Loading...
HomeMy WebLinkAboutContract 44169-FP1 (2)CITY SECkErAlit CONTRACT NO. Departmenof I PW Const. Services DOE# Project Manager r(/C Date,( Risk Management d -- D.O.E. Bro1rton CFA Westerman/Scanned The Proceeding people have been Contacted concerning the request for final payment & have released this project for such payment. clearance Conducted By Etta Bacy %`Recommended for Acceptance Asst. Director, TPW - Infrastructure Design and Construction I CATION AND PUBLIC WORKS OF PROJECT COMPLETION `has 3- oo'7q I c s -LiziJ(o9 D.O.E. Ns: 5843 tzrS Regarding contract 00791 for CONSTRUCTION OF KELLER-HICKS RD FROM 800' as required by the WATER DEPARTMENT as approved by City Council on 01/08/2013 through M&C C-26050 the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation & Public Works Department has accepted the project as complete. Original Contract Prices: Amount of Approved Change Orders: Revised Contract Amount: Total Cost Work Completed: Less Deductions: Liquidated Damages: Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: Less Previous Payments: Final Payment Due $214,912.00 $43,650.00 Ne 1,2,3 $258,562.00 $233,057.50 $0.00 $233,057.50 $218,079.63 $14,977.87 Accepted Asst. Director, WATER DEPARTMENT Asst. City Manager Comments: FUND ACCT: P253-6021700791 SCANNED RECEIVED AUG 2 5 2015 OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX Days @ / Day Date Date Date ":-?4 P,53-CO7J C.5 244I0 City Project Numbers 00791 DOE Number 5843 Contract Name Construction of Keller -Hicks Rd from 800' E of Alta Vista Rd Estimate Number 52 Contract Limits to Park Vista Blvd Payment Number 52 Project Type WATER For Period Ending 7/31/2015 Project Funding Project Manager Weiss City Secretary Contract Number 44169 Inspectors GREGORY / ROGERS Contract Date 1/8/2013 Contractor McCLENDON CONSTRUCTION COMPANY, INC. Contract Time 469 CD P.O. BOX 999 Days Charged to Date 494 CD BURLESON, TX 76097 Contract is .000000 Complete. PO #___i_ _-__ CITY OF FORT WORTH INVOICE # LtLf 161-59- SUMMARY OF CHARGES Line Fund Account Center Amount Funded Gross Retainage Net -5.3-007t11 r lyikila`? 350e + If,477g1 14,977K7 Total Cost of Work Completed $233,057.50 Less % Retained $0.00 WATER DEPARTMENT Net Earned $233,057.50 ENGINEERING AND FISCAL SERVICES Earned This Period $14,977.87 Conta erso Berdena D 8429 Dcfari Apr el Si �' T etainage This Period $0.00 Less Liquidated Damages DEPARTMENT CHLCK PICK- YES 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $218,079.63 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $14,977.87 Tuesday, August 11, 2015 Page 4 of 4 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name Construction of Keller -Hicks Rd from 800' E of Alta Vista Rd Contract Limits to Park Vista Blvd Project Type WATER City Project Numbers 00791 DOE Number 5843 Estimate Number 52 Payment Number 52 For Period Ending 7/31/2015 CD City Secretary Contract Number 44169 Contract Time 46ED Contract Date 1/8/2013 Days Charged to Date 494 Project Manager Weiss Contract is 90.000 Complete Contractor McCLENDON CONSTRUCTION COMPANY, INC. Inspectors P.O. BOX 999 BURLESON , TX 76097 GREGORY / ROGERS Tuesday, August 11, 2015 Page 1 of 4 Arve City Project Numbers 00791 DOE Number 5843 Contract Name Construction of Keller -Hicks Rd from 800' E of Alta Vista Rd Estimate Number 52 Contract Limits to Park Vista Blvd Payment Number 52 Project Type WATER For Period Ending 7/31/2015 Project Funding