Project Name:l Sanitary Sewer Rehabilitation, Contract 79
Project No.(s):l P254-708170149183
Project Description:1
Contractor:1
DOE No. l 6948
City Sec No.: l 45379
I City Proj. No.: 1 01491
The replacement of sanitary sewer mains on Riverside Drive, Berry Street, Ellis Ranch Trail, Fairway Drive, Glen Garden
Drive, Stardust Lane and Three Easements
William J. Shultz, Inc. dba Circle C Const. Co 7/21/2014
City Project Mgr.l Roberto C. Sauceda
Phone Number:I 817-392-2387
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
!Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Sewer
$2,977,235.00
$2,977,235.00
$96,000.00
$3,073,235.00
$89,317.00
$89,317.00
$6,683.00
Change Order #
City Inspector: l
Phone Number:)
1 l Date:
Edward Davila
817-223-2268
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
Totals
$2,977,235.00
$2,977,235.00
$96,000.00
$3,073,235.00.
$89,317.00'
$89,317.00_
$6,683,001
3.22%
$3,721,543.75
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Contract Time
(Calender days)
210
210
030
240_
ammin
The change order will allow for by other than open installation across Berry Street in order to avoid conflict
with an existing gas main and eliminate open cut installation across newly reconstructed Berry Street.
Staff concurs with the contractor's request for 30 additional calendar days on the project.
co �®
OOp0000000
® 0000 ��A
_.8
It is understood and agreed that the acceptance of this Ch'
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
mpany Na
Wiliam J. Schultz dba Circle C. Const CO Teri Skelly ,',1,L,i 7- 5"..
OFFIC@GAP RECC W
CITY SECRETARY'
ssjsta
M&C Number
by the contractor constitutes an accord and satisfaction and represents payment
, Date
7/241/4
gate,
•S. Ls )y
1.60L
N/A
Project Manager
'Constrgction Supejvi . =(—fPW Dept)
A istant City Manager
°Z 30 /it
M&C Date Approved I N/A
RECEIVED AUG 1 2014
FO RT W(o RT If —I City of Fort Worth
Change Order Additions
Project Name
Project No.(s):
Project
Description
Contractor
City Project Mgr.
Sanitary Sewer Rehabilitation, Contract 79
P254-708170149183
City Sec No.: I 45379
I DOE No.I 6948 I City Proj. No.: ( 01491
The replacement of sanitary sewer mains on Riverside Drive, Berry Street, Ellis Ranch Trail, Fairway Drive, Glen
Garden Drive, Stardust Lane and Three Easements
William J. Shultz, Inc. dba Circle C Const. Co
Roberto C. Sauceda
II EM ' t)hSURIN I IUN
13 84 inch Tunnel Liner Plate by OTOC
ADDITIONS
Page 2 of 4
Change Order:l 1 I Date: I 7/21/2014
City Inspector I Edward Davila
DEPT Qty "Unit Unit Cost 1 Total
Sewer 120.00 LF $800.00 $96,000.00
Sewer
Additions Sub Total
$96,000.00
$96,000.00
FORT Worth
City of Fort Worth
Change Order Deletions
Project Name Sanitary Sewer Rehabilitation, Contract 79
Project No.(s): 1 P254-708170149183
Project Description
I City Sec No.: I 45379
DOE No. 1 6948 1 City Proj. No.: I 01491
The replacement of sanitary sewer mains on Riverside Drive, Berry Street, Ellis Ranch Trail, Fairway Drive, Glen
Garden Drive, Stardust Lane and Three Easements
Contractor William J. Shultz, Inc. dba Circle C Const. Co I Change Order: 1 Date 1 7/21/2014
City Project Mgr. 1 Roberto C. Sauceda
City Inspector: I Edward Davila
DELETIONS
ITEM DESCRIPTION
DEPT Qty
Page 3 of 4
Unit Unit Cost
(Sewer
1
(Deletions Sub Total
1
1
Total
MWBE Sub
MIWBE Breakdown for this Change Order
Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co# DATE AMOUNT
Total $0.00
Page 4 of 4
Water Department
DEPARTMENT NAME:
Sanitary Sewer Rehabilitation Contract 79
NAME OFOJECT
; GNA IT E OF /PROJECT MANAGER
City of Fort Worth
Departmental Request for Waiver
Of MBE/SBE Subcontracting/ Supplier Goal
96,000,00 7/16/144
ESTIMATED COST / PROPOSAL DATE
1-6
DOE 6948, CPN: 01491 R
DOE/PROJECT NO.8
2387 7/2/14
EXTENSION DATE
NIGP CODE
Prior to advertisement, the contracting/managing department shall determine whether the bid/proposal is one which MBE/SBE
requirements should not be applied. MBE/SBE requirements may be waived upon written approval of the M/WBE Manager. If one
of the conditions listed below exists, the contracting/managing department shall notify the Manager via this form, stating the specific
reason (s) for requesting a waiver,
If the contracting/managing department and the Manager are in conflict over the granting of a waiver, either
may appeal to the City Manager, or designee, and his/her decision is final.
Please Check Applicable Reason:
A. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the public or administrative emergency exists which requires the goods or
services to be provided with unusual immediacy; or
X a
MWBE•Office; A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the purchase of goods or services from source(s) where subcontracting or
supplier opportunities are negligible; or
C, MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the application of the provisions of this ordinance will impose an economic
risk on the City or unduly delay acquisition of the goods or services; or
D. MWBE Office; A waiver of the goal for MBE/ SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the MWBE Waiver is solicited based on the sole source information
provided to the MWBE Office by the managing department's project manager,
Justify Commodity or Service Waiver Request:
Installation of a 84 Inch hand tunnel under East Berry Street.
Please use additional sheets, if needed
M/WJE OFFICE USE ONLY:
Approved Signature oi(/VBE Authorized Personnel
Not Approved
Signature of M/WBE Authorized Personnel
7/r7/
Date
Date