CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home-rule
municipality (the "CITY"), and Wade Trim, Inc., authorized to do business in Texas, (the
"ENGINEER"), for a PROJECT generally described as: Westcliff Drainage Improvements
Project.
Article I
Scope of Services
A. The Scope of Services is set forth in Attachment A.
Article II
Compensation
A. The ENGINEER's compensation shall be in the amount of $524,244.00 as
set forth in Attachment B.
Article III
Terms of Payment
Payments to the ENGINEER will be made as follows:
A. Invoice and Payment
(1) The Engineer shall provide the City sufficient documentation, including but
nofi limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINEER will issue monthly invoices for all work performed under this
AGREEMENT. Invoices are due and payable within 30 days of receipt.
(3) Upon completion of services enumerated in Article I, the final payment of
any balance will be due within 30 days of receipt of the final invoice.
- ,�
City of Fort Worth, Texas ���,1 �—�---
Standard Agreement for Engineering Related Design Services C� �:
PMO Official Release Date: 1/28/2013 ��� A� �c�'���
Page 1 of 16
' ���������
�' �� b� 2 3 ��1� � - �� ��R��, '�'�
��'��fU� JUI, ---�
(4) In the event of a disputed or contested billing, only that portion so contested
will be withheld from payment, and the undisputed portion will be paid. The
CITY will exercise reasonableness in contesting any bill or portion thereof.
No interest will accrue on any contested portion of the billing until mutually
resolved.
(5) If the CITY fails to make payment in full to ENGINEER for billings contested
in good faith within 60 days of the amount due, the ENGINEER may, after
giving 7 days' written notice to CITY, suspend services under this
AGREEMENT until paid in full. In the event of suspension of services, the
ENGINEER shall have no liability to CITY for delays or damages caused the
CITY because of such suspension of services.
Article IV
Obligations of the Engineer
Amendments to Article IV, if any, are included in Attachment C.
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental
thereto.
B. Standard of Care
The standard of care applicable to the ENGINEER's services will be the
degree of skill and diligence normally employed in the State of Texas by
professional engineers or consultants performing the same or similar
services at the time such services are performed.
C. Subsurface Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be perFormed hereunder. The ENGINEER shall also advise
the CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO O�clal Release Date: 1/28/2013
Page 2 of 16
(2) In soils, foundation, groundwater, and other subsurFace investigations,
the actual characteristics may vary significantly between successive
test points and sample intervals and at locations other than where
observations, exploration, and investigations have been made.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that
could affect the total PROJECT cost and/or execution. These
conditions and cost/execution effects are not the responsibility of the
ENGINEER.
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in
ink on reproducible mylar sheets and electronic files in .pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on-site representatives or otherwise, do not make the
ENGINEER or its personnel in any way responsible for those duties that
belong to the CITY and/or the CITY's construction contractors or other
entities, and do not relieve the construction contractors or any other entity of
their obligations, duties, and responsibilities, including, but not limited to, all
construction methods, means, techniques, sequences, and procedures
necessary for coordinating and completing all portions of the construction
work in accordance with the Contract Documents and any health or safety
precautions required by such construction work. The ENGINEER and its
personnel have no authority to exercise any control over any construction
contractor or other entity or their employees in connection with their work or
any health or safety precautions.
(2) Except to the e�ent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the
progress or quality of the completed work on the PROJECT or to determine,
in general, if the work on the PROJECT is being performed in a manner
indicating that the PROJECT, when completed, will be in accordance with
the Contract Documents, nor shall anything in the Contract Documents or
the agreement between CITY and ENGINEER be construed as requiring
City oF Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1l28/2013
Page 3 of 16
ENGINEER to make exhaustive or continuous on-site inspections to
discover lat�nt defects in the work or otherwise check the quality or quantity
of the work on the PROJECT. If the ENGINEER makes on-site
observation(s) of a d�viation from the Contract Documents, the ENGINEER
shall inform the CITY.
(3) When professional certification of performance or characteristics of
materials, systems or equipment is reasonably required to perform the
services set forth in the Scape af Services, the ENGINEER shall be entitled
to rely upon such certi�cation to establish materials, systems or equipment
and performance criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
(1) The ENGINEER shall provide opinions of probable costs based on the
current available information at the time ofi preparation, in accordance
with Attachment A.
(2) In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate
PROJECT cost or schedule. Therefore, the ENGINEER makes no
warranty that the CITY's actual PROJECT casts, financial aspects,
economic feasibility, or schedules will not vary from the ENGINEER's
opinions, analyses, projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling
and observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
wark, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are not other
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Oate: 1/28/2013
Page 4 of 16
matters at issue between the CITY and the construction contractor that
affect the amount that shouid be paid.
H. Record Drawings
Recard drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for
any errors or omissions in ths information from others that is incorporated
into the record drawings.
I. Minority Business and Small Busin�ss Enterprise (MBE)(SBEj
Participation
In accord with the City of Fort Worth Business Diversity Ordinance Na.
