Loading...
HomeMy WebLinkAboutContract 44702 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § City Secretary Contract No. 406 WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: Steadman Farms, LLC Address, State, Zip Code: 3001 Knox Street, Suite 207 I Dallas, TX 75205 Phone, E-Mail: (214) 445-2211 1 ben@hanoverproperty.com Authorized Signatory/Title: Richard LeBlanc, President Project Name: Steadman Farms Phase 1 Project Location: SWC of Keller -Haslet and Park Vista Blvd. Plat Case No.: FP-013-011 Plat Name: Steadman Farms Mapsco: 8Z, 22D CFA: 2013-036 DOE: 7039 To be completed by staff Received by: ( Council District: 2 City Project No: 02109 RECEIVED AUG 13 2616 1 Date: —1 1244, I 1 �� OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X, Sewer (A-1) _ X, Paving (B) X, Storm Drain (B-1) X , Street Lights & Signs (C) X . 2 E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Steadman Farms Phase 1 CFA No.: 2013-036 DOE No.: 7039 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 1,120,144.30 658,870.80 461,273.50 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total $ 2,251,736.15 $ 1,192,367.10 $ 992,526.55 $ 66,842.50 Total Construction Cost (excluding the fees): $ 3,371,880.45 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 22,402.89 D. Water/Sewer Material Testing Fee (2%) $ 22,402.89 Sub -Total for Water Construction Fees $ 44,805.77 E. TPW Inspection Fee (4%) $ 87,395.75 F. TPW Material Testing (2%) $ 43,697.87 G. Street Light Inspsection Cost $ 2,673.70 H. Street Signs Installation Cost (21 @ $245 EA.) $ 5,145.00 Sub -Total for TPW Construction Fees $ 138,912.32 Total Construction Fees: $ 183,718.09 Choice Financial Guarantee Options, choose one Amount (ck one) (Bond = 100% $ 3,371,880.45 (Completion Agreement = 100% / Holds Plat $ 3,371,880.45 ,,/ (Cash Escrow Water/Sanitary Sewer= 125% $ 1,400,180.38 (Cash Escrow Paving/Storm Drain = 125% $ 2,814,670.19 Letter of Credit = 125% w/2yr expiration period $ 4,214,850.56 8 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said De er has execut- o this instrument in uadruplicate, at Fort Worth, Texas this / L I day of ��.: ?...? ,20 / CITY OF FORT WORTH - Recommended by: Water Department Lk, Wendy Ch. Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. y/a Date: ATTEST: Mar J. Kays City Secreta ATTEST: 444 Signature ,Q (Print) Name: di � 17 /45 14:/4 54 Transportation & Public Works Department DouglaQW. Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager Steadman Farms, LLC a Texas limited liability company By: Hanover Services Group, Inc. a Texas corporation, its manager 9 Signature Print Name: /i'6%iIE% Lc11/one Title: /44.i O/e,t OFFICIAL RECORD CITY SECRETARY FT. WORTT 't X Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE STEADMAN FARMS, PHASE 1 L]MIT KELLER CITY LIMIT - HASLET - ROANOKE SITE TIM:ERLANO SU T FORT IRT CITY LIMIT LOCATION MAP NOT TO SCALE D.O.E. NO. 7039 CITY PROJECT NO. 02109 WATER PROJECT NO. P265-6021502109-00 SEWER PROJECT NO. P275-7021302109-00 