HomeMy WebLinkAboutContract 45379-CO3 (2)FORT WORTH City of Fort Worth Change Order Request Project Name:I Sanitary Sewer Rehabilitation Contract 79 Project No.(s):I P254-708170149183 Project Description: ka? Y SECRE TAtP CONTRACT NO. 3 7 �- cz2 DOE No. I 6948 I City Sec No.: I 45379 I City Proj. No.:I 01491 The replacement of sanitary sewer mains on Riverside Drive, Berry Street, Ellis Ranch Trail, Fairway Drive, Glen Garden Drive, Stardust Lane and Three Easements Contractor:I William J. Schultz, Inc. dba Circle C Constr. Co. City Project Mgr.! Roberto C. Sauceda Phone Number:I 817-392-2387 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date !Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Sewer $2,977,235.00 $194,975.00 $3,172,210.00 $97,600.00 $3,269,810.00 $89,317.00 $97,600.00 Change Order # I City Inspector: I Phone Number:I 3 I Date: Edward Davila 817-994-0975 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) Totals $2,977,235.00 $194,975.00 I 9/15/2015 Contract Time (Calendar days) .210 060 $3,172,210.00 270 $97,600.00 160 *3,269,810.00 430 $89,317.00 $97,600.00 9.83% $3,721,543.75 JUSTIFICATION (REASONS) FOR CHANGE ORDER The change order will provide for the 84 inch tunnel liner plate by other than open in order to avoid cutting recently completed paving improvements on East Berry Street. Staff concurs with the contractor's request for 160 additional calendar days on the change order. OFFICIAL RECORD CITY SECRETARY FT, WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Circle C. Construction Co. Inspector Contractor Name Teri Skelly Date Assistant Director (Water Dept) Assistant City tcrney,, 4, O. (flue" Wirt Date ConstrigSupervisorW Dept) 9/44 Date —Assistant City anyg9 Council Action (If I4equired) Contractor Signature A Project Manager Date Da= ,pate l�/�/// Ch Date M&C Number N/A M&C Date Approved 1 N/A FoRT FORTH City of Fort Worth Change Order Additions Project Name Project No.(s): Project Description Contractor City Project Mgr. ITEM Sanitary Sewer Rehabilitation Contract 79 P254-708170149183 I DOE No. j 6948 City Sec No.: I 45379 City Proj. No.: I 01491 The replacement of sanitary sewer mains on Riverside Drive, Berry Street, Ellis Ranch Trail, Fairway Drive, Glen Garden Drive, Stardust Lane and Three Easements William J. Schultz, Inc. dba Circle C Constr. Co. I Change Order:( 3 I Date: I 9/15/2015 Roberto C. Sauceda City Inspector I Edward Davila ADDITIONS DESCRIPTION DEPT Qty Unit Unit Cost Total 13 84 inch Tunnel Liner Plate by OTOC Sewer 122.00 LF $800.00 $97,600.00 Page 2 of 4 :Sewer (Additions Sub Total $97,600.00 FORT WORTH City of Fort Worth Change Order Deletions Project Name Sanitary Sewer Rehabilitation Contract 79 Project No.(s): I P254-708170149183 Project Description I DOE No. I 6948 City Sec No.: I 45379 City Proj. No.: I 01491 The replacement of sanitary sewer mains on Riverside Drive, Berry Street, Ellis Ranch Trail, Fairway Drive, Glen Garden Drive, Stardust Lane and Three Easements Contractor I William J. Schultz, Inc. dba Circle C Constr. Co. Change Order: 3 Date I 9/15/2015 City Project Mgr. 1 Roberto C. Sauceda City Inspector: I Edward Davila DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Page 3 of 4 Sewer (Deletions Sub Total MWBE Sub MWWBE Breakdown for this Change Order Type of Service Amount for this CO Total Previous Change Orders Co# DATE AMOUNT Total $0.00 Page 4 of 4