Loading...
HomeMy WebLinkAboutContract 48728-A4 CSC No. 48728-A4 AMENDMENT No . 4 TO CITY SECRETARY CONTRACT No . 4872.8 WHEREAS, the City of Fort Worth (CITY) and Pliumnex Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 48728 , (the CONTRACT) which was authorized by M&C C-28096 on the 31st day of January, 2017 in the amount of $390 , 949 . 00; and WHEREAS , the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $25, 000 . 00 administratively authorized on July 20, 2018 and Amendment No. 2 in the amount of $74 ,890 . 00 administratively authorized on April 29, 2020 and Amendment No. 3 in the amount of $200, 000 . 00 authorized by M&C 20-0768 on October 29, 2020; and WHEREAS, the CONTRACT involves engineering services for the following project: Mary' s Creek Water Reclamation Facility Permit Application; and WHEREAS , it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE , CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $287,415. 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $987,254. 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD Prof Services Agreement Amendment Template CITY SECRETARY Revision Date: November 23, 2021 [MCWRF Perm' Page i of 2 FT. WORTH, TX EXECUTED and EFFECTIVE as of the date subscribed by the City' s designated Assistant City Manager. APPROVED: City of Fort Worth ENGINEER Plummer Associates, Inc. Dana Burghdoff( 15,20 2 14:51 CDT) Dana Burghdoff Ellen McDonald, P.E. Assistant City Manager Principal DATE: Jul 15, 2022 DATE: 7/11/2022 APPROVAL RECOMMENDED: CGI�/,I�LGI z 6�yW- ChristopherH rder(Jul 12,202210:17 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements . -A-041 Stacy Walt s(Jul 12,2022 10:16 CDT) Stacy Walters Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: 22-0483 ow Date: 6/28/2022 DBlack(Jul 12,2022 22:03 CDT) Douglas W. Black Form 1295 : 2022-892539 Senior Assistant City Attorney ATTEST: � 00 00000000 0 � o 00 0 a� J ette S.Goodall(Jul 15,2022 16 DT) 00 O ° ° Jannette S. Goodall 4 °° Y ICY City Secretary ����EXAsa�p OFFICIAL RECORD CITY SECRETARY Prof Services Agreement Amendment Template Revision Date: November 23, 2021 (MCWRF Perm FT. WORTH, TX Page 2 of 2 PLUIV MER July 5,2022 Ms.Stacy Walters Regulatory Environmental Administrator Fort Worth Water 200 Texas Street Fort Worth,TX 76102 Re: Discharge Permit Application and Processing for the Mary's Creek Water Reclamation Facility City Contract No,48728 Contract Amendment No.4 Dear Ms.Walters: This Contract Amendment No.4 is provided to support the following additional tasks for the subject project: 1) Perform a feasibility study and prepare a report that meets the requirements of the Bureau of Reclamation (BoR) Title XVI funding program; 2) Support the preparation and processing of a TCEQ Chapter 210 reclaimed water authorization for the Mary's Creek Water Reclamation Facility service area;and 3) Support the preparation of a grant funding application through the BoR Title XVI program. A detailed scope of work is attached to this letter.The following table summarizes the contracted amounts for the original contract,previous amendments,and the current amendment. Item Amount Authorization Date Original Contract $390,949 January 31,2017 Amendment No. 1 $25,000 July 24,2018 Amendment No. 2 $74,890 April 29,2020 Amendment No. 3 $200,000 October 29,2020 Amendment No.4 $287,415 Current Request Total Fee $978,254 We look forward to continuingto serve the City on this project, Please let me know if you have any questions related to this Y P J request. Sincerely, PLUMMER Ellen McDonald, Ph.D., P.E. 1320 S University Drive,Suite 300 Fort Worth,TX 76107 Phone 817.806.1700 plummer.com TBPE Firm No.13 C `. PLUMMER 5/26/2022 EXHIBIT A City of Fort Worth Mary's Creek Water Reuse Funding Support and Reclaimed Water Authorization Scope of Work Background In anticipation of future growth,the City of Fort Worth Water Department (FWWD) has been preparing to construct a new water reclamation facility(WRF) in the Mary's Creek basin on the west side of the city for nearly 20 years. During this time period, a number of planning studies have been carried out, evaluating the feasibility and cost of constructing a new WRF as compared to continuing to convey wastewater across the city to the existing Village Creek WRF. A significant driver and consideration in constructing a new WRF was the availability of a reclaimed water source on the west side of the city and the ability to provide reclaimed water to new