HomeMy WebLinkAboutContract 44624 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
�
0
City Secretary
Contract No. �I � � �"
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Hillwood Alliance Services, LLC
Address, State, Zip Code: 13600 Heritage Parkway, Suite 200 Fort Worth, Texas 76177
Phone, E-Mai1:817.224.6000, Russell.lau hg_lin(�a,hillwood.com
Authorized Signatory/Title: L. Russell Laughlin, Senior Vice President-Properties Division
Project Name: Alliance Town Center North-Phase 1-Water&Sanitary Sewer I�nprovements
Project Location: West of the Intersection of Old Denton Road and Amador Drive
Plat Case No.: FP-013-005 &FP-013-003 Plat Name: Alliance Town Center North
Mapsco: 21-U,Y Council District: 2 City Project No:02108
CFA: 2013- 032 DOE:7044
To be conzpleted b staff
Received by: Date: �
—�--�
�F�IC��9. ����6��
c�l'iY SEGR�TARY
f�'i', aJ111Qit'6H, �X
��C�IV�b J�JL 15 �01�
NOW, THEREFORE, KNOW ALL BY THES� PRES�NTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incoiporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub-contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereo£ Water (A) X,
Sewer (A-1) _X� Paving (B) � Storm Drain (B-1) _, Street Lights &
Signs (C)_.
2
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
3
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre-Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City-issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
4
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, ifs officers, agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, wlzether of• not suclz iniul•i�es, deatli or
damages a��e caused, iti whole o�• in pa��t, bv the alle�ed neQli�en�ce of
the Citv ofFo�•t Wo��th, its of�cers, servaizts, or errtployees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whethef� o�� not such
iizjuries, death o�� dama,�es af�e caused, in whole or in part, bv the
alle�ed ne�li�-ence of the Citv of Fort Worth, its officer�s, serva�zts, oi�
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
E
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
�
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's iinancial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's iinancial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
7
Cost Summar,y Sheet
Project Name: Alliance Town Center North-Phase 1-Water & Sanitary Sewer Improvements
CFA No.: 2013-032 DOE No.: 7044
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following
information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 237,855.00
2. Sewer Construction $ 230,449.00
Water and Sewer Construction Total $ 468,304.00
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee k2°/a)
Sub-Total for Water Construction Fees
$ -
$ 468,304.00
$ 9,366.08
$ 9,366.08
$ 18,732.16
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub-Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee
a�.,� - � nn�i
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2vr expiration peri
$ -
$ -
$ -
$ -
$ -
$ 18,732.16
Chofce
468
8
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has exec d this
instrument in uadruplicate, at Fort Worth, Texas this day of
, 20�.
CITY OF FORT WORTH - Recof�unended by:
Water Department
,� , , ���
Wendy Chi- abulal, E BA, P.E.
Development Engineering Manager
Approved as to Fo�•m & Legaliry:
�i
_. ��,
,; �
Douglas W. Black
Assistant City Attorney
M&C No. �i1 �-
Date:
ATTEST:
)
ary J. K
City Secrf
ATTEST:
`
�
Transportation & Public Works Department
� ��a�.
Douglas W. Wiersig, P.E.
Director
Approved by Ciry Ma�zagef•'s Office
�� ��
Fernando Costa
Assistant City Manager
�
�
�
�;
Hillwood Alliance Services, LLC
���
Signature Signature
(Print) Name: ��'\ a� `� �
Print Name:L. Russell Laughlin
Title: Senior Vice President-Properties Division
t1FFICIAI, R�CORD
�ITY SECRETARY
�'f.1NORTH, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
� Location Map
� Exhibit A: Water Improvements
� Water Estimate
� Exhibit A-1: Sewer Improvements
� Sewer Estimate
❑ Exhibit B: Paving Improvements
❑ Paving Estimate
❑ Exhibit B-1: Storm Drain Improvements
❑ Storm Drain Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
..... - ... - _ - ... _ - - - ... _ -
�
NORTH
NOT TO SCALE
ALLIANCE TOWN
CENTER NORTH
PHASE 1
OWNER / DEVELOPER:
HILLWOOD ALLIANCE
SERVICES, L.P.
13600 HERITAGE PARKWAY, SUITE 200
FORT WORTH, TEXAS 76177
PHONE: ( 81'n 224 - 6000
DATE:
_- .__..
