HomeMy WebLinkAboutContract 44702 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
COUNTY OF TARRANT §
City Secretary
Contract No. 406
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Steadman Farms, LLC
Address, State, Zip Code: 3001 Knox Street, Suite 207 I Dallas, TX 75205
Phone, E-Mail: (214) 445-2211 1 ben@hanoverproperty.com
Authorized Signatory/Title: Richard LeBlanc, President
Project Name: Steadman Farms Phase 1
Project Location: SWC of Keller -Haslet and Park Vista Blvd.
Plat Case No.: FP-013-011 Plat Name: Steadman Farms
Mapsco: 8Z, 22D
CFA: 2013-036 DOE: 7039
To be completed by staff
Received by: (
Council District: 2 City Project No: 02109
RECEIVED AUG 13 2616 1
Date: —1 1244, I 1 ��
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water (A) X,
Sewer (A-1) _ X, Paving (B) X, Storm Drain (B-1) X , Street Lights &
Signs (C) X .
2
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such iniuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused, in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Steadman Farms Phase 1
CFA No.: 2013-036 DOE No.: 7039
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total $ 1,120,144.30
658,870.80
461,273.50
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total $ 2,251,736.15
$ 1,192,367.10
$ 992,526.55
$ 66,842.50
Total Construction Cost (excluding the fees):
$ 3,371,880.45
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 22,402.89
D. Water/Sewer Material Testing Fee (2%) $ 22,402.89
Sub -Total for Water Construction Fees $ 44,805.77
E. TPW Inspection Fee (4%) $ 87,395.75
F. TPW Material Testing (2%) $ 43,697.87
G. Street Light Inspsection Cost $ 2,673.70
H. Street Signs Installation Cost (21 @ $245 EA.) $ 5,145.00
Sub -Total for TPW Construction Fees $ 138,912.32
Total Construction Fees:
$ 183,718.09
Choice
Financial Guarantee Options, choose one Amount (ck one)
(Bond = 100% $ 3,371,880.45
(Completion Agreement = 100% / Holds Plat $ 3,371,880.45 ,,/
(Cash Escrow Water/Sanitary Sewer= 125% $ 1,400,180.38
(Cash Escrow Paving/Storm Drain = 125% $ 2,814,670.19
Letter of Credit = 125% w/2yr expiration period $ 4,214,850.56
8
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said De er has execut- o this
instrument in uadruplicate, at Fort Worth, Texas this / L I day of ��.:
?...?
,20 /
CITY OF FORT WORTH - Recommended by:
Water Department
Lk,
Wendy Ch. Babulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. y/a
Date:
ATTEST:
Mar J. Kays
City Secreta
ATTEST:
444
Signature ,Q
(Print) Name: di � 17 /45 14:/4 54
Transportation & Public Works Department
DouglaQW. Wiersig, P.E.
Director
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
Steadman Farms, LLC
a Texas limited liability company
By: Hanover Services Group, Inc.
a Texas corporation, its manager
9
Signature
Print Name: /i'6%iIE% Lc11/one
Title: /44.i O/e,t
OFFICIAL RECORD
CITY SECRETARY
FT. WORTT 't X
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, & DRAINAGE
IMPROVEMENTS
TO SERVE
STEADMAN FARMS, PHASE 1
L]MIT
KELLER
CITY LIMIT
- HASLET - ROANOKE
SITE
TIM:ERLANO
SU T
FORT IRT CITY LIMIT
LOCATION MAP
NOT TO SCALE
D.O.E. NO. 7039
CITY PROJECT NO. 02109
WATER PROJECT NO. P265-6021502109-00
SEWER PROJECT NO. P275-7021302109-00
FILE NO. W-2267
170
FORT WORTS
CI FR - HASLET
NX HAWN
CAYLOR
'III FR - HICKS
Creek
60.686 - 1R)AN%
CBI
'TEXAS REGISTERED ENGINEERING FIRM F438
16301 Quorum Drive, Suite 2008
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
June 3, 2013 — SHEET 1
Case No. FP-013-011
FINAL PLAT
STEADMAN FARMS
BLOCK A, LOTS 1-21, 22X 8c 23X, BLOCK B, LOTS 1-28, 29X 8c 30X,
BLOCK C, LOTS 1-20, BLOCK D, LOTS 1-20, BLOCK E, LOTS 1-20,
BLOCK F, LOTS 1-15, 8c 16X, BLOCK G, LOTS 1-16,
BLOCK H, LOTS 1-13 8c 14X, BLOCK I, LOTS 1-16,
BLOCK J, LOTS 1-20, BLOCK K, LOTS 12-28, 29X 8c 30X,
BLOCK L, LOTS 1-16, BLOCK M, LOTS 1-16,
BLOCK N, LOTS 1-7 8c 31-33, 34X (Sc 35X,
BEING 60.063 ACRES OUT OF THE
JOSE CHIRINO SURVEY, ABSTRACT NO. 265,
CITY OF FORT WORTH, TARRANT COUNTY, TEXAS
STEADMAN FARMS, LLC
3001 Knox Stre.et Suite 207
Dallas, Texas 75205
JBI PARTNERS, INC.
