HomeMy WebLinkAboutContract 44712 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § City Secretary Contract No. 411 WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements. Developer and Project Information: Developer Company Name: Jabez Development, L.P. Address, State, Zip Code: 9001 Airport Freeway, Ste. 400 I North Richland Hills, TX 76180 Phone, E-Mail: (214) 876-2559 I bruce.french@historymaker.com Authorized Signatory/Title: Bruce French, Vice President Project Name and Brief Description: Water, Sewer, Paving, Drainage, and Street Light Improvements to serve Presidio Village South Ph. 2B Project Location: Loreto Dr. & Gutierrez Dr. Plat Case No.: FP-013-001 Plat Name: Presidio Village South Council District: 2 City Project No: 02080 CFA: 2013-050 DOE: 7011 To be completed by staff. Received by: �' �'`�1 Date: I OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 1 R 'CtI VE i AUG 19 2013' NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor haspaid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be, completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (Al X , Sewer (A-1) X, Paving (B) X , Storm Drain (B-1) X_, Street Lights & Signs (C) X . E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in 2 the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth, its officers. servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries. death or damages are caused. in whole or in part. by the alleged negligence of the City of Fort Worth, its officers. servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 1 YEAR i. If applicable, the City's obligation to participate (exclusive of front foot charges) in the cost of the Improvements shall teitiiinate if the Improvements are not completed within one (1) years; provided, however, if construction of the Improvements has started within the one year period, the developer may request that the CFA be extended for one additional year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of one (1) year from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of one (1) year if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Presidio Village South Ph. 2B CFA No.: 2013-050 DOE No.: 7011 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 137,701.25 2. Sewer Construction $ 159,053.00 Water and Sewer Construction Total $ 296,754.25 B. TPW Construction 1. Street $ 332,133.20 2. Storm Drain $ 64,127.00 3. Street Lights Installed by Developer $ 45,125.00 TPW Construction Cost Total $ 441,385.20 Total Construction Cost (excluding the fees): $ 738,139.45 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 5,935.09 D. Water/Sewer Material Testing Fee (2%) $ 5,935.09 Sub -Total for Water Construction Fees $ 11,789.40 E. TPW Inspection Fee (4%) $ 15,850.41 F. TPW Material Testing (2%) $ 7,925.20 G. Street Light Inspsection