HomeMy WebLinkAboutContract 54648-A3 CSC No. 54648-A3 CITY OF FORT WORTH, TEXAS AMENDED AND RESTATED AGREEMENT FOR ENGINEERING AND OTHER RELATED PROFESSIONAL SERVICES This AMENDMENT No. 3 to City Secretary Contract No. 54648 and RESTATEMENT of ORIGINAL AGREEMENT (as defined herein) (collectively, "AGREEMENT") is between the City of Fort Worth, a Texas home-rule municipality ("CITY" or "City"), and Jacobs Engineering Group Inc., authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: Noise Mitigation Measures at Fort Worth Alliance Airport. RECITALS WHEREAS, Due to increased aircraft operations and expansion at Fort Worth Alliance Airport ("Airport"), the City was required to conduct an Environmental Assessment in 2018 ("EA") to determine the effect of increased activity at the Airport and its effect on surrounding properties; WHEREAS, through the EA process, the Federal Aviation Administration ("FAA") determined that the noise impact from the increased activity at the Airport would not have significant impact to the human environment if appropriate noise mitigation occurred; WHEREAS, to effectively mitigate the noise impacts within specific neighborhoods in close proximity to the Airport, the City set out to implement noise mitigation measures for affected homeowners in accordance with the FAA's Part 150 Noise Mitigation Program ("Program"); WHEREAS, On April 15 and April 22, 2020, a Request for Qualifications (RFQ) was advertised for, among other services, Noise Mitigation Engineering Services at Fort Worth Alliance Airport, and on May 8, 2020, ENGINEER was selected; WHEREAS, On October 7, 2020, the City and ENGINEER entered into City Secretary Contract ("CSC") No. 54648, for Engineering, Consulting, Construction and Other Noise Mitigation services for City Project No. 102901 , "Noise Mitigation Measures at Fort Worth Alliance Airport" which has been amended twice as reflected below ("ORIGINAL AGREEMENT"); WHEREAS, on or about February 4, 2021 , City and ENGINEER executed Amendment No. 1 of the ORIGINAL AGREEMENT which increased the compensation amount to allow for the creation of a website that would allow for the Project to continue while at the same time preventing any potential spread of the novel Coronavirus; WHEREAS, on or about June 2, 2021 , City and ENGINEER executed Amendment No. 2 of the ORIGINAL AGREEMENT which increased the compensation City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 OFFICIAL RECORD Page 1 of22 CITY SECRETARY FT. WORTH, TX amount to allow for acoustical testing of an additional 64 homes based on previous results of testing in the Rivers Edge Subdivision ("Rivers Edge"), which was based on written approval given on or about May 14, 2021 by the FAA; WHEREAS, per the terms of the ORIGINAL AGREEMENT, as amended, the City agreed to pay ENGINEER $3,466,394.52 for the performance of services, with the understanding that these funds would cover certain acoustical testing and a small portion of the costs for the implementation of noise mitigation services taking into account that additional change orders could be necessary depending on the results of the acoustical testing of homes; WHEREAS, currently, all portions of the initial acoustical testing of homes for the Project is complete and it has been determined that all 264 homes in Rivers Edge are eligible for one of five noise mitigation alternatives available as described in the Scope of Services attached to this AGREEMENT as Attachment "A" ("Mitigation Alternatives"); WHEREAS, as a result, the ENGINEER has requested, and the City has appropriated an additional amount up to $13,668,220.35 in FAA grant funding for the Scope of Services set forth in Attachment "A" to this AGREEMENT; WHEREAS, additionally, throughout the acoustical testing and design for initial bid cycles for this Project, many provisions within ORIGINAL AGREEMENT, as well as the ORIGINAL AGREEMENT's Scope of Services have been identified that require changes to reflect more specificity and clarity on how Mitigation Alternatives will be implemented and the responsibilities of the parties during this next phase of the PROJECT; WHEREAS, the parties believe that these changes are significant enough to warrant an amendment and restatement of the ORIGINAL AGREEMENT to ensure that the responsibilities of the parties and the updated Scope of Services to be performed, are clear to both parties and that the services can be sufficiently carried out in accordance with the Program; WHEREAS, City and ENGINEER have, therefore, agreed to enter into this AGREEMENT to (i) amend and restate the ORIGINAL AGREEMENT; (ii) clarify the remaining obligations of ENGINEER by incorporating an updated Scope of Services to be applicable under this AGREEMENT; and (iii) include additional funding under the AGREEMENT in an amount of $13,668,220.35 for the updated Scope of Services with specific costs reflected in the Compensation Schedule, bringing the total not to exceed amount under the ORIGINAL AGREEMENT and this AGREEMENT to $17,134,614.87; WHEREAS, it is estimated that the cost for sound insulation services for each home will average around $60,000.00 per home; WHEREAS, acknowledging that the amount of homes and cost per home for City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 2 of 22 sound insulation are not definitive, in the event additional funding is needed, the City will endeavor, if necessary, to appropriate remaining grant funding and execute subsequent amendments to this AGREEMENT; WHEREAS, both parties recognize that approximately $345,254.05 in costs that were specifically allocated under the ORIGINAL AGREEMENT's compensation schedule for both engineering design work and post-acoustical testing for the PROJECT have either not yet been performed under the PROJECT or have not yet been billed to the City and the parties recognize and agree that such services are incorporated in the Scope of Services of this AGREEMENT and that the line items as reflected in the compensation schedule of the ORIGINAL AGREEMENT for such engineering design work and post-acoustical testing are incorporated into the total not to exceed amount under this AGREEMENT; and WHEREAS, the Parties acknowledge and agree that the terms and conditions of the ORIGINAL AGREEMENT remain unchanged prior to the EFFECTIVE DATE of this AGREEMENT. NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, CITY and ENGINEER hereby agree as follows: The AGREEMENT documents shall include the following: 1 . This AGREEMENT; 2. Attachment "A"— Scope of Services; 3. Attachment "B"— Compensation Schedule 4. Attachment "C"— Reserved ; 5. Attachment "D"— Project Schedule; 6. Attachment "E"— Location Map; 7. Attachment "F"—Verification of Signature Authority; 8. Attachment "G"— Federal Contract Provisions Attachments "A", "B", "D", "E", "F", and "G" which are attached hereto and incorporated herein, are made a part of this AGREEMENT for all purposes. In the event of any conflict between the terms and conditions of the Attachments and the terms and conditions set forth in the body of this AGREEMENT, the terms and conditions of this AGREEMENT shall control. Article I ORIGINAL AGREEMENT Superseded The ORIGINAL AGREEMENT is now superseded by this AGREEMENT in its City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 3 of 22 entirety upon the Effective Date (as hereinafter defined). Nothing contained herein shall serve to relieve the parties of any obligations under the ORIGINAL AGREEMENT that existed prior to the Effective Date of this AGREEMENT. Article II Scope of Services The Scope of Services is set forth in Attachment A. Article III Compensation and Term of Agreement A. The ENGINEER's compensation shall be in an amount not to exceed $17,134,614.87 as set forth in Attachment B. B. Unless otherwise terminated pursuant to Article VII. D. herein, this AGREEMENT shall be for a term beginning upon the Effective Date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein, whichever occurs first. Article IV Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment B to this AGREEMENT, to reasonably substantiate the invoices. (2) The ENGINEER will issue invoices twice monthly, on or about the twelfth and twenty-seventh day of each month, for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. The City will endeavor to pay all invoices to ENGINEER within 14 days of receipt. (3) Upon completion of services enumerated in Article II, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 4 of 22 CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7 days' written notice to CITY, suspend services under this AGREEMENT until paid in full. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article V Obligations of the Engineer A. General The ENGINEER will serve as the CITY's consultant under this AGREEMENT providing professional engineering consultation and advice, design, construction services, other professional services and furnishing customary services incidental thereto in accordance with Exhibit A to this AGREEMENT. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing in the same or similar locality and under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 5 of 22 (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's and City's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY or other entities. The ENGINEER and its personnel have no authority to exercise any control over other entities or their employees in connection with their work or any health or safety precautions. The CITY will be responsible for all acts of the CITY's personnel at a construction site. (2) If the ENGINEER makes on-site observation(s) of a deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 6 of 22 with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the ENGINEER'S construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the ENGINEER'S construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the ENGINEER'S construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the ENGINEER'S construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. I. Minority Business and Small Business Enterprise (MBE)(SBE) Participation City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 7 of 22 In accord with the City of Fort Worth Business Diversity goals (Chapter 20, Article X of the City's Code of Ordinances a/k/a Ordinance No. 20020-12- 2011, as amended), the City has goals for the participation of minority business enterprises and/or small business enterprises in City contracts. Engineer acknowledges the MBE and SBE goals established for this contract and its accepted written commitment to MBE and SBE participation. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the ENGINEER may result in the termination of this AGREEMENT and debarment from participating in City contracts for a period of time of not less than three (3) years. This is a federally funded project. Due to the nature of the scope of services described in Attachment A, the CITY has established a disadvantaged business enterprise (DBE) goal of 35% for the true contractor labor cost. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subcontractor agreements hereunder a provision to the effect that the subcontractor agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subcontract, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subcontractors facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subcontractors reasonable advance notice of intended audits. (3) ENGINEER and subcontractors agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 8 of 22 K. INSURANCE (1) ENGINEER'S INSURANCE a. Commercial General Liability — the ENGINEER shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance with a limit of not less than $1,000,000.00 per each occurrence with a $2,000,000.00 aggregate. If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this PROJECT or location. i. The CITY shall be included as an additional insured with all rights of defense under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any. This insurance shall apply as primary insurance with respect to any other insurance or self- insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions or endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained within the policy, unless the CITY specifically approves such exclusions in writing. ii. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with this AGREEMENT. b. Business Auto — the ENGINEER shall maintain business auto liability and, if necessary, commercial umbrella liability insurance with a limit of not less than $1,000,000 each accident. Such insurance shall cover liability arising out of "any auto", including owned, hired, and non-owned autos, when said vehicle is used in the course of the PROJECT. If the engineer owns no vehicles, coverage for hired or non-owned is acceptable. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this AGREEMENT or under any applicable auto physical damage coverage. c. Workers' Compensation — ENGINEER shall maintain workers City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 9 of 22 compensation and employers liability insurance and, if necessary, commercial umbrella liability insurance with a limit of not less than $100,000.00 each accident for bodily injury by accident or $100,000.00 each employee for bodily injury by disease, with $500,000.00 policy limit. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this AGREEMENT. d. Professional Liability — ENGINEER shall maintain professional liability, a claims-made policy, with a minimum of $1,000,000.00 per claim and aggregate. The policy shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the CITY for each year following completion of the contract. (2) GENERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be attached to this AGREEMENT prior to its execution. b. Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, subject to any defense provided by the policy, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. c. Certificate(s) of insurance shall document that insurance coverage specified in this AGREEMENT are provided under applicable policies documented thereon. d. Any failure on part of the CITY to attach the required insurance documentation hereto shall not constitute a waiver of the insurance requirements. e. A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 200 Texas Street, Fort Worth, Texas 76102. City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 10 of 22 f. Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A:V or greater, in the current A.M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. g. Any deductible or self-insured retention in excess of $25,000.00 that would change or alter the requirements herein is subject to approval by the CITY in writing, if coverage is not provided on a first-dollar basis. The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the CITY. h. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. i. The CITY shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion; the ENGINEER may be required to provide proof of insurance premium payments. j. Lines of coverage, other than Professional Liability, underwritten on a claims-made basis, shall contain a retroactive date coincident with or prior to the date of the contractual agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims-made. k. Coverages, whether written on an occurrence or claims-made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the PROJECT until final payment and termination of any coverage required to be maintained after final payments. I. The CITY shall not be responsible for the direct payment of any insurance premiums required by this AGREEMENT. m. Subconsultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When subconsultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Engineer City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 11 of 22 The ENGINEER agrees to perform all services as an independent Engineer and consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondent superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this AGREEMENT was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this AGREEMENT which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Q. Record and Invoice Retention City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 12 of 22 2 CFR 200.333-200.337 requires that the City, as a sponsor, retain all grant related documentation for three years after the City submits the final payment request. Since this AGREEMENT is related to the management of an FAA grant funded project, ENGINEER agrees to maintain all records, receipts, and invoices, including sub-contractor receipts and invoices, related to the project associated with this AGREEMENT for at least five (5) years and to provide all records and invoices, including sub-contractor invoices to the City upon completion of the work listed under this AGREEMENT or at any time throughout the term of this AGREEMENT if requested by the City. R. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the ENGINEER will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights- of-way, and access necessary for the ENGINEER's services or PROJECT construction. S. Third-Party Beneficiaries (1) This AGREEMENT gives no rights or benefits to anyone other than the ENGINEER and there are no third-party beneficiaries. (2) The ENGINEER will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third-party beneficiary rights under this Agreement. Article VI Obligations of the City A. City-Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other Engineers as the CITY deems appropriate; and render in City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 13 of 22 writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. C. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or ENGINEER'S construction contractors. D. Claims and Third-Party Beneficiaries (1) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third-party beneficiaries. (2) Nothing contained in this Section D. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. E. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. F. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VII General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with each phase of this AGREEMENT upon receipt of a written Notice to Proceed from the CITY as City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 14 of 22 specified in Exhibit A. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure CITY and ENGINEER shall exercise commercially reasonable efforts to meet their respective duties and obligations as set forth in this Agreement, but shall not be held liable for any damages, delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters, declared epidemics/pandemics, wars, riots, material or labor restrictions by any governmental authority and/or any other similar causes; provided, however, the foregoing will not apply to either party's obligation to pay for services rendered in accordance with this AGREEMENT. D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 15 of 22 b.) Out-of-pocket expenses for purchasing electronic data files and other data storage supplies or services; c.) The time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification In accordance with Texas Local Government Code Section 271.904, for services under this Agreement specifically related to work classified as Engineering Services, the ENGINEER shall indemnify and hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, Engineer under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. To the extent allowed by applicable law, for all other services not related to Engineering Services, ENGINEER shall indemnify, defend and hold harmless the CITY and all of its officials, officers, agents and employees from and against any and all third-party liability, claims, losses, damages, suits, demands or causes of action including all expenses of litigation and/or settlement, court costs and reasonable attorney fees which may arise by reason of injury to or death of any person or for loss of, damage to, or loss of use of any property to the extent caused by error, omission or negligent act of ENGINEER, its officers, agents, employees, and subcontractors in the performance of the Scope of Services under this AGREEMENT, and ENGINEER will at its own cost and expense defend and protect the CITY from any and all City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 16 of 22 such claims and demands. G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. I. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles VI.F., VII.B., VII.D., VII.F., VII.H., and VILL shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this AGREEMENT, including completing the Employment Eligibility Verification Form (I-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this AGREEMENT. ENGINEER shall adhere to all City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 17 of 22 Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this AGREEMENT for violations of this provision by ENGINEER. L. Prohibition On Contracts With Companies Boycotting Israel If Engineer has fewer than 10 employees or the AGREEMENT is for less than $100,000, this section does not apply. Engineer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this AGREEMENT, Engineer certifies that Engineer's signature provides written verification to City that Engineer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the AGREEMENT. M. Changes of Work The ENGINEER shall make such revisions in the work included in this AGREEMENT which has been completed as are necessary to correct errors appearing therein when required to do so by the City without undue delays and without additional cost to the CITY. If the CITY finds it necessary to request changes to previously satisfactorily completed work or parts thereof, the ENGINEER shall make such revisions if requested and as directed by the CITY. This will be considered as additional work and paid for as specified under Additional Work. N. Additional Work Work not specifically described under "Scope of Services" must be approved by supplemental agreement to this AGREEMENT by the CITY before it is undertaken by the ENGINEER. If the ENGINEER is of the opinion that any work he has been directed to perform is beyond the scope of this AGREEMENT and constitutes extra work, he shall promptly notify the CITY in writing. In the event the CITY finds that such work does constitute extra work, then the CITY shall so advise the ENGINEER, in writing, and shall City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 18 of 22 provide extra compensation to the ENGINEER for doing this work on the same basis as covered under Compensation and as provided under a supplemental agreement. The lump sum fee shall be adjusted if additional work is approved by supplemental agreement and performed by the ENGINEER. O. Consequential Damages Notwithstanding any other provision of this AGREEMENT to the contrary, the parties hereto mutually agree that neither party shall be liable to the other for any indirect, incidental, consequential, exemplary, punitive or special damages or loss of income, profit or savings of any party, including third parties, arising directly or indirectly from the parties' relationship under this AGREEMENT or applicable law. This provision does not apply in the event that the City is required to pay back any Federal grant funding or is required to pay damages to the Federal Government related to the project associated with this AGREEMENT due to the negligence of ENGINEER for any reason, regardless of whether the damages could be considered indirect, incidental, consequential, exemplary, punitive, or special damages. P. Limit to Use Hard Copies As a component of the Services provided under this AGREEMENT, ENGINEER may delivery electronic copies of certain documents or data (the "Electronic Files") in addition to printed copies (the "Hard Copies") for the convenience of the CITY. The CITY and its Engineers, contractors and subcontractors may only rely on the Hard Copies furnished by the ENGINEER to the CITY. If there is any discrepancy between Electronic File and the corresponding Hard Copy, the Hard Copy controls. Q. Acceptance Procedure The CITY acknowledges that Electronic Files can be altered or modified without the ENGINEER's authorization, can become corrupted and that errors can occur in the transmission of such Electronic Files. The CITY agrees that it will institute procedures to preserve the integrity of the Electronic Files received from ENGINEER until acceptance. The CITY further agrees that it will review the Electronic Files immediately upon receipt and conduct acceptance tests within thirty (30) days, after which period the CITY shall be deemed to have accepted the Electronic Files as received. The ENGINEER will undertake commercially reasonable efforts to correct any errors in the Electronic Files detected within the 30-day acceptance period. The ENGINEER shall not be responsible to maintain the Electronic Files after acceptance by the CITY. City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 19 of 22 R. Warranty of Compatibility The ENGINEER does warrant and represent that the Electronic Files will be compatible with or useable or readable by systems used by the CITY and its Engineers, contractors and subcontractors. The ENGINEER is not responsible for any problems in the interaction of the Electronic Files with other software used by the CITY or its Engineers, contractors and subcontractors. S. Prohibition on Boycotting Energy Companies. ENGINEER acknowledges that, in accordance with Chapter 2274 of the Texas Government Code, as added by Acts 2021 , 87th Leg., R.S., S.B. 13, § 2, the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the CITY with a company with 10 or more full- time employees unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021 , 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is applicable to this AGREEMENT, by signing this AGREEMENT, ENGINEER certifies that ENGINEER's signature provides written verification to the Owner that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this AGREEMENT. T. Prohibition on Discrimination Against Firearm and Ammunition Industries. ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, as added by Acts 2021 , 87th Leg., R.S., S.B. 19, § 1 , the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the CITY with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021 , 87th Leg., R.S., S.B. 19, § 1 . To the extent that Chapter 2274 of the Government Code is applicable to City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 20 of 22 this AGREEMENT, by signing this AGREEMENT, ENGINEER certifies that ENGINEER's signature provides written verification to the Owner that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this AGREEMENT. U. Subordination of AGREEMENT to Certain Agreements with Federal Government; FAA Approval This AGREEMENT shall be subordinate in all respects to the provisions of any existing or future leases or contracts between the CITY and the United States or any agency thereof which relates to the operation or maintenance of the Airport, the execution of which has been or may be required as a condition precedent to the expenditure of federal funds for the development, maintenance, or repair of the Airport. Although this AGREEMENT shall be and become effective upon the execution hereof by the parties hereto, it shall nevertheless be subject to approval by the FAA, and the parties hereby covenant and agree to make any modifications or amendments hereto that may be required to obtain such approval. This AGREEMENT, including its attachments, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings except as set forth in Article I, herein, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. City of Fort Worth,Texas Amendment No.3 and Restatement of City Secretary Contract No.54648 Page 21 of 22 Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager ("EFFECTIVE DATE"). BY: BY: CITY OF FORT WORTH ENGINEER Jacobs Engineering Group Inc. Dana Burghdoff(M 15,20 215:56 CDT) L2 L�L_ Dana Burghdoff Katus Watson Assistant City Manager Senior Vice President Date:Jul 15, 2022 Date. 7/14/2022 APPROVAL RECOMMENDED: By: Roger Venables Director, Aviation Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. $:51 CDT) Tyler Dale Airport Project Coordinator APPROVED AS TO FORM AND LEGALITY By- Thomas Royce Hansen Assistant City Attorney ATTEST: Form 1295 No. 2021-785282 J ette S.Goodall(Jul 18,2022 08: DT) Jannette Goodall of 00000..4; M&C No.: 21-0863 ,c4 o City Secretary 9�o° °�yo, ��o o=� M&C Date: 11/9/2021 *o o °° o °00000°° City of Fort worth,Texas Amendment No.3 and Restatement of City Secrecary c_oncracc r4o.o,+o,+o OFFICIAL RECORD Page 22 of 22 CITY SECRETARY FT. WORTH, TX ATTACHMENT A ,jacobs Noise Mitigation of Eligible Properties Impacted By West Side Development Scope of Services June 28, 2022 Fort Worth Alliance Airport Scope of Services Jacobs Fort Worth Alliance Airport Scope of Services for Noise Mitigation of Eligible Properties Impacted by West Side Development Scope of Services Jacobs DEFINITIONS For purposes of this Scope of Services, the following terms shall have the following meanings unless the context clearly requires otherwise. "Airport" means Fort Worth Alliance Airport. "CITY" or "City" means The City of Fort Worth, a Texas home-rule municipality. "Eligible Property" or "Eligible Home" means a single-family residential home located in either the Rivers Edge Subdivision or the Woodland Springs Subdivision that has met the requirements for participation in the Program (each an Eligible Property or Eligible Home; and, collectively, Eligible Properties or Eligible Homes). "ENGINEER" or"CONSULTANT" means Jacobs Engineering Group Inc. "FAA" means the Federal Aviation Administration. "Homeowner" means the individual(s) or other legal entity that holds legal title to an Eligible Property or Home. "Mitigation Alternatives" means the following mitigation alternatives being offered under the Program to an Eligible Property's Homeowner: Sound Insulation, Purchase Assurance, Sales Assurance, Transaction Assistance, and Purchase of Avigation Easement (each a Mitigation Alternative; and, collectively, Mitigation Alternatives). "ORIGINAL AGREEMENT" means the City Secretary Contract No. 54648 between CITY and ENGINEER dated October 7, 2020, for Engineering, Consulting, Construction and Other Noise Mitigation services for City Project No. 102901, "Noise Mitigation Measures at Fort Worth Alliance Airport". "Program" means the Federal Aviation Administration's Part 150 Noise Mitigation Program. "PROJECT" or"Project" means Noise Mitigation Measures at Fort Worth Alliance Airport. "SI Project" means an Eligible Property where the Homeowner selected the Sound Insulation Mitigation Alternative. Scope of Services Jacobs OVERVIEW OF CONTRACT MODIFICATION 3 The purpose of this Modification 3 is to authorize and fund Services as set forth herein for the PROJECT with reference to the Policies and Procedures Manual dated June 30, 2021, approved by the Federal Aviation Administration on July 23, 2021 ("Policies and Procedures Manual") attached hereto as Exhibit 1. The Services relate to the following: • Program Management Services, Homeowner Outreach and Orientation Services, Post Construction Noise Testing, and Sound Insulation for eligible residential properties; and • Program Management Services and the Sound Insulation for the original 27 residential properties participating in the Project (services for Homeowner Outreach and Orientation and Post Construction Noise Testing were approved and funded previously). CONSULTANT will provide continued program management and administration services to assist the City of Fort Worth with the PROJECT.The Services to be provided under this Modification 3 include noise testing, residential property inspections, noise mitigation design, community outreach, bid management, oversight of noise mitigation alternatives, and noise mitigation installation services. The scope of these services is described in more detail herein. The estimated costs associated with the Services are provided in Attachment B, Compensation to the AGREEMENT. In accordance with the Program and on behalf of the City of Fort Worth, CONSULTANT is authorized to offer five Mitigation Alternatives to qualified Homeowners from which one may be selected by the Homeowner. The Mitigation Alternatives are more fully described in the referenced Sections of this Scope of Services: • Sound Insulation (Section 4.0) • Purchase Assurance (Section 5.1) • Sales Assurance (Section 5.2) • Transaction Assistance (Section 5.3) • Purchase of Avigation Easement(Section 5.4) 1.0 PROGRAM MANAGEMENT CONSULTANT shall manage the PROJECT including its public relations, acoustical testing, design, and construction elements and provide the resources necessary for implementation of the noise mitigation of the impacted homes as identified in the Finding of No Significant Impact ("FONSI") and Record of Decision ("ROD") for the Environmental Assessment for the West Side Air Cargo Development Project, Fort Worth Alliance Airport, Tarrant and Denton Counties, Texas, dated October 19, 2018. 1.1 Work Plan A detailed work plan will be submitted within fourteen (14)calendar days of the Notice to Proceed. The work plan will identify the execution and management of the work throughout the length of the contract. Scope of Services Jacobs Roles and responsibilities of key team members will be confirmed and lines of authority and communication identified. This will be submitted as an organization chart or other type of exhibit that clearly identifies roles, responsibilities and lines of communication. 1.2 Monthly Status Report CONSULTANT will maintain regular communications with the Sponsor and other stakeholders. A monthly report will be prepared to demonstrate the progress and status of the project. This report will include narrative discussion of issues, accomplishments and schedule and budget updates. 1.3 Coordination Meetings CONSULTANT will attend coordination meetings with the Sponsor and stakeholders to coordinate and communicate issues related to the Project. It is anticipated that key staff will attend bi-weekly project coordination meetings for the duration of the Project. 1.4 Program Budget CONSULTANT will develop and maintain a program budget that identifies the major project components, professional services costs, construction costs, contingency and funding sources. This information will be in the form of spreadsheet and updated monthly and included with the Monthly Status Report. Invoices will be prepared and reviewed by the CONSULTANT and submitted to Alliance Air Services for review and approval and then submitted to the City for payment. 1.5 FAA Grant Management Not Used. 1.6 Project Schedule A detailed project schedule will be prepared that identifies dates for key meetings, duration of activities, submittals, deliverables and other important milestones for the completion of the work. The project schedule will be reviewed and updated as necessary for the duration of the Project and submitted with the Monthly Status Report. 2.0 HOMEOWNER OUTREACH AND ORIENTATION The CONSULTANT will perform outreach to affected Homeowners in the Rivers Edge and Woodland Springs subdivisions. Each subdivision will have an outreach program and orientation developed for the noise mitigations measures specific to that subdivision. Scope of Services Jacobs 2.1 Outreach for Rivers Edge Homeowners The Mitigation Alternatives will be offered to all Homeowners in the Rivers Edge Subdivision. The CONSULTANT shall develop informational materials and presentations to thoroughly describe the mitigation process, alternatives and schedule. As part of this outreach, prior to the execution of the AGREEMENT, the parties agreed for CONSULTANT to conduct live "Town Hall" events. CONSULTANT conducted live Town Halls on June 9-10, 2021,to provide a way for homeowners within the Rivers Edge neighborhood to ask questions and voice concerns that they had related to the noise mitigation testing and to explain the remedies that were being offered under the Project. The costs associated with the Town Halls are provided in Attachment B, Compensation to the AGREEMENT. 2.2 Outreach for Woodland Springs Homeowners Only those Woodland Springs Homeowners that are within the 2025 DNL 65 dB contour will be offered the opportunity to participate in the purchase of avigation easements. Those outside the contour will not be eligible for participate in the avigation easement program. The CONSULTANT shall develop informational materials and presentations to thoroughly describe the mitigation process, alternatives and schedule. 3.0 TESTING OF NON-COMPATIBLE STRUCTURES—RIVERS EDGE SUBDIVISION The homes in the Rivers Edge Subdivision must first be evaluated to determine if they are eligible for sound insulation mitigation measures. A noise impacted non-compatible structure must be experiencing existing interior noise levels that are 45 dB or greater,with the windows closed,in habitable areas of the Home (living, sleeping, eating or cooking areas), to be considered eligible. There are 264 homes in the Rivers Edge Subdivision. 3.1 Initial Eligibility Testing This portion of the Scope of Services has been completed previously in former phases of the Project. 3.2 Post Construction Noise Testing Following completion of the noise mitigation treatments, the CONSULTANT will schedule and conduct post construction noise testing. The post construction noise testing will determine that the mitigation treatments have reduced the interior noise level by at least 5 dB and the average interior noise level is below 45 dB. Should the 5 dB noise reduction not be met, CONSULTANT will re-evaluate and rectify this issue. 4.0 SOUND INSULATION WORK Construction will be required to sound insulate Eligible Homes during this phase of the PROJECT. Each Eligible Home receiving sound insulation work will be considered an individual sound insulation project ("SI Project"). Construction Contractors will be pre-qualified to participate in a design, bid, build process that will include the removal of existing doors and windows and the installation of highly efficient sound insulated door and window products developed to significantly lower noise penetration. The estimated Scope of Services Jacobs construction budget for sound insulation is $60,000.00 per Eligible Home based on historic data from prior sound insulation projects and is subject to change on a project-to-project basis.CONSULTANT will manage the construction and post construction activities described below. 4.1 Sound Insulation Work Management CONSULTANT shall manage the development of sound insulation design and construction strategies; maintain and update comprehensive management information, control and documentation systems; and provide management for administration, coordination and completion of the design and construction phases for the sound insulation work. CONSULTANT shall utilize the single parcel bidding method, whereby each SI Project will represent an independent construction contract, as the basis for management of the SI Projects. 4.1.1 Sound Insulation Work Budget CONSULTANT shall develop and monitor an effective system of sound insulation work cost control and revise and refine the approved sound insulation work budget, incorporate approved changes as they occur and develop cash flow reports and forecasts as needed. CONSULTANT shall also identify variances between projected and actual costs and advise the City whenever projected costs will be exceeded. CONSULTANT will assist City, as requested, with administration, monitoring/reporting and close-out of the Federal grant(s) which fund the PROJECT. 4.1.2 Sound Insulation Schedule CONSULTANT shall prepare a sound insulation work schedule, in a mutually agreeable format, for each Program Phase. The sound insulation work Schedule shall be subsequently updated by CONSULTANT, as necessary to maintain control of the sound insulation work. Within the sound insulation schedule, each Bid Cycle of design and construction for the sound insulation work shall proceed continuously through to completion, except when caused by events beyond CONSULTANT's reasonable control. Three Bid Cycles representing the sound insulation of 27 homes were defined in the ORIGINAL AGREEMENT and defined as "Bid Cycles" 1-3. Seven additional Bid Cycles are proposed to be included in Modification 3 and will begin with Bid Cycle #4 and conclude at Bid Cycle #10. 4.1.3 Customer Service Since Acoustical Treatments are provided to private property, CONSULTANT shall provide services to educate and inform Homeowners throughout the process of providing noise mitigation services to their homes. CONSULTANT will have full-time personnel on the PROJECT working with Homeowners to answer questions and explain the Program. Scope of Services Jacobs 4.1.4 Program Office/Showroom and Warehouse CONSULTANT shall staff and maintain, for the duration of this AGREEMENT, a combination of office/showroom/conference room (hereinafter referred to as "Office") to accommodate meetings with Homeowners and to display acoustical products (windows,doors,etc.)for Homeowner and Construction Contractor consideration. CONSULTANT will maintain, update and expand, as necessary,the showroom space for the display of all current approved products available to the Homeowners. In the event CONSULTANT loses its office/showroom or warehouse lease, through no fault of CONSULTANT, CONSULTANT shall propose to City a new office/showroom or warehousing location. City must approve the new office/showroom or warehouse location in writing, which, approval shall not be unreasonably withheld. If City approves the new premises, reasonable labor and material costs incurred by CONSULTANT in the building such new office/showroom/conference room or warehouse will be reimbursable under this AGREEMENT. CONSULTANT shall staff and maintain, for the duration of this AGREEMENT, an indoor warehouse (hereinafter referred to as "Warehouse") to store the needed inventory of materials (windows, doors, etc.). CONSULTANT operations described hereunder shall be performed from the Office and Warehouse according to the schedule to be approved by the City. 4.1.5. Warehouse and Product Inventory Management CONSULTANT shall provide products that meet the Program requirements for noise reduction. The Program requirements for noise reduction are an average interior Day-Night average sound Level(DNL) value of less than 45 db and improvement of the Noise Level Reduction (NLR) of the Eligible Home by at least 5 db. CONSULTANT will pre-approve all products based upon technical review of specifications, shop drawings,architectural details,acoustical laboratory testing data, manufacturer's warranty and customer support and services information. Products must meet quality assurance standards and provide compatibility with the architectural design characteristics of the Homes. CONSULTANT shall maintain, and periodically confirm, an accurate inventory of product on hand. CONSULTANT will ensure that measurements for all products at each SI Project are accurate and seek competitive bids from all pre-approved manufacturers. For each SI Project CONSULTANT shall develop a list of long lead items and ensure that such items are ordered, delivered and installed in a timely fashion, so as not to delay the SI Project. Product bids will be reviewed and awarded, by issuance of purchase orders, to the vendor providing the lowest responsive and reasonable bid. CONSULTANT will accept delivery of all products at Warehouse and will inspect, sort, store and distribute same to Construction Contractors. 4.1.6 Coordination and Meetings CONSULTANT shall promptly inform City of significant events, concerns, and/or issues which impact the Program and/or SI Projects. As requested by City, CONSULTANT shall communicate with community, stakeholders and media. Scope of Services Jacobs CONSULTANT shall maintain coordination and liaison with appropriate affected organizations such as the FAA, local governments, agencies, utilities and regulatory authorities to mitigate negative schedule impacts as well as to mitigate conflicts among any sub-consultants, and Construction Contractors. CONSULTANT shall also establish and implement procedures for coordination among the City and Construction Contractors. As directed by the City,CONSULTANT shall provide support related to City Councilor relevant committee meetings. CONSULTANT shall maintain "on call" status to be available to timely respond to and/or attend meetings with the City staff, City Council, and other Program participants to respond to Program related queries requiring input of a technical nature, including but not limited to PROJECT information, schedule, budget and cost status. CONSULTANT shall conduct two meetings each month, as requested by the City,to review the PROJECT and the progress being made by CONSULTANT including the performance and progress of Construction Contractors on each SI Project (PROJECT Progress Meetings). CONSULTANT shall prepare meeting minutes for the PROJECT Progress Meetings and provide to the CITY. CONSULTANT shall conduct monthly Construction Contractor's meetings to communicate PROJECT update, changes and reminders, as well as provide on-going training. CONSULTANT shall conduct a Construction Contractor interview night one evening each month. The Construction Contractor interview night will provide Homeowners the opportunity to meet CONSULTANT's pre-qualified Construction Contractors. During the event, CONSULTANT shall ensure that approved Contractor Notebooks and qualifications are available for review by Homeowners. Homeowners will receive brochures which provide specific information about each of the Construction Contractors. 4.1.7 Program Records, Reports and Filing CONSULTANT shall record the proceedings of each PROJECT Progress Meeting. CONSULTANT shall submit such meeting records, including a sign-in sheet, summary of the action items, the designated responsible party, to the City within two (2) business days of the meeting date. Distribution of these records shall be to a list of recipients designated by the City. At each PROJECT Progress Meeting, CONSULTANT shall review: a) Project progress; b) current design and construction issues; c) Program financial status; and d) significant activities, accomplishments, manpower, on-site problems (supported by photographs, as appropriate). CONSULTANT shall record the progress of the Project and submit written progress reports to the City including information on each construction contractor's work, the percentage of completion, and the number and amounts of change orders, and CONSULTANT shall keep a log available to the City reflecting all such information. CONSULTANT shall maintain files of all documents, letters, reports, plans, permits, etc. pertinent to the PROJECT. Scope of Services Jacobs 4.1.8 Safety CONSULTANT's Construction Contractors will be fully responsible for Project job site safety. To assist with the Construction Contractor safety effort, CONSULTANT shall designate a safety representative who will visit SI Project job sites during construction periods. CONSULTANT's safety representative will be responsible for noting any safety concerns and reporting deficiencies to the Construction Contractor's management for correction and compliance. The City will be copied on any correspondence related to safety. City shall have no power or responsibility to formulate CONSULTANT and Construction Contractor's safety plan(s) or enforce or modify such safety plan(s). 4.1.9 Security CONSULTANT shall perform background checks on all CONSULTANT personnel, sub-consultants, Construction Contractors and Construction Contractor's sub-contractor personnel prior to such personnel being allowed on any Homeowner premises. CONSULTANT shall ensure all CONSULTANT sub-consultants, Construction Contractors, and sub-contractor of any tier wear photo identification security badges, issued by CONSULTANT, at any time that such personnel is present on the Project site. CONSULTANT will coordinate, monitor and implement actions in an effort to ensure property security provisions related to construction are maintained. CONSULTANT shall conduct activities to reasonably avoid or mitigate disruption of Homeowner activities. 4.1.10 Best Practices CONSULTANT shall investigate and remain current on FAA regulations, policies and procedures for the Program. 4.1.11 Use of Approved Documents CONSULTANT will develop forms, brochures, contracts, presentations, specifications and other written documents in furtherance of the Program. Such written documents shall be presented to Alliance Air Services and the City for approval prior to implementation. Any changes/modifications to the approved documents will require prior approval from Alliance Air Services and the City of Fort Worth. 4.1.12 Avigation Easements CONSULTANT shall,upon receiving a template Avigation Easement from City and after each Homeowner selects one of the Mitigation Alternatives, prepare and secure Avigation Easements and related documents from all Homeowners and the respective lender and secure property title commitments prior to Acoustical Treatment design package development. The City shall record Avigation Easements in Tarrant/Denton County deed records. 4.2 Design Services CONSULTANT shall provide design services during the term of this Agreement which shall include, but limited to, the following tasks: 4.2.1 Design Coordination and Permitting CONSULTANT will coordinate design activities and will provide oversight with respect to the implementation of design management procedures by all parties. CONSULTANT shall coordinate Scope of Services Jacobs activities of designers in the development and production of Acoustical Treatment Design Packages. CONSULTANT shall confer with the City and Homeowners during the design phase to ensure compliance with Program guidelines. CONSULTANT shall secure all necessary permits. CONSULTANT will assist in securing and transmitting appropriate documents to the various approval agencies outside of the control of City,at the appropriate times. CONSULTANT shall verify all building permits are closed at the completion of the project. 4.2.2 House Inspection Visit Not Used. 4.2.3 Design Visit The purpose of the Design Visit will be to gather information necessary to developing the most effective Acoustical Treatment Design Package for each Property. The Design visit will include: a) a Computer Aided Drafting Design (CADD) layout and measurements; b) evaluation of the existing window and door conditions; c) evaluation of existing attic insulation; and d) assessment of pre-existing conditions. Should asbestos containing material or lead-based paint be suspected to exist, it will be the Homeowner's responsibility to provide an abatement plan; and CONSULTANT shall immediately stop performance of on-site services at such Homeowner's Eligible Property. 4.2.4 Acoustical Treatment Design Package Development Based upon the information gathered during the Design Visit, CONSULTANT will prepare an Acoustical Treatment Design Package for the custom acoustical treatment of each Property. CONSULTANT shall review the Acoustical Treatment Design Package with the Homeowner. 4.2.5 Homeowner Design Review Meeting After Homeowners have attended a Construction Contractor interview night meeting, CONSULTANT will arrange a separate Homeowner Design Review Meeting with each Homeowner. The purpose of this meeting is to: a) Present and review with the Homeowner the Acoustical Treatment Design Package for their Property. The Homeowner will have the opportunity to review product styles and colors at the Program Showroom. If necessary, Homeowners will have a final opportunity to adjust their assigned Bid Cycle, depending on any special scheduling needs and/or circumstances. b) Determine if the Homeowner will elect to participate further in the Program and, if so, to obtain the Homeowner's signature on a Homeowner Work Agreement, including the final Acoustical Treatment Design Package, and an Avigation Easement. Upon obtaining the Homeowner signature, CONSULTANT shall provide copies of the documents to the Homeowner. CONSULTANT shall accommodate Homeowners that require additional time for document review. In no event shall CONSULTANT proceed with development of Bid Package prior to CONSULTANT's receipt of the signed Avigation Easement and Homeowner Work Agreement. Scope of Services Jacobs c) Have the Homeowner select three (3) pre-qualified Construction Contractors from the list of Construction Contractors. Neither CONSULTANT nor City will influence Homeowners in the contractor selection process in any way. d) Homeowner executes work agreement authorizing participation in the program and access for all design and construction visits. 4.2.6 Bid Package Development Acoustical Treatment Design Packages will be developed and finalized by CONSULTANT for each property. CONSULTANT will provide bid packages to the Homeowner selected general contractors. CONSULTANT shall deliver Bid Packages to the Property for Construction Contractor to pick up at the Pre-Bid Open House. Each Bid Package will contain the following bid documents (and instructions for completing each): a) Bidder's Checklist; and b) Bid Form and Bidder's Certificate. 4.2.7 Pre-Bid Open House and Bidder Inquiries For each Property a Pre-Bid Open House will be scheduled by CONSULTANT at a date and time selected by the Homeowner from the pre-designated dates for the Bid Cycle. CONSULTANT will contact the Construction Contractors selected by the Homeowners to notify them of the Pre-Bid Open House appointment. The Pre-Bid Open House will provide the opportunity for the Homeowner selected Construction Contractors and their sub-contractors (and suppliers, if required) to view the Home before preparing their final bids.CONSULTANT will track the schedule of all Pre-Bid Open Houses. 