Unit I - Water Improvements Item No. Description of Items Estimated Unit Unit Cost Estimated Completed Completed Quanity Total Quanity Total I-1 0241.1202 6" Water Abandonment Plug 3 EA $400.00 $1,200.00 1-2 9999.0000 Salvage Existing Water Val 4 EA $250.00 $1,000.00 1 $250.00 I-3 3311.0461 12" PVC Water Pipe 2465 LF $43.00 8105,995.00 2465 $105,995.00 I-4 3311.0241 8" PVC Water Pipe 100 LF $21.00 $2,100.00 60 $1,260.00 I-5 3311.0161 6" PVC Water Pipe 25 LF $23.00 $575.00 14 $322.00 I-6 3311.0001 Ductile Iron Water Fitting 5 To $4,950.00 $24,750.00 5 $24,750.00 1-7 3312.3005 12" Gate Valve 6 EA $2,650.00 $15,900.00 6 $15,900.00 I-8 3312.3003 8" Gate Valve (CO 43) 2 EA $1,500.00 $3,000.00 2 $3,000.00 I-9 3312.3002 6" Gate Valve 6 EA $1,000.00 $6,000.00 6 $6,000.00 1-10 0241.1510 Salvage Fire Hydrant 2 EA $750.00 $1,500.00 1-11 3312.0001 Fire Hydrant CO#2 7 EA $3,300.00 $23,100.00 6 $19,800.00 1-12 3312.2003 I" Water Service 11 EA $1,150.00 $12,650.00 11 $12,650.00 1-13 3312.2004 1" Private Service 72 LF $20.25 $1,458.00 1-15 3305.0109 Trench Safety 2590 LF $1.20 $3,108.00 2465 $2,958.00 1-16 3201.0611 6" Concreete Pavement Repa 101 SY $61.00 $6,161.00 1-17 0241.0500 Remove Fence 88 LF $2.00 $176.00 1-18 3231.0412 6' Fence, Wood 88 LF $19.00 $1,672.00 I-19 3305.0103 Exploratory Excavation of (CO #3) 3 EA $725.00 $2,175.00 3 $2,175.00 I-20 9999.0000 Vacuum Excavation of Exist 1 EA $1,500.00 $1,500.00 1-21 3201.0400 Temporary Asphalt Paving R 460 LF $13.95 $6,417.00 50 $697.50 22 12" NL Whip -Down -Install (CO #1) 2 EA $7,200.00 $14,400.00 2 $14,400.00 23 Disassemble & Remove Sign CO#1 2 EA $500.00 $1,000.00 2 $1,000.00 24 ABANDON FH & VALVE C042 1 EA $1,500.00 $1,500.00 1 $1,500.00 25 12X6 T/S & G.V. C042 1 EA $6,000,00 $6,000.00 1 $6,000.00 26 6" ANCHOR 90 BEND CO#2 1 EA $750.00 $750.00 1 $750.00 27 RELOCATE EXIST SSMH CO#2 1 EA $3,900.00 $3,900.00 1 $3,900.00 28 ADD'L DEPTH SSMH C042 3 VF $275.00 $825.00 29 REMOVAL & HAUL OFF EXIST 6" WL CO#2 1 LS $6,250.00 $6,250.00 1 $6,250.00 30 RE -CONSTRUCT SSMH & VENT PIPE (CO 43) 1 LS $3,500.00 $3,500.00 1 $3,500.00 Sub -Total of Previous Unit $258,562.00 $233,057.50 Tuesday, August 11, 2015 Page 2 of 4 Construction of Keller -Hicks Rd from 800' E of Alta Vista Rd to Park Vista Blvd WATER Contract Information Summary Original Contract Amount Change Orders City Project Numbers 00791 Contract Name Contract Limits Project Type Project Funding C Inspection Supervis Project Director / Contracting Depa1-hngnt Change Order Number 1 Change Order Number 2 Change Order Number 3 Date Date Date B r-/ j�- Date Design and Construction Date Total Contract Price DOE Number 5843 Estimate Number 52 Payment Number 52 For Period Ending 7/31/2015 $214,912.00 $15,400.00 $22,525.00 $5,725.00 $258,562.00 Total Cost of Work Completed Less % Retained Net Earned Earned This Period $14,977.87 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $233,057.50 $0.00 $233,057.50 $0.00 $0.00 $0.00 $218,079.63 $0.00 $14,977.87 Tuesday, August 11, 2015 Page 3 of 4 FORT WORTH. City of Fort Worth Change Order Request Project Name' Keller Hicks Rd. Phase II Client Project #(s)l 00791 Project Description Water, Paving and Dainage Improvements for Keller Hicks Rd. Phase II Contractor' McClendon Construction, Co. City Project Mgr. I Mike Weiss City Sec # I 44169 Change Order # I 3 I Date City Inspector I Joe Rogers 6/24/2015 Contract Time Dept. TPW Water Sewer Totals (CD) Original