' : -::,��..J 7'emporary C.onsuvction Fasemrnt OIr09:2007 EXHIBIT A TEMPORARY CONSTRUC710N EASEMENT LOT S, B�OCK G, LAKE CREST ESTATES, FORT WORTH, TARRANT COUNTY, TEXAS Being a strip of land located in Lot 5, Block G, Lake C�est Estates an addition to the City of Fort Worth, TaRant County, Texas, according fa the plat recorded in Volume 388-T, Page 39, Piat Records, 7arrant County, Texas. Said strip of land being more particularly described as follows: BEGINN(NG at a point in the West line of said Lot 4 lying S00°00'40"W, a distance of 10.00 feet from the Northwest corner of said Lot 5, said Narthwest corner lying N00°00'40"E, a distance of 390.00 feet from an 1/2" iron rod found at the Southwest corner of Lot 9, Block G, Lake Crest Estates according to said plat of I�ake Crest Estates; 7HENCE S89°59'20"E, a distance of 174.76 feet along a line 10.00 feet South of and parallel with the North line of said Lot 5 to a point; THENCE S00°00`40"W, a distance of 5.00 feet to a point; 7HENCE N89°59'20"W, a distance of 174.76 feet along a line 15.00 feet South of and para!(el with the North line to a point in said West line; THENCE N00°00'40"E, a distance of 5.00 feet along said West line to the point of beginning, contain(ng 0.020 acres of land. T'he bearings recited hereon are oriented to NAD 83 No�th Central Texas, Grid. SEE 8-1/Z"X11" PLAT A7TACHED � � !Z�� Herbert S. Beasley Registered Professional Land Surveyor 4050 � .......� TS.@ IN�N��M � , S�E 8-1/2"X11" DESCRIPTION ATTACHED 0 40 80 120 SCALE 1"=40' � �__�_�_���—_��Y..__��------- P�B S00'00�40"W S89'S9'20"E 174.76' N00'00'40"E � ~ 5.00' 174.76' N89'59'20"W o _ 0 S � � CRES� EG P�� 5. o � ��'K� BL��K 0 a 0 � � w � z ¢ z m 0 m 0 0 0 rn M W O � O O O O Z ��' �G` `�' R�� +,�U►� �i: �' :.....................:... HERBERT S. BEASIEY ..ti .....................:... ,' �0 405 °?~ Q4 ! �°FsuR� {� ����'`���" ' 6� HERBERT S. BEAS�EY REGISTERED PROFESSIbNAL LAND SURVEYOR N0. 4050 PREPARED FEBRUARY 15, : � /2"�0 (coNrna MON.) E � REqSTEREA PROFESSION/11. SURVEY�ORS ERBERT S. �D SURVEY�ORS L.P. EASLEY . �.,qND • TdPOGRAPHIC • CONSIRUCTiON SURVEYING P, 0. BOX 8873 6fE'�RD �iT-424"01�4 FORT WORTN, TEXAS 76124 FAX ai7-440—'S4a8 �� � Exfilbit 8 Temporary Construction Easement located in g Lot 5, 81ock G, Lake Crest Estatos Fort Worth, Tarrant Caunty, Texas HEREFORD DRIVE � � wcceEsr Erxchange: Authorized Users Only Document aeceipt Infarmatiar� Referena� NumM� : 6552-02-'TCE - Easement Page 1 of 1 - hitps:Uwww.erxchange.com/I1I/ViewReceipt.aspx?DocumeniId=6739154 11/14/2012 � EIBCIfaniC�lYReCatded Tarraot0ovnty7�xu ,� Rcpa�y 1/9t10199:17AM �'j�$OOi260 LAKE C�i OR A(3E IMPRUVEMENT PROJECT Pru�cE� • �s T �o.ao DOE � 8562 ! Ya' ��•�� 5918 HER�FUR{�06lf+etGama s����� AG' a'dy BLOCK- Z, LAKE CREST ESTATES �A �`� �" STATE OF TEXAB § § KNOW ALL MEN BY THEBE PREBENTS COUNTY O� TAFtRANT § '�' ('�iNi.�l 111 � .t t.v,'r.� i��� 1� CIfV AF FORT WORTH t�F/-�T�(?e��+ "�� i,�9-, S.t PERMANENT DRAINAGE FACILlTY �,g5EMENT �7�,yo� , d? DA7E: GRANTOR: PNAV BANYAVONG AND BOUACNANH BANYAVON(� GRANTOR'3 MAIUNG AbDRE33 (including Counlyj: , 8912 HfiREFOFiU OR '� FORT WORTN, TARRANT COUNTY, TX 78179-33B5 GRANTEE; CITY OF FOR7 WOFtTfi '' GRANTEE'S MtAIIiNG ApDRHSS (Including Cuunty}; ' 1000 THfi�CKMQRTUN ST. FURT WORTH. TAtiRANT COUN7Y, TX 7810? , CONSIdERATION: 7�n DWlats (510.00) and othar good and vetuable comWeraHon, fhe recelpt arM suffideney ot whiCh is hereby acknavledped. PROt'ERTY: 6eing a pcMlon oF lend bcated In Block Z Leke Geat Falelea, 8n ' addition tu Iha Gity of Forf Wortfi. TerTanl County, Taxaa, accortfin9 to lhe plet racoNad ' �n Volume 388-T, pege 38, Piet Rscnrds. Tanent County, Texea. and being mora parC�culerfy desaibed �n Exhlbits •A' and "8' qrantor, for Ihe mneldaretton pe�d to Grenlor end oih�r pood er�d velugble cqnsldoreUon, haroby pranta, aaila, entl comeys to GtaMee, its aucceasora and afs�gns, ' an eKduetra, peryetuel easemenl for Ihe aneiructbn, operalion, matnisnance, ' replacement upgrade, and repair af a Pennanent Dra�nage Facility, here�Rer referred to ss "Factlity" The FeciNty Includae etl tncMantei underground and abovepraund attaohmenfa, oqulpmant end eppurtenancos, moiuding, but rrot flmlled to mqnholea. ptpolnee, junctlon boxaa, mlets. tiumes, headwells, wmgwalis, elope pavemenl. gabians, ota/aurt��ow.wna� rncan�se.E�r . .. a«. caivowa I ' LAKE CREST DRAINAGE IMPROVEMENT PROJECT PARCEL # 4 -PDFE DOE # 6552 5918 HEREFORD DR S' '' a«� BLOCK- Z, LAKE CRE5T ESTATES �� �� ��� ` STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS Ct)UNTY OF TARRANT § .,-, -,....�. .i..�ii�ti� i i � E..� � ;;'����i;���( CITY OF FQRT WORTH �� �%�DD� ��. ? y�-� S,C PERMANENT DRAINAGE FACILITY EASEMENT �,�� �y1G i�-7 DATE: GRANTOR: PHAY BANYAVONG AND BOUACHANH BANYAVONG GRANTOR'S MAILING ADDRESS (including County): 5912 HEREFORD DR FORT WORTH, TARRANT COUNTY, TX 76179-3395 GRANTEE: CITY OF FORT WORTH GRANTEE'5 MAILING ADDRESS (including County): 1000 THROCKMURTON ST. FORT WORTH, TARRANT CfaUNTY, TX 76102 CONSIDERATION: Ten Doliars ($10.00) and other good and valuable considerafion, the receipt and sufficiency of which is hereby acknowledged. PROPERTY: Being a portion of land located in Block Z, Lake Crest Estates, an addition to the City of Fort Worth, Tarrant County, Texas, according to the plat recorded in Volume 388-T, Page 39, Plat Records, Tarrant County, Texas, and being more particularly described in Exhibits "A" and "B". Grantor, for the consideration paid to Grantar and other good and valuable consideration, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, and repair of a Permanent Drainage Facifity, hereafter referred to as "Facility". The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manhotes, pipelines, junction boxes, inlets, flumes, headwalls, wingwalls, slope pavement, gabions, PERMANENT DRAINAGE FACILII'Y EASEMEN7 Rev. 04/12/2012 rock rip-rap, drop structures and access ramps, and other erosion control measures in, upon, under and across a portion af the Property and more fuily described in Exhibit "A" attached hereto and incorparated herein for all pertinent purposes, together with the right and privilege at any and ail times to enter Property, or any part thereof, for the purpose of constructing, operating, maintaining, replacing, upgrading, and repairing said Facility. In no event shall Grantor (I) use the Property in any manner which intetferes in any material way or is inconsistent with the rights granted hereunder, or (II) erect or permit to be erected within the easement property a permanent structure or building, including, but not iimited to, monument sign, pole sign, billboard, brick or masonry fences or walls or other structures that require a building permit, or any structure not requiring a building permit but which may threaten the structural integrity or capacity of the Facility and its appurtenances. Grantee shall be obligated to restare the surface of the Property at Grantee's sole cost and expense, including the restoration of any sidewafks, driveways, or similar surface improvements located upon or adjacent to the Easement which may have been removed, relncated, altered, damaged, o� destroyed as a result of the Grantee's use of the easement granted hereunder provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements instalfed in violation of the provisions and intended use of this Easement. TC3 HAVE AND TO HOLD the above-described easement, together with all and singular the rights and appurtenances thereto in anyway beldnging unto Grantee, and Granfee's successors and assigns forever; and Grantor does hereby bind itself and its successors and assigns to warr�nt and forever defend all and singular the easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof. Under Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 10`h anniversary of the date of this acquisition to repurchase the praperty or request certain infarmation about the use and any actual progress made toward the use for which the property was acquired under this deed/easemenUnamed instrument, and the repurchase price wilt be the price the City paid Grantor in this acquisifion When the context requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] PERMANENT DRAINAGE FAGIIfTY EAS�MENT Rev. 04/12/2012 `;. , GRANTOR: Phay Banyavong and Bouachanh Banyavang ro � � �, � -�-�'�z t� Phay Banyavong �C1�C`� CiL�c.cYt{,�-���c�ic�-�t c__.��.�3� Bauachanh Banyavong � GRANTEE: City of Fort Worth l..js�t.r-----+ Fernanda Costa, Assistant City Manager APPROVED AS TO FOR N LEGA�IT�Y � � Assistant City Attorney PERMANEN7 DRAINAC�E FACIUTY EASEMENT ftev. 04l12l2072 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Phay Banyavong, known to me to be the same person whase name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Phay Banyavong and that he/she executed the same as the act of said Phay Banyavong for the purposes and consideration therein expressed and in the capacity therein stated. GiVEN UNDER MY HAND AND SEAL O� OFFICE this � �' day of �`� ) � :. .r-� , 20 l �-: �; . .{�t ����Q=�� �-N � >.� �:� � {Y ��` �J' 1 I` t G k.i�' 1�._�l�:"�� �; '?� . �+� mm. �xp. Gfi-Z,a-t 3 , �� a�y co �� ti .�:�� �� -�.-�.�,�. t.�.�.��.�-- Notary Public in and for the State of Texas ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personafly appeared Bouachanh Banyavong, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowfedged to me that the same was the �ct of Bouachanh Banyavong and that he/she executed the same as the act of said Bouachanh Banyavong for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL O� O��ICE this �� day of � C�i-r, i�.- , 20 ! �-- �::�.�.:�.�:�=[,��,�._.-�:-� � j5 ��qp� .re�'i��w7�B'.0.. �ik�t�`stf�P� {j �`�r'ai `� tdr,fs�r� Pt��ti� s� ����� S�'A"C� t:� i�XRS � ��� *�4 h4y Gamrn. �xg, �h :J�-i 3 `�-" � ACILITY EASEMENT Rev. 04/12/2012 Notary Public in and for the State of Texas ACKNOWLEDG�MENI' STATE �F TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Pubiic in and for the State of Texas, on this day personally appeared Fernando Casta, Assistant City ' Manager of the City of Fo�t Worth, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that he/she executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this _<,:���.�._ day of �i�.- _._., 20�. , � � � ;� Notary Public in and for the State of Texas _��'� `'�.= �Va��a DaNtEts " 41Y C�MMf35iOW �Y,PIRFS ��',y��:rt' J�ti� 10, �15 PERMANENT DRRINAGE FACIU7Y EASEMEPIi Rev. 04112J2012 � � ExNiBir a DRAINAGE EASEMENT BLOCK Z, LAKE CREST ESTAFES, FORT WORTN, TARRANT C�UNTY, TEXAS Being a strip of land located in Block Z, Lake Crest Estates an addition tn the City of Fort Worth, Tarrant County, Texas, according to the plat �eco�ded in Volume 388-T, Page 39, Plat Records, Tanant County, Texas. Said strip of land being more particu(a�iy described as foilows: BEGINNING at a point lying S89°58`57"E, a distance of 263,89 feet and N00°34'23"W, a distance of 239.94 feet from an 1/2" iron rod fou�d at the Southwest carner of Biock Z, said point being in the West line of a fract of land described in the deed to Phay Banyavong and Bcuachanh Banyavong recorded in Volume 12398, Page 1476, peed Records, Tarrant County, 7exas; THENCE N00'34'23"W, a distance of 120.01 feet along said West line to a point at the Northwest corner of said Banyavong tract; THENCE S89°59'20"E, a distance of 75.00 feet to a point at the Northeast corner of said Banyavong tract; iNENCE 500°34'23"E, a distance of 120.01 feet along the East line of said Banyavong tract to a point; THENCE N89°59'20"W, a distance of 75.00 feet to the point of beginning, containing 0.207 acres of land. The bearings recited hereon are oriented to NAD 83 North Cen�ral Texas, Grid. SEE 8-1/2"X11" PLAT ATTACH�D �,��� i�`�"/ � Herbert S. Beasley Registered Professiona( Land Surveyor 4050 BOUNRATTANAPASONG PHONHNABOTH GC. N0. 0204026094 L4 r � �c'� P \ `J � �PK� �`o K Z POB M � � �4 � M �� =o� ��'�,� oo� �'yaac�.►_ x � oa� G }zrn�' Z azN,cr qC3 mQNt� aD (j }. U `'- =Q.J a�� m �c� • °• � r� �r;�G�s FRFo;�..f' �i:' �' ;N ' ::........... .........:... ' HER6ERT S 8EA5l.EY , . Y..... .... , .. . ...... . . :� A � O �,: �.�� °FE s �°'�ta4�a1/ S � � ''; ERBERT S. ' EGI5TERED AND SURVE REPAREO F �� �/z-�o cca�rna. ►�oN.> ESSIONAL N0. 4050 ARY 15, 2012 0 �INE Ll L2 L3 L4 LS L6 SEE 8-1/2"X11" �ESCRIP710N ATTACHEO LINE TABLE LENGTH BEARING 263.89 S89°58`57"E 239,94 N00°34'23"W 120,01 N00°34'23'W 75.00 S89°59'20"E 120,01 S00°34'23`E 75.00 N89°59'ZO"W NEUANG SIPHANOUMUANG VOL. 11447, PG. 1175 D.R.T.C.T. REGiStERED PRQFES510NAL SURVEYORS ER6ERT S. � ��S �,_ EASLEY . �.�,,o • TOPOGRAPHIC • CONSTRUCTION SURVEYING P. 0. BOX 8873 AIE'IRO 61T-424-0194 FORT WORTH, TEXAS 76124 FAX 817-448-5488 40 80 120 Exhibit B SCAL� 1'= 40' Drainage Easement located in 81ock Z, l,ake Crest Estates Fort Warth, Torrant County, Texas NEREFORD DRIVE , ' Erxchange: Authorized Users Only Dacument Receipt information Reteren�e Number: ALDALiBAT0000036749LSK - Easement Instrument Number: No of Pages: Recorded Date: County: Volume: q213007Z50 7 1/9/2013 9:17:41 AM Fee: ��IU Page I of ! https://www.erxchange.com/UIIViewiteceipt.aspx?Documentld=69b2521 1 /4/2013 ElectronicallV Recastied TarrantCountyTexas Officiai Public Records 1/812013 3;53 PM D213005993 l.AKE CR �iII�I��MENT PR�ECT . $36. Pa�1� �.a... �S �" ��� �„�,,,i,�G PARCEL # 10hi�1%?E�uise GarGia �$ubmrtter: ACS DC?E # 6552 725t1 ELKlN5 SCHOO� RD l,Ot-1, Bl.00K-1, EAGi.� MOUNTAIN SAGlNAW !SD SCHVUL SlT� s�a� o� rExns COUNTY QF TARRANT DATE: GRANTOR: � § KNC}W ALL MEN �Y �'HESE PRESENTS § CiTY O� FORT WOI�t1'H p� MANENT ORAtNAG� FACI�.1?Y EASEMENT EACLE NlQUNTAtN-SAGINAW ISO GRANfi4R'S A�AlLlNG AC)C}�tE3S (incluciing Cc�ur�ty): 120Q QlQ DECA7UR RO FORt WtZR'fH, iARRAMT COUNiY, TX 761�9-43Q0 GRAN7�E: CtTY t3F F'ORT WQRTH GRANTE�'S MAILtNG ADDRESS (including Ctiunty}_ 10C}0 THROCKMORTON S7. �'ORt WQR7H� 7ARRAPI7 CdUNTY� TX 78182 CO�iS1DERATION: Ter� Duliacs ($1n.Utt?} and other gaad �nd valvabte cansider�tion, the receipt and su��iency of wtiich is hereby ackr�wledged. �#2QPERTY: B�ing a a.493 acr�s of tand tocated in L.t�t 1, Btacic t, Eagte ivtvuntain Saginaw !SD School Siie, Tarran# County, Texas, a�cording to the plat �scc�rdeti in Cabir�et A, Stide 210, F'lat Records, Tarrarrt C�ounty, T�uas. �nd being mnre pa►tictifarfy descri�ed �n Ext�i�vts `A" �nd "6"- Grantar, for the consideration paid ta Granior arui other gooci and valuabie consideratiori, h�reby grants, se1Fs, and t�nveys to Grantee. if� successors ar►d assigns, �n exciu�ve, parpefugt easement far the oonsiruct�on, operation, mainienance, rgptacement, upgrade, and re�air of a Pemlanent Drainage Faciiity, hereafter reterred to as `F�3ciiity'. The Facit�ty ie►ciudes al( incidentai urxiergrour�d ar�d abavegrau�d atis�ments, equipment and appu�tenances, incfuding, but not limited ta rnanhoi�s, pipe(ines, junctian fioxes, inlets, f�umes. headwalis, winguv�lfs, slope pavem�nt, gabso�s,. r LRl�IAI.'F,NT i7�ih1ldAL� PAGII.�TY �kS�Rl�li' �Ro t7<.tZ24': LAKE CRESi DRAINAGE IMPROVEMENT PROJECi �� �� SS �' i Q� 1� r� PARCEL # 10 -PDFE DOE # 6552 7250 ELKINS SCHOOL RD LOT- 1, BLOCK- 1, EAGLE MOUNTAIN SAGINAW ISD SCHOOL SITE STATE OF TEXAS C(?UNTY OF TARRANT OATE: GRANTOR: . KNOW ALL MEN BY THESE PRESENTS CITY OF FORT WORTH PERMANENT DRAINAGE FACILITY EASEMENT EAGLE MOUNTAIN-SAGINAW ISD GRANTOR'S MAILING ADDRESS (including County): 1200 OLD DECATUR RD FORT WORTH, TARRANT COUNTY, TX 76179-4300 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 1000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Doliars {$10.00) and other good and valuable conside�ation, the receipt and sufficiency of which is hereby acknowledged. PROPERTY: Being a 0.493 acres of (and located in Lot 1, Block 1, Eagle Mvuntain Saginaw ISD School Site, Tarrant County, 7exas, according to the plat recorded in Cabinet A, Slide 210, Ptat Records, Tarrant County, Texas, and being more particularty described in Exhibits "A" and "B". Grantor, for the consideration paid to Grantor and other good and valuable consideration, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, and repair of a Permanent Drainage Facility, hereafter referred to as "Facility". The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manholes, pipelines, junction boxes, inlets, flumes, headwalls, wingwalls, slape pavement, gabions, PERMANENT DRAINAGE FACILITY EASEMENT Rev. 04/12/2012 rock rip-�ap, drop structures and access ramps, and other erasion control measures in, upon, under and across a portion of the Praperty and more fully described in Exhibit "A" attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Property, or any part thereof, for the purpose of constructing, operating, mainiaining, replacing, upgrading, and repairing said Facility. In no event shall Grantor (I) use the Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (II) erect or permit to be erected within the easement property a permanent structu�e or building, including, but not limited to, monument sign, pole sign, billboard, brick or masonry fences or walls or other structures that require a building permit, or any structure not requiring a building permit but which may threaten the structural integrity or capacity of the Facility and its appurtenances. Grantee shal� be abligated to restore the surFace of the Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent ta the Easement which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder provided, however, that Grantee shal! not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use af this Easement. TO HAVE AND TO HOLD the above-described easement, together with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successors and assigns to warrant and forever defend all and singular the easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof. Under Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 10`" anniversary of the dafe of this acquisition to repurchase the property or request certain informafion about the use and any actual progress made toward the use for which the property was acquired under this deed/easemenUnamed instrument, and fhe repurchase price will be the price the City paid Grantor in this acquisition When the context requires, singular nouns and pronouns include the plural. [SIGNAiURES APPEAR ON iHE FOLLOWING PAGE] PERMANENT DRAINAGE FACILITY EASEMEN7 Rev. 04I12/2012 GRANTC)R: Eagle Mountain-Saginaw ISD Jirrt Ch dweli, Supet'intendertt GRANT�E: Cit}r of �ort Worth C.