HomeMy WebLinkAboutContract 44665 (2)CITY OF FORT WORTH, TEXAS
�o�raacrao�.
cWI/Litt
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality
(the "CITY"), and Teague Nall and Perkins, Inc., authorized to do business in Texas, an
independent contractor ("Consultant"), for a PROJECT generally described as: Bellaire Drive
Water and Sanitary Sewer Improvements.
Article I
Scope of Services
(1) Consultant hereby agrees to perform as an independent contractor the services set
forth in the Scope of Services attached hereto as Attachment "A". These services
shall be performed in connection with Bellaire Water and Sanitary Sewer
Improvements.
(2) Additional services, if any, will be requested in writing by the City. City shall not pay
for any work performed by Consultant or its subconsultants, subcontractors and/or
suppliers that has not been ordered in writing. It is specifically agreed that
Consultant shall not be compensated for any alleged additional work resulting from
oral orders of any person.
Article II
Compensation
Consultant shall be compensated in accordance with the Fee 'Schedule shown in
Attachment "B". Payment shall be considered full compensation for all labor, materials,
supplies, and equipment necessary to complete the services described in Attachment "A".
However the total fee paid by the City shall not exceed a total of $239,815.00 unless the
City and the Consultant mutually agree upon a fee amount for additional services and
amend this Agreement accordingly.
The Consultant shall provide monthly invoices to the City. Payment for services rendered
shall be due within thirty (30) days of the uncontested performance of the particular
services so ordered and receipt by City of Consultant's invoice for payment of same.
Acceptance by Consultant of said payment shall operate as and shall release the City from
all claims or liabilities under this Agreement for anything related to, done, or furnished in
connection with the services for which payment is made, including any act or omission of
the City in connection with such services.
City of Fort Worth, Texas
Standard Agreement for Professional Services
PMO Official Release Date: 1/28/2013
Page 1 of 8
OFFICIAL RECORD
CITY SECRIITARY
PT, WORTH, TX
RECEIVED JUL 25 2013
Article I11
Term
Unless terminated pursuant to the terms herein, this Agreement shall be for a term of 30
months, beginning upon the date of its execution, or until the completion of the subject matter
contemplated herein, whichever occurs first.
Article IV
Independent Contractor
Consultant shall operate hereunder as an independent contractor, and not as an officer,
agent, servant, or employee of the City. Consultant shall have exclusive control of and the
exclusive right to control the details of its work to be performed hereunder and all persons
performing same, and shall be solely responsible for the acts and omissions of its officers,
agents, employees, contractors and subcontractors. The doctrine of respondent superior
shall not apply as between City and Consultant, its officers, agents, employees, contractors,
and subcontractors, and nothing herein shall be construed as creating a partnership or joint
venture between City and Consultant.
Article V
Professional Competence and Indemnification
(1) Work performed by Consultant shall comply in all aspects with all applicable local,
state and federal laws and with all applicable rules and regulations promulgated by
the local, state and national boards, bureaus and agencies. Approval by the City
shall not constitute or be deemed to be a release of the responsibility and liability of
Consultant or its officers, agents, employees, contractors and subcontractors for the
accuracy and competency of its services performed hereunder.
(2) In accordance with Texas Local Government Code Section 271.904, the
Consultant shall indemnify, hold harmless, and defend the City against
liability for any damage caused by or resulting from an act of negligence,
intentional tort, intellectual property infringement, or failure to pay a
subcontractor or supplier committed by the Consultant or Consultant's agent,
consultant under contract, or another entity over which the Consultant's
exercises control.
City of Fort Worth, Texas
Standard Agreement for Professional Services
PMO Official Release Date; 1/28/2013
Page 2 of 8
Article VI
Insurance
(1) Consultant shall not commence work under this Agreement until it has obtained all
insurance required under this Article and the City has approved such insurance, nor
shall Consultant allow any subcontractor to commence work on its subcontract until
all similar insurance of the subcontractor has been so obtained and approval given
by the City; provided, however, Consultant may elect to add any subconsultant as
an additional insured under its liability policies.
Commercial General Liability
$1,000,000 each occurrence
$1,000,000 aggregate
Automobile Liability
$1,000,000 each accident (or reasonably equivalent limits of
coverage if written on a split limits basis). Coverage shall be
on any vehicle used in the course of the Project.
Worker's Compensation
Coverage A: statutory limits
Coverage B: $100,000 each accident
$500,000 disease - policy limit
$100,000 disease - each employee
(2) Additional Insurance Requirements
a. Except for employer's liability insurance coverage under Consultant's worker's
compensation insurance policy, the City, its officers, employees and servants shall
be endorsed as an additional insured on Consultant's insurance policies.
b. Certificates of insurance shall be delivered to the Water Department, Attention:
Robert Sauceda, 1000 Throckmorton Street, Fort Worth, TX 76102, prior to
commencement of work.
c. Any failure on part of the City to request required insurance documentation shall
not constitute a waiver of the insurance requirements specified herein..,
d. Each insurance policy shall be endorsed to provide the City a minimum thirty days
notice of cancellation, non -renewal, and/or material change in policy terms or
coverage. A ten days notice shall be acceptable in the event of non-payment of
premium.
City of Fort Worth, Texas
Standard Agreement for Professional Services
PMO Official Release Date: 1/28/2013
Page 3 of 8
e. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: VII or equivalent measure of financial strength and
solvency.
f. Other than worker's compensation insurance, in lieu of traditional insurance, City
may consider alternative coverage or risk treatment measures through insurance
pools or risk retention groups. The City must approve in writing any alternative
coverage.
g.
