Loading...
HomeMy WebLinkAboutContract 44707 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § City Secretary Contract No. NL'7 U 1 WHEREAS, the undersigned Developer ("Developer") desires to make certain improvements ("Improvements") related to a project as described below ("Project"), an addition to the City of Fort Worth, Texas ("City"); and WHEREAS, the Developer and the City desire to enter into this "Agreement" in connection with the Improvements. Developer Information: Developer Company Name: Forestar (USA) Real Estate Group, Inc. Address, State, Zip Code: 14755 Preston Rd., Suite 710 I Dallas, TX 75254 Phone, E-Mail: Darrel Amen: (972) 341-2924 I darrelamen@forestargroup.com Authorized Signatory/Title: Thomas H. Burleson, Executive Vice President Project Name: Bar C Ranch, Phase 2B & 3A-1 Project Location: NE of Intersection of Wagley Robertson Rd. & E. Bailey Boswell Rd. Plat Case No.: FP-011-045 Plat Name: Bar C Ranch Mapsco: 34E CFA: 2013-018 DOE: 5646 To be completed by staaf.f. Received by: �I(� Council District: 7 City Project No: 00758 Date: .._1 1 c3-S I RFCE!VFD AUG 1 3 2013 1 OFFICIAL RECORD CITY SECRETARY FR; WORTH, TX NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X, Sewer (A-1) X, Paving (B) X, Storm Drain (B-1) X , Street Lights & Signs (C) X . 2 E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any material errors in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries. death or damages are caused. in whole or in part. by the alleged negligence of the City of Fort Worth. its officers, servants. or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement and such breach remains uncured following written notice of such breach and a reasonable period of time to cure such breach, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Bar C Ranch, Ph. 2B & 3A-1 CFA No.: 2013-018 DOE No.: 5646 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 210,191.00 113,640.00 96,551.00 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total $ 165,800.70 $ 104,997.70 $ 37,175.00 $ 23,628.00 Total Construction Cost (excluding the fees): $ 375,991.70 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 4,203.82 D. Water/Sewer Material Testing Fee (2%) $ 4,203.82 Sub -Total for Water Construction Fees $ 8,407.64 E. TPW Inspection Fee (4%) $ 5,686.91 F. TPW Material Testing (2%) $ 2,843.45 G. Street Light Inspsection Cost $ 945.12 H. Street Signs Installation Cost $ 735.00 Sub -Total for TPW Construction Fees $ 10,210.48 Total Construction Fees: $ 18,618.12 Choice / Financial Guarantee Options, choose one Amount (ck onel' 'Bond = 100% $ 375,991.70 J 'Completion Agreement = 100% / Holds Plat $ 375,991.70 'Cash Escrow Water/Sanitary Sewer= 125% $ 262,738.75 'Cash Escrow Paving/Storm Drain = 125% $ 207,250.88 'Letter of Credit = 125% w/2vr expiration period $ 469,989.63 8 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said �°°per has execuJejl this instrument in quadruplicate, at Fort Worth, Texas this % �'/7 /�— day of .20 CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi7Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. n!