HomeMy WebLinkAboutContract 44706 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary /'l,tQ� Contract No. �I 1 V WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: Forestar (USA) Real Estate Group, Inc. Address, State, Zip Code: 14755 Preston Rd., Suite 710 I Dallas, TX 75254 Phone, E-Mail: Darrel Amen: (972) 341-2924 I darrelamen@forestargrdup.co'm Authorized Signatory/Title: Thomas H. Burleson, Executive Vice President Project Name: Bar C Ranch, Phase 3A-2 Project Location: NE of Intersection of Wagley Robertson Rd. & E. Bailey Boswell Rd. Plat Case No.: FP-012-021 Plat Name: Bar C Ranch Mapsco: 34E Council District: 7 City Project No: 01986 CFA: 2013-015 DOE: 6915 To be completed by staff Received by. t_h, ,c t Date: .1)-asl►� OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX RECEIVED AUG 13 21113 1 NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) _X, Sewer (A-1) Paving (B) _X, Storm Drain (B-1) X , Street Lights & Signs (C) X . 2 E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any material errors in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries, death or damafles are caused. in whole or in Hart. by the alleged negligence of the Citv of Fort Worth. its officers. servants. or emplovees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement and such breach remains uncured following written notice of such breach and a reasonable period of time to cure such breach, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Bar C Ranch, Ph. 3A-2 CFA No.: 2013-015 DOE No.: 6915 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 115,093.00 $ 55,610.00 $ 59,483.00 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total $ 160,587.05 $ 112,659.05 $ 27,975.00 $ 19,953.00 Total Construction Cost (excluding the fees): $ 275,680.05 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 2,301.86 D. Water/Sewer Material Testing Fee (2%) $ 2,301.86 Sub -Total for Water Construction Fees $ 4,603.72 E. TPW Inspection Fee (4%) $ 5,625.36 F. TPW Material Testing (2%) $ 2,812.68 G. Street Light Inspsection Cost $ 798.12 H. Street Signs Installation Cost $ 490.00 Sub -Total for TPW Construction Fees $ 9,726.16 Total Construction Fees: $ 14,329.88 Choice Financial Guarantee Options, choose one Amount (ck one)/ 'Bond = 100% $ 275,680.05 V 'Completion Agreement = 100% / Holds Plat $ 275,680.05 'Cash Escrow Water/Sanitary Sewer= 125% $ 143,866.25 'Cash Escrow Paving/Storm Drain = 125% $ 200,733.81 'Letter of Credit = 125% w/2yr expiration period $ 344,600.06 8 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said loper has executed this instrument in�c�uadruplicate, at Fort Worth, Texas this % day of CITY OF FORT WORTH - Recommended by: Water Department Wendy Ch. Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality:: Douglas W`Black Assistant City Attorney M&C No. t / A Date: ATTEST: Mary J. Kays City Secretary ATTEST: Signature (Print) Name: Transportation & Public Works Department Director Approved by City Manager's Office Fernando Costa Assistant City Manager Douglas(kT. Wiersig, P.E. Forestar (USA) Real Estate Group, Inc. 9 Print Name: Title: Signature Thomas H. Burleson Executive Vice Presided -(9 )- OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate Z Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, Sc DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 3A-2 WAGLEY—ROBERTSON ROAD L 00 SITE LOCATION >- w -J CO w E. HARMON RD VICINITY MAP NOT TO SCALE D.O.E. No. 6915 City Project No. 01986 JBI Partners, Inc, 16301 Quorum Drive, Suite 200E Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 February 28, 2013_ SHEET 1 Case No. FP 012 021 Final Plat THE BAR C RANCH BLOCK 1, LOTS 32-53, AND LOT 67X, AND BLOCK 3, LOTS 7-19 BEING 6.075 ACRES OUT OF THE JOHN WAGLEY SURVEY, ABSTRACT NO. 1597 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS FORESTAR (USA) REAL ESTATE GROUP INC. OWNER / DEVELOPER 14755 Preston Road, Suite 710 (972)702-8699 Dallas, TX 75254 JBI PARTNERS, INC. 16301 Quorum Drive, Suite 200 B Addison, Texas 75001 SURVEYOR/ENGINEER (972)248-7676 JBI Partners, Inc. 16301 Quorum Drive, Suite 2008 Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 February 28, 2013 — SHEET 2 i i 32 33 34 35 SCALE: 1"=150' JBI Partners, Inc. 16301 Quorum Drive, Suite 200B Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 cn w V m EXIST. 