Workers' compensation insurance policy(s) covering employees employed on the
Project shall be endorsed with a waiver of subrogation providing rights of recovery
in favor of the City.
h. City shall not be responsible for the direct payment of insurance premium costs
for Consultant's insurance.
1. Consultant's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self -funded or commercial coverage
maintained by City shall not be called upon to contribute to loss recovery.
j. In the course of the Agreement, Consultant shall report, in a timely manner, to
City's officially designated contract administrator any known loss occurrence which
could give rise to a liability claim or lawsuit or which could result in a property loss.
k. Consultant's liability shall not be limited to the specified amounts of insurance
required herein.
I. Upon the request of City, Consultant shall provide complete copies of all
insurance policies required by these Agreement documents.
Article VII
Transfer or Assignment
City and Consultant each bind themselves, and their lawful successors and assigns, to this
Agreement. Consultant, its lawful successors and assigns, shall not assign, sublet or transfer
any interest in this Agreement without prior written consent of the City.
Article VIII
Termination of Contract
(1) City may terminate this Agreement for its convenience on 30 days' written notice.
Either the City or the Consultant for cause may terminate this Agreement if either
Party fails substantially to perform through no fault of the other and does not
City of Fort Worth, Texas
Standard Agreement for Professional Services
PMO Official Release Date: 1/28/2013
Page 4 of 8
commence correction of such nonperformance with 5 days of written notice and
diligently complete the correction thereafter
(2) If City chooses to terminate this Agreement under Article 8, upon receipt of notice of
termination, Consultant shall discontinue services rendered up to the date of such
termination and City shall compensate Consultant based upon calculations in Article
2 of this Agreement and Exhibit "B" attached hereto and incorporated herein.
(3) All reports, whether partial or complete, prepared under this Agreement, including
any original drawings or documents, whether furnished by the City, its officers,
agents, employees, consultants, or contractors, or prepared by Consultant, shall be
or become the property of the City, and shall be furnished to the City prior to or at
the time such services are completed, or upon termination or expiration of this
Agreement.
Article IX
Right to Audit
(1) Consultant agrees that the City shall, until the expiration of three (3) years after final
payment under this Agreement, have access to and the right to examine any directly
pertinent books, documents, papers and records of Consultant involving transactions
relating to this Agreement. Consultant agrees that the City shall have access during
normal working hours to all necessary facilities and shall be provided adequate and
appropriate workspace in order to conduct audits in compliance with the provisions of
this section. City shall give Consultant reasonable advance notice of intended audits.
(2) Consultant further agrees to include in all its subcontracts hereunder, a provision to
the effect that the subcontracting consultant agrees that the City shall, until the
expiration of three (3) years after final payment under the subcontract, have access
to and the right to examine any directly pertinent books, documents, papers and
records of such sub -consultant, involving transactions to the subcontract, and
further, that City shall have access during normal working hours to all sub -
consultant facilities, and shall be provided adequate and appropriate work space in
order to conduct audits in compliance with the provisions of this article. City shall
give Consultant and any sub -consultant reasonable advance notice of intended
audit.
(3) Consultant and sub -consultants agree to photocopy such documents as may be
requested by the City. The City agrees to reimburse Consultant for the cost of copies
at the rate published in the Texas Administrative Code in effect as of the time copying
is performed.
City of Fort Worth, Texas
Standard Agreement for Professional Services
PMO Official Release Date: 1/28/2013
Page 5 of 8
Article X
Minority Business and Small Business Enterprise (MBE)(SBE) Participation
In accordance with the City's Business Diversity Enterprise Ordinance No. 20020-12-2011,
as amended, the City has goals for the participation of minority business enterprises and/or
small business enterprises in City contracts. Consultant acknowledges the MBE and SBE
goals established for this Agreement and its accepted written commitment to MBE and SBE
participation. Any misrepresentation of facts (other than a negligent misrepresentation)
and/or the commission of fraud by the Consultant may result in the termination of this
Agreement and debarment from participating in City contracts for a period of time of not less
than three (3) years.
Article XI
Observe and Comply
Consultant shall at all times observe and comply with all federal, state, and local laws and
regulations and with all City ordinances and regulations which in any way affect this
Agreement and the work hereunder, and shall observe and comply with all orders, laws
ordinances and regulations which may exist or may be enacted later by governing bodies
having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance
thereof shall be considered. Consultant agrees to defend, indemnify and hold harmless City
and all of its officers, agents and employees from and against all claims or liability arising out
of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its
employees.
Article XII
Venue and Jurisdiction
If any action, whether real or asserted, at law or in equity, arises on the basis of any
provision of this Agreement, venue for such action shall lie in state courts located in
Tarrant County, Texas or the United States District Court for the Northern District of Texas
— Fort Worth Division. This Agreement shall be construed in accordance with the laws of
the State of Texas.
Article XIII
Contract Construction
The Parties acknowledge that each party and, if it so chooses, its counsel have reviewed
and revised this Agreement and that the normal rule of construction to the effect that any
ambiguities are to be resolved against the drafting party must not be employed in the
City of Fort Worth, Texas
Standard Agreement for Professional Services
PMO Official Release Date: 1/28/2013
Page 6 of 8
interpretation of this Agreement or any amendments or exhibits hereto.
Article XIV
Severability
The provisions of this Agreement are severable, and if any word, phrase, clause,
sentence, paragraph, section or other part of this Agreement or the application thereof to
any person or circumstance shall ever be held by any court of competent jurisdiction to be
invalid or unconstitutional for any reason, the remainder of this Agreement and the
application of such word, phrase, clause, sentence, paragraph, section, or other part of this
Agreement to other persons or circumstances shall not be affected thereby and this
Agreement shall be construed as if such invalid or unconstitutional portion had never been
contained therein.
