Loading...
HomeMy WebLinkAboutContract 43084-A1 AMENDMENT No-1 CONTRACT NO, TO CITY SECRETARY CONTRACT No. 43084 WHEREAS, the City'" of F' rt Worth (CITY) and URS Co c.,,j,-t j , (ENGINEER) made and entered into City Secretary Contract No. 3 the CONTRACT) which was authorized by M&C C-2 1 can the 21 day cif February, 20.12 in the amount of' $ 143, 680- 00; and WHEREAS, the CONTRACT involves engineering services for the I.... 11oin.g project .- necessary Carten Street Drainage DnprovemenLs.- and, WHEREAS, it has become to execute Amendnent No. . t- the CONTRACT to include an increased scope of work and revised fee NOW THEREFORE, CITY and ENGTNEER, acting here -hereli-n by and t hreugl-I their my authorized representatives, enter into the following ng a :eement, which amends the CONTRACT : 1. Article I of the NTRA T s amended to include the additional engineering services specified in a proposal dates February 12, 2013, copy of which is attached hereto and i nc rporated herein . The cost City for the additional design services e to be perfoirmed by Enginecr totals $59,995. c See Attached Funding Breakdown Sheet, Page 3- 2 . Article 1I of the CONTRACT is amended to provide for an increase 1 the fee to be paid to Engineer for all work and services performed med under the Contract as amended, so that the total fee paid by the City for all work and services shall be an amount of $203, 675 .00 . 3 . All ether provis,ions of the Contract, which a ,e net. ex. rsl... ended herein, shall remain in full force and effect . EXECUTED and EFFECTIVE as of the date ,fast written by a signatory, below City o,f Poet Worth Professional Services Agreement Amendment Template P O Official Release 8/1/2012 Page 1 of'3 FOFFICIALRECORD CITY SECRETARY E C 0 UN - T On MWORTH,TX A P PROV 'D C.ity of Fort Worth ENGINEER URS Corporation Fernando Costa D:ev Rastogi , PE" Assistant. Cl Vice PresldenL DATE#- DATE.- APPROVAL RECOMMENDED,: Dougla weirls-Ig F)irector, Depiartment of T anspor't:atlion Eyre and Public 'Wo;r APPROVED AS TO FORM AND LEGALITY: Dates A.c.;,sisitant Cat'y Attorney ATTEST: A a ary J. Ka 0(jo0o0opo City Secre y kL City of Fort Worth OFFICIAL RECORD Professional services Agreement:Amendment rl"emplate CITY SECRETARY PM0 Official Retease 6/l/2012 Page 2 of 3 no WORTH9 TX FUNDING BREAKDOWN SHEET City Secretary No. 43 8 Amendment No. 1 Department nd-Account-Center Amount T'PW P227 531200 20428006-73 3 $5,9r 995 . Total : $59, 995 - 00 City of Fort Wow Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 t UM February 12, 2013 Mr. Michael R. Perkins, P.E. Stoma Water Management Division Transportation &Public Works Department City 'Foirt Worth 900 Monroe Street, Suite 404 Fort Worth, Texas 76102 Re imo Re nest for Amendment No. I —Addiftional Design Services for Storm Drain Improvements CA TS ST. DRAJNAGE IMPROVEMENTS City Project No. 00673 URS Project No. 253,351260 roar Mr. Perkins: This letter is .for requested additional engineering services for the above referenced project. The services for Amendment No. I are in addition to or modify our current scope of services, A description of the additional services and associated fees are pirovide�d betow. A detailed breakdown of the proposed, fee for these additional. services is also attached. ADDITIONAL ENGINEERING DESIGN SERVICES 1. Pro 0 ect Management - Provide pro'�ect management services for the preparation of additional storna, J J drain design, water line lowering design, headwall improvements, and oversIght of sir bconsultants. URS Corporation Services — $3)540,010 Subconsultant,*,Miark-up (10%) = $ 355.00 Total Additional.Manage rent Services = $39895.00 A-1 16 2. Additional