�rit-�---� Femanda Costa, Assistanf City Manager / ' APP VED AS TO �OR ND L�GA� 7Y 1 � Assistant City Attorney PERMANENT pRAINAGE FACICt7Y EASEMEh1T Kiev. 04i 1?l2'J t 1 ACKNOWLEDGEMEN7 STAT� U� T�XAS § COUNTY OFTARRANT § BEFORE M�, the undersigned authority, a Notary Public in and for the State of Te�s, on this day personafiy appeared Jim Chadwetl� Superintendertt Eagle Mnuntain-S�ginaw fSO, known to me ta be the same persan whose name is subs�ribed to the faregoing instrument, and acknawledged to me that the same was the act af Jim Ghadwelt, Superintendent Eag(e Mountain�Saginaw ISD and that he/she executed the same as the act of said Jim Chadwe{i, Superintendent Eagle Mountain-Saginaw tSD for the purposes and consideration therein expressed and in the capacity therein stated. G(V�N, UNDER MY HAND ANC7 S�AL OF OFFIC� this „��� day af , � ,1� �!_ � � . �,�acia@ n. rvetne�y �, P1owy Pufr�tc, ' Statee of'iie�cns � Ccmm, F.x�►.07-22-IS Nota blic in and for the State of Texas ACKNUWLEDGEM T STATE OF TEXAS § COUNTY OF TARRANT § BE�ORE ME, the und�rsigned authority, a Nptary Public in and for the 5tate of Texas, on this day personaily appeared Fernanda Cosfa, Assistant City Manag�r of the City of Fart Worth, knoum ta me to be the same persan whose name is subscribed td the faregoing instr��ment, and acknow{edged to me that the same was the act of the City vf �ort Worth and that he/she executed the same as the act of the City of Fori VVorfh fnr the purposes and consideration therein c�xpressed and in the capacity therein stated. G{VEN UND�R MY HAND AND SEAL OF O�'�ICL this ,���� day af - , 20� ylll_ y `, ;�n P{ti EYONIA DPJd1ELS �� `;: :*' MY COMM�SSION EXPIRES ;�;, 4<;� Jufy 44, 2013 � f?t,U`" PERAMNENT DflA1NAGE fACILITY EA5EMEN? Rev_ QMt2l20t'L � 1 / . , -- otary pub(ic in and for the State af Texas �t,ib�t a Drainage Easeme»t ' Lot 1t Block 1, Eagie Mount�in-Saginaw I.S.D. 5chooi Site, i'arranf County, Texas Being b.493 acres of land located in Lot f, Biock 1, Eag�e Mauntein-Saginaw I.S.D. School Site, iarrant Cou�ty, Texas, according to the plat recorded in Cabinet A, Slide 210, Plat Records, Tarrant Counry, Texas. Said 0.493 acres of land being more particularfy described as foilows: �EGINNING at a point in the West line of seid Lot 1, fying N00°34'23"V1l a distance of 511.92 fest from the Southwest come� ai said Lot 1, said paint fying S�9°58`57"E a distance of 491.89 feet and S00°34'23"E a distance of 77.99 feet from an 1/2" iron rod faund at the Southwest corner of Biock Z, Lake Crest �states an additian to the Gity of Fort Warth, Tarrant County, �'exas according tn the plat recorded in Votume 388-T, Page 39, Piat Records, Tarrant Caunty, Texas; 7HENCE N00'34'23°W, a distance of 305.28 feet along said West line to a point at the Sduthwest aamer of a Floadway Easement located in said Lot 1 according to said piat recorded in Cabinet A, Siide 210; THENCE along the South line of said Fioadway �asement as fallows: 1. N84°10'54"E, a distance of 175.85 feet to a point; 2. S78°39'31"E, a distance of 4U.03 fest to a point; T'HENCE S59°25'37"'W, a distance of 20125 feet to a point; THENCE S00°34'23"�, a distance af 212.47 feet to a point; THENCE S89'25'37"W, a distance of 40.OQ feet to the point of beginning, containing 0.493 �cres of tand_ The bearings recited hereon are oriented to NAD 83 North Genfrai 7exas, Grid. SEE 8-1/2"X11" f'I.AT ATTACNED �`� �L`��/��`G�� ���''' " Herbert S. Beasley � Registered Profession�i . , �F� s-t/z"xt�" DESCRIPi'IfON AT7ACHED L07 1, B�OCiC 1, �AGLE MOUNTAIN — SAGlNAW I50 SCNOOL 517E CAB. A, S�IDE 210 P.R.T.C.T. '+ �• 7'��• ' • .1�1" • � ! 'A't Z � 1.AKE �R�S, p5��9�5 � ��j �S. ,/2'�� o sw cok a�c z (caatRcx r�oH.) saa�sa'sr� 491,89' HEREFaRa( DRI VE � N u . m �LO� �S"f A�S � '2s' �'w �,K� �a5�, p 'S9. � � 40.00' `� p'R.� � � e u N � SW WR U3T t ERBERT 5. EASLEY P. 0. BOX 8873 FORT W�ft'tH. TEXA5 i8124 ,�, o�...r ��•��,� Rf� ��N G1: �' ...............•... HEae�ar s. a�stFr ► ..v.q...4t)50...v �... �7'�°:;e s s � °i;.04' � s'ua� � u►� stn�v�r�s t..�. • IAN� • TOPOGR�IPNIC • CONSTRUCTtON SURVEYfNQ 1f�TR0 1117-42fF-01o4 FAX �17-4�-64� �t'��'z/G��� HER�ER7 S. BEASLEY REGIST�REp PROF�SSIONAL LAND SUR1/EYOR N0. d050 PR�PAREO FEBRUARY 15, 2012 0 40 80 120 SCaL� 1'=40' SCA[.£ Exhibti 8 Oratnupe Easernent {acated in Lot 1, 81ock t, Eaqle �iauntaln - Saginaw ISt7 Schoal Site Fat Warth. Tarrant County, Texas R�.0.98888 ►+�N-�*�-wr-�-�-.wnt,u.o Ez7cchange: Authorized Users �nly Document aeceipt Informa�ion Refer�nce Namber: 6552-id-PDFE - Easement Page 1 of 1 https://www.etxchange.com/UINiewReceipt.aspx?DocumentId=6959376 41 I09/2013 ' . Electroni��tv Recorcied TarrantCouMyTexas ° Otficiai Public Reco�ds 1/8J2013 3:53 PM D213QOS992 LAKE CREST�31�����IpMENT PRrJJ�CT 6 3�s.ao RARCEL # 10-TCB+iary �a.tise Gat+cia submitier aCS OOE � 6552 j 725Q ELKtNS SCHOOI. RD �� ��+�*����-����� LC�i-1. BL4CK» 1� EAGLE MTN-S,AG f.�`sD SCH SITE GITY Q� Fi�RT WORiN TENIPQRARY GQNStRt1C,�Qtd EA$�M„�MT [�ATE: GFt�1PJTC7�2= EAGl.� MOUtdTAlNWSAGItdAW iSD Cl2ANTOR`S MAILII�EG AbOR�55 (in�lud'+ng Countyj: l200 O�D QECATUR RD FORT WORTH, TARRANT C4UNiY, TE�JCAS 76179-4300 GRANTE�: CltY O� FC1RY WQRTH GRANTEL'S MAII,iNG AfaDRESS (includirtg Caunty}; t000 THROGKMURidN ST. �OR�' WORTH� TARRANT CDUNTY, TX 76102 CONStD�RATiON: Ten [h�llars {$14.Qt}} and ather good arni valuabfe consideraiian, the receipt and su�ciency of which is hereby acknowiedged. P�2C?P�RTY: fiain� a 0_483 acre purtiat� af land k�cated in Lot t. Stack 1, Eagie Mautain Saginaw ISD Schoal Site, 7grrdnt �ounty, Texas, �t�rding ta the+ plat recortied in Cabinet A, SI'�de 210, Pi�t Recvrds, Tarrant Counry, T�xas, and being mare pa�ticutarty described ir� Exhibits `A" arxi "B". Grt�r�tor. ;ar the t�nsideration paid to Grantor, he�reby grant: bar�ain artcf canvey ur�tv Grantes, its successors anri �ssigns, the use and passag� in. over. arnf acrass. batow ar�d �lr�ng the e�sement situ�teti ir� 1'2rrrant Counfy. Texas, irr accard�r� witi� the fega! descrFptia! a hefe#a attacl�eti as �ibit "A". �rr�f in�res� at� egre�s o�,er Grantor's pro�erty to fhe aasemeni as st�own ar� �xh€bit '�3" . !t is furth�r agreed and und�rstaod tt�t Grant+� uill ;�e permittet! the use of 5aid easemer�t for tize purpose of drainage impravements for the la�Ce Crest [kainage imprvvernsnt pr�s�t. Upon com�fefior� c�f improv�ements and iis acceptance by Grantee, aii rights granfed within the desrxibed T�mporary Cartstnictian E�sement shatl cease. 7t�,r,rnry ('rr�en�cticw Fi•auxar, .J (: �V t:`,lt(j' • ! LAKE CREST DRAINAGE IMPROVEMENT PROJECT PARCEL # 10-TCE DOE # 6552 7250 ELKINS SCHOOL RD LOT- 1, BLOCK- 1, EAGLE M7N-SAG ISD SCH SITE �,� �.�.,s�'�-..�.:.�'�.� CITY OF FORT WORTH TEMPORARY CONSTRUCTION EASEMENT �. GRANTOR: EAGLE MOUNTAIN-SAGINAW ISD GRANTOR'5 MAILING ADDRESS (including County): 1200 OLD DECATUR RD FORT WORTH, TARRANT COUNTY, TEXAS 76179-4300 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 1000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSiDERATION: Ten Dol(ars ($10.00) and other good and valuable consideration, the receipt and su�ciency of which is hereby acknowledged. PROPERTY: Being a 0.483 acre po�tian of land located in Lot 1, Block 1, Eagle Moutain Saginaw ISD School Site, Tarrant County, Texas, according to the plat recorded in Cabinet A, Slide 210, Plat Records, Tarrant County, Texas, and being more pa�ticularly described in Exhibits "A" and "B". Grantor, for the consideration paid to Grantor, hereby grant, bargain and convey unto Grantee, its successors and assigns, the use and passage in, over, and across, belvw a�d along the easement situated in Tarrant County, Texas, in accordance with the legal description hereto attached as Exhibit "A", and ingress and egress over Grantor's property to the easement as shown on Exhibit "B". (t is further agreed and understood that Grantee will be permitted the use of said easement for the purpose of drainage improvements for the Lake Crest Drainage improvement projeci. Upon compfetion of improvements and its acceptance by Grantee, afl rights granted within the described Temporary Construction Easement shall cease. Tamporary CoiLstruction Easemem 61 i0412007 TO HAVE AND TO HOLD the above described easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns until the completian of construction and acceptance by Grantee. Grantor hereby bind themselves, their heirs, successors, and assigns, to warrant and defend, all and singular, said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof. jSIGNATURES AF'PEAR ON THE FOLLOWING PAGEJ Temporary fonsuvMion [asement 0 I /0912007 � e GRANTOR: }�agle Mountain-Saginaw ISD Jim Chadwefl Superintendent GRANTF:E: City af Fort Worth --�—• �/ �"�� ��M�---� Fernando Costa, Assistattt City Mana�er AI'PROVI:I� AS T(� FC7KM A'll LEC;AL,ITY � � • .qs�istant City Attorney f ertpx+rerr (';�rKini. iiun Caietnent fl l'p4r�(i9� ACKNOWi.EDGEMENT SiATE O� TEXAS � COUNTY OF TARRANT § BEFORE M�, the undersigned authoriry, a Notary Public in and for the State of Texas, on tF�is day personally �ppeared Jim Chadweli, Superintendent of Eagle Mountain- Saginaw ISD knawn to me to be the same persan whose name is subscribed to the fnregoing instrument, and acknawledged to me that the same was the act of Jim Chadwelt ' Superintertdent of �agle Mauntain-Saginaw ISD and fhat he/she executed the same as the �ct of said Jim Chaclweli Superintendent of Eagie Mourrtain-Saginaw ISD for the pu�poses �nd consideration fherein expressed and in the capaciry ther�in stated. GIVEN UNDER MY HAND AND SEAL t3� OFFICE this __��,___ day of --- ��' ' �� �'- — � � — �..� �NA�r►NMNi�K������. �J�'Y .lc�ckie D. Netttery; {� Noeary Publie, ti�:�/ State of 'Tiwu �� �p. 07-22- i S .�.. ► � � Nofa i'' 1ic in and for tF�e State of iexas ACKNOWLEDGEMENT STAT� OF TEXAS COUN7� OF TARRANT � 0 BEFORE; MF?, the undersigned authurity, a Notary Public in and ['ar the State nf'i'exas, cm this day persotiatiy aUpeared Femanda Costa, Assistant City Manager c�f the City of Fort Wc�rth, knowi� t� me to be itie same person whase name is subscribed to the foregoing instrument, and acknow[edged to tue that the same was the act �f the City af Fort Wotth and that heishe cxecuted the satne a,c ttre act ol� the City uf Fort Worth for the purposes and eonsideratinn therein expressed and in the c:apacit}' th�rein stated. GlV�N UNOER MY HAND AND SEA� OF OFFICE this � day of � _____. 20,� . • NI �4' �_� Tt; ��= �c+or��Aoa�w�.g Notary Public in and for the State of 7exas '��,. MY COMMI;,SIUN E�;pIpES ;,v�,��° �y �o, �ota Yem�rbry (",.�nstructiun Cascmcnt 0 L (14�?lln7 Exhibit A iemporary Constructian Easement Lot 1, BI6Ck 1, Eagle Mountain-Sagtnaw I.S.D. Schaoi Site, Tarrant County, Texas Being 0.483 acres of I�nd located in Lot 1, Biack 1, Eagle Mountain-Sagir�aw I.S,D, Schocai Site, iarrant County, Texas, accnrding to the piat recorded in Cabinet A, Slide 210, Plat Records, iarrant County, Texas. Said 0.483 acres of (and being rnore particularly desc�ibed as follaws: BEGINNING at a point lying N00°34'23"W a distaince of 511.92 feet and N89°25'37"E a distance 40.00 feet from the Southwest corner nf said Lat 1, said point lying S89°58'57"E s distance of 491.89 feet, 504'34'Z3"E a disiance of 77.99 feet and N89°25'37"E a distance of 4Q.00 feet from an 1/2" �ran rad found at the Southwest comer of Bfock z, Lake Crest Estates an addition ta the Ciiy of �art Worth, T�rrant County, Texas according to the plat recorded in Valume 388-T, Page 39, Plat Records, Tarrant County, Texas; 7HENCE N00'34'23"tN, a distance of 212.47 feet to a point; TH�NCE N59°25'37"E, a distance af 201,25 feet to a point; TH�NCE N76°39'31 "W, a distance of 40.03 feet to a point; THENCE S84°10'S4"W, a distance af 163.Ot feet to a poinf; i'HENCE N59°25'37"E, a disiance vf 238.79 feet to a paint; iH�NCE S30°34'23"E, a distance of 10b.00 feet to a point; TH�NCE 559°25'37"W, a distance of 230.46 feet to a point; 7WENCE SOR°34'23"E, a distance of 224.02 feef ta a point; THENC� S89°25'37"W, a disfance of �0.00 feet to the point of beginning, containing 0.483 acres of land. The bearings recited hereon are oriented to NAD $3 North Central Texas, Grid. SEE 8-1/2"Xf 1" PLAT Al'TACHEC3 /����/. ��' Herbe�t S. Beasley �i'� Registered Professianat Land 5urveyor No. 4050 ' LOT 1, BIQCK 1, EAGt�E lAOUN7AIN — SAGtNAW 15D SCHOQC StTE CAB. A, S�IUE 210 P. R. T. C. T. s� s-i/z'xn� OESCRIpT10N AT7ACNED ��t���5 V. �'t. R;{.G.�- �ri's�o e sw cau �ac t (ocw�xa �roa.) �o�sersr'E t91.tl9' HERE�aRD( DRI VE � �s gL4�` �TF�' � N88'25'37�E SE; �r.YS� �Si. t. �' 40.00' aae V• pR`G u k fi7 COh LOT i RD013'IEREU PROf'FS�OtlAI. Sl1R1�£1A0�� T S. � �� �. EASLEY .,,,�, . rnPo�c • coNsrnucna�, su��r�o P. Q HdX 6673 1�iR0 017—�OIY4 FORT Mr01�1H. TE7lAS 78124 fAX �17-416-�lNUI� �l'fti,� t 4R f'�" j� ���ii� �' /�� J`t� � O ti'� � � � .• .:............«......a.. HEF28�RT 5_ BErS'i.E �7 S. 8E/1'u�.F,Y REq5TERE0 PRC� UNAL .•Y•••.•..•�•�••«•••••�r•. LAND SilRYEYOR NO. 405U .. *� PREPAftEO F'E[iRUARY t5. 2012 � ��y�x f� Ot� �� � so iao iso SCA�E 1' =�0' Cfatf sckt r�ctoa.aooQee E�tlbit 8 Temporary Construction Enaement idcdtesd In LOt i, 81oc�c 1, EQgid Mounta(n — Saqtnaw ISO Schod 5Jte Fort Worth, Tarrant Caunty, Texas suqta-m l-uA- i- t tamp- esm t.dwp Erxchange: Authorized Users Only D►ocument Receip�t Infarma#ion Reference Numbar. 6552-10-7CE - Easement Page 1 of 1 https://www.encchange.com/UI/ViewReceipt.aspx?DocumentId=6959367 01/09/2013 ElectronicailV Recorde�d Tarrant Caunty Texas Qfficia( Public Records 1/24I201310:13 AM D213019718 LAK� CRi� � JJEMENT PR�3�C1� $40.00 pARCEE. # 11 � Submitter. ACS Feuise Garcis DOE # 6552 6716 MARVIN BROWN ST �+.�� ��s�. ��--� �� �� LOT- 41, Bi.C�K- R, LAKE CRESi ES7ATE5 SiATE �fi TEXAS �OUNTIC 0� TARriANT oa�r�: GRANTQR: § § KNOW ALL N{EN BY tHESE PRESENTS § CtTY b� FdRT WORTH P�RMANEN�' Df�,AINAG� �ACtLi'TY �AS�MENT NG0�7A SQUNAV�NG AND VANHKHAM SOUNAVONG GRANTOR'S MAILiNG ADDR�SS (inc[uding Cau�rty): 6716 MARVtN BROWN S7 FORT WaRTN, TARftANT CC?UNiY, 'hC 76179-3�40 GRANTE�: CfTY OF �ORT W4RTW GRANTEE'5 MAILING ADDRE5S (including County): 10001'NROCKMORTON S7. FORT WORTH, TARRANT COUNTY, 7X 761Q2 CON�IOEf7ATlON: Ten Dailarr ($10.OQ} and other go�d and v�luable consider�tian, the receipt and suPficiency af which is hereby acknowl�dgsd. PRUPERTY: B�ing a portion of I�nd loc�tet! in Loi 11, Btadc R, Lak� Crest Estates, an additior� ta ihe Ctty af Fort Worth, Tarrant Cou�ty, Tex�s, �ccarding fa the p{a# recc�rded in Volurne 388-W, Pays 13�, Plat Records, Tarras�i Courrty, Texas, and E�ing rnnre particuiariy describ�d in �chibits 'A" and "BH. Grantar, for ihe considerat"san paid to Gtantor and ofher good and valuable consideration, hereby grants, se!!s, and canv�ys ta Grantee, its successors ar�d assigns, ' �ri exdusive. perpetual easement for tt►e constructinn. 4peratton, rnsEntenance, repiacement, upgrade, and repair Qi a Pernrtanent Drainage Facitity, hereafter refeRed io as `�Faciiity". The Facifity inc(udes aiC incidentat undeaground and aboveground �ttaci�ments, equipment �nd �ppu�tenanGes, including, but not (imit�ci to m�nholes, pipeiines, junction boxes, iniets, flumes. headwalls, wingwaiis, slope pavement, gabions, PpRMAN�NT DRAiNAGE FACILfTY EASEMEt�T F2ry 4h�iZ'2[f�2 �. . � . LAKE CREST DRAINAGE IMPROVEMENT PROJECT PARCEL # 11 -PDFE DOE # 6552 6716 MARVIN BROWN ST ��� ���,� �� LOT- 11, BLOCK- R, LAKE CREST ESTATES STAT� O� TEXAS COUNTY OF TARRANT DATE: GRANTOR: § § KNOW ALL MEN BY THESE PRESENTS § CITY OF FORT WORiH PERMANENT DRAINAGE FACILITY EASEMENT NGOLTA SOUNAVONG AND VANHKHAM SOUNAVONG GRANTOR'S MAILING ADDRESS (inciuding County): 6716 MARVIN BROWN ST FORT WORTH, TARRAN7 COUNTY, TX 76179-3340 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (inciuding Cnunty): 1000 THROCKMORTUN ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuabie consideration, the receipt and su�ciency of which is hereby acknowledged. PROPERTY: Being a partion of land located in Lat 11, Block R, Lake Crest Estates, an addifion to the City of Fort Worth, Tarrant County, Texas, according to the plat recorded in Volume 388-W, Page 136, Plat Records, Tarrant County, Texas, and being more particulariy described in Exhibits "A" and °B". Grantnr, for the consideration paid to Grantor and other good and valuable consideration, hereby granfs, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, and repair of a Permanent Drainage Facility, hereafter referred to as "Facility". The Facifity incfudes all incidental underground and aboveground atiachments, equipment and appurtenances, including, but not limited to manholes, pipelines, junction boxes, inlets, flumes, headwalls, wingwalls, slope pavement, gabions, PERMANENT DRAINAGE FACILITY EASEM6NT Rev. 04/1?J2012 rock rip-rap, drop structures and access ramps, and ather erosion control measures in, upon, under and across a portion of the Property and more fully described in Exhibit "A" attached hereta and incorporated herein for ail pertinent purposes, together with the right and privilege at any and all times ta enter Property, or any part thereof, for the purpose of constructing, operating, maintaining, replacing, upgrading, and repairing said Facility. in no event shall Grantor (I) use the Prope�ty in any manner which interferes in any materiai way or is inconsistent with the rights granted hereund�r, or (il) er�ct or permit to be erected within the easement property a permanent structure or building, including, but nat limited to, monument sign, pole sign, billboard, brick or masonry fences or walls or other structures that require a building permit, or any structure not requiring a building permit but which may threaten the strucfural integrity or capacity of the Facility and its appurtenances. Grantee shall be obligated to restore the surface of the Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, ar similar surface improvements located upon or adjacent to the Easement which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this Easement. T4 HAVE AND TO HU�D the above-desc�ibed easement, together with all and singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successors and assigns to warrant and forever defend all and singular the easement unto Grantee, its successors and assigns, against every person whomsoever ►awfully claiming or to claim the same, or any part thereof. Under Subchapter E of the Texas Proper-ty Cade, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 10�' anniversary of the date of this acquisition to repurchase the property or request certain information about the use and any actual progress made toward the use for which the property was acquired under this deed/easement/named insin.