HomeMy WebLinkAboutContract 44706 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
City Secretary /'l,tQ�
Contract No. �I 1 V
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Forestar (USA) Real Estate Group, Inc.
Address, State, Zip Code: 14755 Preston Rd., Suite 710 I Dallas, TX 75254
Phone, E-Mail: Darrel Amen: (972) 341-2924 I darrelamen@forestargrdup.co'm
Authorized Signatory/Title: Thomas H. Burleson, Executive Vice President
Project Name: Bar C Ranch, Phase 3A-2
Project Location: NE of Intersection of Wagley Robertson Rd. & E. Bailey Boswell Rd.
Plat Case No.: FP-012-021 Plat Name: Bar C Ranch
Mapsco: 34E
Council District: 7 City Project No: 01986
CFA: 2013-015 DOE: 6915
To be completed by staff
Received by. t_h, ,c t Date:
.1)-asl►�
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
RECEIVED AUG 13 21113
1
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water (A) _X,
Sewer (A-1) Paving (B) _X, Storm Drain (B-1) X , Street Lights &
Signs (C) X .
2
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any material errors in the preliminary plans, specifications and
cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees,
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
iniuries, death or damafles are caused. in whole or in Hart. by the
alleged negligence of the Citv of Fort Worth. its officers. servants. or
emplovees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement and such breach remains
uncured following written notice of such breach and a reasonable period of
time to cure such breach, becomes insolvent or fails to pay costs of
construction and the financial guarantee is not a Completion Agreement. If
the financial guarantee is a Completion Agreement and the Developer's
contractors and/or suppliers are not paid for the costs of supplies and/or
construction, the contractors and/or suppliers may put a lien upon the
property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Bar C Ranch, Ph. 3A-2
CFA No.: 2013-015 DOE No.: 6915
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total $ 115,093.00
$ 55,610.00
$ 59,483.00
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total $ 160,587.05
$ 112,659.05
$ 27,975.00
$ 19,953.00
Total Construction Cost (excluding the fees):
$ 275,680.05
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 2,301.86
D. Water/Sewer Material Testing Fee (2%) $ 2,301.86
Sub -Total for Water Construction Fees $ 4,603.72
E. TPW Inspection Fee (4%) $ 5,625.36
F. TPW Material Testing (2%) $ 2,812.68
G. Street Light Inspsection Cost $ 798.12
H. Street Signs Installation Cost $ 490.00
Sub -Total for TPW Construction Fees $ 9,726.16
Total Construction Fees:
$ 14,329.88
Choice
Financial Guarantee Options, choose one Amount (ck one)/
'Bond = 100% $ 275,680.05 V
'Completion Agreement = 100% / Holds Plat $ 275,680.05
'Cash Escrow Water/Sanitary Sewer= 125% $ 143,866.25
'Cash Escrow Paving/Storm Drain = 125% $ 200,733.81
'Letter of Credit = 125% w/2yr expiration period $ 344,600.06
8
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said loper has executed this
instrument in�c�uadruplicate, at Fort Worth, Texas this % day of
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Ch. Babulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality::
Douglas W`Black
Assistant City Attorney
M&C No. t / A
Date:
ATTEST:
Mary J. Kays
City Secretary
ATTEST:
Signature
(Print) Name:
Transportation & Public Works Department
Director
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
Douglas(kT. Wiersig, P.E.
Forestar (USA) Real Estate Group, Inc.
9
Print Name:
Title:
Signature
Thomas H. Burleson
Executive Vice Presided
-(9 )-
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Estimate
® Exhibit B: Paving Improvements
® Paving Estimate
Z Exhibit B-1: Storm Drain Improvements
® Storm Drain Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, Sc DRAINAGE
IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 3A-2
WAGLEY—ROBERTSON ROAD
L
00 SITE LOCATION
>-
w
-J
CO
w
E. HARMON RD
VICINITY MAP
NOT TO SCALE
D.O.E. No. 6915
City Project No. 01986
JBI Partners, Inc,
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
February 28, 2013_ SHEET 1
Case No. FP 012 021
Final Plat
THE BAR C RANCH
BLOCK 1, LOTS 32-53, AND LOT 67X,
AND BLOCK 3, LOTS 7-19
BEING 6.075 ACRES OUT OF THE
JOHN WAGLEY SURVEY, ABSTRACT NO. 1597
CITY OF FORT WORTH, TARRANT COUNTY, TEXAS
FORESTAR (USA) REAL ESTATE GROUP INC. OWNER / DEVELOPER
14755 Preston Road, Suite 710 (972)702-8699
Dallas, TX 75254
JBI PARTNERS, INC.