Contract Amount $1,714,724.44 $214,912.00 $0.00 $1,929,636.44 360 Extras to Date $43,276.50 $37,925.00 $81,201.50 81 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $1,758,000.94 $252,837.00 $0.00 $2,010,837.94 441 Amount of Proposed Change Order $17,879.81 $5,725.00 $0.00 $23,604.81 28 Revised Contract Amount $1,775,880.75 $258,562.00 $0.00 $2,034,442.75 469 Original Funds Available for Change Orders $77,363.56 $8,588.00 $85,951.56 Remaining Funds Available for this CO $34,087.06 $0.00 $0.00 $34,087.06 Additional Funding (if necessary) $5,725.00 $5,725.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER Relocation of State Farm sign was canceled after the permiting office declined the proposal to relocate the exisitng sign, and required a stone monument sign if the sign is moved. Coordination costs to relocate the have already been incured, based on the original approval of the proposal to relocate the sign and begin the permiting process Other new items included reconstruciton of an existing SSMH with vert pipe, remove and replace sidewalk to avoid State Farm Sign, modify gates and brick colums to allow existing gates to function propertly, and adding a stone/gravel driving surface at the Smithfield Storage Facility. In addition to the new items listed above I have included the list of significant quantity overruns. 5.43% $2,412,045.55 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractors Company Name McClendon Construction, Co. Inspector/Inspection Supervisor, Assistant Director (Dept) Assistant City Attorney Ut«!ft('c'D Contractor (Name) Contract Signature I Date .—.„ — -- -s1 - ..- /; r A, Date Project Manager/Program Manager v Date t Date Director, Contracting Department (Dept) Date \� h Date Assistant City Manager Date ti • �Iit1Ir r .1 Council Action (if required) M&C Number I C-26050 M&C Date Approved I 1/8/2013 I FORT WORTH Project Name J Keller Hicks Rd. Phase 11 Client Project # 1 00791 Project Description City of Fort Worth Change Order Additions Water, Paving and Dainage Improvements for Keller Hicks Rd. Phase II Contractor McClendon Construction, Co. City Project Mgr. 1 Mike Weiss Change Order # 3 City Inspector 1 Joe Rogers City Sec # 1 44169 Date 1 6/24/2015 I ADDITIONS I I HUI DESCFkIN I ION DEN 1 Qty Unit Unit Cost "Total 1-8 8" Gate Valve Water 1.O0 EA $1,500.00 $1,60O.00 i 1-19 Exploratory Digging Water 1.00 EA $725.00 $725.00 / 1-30 Re -Construct SSMH & Mod. Vent Pipe & oversized conc. collar Water 1.00 LS $3,500.00 $3,600.O0 .. 11-16 7' Chain Link Fence TPW 9.00 LF $30.001 $210.00 i 11-5 Lime TPW 39.00 TN $140.001' $5,460.O0 11-8 10" Concrete Paving TPW 78.00 SY $37.50! $2,925.00 11-9 6" Concrete Driveway TPW 140.00 SF $5.00 $700.O0/ II 10 Joint Sealant TPW 271.00 LF $1.10 $298.1 O _./' 11-11 4" Concrete Sidewalk TPW 1,756.00 SF $4.00: $7,024.00'/ 11-23 Raised Marker TY Y TPW 41.00 EA $3.10 $127.10 11-24 REFL. Raised Marker TY 11-A TPW 2.00 EA $4.35 : $8./01 J 11-42 Traffic Control TPW 3,00 EA $1,500.00 ` $4,500.00 / 11-45 Block Sod Placement TPW 43.00 SY $3.221 $138.46 11-78 7" Curb & Gutter TPW 217.00 LF $27.50' $5,967 501.