Article XV
Notices
Notices to be provided hereunder shall be sufficient if forwarded to the other Party by
hand -delivery or via U.S. Postal Service certified mail return receipt requested, postage
prepaid, to the address of the other Party shown below:
City of Fort Worth
Attn: Water Department
1000 Throckmorton Street
Fort Worth, Texas 76102
Consultant:
Teague Nall and Perkins, Inc.
Attn: Ty Hilton, P.E.
1100 Macon Street
Fort Worth, Texas 76102
Article XVI
Headings
The headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement
City of Fort Worth, Texas
Standard Agreement for Professional Services
PMO Official Release Date: 1/28/2013
Page 7 of 8
Article XVII
Counterparts
This Agreement may be executed in one or more counterparts and each counterpart shall,
for all purposes, be deemed an original, but all such counterparts shall together constitute
but one and the same instrument.
Executed and effective this the '36 day of() ut,y , 20/'
BY:
CITY OF FORT WORTH
Fernando Costa
Assistant City Manager
Date: 7/ditA3
APPROVAL RECOMMENDED:
: Bye‹
S. Frank Crumb, P.E.
Director, Water Department
APPROVED AS TO FORM AND LEGALITY
By: I'YL( il't e IC r
Oougtas-tithlataelt- Yv1 r
Assistant City Attorney
ATTE
1 it_
CMar/iJ. Kayser
City Secretary
City of Fort Worth, Texas
Standard Agreement for Professional Services
PMO Official Release Date: 1/28/2013
Page 8 of 8
Date:
M&C No.:
M&C Date:
fir 04.4:6* F011;44.4ix
Afa we' oopo
000027
ate 0
L O
000
a
o0 OOQ0° *c:
BY:
ENGINEER
Teague Nall and Perkins, Inc.
THiI`tdn, P.E.
Principal
7r//i//,9
C-Z(o34-LR
OFFICIAL RECORD
CITY SECRETARY
FTC WORTH, TX
RECEIVED JUL 2 5 2013
ATTACHMENT A
DESIGN SERVICES FOR
BELLAIRE DRIVE WATER AND SANITARY SEWER IMPROVEMENTS
CITY PROJECT NO.: 02144
ATTACHMENT A
Scope for Enaineerina Design Related Services for Water and/or Sanitary Sewer
Improvements
DESIGN SERVICES FOR
BELLAIRE DRIVE WATER AND SANITARY SEWER IMPROVEMENTS
CITY PROJECT NO.: 02144
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
WORK TO BE PERFORMED
Task 1. Design Management
Task 2. Conceptual Design
Task 3. Preliminary Design
Task 4. Final Design
Task 5. Bid Phase Services
Task 6. Construction Phase Services
Task 7. ROW/Easement Services
Task 8. Survey and Subsurface Utility Engineering Services
Task 9. Plan Submittal Checklists
TASK 1. DESIGN MANAGEMENT.
ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and
resources.
ENGINEER shall manage change,
• communicate effectively,
• coordinate internally and externally as needed, and
• proactively address issues with the CITY's Project Manager and others as
necessary to make progress on the work.
1.1. Managing the Team
• Lead, manage and direct design team activities
• Ensure quality control is practiced in performance of the work
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 1 of 17
ATTACHMENT A
DESIGN SERVICES FOR
BELLAIRE DRIVE WATER AND SANITARY SEWER IMPROVEMENTS
CITY PROJECT NO.: 02144
• Attend the prebid conference in support of the CITY.
• Assist the CITY in determining the qualifications and acceptability of prospective
contractors, subcontractors, and suppliers.
• When substitution prior to award of contracts is allowed in the contract
documents, the ENGINEER will advise the CITY as to the acceptability of
alternate materials and equipment proposed by bidders.
• Attend the bid opening in support of the CITY.
• Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract. A copy of the Bid
Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only
are to be uploaded into the project's Bid Results folder on Buzzsaw.
• Incorporate all addenda into the contract documents and issue conformed sets.
5.2 Final Design Drawings
1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall be created from the original
CAD drawing files and shall contain all associated sheets of the particular plan
set. Singular PDF and DWF files for each sheet of a plan set will not be
accepted. PDF and DWF files shall conform to naming conventions as follows:
I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is
of an original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shall be the total number
of sheets in this file.
Example: X-12755_org18.pdf
Both PDF and DWF files shall be uploaded to the project's Final Drawing folder in
Buzzsaw.
2) In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet
as an individual DWG file with all reference files integrated into the sheet. If the
plans were prepared in DGN format, they shall be converted to DWG prior to
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 10 of 17
ATTACHMENT A
DESIGN SERVICES FOR
BELLAIRE DRIVE WATER AND SANITARY SEWER IMPROVEMENTS
CITY PROJECT NO.: 02144
uploading. The naming convention to be used for the DWG files shall be as
follows:
I. TPW files shall use the W number as for PDF and DWF files, but shall
include the sheet number in the name — "W-1956_SHT01.dwg", "W-
1956_SHT02.dwg", etc.
II. Water and Sewer file names shall use the X number as for PDF and
DWF files, but shall include the sheet number in the name — "X-
12155_SHT01.dwg", "X-12755_SHT02.dwg", etc.
For information on the proper manner to submit files and to obtain a file number for
the project, contact the Department of Transportation and Public Works Vault at
telephone number (817) 392-8426. File numbers will not be issued to a project
unless the appropriate project numbers and fund codes have been assigned and
are in the Department of Transportation and Public Works database.
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• 15 sets of construction documents will be sold to and made available on
Buzzsaw for plan holders and/or given to plan viewing rooms.
