HomeMy WebLinkAboutContract 44707 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
COUNTY OF TARRANT §
City Secretary
Contract No. NL'7 U 1
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Forestar (USA) Real Estate Group, Inc.
Address, State, Zip Code: 14755 Preston Rd., Suite 710 I Dallas, TX 75254
Phone, E-Mail: Darrel Amen: (972) 341-2924 I darrelamen@forestargroup.com
Authorized Signatory/Title: Thomas H. Burleson, Executive Vice President
Project Name: Bar C Ranch, Phase 2B & 3A-1
Project Location: NE of Intersection of Wagley Robertson Rd. & E. Bailey Boswell Rd.
Plat Case No.: FP-011-045 Plat Name: Bar C Ranch
Mapsco: 34E
CFA: 2013-018 DOE: 5646
To be completed by staaf.f.
Received by: �I(�
Council District: 7 City Project No: 00758
Date: .._1 1 c3-S I
RFCE!VFD AUG 1 3 2013
1
OFFICIAL RECORD
CITY SECRETARY
FR; WORTH, TX
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water (A) X,
Sewer (A-1) X, Paving (B) X, Storm Drain (B-1) X , Street Lights &
Signs (C) X .
2
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any material errors in the preliminary plans, specifications and
cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees,
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
iniuries. death or damages are caused. in whole or in part. by the
alleged negligence of the City of Fort Worth. its officers, servants. or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement and such breach remains
uncured following written notice of such breach and a reasonable period of
time to cure such breach, becomes insolvent or fails to pay costs of
construction and the financial guarantee is not a Completion Agreement. If
the financial guarantee is a Completion Agreement and the Developer's
contractors and/or suppliers are not paid for the costs of supplies and/or
construction, the contractors and/or suppliers may put a lien upon the
property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Bar C Ranch, Ph. 2B & 3A-1
CFA No.: 2013-018 DOE No.: 5646
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total $ 210,191.00
113,640.00
96,551.00
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total $ 165,800.70
$ 104,997.70
$ 37,175.00
$ 23,628.00
Total Construction Cost (excluding the fees):
$ 375,991.70
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 4,203.82
D. Water/Sewer Material Testing Fee (2%) $ 4,203.82
Sub -Total for Water Construction Fees $ 8,407.64
E. TPW Inspection Fee (4%) $ 5,686.91
F. TPW Material Testing (2%) $ 2,843.45
G. Street Light Inspsection Cost $ 945.12
H. Street Signs Installation Cost $ 735.00
Sub -Total for TPW Construction Fees $ 10,210.48
Total Construction Fees:
$ 18,618.12
Choice /
Financial Guarantee Options, choose one Amount (ck onel'
'Bond = 100% $ 375,991.70 J
'Completion Agreement = 100% / Holds Plat $ 375,991.70
'Cash Escrow Water/Sanitary Sewer= 125% $ 262,738.75
'Cash Escrow Paving/Storm Drain = 125% $ 207,250.88
'Letter of Credit = 125% w/2vr expiration period $ 469,989.63
8
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said �°°per has execuJejl this
instrument in quadruplicate, at Fort Worth, Texas this % �'/7 /�— day of
.20
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi7Babulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. n!/ t.
Date:
ATTEST:
Mary J. Kays
City Secretary
ATTEST:
Signature
(Print) Name:
Transportation & Public Works Department
L, LAJ
Douglas 7V. Wiersig, P.E. 7
Director
Approved by City Manager's Office
77/44asiaci,
Fernando Costa
Assistant City Manager
Forestar (USA) Real Estate Groupy, Inc.
9
Print Name:
Title:
Signature
Thomas H. Burleson
Executive Vice President
OFFICIAL RECORD
CITY SECRETARY
FT, WORTH, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A: Water Improvements
® Water Estimate
® Exhibit A-1: Sewer Improvements
® Sewer Estimate
® Exhibit B: Paving Improvements
® Paving Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, DRAINAGE, &
STREET LIGHTING IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 2B Sc 3A-1
E. BAILEY BOSWELL
WAGLEY ROBERTSON ROAD I
L
SITE LOCATION
E. HARMON RD
VICINITY MAP
NOT TO SCALE
D.O.E. No: 5646
City Project No: 00758
JBI Partners, Inc.