16301 Quorum Drive, Suite 200 B
Addison, Texas 75001
TEXAS REGISTERED ENGINEERING FIRM F-438
OWNER/DEVELOPER
(214)445-2211
SURVEYOR/ENGINEER
(972)248-7676
16301 Quorum Drive, Suite 200B
Addson, Texas 75001
Tel: 972-248-7676
Fax 972.248.1414
June 3, 2013 — SHEET 2
17.
EXIST.
8" WATER
'CONNECT TO EXISTING
8" WATER LINE
DOE -UNKNOWN
X-20150
SCALE: 1"=500'
dB!
'IE{AS REGISTERED ENGINEERING FIRM F-438
16301 Quorum Drive, Suite 200B
Addson, Texas 75001
Tel: 972-248-7676
Fax 972-248-1414
CONNECT TO EXISTING
2" WATER LINE
.a.
vr.w rn va ota•
sw
r.1
T77-
I:I�
• s '
LEGEND
PROP. WATERLINE
PROP. VALVE
PROP. FIRE
HYDRANT
PROPOSED WATER
LINES ARE 8" UNLESS
OTHERWISE INDICATED.
Fd
1
CONNECT TO EXISTING
24" WATER LINE
r- DOE-3049
X-12395
WATER PROJ #
PW77-060770140530
it
\F
WATER
EXHIBIT A
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
STEADMAN FARMS, PHASE 1
(D.O.E NO. 7039)
June 3, 2013 — SHEET 3
ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST
REVISED BY 181 PARTNERS, INC. ON JULY 9, 2013
FORT WORTH, TEXAS
1B1 PROJECT NO. HPC085A
STEADMAN FARMS, PHASE 1
DOE 7039
X-22109
ITEM UNIT ITEM
TOTAL PRICE TOTAL COST
ITEM NO. BID ITEM UNIT
3311.0001 Ductile Non Water Fittings w/ Restraint TON
14.1 $3,400.00 $47,940.00
3311.0260 6" PVC Water Pipe LF 20.0 $15.85 $317.00
3311.0261 8" PVC Water Pipe LF 6,725 $21.00 $141,225.00
3311.0262 8" PVC Water Pipe, CSS Backfi l LF 140 $23.00 $3,220.00
3311.0461 12" PVC Water Pipe LF 5,577 $31.00 $172,887.00
3311.0462 12" PVC Water Pipe, CSS Backfill LF 40.0 $34.65 $1,386.00
3312.0001 Fire Hydrant EA 19.0 $2,340.00 $44,460.00
3312.2003 1" Water Service EA 248.0 $615.00 $152,520.00
3312.2103 1 1/2" Water Service EA 3.0 $1,310.00 $3,930.00
3312.3002 6" Gate Valve EA 21.0 $750.00 $15,750.00
3312.3003 8" Gate Valve EA 25.0 $1,020.00 $25,500.00
3312.3005 12" Gate Valve EA 16.0 $1,900.00 $30,400.00
3312.4005 8" x 8" Tapping Sleeve & 8" Valve EA 1.0 $2,865.00 $2,865.00
24" x 12" Tapping Sleeve & 12" Valve,to
3312.4211 include any removal and replacement of IS
existing pavement 1.0 $7,748.00 $7,748.00
9999.0000
Remove 201F of existing 2" water pipe
and replace with 20LF of 12" PVC Pipe,
to include pavement removal and
replacement, See Sheet 5
LS
1.0 $2,500.00 $2,500.00
Remove 20 LF of existing 6" water pipe
9999.0001 and replace with 20LF of 6" PVC Pipe, to
LS
include pavement removal and
replacement, See Sheet 6
1.0 $750.00 $750.00
9999.0002 4" Irrigation casing LF 248.0 $7.30 $1,810.40
9999.0003 6" Irrigation casing LF 248.0 $12.55 $3,112.40
1.3471.0001 Traffic Control LS 1.0 $550.00 $550.00
$658,870.80
SCALE: 1"=400'
TEXAS REGISIERFD ENGINEERING FIRMF-438
16301 Quorum Drive, Suite 2008
Addson, Texas 75001
Tel: 972-248-7676
Fax 972-248-1414
a L-1 1-1 I' I I \' `ra-
w.
