Loading...
HomeMy WebLinkAboutContract 43147-CO4 (2)FORT WORTHw City of Fort Worth ClTY SEC�ETARY� 1 r Chan e Order Re uest ����� �° "��-" g q Project Name 2008 CIP District 4 Contract 4A City Sec # 43147 Client Project #(s) #01232 DOE # 6141 Original Contract Amount Extras to Date Change Order Submittal # � Dept. TPW Water Sewer $1,024,988,41 $408,176.35 $558,513.70 $ $17,372.50 $9,575.00 $8,534.00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Chanue Order Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) 7.75 ,733.75 Date 11/13/2013 Contract Time Totals CD a91,678.46 365 635,481.50 18 67,047.70 $2,027,159.96 383 $0.00 $12,978.00 56 67,047.70 $2,040,137.96 439 15,721.20 $125,346,98 $7,187.20 $89.865.48 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.43% MAX ALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) $2,489,598.08 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change order is required to add items that were required on the project for which there were no original bid items established. Item #48 Remove Concrete Driveways By Flatwork Crew is a new item required to cove the additional driveway removals beyond the limits shown on the plans, This item covers the addtional cost required to perform the removals with the concrete crew in lieu of performing them at the time of the excavation and all other removals. This work is performed as instructed in the field by the inspector. It is typically required to properly tie- in the slope of the driveway or due to the condition of the existing driveway at the plan limits. This change order also includes the atldtional contract time due to the delay associated with the gas service line conflicts on Lambeth. Upon mobilizing on Lambeth it was discovered that the existing gas services were in conflict therefore the contractor moved off the project until the gas company completed the relocates. � �_,.� � ~� � '� � =�6��, �_ � ��-� �ald P. Gonzal�s, A , � � � � �,� — �� : �,��� DUobUO��� � � �FFICIAL l�,��ORD �0� �ECRETARY �" ����, �'X I N C L O O 0 � Q � �- O d � O O � ..�+ Of 'cU � � c J x � 3 � L� � � m � Z .o � a a � U � y _ � ' � : . i .. : w 0 .ti ai m a c 0 a Q v O � � u N C t O � y o- 3� �� o� LL � O � �i O1 fU � A c � x � z 3 � {� � � � d � a` � - U � a s N 'a i � N � C t� _ U � t w � W 3 0 -� Y � a� m w m � � O O O ; E9� � 0 � � o; � L d � L 0 d � c �a � U � � 0 .� a� L a CF'JJ Cha�ige Order Approval St-COApp01 FORTwORTH�H� c�ty of Fo�t wo�tr, Change Order Request Approval (Change Order Breakdown Available in Links) Page 2 of 5 For Change Order Submittal No.: CO#4 (On Line) Change Order No.: St-COApp01 Date Started: 2013-1i-15 City Sec. No.: 43147 Date Due; 2014-01-04 Project Name: Cleckler, Dogwood, Lambeth Contract 2008 CIP 4A 01232 DOE Numbers: Project Numbers: DOE 6141 Project 2008CIP: Pavement Reconstruction and Water/Sewer Main Description: Replacements on Portions of Cleckler Ave, Dogwood Ln and Lambeth Ln Project Manager: Gopal Sahu Contractor: Satbile & Winn, Inc. City Inspector: Kim Brenz COUNCIL ACTION (If Required): M&C Log Name: 202008 CD4 CONTRACT 4A M&C Number: C-25556 M&C Date: 2012-04-10 COST AND DAYS SUMMARY: Req uested Department: Cost($) Fund Account Center: Days: T/PW $ 12,978.00 56 Total Cost: $ 12,978.00 Total Requested Days: 56 Approval Status; �F�F��FI�) ,��;,,., . ; i� i�l,i https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 12/10/2013 CFW Change Order Approval St-COApp01 Approved: Yes Comments: User: Tara Fishback Date: 2013-11-15 11:02 AM Approved: Yes Comments: User: Jerry Henderson Date: 2013-11-15 3:57 PM Approved: Yes Comments: User: Tara Fishback Date: 2013-11-19 9:15 AM Approved: Yes Comments: User: Tara Fishback Date: 2013-11-19 2:51 PM Approved: Yes Comments: User: Jerry Henderson Date: 2013-11-19 3:18 PM Approved: Yes Comments: User: Tara Fishback Date: 2013-11-19 3:21 PM Approved: Yes Comments: User: Najib Fares Date: 2013-11-19 4:04 PM Approved: Yes Comments: User: Todd Estes Date: 2013-11-19 10:05 PM Approved: Yes Comments: User: Doug Wiersig Date: 2013-11-19 4:17 PM Approved: Yes Comments: Page 4 of 5 https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&Proces... 12/10/2013 CFW Change Order Approval St-COApp01 User: Doug Black Date: 2013-11-19 4:53 PM Approved: Yes Comments: User: Fernando Costa Date: 2013-1i-19 11:18 PM Action Required: Page 5 of 5 https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&Proces... 12/10/2013