- 11-79 Coordination of Sign Relocation/Cancellation TPW 1,00 LS $1,500.00 $1,b00.001 11-80 Raise Wrought Iron Gates @ Absolute Stone, and Add Support Braces TPW 1.00 LS $2,500.00 , $2,500.00 11-81 Remove Sidewalk @ State Farm Sign TPW 1,00 LS $1,950.00 $1,950.00 11-82 Remove,Raise, & Reset Brick Column at Flume/Storm Drain Line B TPW 1.00 LS $750.00, $750.O0 ` 11-83 Gravel Parking Lot at Smithfield Storage TPW 475.00 SY $5.50 $2,612.50 11-84 24" Thermoplastic Stripping at crosswalks TPW 390.00 LF $14.00'.' $5,460.00 - 111-2 18" RCP, Class III TPW 11.00 LF $69.00 ' $759.00 III-3 21" RCP, Class Ill TPW 155.00 LF $56.00 $8,680.00 " III-4 24" RCP, Class III TPW 259.00 LF $66.00' $17,094.00 1 1 Change Order Additions Page 1 of 2 Change Order Additions Page 2 of 2 TF1W $68,724.36 Water $5,725.00 Sewer $0.00 Sub Total Additions $74,449.36 FORT WORTH Project Name Client Project # Project Description ITEM 11-4 I1-6 11-7 City of Fort Worth Change Order Deletions Keller Hicks Rd, Phase II 00791 Water, Paving and Dainage Improvements for Keller Hicks Rd, Phase II Contractor McClendon Construction, Co. City Project Mgr. Mike Weiss 8" Lime I reatment 4" asphalt base type B 2" asphalt base type D 11-15 Remove Fence 11-17 Concrete Retaining Wall 11-19 18" SLD Pvmt Marking 11-20 12" SLD Pvmt Marking 11-21 Raised Marker TY W 11-22 REFL. Raised Markers TY I-C 11-25 Lane Legend Arrow II-26 Install Alum. Sign Ground M 11-43 Temp. Pvmt. 6" flex base UESCRIP PION Change Order # City Inspector DELETIONS DENT Ii'W TPW TPW TPW TPW TPW TPW ITPW TPW TPW TPW TPW Change Order Deletions Page 1 of 2 3 Joe Rogers city b,116.UU 309.00 309.00 902.00 1,424,00 10.00 44,00 694,00 244.00 1.00 1.00 327.00 Unit SY SY SY LF LF LF LF EA EA EA EA SY City Sec # I 44169 Date I 6/24/2015 Unit Cost 1 1 otal $3.0$15,348,001 $16.00 $4,944.001 $10.50 $3,244.b01 $2.001 $1,804,00 $11.00 $10.25 $7.25 $3.10 $4, 35 $215.00 $350.00 $17,25 $15,664.00 / -$102.50 .f $319,00 / $2,151,401 / $1,061.401 $215,001 / $350.00 / $5,640.75 / TPCV $50,844.55 Water $0.001 Sewer $0.001 Sub Total Deletions $50,844.551 Change Order Deletions Page 2 of 2 MIWBE Breakdown for this Change Order Previous Change Orders TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Keller Hicks Rd. Ph. 2 - Alta Vista to Park Vista PROJECT NUMBER: CPN 00791 DOE NUMBER: 5843 WATER PIPE LAID SIZE TYPE OF PIPE LF WATER 12" PVC 2465 8" PVC 60 6" PVC 14 FIRE HYDRANTS: 6 PIPE ABANDONED NONE SIZE VALVES (16" OR LARGER) TYPE OF PIPE LF DENSITIES: ALL PASSED NEW SERVICES: 11 1" COPPER PIPE LAID NONE SIZE SEWER TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF NONE DENSITIES: N/A NEW SERVICES: NONE TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 110 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Justin Blair, Treasurer of McClendon Construction Company, Incorporated, known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That there are no claims pending for personal injury and /or property damages; On Contract described as; Keller Hicks Road Subscribed and sworn before me on this r 4y Justin Blair ` 3 . 20 /s day of / ` otary Public in Tarrant County, Texas s'+ Psi , MARY J. PORTER MY COMMISSION EXPIRES 0,.4,„�fi'` September 17, 2016 CONSENT OF SURETY COMPANY TO FINAI, PAYMENT AIA DOC'UMi t\TG707 Owncr Architect C'ontractoi Surety Other PROJECT, Bond Number: TXC 604810 n;,n;e• address) Keller Hicks Road Paving Drainage (Alta Vista to Park Vista), Fort Worth, TX TO: (owner) City of Fort Worth, Texas 1000 Throckmortou Drive Fort Worth, TX 76108 CONTRACTOR: McClendon Construction Company, Inc. PO Box 996 Burleson, TX 76097 ARCHITECT'S PROJECT NO: CONTRACT FOR: Construction CONTRACT AMOUNT: $1,786,460.36 CONTRACT DATE:: In accordance with the provisions of the