g 1
BLDG
' iJ is
-r
.- , la. 1-1 ' I F I
-I. I.. I, H I;I
_ -f , -t. --1—
LEGEND
PROP. S.S. LINE
PROP. S.S. MH
— —0— EXIST. S.S. MH
EXIST. S.S. LINE
PROPOSED SANITARY
SEWER LINES ARE 8"
UNLESS OTHERWISE
INDICATED.
•
CONNECT TO EXISTING
8" SEWER LINE
DOE-4559
SEWER PROJ f
P011993.010.1.0625
•
•
CONOECT TO EXISTING
8" SEWER LINE
DOE-5222
SEWER PROJ #
P174-070174013471
SANITARY SEWER
EXHIBIT A-1
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
STEADMAN FARMS, PHASE 1
(D.O.E NO. 7039)
June 3, 2013 — SHEET 4
ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST
REVISED BY Jel PARTNERS, INC. ON JULY 9, 2013
FORT WORTH, TEXAS
Jel PROTECT NO. HPC085A
STEADMAN FARMS, PHASE 1
DOE 7039
X-22109
ITEM UNIT ITEM
TOTAL PRICE TOTAL COST
ITEM NO. BID ITEM UNIT
3301.0002 Post -CCTV Inspection LF 11,499 $ 1.00
3301.0101 Manhole Vacuum Testing EA 49 $ 115.00
3305.3005 16" Steel Encasement LF 21 $ 74.00
3331.3102 4" 2-Way Cleanout EA 248 $ 387.00
3331.4115 8" Sewer Pipe LF 9,684 $ 19.75
3331.4117 8" Sewer Pipe, CSS Backfill LF 598 $ 20.00
3331.4201 10" Sewer Pipe IF 1,139 $ 23.00
3331.4202 10" Sewer Pipe, CSS Backfill LF 78 $ 23.25
3339.1001 4' Manhole (all depths) EA 45 $ 2,200.00
4' manhole with internal corrosion
9999.0004 protection (all depths) See Sheets 14, EA
17, and 18
9999.0005 Connect to Existing Sewer Pipe EA
3471.0001 Traffic Control lS 1 $500.00
4
2
$ 3,820.00
$ 300.00
$11,499.00
$5,635.00
$1,554.00
$95,976.00
$191,259.00 I
$11,960.00
$26,197.00 I
$1,813.50 I
$99,000.00
$15,280.00
$600.00
$500.00
$461,273.50
HII L-1.
l
ii \ '1 wow,
1311
tar PALMY
ar
WPM Ncrai al.493 b%i �'
M7Bg1 R 13 ID
SCALE: 1"=400'
TEXAS REGISTERED ENGINEERING HRM F-438
16301 Quorum Drive, Suite 2008
Adelson, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
/
/ .m.
/1
A
1
ii
y/ , 'fK�CaG .f__ ,„ . N
rwioxo
M91,11 11,307.0
Si trox
1!fINI
3.
5E0161 32.33as upon fa=wyne. wq
sr Rnr
1 s Tr
rem
PROMS. 3, 31311.13,0
LEGEND
PROP. 50' ROW 29 B—B
PAVEMENT SECTION
l S PALMY
TAUPE° IMPS.. PER
W0m s0om
/3313.1213,
it
roar.1,0 RN)
PAVING
EXHIBIT B
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
STEADMAN FARMS, PHASE 1
(D.O.E NO. 7039)
June 3, 2013 — SHEET 5
ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST
REVISED BY 18I PARTNERS, INC. ON JULY 9, 2013
FORT WORTH, TEXAS
181 PROJECT NO. HPC085A
STEADMAN FARMS, PHASE 1
DOE 7039
X-22109
ITEM UNIT ITEM
TOTAL PRICE TOTAL COST
ITEM NO. BID ITEM UNIT
0241.1300 Remove Conc Curb & Gutter LF 160.0 $20.00 $3,200.00
3211.0400 Hydrated Lime TN 588.0 $145.00 $85,260.00
3211.0501 6" Lime Treatment SY 39,230.0 $2.20 $86,306.00
3213.0101 6" Concrete Pavement EA 36,699.0 $25.90 $950,504.10
3213.0301 4" Concrete Sidewalk SF 4,976.0 $4.00 $19,904.00
3213.0501 Barrier Free Ramp, Type R-1 EA 37.0 $1,000.00 $37,000.00
3471.0001 Trafic Control LS 1.0 $800.00 $800.00
9999.0013 Concrete Header IF 145.0 $15.00 $2,175.00
9999.0014 Type III Traffic Barricade LF 87.0 $50.00 $4,350.00
9999.0015 Connect to Existing Pavement IF 239.0 $12.00 $2,868.00
$1,192,367.10
Ca/ itOACT
SCALE: 1"=400'
TEXAS REGISTEREDFNGI FRING FIRM F-438
16301 Quorum Drive, Suite 2008
Ad6son, Texas 75001
Tel: 972-248-7676
Fax 972.248.1414
7.24574.7
q,.
