COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
COUNTY OF TARRANT §
City Secretary
Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Duke Realty BEMC Burleson Development, LLC
Address, State, Zip Code: 14241 N. Dallas Pkwy., Ste. 1000 � Dallas, TX 75254
Phone, E-Mail: (972) 631-6700
Authorized Signatory/Title: Jeffrey D. Turner, Regional EVP
Project Name: Emerus Emergency Hospital (Baylor Emergency Medical Center at Burleson)
Project Location: 12500 S. Freewa
Plat Case No.: FS-007-705 Plat Name: McAlister Square
Mapsco: 119K Council District: 6 City Project No: 02069
CFA:2013-027 DOE:6997
To Ue completed b staff:•
Received by: Date: �/ � / � �
OPFICIAL RECOfdD
i �A'�"Y S�CIR�V�RY
�"� [�C�6�i'�d '�X
a�C�IV�n JUI� 1'� �D13
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended fiom time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no redtiction in the
collateral until the Project has been completed and the City has officially
accepted the infrastr�.icture. Developer fi�rther acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub-contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A��
Sewer (A-1) _X Paving (B) � Storm Drain (B-1) X, Street Lights &
Signs (C)_.
2
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its conhactor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastrlicture, and a maintenance bond
in the name of the City for one hundred percent (100°Io) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
3
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre-Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City-issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
4
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brotight for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, its contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, its contractors, sub-contractors, officers,
agents or employees, whether or not such iniuries, deccth or dama�es are
caused, in whole or in nt�rt, bv tlae alle,�ed neQli�ence of the Ciiy of
Fort Worth, its of�cers, servants, or employees.
M. Developer will fiirther require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or rtot sucla
iniuries, death or damaQes are caused, in wlaole or in part, bv tlae
�clleQed neQli�ence of the Citv of Fort Worth, its of�cers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
5
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with a nonexclusive assignment of all war�anties given by the
contractor, whether express or implied. Further, Developer agrees that all
contracts with any contractor shall include provisions granting to the City the
right to enforce such contracts as an express intended third party beneficiary of
such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
Developer's share of the total constniction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the Developer's share of the total constrt�ction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
Developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the Developer
may request that this Agreement be extended for one year. If the community
C�
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be stibject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement, as
such period may be extended pursuant to subsection (i) above, the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to catise the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
7
Cost Summary Sheet
Project Name: Emerus Emergency Hospital (Baylor Emergency Medical Center at Burleson)
CFA No.: 2013-027
DOE No.: 6997
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
wili ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments wiil be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 8,520.00
2. SewerConstruction $ 1,692.00
Water and Sewer Construction Total $ 10,212.00
B. TPW Construction
1. Street $ -
2. Storm Drain $ 81,060.00
3. Street �ights Installed by Developer $ -
TPW Construction Cost Total $ 81,060.00
Total Construction Cost (exciuding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub-Total for Water Construction Fees
$ 91,272.00
$ 204.24
$ 204.24
$ 408.48
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub-Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee
Bond = 100°/a
ent = 100%/ Holds Plat
r/Sanitary Sewer= 125%
5/Storm Drain = 125%
Letter
$ 3,242.40
$ 1,62120
$ -
$ -
$ 4,863.60
$ 5,272.08
Choice
X
IG
�
8
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Deve per has exe�`u ed this
instrument in quadruplicate, at Fort Worth, Texas this day of ` L''1�_..:�----
, 20� "�.
CITY OF FORT WORTH - Recom�nended by:
Water Department
����� - � 6 � l �l � �
�Wendy Chi-Babulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
i
, � � ��
T � ���
Douglas W. Black
Assistant City Attorney
M&C No. �'�/ ��
Date:
ATTEST: _�
i
a J. K s
City Secre r
ATTEST:
Signature
(Print) Name:
Transportation & Public Works Department
,�.
f ,C� �. �.�
Dougla� . Wiersig, P.E.