16301 Quorum Drive, Suite 200 B
Addison, Texas 75001
SURVEYOR/ENGINEER
(972)248-7676
JBI Partners, Inc.
16301 Quorum Drive, Suite 2008
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
February 28, 2013 — SHEET 2
i
i
32
33
34
35
SCALE: 1"=150'
JBI Partners, Inc.
16301 Quorum Drive, Suite 200B
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
cn
w
V
m
EXIST. 8' WATER
CONNECT TO EXISTING
6' WATER UNE
DOE 5336
WATER PROJ #
P164-060164015529
MYSTIC RIVER TRAIL
EXISTING BAR RANCH,
PHASE 1
DOE 4554
BRANDING IRON TRAIL
EXISTING BAR C RANCH,
PHASE 2
I DOE 5330
19 18 17 16 15 14 13 12 11 10 9 8 7
0
MARISCAI. PLA1:E
1!
SPLIT R=K DRIVE
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
CITY OF FORT WORTH
CITY OF SAGINAW
LEGEND
PROP. WATERLINE
PROP. VALVE
♦ PROP. FIRE
HYDRANT
PROPOSED WATER
LINES ARE 8" UNLESS
OTHERWISE INDICATED.
CONNECT TO E !STING
B. WATER UNE
DOE 5336
WATER PROJ r!
P164-060164015529
53
51
C)
WATER
EXHIBIT A
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 3A-2
(D.O.E NO. 6915)
February 28, 2013 — SHEET 3
Er)
Er.
1.1.1
SCALE: 1"=150'
32
33
34
35
JBI Partners, Inc.
16301 Quorum Drive, Suite 200B
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
R1LSJH3IVER _MAIL — — — —
EXISTING BAR ¢ RAI'CH,
PHASE 1
DOE 45t4
EXIST. 8" SSWR BEANDING
DOE 5336, SS NO. P174-070174013520
CONNECT TO
J. EXIST. 8• SS
EXISTING BAR C RANCH,
PHASE 2
DOE 5336
19 18 17 16 15 14 13 12 11
LiLI
.RISCA\ PCE
36 37 38 39 40 41 42 43 44 45
_ CITY OF FORT WORTI-
._ CITY OF SAGINAW
LEGEND
PROP. S.S. LINE
C PROP. S.S. MH
�— EXIST. S.S. MH
— — EXIST. S.S. LINE
PROPOSED SANITARY
SEWER LINES ARE 8"
UNLESS OTHERWISE
INDICATED.
10 9 8 7
8" SSWR (BY -ETHERS)
OE 5646 SS P0.
P274-707130075883
UI
I
5I
� C
CONN:CT TO
EXIST. 8" SS
46 47 48 49 50
53
52
51
SANITARY SEWER
EXHIBIT A-1
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 3A-2
(D.O.E NO. 6915)
February 28, 2013 — SHEET 4
-J
0
0
a
(0
Eh
LLi
•
()
0
SCALE: 1"=150'
32
35
JBI Partners, Inc.
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
Y CF-.1C ROAD
ir▪ t
19 18 17 16
N
MYSTIC RIVER TRAIL
EXISTING'BAR RANCH,
PHASE 1
DOE 4554
BRANDING IRON TRAIL
EXISTING BAR C RANCH,
PH/ SE 2
DOE 5336
15 14 13 12 11 10 9 8 7
MA ISCA I PLAeE
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
29' B—B
SPLAT RCK DRIVE
m
i
m
N
105' PARKWAY
TAMPED TOPSOIL PER
SECTION 32 91 19
y- PER FT, MN)
4:1-(yAK)
•
STANOARO
SIDEWALK PER
SECTION 32 13
CCMPACTE0
ACCEPTABLE
NATIVE BACKFlLL
PER SECTION
31 24 00
C TY OF FORT WORTRI
CITY OF SAGINAW
14.5'
STANDARD 6' CURB
PER 32 13 13-0525
5' CROWN
32' R.O.W.