Storm Dra*n Design 6ervices,-Per City's direction during the 30% design review meeting held on. 12/11/12, the following additional design services will be performed by the URS design team, a. "Phase 2" Storm Drain Design: The proposed stom-1 drain on Janice Lane will be extended to a point approximately 2,25-ft, south of the,intersectioia with No St. as shown on, the 30% design submittal. This extension involves preliminary and final, design of an additional 825 ft. of storm drain and approximately mately four additional storm inlets. The additional storm drain design includes performing hydraulic calculations, hydraulic gradient line, and inlet computation tables to be included on the construction plans. The traffic control plan and URS Corporation 130:0 SulmrnA Avenue,Suite 600 Fort Worth,TX 76102 Tel:81.7.390.1000 Fax:817.882.9462 www,urscorp.com 11 UIARtb"" Mr. Michael R. Perkins, P.E. FebrUary 12, 2013 Page 2 of 4 erosion control plan will require expansion to include the additional area of c ns,t,ruction for the "Phase 2" portion of the project, U Corporation Se-vices $44,5 0.00 EBG Engineering Services, $ 211300.00 Phase 11 Storm Drain Design $46,850.00 b. ",Phase, 2" Water Line .'Lowering Design: The additional storm drain laterals will conflict with the existing 8" water line in Janice Lane. Four additional. water tine lowering locations are included in the additional design efforts. ECG Engineering Services := $_j_,_Z50.00 44 4 0 V-41 Phase 211 Water.Line Lowering juesi gn 1,250.010 c. Headwall Improvements: A new vertical headwall will be, designed to replace, the existi,ng flared in wall, north of Meadolwbroo,k Drive., Minor grading design will be perfortned on th.e channel immediately north of the headwall. The existing 6'X5' box drain will be I -th extended approximate y six feet noi . to accommodate the proposed tangential sidewalk align-ment revision along the north side of Meadowbrook Drive. URS Corporation Services, = $ .000.00 Headwall Improvements $ 8,000.00 Total Additional Design Services = $56,100.00 The proposed fee for the services as described above does not include the following services-, 1. Addi.tional toplographic survey,, as it is assumed that existing Topographic survey is sufficient to r *de the above mentioned design services. p 2. Permit preparation, services. 3. Any Additional Geo-Technical exploratory boffin other than the eight borings included in the y . original contract., 4. Easement preparation. 5. Paving improvements beyond the normal limits as defined by the City Standard pavenient trench repair detalls) of the proposed storm drain improvements and water,line lowering,, 6. Any services not specifically stated above. We therefore request a contract amendment to 'increase the lump sum fee amount by$59,,9950, I JKJL-a, J Mr. Michael R. Perkins) P.E. February 12, 201,3 Page 3: of 4 Summary-Amendment No. I The additional fees to provide the above mentioned additional services are as follows: EBG Gorrondona & Arlington Engineering Assoc, Blueline Description U Fee JWIE3E) (M/WBE) (M/WBE) MW BE % Project Management $3,895.00 $0.0o $0.00 $0.00 0.00 % Surveying $0.00 $0.00 $ .0�O $0.010 0.00 % Engineerinv Services $52,5501,010 $35550.00 $0-00 $0.00 61.76 %, %.o� Reproduction $0.00 $0.00 $0.00 $0.00 0.00 % Total Fee $56,445.00 $3,550.010 $0100 $0.00 6.29 % Original Contract Amount $, 143,,68o Amendment No. 1 $1 5939915 -Requested heriei'n I'lotal Revised Lump Sum Amount $ 203,675 The MW-BE participation goal assigned to the original contract is 19.0%. In order to maintaint at goal, URS proposes to transfer the,Phase 1 design services for preparation of traffic control plans, erosion I