HomeMy WebLinkAboutContract 44650-A1CITY S�ChETAR1�
CdNTR�#CT �. � - �
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 44650
WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 44650, (the
CONTRACT) which was authorized by M&C C-26322 on the 9th day of �7uly,
2013 in the amount of $ 164,371; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Evaluation of Stormwater Development Review Policies; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated January 15, 2014, a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional engineering services to be performed by Engineer
totals $48,341. (See Attached Funding Breakdown Sheet, Page -3-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $212,712.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 1 of 3
� c{��i�l�il �2E�ORD
�� �ITY SECRETARY
FT. WORTH, TX
��
REC���!�,,:3 �til� �� �(�14
APPROVED:
City of Fort Worth
LI•�.----+
Fernando Costa
Assistant City Manager
DATE : .�
ENGINEER
Freese and Nichols, Inc.
Jo n Dewar, P. E.
Vi ce President
DATE: �- 3-
APPR VAL RECOMMENDED:
G�
� (�„� , �) U-�. `
Douglas . Wiersig, P. E.
Director, Transportation and Public Works Department
APPROVED AS TO FORM AND LEGALITY:
�. � �
• rn, � �. L 1 I � � - �� �I--�
Assistant City Attorney
ATTEST:
City
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release II/1/2012
Page 2 of 3
M&C:
Date:
� �'�FFICIAL RECORD
' GITY SECRETARY
II �. ��H, TX
�_
M�li1�l�7i�i�(ef ;����\;i�Z�]:�I���:i�M�4y
City Secretary No. 44650
Amendment •No
Department Fund-Account-Center Amount
TPW PE69 531200 0209207 $48,341.00
Total: $48,341.00
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 3 of 3
OFFICIAL RECORD
CITY SECRETARIf
�o ������ ��
� i i� ��I '. L� ' � � . .
- I t_ I i_ I' I,, . .
� I�.,il ! F+ih, �,
� �
� �� � � � � �ufi� i�i-lal �YAd:;�;f'f'iI+AK�R?
4055 International Plaza, Suite 200 • Fort Worth, Texas 76109 • 817-735-7300 • fax 817-735-7491 • www.freese.com
January 15, 2014
Mr. Greg Simmons, P.E.
Transportation and Public Works — Stormwater Division
City of Fort Worth
1000 Throckmorton
Fort Worth, TX 76102
RE: Evaluation of Stormwater Development Review Policies — Amendment No. 1
Dear Mr. Simmons:
Through discussions with the City of Fort Worth, it was determined that additional effort would be
required to modify the iSWM Criteria Manual forSite Development and Construction which is the drainage
standard for the City of Fort Worth. We are requesting an amendment for the additional services included
in revising and updating the stormwater criteria. The scope items are discussed briefly below. A fee
summary is also included.
Scope Addition:
1. iSWM Criteria Manual Updates and Revisions
a. Update document to align with the following changes implemented during the
Evaluation of Stormwater Development Review Policies. These changes include:
i. Modify Chapter 1— Overview of iSWM Criteria Manual to represent the
Stormwater Policy and Guidelines for the City of Fort Worth. This includes
clarification of the purpose and goals of the City's drainage criteria and the
applicability of the drainage standards as it applies to land disturbance and
previously approved projects.
ii. Modify Chapter 2— integrated Development Process specifically for the City of
Fort Worth stormwater development reviews. This will incorporate the
flowchart developed as part of the original project. The local provisions for
requirements on the iSWM plans will be incorporated into the drainage
manual, and no longer included in the separate local provision boxes.
iii. Modify Chapter 3— integrated Design Criteria specifically for the City of Fort
Worth stormwater design criteria. These revisions will consolidate the existing
Chapter .3 design guidelines with the specific City of Fort Worth criteria
provided in the current Chapter 5. The local provisions will be incorporated into
the drainage manual, and no longer included in the separate local provision
boxes.
iv. Modify Chapter 4— integrated Construction Criteria will be modified to
incorporate the local provisions into the drainage manual, and no longer
included in the separate local provision boxes.
v. Re-write Chapter 5— The existing Chapter 5, Additional Local Requirements,
will be incorporated, where appropriate, in Chapters 2 and 3. Chapter 5 will
then be modified to provide sample submittals for the iSWM plans, final
construction drawings, and the final iSWM plan.
vi. Appendix A— City of Fort Worth checklists will be revised according the
modified review requirements for the conceptual, preliminary and final iSWM
plans. __ _ _ _
�, -�
�' J6�f�9�V�� ���0f��
� �9TY SECRETARY
�
[FT113294] T:\Contract\Amendment No. 1\02 FTi13294 - Amendment Letterl.doc I�I � e• ��n��y ��
F -
FREESE
o ;��
Evaluation of Stormwater Development Review Policies
January 15, 2014
Page 2 of 2
In addition to the scope items added for the iSWM criteria manual revisions, additional funds are being
requested to complete the following items for the Evaluation of Stormwater Review Polices.
1. Project Management and Meetings — Additional meetings to discuss the iSWM criteria manual
revisions and the final project summary document.
2. Summary Documentation of Findings — A summary report documenting data collected, final
recommendations and implementation plan.
3. Training—One additional training meeting, as required by our original scope.
The total fee requested for this contract amendment is $48,341. Attachment B includes the fee breakout.
We look forward to discussing this work with you further. Please feel free to contact me if you have any
additional questions.
Sincerely,
I
Kelly Di ard, P.E.