20020-12-2011, as amended, the City has goals for the participation of
minority business enterprises and/or small business enterprises in City
contracts. Engineer acknowledges the MBE and SBE goals established for
this contract and its accepted written commitment to MBE and SBE
participation. Any misrepresentation of facts (other than a negligent
misrepresentation) and/or the commission of fraud by the Engineer may
result in the termination of this Agreement and debarment from participating
in City contracts for a period of time of not less than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiratior� of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers
and records of the ENGINEER involving transactions relating to this
contract. ENGINEER agrees that the CITY shall have access during normal
working hours to all necessary ENGINEER facilities and shall be provided
adequate and appropriate work space in order to conduct audits in
campliance with the provisions of this section. The CITY shall give
ENGINEER reasonable advance notice of intended audits.
(2) ENGINEER further agrees to include in all it� subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the
CITY shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 5 of 16
facilities, and shall be provided adequate and appropriate work space, in
order to conduct audits in compliance with the provisions of this article
together with subsection (3) hereof. CITY shall give subconsultant
reasonable advance notice of intended audits.
(3) ENGINEER and subconsultant agree fio photocopy such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for
the cost of copies at the rate published in the Texas Administrative Code in
effect as of the time copying is perFormed.
['�
(1)
INSURANCE
ENGINEER'S INSURANCE
a. Commercial General Liability — the ENGINEER shall maintain
commercial general liability (CGL) and, if necessary, commercial
umbrella insurance with a limit of not less than $1,000,000.00 per each
occurr�nce with a$2,000,000.00 aggregate. If such Commercial General
Liability insurance contains a general aggregate limit, it shall apply
separately to this PROJECT or location.
The CIiY shall be included as an insured under the CGL, using
ISO additional insured endorsement or a substitute providing
equivalent coverage, and under the commercial umbrella, if any.
This insurance shall apply as primary insurance with respecfi to
any other insurance or self-insurance programs afforded to the
CITY. The Commercial General Liability insurance policy shall
have no exclusions by endorsements that would alter or nullify:
premises/operations, products/completed operations, contractual,
personal injury, or advertizing injury, which are normally contained
within the policy, unless the CITY approves such exclusions in
writing.
ii. ENGIN�ER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b. Business Auto — the ENGINEER shall maintain business auto liability
and, if necessary, commercial umbrella liability insurance with a limit of
not less than $1,000,000 each accident. Such insurance shall cover
liability arising out of "any auto", including owned, hired, and non-owned
autos, when said vehicle is used in the course of the PROJECT. If the
engineer owns no vehicles, coverage for hired or non-owned is
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/26/2013
Page 6 of 16
acceptabie.
ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the business auto liability or
commercial umbrella liability insurance obtained by ENGINEER
pursuant to this agreement or under any applicable auto physical
damage coverage.
c. Workers' Compensation —ENGINEER shall maintain workers
compensation and employers liability insurance and, if necessary,
commercial umbrella liability insurance with a limit of not less than
$100,000.00 each accident for bodily injury by accident or $100,000.00
each employee for bodily injury by disease, with $500,000.00 policy limit.
ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant to this agreement.
d. Professional Liability — the ENGINEER shall maintain professional
liability, a claims-made policy, with a minimum of $1,000,000.00 per
claim and aggregate. The policy shall contain a retroactive date prior to
the date of the contract or the first date of services to be performed,
whichever is earlier. Coverage shall be maintained for a period of 5 years
following the completion of the contract. An annual certificate of
insurance specifically referencing this project shatl be submitted to the
CITY for each year following completion of the contract.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be delivered to the CITY prior to ENGINEER
proceeding with the PROJECT.
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, as its interests may appear. The term CITY shall
include its employees, officers, officials, agents, and volunteers as
respects the contracted services.
c. Certificate(s) of insurance shall document that insurance coverage
specified in this agreement are provided under applicable policies
documented thereon.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO O�cial Release Date: 1/28/2013
Page 7 of 16
d. Any failure on part of the CITY to request required insurance
documentation shall not constitute a waiver of the insurance
requirements.
e. A minimum of thirty (30) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) days notice shall be
acceptable in the event of non-payment of premium. Notice shall be sent
to the respective Department Director (by name), City of Fort Worth,
1000 Throckmorton, Fort Worth, Texas 76102.
f. Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A:V or greater, in the current A.M.
Best Key Rating Guide or have reasonably equivalent financial strength
and solvency to th� satisfaction of Risk Management.
g. Any deductible or self insured retention in excess of $25,000.00 that
would change or alter the requirements herein is subject to approval by
the CITY in writing, if coverage is not provided on a first-dollar basis. The
CITY, at it sole discretion, may consent to alternative coverage
maintained through insurance pools or risk retention groups. Dedicated
financial resources or letters of credifi may also be acceptable to the
CITY.
h. Applicable policies shall each be endorsed with a waiver of subrogation
in favor of the CITY as respects the PROJECT.
The CITY shall be entitled, upon its request and without incurring
expense, to review the ENGINEER's insurance policies including
endorsements thereto and, at the CITY's discretion; the ENGINEER may
be required to provide proof of insurance premium payments.
Lines of coverage, other than Professional Liability, underwritten on a
claims-made basis, shall contain a retroactive date coincident with or
prior to the date of the contractual agreement. The certificate of
insurance shall state both the retroactive date and that the coverage is
claims-made.
k. Coverages, whether written on an accurrence or claims-made basis,
shall be maintained without interruption nor restrictive modification or
changes from date of commencement of the PROJECT until final
payment and termination of any coverage required to be maintained after
final payments.