Cost $ 1,805.00 H. Street Signs Installation Cost $ 980.00 Sub -Total for TPW Construction Fees $ 26,560.61 Total Construction Fees: $ 38,350.01 Choice Financial Guarantee Options, choose one Amount (ck one) Bond = 100% $ 738,139.45 'Completion Agreement = 100% / Holds Plat $ 738,139.45 'Cash Escrow Water/Sanitary Sewer= 125% $ 370,942.81 'Cash Escrow Paving/Storm Drain = 125% $ 551,731.50 'Letter of Credit = 125% w/1yr expiration period $ 922,674.31 X 7 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and sai Dev 1 per has exec this instrument in quadruplicate, at Fort Worth, Texas this day o , 20 CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-Bbulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: ice i'�� Douglas W. Black Assistant City Attorney M&C No. WA - Date: ATTEST: ary J. City Secret ATTEST: Rtfix Sigi> Lure (Print) Name: 5 t(i'( C ec/ 3e ( I Transportation & Public Works Department Douglas ViSY. Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager DEVELOPER: Jabez Development, L.P. By: BNMJR, Inc. its General Partner 8 Signature Print Name: .+u Title: V �'`„ OFFICIAL RECORD CITY SECRETARY FT. WORTH TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements ® Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storni Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 9 HARMON ROAD HERITAGE TRACE PKWY SITE . PRESIDIO VISTA -4 ;t) a G) rn -1 N TARRANT PKWY NORTH NOT TO SCALE OWNER / DEVELOPER: III P E LOTO N SOUTH JABEZ DEVELOPMENT, L.P. PHASE 2B 9001 NORTH AIRPORT FREEWAY, SUITE 400 NORTH RICHLAND HILLS, TEXAS 76180 PHONE: 817-507-1223 LAND SOLUTIONI 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 DATE: JULY. 2013 LOT 46X BLOCK 10 \44)41*N\ \\NS. / aESID!�HASt 2A rS / / /��.../ /1 / / / ril J LJ / PRIVATLOT64XSP(\ E BLOCK 18 \ N 900 0 NDRTN FDR1 WDRTN, L1 s` PRIVATE OP' LOT 64,.. BLOCK 18\ SPACE LEGEND PROPOSED GATE VALVE EXIST GATE VALVE PROPOSED FIRE HYDRANT EXIST FIRE HYDRANT NOTE: ALL PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE NOTED EXHIBIT A - WATER 32 33 34 35 36 37 36 39 40 41 42 43 44 45 10DE 9d11TF 12 13 IAa1 41 14 LOT 2. BLOCK 8 ( 52 VI- ' -VH- -- - 1 2 3 37 36 35 7 L_ ova 0 NORTH 200' PRESIDIO VILLAGE OWNER / DEVELOPER: I111I PELOTON SOUTH JABEZ DEVELOPMENT, L.P. 5751 KROGER DRIVE Mil LAND SOLUTIONS SUITE 185 GRAPHIC SCALE DATE: JULY, 2013 PHASE 2B KELLER, TX 76244 PHONE: 817-562-3350 9001 NORTH AIRPORT FREEWAY, SUITE 400 NORTH RICHLAND HILLS, TEXAS 76180 PHONE: 817-507-1223 P E LOTO N pLAND SOLUTIONS 5751 KROGER DR. 5TE. 185 1 KELLER, TX 7624. 