FILE NO. W-2267 170 FORT WORTS CI FR - HASLET NX HAWN CAYLOR 'III FR - HICKS Creek 60.686 - 1R)AN% CBI 'TEXAS REGISTERED ENGINEERING FIRM F438 16301 Quorum Drive, Suite 2008 Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 June 3, 2013 — SHEET 1 Case No. FP-013-011 FINAL PLAT STEADMAN FARMS BLOCK A, LOTS 1-21, 22X 8c 23X, BLOCK B, LOTS 1-28, 29X 8c 30X, BLOCK C, LOTS 1-20, BLOCK D, LOTS 1-20, BLOCK E, LOTS 1-20, BLOCK F, LOTS 1-15, 8c 16X, BLOCK G, LOTS 1-16, BLOCK H, LOTS 1-13 8c 14X, BLOCK I, LOTS 1-16, BLOCK J, LOTS 1-20, BLOCK K, LOTS 12-28, 29X 8c 30X, BLOCK L, LOTS 1-16, BLOCK M, LOTS 1-16, BLOCK N, LOTS 1-7 8c 31-33, 34X (Sc 35X, BEING 60.063 ACRES OUT OF THE JOSE CHIRINO SURVEY, ABSTRACT NO. 265, CITY OF FORT WORTH, TARRANT COUNTY, TEXAS STEADMAN FARMS, LLC 3001 Knox Stre.et Suite 207 Dallas, Texas 75205 JBI PARTNERS, INC. 16301 Quorum Drive, Suite 200 B Addison, Texas 75001 TEXAS REGISTERED ENGINEERING FIRM F-438 OWNER/DEVELOPER (214)445-2211 SURVEYOR/ENGINEER (972)248-7676 16301 Quorum Drive, Suite 200B Addson, Texas 75001 Tel: 972-248-7676 Fax 972.248.1414 June 3, 2013 — SHEET 2 17. EXIST. 8" WATER 'CONNECT TO EXISTING 8" WATER LINE DOE -UNKNOWN X-20150 SCALE: 1"=500' dB! 'IE{AS REGISTERED ENGINEERING FIRM F-438 16301 Quorum Drive, Suite 200B Addson, Texas 75001 Tel: 972-248-7676 Fax 972-248-1414 CONNECT TO EXISTING 2" WATER LINE .a. vr.w rn va ota• sw r.1 T77- I:I� • s ' LEGEND PROP. WATERLINE PROP. VALVE PROP. FIRE HYDRANT PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE INDICATED. Fd 1 CONNECT TO EXISTING 24" WATER LINE r- DOE-3049 X-12395 WATER PROJ # PW77-060770140530 it \F WATER EXHIBIT A PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE STEADMAN FARMS, PHASE 1 (D.O.E NO. 7039) June 3, 2013 — SHEET 3 ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST REVISED BY 181 PARTNERS, INC. ON JULY 9, 2013 FORT WORTH, TEXAS 1B1 PROJECT NO. HPC085A STEADMAN FARMS, PHASE 1 DOE 7039 X-22109 ITEM UNIT ITEM TOTAL PRICE TOTAL COST ITEM NO. BID ITEM UNIT 3311.0001 Ductile Non Water Fittings w/ Restraint TON 14.1 $3,400.00 $47,940.00 3311.0260 6" PVC Water Pipe LF 20.0 $15.85 $317.00 3311.0261 8" PVC Water Pipe LF 6,725 $21.00 $141,225.00 3311.0262 8" PVC Water Pipe, CSS Backfi l LF 140 $23.00 $3,220.00 3311.0461 12" PVC Water Pipe LF 5,577 $31.00 $172,887.00 3311.0462 12" PVC Water Pipe, CSS Backfill LF 40.0 $34.65 $1,386.00 3312.0001 Fire Hydrant EA 19.0 $2,340.00 $44,460.00 3312.2003 1" Water Service EA 248.0 $615.00 $152,520.00 3312.2103 1 1/2" Water Service EA 3.0 $1,310.00 $3,930.00 3312.3002 6" Gate Valve EA 21.0 $750.00 $15,750.00 3312.3003 8" Gate Valve EA 25.0 $1,020.00 $25,500.00 3312.3005 12" Gate Valve EA 16.0 $1,900.00 $30,400.00 3312.4005 8" x 8" Tapping Sleeve & 8" Valve EA 1.0 $2,865.00 $2,865.00 24" x 12" Tapping Sleeve & 12" Valve,to 3312.4211 include any removal and replacement of IS existing pavement 1.0 $7,748.00 $7,748.00 9999.0000 Remove 201F of existing 2" water pipe and replace with 20LF of 12" PVC Pipe, to include pavement