The CITY shall not be responsible for the direct payment of any
insurance premiums required by this agreement.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Deslgn Services
PMO Officlal Release Date: 1/28/2013
Page 8 of 16
m. Sub consultants and subcontractors to/of the ENGINEER shall be
required by the ENGINEER to maintain the same or reasonably
equivalent insurance coverage as required for the ENGINEER. When
sub consultantslsubcontractors maintain insurance coverage,
ENGINEER shall provide CITY with documentation thereof on a
cerkificate of insurance.
L. Independent Consultant
The ENGINEER agrees to perForm all services as an independent
consultant and not as a subcontractor, agent, or employee of the CITY.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure
in writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing
of any conflicts of interest that develop subsequent to the signing of this
contract and prior to final payment under the contract.
N. A�bestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
O. Permitting Authorities - Design Changes
If permitting authorities require design changes so as to comply with
published design criteria and/or current engineering practice standards
which the ENGINEER should have been aware of at the time this
Agreement was executed, the ENGINEER shall revise plans and
specifications, as required, at its own cost and expense. However, if design
changes are required due to the changes in the permitting authorities'
published design criteria and/or practice standards criteria which are
published after the date of this Agreement which the ENGINEER could not
have be�n reasonably aware of, the ENGINEER shall notify the CITY of
such changes and an adjustment in compensation will be made through an
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO O�cial Release Date: 1/28/2013
Page 9 of 16
amendment to this AGREEMENT.
P. Schedule
ENGINEER shall manage the PROJECT in accardance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City-Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of
the information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY wiil perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of
the CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids; permits and licenses
required by local, state, or federal authorities; and land, easements, rights-
of-way, and access necessary for the ENGINEER's services or PROJECT
construction.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 10 of 16
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches,
drawings, specifications, proposals, and other documents; obtain advice of
an attorney, insurance counselor, accountant, auditor, bond and financial
advisors, and other consuttants as the CITY deems appropriate; and render
in writing decisions required by the CITY in a timely manner in accordance
with the project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services ar of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks that may give rise to
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of
such materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos
is a result of ENGINEER's negligence or if ENGINEER brings such
hazardous substance, contaminant ar asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of
Article lV.E. regarding the ENGINEER's P�rsonnel at Construction Site, and
provisions providing contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third-Party Benefciaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain
City of Fort Worth, Texas
Standard Agreement for Engineering Related Deslgn Services
PMO Officlal Release Date: 1/28/2013
Page 11 of 16
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of,
in connection with, or resulting from the engineering
services perFormed. Only th� CITY will be the beneficiary
of any undertaking by the ENGINEER."
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third-party bene�ciaries.
(3) The CITY will include in each agreement it enters into with any other entity
or person regarding the PROJECT a pravision that such entity or persan
shall have no third-parly beneficiary rights under this Agreement.
(4) Nothing contained in this section V.H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
I. CITY's Insurance
(1) The C11'Y may maintain properly insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will ensure that Builders Risk/Installation insurance is maintained
at the replacement cost value of the PROJECT. The CITY may provide
ENGINEER a copy of the policy or documentation of such on a certificate of
insurance.
(3) The CITY will specify that the Builders Risk/Installation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
J. Litigation Assistance
The Scope of Services does nofi include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
K. Changes
The CITY may make or approve changes within the general Scope of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made through an amendment to this AGREEMENT with appropriate
CITY approval.
City of Fort Worth, Texas
Standard Agreement for Engineering Related Deslgn Services
PMO Officlal Release Date: 1/28/2013
Page 12 of 16
Article VI
General Legal Provisions
Amendments to Article Vi, if any, are included in Attachment C.
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not re�ponsible for damages or delay in performance
caused by acts of God, strikes, lockouts, accidents, or other events beyond
the control of the ENGINEER that prevent ENGINEER's performance of its
obligations hereunder.
D. Termination
(1) This AGREEMENT may be terminated only by the City for convenience on
30 days' written notice. This AGREEMENT may be t�rminated by either the
CITY or the ENGINEER for cause if either party fails substantially to perform
through no fault of the other and does not commence correction of such
nonperformance with in 5 days of written notice and diligently complete the
correction thereafter.
(2) If this AGREEMENT is terminated for the convenience of fihe City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or complete studies, plans,
specifications or other forms of ENGINEER'S work product;
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO O�cial Release Date: 1/28l2013
Page 13 of 16
b.) Out-of-pocket expenses for purchasing electronic data files and other
data storage supplies or services;
c.) The time requirements for the ENGINEER'S personnel to document
the work underway at the time of the CITY'S termination for
convenience so that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of all termination expenses. The
CITY'S approval will be obtained in writing prior to proceeding with
termination services.
E. Suspension, Delay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER
for the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors,
and ENGINEER's compensation will be made.
F. Indemnification
In accordance with Texas Local Governmenfi Code Section 271.904, the
�NGINEER shall indemnify, hold harmless, and defend the CITY
against liability for any damage caused by or resulting from an act of
negligence, intentional tort, intellectual property infringement, or
failure to pay a subcontractor or supplier committed by the ENGINEER
or ENGINEER's agent, consultant under contract, or another entity
over which the ENGINEER exercises control.
G. Assignment
Neither party shall assign all or any part of this AGREEMENT without the
prior written consent of the other party.