1817.562.3350 CFA ESTIMATE FOR: Presidio Village Phase 2B 7/31 /2013 EXHIBIT A - WATER IMPROVEMENTS ITEM # DESCRIPTION UNIT QTY UNIT PRICE TOTAL) 2010 8" PVC Water Line LF 2,549 30.00 76,470.00 2020 8" Gate Valve & Box EA 4 900.00 3,600.00 2030 Fire Hydrant Assembly (includes 6" GV) EA 4 3,200.00 12,800.00 2040 Cast Iron Fittings TON 1.3 3,500.00 4,550.00 2050 Concrete Blocking - Type B CY 3.4 100.00 340.00 2060 Water Service, 1"Tap to Main EA 86 150.00 12,900.00 2070 Water Service, 1" Line LF 2,638 8.00 21,104.00 2080 Connect to Existing Water Line EA 2 500.00 1,000.00 2090 Meter Box COFW Standard - Residential EA 86 50.00 4,300.00 2100 Trench Safety LF 2,549 0.25 637.25 TOTAL WATER $137,701.25 ) I ' LOT 46X BLOCK 10 15 MI in 0 32 33 34 35 36 37 38 2 3 4 5 s C.I.L4 ti‘G IL,,g 9A - MI 11111 11111111,11111111Nel • 19 21 90 NO6114 FORT WORTH,L13- Ss \\ RtVATE \ \ LOT 64 SPACE BLOCK 1 8 \ / 21 22 23 • 24 25 2 MN 6 2 7 MffillIMANIIII! MI 25 OZ) 6 27 39 40 41 8 42 9 10,F 5046 SIOIOSA 1 111 28 •111•••••••14.11.111•110MIMMOIN INIPM 20 43 44 45 12 13 Il 16 ••• ••••,...magone,..ma 23 38 18 3 4 LyAL,AWAI 4 19 *3 14 5 EII 11 11. witver tis0 44- 10 40 V50 55 56 57 58 59 60 2 63 25 26_11 27 28 I 11Dt..-0.-111111=10. 1111F-C. LEGEND • PROPOSED SEWER LINES --s-- - EXIST SEWER LINES SDR 26 SERVICES NOTE: ALL PROPOSED SANITARY SEWER LINES ARE 8" UNLESS OTHERWISE NOTED EXHIBIT Al - WASTEWATER 30 46 47 50 51 52 2 3 37 36 35 64 65 00 HE r8 Loci< 0 ir_OT 2' 1 4 7 8 9 "410 NORTH 200' GRAPHIC SCALE PRESIDIO VILLAGE OWNER / DEVELOPER: 11111 PE LOTON SOUTH JABEZ DEVELOPMENT, L.P. 1111 LAND SOLUTION, 5751 KROGER DRIVE PHASE 2B KELLER, TX 76244 SUITE 185 PHONE: 817-562-3350 9001 NORTH AIRPORT FREEWAY, SUITE 400 NORTH RICHLAND HILLS, TEXAS 76180 PHONE: 817-507-1223 DATE: JULY, 2013 1 PE LOTO N I'' LAND SOLUTIONS 5751 KR06ER DR. STE. 185 I KELLER, TX 76246 1 817.562.3350 CFA ESTIMATE FOR: Presidio Village Phase 2B 7/31/2013 EXHIBIT Al - SANITARY SEWER IMPROVEMENTS ITEM # DESCRIPTION UNIT QTY TOTAL 3010 8" Sanitary Sewer Main (SDR-35 PVC) LF 2,334 32.00 74,688.00 3020 8" Sanitary Sewer Main (SDR-26 PVC) LF 180 42.00 7,560.00 1 3030 Manhole - Std 4' Dia EA 12 2,500.00 30,000.00 1 3040 Manhole - Vacuum Test EA 12 50.00 600.00 1 3050 Manhole - Interior Protective Coating VF 13 175.00 2,275.00 3060 Sewer Service - 4" Tap EA 86 150.00 12,900.00 3070 Sewer Service - 4" Line w/ Cleanouts (SDR - 35) LF 1,075 9.00 9,675.00 3080 Sewer Service - 4" Line w/ Cleanouts (SDR - 26) LF 1,370 11.00 15,070.00 3090 Trench Safety LF 2,514 1.00 2,514.00 3100 Post Construction CCTV LF 2,514 1.50 3,771.00 TOTAL SANITARY SEWER $159,053.00 ) 111 32 33 34 VIL— 2A Dillmulrini we mu rommirminum Net r remok, I.64 - "NI \\N_ / / \L_ J \\ PRIVATE OPEN SPACE \ um* 64x \\ BLOCK 18 \ \ \ \ \ \ \ \ \ \ \ \ \ \ WORTH, 90 NORTH FORT LTO LEGEND 17 18 19 0 - 21 22 IMMINIMIrdr.....10•111,1.11.1Mr-NYIEs \ \ ..1tIVATIERP64 SPACE \ \ BLOCK 18 \ \\ 29' B-B / 50' ROW (TYP) 23 24 SIDEWALK BY DEVELOPER SIDEWALK BY HOMEBUILDER H.C. RAMPS BY DEVELOPER EXHIBIT B - PAVING 23 24 35 36 111 28 37 36 39 40 41 28 30 15 29 42 43 44 45 9 0:1R,F ROO 12 010,4ASE 1 30 ICII 34 0 44=Arl!41110. (t) 4 2 3 I 4c1 13 14 0 INN 11:11 1111 1111 46 51 52 2 3 37 36 35 19 20 '01 22 23 24 ! 