• 10 sets of 11" x 17" size and 10 sets of 22" x 34" size drawings plans and 20
specifications (conformed, if applicable) will be delivered to the CITY.
• PDF, DWF and DWG files will be uploaded to Buzzsaw.
DELIVERABLES
A. Addenda
B. Bid tabulations
C. CFW Data Spreadsheet
D. Recommendation of award
E. Construction documents (conformed, if applicable)
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1 Construction Support
• The ENGINEER shall attend the preconstruction conference.
• After the pre -construction conference, the ENGINEER shall provide project
exhibits and attend public meeting to help explain the proposed project to
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 11 of 17
ATTACHMENT A
DESIGN SERVICES FOR
BELLAIRE DRIVE WATER AND SANITARY SEWER IMPROVEMENTS
CITY PROJECT NO.: 02144
residents. The CITY shall select a suitable location and mail the invitation letters
to the affected customers.
• The ENGINEER shall visit the project site at requested intervals as construction
proceeds to observe and report on progress.
• As requested by the CITY, the ENGINEER shall provide necessary interpretations
and clarifications of contract documents, review change orders, and make
recommendations as to the acceptability of the work.
The ENGINEER shall attend the "Final" project walk through and assist with preparation of
final punch list
6.2 Record Drawings
• The ENGINEER shall prepare Record Drawings from information provided by
the CITY depicting any changes made to the Final Drawings during construction.
The following information shall be provided by the CITY:
o As -Built Survey
o Red -Line Markups from Contractor
o Red -Line Markups from City Inspector
o Copies of Approved Change Orders
o Approved Substitutions
• The ENGINEER shall modify the Final Drawings electronically and shall place a
stamp on the plans indicating that they represent Record Drawings of the project
as constructed. The stamp shall be signed and dated by the ENGINEER and
shall be placed on each plan sheet, whether there are any revisions on the sheet
or not. Each sheet shall clearly indicate all changes which apply to that sheet by
clouding and numbering, or other suitable means.
• The following disclaimer shall be included with the Record Drawing stamp:
o These Record Drawings were prepared using information provided by
others and represent the as constructed conditions to the extent that
documented changes were provided for recording. The ENGINEER
assumes no liability for undocumented changes and certifies only that the
documented changes are accurately depicted on these drawings.
• The ENGINEER shall submit a set of sealed Final Drawings, modified and
stamped as Record Drawings, on mylar for record storage. The ENGINEER may
keep copies of the information provided by the CITY for their files, but all original
red -lined drawings shall be returned to the CITY with the mylars.
2) Record Drawings shall also be submitted in both Adobe Acrobat PDF format
(version 6.0 or higher) format and DWF format. There shall be one (1) PDF file
and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall contain all associated sheets
of the particular plan set. Singular PDF and DWF files for each sheet of a
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 12 of 17
ATTACHMENT A
DESIGN SERVICES FOR
BELLAIRE DRIVE WATER AND SANITARY SEWER IMPROVEMENTS
CITY PROJECT NO.: 02144
plan set will not be accepted. PDF and DWF files shall conform to naming
conventions as follows:
I. TPW file name example — "W-1956_rec47.pdf " where "W-1956" is the
assigned file number obtained from the CITY, "_rec" designating the file is
of a record drawing plan set, "47" shall be the total number of sheets in this
file.
Example: W-0053_rec3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_rec36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_rec"
designating the file is of a record drawing plan set, "36" shall be the total
number of sheets in this file.
Example: X-12755_recl8.pdf
Both PDF and DWF files shall be uploaded to the project's Record Drawings folder
in Buzzsaw.
ASSUMPTIONS
• 4 RFI's are assumed.
• 2 Change Orders are assumed
• One copy of full size (22"x34") mylars will be delivered to the CITY.
DELIVERABLES
A. Public meeting exhibits
B. Response to Contractor's Request for Information
C. Review of Change Orders
D. Review of shop drawings
E. Final Punch List items
F. Record Drawings on Mylar
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CITY's Project Manager.
7.1. Right -of -Way Research
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 13 of 17
ATTACHMENT A
DESIGN SERVICES FOR
t3ELLAIRE DRIVE WATER AND SANITARY SEWER IMPROVEMENTS
CITY PROJECT NO.: 02144
• The ENGINEER shall determine rights -of -way, easements needs for construction of the
project. Required temporary and permanent easements will be identified based on available
information and recommendations will be made for approval by the CITY.
7.3. Temporary Right of Entry Preparation and Submittal
• Prior to construction, the ENGINEER shall prepare and submit Temporary Right of Entry
documents for landowners to CITY PM for real property acquisition. It is assumed that letters
will only be required for land owners adjacent to temporary construction easements or who
are directly affected by the project and no easement is required to enter their property.
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's Buzzsaw site.
ASSUMPTIONS
• 0 Easements or right-of-way documents will be necessary.
• 20 Temporary right -of -entry documents will be necessary.
DELIVERABLES
A. Temporary Right of Entry Letters
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
ENGINEER will provide survey support as follows.
8.1. Design Survey
• ENGINEER will perform field surveys to collect horizontal and vertical elevations and
other information needed by ENGINEER in design and preparation of plans for the project.
Information gathered during the survey shall include topographic data, elevations of all
sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities,
structures, trees (measure caliper, identify overall canopy, and have qualified arborist
identify species of trees), and other features relevant to the final plan sheets. Existing
drainage at intersections will be verified by field surveys. Spot elevations will be shown on
intersection layouts with cross slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans shall include the following:
- A Project Control Sheet, showing ALL Control Points, used or set while gathering data.