4.2.8 Design Cost Estimating CONSULTANT shall prepare an Estimate of Construction Costs for each SI Project and such estimate shall be included for reference in the Bid Tabulation form to be used by CONSULTANT at the Bid Opening. 4.2.9 Bid Opening, Bid Review&Contract Award CONSULTANT shall conduct a Bid Opening for all Properties included within a Bid Cycle. CONSULTANT will record each Construction Contractor's bid on a Bid Opening Summary. Following the Bid Opening, the results will be tabulated on the Bid Tabulation and distributed to all bidders and the City. CONSULTANT will evaluate the bids for completeness,full responsiveness and price. CONSULTANT will communicate with each low bidder whose bid is twenty percent (20%) or more below the Estimate of Construction Costs to determine if all labor and incidental materials were included. CONSULTANT shall allow Construction Contractors who advise CONSULTANT of a bid error to withdraw their bid without penalty. If a Construction Contractor is the low, responsive, and responsible bidder on multiple Projects, CONSULTANT will consistently monitor contractor performance and capacity to ensure successful completion of work. may require the Construction Contractor to provide a construction staging plan for all such Projects. CONSULTANT shall consider the construction staging plan and the Construction Contractor's past performance, capacity, and quality of work in its formulating its recommendation for contracts to be awarded for the Bid Cycle. Scope of Services Jacobs CONSULTANT shall forward to City a Bid Award Notification and the "Bid Tabulation as Awarded. CONSULTANT will prepare and submit a "Bid Tabulation as Awarded" to all Construction Contractors. CONSULTANT will notify all successful bidders of their contract awards. CONSULTANT will prepare a construction contract for each Project to be executed by the Construction Contractor. After execution by the Construction Contractor, CONSULTANT will sign the construction contract and provide a copy to the Construction Contractor. Construction Contractor may order incidental products or materials only after both parties have executed the construction contract. 4.2.10 Homeowner Notification of Award CONSULTANT will notify the Homeowner of the Construction Contractor being awarded the construction contract for their Project. 4.3 Construction Management Services CONSULTANT shall provide Construction services during the term of this AGREEMENT which shall include, but not be limited to, the following tasks: 4.3.1 Construction Contractor Outreach Throughout the term of this Agreement, CONSULTANT will conduct outreach to encourage the participation of local general contractors and subcontractors in the Program. The Construction Contractor outreach process will be designed to eventually lead local general contractors to qualification and inclusion in the CONSULTANT implementation team. CONSULTANT will periodically review and refine the contractor outreach brochure and presentation materials. CONSULTANT will assist the City with development and placement of Program outreach advertisements in local newspapers, trade publications and with local builders' associations. CONSULTANT will conduct a Contractor Outreach meeting with interested local general contractors. During Contractor Outreach, CONSULTANT will provide a summary of the Program contractor requirements and expectations to include: i) general contractor qualifications; ii) Program process review; iii) contractor performance requirements; iv) contractor meeting requirements; v) contractor commitment; vi) DBE participation; vii) Program specifications and payment, viii) contractor training requirements. 4.3.2 Construction Contractor Participation CONSULTANT shall ensure the following requirements are met in conjunction with Construction Contractor participation in the Program: a) Pre-Qualification: CONSULTANT shall implement a pre-qualification process to determine the eligibility and qualifications of contractors interested in being included on CONSULTANT team. The pre-qualification process will include review of application, and reference checks. CONSULTANT shall present a list of contractors it deems to be qualified to the City. Upon approval, CONSULTANT shall conduct training that shall include the following topics:i) general contractor qualifications; ii) Contractor performance requirements; iii) Program process; iv) construction specifications; v) Homeowner selection process; vi) product showroom and Scope of Services Jacobs warehouse procedures; vii) bidding process; viii) payment process; and ix) notification that certification will not assure receipt of any Project assignments. CONSULTANT will enter into a Contractor Participation Agreement only with general contractors successfully completing the training. CONSULTANT will provide each new Construction Contractor with a construction manual. CONSULTANT will maintain the list of qualified Construction Contractors and periodically provide the list to the City. CONSULTANT will provide on-going Construction Contractor training as part of the monthly Construction Contractor meeting as otherwise required herein. b) Construction Contracts: CONSULTANT shall enter into construction contracts with pre-qualified Construction Contractors for construction services and procurement of incidental (non- acoustical) products for each Project. CONSULTANT shall select a Construction Contractor for each Project based on both, the lowest, responsive and responsible pre-qualified bid and the Construction Contractor's current workload, scheduling and capability. c) Prevailing Wage Rate and General Labor Conditions: The provisions of Chapter 2258 of the Texas Government Code, as amended, are expressly made a part of this contract. CONSULTANT shall comply with Federal and State law regarding wages to be paid to or hours worked pursuant to this Agreement, including but not limited to the Davis Bacon labor requirements as set out in 29 CFR Part S.S. d) Construction Contractor Monitoring: CONSULTANT will observe, monitor and evaluate the performance of Construction Contractors throughout the construction process and upon the completion of each Project. Additionally, CONSULTANT will hold an evaluation conference with each Construction Contractor at least once per calendar year as a means of communicating strengths, weaknesses and overall performance. Evaluation criteria include, but are not limited to, Construction Contractor's quality of work and adherence to specifications, program policies and procedures and construction schedules. The evaluation shall be used by CONSULTANT as a tool for evaluating a Construction Contractor's overall Program performance and potential contract capacity. e) Construction Contractor Payment: Upon successful Final Inspection of the Project and approval by CONSULTANT team, CONSULTANT shall pay Construction Contractors one payment for the full amount of the Construction Contract for the Project. Such payment shall be considered full and final payment for all services rendered by Construction Contractor and any subcontractor on that Project as well and shall constitute a representation by CONSULTANT to City, based on CONSULTANT's observations at the site, as required herein, that to the best of CONSULTANT' knowledge, information and belief, the Construction Contractor completed the Project in accordance with the plans and specifications and is entitled to payment. When the above applicable reasons for withholding payment are cured, payment shall be made to Construction Contractor for amounts previously withheld. Scope of Services Jacobs 4.3.3 Performance and Payment Bonds CONSULTANT will prepare the necessary work-on-hand documentation for submittal to the bonding company and order the Payment and Performance bonds for the Bid Cycle. Upon issuance of the Payment and Performance Bonds, CONSULTANT will transmit the originals to the City. CONSULTANT shall provide City with construction performance and payment bonds made payable to the City of Fort Worth, executed by a corporate surety acceptable by the City who is licensed pursuant to the Texas Insurance Code in the potential cumulative amount of each Bid Cycle's estimated construction and product costs only(excluding design, Program and Project administration, construction observation and testing fees) as estimated by CONSULTANT. Said bonds shall further provide that the surety shall indemnify the City for all damages or losses resulting from CONSULTANT's construction default. Said bonds shall further guarantee CONSULTANT's performance of all terms and obligations under the construction contract awarded. Said bonds must have attached thereto a Power of Attorney as evidence of authority of the person executing the bond to bind the surety. The bonds must be furnished in compliance with the statutory requirements of the Texas Government Code, Chapter 2253. The bonds must be executed and delivered to City prior to commencement of construction work under this Agreement. 4.3.4 Pre-Construction Activities Construction Contractors shall apply for and obtain building permits from all governmental authorities having jurisdiction over a particular Project and such approval and consents from others as may be necessary for completion of a Project. Approximately three (3) weeks prior to the Pre-Construction Visit as described in section 4.3.5 below, CONSULTANT will send reminders to all Construction Contractors awarded work in the Bid Cycle regarding the necessity to obtain building permits and begin developing construction schedules. Construction Contractors are required to provide CONSULTANT with a copy of the required permit(s) one (1) week prior to the Pre-Construction Visit. All SI Projects within a particular Bid Cycle must be completed by CONSULTANT within a defined thirty- day (30) construction timeline. These time periods shall be adjusted or extended day-for-day for excusable delays so long as City does not incur any additional costs for such delays. The Construction Contractor is required to submit a construction schedule to CONSULTANT three business days prior to the Pre-Construction Visit. CONSULTANT will review the construction schedule to determine feasibility of proposed work flow. 4.3.5 Pre-Construction Visits At the Pre-Construction Visit, CONSULTANT and the Construction Contractor will meet with the Homeowner at the Eligible Property to review all aspects of the SI Project including the final construction schedule. The Pre-Construction Visit will give the Homeowner the opportunity to ask any final questions or make any final paint or stain color selections prior to the start of construction. The Pre-Construction Visit must be scheduled a minimum of three (3) days prior to the start of construction in order to give the Homeowner sufficient time to remove window coverings and move furniture. Scope of Services Jacobs A lockbox supplied by the Construction Contractor will be placed on each Property from the Pre- Construction visit through the Final Inspection Visit. The Homeowner will be required to provide a home key for the lockbox. 4.3.6 Emergencies In the event that an emergency situation is identified or arises during any phase of a Project which poses an immediate danger to the health and/or safety to any person or property, CONSULTANT shall take such steps as are reasonably necessary, including, but not limited to ordering a work stoppage. 4.3.7 Punch List Inspection Upon substantial completion of the construction work, CONSULTANT shall conduct a punch list inspection to determine if the work has been completed in accordance with the Project's Scope of Work. CONSULTANT shall provide the punch list inspection to the Construction Contractor. The Construction Contractor must complete all punch list items prior to requesting a final inspection. 4.3.8 Coordination of Post Construction Technical Inspection and Testing CONSULTANT will coordinate and review the technical inspection, testing and reports provided by acoustical sub-consultants. CONSULTANT shall confirm that all technical inspections and testing comply with any FAA requirements and grant agreements. The acoustical sub-consultants will prepare reports and submit to CONSULTANT. 4.3.9 Construction Dispute Management In the event disputes or claims arise during the SI Project, CONSULTANT will resolve such disputes or claims using commercially reasonable efforts. 4.3.10 Project Closeout Upon verification that all construction punch list items are complete, CONSULTANT will conduct a final inspection to verify all work has been completed (100% completion of Scope of Work). CONSULTANT shall afford the City the opportunity to participate in the final construction inspection. For each Project CONSULTANT shall obtain from the Construction Contractor and all sub-contractors and suppliers and provide to the City releases and waivers of liens or bonds indemnifying City. CONSULTANT will provide Homeowners with a warranty package to include manufacturer warranties and maintenance instructions for all products installed, as well as the Construction Contractor's one- year workmanship warranty. CONSULTANT will provide a Homeowner Exit Survey to Homeowner in order to obtain feedback and suggestions concerning the Program. 4.3.11 Warranty Repairs CONSULTANT will assist Homeowners in the coordination of warranty repairs with Construction Contractors during the one (1)year post-construction workmanship warranty period. Homeowners will file claims with CONSULTANT during the (1)year post-construction workmanship warranty period. Scope of Services Jacobs 5.0 PURCHASE ASSURANCE /SALES ASSURANCE /TRANSACTION ASSISTANCE,AND PURCHASE OF AVIGATION EASEMENTS Homeowners within the Rivers Edge Subdivision are eligible for Purchase Assurance, Sales Assurance, and Transaction Assistance to facilitate a timely sale of their property, should they decide to sell. The Homes are eligible for sound insulation prior to resale. Furthermore, the CONSULTANT must ensure that eligible buyers have an appropriate disclosure describing the Airport's noise exposure on the Eligible Property and the intention of the CITY to retain an easement on the property. 5.1 Purchase Assurance(Refer to Exhibit 1, Section#4) Consultant Services related to Purchase Assurance will be all requirements as listed under section 4 of the FAA Policies and Procedures Manual attached as Exhibit 1. This includes Services that are to be conducted by CONSULTANT's subcontractors. 5.2 Sales Assurance(Refer to Exhibit 1, Section#5) Under Sales Assurance,the appraised market value of the Homeowner's Home is guaranteed on a timely market sale; however, the airport does not acquire the Eligible Property. A timely market sale shall be the average number of days on the market as defined by the Greater Denton/Wise County Association of Realtors for Justin, Texas. Should the Eligible Property sell for less than the appraised value, the Homeowner is compensated for the shortfall by the CITY. Property is appraised at its current market value "as is" subject to airport noise. The Eligible Property is listed and sold subject to the Avigation Easement that is conveyed to the CITY at the sale of the Eligible Property.CONSULTANT Services related to Sales Assurance will be all requirements as listed under section 5 of the FAA Policies and Procedures Manual attached as Exhibit 1. This includes Services that are to be conducted by CONSULTANT's subcontractors. 5.3 Transaction Assistance(Refer to Exhibit 1, Section#6) Transaction Assistance generally involves an agreement by the CITY to pay certain costs associated with the sale of Eligible Property. Allowable costs are generally limited to the real estate sales commission. The Eligible Property is listed and sold subject to the Avigation Easement that is conveyed to the CITY at the sale of the Eligible Property. Homeowners will have the option to select Transaction Assistance on or before January 1, 2024.This deadline is one year prior to the PROJECT completion date of December 31,2024. CONSULTANT's Services related to Transaction Assistance will be all requirements as listed under section 6 of the FAA Policies and Procedures Manual attached as Exhibit 1. This includes Services that are to be conducted by CONSULTANT's subcontractors. 5.4 Purchase of Avigation Easements(Refer to Exhibit 1, Section#3) Avigation Easement provided the CITY with a limited form of control on surrounding properties. CONSULTANT's Services related to Purchase of Avigation Easement will be all requirements as listed under section 3 of the FAA Policies and Procedures Manual attached as Exhibit 1. This includes Services that are to be conducted by CONSULTANT's subcontractors. Scope of Services Jacobs 6.0 EXCLUSIONS AND CLARIFICATIONS The following exclusions and clarifications expressly apply to this Scope of Services. 1. The City of Fort Worth and the airport operator will timely perform their respective duties and obligations as set forth in The Policies and Procedures Manual, attached hereto as Exhibit 1. 2. Identification and abatement of asbestos is expressly excluded. 3. Identification, remediation, removal and transport all pre-existing hazardous materials are expressly excluded. 4. Geotechnical services are expressly excluded S. CONSULTANT shall have no liability for pre-existing conditions and damage within a Home which prevent CONSULTANT from installing any or all sound insulating products. 6. The design will be based on the federal, state, and local codes and standards in effect at the start of the PROJECT.Any changes in these codes may necessitate a change in Scope of Services. 7. The provision of on-site security personnel and security systems are excluded from this Scope of Services. If expressly authorized in writing by Homeowner prior to the provision of Sound Insulation Work for a SI Project, CONSULTANT will coordinate with the Homeowner's security vendor to provide infrastructure required for pre-existing security device support post-installation of sound insulation materials. EXHIBIT 01 Policies and Procedures Manual CITY OF FORT WORTH ALLIANCE AIRPORT NOISE MITIGATION PROGRAM POLICIES AND PROCEDURES MANUAL Prepared by THC, Inc. June 30, 2021 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures SECTION 1. INTRODUCTION..................................................................... 1 I. Purpose................................................................................. ... 2 II. Program Overview.................................................................. 2 III. Program Objectives..................................................................... 2 SECTION 2. NOISE MITIGATION OPTIONS — IMPACTED NEIGHBORHOODS.... 3 I. Rivers Edge Subdivision............................................................. 4 II. Woodland Springs Subdivision..................................................... 4 SECTION 3. PURCHASE OF AVIGATION EASEMENT........................................... 5 I. Description.............................................................................. 6 II. Procedures.............................................................................. 6 SECTION 4. PURCHASE ASSURANCE...................................................... 9 I. Description............................................................................:... 10 IIProcedures.............................................................................. 10 III. Examples................................................................................ 13 SECTION 5. SALES ASSURANCE............................................................... 15 I. Description............................................................................... 16 IIProcedures.............................................................................. 16 III. Examples................................................................................ 18 SECTION 6. TRANSACTION ASSISTANCE................................................... 22 I. Description............................................................................... 23 IIProcedures.............................................................................. 23 III. Examples................................................................................ 24 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures SECTION 7. SOUND INSULATION OF NON-COMPATIBLE STRUCTURES...... ... 26 I. Acoustical Testing Process.......................................................................27 A. Acoustical Testing to Determine Eligibility...........................27 B. Acoustical Testing Initial Results .........................................30 II. Implementation Process .......................................................................:...32 III. Organization and Staffing .........................................................................34 A. Organization Chart ..............................................................35 B. Acoustical Treatment Consultant Staffing.............................36 IV. Security Background Checks....................................................................40 A. Submission of Application Form ..........................................40 B. Background Review ............................................................41 C. Ethics and Expectation Training ...........................................41 D. Issuance of Photo I.D. Badge..............................................42 V. Office, Showroom and Warehouse ...........................................................42 VI. Development of Sound Insulation Program...............................................42 A. Prioritization Methodology...............................................:...43 B. Database Management.......................................................43 C. Acoustical Treatments.........................................................44 D. Construction Specifications Manual ....................................45 E. Homeowner Outreach, Orientation and Handbook..........:...45 VI I. Contractor Outreach, Qualification and Training .......................................46 A. Contractor Evaluation ..........................................................47 1 . Experience Evaluation................................................47 2. Capacity Evaluation....................................... .. 47 B. Contractor Training..............................................................48 C. Issuance of Photo ID Badge................................................48 D. Contractor Participation Agreement.....................................48 E. Timing of General Contractor Qualification..........................49 VIII. Design Process.........................................................................................49 A. House Inspection Visit.........................................................49 B. Design Visit .........................................................................50 C. Design Package Development ............................................51 D. General Contractor Interview Night and Selection ...............51 E. Design Review Meeting with Homeowners .........................51 F. Avigation Easement and Work Agreement..........................52 G. Bid Package Development ................... 52 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures IX. Bid and Award Process............................................................... 52 A. Pre-Bid Open House................................................. 52 B. Bid Opening and Contract Award.............................. 53 C. Homeowner Notification of Award................................ 53 X. Construction Process.................................................................. 54 A. Product Procurement................................................ 54 B. Pre-Construction Activities......................................... 54 C. Pre-Construction Visit............................................. 54 D. Construction Oversight.............................................. 55 E. Punch List Inspection................................................ 56 F. Final Inspection....................................................... 56 G. Warranty Package and Homeowner Exit Survey............. 56 H. Contractor Payment Process.................................... 