25 N 55 56 57 58 59 60 111 11,12P,Rils45 2 4 5 7 9 0 1"D NORTH 200' 111111111111111 GliRAIPIHIC SCALE PRESIDIO VILLAGE OWNER / DEVELOPER: 11111 PELOTON SOUTH JABEZ DEVELOPMENT, L.P. PHASE 2B 9001 NORTH AIRPORT FREEWAY, SUITE 400 NORTH RICHLAND HILLS, TEXAS 76180 PHONE: 817-507-1223 IIIII LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 DATE: JULY, 2013 PE LOTO N pLAND SOLUTIONS 5751 KROGER OR. STE. 185 I KELLER, TX 762,4 1817.562.3350 CFA ESTIMATE FOR: Presidio Village Phase 2B 7/31/2013 EXHIBIT 3- PAVING IMPROVEMENTS ITEM # DESCRIPTION UNIT QTY TOTAL 5010 6" Concrete Pavement w/ 7" Curbs 29' B-B SY 9,414 29.00 273,006.00 5020 6" Lime Stabilized Subgrade SY 9,992 2.85 28,477.20 5030 Hydrated Lime (30#/SY) TON 150 165.00 24,750.00 5040 4', 4" Conc. Sidewalk LF 75 12.00 900.00 5050 B/F Ramps EA 4 1,000.00 4,000.00 5060 Remove Barricade and Connect to Existing Header EA 2 500.00 1,000.00 TOTAL PAVING $332,133.20 \ \ LOT 46X BLOCK 10 ( I --) •-, \ \ /' % , \ \ \ \ \ \ NPRIVATE OPEN SPACE \ \ s LOT 64X \ \ \ BLOCK 18 \ \ N % \ \ S \ \ \ \ \ \ \ \ \ /7 5 Ell MISINIMINIIIIININT MN \ \ \\ LTO. S \ 90 NORTH "Ri WCwi H' S \ \\ \\ \ ‘FltVATE OP SPACE s LOT 64 \ \\ \ \ NBLOCK 18\ ) LEGEND 13 1 P P f I ININIIIMINNIIIMMI IN 11111=111.111111!. 21 20 21 23 24 25 ..110“10= NI NU 11111•11111M.IMI! 26 26 27 11941*F9V40 114 4**1419 20 28 30 30 32 41(19 MI 2 3 I 4c1 55 PROPOSED STORM DRAIN INLET EXIST STORM DRAIN INLET PROPOSED STORM DRAIN MANHOLE PROPOSED STORM DRAIN HEADWALL EXHIBIT B1 - STORM DRAINAGE 56 2 4 7 9 57 58 59 60 10 ine 22 23 18 62 24 2 3 37 36 35 : ; II ) r"" 63 "40 0 NORTH 200' GRAPHIC SCALE SUITE 185 PHASE 2B KELLER, TX 76244 PHONE: 817-562-3350 IiIiF LAND SOLUTIONS JABEZ DEVELOPMENT, L.P. 5751 KROGER DRIVE 9001 NORTH AIRPORT FREEWAY, SUITE 400 NORTH RICHLAND HILLS, TEXAS 76180 PHONE: 817-507-1223 PRESIDIO VILLAGE OWNER / DEVELOPER: 11111 PELOTON SOUTH DATE: JULY, 2013 1 PELOTON oLAND SOLUTIONS 5751 KROGER DR. STE. 185 $ KELLER, TX 76244 1 817.562.3350 CFA ESTIMATE FOR: Presidio Village Phase 2B 7/31/2013 EXHIBIT 31- STORM DRAIN IMPROVEMENTS IrrEm# DESCRIPTION UNIT QTY TOTAL 4010 39" RCP LF 134 90.00 12,060.00 1 4020 36" RCP LF 32 85.00 2,720.00 4030 27" RCP LF 60 65.00 3,900.00 4040 24" RCP LF 53 55.00 2,915.00 4050 21" RCP EA 43 50.00 2,150.00 4060 Engineered Channel SY 980 6.00 5,880.00 4070 10' Curb Inlet EA 2 2,200.00 4,400.00 4080 15' Curb Inlet EA 3 3,200.00 9,600.00 4090 27" Headwall EA 1 2,500.00 2,500.00 4100 39" Headwall EA 1 3,500.00 3,500.00 4110 4' Square Manhole EA 1 2,800.00 2,800.00 4120 18" Thick Rock Rip Rap SY 160 65.00 10,400.00 4130 Trench Safety LF 1,302 1.00 1,302.00 TOTAL STORM DRAIN $64,127.00 // LOT 46X BLOCK 10 