H. Interpretation
Limitations on liability and indemnities in this AGREEMENT are business
understandings between the parties and shall apply to all the different
theories of recovery, including breach of contract or warranty, tort including
negligence, strict or statutory liability, or any other cause of action, except for
willful misconduct or gross negligence for limitations of liability and sole
negligence for indemnification. Parties mean the CITY and the ENGINEER,
and their officers, emplayees, agents, and subcontractors.
City of Fort Worth, Texas
Siandard Agreement for Engineering Related Design Services
PMO Officlal Release Date: 1 /2 812 0 1 3
Page 14 of 18
I. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT,
its interpretation and performance, and any other claims related to it. The
venue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
J. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any
reasan to be invalid, illegal, or unenforceable in any respect, such invalidity,
illegality, or unenforceability will not affect any other provision, and this
AGREEMENT shall be construed as if such invalid, illegal, ar unenforceable
provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F.,
VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause.
K. Observe and Comply
ENGINEER shall at all times obs�rve and comply with all federal and Stafie
laws and regulations and with all City ordinances and regulations which in
any way affect this AGREEMENT and the work hereunder, and shall
observe and comply with all orders, laws ordinances and regulations which
may exist or may be enacted later by governing bodies having jurisdiction or
authority for such enactment. No plea of misunderstanding or ignorance
thereof shall be considered. ENGINEER agrees to defend, indemnify and
hold harmless CITY and all of its offic�rs, agents and employees from and
against all claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or its employees.
Article VII
Attachments, Schedules, and Signatures
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. The following attachments
and schedules are hereby made a part of this AGREEMENT:
Attachment A- Scope of Services
Attachm�nt B — Compensation
Attachment C- Amendments to Standard Agreement far Engineering Services
Attachment D - Project Schedule
Attachment E - Location Map
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 15 of 16
Executed and effective this the ���n-day of {�'�� 2013.
J
BY:
CITY OF FORT WORTH
uwGGO ,f�--.
Fernando Costa
Assistant City Manager
Date: 3
APPROVAL RECOMMENDED:
BY:
ENGINEER - � �
Wade rimy��ic. � / y
�� �
� � // /�
l � �.
��,(,/�.'�, ; �,�/�
,
David Speycher, �'P.E.
,
Vice President � �
Date: � � �, ' b � C� ��'
�f �;, l ; ,� ��
�
By: (.�J , �
Douglas . Wiersig, P.E.
Directo , Transportation/Pu ic Works
Department
APPROVED AS TO FORM AND M&C No.: C'- � 4�3 � v
LEGALITY
M&C Date: �7 H �3
By: / 1 1. i � �z<� G �� � ��� ����� -G1 �
-Douglas-W:�a�l�� �� r,� ti� �< <,�- lc,�� 1�
Assistant City Attorney
City Secretary
City of Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
PMO OKcial Release Date: 1/28/2013
Page 16 of 18
C�FFICIAL RECORD
� (�IiY SECRETARY
�
� �o ������ ��
ATTACHMENT "A"
Scope for Enaineering Desian Related Services for Storm Water Improvements Proiects
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project. Under this scope, "ENGINEER"
is expanded to include any sub-consultant, including surveyor, employed or contracted by
the ENGINEER.
OBJECTIVE
The objective of this project is to relieve flooding within the Westcliff North and Westcliff
South areas by constructing approximately 3500 feet of large storm water pipe, culvert
crossing, and detention pond as shown in Attachment E1.
WORK TO BE PERFORMED
Task 1.
Task 2.
Task 3.
Task 4.
Task 7.
Task 8.
Task 10
Design Management
Conceptual Design
Preliminary Design
Final Design
ROW/Easement Services
Survey Services
Plan Submittal Checklists
TASK 1. DESIGN MAtdAGEMENT.
ENGINEER will manage the work outlined in this scope to ensure efficient and effective use
of ENGINEER's and CITY's time and resources. ENGINEER will manage change,
communicate effectively, coordinate internally and externally as needed, and proactively
address issues with the CITY's Project Manager and others as necessary to make progress
on the work.
1,1.
Managing the Team
• Lead, manage and direct design team activities
• Ensure quaiity control is practiced in performance of the work
• Communicate internally among team members
• Task and allocate team resources
1.2
Communications and Reporting
o Attend a pre-design project kickoff/chartering meeting with CITY staff to confirm and
clarify scope, understand CITY objectives, and ensure economical and functional
designs that meet CITY requirements.
• Conduct review meetings with the CITY at the end of each design phase.
Conduct and document Monthly design team meetings,
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 1 of 22
• Prepare invoices, in accordance with Attachment B to this Standard Agreement and
submit monthly in the format requested by the CITY.
• Prepare and submit monthly progress reports in the format provided by the respective
CITY Department.
e Prepare and submit baseline Project Schedule initially, and Project Schedule updates
with a schedule narrative monthly, as required in Attachment D to this Standard
Agreement and according to the City of Fort Worth's Schedule Guidance Document.
• Complete Monthly M/WBE Report �orm and Final Summary Payment Report Form at
the end of the project.
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design.
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs, ENGINEER shall work with regulatory
authorities to obtain approval of the designs, and make changes necessary to meet
their requirements, as part of the design scope.
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub-consultants shall carry readily visible
information identifying the name of the company and the company representative.