removal and replacement, See Sheet 5 LS 1.0 $2,500.00 $2,500.00 Remove 20 LF of existing 6" water pipe 9999.0001 and replace with 20LF of 6" PVC Pipe, to LS include pavement removal and replacement, See Sheet 6 1.0 $750.00 $750.00 9999.0002 4" Irrigation casing LF 248.0 $7.30 $1,810.40 9999.0003 6" Irrigation casing LF 248.0 $12.55 $3,112.40 1.3471.0001 Traffic Control LS 1.0 $550.00 $550.00 $658,870.80 SCALE: 1"=400' TEXAS REGISIERFD ENGINEERING FIRMF-438 16301 Quorum Drive, Suite 2008 Addson, Texas 75001 Tel: 972-248-7676 Fax 972-248-1414 a L-1 1-1 I' I I \' `ra- w. g 1 BLDG ' iJ is -r .- , la. 1-1 ' I F I -I. I.. I, H I;I _ -f , -t. --1— LEGEND PROP. S.S. LINE PROP. S.S. MH — —0— EXIST. S.S. MH EXIST. S.S. LINE PROPOSED SANITARY SEWER LINES ARE 8" UNLESS OTHERWISE INDICATED. • CONNECT TO EXISTING 8" SEWER LINE DOE-4559 SEWER PROJ f P011993.010.1.0625 • • CONOECT TO EXISTING 8" SEWER LINE DOE-5222 SEWER PROJ # P174-070174013471 SANITARY SEWER EXHIBIT A-1 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE STEADMAN FARMS, PHASE 1 (D.O.E NO. 7039) June 3, 2013 — SHEET 4 ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST REVISED BY Jel PARTNERS, INC. ON JULY 9, 2013 FORT WORTH, TEXAS Jel PROTECT NO. HPC085A STEADMAN FARMS, PHASE 1 DOE 7039 X-22109 ITEM UNIT ITEM TOTAL PRICE TOTAL COST ITEM NO. BID ITEM UNIT 3301.0002 Post -CCTV Inspection LF 11,499 $ 1.00 3301.0101 Manhole Vacuum Testing EA 49 $ 115.00 3305.3005 16" Steel Encasement LF 21 $ 74.00 3331.3102 4" 2-Way Cleanout EA 248 $ 387.00 3331.4115 8" Sewer Pipe LF 9,684 $ 19.75 3331.4117 8" Sewer Pipe, CSS Backfill LF 598 $ 20.00 3331.4201 10" Sewer Pipe IF 1,139 $ 23.00 3331.4202 10" Sewer Pipe, CSS Backfill LF 78 $ 23.25 3339.1001 4' Manhole (all depths) EA 45 $ 2,200.00 4' manhole with internal corrosion 9999.0004 protection (all depths) See Sheets 14, EA 17, and 18 9999.0005 Connect to Existing Sewer Pipe EA 3471.0001 Traffic Control lS 1 $500.00 4 2 $ 3,820.00 $ 300.00 $11,499.00 $5,635.00 $1,554.00 $95,976.00 $191,259.00 I $11,960.00 $26,197.00 I $1,813.50 I $99,000.00 $15,280.00 $600.00 $500.00 $461,273.50 HII L-1. l ii \ '1 wow, 1311 tar PALMY ar WPM Ncrai al.493 b%i �' M7Bg1 R 13 ID SCALE: 1"=400' TEXAS REGISTERED ENGINEERING HRM F-438 16301 Quorum Drive, Suite 2008 Adelson, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 / / .m. /1 A 1 ii y/ , 'fK�CaG .f__ ,„ . N rwioxo M91,11 11,307.0 Si trox 1!fINI 3. 5E0161 32.33as upon fa=wyne. wq sr Rnr 1 s Tr rem PROMS. 3, 31311.13,0 LEGEND PROP. 50' ROW 29 B—B PAVEMENT SECTION l S PALMY TAUPE° IMPS.. PER W0m s0om /3313.1213, it roar.1,0 RN) PAVING EXHIBIT B PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE STEADMAN FARMS, PHASE 1 (D.O.E NO. 7039) June 3, 2013 — SHEET 5 ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST REVISED BY 18I PARTNERS, INC. ON JULY 9, 2013 FORT WORTH, TEXAS 181 PROJECT NO. HPC085A STEADMAN FARMS, PHASE 1 DOE 7039 X-22109 ITEM UNIT ITEM TOTAL PRICE TOTAL COST ITEM NO. BID ITEM UNIT 0241.1300 Remove Conc Curb & Gutter