51,2140 [OW
1r
f!Th
II
e II
-- JAI\ A
N a�
a \
u ft
° CONNECT TO EXISTING
9'x5' RCP STORM LINEI
FILE NO. W-1534
°
-, I
$ I g 13 „ i Imo-
h I I1I
.ffHi i i I -
LEGEND
PROP. INLET
- EXIST. INLET
PROP. STORM DRAIN
= _ — EXIST. STORM DRAIN
r..
•
•• II„ I � P
I• I• I I I'
CONNECT TO EXISTING
' 4'x4 DROP INLET
• FILE NO. W-1534
1
44
CONNECT TO EXISTING
DROP INLET & CONSTR.
5'x5' SEWER MH
FILE NO. W-1811
CONNECT TO EXISTING
21" RCP STORM LINE
FILE NO. W-1811
CONNECT TO EXISTING
8'x8' DROP INLET
FILE NO. W-1811
dt=
OLIO
STORM DRAIN
EXHIBIT B-1
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
STEADMAN FARMS, PHASE 1
(D.O.E NO. 7039)
— SHEET 6
H:\ProJects\HPC085 Park Vlsta\dwg\PHASE AVCHPC085A-Exhibits.dwg
ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST
REVISED 8Y181 PARTNERS, INC. ON JULY 9, 2013
FORT WORTH, TEXAS
181 PROJECT NO. HPC085A
STEADMAN FARMS, PHASE 1
DOE 7039
X-22109
ITEM UNIT ITEM
TOTAL PRICE TOTAL COST
ITEM NO. BID ITEM UNIT
0241.1000 Sawcut Remove, Dispose Concrete SY
Flume 85.0 $6.70 $569.50
0241.3019 Remove 36" Storm Line LF 41 $7.65 $313.65
0241.4201 Remove 4' Drop Inlet EA 1 $250.00 $250,00
3305.0109 Trench Safety LF 7,402 $0.20 $1,480.40
Special Riprap (8" rock riprap on 6"
3317.0110 bedding material; Dso'6") SY 13 $65.00 $864.50
3317.0110 8" to 12" diameter rock riprap SY 1,070 $70.00 $74,900.00
3341.0201 21" RCP, Class III LF 335 $33.10 $11,088.50
3341.0202 21" RCP, Class IV LF 155 535.75 $5,541.25
3341.0205 24" RCP, Class III LF 1,479 $39.25 $58,050.75
3341.0206 24" RCP, Class IV LF 221 $43.40 $9,591.40
3341.0208 27" RCP, Class 111 LF 228 $43.50 $9,918.00
3341.0209 27" RCP, Class IV LF 189 $50.90 $9,620.10
3341.0302 30" RCP, Class III LF 501 $48.65 $24,383.38
3341.0303 30" RCP, Class IV LF 204 $55.10 $11,240.40
3341.0305 33" RCP, Class III LF 192 $56.60 $10,857.01
3341.0306 33" RCP, Class IV LF 33 $66.50 $2,194.50
3341.0309 36" RCP, Class 111 LF 1,113 $64.20 $71,454.60
3341.0310 36" RCP, Class IV LF 98 $71.50 $7,007.00
3341.0402 42" RCP, Class 111 IF 8 588.95 $711.60
3341.1102 4x3 Box Culvert LF 294 $118.55 $34,853.70
3341.1201 5x3 Box Culvert LF 772 $146.00 $112,712.00
3341.1302 6x3 Box Culvert LF 374 $180.95 $67,675.30
3341.1304 6x5 Box Culvert LF 160 $212.10 $33,936.00
3341.1402 7x4 Box Culvert LF 182 $236.65 $43,070.30
3341.1403 7x5 Box Culvert LF 214 $260.10 $55,661.40
3341.1501 8x4 Box Culvert LF 40 $258.25 $10,330.00
3341.1502 8x5 Box Culvert LF 46 $272.65 $12,541.90
3349.0001 4' Storm Junction Box EA 7 $2,855.00 $19,985.00
3349.0002 5' Storm Junction Box EA 1 $3,730.00 $3,730.00
3349.0102 4' Manhole Riser EA 5 $1,800.00 $9,000.00
3349.0103 5' Manhole Riser EA 1 $2,035.00 $2,035.00