ASSUMPTIONS
• The current schedule assumes the design project will have a 12 month duration
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices
C. Monthly progress reports
D. Baseline design schedule
E. Monthly schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly M/WBE Report Form and Final Summary Payment Report Form
G. Plan Submittal Checklists (See Task 10)
TASK 2. CONCEPTUAL DESIGN (30 PERCENT).
The Conceptual Design shall be submitted to CITY per the approved Project Schedule.
The purpose of the conceptual design is for the ENGINEER to identify, develop,
communicate through the defined deliverables, and recommend the design concept that
successfully addresses the design problem, and to obtain the CITY's endorsement of this
concept. ENGINEER will utilize concepts and criteria contained in the current CITY — iSWM
Criteria Manual for Site Development and Construction for conceptual planning and design.
Clty of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 2 of 12
ENGINEER wiil develop the conceptual design of the infrastructure as follows.
2.1. Data Collection
In addition to data obtained from the CITY, ENGINEER will research and make
efforts to obtain pertinent information to aid in coordination of the proposed
improvements with any planned future improvements that may influence the
project. ENGINEER will also identify and seek to obtain data for existing
conditions that may impact the pr4ject including; utilities, agencies (such as
TxDOT and railroads), CITY Master Plans, CITY drainage complaint files,
existing applicable drainage studies, FEMA floodplain and floodway maps,
existing models of project area (if any) and property ownership as available frorn
the Tax Assessor's office.
• Elevations at top of slab (FFE) for all buildings and homes assumed to be
flooding within the latest modeling of Westcliff North and South.
2.2. Drainage Computations
ENGINEER will delineate the watershed based on contour data and field
verification and document existing street, right-of-way and storm drain capacities
for the subject site. A drainage area map will be drawn at maximum 1" = 200'
scale from available 2-foot contour data with the contours labeled. Data source
and year will be provided by the CITY. Calculations regarding street and right-of-
way capacities and design discharges (5-year and 100-year frequencies) at
selected critical locations will be provided. Other frequencies as required by
iSWM criteria may be appropriate for outfalls and sensitive locations. Capacities
of existing storm drain will be calculated and shown. All calculations shall
conform to CITY criteria delineated in the current CITY iSWM Criteria Manual for
Site Development and Construction. All locations in the project area where 100-
year runoff exceeds available storm drain and right-of-way capacities shall be
clearly identified. The ENGINEER's responsibility includes recommendations for
improvements of the existing system as deemed reasonable and consistent with
CITY standards.
• Continue with alternative task to assist in the evaluation of the drainage areas.
• Task 1: Existing Conditions Evaluation and Finished Floor Elevation Survey
• Update Impacted Structures
• Field Survey of FFE
• Task 2: Sou4h Pipeshed Incremental Cost-Benefit Evaluation
• Obtain and Review Utility Information
• Phase 1-3 Model Simulation and Impacted Structure Analysis
• Phase 1-3 Alternatives Cost �stimate
• Task 3: North Pipeshed Incremental Cost-Benefit Evaluation
• Obtain and Review Utility Information
Clty of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 3 of 12
• Alternative 1-2 Model Simulation and Impacted Structure Analysis
• Alternative 1-2 Cost Estimate
2.3. Subsurface Utility Engineering
Provide Subsurface Utility Engineering (SUE) to Quality Level A, as described below.
The SUE shall be performed in accordance with Cl/ASCE 38-02.
Level A
• Expose and locate utilities at specific locations,
• Tie horizontal and vertical location of utility to survey control.
• Provide utility size and configuration.
• Provide paving thickness and type, where applicable.
• Provide general soil type and site conditions and such other pertinent information
as is reasonably ascertainable from each test hole site.
2.4. The Conceptual Design Package shall include the following:
• Cover sheet
• Drainage area map with supporting drainage computations in the CITY's
standard tabular format.
• Conceptual iSWM Checklist in accordance with the current iSWM Criteria Manual
for Site �evelopment and Construction, Include documentation that the
proposed storm water project will not impact upstream and downstream
properties.
• SUE Plan sheets sealed by a licensed professional engineer registered in the
State of Texas.
• Horizontal alignment (excluding profiles) of proposed storm water improvements,
including existing lot layout, streets, street right-of-way, proposed easements,
and existing utilities gathered during the SUE within the project limits.
• Propased phasing of water, sanitary sewer, street and drainage work
documented in both the project schedule and narrative form.
• Documentation of key design decisions (Project Decision Log).
• Estimates of probable construction cost.
AS�UMPTIONS
• All storm water calculations and design shall conform to the current CITY iSWM
Criteria Manual for Site Development and Construction.
• The SUE and SUE plan sheets shall be in accordance with Cl/ASCE 38-02.
• Ten (10) copies of the conceptual design package will be delivered. Drawings
will be half size (11" x 17").
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 4 of 12
• DWF files created from design CAD dr�wings will be upioaded to the designated
project folder in Buzzsaw
• All submitted documents and checklists will also be uploaded the designated
project folder in Buusaw
• ENGINEER shall not proceed with Preliminary Design activities without written
approval by the CITY of the Conceptual Design Package.
DELIVERABLES
A. Conceptual Design Package.
B. Conceptual iSWM Checklist
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
Preliminary plans shall be submitted to CITY per the approved Project Schedule.
ENGINEER will develop the preliminary design of the infrastructure as follows.
3.1. Development of Preliminary Design Drawings shall include the following:
• Cover Sheet
• Drainage area maps showing proposed improvements with drainage calculations
and hydraulic computations in accordance with the current iSWM Criteria Manual
for Site Development and Construction.