111111111111111171... -- AGES° VIL"-e- 2A / r / / \ \ --- cs / \\ \ \ \ k... \ \ \ \ P R I VAT LE0OrP6E4Nx S P E \\ BLOCK 18 \\ N Ss \ \ '\ \ MI WI MI11,.11111(.1 \ \ " \ \ \ \\ w • \\ so NoRTH FORT 0004, \ \ LOT 64 K 18 •RkVATEL00cP i —I. LEGEND SPACE • PROPOSED STREET LIGHTS 0 EXIST STREET LIGHTS EXHIBIT C - STREET LIGHTS 42 43 44 45 10GE SOO 12 13 I L LsAE 14 15 32 33 34 35 36 37 38 39 40 41 ••• 49 50 51 1 2 52 3 37 36 35 6 111PD 0 NORTH 200' PRESIDIO VILLAGE OWNER / DEVELOPER: 11111 PELOTON SOUTH JABEZ DEVELOPMENT, L.P. S PHASE 2B SUITE 185 9001 NORTH AIRPORT FREEWAY, SUITE 400 NORTH RICHLAND HILLS, TEXAS 76180 PHONE: 817-507-1223 11111 LAND SOLUTIONS 5751 KROGER DRIVE KELLER, TX 76244 GRAPHIC SCALE DATE: JULY. 2013 PHONE: 817-562-3350 P E LOTO N mLAND SOLUTIONS 5751 KR06ER DR STE. 185 1 KELLER, TX 76244 1817.562.3350 CFA ESTIMATE FOR: Presidio Village Phase 2B 7/31 /2013 EXHIBIT : - STREET LIGHTING IMPROVEMENTS DESCRIPTION UNIT QTY TOTAL 6010 #10 THHW Aluminum Elec Conductor LF 1,875 3.00 5,625.00 1 6020 Rdwy Ilium Foundation TY 1, 2 and 4 EA 10 1,000.00 10,000.00 1 6030 150W MH PC Lighting Fixture EA 10 400.00 4,000.00 6040 Type 33B Arm - Furnish and Install EA 10 800.00 8,000.00 6050 Conduit - Sch 80 PVC 2" Open Cut - Install LF 625 12.00 7,500.00 6060 Rdway Illum TY 11 Pole - Furnish and Install EA 10 1,000.00 10,000.00 ITOTAL STREET LIGHTS $45,125.00 111 40 LOT 46X BLOCK 10 39 32 33 34 8 3 35 36 37 38 39 40 41 42 43 44 45 4 5 6 7 26 11111 2 b .1sOt WS S ICA FIAS 13 10 ) ggj •111111MMINIE 111111 IIMIMMIIMMINw MN 11•••••••••, EMI • I --/ / / / /1 ,- ---, / - .. / / ( / ,----, / \\ \_ -_. \ \ ., \ 4.. —I ----- \ \ \ \ \\ \ k.. \ PRIVATE OPEN SPACE \ air 64x \ \ \ BLOCK 18 \ \ S \ \ S \ \ \ \ \ \ \ \ \ % \ \ S \ \ \ \ \ \ \ \ \ \ \ 014, L' -. S \ \ FORT W° 90 P4°' \ \ RtVATE09rP64 \ \ BLOCK 18 \ `I, \ \ \ \ \ i i II I 18 19 Ifl A 0 0 LEGEND III 2 23 2 24 25 I 11 "114 *TV *205 40 *tV4\19:**** \1 8 141 9 *q 20 4•4 8 >11 3 sol ° 9 70see 12 13 LAGE SE 1 0 27 2 0 30 32 40 2 3 Um! SPACE 11:11 55 1 1 56 57 34 58 sa 59 60 10 15 36 OD35 CI 0 23 62 63 50 A 51 52 2 3 37 36 35 64 65 PROPOSED STREET NAME SIGNS EXIST STREET NAME SIGNS PROPOSED STOP SIGN PROPOSED WARNING SIGN EXHIBIT C1 - STREET NAME SIGNS\ NORTH 200' GRAPHIC SCALE ~IISMIIININM- E PRES,d,gr13 LTP)T 2 BI- 2 4 7 6 9 PRESIDIO VILLAGE OWNER / DEVELOPER: 11111 PELOTON SOUTH PHASE 2B IIIII LAND SOLUTIONS JABEZ DEVELOPMENT, LP. 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 9001 NORTH AIRPORT FREEWAY, SUITE 400 NORTH RICHLAND HILLS, TEXAS 76180 PHONE: 817-507-1223 DATE: JULY. 2013 a P E LOTO N LAND SOLUTIONS 5751 KROGER DR. STE. 185 1 KELLER, TX 762E4 1 817.562.3350 EXHIBIT C1 - STREET SIGNS DESCRIPTION 7010 Street Name Blades (TOTAL STREET SIGNS CFA ESTIMATE FOR: Presidio Village Phase 2B 7/31/2013 UNIT IQTY EA 4 245.00 TOTAL 980.00 $980.00