3349.5001 10' Curb Inlet EA 25 $2,650.00 $66,250.00
3349.5002 15' Curb Inlet EA 5 $3,566.00 $17,830.00
3349.7001 4' Drop Inlet EA 5 $3,468.00 $17,340.00
3349.7003 6' Drop Inlet EA 1 $4,950.00 $4,950.00
3349.4105 24" SET, 1 pipe EA 2 $1,270.00 $2,540.00
9999.0005 8'X3' Box Culvert LF 564 $236.60 $133,442.40
9999.0006 4' x 4' Drop Inlet on RBC EA 3 $2,866.00 $8,598.00
9999.0007 Conned to existing storm drain line EA 2 $800.00 $1,600.00
9999.0008 Connect to existing storm drain EA
structure 5 $aoo.0o $4,000.00
9999.0009 Remove and replace paving at 8 x 5 RCB
LS
connection 1 $2,740.00 $2,740.00
Remove and dispose of existing
headwall and mitered pipe to a dean
9999.0030 joint on existing 42" RCP at west
LS
detention pond, install orifice plate and
construct new headwall as per plans
and City specs 1 $7,357.00 $7,357.00
Remove and dispose of existing
9999.0011 headwall and mitered pipe to a clean
LS
joint and plug on existing 36" RCP at
west detention pond 1 $375.00 $375.00
Steel plates at upstream face of middle
9999.0012 detention pond culvert control structure
LS
as per plans & City specifications
1 $3,562.00 $3,562.00
9999.0013 Inlet Erosion Protection (2 Stages) EA 47 $125.00 $5,875.00
rafic Control LS 1.0 $500.00 $500.00
$992,526.55
COI MI1,011012
Orr ,Ootrt Pk, On,
I-11 I I I I `I mVW
SCALE: 1 "=400'
LEGEND
STANDARD STREET LIGHT
TEXAS REGISTERED ENGINEERING FIRM F-438
16301 Quorum Drive, Suite 200B
Addison, Texas 75001
Tel: 972-248-7676
Fax 972-248-1414
STREET LIGHTING
EXHIBIT C
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
STEADMAN FARMS, PHASE 1
(D.O.E NO. 7039)
June 3, 2013 — SHEET 7
H:\Projects\HPC085 Park Vista\dwg\PHASE A' (HPC085A-Exhibits.dwg
ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST STEADMAN FARMS, PHASE 1
REVISED BY 181 PARTNERS, INC. ON JULY 9, 2013 DOE 7039
FORT WORTH, TEXAS X-22109
1BI PROJECT NO. HPC085A
ITEM NO.
3441.3101
3441.3301
3441.3011
3441.1410
UNIT TOTAL
BID ITEM
Instal1100W HPS PC Lighting Fixture
Rdwy Ilium Foundation TY 7
2" CONDT PVC SCH 40 (T)
NO 10 Insulated Elec Condr
UNIT
EA
EA
LF
LF
ITEM UNIT ITEM
TOTAL PRICE TOTAL COST
43 $585.00 $25,155.00
43 $610.00. $26,230.00
2290 $5.10 $11,679.00
6870 $0.55 $3,778.50
$66.842.50
1 $2,910,606.95
C/A ....leaf
Cet r..0„ov
BLDG
mAgemer
SCALE: 1"=400'
dB!
TEXAS REGISTERED ENGINEERING HRM F438
16301 Quorum Drive, Suite 200B
Adelson, Texas 75001
Tel: 972-248-7676
Fax 972-248-1414
.-.7.141. I . \.\1
wow
LEGEND
PROPOSED SIGNBLADE
8 � . i "
ALE
am 7
T T
11
107272171.1 CONE
Ex 7
STREET SIGNS
EXHIBIT C-1
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
STEADMAN FARMS, PHASE 1
(D.O.E NO. 7039)
June 3, 2013 — SHEET 8