A Project Control Sheet, showing all Control Points, used or set while gathering
data. Generally on a scale of not less than 1:400. The following information shall
be indicated for each Control Point: Identified (existing City Monument #8901, PK
Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system,
and a referred bearing base. Z coordinates on City Datum only; descriptive
location (i.e, set in the centerline of the inlet in the South curb line of North Side
Drive at the East end of radius at the Southeast corner of North Side Drive and
North Main Street),
• SUE plan drawings.
• Preliminary iSWM Checklist in accordance with the current iSWM Criteria Manual
for Site Development and Construction
• Plan and profile drawings of proposed storm water improvements, including
existing lot layout with property ownership, streets, curb lines, driveways,
medians (if applicable), sidewalks, existing and proposed water and sanitary
sewer mains, existing utilities gathered during the SUE and existing utility
easements within the project limits.
3.2. Geotechnical Investigation/Pavement Design
• Soil investigations, including field and laboratory tests, borings, related
engineering analysis and recommendations for determining soil conditions will be
made. In addition to the above investigation�, borings and appropriate field and
laboratory analysis will be made at reasonable intervals along the project
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 5 of 12
alignment for the Contractor's use in determining soil conditions for preparing
bids and a Trench Safety Plan.
• The ENGINEER shali prepare a detailed geotechnical engineering study. The
study shall include recommendations regarding utility trenching and identifying
existing groundwater elevation at each boring.
3.3 Constructability Review
• Prior to the 60 percent review meeting with the CITY, the ENGINEER shall
schedule and attend a project site visit with the CITY Project Manager and
Construction personnel to walk the project. The ENGINEER shall summarize the
CITY's comments from the field visit and submit this information to the CITY in
writing.
3.4 Public Meeting
After the preliminary plans have been reviewed and approved by the CITY, the
ENGINEER shall prepare project exhibits, and attend public meeting to help
explain the proposed project to residents. The CITY shall select a suitable
location and mail the invitation letters to the affected customers. The ENGINEER
shall coordinate with CITY GIS staff to identify affected property owners/residents
and develop a spreadsheet listing addresses of those to invite to the public
meeting.
3.5 Utility Clearance
The ENGINEER will consult with the CITY's Transportation and Public Works
Department, Water Department, and other CITY departments, public utilities,
private utilities, and government agencies to determine the approximate location
of above and underground utilities, and other facilities (current and future) that
have an impact or influence on the project. ENGINEER wili design CITY facilities
to avoid or minimize conflicts with existing utilities, and where known and
possible consider potential future utilities in designs.
• The ENGINEER shall upload individual DWF files for each plan sheet of the
approved preliminary plan set to the designated project folder in Buzzsaw for
forwarding to all utility companies which have facilities within the limits of the
project. The DWF files should be created directly from the CAD files as opposed
to PDF files.
3.7 Traffic Control Plan
• Develop a traffic control plan utilizing standard traffic reroute configurations
posted as "Typicals" on the CITY's Buzzsaw website. The typicals need not be
sealed individually, if included in the sealed contract documents.
• Develap supplemental traffic control drawings as needed for review and approval
by the Traffic Division of the Transportation and Public Works Department.
These drawings shall be sealed by a professional engineer registered in the
State of Texas.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 6 of 12
ASSUMPTIONS
• All storm water caiculations and design shall conform to the current CIiY iSWM
Criteria Manual for Site Development and Construction.
• 2 borings at an average bore depth of 12 feet each will be provided.
• Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an
additional 2 project specific traffic control sheets will be developed.
• 10 full size (22' x 34") plans will be delivered for Utility Clearance.
• 1 full size (22"x34") plans will be delivered for Constructability Review.
• 8 half size (11" x 17") drawings will be delivered for Preliminary Design.
• DWF files created from design CAD drawings will be uploaded to the designated
project folder in Buzzsaw.
• All submitted documents and checklists will also be uploaded to the designated
project folder in Buzzsaw.
• ENGINEER shall not proceed with Final Design activities without written approval
by the CITY of the Preliminary Design plans.
DELIVERABLES
A. Preliminary Design drawings
B. Preliminary iSWM Checklist
C. Utility Clearance drawings
D. Geotechnical Report
E. Documentation of key design decisions (Project Decision Log)
F. Estimates of probable construction cost
G. Public Meeting exhibits
H. Traffic Control Plans
TASK 4. FINAL DESIGN (90 PERCENT) AfVD FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as
follows:
• Final draft construction plans and specifications inctuded iSWM Construction Plan shall
be submitted to CITY per the approved Project Schedule.
• Final iSWM Checklist in accordance with the current CITY iSWM Criteria Manual for Site
Development and Construction.
• The ENGINEER shall submit a final design estimate of probable construction cost with
the final design plans submitted. This estimate shall use ONLY standard CITY bid items.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 7 of 12
• Following a 90% construction plan review meeting with the CITY, the ENGINEER shall
submit Final Plans (100%) to the CITY per the approved Project Schedule, Each plan
sheet shall be stamped, dated, and signed by the ENGINEER registered in State of
Texas.
ASSUMPTIONS
• All storm water calculations and design shall conform to the current CITY iSWM Criteria
Manuaf for Site Development and Construction.
