Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
!Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
FORT
Project Name' Keller Hicks Rd. Phase II
Client Project #(s)I 00791
Project Description
City of Fort Worth
Change Order Request
Water, Paving and Dainage Improvements for Keller Hicks Rd. Phase II
Contractor) McClendon Construction, Co.
City Project Mgr.l Mike Weiss
Dept. TPW
$1,714,724.44
$1,714,724.44
$43,276.50
$1,758,000.94
$77,363.56
$77,363.56
CITY SECRETARY
CONTRACT No. _ ..... , -c.,
City Sec # I 44169
Dog,. .c8f,
Change Order # l 2 l Date I 6/3/2014
City Inspector l Joe Rogers
Water
$214,912.00
$15,400.00
$230,312.00
$22,525.00
$252,837.00
$8,588.00
$0.00
$22,525.00
Sewer Totals
$0.00 $1,929,636.44
$15,400.00
$0.00
$0.00
$0.00
$0.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
Contract Time
(CD)
360
5
$1,945,036.44 365
$65,801.50 76
$2,010,837.94 441
$85,951.56
$77,363.56
$$22,525.00
4,21%
$2,412,045.55
Add temporary 5 gravel sidewalk; wooden bridge crossing at detention pond; pedestrian traffic control signage
(REASONS)FOR CHANGE ORDER
- � and safety fence. Delete
temporary 2"thk. HMAC sidewalk. Tie into existing private storm drain lines to separate main. Remove concrete payment and add asphalt
pavement for future roundabout at Park Vista Blvd. Add bike pavement markings and signs. Add new headwall with guardrail on existing
culvert on south side of Keller -Hicks Rd. near Pine Tree Circle, e , fire hydrant at Park Vista Blvd. Relocate existing precast sanitary
sewer manhole in conflict with storm drain. Locate, repair of x s gter line that was originally called out to remain in place, but it
was in conflict with the storm drain and had to be remo °°oo°O°Ooo��
o°°° °0 , oFFI IAL Gkf CORD
C)' 70 ",'t.ITY SECRETARY.
4 �irn W RTHI TX
° O •
o p
%%0p0p0o°01*
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
I - Contractor's Company Name
McClendon Construction, Co.
r/inftpec ipn Su
tr
I_�
r OpirlAtantICjtOttomeyiliankiik.
Wetfkj_ JP.131Aet-
1.11111111111
M&C Number C-26050
, ..5
•
ont ". natu
Project :Hager/Program anager
e
Dp'te
r%rj17"/i211
ctor, Con acting Department (Dept)
Date Assistant City Manage
Council Action (if reel
17/9//4.
M&C Date Approved 1 1/8/2013
FORT WORTH..
Project Name' Keller Hicks Rd. Phase II
Client Project #(s)I 00791
Project Description
City of Fort Worth
Change Order Request
Water, Paving and Dainage Improvements for Keller Hicks Rd. Phase II
Contractor) McClendon Construction, Co.
City Project Mgr.I Mike Weiss
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
!Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
$1,714,724.44
$1,714,724.44 I
$43,276.50 j
$1,758,000.94
$77,363.56
$77,363. 66 1
Change Order # I 2
L/Lj 11((I ((.
City Sec # I 44169
Day 5ij 3
City Inspector I Joe Rogers
Water Sewer
$214,912.00
$15,400.00
$230,312.00
$22,525.00
$252,837.00
$8,588.00
$0.00
$22,525.00
Date I 6/3/2014
Totals
$0.00 $1,929,636.44
$15,400.00
$0.00
$0.00
$0.00
$0.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
$1,945,036.44
$65,801.50
$2,010,837.94
$85,951.56
$77,363.56
$22,525.00
4.21%
$2,412,045.55
I Contract Time
(CD)
360
5
365
76
441
Add temporary 5' gravel sidewalk; wooden bridge crossing at detention pond; pedestrian traffic control signage and safety fence. Delete
temporary 2"thk. HMAC sidewalk. Tie into existing private storm drain lines to separate main. Remove concrete payment and add asphalt
pavement for future roundabout at Park Vista Blvd. Add bike pavement markings and signs. Add new headwall with guardrail on existing
culvert on south side of Keller -Hicks Rd. near Pine Tree Circle. Install new fire hydrant at Park Vista Blvd. Relocate existing precast sanitary
sewer manhole in conflict with storm drain. Locate, repair, & remove existing water line that was originally called out to remain in place, but it
was in conflict with the storm drain and had to be removed.
fi
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name
McClendon Construction, Co.
nG pe91orllgspection Supervisor
`Assistant Director (Dept)
Contractor (Name)
�sf i ►^� Die,\t C
Assistant City Attorney
1't/t 't
M&C Number I C-26050
Date
Date
/,/
Confr"act Signature
Project Manager/Program Manager
Director, Contracting Department (Dept
Assis ant City Manag
Council Action (if required)
M&C Date Approved 1 1/8/2013
FORT WORTH®
Project Name' Keller Hicks Rd. Phase II
Client Project #(s)I 00791
Project Description
City of Fort Worth
l-/I q j (((I.