ENGINEER:
ii�!� P E LOTO N
II LAND SOLVTIONS
5751 KROGER DRIVE
SUITE 185
KELLER, TX 76244
PHONE: 817-562-3350
>
J
m
�
W
� fll I�Vf"S( 1 f ❑.�� Z
Ir+y rn y
V'lL ( n(3 ( C l c>� _�.S �
, ;
' �. _._
I_— �--------
�', �;
Il� i
� � 12" W L
I �� I
i�� ,
�
I LIP[ c.F �OJt C YiCRt10�2T1 .�
I LO 7, BICRtSr j
l. _,.;., xi, 3
12" WL
�,,...'..\ 5 1S t� _ ,r..-.��"�
r �cra
e,. i s v
rr�
� 12" WL
.,` \
'\ �
,,� �
12" WL ,
�� �I
I
d �
� � �o
>
�.4t I IP !C F l 011N CFF E!? IOrt ti, �
I lOi3 lOC<l
� 3 �Cr1LS
� �
� i iJ,
I � �� �,r -�
���ill
i� I�� ��
'i��'jI
i�
!,�,il
I �
�!��'�h�l i
�1'
,`
�` �p�\\�,
\�V , �'�,
�\ \
, 1� ) 1� \
.J � '�. -"' =
-j �' � ,
._- �� � f1�( - _ —
�� �� I I
�i �,I
� 'i �� �
Ijl�%I
,' i ,
Ii;,�I';Ii
i j ;;I �
, � � i� �
�i III I
�i II� �
Ii �I �
�� i�� i
i ! i i ��
� j �, �
�; ��� i'
iI
�' '�i
;Ii�;l
�
1/
,___----
`_ _ --- ---
"�.� �..._�_�_`_` � � Z J ;
__
,_ _ — _".--- ------.._. --.-...._ EX24' WTR m �� �I �
-' -
1�'�'-^---� �------._ �--- - �=-_.="�:.��- ...
--_^E�436'-{iyTR�___—_____-�'----`-<',=_...`--'-�*-�...�, -- �i I�
, ,
, _- ._._.----�_.�I�--- --- -
, -__._, ._�1,_
_ _ _:�-ti, �,�„� �...
, __ _ _ --_ — - —
� 'I
; �_---c_=-�-- ` � ` ---
` '�_.�.--,,,_,
� — _ � �
� —� `
_-�. HERITAGE T -y �-�- EX 24" yy7{�
LEGEND --� __- - — ---_- '
� I ��I I � `' R.4CE PI<yyy — `- EX 36' yyT � =— % .
_-_ _--_. . . _ - — — R _ 1 _ _ _ `�._" _ _`� `_" — — �
; PROPOSED WATER �INE �� -__ ---�
, -�
; ------- EXIST WATER LINE ``
; � �i
PROPOSED FIRE HYDRANT
NOTE: ALL PROPOSED WATER LINES ARE 8"
UNLESS OTHERWISE NOTED
EXHIBIT A - WATER
:_..- - - - - - _ --- - _____.
� ALLIANCE TOWN OWNER/DEVELOPER: i�fi� pELOTON
� NORTH 300� HILLWOOD ALLIANCE � I �AND ,o��T,o�S
CENTER NORTH SERVICES� L.P. 5751 KROGERDRIVE
13600 HERITAGE PARKWAY, SUITE 200 SUITE 185
PHASE 1 FORT WORTH, TEXAS 76177 KELLER, TX 76244
GRAPHIC SCALE DATE:APRIL,2013 PHONE: (81n 224-6000 PHONE:817-562-3350
._
�
0
J
m
�
W
� u invi � N� z
�H� f
�o ( 7�l � f� �
�._..L�..�
�Y� �i
; l�
�' � i
�', � i
� � I
��.�� I�
�lltll+l(,F (7/tt C�� fRilO 11{'�
LOl HLOCC7
7 !Gt'
�,��, �,<E,�tif, �< < � ,�>�����
I Q733LRL�2
�ru .,< .� , ,,,, .� . . .
. . . . ... .. . . . _._....,
_ ._, _ :. �`.�— ,���_y.,_��
� �7 I'v S r 1_P :,
RA(, 4 '
\ll.. 3 f �
l 7 ( (
I�e�w.._...,__�:. �
�' \ 10" SS
.�
� r =_ -
10" SS
�
�
I
I�
��
�i
�!
�
I
�
'/�
. < < ----�
, , - -- � '�
� � �� .` �o"ss . � ;
I I�, r� �
� - - --- - -- ------- ---------__ ___ � � �� � �
�----- � W> -- ,
�___ ---_____==__--__- ---- -------_-- � ' zm
. ---____ o
��
.