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures SECTION 1 . INTRODUCTION Page 1 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures I. PURPOSE This Policies and Procedures Manual details the guidelines and specifications for the implementation of the City of Fort Worth Noise Mitigation Program. The policies and procedures outlined in this manual are based on the results and findings of the Final Environmental Assessment and Finding of No Significant Impact / Record of Decision as stated below. While certain policies and procedures have been successfully implemented at other airports, this manual has been tailored to best suit the needs and interests of the City of Fort Worth and the affected community, while providing maximum flexibility in its implementation. II. PROGRAM OVERVIEW On September 24, 2018, the Federal Aviation Administration (FAA), Southwest Region, approved a Final Environmental Assessment (FEA), and issued a Finding of No Significant Impact (FONSI) / Record of Decision (ROD) for the proposed West Side Air Cargo Development Project at Fort Worth Alliance Airport, dated October 19, 2018. The FONSI/ROD outlined specific measures to mitigate the noise impacts experienced by two (2) neighborhoods: Rivers Edge and Woodland Springs. III. PROGRAM OBJECTIVES The primary objective of the City of Fort Worth Noise Mitigation Program is to maintain the integrity and stability of the subject neighborhoods. The five (5) noise mitigation alternatives are the methods used to attain this goal, with the Sound Insulation Option having an additional goal of reducing the interior noise level of a dwelling by a minimum of five (5) decibels by making modifications to the residence. A detailed explanation will follow in the section entitled Sound Insulation of Noncompatible Structures. Page 2 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures SECTION 2. NOISE MITIGATION OPTIONS FOR IMPACTED NEIGHBORHOODS Page 3 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures NOISE MITIGATION OPTIONS FOR IMPACTED NEIGHBORHOODS As previously stated, the Finding of No Significant Impact (FONSI) / Record of Decision (ROD) for the proposed West Side Air Cargo Development Project at Fort Worth Alliance Airport, dated October 19, 2018, outlined specific measures to mitigate the noise impacts experienced by two (2) neighborhoods, Rivers Edge and Woodland Springs, as follows: I. RIVERS EDGE SUBDIVISION A significant portion of the Rivers Edge subdivision experiences a DNL 1 .5 dB increase in airport noise and therefore, five (5) alternative noise mitigation methods are being offered to all 264 residents, as follows: • Purchase ofAvigation Easements • Purchase Assurance • Sales Assurance • Transaction Assistance • Sound Insulation of Noncompatible Structures (Acoustical Eligibility Testing Required) II. WOODLAND SPRINGS SUBDIVISION Thirty (30) homes in the Woodland Springs subdivision that chose not to participate in the 2010 Part 150 Noise Mitigation Program, and are within the DNL 65 dB noise contour, are once again being offered an opportunity to participate in the City of Fort Worth Noise Mitigation Program. They are being offered the following noise mitigation option. • Purchase ofAvigation Easements Each of the noise mitigation options will be explained in detail within this Policies and Procedures Manual. Page 4 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures SECTION 3. PURCHASE OF A VIGA TION EA SEMEN TS Page 5 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures PURCHASE OF AVIGATION EASEMENTS I. DESCRIPTION An eligible homeowner may choose to sell an avigation easement to the City of Fort Worth versus participating in the acoustical treatment program, or either of the three property sales options. An avigation easement is a conveyance of airspace over another property for use by the airport. Easement rights acquired typically include the "right of flight" of aircraft, the right to cause noise, dust, etc., the right to remove all objects protruding into the airspace together with the right to prohibit future obstructions or interference in the airspace, and the right of ingress/egress onto the property to exercise the rights acquired by the airport sponsor, in this case, the City of Fort Worth. A typical example is the removal of trees, or partial removal of trees, that may penetrate designated Part 77 approach and departure surfaces. However, this easement is not limited to tree or plant growth. The avigation easement prevents current or future property owners from erecting anything, such as a radio or cell phone towers, buildings, etc., that penetrates Part 77 surfaces. The avigation easement also prevents the current or future property owners from creating any electrical interference or lighting that may adversely impact normal airport operations. The avigation easement is recorded on the deed to the property and runs in perpetuity in the name of the City of Fort Worth. The avigation easement option is available to all 264 properties in the Rivers Edge subdivision and 30 properties in the Woodland Springs neighborhood. This document describes the procedures necessary for the implementation of the avigation easement option. II. PROCEDURES 1 . The City of Fort Worth will select an appraiser from their certified list of appraisers to perform a market analysis to determine one lump-sum payment to be paid for an avigation easement over any eligible property. Appraisal guidance of an avigation easement is provided at FAA AC 150/5100-17, Section 2.2.9. 2. The appraiser will attempt to identify real estate sales from the subject neighborhoods that have sold with recorded avigation easements on the deeds to the property. Page 6 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures 3. The appraiser will also identify real estate sales from the subject neighborhoods that have sold without recorded avigation easements on the deeds to the property. 4. This data will form the basis of the appraiser's market analysis which will determine a lump-sum payment for an avigation easement. 5. The City of Fort Worth will select another appraiser from their certified list of appraisers to perform a review of the appraiser's market analysis. 6. Any items of disagreement or discrepancies in the market analysis must be agreed upon and finalized between the appraiser and the review appraiser to determine the approved lump-sum payment for an avigation easement. This will represent the final market analysis. 7. The final market analysis will be submitted to THC for review prior to submittal to the City of Fort Worth. 8. If there are any questions or items for clarification, THC will consult with both appraisers to resolve these questions. 9. THC will submit the final market analysis to the City of Fort Worth for final approval. 10. Once all parties agree with the final market analysis, THC will publish the lump- sum amount for all eligible property owner's information. 11 . If a homeowner selects the avigation easement option, THC will proceed with securing the option to sell the avigation easement. 12. THC will direct a title attorney to prepare a title examination to identify all rightful owners of the subject property. 13. THC will meet with the homeowner(s) to discuss the program and initiate participation. 14. Homeowner signs a participation agreement. Signing this agreement requires the homeowner to grant an avigation easement to the City of Fort Worth. 15. If applicable, THC will communicate with the homeowner's lender to obtain lender's consent to the avigation easement. 16. The avigation easement will be held in escrow until lender's consent is received. Page 7 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures 17. THC will forward the signed avigation easement and lender consent to the City of Fort Worth and request the lump-sum check for payment. 18. The City of Fort Worth will send the check to the homeowner for the avigation easement via US mail or direct deposit. 19. The City of Fort Worth records the avigation easement and the lender consent(s), at the County courthouse. 20. Either the City of Fort Worth or the title company will issue a 1099S form, if warranted, depending on the amount of the avigation easement. Page 8 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures SECTION 4. PURCHASE ASSURANCE Page 9 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures PURCHASE ASSURANCE I. DESCRIPTION The airport operator may have to purchase the property and resell it while retaining an avigation easement. Under Purchase Assurance, a property that fails to sell within a specified time is purchased by the airport operator and then resold for continued residential use. The airport operator purchases the property at the appraised market value "as is" subject to airport noise. II. PROCEDURES 1. THC will direct a title attorney to prepare a title examination to identify all rightful owners of the subject property. 2. THC meets with the homeowner to discuss the program and initiate participation. 3. Homeowner signs a participation agreement. Signing this agreement requires the homeowner to grant an avigation easement to the City of Fort Worth. 4. Homeowners select an appraiser from the City of Fort Worth's approved appraiser list. 5. THC meets with the appraiser and homeowners to explain the Purchase Assurance Program to the appraiser. Appraisal is to be performed "as is" with no avigation easement in place on the subject property. 6. Appraiser completes the appraisal of the subject property. 7. Homeowner provides a copy of the appraisal to THC. 8. THC has the appraisal reviewed by another approved appraiser from the City of Fort Worth's approved appraisers list. The review appraisal is necessary because the City of Fort Worth must acquire the property outright if it does not sell within the listing term. Thus, it is imperative for the homeowners and the City of Fort Worth to agree on the fair market value of the subject property. 9. Any items of disagreement or discrepancies in the appraisal must be agreed upon and finalized between the appraiser and the review appraiser to determine the approved fair market value of the subject property. Page 10 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures 10. Homeowners select a licensed Realtor to list the property for the agreed upon appraised amount. 11 . Homeowner provides THC with a copy of a signed listing agreement with their Realtor. 12. THC meets with the homeowner and their Realtor to explain the Purchase Assurance Program. The listing must disclose upon sale of the property, the City of Fort Worth will retain an avigation easement on the title of the property. 13. Homeowner, Realtor and THC agree to the typical days on market for the specific neighborhood. 14. Typical "days on market" times a multiplier of 3 becomes the term of the listing agreement. 15. Homeowner, Realtor and THC agree to the average sales-to-list-price ratio for the specific neighborhood. 16. The homeowner must accept any offer presented by the Realtor that is equal to, or greater than, the agreed upon sales-to-list-price ratio. 17. Homeowner pays their share of the Realtor's commission (typically half). 18. Homeowner pays the closing costs on their sale of their property (typically 100% unless the purchaser is securing a mortgage). 19. If the homeowner sells their property for 100% or greater than the listed price, the City of Fort Worth will pay the homeowner (seller) the value of the avigation easement in exchange for the avigation easement. This amount will be determined by a market analysis performed by an independent appraiser and reviewed by another independent appraiser. Both appraisers will be selected by the City of Fort Worth from their certified approved appraiser list. 20. THC will forward the signed avigation easement to the City of Fort Worth and request the lump-sum check for payment. 21 . The City of Fort Worth will send the check to the homeowner for the avigation easement via US mail or direct deposit. 22. The City of Fort Worth records the avigation easement at the County courthouse. Page 11 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures 23. Either the City of Fort Worth or the title company will issue a 1099S form, if warranted, depending on the amount of the avigation easement. 24. City of Fort Worth must purchase the subject property if no offers are received equal to, or greater than, the average sales-to-list-price ratio, after the listing term expires. 25. If the subject property did not sell within the listing term, there is no commission due to the Realtor. 26. If the subject property is owned by an absentee-owner (landlord), and is occupied by tenants, and if the City must purchase the property, the tenants are considered displaced and eligible for relocation benefits as described in the Uniform Relocation Act of 1970, as amended. 27. The homeowner pays the closing costs on the sale of the subject property. 28. The City of Fort Worth takes possession of the subject property. 29. The City of Fort Worth directs THC to proceed with acoustical treatment of the subject property prior to listing it for sale. 30. THC acoustically treats the subject property. 31 . THC meets with a licensed Realtor to determine a fair list price for the property. 32. Realtor lists the property for sale and presents all offers to THC for consideration. 33. THC presents any reasonable offer to a City of Fort Worth representative for City Council approval. 34. Contract to sell is agreed to between purchaser and THC, based on the Realtor's presented offer, as approved by the City of Fort Worth. 35. City of Fort Worth will pay the Realtor's commission (a percentage orwhole) based on current real estate market conditions. 36. City of Fort Worth pays closing costs on the sale of the subject property but does not pay any closing costs associated with a purchaser obtaining financing. Purchaser is responsible for any closing costs associated with obtaining a mortgage. Page 12 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures 111. EXAMPLES Scenario 1 - House appraises for $100,000. The agreed upon average sales-to-list-price ratio is 95%. Therefore, any offer presented by the Realtor of $95,000 or greater MUST be accepted by the homeowners. The homeowners pay their share of the Realtor's commission (typically half of the commission). The full commission is typically 6% of the sales price, so the homeowner would be responsible for 3% of the Realtor's commission. The homeowner pays the closing costs on the sale of the subject property (all closing costs except any costs associated with the purchaser obtaining financing). Closing costs, without financing costs for a purchaser, are typically around 3% of the sales price. Summary of Scenario 1: • Purchaser pays seller (our homeowner and program participant)$95,000. • Homeowner pays 3% of Realtor's commission, or$2,850. • Purchaser pays remaining 3% of Realtor's commission, or$2,850. • Homeowner pays closing costs at$2,850. • Purchaser pays any closing costs associated with their financing needs. • City of Fort Worth has no expenses yet retains an avigation easement on the property. Scenario 2 - The homeowners are not required to accept any offer under the agreed upon sales-to-list-price ratio. If no offers are presented equal to, or greater than, the average sales-to-list-price ratio (95% in this example), and the listing term expires, the City of Fort Worth MUST purchase the subject property for 100% of the appraisal amount (listed price). The City of Fort Worth retains the avigation easement. The seller (our participating homeowner) pays the closing costs associated with the sale. Closing costs, without financing costs for a purchaser, are typically around 3% of the sales price. No Realtor's commission is owed. Summary of Scenario 2: • City of Fort Worth pays seller (our homeowner and program participant) $100,000. • No Realtor's commission is owed since the property did not sell during the listing term. • Homeowner pays closing costs at $2,850. • City of Fort Worth pays to have the subject property acoustically treated. • City of Fort Worth lists the house for sale with a Realtor. • Realtor sells the house, and the City of Fort Worth receives the sales price, hopefully recouping the amount paid to the homeowner($100,000 in this example). • City of Fort Worth pays a percentage, or the whole amount, of the Realtor's commission based on current real estate market conditions. Page 13 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures • Purchaser pays remaining percentage of Realtor's commission if current real estate market conditions mandate a split commission. • City of Fort Worth pays closing costs. • Purchaser pays any closing costs associated with their financing needs. • City of Fort Worth retains an avigation easement on the property. Scenario 3 - The homeowner receives an offer equal to, or greater than, 100% of the listed fair market value. The City of Fort Worth pays the homeowner the lump-sum avigation easement amount in exchange for the avigation easement over the property. The homeowner pays their share of the Realtor's commission (typically half of the commission). The full commission is typically 6% of the sales price, so the homeowner would be responsible for 3% of the Realtor's commission. The homeowner pays the closing costs on the sale of the subject property (all closing costs except any costs associated with the purchaser obtaining financing). Closing costs, without financing costs for a purchaser, are typically around 3% of the sales price. Summary of Scenario 3: • Purchaser pays seller (our homeowner and program participant)$105,000. • City of Fort Worth pays the homeowner the established lump-sum amount for an avigation easement. • Homeowner pays 3% of Realtor's commission, or$3,150. • Purchaser pays remaining 3% of Realtor's commission, or$3,150. • Homeowner pays closing costs at$3,150. • Purchaser pays any closing costs associated with their financing needs. • City of Fort Worth retains an avigation easement on the property. Page 14 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures SECTION 5. SALES ASSURANCE Page 15 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures SALES ASSURANCE I. DESCRIPTION The airport operator may have to participate in the sale of the property, but not acquire it outright, and receive an avigation easement in exchange for its participation. Under sales assurance, the appraised market value of the homeowner's residence is guaranteed on a timely market sale; however, the airport does not acquire the property. Should the property sell for less than the appraised value, the selling owner is compensated for the shortfall by the airport operator based on a sliding scale. Property is appraised at its current market value "as is" subject to airport noise. The property is listed and sold subject to the airport's avigation easement that is conveyed to the airport operator at the sale of the property. II. PROCEDURES 1. THC will direct a title attorney to prepare a title examination to identify all rightful owners of the subject property. 2. THC meets with the homeowner to discuss the program and initiate participation. 3. Homeowner signs a participation agreement. Signing this agreement requires the homeowner to grant an avigation easement to the City of Fort Worth. 4. If applicable, THC will communicate with the homeowner's lender to obtain lender's consent to the avigation easement. 5. The avigation easement will be held in escrow until lender's consent is received. 6. Homeowner selects an appraiser from the City of Fort Worth's approved appraiser list. 7. THC meets with the appraiser and homeowners to explain the Sales Assurance Program to the appraiser. Appraisal is to be performed "as is" with no avigation easement in place on the subject property. 8. Appraiser completes the appraisal of the subject property. 9. Homeowner provides a copy of the appraisal to THC. Page 16 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures 10. A review appraisal is not necessary since there is no option for the City of Fort Worth to purchase the subject property under the Sales Assurance option. 11 . Homeowners select a licensed Realtor to list the property for the appraised amount. 12. Homeowner provides THC with a copy of a signed listing agreement with their Realtor. 13. THC meets with the homeowner and their Realtor to explain the Sales Assurance Program. The listing must disclose upon sale of the property, the City of Fort Worth will retain an avigation easement on the title of the property. 14. Homeowner, Realtor and THC agree to the typical days on market based on listing term of Realtor's contract (typically 90 days). 15. If the homeowner sells their property for 100% or greater than the listed price, the City of Fort Worth will pay the homeowner (seller) the value of the avigation easement in exchange for the avigation easement. This amount will be determined by a market analysis performed by an independent appraiser and reviewed by another independent appraiser. Both appraisers will be selected by the City of Fort Worth from their certified approved appraiser list. 16. THC will forward the signed avigation easement to the City of Fort Worth and request the lump-sum check for payment. 17. The City of Fort Worth will send the check to the homeowner for the avigation easement via US mail or direct deposit. 18. The City of Fort Worth records the avigation easement at the County courthouse. 19. Either the City of Fort Worth or the title company will issue a 1099S form, if warranted, depending on the amount of the avigation easement. 20. If the homeowner receives an offer that is 95% or more of the appraised amount of the subject property, the City of Fort Worth will pay 100% of the difference between the appraised amount and the offer amount. 21 . If the homeowner receives an offer that is equal to 90% to 94.99% of the appraised amount of the subject property, the City of Fort Worth will pay 75% of the difference between the appraised amount and the offer amount. Page 17 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures 22. If the homeowner receives an offer that is equal to 80% to 89.99% of the appraised amount of the subject property, the City of Fort Worth will pay 50% of the difference between the appraised amount and the offer amount. 23. In either of these Sales Assurance options, the City of Fort Worth will issue the appropriate check to THC in the name of the homeowner. THC will attend the closing and deliver the check to the homeowner, or homeowners closing attorney. 24. If the homeowner receives an offer that is less than 80% of the appraised amount of the subject property, the City of Fort Worth will only pay the homeowner's share of the Realtor's commission, which is typically 3% of the sales price of the property. 25. Homeowner pays their share of the Realtors commission (typically half, or 3% of the sales price) if the subject property sells for 80% or more of the appraised amount. 26. Homeowner pays the closing costs on their sale of their property (typically 3% of the sales price unless the purchaser is securing a mortgage). 27. The City of Fort Worth records the avigation easement at the County courthouse. 111. EXAMPLES Scenario 1 - House appraises for $100,000. The Realtor lists the subject property for $100,000. The Realtor presents the homeowner with an offer to purchase of $95,000. If the homeowner accepts the offer, then the City of Fort Worth would pay the homeowner the balance amount, which is $5,000 in this example. The homeowners pay their share of the Realtor's commission (typically half of the commission). The full commission is typically 6% of the sales price, so the homeowner would be responsible for 3% of the Realtor's commission. The homeowner pays the closing costs on the sale of the subject property (all closing costs except any costs associated with the purchaser obtaining financing). Closing costs, without financing costs for a purchaser, are typically around 3% of the sales price. Summary of Scenario 1: • Subject Property is appraised for and listed for$100,000. • Purchaser pays seller (our homeowner and program participant)$95,000. • City of Fort Worth pays homeowner$5,000. • Total amount received by the homeowner for the sale of the subject property is $100,000, or 100% of the appraised amount. Page 18 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures • Homeowner pays 3% of Realtor's commission, or$2,850. • Purchaser pays remaining 3% of Realtor's commission, or$2,850. • Homeowner pays closing costs at$2,850. • Purchaser pays any closing costs associated with their financing needs. • City of Fort Worth retains an avigation easement on the property. Scenario 2 - House appraises for $100,000. The Realtor lists the subject property for $100,000. The Realtor presents the homeowner with an offer to purchase of $90,000. If the homeowner accepts the offer, then the City of Fort Worth would pay the homeowner 75% of the difference between the appraised amount ($100,000) and the offer amount ($90,000), or $7,500 ($10,000 x 75%). The homeowners pay their share of the Realtor's commission (typically half of the commission). The full commission is typically 6% of the sales price, so the homeowner would be responsible for 3% of the Realtor's commission. The homeowner pays the closing costs on the sale of the subject property (all closing costs except any costs associated with the purchaser obtaining financing). Closing costs, without financing costs for a purchaser, are typically around 3% of the sales price. Summary of Scenario 2: • Subject Property is appraised for and listed for$100,000. • Purchaser pays seller (our homeowner and program participant)$90,000. • City of Fort Worth pays homeowner $7,500 (75% of the difference between the appraised amount and the offer amount). • Total amount received by the homeowner for the sale of the subject property is $97,500 ($90,000 + $7,500). • Homeowner pays 3% of Realtor's commission, or$2,700. • Purchaser pays remaining 3% of Realtor's commission, or$2,700. • Homeowner pays closing costs at$2,700. • Purchaser pays any closing costs associated with their financing needs. • City of Fort Worth retains an avigation easement on the property. Scenario 3 - House appraises for $100,000. The Realtor lists the subject property for $100,000. The Realtor presents the homeowner with an offer to purchase of $85,000. If the homeowner accepts the offer, then the City of Fort Worth would pay the homeowner 50% of the difference between the appraised amount ($100,000) and the offer amount ($85,000), or $7,500 ($15,000 x 50%). The homeowners pay their share of the Realtor's commission (typically half of the commission). The full commission is typically 6% of the sales price, so the homeowner would be responsible for 3% of the Realtor's commission. The homeowner pays the closing costs on the sale of the subject property (all closing costs except any costs associated with the purchaser obtaining financing). Closing costs, without financing costs for a purchaser, are typically around 3% of the sales price. Page 19 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures Summary of Scenario 3: • Subject Property is appraised for and listed for$100,000. • Purchaser pays seller (our homeowner and program participant)$85,000. • City of Fort Worth pays homeowner $7,500 (50% of the difference between the appraised amount and the offer amount). • Total amount received by the homeowner for the sale of the subject property is $92,500 ($85,000 + $7,500). • Homeowner pays 3% of Realtor's commission, or$2,550. • Purchaser pays remaining 3% of Realtor's commission, or$2,550. • Homeowner pays closing costs at $2,550. • Purchaser pays any closing costs associated with their financing needs. • City of Fort Worth retains an avigation easement on the property. Scenario 4 - House appraises for $100,000. The Realtor lists the subject property for $100,000. The Realtor presents the homeowner with an offer to purchase of $79,000. If the homeowner accepts the offer, then the City of Fort Worth is not required to pay any additional compensation relative to the appraised amount of the subject property because the offer amount is less than 80% of the appraised amount of the subject property. Although this scenario is unlikely, it typically proves that the appraisal amount was excessive. The City of Fort Worth will pay the seller's share of the Realtor's commission (typically half of the commission, or 3% of the sales price). The purchaser pays the remaining 3% of the Realtor's commission. The homeowner pays the closing costs on the sale of the subject property (all closing costs except any costs associated with the purchaser obtaining financing). Closing costs, without financing costs for a purchaser, are typically around 3% of the sales price. Summary of Scenario 4: • Subject Property is appraised for and listed for$100,000. • Purchaser pays seller (our homeowner and program participant)$79,000. • City of Fort Worth pays nothing to the homeowner because the accepted offer is less than 80% of the appraised amount of the subject property. • Total amount received by the homeowner for the sale of the subject property is $79,000. • City of Fort Worth pays 3% of Realtor's commission, or$2,370. • Purchaser pays remaining 3% of Realtor's commission, or$2,370. • Homeowner pays closing costs at$2,370. • Purchaser pays any closing costs associated with their financing needs. • City of Fort Worth retains an avigation easement on the property. Page 20 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures Scenario 5 - The homeowner receives an offer equal to, or greater than, 100% of the listed fair market value. The City of Fort Worth pays the homeowner the lump-sum avigation easement amount in exchange for the avigation easement over the property. The homeowner pays their share of the Realtor's commission (typically half of the commission). The full commission is typically 6% of the sales price, so the homeowner would be responsible for 3% of the Realtor's commission. The homeowner pays the closing costs on the sale of the subject property (all closing costs except any costs associated with the purchaser obtaining financing). Closing costs, without financing costs for a purchaser, are typically around 3% of the sales price. Summary of Scenario 5: • Purchaser pays seller (our homeowner and program participant)$105,000. • City of Fort Worth pays the homeowner the established lump-sum amount for an avigation easement. • Homeowner pays 3% of Realtor's commission, or$3,150. • Purchaser pays remaining 3% of Realtor's commission, or$3,150. • Homeowner pays closing costs at$3,150. • Purchaser pays any closing costs associated with their financing needs. • City of Fort Worth retains an avigation easement on the property. Page 21 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures SECTION 6. TRANSACTION ASSISTANCE Page 22 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures TRANSACTION ASSISTANCE I. DESCRIPTION The airport operator is only responsible for paying the Realtor's sales commission if the house sells under this option. Transaction assistance generally involves an agreement by the airport operator to pay certain costs associated with the sale of residential property. Allowable costs are generally limited to the real estate sales commission. The property is listed and sold subject to the airport's avigation easement that is conveyed to the airport operator at the sale of the property. II. PROCEDURES 1. THC will direct a title attorney to prepare a title examination to identify all rightful owners of the subject property. 