�ment, and the repurchase price will be the price the City paid Grantor in this acquisition When the context requires, singular nouns and pronauns inc(ude the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] PERMANENT ORAINAGE �ACILfTY �ASEMENT Rev. OM12/2012 GRANTOR: Ngolta Sounavong and Vanhkham Sounavang � � Ngolta Sounavong '���...�.�`_..I .�-�. • .�. • GRANTEE: City of Fort Worth �� ��.__-- Femando Costa, Assistant City Manager APPROVED AS TO FORM AND LEGA� lTY / Assistant City Attorney PERMANENT DRAINAGE �AC�LITY EASEMENT Rev. OM1?J2012 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Nc�tary Public in and for the State af Texas, on this day personal(y appeared Ngolta Sounavong, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Ngoita Sounavong and that he/she executed the same as the act af said Ngolta Sounavong for the purposes and cansideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL �F C�FFICE this �'t"` day of �•+��w0.�.�i , 20 ��. �c vrt� JI�L D. GRI�F'IN � �. ' � *�* Notary public No ry Public in and for the State of Texas S���TE 0� TEXAS � �4 �py My Corren. �xA• 11/13l2014 CKNCIWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and far the State of Texas, on this day personaliy appeared Vanhkham Sounavong, known to me to be the same person whose name is subscribed to the foregaing instrument, and acknowiedged ta me that the s�me was fhe act of Vanhkham Sounavang and tha# he/she executed the same as the act of said Vanhkham Sounavang for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL aF OFF(CE this I� �'� day of �,��Q�n.� , 20,� �� �rt JlLL D. GRt�FIN Notmry Public * '` Si�iTE 0� i�XAS J} �h p My Comm. Exp.11l13J2014 Not Public in and fa t e State of Texas PERMANENT DRAINAGE �ACILfTY EASEMENT Rev. OQl12/2012 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEF'ORE ME, the undersigned authority, � Notary Public in and for the State of Texas, on this day personally appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the same persnn whose name is subscribed ta the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that he/she executed the same as the act of the City of Fart Worth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL O� OFFICE this _� `day of � 2�• 5 Notary Public in and or the State of Texas ri+`�"'l`�: EVONiADAN1�lS ~`• -' z MY CO�IMIS516N EXPIRES W;i ;,�,. '�:= July t0, 2013 PERMANEN7 DRAINAGE FACILITY EASEMENT Rev. 04/12/2012 �'r EXHtBIi A DRAINAGE EASEMENT Lot 11, BLOCK R, LAKE CRESl' ESTATES, FORT WORTH, 7ARRANT COUNTY, TEXAS Being a strip of land lacated in Lot 11, Block R, Lake Crest Estates an addition ta the City of Fort Worth, Tarrant County, Texas, according to the piat recorded in Volume 388-W, Page 136, Plat Records, Tarrant County, Texas. Said strip of land being more particulariy described as foltows: B�GINNING at a point at the Southwest comer of said Lot 11, said point lying N00°00'12"W, a distance of 280.00 feet from an 112" iron rod found at the Southwest comer of said Biack R; THENCE N00°00'12"W, a distance of 10,75 feet along the West line of said Lot 11 to a point; THENCE 589°59'40"E, a distance of 199.71 feef along a line 10.75 feet Norfh of and parallel with the South line of said Lat 11 to a point; TNENCE S86°28'15"E, a distance of 8.14 feet to a point in the West line of said Lot 11; THENCE S00°00'20"W, a distance of 10.25 feet along said West line io a point at the Southwest corner of said Lot 11; 7HENCE N89°59'40"W, a distance of 207.83 feet along said South line of Lot 11 to the point of beginning, containing 0.051 acres of land. The bearings recited hereon are oriented to NAD 83 North Central Texas, Grid. SEE 8-1/2"X11" PLAT ATTACHED ����,�� Herbert S. Beasley Registered Profess onal Land Surveyor 4050. �EE 8-1J2"X11" D�SCRIPTION A7TACHED z g� o� . J � � N • � POB ,��,........ � \ ~�.�G, � R� �+�N y:• e� ............................. WERBER7 S. 8EA5LEY ..Y..... ....s... �. A � 4050�� �: � � �.;�oFe s s °`•�' oQ'� \�:7.�.: ... � •,-t 12 LAKE CRE5T ESTATE5 UNIT N0. 2 VOL. 388— T--136 P.R.T.C.T. H W W � � � � � � m Z � � i/2"r�o (coratRa. MON. } 11 199. ��j 14 REGISTERED ONAL SURVEYORS ERBERT S. � �RVEY�RS LP. EASLEY . �,qN� • TOPOCRAPNIC • CONS UC�1QN SURVEYING P. o. eax ae�a a��—�e2a�—ot� FORT WORT}i, 1EXAS 76124 FAX 81T-448—SA�B S86'2Q'15"E 8.14' sooroo'2o•w � 0, 25� �AKE B�EOCK ER TA7ES 0 40 80 120 crni � i ��an� �fG�G`'!/� � HERBER7 5. BEAS REGISTERED PROFESSI�NAL LAND SURVEYOa N0. 4050 PREPARED FEBRUARY 15, 2012 Exhibit B 15 Drafnage Easement locotad in Lot t1, Block R, �ake Crest Estates Fort Worth. Tarrant County, SANTA GERTRUDIS STREET WCCREST-R-fl-yantdwQ z g 0 0 N � Erxchange: Authorized Users Only D►ocument Reeeipt Informatir�n Referenrs Number: 6552�11-PDF� - Easement Page 1 of 1 https://www.erxchange.com/tlINiewReceipt.aspx?Documentld=7022472 O1 /24/2013 ,, • '' ElectroniC2lilY Recnrded Tarrant County Texas O�icial Pubiic Records 1/241201 3 1 0:13 AM p213d1971S t.AlCE CR�ST�SI�iA��'IM��(/EIYIENT PRQJ�.GT 7 $40.00 PARCEL # ti•TCE,3viary Louise Garcia Submit#er: ACS ao� � s�� �, ��M �- � 1-� �`� � sr�� r�aRrnH aaawN sr �,��. #�..�..�.-�-�-�--� LOT- t1. BL.00K- R, LAKE CR�ST ESTA?ES CITY OF �ORT WORTH 1'�MPQItARY �ONSTRUCTIC?N EASEMEN7 DAT�: GRAN70R: NGOL.TA SOUNAVONG AND VANNKNAM SOUNAYCINC GRANiOR'S MA{LING ADC�RESS (including Counry): 6716 MARVIN BRCIWN ST �QitT WORTH, TARRANT COUNIY, TEXAS 76179-3340 GRANT�E: CITY OF �OR7 WORTN GRANTEE'S MAILIFVG ADQF2ESS (induding County}; 1Q00 THttOCKMC3F2TON ST. FORT WORTN, TARRANT' CQUNTY, TX 7�102 CC?NStDER�A'Fl4N: 7en Datiars ($10.0�) and other gc�od and valuabie cansid�r�tinn, thg receipt anc! sufflciency of which is hereby ackrtawledged. PRc7P�RTY: Being a portion of land it��ated in �.ot 11, Block R, Lak� Crest E�tates an addi6an ta the City of Fart Worth, Tarra�t Caunty, Texas, according to the p(at recarded ir� Vofume 388- W, Page 136, Piat Records, Tarrant County, Texas, and being rrrore particufa�ty described in Exhibits "A' and "B". Grantor, for the cansiderativn paid t4 Grantor, hereby grant, bargain and convey urrta Gr�nte�, its successars and assigns, th� use ami passage in, over, and acrass, below and al�ng the easement situated in Tarrarrt Ca:.�nty, T�xas, in accordas�ce witfii tt� feg�f description heretg atta�hed as Exhibil `An, and ings�s� nnc� e�ress �ver Grantor's p�p�rty to ths ea��mEnt �� shc�wr� an Exi�ibit "B". It is further agreed and understood that Grantee wii! be permitt�d ihe use of saici eas�ment for the purpose of drainage improvernents for the Lake Cresf Urainage irt�provement project. Upon completion of irnprovements and its ar,cept�nce by Grantee, al! rights granted uvithir� the described Temporary Construction Easemenf shali cg�s�. feinpr+nh i'�--�sneceiun l-ascmeol �'r! rMi.,irii? � y LAKE CREST DRAlNAGE IMPROVEMENT PROJECT PARCEL # 11-TCE DOE # 6552 6716 MARVIN BROWN ST LOT- 11, BLC,�K- R, LAKE CREST ESTATES �� # � ,5.5 a • 1 i�- �-C r C(TY O� FORT WORTH TEMPORARY CONSTRUCTION EASEMENT DATE: GRANTOR: NG�LTA S�UNAVONG AND VANHKHAM SOUMAVONG GRANTOR'S MAILING ADDRESS (including Caunty): 6716 MARVIN BROWN ST FORT WORTH, TARRANT COUNTY, TEXAS 76179-3340 GRANTEE: CITY qF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 9000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Doliars ($10.00) and ather good and va(uable consideration, the receipt and sufficiency of which is hereby acknowledged. PROPERTY: Being a portion af land lacated in Lot 11, Block R, Lake Crest Estates an addition to the City of Fort Worth, TaRant County, Texas, according to the plat recorded in Volume 388- W, Page 136, Plat Recards, Tarrant County, Texas, and being more particulariy described in Exhibits "A" and uB". Grantor, far the consideratian paid to Grantor, hereby grant, bargain and convey unto Grantee, its successors and assigns, the use and passage in, aver, and across, below and along the easement situated in Tarrant Counfy, Texas, in accordance with the legal description hereto attached as Exhibit "A", and ingress and �gress over Grantor's property to the easement as , shown on Exhibit "B". It is further agreed and understood that Grantee wilf be permitted the use of said easement for the purpose of drainage improvements for the Lake Crest Drainage improvernent project. Upcn completion of improvements and ifs acceptance by Grantee, all rights granted wifhin the described Temporary Construction Easemsnt shall cease, Temporary Construction Easement 01/09t200� , • `, TO HAVE AND TO HO�D the above described easement, togethe� with, ail and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns untii the compietion of consfruction and acceptance by Grantee. Grantor hereby bind themselves, their heirs, successors, and assigns, to warrant and defend, all and singular, said easement unto Grantee, its successors and assigns, against every person whomsoever lawfui(y claiming or to claim the same, or any part thereof. [SIGNATURES APPEAR ON THE FOLLOWING PAGE) Temporery Consuvecion Easement 0 U09Q007 , � ,• �,RANTOR: Ngolta Sounavong and Vanhkham Sounavong � � L���� Ngolta Sounavang t��"� a9" --." Vanhkham ounavd� g GTtANT�B: City of Fort Worth � �� Femando Costa, Assistant Ciiy Manager APPROVED AS TO FORM AND LEGALI �Y / Assistant City Attomey . Temporary Conswction Tasement OI/09/2007 , �. ACKNOWLEDGEMENT STATE OF TEXAS COUNTY OF TARRANT � 0 BEFORE ME, the undersigned authorify, a Natary Public in and for the State of Texas, on this day personally appear�d Ngolta Sounavong, known to me ta be the same person whose name is subscribed to the foregoing instrument, and acknowiedged to me that the same was the act of Ngotta Sounavong and that he/she executed the same as the act of said tdgolta Sounavong for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNOER MY NAND AND SEA� OF OFFICE this '�� day of �f��n�6.�r�.Y , , , 20� �ILL D. GRIFFItV Notary Public * � # STATE OF TEXAS �4 �*y My Cort�m. Exp.11l1312014 � O � Nota Pubtic in and f r the State of Texas ACKNOWLEDGEMENT Si'ATE OF TEXAS COUNTY UF TARRANT � 0 BEFORE ME, the undersigned authvrity, a Notary Public in and for the State of Texas, on this day personaAy appeared Vanhkham Sounavong, knawn ta me to be th� same persan whase name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Vanhkham Sounavong and that he/she executed the same as the act of said Vanhkham Sounavong for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this Ig�'� day of ��kt3�vi."� � 24 ��a. � �.��r JlLL D. GRI�FfN rlotery P�11� * � * 5'� AT� 0� T�XAS �'0 '� My Camrn. Exp.11/13J2014 Na ry Public in a for the State of Texas Temporary Conshuctioa Easement 01 /09/2007 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, ' on this day personally appeared Fernando Costa, Assistant Gity Mana�,er of the City of Fort ��Jorth, known to me to be the same person whose name is subscribed to the foregoing instrument, and ' acknowledged to me that the same was the act af the City of Fort Worth and that he/she executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this o�:� day of 2Q,�. � Notary Public in an or the State of Texas �,NH � �---=� _�; ��;: EY(?NIA DA1VIElS `'� �: �+r cotitMi�s,� exP�a�s ?'�;�;: �u►v �o, 2o�s Temporary Construction Easement O1/09/2009 4• .�. EXHIB(T A TENtAORARY CONSTRUCTtON ��EIVIENT Lot 11, B�OCK R, LAKE CREST �STAT6S, �ORT WORTH, TARRANT COUNTY, iEXqS Being a strip of (and located in Lot 11, Bfock R, Lake Crest Estates �n addition ta the City of Fort Worth, Tarrant County, Texas, according to the piat racorded in Volume 388-W, Page 136, Piat Reco�ds, Tarrant Caunty, Texas. Said strip of land being more particula�ly desc�tbed as foltaws: Cammencing �f an tf2" iron rod found at th� Sauthwest comer of said Block a; THENCE N00°00'12"W, a distance of 290.75 feet alo�g the West line of said Block R to a point; THENCE S89°58'40"E, a distance of 130.Qp feet t4 the PQtNT OF BEGINNiNG of tha hereinabove desc�ibed tract, said point of beginning being Northeriy 10.75 feet perpendicular to ttte South line of said Lot 11 and lying N00°00'12"W a distance of 10.75 feet and S89'59'40"�, a disfance of 130.00 feet from the Sauthwest comer of said Lot 11; 1'HENCE N00°00'12"V11, a dist�nc� o� 10.On feet to a paint; iHENC� S89°59'd0"E, a distance of 77.83 feet along a line 20.75 perpendicutar to an parallel with said �outh line �ta a point in the �ast tine of said Lot 11; iHLNCE S00°00`20"W, a distance of 10.50 fest along said East line af to a point, safd point lying N00°00'20"E a distance of 10.25 feet from the Southeast comer of said Lot 11 ; THENCE N86°28'15"W, a distance of 8.14 feet tp a point, said paint being Northerty 10.75 feet perpendlcul�r to said South line of Ltrt 11; THENCE N89°59'40"VV, a distance of 69.71 feet alnng a line 10.75 perpendicular to and parallei with said South tine to the point of beginning, containing 0.018 acres of land. The bearings recited hereon ar� oriented to NAD 8� North C�nfrai T�xas, Grid. SEE 8-1/2"X11" PLAT ATTACHED : ���G��l I , Herbert S. Bea5ley Registered Professionai Land Survey<a�- 4d54. REGi PROFESSIONA! SURVEY�ORS ER�ER S. SEE 6-1 /2�x„ � . • � �R� �� O�SCRIPTION ATTACHED EAS Y .-�,,,p • TOPQGRAPHIC • CONSTRUCTfON SURVEYING� � P. 0. 80X 8� 3 fAfTRt3 817-42�—Otli� FORT WORTH. TEXA 76124 FAX lfi7—M8—lS488 saa�s'ao"E Noo�oo�tz•w "'�'__._•.�.�. 77.83' _ ,_,,, ` V i, � S89'S9'40'E — — — ` 10.004 N89'59'40'W ' ' 130 00' sooroo'zo•w f 0.50' • P08 69J1' 8.f4 � — ' "' -- --- ..._. ', N$878'!5'W SW COtt LOT 11 _. _.. _. .._ .� _ � — — — — -- --- — _., ._. ..._ � .._._ _.... � .,, SE COR LOT 11 � Z LAK� CREST E5TATES UNIT Nb. 2 VOL. 388— T-136 P. R. T. C. T. F— W W � h � � O � m Z � a � z $ $ N � � 0 � �/z'�o t�+�a MON. j /jh�+,�� � S T �RF c,;�.' \ �y: � � � �'�N ............... ..........:... HERBERT S. 8EA5lEY ..v .....................ti... ' A 4450 �: ��7 �°F� s s � ° {O�� \�l• •H.: • ... •�� .U/ ��f��% i!, HERBERT 5. BEAS REGiSiEREO PROf ESSfONAL LAND 5URVEYpR N0. 4050 PREPARED MARCH 26, 2012 14 0 40 80 120 rrni r ��_,,n. EachibiE 8 � 5 Temporary Constavct(an Easement Incated in lot 11, 91ock F2, Lake Crest Eatates Fart Warth, Tarrant County, Texas SANTA GERTRUDIS STREET 13 L�� BR �CK R TAiES lN(CREST-R-11-lKnD-Nmi.O�p Erxchange: Authorized Users Only �OCl,tttlE',�'tt �@CE1�� �t'9fOf CY13t1011 Reterence Number: 6552-11-TCE - Easement Page l of 1 https:/Iwww.erxchange.comlUUViewReceipt.aspx?DocumentId-7022485 O l /24/2013 ` £ • x � Electronic�iy Re�carded TarrantCountyTexas ', •, C3fftciai Pubtic Records 1/8f20� 3 3:51 PM D213096�83 t�c� C1� ' �AO�i�v�+t���r p�Ec�' $ss.00 PARCEL i� 1i"�ary o�uise Garcia Submit#er. ACS f)OE t� 65� 67t2 MARI/tN HROWiV ST � � i�t�'% 1:�� BL.Q�K- R, �.A�CE CRES�' ES7A'CE� ��,�, ��.� �..-.�,���� �TAT� OF TEXAS � § KNbW ALL A�lEN BY THES� PR�SENiS Ct3UN7Y � �'ARRANT § G�iY O� FqitT WORTH R�RMANENT QRAtN�1GE FA�ItJ1'Y�5���r DATE: GRANTUR: DAl2A YANH PRASATNANE GIRANTOR`3 MAILING ADDRESS (inctudir�g Caurtty�: 6�'12 �AAARVIW BRQWN ST FOR7 WURTH, iARRANT CC}UNiY. TX 7'&'179-334ft Gt�ANTEE: C#`fY t7F F'ORT WORTN GRAN�'EE'S MAlL{NG ADDRESS (induding County): i800 'fHRQCKMORTON ST. FORT Wt3RTH. TARRAN7 CQUPITY, TX 76102 GUNSlDEFt��'(QN: T�r Uo€�� (�'�Q.OE3) �nd atiser gocxi and vatuabl� cvnsideration, the r�ceipt and sufficiency af which is i�reby acknowiedged. PRQP�RTY: Being a porti� ot l�ncf ta�ie� �n L�t 12, Bl�cis R, Laic� Gn�s�t �stat�s. �n acfditiort to the City aF Fv;# Worth, 7arrant Caunty, Texas, accordirtg to the ptat rsco�cfsd 'sri Vofurne 388-W, Page 136, Plat Recards, i`atrant Caunty. 1'e�s, and t�in� mnre pa;#ir,tilar�y tlescrib�ci ir: �xt�+sbits `A" anc� "B", Grantor, tor th� ca�tsider�tion paic3 to Gt�a�tar artd oth$r gaod and valuabae cart�ide�-atlon, heraby grants, sells� and conveys ta Grantse, its s�ccsssors �nd assigrts, an exctusive, p�+rpetuai ��serrrent fc�r tt�e construcii�. a�seration, maintenar�ce, repiar,�m�ni, upgt��e. �nc! �a�r �f a Psrmar�i Qrair�gs� Fa�"siity. h���ftdr r�f�d io as `Facitity"� �'he Facitity includes alt inciderrta! unc#e�grount{ and abo�veground �tf�ctaments, equiprt:ec�t and appt,rtenanc�s, inciu�ing, bcrf not fimited to mar►#x�les, pipel'snes. }unctio�n boxes, in��ts, fiu!mes. heactu►alis, wingwaHs, slape pavrstn�nt, gabions, �s���o��:.b;ac�F,�..