Generally on a scale of not less than 1:400:
- The following information about each Control Point;
a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod)
b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing
base. Z coordinate on CITY Datum only.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 14 of 17
ATTACHMENT A
DESIGN SERVICES FOR
BELLAIRE DRIVE WATER AND SANITARY SEWER IMPROVEMENTS
CITY PROJECT NO.: 02144
c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of
North Side Drive at the East end of radius at the Southeast corner of North Side Drive and
North Main Street).
— Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate
system, as the Control.
- No Tess than two horizontal bench marks, per line or location.
— Bearings given on all proposed centerlines, or baselines.
- Station equations relating utilities to paving, when appropriate.
8.2. Temporary Right of Entry Preparation and Submittal
• Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of
Entry for landowners to CITY PM.
• The documentation shall be provided in conformance with the checklists and templates
available on the CITY's Buzzsaw site.
ASSUMPTIONS
• Topographic survey at intersection will include no more than 100 ft. in each direction.
DELIVERABLES
A. Copies of field survey data and notes signed and sealed by a licensed surveyor.
B. Drawing of the project layout with dimensions and coordinate list.
TASK 9. PLAN SUBMITTAL CHECKLISTS
Engineer shall complete and submit Plan Submittal Checklists in accordance with the
following table:
PLAN SUBMITTAL CHECKLIST REQUIREMENTS
Traffic
Attachment "A" Signal
Type (Submit All
@ 30%)
Street
City of Fort Worth, Texas
Attachment A
HMO Release Date: 07.23.2012
Page 15 of 17
Street Water
Storm Storm Lights /Sewer
Water Water (Submit (Submit
30% 60% All @ All @
30% 60%)
Traffic
Engineering
(Submit All
@ 60%)
Traffic Traffic Traffic
Control Control Control
30% 60% 90%
Required for all work in City
ROW
x
ATTACHMENT A
DESIGN SERVICES FOR
BELLAIRE DRIVE WATER AND SANITARY SEWER IMPROVEMENTS
CITY PROJECT NO.: 02144
Storm Water X X
Water / Sewer
*If included in street project
DELIVERABLES
A. Plan submittal checklists
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF
SERVICES
Additional Services not included in the existing Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Negotiation of easements or property acquisition including temporary right -of -
entries.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests, bid rejection and
re -bidding of the contract for construction.
• Construction management and inspection services
• Periodic site visits during construction phase
• Design phase public meetings
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
•, Services related to damages caused by fire, flood, earthquake or other acts of
God.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services related to submitting for permits (ie.TxDOT, railroad, etc...)
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 16 of 17
ATTACHMENT A
DESIGN SERVICES FOR
BELLAIRE DRIVE WATER AND SANITARY SEWER IMPROVEMENTS
CITY PROJECT NO.: 02144
• Services related to Subsurface Utility Engineering Levels A, B, C or D
• Services related to Survey Construction Staking
• Services related to acquiring real property including but not limited to easements,
right-of-way, and/or temporary right -of -entries.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Construction Shop drawing review, samples and other submittals submitted by the
contractor.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 17 of 17
ATTACHMENT B
COMPENSATION
Design Services for
Bellaire Drive Water and Sanitary Sewer Improvements
City Project No. 02144
Lump Sum Project
I. Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $239,815 as
summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total
Project Fees. The total lump sum fee shall be considered full compensation for
the services described in Attachment A, including all labor materials, supplies,
and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of
an invoice prepared and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item III. of
this Attachment B, and Schedule as required in Attachment D to this Agreement.
B. The estimated current physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Worth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed the
total current project budget including all approved Amendments.
D. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Water Department monthly progress reports and schedules in the format
required by the City.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 1 of 3
B-1
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility
Prime Consultant
Teague Nall & Perkins Engineering
Proposed MBE/SBE Sub -Consultants
Gorrondona & Assoc. Surveying
Non-MBE/SBE Consultants
Project Number & Name
Bellaire Drive Water and Sanitary Sewer
Fee Amount i %
$186,915.00 77.9%
$52,900.00 22.1%
TOTAL $239,815.00 100%
Total Fee MBE/SBE Fee MBE/SBE
cyo
$239,815 1 $52, 900 J 22.1%
City MBE/SBE Goal = __% Consultant Committed Goal = 22.1 %
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8:09.2012
Page 2 of 3
B-2
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across work types and work phases.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 3 of 3
B-3
Professional Services Payment Request Project Manager
Project: I Bellaire Drive Water and Sanitary Sewer Improveme
City Project #: I02144
City Sec Number:
Company Name: 'Teague Nall and Perkins. Inc.
Consultant's PM:
Vendor Invoice #:
Payment Request #:
From Date:
To Date:
Invoice Date:
Sheet
Work Type 1
Work Type 2
Work Type 3
Work Type 4
Work Type 5
Work Type 6
Tv Hilton. P.E.
email:
Office Address
Telephone:
Fax:
Consultant Instructions:
Summary
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Projects folder.
thilton;Stncinc corn
1100 Macon Street Fort Worth, Texas 76102
817-336-5773
817-336-2813
Remit Address 1100 Macon Street Fort Worth. Texas 76102
FAC and Work Type Description
Totals This Payment Request
Agreement
Amount
$43.365.0C
$65.715.0C
$60.775.0C
$17,060.0Q
$52,900.00
$719 815.00
Agreement
Amendment Amount to Completed Percent ($) Invoiced Current Remaining
Amount Date Amount Completed Previously Invoice Balance
$43,365.0C $43.365.0
$65.715.0 $65.715.0
$60,775.0 $60.775.0
_ $17.060.0 _ $17.060.0
$52,900.0 $52.900.0
$239 815.0Q 3239 815 00
Overall Percentage Complete:
Project:
City Project #:
Work Type Desc:
HAM:
City Sec Number.