�FFICI�L �3EC0(dD
CIYY SECRETARV
�Y. VIIOItTH, 7'X
I
[FT113294] T:\Contract\Amendment No. 1\02 FTll3294 - Amendment Letterl,doc
ATTACHMENT "B"
EVALUATION OF STORMWATER DEVELOPMENT REVIEW POLICIES
AMENDMENT NO. 1
COMPENSATION AND PAYMENT SCHEDULE
A. The Engineer shall be compensated a total project fee of $48,341.00, on a
time and materials basis for hours actually worked on the project at the
rates shown on the attached compensations schedule. Payment of the
hourly fees shall be considered full compensation for the Basic Services
described in Attachment "A" for all labor materials, supplies and
equipment necessary to complete the project.
B. The Engineer shall be paid in accordance with "Exhibit B-1 ", Supplement
to Attachment B. Each invoice from the Engineer shall be verified as to its
accuracy and compliance with the terms of this contract by an officer of
the Engineer.
C. Additional tasks assigned by the CITY not included in Attachment "A"
Scope of Services will be billed on an hourly basis. These tasks will not
be performed without written authorization from the CITY. A summary of
current hourly billing rates is provided in Exhibit "B-2".
L�7
E
F
Professional Services Fee summary is provided in Exhibit "B-3".
A Summary of Total Project Fees including SBE participation percentages
is provided in Exhibit "B-3A".
A schedule of partial submittals for review will be based on the Project
Schedule Attachment "D" and is as follows:
Proiect Phase
Draft iSWM Revisions
Final Summary Report
Training Course
Estimated Completion Date
January 2014
Early 2014
Early 2014
OFFICIA� RECORD
��T� �ECRE�'ARY
�'o M!�l��T�f�11f�(
ATTACHMENT "B"
Page 1 of 1
EXHIBIT "B-1"
(SUPPLEMENT TO ATTACHMENT B)
EVALUATION OF STORMWATER DEVELOPMENT REVIEW POLICIES
AMENDMENT NO. 1
METHOD OF PAYMENT
&
PROGRESS REPORT REQUIREMENTS
I. Method of Payment
�
Partial payment shall be made to the Engineer monthly based on hours actually
worked, upon City's approval of an invoice from the Engineer outlining the current
labor and expenses of the total project. The aggregate of such monthly partial fee
payments shall not exceed the following:
Proiect Phase
Project Management
Summary Report
iSWM Revisions
Training Curriculum
Estimated Proiect Percent Complete
10%
35%
95%
100%
The balance of fees for the time and materials expended on the project, less
previous payments, shall be payable after delivery of the FINAL report and
electronic files.
Progress Reports
A. The Engineer shall submit to the designated representative of the Director of
the Department of Transportation/Public Works monthly progress reports
covering all phases of the analysis in the format required by the City.
B. Periodic reports concerning MWBE participation shall be submitted as required
by the MWBE Office.
�FF���Ai. RECORD
�1'�Y SECRE'�ARV
�To alIll0li?'H, TaS
EXHIBIT "B-1"
Page 1 of 1
EXHIBIT "B-2"
(SUPPLEMENT TO ATTACHMENT B)
EVALUATION OF STORMWATER DEVELOPMENT REVIEW POLICIEES
AMENDMENT NO. 1
HOURLY RATE SHEDULES
A summary of current hourly billing rates is provided below:
CAD Technician/Designer - 1
CAD Technician/Designer - 2
CAD Technician/Designer - 3
Construction Manager - 1
Construction Manager - 2
Construction Manager - 3
Construction Manager - 4
Corporate Project Support - 1
Corporate Project Support - 2
Corporate Project Support - 3
Intern/ Coop
Professional - 1
Professional - 2
Professional - 3
Professional - 4
Professional - 5
Professional - 6
Technology Charge
95
123
151
89
115
135
170
90
109
145
55
111
134
152
175
205
234
OFFICB�1� �ECORD
CITY SE�CPtE'�ARII
�T'. dVARTH, T�
8.50
EXHIBIT "B-2"
Page 1 of 1
EXHIBIT "B-3"
(SUPPLEMENT TO ATTACHMENT B)
EVALUATION OF STORMWATER DEVELOPMENT REVIEW POLICIES
AMENDMENT NO. 1
PROFESSIONAL SERVICES FEE SUMMARY
Task Descri tion Fee
1 Pro'ect Mana ement and Meetin s $5,196
2 Summa Re ort $12,016
3 iSWM Revisions $27,550
4 Trainin Curriculum and Resource Develo ment $3,579
Total Fee $48,341
�FFICIe4L E�ECORD
CITV S�C���ARY
fFT'. dIIORT�I, �}� �
EXHIBIT "B-3"
Page 1 of 1
EXHIBIT "B-3A"
(SUPPLEMENT TO ATTACHMENT B)
EVALUATION OF STORMWATER DEVELOPMENT REVIEW POLICIES
AMENDMENT NO. 1
SUMMARY OF TOTAL PROJECT FEES
Consultinq Firm Prime Responsibility Amount Percent
PRIME ENGINEER:
Freese and Nichols, Inc. Engineering and Project Mgmt. $48,341 100%
SUB ENGINEER. shall participate in performing portions of the following Tasks:
Project Description Scope of Services Total Fee MWBE Fee Percent
N/A
N/A
N/A N/A
N/A
Non-MWBE Participation Scope of Services Total Fee Non-MWBE Fee Percent
N/A
�
N/A N/A
[�1l_1
�
__ - --- --
a ��PFIC9AL RECORD
�
` �I'fY' SE�RE'�ARY
�'. WOR4H, 'g'X
EXHIBIT "B-3A"
Page 1 of 1