�.��. �scu��r i?�v. :�5i?:!'Lnt2 Y' , � ! . LAK� CREST DRAlNAGE IMPROVEMENT PROJECT PARC�L # 12 •PDFE DOE # 6552 6712 MARViN BROWN ST 'r''�� 4� .__ l.�"C- 12, BLOCK- R, LAKE CREST ESTATES �.�� ���? -�" '°� STA7E (3F TEXAS COUNTY OF TARRANT DATE: GRANTOR: § § § KNt;W pl.L MEN BY 7HESE PRESENTS CiTY OF FORT Wt�Ri°H PERMANENT DRAINAGE FACtLiTY EASEMENT DARA VANH PRASATHANE GRANTOR'S MAILlNG ADDRESS (including Cvunty): 6712 MARVIN BROWN ST FORT WORTH, TARRANT COUNTY, TX 76179-3340 GRANTE�: CtTY OF FORT WORTH GRANTEE'S MAILING ADORESS (including County): 1000 THRCICKMORTON ST. FORT WORTH, TARRANT COUNTY, TX T6102 CONSIDEF2A710N: Ten Dollars ($10.00) and other good and valuable cnnsideration, the �eceipt and sufficiency of which is hereby acknowledged. PRUPERTY: Being a portion of land iocated in Lot 12, Block R, Lake Crest Estates, an addition to the Giry of Fort Worth, Tarrant County, Texas, accvrding to the p(at recorded in Volume 388-W, Page 136, Plat Records, Tarrant Counry, 7exas, and being more parti�ufar(y describe� in Exhibits "A" and "B". Granfnr, for the consideration paid to Grantor and other good and valuable consideratian, hereby grants, sells, and conveys to Grantee, ifs successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, r�placement, upgrade, and repair of a Permaner�t Drain�ge Facility, hereafte� referred to as "Facility". The Facility includes all incidental underground and aboveground atfachments, equipment and appurtenances, including, but not limited to manholes, pipelines, junction boxes, inlets, flumes, headwalfs, wingwal(s, slope pavement, gabions, ' P�RMANENT DRIIINAGE FACIlt7Y EAS�MENT Rev. 04l12l2017 rock rip-rap, drop structures and access ramps, and other erosion control measures in, upon, under and across a portion of the Praperty and more fuliy described in Exhibit "A" attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and ail times to enter Property, ar any part thereof, for the purpase af constructing, operating, maintaining, replacing, upgrading, and repairing said Facility. !n no event shall Grantor (!) use the Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (II) erect or permit to be erected within the easement property a permanent structure nr building, including, but n�t lirt7ited fa, monument sign, pole sign, bil(board, brick or masonry fences or wa!!s or ather structures ihat require a building permit, or any structure not requiring a building permit but which may threaten the structural integrity or capacity of the Facility and its appurtenances. Grantee sha�{ be obligated to restore the surface of the Property at Granfe�'s sol� cdst and expense, inciuding the restoration of any sidewalks, driveways, or similar surt'ace imprpvements located upan or adjacent to the Easement which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder provided, however, that Grantee shall not be obligated to restore or repl�ce irrigafian systems or other improvements instalied in violation of the provisions and intended use of this E�sement. TO HAVE ANO 70 HOLD the above-described easement, together with all anci singular the rights and appurtenances thereto in anyway belonging unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successors and assigns ta warrant and farever defend all and singular the easement unto Grantee, its successors and assigns, again�t every person whomsoever lawfully claiming �r to claim the same, or any part thereof. Under Subchapter � of the Texas Property Code, as amended, the Grantor vr the Grantor's heirs, successors, or assigns may be entitlsd before the 10�' anniversary of the date of this acquisition to repurchase the property or request certain information about the use and any actual p�ogress made toward the use for which the property was acquired under this deed/easement/named instr�ment, and the repurchass price wi!! b� the price the City paid Grantor in this acquisition When fhe context requires, singular nouns and pr4nouns include the plural. [51GNATURES APPEAR ON THE FOLLUWING PAGE] F'ERMAN�NT OftAINAGE FACILtTY EASEMENT a�, oa��2izo�z 0 GRANTOR: Dara Vanh Prasathane ����� , �� U� �r�.������`"" Dara Vanh Prasathane GRANTEE: City of �ort Worth ���� �� Ferna�do Costa, Assistant City Manager % APPROVED AS TO RM AND � GA ITY � s istant City Attorney , PERMANEi+i7' DRAINAGE FACILITY EASEMENT ', Rev. 04l12/2012 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF 7ARRANT § BE�ORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personaily appeared Dara Vanh Prasathane, kr��wn to me to be the same person whose name is subscribed to the foregoing instrument, and acknowiedged to me that the same was the act of Dara Vanh Prasathane and that he/she executed the same as the act of said Dara Vanh Prasathane for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this �"1� day of t.��`.�.fM �V , 20��; � '�" LORI CARVEk 4 � �����4y *� ;*� Nartary Pablic ��'. % S'iATE OP'tZ'XAXt155 �V � MY��R�1��t4 �'� ��-�1..1 � Notary Public in and for the State of Texas ACKNOWLEDGEMENT STATE OF TEXAS C4U�lTY OF TARRANT � 0 BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Femando Costa, Assistant Ciry Manager af the City of Fort Worth, known to me to be the same person whose name is subsc�ibed to the foregoing instrument, and acknawledged to me that the same was the act of the City of Fort Warth and that he/she executed the same as the act of the City of �ort Warth for the purposes and consideration therein expressed an� in the capacity therein stated_ GIVEN UNDER MY HAND AND SEAL OF OFFICE th�s?��✓� day af �' 1 , 20� � � '"�.�'�, EVOt+f1ADAt�.S / ~ i : � FAY CtlMMISStON q(PtRE5 '•: f�,„��-` �ny io, zat� ntary Public in and for the State of Texas PERMANENT DRAINAGE FACIU7Y FJISEMENT Rev. tlM1712tl12 • - EXHIBIT A C3RAINAGE EASEMENT Lot 12, BLaCK R, LAKE CREST ESTATES, ' FOR7 WORTH, TARRANT COUNTY, TEXAS Being a strip of I�nd loc�ted in Lot 12, Block R, Lake Cresf Estates an addition to the City of Fort Wnrth, Tarrant County, Texas, according to the plat �ecorded in Volume 388-W, Page 136, plat Records, iarrant County, Texas. Said strip of land being more particutariy described as foilows: BEGINNiNG at a point at the Northwest corner of said Lot 12, said point lying NOQ°00'12"W, a distance of 280.00 feet from an 1/2" iron rod found at the 5outhwest corner of said Block R; THENCE S89°59'40"E, a distance of 207.83 feet along the North line of said Lot 12 to a point at the Northeast corner of said l.ot 12; THENCE 500°00`20"W, a distance of 9.79 feet along the East line of said l.ot 12 to a point; THENCE N86°28'15"VV, a distance of 8.75 feet to a point; iHENCE N89°59'40"W, a distance af 999.09 feet along a line 9.25 feet South of and parallel with said North line to a point in the West line of said Lot 12; ' TNENCE N00°00'12"W, a distance af 9.25 feet along said West line to the point of beginning, containing 0.044 acres of land. The bearings �ecited hereon are oriented to NAD 83 North Central iexas, Grid. SEE 8-1/2"X11" PLAT ATTACHED ��r�'"/ ��4=�"' Herbert S. Beasle}� .�� �,�; Registered Professic�nai ti�°v �T� Land Sunreyor 4050. �' � � ..:........�---- ,�� 1�J su , REqS7ERED PR ONAI. SURVE'r+ORS -. ' DESCRIP110N ATTACNED ER6ERT S. �0 �R��S LP� EASLEY . �nNo • To�oc�aPHic 11 • CON5 UCT10N SURYEYING P. 0. BOX 8873 a17-429-81�4 FORT WOR7N, TEXAS i6124 F/1�( g�7'-•�.-�� p� S89'S9'40'E � � 5.25' N00'OU92`W t N86'28'15"W 8.75' � Z LAKE CREST ESTA7E5 UNIT N0. 2 VOI.. 388— T-136 P. R. T. C. Y. w- w w � � � O � �D z Q..' d � pz l7 N g$ N. � 13 LAKE BR OCK R TATES o� r �,. �G, � RE`� ;!r.yrN h:' �' .............:... HERBERT S. BEASIEY ..Y...... .... . ::A �'c�"' ! : :' \li7.� �� $ 5 ��' �t��� 14 0 40 SO 1�C0 Cf"AI F" 1 `=4f1' � �/ .� f�' HERBERT S. B�ASLEY 1 � R�GiSTER�a F�Rp�ESSIONAL LAND SURVEYOR N0. 4050 PREPARED FEBRUARY 15, 2012 i /z'�v (cori rna MON.} SANTA GERTRUDIS STREET Exhibit 9 Dra(ncge Easerrtent )ocoted ln Lot 12, 81ock R, Lake Crest Estatcs �'ort Warth, Tarrant County, 9.79' wccatsr—a—,2—..�„�a.p GRIU SCALE FACTORe0.99988 Erxchange: Authorized Users Only Document �teceipt Informatios� Referer�e Number: 8552-12 - Egseme�nt Page 1 of 1 https://www.encchange.com/UI/V iewRecei pt.aspx?Document[d-69593 58 01 /09/2013 • i � r Electronically Reco�ded Tarr�nt County Texas Offlcial Public F�ecords 'i 1/16/"�U12 4:14 PtJ D2'12283839 LAKE CR �l�Yi�ff`�#PR�h1/EM�NT PRC�S�T 6 ��s.00 F'ARGEL # 13 Submitter: ACS .-- ,. �ouise Garcia �� � � � � a _ � �_ �/'� r� DOE # 8552 •---��� 5713 GILL.{S JOHNSON ST LO7- 19, BL,OGK- R, I.AK� CRES'T ESTATES S'tAT� OF TEXAS § C KNOW ALL Mf�N SY TI�ESE PRES�NTS COUNTY n� TARRANT § ,�iL�l�l�� i I I LI, C;(.�IVII��1(�IY ��I- ./�/f0_QG�?0��7',; � wL-S,� CITY OE FORT WORTH /,�!C �!�G ,/�' PERMAN�NT DRAINAGE �ACILITY EASEMENT DAT�: September 28, 2p12 GRANT'OR: MARVIN RAY WINSLAGER GRAtVT'OR'5 MAILING ADDRESS (including Gounty): 67U9 GILLIS JOHNS�N ST �AR`f WAR'fH, TARRAN'f COUNTY, TX 76979-3302 GRANTEE: CtTY OF ��RT W�RThI GRANTEE'S MAll..f NG ADDRESS (including County): 1000 THR�CKMORT�N ST. FORi WORTH, TARRANT GOUNTY, TX 76102 COt�SiDERATION; T�r� Dollars ($10.a0) and aft►er g��d and valuable consideratian, the receipt and sufficiency of which is hereby acknowledged. pRpPERTY: Beinc� a partion of land lar,atec� in l.ot 19, Biack R, l.ake Crest �stafes, an additian to the City of Fart Warth, 7arranf Caunty, Texas, �ccording to the p(at recarded in Volume 388-W, Page 136, Piat Recards, Tarrant County, iexas, and being mora particularly descri6ed in Exhibits "A" and "B". Gr�rttar, fpr the cansideratidn pald to Granfor and other gond and valuabie consideration, hereby grants, sells, and cnnveys to Grantee, ifs successors and assigns, an exciu5ive, perpetu�l easemenf for the constructian, operatlon, maintenance, r�plac�m�nt, upgrade, and repafr of a Perm�nent [�rainage Facility, h�re�fter referred to as "Faciilty . 7he Facility inciudes ail incidentai underground and aboveground �� attachments, equipment and appurtenances, incfuding, but not limlted to manholes, pipefines, }unctian boxes, iniets, fiumes, headwalis, wingwalis, slope pavement, gabions, rock rip-rap, drop structur�s and access ramps, and other erosion controi measurss in, f�@RMANENT Of2AItJAGE FACILITY EASEM�NT Rev 04/t2/2012 m LAKE CREST ORAINAGE IMPROVEMENT PROJEC7 PARCEL # 13 -PDFE DOE # 6552 6713 GILLIS JOHNSQN ST LOT- 19, BLdCK- R, LAKE CREST ESTATES ��. � � s s� - i �` �nr`�- § KNOW ALL MEN BY THESE PRESENTS COUNTY OF TARRANT § �',�.C-l�r<, G ��iL'=: f°ti�`�f �'AN�Y STATE OF 7EXAS § � � v < < �_: ! ��F �ao�o3�.�� �, �s,� CITY OF FORT WORTH /-�C:. �>f�G. ��� f PERMANENT DRAINAGE FACILITY EASEMENT DATE: September 28, 2012 GRANTOR: MARVIN RAY WINSLAGER GRANTOR'S MAILING ADDRESS (including County): 67Q9 GILLIS JOHNSON ST FORT WORTH, TARRANT COUNTY, TX 76179-3302 GRANTEE: CITY OF �ORT WORTH GRANTEE'S MAILING ADDRESS (including County): 1000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and suffrciency of which is hereby acknowledged. PROPERTY: Being a portion of land located in Lot 19, Block R, Lake Crest Estates, an addition to the City of Fort Worth, Tarrant County, Texas, according to the plat recorded in Volume 388-W, Page 136, Plat Records, Tarrant County, Texas, and being more particularfy described in Exhibits "A" and "B". Grantor, for the consideration paid to Grantor and other gaod and valuabfe consideration, hereby grants, sells, and conveys to Grantee, its successars and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, and repair of a Permanent Drainage Facility, hereafter referred to as "Facility". The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manholes, pipelines, junction boxes, inlets, flumes, headwalls, wingwalfs, slope pavement, gabions, rock rip-rap, drop structures and access ramps, and other erosion contral measures in, PERMAN�NT DRAINAGE FACILITY EASEMEN7 Rev.04/12/2Q12 i m upon, under and across a portion of the Property and mare fully described in Exhibit "A" attached hereto and incorporated herein for ai( pertinent purposes, together with the right and privitege at any and all times ta enter Property, ar any part thereaf, for the purpose of constructing, operating, maintaining, replacing, upgrading, and repairing said Facility. In no event shall Grantor (I) use the Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, ar (II) erect or permit to be erected within the easement property a permanent structure or buiiding, including, but not limited to, monument sign, pole sign, billboard, brick ar masonry fences or walls or other structures that require a building permit, or any structure not requiring a building permit but which may threaten the structural integrity or capacity of the Facility and its appurtenances. Grantee shall be obligated to restore the surface of the Property at Grantee's sole cost and expense, including the restaration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the �asement which may have been removed, relocated, altered, damaged, or desfroyed as a result of the Grantee's use of the easement granted hereunder provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation af the provisions and intended use of this Easement. TO HAVE AND TO HOLD the above-described easement, together with all and singular the rights and appurtenances thereto in anyway belanging unto Grant�e, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successors and assigns to warrant and forever defend all and singular the easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same, or any part thereof. Under Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 1 Q`h anniversary of the date of this acquisition to repurchase the property or request certain information about the use and any actual progress made toward the use for which the property was acquired under this deed/easement/named instrument, and the repurchase price will be the price the City paid Grantor in this acquisitian When the conte�tt requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] PERMAN�N7 DRAINAGE FACIIfTY EASEMENT Rev. OM17J2012 % GRANYOR: Marvin Ray Winslager ,- �U Ma in Ray Win ger GRANTEE: City of Fort Worth � / ��...I�i GN,G�...... Fernando Costa, Assistant City Manager APP OVED AS TO FORM AND LE�GALITY � , � a Assistant City Attorney PERMANENT DRAINAGE �AGILI7Y EA5EMEM' Rev. 04l12l2012 0 � � ACKNOWL.EDGEMENT STATE OF TEXAS � COUNTY OF TARRANT § ' � � GI EN UNDER MY HAND AND SEAL OF OFFICE this � day of 20�v BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Marvin Ray 1lVinslage�, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was fhe act of Marvin Ray Winsiager and that he/she executed the same as the act of said Marvin Ray Winslager for the purposes and consideration therein expressed and in the capacity therein statsd. � ==.:a.�:. ,� �N�F?RY SK!!�lITE �.�- * NQTARY F'UBC.IG STATE OF TEXqB Notary Public in an for the State of Texas v�' `�� MY Catun, Exp. 09-17-2015 ACKNOWLEDGEMENT STATE OF TEXAS COUNTY OF TARRANT � � BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Fernando Costa, Assistant City Manager of the City of Fort Worth, known to me to be the same person whose name is subscribed to the foregaing instrument, and acknowledged to me that the same was the act of the City of Fa►t Worth and that he/she executed the same as the act nf the City of �ort Worth for the purposes and consideration therein expressed and ir� the capacity therein stated. GIVEN UNDER MY HAND AND 5EAL OF OFFIC� this � .s� � � - 1� �h� �i.�r�►aw�R : � �,r co�� a��s r-�ry�2ot4 `� � day af Ul��- � �� l� �1 Notary Public in and for the S te of Texas PERMANENT ORAtNAGE FACILtTY EASEMEN7 Rev. OAl1?J2012 � EXHIBiT A DRAINACsE EASEMENT Lot 19, BLOCK R, L.AKE CREST ESTATES, FORT WORTH, TARRANT COUNTY, 7EXAS 8eing a strip of land located in Lot 19, Block R, Lake Crest Estates an addition to the City of Fort Worth, ' Tarrant County, Texas, according to the plat recorded in Volume 388-W, Page 136, Plat Records, Tarrant County, Texas. Said strip of land being more particularly described as fallows: BEGINNING at a point at the Northeast corner of said Lot 19, said point lying N89°57'37"E a distance of 415.57 feet and N00°00'51"E, a distance of 280.00 feet from an 1/2" iron rod found at the Southwest corner of said Block R; THENCE S00�00'51 "V11, a distance af 15.00 feet along the East line af said Lot 19 to a point; THENCE N89°59'40"W, a distance of 123.19 feet along a line 15.00 feet South of and Parailel with the North line of said Lot 19 to a point; THENCE N86°28'15"V11, a distance of 84.80 feet to a point in the West line of said Lot 19; THENCE N00°00'20"E, a distance of 9.79 feet to a point at the Northwest corner of said Lot 19; THENCE S89°59'40"E, a distance of 207.83 feet along said North line to the point of beginning, containing 0.067 acres of land 7he bearings recited hereon are o�iented to NAD 83 North Central 7exas, Grid. SEE 8-1/2"X11" P�AT ATTACHED ������ Herbert S. Beas(ey Registered Professionai Land Surveyor 4050. ;, Erxchange: Auihorizecl Users Only P�igc i c>C I ., hups:/iww�v.erxchartge.coin/UUVie�vKece ipt.aspx?Docwn entld—G7S4816 11 / 19/2U 12 Document Receipt Infarmation Reference Number; ALDAL i8 - ATd000036758 - Easement ���� � . f oz�a�sssao DQE # 6552 ary Louise Garaa 6713 G!`LIS JOHNSON S'i' ��� � �' $ ����C � LQT� 19, ��OCK- R, LAKE CREST ESTATES Etect�onicallv Recorded Tarrant Counry Texas Official Pubiic Records 11/16/2012 4:14 PM LAKE GRES�"�4d� �1��j�ENT PROJ���s 6 $36.00 PAR(;EL # 13-7'C�� Submitter: ACS CI'f"Y OF FORT WORl'H TEMPORARY CON57(iUCTtON �ASEMEiVT DATE: Sepkember 26, 207.2 ,y'_�t���� I�7 �_�= t_;(.Ji�/�r�F1C�(�% (�F .