Purchase Order:
Name:
Professional Services Payment Request Project Manager.
Bellaire Drive Water and Sanitary Sewer Improe
02144
Teague Nall and Perkins, Inc.
Consultants PM: Ty Hilton, P.E
Vendor invoice #:
Payment Request #:
From Date:
To Date:
invoice Date:
Pay Items
31 - Conceptual Design
Description
Consultant Instruction=
Fill in green cells including Percent Complete and Invoiced Previously Quanities
When your invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
email: thilton®tnpinc.com
Office Address 1100 Macon Street Fort Worth, Texas 76102
Telephone: 817-336-5773
Fax: 817-336-2813
Remit 1100 Macon Street Fort Worth, Texas 76102
Agreement
Agreement Amendment Amendment Amount to Completed Percent (S) Invoiced Current Remaining
Amount Number Amount Date Amount Completed Previous y Invoice Balance
$43,365.00 $43.365.00 i .. r:...... ' -- $43,365.00
Totals This Unit: w3c5 ,
643 365.00 543.3As.nn
Overall Percentage Complete:
Professional Services Payment Request Project Manager I
Project: (Bellaire Drive Water and Sanitary Sewer Improveme
City Project #: I 1
City Sec Number: l
Company Name: 'Teague Nall and Perkins, Inc.
Consultant's PM:
Vendor Invoice #:
Payment Request #:
From Date:
To Date:
Invoice Date:
Sheet
Work Type 1
Work Type 2
Work Type 3
Work Type 4
Work Type 5
*Work Type 6
'Ty Hilton, P.E.
email:
Office Address
Telephone:
Fax:
Summary
Consultant Instructions:
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Projects folder.
ihllton(tnoinc_com 1
1100 Macon Street Fort Worth. Texas 76102
817-336-5773
817-336-2813.•
Remit Address 1100 Macon Street Fort Worth. .TPYas. 76102
FAC and Work Type Description
Totals This Payment Request
Agreement
Agreement Amendment Amount to Completed Percent (S) Invoiced Current Remaining
Amount Amount Date Amount Completed Previously Invoice Balance
$239,815.06 S239.815.0( $239.815.0C
c2 q.815 00
$239.815.OQ V' 1P 815 OQ
Overall Percentage Complete:
Professional Services Payment Request Project Manager.
Project:
City Project #:
Work Type Desc:
F/AIC:
City Sec Number:
Purchase Order.
Name:
Bellaire Drive Water and Sanitary Sewer ImproN,
Teague Nat and Pertuns. Inc.
Consultant Instructions:
Fill in green cells including Percent Complete and Invoiced Previously Quanities
When your Invoice is complete, save and dose, start Buxuaw and Add your invoice to the
Consultant folder within Project's folder.
Consultant's PM: Ty-8tton, P.E. email: haton@lnpinacom
Vendor Invoice #: Office Address 1100 Macon Street Fort Worth, Texas 76102
Payment Request #: Telephone: 817-336-5773
From Date: Fax: 817-336-2813
To Date:
Invoice Date: Remit 1100 Macon Street Fort Worth, Texas 76102
Pay Items Agreement
Agreement Amendment Amendment Amount to Completed Percent (S) Invoiced Current Remaining
Description Amount Number Amount Date Amount Completed Previously Invoice Balance
31 - Conceptual Design 1 849.051.671 $
49.051.67 - $49.051 67
32 - Preliminary Design 571.401.67 571,401.67 - - S71,401.67
33 - Final Design 566.461.66 $66.461.66 566,461.66
51 - Preliminary Survey $52,900.00 552.900.09 $52.900.00
Totals This Unit: 473q.81500 5239.815.00 5239.815.00
Overall Percentage Complete:
Professional Services Payment Request Project Manager.
Project: Bellaire Drive Water and Sanitary Sewer Improve)
City Project #:
Work Type Desc:
F/A/C:
City Sec Number.
Purchase Order.
Company Name:
Teague Nall and Perkins. Inc.
Consultant Instructions:
Fill in green calls including Percent Complete and Invoiced Previously Quanities
When your Invoice is complete, save and close, start Buasaw and Add your invoice to the
Consultant folder within Projects folder.
Consultants PM: Ty Hilton, P.E. email: thilton@tnpinc.com
Vendor Invoice #: Office Address: 1100 Macon Street Fort Worth. Texas 76102
Payment Request #: Telephone: 817 3365773
From Date: Fax: 817-336-2813
To Date:
Invoice Date: Remit 1100 Macon Street Fort Worth, Texas 76102
Pay Items
Description
132 - Preliminary Design
Totals This Unit:
Submitted by:
Agreement
Agreement Amendment Amendment Amount to Completed Percent ($) Invoiced Current Remaining
Amount Number Amount Date Amount Con p)eted Previously Invoice Balance
Overall Percentage Complete:
ATTACHMENT "C"
CHANGES AND AMENDMENTS TO STANDARD AGREEMENT
Design Services for
Bellaire Drive Water and Sanitary Sewer Improvements
City Project No. 02144
No changes to the Standard Agreement.
