Loading...
HomeMy WebLinkAboutContract 44705 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § City Secretary Contract No. L)L+-S WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements. Developer and Project Information: Developer Company Name: Hahei, Ltd. Address, State, Zip Code: 365 Miron Dr., Suite A I Southlake, TX 76092 Phone, E-Mail: (817) 416-3981 I jancaster@offrceeyuitysolutions.com Authorized Signatory/Title: James Lancaster, Director Project Name and Brief Description: Water & Sewer Improvements to serve Heritage Trace Center Ph. V, Lot 4 Project Location:SW Corner of Heritage Trace Pkwy. & N. Beach St. Plat Case No.: FS-013-054 Plat Name: Heritage Addition Council District: 2 City Project No: 02124 ICFA: 2013-043 To be completed by staff. ` 1 Received by: � V\ k�� RECEIVED AUG 13 2013 1 DOE: 7067 Date: i 1 3 i I 13 OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. ;The following checked exhibits are made a part hereof: Water (A) X, Sewer (A-1) __X, Paving (B) Storm Drain (B-1) , Street Lights & Signs (C)_ E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in 2 the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries. death or damages are caused. in whole or in part. by the alleged negligence of the City of Fort Worth. its officers. servants. or enwlovees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries. death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth. its officers. servants. or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the infrastructure and Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. If applicable, the City's obligation to participate (exclusive of front foot charges) in the cost of the Improvements shall terminate if the Improvements are not completed within two (2) years; provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Heritage Trace Center Ph. V, Lot 4 CFA No.: 2013-043 DOE No.: 7067; Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 51,153.00 2. Sewer Construction $ 38,979.00 Water and Sewer Construction Total $ 90,132.00 B. TPW Construction 1. Street $ 2. Storm Drain $ 3. Street Lights Installed by Developer $ TPW Construction Cost Total $ Total Construction Cost (excluding the fees): $ 90,132.00 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 1,802.64 D. Water/Sewer Material Testing Fee (2%) $ 1,802.64 Sub -Total for Water Construction Fees $ 3,605.28 E. TPW Inspection Fee (4%) $ F. TPW Material Testing (2%) $ G. Street Light lnspsection Cost $ H. Street Signs Installation Cost $ Sub -Total for TPW Construction Fees $ Total Construction Fees: $ 3,605.28 Choice Financial Guarantee Options, choose one Amount (ck one) 'Bond = 100% $ 90,132.00 'Completion Agreement = 100% / Holds Plat $ 90,132.00 'Cash Escrow Water/Sanitary Sewer= 125% $ 112,665.00 'Cash Escrow Paving/Storm Drain = 125% $ - 'Letter of Credit = 125% w/2yr expiration period $ 112,665.00 V 7 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said eloper has execute this instrument in quadruplicate, at Fort Worth, Texas this day of .20>�. CITY OF FORT WORTH - Recommended by: Water Department (.6411,1 Wendy Chit Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. /.