/ t. Date: ATTEST: Mary J. Kays City Secretary ATTEST: Signature (Print) Name: Transportation & Public Works Department L, LAJ Douglas 7V. Wiersig, P.E. 7 Director Approved by City Manager's Office 77/44asiaci, Fernando Costa Assistant City Manager Forestar (USA) Real Estate Groupy, Inc. 9 Print Name: Title: Signature Thomas H. Burleson Executive Vice President OFFICIAL RECORD CITY SECRETARY FT, WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, DRAINAGE, & STREET LIGHTING IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 2B Sc 3A-1 E. BAILEY BOSWELL WAGLEY ROBERTSON ROAD I L SITE LOCATION E. HARMON RD VICINITY MAP NOT TO SCALE D.O.E. No: 5646 City Project No: 00758 JBI Partners, Inc. 16301 Quorum Drive, Suite 200B Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 April 3, 2013 — SHEET 1 Case No. FP-011-045 Final Plat THE BAR C RANCH BLOCK 1, LOTS 54-63, 65X, 66X, AND LOTS 68-71 BEING 3.602 ACRES OUT OF THE JOHN WAGLEY SURVEY, ABSTRACT NO. 1597 AND BEING A REPLAT OF LOT 33R, BLOCK 3, BAR C RANCH, PHASE 2, AN ADDITION TO THE CITY OF FORT WORTH AS RECORDED IN DOCUMENT NO. AND BEING A REPLAT OF LOTS 35-37, BLOCK 3 AND WYOMING DRIVE (A 50 FOOT RIGHT—OF—WAY), BAR C RANCH, PHASE 2, AN ADDITION TO THE CITY OF FORT WORTH AS RECORDED IN CABINET A, SLIDE 12013, TARRANT COUNTY MAP RECORDS. CITY OF FORT WORTH, TARRANT COUNTY, TEXAS FORESTAR (USA) REAL ESTATE GROUP INC. OWNER / DEVELOPER 14755 Preston Road, Suite 710 Dallas, TX 75254 JBI PARTNERS, INC. 16301 Quorum Drive, Suite 200 B Addison, Texas 75001 (972)702-8699 SURVEYOR/ENGINEER (972)248-7676 JBI Partners, Inc. 16301 Quorum Drive, Suite 200E Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 April 3, 2013 — SHEET 2 EXIST 8" WATER MYSTIC RIVER TRAIL EXISTING BAR C RANCH PHASE 1 )OE 4554 EXIS-1NG EAR C RANCH, PRASE DO 533 CONNI&T TO EXISTI 8" WATER LINE DOE 5336 WATER PROJ # P164-050164015529 BRANDING IRON TRAIL Exlsr. e WATER EX. BAR C RANCH, PHASE 2 DOE 5336 uv&PLUG BAR C RA\JCH, a WATER LINED" PHASE 3k-2 " DOE 6915 (BY OTHERS) LU BERM;:N'S INVESTMENT CDRPOR TION DOC. NO. D204097110 (C1LLED: 277.5113 ACRES) SCALE: 1 "=150' JBI Partners, Inc. 16301 Quorum Drive, Suite 200E Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 56 55 'EMOVE 4 EXISTING WATER SERVICES DOE 4554 WATER PROJ # 54 P164-060164015178 END & PLUG 8" WATER LINE IEND & PLUG 8' WATER UNE 57 x 58 m LEGEND LOT 1, BLOCK A EAGLE MOUNTAIN-SAGINAW MIDDLE SCHOOL ADDITION CAB. "A", SLIDE 10907 CONNECT b EXISTING 8" WATER LINE DOE 4554 WATER PROJ # P164-060164015178 59 62 REMOVE 33 LF OF11\ 8" WATER LINE 60 61 7 DESERADO DRIVE 69 70 CITY OF FORT NORTH CITY OF SAGINAW 71 1 CONNECT TO EXISTING 8" WATER LINE DOE 4554 WATER PROJ # P164-060164015178 REMOVE EX. WATER SERVICE [4 SERVICES] REMOVE EX. WATERLINE EX. WATERLINE PROP. WATERLINE PROP. VALVE PROP. FIRE HYDRANT PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE INDICATED. WATER EXHIBIT A PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, DRAINAGE, & STREET LIGHTING IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 2B & 3A-1 (D.O.E NO. 5846) April 3, 2013 — SHEET 3 MYSTIC RIVER TRAIL EXISTING BA C RANCH PHASE 1 DOE 4554 EXIS-ING AR C RANCH, PHASE 2 Doll 533r BRANDING IRON TRAIL EXIST. 