16301 Quorum Drive, Suite 200B
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
April 3, 2013 — SHEET 1
Case No. FP-011-045
Final Plat
THE BAR C RANCH
BLOCK 1, LOTS 54-63, 65X, 66X, AND LOTS 68-71
BEING 3.602 ACRES OUT OF THE
JOHN WAGLEY SURVEY, ABSTRACT NO. 1597
AND BEING A REPLAT OF LOT 33R, BLOCK 3, BAR C RANCH, PHASE 2,
AN ADDITION TO THE CITY OF FORT WORTH AS RECORDED IN DOCUMENT
NO. AND BEING A REPLAT OF LOTS 35-37, BLOCK 3
AND WYOMING DRIVE (A 50 FOOT RIGHT—OF—WAY), BAR C RANCH, PHASE
2, AN ADDITION TO THE CITY OF FORT WORTH AS RECORDED IN CABINET
A, SLIDE 12013, TARRANT COUNTY MAP RECORDS.
CITY OF FORT WORTH, TARRANT COUNTY, TEXAS
FORESTAR (USA) REAL ESTATE GROUP INC. OWNER / DEVELOPER
14755 Preston Road, Suite 710
Dallas, TX 75254
JBI PARTNERS, INC.
16301 Quorum Drive, Suite 200 B
Addison, Texas 75001
(972)702-8699
SURVEYOR/ENGINEER
(972)248-7676
JBI Partners, Inc.
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
April 3, 2013 — SHEET 2
EXIST 8" WATER
MYSTIC RIVER TRAIL
EXISTING BAR C RANCH
PHASE 1
)OE 4554
EXIS-1NG EAR C RANCH,
PRASE
DO 533
CONNI&T TO EXISTI
8" WATER LINE
DOE 5336
WATER PROJ #
P164-050164015529
BRANDING IRON TRAIL Exlsr. e WATER
EX.
BAR C RANCH,
PHASE 2
DOE 5336
uv&PLUG
BAR C RA\JCH, a WATER LINED"
PHASE 3k-2 "
DOE 6915 (BY OTHERS)
LU
BERM;:N'S INVESTMENT CDRPOR TION
DOC. NO. D204097110
(C1LLED: 277.5113 ACRES)
SCALE: 1 "=150'
JBI Partners, Inc.
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
56
55 'EMOVE 4 EXISTING
WATER SERVICES
DOE 4554
WATER PROJ #
54 P164-060164015178
END & PLUG
8" WATER LINE
IEND & PLUG
8' WATER UNE
57
x
58 m
LEGEND
LOT 1, BLOCK A
EAGLE MOUNTAIN-SAGINAW
MIDDLE SCHOOL ADDITION
CAB. "A", SLIDE 10907
CONNECT b EXISTING
8" WATER LINE
DOE 4554
WATER PROJ #
P164-060164015178
59
62
REMOVE 33 LF OF11\
8" WATER LINE
60 61
7
DESERADO DRIVE
69 70
CITY OF FORT NORTH
CITY OF SAGINAW
71
1
CONNECT TO EXISTING
8" WATER LINE
DOE 4554
WATER PROJ #
P164-060164015178
REMOVE EX. WATER SERVICE [4 SERVICES]
REMOVE EX. WATERLINE
EX. WATERLINE
PROP. WATERLINE
PROP. VALVE
PROP. FIRE
HYDRANT
PROPOSED WATER
LINES ARE 8" UNLESS
OTHERWISE INDICATED.
WATER
EXHIBIT A
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, DRAINAGE, &
STREET LIGHTING IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 2B & 3A-1
(D.O.E NO. 5846)
April 3, 2013 — SHEET 3
MYSTIC RIVER TRAIL
EXISTING BA C RANCH
PHASE 1
DOE 4554
EXIS-ING AR C RANCH,
PHASE 2
Doll 533r
BRANDING IRON TRAIL EXIST. 8' SSWR DOE 5336, SS NO. P174-070174013520 —
EX.
BAR C RANCH,
PHASE 2
DOE 5336
BAR C RA\1CH,
PHASE 3A-2
DOE 691 t (BY OTHERS)
ND & PLUG
8" SS
LU
BERME N'S INVESTMENT CORPOR
DOC. O. D204097110
(CALLED: 277.5113 ACRES)
SCALE: 1 "=150'
JBI Partners, Inc.
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
.•
55 O
54
TI ON
1
57
66X
LEGEND
PROP. S.S. LINE
t PROP. S.S. MH
t— EXIST. S.S. MH
— — EXIST. S.S. LINE
EXIST. S.S. LINE TO BE REMOVED
EXIST. S.S. SERVICE TO BE REMOVED
[4 SERVICES]
LOT 1, BLOCK A
EAGLE MOUNTAIN-SAGINAW
MIDDLE SCHOOL ADDITION
CAB. "A", SLIDE 10907
NECT TO EX.