- Date: ATTEST: Mary J. a City Secre Transportation & Public Works Department "V Dougla. Wiersig, P.E. Director Approved by City Manager's Office "7/4414.40‘ Fernando Costa Assistant City Manager ATTEST: Hahei, Ltd. g0..kra\ t-1on *art L 1, W'\L. By: Hahei Management Corp. its General Partner l(A q/umut\ Signature (Print) Name: Y_IrrAto-eAtl 8 Print Nal Title: ignature iCUM1LS Lan CaS-t�' OFFICIAL RECORD. CITY SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ►1 Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ❑ Exhibit B: Paving Improvements 111 Paving Estimate ❑ Exhibit B-1: Storm Drain Improvements ❑ Storm Drain Estimate ❑ Exhibit C: Street Lights and Signs Improvements ❑ Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 9 DOE No: 7067 City Project No: 02124 OLD DENTON ROAD OFFICE EQUITY SOLUTIONS I I 365 Miron, Suite A �R ISouthloke, TX 76092 r r Tel. (817)416-3981 Fox: (817)416-8372 o Baird, Hampton & Brown, Inc. 4� c Engineering & Surveying 4550 SH 360 Ste. 180, 0(66.60o, TX 76051 Te16817)251-8550 To)(817)251-8810 woo 8H831Ccom THE FRV 144 r GLEN DR SILVERWOOD TRAIL VICINITY MAP N ALTA VISTA N BEACH STREET SHIVER 0 1,000' 2,000' HERITAGE TRACE CENTER PHASE v HERITAGE ADDITION LOT 4, BLOCK 162 FORT WORTH, TX 07 co Ed 0 DATE: JULY 2013 SCALE 1"=1,000' THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW UNDER THE AUTHORITY OF KONSTANTINE BAKINTAS, P.E. Tx No. 67022 IT IS NOT INTENDED FOR CONSTRUCTION, BIDDING OR PERMIT PURPOSES. BHB PROJECT NO: 2013.700.000 DRAWING FILE: E:\2013.000.000\2013 700 000\dwg\CFA\CFA dwg I Vicinity lop DOE No: 7067 City Project No: 02124 CONNECT TO EX. In Heritage Addtion 10" WATER LINE (Variable WidthRighlol-Wa) PROPOSED 10" svD H WATER LINE oI z DOME TI IRRIGATIOI+1' IA IE i METER III 9,824 SF BUILDING Document Ito D203220170, P.R T.0 T 16ti W>>0i �PRIVATE SANITARY SEWER SERVICE v e Paaxo �. v �et�V9 Jn�e L' C. 02 p5$bZ,Q LEGEND EXISTING PROPOSED PROPERTY LINE BUILDING FOOTPRINT CURB & GUTTER WATER LINE WATER VALVE FIRE HYDRANT METER BOX SANITARY SEWER 0 SEWER MANHOLE Fer Ie 0 PROPOSED SSMH OFFICE EQUITY SOLUTIONS 365 Miron, Suite A Southlake, TX 76092 Tel: (817)416-3981 Fox; (817)416-8372 re=, o Baird, Hampton & Brown, Inc. e� 0 Engineering ,Sc Surveying 4550 5 H. 360 Ste, 180, Crope/ne. TX 76051 TH(817)251-8650 Fo6(817)251-8810 ""w.BHB;;C torn 18PE FIR4 j44 DRAWING FILE; E:\2013.000.000\2013.700.00D\dog\CFA\CFA dwg I Woter 1 4 Si • Heritage Trace Parkway GAS PROPOSED FIRE HYDRANT VARIABLE WIDTH WATER EASEMENT (DEDICATED BY SEPARATE INSTRUMENT) N \ TEMPORARY CONSTRUCTION EASEMENT r-- Ji° 1 L- °N.; \ \\ I i CONNECT TO ISTING _X 12" WATER Remainder of ELECTRIC Hillwoodi2500, LTD EASEMENT Volume 9409, Page 1403, D.R.T.C.T. PPF:POSED 8" SAN''TARY SEWER 15" SANITARY (DE I SEVER EASEMENT CATED BY SEPARATE INSTRUMENT) t TEMPORARY CONSTRUCTION EASEME N 45°00'00" W 14.26' —EX_8 _WATER Document No. D212057882, P.j1.7.T. �� ��SEw C / �Pa/ (Vay) Bewley Drive/ nieble WIdt -W EXHIBIT "A" 10" WATER LINE 0 60' / SCALE 1"=60' HERITAGE TRACE CENTER PHASE v HERITAGE