29' ROAD'
12
83 BARS 0 18'
6" REINFORCED CONCRETE
PAVEMENT PER SECTION 32 13 13
STANDARD T CURB
PER 32 13 13-0525
wr9Muwonew.a .
L0NC111I0INAl
CONSTRUCTION 1091T
PER 32 13 13-0511
PROPOSED 6' LIME STABILIZED
SUOGRA0E 0 30 L85./SY PER
SECTION 32 11 29
RESIDENTIAL CONCRETE
STREET SECTION (L)
32 13 13-D502
LEGEND
SIDEWALK TO BE
CONSTRUCTED
BY DEVELOPER
SIDEWALK TO BE
CONSTRUCTED
BY HOMEBUILDER
-99
1095.'5' PARKWAY
TAUPEO TOPSOIL PER
SECTION 32 91 19
y' PER Y. MK)
STANDARD.'
SIDEWALK PER
SECTION 32 13 20
COMPACTED
ACCEPTABLE
NATIVE BACKFILL
PER SECTION
31 24 00
NOTE
I. SIDEWALK SLOPE SHALL BE Y.' PER
FOOT (ARIL) UNLESS DIRECTED
OTHERWISE BY THE ENGINEER.
2_ PRIME 6' TOP SO4. SEED.
N1OROMUCH CR SOD. AN0 IRRIGATE
UNTIL 60f VEGETATIVE C01431 IS
ATTAINED. PER MEDAN MO
PARKWAY 1N9H GENERAL NOTES
53
52
51
PAVING
EXHIBIT B
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 3A-2
(D.O.E NO. 6915)
February 28, 2013 — SHEET 5
c
SCALE: 1 "=150'
32
33
34
JBI Partners, Inc.
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
.I -
MYSTIC RIVER TRAIL
EXISTING BAR C RANCH,
PHASE 1
DOE 4554 i
BRANDING IRON TRAIL
EXISTING BAR C
PHASE 2
DOE 5336
RANCH,
19 18 17 16 15 14 13 12 11 10 9 8 7
21" RCP 24"
0
MAZISCAI. PLAt:E 21" RCP-
24
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
CITY OF FORT WORM
CITY OF SAGINAW
LEGEND
10' CURB INLET
(UNLESS OTHERWISE INDICATED)
a STORM SEWER MANHOLE
53
i..i
<L I
52 0r� �
RCP L .
(CONNECT TO
EXISTING 24" RCP
DOE 5646
STORM DRAIN
EXHIBIT B-1
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 3A-2
(D.O.E NO. 6915)
February 28, 2013 — SHEET 6
Z
8
W
(n
Cr_
L.J
j I)
zLA
o
ram@
fn
32
o.
5-
33 m
34
35
SCALE: 1"=150'
JBI Partners, Inc.
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
EXISTING BAR C RANCH,
PHASE 1
DOE 4554
BRANDING IRON TRAIL
I 1
EXISTING BAR C IRAN4H,
PHASE 2
DOE 5336
18 17 16 15 14 13 12 11 10 9 8 7
0
t
MARISCA► PLACE
36 37 38 39 40 41 42 43 I 44 45
1
CITY OF FORT WORTH
CITY OF SAGINAW
LEGEND
PROPOSED STREET LIGHT
—100 WATT HPS COBRA YATH
TYPE 3 DIST. AND DROP
GLASS LUMINAIRE
—25' LIGHT STANDARD
PROPOSED SIGNBLADE
SPLIT RCK DRIVE
0-0
46 47 48 49 50
53
52
51
ST T LIGHTING &
STREET SIGNS
EXHIBIT C
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, STREET LIGHTING, &
DRAINAGE IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 3A-2
(D.O.E NO. 6915)
February 28, 2013 — SHEET 7
ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST
PREPARED BYJB1 PARTNERS, INC. ON FEBRUARY 28, 2013
FORT WORTH, TEXAS
JBI PROJECT NO. L1C006C3
ITEM NO.