554
P174-07017401317
62
-REMONG"-8
OF 8" SSWR
58 D 59 60 61
0
1
DESERADO DRIVE a 1 1
68 69 70 71
CITY OF FORT NORTH
CITY OF SAGINAW
PROPOSED SANITARY
SEWER LINES ARE 8"
UNLESS OTHERWISE
INDICATED.
SANITARY SEWER
EXHIBIT B
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, DRAINAGE, &
STREET LIGHTING IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 2B & 3A-1
(D.O.E NO. 5646)
April 3, 2013 — SHEET 4
MYSTIC RIVER TRAIL
EXISTING BA C RANCH
I I PHAE 1
DOE 4554
EXIS—ING EAR C RANCH,
PHASE 2.
DO 531
BRANDING IRON TRAIL
EX.
BAR C RANCH,
PHASE 2
DOE 5336
BAR C RA ICH,
PHA E 3 —2
DOE 691 5 (BY OTHERS)
LUh
54
SPUT
BERMINVESTMENT CpRPOR TION
DOC. NO. D204097110
(CALLED: 277.5113 ACRES)
10.5' PARKWAY
TAMPED TOPSOIL PER
SECTION 32 91 19
PER FT. (9404
411. AX)
STANDARD
SIDEWALK PER
SECTION 32 13 20
COMPACTED
ACCEPTABLE
NATIVE BACKFTLL
PER SECTION
31 24 00
SCALE: 1"=150'
JBI Partners, Inc.
16301 Quorum Drive, Suite 200E
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
2
LOT 1, BLOCK A
EAGLE MOUNTAIN—SAGINAW
MIDDLE SCHOOL ADDITION
CAB. "A", SLIDE 10907
0
57 58 m 59 60 61
DESERADO DRIVE
t O
�� 68 69 70
66X
STANDARD 6' CURB
PER 32 13 13-0525
S CROWN
,3 BARS 0 10'
CITY OF FORT NORTH
CITY OF SAGINAW
R.O.W.
29' 50' ROADWAY
6' REINFORCED CONCRETE
PAVEMENT PER SECTION 32 13 13
STANDARD 7' CURB
PER 32 13 13-D525-\
71
PROPOSED 6' LIME STABILIZED
O.0 B.W. SUBGRADE 0 30 LBS./SY PER
SECTION 32 11 29
RESIDENTIAL CONCRETE
STREET SECTION (L)
32 13 13-D502
VA
LONGITUDINAL
CONSTRUCTION J024T
PER 32 13 13-0511
LEGEND
SIDEWALK TO BE
CONSTRUCTED
BY DEVELOPER
SIDEWALK TO BE
CONSTRUCTED
BY HOMEBUILDER
PAVEMENT TO BE REMOVED
PAVEMENT TO BE REPLACED
'PAVEMENT TO BE REMOVED
10.95.'5' PARKWAY
TAMPED TOPSOIL PER
SECTION 32 91 19
x' PER (t(4 N.)
STANDARD
SDEWALK PER
SECTION 32 13 20
COMPACTED
ACCEPTABLE
NATIVE BACKFlLL
PER SECTION
31 24 00
PAVING
EXHIBIT C
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, DRAINAGE, do
STREET LIGHTING IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 2B & 3A-1
(D.O.E NO. 5646)
April 3, 2013 — SHEET 5
MYSTIC RIVER TRAIL
EXISTIN
BA" C RANCHPHASE 1
DOE 4554
EXIS-ING EAR C RANCH,
PHASE
DOf 5336
BRANDING IRON TRAIL
EX.
BAR C RANCH,
PHASE 2
DOE 5336
BAR C RAA ICH,
PHASE 3 -2
DOE 6915 (BY OTHERS)
LUMBERM N'S INVESTMENT CORPOR
DOC. O. D204097 10
(CikLLED: 277. 113 ACRES)
SCALE: 1"=150'
JBI Partners, Inc.
16301 Quorum Drive, Suite 200B
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
CONNE
EXISTING 36'
D.O.E. No.
T TO
RCP
5336
55 O
54
END & PLUG
24" RCP
TION
\ r•
36" RCP
24 ' RCP
LOT 1, BLOCK A
EAGLE MOUNTAIN-SAGINAW
MIDDLE SCHOOL ADDITION
CAB. "A", SLIDE 10907
48" RCP
36" RC
30" RCP
21" RCP
REMOVE APPROX.