Director
Approved by City Manager's Office
�I+�
Fernando Costa
Assistant City Manager
rb�{
� �y��
�
��"
Duke Realty BEMC Burleson Development, LLC
By: Duke Realty Limited Partnership
its Managing Member
By: Duke Realty Corporation
its General Partner - �
�
i"
�
Signature
Print Name: Jeffrey D. Turner
Title: Regional EVP
�PFICIAL REC�R�A
CI'�X S��6t�TA��
IFT'. �l141�T�� �'�
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
� Location Map
� Exhibit A: Water Improvements
� Water Estimate
� Exhibit A-1: Sewer Improvements
� Sewer Estimate
❑ Exhibit B: Paving Improvements
❑ Paving Estimate
� Exhibit B-1: Storm Drain Improvements
� Storm Drain Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
�
LOCATI ON M AP
NOT TO SCA�E
MAPSCO NO. 119 K
COUNCIL DISTRICT 6
DOE NO.
.
..
CITY PROJECT NO. 02069
d�El „9f 31tl�IHd
� � �
�•,
� a
�m�
W�Q
wo` �
�m
z�o
<
� /
Z �w�
o?�
o - a�
� NUd
�
m
� '
w
�
w /
/ /
/
/ QQ
\ �
\ts � m
d� + oo W �
s ` W^ /
ry� m /
.9 r� °��r'. Wo�^ �
h7� NV �
� �j�
a WQd' <
wv a�a.
3Z
om
a tl � � a
6M1�� ��
\ � �
/ \ e a.
<.. � � .
/` e\ � a � � � �
� ��a'`�'��i6
� <�,
� �.
� Il � �—' e l�. �oo.
\ a'., `. �- J Yy °
i � � ��� ��. `
�
W \ a ����
U I a/; e�vY �'). <
a ,�, ,
� � � d.
13 � �- 6.
" IW ^ �y�y
o I' � I \ � d " ��°
,��, Jl
la I sf��
( \� / ��% � \� a
'
i
� �
/ /
/ /
/
_—.... -" __....__ /
— //
1 I
I I
—� - ❑ 9 �
'- e �J -: . . a
�a �
. � — . —. '--..-F-�
- -2i31Vh1=8 'X3 � � ��
� W �o�
� m � I w��
3 �d�
�pi w 3Za
�5:�1
T�
NU
w�� \ WI �
\
\
1- TW \
WFW03h \
V^
K
��aaU
a .
rc�iQap� \
��O
a
3�v�imo
°- w
�io�
pwoo \
�
�
I \
. . , ' !J . � a . . '�
� e a a °�.
° 1
�
w
%/%%// �
�
L �
� �
�- � �
� �
-�-� � � � �
� � � � �
N
p� -'-' a -'-' a
� . �' o . �' o
� W � W �
I
I
�
(/')
�
Z
W
�
W Q
O �—
� m
� _
� X
W
�
W
F--
�
U�
Z�
4
rn
(n N
� �
� � m
U� M
� �
� � m
Q � �
� z
�2S � z
Z °
�a
� �
^' � N
L.L
W N �
� j W
Zo <
� �G �
d
� V
W �
/ �
ON
N
� �
/
I �
,
�
\ \
\\ � `.
1 \ � J
NZ � a
J( W
�W
�
�i X
� w W
x� O
ww
ci N
N
i0
~ J
W �
Z =
Oa
U�
\\ \
��
\
�\
.m
6\\
\\
� dJL ,9£ 31V�Itld
� � � �
� �—
�tt
. eoa sxs xa ° _
�_<=�°-- . �—_
— ,�<— , � — .� e ,��. < _-
.e a l� —�. J d . J;� .d . .. .