Change Order Request
' City Sec # I 44169
Water, Paving and Dainage Improvements for Keller Hicks Rd. Phase II
Contractor' McClendon Construction, Co.
City Project Mgr.' Mike Weiss
Change Order # I 2 I Date I 6/3/2014
City Inspector I Joe Rogers
Contract Time
Dept. TPW Water Sewer Totals (CD)
Original Contract Amount $1,714,724.44 $214,912.00 $0.00 $1,929,636.44 360
Extras to Date $15,400.00 $15,400.00 5
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $1,714,724.44 $230,312.00 $0.00 $1,945,036.44 365
!Amount of Proposed Change Order $43,276.50 $22,525.00 $0.00 $65,801.50 76
Revised Contract Amount $1,758,000.94 $252,837.00 $0.00 $2,010,837.94 441
Original Funds Available for Change Orders $77,363.56 $8,588.00 $85,951.56
Remaining Funds Available for this CO $77,363.56 $0.00 $0.00 $77,363.56
Additional Funding (if necessary) $22,525.00 $22,525.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
4.21%
$2,412,045.55
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Add temporary 5' gravel sidewalk; wooden bridge crossing at detention pond; pedestrian traffic control signage and safety fence. Delete
temporary 2"thk. HMAC sidewalk. Tie into existing private storm drain lines to separate main. Remove concrete payment and add asphalt
pavement for future roundabout at Park Vista Blvd. Add bike pavement markings and signs. Add new headwall with guardrail on existing
culvert on south side of Keller -Hicks Rd. near Pine Tree Circle. Install new fire hydrant at Park Vista Blvd. Relocate existing precast sanitary
sewer manhole in conflict with storm drain. Locate, repair, & remove existing water line that was originally called out to remain in place, but it
was in conflict with the storm drain and had to be removed.
/)
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
McClendon Construction, Co. _ "\ �� i pact Snature
Contractor's
Company Name Contractor (Name) I Contr ,re
Inspector/Inspection Supervisor Date Project aM nager/Program Manager
Assistant Director (Dept)
Director, Contracting Department (Dept)
Assistant City Attorney Date Assistant City Manager
M&C Number I —C-26050
• I
Council Action (if required) 11111111
M&C Date Approved I 1/8/2013
/4-
FORT WORTH. City of Fort Worth
Change Order Request
Project Name' Keller Hicks Rd. Phase II
Client Project #(s)I 00791
Project Description
Water, Paving and Dainage Improvements for Keller Hicks Rd. Phase II
Contractor' McClendon Construction, Co.
City Project Mgr.' Mike Weiss
I City Sec # I 44169
I Change Order # I 2 I
City Inspector I Joe Rogers
Date I 6/3/2014
Contract Time
Dept. TPW Water Sewer Totals (CD)
Original Contract Amount $1,714,724.44 $214,912.00 $0.00 $1,929,636.44 360
Extras to Date $15,400.00 $15,400.00 5
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $1,714,724.44 $230,312.00 $0.00 $1,945,036.44 365
!Amount of Proposed Change Order $43,276.50 $22,525.00 $0.00 $65,801.50 76
Revised Contract Amount $1,758,000.94 $252,837.00 $0.00 $2,010,837.94 441
Original Funds Available for Change Orders $77,363.56 $8,588.00 $85,951.56
Remaining Funds Available for this CO $77,363.56 $0.00 $0.00 $77,363.56
Additional Funding (if necessary) $22,525.00 $22,525.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
4.21%
$2,412,045.55
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Add temporary 5' gravel sidewalk; wooden bridge crossing at detention pond; pedestrian traffic control signage and safety fence. Delete
temporary 2"thk. HMAC sidewalk. Tie into existing private storm drain lines to separate main. Remove concrete payment and add asphalt
pavement for future roundabout at Park Vista Blvd. Add bike pavement markings and signs. Add new headwall with guardrail on existing
culvert on south side of Keller -Hicks Rd. near Pine Tree Circle. Install new fire hydrant at Park Vista Blvd. Relocate existing precast sanitary
sewer manhole in conflict with storm drain. Locate, repair, & remove existing water line that was originally called out to remain in place, but it
was in conflict with the storm drain and had to be removed.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
' Contractor's Company Name Contractor (Name) Contract Signature
McClendon Construction, Co. p -
Inspector/Inspection Supervisor 111=M1111F Project Manager/Program Manager
Assistant Director (Dept) Date
Assistant City Attorney
M&C Number I C-26050
Director, Contracting Department (Dept)
Date Assistant City Manager Date
r +
Council Action (if required)
M&C Date Approved 1/8/2013
FORT WORTH
Project Name 1 Keller Hicks Rd. Phase II
Client Project # 1 00791
Project Description
City of Fort Worth
Change Order Additions
Water, Paving and Dainage Improvements for Keller Hicks Rd. Phase II
Contractor McClendon Construction, Co.