101 L OF STO M
DRAIN
REMOVE EXISTING
57 58 u 59 60 61 \ DROP INLET
36 RCP
— 21" RCP
66X
LEGEND
DESERADO DRIVE
24" RCP
68 69 70 71
CITY OF FORT NORTH
CITY OF SAGINAW
1
PROP. STORM SEWER & INLET STORM
EXHIBIT D
EX. STORM SEWER &INLET PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, DRAINAGE, &
EX. STORM SEWER &INLET STREET LIGHTING IMPROVEMENTS
TO SERVE
TO BE REMOVED [101 LF] BAR C RANCH, PHASE 2B & 3A-1
(D.O.E NO. 5646)
April 3, 2013 - SHEET 6
MYSTIC RIVER TRAIL
EXISTIN3 BAIIY C RANCH
PHASE 1
)OE 4554
EXIS- ING ‘''AR C RANCH,
PHASE 2
DO 533.
BRANDING IRON y
TRAIL
I -
EX. BAR C RA1NCH,
PHASE 2
DOE 5336
BAR C RA\ICH,
PHASE 3/-A-2
DOE 6915 (BY OTHERS)
FUT. MARISCAL PLACE
LU
SPUT ROCK DRIVE
i
BERM NHS INVESTMENT CpRPORTION
DOC. NO. D204097110
(ILLED: 277.5113 ACRES)
SCALE: 1 "=150'
JBI Partners, Inc.
16301 Quorum Drive, Suite 200B
Addison, Texas 75001
Tel: 972-248-7676
Fax: 972-248-1414
55 O
54
00-40
i' DESERADO DRIVE
)!
66X
LEGEND
LOT 1, BLOCK A
EAGLE MOUNTAIN—SAGINAW
MIDDLE SCHOOL ADDITION
CAB. "A", SLIDE 10907
61
\v,
68 69 70 71
CITY OF FORT NORTH
CITY OF SAGINAW
PROPOSED STREET LIGHT
-100 WATT HPS COBRA INTH
TYPE 3 DIST. AND DROP
GLASS LUMINAIRE
-25' LIGHT STANDARD
PROPOSED SIGNBLADE
EXISTING STREET LIGHT
V)
L),
Q0Q
U
r
a
wOo
z o_N)
cc
ON
0
CL wW
j J
(J
STRIXT LIGHTING &
STRtET SIGNS
EXHIBIT E
PLANS FOR THE CONSTRUCTION OF WATER,
SEWER, PAVING, DRAINAGE, &
STREET LIGHTING IMPROVEMENTS
TO SERVE
BAR C RANCH, PHASE 2B & 3A-1
(D.O.E NO. 5646)
April 3, 2013 — SHEET 7
ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST
PREPARED BY JBI PARTNERS, INC. ON APRIL 3, 2013
FORT WORTH, TEXAS
JBI PROJECT NO. L1C006C2
I ITEM NO. BID ITEM UNIT 3
3311.0261 8" PVC Water Pipe LF
3312.3003 8" Gate Valve EA
3312.3002 6" Gate Valve EA
3312.0103 Connection to Existing 8" Water Main EA
3312.0001 Fire Hydrant EA
3311.0001 Ductile Iron Water Fittings TON
3305.1004 24" Casing by other than Open Cut LF
3305.2002 8" Water Carrier Pipe LF
0241.1000 Remove Concrete Pavement (for water improvements) SY 64
6" Concrete Pavement (pavement repair for water
3213.0101
improv.)