8' SSWR DOE 5336, SS NO. P174-070174013520 — EX. BAR C RANCH, PHASE 2 DOE 5336 BAR C RA\1CH, PHASE 3A-2 DOE 691 t (BY OTHERS) ND & PLUG 8" SS LU BERME N'S INVESTMENT CORPOR DOC. O. D204097110 (CALLED: 277.5113 ACRES) SCALE: 1 "=150' JBI Partners, Inc. 16301 Quorum Drive, Suite 200E Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 .• 55 O 54 TI ON 1 57 66X LEGEND PROP. S.S. LINE t PROP. S.S. MH t— EXIST. S.S. MH — — EXIST. S.S. LINE EXIST. S.S. LINE TO BE REMOVED EXIST. S.S. SERVICE TO BE REMOVED [4 SERVICES] LOT 1, BLOCK A EAGLE MOUNTAIN-SAGINAW MIDDLE SCHOOL ADDITION CAB. "A", SLIDE 10907 NECT TO EX. 554 P174-07017401317 62 -REMONG"-8 OF 8" SSWR 58 D 59 60 61 0 1 DESERADO DRIVE a 1 1 68 69 70 71 CITY OF FORT NORTH CITY OF SAGINAW PROPOSED SANITARY SEWER LINES ARE 8" UNLESS OTHERWISE INDICATED. SANITARY SEWER EXHIBIT B PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, DRAINAGE, & STREET LIGHTING IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 2B & 3A-1 (D.O.E NO. 5646) April 3, 2013 — SHEET 4 MYSTIC RIVER TRAIL EXISTING BA C RANCH I I PHAE 1 DOE 4554 EXIS—ING EAR C RANCH, PHASE 2. DO 531 BRANDING IRON TRAIL EX. BAR C RANCH, PHASE 2 DOE 5336 BAR C RA ICH, PHA E 3 —2 DOE 691 5 (BY OTHERS) LUh 54 SPUT BERMINVESTMENT CpRPOR TION DOC. NO. D204097110 (CALLED: 277.5113 ACRES) 10.5' PARKWAY TAMPED TOPSOIL PER SECTION 32 91 19 PER FT. (9404 411. AX) STANDARD SIDEWALK PER SECTION 32 13 20 COMPACTED ACCEPTABLE NATIVE BACKFTLL PER SECTION 31 24 00 SCALE: 1"=150' JBI Partners, Inc. 16301 Quorum Drive, Suite 200E Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 2 LOT 1, BLOCK A EAGLE MOUNTAIN—SAGINAW MIDDLE SCHOOL ADDITION CAB. "A", SLIDE 10907 0 57 58 m 59 60 61 DESERADO DRIVE t O �� 68 69 70 66X STANDARD 6' CURB PER 32 13 13-0525 S CROWN ,3 BARS 0 10' CITY OF FORT NORTH CITY OF SAGINAW R.O.W. 29' 50' ROADWAY 6' REINFORCED CONCRETE PAVEMENT PER SECTION 32 13 13 STANDARD 7' CURB PER 32 13 13-D525-\ 71 PROPOSED 6' LIME STABILIZED O.0 B.W. SUBGRADE 0 30 LBS./SY PER SECTION 32 11 29 RESIDENTIAL CONCRETE STREET SECTION (L) 32 13 13-D502 VA LONGITUDINAL CONSTRUCTION J024T PER 32 13 13-0511 LEGEND SIDEWALK TO BE CONSTRUCTED BY DEVELOPER SIDEWALK TO BE CONSTRUCTED BY HOMEBUILDER PAVEMENT TO BE REMOVED PAVEMENT TO BE REPLACED 'PAVEMENT TO BE REMOVED 10.95.'5' PARKWAY TAMPED TOPSOIL PER SECTION 32 91 19 x' PER (t(4 N.) STANDARD SDEWALK PER SECTION 32 13 20 COMPACTED ACCEPTABLE NATIVE BACKFlLL PER SECTION 31 24 00 PAVING EXHIBIT C PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, DRAINAGE, do STREET LIGHTING IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 2B & 3A-1 (D.O.E NO. 5646) April 3, 2013 — SHEET 5 MYSTIC RIVER TRAIL EXISTIN BA" C RANCHPHASE 1 DOE 4554 EXIS-ING EAR C RANCH, PHASE DOf 5336 BRANDING IRON TRAIL EX. BAR C RANCH, PHASE 2 DOE 5336 BAR C RAA ICH, PHASE 3 -2 DOE 6915 (BY OTHERS) LUMBERM N'S INVESTMENT CORPOR DOC. O. D204097 10 (CikLLED: 277. 