HomeMy WebLinkAboutContract 44665-A1 (2)AMENDMENT No. 1 TO CITY SECRETARY CONTRACT CITY SECRETARY, �y , }� CONTRACT NO. WHEREAS, the City of Fort Worth (CITY) and Teague Nall & Perkins, Inc.(ENGINEER) made and entered into City Secretary Contract No. 44665, (CONTRACT) which was authorized by M&C C-26346 on the 16th day of July, 2013 in the amount of $239,815.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Bellaire Drive Water and Sanitary Sewer Improvements; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 3, 2014, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $44,120.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $283,935.00. PAGE -1- OFFICIAL RECORD CITY SECRETARY Fr. WORTH, TX RECEIVED F :i14 enfed herein, sh other 3 provisions oe the j remain inf uzj force of h signatory, beloze w. 4� al e Contrac and AppRoVz7) ow exAressxy Dn �l which - ilt City o as f Fort Worth Pernan Assistant City Manager . "an\ Director. Cr Wa LAPPROVED AS2, AZzTZ: Assistant the22e Kret 2 s Cant City AT kiry City secre 'ib,p ter Department o FOB Aft L Att PAGE -2- C. Date: ENGI EEA Teagn$ N41 j & Perkins' Xn c. Ty �" Vice presid n E t DA2'E : z N/A date last OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX not written by a tnp teague nail & perkins February 3, 2014 Mr. Roberto Sauceda, P.E. City of Fort Worth Water Department 311 W Tenth Street Fort Worth, Texas 76102 Re: Revised Fee Proposal for Contract Amendment No. 1 — Bellaire Drive Water and Sanitary Sewer Improvements City of Fort Worth Project No. 02144 (TNP Project No. FTW 13130) Dear Mr. Sauceda: www.tnpinc.com engineers surveyors landscape orchitects Teague Nall and Perkins, Inc. is submitting this fee Amendment for the above referenced contract based on additional services requested. The City has requested that TNP remove 840 linear feet of 8" sanitary sewer design from the project after results of record drawings and TV inspections showed the lines were in good condition and did not need replacement. The City subsequently requested that TNP provide the survey and design of 2,493 linear feet of 24" sanitary sewer along Overton Park Drive East, resulting in a net increase of sanitary sewer design. The following is a brief description and cost for the additional services to be provided on this project: I. Design of Sanitary Sewer Line M-189 The scope of services necessary to accomplish the design of the M-189 sewer line is addressed below. A. Design 1. An increase in effort will be required in the following work phases due to the additional 2,493 linear feet of 24" sanitary sewer. A level of effort spreadsheet is attached to this amendment giving a breakdown in additional effort. B. Survey 1. An additional approximately 2,800linear feet of topographic and design survey will be required within Overton Park Drive East right of way to design the M-189 sanitary sewer line. The following surveying services will be provided i. Research parcels/lots along proposed route, obtain copies of plats, easements, and metes & bounds deeds, prepare a deed sketch, and provide addresses of adjacent parcels/lots. ii. Extend the horizontal and vertical control for the project from existing control in previous segments of the project. iii. Provide a topographic survey including all improvements (water valves, manholes, curbs, etc.) and measure downs of all utility manholes from right of way to right of way for Overton Park Drive East. Fort Worth.1100 Macon Street. Fort Worth, Texas 76102 817.336.5773 Dallas + 17304 Preston Rood, Suite 1340* Dallas, Texas 75252. 214.461.9867 Denton. 1517 Centre Place Drive, Suite 320 Denton, Texas 76205. 940.383.4177 Sherman.- 200 North Travis Street, Suite 500 +Sherman, Texas 75090..903.870.1089 Registered by the Texas Board of Professional Engineers, Firm No. F-230 . Registered by the Texas Board of Professional Surveyors, Firm No, 100116-00 Mr. Roberto Sauceda, PE February 3, 2014 Page 2of3 II. SUE Services for Bellaire Drive from Bellaire Court to Bellaire West TNP proposes to provide quality level 'B' Subsurface Utility Engineering (SUE) performed in accordance with Cl/ASCE 38-02 for the existing AT&T fiber optic and buried telephone cables located along Bellaire Drive from Bellaire Court to Bellaire Drive West. This will consist of approximately 1800' of underground utilities - 1200' of fiber optic cable, and 600' of buried telephone. Locating these lines will help minimize conflicts between the proposed water line and existing AT&T lines it is in close proximity to. The scope of services necessary to locate these lines is given below. A. Level IT SUE Investigation The following effort will be required: 1. Select and apply appropriate surface geophysical mehod(s) to search for and detect the fiber optic and buried telephone subsurface utilities within the project limits. 2. Based on an interpretation of data, mark the indications ofutilities on the ground surface for subsequent survey. Utilize paint or other method acceptable for marking of lines. 3. Unless otherwise directed, mark centerline of single -conduit lines, and outside edges of multi -conduit systems. 4. Resolve differences between designated utilities and utility records and surveyed appurtenances. 5. As an alternative to the physical marking of lines, the ENGINEER may, with CITY's approval, utilize other means of data collection, stoage, retrieval, and reduction that enables the correlation of surface geophysical data to the project's survey control, Fee Proposal for Contract Amendment No. 1: $ 44,120.00 TNP proposes a fixed fee of $49,945.00 to accomplish the scope of services described above. This fee shall be full compensation for work required of TNP and one sub -consultant. Summary of Fees: I. Design of Sanitary Sewer Line M-189 A. Design B. Survey $ 27,200 $ 13,160 II. SUE Services for Bellaire Drive from Bellaire Court to Bellaire West A. Level 'B' SUE Investigation $ 3,760 Total $ 44,120 M/WBE Utilization: TNP commits 29.8% of the work covered under this amendment to a certified M/SBE firm. The breakdown of this participation is shown below: Gorrondona & Associates $ 13,160 Total Contract Amendment No. 1: $44,120 Summary of Contract Fee: Original Contract Amount: Amendment No. 1 Revised Contract Amount $ 239,815 $ 44.120 $ 283,935 Mr. Roberto Sauceda, PE February 3, 2014 Page 3 of 3 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE NALL AND PERKINS, INC. aoLi:.G Andrew Luce, P.E. Project Manager Attachment: 1) Revised Level of Effort Spreadsheet 2) Revised Gorrondona and Associate, Inc. Survey Proposal