, _ __ _—_--_ ,
_____ -------___-- - � � � �
---------------- -- - � -
-__f�__-,�_
. ___-------__ __ �
----- — �� --___ �
� ,� __�i !�
__ _ _ _ -
, ---_ ---
- -� _ �� -
___
_ _ - ---
: _ , �, __ � ,
- - - � - -- _- i
. ` - --�'} HERI7AGE TRACE PKyyy ` -- --_ _ __ __ _-- ,
��I l��� � � o ��
P_
_ �
�. ;
----_ � .
_--- ---__ �
-___
��,
; - �-- --���'o" ._ ,
� \ , ,- :
; LEGEND �
; —�-- PROPOSED SEWER LINES �
�
---o----- EXIST SEWER LINES �� ;
�� ,
NOTE: ALL PROPOSED SANITARY SEWER �
LINES ARE 8" UNLESS OTHERWISE NOTED
� - WASTEWATER I :
� EXHIBIT A1 �
� - - - - - - .._... _ _ _... - _� - - -_
� ALLIANCE TOWN OWNER/DEVELOPER: i��l� pE�OTON
Q NORTH 300� HILLWOOD ALLIANCE � I �AND SOLUTIONS
CENTER NORTH SERVICES� L.P. 5751 KROGERDRIVE
13600 HERITAGE PARKWAY, SUITE 200 SUITE 185
PHASE 1 FORT WORTH, TEXAS 76177 KELLER, TX 76244
GRAPHIC SCALE DATE: APRIL, 2013 PHONE: ( 81� 224 - 6000 PHONE: 817-562-3350
i
i
�� � 1
� ���1
,' � �,
�� �; ��
�� ��� V��,
\\:.. i1 ��� 55
J,Y � 1����..
.-- � I �11 �1-- i � ' _ �
��' i ��` �
i� � II ��
1II�1 I �
� I i �
i I �iIi
� I I I�Ii I �
S�CTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
wnT��iMr�ovaE�iv�rs °
Project Item ]nfomiatio�t Bidders Proposal
Bidlist Item Specification Unit of
No Descriptiot� Sectiou No. Measure Bid Quantity Unit Piice Bid Value
8" Water Main (PVC AWWA C900, DR-14),
3311.0261 Complete in Place for the Sum Of: 33 11 12 L.F. 548 $32.00 $17,536.00
Dollars &
Cents per LF.
12" Water Main (PVC AWWA C900, DR-14),
3311.0461 Complete in Place for the Sum Of: 33 11 12 L.F. 3687 $40.00 $147,480.00
Doliars &
Cents per L.F.
8" Gate Valve,
3312.3003 Complete in Place for the Sum Of: 33 12 20 EA 13 $1,100.00 $14,300.00
Doilars &
Cents per L.F.
12" Gate Valve,
3312.3005 Complete in Place for the Sum Of: 33 12 20 EA 7 $2,000.00 $14,000.00
Dollars &
Cents per L.F.
24" x 12" Tapping Sleeve & Valve,
3312.4211 Complete in Piace for the Sum Of: 33 12 25 EA 1 $8,250.00 $8,250.00
Doliars &
Cents per L.F.
Fire Hydrant Assembly,
3312.0001 Complete in Place for the Sum Of: 33 12 40 EA 1 $3,300.00 $3,300.00
Dollars &
Cents per L.F.
Connect to Ex 12" Water Main,
3312.0105 Complete in Place for the Sum Of: 33 12 25 EA 1 $800.00 $800.00
Doilars &
Cents per L.F.
Ductile Iron Water Fittings,
3311.0001 Compiete in Place for the Sum Of: 33 11 11 TON 3.48 $3,800.00 $13,224.00
Dollars &
Cents per L.F.
Concrete Blocking, Type B,
Compiete in Place for the Sum Of: CY 10 $60.00 $600.00
Doilars &
Cents per L.F.
Trench Safety,
3305.0109 Compiete in Place for the Sum Of: 33 05 10 L.F. 4235 $1.00 $4,235.00
Dollars &
Cents per L.F.
Total Water Improvements $223,725.00
SATIITARY SEWEIt IMFRQY�MENTS:
Project Item Infonnation Bidde�'s Proposal
Bidlist Item Specification Unit of
No Description Section No. Measwe Bid Quantity Utut Price Bid Value
8" Sanitary Sewer Main (SDR-35 PVC),
3331.4115 Complete in Piace for the Sum Of: 33 31 20 L.F. 2408 $36.00 $86,688.00
Dollars &
Cents per L.F.