113 ACRES) SCALE: 1"=150' JBI Partners, Inc. 16301 Quorum Drive, Suite 200B Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 CONNE EXISTING 36' D.O.E. No. T TO RCP 5336 55 O 54 END & PLUG 24" RCP TION \ r• 36" RCP 24 ' RCP LOT 1, BLOCK A EAGLE MOUNTAIN-SAGINAW MIDDLE SCHOOL ADDITION CAB. "A", SLIDE 10907 48" RCP 36" RC 30" RCP 21" RCP REMOVE APPROX. 101 L OF STO M DRAIN REMOVE EXISTING 57 58 u 59 60 61 \ DROP INLET 36 RCP — 21" RCP 66X LEGEND DESERADO DRIVE 24" RCP 68 69 70 71 CITY OF FORT NORTH CITY OF SAGINAW 1 PROP. STORM SEWER & INLET STORM EXHIBIT D EX. STORM SEWER &INLET PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, DRAINAGE, & EX. STORM SEWER &INLET STREET LIGHTING IMPROVEMENTS TO SERVE TO BE REMOVED [101 LF] BAR C RANCH, PHASE 2B & 3A-1 (D.O.E NO. 5646) April 3, 2013 - SHEET 6 MYSTIC RIVER TRAIL EXISTIN3 BAIIY C RANCH PHASE 1 )OE 4554 EXIS- ING ‘''AR C RANCH, PHASE 2 DO 533. BRANDING IRON y TRAIL I - EX. BAR C RA1NCH, PHASE 2 DOE 5336 BAR C RA\ICH, PHASE 3/-A-2 DOE 6915 (BY OTHERS) FUT. MARISCAL PLACE LU SPUT ROCK DRIVE i BERM NHS INVESTMENT CpRPORTION DOC. NO. D204097110 (ILLED: 277.5113 ACRES) SCALE: 1 "=150' JBI Partners, Inc. 16301 Quorum Drive, Suite 200B Addison, Texas 75001 Tel: 972-248-7676 Fax: 972-248-1414 55 O 54 00-40 i' DESERADO DRIVE )! 66X LEGEND LOT 1, BLOCK A EAGLE MOUNTAIN—SAGINAW MIDDLE SCHOOL ADDITION CAB. "A", SLIDE 10907 61 \v, 68 69 70 71 CITY OF FORT NORTH CITY OF SAGINAW PROPOSED STREET LIGHT -100 WATT HPS COBRA INTH TYPE 3 DIST. AND DROP GLASS LUMINAIRE -25' LIGHT STANDARD PROPOSED SIGNBLADE EXISTING STREET LIGHT V) L), Q0Q U r a wOo z o_N) cc ON 0 CL wW j J (J STRIXT LIGHTING & STRtET SIGNS EXHIBIT E PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, DRAINAGE, & STREET LIGHTING IMPROVEMENTS TO SERVE BAR C RANCH, PHASE 2B & 3A-1 (D.O.E NO. 5646) April 3, 2013 — SHEET 7 ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST PREPARED BY JBI PARTNERS, INC. ON APRIL 3, 2013 FORT WORTH, TEXAS JBI PROJECT NO. L1C006C2 I ITEM NO. BID ITEM UNIT 3 3311.0261 8" PVC Water Pipe LF 3312.3003 8" Gate Valve EA 3312.3002 6" Gate Valve EA 3312.0103 Connection to Existing 8" Water Main EA 3312.0001 Fire Hydrant EA 3311.0001 Ductile Iron Water Fittings TON 3305.1004 24" Casing by other than Open Cut LF 3305.2002 8" Water Carrier Pipe LF 0241.1000 Remove Concrete Pavement (for water improvements) SY 64 6" Concrete Pavement (pavement repair for water 3213.0101 improv.) 