8' WATER CONNECT TO EXISTING 6' WATER UNE DOE 5336 WATER PROJ # P164-060164015529 MYSTIC RIVER TRAIL EXISTING BAR RANCH, PHASE 1 DOE 4554 BRANDING IRON TRAIL EXISTING BAR C RANCH, PHASE 2 I DOE 5330 19 18 17 16 15 14 13 12 11 10 9 8 7 0 MARISCAI. PLA1:E 1! SPLIT R=K DRIVE 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 CITY OF FORT WORTH CITY OF SAGINAW LEGEND PROP. WATERLINE PROP. VALVE ♦ PROP. FIRE HYDRANT PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE INDICATED. CONNECT TO E !STING B. WATER UNE DOE 5336 WATER PROJ r! P164-060164015529 53 51 C) WATER EXHIBIT A PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 3A-2 (D.O.E NO. 6915) February 28, 2013 — SHEET 3 Er) Er. 1.1.1 SCALE: 1"=150' 32 33 34 35 JBI Partners, Inc. 16301 Quorum Drive, Suite 200B Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 R1LSJH3IVER _MAIL — — — — EXISTING BAR ¢ RAI'CH, PHASE 1 DOE 45t4 EXIST. 8" SSWR BEANDING DOE 5336, SS NO. P174-070174013520 CONNECT TO J. EXIST. 8• SS EXISTING BAR C RANCH, PHASE 2 DOE 5336 19 18 17 16 15 14 13 12 11 LiLI .RISCA\ PCE 36 37 38 39 40 41 42 43 44 45 _ CITY OF FORT WORTI- ._ CITY OF SAGINAW LEGEND PROP. S.S. LINE C PROP. S.S. MH �— EXIST. S.S. MH — — EXIST. S.S. LINE PROPOSED SANITARY SEWER LINES ARE 8" UNLESS OTHERWISE INDICATED. 10 9 8 7 8" SSWR (BY -ETHERS) OE 5646 SS P0. P274-707130075883 UI I 5I � C CONN:CT TO EXIST. 8" SS 46 47 48 49 50 53 52 51 SANITARY SEWER EXHIBIT A-1 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 3A-2 (D.O.E NO. 6915) February 28, 2013 — SHEET 4 -J 0 0 a (0 Eh LLi • () 0 SCALE: 1"=150' 32 35 JBI Partners, Inc. 16301 Quorum Drive, Suite 200E Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 Y CF-.1C ROAD ir▪ t 19 18 17 16 N MYSTIC RIVER TRAIL EXISTING'BAR RANCH, PHASE 1 DOE 4554 BRANDING IRON TRAIL EXISTING BAR C RANCH, PH/ SE 2 DOE 5336 15 14 13 12 11 10 9 8 7 MA ISCA I PLAeE 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 29' B—B SPLAT RCK DRIVE m i m N 105' PARKWAY TAMPED TOPSOIL PER SECTION 32 91 19 y- PER FT, MN) 4:1-(yAK) • STANOARO SIDEWALK PER SECTION 32 13 CCMPACTE0 ACCEPTABLE NATIVE BACKFlLL PER SECTION 31 24 00 C TY OF FORT WORTRI CITY OF SAGINAW 14.5' STANDARD 6' CURB PER 32 13 13-0525 5' CROWN 32' R.O.W. 29' ROAD' 12 83 BARS 0 18' 6" REINFORCED CONCRETE PAVEMENT PER SECTION 32 13 13 STANDARD T CURB PER 32 13 13-0525 wr9Muwonew.a . L0NC111I0INAl CONSTRUCTION 1091T PER 32 13 13-0511 PROPOSED 6' LIME STABILIZED SUOGRA0E 0 30 L85./SY PER SECTION 32 11 29 RESIDENTIAL CONCRETE STREET SECTION (L) 32 13 13-D502 LEGEND SIDEWALK TO BE CONSTRUCTED BY DEVELOPER SIDEWALK TO BE CONSTRUCTED BY HOMEBUILDER -99 1095.'5' PARKWAY TAUPEO TOPSOIL PER SECTION 32 91 19 y' PER Y. MK) STANDARD.' SIDEWALK PER SECTION 32 13 20 COMPACTED ACCEPTABLE NATIVE BACKFILL PER SECTION 31 24 00 NOTE I. SIDEWALK SLOPE SHALL BE Y.' PER FOOT (ARIL) UNLESS DIRECTED OTHERWISE BY THE ENGINEER. 