2. THC meets with the homeowner to discuss the program and initiate participation. 3. Homeowner signs a participation agreement. Signing this agreement requires the homeowner to grant an avigation easement to the City of Fort Worth. 4. There is no requirement for an appraisal or review appraisal under this option. 5. Homeowners select a licensed Realtor to list the property for an amount agreed to between the homeowner and the Realtor. 6. Homeowner provides THC with a copy of a signed listing agreement with their Realtor. 7. THC meets with the homeowner and their Realtor to explain the Transaction Assistance Program. The listing must disclose the presence of an avigation easement, owned by the City of Fort Worth, on the title of the property. 8. Homeowner, Realtor and THC agree to the typical days on market based on listing term of Realtor's contract (typically 90 days). 9. If the homeowner receives and accepts an offer to acquire the subject property, the City of Fort Worth will pay 100% of the Realtor's commission. 10. The City of Fort Worth will issue the appropriate check to THC in the name of the homeowner. THC will attend the closing and deliver the check to the Realtor. Page 23 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures 11 . Although highly unlikely, if the homeowner does not accept an offer to sell the subject property, the City of Fort Worth is not responsible for any costs associated with the Transaction Assistance option. 12. If the subject property does not sell, the City of Fort Worth should consider allowing the homeowner to participate in the Avigation Easement Purchase option. 13. If the homeowner participates in the Avigation Easement Purchase option, they will receive the established lump-sum avigation easement compensation amount. 14. THC will forward the signed avigation easement and lender consent to the City of Fort Worth and request the lump-sum check for payment. 15. The City of Fort Worth will send the check to the homeowner for the avigation easement via US mail or direct deposit. 16. The City of Fort Worth records the avigation easement at the County courthouse. 17. Either the City of Fort Worth or the title company will issue a 1099S form, if warranted, depending on the amount of the avigation easement. 111. EXAMPLES Scenario 1 - The Realtor lists the subject property for$100,000. The Realtor presents the homeowner with an offer to purchase the subject property for$100,000 (under this option it can be any amount). If the homeowner accepts the offer, then the City of Fort Worth would pay 100% of the Realtor's commission, or $6,000. The full commission is typically 6% of the sales price. The homeowner pays the closing costs on the sale of thesubject property (all closing costs except any costs associated with the purchaserobtaining financing), or $3,000. Closing costs, without financing costs for a purchaser, are typically around 3% of the sales price. Summary of Scenario 1: • Subject Property is listed for$100,000. • Homeowner accepts an offer to sell the subject property for$100,000. • City of Fort Worth pays 100% of Realtor's commission, or$6,000. • Homeowner pays closing costs at$3,000. • Purchaser pays any closing costs associated with their financing needs. • City of Fort Worth retains an avigation easement on the property. Page 24 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures Scenario 2 - The Realtor lists the subject property for $100,000. The homeowner accepts no offers from the Realtor to sell the subject property during the listing term. The City of Fort Worth allows the homeowner to participate in the Avigation Easement Purchase option. The homeowner accepts the established payment for the avigation easement. The City of Fort Worth retains an avigation easement on the property. Summary of Scenario 2: • Subject Property is listed for$100,000. • Homeowner accepts no offers to sell the subject property. • City of Fort Worth has no expenses under this scenario. • City of Fort Worth allows the homeowner to participate in the avigation easement program if they so choose. • City of Fort Worth pays the established lump-sum avigation easement amount to the homeowner. • City of Fort Worth retains an avigation easement on the property. Page 25 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures SECTION 7. SOUND INSULATION OF NON= COMPATIBLE S TRUC TURES Page 26 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures SOUND INSULATION OF NON-COMPATIBLE STRUCTUES I. ACOUSTICAL TESTING PROCESS A. ACOUSTICAL TESTING TO DETERMINE ELIGIBILITY Appendix R of the "Airport Improvement Program (AIP) Handbook, FAA Order 5100.38D, requires airports to develop an Acoustical Test Plan for the Federal Aviation Administration (FAA) to review prior to commencing acoustical testing for the determination of eligibility to participate in a Noise Mitigation Program. The AFW Noise Mitigation Program is a result of the West Side Air Cargo Development Project approved by the FAA in October 2018. The Record of Decision (ROD) from the FAA approved mitigation program that included, among multiple options, the sound insulation of noncompatible structures. The ROD approved noise mitigation for all 264 properties in the Rivers Edge Subdivision. As of October 1 , 2015, any new properties entering construction in a mitigation program must meet the "2-tier" eligibility criteria, as outlined in FAA Order 5100.38D, "Airport Improvement Program (AIP) Handbook, Appendix R, Noise Compatibility Planning/Projects", Change 1 , dated February 26, 2019. The eligibility criteria state that: 1) Properties must be located within an approved 65 DNL NEM contour; and 2) Properties must have an average interior DNL value of 45 dB or greater. The DNL 45 standard has been adopted by the FAA for interior noise. This is based on 46 Federal Register 8316 (January 26, 1981), which established the interim rule for 14 CFR Part 150 and included specific requirements regarding interior noise level. This was further clarified in 1992 by the Federal Interagency Committee on Noise (FICON) findings of DNL 45 to be the interior noise level that will accommodate indoor conversations or sleep. Pursuant to the AIP Handbook, residential units with interior noise levels that are less than DNL 45 dB are compatible and not eligible for sound insulation treatments. The acoustical consultant will conduct pre-construction acoustical testing for all habitable rooms within a specific residential unit to determine the measured existing interior DNL (dB) noise level. Habitable rooms are, by definition, considered to be living rooms, dining rooms, family rooms, bedrooms, offices, kitchens and dens. Page 27 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures Non-habitable rooms include bathrooms, foyers, laundry rooms, garages, hallways and rooms that may not meet local building codes. All noise measurements will be conducted in accordance with the procedures set forth by ASTM E966-10. Measurements will be taken using an artificial noise source to determine the noise level reduction (NLR) in decibels (dB) which will then be used to identify the types of acoustical treatments necessary to meet the program and FAA goals. The eligibility criteria expressed in 5100.38D applies to all properties in the Rivers Edge Subdivision and, as such, the properties are subjected to the eligibility testing requirements defined in the Acoustical Test Plan prepared by Landrum & Brown, dated November 12, 2020. The initial testing phase begins with a windshield property survey in which the neighborhood is characterized by identifying the housing types, level of noise exposure (i.e., location within the noise contour) and address, and also describing the acoustical issues, number of residences to be tested, the testing criteria and testing methodology. The windshield property survey for all 264 single-family residences in the Rivers Edge Subdivision was conducted on November 2, 2020, by representatives of Landrum & Brown and THC, Inc. The property information collected consisted of: • Type of building • Exterior construction • Number of levels • Roof styles • Presence of unusual openings; and • Other factors that could impact the acoustical testing. The Rivers Edge Subdivision consists of 264 one- and two-story single-family residences, built between about 2007 and 2013. The property survey revealed that approximately 166 homes are one-story and 98 are two-story homes. Further, 64 one-story homes and29 two-story homes are outside the 65 DNL, while 102 one-story homes and 69 two-story homes are inside the 65 DNL. Homes are generally wood-frame construction with brick and/or stone exterior on the first floor. Second floor is a combination of brick, stone and wood siding, likely of Hardie Board construction. The roof construction is a typical pitched roof with attic space and presumably some level of insulation. With one exception, the windows were generally aluminum windows, likely dual-glazed, in excellent condition. Page 28 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures The property survey revealed five (5) building styles, as follows: • Building Style A: 1-story with flush front facade (98 homes). • Building Style B: 1-story with setback front facade (68 homes). • Building Style C: 2-story with full 2nd floor and windows over garage (58 homes). • Building Style D: 2-story with partial 2nd floor (24 homes). • Building Style E: 2-story with full 2nd floor and no windows over garage (16 homes). In accordance with the Acoustical Test plan developed for the Fort Worth Alliance Airport (AFW) Noise Mitigation Program, acoustical testing for eligibility was undertaken on roughly 10%, or a minimum of two (2), of each building style and location. A total of 37 units were tested, which represented the aforementioned 10%, with testing conducted in all habitable rooms having an exterior element. Per the AIP Handbook, habitable rooms are defined as living, sleeping, eating or cooking areas. This would include living rooms, family rooms, dining rooms, bedrooms, kitchens and offices. Bathrooms, closets, halls, vestibules, foyers, stairways, unfinished basements, garages, storage and utility spaces are not considered to be habitable space. In addition, spaces not allowed under local building codes are not considered habitable. The exterior noise levels are based on the results of the year 2025 proposed project. This information is calculated (modeled) and are based on using data from the most recent set of modeled DNL noise contours (long-term average noise levels). The 65 DNL noise contours for this project run through the Rivers Edge Subdivision. For properties located inside of the 65 DNL noise contour, a DNL of 70 dB was used as the exterior DNL for the calculation of interior DNL levels. This represents the higher end of the 65 to 70 DNL noise contours in which the properties are located. For properties located outside of the 65 DNL noise contour, a DNL of 65 dB was used as the exterior DNL for the calculation of interior DNL levels. This represents the higher end of the 60 to 65 DNL noise contours in which the properties are located. Properties that have average interior DNL noise levels equal to, or greater than, 45 dBA would be considered noise impacted. In any calculation using interior DNL, the interior DNL value will be rounded up. For example, an interior DNL of 44.5, or above, will be rounded up to 45. The final determination of eligibility is based on the following: • If more than 50% of the properties in any one category test eligible, then all properties in that category are eligible. Page 29 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures • If less than 50% of the properties in any one category test eligible, then all properties in that category will have to be tested for eligibility. B. ACOUSTICAL TESTING INITIAL RESULTS Acoustical testing was completed at 37 homes, consisting of five (5) separate categories and two (2) separate noise levels (DNL 65 and DNL 70) during the period of February 8 through February 20, 2021 . A total of 24 properties were tested inside the 65 DNL (65- 70) noise contours. The average interior DNL for all 24 residences ranged from 48 to 52 DNL. The eligibility by building category for the properties inside the 65 DNL noise contour is as follows: • Building Category A: 7 out of 7 properties tested eligible (100%) — all 67 properties in the category are eligible for treatment • Building Category B: 5 out of 5 properties tested eligible (100%) — all 35 properties in the category are eligible for treatment. • Building Category C: 5 out of 5 properties tested eligible (100%) — all 43 properties in the category are eligible for treatment. • Building Category D: 3 out of 3 properties tested eligible (100%) — all 16 properties in the category are eligible for treatment. • Building Category E: 4 out of 4 properties tested eligible (100%) — all 10 properties in the category are eligible for treatment. A total of 13 properties were tested outside the 65 DNL (<65) noise contours. The average DNL for all 13 residences ranged from 43 to 46 DNL. The eligibility by building category for the properties outside the 65 DNL noise contour is as follows: • Building Category A: 1 out of 3 properties tested eligible (33%) — 2 properties tested are not eligible and the remaining 28 properties in the category require additional testing. • Building Category B: 1 out of 3 properties tested eligible (33%) — 2 properties tested are not eligible and the remaining 30 properties in the category require additional testing. • Building Category C: 2 out of 3 properties tested eligible (67%) — all 15 properties in the category are eligible for treatment. • Building Category D: Neither of the 2 properties tested eligible (0%)—remaining 6 properties require additional testing. • Building Category E: 2 out of 2 properties tested eligible (100%) — all 6 properties in the category are eligible for treatment. Page 30 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures A summary of property eligibility for properties in the Rivers Edge Subdivision follows: • 194 properties would be eligible for noise mitigation treatments as the average interior DNL levels in the properties tested would be at 45 dB or above in a minimum of 50% of the buildings tested in each category. • 6 properties would not be eligible for noise mitigation treatments as the average interior DNL levels in the properties tested would be below 45 dB in less than 50% of the buildings tested in each category. • 64 properties would require additional testing before eligibility for noise mitigation treatments can be verified as the average interior DNL levels in the properties tested would be below 45 dB in less than 50% of the buildings tested in each category. For additional details, reference the Program Eligibility Report— Fort Worth Alliance Airport Noise Mitigation Program prepared by Landrum & Brown, dated March 2021 . Page 31 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures II. IMPLEMENTATION PROCESS The Acoustical Treatment Consultant (ATC) will utilize a design-bid-build approach in the daily implementation of the Noise Mitigation Program (NMP). A significant advantage of the design-bid-build approach is that the qualified general contractors become participating team members. In a traditional sound insulation program, the consultant and qualified general contractors are contracted as separate entities with the program sponsor. While the ATC is typically responsible for providing overall program management, including general administration, homeowner liaison, public communication, design and construction management services, the general contractor is independently responsible for providing all construction services consistent with Federal, State and local codes and regulations. In the City of Fort Worth design-bid-build approach, all qualified general contractors are subcontracted directly to THC, Inc., a member of the ATC team. In addition to performing typical program management tasks, THC will also be responsible for the direct management of all general contractors to include qualification, training, contracting, daily construction management oversight and payments. The design-bid-build process will insure a higher degree of quality control and cost efficiency. The NMP will follow the procedures outlined in this Policies & Procedures Manual to qualify local General Contractors interested in program participation. Within the design-bid-build implementation process, a Single Parcel Bidding Method (SPM) will be utilized, whereby each home will represent an independent construction contract. Each month, several new contracts (homes) will be assigned to a Monthly Bid Cycle. The SPM is specifically designed to provide maximum attention to participating homeowners, ensuring superior quality, homeowner satisfaction, contractor success and program cost efficiencies. The utilization of manageable contract sizes within each Monthly Bid Cycle guarantees a greater opportunity for local and minority contractors to participate and increases participation in the Disadvantaged Business Enterprise (DBE) and Minority/Women Business Enterprise (M/WBE) Programs. The NMP is projected to have twelve (12) individual Monthly Bid Cycles for each calendar year. Each Monthly Bid Cycle will consist of a seven (7) month period which includes all the essential program processes, including homeowner orientation, house inspection visit, design visit, design development, design review, pre-bid, bid/award, pre- construction, construction and close-out activities. The ATC will determine the number of homes that will be assigned to each of the twelve (12) Monthly Bid Cycles. The following is an illustration of a typical seven (7) month Monthly Bid Cycle: Page 32 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures 7-MONTH PROCESS MONTHLY BID CYCLE Homeowner Orientation MONTH 1 • House Inspection Visit • Design Visit • Design Development MONTH 2 • General Contractor Interview Night • Design Review Meeting • Design Document Finalization MONTH 3 • Pre-Bid Open House • Final Measurement Visit MONTH 4 • Bid Opening • Bid Review • Contract Award MONTH 5 • Contractor Notice to Proceed • GC Permitting and Preparation • Product Procurement • Product Inventory and Verification • Pre-Construction Visit • Release of Product to General Contractor MONTHS 6-7 • 30-day Construction Period • Punch List Inspection • Final Completion Inspection • Homeowner Exit Survey • Warranty Package Distribution Page 33 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures III. ORGANIZATION AND STAFFING The City of Fort Worth will apply a design-bid-build implementation process for the NMP. An extensive management team of experienced personnel will be assembled to successfully implement the program. The City has retained an On-Call Engineering firm (Jacobs) who will subcontract the acoustical testing activities to Landrum & Brown and acoustical consulting and construction activities to THC, Inc. THC will manage and implement the program as an extension of Jacobs and City staff. The ATC team will consist of a Program Manager, Construction Manager, Financial Analyst, Administrative Assistant, Procurement/Inventory Manager, Homeowner Agents, Construction Inspectors, Warehouse Coordinator, Architectural Team Lead, Design Technicians and Acoustical Consultants. Based on the design-bid-build implementation approach, all qualified General Contractors will also become integral members of the project team. An organization chart is illustrated below showing the various members of the implementation team. The following list details the roles and responsibilities of each member of the ATC Team. Page 34 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures A. ORGANIZATION CHART City of Fort Worth Noise Mitigation Program (NMP) City of Fort Worth Aviation Department Jacobs Engineering Architectural Prime Consultant Designs Landrum&Brown THC, Inc. Acoustic Consultant [Acoustical Treatment Consultant Eligibility Homeowner Construction Testing Liaison Management Design Product Contractor Outreach Consultation Procurement &Training Pre-and Post- Construction Construction Construction Testing Inspections Page 35 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures B. ACOUSTICAL TREATMENT CONSULTANT STAFFING Program Manager Responsibilities: ■ Serves as client liaison. ■ Ensures contract compliance with FAA, State and City of Fort Worth regulations and established Policies and Procedures. ■ Develops annual design and construction schedules to include all program activities. ■ Develops program budget and monitors expenditures. ■ Identifies and assigns program participants in accordance with the established prioritization process. ■ Coordinates bid process, including evaluation, award recommendation and issuance of contracts. ■ Conducts meetings with homeowners and contractors. ■ Facilitates General Contractor Interview Night with homeowners. ■ Develops sub-consultant tasks and timetables. ■ Effectively communicates project goals to project team. ■ Coaches, mentors and motivates staff and contractors. ■ Communicates with City and Airport officials and homeowners. ■ Reviews and signs legal documents (Work Agreement, Avigation Easement and Construction Contract). ■ Reviews and approves sub-consultant invoices. ■ Submits monthly status reports to client. ■ Assists with preparation of FAA Weekly Reports,Quarterly Reports, Annual Reports and Grant Close-Out Reports, as needed. Construction Manager Responsibilities: ■ Develops construction policies,specifications, program contractor and construction compliance standards. ■ Develops and maintains contractor outreach program. ■ Manages contractor qualification and training. ■ Manages construction inspectors, procurement manager and warehouse staff. ■ Serves as liaison between architect and contractor. ■ Conducts House Inspection Visits. ■ Prepares Pre-Existing Deficiency Reports. ■ Acts as representative in administering construction. ■ Conducts weekly construction progress meetings with staff. ■ Conducts monthly construction meetings with contractors. ■ Provides direction on construction inspection process. ■ Visits homes under construction to ensure compliance with intent of sound insulation treatment scope of work. ■ Prepares reports on progress, costs,schedule and quality of work by contractors. ■ Assists in the development of field change process, if warranted. ■ Develops program implementation and parcel status mapping. ■ Develops product showroom and provides for additional displays. ■ Communicates program changes with product manufacturers. ■ Processes General Contractor payments. Page 36 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures Financial Analyst Responsibilities: ■ Reviews individual contractor Requests for Payment. ■ Prepares bi-monthly construction pay applications to Jacobs for processing by City(contractor payments and manufacturer invoices). ■ Prepares pay application templates per bid cycle for product data entry by procurement manager. ■ Reviews contractor certified payrolls for compliance with wage rates and assists in resolution of errors. ■ Distributes checks to contractors. ■ Prepares "Contractor's Affidavit of Release of Liens" and "Contractor's Affidavit of Payment of Debts and Claims" forms for contractors (per individual home)and manufacturers (per Bid Cycle). ■ Prepares spreadsheets required to obtain Payment and Performance bonding per bid cycle. ■ Requests payment and performance bonds from Texas licensed bond agent. ■ Records bids at monthly bid opening, prepares Bid Tabulation and cost comparisons. ■ Prepares construction /product cost data spreadsheets for use by contractors in obtaining building permits. ■ Tracks information on faulty products for billing and back-charge. ■ Prepares construction contracts. ■ Updates Change Order tracking spreadsheet, as needed. ■ Prepares miscellaneous cost data, as needed. ■ Serves as backup Homeowner Agent, if needed. Administrative Assistant Responsibilities: . Maintains a record of all homeowner eligibility calls. ■ Coordinates worker applications for Pinkerton background checks. ■ Manages the program security badge process. ■ Provides receptionist services, answers telephone, directs calls, takes messages and provides information to homeowners. ■ Prepares routine correspondence. ■ Monitors contractor insurance and licensing status to ensure renewals are current and complete. ■ Receives, sorts, date stamps and distributes mail. ■ Takes inventory of office supplies and prepares purchase orders. ■ Re-programs the office telephone system to reflect changes in personnel and general office messages, as required. ■ Ensures routine maintenance of office equipment and ordering of supplies for said equipment. ■ Acts as office manager, coordinating the needs of staff and ensuring the smooth operation of the office. ■ Purchases supplies and refreshments for program meetings. ■ Provides staff support for all evening meetings with homeowners. ■ Assists in the coordination of program activities. ■ Assists Construction Manager with preparation of Change Orders. ■ Coordinates and distributes all program schedules (House Inspection, Design Visit, Design Review and Pre-Bid Open House). ■ Tracks exit survey responses from AFW participants. ■ Assists homeowners in product showroom. Page 37 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures Procurement/Inventory Manager Responsibilities: ■ Reviews each Scope of Work to ensure product will meet installation requirements and needs of project specifications. ■ Conducts home product measurement visits. ■ Compiles measurement and Contractor Product Detail Sheets. ■ Compiles and processes product bid packages (various vendors)per Bid Cycle. ■ Places and tracks product orders. ■ Enters bid information into Parcel Payment sheets. ■ Develops and enters information into Material and Inventory Database. ■ Maintains continuous communication with product vendors. ■ Assists vendors in resolving issues relating to product, shipping, deliveries, warranties, etc. ■ Assists contractors with product installation issues. ■ Coordinates repairs of damaged product. ■ Assists in product receiving process and contractor loading. ■ Coordinates with Financial Analyst for vendor payment process. ■ Oversees warehouse operation. Homeowner Agents Responsibilities: ■ Serves as homeowner representative. ■ Coordinates activities with eligible participants. ■ Assists in Homeowner Orientation Session. ■ Attends House Inspection Visit. ■ Attends the Design Visit. ■ Obtains title commitments. ■ Coordinates with title company to resolve curative issues and assists with Power of Attorney provisions. ■ Coordinates with homeowner mortgage companies to secure Consents to Avigation Easement and Subordination of Mortgage. ■ Assists homeowners at General Contractor Interview Night. ■ Coordinates Pre-Existing Deficiency Reports and legal releases. ■ Assists homeowners with product selections in showroom. ■ Participates in Design Review Meeting with homeowners. ■ Prepares and presents legal documents to homeowners. ■ Prepares and distributes bid package documents at Pre-Bid Open House appointment. ■ Obtains homeowner signatures or architect on scope of work revisions. ■ Coordinates Pre-Bid Open House Session. ■ Facilitates Pre-Construction meetings with homeowners and contractors. ■ Communicates with construction inspectors during construction. ■ Handles all communications with homeowners and responds to questions. ■ Maintains parcel file information. ■ Prepares and delivers warranty packages to homeowners following Final Completion. Page 38 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures Construction Inspectors Responsibilities: ■ Assists Procurement Manager at Measurement Visit. ■ Reviews acoustical scope of work documents for each assigned home. ■ Attends Pre-Construction Meeting. ■ Visits job sites several times daily to inspect installations and construction activities. ■ Prepares daily inspection reports. ■ Assists general contractors with installation issues and provides clarification regarding scope of work. ■ Ensures that contractor is meeting schedule requirements. ■ Communicates with homeowners during construction phase. ■ Provides supporting documentation for field change orders, if needed. ■ Ensures that work and installations meet program specifications. ■ Compiles inspection punch list. ■ Attends weekly construction team meetings. ■ Performs final inspection. ■ Executes Final Certificate of Completion. Warehouse Coordinator Responsibilities: ■ Receives and unloads product(certified forklift operator). ■ Processes product into inventory. ■ Conducts thorough product inspection. ■ Processes delivery documentation. ■ Maintains inventory database. ■ Organizes and stages warehouse. ■ Coordinates release of product to contractors. ■ Maintains pick-up documentation. ■ Assists in resolving shipping issues with vendors. ■ Performs minor repairs of damaged product. ■ Assists in loading product for contractors. ■ Contacts contractors regarding replacement or backordered material. ■ Oversees warehouse maintenance Architectural Team Lead Responsibilities: ■ Develops and modifies construction and technical specifications. ■ Provides assistance in developing design process. ■ Assists in development of architect's estimate for bid process. ■ Oversees preparation of design plans and scopes of work. Page 39 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures Design Technicians Responsibilities: • Conducts Design Visit at each eligible home. ■ Prepares designs and Final Scope of Work document. ■ Conducts Design Review with homeowners. ■ Provides alternative solutions/options to homeowners regarding aesthetics/function. ■ Provides construction cost estimates for bids. ■ Prepares addenda to bids and specifications. ■ Assists in contractor training. Acoustical Consultant Responsibilities: ■ Develops acoustical test plan. ■ Performs eligibility testing. ■ Develops acoustical design strategies. ■ Communicates with the FAA for coordination and approval of test results. ■ Conducts pre-and post-construction testing. ■ Analyzes and reports noise test results. IV. SECURITY BACKGROUND CHECKS As a condition of performing work on a Fort Worth Noise Mitigation Program worksite, all persons seeking authorization to enter a program home, as consultants, general contractors and subcontractors of any tier ("Worker Participants"), will be required to complete the following Worker Participation Process to assure the safety of citizens participating in the NMP. A. SUBMISSION OF APPLICATION FORM All Worker Participants will be required to submit a completed Application, containing specific information to assist in the Background Review process and assessment of their character, criminal history, general reputation and personal characteristics. The Worker Participant completing the Application will be required to certify that facts contained in this application are true and complete to the best of their knowledge and that they understand, falsified statements on this application shall be grounds for dismissal from the NMP, or denial of their application to participate in the NMP. Page 40 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures B. BACKGROUND REVIEW All Worker Participants are required to consent to a Background Review covering information about each worker's character, criminal history, general reputation and personal characteristics. A report will be compiled by a third-party agency, utilizing information from criminal record repositories, departments of motor vehicles, past or present employers, educational institutions, government occupational licensing or registration entities, business or personal references and any source required to verify information that the applicant has voluntarily supplied. For construction contractors and their employees, we perform a criminal background check (Federal, state and local counties), sex offender list, and E-verify. Upon receipt of the Background Review report from the third-party agency, THC executive staff will conduct a review of all report findings and determine whether the individual will be allowed to participate in the NMP. If the Worker Participant's Background Review includes any convictions, whether felony or misdemeanor, (includingdeferred adjudication and pleas of nolo contendere) which involve serious drug offenses,sex crimes, violent crimes or evidence that the Worker Participant is not lawfully authorized to work in the United States, they will automatically be denied participation inthe NMP. The Worker Participant's Authorization for Background Review and Release shall be effective for so long as they are a Worker Participant on any NMP worksite, and THC reserves the right to conduct additional background checks at any time it is deemed necessary for the safety of Program Participants. C. ETHICS AND EXPECTATION TRAINING SESSION THC will conduct an Ethics and Expectation Training Session for all Worker Participants. Attendance at this training session is mandatory and must be completed before beginning work on an NMP worksite. The training will cover THC expectations of workers with regard to homeowner communication, guidelines for authorized property entry andappropriate worker behavior while at the NMP worksite. This training session will also cover actions by a Worker Participant which will constitute grounds for removal or termination of a Worker Participant from participation in the NMP, including allegations oftheft, drug use, alcohol use, violent behavior, inappropriate sexual behavior, or unauthorized NMP worksite entry of any kind. THC reserves the right to require Worker Participants repeat the Ethics and Worker Expectation Training at any time it deems suchaction necessary for the safety of Program Participants. Page 41 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures D. ISSUANCE OF SECURITY I.D. BADGE Upon completion of the Background Review, the Ethics and Expectation Training Session and issuance of THC approval, the Worker Participant will be issued an NMP Security Badge which will be required for entry to any NMP worksite and shall be clearly displayed at all times while a Worker Participant is on site. Any individuals not in possession of an NMP Security Badge shall not be admitted to the NMP worksite. V. OFFICE, SHOWROOM AND WAREHOUSE The ATC will establish a program office where program activities will be conducted. The office will include a presentation room where homeowners will attend Orientation Session and General Contractor Interview Night. The office space will include a product showroom which will be built to display all products approved for use in the AFW program.The product showroom will be beneficial to the homeowners when making their selectionsof product styles and colors. Ideally, the office / showroom will have an attachedwarehouse where products will arrive and be inventoried by ATC staff prior to being disseminated to contractors. The ATC will: 1 . Locate sufficient office space and separate area for the product showroom. 2. Develop showroom layout and plans. 3. Procure all selected showroom products. 4. Secure and construct required showroom displays and modifications. 5. Label and inventory all displayed products. 6. Include space for public information meetings and workshops. 7. Provide attached warehouse facilities for the receipt and distribution of products. VI. DEVELOPMENT OF SOUND INSULATION PROGRAM The ATC will be responsible for implementing the City of Fort Worth Noise Mitigation Program. It will develop an annual design and construction schedule containing the following services that include Prioritization Methodology, Database Development, Acoustical Treatment, development of Construction Specification Manual and all required administrative support services. Page 42 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures A. PRIORITIZATION METHODOLOGY The following prioritization has been established for the homes that qualify for the Sound Insulation Option. • Priority 1 : Homes that were initially tested in February 2021 and qualify for Sound Insulation. • Priority 2: Homes whose owners volunteered for acoustical testing in February 2021 but were considered "alternates" because their home's category was already filled for testing. • Priority 3: Homes inside the 65 DNL noise contour (beginning with the street closest to the end of the runway and working outward). • Priority 4: Homes outside the 65 DNL noise contour (beginning with the street closest to the end of the runway and working outward). B. DATABASE MANAGEMENT The ATC will develop a database management system to manage and maintain the data generated from the Noise Mitigation Program. This database will include, at a minimum, information from the following data files: 1 . Homeowner Information 2. Acoustical Test Data Tracking 3. Homeowner Option Selection and Tracking 4. Prioritization Data for Sound Insulation 5. Homeowner Schedule for Sound Insulation (assigned bid cycle, orientation, house inspection visit, design visit, design development, design review, product procurement, pre-construction, construction start, daily construction reports, punch list and final completion) 6. Design Documents and Cost Estimate Records 7. Acoustic Design Scope of Work (CAD drawings and window schedules) 8. Avigation Easement Signature and Conveyance 9. Work Agreement Documents 10. Bid Opening Spreadsheet and Recommendation forAward 11 . Construction Changes, Field Directives and Extensions 12. Contractor Eligibility Information and Program Activity History 13. Pre- and Post-Construction Testing Data 14. Contractor Payment Processing 15. Homeowner Exit Survey Responses Page 43 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures C. ACOUSTICAL TREATMENTS The ATC will design effective home acoustical treatment modification strategies that not only meet the minimum overall acoustic reduction of five (5) decibels and post- modification maximum interior noise measurement of 45 DNL, but also the individual needs of the homeowner. These needs include product style and color choices, architectural aesthetics, product quality, and a "homeowner friendly" design and construction process. The ATC will customize the acoustical treatment recommendations to meet the unique architectural characteristics and aesthetic sensitivities found in each home. The acoustical treatment recommendations should be nonexclusively applied to all homes. The design specifications that are developed with these priorities will maximize homeowner satisfaction. All typically recommended acoustical treatments should be evaluated for each home relative to its acoustical benefit, program cost benefit and impact on homeowner satisfaction. The sound insulation treatment package will be developed utilizing the following product strategies: • Aluminum acoustic replacement windows • Vinyl acoustic replacement windows • Window styles including double-hung, slider, fixed and Window Treatments: casement. • Interior glazing panels(if required) • Exterior aluminum acoustic storm windows,if warranted • Solo acoustic replacement prime door(steel)(storm-less) • Non-acoustic prime doors(steel and fiberglass(with storm door) • Exterior acoustic aluminum storm doors Door Treatments: 0Aluminum or vinyl replacement patio doors(sliders) • Aluminum or vinyl replacement French doors All as available Attic Insulation Treatment: 0 Cellulose dense-packed insulation strategies(if applicable) • Ductwork modifications(if required) • Electrical upgrade(if required) Air Conditioning Modifications: • Ductless AC unit(if required) Page 44 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures D. CONSTRUCTION SPECIFICATIONS MANUAL A Construction Specifications Manual will be assembled and provided to each qualified General Contractor for use throughout the program. At a minimum, the general specifications manual will include the following: 1 . "Front-end"specifications 2. General conditions 3. Technical construction specifications 4. Architectural details 5. Sample program forms and templates 6. Specification attachments (i.e., certification lists, approved products, etc.). 7. Program policy statements. E. HOMEOWNER OUTREACH, ORIENTATION AND HANDBOOK The ATC will develop a Homeowner Handbook and Homeowner Orientation Session presentation to fully explain the seven-month participation timeline, so homeowners know what to expect during the entire process. The handbook and presentation will explain the responsibilities of the ATC, the homeowners and the contractors. They will also explain the processes and procedures and contain contact numbers for the ATC. Approximately one (1) month prior to a scheduled Homeowner Orientation Session, an invitation letter will be sent to the homeowners assigned to a Bid Cycle, utilizing the established Prioritization Methodology, with a request to confirm attendance. The mailing will also contain a Notice of Participating Property for the homeowner to return at the Orientation Session. A reminder phone call will be placed to each homeowner to enhance participation in the AFW program. The ATC shall keep track of attendance and participation. At the Homeowner Orientation Session, homeowners will view a PowerPoint Presentation and be provided with a handbook and complete overview of the program, including: an explanation of consultant team organization; a summary of the mitigation goals; a description of the acoustical treatment modifications; a description of program rules, procedures, and processes; program monthly bid cycle timetables (design and construction); as well as homeowner requirements and responsibilities. Homeowners will have an opportunity to have all general questions answered and, if interested in proceeding to the next step in the process, to sign up for the House Inspection Visit. Page 45 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures VII. CONTRACTOR OUTREACH, QUALIFICATION AND TRAINING The Single Parcel Bidding Method (SPM) is designed to maximize the participation of local general contractors and subcontractors. The Contractor Outreach Program is a process whereby the ATC will seek local contractors in the Metropolitan Dallas/Fort Worth area who may be interested in participating in the Noise Mitigation Program. The Contractor Outreach process is designed to lead General Contractors to qualification and inclusion in the implementation team. The Contractor Outreach process will be an ongoing service throughout the life of the program. The Sound Insulation consultant will develop a contractor outreach brochure and presentation materials and develop outreach advertisements in local newspapers, trade publications and with local builders' associations to reach contractors. In the Contractor Outreach meetings, the ATC will provide a complete summary of all contractor requirements and expectations to include: • general contractor qualification • design and construction process review • contractor performance • contractor meetings • contractor commitment • DBE participation • program paperwork • training sessions (paperwork and installation) The City of Fort Worth Noise Mitigation Program will be implemented as a "design-bid- build" project, whereby the ATC will be responsible to the City of Fort Worth for all management tasks, including general contractor qualification. General Contractors must first be qualified by the ATC before participating in the program as part of the implementation team. The number of qualified General Contractors may vary throughout the program. To participate in the program, interested General Contractors must be registered with the local permitting authority, if required. Page 46 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures A. CONTRACTOR EVALUATION To be selected for participation, General Contractors will be evaluated based on the following qualification criteria: 1. Experience Evaluation -residential or similar type construction experience -primary area of company's experience -residential insulation experience -painting experience -stucco/masonry experience -claims and/or litigation evaluation -credit report evaluation -local office facility and staffing -local warehouse/workshop facility -on-line internet access -current professional affiliation references -past customer references -current job site inspection 2. Capacity Evaluation Once a General Contractor has completed the Experience Evaluation identified in Step One above, the ATC will determine and assign a Monthly Bid Award Limit based on the following criteria: • insurance limits • crew size • number of available subcontractors in each required trade This award limit is designed to maximize contractor success, while preventing the potential of a General Contractor being awarded more work than it can complete within the thirty (30) day construction period. The ATC will establish a Monthly Bid Award Limit for each qualified General Contractor utilizing a calculation based on thirty-five percent (35%) of parcels assigned to a monthly Bid Cycle. The ATC will continue to monitor and evaluate General Contractor performance and make adjustments to each individual contractor's monthly award limit. The evaluation and adjustment will be based on overall performance, crew capacity, execution of work plan and homeowner satisfaction. Page 47 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures B. CONTRACTOR TRAINING The ATC will provide necessary training to the selected General Contractors in an effort to ensure their program success. This training process will be divided into a series of training sessions conducted at the Acoustical Treatment Consultant's office, as follows: ► Review of program processes -schedules -paperwork -technical specifications -homeowner selection of contractor process -bidding process -performance requirements -design documents -product procurement -construction management -payment process ► Product Installation Training -product demonstrations -window and doors -attic insulation -attic access panels C. ISSUANCE OF PHOTO ID BADGE All General Contractors and workers will be required to pass a security background investigation conducted by Pinkerton Consulting and Investigations. All personnel will execute the required forms to initiate the process. Pinkerton will conduct the investigations based upon the information provided by the workers and will provide follow-up reports within ten (10) days. THC executive staff will review the reports to determine acceptability for participation in the program. Upon completion of the above steps, the ATC will process the photo ID badge. D. CONTRACTOR PARTICIPATION AGREEMENT At the conclusion of the above contractor training, General Contractors will receive final qualification and will be required to sign the Contractor Participation Agreement before they will be allowed to officially participate in the NMP. Page 48 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures The ATC will perform the above contractor qualification process before the start of each program phase and/or as needed to ensure that additional contractors can be added to the team throughout the life of the project. All General Contractors must be qualified to establish their eligibility and inclusion on the ATC team. Once a contractor becomes qualified via the above qualification process, that contractor will become a subconsultant to the ATC and be included on the ATC team. However, this qualification will not assure a contractor receives any work assignments. The ATC will maintain the list of qualified General Contractors. In each Bid Cycle, participating homeowners will select three (3) General Contractors (from the list of qualified General Contractors) to submit bid proposals for the work assigned to their home. The ATC will evaluate each bid proposal and award the work assignment based upon the lowest, responsible bid proposal. Therefore, work assignments will be awarded based upon a competitive bid process to contractors who have been qualified as eligible for the program and who are members of the ATC team. E. TIMING OF GENERAL CONTRACTOR QUALIFICATION Due to the administrative time and effort required by the ATC to conduct General Contractor Outreach Sessions, review and assess General Contractor applications, conduct site evaluations, contact references, and conduct numerous General Contractor training sessions, the above General Contractor Qualification Process will occur on a one- time basis prior to the beginning of each individual AFW Phase. This process will also provide continuity to the contractor selection process (homeowner's selection of three (3) qualified General Contractors to bid), providing assurance that the list of qualified General Contractors remains consistent within each AFW Phase. Depending on future levels of funding, the number of Monthly Bid Cycles and the number of parcels assigned to future AFW Phases, the ATC will have the authority to increase the rate at which the General Contractor Qualification Process is conducted (per AFW Phase) to a two-time basis, one occurring prior to the beginning of an AFW Phase and one occurring at the halfway point of an AFW Phase. VIII. DESIGN PROCESS A. HOUSE INSPECTION VISIT Before the design process can officially begin, the ATC will conduct a House Inspection Visit at each participating home to identify pre-existing deficiencies that may negatively impact the addition of acoustical treatments. Typical pre-existing deficiencies may include: Page 49 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures 1 . Structural issues 2. Moisture and mold issues 3. Building and safety code issues 4. Health and safety issues Due to Federal limitations, program funds cannot be used to correct pre-existing deficiencies. Homeowners will be required to assume all associated responsibility and liability for their pre-existing deficiencies before becoming eligible to participate in the program. The ATC will retain sole discretion and authority in the identification and classification of all observed pre-existing deficiencies. If identified, pre-existing deficiencies will be recorded on the Pre-Existing Deficiency Report. The report will describe the nature of the deficiency and whether corrective action is needed. A homeowner's participation can resume once the ATC has inspected and approved the pre-existing deficiency corrections. B. DESIGN VISIT Once the House Inspection Visit process has been successfully completed, the Homeowner Agent will schedule the Design Visit with the homeowner. The Design Visit will serve as the "fact finding" mission that assists the ATC in developing the most effective acoustical treatment design package for each home. The Design Visit will include: 1 . A Computer Aided Design (CAD) layout and measurements. 2. Evaluation of the existing window and door conditions. 3. Evaluation of existing attic insulation. 