• 8 half size (11" x 17") and 1 full size (22" x 34") drawings and 2 specifications will be
delivered for the 90% design.
• A DWF file for the 90% Design will be created from design CAD drawings and will be
uploaded to the project folder in Buzzsaw.
• 1full size (22" x 34") drawings and 2 specifications will be delivered for the 100% design.
• A DWF file for the 100% Design will be created from design CAD drawings and will be
uploaded to the project folder in Buzzsaw.
DELIVERABLES
A. 90% construction plans specifications.
B. 100% construction plans and specifications.
C. Final iSWM Checklist
D. Documentation of key design decisions (Project Decision Log).
E. Detailed estimates of probable construction cost for the authorized construction project,
including summaries of bid items and quantities using the CITY's standard bid items and
format.
F. Original cover mylar for the signatures of authorized CITY officials.
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and easements as outlined
below, per scoping direction and guidance from the CITY's Project Manager.
7.1. Right-of-Way Research
• The ENGINEER shall determine rights-of-way and easement needs for
construction of the project. Required temporary and permanent easements will
be identified based on available information and recommendations will be made
for approval by the CITY.
7.2 Right-of-WaylEasement Preparation and Submittal.
• The ENGINEER shall prepare documents to be used to obtain right-of-way and
permanent andlor temporary easements required to construct the improvement�.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23l2012
Page 8 of 12
• The documentation shall be provided in conformance with the checklists and
tempiates available on the CITY's Buzzsaw site.
An on the ground survey of the property under the direct supervision of a
Registered Professional Land Surveyor and will prepare a certified survey plat
and written property description of said tract. The survey will be prepared in
accordance with the "Manual of Practice for Land Surveying in the State of
Tex�s," 2006 Revised Eleventh Edition and will conform to the specifications for
a Category 1A, Condition II Survey, This survey is for the lot at the northeast
corner of Suffolk Drive and the BNSF Railway, We will not perform an abstract of
title on the subject tract but instead will rely on a current commitment for title
insurance to be provided by the client.
7.3 Temporary Right of Entry Preparation and Submittal
• Prior to construction, the ENGINEER shall prepare, mail and obtain Temporary
Right of Entries from landowners. It is assumed that letters will only be required
for land owners adjacent to temporary construction easements or who are
directly affected by the project and no easement is required to enter their
property.
• The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Buzzsaw site.
ASSUMPTIONS
Right-of-Way research includes review of property/right-of-way records based on
current internet based Tarrant Appraisal District (TAD) information available at
the start of the project and available on-ground property information (i.e. iron
rods, fences, stakes, etc.). It does not inctude effort for chain of title research,
parent track research, additional research for easements not included in the
TAD, right-of-way takings, easement vacations and abandonments, right-of-way
vacations, and street closures.
DELIVERABLES
A. Right-of-Way, easement exhibits and metes and bounds provided on CITY forms
B. Temporary Right of Entry Letters
TASK 8. SURVEY.
ENGINEER will provide survey support as follows.
8,1 Design Survey
• ENGINEER will perform field surveys to collect horizontal and vertical elevations
and other information needed by ENGINEER in design and preparation of plans
for the project. Information gathered during the survey shall include topographic
data, utilities as required by the SUE, structures, trees (measure caliper, identify
overall canopy, and have qualified arborist identify species of trees), and other
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 9 of 12
features relevant to the final plan sheets. Existing drainage at intersections will
be verified by field surveys. Spot elevations will be shown on intersection layouts
with cross slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans shall include the
following:
— A Project Control Sheet, showing ALL Control Points, used or set while
gathering data. Generally on a scale of not less than 1:400:
— The following information about each Control Point;
a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a
referred bearing base. Z coordinate on CITY Datum only.
c. Descriptive Location (Ex. Set in the centerline of the inlet in the South
curb line of North Side Drive at the East end of radius at the Southeast
corner of North Side Drive and North Main Street).
8,2. Temporary Right of Entry Preparation and Submittal
• Prior to entering property for field survey, the ENGINEER shall prepare, mail and
obtain Temporary Right of Entry from landowners.
• The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Buzzsaw site.
8.3. Construction Survey is not included within this agreement.
However the Surveyor will be available to the CITY on matters concerning the
layout of the project during its construction
DELIVERABLES
A. Copies of field survey data and notes signed and sealed by a licensed surv�yor.
B. Drawing of the project layout with dimensions and coordinate list.
TASK 9. PERMITTING.
ENGINEER will provide permitting support for the CITY to obtain any and all agreements
and/or permits normally required for a project of this size and type, as follows.
9.1. Storm Water Pollution Prevention Plan
For projects that disturb an area greater than one (1) acre, the contractor will be
responsible for preparing and submitting the Storm Water Pollution Prevention
Plan (SWPPP) with appropriate regulatory agencies. The ENGINEER will
prepare the iSWM Construction Plan according to the current CITY iSWM
Criteria Manual for Site Development and Construction with will be incorporated
into the SWPPP by the contractor.
9.2 Railroad Permit
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 10 of 12
• Negotiating and coordinating to obtain approval of the agency issuing the
agreement and/or permits
• Completing all forms/applications necessary
• Submitting forms/applications for CITY review
• Submitting revised forms for agency review
• Responding to agency comments and requests
ASSUMPTIONS
• Permit preparation will begin after approval of the Conceptual Design.