3312.2003 1" Water Service 3312.2203 2" Water Service SY 64 EA EA 3331.4115 8" PVC Sewer Pipe LF 3331.4116 8" PVC Sewer Pipe, CSS Backfill LF 3339.1001 4' Manhole EA 3339.1003 4' Extra Depth Manhole VF 3331.3101 4" Sewer Service EA 0241.1000 Remove Concrete Pavement (for sewer improvements) SY 421 6" Concrete Pavement (pavement repair for sewer 3213.0101 SY 96 improvements) 3301.0001 Pre -CCTV Inspection LF 3301.0002 Post -CCTV Inspection LF 3301.0101 Manhole Vacuum Testing EA 9999.0001 Connect to existino sanitary sewer EA 3349.5001 10' Curb Inlet EA 3341.0309 36" RCP, Class III LF 3341.0205 24" RCP, Class III LF 3341.0103 21" RCP, Class III LF 3339.1001 4' Manhole EA 3339.1101 5' Manhole EA 3125.0101 SWPPP > 1 acre LS 9999.0002 Connect to existino storm drain EA 6 8 571 3 3 3 3 1.3 41 44 12 1 9 I 23 448 443 20 3 4 11.6 17.9 9 7 468 468 3 443 443 4 BAR C RANCH, PHASE 2B and 3A-1 ITEM UNIT TOTAL PRICE 24 26 27 33 2 237 1 1 153 33 571 $30.00 3 $1,250.00 3 $1,000.00 3 $750.00 3 $3,000.00 1.3 $4,500.00 41 $300.00 44 $45.00 64 $30.00 64 $27.50 12 $4,500.00 1 $700.00 891 $35.00 20 $65.50 7 $2,750.00 29.5 $650.00 16 $500.00 421 $30.00 96 $27.50 911 $0.50 911 $0.50 7 $100.00 1 $750.00 2 $3,000.00 237 $60.00 153 $45.00 33 $40.00 1 $2,750.00 1 $3,000.00 1 $1,500.00 1,500.00 ITEM TOTAL COST $17,130.00 $3,750.00 $3,000.00 $2,250.00 $9,000.00 $5,850.00 $12,300.00 $1,980.00 $1,920.00 $1,760.00 $54,000.00 $700.00 $113,640.00 $31,185.00 $1,310.00 $19,250.00 $19,175.00 $8,000.00 $12,630.00 $2,640.00 $455.50 $455.50 $700.00 $750.00 $96,551.00 $6,000.00 $14,220.00 $6,885.00 $1,320.00 $2,750.00 $3,000.00 $1,500.00 $1,500.00 $37,175.00 DOE 5646 I 1 FP-011-045 F:\Projects\LIC006C2\image\U20130403) CFA Submittal\LIC006C2 CFA Quantity Matrix.xls CITY PROJECT NO. 00758 ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST PREPARED BY JBI PARTNERS, INC. ON APRIL 3, 2013 FORT WORTH, TEXAS JBI PROJECT NO. LIC006C2 ITEM NO. BID ITEM 3213.0101 6" Cone Pvmt 3211.0501 6" Lime Treatment 3211.0400 Lime 3213.0301 4" Cone Sidewalk 3213.0508 4' Barrier Free Ramp, Type R-1 3317.0110 Special Riprap [3"-5" Rock Riprap] 0241.1300 Remove concrete curb & gutter 9999.0004 Street Barricade 9999.0004 Connect to existing concrete street pavement 3471.0001 Traffic Control 3441.3101 3441.3301 3441.3002 3441.1501 3441.3011 3441.1410 100W HPS PC Lighting Fixture Rdwy Ilium Foundation TY 1,2, and 4 Rdwy Ilium Assmbly TY 8,11,D-25, and D-30 Ground Box, Small, w/ Lid 2" CONDT PVC SCH 40 (T) NO 10 Insulated Elec Condr UNIT 3 SY SY TN SF EA SY LF 141 LF LF LS EA EA EA EA LF LF 6 8 9 23 24 1,082 1,525 1,137 1,631 17.1 24.6 906 518 2 2 80 29 72 69 1 BAR C RANCH, PHASE 26 and 3A-1 ITEM UNIT ITEM TOTAL PRICE TOTAL COST 26 27 33 2,607 $27.50 $71,692.50 2,768 $2.40 $6,643.20 41.7 $150.00 $6,255.00 1,424 $3.00 $4,272.00 4 $1,500.00 $6,000.00 80 $60.00 $4,800.00 141 $10.00 $1,410.00 29 $35.00 $1,015.00 141 $10.00 $1,410.00 1 $1,500.00 $1,500.00 $104,997.70 4 4 $600.00 $2,400.00 4 4 $1,200.00 $4,800.00 4 4 $2,200.00 $8,800.00 4 4 $500.00 $2,000.00 268 268 $9.00 $2,412.00 804 804 $4.00 $3,216.00 $23,628.00 T TOTAL $375,991.70 F:\Projects\LIC006C2\image \(20130403) CFA Submittal \LIC006C2 CFA Quantity Matrix.xls DOE 5646 I FP-011-045 CITY PROJECT NO. 00758