3311.0261
3312.0103
3311.0001
3312.2003
3331.4115
333I.4116
3339.1001
3339.1003
3331.3101
3301.0001
3301.0002
3301.0101
9999.0001
3349.5001
3341.0103
3341.0205
3339.1001
3125.0101
9999.0002
3213.0101
3211.0501
3211.0400
3213.0301
9999.0004
3125.0I01
3471.0001
3441.3101
3441.3301
3441.3002
3441.1501
3441.3011
3441.1410
UNIT TOTAL
BID ITEM
8" PVC Water Pipe
Connection to Existing 8" Water Main
Ductile Iron Water Fittings
1" Water Service
8" PVC Sewer Pipe
8" PVC Sewer Pipe, CSS Backfill
4' Manhole
4' Extra Depth Manhole
4" Sewer Service, Two-way cleanout
Pre -CCTV Inspection
Post -CCTV Inspection
Manhole Vacuum Testing
Connect to existin sanit. sewer
10' Curb Inlet
21" RCP, Class III
24" RCP, Class III
4' Manhole
SWPPP> 1 acre
Connect to existin storm drain
6" Conc Pvmt
16" Lime Treatment
Lime •
4" Conc Sidewalk
Connect to existing concrete street pavement
ISWPPP>_1 acre
Traffic Control
100W HPS PC Lighting Fixture
Rdwy Ilium Foundation TY 1,2, and 4
1Rdwy Ilium Assmbly TY 8,11,D-25, and D-30
Ground Box, Small, w/ Lid
2" CONDT PVC SCH 40 (T)
NO 10 Insulated Elec Condr
Fc\Projects\UC006Q\Images\{20130228} CFA submittal \UC006C3 CFA Quantity Matrix.xts
UNIT
LF
EA
TON
EA
LF
LF
EA
VF
EA
LF
LF
EA
EA
EA
LF
LF
EA
LS
EA
SY
SY
TN
SF
LF
LS
LS
EA
EA
EA
EA
LF
LF
6 7 8 23
903
2
0.56
35
651 112
20
2 1
7.1 0.8
27 4
671 112
671 112
2 1
1 1
2,798
2,975
44.6
118
24 20
553
591
8.9
58
2
33
209
3
1
1
ITEM
TOTAL
28
4
4
4
4
93
279
BAR C RANCH, PHASE 3A-2
UNIT ITEM
PRICE TOTAL COST
903 $30.00 $27,090.00
2 $750.00 $1,500.00
0.56 $4,500.00 $2,520.00
35 $700.00 $24,500.00
$55,610.00
763 $35.00 $26,705.00
20 $65.50 $1,310.00
3 $2,750.00 $8,250.00
8 8650.001 $5,135.00
31 8500.001 $15,500.00
783 $0.501 $391.50
783 $0.50 $391.50
3 $100.00 $300.00
2 $750.00 $1,500.00
$59,483.00
2 $3,000.00 $6,000.00
33 840.001 $1,320.00
209 845.001 $9,405.00
3 82,750.001 $8,250.00
1 81,500.001 $1,500.00
1 81,500.001 $1,500.00
$27,975.00
3,351 82750 $92,141.62
3,566 1 $2.40 $8,558.43
53.5 1 $150.00 $8,025.00
118 1 $3.00 $354.00
58 1 $10.00 $580.00
1 I 81,500,00 $1,500.00
1 $1,500.00 $1,500,00
$112,659.05
4 $600.00 $2,400.00
4 1 $1,200.00 $4,800.00
4 1 $2,200.00 $8,800.00
4 1 $500.00 $2,000.00
93 1 $9.00 $837.00
279 $4.00 $1,116.00
$19,953.00
$275,680.05
DOE 6915 II FP-012-021
CITY PROJECT NO. 01986