developments in the area to offset potable water demands. In 2018,the FWWD submitted an application to the Texas Commission on Environmental Quality(TCEQ) for a Texas Pollutant Discharge Elimination System (TPDES) permit for the Mary's Creek WRF. It is expected that this permit will be issued before the end of 2022 at which time the FWWD will proceed with design of the WRF and the initial phase of the western reclaimed water system. The FWWD is interested in pursuing an opportunity to obtain grant funding from the Bureau of Reclamation (BoR)Title XVI Program to offset planning, design and construction costs for the project.To be eligible for this funding,the FWWD must complete a Title XVI feasibility study that meets BoR requirements and has been approved by the BoR. In preparation for development of a reclaimed water delivery system,the FWWD also wishes to apply for and obtain a TCEQ Chapter 210 reclaimed water authorization for the Mary's Creek WRF and service area. The following describes the detailed scope of work to complete a Title XVI feasibility study, support the preparation and processing of a Chapter 210 reclaimed water authorization, and provide support in preparing an application for grant funding through the BoR Title XVI program. Basic Services Activity I: Title XVI Feasibility Study Task A: Background Information 1. Review of Previous Reports: Gather and review previous reports and other documents related to planning and evaluation of the Mary's Creek WRF and water reuse within the service area. Documents that will be reviewed may include (but not be limited to): • 2004—Mary's Creek WRC Feasibility Study • 2007—Water Reuse Master Plan 1 C PLUMMER 5/26/2022 • 2010—MCWRC Site Selection Study • 2017- Mary's Creek Wastewater System Impact Analysis (memorandum) • 2021 Region C Water Plan 2. Review of Additional Information:The FWWD will provide Engineer with available additional documents or data that provide information related to current and projected water demands/supplies, potential reclaimed water customers or other relevant development plans within the Mary's Creek WRF service area. Engineer will review and use, as appropriate, in remainder of study. Task B:Water Reclamation Opportunities 1. Potential Existing Reclaimed Water Customers:The FWWD will provide Engineer with 5 years of historical monthly irrigation meter data for existing customers in the Mary's Creek service area. Engineer will coordinate with the FWWD to identify any other potential major existing customers that may not have an irrigation meter. If any are identified,the FWWD will provide 5 years of historical monthly potable water meter data for those customers. Engineer will analyze data to estimate annual average and estimated peak day/peak hour demands for each potential customer. 2. Potential Future Reclaimed Water Customers: Engineer will coordinate with FWWD planning staff to obtain information for: • any known potential future customers who may be candidates for use of reclaimed water; and • future land use/development plans within the Mary's Creek service area. Engineer will estimate potential future annual average and peak day/peak hour demands within the service area based on land use assumptions and/or any specific information available for future customers. 3. GIS Map and Tabular Summary: Engineer will prepare a GIS map showing the location of potential existing and future reclaimed water customers and existing reclaimed water easements.A tabular summary of customers and demands will also be prepared. 4. Workshop#1: Using information developed in Tasks 61-133, Engineer will facilitate a workshop with FWWD staff to discuss potential reclaimed water delivery concepts. Up to 3 alternative concepts will be identified for evaluation in subsequent tasks. 5. Indirect Reuse: Engineer will summarize the concept for the proposed indirect reuse project to be developed by Tarrant Regional Water District(TRWD).The description will include anticipated quantity of reuse water to be diverted and delivered to supplement TRWD raw water supply on an annual basis. Information summarized will be limited to that available from and provided by TRWD. 2 it PLUMMER 5/26/2022 6. Environmental and Recreational Uses: Engineer will quantify the amount of reuse water that may be used to support downstream environmental and/or recreational uses in the Clear Fork Trinity River. Estimates will be developed in collaboration with TRWD. Task C:Water Supply