2_ PRIME 6' TOP SO4. SEED. N1OROMUCH CR SOD. AN0 IRRIGATE UNTIL 60f VEGETATIVE C01431 IS ATTAINED. PER MEDAN MO PARKWAY 1N9H GENERAL NOTES 53 52 51 PAVING EXHIBIT B PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 3A-2 (D.O.E NO. 6915) February 28, 2013 — SHEET 5 c SCALE: 1 "=150' 32 33 34 JBI Partners, Inc. 16301 Quorum Drive, Suite 200E Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 .I - MYSTIC RIVER TRAIL EXISTING BAR C RANCH, PHASE 1 DOE 4554 i BRANDING IRON TRAIL EXISTING BAR C PHASE 2 DOE 5336 RANCH, 19 18 17 16 15 14 13 12 11 10 9 8 7 21" RCP 24" 0 MAZISCAI. PLAt:E 21" RCP- 24 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 CITY OF FORT WORM CITY OF SAGINAW LEGEND 10' CURB INLET (UNLESS OTHERWISE INDICATED) a STORM SEWER MANHOLE 53 i..i <L I 52 0r� � RCP L . (CONNECT TO EXISTING 24" RCP DOE 5646 STORM DRAIN EXHIBIT B-1 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 3A-2 (D.O.E NO. 6915) February 28, 2013 — SHEET 6 Z 8 W (n Cr_ L.J j I) zLA o ram@ fn 32 o. 5- 33 m 34 35 SCALE: 1"=150' JBI Partners, Inc. 16301 Quorum Drive, Suite 200E Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 EXISTING BAR C RANCH, PHASE 1 DOE 4554 BRANDING IRON TRAIL I 1 EXISTING BAR C IRAN4H, PHASE 2 DOE 5336 18 17 16 15 14 13 12 11 10 9 8 7 0 t MARISCA► PLACE 36 37 38 39 40 41 42 43 I 44 45 1 CITY OF FORT WORTH CITY OF SAGINAW LEGEND PROPOSED STREET LIGHT —100 WATT HPS COBRA YATH TYPE 3 DIST. AND DROP GLASS LUMINAIRE —25' LIGHT STANDARD PROPOSED SIGNBLADE SPLIT RCK DRIVE 0-0 46 47 48 49 50 53 52 51 ST T LIGHTING & STREET SIGNS EXHIBIT C PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 3A-2 (D.O.E NO. 6915) February 28, 2013 — SHEET 7 ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST PREPARED BYJB1 PARTNERS, INC. ON FEBRUARY 28, 2013 FORT WORTH, TEXAS JBI PROJECT NO. L1C006C3 ITEM NO. 3311.0261 3312.0103 3311.0001 3312.2003 3331.4115 333I.4116 3339.1001 3339.1003 3331.3101 3301.0001 3301.0002 3301.0101 9999.0001 3349.5001 3341.0103 3341.0205 3339.1001 3125.0101 9999.0002 3213.0101 3211.0501 3211.0400 3213.0301 9999.0004 3125.0I01 3471.0001 3441.3101 3441.3301 3441.3002 3441.1501 3441.3011 3441.1410 UNIT TOTAL BID ITEM 8" PVC Water Pipe Connection to Existing 8" Water Main Ductile Iron Water Fittings 1" Water Service 8" PVC Sewer Pipe 8" PVC Sewer Pipe, CSS Backfill 4' Manhole 4' Extra Depth Manhole 4" Sewer Service, Two-way cleanout Pre -CCTV Inspection Post -CCTV Inspection Manhole Vacuum Testing Connect to existin sanit. sewer 10' Curb Inlet 21" RCP, Class III 24" RCP, Class III 4' Manhole SWPPP> 1 acre Connect to existin storm drain 6" Conc Pvmt 16" Lime Treatment Lime • 4" Conc Sidewalk Connect to existing concrete street pavement ISWPPP>_1 acre Traffic Control 100W HPS PC Lighting Fixture Rdwy Ilium Foundation TY 1,2, and 4 1Rdwy Ilium Assmbly TY 8,11,D-25, and D-30 Ground Box, Small, w/ Lid 2" CONDT PVC SCH 40 (T) NO 10 Insulated Elec Condr Fc\Projects\UC006Q\Images\{20130228} CFA submittal \UC006C3 CFA Quantity Matrix.xts UNIT LF EA TON EA LF LF EA VF EA LF LF EA EA EA LF LF EA LS EA SY SY TN SF LF LS LS EA EA EA EA LF LF 6 7 8 23 903 2 0.56 35 651 112 20 2 1 7.1 0.8 27 4 671 112 671 112 2 1 1 1 2,798 2,975 44.6 118 24 20 553 591 8.9 58 2 33 209 3 1 1 ITEM TOTAL 28 4 4 4 4 93 279 BAR C RANCH, PHASE 3A-2 UNIT ITEM PRICE TOTAL COST 903 $30.00 $27,090.00 2 $750.00 $1,500.00 0.56 $4,500.00 $2,520.00 35 $700.00 $24,500.00 $55,610.00 763 $35.00 $26,705.00 20 $65.50 $1,310.00 3 $2,750.00 $8,250.00 8 8650.001 $5,135.00 31 8500.001 $15,500.00 783 $0.501 $391.50 783 $0.50 $391.50 3 $100.00 $300.00 2 $750.00 $1,500.00 $59,483.00 2 $3,000.00 $6,000.00 33 840.001 $1,320.00 209 845.001 $9,405.00 3 82,750.001 $8,250.00 1 81,500.001 $1,500.00 1 81,500.001 $1,500.00 $27,975.00 3,351 82750 $92,141.62 3,566 1 $2.40 $8,558.43 53.5 1 $150.00 $8,025.00 118 1 $3.00 $354.00 58 1 $10.00 $580.00 1 I 81,500,00 $1,500.00 1 $1,500.00 $1,500,00 $112,659.05 4 $600.00 $2,400.00 4 1 $1,200.00 $4,800.00 4 1 $2,200.00 $8,800.00 4 1 $500.00 $2,000.00 93 1 $9.00 $837.00 279 $4.00 $1,116.00 $19,953.00 $275,680.05 DOE 6915 II FP-012-021 CITY PROJECT NO. 01986