4. Identifying the existence of any window or through-wall A/C units. The Design Visit will be conducted by the Architectural Team Leader, Design Technicians, and a Homeowner Agent. In rare cases, a mechanical/electrical consultantmay need to attend the Design Visit. The ATC will perform the Design Visit and compile all necessary information required to develop the final acoustic design package based onthe design and measurement data collected. Page 50 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures C. DESIGN PACKAGE DEVELOPMENT Based upon the information gathered during the Design Visit, an acoustical treatment design package will be created. This package will include a summary of all window and door modifications necessary to treat the home within FAA guidelines. If required, the package may include attic insulation, attic access sealing and mechanical modifications. D. GENERAL CONTRACTOR INTERVIEW NIGHT AND SELECTION One evening each month, a General Contractor Interview Night will be held to enable the homeowners to meet their prospective General Contractors. This event provides homeowners with the opportunity to meet and interview the qualified General Contractors and to review Contractor Notebooks and qualifications. Homeowners will receive brochures which provide specific information about each of the General Contractors. This session also provides another opportunity for homeowners to speak with the ATC staff, ask program-related and product-related questions and visit the Product Showroom. The homeowner will select three (3) qualified General Contractors from the list of qualified contractors supplied by the ATC. This selection of contractors by the homeowners is disclosed during the Design Review Meeting. Due to Federal bidding laws, the ATC and the City of Fort Worth cannot assist homeowners in the contractor selection process in any way. E. DESIGN REVIEW MEETING WITH HOMEOWNERS The Design Team and Homeowner Agent will meet with each homeowner at a Design Review Meeting. The Design Team will present and review the home's unique Acoustical Treatment Design Package with the homeowner. During the design review process, each homeowner will have a final opportunity to select product styles and colors at the Product Showroom as well as make final paint and stain color selections, if applicable. If necessary, homeowners will have a final opportunity to adjust their assigned bid and construction cycle, depending on any special scheduling needs and/or circumstances. Page 51 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures F. AVIGATION EASMENT AND WORK AGREEMENT After review and acceptance of their design package, homeowners are required to sign the Work Agreement and the Avigation Easement. If required, homeowners will sign program waivers and/or the Addenda to Work Agreement: The ATC will manage the recording of the executed avigation easements and provide same to the City of Fort Worth. G. BID PACKAGE DEVELOPMENT The Design Team will finalize development of the Scope of Work documents and prepare an Architect's Estimate on each home's Acoustic Treatment Design Package. A copy of the finalized Scope of Work documents will be provided to the homeowner. The ATC will also prepare three (3) Bid Packages for each home. Each Bid Package will contain the bid documents containing the Business Equity Utilization Form, Business Equity Division Good Faith Effort Form, Joint Venture Eligibility Form and Prime Contractor Waiver Form. Instructions for the completion of the forms are included. IX. BID AND AWARD PROCESS A. PRE-BID OPEN HOUSE A Pre-Bid Open House will be scheduled by the Homeowner Agent at a date and time selected by the homeowner (from the pre-designated dates for the Bid Cycle). The Program Manager will contact the General Contractors selected by the homeowners to notify them of the Pre-Bid Open House appointment. The Pre-Bid Open House will provide the opportunity for the selected General Contractors and their subcontractors and suppliers, if required, to view the home before preparing their final bids. Contractors will visit the homes for which they have been selected to bid; sign in and pick up their bid packages containing bidding documents. The ATC will track the schedule of all open houses. General Contractors will prepare their bid proposals for submittal to the ATC for review on the date of the Bid Opening. Page 52 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures B. BID OPENING AND CONTRACT AWARD The ATC shall conduct a Bid Opening for all homes included within a Bid Cycle. Participants in the Bid Opening will record each contractor's bid on a Bid Opening Summary. Following the bid opening, the results will be tabulated and a Tabulation of Bids — As Read will be distributed to all bidders and representatives of Jacobs and the City of Fort Worth. The ATC will conduct a review of the bid results of the selected contractors. The review shall include communication with each low bidder whose bid is twenty percent (20%) or more below the Architect's Estimate to determine if all labor and incidental materials were included. General Contractors who advise the ATC of a bid error can withdraw their bid without penalty. Current workload, scheduling and capability of the successful contractors will be examined and verified by the ATC. The ATC shall collect from all low, responsive bidders, a Letter of Intent, if applicable, signed by subcontractors who will be working on each individual home. Once all documentation is received, the ATC shall forward to the City of Fort Worth a Bid Award Recommendation letter, a Tabulation of Bids - As Recommended, the bid documents as submitted by the contractors being recommended for award, the original copies of the DBE documentation, and any other documentation in support of the recommendation. Upon concurrence in award and authorization from the City of Fort Worth, the ATC will prepare and submit a Bid Tabulation - As Awarded to all General Contractors and notify all successful bidders of their contract awards. The ATC will prepare a Construction Contract for each home in the Bid Cycle which the successful General Contractor will be required to execute. Once all necessary signatures are obtained, the ATC will issue a fully executed contract to the contractor which provides authorization to order incidental products or materials. C. HOMEOWNER NOTIFICATION OF AWARD The ATC will notify the homeowner of the General Contractor receiving the contract award to work on their home. Page 53 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures X. CONSTRUCTION PROCESS A. PRODUCT PROCUREMENT The ATC will visit all homes within a Bid Cycle during the Pre-Bid Open House appointments. The Procurement Manager and the Construction Inspector assigned to the home will take final measurements of all specialty products, such as windows and doors. The Procurement Manager shall seek competitive bids from program manufacturers, if applicable. Product bids will be reviewed and awarded to the vendor providing the lowest, responsible bid. The ATC will be responsible for the procurement process, which includes delivery from the manufacturers, warehouse storage, inspection,sorting and distribution of all specialty window and door products. B. PRE-CONSTRUCTION ACTIVITIES Approximately three (3) weeks prior to the Pre-Construction Visit period, the Financial Analyst will send reminders to all General Contractors awarded work in the Bid Cycle regarding the necessity to obtain building permits and begin developing construction schedules. General Contractors are required to provide the ATC with a copy of the permit and their construction schedule one (1) week prior to the Pre-Construction Visit period. The Financial Analyst will prepare the necessary Work on Hand documentation for submittal to the bonding company and order the Payment and Performance Bonds for the Bid Cycle. Upon issuance of the Payment and Performance Bonds, the ATC will transmit the originals to the City of Fort Worth. C. PRE-CONSTRUCTION VISIT Once all products for the home have been received at the warehouse and verified as correct, the Homeowner Agent will schedule a Pre-Construction Visit with the homeowner, the General Contractor and the Construction Inspector assigned to the home. The General Contractor is required to submit the construction schedule to the ATC one (1) week prior to the Pre-Construction Visit. The Construction Manager will review the construction schedule to determine feasibility of proposed workflow. Page 54 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures At the Pre-Construction Visit, the Homeowner Agent, the Construction Inspector, and the General Contractor will meet with the homeowner at their home to review all aspects of the pending construction. The Pre-Construction Visit will give the homeowner the opportunity to ask any final questions prior to the start of construction. The Pre- Construction Visit must be scheduled a minimum of three (3) days prior to the start of construction to give the homeowner sufficient time to remove window coverings and move furniture. The General Contractor shall develop a construction schedule which illustrates uninterrupted construction activity through completion of the home. The General Contractor will present the homeowner, Homeowner Agent, and the Construction Inspector with the final construction schedule. The General Contractor will have the flexibility to determine the scheduling of awarded work within the established thirty (30) calendar day construction period for the Bid Cycle. A lockbox supplied by the General Contractor will be placed on the home. The lockbox is required to remain on the home from the Pre-Construction Visit until the Final Inspection Visit. The homeowner will be required to provide a home key for the lockbox. The key to the lockbox will remain in the possession of the General Contractor's superintendent. Access to the lockbox cannot be shared with anyone. Upon notification from the ATC that products have arrived and have been inventoried, contractor will pick up and sign for all products for the home (at the ATC's warehouse). D. CONSTRUCTION PROCESS AND OVERSIGHT The General Contractor will begin construction, consistent with the construction schedule presented to all parties during the Pre-Construction Visit. Contractors are required to complete all work awarded in a single bid cycle within the thirty (30) calendar day construction period associated with the specific bid cycle. Once work begins on a home, continuous activity must be maintained until all work on the home is completed. Contractors are not allowed to remove more windows or doors than they can reasonably replace during that same workday. Construction work hours are defined as Monday through Friday, beginning no earlier than 8 AM, with site clean-up and removal of debris completed by 5 PM. Throughout the term of construction, ATC Construction Inspectors will monitor construction progress on a daily basis ensuring compliance with all program work rules and confirming that correct materials are being properly installed. Inspectors will prepare a daily inspection report for each site visit, documenting the construction activity, Page 55 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures status and key observations, including photo documentation. Inspection reports and other construction-related documentation will be made available to the Program Manager, Construction Manager and Homeowner Agent. Inspectors will also assist contractors by trouble-shooting questions in the field, investigating claims and initiating documentation for any Field Directives or Change Orders, if required. All construction personnel, as well as all ATC personnel, are required to wear photo identification security badges issued by the ATC. E. PUNCH LIST INSPECTION When the General Contractor has verified the work is substantially complete, the Contractor will request that the Construction Inspector perform a Punch List Inspection. The Construction Inspector shall conduct a comprehensive punch list inspection at the home to verify construction status and confirm compliance with the Construction Specifications and Scope of Work documents. The Construction Inspector will provide a punch list to the General Contractor which outlines any work that needs to be completed. A copy of the punch list will be included in the Inspector's daily inspection report. The General Contractor must complete any listed work prior to requesting a final inspection. All punch list work must be completed within two (2) calendar days. F. FINAL INSPECTION Following the General Contractor's completion of all items identified on the punch list, the Contractor will request a Final Inspection. The Construction Inspector will verify completion of all work and issue a Certificate of Final Completion. G. WARRANTY PACKAGE AND HOMEOWNER EXIT SURVEY Upon completion of the construction process, the Homeowner Agent will provide the homeowner with a warranty package containing a one-year workmanship warranty from the general contractor and manufacturer's warranties for all installed products. A Homeowner Exit Survey will also be included for the homeowner to express theirindividual experience with all aspects of the program. A self-addressed, stamped envelope will accompany the exit survey for the homeowner's ease in returning said form.The ATC will compile the surveys for a monthly summary and review by the City of Fort Worth and project team. Page 56 of 57 City of Fort Worth Alliance Airport Noise Mitigation Program Policies and Procedures H. CONTRACTOR PAYMENT PROCESS The General Contractor will be provided one (1) payment (representing 100% of their construction contract) upon successful Final Inspection and approval by the Construction Manager. To ensure timely payment to small, local general contractors, THC will invoice Jacobs twice monthly for all work completed within the same period of time for reimbursement by City of Fort Worth. Page 57 of 57 Compensation Jacobs ATTACHMENT B COMPENSATION The cost amount for Modification No. 3 is $13,668,220.35 (Lump Sum Fee of$5,036,117.59 for professional services, plus Reimbursable Expenses of$8,632,102.76). The generation of the estimated costs for Construction for Sound Installation of Residential Properties (Section 4.0), Sales Assurance (Section 5.2), Transaction Assistance (Section 5.3), and Purchase of Avigation Easements (Section 5.4) utilized historical bid data from similar sound insulation programs considering the current local housing market conditions and average percentage rates for the option selections from participating homeowners. As such, the estimated cost amount is to be considered a "variable" amount given it will be continually adjusted following receipt and finalization of bids or firm pricing from subcontractors and suppliers along with the options selected by individual homeowners. Therefore,this estimated cost amount, shall not to be construed as a guarantee of the actual final cost of the work. CONSULTANT has no control over market conditions or the cost of construction/installation labor, materials and/or equipment. CONSULTANT shall submit at least twice a month, an invoice along with a summary of activities performed during the pay period and a progress schedule to the City of Fort Worth (the "City"). These submittals will be submitted on the first, and fifteenth of each month and will include all applicable invoices from subcontractors, equipment vendors, material suppliers, realtor fees as well as the associated conditional lien releases through and including the current requested payment to CONSULTANT. The attached fee tables reflect the rates to be used for invoicing purposes. The City shall make bi- monthly progress payments within fourteen (14) days after receipt of each properly submitted and accurate invoice Estimated Amount 1. The estimated amount set forth in the attached pricing breakdown will be adjusted following receipt and finalization of price proposals from pre-qualified subcontractors and vendors. The estimated variable amount is based on the judgment and experience of CONSULTANT estimators but is not to be construed as a guarantee of the actual cost. 2. Given the nature of this work, it is the CONSULTANT's objective to contract directly with THC who has been previously prequalified by CONSULTANT. THC will solicit bids from a prequalified poolof specialty contractors andthe lowest responsible, responsive bid willform the basis of final pricing. 3. In the event the actual cost is less than the estimated amount,the savings may be assigned to other portions of the project. If the actual cost is more than the estimated variable amount,a request shall be submitted to have the contract value increased to cover any shortfall. In the event the actual cost is more than the estimated variable amount, CONSULTANT shall have no obligation to perform any work until the City increases the contract value to cover the shortfall. Date: 09/21/21 Fort Worth Alliance Airport Fee Proposal for Noise Mitigation Program -Phase 2 Jacobs $ 2,170,636.07 THC $ 11,479,175.79 Landrum &Brown $ 18,408.49 Total Fee Proposal 13,668,220.35 Noise Mitigation of Residential Homes Impacted by Westside Development Jacobs Fee Proposal Date:9/21/2021 JACOBS LABOR HOUR ESTIMATE Project Senior Project CADD Tech Project Task Manager Architect Architect Cordinator 1.0 Program Management I 1 \A/ rl, Dl.,DI.,.. 1.2 Monthly Status Report 32 32 1.3 Coordination Meetings 400 400 1.4 Program Budget 100 100 1.5 CAA (_runt�A.......... 1.6 Project Schedule 80 2.0 Homeowner Outreach and Orientation 2.1 Outreach for Rivers Edge Homeowners 200 7 2 fox Woodland Springs c 4-Inmennine rc 3.0 Initial Eligibility Testing-Rivers Edge Subdivision 9.4 Initial F=1 gihi1 tl Tnr•4in.. 3.2 Post Construction Noise Testing 80 60 4.0 Sound Insulation Program 4.1 Program Management 4.1.1 Program Budget 200 0 n 4I 2 Drn..ram Cnhn.JH n I '1(`ir 4n w. r Cnr.inn Chn'.'rARM nn.J\A/..rn hnir•n n 1 F\A/nrnhe--me nn.J Pre GluAt Invnnlnni MaRa eme4 4 4.1.6 Coordination Meetings 300 300 4.1.7 Program Records, Reports and Filing 200 n I O Cnniri4i r-ro-vcocmcp 44�Drn..IiA 4.1.11 Use of Approved Documents 120 n 4I 42 AVigat Gn Cnr•n w.n n4r• JACOBS LABOR HOUR ESTIMATE Project Senior Project CADD Tech Project Task Manager Architect Architect Cordinator 4.2 Design Services 4.2.1 Design Coordination and Permitting 120 120 480 A a )�nsne Atien\/isit 4.2.3 Design Visit 240 650 650 4.2.4 Acoustical Treatment Design Package Development 120 600 2000 3000 4.2.5 Homeowner Design Review Meeting 350 350 4.2.6 Bid Package Development 400 1500 1500 4.2.7 Pre-Bid Open House and Bidder Inquiries 0 800 4.2.8 Design Cost Estimating 0 800 4.2.9 Bid Opening, Bid Review and Contract Award 150 n 2 AMA meA,.,ner Ati{iAatiAn A A,.,ard 4.3 Construction Management Services 250 350 4.2.1 CAnn tri,Atien 9Antra Ater Q ,treaAh A 1 2 GopstruA ti An(`Antra Ater DartiAinatiAn A 2 2 Per{Arw;;RGe and Payment❑Anrfn 1 A Pre (`enstriAtiAn AAti.hies 4.2.5 Pre (`enstriAtiAn\/isits A 1 6 EmergenA 4.3.7 Punch List Inspection 350 A 1 4(`eer.Jina tien e{Te Ahni Aal Ins ne Ati9n and Testing 4..2.9 Genstruptien D spute NAanage e. A 1 1Q Preje At GIAse QA A 1 11 Warranty Repairs 5.0 Purchase Assurance/Sales Assurance/Transaction Assistance 5.1 Purchase Assurance-Allowance 80 5.2 Sales Assurance-Allowance 80 5.3 Transaction Assistance-Allowance 80 5.4 Purchase of Avigation Easements-Allowance 80 Total Hours 2472 1710 6930 5150 1442 Jacobs Fee Proposal Date: 9/21/2021 LABOR COST Salary Rate Hours Salary Cost Project Manager $ 93.76 2472 $ 231 ,774.72 Senior Architect $ 76.64 1710 $ 131 ,054.40 Project Architect $ 44.43 6930 $ 307,899.90 CADD Tech - TBD $ 41 .50 5150 $ 213,725.00 Project Coordinator $ 29.91 1442 $ 43,130.22 Salary Cost $ 927,584.24 Overhead Rate @ 111 .18% $ 1 ,031 ,288.16 Sub-Total $ 1 ,958,872.40 Fee @ 10.00% $ 195,887.24 Total Labor Cost $2,154,759.64 REIMBURSABLE EXPENSES Cost Amount Total Meals & Incidentals (per month) $ 200.00 16 $ 3,200.00 PPE $ 500.00 Mileage (.58 cents per mile x 40 miles $ 0.58 10000 $ 5,800.00 Reproduction/Presentation Materials $ 4,000.00 n/a $ 4,000.00 Recovery of Town Hall Venue Cost Venue Rental $ 2,376.44 1 $ 2,376.44 Total Reimbursables $ 15,876.44 TOTAL FEE $271707636.07 Noise Mitigation of Residential Homes Impacted by Westside Development THC Fee Proposal Date: 9/21-2021 LABOR HOUR ESTIMATE On-site Constructi Constructi Procureme Homeow Financial IT Admin Warehous Progra Principal Project on on nt/ Coordinat Assistan Task m Mana er Mana er Inspector Constructi ner Agent Analyst or t e Worker 1.0 Program Management 1.1 Work Plan 28 10 1.2 Monthly Status Report 28 1.3 Coordination Meetings 56 80 40 1.4 Program Budget 40 1.5 FAA Grant Management 8 8 1.6 Project Schedule 2.0 Homeowner Outreach and Orientation 2.1 Outreach for Rivers Edge Homeowners 20 80 80 40 40 2.2 Outreach for Woodland Springs Homeowners 20 40 40 20 40 3.01nitial Eligibility Testing-Rivers Edge Subdivision 3.1 Initial Eligibility Testing 3.2 Post Construction Noise Testing 4.0 Sound Insulation Program 4.1 Program Management 4.1.1 Program Budget 40 24 120 4.1.2 Program Schedule 40 16 120 4.1.3 Customer Service 400 600 140 140 444 220 40 4.1.4 Program Office/Showroom and Warehouse 40 40 4.1.5 Warehouse and Product Inventory Management 80 80 1200 2426 4.1.6 Coordination Meetings 140 160 120 80 100 80 40 4.1.7 Program Records,Reports and Filing 160 160 80 200 120 1860 4.1.8 Safety 40 40 4.1.9 Security Pinkerton Background Checks/Bad in 40 200 4.1.10 Best Practices 4.1.11 Use of Approved Documents 80 40 4.1.12 Avi ation Easements 40 80 200 120 40 4.2 Design Services 4.2.1 Design Coordination and Permitting 40 4.2.2 House Inspection Visit 112 112 112 4.2.3 Design Visit 20 200 200 4.2.4 Acoustical Treatment Design Package Development 40 4.2.5(a)Conduct General Contractor Interview Night 28 28 28 19 40 4.2.5(b)Homeowner Design Review Meeting 28 232 180 4.2.6 Bid Package Development 30 28 60 4.2.7 Pre-Bid Open House and Bidder Inquiries/Prod.Proc.Activities 40 112 112 112 40 20 4.2.8 Design Cost Estimating 28 4.2.9 Bid Opening,Bid Review and Contract Award 112 120 112 40 20 20 4.2.10 Homeowner Notification of Award 40 100 50 4.3 Construction Management Services 4.3.1 Construction Contractor Outreach 24 24 80 20 4.3.2 Construction Contractor Participation 24 24 80 80 28 4.3.3 Performance and Payment Bonds 12 24 100 4.3.4 Pre-Construction Activities 24 80 28 80 40 4.3.5 Pre-Construction Visits 24 100 28 100 50 4.3.6 Emergencies 4.3.7(a)Construction Activities 860 1000 164 40 20 4.3.7(b)Punch List Inspection 100 4.3.8 Coordination of Technical Inspection and Testing 25 50 25 66 4.3.9 Construction Dispute Management 4 25 4.3.10 Contr/Mfr.Inv/Lien Waivers/Payroll Com I/Permit Values/Closeout 40 30 940 4.3.11 Warranty Repairs 14 28 40 5.0 Purchase Assurance I Sales Assurance I Transaction Assistance 5.1 Purchase Assurance 40 24 20 20 5.2 Sales Assurance 40 24 20 20 5.3 Transaction Assistance(estimate of 15 homes) 600 24 400 200 50 5.4 Avi ation Easement Purchase estimate of 15 homes 300 24 200 100 Total Hours 2240 194 2426 2250 1920 1600 2426 2426 80 2426 2426 ONOC) C) 0 00 0 00 qqt N In O I- 000 O N O OLOLOC) — (0 M O 1-t O Nt OOO O 6 N — — OOMO 6 M 6 O 6 000 I O w m N M00000 m N — 0) qqt NOO N MI- MON � qqtM M N N 0) Ln (00 qqt O (O M 0) I-- I-- N 0) Ln Ul (0 Ul N 0) Ln (0 C, — — — ao (0 ao ao (0 (0 Cl 00 (0 M 0 LO 000 � � N N 0 co H co (n fA fA fA fA fA fA fA fA fA fA 66 fA fA fA fA fA 6c}6c}6c}6c} O U) O (0 O O O (0 (0 (0 (0 L 0NNtN0) (0NtNt0c0NtNt 0) 0) D = N N N N N N N MIl- NIl- Il- (0 (0LONtL o o O 000 LO (OMNNOOMg1tM O O O 000 LoLo — MM (0 (000 (06 M O ui 000 lnNtlnNtNtMMNNN 0) Ln 00 0000 N 0) N O (0NUl co I co Q' co co N y (n fA fA fA fA fA fA fA fA fA fA fA C fA fA fA O � U � � c O � i m � U a J 3 co N U) O In co In U) co In O U) C co U) � � U L Q L L c C L cco 0 0 C C E p L O O _ co co O L -a a O C fC L co co a) U) +' N N C •�—i +—p+ V! _ U) Q C U) Y �' L 3 Q N Co co c 0 U)U U�' Q O a) o a) U) a p p a) co O U) � U H co p L N CU .0 C C L — > L L d O O O U) N Q C U) U) p Q (� N N d U U E +L O 2H D L .fA C E c � N O LL Q�U) cocu LL — — — UC U) U) p O E E O O cu H�dO i i 0U) >U TOEU 0 H p O O O O O N O O O O O O O O O O O O O O O O O O O O O O O O O O O N OA O O O O O M O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M I,. O O O O N 4 O O O O O O O O O O O O O O O O O O O O O O O O O O O O 6 U) U) w U) U) N O O O O O w 0 0 U) 0 0 w 0 0 0 0 0 0 0 0 Ul 0 0 0 0 0 O I%. N N N M N O — I- r- N N 0 0 0 M M O U) 0 N N r- M M U) Mqqt 0 0 0 0 — T- I_ I` 00 O O) N N O r- r- q�i I` O I` r- N N I— N (O O O O O O a N N — N N C) O O co I* 1` 00 I fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA fA Q9,1 ff}Q9,r W- � M M M N -1 r-I r-I r-I r-I r-I r-I 000 r-I r-I r-I r-I r-I r-I -1 -1 -1 rn ON O O r-I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O LO O LO (N 0) O O O O O O O O ui O O O O O O O O O O O O O O O O O O N O Ln Ln Ln O N O O rl t0 r-I 0 rl Ln O O O Ln O O O Ln O O O O O a-- M O r-I r-I N O Ln Ln N Ln rl Ln M 00 r-I N M Ln 00 -tt O O O O r-I O r-I N t0 0 0 0 -::F (n O N l0 r-I N W U co Z W d EA EA EA EA EA EAR X W LU J c Q N W N m L a. > U 0 LL Q O W 06 (n O E -0 a — v ° ° E 4 p O O a1 >, > s E co c •v O v C o � 0) c Q" v � W c a1 W 0A a) L U c (B o a1 E 0A L ° c o L Q 7 a) (p a) 0A v1 0A N E •7 LS m C a1 OU U v�i > Q ZS 'a Q O i '++ - t c Q Q O . W p Q 0 Q c liA O f(AO Yc f0 U + CL ++ up co 4- " a1 0� O OO � �O U c U? , Q M a Q :E O c 0 00 a1 O WVI Q wtai1 CL tNo �--' ++ L (n of U 7 a1 C a1 i O O n3 7 i -O O a1 1A f6 f6 t E UA o6 > U_ N C •N C CL Z U cif d Q 0A 1A N Y ++ a1 fp ,� t 7 t � W (� L � L Y > a) U a) U a) a) a) aJ 0) f0 o f V3 U 0A cif L a) Q N ,� U U ,� +� +� +� +� E W +o •_ s v a 0A c >, n3 E v v a) Q c O +� +� n3 n3 n3 n3 c U 06 c c a) cn m c V) v v a v v E E E E N 11 LL _ Laj x fO a1 a) L L }�+ c U a1 i CIA CIAQj c a a N N N N Q L O L Y > Y Q f0 VI W Q U +, 7 7 C C L a1 VI U •a) ++ ++ -a UA Q Q O o v f6 �' O +� U U O °' o a c v E E O N m LL J U d - W V) CL a O cn cii H a O O U a a m ri ri ri H Ltj Noise Mitigation of Residential Homes Impacted by Westside Development Landrum& Brown Fee Proposal Date 21-Sep-21 LANDRUM& BROWN LABOR HOUR ESTIMATE Associate Senior Managing Senior Task VP Consultant Consultant 3.0 Initial Eligibility Testing -Rivers Edge Subdivision 4 4 �-� 4 n ❑ sto + A 9 12 A"igatinn Cocomon+c LANDRUM& BROWN LABOR HOUR ESTIMATE Associate Senior Managing Senior Task VP Consultant Consultant 4.2 Design Services 4.2.1 Design Coordination and Permitting 40 40 C A Drnhnce Accrn v.ne /Cnlec Accrn v.ne /Trn v.cnn+inv. Ac c+n v.ne Total Hours 40 1 0 40 Landrum & Brown Fee Estimate Date: 9/21/2021 LABOR COST Salary Rate Hours Salary Cost Associate VP $ 86.54 40 $ 3,461.60 Senior Managing Consultant $ 87.02 0 $ - Senior Consultant $ 56.25 40 $ 2,250.00 Consultant $ - Analyst $ - Project Administrator $ - Salary Cost $ 5,711.60 Overhead Rate @ 193.00% $ 11,023.39 Sub-Total $ 16,734.99 Profit @ 10.00% $ 1,673.50 Total Labor Cost $ 18,408.49 REIMBURSABLE EXPENSES Cost Amount Total Flights $ - Lodging $ - Meals & Incidentals per trip $ - Car Rental $ - SLM LD824/ per day $ - SI L System / per day $ - Shipping per trip $ - Miscellanenous per trip (gas, parking, tolls, taxi) $ - Total Reimbursables $ - TOTAL FEE $ 18,408.49 ATTACHMENT C Reserved , \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ ( \ \ \ \ \ \ g g g g g g G G G G w / \ \ \ \ : , \ / / \ \ / � LU m m 0 0 f ) / \ 010 \ \ 010 / 2 k 2 § § L � 2 >- 0 0 0 0 0 0 0 0 § LL w $ EU) LU 2 k E o \ \ \ \ \ \ \ \ \ \ � LU2o J m Z \ ON 2 2 ' \ \ \ \ \ \ \ \ \ } 0 w , , a , , , , , , \ § / } ¥ 2 \ § § ® ® ` ` ` ` — / £ 2 , , , 3 G \ \ \ \ \ \ \ \ \ \ \ \ \ ; G R G 3 G e R G m / / 2 0 o e : § § § Attachment E — Project Location Map 0 I, ^ River's Edge Subdivision 14, h77 y wl C^" - l 1 � jP I 1 � ;.. • f' 1 w � DIAL 65 Without Project y , DIAL 70 Without Project DIAL 75 Without Project DIAL 65 With Project f � � r Impacted Homes _ in Woodland ❑NL 70 With Project - Springs Subdivision 5 _ F i ❑NL 75 With Project .7 � ATTACHMENT F VERIFICATION OF SIGNATURE AUTHORITY FORM Execution of this Signature Verification Form ("Form") hereby certifies that the following individuals and/or positions have the authority to legally bind Vendor and to execute any agreement, amendment or change order on behalf of Vendor. Such binding authority has been granted by proper order, resolution, ordinance or other authorization of Vendor. City is fully entitled to rely on the warranty and representation set forth in this Form in entering into any agreement or amendment with Vendor. Vendor will submit an updated Form within ten (10) business days if there are any changes to the signatory authority. City is entitled to rely on any current executed Form until it receives a revised Form that has been properly executed by Vendor. Name: Position: Signature Name: Position: Signature Name: 4 ----= Signature of Senior Vice President Other Title: Date: 7/14/2022 City of Fort Worth,Texas Standard Agreement for Engineering Related Design Services Revised Date:11.17.17 ATTACHMENT G FORT WORTH,.) City of Fort Worth Federal Contract Provisions FCP-1 ACCESS TO RECORDS AND REPORTS The Contractor must maintain an acceptable cost accounting system. The Contractor agrees to provide the Owner, the Federal Aviation Administration and the Comptroller General of the United States or any of their duly authorized representatives access to any books, documents,papers and records of the Contractor which are directly pertinent to the specific contract for the purpose of making audit, examination, excerpts and transcriptions. The Contractor agrees to maintain all books, records and reports required under this contract for a period of not less than three years after final payment is made and all pending matters are closed. FCP-2 BREACH OF CONTRACT TERMS Any violation or breach of terms of this contract on the part of the Contractor or its subcontractors may result in the suspension or termination of this contract or such other action that may be necessary to enforce the rights of the parties of this agreement. Owner will provide Contractor written notice that describes the nature of the breach and corrective actions the Contractor must undertake in order to avoid termination of the contract. Owner reserves the right to withhold payments to Contractor until such time the Contractor corrects the breach or the Owner elects to terminate the contract.The Owner's notice will identify a specific date by which the Contractor must correct the breach. Owner may proceed with termination ofthe contract if the Contractor fails to correct the breach by the deadline indicated in the Owner's notice. The duties and obligations imposed by the Contract Documents and the rights and remedies available thereunder are in addition to, and not a limitation of, any duties, obligations, rights and remedies otherwise imposed or available by law. FCP-3 GENERAL CIVIL RIGHTS PROVISIONS The Contractor agrees to comply with pertinent statutes,Executive Orders and such rules as are promulgated to ensure that no person shall, on the grounds of race, creed, color, national origin, sex, age, or disability be excluded from participating in any activity conducted with or benefiting from Federal assistance. This provision binds the Contractor and subcontractors from the bid solicitation period through the completion of the contract. This provision is in addition to that required by Title VI of the Civil Rights Act of 1964. FCP-4 CIVIL RIGHTS—TITLE VI ASSURANCES COMPLIANCE WITH NONDISCRIMINATION REQUIREMENTS: During the performance of this contract, the Contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "Contractor"), agrees as follows: 1. Compliance with Regulations: The Contractor (hereinafter includes consultants) will comply with the Title VI List of Pertinent Nondiscrimination Acts and Authorities,as they may be amended from time to time,which are herein incorporated by reference and made a part of this contract. 