���"���o,�U 7�;�`� S,� Gi�ANTOR: fillARViN RAY WIPISLAGER ��' ��� ��' GRANTOR'S MAILING ADdRESS (including Gouniy): 6709 GILLtS JOHNSON ST �ORT WC3RTH, 7ARRANT COUN'CY, TEXAS 76179-3302 GRANiEE: CITY A� �4FtT WORiH GRANTE�.'S MAILING AfJDR�SS (including Caunty): 1flUO THROCKMORi"ON ST, FOR7' WARThi, TARRANT COUNTY, TX 76102 GQNSIL7�(�A711�N: T'err poliars ($i(1.00) �nci rriF�er gnc�d and valuabla consideratirari, fl�e receipt and suffici�ncy oF whiah is hereby acknowledged. PROF'ERiY: B�fng a partlon of fand located in Lo# 19, Biack R, l�ake Crest �sfates an additian to the Cify of �ort Worth, 7arrant Caunty, i'exas, according to the plat recorded in Valume 388- W, Page 136, Plat Records, Tarrant County, 7exas, �nd being more particulariy described in Exhibits "A" a�d "B" Grantar, �or the cansideration p�id to Grantor, hereby giant, bargain and convey unto Grantee, its successars and assigns, the use and passage in, over, and across, below and along fhe easement sftuated in 7arrant Caunty, Texas, in acc4rd�nce with the legai description hereto atfached a� �xhlbit "A", and ingr�ss �nd egress over Grantor's prpp��ty t� the �asemer�t as shown an Exhlbit "B". It is further agreed and understood that Grantee w�ll be permitted the use oF said easemenf for thc p�arpase �f drainage improvements far the Lake Crest drainag� improvement project. Upon cc�mplefion of improvements and its acceptance by Granfee, all rights granted within the �iescribed Temparary Construction Easem�nt shall cease. Trmporary Canswctimi L�smncnt OI/U9f30U7 . 4 Y � LAKE CREST DRAINAGE IMPROVEMENT PROJECT PARCEL # 13-TCE DOE # 6552 6713 GII.LIS JQHNSON ST LOT- 19, BLOCK- R, LAKE CREST ES7ATES ,p��►. � 4�. �' � �" � `�� � CITY OF F4RT WORTH TEMPORARY CONSTRUCTION EASEMENT DATE: September Za, zo12 :��%��C-� � I� j�~ s�;"vCv�p�,�Y ��` .r_'�?rDOGYo,�U 7� ��� S,C. GI�ANTOR: IUTARVIN RAY WINSLAGER ��"'�'�G �� GRANTOR'S MAII.iNG ADDRESS (including Countyj: 6i09 GILLIS JOHNSON ST �ORT WOR7H, TARRANT COUNTY, TEXAS 76179-3302 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including Caunty): 1000 THROCKMORTON ST. F4RT WORTH, TARRANi COUNTY, TX 76102 CONSIDERA710N: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. PROPERTY: Being a portion of land located in Lot 19, Block R, Lake Crest Estates an addition to the City of Fort Worth, Tarrant County, Texas, according ta the plat recorded in Volume 388- W, Page 136, Plat Records, Tarrant Counfy, Texas, and being more particularly described in Exhibits "A" and "B". Grantor, for the consideration paid to Grantor, hereby grant, bargain and convey unto Grantee, its successors and assigns, the use and passage in, over, and across, below and along the easement situated in Tarrant County, Texas, in accordance with the legal description hereto aftachsd as Exhibit "A", and ingress and egress ov�r Grantor's properry ta the easement as shown on Exhibit "B". It is further agreed and understood that Grantee will be permitted the use of said easement for the purpose of drainage improvements far the Lake Crest Drainage improvem�nt project. Upon completion of improvements and its acceptance by Grantee, all rights granted within the described Temporary Constructian Easement shall cease. Tempc�rary Construction Easemeni 01/09/2007 TO HAVE AND TO HOLD the above described easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unta Grantee, and Grantee's successors and assigns until the compietion of construction and acceptance by Grantee. Grantar hereby bind themselves, their heirs, successors, and assigns, fo warrant and defend, all and singular, said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or ta claim the same, or any part thereof. [SIGNATIJRES AYPEAR ON THE FOLLOWING PAGE] Tempotary ('o«struction E;asement Ol /69l2007 GR�N'1'OR: Marvin Ray Winslager M rvin Ray W slager GRANTEE: City of Fort Worth .�-." �� - Fernando Costa, Assistant City Manager APPROVED AS TO FO AND LEGAIrITY 1 � Assistant City Attorney r . Tempurary Consrruccion 6asement . 01 �09.r2007 ACKNO WLEDGEMENT STATE OF TEXAS § COUNYY OF TARRANT § BEFORE ME, the undersigned authority, a Natary Public in and for the State of Texas, an this day personaily appeared AIlanEin Ray Winslager, known to m� to b� the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Marvin Ray Winsiager and that he/she executed the same as the act of said Marvin Ray Winslager for the purposes and consideration therein expressed and in the capacity therein stated. � GIVEN UNDER MY HAND AND SEAL OF OF�ICE this t1` - day of � � , 20 1 `�' �"+a"�a SH�FiF�Y WlLHIiE ,� �� N07ARY PUBUC . STATE OF TEJ(AS �'� or �� My Comm. Exp. 09-1�-2015 � � Notary Public in and r the State of Texas ACKNOWLEDGEMENT STATE OF TEXAS COUNTY OF TARRANT 0 � BEFORE ME, the undersigned authoriey, a Notary Public in and for the State af Texas, on this day persnnally appeared Femand� Gosta, Assistant City Manager of th� Gity of Fort Worth, known to me to be the same person whose name is subscribed to the faregoing instrument, and acknowledged to me that the same was tke act of the City of Fort Worth and that he/she executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. � GIVEN UNDER MY HAND AND SEAL OF OFFICE this � day of � C-`�D W�' , ZO�. .;;! ,A��� t I.I�DA M. �fIR�R �'� ; i � M`� GQ�d�At331�±V EXPfHE5 ; V`�?� ;�,;,;,� . F�y z, zt�� ._ N--�� . . _ �'t'� � c�� Notary Public in and for the S te of Texas Tamporary Conswction Pasement 01 /U9i2007 EXHIBIT A TEMPORARY CONSTRUCTION EASEMENT Lot 19, BLOCK R, LAKE CREST ESTATES, FORT WORTH, TARRANT COUNTY, TEXAS Being a strip of land located in Lot 19, Biock R, Lake Crest Estates an addition to the Gity of Fort Worth, Tarrant County, Texas, according to the plat recorded in Volume 388-W, Page 136, Plat Records, TaRant County, Texas. Said strip of land being more particularfy described as follows: BEGINNING at a point in the East line of said Lot 19, lying S00°00'51"W, a distance of 25.00 feet from the Northeast corner of said Lot 19, said point lying N$9°57'37"E, a distance of 415.57 feet and N00°00'S1 "E, a distance of 254.76 feet from an 1/2" iron rod found at the Southwest corner of said Block R; THENCE N89°59'40"W, a distance of 207.83 feet along a line 25.00 feet perpendicular to and parallel with the North line of said Lot 19 to a point in the West Hne of said Lot 19; 7HENCE N00°00'20"E, a distance of 15.21 feet along said West lin� to a point said point lying S00°00'20"W a distance of 9.79 feet from the Northwest corner of said Lot 19; THENCE S86°28'15"E, a distance of 84.80 feet to a point; THENCE S89°59'40°E, a distance of 123.19 feet along a iine 15.00 feet perpendicular and parallef with the North line of said Lot 19 to a point in said East line of Lot 19; TNENCE S00°00'S1"VV, a distance of 10.00 feet along said East line to the point of beginning, containing 0.053 acres of land. 7he bearings recited hereon are oriented to NAD 83 North Central Texas, Grid. SEE 8-1l2"X11" PLAT A7TACHED �il��e�•✓2i'/ �J , Herberf S. Beasley Registared Professi�r�ai Land Surveyor 4050. . �� �F..r.cchenge: Authorized Uscrs Only Pagc I of [ https://www. er. cchange.com/liUViewKeceipt. aspx'?llocum cntTd�G7$4818 I 1/ 19/2U 12 Document Receipt Ynformation Reference Number: ALDAL 18 - ATQ000036758 - Eaaemetrt �Ii�i Electranically Recorded iarrantcountyTexas O(iicial Public Records 1/22/2013 3:03 PM D213017812 tAK� CR����t3'V�iyIENT F+�tl�J�c�7 , �s.ao PARC�L # 14 �uise Garcie a mrtter: ACS DOE # 6552 ����...� 6717 GILLIS JOWNSQN ST A�� ���� " L�T- 20, 8#.00K- R, LAKE GREST �STAT�S SiATE OF TEXAS § § KN�W ALL MEN BY THESE PRESENTS COUNT'Y OF TptRRAN7 § C17Y O� �OR7 WORTH R�RMAN�i�7 t?RAINAGE �ACl�.ITY EA��M�NT D�1TE: GRANTOR: CHANTH1SOdNYAQE7H GaANTlJR`3 MAILING ADDRESS (inciudir� Cour�ty): 6717 CyiL�,lS JfJHN50N 5T FORT WORTH, TARRANT COUNTY, TX 76179-3302 GRA�lTE�: CtTY OF FORT Wt�R'fN GRANTEE'S MAlLING ADDR�SS (including Caunty): 1000 THR(�CKMC�RTON ST. F(�RT WORTH, TARRANT GOUNTY, TX 761�2 CONStC7�RATlON: Ten po(�ats {$1Q.Op) �nd atY�er good and valuable consideratior�, the rar.eipi and suffici�ncy of which is hereEsy adcnowiedg�d. PROPERTY; L�eing a Rorticsn af I�nd lv�at�si in Lot 20, Slock R, L�►ice Crest �states, an addifian tcr the City af Fo�t Warth, 7arrant County, i`exas, eccording to the plat recorded i� Volum� 388-W, Rage 138, Piat F?econds, Tarrant Caunty, 'Cexas, and bein� rnare patficularly described in Exhibiis "A" and "B'. Gr�nior, for the c�or�sicferation paid tv Grantar �nd ath�r gootf a�d vafuable consideration, hereby grants, seqs, and convsys to Grante�. iis su�cessars and assigns, an exclusive, perpefual easement fo� the c�nstruct+on, op�fian, ma€nEenance, repfacem�nt, upgrac��, �n�t repair of e Petmar�snt Orainags Facili#y, hereaft�t reterred tb as "�acitity". i'Me Fa�iiity inc{udss a!I incidenta! underground and abaveground atta�ttmenEs, equipment and appurter►ances, inciuding, but not limited to manhotes, pipelines, junctitm baxes, inlets, flumss, headwalis, wirtg4+ralls. slope pavemenf, gabions, ���r�►a�Nr a�4�rr�c� Fs,c��iry f:as�e�cs�; R3v_ t147 • 212C4;t LAKE Ct��ST aRAINAGE iMP1�(7V�IVI�NT PROJECT PARCEL # 14 •PDFE DOE # 6552 6717 GILLIS JOHNSON ST ��� ���'s'�" L�� � LOT- 20, BLOCK- R, LAKE CREST ESTATES STATE OF TEXAS COUNTY OF TARRANT § § KN�W AL� MEN BY THESE PRESENTS § CITY OF FOi�T WORTH PERMANENT DRAINAGE FACILITY EASEMENT DATE: GRANTOR: CHANTHI SOONYADETH GRANTOR'S MAILING ADDRESS (including County); 6717 GILLIS J�HNSON ST FORT WORTH, TARRANT COUNTY, TX 76179-3302 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 1004 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Doilars ($10.00) and other good and valuable consideration, the receipt and su�ciency of which is hereby acknowledged. PROPERTY: Being a portion of land located in Lot 20, Block R, Lake Crest Estates, an addition to the City of Fort Wo�th, Tarrant County, Texas, according to the piat recorded in Volume 388-W, Page 136, Plat Records, Tarrant County, Texas, and being more particularly described in Exhibits "A" and "B". Grantor, for the consideration paid to Grantor and other good and valuable consideration, hereby grants, sells, and conveys ta Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, and ��pair of a Permanent Drainage Facility, hereafter referred to as "Facility". The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manholes, pipelines, junction boxes, inlets, flumes, headwalls, wingwalls, slope pavement, gabions, PERMANEN7 DRAINAGE FACILITY EASEMENT Rev. 04/12l2012 rock rip-rap, drop structures and access ramps, and other erosion contrai measures in, upon, under and across a portion of the Property and more fuily described in Exhibit "A" attached hereto and incorporated herein for ail pertinent purposes, together with the right and privilege at any and all times to enter Property, or any part thereof, for the purpose of constructing, operating, maintaining, replacing, upgrading, and repairing said Facility. In no event shall Grantor (I) use the P�operty in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (II) erect or permit to be erected within the easement property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, brick or masonry fences or waUs or other structures that require a building permit, or any structure not requiring a building permit but which may threaten #he structural integrity ar capacity of the Facility and its appurtenances. Grantee shall be obligated to restore the surface of the f�roperty at Grantee's sole cost and expense, including the restoration af any sidewa(ks, driveways, or similar surface improvements located upon or adjacent to the Easement which may have been removed, relocated, altered, damaged, or destroyed as a result af the Grantee's use of the easement granted hereunder provided, however, that Grantee shall not be abligated to restore or replace irrigation systems or other impre�verr�ents instalied in violation of the provisions and intended use of this Easement. TO HAVE AND TO HOLD the above-described easement, together with all and singular the rights and appurtenances therefv in anyway belonging unto Grantee, and Grantee's successors and assigns forever; and Grantor does hereby bind itself and its successors and assigns to warrant and forever defend all and singular the easement unto Grantee, its s�accessors and assigns, against every person whomsoever lawfully claiming ar to claim the same, or any part thereof. Under Subchapter E af the Texas Properfy Code, as amended, the Grantar or the Grantor's heirs, successors, or assigns may be entitled before the 10`" anniversary of the date of this acquisition to repurchase the property or request certain information about the use and any actual progress made toward the use for which the property was acquired under this deedleasement/named instrument, and the repurchase price will be the price the City paid Grantor in this acquisition When the context requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWtNG PAGE] PERMANENT DRAINAGE FACILITY EASEMENT Rev. 04/12/2012 GRANTOR: Chanthi Soor�yadeth � � Chanthi Soo yadeth GRANTEE: City of Fort Worth .--r„ �ft�-�-�--. Femando Costa, Assistant City Manager 1 APPF20VED AS TO �O ANj� LEGALI� � ,�`�%� � �` . �;�` _ ' Assistant City Attomey PERMANENT DRAINAGE FACILITY EASEMENT Rev. 04J12/2012 ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Natary Pubiic in and for the State of Texas, on this day personaliy appeared Chanthi Soonyadeth, known ta me to be the same person whose name is subscribed to the foregoing instrument, and acknowiedged to me that the same was the act of Chanthi Soonyadeth and that he/she executed the same as the act of said Chanthi Soonyadeth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this i] �� day of �CA�� , 20�. � JILL 8. �f�I�FiN Notary PublSc * � * STATE 0� i'�XAS � �'� '�py My Comm. Exp.1111312014 STATE OF TEXAS COUNTY OF TARRANT 0 0 � 'd . Nota Public in and or the State of Texas ACKNOWLEDGEMENT BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personaliy appearsd Fernando Costa, Assi�tant City Manager of the Cify of Fort Worth, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowiedg�d to me that the same was the act of the City of Fort Worth and that he/she executed the same as the act of the City af Fort Worth for the purpases and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAI.OF OFFICE this lX a�. day af 20�. EYONtA 4AN{ELS MY rpMMISSiOri EXPiR£S Juty 14, �13 ` otary Public n an for the State of Texas PERMANENT DRAINAG@ FACILITY 6ASEMENT Rev. 04/12/2012 EXHlBIT A DRAINAGE EASEMENT Lot 20, BLOCK R, LAKE CREST ESTATES, FORT WORTH, TARRAN7 COUNTY, TEXAS Being a strip of land located in Lot 20, Block R, Lake Crest Estates an addition fo the City of Fort Worth, Tarrant County, Texas, accnrding to the plat recorded in Volume 388-W, Page 136, Piat Records, Tarrant County, Texas. Said strip of land being more particularly described as foilows: BEGINNING at a point at the Southeast corner of said Lot 20, said point lying N$9°57'37"E a distance of 415.57 feet and N00°00'51 "E, a distance of 280.00 feet from an 1/2" iron rod found at the Southwest comer of said Block R; THENCE N89°59'40"VIl, a distance of 207.83 feet along the South line of said Lot 20 to a point at the Southwest comer of said Lot 20; THENCE N00°00'20"E, a distance of 10.25 feet along the West line of said Lot 20 to a point; THENCE S86°28'15"E, a distance of 85.42 feet to a point; THENCE S89°59'40"E, a distance of 122.58 feet along a line 5.00 feet North of and parallel with said South line to a point in the East line of said Lot 20; THENCE S00°00'51 "W, a distance of 5.00 feet along said East line fo the point of beginning, containing 0.029 acres af land. The bearings recited hereon are oriented to NAD 83 North Central Texas, Grid_ SEE 8-1/2"X11" PLAT ATT'ACHED ������� Herbert S. Beasley �'� Registered Professional Land Surveyor 4050, Erxchange: Authorized Users Only Document Receipt Informatior� Refervence N�mber: 6552-14-pDPE - Easement Page 1 of 1 https://www.erxchange.com/UINiewReceipt.aspx?DacumentId=7014063 O 1 /23/2013 Elect�o�icaliy Recorded TarrantCountyTexas Official Public Recards 1/22l2013 3:10 PM D213017827 LAKE CRESl�'t���#��pRENT PROJ� � �3�.00 PARCEL. # 14-TC�ery �ouise Garcia Submitter: ACS oaE � g5�z 8717 GILUS JOWNSO►N ST ��� ���������„�, l0T'- Z0, BLOCK- R, LAKE CREST ESTAT�S �ITY 4� �QRT WORiH TEMPORr4RY CQNS'1'�t CT10N,.,EAS�M�1�T DA7E: GRANTOR: CWANI'HI S(�4NYADETH GRANTOR'5 MAf�ING AODRESS {inctuding Gounty}: 6T17 GIlUS JOHNSC�N ST �ORT WOR7H� T'ARRANT COUNTY� TEXAS 76179-3302 GRANTE�: CtTY OF Ft�RT W4RTH GF�ANTE�`S MAILiNG ADDRES5 (indud'mg County}: 1000 THROCKMORT4N ST. �ORT WORTH, TARI�ANT COUNTY, TX 78102 C�NSIDER/�T1C3N: T�n Doiiars {$10.t}t3) and other gooci and valuabla cansidera�on, the receipt and su�cie�cy of which is hereby gdcnowiedged, PRUPERTY: Being a portipn qf land (acafe�+ in Lot 2Q, Block Fi, l.ake Crr�st Estate�s an addiGon to the City of Fort Worth, Tarrant County, 7exas, accordtng to ih� ptat recorded in Volume 388- W, Pa�e 136, f�1at Reac�rds, Tanant County, Texas, and being mors particula�rfy descrfbed in Exhibits "A" and �B". Grantnr, for ihe considerafion p�id to Granior, hereby grarti, bargain and convey unto Granfee, its succ�ssars and �ssigns, the use and passage irt, over, and across, t�e4ow ar�rf aiony t�te �asement situated ic� Tarrant Ccyunty, 1'exas, in accardar�ce wit1� the ieg�l descripfion hereto aitached as ��i�iii "A", �nd ingre� arr� egr�s �,�r G�nt6r's prcp�riy ta the easement as shawn pn Euhibii `B". !t is h,rther agreed and undersfood thaf Grartt�e wit! be pe�rr�itted the use af said easement �r the purpose of drainage imprav�ments for [he Lake Gr��t Drair�a�e im�ravemsnt project Upor cc�rnple4ion of imprawements and ifa a�ceptance by Grantes, a!t rights granted within the described 7emporary Construction Easernent shall ceasa. Tef:fpeYft}� C4hSt/1sC(tOtl FS4eultf�t !71.