8" Sanitary Sewer Main w/ CSBF (SDR-26 PVC),
3331.4116 Compleie in Place for the Sum Of: 33 31 20 L.F. 200 $44.00 $8,800.00
Dollars &
Cents per L.F.
8" Sanitary Sewer Main within 16" Steel Casing (SDR-26 PVC),
3331.4115 Complete in Place for the Sum Of: 33 31 20 L.F. 70 $55.00 $3,850.00
Doilars &
Cents per L.F.
16" Steel Casing By Open Cut,
3305.1002 Complete in Place for the Sum Of: 33 05 22 L.F. 70 $95.00 $6,650.00
Dollars &
Cents per L.F.
10" Sanitary Sewer Main (SDR-35 PVC), 33 11 10
3331.4201 Complete in Place for the Sum Of: 33 31 12 L.F. 898 $38.00 $34,124.00
Doilars & 33 31 20
Cents per L.F.
10" Sanitary Sewer Main within 20" Steel Casing (SDR-26 PVC), 33 11 10
3331.4201 Complete in Place for the Sum Of: 33 31 12 L.F. 100 $60.00 $6,000.00
Doliars & 33 31 20
Cents per L.F.
20" Steel Casing By Open Cut,
3305.1003 Complete in Piace for the Sum Of: 33 05 22 L.F. 100 $115.00 $11,500.00
Dollars &
Cents per �.F.
Manhole - Std 4' Dia. (6 Ft Depth max),
3339.1001 Complete in Place for the Sum Of: 33 39 10 EA 13 $2,600.00 $33,800.00
Dollars & 33 39 20
Cents per EA
Manhole - Std 4' Dia. (Extra Depth),
3339.1003 Complete in Place for the Sum Of: 33 39 10 VF 33 $160.00 $5,280.00
Dollars & 33 39 20
Cents per EA
Concrete Collar - Manhole,
3305.0112 Complete in Place for the Sum Of: 33 05 17 EA 2 $500.00 $1,000.00
Dollars &
Cents per EA
Clay Dams,
3305.0113 Complete in Piace for the Sum Of: 33 05 15 EA 8 $700.00 $5,600.00
Doilars &
Cents per EA
Epoxy Manhole Liner,
3339.0001 Compiete in Piace for the Sum Of: 33 39 60 VF 35 $200.00 $7,000.00
Dollars &
Cents per EA
Connect to Sanitary Sewer Line per plans,
Complete in Place for the Sum Of: EA 2 $1,000.00 $2,000.00
Dollars &
Cents per EA
Trench Safety,
3305.0109 Complete in Place for the Sum Of: 33 05 10 L.F. 3746 $2.00 $7,492.00
Dollars &
Cents per L.F.
Post Construction CCTV,
3301.0002 Complete in Place for the Sum Of: 33 01 31 L.F. 3746 $2.50 $9,365.00
Dollars &
Cents er L.F.
Manhole Vacuum Testing,
3301.0101 Complete in Piace for the Sum Of: 33 01 30 EA 13 $100.00 $1,300.00
Dollars &
Cents er L.F.
Total Sanitary Sewer Improvc�nents $230,449.00
Projec[ Item Infonna[ion � Bidde�'s Proposal
Bidlist Item I ( Speci6cation I Unit of I ( I
Description Bid Quantity Unit Price Bid Value
No. Section No. Measm'e
Siit Fence, Complete in
Piace for the Sum Of: L.F. 4,383 1.50 $6,574.50
Dollars &
Cents per L.F.
Sediment Trap, Complete in
Place for the Sum Of: L.F. 70 40.00 $2,800.00
Dollars &
Cents per L.F.
SWPPP (Maintenance),
3125.0101 Complete in Piace for the Sum Of: 31 25 00 L.S. 1 500.00 $500.00
Dollars &
Cents per L.S.
Construction Entrance,
3125.0101 Complete in Place for the Sum Of: 31 25 00 L.S. 1 1,500.00 $1,500.00
Dollars &
Cents per L.S.
Seeding ydromu c Along Off- ite Sewer Trench (Inciu es
Watering/Irrigation unti170% Vegetative Cover is Attained),
3292.0400 Complete in Place for the Sum Of: 32 92 13 S.Y. 1,670 $1.65 $2,755.50
Dollars &
Total �rosion Control $14,130.00
Total Bid $468 304.00