City of Fort Worth, Texas
Attachment C
PMO Release Date: 05.19.2010
Page IofI
CITY OF FORT WORTH
Bellaire Drive Water and Sanitary Sewer Improvements
CITY PROJECT NO. 02144
ID Task Name
1 ENGINEERING
2 Conceptual Design Phase
3 Notice to Proceed/Kick-Off Meeting
4 Data Collection
Sanitary Sewer Report
Design/Topographic Surveys
Conceptual Design (30%) Plans
Conceptual Design (30%) Submital
9 City Review & Approval of Concept Plans
10 Preliminary Design Phase
...._........ 11 Preliminary Design( ° )
60 /o Plans
12 Preliminary Design (60%) Submittal
13 City Review
14 Neighborhood Meetings
15 Utility Clearance Phase
16 Final Design Phase
17 Final Design (90%) Plans
18 Final Design (90%) Submittal
19 City Review
20 Final PS&E (100%)
21 City Review/Sign Cover Sheet
22 CONSTRUCTION
23 Bid Phase
24 Project Advertisement 1st
25 Project Advertisement 2nd
26 Pre -bid Conference
27 Open Bids
28 M & C Circulation Process
29 Council Award of Contract
30 Contract Execution
31 Construction Phase
32 Pre -Construction Meeting
33 Neighborhood Meetings
34 Construction
Duration
Jul I Aug L Sep L Oct
314 daN 4$0 8/28
95 dal
0 da
15 daj
15 daj
45 da)
20 da)
0 da)
20 dal
219 da} 8/28
60 dal
0 da)
20 da
0 dal
139da - 8/28
91 da)3
40 daj
0 de)
20 da
20da
11 dal
360 da) 8/28
70 daj 8/28 W
0 dal ® 8/28
0 da; 9/4
0 da; 9/9
0 da 9/25
30 da 9/26
0 da
20 da
290 da!
10 da
10 da
270 da
11/7
Teague Nall and Perkins, Inc.
No L Dec
//
11/6
• 11/6
12/4
12/4
2015
Jan
12/5
12/5 I":jI 12/18
12/19 ® ♦ 1/1
1/2 I:::::::::
b
Consulting Contract Schedule Specifications
City of Fort Worth Capital Improvement Program
FORT WORTH
Attachment D - Project Schedule
This PROJECT requires a Tier « _» schedule as defined herein and in the Citu's Schedule
Guidance Document.
D1. CONSULTING SERVICES SCHEDULE DEVELOPMENT: The CONSULTANT shall
prepare schedules for consulting services that meet the requirements described in this
specification, showing by Critical Path Method (CPM) the planned sequence and tuning of
the Work associated with the Agreement. All submittals shall be submitted in PDF format,
and schedule files shall also be submitted in native file format (i.e. file formats associated
with the scheduling software). The approved scheduling software systems for creating the
schedule files are:
Primavera (Version 6.1 or later or approved by CITY)
- Primavera Contractor (Version 6.1 or later or approved by CITY)
- Microsoft Project (Version 2003/2007 or later or approved by CITY)(PHASING OUT)
D2. BASELINE CONSULTING SERVICES SCHEDULE: Following notice -to -proceed, the
CONSULTANT shall develop, submit and review the draft detailed baseline consulting
services schedule with the CITY to demonstrate the CONSULTANT's understanding of the
Agreement requirements and approach for performing the work. The CONSULTANT will
prepare the final detailed baseline consulting services schedule based on CITY comments, if
any, and submit to the CITY no later than the submittal of the first project invoice.
The following guidelines shall be adhered to in preparing the baseline schedule, and as
described in further detail in the CITY's Schedule Guidance Document.
a. The scope shall be subdivided by work breakdown structure (WBS) representing the
tasks, subtasks, and activities associated with delivering the work.
b. The schedule shall accurately describe the major work activities, key milestones, and
dependencies/relationships as appropriate to the work.
c. The schedule should include appropriate meetings, review periods, critical decision
points, including third party utility dependencies and reviewing agencies.
D3. PROGRESS CONSULTING SERVICES SCHEDULE: The CONSULTANT shall prepare
and submit monthly to the CITY for approval the updated schedule in accordance with D1
and D2 and the CITY's Schedule Guidance Document inclusive. As the Work progresses,
the CONSULTANT shall enter into the schedule and record actual progress as described in
the CITY's Schedule Guidance Document.
The updated schedule submittal shall also include a concise schedule narrative that
highlights the following, if appropriate and applicable:
• Changes in the critical path,
• Expected schedule changes,
• Potential delays,
• Opportunities to expedite the schedule,
• Coordination issues the CITY should be aware of or can assist with,
City of Fort Worth, Texas
Attachment D
PM() Release Date: 02.15,2011
Page 1 of 2
• Other schedule -related issues that the CONSULTANT wishes to communicate to the
CITY.
D4. PERFORMANCE AND CONSULTING SERVICES SCHEDULE: If the work
accomplished falls behind that scheduled due to factors within the CONSULTANT's
control, the CONSULTANT shall take such action as necessary to improve the progress of
the Work. In addition, the CITY may require the CONSULTANT to submit a revised
schedule demonstrating the proposed plan to make up the delay in schedule progress and
to ensure completion of the Work within the allotted Agreement time.
D5. SCHEDULE TIERS SPECIAL INSTRUCTIONS:
The requirements for the schedule are determined based on the nature and needs of the
project. The schedule tier for this project is stated at the top of this document.
CONSULTANT shall submit each schedule relying on the CITY's current Schedule
Guidance Document.
D6. SCHEDULE SUBMITTAL AND PAYMENT:
As stated in III.A.(1). of the Agreement, CONSULTANT shall provide the information
required by Attachment D. CONSULTANT's monthly invoices will not be accepted and
processed for payment without monthly schedule updates that are submitted in the time
and manner required by Attachment D and the CITY's current Schedule Guidance
Document.
City of Fort Worth, Texas
Attachment D
PMO Release Date: 02.15.2011
Page 2 of 2
BELLAIRE S. DR.