Alternatives 1. Water Reuse Alternatives: Engineer will evaluate up to 3 alternatives for reclaimed water delivery, as identified in Workshop#1. Each alternative will include planning-level design of pumping, storage and pipeline systems. A hydraulic model will be developed for each alternative to evaluate sizing and hydraulic performance. GIS maps and descriptions of infrastructure will be developed for each alternative. For all alternatives it will be assumed that water discharged to Mary's Creek would either be diverted by TRWD and delivered to Eagle Mountain Lake to augment TRWD raw water supplies (indirect reuse) or will be left in Mary's Creek to provide enhanced environmental or recreational benefits. 2. Non-Project Alternative: Engineer will prepare a description of the non-project alternative, assuming that the Mary's Creek WRF is not constructed and instead improvements to the collection system are made to deliver wastewater to the Village Creek WRF. For this alternative, it is assumed that potential non-potable water demands in the Mary's Creek service area would be met with potable water from the city's drinking water system. The non-project alternative will be based on information provided in the April 2010 memorandum prepared by Freese and Nichols,titled "Mary's Creek WRC Engineering Feasibility Study". In addition,for the non- project alternative, it will be assumed that any return flows discharged would be diverted from the Trinity River through the TRWD Richland Chambers or Cedar Creek wetland reuse projects. 3. Life Cycle Costs: Engineer will prepare opinions of probable construction and non-construction cost, annual operation, maintenance and replacement costs, and life cycle costs for each alternative, including the non-reuse alternative.The estimated costs will be presented in terms of dollars per million gallons and dollars per acre-foot of capacity. Costs associated with the non- reuse alternative will be based on the April 2010 memorandum referenced in Task C2 and adjusted to current values using the ENR construction cost index and checked against recent cost data for the DFW area. Costs for the Mary's Creek WRF will be updated to current dollars from the most recent estimate prepared by Engineer in 2018. 4. Economic Analysis: Engineer will perform an economic analysis of the recommended alternative relative to the alternative water supply alternatives (continuing to supply demands with potable water and/or pumping raw water from TRWD East Texas supplies).The economic analysis will include the following elements: • Description of the conditions that exist in the area and a description of projected future economic conditions with and without the project. • Summary of cost comparison of the reclamation and non-reclamation alternatives. • Description of qualitative, non-cost factors for each alternative. 3 PLUMMER 5/26/2022 Task D: Environmental Considerations and Potential Impacts The purpose of the environmental evaluation is to provide sufficient information on the proposed Title XVI project to assess the potential measures and costs that will be necessary to comply with NEPA, and any other applicable Federal law. Engineer will: 1. Describe potentially significant environmental effects or unique or undefined environmental risks. 2. Describe the status of required Federal,state,tribal,and/or local environmental compliance measures, including copies of any documents that have been prepared, or results of any relevant studies. 3. Describe other available information that would assist with assessing the measures that may be necessary to comply with the NEPA and other applicable Federal, state, or local environmental laws such as the Endangered Species Act or the Clean Water Act. 4. Describe how the proposed potable reuse alternatives will affect water supply and water quality from the perspective of a regional,watershed, aquifer, or river basin condition. 5. Describe the extent of public involvement in the feasibility study and summarize comments received, if any. 6. Describe the potential effects the project may have on historic properties. Include potential mitigation measures,the potential for adaptive reuse of facilities, an analysis of historic preservation costs, and the potential for heritage education, if necessary. Task E: Energy Evaluation A high level evaluation of energy requirements and potential energy saving measures will be performed. The purpose of the evaluation is to identify potential areas of focus during design and to develop potential strategies for inclusion in a Title XVI grant application. 