CITY OF FORT WORTH ���� �o LI � 5�'C'L, I
CHANGE ORDER REQUEST
CHANGE ORDER NO. DATE ^.^.�. "'� PROJECT NO.
1 February 4, 2014 City Project
02073
PROJECT DESCRIPTION: Village Creek WRF Bar Screen Bldg. 3 Rehabilitation
P258-541200-701300207380
CITY SECR�TARY CONTRACT NO.
44458
ORIGINAL CONTRACT AMOLJNT .......................................... $ 520,000.00
�XTRAS TO DATE ............................................... $ 0.00
CREDITS TO DATE .............................................. $ 0.00
CONTRACTCOST TO DATE ............................................................................................................................................................... $ 520.000.00
AMOUNT OF PROPOSED CHANGE ORDER .................................................................................................................................... $ 49.387.00
REVISEDCONTRACTAMOLJNT .......................................................................................................................................................$ 569.387.00
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS .............................................................................................................. $ 25,000.00
ADDITIONAL FUNDING (IF NECESSARY) ...................................................................................................................................... $ 24.387.00
REMAINING FUNDS AVAILABLE FOR CHANGE ORDER ............................................................................................................$ 0.00
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: modify/change the contcact as shown below to provide a complete,
functional, and operational plant. These changes are as listed below. Further descriptions and Cost Breakdowns are attached.
CMR-001- 84-HDPE-Foul Air Duct- The Original Contract included a scope of work and a cost to repair one joint in the 84-inch HDPE Foul Aic Duct fi•om
the Pcimary Clarifiers to the Odor "B" Scrubber System. Time has elapsed sinOtthe remedy was bid, and the joint has deteriorated to a degree that the
original repair method proposed is insufficient to stop the water leak. During attempts to make the contracted repaic, a second joint was found to be leaking,
The Contractor proposed an alternative method to repair both joints using dry oakum and hydrophilic polyurethane foam.
The ConU•actor shall repair rivo leaking joints. The Contractor submitted a cost for this work of $49,387.00. The Contractor has requested no additional days.
'I'OTAL COST FOR CHANGE ORDER NO. 1---------------��,;:---------------------------------------------------------------------------------------------------$49,387.00
�'Q�''G � �!���
�
� o�
o°
j � _ o°
s
—� � $
' / /L ��U
�.��y �.: � s���icy
ADDITIONAL AI'PROVED TIIv1E TO DATE
None
_� DATE
Z�,l�I�I'
DATE
, 62/t`����
o'�
o�
��
��
_.� �CA�
It is understood and agreed thet the acceptance of 8�is Change Order Uy the contractor constitutes an nccord and satisfac[iou and represents payment in full (both in time and money) for TII
costs xrising out of, or incidental to, the Clienge Order.
ORIGINAL CONTRACT TIn4E
120 Calendar L
CONTRAC'POR
Ark Cont •
b1An R/CO
Ma l�
�ST DIjiECTC
� /�
Andr w T:
T',L
Fer anao C
Assistan't Director �` � I' �� I i'
l+„a�I"�V�N6. Yu�l�O�Q
�I?Y 3ECitETAFdV
�1'.1IVOIR'i'H, '�'�
APPROVED CON7'RACT TIME TO DATE ADDITIONAL TI�7E FOR THIS CHANGE ORDER
120 Calendar Days NONE Calendar Days.
FIELD ENGINEER
Amy Robinson, P�, C
DIRECTOR/MAN� GD�T.
/
CITY ATTORNLI}'
/ � nnT� ' couNcir. ncTioN (rn aEQuiaE��: ^
S1Sia� 1C ty Manager 2/ZS/� ❑ APPROVED ❑ DISAPPROVED ❑ OTHER�/H
' R�C�IVED FEB
����� �
DA7'E
DATE
2 � � �l. (
DATE
2014