Contract between the Owner and the Contractor as Merchants Bonding Company 2100 Fleur Drive Des Moines, Iowa 50321 on bond of f her insert name and uddres» qi C :at actor) McClendon Construction Company, Inc. PO Box 996 Burleson, Texas 76097 hereby approves of the final payment to the Contractor, and agrees that final payment to the relieve the Surety Company of any of its obligations to (here insert name and address of Owner) City of Fort Worth, Texas 1000 Throckmorton Drive Fort Worth, Texas 76108 as sot forth in the said Surety Company's bond. 1 v:1NI;SS WHEREOF, the Surety Company has hereunto sct its hand this 14th day of July, Auc,c (Seal): indicated above, the ,SURETY COMPANY .CONTRACTOR, Contractor shall not ,O\I NER, Surety Company 4 Merchants Bonding Company 1 Si uaturc of Atithorircd Representative ' Betty J. Reeh - Attorney -In -Fact I itla 2015 NOTE: This form is to be used as a companion document to MA LOCUM ENT ('706, CONTRACTOR'S AlI•IDAVIT OF PAYMENT OF DEBTS AND CI AIMS, Current edition :VA DOCuMIENT 0707•CONSLb i OF SURETY COMPANY TO FTIAL PAYMENT•APRII. 1970 bDITION•AIAv PAGE R,'1970•TiiE AMERICAN INSTITUTE OF AR('HITL•CI'S. I735 NF.W YORK, AVE., NW, WASIIINGTON, D.C. 20006 ONE POA 0014 (7/14) MERCHANTS BONDING COMPANY, POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations duly organized under the laws of the State of Iowa (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint, individually, Betty J Reeh; Bryan K Moore; Gary Wayne Wheatley; Michael D Hendrickson; Pat J Moore of San Antonio and State of Texas their true and lawful Attorney -in -Fact, with full power and authority hereby conferred in their name, place and stead, to sign, execute, acknowledge and deliver in their behalf as surety any and all bonds, undertakings, recognizances or other written obligations in the nature thereof, subject to the limitation that any such instrument shall not exceed the amount of: SEVEN MILLION FIVE HUNDRED THOUSAND ($7,500,000.00) DOLLARS and to bind the Companies thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the Companies, and all the acts of said Attorney -in -Fact, pursuant to the authority herein given, are hereby ratified and confirmed. This Power -of -Attorney is made and executed pursuant to and by authority of the following By -Laws adopted by the Board of Directors of the Merchants Bonding Company (Mutual) on April 23, 2011 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 24, 2011. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attomeys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof. The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manually fixed." In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 13thday of STATE OF iOVVA COUNTY OF POLK ss. - ' 2003 �C) -�y�••.... ':i�•�� August , 2014. MERCHANTS BONDING COMPANY (MUTUAL) MERCHANTS NATIONAL BONDING, INC. By '27 7er-710---- President On this 13thday of August 2014, before me appeared Larry Taylor, to me personally known, who being by me duly swom did say that he Is President of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument is the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. In Testimony Whereof, I have hereunto set my hand and affixed my Official Seal at the City of Des Moines, Iowa, the day and year first above written. STATE OF IOWA COUNTY OF POLK ss. ?JAL WENDY WOODY v Commission Number 784654 My Commission Expires wP June 20, 2017 Notary