1. Evaluate the energy requirements of the proposed treatment and conveyance facilities 2. Evaluate potential energy saving measures that could be incorporated in the design of the new Mary's Creek WRF and/or reclaimed water system. Engineer will contact the landfill adjacent to the project site to determine if there are opportunities to collaborate related to biogas generation and energy. 3. Evaluate the availability of renewable energy, including a. Purchasing energy produced renewably from local utilities b. Construction of a local renewable energy project,such as solar collectors or wind turbines. Task F: Legal and Institutional Requirements This task will identify potential g otential legal and institutional requirements, or other barriers to implementing the proposed Title XVI project. Engineer will: 4 PLUMMER 5/26/2022 1. Analyze Water Rights:Any water rights issues associated with the recommended project will be summarized. 2. Analyze Institutional and Legal Requirements:Other institutional and legal requirements will be identified and summarized.These may include contractual agreements, settlement agreement or other obligations related to the recommended project. 3. Analyze Multi-Jurisdictional and Interagency Aspects:Any multi-jurisdictional or interagency agreements associated with the proposed project will be summarized in this task. 4. Analyze Permitting Requirements:This task will describe permitting requirements for project implementation and recommendations for strategies to help streamline the permitting process. 5. Discuss Any Unresolved Issues Pertaining to Implementing the Proposed Project:Any other unresolved legal or regulatory issues that may impact project implementation will be addressed in this task. Task G: Implementation and Funding Plan Engineer will develop an implementation and funding plan, including the following information: 1. A plan for implementing the recommended alternative: a. Describe the treatment and infrastructure requirements based on information developed in previous tasks. b. Describe the extent to which the proposed alternative will use proven technologies and conventional system components. c. Define any recommended future public outreach initiatives needed to address public concerns related to implementation of the reuse project. d. Identify basic research needs, if any. i. Describe research needs associated with the proposed Title XVI project, including the objectives to be accomplished through research. Depending on treatment schemes identified, pilot-and/or bench-scale testing of treatment processes will likely be necessary to obtain TCEQ approval. Research related to concentrate disposal strategies may also be identified. 1. Describe the basis for Reclamation participation in the identified research. 2. Identify the parties who will administer and conduct necessary research. e. Develop a schedule for implementation of the preferred alternative, including basic research, pilot-testing, design and construction, customer contracts, permitting, and other necessary elements. 2. A plan for funding the proposed project construction, operation, maintenance, and replacement costs: 5 PLUMMER 5/26/2022 a. Describe the willingness of FWWD to pay for its share of capital costs and the full operation, maintenance, and replacement costs. b. Describe how FWWD will pay construction, annual operation and maintenance, and replacement costs. Identify the potential sources of revenue, including grants and/or loans that may be available to fund design and construction of the preferred alternative. c. Describe all Federal and non-Federal sources of funding and any restrictions on such sources,for example, minimum or maximum cost-share limitations. d. Describe the reasonably foreseeable future actions that FWWD would take if Federal funding were not provided for the proposed water reclamation and reuse project, including estimated costs. Task H: Report 1. Draft Report: Engineer will prepare a draft Title XVI feasibility report that organizes and describes the work performed in the previous tasks and meets applicable requirements of RM Directives &Standards WTR 11-01. An electronic copy of the report will be provided to the FWWD for review and comments. 2. Revised Draft Report: Engineer will address comments from FWWD and prepare a revised draft report that will be submitted to Reclamation for review. 