Loading...
HomeMy WebLinkAboutContract 44732-Co1 (2)CITY SECRETARY, FORT WORTH. City of Fort Worth CONTRACT NO. biLlg12 -(01 Change Order Request Project Name' Paving, Drianage, & Utility Work for Ray White Road I City Sec # I 44732 Client Project #(s)I Project #01674 - DOE #6672 Change Order Submittal # I 1 Date I 1/27/2014 Dept. TPW Water Sewer Contract Time Totals (CD) Original Contract Amount $262,162,41 $27,734.00 $58,602,00 $348,498.41 90 Extras to Date 10 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $262,162,41 $27,734'00 $58,602.00 !Amount of Proposed Change Order $32,002.00 $0,00 $0.00, Revised Contract Amount $294,164;41 $27,734.00 $58,602,00 Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) $0,00 ' $0,00 $0',00 $32,002.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $348,498.41 100 $32,002.00 21 $380,500.41 121 $0.00 $32,002.00 9 18%0 $435,623;01 ,itl17 c-,A 1 O p,,,, , 0 ^'"t) F o ; c n r 1, " 0 D E This change order is required to add the over -run in the excavation quantity. This change order also adds the 6" Pipe Sudrain required due to 1 the ground water encountered on from station 1+00 approximately to 2+40. The groundwater was encountered on both sides of the roadway and therefore a 6" sudrain was installed for approximately 150 LF on each side of the roadway and connected to the inlets installed on the east end of the project. An item for the root barrier reuired as directed by the inspector in the field. The addtional contract time requested is summarized as follows: Days added due to ice strom 9 CD, Addtional Excavation Work 7 CD, Subdrain installation 5 CD for a total of 21 CD. 1 i OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX RECEIVED MAR 2,6 2014 FORT WORTH City of Fort Worth Change Order Additions Project Name ( Paving, Drianaqe, & Utility Work for Ray White Road Client Project # ( Project #01674 - DOE #6672 11 EM UESCRIP I ION UNIT IV - PAVING & DRAINAGE IMPROVEMEN 1 S IV-02-INCR 3123.0101 Unclassified Excavation IV-47-NEW 3346.0101 6" Pipe Underdrain IV-48-NEW 9999.0000 Connect to Inlet IV-49-NEW 9999.0000 24" Root Barrier Change Order Submittal # 1 City Sec # I 44732 Date I 1/27/2014 ADDITIONS DEP 1 Oty Unit Unit Cost I otal $U.UU U.UU 25.0 2 TPW TPW TPW TPW 712.88 CY 300.00 LF 37.6011,2807 2.00 EA $150.00 65.00 LF $40.00 TPW $32,002.00 Water $0.00 Sewer $0.00 Sub Total Additions $32,002.00 Change Order Additions Page 1 of 1 ITEM FoRr W City of Fort Worth Change Order Deletions Project Name 1 Paving, Drianage, & Utility Work for Ray White Road Client Project # 1 Project#01674 - DOE #6672 City Sec # I 44732 Change Order Submittal # 1 Date 1/27/2014 1 DELETIONS DESCRIP I ION DEP I Qty Unit Umt Cost I otal ` TFW $0.00 I Water $0.00 I Sewer $0.00 Sub Total Deletions $0.00 Change Order Deletions Page 1 of 1 N/A M/SBE Breakdown for this Change Order M/SBE. Sub Type of Service N/A Total Previous Change Orders co# DATE AMOUNT Total mount for this CO N/A CFW Change Order Approval St-COApp03 Page 2 of 3 FORT WORTH® City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: COSub-01 Change Order No.: City Sec. No.: Project Name: Project Numbers: Project Description: City Project Mgr.: Contractor: St-COApp03 Date Started: 1/30/2014 44732 Date Due: 3/21/2014 Ray White Gap 01674 DOE Numbers: DOE 6672 Construction of Ray White Road as a 2-lane residential street from North Beach St to Stoneside Tr. Project includeds paving, storm drain, water, and sewer. Mike Bennett Stabile & Winn, Inc COUNCIL ACTION (If Required): M&C Log Name: NA M&C Number: NA COST AND DAYS SUMMARY: Department: TPW Approval Status: City Inspector: Thomas Miller M&C Date: Cost($) Fund Account Center: fit Requested Days: $ 32,002.00 C202 541200 202760167483 21 Total: $ 32,002.00 Total Requested Days: 21 https://projectpoint.buzzsaw.corn/ bz web/Forms/FormPrint.asox?SiteId=51500&ProcessT... 3/25/2014 CFW Change Order Approval St-COApp03 Page 1 of 3 Links (1) fortworthaov/Infrastructure Proiects/01674 - Rav White Gan/Contractor/Chanae Orders/Chanae Order Breakdown #1.xls Attachments (01 No Attachments have been added to this form. https://proiectpoint.buzzsaw.com/ bz web/Forms/FormPrint.asnx?SiteTd=5150f&&PrccessT... 1/25/7X)14 CFW Change Order Approval St-COApp03 Page 3 of 3 Approved: Yes Comments: Current WP Balance 77,337.59 User: Danielle Pickle Date: 2014-02-17 10:09 AM Approved: Yes Comments: User: Jerry Henderson Date: 2014-02-17 10 : 21 AM Approved: Yes Comments: No M&C required User: Mike Bennett Date: 2014-02-17 5:52 PM Approved: Yes Comments: User: Kim Arnold Date: 2014-02-19 12 : 25 PM Approved: Yes ,Comments: User: Andy Anderson Date: 2014-02-21 11:22 AM Approved: Yes Comments: User: Doug Wiersig Date: 2014-03-13 8:05 AM Approved: Yes Comments: User: Doug Black Date: 2014-03-20 10 : 47 AM Approved: Yes Comments: User: Fernando Costa Date: 2014-03-20 4:03 PM Action Required: Please review, approve, and submit https://proiectpoint.buzzsaw.com/ bz web/Forms/FormPrint.asnx?SiteTd=51500&ProcesST... 3/7.50014