City Project Mgr. Mike Weiss
City Sec # 44169
Change Order # 2 Date I 6/3/2014
City Inspector
Joe Rogers
ADDITIONS
I I EM DESCKIP I ION DEP I Uty Unit Unit Cost I otal
II-65 I emporary Gravel Sidewalk I PVV 38b.UU SY $11.00 $4,23b.UU
11-66 Wood Crossing Bridge at Detention Pond TPW 1.00 EA $3,575.00 $3,b/b.U0
11-67 Additional Traffic Control Signage and Temporary Construction Fence TPW 1.00 LS $7,325.00 $/,32b.UU
III-30 Tie -In Existing Private Storm Drain Lines w/ separate main. TPW 1.00 LS $6,250.00 $6,25U.UU
11-6 3212.0501 4" Asphalt Base Type B TPW 3,291.00 SY $16.00 $b2,55b.UU
11-7 3212.0302 2" Asphalt Pavement Type D TPW 3,291.00 SY $10.50 $34,bbb.SU
I1-36 7" Concrete Curb & Gutter (D534) TPW 575.00 LF $27.50 $1b,812.bU
11-68 Bike Lane Signs
11-69 6" Solid White Pavement Tape
11-70 Bike Lane Symbol w/ Arrows
11-71 Remove & Dispose of Existing Headwall
11-72 Furnish and Install Headwall
11-73 18" Rock Riprap
11-74 Metal Beam Guard Fence
11-75 Terminal Anchor Section
11-76 Driveway Terminal Anchor Section
11-77 Thrie-Beam Terminal
1-22 Abandon Fire Hydrant & Valve
1-23 12" x 6" Tapping Sleeve & Valve
1-24 6" Anchor 90 Degree Bend
I-11 Fire Hydrant
TPW
TPW
TPW
TPW
TPW
TPW
TPW
TPW
TPW
TPW
Water
Water
Water
Water
111-31 Additionl 4" Sch 40 Storm Drian to Connect to Private Drain 1 TPW
1-25 Relocate Existing Precast Sanitary Sanitary Sewer Manole Water
I-26 Added Depth to Sanitary Sewer Manhole 1 Water
4.00 EA $350.00 $1,4UU.UU
4,850.00 LF $2.00 $9,/UU.UU
16.00 EA $600.00 $9,5UU.UU
1.00 EA $4,500.00 $4,5UU.UU
1.00 LS $17,000.00 $1 /,000.UU
83.00 SY $85.00 $/,Ubb.UU
150.00 LF $35.00 $b,2bU.UU
1.00 EA $550.00 $55U.UU
1.00 EA $550.00' $bbU.UU
2.00 EA $1,750.00' $3,5UU.UU
1.00 EA $1,500.00. $1,bUU.UU
1.00 EA $6,000.00. $6,000.U0
1.00 EA $750.00' $/$0.00
1.00 EA $3,300.00' $3,3UU.UU
1.00 LS $1,550.00 ' $1,b5U.UU
1.00 Ea $3,900.00 ' $3,9UU.UU
3.00 VF $275.00 ' $825.UU
Change Order Additions Page 1 of 2
1-27 Downtime to Locate, Repair, & Removal of Existign Waterline
Water
1.00 LS $6,250.00 $6,250-00
TFW $185,064.00
Water $22,525.00
Sewer $0.00
Sub Total Additions $207,589.00
Change Order Additions Page 2 of 2
FORT WORTH
Project Name I Keller Hicks Rd. Phase II
Client Project # I 00791
Project Description
City of Fort Worth
Change Order Deletions
IWater, Paving and Dainage Improvements for Keller Hicks Rd. Phase II
Contractor McClendon Construction, Co.
City Project Mgr. Mike Weiss
1
1
Change Order #
2
City Inspector I Joe Rogers
I City Sec # I 44169
1
Date I 6/3/2014
1
DELETIONS
I I EM UESCKIP I ION DEP I Uty Unit Unit Cost I otal
11-b6 I emporary VValk 2" Asphalt I ype U I PVV / /4.UU SY $12.b0 $9,6/b.UU
11-36 10" Concrete Pavement TPW 3,523.00 SY $37.50 $132,112.bU
Change Order Deletions Page 1 of 2
T�W
Water
Sewer
Sub Total Deletions
$141,787.50
$0.00
$0.00
$141,787.50
Change Order Deletions Page 2 of 2