HomeMy WebLinkAboutContract 43149-CO5 (2)FORT WORTH®
Project Name' 2008 CIP Contract 9A
Client Project #(s)I #01237 / DOE 6145
City of Fort Worth
Change Order Request
RETARY
c NrMC `13)149-CO
I City Sec # I 43149
Change Order Submittal # I 5
Date I 12/20/2013 I
Dept. TPW Water Sewer Contract Time
Totals (CD)
Original Contract Amount $631,268.50 $255,401.75 $0.00 $886,670.25 250
Extras to Date $113,200.50 $36,056.25 $149,256.75 97
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $744,469.00 $291,458,00 $0.00 $1,035,927.00 347
'Amount of Proposed Change Order $43,406.50 $0.00 1 $0.00 $43,406.50 155
Revised Contract Amount $787,875.50 $291,458.00 1 $0.00 $1,079,333.50 502
Original Funds Available for Change Orders $25,000.00 $12,770.00 1 $37,770.00
Remaining Funds Available for this CO $0.00
Additional Funding (if necessary) $43,406.50 1 1 $43,406.50
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
JVIIA I (RA
$0.00 1 $0.00
3015} ORCIiAi 60,RbE,
This change order is required to add the following items of work to the contract that were required for which there were no items in the original
contract: Sidewalk Variable Height Curb, Remove & Replace Conc. Steps, Gravel Drives, Conc, Curb & Gutter, Remove Conc. Wall, Adjust
Brick Mailbox, & Remove Conc. Driveways by Flatwork Crew. The change order also will compensate the contractor for the addtional contract
time for these items of work along with the addtional time associated with the city storm drain department replacing the damaged storm drain
system that was discovered by the contractor upon mobilizing on the site. The addtional time is broke down as follows:
Storm Drain Work Delay - 59 Calendar Days
This is the amount of time Beddell was shut down waiting on the storm drain department to replace the storm drain that was not
functioning properly. We were ready to mobilize on April 1, 2013 on Beddell but it was not cleared until May 30, 2013.
Overrun in Contract Items of work - 44 Calendar Days
Items of work Drives, Utility Adjustments, HMAC Transitions, Excavation, and the additional backfill grading required to properly tie-in
the slopes on the private yards. Most of these overruns were on Beddell.
Additional Cure Time - 7 Calendar Days
We bid this project to construct 5th, 6th, & Beddell streets all together. This would allow us to be paving on one while the other was
curing. So basically we would only have once mobilization of all operations (Dirtwork/Lime, Paving Crew, & Flatwork Crew). But since we
were not able to construct Beddell along with 5th & 6th we had an additional mobilization for all operations and an additional amount of
cure time that affected the schedule.
21.73%
$1,108,337.81
New Items of Work Added to Contract 34 Calendar Days
Holiday Shut Down for 2012 (Dec. 22, 2012 to Jan. 2, 20130 11 Calendar Days
OFFICIAL RECORD
CITY SECRETARY l
FT, WORTH, TX
gonald P. Gonza is, . ; City
iyeIVro 2bi4
Fo RT WO RTH
Project Name I 2008 CIP Contract 9A
Client Project# I #01237 / DOE 6145
City of Fort Worth
Change Order Additions
Change Order Submittal #
ADDITIONS
ITEM DESCRIPTION DEPT
PAVING SECTION
40 - NEW 9999.0000 Variable Height Sidewalk Curb (6"-12") TPW
41 - NEW 9999.0000 Remove & Replace Conc. Steps TPW
41- NEW 3211.0112 6" Flexible Base Driveways TPW
42 - NEW 3216.0102 7" Conc Curb and Gutter TPW