>S9 eNji . � LAKE CREST DRAiNAGE IMPROVEMENT PROJECT PARCEL # 14-TCE DOE # 6552 6717 GILLIS JOHNSON ST LOT- 20, BLOCK- R, LAKE CREST ESTATES ,�i� �. � / � �' 1. ! �� `� '� . CITY OF FORT WORTH TEMPORARY CONSTRUCTION EASEMENT DATE: GRANTOR: CHANTHISOONYADETM GRANTOR'S MAILING ADDRESS (including County): 6717 GILLIS JOHNSON S7 FORT WORTH, TARRANT COUNTY, TEXAS 76179-3302 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (inciuding County): 1000 THROCKMORTON ST. FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Doifars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. PROPERTY: Being a po�tion of land located in Lot 20, Block R, Lake Crest Estates an addition to the City of Fort Warth, Tarrant County, Texas, according to the plat recorded in Volume 388- ' W, Page 136, Plat Records, Tarrant County, Texas, and being more particularly described in Exhibits "A" and "B". Grantor, far the cansideration paid to Grantor, hereby grant, bargain and convey unto Grantee, its successors and assigns, the use and passage in, over, and across, below and along the easement situated in Tarrant County, Texas, in accordance with the legal description hereto attached as Exhibit "A", and ingress �nd egr�ss over Grantor's property to the easemerit as shown on Exhibit "B". It is further agreed and understood that Grantee will be permitted the use of said easement for the purpose of drainage imp�ovements for the Lake Crest Drainage improvement project. Upan compietian of improvements and its acceptance by Grantee, all rights granted within the described Temporary Constructian Easement shall cease. ' Temporary Cons Wction Easement , 0 t/092007 TO HAVE AND TO HOLD the above d�scribed easement, together with, aii and singular, the rights and appurtenances thereto in anyway be(onging unto G�antee, and Grantee's successors and assigns until the compietion of construction and acceptance by Grantee. Grantor hereby bind themselves, their heirs, successors, and assigns, to warrant and defend, all and singular, said easement unta Grantee, its successars and assigns, against every person whomsoever lawful{y claiming or to claim the same, or any part thereof. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] Temporary ConSwction Pasement 01/09i�007 GRAIti'TOR: Chanthi Soonyadeth ,t�, _ ���,�,,,�,-�" Chanthi S onyadeth GRANTEE: City of Fart Worth ----�.• -1���� ..1 Fernando Costa, Assistant City Manager APPROVED AS TO FORM AND LEGALI'�Y .� � - ! Assistant City Attorney ' T�mporary Conswction Easemenc , Ol%09/2007 AChNOWI,EDGEMENT STATE UF TEXAS COUNTY OF TARRANT 0 � BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Chanthi Saanyadeth, known to me to be the same person whose name is subscribed to the foregoing inst�ument, and acknowledged to me that the same was the act of Chanthi Soonyadeth and that he/she executed the same as the act of said Chanthi Soonyadeth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this �� day of ��►h�+�.0.�.�*r , 20�. �,�►s►vAy� Jit L C�. GRlFFlN �latary Public ` * s�-Ar� o� r�xas �� '�py My Comm. Exp.11h312014 STATE O� TEXAS COUNTY OF TARRANT � �� � � Notary Pubiic in an or the State of Texas ACKNOWLEDGEMENT BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Fernando Costa, Assistant City Manager of the City of Fort Warth, known to me to be the same person whose name is subscribed to the foregaing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that he/she executed the same as the act of the City of Fort Worth for the purposes and consideratian therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this �� day of �� l � � ` Zd � � ` Nax�m,. . % \ s . r�; �'�'LC.� �, � 1;,,,; ,; �'�N�ADpNiELS otary Public in and for e State of Texas • s MY CCMyt1SSiOW EXPlRES ���j;p�; �� JrAy t0, 20i3 Temporary Conswction Fasement Ol/09l2007 ' ' EXHIBIT A TEMPORARY CONSTRUCTION EASEMENT Lot 20, BI.00K R, ' LAKE CREST ESTATES, ' FOR7 WORTH, TARRANT COUNTY, TFXAS Being a strip of land located in Lot 20, Block R, Lake C�est Estates an addition to the City of Fort Worth, Tarrant County, Texas, according to the plat recorded in Volume 388-W, Page 136, Piat Records, Tarrant County, Texas. Said strip of land being more particularly described as follows: BEGINNING at a point in the West line of said Lot 20, lying N00°Ob'20"E a distance of 10.25 feet from the Southwest corner of said Lot 20, said point lying N89°57'37"E, a distance of 207.79 feet and N00°00'20"E, a distance of 290.18 feet from an 1/2" iron rod found at the Southwest comer of said Block R; N00°00'20"E, a distance of 10.50 feet along said West fine to a point; 7HENCE S89°59'40"E, a distance of 67.83 feet along a line 20.75 feet Perpendicutar to and paraliel with the South line of said Lot 20 to a point; l'HENCE S00°00'S1"VV, a distance of 14.68 feet to a point; THENCE N86°28'15"'W, a distance.pf 67.96 feet to the point of beginning, cantainfng 0.020 acres of land, The bea�ings recited hereon are oriented to NAD 83 North Central Texas, Grid. SEE 8-1/2"X11" PLAT ATTACNED �,����'�%i�.� Herbert S. Beasiey Registered Profession Land Surveyor 4050. - �as�n �a�or� suRv�roRs .�•�' EE 8-, fz"X„� ERBERT S. ESCRIPTION ATTACHED LAND SU ��EY�RS („p� EASLEY . �q�p . pppqZAPHIC w 20 •CONSTRUC ON StJRVE11NG ' N � P. 0. BOX 8873 AfE7R0 817-42Q-01Q4 �' S8B7 B��E � FORT WOR1H. TEXAS 76124 FAX !l17-4�8—�{� = o ',Wo � _._. .._. ._ — — POB ty N96'28'15'W � � oBT.9&' --._...�__...���_..._------ SW COR lOT 20 19 W N � � S -; z m c� `' r,: • '�\ y' Q'�'a � '� R�� +��►� ...:.....................:... WERBERT S. B�ASL�Y ..., .......................... C �P� , �f,v � \.��/._•�fSS �•iO�I/ LAKE CRES7 .� $ ESTATES UNIT N0. 2 VOL. 388— T-136 P.R.LC.T. LAKE BR OCK �R TATES 17 o ao so i2o SCA(�E 1'=40` r � ����� ��� � HER��RT S. BEA5L REGlSTEREO F'R0�551t�NAL LANd SURVEYOR N0. 4050 2o�.�s' PREPAR�O �iARCH 26, 2012 N89'Si3y'E t/2�FN0 O S�V cor 9k R (CONTRtlI A{ON.) SANTA GERTRUDIS STREET ��,��t � Temporary Constructto� Easement j 6 tocated in Lot 20. 8fock R, Lc�ke Crest Estatea Fort Worth, Tarrant Caunty, Texas CRID SCALE FACTOR�0.99988 Z 0 � Z 2 0 � � J J � IAK�SY-R_ZO-.eM-,OAP.d�p Erxchange: Authorized Users Only I�ocur��nt Receipt in�a�mativ� Referonce Number: 6552-14-TCE - Easement Page t of 1 https://www.erxchange.com/UINiewReceipt.aspx?Documentld=7014098 01/23/2013 GC-6.06.D Minority and Women Owned Business Enterprise Compliance THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 � ATTACHMENT1A Page 1 of 4 FOR'�C WOR'1'H City of Fort Worth Subcontractors/Suppliers Utilization Form �T PRIME COMPANY NAME: Check applicable block to describe prime C D gui�ders, �nc M/W/DBE NON-M/W/DBE PROJECT NAME: BID DATE L-aKe Cres Dra�na e Im rovemer�-s A r� � l S 2o I 3 City's M/WBE Project Goal: Prime's BE Project Utilization: PROJECT NUMBER l 5 °�o I 7 3°�o O I 60 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1St tier, a payment by a subcontractor to its supplier is considered 2�d tier ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise (DBE) is synonymous with Minority/Women Business Enterprise (M/WBE). If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another M/WBE firm, including M/WBE owner-operators, and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner-operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement. Rev. 5/30/03 ' ATTACHMENT1A FORT WORTH Page 2 of 4 � Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority, Women and non-M/WBEs. Please list M/WBE firms first, use additional sheets if necessary. Certification N (check one) ° SUBCONTRACTOR/SUPPLIER T n Detail Detail Company Name i N T Address e M W C x M Subcontracting Work Supplies Purchased Dollar Amount Tele hone/Fax T D W p r E E R O B C T E A Uhcic�ssi-�iet� � �75�000�°p MG �rucKa,r�Q �x���Cti-1on, J �; CruSh �i-one c��°��` �� ql 2 - 82l - za��4 K DA�T, LLC �S,�'hQ� �75,ov0.°—° t'aveme�" Po. aox�2ooyss X �r�i�np�i'on ► � x 8��- 5�{ 8- I 6� 600� Fra�re`s �Reba� In��-s, 4��dwa I� � 200�OOD.00 ,�uno�-ion �oX X z1y9y2-y630 Rev. 5/30/03 ' ATTACHMENT1A FORT WORTH Page 3 of 4 � Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority, Women and non-M/WBEs. Please list M/WBE firms first, use additional sheets if necessary. Certification N (check one) ° SUBCONTRACTORISUPPLIER T � Detail Detail Company Name i N T Address e M W C x M Subcontracting Work Supplies Purchased Dollar Amount TelephonelFax r B B R o B E E C T E A S�+'G Cohc,�r�e �m�. R C l� Cla�s �' S5/, y!l• 25 P0. B�X# q1y Pre Ca� aox QQ4e �;d Wa�ch.ach�e,TX � C�.lv�ls � 933,�f89. �4s e �c:� f 972- 3 - 420o A�l �erna,�e � �}cT �� �supply,.l . 4�a-�erline � �/22,�69. 2s /888 1�/. Nfl�`f�hcves� l�wy 5e,�vP.r- L�e �q5e �'3�a1 j�ri��as X Su.�plies � 330� /5(�,75 ��%rm l�rq.i.�. ,�s e �Qia� f 8 �1- 83l-1663 r`Pe ,� �c�- 2 Rev. 5/30/03 FORT WOR'('H � �, ATTACHMENT1A Page 4 of 4 Total Dollar Amount of M/WBE Subcontractors/Suppliers $�$�� ��0 •� Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ C, b 56, 058. 25 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ l, SD(p,OSB 25 The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of. contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. �,, By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or �I examination of any books, records and files held by their company. The bidder agrees to allow the I` transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work � � performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or � Local laws concerning false statements. Any failure to comply with this ordinance and create a material f breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. A or' ed Si nat re (�i Ce �resrq�ertT Title C 1,� �c,� i �deY'S ,�h C- Company Name �f�� c� Co`leae �r. Address Keehe, TX %OD59 City/State/Zip � � a�►hn ��'�r►^a, Printed Signature Contact Name/Title (if different) 787-y69-5�33 Telephone and/or Fax --%vG�nhu�s 5 I p yaG�oo. com 6hnail Address /��r�►� 2 5, 2D13 Date Rev. 5/30/03 I� � 1� 1 � �;��,,,�� � A �: '::.;_-�:.�: ti .! ��a ,�m�' ��,► .� o► a � � O �r ��'� . G d� Ce�ti,�� �I/ � � •O � � � ��'w � V1 � � � � �� � � � � � VJJ � � � i�1 •/�1 � � � � � � � � � �� � AW � •�\7/ .,,,4� �� � �-. i� '�� ,�; ' w 'a.. .• S! ����M�W�� a� � .a N C � W C N �C � V � � �N L � � m � � � � � N C � � (0 � � , ' � I 1 n �. �,. `. � .: . . uYX i � oN ir r?, a!� , ;;�:s." � � ,�':� ,. . . �:.7'-. 1..�. ��� " " F � � L" C :C O � �, ar +� � � U ." y +�+ C�V +��+ ��� L � v '��` z � � v � � : � u R ee �. � b a i i X 'fl "� �' �, � y v t � 7 R � r v � ;.p Q, a � a a 'a� � .L 8 �Q ti v c � N 'v� � C�p ,��„ u � v N � :C a � �@ � E � on 'v r�..° a a� � � U 3 cA c �� '-' � Q, ? . . �D � � `Y' p (6 tn � � i, �' U v' 'C = O J � ,p' O � ^ � � J N �' u ^O � � � C N � O :7 •- N � Y � C j u � y ' � b � a u � � H � � L o � � :o �«. '� a.�"'. •- � �n Q� � c� er p i� � U ^J a�.. OF. O M o �(r� � p O j' `� � n o d � � � oL � � X � � C�J � d p O L y 'C ar O L '7 � � ��L � � v� •i � � +• � C 'O u- "� u C t 'p " I �^ N > '.: O C � •� _ � � o s . � .� o � L ` a c� a � ro L � � � u ��,pU � Q U ? '_ e � � •� L' �bC s L � � F a .. -, .- L � :7 � E � � � � � �.u—, ,� a J M I N � � ch N } � (fl ti nC .aC m C C � N � _ � � 0 7_ � � � O .r 'a. � x U a� .. � '.J' � � b E■ u � � � W � � V U � �•� � ���r• ��:♦ � •�.� ��h � � a rr.�"ti'�jrs' �..��" �� �i Y. R1 �n... e;. , � : B •L ;. }y . 4f✓ +t � ,. :..1 �_: � a r � �' � r,� ts }=i M, '�\��i!i�. �� �} � ::::���. ►: `� � �'�r�Jr.: +' t;; �a� r ' ' d':� , •il �I,:i;i' �G 1 '. �.4 A' �1 ' (�_ i��T� 04 � t �/i�ttt..� 6 t Q ' � a. '!. Jl1 tt �f�+ f .. ���,1"� _ �P \1: 1111 � y1Ni� . �. ,t� �7 S ie� fr ;� l� 2�,v , t 1 - ,,,,� c' '-�*ti� n _ � ,� : :. i 't �, _ _ , ,�� � � � �� a � u � �� � .j a°�-� �� . � �� ��. � � � `�,' J� � E�, �� � � /i i ! � ( S� � �� �" � ~ �`� � C': � '� ��, ��� F 4 ' � � ����� „i a � ° �� � � � ,� � , � �� � � ; .- ;;� " t� } � � l `y � � �� ' ��� o � � . ��' � � � �� � t. � � � � ��i f �c s'� � � � �� � <b� � P 4 t� � � � 2 � � f;� � i tp � . � � : � ,� � �� � ~� � �� e �--�-� i��� t����� k s� � � r� f.: h f � T � c `� ru � � .s �s�-� o :� � ` � � � � ( ' t�� � � � d k p� �J "� .� _ �� � � � � ,,� � b *r ` � G'1 , � L t � r^' � � � k :z � �..�_ I a - �' i � }, L:1 c < � t ��a � e � :� L t !i � . .�� -' ! .: � �Y . � 'r`:�.,"""� - t � t � r • �a� t � n . � , : �; , � �t , 't k>> � "41 �. :� � 1.3t 14l ll "4. y �� �I .._.. Y _.. .. 1111IF '�A' �r � 1; Fi ���✓} 1U ry �' :i ,' :.� � '�A: Y R � s �. � y � ���. J , � ,� I IJ 2L'S�: „^„ !�i � � y - . 4 � � `=�� � f �� .� �: � � � r���E�b f=�; � � � '� ��£ � , �� ! � � •�� � � � � ��� : � � i5 `� _ ... '" r� ^ a � � v � � , � ,ri-.� �f�' . !J ,�, ,� �" � V Q %'. � "� y U )� � � L � � � � � ; �J � �/ � .ej� . 'f V a � I� � :�.J� ���� ��1 � 'a ' ry � n � c I � �� E u s�rt � ^ . t �, : • vi C � . ! �r,�� � q p ='a � ,a i � � �• 7-'s.' �'.. ` v � - �, j � - � �- ' � � C � f�s • CA �i b� C �',n" 6� �' I Q- U 5 U I'� � ' r�o '`-r�.! � � h� � � � � � `�#����F� r W - � C � T. C �� '��-� .=,a � Q�j J � U � '.. :c �i C �. ���{serF., `� � �47 n, O in N '^ 2^ N r� �.�,��.,y-? . � � � �o �; cv �u o •;. �� '� <. � � Cp � � � N N C � I '� �L! 'I M � <C „` � . � N �- — � � � i � �.� W � � � V � � � ' ; � QS '� G C Q r� ;, a�3 n(� � �" > � Q � ,C C� ! ( � . �f'.�.{t#� ; � ��. S— @ � � yll � '� i � V' � `� �� .. � �" � ' o � p „ I � �- � ts��4 � � >: L i .. j r, ,�-�� r � 'J_ � L I ; � . � � � M `Q � cc v � - � c'� -, t j�t ! i G � i � rYf��`%' , � � y� C `� m ` t . _ ^ � � � p il ,�� � �- tv ---j � � t rnc.� ,� J �i. �'^ c� �4 ~ . �t��''Y � � � �� � `� � ��,,. i�is�; �� � � � r � f � i � � s,Y� � J � � p� f% j 1�"��"� '' ... C C r '-+ ti (� '� i� � v � "` : ( � �%j,�,� � � . � re� :� , `J, _ ,� ria � V � "', C� TilEE�{ ]�: � c: � � � � � � :. � `' 4i o ' � r,^. ..-. . �,s �1 r „'�„ J L �T, J .�r a * I�i j tt. -. • C.J y V N `} ��,�,yZ 5 � c. _. � �: � .�`�.v=� ��� ,� ��.n�s..,,.,P.,r"'�3 �� ," x 1 ),�, �G � r.� �;1� rt-��l //� ;'ni �� 6+1 i j �11I/6� � . y L� t.ti�!/\y`� . z � �.. (J / � � � � � �' • . • - - � : - � � � � � • � . ' � ! • . ' � �� r� I'' / � . ^� r.�— � ��� +r'�'';� �� ;�w �J, The Texas Comptroiler of Public Accounts (CPA), hereby certifies that • . . - - . - - has successfully met the established requirements of the State of Texas Historicaliy Underutilized Business (HUB) Program to be recogniZed as a HUB. This certiticate, printed 13-MAR-2010, supersedes any registration and certificate previously issued by the HUB Program. If there are any changes regarding the information (i.e., business structure, ownership, day-to-day management, operational control, addresses, phone and fax numbers or authorized signatures) provided in the submission of the business' application for registration/certification as a HUB, you must immediately (within 30 days of such changes) notify the HUB Program in writing. The CPA reserves the right to conduct a compliance review at any time to confirm HUB eligibility. HUB certification may be suspended or revoked upon findings of ineligibility. � � ..- CertificateNiD Number FileNendor Number: Approval Date: Expiration Date: 1010770624300 03230 09-MAR-2010 09-MAR-2014 Paul A. Gibson Statewide HUB Program Manager Texas Comptroller of Public Accounts Texas Procurement and Support Services Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the CertificateNlD Number identified above. Agencies and universities are encouraged co validate HUB certification prior to issuing a notice of awa�d by accessing the Internet (http:/1www.window.state.tx.us/procuremenU/cmbl/hubonly.html) or by contacting the HUB Program at (888) 863-5881 or (512) 463-5872. ATTACHMENT 1C Page 1 of 3 F��� City of Fort Worth MBE Good Faith Effort Form PRIME COMPANY NAME: Check appiicable block to describe prime M/WlDBE NON-MlNVDBE PROJECT NAME: BID DATE City's MBE P�oject Goal: Prime's MBE Project Commitment: PROJECT NUMBER % % if the Offeror did not meet or exceed the MBE subcontracting goal for this project, the Offeror must complete this form. if the Offeror's method of compiiance with the MBE goai is based upon demonstration of a "good faith effort", the Offeror will have the burden of correctiy and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 11 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Offeror. Failure to complete this form, in its entirety with supporting documentation, and it being submitted to and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, wili result in the bid being considered non-responsive to bid specifications. �1.) Please list each and every subcontracting and/or supplier opportunity for the complet�on of this project, regardless of whether it is to be provided by a MBE or non-MBE. �DO NOT LIST NAMES OF FIRMS On all projects, the Offeror must list each subcontracting and or supplier oppartunity regardless of tier. (Use additionat sheets, if necessa►7� List of Subcontracting Opportunities List of Supplier Opportunities Rev. 5130/12 ATTACHMENT 1C Page 2 of 3 2.) Obtain a current (not more than two (2) months old from the bid open date) list of MBE subcontractors and/or suppliers from the City's M/WBE Office or the City's website. �Yes Date of Listing No 3.) Did you solicit bids from MBE firms, within the subcontracting andlor supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the b'rds are opened? Yes (If yes, attach MBE mail listing to include name of flrm and address and a dated copy of letter mailed.) No 4.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exciusive of the day the bids are opened? Y83 (If yes, attach list to include name of MBE firm, Qerson contacted, phone number and date and tlme of contact) No 5.