�
— — �a �—_= � —
w—
<o�
z
0
m=
W N m
< /
wNm
<Q
0
U pz~ /
O • az
-� �v c� a
�
� �
�
�
�
w /
/ /
� —
�
_d ° �,
— a�
�
w
�//�/� z
�
V /
�
z
w
W
O
� I
� Q
� ��-�r�
W W
� _
W X
� w
�
�
Q
, f--'
Q �../ �
� Z Q
� M
� �
� h
w Ql
Q M p�l
V� M
o LL
O^
��m
N��
z = Q =
= z
� � °� a z0
� � � � � �o �a
� (n (/') (/') (/) (n � �
�1 � � Q Q W v=i �
Q� 'X 'X � � 0 > u+
_l W W � � Z o ¢
Q d �
�
I ' w �
I O � �
ON
� � � �
/
I �
�
� � I
� ,�
�
: �
� IN .
N�p�j.
o ej<i
W X J
�
� `
��
�
�Jde\\
�6d�\
i
� � d��.ss 3ivniad
�
� � �
a�vm .e 3ivniaa
� w�
�p
�o�
2 N�
�m Qa�
�"�n 3za
I w^
�or x�
W�FU
� Q K
I a
VQ-Z
m
N U
w
w
w
�Q z
� o
Q
M W c�i
h
w
Q � O
� t3i � a
� �
'
�
0
za
"i /
mm
�Qa /
-m
allo
d
s� pz~ /
m
J NU�
�
m
N
�
�
/
/ /
I
I I
, t ,a
•i � /
— _ _ _ _ �.
B
i /
U —
�
i�
O X
� � in
F- c�
U Z
I/ Z F=
Z �
, �U W�
�
�' �.
d
,�
\\
m w
w
.- wa�: . ������ �
Q N U _/J �''i
F: a
��3�a / j N
m
\�U a'' �
� \ •j � a. Q 0
� � O
\�. a� � Q �
� Q
�, a\ e d � ' x O
� W � �
� � � � ��
� / /
/ W \ _J
� J I I
� � Oa
� m I �= II
a �
� �3 X
N N
Im
o I� I K I
a la I
I �
I
F I
I \
I dJ\
3
' 1 b�i\
/ /
/ /
/ / / /
�
, eoa cxs x� ° -- _ _ �
, — �— � —¢ — . �—�--e e � , , � a '' ; <
� a—,_ . ° '�'s�e aci..--,-� �;'��^, --� :_--�� a . � a. . �e a ... � . . . .
° ... . � :ea .. � ° . ° .. . .. . � — -� — � �—� — . . a�rn
83I97�H R3— �in — "j— — — —� _ �1VM=8 'X3 � � I �Q
wo� {3 "'�h-
ti � � W N�
w�=irr \ m 3 da
zad � W iol iia
<w - m
�a WIII \ wI I Nu
N V
�
�
z
W
W\
/
�..{� I
� m.
� �
z °°
QN =
L_I... '�. I
Q w
G�/
L_[_
O
� Z R
� M
O�
(n N
�.:.� �
� M p�1
VoM
O `� LL
�
�%% � m
a�
Q ~ �
c Z
� a Z
O o �
� ,�
W cn W
Q � �
> W
Zo ¢
Q � �
�
'.. V
W �
� �
J �
ON
N
� �
/
�
I. ._�... .�
CFA QUANTITY MATRIX
PUBLIC WATER IMPROVMENTS SHEET NO. ITEM TOTA� UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT C.4 C.15
t a^ DR14 E.n. 35 35 $22.00 $770.00
2 6" DR14 E.A. 'IH �$ $2�.�� $360.00
3 8" GATE VALVE E.A. 2 2 $�,325.00 $2,650.00
4 G° GATE VALVE E.A. � 1 $915.00 $915.00
5 2"SERVICETOMETERBOX EA. Z Z $"I,HSO.00 $3,%OO.00
6 CONNECC TO 8" STUB-OUT EA. � 1 $125.00 $125.00
WATER SUB-TOTAL $8,520.00
PUBLIC SANITARY SEWER IMPROVEMENTS SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM N0. BID ITEM UNIT C.4 C.15
7 6" SDR35 Lt 4 4 $23.�� $92.0�
8 CONNECTTOEX.S.S.NIANHOLG EA. 'I � $'I,EOO.00 $�,EOO.00
SANITARY SEWER SUB-TOTAL $1,692.00