Public, Polk County, Iowa I, William Warner, Jr., Secretary of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand and affixed...... seal of the Companies on this (s:t� day of , L 0'$ • ��� OV "' �d 0- , �O ' , P O R9 9y •,. �c/ �: _0_ aSL" c •I— -o- a • �° 1933 3� Secretary '",,,,,,,,,,,1110. MERCHANTS BON DING COMPANY IMPORTAI1 To obtain information or make a complaint: T NOTICE You may contact your insurance agent at the telephone number provided by your insurance agent. You may call Merchants Bonding Company's toll -free telephone number for information or to make a complaint at: 1-800-678-8171 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at: P. O. Box 149104 _ Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. SUP 0032 TX (1/09) Checklist for Infrequent Presenters ❑ Presentation Content According to research, audiences can only remember five key points from a speech. Therefore, when writing your speech, try to emphasize no more than five key points. ❑ Humor Be cautious when choosing to use humor during your presentation. What is funny to one person may not be to another. ® Before you give the speech The best speeches and presentations are rehearsed thoroughly. Practice, practice, practice. ❑ Recitation makes perfect Say your presentation out loud as many times as you can. Standing in front of a mirror, speaking to a small group or even to a friend are good ways to get helpful feedback. ® The hour before show time Arrive early and mingle with your audience. It is easier to give a speech to friends than to strangers. Check that all A/V equipment is working properly. In case of technical problems, have back-up handouts ready. ❑ Giving the speech Attention to the following key points will make you look like a pro: • Voice: Speak clearly and loudly, as if you are speaking to the person sitting farthest from you in the room. Avoid a monotone delivery and pace yourself. •Eye contact: Hold eye contact with audience members for 3-5 seconds before moving your glance to another person. •Gestures: During your presentation, find places to gesture and engage the audience. When not using your hands, keep them at your sides. Never cross your arms at your chest or hold your hands together at your waist. Both of these positions imply a "closed -off' attitude. •Attire: Wear business attire for presentations. Professionalism is always best. -Posture.. Make a conscious effort to stand up straight at all times while speaking. •Questions: Repeat questions to ensure that everyone heard it before you answer. ® Evaluating your performance Measuring your audience is important for your next speech preparation. Notice what your audience is doing. Are they engaged, paying attention, taking notes or looking at their watches? Make a mental note of this and write down what you saw as soon as the presentation is over. Use these notes to help you next time. !VoRT V.70 �raTH TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR REV: 02/20/07 I) CONTRACTOR & PROJECT DATA A4ane of Contractor Project Name McClendon Construction Co., Inc. Keller Hicks Ph. 2 -Alata Vista to Park Vista DOE Inspector DOE Number Joe Rogers 5843 DOE Inspector Project Manager Q Water Waste Water Storm Drainage✓ Pavement Mike Weiss Initial Contract Amount Project Dculty $1,929,636.44 0 Simple ® Routine 0 Complex Final Contract , I,nounl Date $2,034,442.75 8/6/2015 II) PERFORMANCE EVALUATION 0 - Inadequate 1 - Deficient 