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by facsimile (fax), exclusive of the day the bids are opened? _�Yes (If yes, attach list to include name of MBE firm, fax number and date and time of contac� In addition, if the fax is returned as undeliverabie, then that "undeliverable confirmation" recetved must be printed direcdy from the facsimile for proper documentation. Failure to submit confirmadon and/or "undeliverable confirmation" documentation may render the GFE non-responsive.) _� No 6.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? �_Yes (If yes, attach email confirmation to include name of MBE firm, � and time. In addition, if an email is returned as undeliverable, then that "undeliverable message" receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation andlor "undeliverable message" documentation may render the GFE non- responsive.) _�No NOTE: The four methods identified above are acceptable for soliciting bids, and each selected method must be applied to the appiicable contract. The Offeror must document that either at least two attempts were made using two of the four methods or that at least one successful contact was made using one of the four methods in order to be deemed responsive to the Good Faith Effo�t requirement. NOTE: The Offeror must contact the entire MBE list specific to each subcontracting and supplier opportunity to be in compliance with questions 3 through 6. 7.) Did you provide plans and specifications to potential MBEs? Yes No 8.) Did you provide the information regarding the location of plans and specifications in orde� to assist the MBEs? �Yes No Rev. 5130112 ATTACHMENT 1 C Page 3 of 3 9. Did you prepare a quotation for the MBEs to bid on goods/services specific to their skill set? Y@S (if yes, attach all copies of quotations.) No 10�Was the contact information on any of the listings not valid? _ j_j Yes (If yes, attach the informaUon that was not valid in order for the M/WBE Office to address the corrections needed.) _�No 11.)Submit documentation if MBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the MBE was rejected and any supporting documentation the Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Offeror will provide for confidential in-camera access to and inspection of any relevant documentation by City personnel. Please use addlfional sheets, if necessa and attach. Com an Name Tele hone Contact Person Sco e of Work Reason for Re'ection ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain MBE participation on this project. The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actuai work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or L.ocal laws concerning false statements. Any failure to comply with this ordinance shall create a materiai breach of Rev. 5130/12 ATTACHMENT 1C Page 4 of 3 contract and may result in a determination of an irresponsible offeror and debarment from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the MBE(s) listed was/were contacted in good faith. It is understood that any MBE(s) listed in Attachment 1 C wiil be contacted and the reasons for not using them will be verified by the City's M/WBE Office. Authorized Signature Titie Printed Signature Contact Name and Title (if different) Company Name Phone Number Fax Number Address City/State/Zip Email Address Date Rev. 5130l12 Joint Venture Page 1 of 3 FORT WORTH CITY OF FORT WORTH MBE Joint Venture Eligibility Form ' All questions must be answered; use "N/A"if not npplicabte. Name of City project: A joint ventwe form must be completed on each project ' RFP/Bid/Purchasing Number: 1. Joint venture information: Joint Venture Name: Joint Venture Address: (If applicable) Telephone: Facsimile: E-mail address: Cellular. Identify the firms that comprise the joint venture: P/ease atfach extra sheets if additional space is required to provide detailed explanations of work to be performed by each rrm comprising the 'oint venture MBE firm Non-MBE firm name: name: Business Address: Business Address: City, State, Zip: City, State, Zip: Telephone Facsimile E-mail Telephone Facsimile Cellular Cellular Certification Status: E-mail address Name of Certifying Agency: ' Rev. 5/30/12 Joint Venture Page 2 of 3 3. What is the percentage of MBE participation on this joint venture that you wish to 6e counted toward meeting the project goal? 4. Attach a copy of the joint venture agreement. 5. List components of ownership of joint venture: (Do not complete if tliis information is described in joint venture agreement) Profit and loss sharing: Capital contributions, including ecluipment: Other applicable ownership interests: 6. Identify by name, race, sex and firm those individuals (with titles) who are responsible for the day-to-day management and decision making of the joint venture: NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's MNVBE Office immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's BDE Ordinance. Rev. 5/30/12 The City's Minority and Women Business Enterprise Office will review your joint venture submission and wili have final approval of the MBE percentage applied toward the goal for the project listed on this form. Joint Ventur Pa e3of3 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work, decision-making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits, interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful misrepresentaxion of facts�__ ----•-------------------•---------- - -- - -- - -- -----_..--- - ----------------------------------------------------•---------------------------------•-------- Name of MBE firm Name of non-MBE firm Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Printed Name of Qwner Printed Name of Owner Signature of Owner Signature of Owner Title Title Date Date Notarization State of On this County of day of , 20 , before me appeared and to me personally known and who, being duly sworn, did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public Signature Commission Expires _ (seal) Rev. 5/30/12 F4RT WORTH �� city of Fort worth Prime Contractor Waiver Form ATTACHMENT 1B Page 1 of 1 Failure to complete this form in its entirety and be receivetl by the Manas�ins� Deaartment on or before 5:00 p.m. five (51 Citv business days after bid openinst, exclusive of the bid opening date, will result in the bid bein� considered non-responsive to bid specifications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this NO project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) on this contract, the payment therefore and any proposed changes to the original MBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to compty with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. __ - Authorized Signature Title Company Name Address City/State/Zip Printed Signature Contact Name (if different) Phone Number Fax Number Email Address Date Rev. 5I30112 If both answers to this form are YES, do not complete ATTACHMENT 1 C(Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1 C. This form is only applicable if �.th answe�s are yes. FORT WORTH —�"'�-+��- City of Fort Worth Minority Business Enterprise Specifications SPECIA� INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY if the total dollar value of the contract is greater than $50,000, then a MSE subcontracting goal may be applicable. If the total doilar value of the contract is $50,000 or less, then an MBE subcontracting goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the fuil and equitable participation by Minority Business Enterprises (MBE) in the procurement of all goods and services. Ail requirements and regulations stated in the City's current Business Diversity Enterprise Ordinance applies to this bid. MBE PROJECT GOA�S The City's MBE goal on this projeCt is % of the total bid (Base bid applies to Parks and Community Services}. Note: If both MBE and SBE subcontracting goals are established fo� this project, then an Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. COMPLIANCE TO BID SPECIFICATIONS On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are required to comply with the intent of the City's Business Diversity Enterprise Ordinance by one of the following: 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through M8E Joint Venture participation, or; 3. Good Faith Effort documentation, or; 4. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror sha0 detiver the MBE documentation in person to the appropriate employee of the managing department and obtain a date/time receipt. Such receipt shall be evidence that the City received the documentation in the time allocated. A faxed copy will not be accepted. Any questions, please contact the M/WBE Office at (817) 212-2674. Rev. 5/30/12 __ _ FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE, WILI, RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS FoR.�.�" REQUEST FOR M/SBE CONTRACT GOAL Check type of contract: U Construction �� CMAR � Construction Management � Design/Build ,�Professlonai � C/S!P Z� Other, please explain DEPT. Name: r�'W - Stormwater First Advertise pate: 03/O7/2013 D�te to MWB� Office: �z6/2013 IS THIS CONTRACT ASSOCIAl'ED WITH TRV? Yes � Na ✓ OR WlTH SH-121TR Yes [] No Q✓ Dollar value of TRY contract portion $ SH-121TR contract portion $ IS THIS A F�pERALLY FUNDED CONTRAC77 Yes [] No[�✓ IS 7HIS A CIP CONTRACT? Yes� No[� tS THtS A BONp PUNDED CONTRACT? Yes � No ❑ If yes, what year 20� 1 'I Construction: IS THIS A LUMp SUM CONTRAGT? Yes [�✓ No[� B(D DA7E 04/04/2013 Professional: IS TNIS A FfXED FEE NOT-TO-EXCEED CONTRACT? Yes Q Na� � IS THIS A HOUR�Y NOY-TO-EXCEED CONTRACT? Yes [� NoCj !S TMIS A COMBtNED PROJECT? Yes (� No [�✓ IS THtS A REVISION? Yes CJ No [d] if yes, enter the revision numbera 1S THlS A CHANGE ORDER? Yes Q No [�✓ Ettter # a Contractor: iS THIS AN AMENDMENT? Yes� No ✓�En#er # a Design Flrm; SHIELD ENGINEERING GROUP, P�.�.c If ihis ts not the initlal change orderlamendment, submit coples ot al! previous change order/ame�drt�ents regardless of whether a Nt&C was required for funding. CONTRACT DESCRlPTION pnc�udmg street Hamea)• The scope of this construction contract is to install storm drain plpe on to address street and home flooding In Lake Crest neighUorhood due to inadequate storm drain system. lmprovomente wiil be atong Nerefwd Dt. Btahma Ttail, 8ab Hanper SL Check appifcable boxes: Concrete Paving Asphalt Paving ✓[j Drainage ❑ Water Sewer ❑t3therAlternates Capital Project# 0�335 DOE/Other Project# szos TOTAI. CONTRACT ESTIMATE: $ 3,831,519.18 (Please ATTACH individuai sub-toials for contracts with multiple units/secttons inaluding contingency. If the documentaEion is not ctear and concise, it witl be returned ta the departmeni.j Vibhuti Pandey P�oject Manager OATE: OZ/26/2012 Name of �..,��„�,...d., ac �.e�,..�c,, aa, a,a ra�, i huti Pandey ���--��«�,.�, EXT. z42� .,,,.�a,,�, Project Manager Signature SHlELD ENGINEERING GROUP, PLLC �Check here to acknowledge that tf pay item quantlHes are added to the proposal sectton after an M188E goal has been ✓ provtded by the M/W8E Off[ce, the revlaed propoaal must be aubmitted to the MNVBE OtHce fo� revtew. A compliance revlew wllt not be {terformed tf addittonal pay items or quant[dea, whtch wlll potentiaBy tmpact the M13ID8E gaai, ere added W the proposal secUon aker the issuance of a MlSB� goal. ���� THIS pORTION TO BE COMPL6T�D BY MNVBE OFFICE Prof. SBE Goal Canst MBE Goal Conat. SBH Ooal M/SBE PROJECT GOAL: � °/a ��^% °�a tt the goal provided by the only authorized entity, tha MWBE OfBce ataH ts modfied In eny way, the submlea(on atlhe foliow-up co iance men �� � be null and void. � �/'� � Comments: � �� . � �n •f'ar � �.1,1l�i iL �U.� � . ,,""""""""" MM►BE CCS: EXT: ,���� DATE: �'~'�0� d ~I d Rev. 07/24/12 � cB �$'�3 AM 3:� GC-6.07 Wage Rates THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July i, 2011 City af Forf Vliorfh, 7`exas Mayor and Councit Communication COUNCtL AGTtQN: Approved on fi18/2t�08 aA'�E. Tuesday, Juiy 08, 2008 REFERENCE NO.: �*G-1619� LOG NAME: 30WAGE RATES SU�.J.��: Adopt 2048 Prevailing Wage Rates far City-Awarded Public-Works Projects RECOMMENDpTtUN: (t is r�commended that ihe Cify Caun�sl adopt the attached 2008 Prevaiting Wage Rates for Gity-awarded public warks projects. I�scu�$I�N: Texas Gavemm�nt Gode Chapter 2258 requires that a pubHc body av+rarcfing a c,antract far public v+rarks shafi deisrmine the generai prevailing rate of per diem wages for each craft or type of worker needed to execute ti�e contract, and shai! specrfy In the bid dacumen#s and in the contract the prevailing wage rates in thai locatity. Each year The Quoin Chapter of the Associated General Contractors, in conjunciion with the Association of Builders and Contracta�s {ABC) and the Ameri�an Sub-Confractors Ass+ociation (ASA}, conducts a wage rate survey for North Texas consfruction. The attached 2008 Prevailing Wage Rate data was compiled f�am that survey. �fSCA� tNFORii�ATtON/CERT[�iCAT[C1N: The Finance t7irector certifies that this action wf!! have no materia! effect on City funds. TQ F��ndlAccountlG�nters FROM �undlAccouritlCe+nter� S��bmitted for Citv Manager's O ce bv• Fernando Costa (8476} Ori 'n in� DP��..rtment Head: Addifionat (nfiormation Coniact: A. Dauglas Rademaker (6157j Eric Bundy (7598) HEAVY' & HIGHWAY CONSTRUCTION PREVA�L�NG WAGE RA.TES 20Q8 Air TooE Operatar _ Paving Machine Raker : Shoveler �g Plant Weigher or Sweeper Oper Concrete Structures Cancrete Paving Concrete Paving , Concrete paving ; Concrete Paving Concrete Rubber Farm Setter, Paving & Foundatian Drill C?per Faundation Drili Qper, Front End Loader Ope Lahorer, Common Labarer, Utilit� Mechanic Iviitting Machine Oper Mixer Qperator Motor Grader Operatc Momr Grader Operatc t?iler Painter, Structa�res Pavement Marking M Fine Steel Setter, Structure Mounted Mix Pavement rorm Ma ader Box Crawter Truck Driver, Single Axie, k�tea�vy Truck Driver, Single AxIe, Light Truck Driver, Tandem A1de, Semi-Traile Truck Driver, Transit-Mix Wagon Drill, Baring Machine, Post Hole Wekier 'Work Zone Barricada Servicer $ I O.Ofi $13.99 $I2.78 �] 1.U1 $ 8.sa $14.i5 $ 9.88 $13,22 $I2.80 $12.85 $13.27 �12,00 $13.63 $12.50 $13.56 $I4.54 $10.61 $14. �2 $18.12 $ 8.43 $11.63 $I 1.83 $13.67 � 16.3Q $12.62 $ 9.18 $1 Q.65 $16.97 $11.83 $11.58 $15.20 $14.50 '. $ I4.9$ $13.i7 $t0.04 $11.04 $14.86 $16.29 $21.0'1' $10.92 $1 t.28 $I1.42 $12.32 $ I2.33 $10.92 $12.60 $12.91 $22.03 $14.93 $11.47 $10.91 $11.75 $12.08 $ ] 4.04 $13.57 $10.09 20Q8 PREVAILING WAGE RATES GQNSTRUCTIONINDUSTRY GC-6.09 Permits and Utilities THIS PAGE LEFT INTENTIUNALLY BLANK CITY OF FORT WORTH City of Fort Worth Lake Crest Drainage Improvements STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 01604 Revised July 1, 2011 DEPARTMENT OF THE ARMY FORT WORTH DISTRICT, CORPS OF ENGINEERS P.O. BOX 17300 FORT WORTH, TEXAS 76102-0300 Y,o September 25, 2012 N770� OF Planning, Environmental, and Regulatory Division Regulatory Branch SUBJ�CT: Project Number SWF-2012-00341, Lake Crest Drainage Improvement Project Ms. Linda Young City of Fort Worth 900 Monroe Street, Suite 201 Fort Worth, Texas 76102 Dear Ms. Young: This Jetter is in regards to information received August 7, 2012, and subsequent submittals dated September 9, 2012 and September 10, 2012, concerning a proposal by the City of Fort Worth to construct drainage improvements in the city of Fort Worth, Tarrant County, Texas. This project has been assigned Project Number SWF-2012-00341. Please include this number in all future correspondence concerning this project. Under Section 404 of the Clean Water Act the U. S. Army Corps of Engineers (USACE) regulates the discharge of dredged and fill material into waters of the United States, including wetlands. USACE responsibility under Section 10 of the Rivers and Harbors Act of 1899 is to regulate any work in, or affecting, navigable waters of the United States. Based on the description of the proposed work, and other information available to us, we have determined this project will involve activities subject to the requirements of Section 404. The USACE based this decision on a preliminary jurisdictional detertninatron that there are waters of the United States on the project site. We have reviewed this project under the pre-construction notification procedures of Nationwide Permit General Condition 31 (Federal Register, Vol. 77, No. 34, Tuesday, February 21, 2012). We have determined this project is authorized by Nationwide Permit 43 for Stornnwater Management Facilities. To use this pernut, the person responsible for the project must ensure the work is in compliance with the specifications and conditions listed on the enclosure, and the special conditions below: 1. The permittee shall implement and abide by the mitigation plan titled "7.0 Mitigation Plan" prepared by VRX, Inc. dated Septeznber 10, 2012, except where changes are necessary to comply with the special condition listed below. The permittee shall implement the mitigation plan concurrently with the construction of the project. Completion of all elements of this mitigation plan is a requirement of this permit. -2- 2. The permittee shall debit the appropriate number and type of credits from any U.S. Army Corps of Engineers, Fort Worth District (USACE) approved mitigation bank(s) having a service area encompassing the project site. The debit(s) shall compensate off-site for unavoidable adverse project impacts that would not be compensated for by on-site mitigation and shall be calculated in accordance with the appropriate mitigation banking instrument (MBI). The permittee shall identify the mitigation bank(s) selected for use, calculate credits required and submit to the USACE for verification. Upon vexification, complete the mitigation bank transaction(s), and provide documentation to the USACE that the