PUBLIC STORM SEWER IMPROVEMENTS SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT C.4 C.15
9 CONNECTTOEX.STORMI-BOY E.A 1 1 $�,���.�� $�,���.��
10 5' X 3' HEADWALL EA 1 1 $3,950.00 $3,950.00
� t s� x s� sox cuLVExT [..F. 390 390 $148.00 $57,720.00
12 36"RCP t,.F. 15 15 $�2.�� $�,�8�.0�
is za^xcr L.F. Z5 25 $45.00 $1,125.00
ta Tvrs°x°xocxiurxnr L.F. 154 154 $35.00 $5,390.00
15 CONCRETEFLUME L.F. 6 6 $130.00 $�80.��
16 REMOVBEXISTINGSTORMBO:C L.F. 3�Z 372 $2�.�� $7,440.00
17 REMOVE EXISTING HEADNALL L.F. � 1 $850.00 $$50.��
18 REMOVE CONCRETE APRON L.F. � 1 $650.00 $650.00
19 SOD REPLACEMENT LS O � $'IOO.00 $'I OO.00
20 TRENCH SAFETY LS 1 $250.00 $ZSO.00
2t TESTING LS 1 $725.00 $�25.��
STORM SEWER SUB-TOTAL $81,060.00
PUBLIC IMPROVEMENTS TOTAL $91,272.00
00 4? 43
I3lD PROPOSAL
Pxge I of I
SECTION 00 42 43
PROPOSALFORM
UNIT PRICE BID
Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Unit of B�� Unit Price Bid Value
No. Section No. Measure Quantity
1 8" DR 14 Water pipe LF 35 $22.00 $770.00
_ _ __
2 6" DR 14 Water pipe . LF 18 $20.00 $360.00
_ :_ _.
3 8" Gate Valve EA 2 $1,325.00 $2,650.00
4 6�� Gate Valve .. . _ _ _ . ,EA _ 1 $915.00 . $915.00
5 2" Domestic Service with Meter & Backflow EA 2 $1,850.00 $3,700.00
6 Connect to 8" Stubout C�C(�J�� EA 1 $125.00 . $125.00
_ .
7 6" SDR 35 Sanitary Sewer Pipe LF 4 $23.00 $92.00
8 Connect to Existing Sanitary Sewer Manhole EA 1 $1,600.00 $1,600.00
__ _. _ _ _ . _ _. _ _ __. _. _ _ _ _
9 Connect to Existing Storm Junction Box EA 1 $1,000.00 $1,000.00
10 _ _ 5'x3' Headwall _ _EA _ 1 $3,950.00 $3,950.00
11 5'x3' RBC _ �F 390 $148.00 $57,720.00
_ .. __ _ _
12 36" RCP LF 15 $72.00 $1,080.00
_ _ _ _ __ _ _ __ __ _
13 24" RCP LF 25 $45.00 $1,125.00
14 Type "R" Rock Rip Rap SF 154 $35.00 $5,390.00
15 Concrete Flume LF 6 $130.00 $780.00
__ __
16 Removal of Existing 5'x3' RBC LF 372 $20.00 $7,440.00
_ _ _. . _ _.
17 Removal of Existing 5'x3' Headwall EA 1 $850.00 $850.00
_ __ _ _ ..
18 Removal of Existing Concrete Apron EA 1 $650.00 $650.00
_.. _ _ . .. . .,,
19 Sod Replacement LS 1 $100.00 $100.00
__
20 Trench Safety LS 1 $250.00 $250.00
_ ___ ___ _ _ _
_ 21 Testing __ ___ __ ___ _ _LS 1 $725.00 _$725.00
Total Bid $91,272.00
END OF S�CTION
CITY OF FORT \VORTH
STANDARD CONST2UCTION SPECIFICATION DOCUMENTS
Fomi Revised 20120130 (�42 43 - Proposnl Fomi Unit Price.xls