2 - Standard 3 - Good 4 - Excellent ELEMENT WEIGHT ( x) APPLICABLE (Y / N) RATING (0 - 4) MAX SCORE SCORE I 1 Submission of Documents 2 Y 3 8 6 1 2 Public Notifications 5 Y 3 20 15 i 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 3 60 45 i 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 3 20 15 11 Property Restoration 5 Y 3 20 15 12 After Hours Response 5 Y 3 20 15 13 Project Completion 5 Y 2 20 10 TOTAL ELEMENT SCORE (A) 331 BONUS POINTS (25 Maximum) (B) TOTAL SCORE (TS) 331 III) CONTRACTOR'S RATING Maximum Score (MS) = 448 or sum of applicable element score maximums which = 448 Rating ( ITS / MSI * 100%) 331 / 448 = 74% Performance Category Good • - 20% = Inadequate 20% to <40% = Deficient 40% to <60% = Standard 60% to <80% = Good >_80% = Excellent Inspector's Comments (INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENTS Signature Contracto • 437 TRANSPORTATION AND PUBLIC WORKS The City of Fort North • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 FORT WORTH TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY 1) PROJECT INFORIV1ATION 'Name oft-antuctor McClendon Construction Co., Inc. DOE Inspector Joe Rogers Date: REV: 02/22/07 8/6/2015 Project Name Keller Hicks- Ph. 2 - Alta Vista to Park Vista Project Manager Mike Weiss DOE ,\honber Project Difficulty 5843 ; 0 Simple Q Routine 0 Complex Initial Contract Amount $1,929,636.44 II) PERFORMANCE EVALUATION 0 - Inade lil_EMEN1 INSPEC I Avail 2 Kno 3 Accu 4 Displ 5 Citiz 6 Perfo ADMIN • I Chan •2 Timli 3 Bid 1 - Deficient 2 - Standard 3 - Good Type of Contract Watery Waste Water Storm Drainage Pavement Final Contract Amount $2,034,442.75 4 - Excellent /ledge Opening RATING (0 -4) ELEMENT RATING (0 - 4) TION EVALUATION PLANS & SPECIFICATIONS ability of Inspector 3 1 Accuracy of Plans to Existing Conditions 1 of Inspector 3 2 Clarity & Sufficiency of Details 3 racy of Measured Quantities 3 3 Ap_licability of_Specifications 3 ay Of Professionalism 3 4 Accuracy of Plan Quantities 2 n Complaint Resolution 3 PROJECT MANAGER EVALUATION nuance - Setting lip Valve Crews, Labs 3 1 Knowledge And/Or Problem Resolution 3 ISTRATION 2 Availability of Project Manager 3 3 ge Order Processing Time 3 3 Communication ness of Contractor Payments 3 4 Resolution of Utility Conflicts .3 to Pre -Con Meeting Timeframe a 111) COMMENTS & SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 FORT WORTH 'mac.--a;;3?ii.-� •- TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME rev 03/05/07 FINAL STATEMENT NO.:FINAL NAME OF PROJECT: Water, Paving, & Drainage Improvements for Keller Hicks Rd. Phase 11 - Alta Vista to Park Vista PROJECT NO.: CPN- 00791 PERIOD FROM:07/01/15 TO: 07/31/15 WORK ORDER EFFECTIVE:6/3/2013 DAY OF MONTH DAYS CHARGED DURING CONTRACTOR: McClendon DOE NO.: 5843 FINAL INSPECTION DATE: 17-Feb-15 CONTRACT TIME: 469 REASON FOR DAYS CREDITED DAY OF MONTH 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT, SUN, RAIN, TOO WET, UTILITIES & HOLIDAYS & TOO COLD RELOCATIONS THIS PERIOD PREVIOUS PERIOD TOTALS TO DATE *REMARKS: DAYS CHARGED DURING OTHERS Contractor charged for 25 days of LD's Total costs deducted from Final Payment. Sr-13-Il CONTI 0 DATE - INSPECTQ ENGINEERING DEPART\ The City of Fort Worth • 1000 Throckmorton Street • Fort (817) 392 - 7941 • Fax: (817) 392 - 784 O WCQ CD REASON FOR DAYS CREDITED DAYS TOTAL CHARGED DAYS 0 0 494 494 494 494 v(/ice DATE hiCille6oRD CITY SECRETARY FT. WORTH, TX