43 - NEW 0241.0600 Remove Wall <4' TPW
44 - NEW tb241.0401 Remove Concrete Drive - By Flatwork/Concrete Crew TPW
45 - NEW N 999.0000 Adjust/Relocate Brick Mailbox TPW
46 - NEW 19999.0000 Remobilization Dirt/Stabil. Crew TPW
47 - NEW 19999.0000 Remobilization Paving Crew TPW
48 - NEW 19999.0000 Remobilization Flatwork Crew TPW
5
City Sec # I 43149
Date I 12/20/2013
Qty Unit Unit Cost Total
$0.00 $0.00
1,701.00 LF $12.00 $20,412.00
133.00 SF $25.00 $3,325.00
1,798.00 SF $4.00 $7,192.00
21.00 LF $20.00 $420.00
75.00 LF $8.00 $600.00
2,105.00 SF $1.50 $3,157.50
5.00 EA $500.00 $2,500.00
1.00 LS $1,800.00 $1,800.00
1.00 LS $2,500.00 $2,500.00
1.00 LS $1,500.00 $1,500.00
TPW $43,406.50
Water $0.00
Sewer $0.00
Sub Total Additions $43,406.50
Change Order Additions Page 1 of 1
FORT WORTH
Project Name I 2008 CIP Contract 9A
Client Project # ( #01237 / DOE 6145
City of Fort Worth
Change Order Deletions
Change Order Submittal #
5
City Sec # I 43149
Date I 12/20/2013
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
TPW
Water
Sewer
Sub Total Deletions
$0.00
$0,00
$0.00
$0.00
Change Order Deletions Page 1 of 1
N/A
M/SBE Sub
CO#,
M/SBE Breakdown for this Change Order
Type of Service ` Amount for this CO
Total $000
Previous Change Orders
DATE AMOUNT
Total
$000
CFW Change Order Approval St-COApp04 Page 1 of 3
Routing
Assigned To:
Assigned By:
Due Date:
Due Time:
Links (1)
fortworthaov/Infrastructure Proiects/01237 - 5th Ave 6th Ave Beddell St W 2008 CIP 9A/Contractor/Chance
Orders/Chanae Order #5 Breakdown.xls
Attachments (01
No Attachments have been added to this form.
httnc•//nrnipctnnint hn77caww r.nrn/ h7 weh/Fnrrnc/PnrmPrint acnx7Cite.Tr1=51 SMRrPrncPccT 7/14/7(114
CFW Change Order Approval St-COApp04 Page 2 of 3
FORT WORTH® City of Fort Worth
��- Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: COSub05
Change Order No.: St-COApp04 Date Started: 2013-12-30
City Sec. No.: 43149 Date Due: 2014-02-18
Project Name: 5th Ave 6th Ave Beddell St W 2008 CIP 9A
01237 DOE Numbers:
Project Numbers:
DOE 6145
Project 208 CIP: Pavement Reconstruction and Water and Sanitary Sewer
Description: Main Replacements Along Portions of 5th Avenue, 6th Avenue and
Beddell Street.
Project Manager: Gopal Sahu City Inspector: Kim Brenz/ Luisa Allbrighi
Contractor: Satbile & Winn, Inc.
COUNCIL ACTION (If Required):
M&C Log Name:
M&C Number:
COST AND DAYS SUMMARY:
Department:
T/PW
Approval Status:
M&C Date:
Cost($) Fund Account Center:
$ 43,406.50 C204 541200 209400123783
Total Cost: $ 43,406.50
Requested
Days:
155
Total Requested Days: '155
httns://nroiectnoint.buzzsaw.com/ bz web/Forms/FormPrint.asnx?SiteId=51500&Processl... 2/14/2014
CFW Change Order Approval St-COApp04 Page 3 of 3
Approved: Yes
Comments:
User: Tara Fishback
Date: 2014-01-06 3:19 PM
Approved: Yes
Comments:
User: Jerry Henderson
Date: 2014-01-06 3:58 PM
Approved: Yes
Comments:
User: Gopal Sahu
Date: 2014-01-06 10:05 PM
Approved: Yes
Comments:
User: Najib Fares
Date: 2014-01-07 9:30 AM
Approved: Yes
Comments:
User: Andy Anderson
Date: 2014-01-07 9:53 AM
Approved: Yes
Comments:
User: Doug Wiersig
Date: 2014-01-08 11:11 AM
Approved: Yes
Comments: See note attached.
User: Doug Black
Date: 2014-02-03 3:57 PM
Approved: Yes
Comments:
User: Fernando Costa
Date: 2014-02-04 6:10 PM
Action Required: PI Review, Approve and Submit