HomeMy WebLinkAboutContract 44676-A2 (2)AMENDMENT No. 2
CITY SECRETARY,
CONTRACT NO. L1LL1(o -'J��
TO CITY SECRETARY CONTRACT No. 44676
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and
Associates, Inc., (ENGINEER) made and entered into City Secretary
Contract No. 44676, (the CONTRACT) which was authorized by M&C #C-26358
on the 23rd day of July, 2013 in the amount of $ 422,850.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $143,200.00 which was authorized by M&C #C-26963 on
September 9, 2014.
WHEREAS, the CONTRACT involves engineering services for the
following project:
Caylor 5 Million Gallon Ground Storage Tank; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated November 13, 2015, a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional design services to be performed by Engineer
totals $34,400.00. (See Attached Funding Breakdown Sheet, Page -3-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $600,450.00.
All other provisions of
amended herein, shall remain in
City of Fort Worth
Professional Services Agreement Amendment Template
PM0 Official Release 8/1/2012
Page 1 of 3
SCAED
3.
the Contract, which
full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
are not expressly
4 ToskVfD
�23 Zp5
�1,
`TOR �y("
otscoo,#
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth
hai1CiJ C LC Qe
Assistant City Manager
DATE: /l-a-(5
APPROVAL RECOMMENDED:
John Robert Carman
pii.. Director, Water Department
APPROVED AS TO FORM AND LEGALITY:
Douglas W. Black
Assistant City Attorney
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 2 of 3
ENGINEER
Kimley-Horn and Associates, Inc.
Glenn A. Gary, P.E.
Senior Vice President
DATE : / 1 - 1 G A&
M&C:
Date:
IN OT
OFFICIAL RECORD
CITY SECRETARY
Ft WORTH, TX
Department
Water
FUNDING BREAKDOWN SHEET
City Secretary No. 44676
Amendment No. 2
Fund -Account -Center Amount
P265 531200 601180211130 34,400.00
Total: 34,400.00
City of Fort Worth
Professional Services Agreement Amendment Template
PM0 Official Release 8/1/2012
Page 3 of 3
<<��mley») Horn
November 13, 2015
Ms. Farida Goderya, Ph.D., P.E.
Project Manager
City of Fort Worth Water Department
1000 Throckrnorton
Fort Worth, TX 76012
RE: City of Fort Worth- Caylor 5!I/MG Ground Storage Tank
Project No. P265-607180211130/City Secretary Contract #44676
Amendment #2-Additional Services —Off-Site Water Line Design
KHA No. 061018119
Dear Farida:
As part of the off -site improvements for this project, it was recommended by the City that the existing
water lines in Caylor Road be looped to existing cross streets. This change from the original design
intent of the project required additional services that were not included as part of our Original
Contract. This included water line design and construction phase services associated with these off -
site improvements totaling 2,300 linear feet of 8-inch water line. In addition, as part of the
Construction Phase Services associated with the Ground Storage Tank (GST), the City requested that
Kimley-Horn perform a few additional tasks that were not specifically identified in the Original
Contract. These services are further described below.
Off -Site Water Line - Design, Bidding, and Construction Phase Services
The original contract did not include services associated with preparing Construction documents for
off -site water improvements. During preliminary design for the GST, the City decided that due to the
proximity of proposed off -site improvements to the existing dead-end water lines that approximately
2,300 linear feet of 8-inch water line design would be added to the project. These water line
improvements are along Caylor Road from Martinsburg Drive to the second bend in Caylor Road
west of the tank site.
Contract documents consisted of 6 total plan sheets (1 existing water system, 2 plan, 2 detail, and 1
paving extents sheets) and specifications. These services were performed in accordance with Tasks
3 (Preliminary Design) and 4 (Final Design) of the Attachment "A" Scope for Engineering Design
Related Services for Water and/or Sanitary Sewer Improvements as located on the City's Buzzsaw
site.
Additional Bid Phase services were be performed to incorporate bidding the water improvements
together with the GST plans and specifications as one project. These services required development
of additional Division 01 General Requirements, Division 33 Specifications, as well as a Unit Price Bid
Form for the water portion of the project. These services were performed in accordance with the
terms described in Task 5 of the Original Contract.
801 Cherry Street, Unit 11, Suite 950, Ft. Worth, TX 76102
817 335 6511
Kimley»>Horn
Mrs. Farida Goderya, P.E., November 13, 2015, Page 2
Additional Construction Phase Services will be performed associated with the water construction
related to Site Visits, Clarifications, Shop Drawings, Final Walk Through, and Record Drawings in
accordance with Task 6 — Construction Phase Services of the Original Contract. These services will
include review of up to three (3) shop drawings, responses for up to one (1) Requests For Information
(RFI), and up to one (1) site visit during construction.
The additional amount requested for these services is $25,000.
(SBE Fee: $0)
Construction Phase Services — Additional Tasks
Tank Foundation Pour Public Notice Coordination
The original contract included services associated with two (2) public meetings, one during design
and one during construction. During construction of the tank foundation, hot weather conditions
required the concrete foundation of the GST to be performed beginning at 1:30 a.m. in the morning.
Since this might be a disruption to the surrounding area, the City requested that Kimley-Horn prepare
public notices, and prior to release, to review the notice with multiple staff members within the Water
Department and Council District Member's office. This required additional coordination with the tank
contractor to include specific information related to the schedule and sequence of the proposed
construction activities including approval of concrete truck routes coming to and from the site.
Tank Mixer Design
During preliminary design of the GST, the City decided that it was preferred not to install a mixer
within the GST. However, as part of approval for construction by TCEQ, the addition of a mixing
system was necessary to satisfy their findings associated with the GST's operational parameters
within the North Side 11 pressure plane. Kimley-Horn coordinated with TCEQ and provided back-up
information related to the water system's operation to satisfy their requests. In addition, Kimley-Horn
prepared revised construction plans and specifications for installation of the mixing system to obtain
approval for construction of the GST by TCEQ.
The additional amount requested for these services is $9,400.
(SBE Fee: $0)
Task Kimley-Horn Fee SBE Fee Total Fee
Off -Site Water Line $25,000 $0 $25,000
Construction Phase Services $9,400 $0 $9,400
Amendment No. 2 TOTAL $34,400 $0 $34,400
Original Contract
Amendment #1
Amendment #2
Revised Contract Total
$422,850
$143,200
$34,400
$600,450
kim ey-horn.com
801 Cherry Street, Um " , Suite 950, Ft. Worth, TX 76102
817 335 6511
C lltnt k »>> Horn
Mrs. Farida Goderya, Ph.D., P.E., November 13, 2015, Page 3
Since a majority of the alignment was surveyed previously associated with Amendment No. 1, no
SSE sub -consultants were utilized for these additional services. With this Amendment, our revised
contract amount will be $600,450. Our total SBE participation percentage for the project is 23.64%.
We appreciate the opportunity to be of continued service to the City. Please contact us if we need to
provide any further information.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
Texas Registration No. F-928
Glenn A. Gary, P,E.
Senior Vice President
JRT/jrt
\\\FTWFP01IData\Project\FTW Utililies1061018119\PPPWmendment#2\Amend2 Addsvcrequesl.Doc
kimiey-horn.com
801 Cherry Street, Unit 11, Suite 950, Ft. Worth, TX 76102
817 335 6511