LF 160.0 $20.00 $3,200.00 3211.0400 Hydrated Lime TN 588.0 $145.00 $85,260.00 3211.0501 6" Lime Treatment SY 39,230.0 $2.20 $86,306.00 3213.0101 6" Concrete Pavement EA 36,699.0 $25.90 $950,504.10 3213.0301 4" Concrete Sidewalk SF 4,976.0 $4.00 $19,904.00 3213.0501 Barrier Free Ramp, Type R-1 EA 37.0 $1,000.00 $37,000.00 3471.0001 Trafic Control LS 1.0 $800.00 $800.00 9999.0013 Concrete Header IF 145.0 $15.00 $2,175.00 9999.0014 Type III Traffic Barricade LF 87.0 $50.00 $4,350.00 9999.0015 Connect to Existing Pavement IF 239.0 $12.00 $2,868.00 $1,192,367.10 Ca/ itOACT SCALE: 1"=400' TEXAS REGISTEREDFNGI FRING FIRM F-438 16301 Quorum Drive, Suite 2008 Ad6son, Texas 75001 Tel: 972-248-7676 Fax 972.248.1414 7.24574.7 q,. 51,2140 [OW 1r f!Th II e II -- JAI\ A N a� a \ u ft ° CONNECT TO EXISTING 9'x5' RCP STORM LINEI FILE NO. W-1534 ° -, I $ I g 13 „ i Imo- h I I1I .ffHi i i I - LEGEND PROP. INLET - EXIST. INLET PROP. STORM DRAIN = _ — EXIST. STORM DRAIN r.. • •• II„ I � P I• I• I I I' CONNECT TO EXISTING ' 4'x4 DROP INLET • FILE NO. W-1534 1 44 CONNECT TO EXISTING DROP INLET & CONSTR. 5'x5' SEWER MH FILE NO. W-1811 CONNECT TO EXISTING 21" RCP STORM LINE FILE NO. W-1811 CONNECT TO EXISTING 8'x8' DROP INLET FILE NO. W-1811 dt= OLIO STORM DRAIN EXHIBIT B-1 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE STEADMAN FARMS, PHASE 1 (D.O.E NO. 7039) — SHEET 6 H:\ProJects\HPC085 Park Vlsta\dwg\PHASE AVCHPC085A-Exhibits.dwg ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST REVISED 8Y181 PARTNERS, INC. ON JULY 9, 2013 FORT WORTH, TEXAS 181 PROJECT NO. HPC085A STEADMAN FARMS, PHASE 1 DOE 7039 X-22109 ITEM UNIT ITEM TOTAL PRICE TOTAL COST ITEM NO. BID ITEM UNIT 0241.1000 Sawcut Remove, Dispose Concrete SY Flume 85.0 $6.70 $569.50 0241.3019 Remove 36" Storm Line LF 41 $7.65 $313.65 0241.4201 Remove 4' Drop Inlet EA 1 $250.00 $250,00 3305.0109 Trench Safety LF 7,402 $0.20 $1,480.40 Special Riprap (8" rock riprap on 6" 3317.0110 bedding material; Dso'6") SY 13 $65.00 $864.50 3317.0110 8" to 12" diameter rock riprap SY 1,070 $70.00 $74,900.00 3341.0201 21" RCP, Class III LF 335 $33.10 $11,088.50 3341.0202 21" RCP, Class IV LF 155 535.75 $5,541.25 3341.0205 24" RCP, Class III LF 1,479 $39.25 $58,050.75 3341.0206 24" RCP, Class IV LF 221 $43.40 $9,591.40 3341.0208 27" RCP, Class 111 LF 228 $43.50 $9,918.00 3341.0209 27" RCP, Class IV LF 189 $50.90 $9,620.10 3341.0302 30" RCP, Class III LF 501 $48.65 $24,383.38 3341.0303 30" RCP, Class IV LF 204 $55.10 $11,240.40 3341.0305 33" RCP, Class III LF 192 $56.60 $10,857.01 3341.0306 33" RCP, Class IV LF 33 $66.50 $2,194.50 3341.0309 36" RCP, Class 111 LF 1,113 $64.20 $71,454.60 3341.0310 36" RCP, Class IV LF 98 $71.50 $7,007.00 3341.0402 42" RCP, Class 111 IF 8 588.95 $711.60 3341.1102 4x3 Box Culvert LF 294 $118.55 $34,853.70 3341.1201 5x3 Box Culvert LF 772 $146.00 $112,712.00 3341.1302 6x3 Box Culvert LF 374 $180.95 $67,675.30 3341.1304 6x5 Box Culvert LF 160 $212.10 $33,936.00 3341.1402 7x4 Box Culvert LF 182 $236.65 $43,070.30 