ADDITION LOT 4, BLOCK 162 FORT WORTH, TX co 0 co 0 DATE: JULY 2013 x w 120' THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW UNDER THE AUTHORITY OF KONSTANTINE BAKINTAS, P.E. Tx No. 67022 IT IS NOT INTENDED FOR CONSTRUCTION, BIDDING OR PERMIT PURPOSES. BHB PROJECT NO: 2013.700.000 Page 1 of 1 Engineer's Preliminary Opinion of PROBABLE CONSTRUCTION COST for WATER IMROVEMENTS to Serve Heritage Trace Center Phase V-Lot 4 Item BID LIST DESCRIPTION ITEM No. 1 3305.0103 Exploratory Excavation of Existing Utilities 3 7 11 12 13 14 15 16 17 18 19 3305.0109 Trench Safe 3311.0361 10" PVC Water Pipe 3311.0001 Ductile Iron 3312.0001 Fire Hydrant 3311.0161 6" PVC Water Pipe 3312.2103 1 1/2" Water Service 3312.3002 6" Gate Valve w/ Box &.laid 3312.3004 10" Gate Valve w/ Box & Lid 3441.1301 Saw Cut (Driveway} 0241.0401 Remove Concrete Drive 3213.0401 6" Concrete Driveway. 0241.0300 Remove ADA Ramp 3213.0501 Barrier Free Ramp, Type 3312.4108 12" x 10" Tapping Sleeve & Valve i1'S1 3471.0001 Traffic Control 3291.0100 Topsoi 3292.0100 Block Sod Replacement ings QTY UNIT PRICE AMOUNT 2 EA 471 LF 452 0.75 1 LF EA 2 EA $600.00 $1,200.00 $2.00 $942 00 $40.00 $18,080.00 0 $2,500.00 $2,500.00 $600.00 $1,200.00 1 EA $1,500.00 $1,500.00 620 SF $3.00 $1,860.00 $200.00 1 EA $3,500.00 $3,500.00 LS $3,500.00 $3,500.00 518 SY $5.00 $2,590.00 Total for Water Improvements $51,153.00 CITY OF FORT WORTH Water & Sewer Improvements to Serve Heritage Trace Center Phase V-Lot 4 C.P. 02124 DOE No: 7067 City Project No: 02124 - sv0 ,; EXISTING Heritage Trace Parkway PROPOSED 10" WATER LINE DOMESTIC IRRIGATIOtV WATER METER 1 !II; i PRIVATE DOMES'pk WATER SERV 9,824 SF BUILDING PRIVATE SANITARY SEWER SERVICE LEGEND PROPERTY LINE BUILDING FOOTPRINT CURB & GUTTER WATER LINE WATER VALVE FIRE HYDRANT METER BOX SANITARY SEWER SEWER MANHOLE in Heritage Addtion (Venable WMth Rightol-Way) Document Ho D203220170, P R T C T. nns PROPOSED rn PROPOSED SSMH Z 4 OFFICE EQUITY SOLUTIONS 365 Miron, Suite A Southlake, TX 76092 Tel: (617)416-3981 Fox: (817)416-8372 Baird, Hampton & Brown, Inc. L'— 0 e Engineering 8c Surveying 4550 SR 360 Ste. 100, Cropegne, 1X 76051 10.(817)251-8550 Fo, (817)251-8810 ....BHBliC cnm 1BPE MU 144 DRAWING FILE: E:\2013.000.000\2013700000\dog\CFA\CFA dog 1 Sewer cis GAS VARIABLE WIDTH WATER EASEMENT (DEDICATED BY SEPARATE INSTRUMENT) TEMPORARY CONSTRUCTION EASEMENT Remainder of Hillwood/2500, LTD Volume 9409, Page 1403, D.R.T.C.T. PROPOSED SSMH PR POSED 8" SAN TARY SEWER 15" SANITARY (DE I SEER EASEMENT CATED BY SEPARATE INSTRUMENT) L � L- ELECTRIC EASEMENT TEMPORARY CONSTRUCTION EASEME Bewley Drive/ \ti VMt (Variable h Right -of -Way) Document No. D212057082, P.R.TC E 50 R cP / o • — 8 11 EXHIBIT "A-1" SANITARY SEWER LINE HERITAGE TRACE CENTER PHASE v HERITAGE ADDITION LOT 4, BLOCK 162 FORT WORTH, TX R Li N 11 lk� NII X W et- M11O D 1 NIL CONNECT T EX 12" SANITAR SEWEF 60' 120' aa 0 0 0 DATE: JULY 2013 SCALE 1"=60' THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF INTERIM REVIEW UNDER THE AUTHORITY OF KONSTANTINE BAKINTAS, P.E. Tx No. 67022 IT IS NOT INTENDED FOR CONSTRUCTION, BIDDING