control plans, and water line lowering to EBG Engineen,ng for an agreed I'Limp, sum fee of$7,850-00. This will provide EBG,Engineering with a,more significant role "in the project. The total M/'WBE fee participation for this project including Amendment No. I and the afore-mentiolned transfer of desUY'n services to EBG Engineering will be $ 8,934.00 ($2 ",534.00 + 3,550.00 + $71,850.00 = $38,934.00) or a total M/WBE percentage of 19.00%. Please contact me if you have any questions regarding this contract amendment. Thank you for the opportunity to continue providing professional engineering services to the City of Fort Wortb. UR� S Mr. Michael R. Perkins, P February 12, 2013 Page RS ORPO A T ION Douglas C. Mikeworth, P.E. w`"wr r S e m or Project Man er C m 401 f i �II G pub I I I I� to LL B I� I I I I I I f I.8 wi 8 I raw � I I L f' 711 1 I� CL S 0 C Z " ..� co to co *WON l C04 _ I � I �I I I I I I � I ;I � I 01 d I I to co C4 w— y LIR Mo ,Il 0. 10"'A"Oly of Fort Worth,, Texas L101 19 Mayor and Councial Co unication, COUNCIL ACTION-0 Approved on 5/14/2013 DATE: Tuesday, May 14, 2013 REFERENCE NO.,- **C_26248 LOG NAME: 20SW—CARTEN STREET—DESIGN—AMENDMENT#1 &BUL.CT: Authorize Execution of Amendment No. 1. to City Secretary Contract No. 43,084, an Engineering Services Agreement with URS Corporation, in the Amount of$59,995.00 for the Design of Stormwater Utility Pro ect—C art en Street Erosion Protect ion and Drainage Improvements, Thereby Increasing the Total Contract j Amount to$,203,6,75.0 COUNCIL DISTRICTS 4 and 5) _UCQN1MLN)2AT1ON0 It is recommended that the City Council authorize execution of Amendment No., I to City Secretary Contract No.4` 084,an engineering services Agreement with URS Corporation, in the,amount of$59,,995.00 for the design of stormwater utility project—Carten Street erosion protection and drainage improvements,thereby increasing the total contract amount to$203,675.00. DI .SLL7SS1QN* The Amendment recorrunended by this Mayor and Council Communication will provide for the design of additional, storm drain, replacement of an existing headwall and relocation of a City waterline outside of the original project limits. The need to expand project lin-6ts was identified during preliminary analysis. On January 21, 2012, the City Council authorized an Agreement with URS Corporation,to provide prelirm*nary analysis and engineering (MSC' C-25441). URS Corporation, proposes to perforrn the Amendment design services for a lump sum fee in the amount of$59,995.00. Staff considers the fee to be fair and reasonable for the scope of services provided. Funding for this pro j. is being provided from revenue bonds in the Stormwater Capital Projects Bond Fund. M Office: URS Corporation, agrees to maintain its initial M/WBE commitment of 19 percent that it made on the original Agreement and extend and maintain that same NM BE commitment of 19 percent to this first Arnendment. Therefore,, URS Corporation, remains in compliance with the City's M/WBE Ordinance and attests to its comm.itment by its signature on the Acceptance of Previous MAVBE Comraitment,form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICTS 4 and 5, Mapsco 80G. FISCAL INFQRMATIQNO The Financial management Services Director certifies,that funds are available in the current capital budget, as,appropriated,of the Stormwater Capital Projects Bond Fund. 0 F CENTERSO IQ EundL&c%ountXcnters FRQM JEandIACOUDIAIDWEN 'L , 221,.. 531... 2 6210 S59,225 IL 0 r -f ilk Fernando Cos inafing.Department a Douglas W. Wiersig (780 . . 'Addliffln,a] . n n . : Russell,Pose (789 1) AT T 2. i 673 Ma j2. df 3 23 'ark Design n ant R. v.erification .Qf fUn.j I!L:T 4— , cx