3341.1403 7x5 Box Culvert LF 214 $260.10 $55,661.40 3341.1501 8x4 Box Culvert LF 40 $258.25 $10,330.00 3341.1502 8x5 Box Culvert LF 46 $272.65 $12,541.90 3349.0001 4' Storm Junction Box EA 7 $2,855.00 $19,985.00 3349.0002 5' Storm Junction Box EA 1 $3,730.00 $3,730.00 3349.0102 4' Manhole Riser EA 5 $1,800.00 $9,000.00 3349.0103 5' Manhole Riser EA 1 $2,035.00 $2,035.00 3349.5001 10' Curb Inlet EA 25 $2,650.00 $66,250.00 3349.5002 15' Curb Inlet EA 5 $3,566.00 $17,830.00 3349.7001 4' Drop Inlet EA 5 $3,468.00 $17,340.00 3349.7003 6' Drop Inlet EA 1 $4,950.00 $4,950.00 3349.4105 24" SET, 1 pipe EA 2 $1,270.00 $2,540.00 9999.0005 8'X3' Box Culvert LF 564 $236.60 $133,442.40 9999.0006 4' x 4' Drop Inlet on RBC EA 3 $2,866.00 $8,598.00 9999.0007 Conned to existing storm drain line EA 2 $800.00 $1,600.00 9999.0008 Connect to existing storm drain EA structure 5 $aoo.0o $4,000.00 9999.0009 Remove and replace paving at 8 x 5 RCB LS connection 1 $2,740.00 $2,740.00 Remove and dispose of existing headwall and mitered pipe to a dean 9999.0030 joint on existing 42" RCP at west LS detention pond, install orifice plate and construct new headwall as per plans and City specs 1 $7,357.00 $7,357.00 Remove and dispose of existing 9999.0011 headwall and mitered pipe to a clean LS joint and plug on existing 36" RCP at west detention pond 1 $375.00 $375.00 Steel plates at upstream face of middle 9999.0012 detention pond culvert control structure LS as per plans & City specifications 1 $3,562.00 $3,562.00 9999.0013 Inlet Erosion Protection (2 Stages) EA 47 $125.00 $5,875.00 rafic Control LS 1.0 $500.00 $500.00 $992,526.55 COI MI1,011012 Orr ,Ootrt Pk, On, I-11 I I I I `I mVW SCALE: 1 "=400' LEGEND STANDARD STREET LIGHT TEXAS REGISTERED ENGINEERING FIRM F-438 16301 Quorum Drive, Suite 200B Addison, Texas 75001 Tel: 972-248-7676 Fax 972-248-1414 STREET LIGHTING EXHIBIT C PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE STEADMAN FARMS, PHASE 1 (D.O.E NO. 7039) June 3, 2013 — SHEET 7 H:\Projects\HPC085 Park Vista\dwg\PHASE A' (HPC085A-Exhibits.dwg ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST STEADMAN FARMS, PHASE 1 REVISED BY 181 PARTNERS, INC. ON JULY 9, 2013 DOE 7039 FORT WORTH, TEXAS X-22109 1BI PROJECT NO. HPC085A ITEM NO. 3441.3101 3441.3301 3441.3011 3441.1410 UNIT TOTAL BID ITEM Instal1100W HPS PC Lighting Fixture Rdwy Ilium Foundation TY 7 2" CONDT PVC SCH 40 (T) NO 10 Insulated Elec Condr UNIT EA EA LF LF ITEM UNIT ITEM TOTAL PRICE TOTAL COST 43 $585.00 $25,155.00 43 $610.00. $26,230.00 2290 $5.10 $11,679.00 6870 $0.55 $3,778.50 $66.842.50 1 $2,910,606.95 C/A ....leaf Cet r..0„ov BLDG mAgemer SCALE: 1"=400' dB! TEXAS REGISTERED ENGINEERING HRM F438 16301 Quorum Drive, Suite 200B Adelson, Texas 75001 Tel: 972-248-7676 Fax 972-248-1414 .-.7.141. I . \.\1 wow LEGEND PROPOSED SIGNBLADE 8 � . i " ALE am 7 T T 11 107272171.1 CONE Ex 7 STREET SIGNS EXHIBIT C-1 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE STEADMAN FARMS, PHASE 1 (D.O.E NO. 7039) June 3, 2013 — SHEET 8