OR PERMIT PURPOSES. BHB PROJECT NO: 2013.700.000 Page 1 of 1 Engineer's Preliminary Opinion of PROBABLE CONSTRUCTION COST for SANITARY SEWER IMPROVEMENTS to Serve Heritage Trace Center Phase V-Lot 4 Item BID LIST DESCRIPTION ITEM No. 1 3305.0103 Exploratory Excavation of Existing Utilities 2 3305.0109 Trench Safety 3 3331.4115 8" PVC Sewer Pipe 3301.0002 Post -CCTV Inspection_ 3331.3101 4" Sewer Service 3339.1001 4' Manhole 7 9999.0002 Normal Drop at Ex. Manhole 9 11 3301.0101 Manhole Vacuum Testing 3305.0112 Concrete Collar 3339.0001 Corrosion Protection for Existing'IitlanHole 3339.1003 4' Extra Depth Manhole 12� 3291.0100 Topsoil, 13 3292.01001Block Sod Replacement QTY UNIT PRICE AMOUNT 1 EA $1,250.00 $1,250.00 282 IF $3.00 $84+6.00 282 LF $36.00 $10,152.00 282 LF 1 EA 1 EA 4 EA 4 EA 16 VF 2 VF 56 CY 487 SY 3.00 $846.00 $550.00 $550.00 $3,500.00 $14,000 00 $2,000.00 $2,000.00 $200.00 - $000 00 $300.00 $1,200.00 $175.00 $2,800.00 $350.00 $700.00 $25.00 $1,400 00 $5.00 $2,435.00 Total Bid for Sanitary Sewer Improvements $38,979.00 CITY OF FORT WORTH Water & Sewer Improvements to Serve Heritage Trace Center Phase V-Lot 4 C.P. 02124 1 of 1 ITEM NO. 1 2 CFA QUANTITY MATRIX FOR IMPROVEMENTS TO SERVE HERITAGE TRACE CENTER PHASE V-LOT 6 BID ITEM Exploratory Excavation of Existing Utilities Trench Safety 3 10" PVC Water Pipe 4 Ductile Iron Water Fittings 5 Fire Hydrant 6 6" PVC Water Pipe 7 1 1/2" Water Service 8 6" Gate Valve w/ Box & Lid 9 10" Gate Valve w/ Box & Lid 10 Saw Cut (Driveway) 11 Remove Concrete Drive 12 6" Concrete Driveway 13 Remove ADA Ramp 14 15 16 17 18 19 Barrier Free Ramp, Type R-1 12" x 10" Tapping Sleeve & Valve SW3P Traffic Control Topsoil Block Sod Replacement 17 Exploratory Excavation of Existing Utilities is Trench Safety 19 8" PVC Sewer Pipe 20 Post -CCTV Inspection 21 4" Sewer Service 22 4' Manhole 23 Normal Drop at Ex. Manhole 24 Manhole Vacuum Testing 25 Concrete Collar 26 Corrosion Protection for Existing ManHole 27 4' Extra Depth Manhole 28 Topsoil 29 Block Sod Replacement UNIT EA LF LF TON EA LF EA EA EA LF SF SF EA EA EA LS LS CY SY EA LF LF LF EA EA EA EA EA VF VF CY SY SHEET NO. 3 4 2 471 452 0.75 1 19 2 1 1 170 620 620 2 2 1 1 56 518 ITEM TOTAL UNIT PRICE COST $600.00 $2.00 $40.00 $3,500.00 $2,500.00 $34.00 $600.00 $800.00 $1,500.00 $3.00 $3.00 $5.00 $100.00 $250.00 $3,500.00 $4,500.00 $3,500.00 $25.00 $5.00 WATER IMDROVEWATS TOTAL ITEM TOTAL 2 471 452 0.75 1 19 2 1 1 170 620 620 2 2 1 1 1 56 518 1 1 $1,250.00 282 282 $3.00 282 282 $36.00 282 282 $3.00 1 1 $550.00 4 4 $3,500.00 1 1 $2,000.00 4 4 $200.00 4 4 $300.00 16 16 $175.00 2 2 $350.00 56 56 $25.00 487 487 $5.00 SEWER IlVf2ROVEMNTS TOTAL PROJECT TOTAL $1,200.00 $942.00 $18,080.00 $2,625.00 $2,500.00 $646.00 $1,200.00 $800.00 $1,500.00 $510.00 $1,860.00 $3,100.00 $200.00 $500.00 $3,500.00 $4,500.00 $3,500.00 $1,400.00 $2,590.00 $51,153.00 $1,250.00 $846.00 $10,152.00 $846.00 $550.00 $14,000.00 $2,000.00 $800.00 $1,200.00 $2,800.00 $700.00 $1,400.00 $2,435.00 $38,979.00 $90,132.0T CITY OF FORT WORTH Water & Sewer Improvements to Serve Heritage Trace Center Phase V-Lot 4 C.P. 02124