3. Final Report: Engineer will address comments from Reclamation and prepare a final report. Three hard copies and one electronic copy will be provided to FWWD. Engineer will assist FWWD in submitting the final report to Reclamation for approval. Task I: Project Administration and Meetings 1. Proiect Administration: Project administration will include but not be limited to developing and implementing a project management plan;tracking and managing internal schedules of work; monitoring and addressing issues related to the scope of work, budget and deliverables; preparing and processing monthly billings; providing labor resources necessary to fulfill scoped work;scheduling and participating in quality control reviews; and providing updates to FWWD on a regular basis. Engineer will prepare a standard monthly invoice and progress report for all services. 2. Meetings: a. Engineer will prepare for and facilitate up to 5 project meetings with FWWD staff. b. Engineer will prepare for and facilitate up to 2 meetings with TRWD to coordinate on efforts to complete the Feasibility Study, provide consistent information, and maximize the opportunity to obtain grant funding for both FWWD's and TRWD's projects. 6 -� PLUMMER 5/26/2022 Activity II: Chapter 210 Reclaimed Water Authorization Task A:Application Preparation and Processing 1. Engineer will meet with FWWD to review requirements under Chapter 210, determine service area boundary to include in application, and confirm whether existing ordinances, user contract templates and operation and maintenance plans used for the Village Creek Chapter 210 authorization require modifications to be applicable to the Mary's Creek system.The budget provides an allowance for minor modifications to these documents. Major modifications would need to be done as additional services. 2. Engineer will gather other required information for completion of an application for a new reclaimed water authorization associated with the Mary's Creek WRF and prepare a draft application document for review by the FWWD. 3. Engineer will address comments from FWWD and prepare a final application.The application will be submitted on the FWWD's behalf to the TCEQfor processing. Engineer will support the FWWD in responding to any questions or requests for information from the TCEQ during application processing. Activity III:Title XVI Construction Grant Application Support Task A: Information Gathering and Technical Proposal Development 1. Engineer will review the following items associated with the BoR Title XVI Construction Grant funding program: a. Grant application requirements b. Scoring criteria c. Previous successful grant applications posted on the BoR website 2. Engineer will prepare an outline of the Technical Proposal portion of the application, including the executive summary,the technical project description, and the evaluation criteria.The outline will be provided to FWWD staff for review. 3. Engineer will facilitate a kickoff meeting with FWWD staff to review the grant application format, requirements and schedule.At the kickoff meeting,the Engineer will review the draft technical proposal outline to obtain feedback and gather additional suggestions and ideas for strengthening or adding to each of the technical proposal application sections. In addition,the structure, content and format of the funding plan and budget proposal and narrative will be discussed at this meeting. Engineer will coordinate with FWWD finance staff to determine what portions of the Project Budget tasks will be completed by FWWD and which will be completed by the Engineer. 7 PLUMMER 5/26/2022 Task B:Application Package Engineer will prepare a draft application package.As needed, Engineer will request information and/or documentation from FWWD to complete the draft application. Based on previous similar funding solicitations, it is anticipated that the application will include the following sections: 1. Administrative Forms: Engineer will complete administrative forms based on information provided by FWWD 2. Technical Proposal: Based on the outline developed in Task A and input from the FWWD, Engineer will develop a draft Technical Proposal that describes the project and explains how each of the evaluation criteria will be met. 3. Environmental and Cultural Resources Compliance: Engineer will prepare a detailed discussion of potential environmental and cultural impacts of the project and actions that will be taken to comply with National Environmental Policy Act (NEPA), National Historic Preservation Act (NHPA), and Endangered Species Act(ESA) requirements. 