3312.2003 1" Water Service
3312.2203 2" Water Service
SY 64
EA
EA
3331.4115 8" PVC Sewer Pipe LF
3331.4116 8" PVC Sewer Pipe, CSS Backfill LF
3339.1001 4' Manhole EA
3339.1003 4' Extra Depth Manhole VF
3331.3101 4" Sewer Service EA
0241.1000 Remove Concrete Pavement (for sewer improvements) SY 421
6" Concrete Pavement (pavement repair for sewer
3213.0101 SY 96
improvements)
3301.0001 Pre -CCTV Inspection LF
3301.0002 Post -CCTV Inspection LF
3301.0101 Manhole Vacuum Testing EA
9999.0001 Connect to existino sanitary sewer EA
3349.5001 10' Curb Inlet EA
3341.0309 36" RCP, Class III LF
3341.0205 24" RCP, Class III LF
3341.0103 21" RCP, Class III LF
3339.1001 4' Manhole EA
3339.1101 5' Manhole EA
3125.0101 SWPPP > 1 acre LS
9999.0002 Connect to existino storm drain EA
6 8
571
3
3
3
3
1.3
41
44
12
1
9 I 23
448 443
20
3 4
11.6 17.9
9 7
468
468
3
443
443
4
BAR C RANCH, PHASE 2B and 3A-1
ITEM UNIT
TOTAL PRICE
24 26 27 33
2
237
1
1
153
33
571 $30.00
3 $1,250.00
3 $1,000.00
3 $750.00
3 $3,000.00
1.3 $4,500.00
41 $300.00
44 $45.00
64 $30.00
64 $27.50
12 $4,500.00
1 $700.00
891 $35.00
20 $65.50
7 $2,750.00
29.5 $650.00
16 $500.00
421 $30.00
96 $27.50
911 $0.50
911 $0.50
7 $100.00
1 $750.00
2 $3,000.00
237 $60.00
153 $45.00
33 $40.00
1 $2,750.00
1 $3,000.00
1 $1,500.00
1,500.00
ITEM
TOTAL COST
$17,130.00
$3,750.00
$3,000.00
$2,250.00
$9,000.00
$5,850.00
$12,300.00
$1,980.00
$1,920.00
$1,760.00
$54,000.00
$700.00
$113,640.00
$31,185.00
$1,310.00
$19,250.00
$19,175.00
$8,000.00
$12,630.00
$2,640.00
$455.50
$455.50
$700.00
$750.00
$96,551.00
$6,000.00
$14,220.00
$6,885.00
$1,320.00
$2,750.00
$3,000.00
$1,500.00
$1,500.00
$37,175.00
DOE 5646 I 1 FP-011-045
F:\Projects\LIC006C2\image\U20130403) CFA Submittal\LIC006C2 CFA Quantity Matrix.xls CITY PROJECT NO. 00758
ENGINEER'S QUANTITY TAKE -OFF AND OPINION OF ESTIMATED COST
PREPARED BY JBI PARTNERS, INC. ON APRIL 3, 2013
FORT WORTH, TEXAS
JBI PROJECT NO. LIC006C2
ITEM NO. BID ITEM
3213.0101 6" Cone Pvmt
3211.0501 6" Lime Treatment
3211.0400 Lime
3213.0301 4" Cone Sidewalk
3213.0508 4' Barrier Free Ramp, Type R-1
3317.0110 Special Riprap [3"-5" Rock Riprap]
0241.1300 Remove concrete curb & gutter
9999.0004 Street Barricade
9999.0004 Connect to existing concrete street pavement
3471.0001 Traffic Control
3441.3101
3441.3301
3441.3002
3441.1501
3441.3011
3441.1410
100W HPS PC Lighting Fixture
Rdwy Ilium Foundation TY 1,2, and 4
Rdwy Ilium Assmbly TY 8,11,D-25, and D-30
Ground Box, Small, w/ Lid
2" CONDT PVC SCH 40 (T)
NO 10 Insulated Elec Condr
UNIT 3
SY
SY
TN
SF
EA
SY
LF 141
LF
LF
LS
EA
EA
EA
EA
LF
LF
6 8
9 23 24
1,082 1,525
1,137 1,631
17.1 24.6
906 518
2 2
80
29
72 69
1
BAR C RANCH, PHASE 26 and 3A-1
ITEM UNIT ITEM
TOTAL PRICE TOTAL COST
26 27 33
2,607 $27.50 $71,692.50
2,768 $2.40 $6,643.20
41.7 $150.00 $6,255.00
1,424 $3.00 $4,272.00
4 $1,500.00 $6,000.00
80 $60.00 $4,800.00
141 $10.00 $1,410.00
29 $35.00 $1,015.00
141 $10.00 $1,410.00
1 $1,500.00 $1,500.00
$104,997.70
4 4 $600.00 $2,400.00
4 4 $1,200.00 $4,800.00
4 4 $2,200.00 $8,800.00
4 4 $500.00 $2,000.00
268 268 $9.00 $2,412.00
804 804 $4.00 $3,216.00
$23,628.00
T TOTAL
$375,991.70
F:\Projects\LIC006C2\image \(20130403) CFA Submittal \LIC006C2 CFA Quantity Matrix.xls
DOE 5646 I FP-011-045
CITY PROJECT NO. 00758