PROP. 24" WATER LINE
8"SS L-5185
STA. 0+00 to 6+48
8"SS L-5361
STA. 0+00 to 3+83
110
BELLAIRE S. DR.
PROP. 12" WATER LINE
8"SS L-2405
STA. 33+50 to 40+03
BELLAIRE W. DR.
PROP. 16" WATER UNE
8-SS L-2405
STA. 57+62 to 59+57
8"SS L-2505
STA. 0+00 to 0+93
8"SS L-4279
STA. 0+00 to 1+92E
Attachment E
Bellaire Water and Sanitary Sewer Improvements
City Project No. 02144
Project Location
Bellaire S. &
Bellaire W.
City Project No. 02144
Mopsco 75Y & 752
LEGEND
PROP. WATER UNE
PROP. SANITARY SEWER LINE
FORT FORTH
teepee nail & perkins 1 OF 1
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION:Approved on 7/16/2013 - Ordinance Nos. 20802-07.2013 & 20803-07-
2013
DATE: Tuesday, July 16, 2013
LOG NAME: 60BELLWSS-TNP
SUBJECT:
REFERENCE NO.: **C-26346
Authorize Execution of an Engineering Agreement with Teague Nall & Perkins, Inc., in the Amount of
$239,815.00 for Bellaire Drive Water and Sanitary Sewer Improvements on Bellaire South Drive and
Bellaire West Drive, Provide for Project Management, Real Property Acquisition and Utility Coordination
Costs for a Project Total in the Amount of $259,815.00 and Adopt Appropriation Ordinances (COUNCIL
DISTRICT 9)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of $259,815.00 from the Water and Sewer Operating Fund in the amounts of
$158,719.00 to the Water Capital Projects Fund and $101,096.00 to the Sewer Capital Projects Fund;
2. Adopt the attached appropriation ordinances increasing estimated receipts and appropriations in the
Water Capital Projects Fund in the amount of $158,719.00 and in the Sewer Capital Projects Fund in the
amount of $101,096.00; and
3. Authorize the execution of Engineering Agreement with Teague Nall & Perkins, Inc., in the amount of
$239,815.00 for Bellaire Drive Water and Sanitary Sewer Improvements.
DISCUSSION:
This project consists of the preparations of plans and specifications for the replacement of the deteriorated
water and sanitary sewer mains along Bellaire South Drive (Overton Park East Drive to Bellaire West
Drive) and Bellaire West Drive (Bellaire South Drive to Westcliff North Road).
Teague Nall & Perkins, Inc., proposes to perform the design work for a lump sum fee in the amount of
$239,815.00. Staff considers this fee to be fair and reasonable for the scope of services proposed.
M/WBE Office: Teague Nall & Perkins, Inc., is in compliance with the City's BDE Ordinance by committing
to 22 percent SBE participation on this project. The City's SBE goal on this project is 20 percent.
In addition to the contract amount, $20,000.00 (water: $12,000.00 and sewer: $8,000.00) is required for
project management, real property acquisition and utility coordination.
The project is located in COUNCIL DISTRICT 9, Mapsco 75Y and 75Z.
FISCAL INFORMATION / CERTIFICATION:
i ne rinanciai Management Services uirector certities tnat upon approval of me above recommenaations,
Logname: 60BELLWSS-TNP Page 1 of 2
and adoption of the attached appropriation ordinance, funds will be available in the current capital
budgets, as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund.
FUND CENTERS:
TO Fund/Account/Centers
1&2)P253 476045 6091702144ZZ
1&2)P258 476045 7091702144ZZ
2)P253 511010 709170214430
2)P253 531200 709170214431
2)P253 531200 709170214432
2)P253 531200 709170214433
2) P253 531200 709170214451
2)P253 531350 709170214442
2)P253 531350 709170214473
2)P258 511010 709170214430
2)P258 531200 709170214431
2) P258 531200 709170214432
3)P258 531200 709170214433
2)P258 531200 709170214451
2)P258 531350 709170214442
2)P258 531350 709170214473
$158.719.00
$101. 096.00
$8.000.00
$33.645.00
$67,289.00
$11.215.00
$34.570.00
$2.000.00
$2.000.00
$4.000.00
$22.430.00
$44.860.00
$7.477.00
$18.329.00
$2,000.00
$2,000.00
CERTIFICATIONS:
Submitted for Citv Manaaer's Office bv:
Oriainatina Department Head:
Additional Information Contact:
FROM Fund/Account/Centers
1) PE45
1) PE45
31 P253
3) P253
3) P253
3) P253
3) P258
3) P258
3) P258
3) P258
538040 0609020
538040 0709020
531200 609170214431
531200 609170214432
531200 609170214433
531200 609170214451
531200 709170214431
531200 709170214432
531200 709170214433
531200 709170214451
Fernando Costa (6122)
S. Frank Crumb (8207)
Roberto C. Sauceda (2387)
ATTACHMENTS
1. 60BELLAIRE-DRIVE P253 A013.doc (Public)
2. 60BELLAIRE-DRIVE P258 A013.doc (Public)
3. 60BELLWSS-TNP COMPLIANCE.odf (CFW Internal)
4. 60BELLWSS-TNP MAP.ndf (Public)
5. 60BELLWSS-TNP Sewer FAR.odf (CFW Internal)
6. 60BELLWSS-TNP Water FAR.odf (CFW Internal)
7. PE45-538040-0609020.docx (CFW Internal)
8. PE45-538040-0709020.docx (CFW Internal)
$158.719.00
$101.096.00
$33.645.00
$67.289.00
$11.215.00
$34.570.00
$22,430.00
$44,860.00
$7.477.00
$18.329.00