4. Required Permits and Approvals: Engineer will document anticipated required permits and approvals associated with the project. 5. Project Budget:As determined in Task A3, Engineer will support FWWD in the development of a project budget, including the following sections: a. Funding Plan b. Budget Proposal c. Budget Narrative 6. Letters of Project Support: Engineer will coordinate with FWWD to identify stakeholders from whom letters of support will be requested. Engineer will prepare draft letters that can be provided to each stakeholder. It is assumed that FWWD staff will make the requests for letters of support. 7. Official Resolution: Engineer will prepare a draft resolution document and provide to FWWD for review. 8. Application Package:The draft application package will be provided to the FWWD for review. Engineer will facilitate a meeting with FWWD to review the package and receive comments. Engineer will address comments and prepare a final application package for submittal to the BoR. Task C:Application Processing Support 1. As needed, Engineer will provide support responding to questions or requests for information during application processing. 8 City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, June 28, 2022 REFERENCE NO.: **M&C 22-0483 LOG NAME: 60MARYS CREEK PERMIT AMEND4 - PLUMMER SUBJECT: (ETJ W-CD 3 and CD 7)Authorize Execution of Amendment No. 4 in the Amount of$287,415.00 to an Engineering Agreement with Plummer Associates, Inc., for Mary's Creek Water Reclamation Facility Permit Application and Adopt Appropriation Ordinance to Effect a Portion of Water Contribution to the Fiscal Years 2022-2026 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1.Authorize execution of Amendment No. 4 to City Secretary No. 48728, an agreement with Plummer Associates, Inc., in the amount not to exceed $287,415.00 for the Mary's Creek Water Reclamation Facility Permit Application for a revised contract amount of$978,254.00; and 2.Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water& Sewer Bond 2017A Fund by decreasing estimated receipts and appropriations in the Unspecified—All Funds project (City Project No. UNSPEC) in the amount of$287,415.00 and increasing estimated receipts and appropriations in the Mary's Creek Water Reclamation Facility Permit Application project (City Project No. C01239) by the same amount to effect a portion of Water's contribution to the Fiscal Years 2022-2026 Capital Improvement Program. DISCUSSION: On January 31, 2017 Mayor and Council Communication (M&C) C-28096, the City Council authorized the execution of an agreement with Plummer Associates, Inc. (City Secretary Contract No. 48728), in the amount of$390,949.00 for the preparation of the Texas Pollutant Discharge Elimination System (TPDES) permit application for the proposed Mary's Creek Water Reclamation Facility (MCWRF)to be submitted to the Texas Commission on Environmental Quality (TCEQ). The agreement was subsequently revised by Amendment No. 1 in the amount of$25,000.00, administratively authorized July 20, 2018, that provided for additional data review, public outreach and coordination meetings, Amendment No. 2 in the amount of$74,890.00, administratively authorized April 29, 2020, that provided for additional water quality modeling services and data analysis to support the permitting process and Amendment No. 3 in the amount of$200,000.00 (M&C 20-0768, October 29, 2020), that provided for additional technical support, expert testimony, and attendance at meetings/hearings with TCEQ and State Office of Administration Hearings for the discharge permit contested hearing. In support of the design and future construction of the MCWRF project, Amendment No. 4 is needed for the preparation of the reclaimed water authorization which must be issued by the TCEQ and which is required prior providing reclaimed water to customers . Fort Worth also intends to apply for a grant with the United States Bureau of Reclamation (USBR)for funding to offset the costs of design and construction of the MCWRF and its associated reclaimed water facilities. Prior to making this application, a feasibility study must be prepared and submitted to the USBR, in accordance with federal rules and regulations. Plummer Associates, Inc. will be providing the necessary support documentation for this process as part of this Amendment. 