transaction(s) occurred prior to any ground disturbing activities within waters of the United States. Failure to comply with these specifications and conditions invalidates the authorization and may result in a violation. We have determined the proposed activity would comply with a11 the terms and conditions of Nationwide Permit 43 for Stormwater Management Faeilities, and that the adverse environmental efFects of the proposed project would be minimal both individually and cumulatively. Therefore, we are waiving the 300-linear foot limit for loss of streambed in this case. Our verification for the construction of this activity under this nationwide permit is valid until Mareh 1$, 2Q17, unless prior to that date the nationwide permit is suspended, revoked, or modified such that the activity would no lon�er comply with the terms and conditions of the nationwide permit on a regianal or national basis. The USACE will issue a public notice announcing the changes when they oceur. Furthermore, activities that have commenced, or are under contract to commence, in rel�ance on a nationwide permit wi11 remain authorized provided the activity is completed within 12 manths of the date of the nationwide permit's expiration, modification, or revocation, unless diseretionary authority has been exercised on a case-by-case basis to modify, suspend, or revoke the authorization in accordance with 33 CFR 330.4(e) and 33 CFR 330.5(c) ar (d). Continued confirmatian that an activity complies witl� the speciiications and conditions, and any changes to the nationwide permit, is the responsibility of the permittee. Our review of this project also addressed its effects on threatened and endangered species. Based on the infoi�rnation provided, we have detennined this project will not affect any species listed as threatened or endangered by the U.S. Fish and Wildlife Service within our permit area. However, please note you are responsible %r meeting the requirements of General Condition 18 on endangered species. The permittee must sign and submit to us the enclosed certificarion that the work, including any proposed mitigation, was completed in compliance with the nationwide permit. The permittee should submit the ce�tification within 30 days of the completion of work. -3- This peimit should nat be considered as an approval of the design features of any activity authorized or an implication that such construction is. considered adequate for the purpose intended. It does not authorize any damage to private property, invasion af property rights, or any infringement of federal, state, or local laws or regulations. Thank you for your interest in our nation's water resources. If you have any questions concerning our regulatory program, please refer to our website at http://www.swf.usace.army.mil/regulatory or contact Mr. Eric Dephouse at the address above or telephone 817-886-1820. Please help the Regulatory Program improve its service by completing the survey on the following website; http://per2,nwp.usace.army.mil/survey.html. Sincerely, Stephen L Brooks Chief, Regulatory Branch Enclasures Capy Furnished (Without Enclosures): V Mr. Eric Huff VRX, Inc. 2500 North Da11as Parkway, Suite 450 Plano, Texas 75093 SWF-2012-00341 Project File FORT WORTH Urban Forestry Permit Permit #: UFC12-0125 Status: ISSUED Date Approved: Project Name: LAKE CREST DRAINAGE IMPROVEMENTS Address Description: improvements to pubiic drainage system ' Project Type: PU ' Acreage: 7 Piat #: Building Permit #: DOE#6552 Method A - Preservation: N Method B- Protected Trees Oniy: N Applicant: LINDA YOUNG, PE 900 MONROE STREET, SUITE201, FORT WORTH, TEXAS 76102 ' Owner: CITY OF FORT WORTH 1000 THROCKMORTON, , FORT WORTH, TEXAS 76102 Agent: CRAIG BARNES, PE 1200 W FREEWAY, SUITE 300, FORT WORTH, TEXAS 761Q2 I hereby affirm that the information contained herein is true and correct to the best of my knowledge, and agree to '` conform to all regulations of the City of Fort Worth as described in the Fort Worth Municipal Code. I understand that failure to comply with these provisions may result in the revocation of this permit. Signed: Date: TO SCHEDULE URBAN FORESTRY INSPECTIONS CALL (817) 392-7931 (Call 48 hours prior to final inspection for CO) Planning and Development Department www.fortworthgov.org/PlanningandDevelopment The City of Fort Worth * 1000 Throckmorton Street * Fort Worth, Texas 76102-6311 (817)392-2222 " Fax (817)392-8116 E-Mail: DevCustomerService@fortworthgov.org FORT WORTH�x, e�--- URBAN FORESTRY PERMIT PLAN REVIEW ' '' Planning and Development Department ' ' Zoning: Urban Forestry Compiiance Caleb Tandy, ISA Certified Arborist: Compliance Specialist 817-392-7931;caleb.tandy@fortworthtexas.gov ' ' www.fortworthtexas.qov/planninqanddevelopment/urbanforestry Permit #: # of Reviews to Date: # of Plan Revisions to Date: Physical address: �egal address: Preliminary Plat or Final Plat #s: Building Permit #s for this project: Zoning District: Specific Land Use For Urban Forestry Requirements: ' Name of project: Scope of project: Property Owner of Record: Applicant: Applicant's Agent: i Canopy requirement for land use (%): 1 of 3 UFC12-0125 1 � Lake Crest Addition, along Bob Hanar St from north of Hereford Dr to south of Cromwell Marine Creek Rd Department of Engineering #6552 A-5; E; C Public Project Lake Crest Drainage Improvements DOE #6552 improvements to public drainage system Various Transportation Public Works, Stormwater Management, City of Fort Worth Linda Young, PE Option - 30% Preservation method (unless exempt): exemp�}f 3 Plan Reviewer Calculations *based on information available at time of review Part I: Documentation of Existinq Conditions gross area of property or artificial lot: utility easements/other deductions area: net urban forestry a�ea: required canopy (total - includes additional mitigation or 5% for method B): existing canopy (includes significant tree canopy): ' ' existing significant tree canopy: significant tree canopy to be removed: , significant tree canopy to be preserved: 'I total preservation requirement (includes any mitigation) ' preserved canopy (includes significant tree canopy): total preserved canopy credit: significant tree canopy preservation credit: Part II• Components of the Urban Forestry Plan preserved canopy (includes significant tree canopy): significant tree preservation credit: planting canopy credit (includes any deductions for overlap): net gain for counting certain existing trees at full planting credit: deduction for overlap of new trees spaced less than minimum distance total credit for provided canopy total required canopy excess/deficient canopy: area of parking: required parking canopy: area of canopy provided for parking : parking canopy excess/deficiency: ft2 305,245 70, 553 234,692 70,408 115,684 1,238 1,238 0 71,105 71,724 619 ft2 71,105 619 0 0 71, 724 �o,aos 1,316 0 0 0 Date REVIEW NOTES' * Holds must be "cleared" for plan aaaroval CommentlHold 11/06/2012 Plan meets all requirements for public project use with preserved trees in project boundary. Trees in existing permanent easements and proposed non-drainage permanent easements were excluded from preservation. PLAN APPROVED END REVIEW NOTES** see below regarding all revisions Submit all documents required in the original submission only if they are affected by any revisions made. Revision 1- no additional fee. ' Revisions 2+ require a$100.00 fee each. A Certificate of Occupancy wili not be issued for any building until the site conforms to the approved Urban Forestry Plan. No person shall remove or damage any tree greater than or equai to six inches dbh (diameter at 4.5ft height) unless it is shown as such on an approved Urban Forestry Permit or Tree Removal Permit. Failure to obtain the appropriate ; permit could result in both civil and criminal penalties. To view permit holds & comments visit www.fortworthtexas.qov and go to ; departments, planning and development, online permitting, check/research permits `' ***END REVIEW 3of3 5 � C>`� � � � i, ' � � ' " � a' � � �� �r �. � �-� � - � � ��r -��; _ _ .:-. z _ i � _�� ,� � - - ���� ;..-� : ��,�`: '�£ � .;� r�e� � a oe� s.�, we. ne„��w spetl a�+ara Ac.es v.aeved 1 �u� 28' 397.5 O.OD3 Rest v�.d 2 Cottornwwd 32' 840.0 OA39 PmsenN Tata�s fA" 1,237.5 O.OiB : ��: . �pi ,� 4 & _a � � �egend Gross Site Area � Proposed Permane�t Drainage Easemen( � ��' Proposed Temporary Work Easement � Exis6ng Canopy Coverage ; Exislirg UNlity Easements OSignificanl Tree Lotations - � �� __ �. '3 =�y � - � � �c :' � � vt+asEor�� nneu�oa�a �������� �7otaltorvroectL .,c�E�,�G7 TC� Tii� AP.t'+Y15tC)Fdb �' VeturbanForestrv/+re ra � Peet noes �y}�j�j(� ;3%::StC} i?E�L?tfvAldCE :ross Area of ProperN 305,244.96 � 7 007 iltiliryEasements 70,553.16� l.sz �:; 6�. ;��' I, '`l- -;:� �Jv rt Ne[ lkban Forestry Area 734,�1.80 S 387 �'f ��' `• iea a r�_ ��.c �x �. Hntatyi K f! �&`.rtt9Y� t�f A� a` �7Y� � � Ctii3'aQ flOt b# 'tin3?it�-� i9 (�, � ��RM1iC �, S97 �6 �i� C� g�y vi�a�i oi�IFray Ct tYla ;x�r�.,s�Unf '� th;i :�<f¢ 0.' �T." er:i �S�f � qf ReQuiredTree Area SryuareFeet �Aaes 1d+��urP9d�Y:nn tln.,,�s-r�aip�»s<,,;:����ysny;r.nsss�ti�ixit�bk�9ats�atc+�tx�'scC Ne[ tkban Forestry Area 234 B31 W 5.387 �yt fl! �h�� c<Kia ei�a� h�a ve:,v� Carwpyeovetage �clPubllcProJea1 ��"c.e n! a 4t�;,o.t 4asHti '�tn�n 4:��rif s�� t� ���7u �uireme�t t�f ts�i�var:? fp�s Fn�n�r,g c:4Fr:�ia+ irum x:�:�aRa� rre�ifs� � txir� ,�;s �e Re ulredCano Covera e 70.407.54 1.616 �!`8 fn es�f FEsr�s, snetr�tK.nx er� u� c?�Ec. ar 4€am y�.�`s���� $ta�dat� ��es Ma�ig c€�s�t*� <�y E#e�r�,+!e� �F+� �', t�l�e� zf F^Et � ar d� srrr a�i'Ra�aa ai 8`� n!tz���> � � / !�' ;i INeservatt��teMionof �Feet Paes �� 11l6/2012. � ' Z '�- -+��t�--- �H—_PJL .�� �",.,T- FxisHngTreeCan I 115,6&i.22 2.656 �_._. _l1 ._ .. `, � - Preservadon ulrement � �-'' UFC12-0125 MnlrtumReterrtion 28,92L06 ! 0.664 ,;.� ��.�„ _ . . � � There are no existi or ea na areas. - � oev�oPer. c�y oi Fi wonn n' PHASE ONE • Method A(Sheet 1 of 3) Prqecl Manager. Vbhuti Pandey, PE Q 60 � Q� QQQ '• pro}ed Name: Lake Geat �rainay7e Irtprovementa Feet A Locatlon: Leke Crest Addition, Along 9ob Hanger Street hom Norlh 2600H OsbaPMy.9+1e �90 En9�e� Shieid Engineenng Group, PLLC �� of Herefatl Drlve to SaM ol Cromarell Metl�e Creek Roed. wno.4x tw9� 12U0 W. Ftaeway, Suite 300 ■\ Department of Enp�neerin9 Number. 8552 BeuLa���crSwce:NatlonalAgrfculvaYNpayPmpan.]Ot0 ��\ a,o,,,a �. o,,,�',i, Fort Worth, Texes 78102 ��� plan Scale: 1 i� = 60 Feet isnce�raeeao«is�rTzanen (817) 810-0698 Pro ared: ieA �i12 1 o�x osa�z�n N A � :�� �f, � _ � � � � � �� � 3� S _ � -�. �4 .:."'�=sk: �� £ � � < � r, c . �� � - 3 �� � t s.:;� �..V � - �;� - c � � "� � ��� - -�� v �,� � ' �r���� � � � � .� - � � a� = �� _ � �-� :�-�� �, �: _-� . � - ,�� ::�� � _ � � � � �z .. - ,.�s�m_ " �������� SLl�G77t5 TNE PP,CYJlSiOtiS QF �CTI�#t 3Q3iGy 0!2(1IkA.4f:E PK7. 1$��`` i �--�ao�q VcRdly d Pt+mi 7t�e a�uar�.-c a grp+tv+q d R�e�mt a 1�D�d at SEa'e Ey �� L:U11R !%N �k CUII3UUM} t0 {19 ! Qt+n'X �fF, a1 O S i�pfL40i (K py �:ot�x d�ey' d GYn Wi: v�ea,ns M thii o�de Pr d asY oB�er aAiii�ms d !y jwf�ptt. � penn+t Gitwr�unq 1a p4c e��aeihr 19 v1aMs atsrtx! tm �'eqYM�Xi� (�( 7Yb oC:JY i7Mq GG Yci�tl TTf� iwracrct d��a�ttil S+saA u}k�r Wuu. spac�WesUaro uM �t+a+' aste �Il NtDrcra:dtlw hud�l,p of7x��t fr+mi fit�ta+Mr re�drky M aM�carra rn' M�Tlf M Mi6 p4dtt. iflec�B�1719 �!M tRl1K dYG. W�liRlt �4'Y!tlU1W HU�A`'1tl �+rt.64ir� ctm�d m�Mi'� wP�en n vL'mdetlm+d Hea mcy a at a1r ,srwe.� etav+kkk-Netc�«�. ��% 7 � .�s� � : s wsa ��`4`� 11/8J2072 ��: .. �� a �� UFC12-0125 r� � � sv�w 1 ow+ PHASEONE-Metiwd'A' preservafion/Retentlon d v.��a 73a.e9iao i �� �uare Feet Paes 734,631@J 5.387 30f6 (Public Projed) 70L407.54 L616 2476 �, �a � , _ t: i ' ., � ;� :�: � � � � s: r s There xe fro extsu w sea Ki areas. ._, , -.. .s.. .-..— � � Developer. CAY of Ft Worth PHASE ONE - Method A(Sheet 3 of 3) Ptoject Managec vbhufi Pandey, PE � 80 � 6� 3z� � Proled Name: lake Cresl Oreinage Imprwoments Feet A �O���on: Leke Cresl Addition, Along Bob Nanger SVeet han Nohh xaooN. o.u. cv.v. uae.w Engmeer. Shield Engineering Group, PILC � � of Herefad Drtve to South ol Cromweii Marine Creek Road. wro.*xTSos� 1200 W. Fteeway, Suile 300 �� Departrnent of Enginearing Numbec 6552 e:u �ara x : rvwo�wM�m•� �+wm r,oyam. xo�o �\ p„P,,,aey o,,,r �,�, Fort Worth, Texas 76102 V Plen Swle: 1 Indi = oo Feet �,v,r.«re,en�e�urxanen (g��)g10-0898 � oaredtlBA i20t2 crz aaa i � �.��Ri��E� SiJpJECT TCi i1tE Mtt1Vi$qtt3 0'� s€cr� wat�! orsn��wce tta. f 86 i, c.�; - a o � � v�nl.y�t� rn.a� ;�«��,t,�a.ermatt��pa�. 1n +e�a � MtM ++M �-. r.,nanaM tc w. p.n,w te�. a sn � r# �wy �s ol s(ryr U Ma M'v*sx..n� ��( tlJa wde or d a�y c4+sr a�u6� ct yM �1K�5'-{ItXi. i�0 ��y1 �d}una�t(�` 03 SjWO 4Ji�0'�ij b kk!%6f6 Qf Q$lT:�'}'4 �Xvwiora M i+�+e anfe MeM I>e �e+,d 1'M asmrce ca � yxmt besed ur� Viu�s. a�raR t�M �,ae as� w�+A ewlafvei� nm WMk-�o cfln�N rr«n aweata. rptak�p sue eartcSqze a MM Y1 tFQ p+M. s�}R�'WN �r,6.'Y�1N E�ti..�i It9G!�p�p b4�='9 @�M 6arp�r.wdanR+m� +swnh�aElhm4tadenr OiM(�w3At�KasOt@w� /� . � : �A`� it/6t2012 �, " /. �- ��c. _�. UFC12-0125 TreeY Se �a OBH I SQuare �g ��ry� 1 28' 397.5 O.W9 Prese�d PFiASETWO- MeNqd'A' �e�� 30M(PubiicPrajectl ment .fr n,�� �ace . 70.407.54 � 1676 FeM MnimumRetention � TB92to61 Q664 Reseft2tlon and/or Syuae fe�Aaes %antinBof Tree Caw�r Areaof�istlngTree �lCbu� LfiiZ Canopy Preserved TotalPreserva[ionCredit 7 7J3.90 1606 Plarrclrrg No plandng required. Preserved �anopy exweds Legend Gross Site Area dProposetl Permanenl Orainege Easement Proposed Temporary Work Easement � Canopy lo be Preserved � Canopy lo be Removed � Existing UtilAy Easements � Proposed Grading Contours _ � � � i� ��� Y�I �; � � � r - � I � _ ��'� '� � � � i +' - � ; �� � _ '.rz"s. '-S '.�'S � � � 4 F " � 5` � ��,-�s -� �: � �+ _ ^, � �; 3 1 �. ' � �!� � _ "y _' ____._ __.. � oeve�oPec ciryotFt Worth N PHASE TWO - Method A(Sheet 3 Ot 3) Prqecf Menagec Vbhuti Pandey, PE 0 $Q 160 ',j20 �led Name: Lake Gest Drainage �irqrovements Feet A ����' Lako Crest Adtli6on, AJong Bob Henger StreM trom North 2svox. owe r�..x ame.w EnglneeC Shield EOgineering Group, PLLC � M Hereford OrNe to South ot Cmttm�ell Manne Creek Road. �TX��� 1200 W. Fleeway, Suile 300 Depar6neo! of Enqineerinp Numbec 6552 q,v+„�anoe„�„„ foAWorlh.Texas76102 e"°uws°�"`e".m'„�nykm`°""°nyv"v�.zoio �cmeba�mon.urxanen 817 870-0698 Plan Swle: 1 infi = 80 Feet n 9eo.>ne � ) Pre ared: 18A �12012 Application for Tree Removal Permit On City of Fort Worth Property Including parkways and medians Submit to City Forester 4200 South Freeway Suite 2200 Fort Worth, TX 76111 Section 2- Location Location address Lake Crest Addition, Along Bob Hanger Road and Hereford Drive from north of Hereford Drive to south of Cromwell Marine Creek Road. Business/Residence N/A — Cit of Forth Worth draina e ro'ect in residential area. Name of Business N/A ' Atta.ch site plan drawn to scale showing location of all trees by size (DBH) and species to be removed. Site plan should also include layer demonstrating why trees must be removed, such as proposed turn lane, drive approach or grade change. Plan must also include north arrow, scale, City Trees to remain on site, any nronosed nlantin� on parkwav or median and planting details along with method of watering. Guidelines fior Landscaping in Parkway Public Open Space Easement (P.O.S.E.) A 20-foot by 20-foot triangular public open space easement is required on corner lots at the intersection of two streets. A 15-foot by 15-foot triangular public open space of easement is required on corner lots at the intersection of an alley and a street. In addition, at the intersection of a driveway or turnout section and a dedicated alley, a 10-foot by 10-foot triangular open space easement is to be provided on each side at the driveway or turnout at the time the driveway and/or alley is constructed. No structure, object, or plant of any type may obstruct vision from a height of 24-inches to a height of 11 feet above the top of the curb, including, but not limited to buildings, fences, walks, signs, trees, shrubs, cars, trucks, etc., in the public open space easement as shown on the illustration. Landscaping in Parkways • A medium or large tree shall be planted a minimum of 2 feet from the face of the curb, sidewalk, or other structure. • A small tree or shrub shall be planted a minimum of 1.5 feet from the face of the curb, sidewalk, or other structure. • A minimum planting area of 3 feet must be available between back of curb and sidewalk to plant any small tree or large shrub and a minimum of 4 feet to plant large trees. A large tree shall be defined as a species that reach a height of 50 feet at maturity. • In residential areas a minimum spacing of twenty-five feet is recommended between shade trees planted on parkways and is required in commercial districts or major arterial streets. • All landscaping shall be located so that pedestrians can walk parallel to the street within the parkway whether a paved sidewalk is or is not provided. • No tree or shrub shall obstruct the view of any tra�c signal, sign, or other public sign. • Any tree or shrub planted in the parkway is the property of the City and the City reserves the right to prune or remove such tree or shrub if it becomes a traffic hazard or poses risk. • Planting trees or shrubs on any public property requires a free permit from Parks and Community Services and can be obtained by calling the City Forester at 817/871-5738. � � � _ � � a Public Open � ,� Space Easement � z -' ��_ (P.O.S.E.) o � ���.. � � . �..3 =s � w��;i�i � .S Cj ' t,�y'�` � ( j) � p � � / �"' V � p- M - a;,\��o Propirty �ine ., G �.,�'pl��nted in thisa�•c.+ Cu Public Strcet Right-of-way