DELIVERABLES
A. Storm Water Pollution Prevention Plan
B. Railroad Permit
TASK 10. PLAN SUBMITTAL CHECKLISTS
Engineer shall complete and submit Plan Submittal Checklists in accordance with the
following table:
PLAN SUBMITTAL CHECKLIST REQUIREMENTS
Street Water Traffic Tra�ic Tra�c
Traffic Tra�c Control Control Control
Storm Storm Lights /Sewer o 0 0
Attachment "A" Signal Engineering 30 /0 60 /0 90 /o
T e ( Submit All Water Water (Submit (Submit
yp ( (Submit All
@ 30%) 30% 60% 3I0°/��0 60°/@ � 60%) Required for all work in City
ROW
X
X
X
*If included in street project
ADDITIONAL S�RVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existinq Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services
described in the tasks above. However, ENGINEER can provide these services, if
needed, upon the CITY's written request. Any additional amounts paid to the
ENGINEER a� a result of any material change to the Scope of the Project shall be
agreed upon in writing by both parties before the services are performed. These
additional services include the following:
• Preparation of documents nor negotiation of easements or property acquisition.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre-qualification, bid protests, bid rejection
and re-bidding of the contract for construction,
Clty of Fort Worth, Texas
Attachment A
PMO Release Date: 07/23/2012
Page 11 of 12
• Bid Phase services and Construction Phase services
• Construction management and inspection services
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
e Services related to damages caused by fire, flood, earthquake or other acts of
God.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
e Performance of miscellaneous and supplemental services related to the project
as requested by the CITY.
City of Fort Worth, Texes
Attachment A
PMO Release Date: 07/23/2012
Page 12 oF 12
ATTACHMENT B
COMPENSATION
Design Services for
Westcliff Drainage Improvement
City Project No. 01669
Lump Sum Project
Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $ 524,244 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total
Project Fees. The total lump sum fee shall be considered full compensafiion for
the services described in Attachment A, including all labor materials, supplies,
and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment,
I1. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item III. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B, The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
III. Progress Reports
A. The ENGINEER shall prepare and submit to Vibhuti Pandey, Project Manager a
designated representative of the Transportation and Public Works, monthly
progress reports and schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 1 of 3
�
TnsHntours erseacoown
oes�yn services tor
so�n we�anr o�.ireye npro��M,
MAYO� AND COUNCIL COMMUNi��4TION MAP
01669 - Westcliff Drainage
3,0001,500 0 3,000 Ft
��
�� �
� ���,����
� ' ;�
�� � � �
� � � ��
• � "_„� , r,�.
' . . 1 .. •
DETAIL OF PROJECT LOCATION
M&C Review
. �� � �� �:;
� �. €
Page 1 of 1
Officiai s'�te of the City of F'o�t L�Iarth, l�exas
F"���r �,�c��t`rt�
COUNCI� ACTION: Approved on 7/9/2013
� ,,:�, , .x ,�� � -� �„ �� _�� .. , .,_� .... ..�� .�.._ ��.�.�. ,,.. ,. . � ,.�_ �� w �, .,. �
DATE:
CODE
7/9/2013 REFERENCE
NO..
C TYPE:
**C-26320 LOG NAME
CONSENT PUBLIC
HEARING:
20SW_WESTCLIFF
DRAINAGE_DESIGN
NO
SUBJECT: Authorize Engineering Agreement with Wade Trim, Inc., in the Amount of $524,244.00 for
the Design of the Westcliff Drainage Improvements Project (COUNCIL DISTRICTS 3 and
9)
� � ��,��-� ,_, �w: �.�...�������,����. �..� ���� � ���_.....� �.�� ,�� �.�_�..������ .�;._�a� ����������. �� � �.2.,..,�.� �,,a��
RECOMMENDATION:
It is recommended that the City Council authorize the execution of an engineering Agreement in the
amount of $524,244.00 with Wade Trim, Inc., for the design of the Westcliff Drainage Improvements
Project.
DISCUSSION:
The Engineering Agreement recommended by this Mayor and Council Communication will provide for
the design services for the Westcliff Drainage Improvements Project, which is needed to reduce the
probability of home flooding in the Westcliff North and Westcliff South Drainage Basins (south of
Berry Street, north of Bilglade Road, east of Manderly Place and west of Cockrell Avenue).
Wade Trim, Inc., was selected to design this project based on a Request for Qualifications (RFQ)
process. They propose to perform the design services for a lump sum fee of $524,244.00. Staff
considers the fee to be fair and reasonable for the scope of services proposed.
Funding for this project is being provided from revenue bonds in the Stormwater Capital Projects
Bond Fund.
M/WBE Office: Wade Trim, Inc., is in compliance with the City's BDE Ordinance by committing to 16
percent SBE participation on this project. The City's SBE goal on this project is 14 percent.
This project is located in COUNCIL DISTRICTS 3 and 9.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Stormwater Capital Projects Bond Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
P227 531200 203280166930 $524,244.00
Submitted for City Manaqer's Office bv:
Oriqinatinq Department Head:
Additional Information Contact:
ATTACHMENTS
01669 WestclifF Drainaqe Map.pdf
Fernando Costa (6122)
Douglas W. Wiersig (7801)
Vibhuti Pandey (2424)
http://apps.cfwnet.org/council�acicet/mc_review.asp?ID=18595&councildate=7/9/2013 7/25/2013