60MARYS CREEK PERMIT AMEND4-PLUMMER -- — ---� — -- --- Budget Revised CapitalFund FY2022 CIP Change Name Project Name Appropriations Authority (Increase/ Budget Decrease) i Budget Water & C01239 — $0.00 This M&C $287,415.00 $287,415.00 Sewer Bond Mary's Creek i i 2017A Water Fund 56011 J�RecyclingC Funding is currently available in the Unspecified-All Funds project within the Water& Sewer Bond 2017A Fund for the purpose of funding the Mary's Creek Water Recycling C project. Funding for the Mary's Creek Water Recycling C Project is depicted below: FUND Existing Appropriations Additional Project _ Appropriations Total* Water& Sewer Bond 2015A - $690,839.00 $0.00 $690,839.00 Fund 59607 Water & ---- — �-- - --j Sewer Bond 2017A - $0.00 $287,415.00 $287,415.00 Fund 56011 Project Total $690,839.00 $287,415.001$978,254.00I *Numbers rounded for presentation purposes. This project will have no impact on the Water Department's annual operating budget when completed. Business Equity—A waiver of the goal for Business Equity subcontracting requirements was requested and approved by the DVIN, in accordance with the applicable Ordinance, because the proposed scope of services in this Amendment No. 4 is similar to the scope of services in the original agreement. This project is located in the Extraterritorial Jurisdiction West of COUNCIL DISTRICTS 3 and 7. FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified—All Funds project within the Water& Sewer Bond 2017A Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the Water& Sewer Bond 2017A Fund for the Mary's Creek Water Recycling C project to support the approval of the above recommendations and execution of the amendment to agreement and contract. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs),: TO__ _ Fund Departments ccount� Project Program ctivity uBuB dget Reference # Amount T _ . ID �'` ID 1 Year Chartfield 2 - --- - -- -J — - -- ----- -- ------�--(----field - --FROM _ _ Fund Department IAccoun] Project Program ctivity Budget Reference # Amount! ID ID Year Chartfield 2 i - -----— --� - -----�--- - —---- ---� ----- -- --- ---.1 CERTIFICATIONS: Submitted for City Manager's Office by_ Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Stacy Walters (8203) ATTACHMENTS 1. 60MARYS CREEK PERMIT AMEND4- PLUMMER 1295.pdf (CM internal) 2. 60MARYS CREEK PERMIT AMEND4 - PLUMMER Compliance Waiver.pdf (CFW Internal) 3. 60MARYS CREEK PERMIT AMEND4 - PLUMMER MAP.pdf (Public) 4.60MARYS CREEK PERMIT AMEND4- PLUMMER PBS.pdf (Public) 5. 60MARYS CREEK PERMIT AMEND4 - PLUMMER SAM.pdf (CM internal) _O N N N N N N N N N N N N N N N N N N 'nTl r1 r" cn Ul W un LP U1 V1 U1 U1 Ln m Ul Un L1 Ul Ul U1 Ul W 71 m m m m m m m m m m m m m m m m m m ti 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r. 0 0 C. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J V V J V V V V V V J V m V m V m ?1 C-) CD O O O O (DO CD C) CD C) CDO O O 0 e C) O O (D C:) O C) C) O O O C) CDO O CD0 A A A A A A A A A A A A A A A A A .� W W W W W W W W W W W W W W W W W ?� O O O O 0 O O o O O O O Cr) O O O O C A N cn In to Ln to W In Ln W A A A A A C:) W W W V W F-� V W W F- lD LD lD l0 l0 m 1-1 W F� A W F-' F' W Ul I-A C:) CD (D C) C)O C) O O O O O C) C:) O O w In Ul W Ln C) W w W O Ul F, CD Ul F' F' F� F, " F, h' C) Ul C) In F� (Z) O N C:) O o W W W W W CD O O O O F-' O O N N Ul Ln Ul N Ln F, I-' F� " F, F� F-' F� H F' F-' F' N C F-` C " C O C) C) O C) CD 0 CD O C) (D O Z CD C:) Z W W W W W W W W W W W W W m W ,) W In m m m m m m m m m m m m m -0 m „ m -a A A A A A A A A A A A A A m A m A m 00 00 00 w w m w w w w DO w CO n DO n 00 n 0 0 0 o O o 0 0 0 0 0 C:) C:m o 0 0 0 o C:) C) C:) C) C) C) C:) Z -{ F, F, N )-I F-� F" Vl D lD l0 lD lD lD m w w w w w LD Do 00 V 00 A A A W W W W W M Z A A O O O O o 0 0 0 0 O lD l0 U7 LD M lD W W M lD lD W W N N N N lD W LD M lD W lD M LD W M lD (D O O O 0 W M lD W LD M W W LD LD lD M LD N N N N LD W (D lD M W LD lD W W M lD LO N N N N V). qA iA VT Vf N " '" O J N Q) m m m m m m W DO V). ul In C) O m V)- N C O O 0 0 0 0 V DO W O O O O 1-� W A CG 90 DO DO W 00 00 Oo W O O O O O in O Cr) A A A A A A A J V O O O O O LD O N m m m m m m m Ut Ui O O O O O O O U'1 t7� In (n In U'1 p Ul O O O O O O O O O O C O C) CD C:) C:) CD C) CD (DO C) CD CD O C) O O C:)W C) O C:) O o o C a v v m n Di -Vv 00 C rt 3333 d o- o- n (D ID rD m h p ((DD --I n o ° Q D D D D m n O V, Ofl/ o N In In N h O O O O O Q 7 7 7 7 (D