2. Nondiscrimination: The Contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The Contractor will not participate directly or indirectly in the discrimination Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 2 of 23 prohibited by the Nondiscrimination Acts and Authorities, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR part 21. 3. Solicitations for Subcontracts, including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding or negotiation made by the Contractor for work to be performed under a subcontract,including procurements of materials,or leases of equipment, each potential subcontractor or supplier will be notified by the Contractor of the Contractor's obligations under this contract and the Nondiscrimination Acts and Authorities on thegrounds of race, color, or national origin. 4. Information and Reports: The Contractor will provide all information and reports required by the Acts,the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the sponsor or the Federal Aviation Administration to be pertinent to ascertain compliance with such Nondiscrimination Acts and Authorities and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails or refuses to furnish the information, the Contractor will so certify to the sponsor or the Federal Aviation Administration,as appropriate, and will set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance: In the event of a Contractor's noncompliance with the non- discrimination provisions of this contract,the sponsor will impose such contract sanctions as it or the Federal Aviation Administration may determine to be appropriate, including, but not limited to: a. Withholding payments to the Contractor under the contract until the Contractor complies; and/or b. Cancelling,terminating, or suspending a contract, in whole or in part. 6. Incorporation of Provisions: The Contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts,the Regulations, and directives issued pursuant thereto. The Contractor will take action with respect to any subcontract or procurement as the sponsor or the Federal Aviation Administration may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the Contractor becomes involved in, or is threatened with litigation by a subcontractor,or supplier because of such direction,the Contractor may request the sponsor to enter into any litigation to protect the interests of the sponsor.In addition,the Contractor may request the United States to enter into the litigation to protect the interests of the United States. TITLE VI LIST OF PERTINENT NONDISCRIMINATION ACTS AND AUTHORITIES During the performance of this contract, the Contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "Contractor")agrees to comply with the following non-discrimination statutes and authorities; including but not limited to: • Title VI of the Civil Rights Act of 1964(42 USC§2000d et seq.,78 stat.252)(prohibits discrimination on the basis of race, color,national origin); Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 3 of 23 • 49 CFR part 21 (Non-discrimination in Federally-assisted programs of the Department of Transportation—Effectuation of Title VI of the Civil Rights Act of 1964); • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 USC § 4601) (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); • Section 504 of the Rehabilitation Act of 1973 (29 USC § 794 et seq.), as amended (prohibits discrimination on the basis of disability); and 49 CFR part 27; • The Age Discrimination Act of 1975,as amended(42 USC §6101 et seq.)(prohibits discrimination on the basis of age); • Airport and Airway Improvement Act of 1982 (49 USC § 471, Section 47123),as amended(prohibits discrimination based on race, creed, color,national origin, or sex); • The Civil Rights Restoration Act of 1987 (PL 100-209) (broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, the Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities"to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors,whether such programs or activities are Federally funded or not); • Titles II and III of the Americans with Disabilities Act of 1990, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 USC §§ 12131 — 12189) as implemented by U.S. Department of Transportation regulations at 49 CFR parts 37 and 38; • The Federal Aviation Administration's Nondiscrimination statute (49 USC § 47123) (prohibits discrimination on the basis of race, color,national origin, and sex); • Executive Order 12898,Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures nondiscrimination against minority populations by discouraging programs,policies,and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; • Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency(LEP).To ensure compliance with Title VI,you must take reasonable steps to ensure that LEP persons have meaningful access to your programs(70 Fed.Reg.at 74087 to 74100); • Title IX of the Education Amendments of 1972, as amended,which prohibits you from discriminating because of sex in education programs or activities (20 USC 1681 et seq). FCP-5 CLEAN AIR AND WATER POLLUTION CONTROL Contractor agrees to comply with all applicable standards, orders,and regulations issued pursuant to the Clean Air Act(42 USC § 740-7671q) and the Federal Water Pollution Control Act as amended (33 USC 1251-1387). The Contractor agrees to report any violation to the Owner immediately upon discovery. The Owner assumes Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 4 of 23 responsibility for notifying the Environmental Protection Agency(EPA)and the Federal Aviation Administration. Contractor must include this requirement in all subcontracts that exceeds $150,000. FCP-6 CONTRACT WORKHOURS AND SAFETY STANDARDS ACT REQUIREMENTS 1. Overtime Requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic,including watchmen and guards, in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. 2. Violation; Liability for Unpaid Wages; Liquidated Damages. In the event of any violation of the clause set forth in paragraph (1) of this clause, the Contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory,to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph(1) of this clause,in the sum of$10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph(1) of this clause. 3. Withholding for Unpaid Wages and Liquidated Damages. The Federal Aviation Administration (FAA) or the Owner shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph(2) of this clause. 4. Subcontractors. The Contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraphs (1)through (4) and also a clause requiring the subcontractor to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (1)through(4) of this clause. FCP-7 COPELAND "ANTI-KICKBACK"ACT Contractor must comply with the requirements of the Copeland"Anti-Kickback"Act(18 USC 874 and 40 USC 3145), as supplemented by Department of Labor regulation 29 CFR part 3. Contractor and subcontractors are prohibited from inducing, by any means, any person employed on the project to give up any part of the compensation to which the employee is entitled. The Contractor and each Subcontractor must submit to the Owner, a weekly statement on the wages paid to each employee performing oncovered work during the prior week. Owner must report any violations of the Act to the Federal Aviation Administration. Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 5 of 23 FCP-8 DAVIS-BACON REQUIREMENTS 1. Minimum Wages. (i) All laborers and mechanics employed or working upon the site ofthe work will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by the Secretary of Labor under the Copeland Act(29 CFRPart 3)),the full amount of wages and bona fide fringe benefits (or cash equivalent thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics. Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph(1)(iv)of this section;also,regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly)under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed,without regard to skill, except as provided in 29 CFR Part 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein:Provided that the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination(including any additional classification and wage rates conformed under(1)(11)of this section) and the Davis-Bacon poster (WH- 1321) shall be posted at all times by the Contractor and its subcontractors at the site of the work in a prominent and accessible place where it can easily be seen by the workers. (ii)(A) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met: (1) The work to be performed by the classification requested is not performed by a classification in the wage determination; (2) The classification is utilized in the area by the construction industry;and (3)The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination. (B) If the Contractor and the laborers and mechanics to be employed in the classification(if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent bythe contracting officer to the Administrator of the Wage and Hour Division, Employment Standard Administration, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve,modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 6 of 23 necessary. (C) In the event the Contractor, the laborers, or mechanics to be employed in the classification, or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits where appropriate),the contracting officer shall refer the questions, including the views of all interested parties and the recommendation of the contracting officer,to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. (D) The wage rate(including fringe benefits where appropriate)determined pursuant to subparagraphs(1)(11) (B) or (C) of this paragraph, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification. (iii) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate,the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof. (iv) If the Contractor does not make payments to a trustee or other third person,the Contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program: Provided that the Secretary of Labor has found, upon the written request of the Contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the Contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. 2. Withholding. The Federal Aviation Administration or the sponsor shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld from the Contractor under this contract or any other Federal contract with the same prime contractor,or any other federally-assisted contract subject to Davis-Bacon prevailing wage requirements,which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices,trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of work, all or part of the wages required by the contract, the Federal Aviation Administration may, after written notice to the Contractor, Sponsor, Applicant, or Owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. 3. Payrolls and Basic Records. (i) Payrolls and basic records relating thereto shall be maintained by the Contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker;his or her correct classification; hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 1(b)(2)(B) of the Davis- Bacon Act); daily and weekly number of hours worked; deductions made; and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 7 of 23 the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-Bacon Act, the Contractor shall maintain records that show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing tothe laborers ormechanics affected,andthat show the costs anticipated or the actual costs incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs,the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs. (ii)(A)The Contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the Federal Aviation Administration if the agency is a party to the contract,but if the agency is not such a party,the Contractor will submit the payrolls to the applicant, Sponsor, or Owner, as the case may be, for transmission to the Federal Aviation Administration. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g. the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at www.dol.gov/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker and shall provide them upon request to the Federal Aviation Administration if the agency is a party to the contract,but if the agency is not such a party,the Contractor will submit them to the applicant, sponsor, or Owner, as the case may be, for transmission to the Federal Aviation Administration,the Contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records,without weekly submission to the sponsoring government agency(or the applicant, Sponsor, or Owner). (B) Each payroll submitted shall be accompanied by a"Statement of Compliance," signed by the Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following: (1) The payroll for the payroll period contains the information required to be provided under 29 CFR § 5.5(a)(3)(11), the appropriate information is being maintained under 29 CFR § 5.5 (a)(3)(1), and that such information is correct and complete; (2) Each laborer and mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly,and that no deductions have been made either directly or indirectly from the full wages earned,other than permissible deductions as set forth in Regulations 29 CFR Part 3; (3) Each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract. (C) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 8 of 23 WH-347 shall satisfy the requirement for submission of the"Statement of Compliance"required by paragraph (3)(11)(B) of this section. (D)The falsification of any of the above certifications may subject the Contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 231 of Title 31 of the United States Code. (iii) The Contractor or subcontractor shall make the records required under paragraph (3)(1) of this section available for inspection, copying, or transcription by authorized representatives of the sponsor, the Federal Aviation Administration, or the Department of Labor and shall permit such representatives to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit the required records or to make them available, the Federal agency may, after written notice to the Contractor, Sponsor, applicant, or Owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12. 4. Apprentices and Trainees. (i) Apprentices. Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor,Employment and Training Administration,Bureau of Apprenticeship and Training,or with a State Apprenticeship Agency recognized by the Bureau,or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Bureau of Apprenticeship and Training or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as anapprentice. The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition,any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered,the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the Contractor's or subcontractor's registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination forthe applicable classification.Ifthe Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Bureau of Apprenticeship and Training, or a State Apprenticeship Agency recognized by the Bureau,withdraws approval of an apprenticeship program,the Contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (ii) Trainees. Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval,evidenced by formal certification by the U.S. Department of Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 9 of 23 Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration.Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination.Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits,trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination that provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate that is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program,the Contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (111) Equal Employment Opportunity. The utilization of apprentices,trainees,and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended,and 29 CFR Part 30. 5. Compliance with Copeland Act Requirements. The Contractor shall comply with the requirements of 29 CFR Part 3, which are incorporated by reference in this contract. 6. Subcontracts. The Contractor or subcontractor shall insert in any subcontracts the clauses contained in 29 CFR Part 5.5(a)(1) through (10) and such other clauses as the Federal Aviation Administration may by appropriate instructions require, and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR Part 5.5. 7. Contract Termination: Debarment. A breach of the contract clauses in paragraph 1 through 10 of this section may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12. 8. Compliance with Davis-Bacon and Related Act Requirements. All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR Parts 1, 3, and 5 are herein incorporated by reference in this contract. 9. Disputes Concerning Labor Standards. Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 10 of 23 Disputes arising out of the labor standards provisions of this contract shall not be subj ect to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR Parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the Contractor(or any of its subcontractors)and the contracting agency,the U.S. Department of Labor, or the employees or their representatives. 10. Certification of Eligibility. (1) By entering into this contract,the Contractor certifies that neither it(nor he or she)nor any person or firm who has an interest in the Contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1). (11) No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1). (111) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 USC 1001. FCP-9 CERTIFICATION OF CONSULTANT REGARDING DEBARMENT By submitting a bid/proposal under this solicitation, the consultant certifies that neither it nor its principals are presently debarred or suspended by any Federal department or agency from participation in this transaction. CERTIFICATION OF LOWER TIER CONTRACTORS REGARDING DEBARMENT The successful bidder, by administering each lower tier subcontract that exceeds $25,000 as a "covered transaction",must verify each lower tier participant of a"covered transaction"under the project is not presently debarred or otherwise disqualified from participation in this federally assisted project. The successful bidder will accomplish this by: 1. Checking the System for Award Management at website: http://www.safn.gov. 2. Collecting a certification statement similar to the Certification of Offerer/Bidder Regarding Debarment, above. 3. Inserting a clause or condition in the covered transaction with the lower tier contract. If the Federal Aviation Administration later determines that a lower tier participant failed to disclose to a higher tier participant that it was excluded or disqualified at the time it entered the covered transaction,the FAA may pursue any available remedies,including suspension and debarment of the non-compliant participant. FCP-10 DISADVANTAGED BUSINESS ENTERPRISES The Contractor or subcontractor shall not discriminate on the basis of race, color,national origin, or sex in the performance of this contract. The Contractor shall carry out applicable requirements of 49 CFR part26 in the award and administration of Department of Transportation-assisted contracts. Failure by the Contractor to carry out these requirements is a material breach of this contract,which may result in the termination of this contract or such other remedy as the Owner deems appropriate,which may include,but is not limited to: 1) Withholding monthly progress payments; 2) Assessing sanctions; 3) Liquidated damages; and/or Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 11 of 23 4) Disqualifying the Contractor from future bidding as non-responsible. The prime contractor agrees to pay each subcontractor under this prime contract for satisfactory performance of its contract no later than [specify number] days from the receipt of each payment the prime contractor receives from [Name of recipient].The prime contractor agrees further to return retainage payments to each subcontractor within [specify the same number as above] days after the subcontractor's work is satisfactorily completed. Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of the [Name of Recipient]. This clause applies to both DBE and non-DBE subcontractors. FCP-11 TEXTING WHEN DRIVING In accordance with Executive Order 13513, "Federal Leadership on Reducing Text Messaging While Driving", (10/1/2009) and DOT Order 3902.10, "Text Messaging While Driving", (12/30/2009), the Federal Aviation Administration encourages recipients of Federal grant funds to adopt and enforce safety policies that decrease crashes by distracted drivers, including policies to ban text messaging while driving when performing work related to a grant or subgrant. In support of this initiative, the Owner encourages the Contractor to promote policies and initiatives for its employees and other work personnel that decrease crashes by distracted drivers,including policies that ban text messaging while driving motor vehicles while performing work activities associated with the project. The Contractor must include the substance of this clause in all sub-tier contracts exceeding $3,500 that involve driving a motor vehicle in performance of work activities associated with the project. FCP-12 ENERGY CONSERVATION REQUIREMENTS Contractor and Subcontractor agree to comply with mandatory standards and policies relating to energy efficiency as contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act(42 USC 620let seq). FCP-13 EQUAL OPPORTUNITY CLAUSE During the performance of this contract,the Contractor agrees as follows: (1) The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, sex, sexual orientation, gender identify, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff, or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. (2) The Contractor will,in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive considerations for employment without regard to race, color, religion, sex, or national origin. (3) The Contractor will send to each labor union or representative of workers with which it has a collective Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 12 of 23 bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (4) The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965,and of the rules, regulations, and relevant orders of the Secretary of Labor. (5) The Contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto,and will permit access to his books,records,and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (6) In the event of the Contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965,and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965,or by rule,regulation,or order of the Secretary of Labor, or as otherwise provided by law. (7) The Contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor.The Contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance: Provided,however,that in the event a contractor becomes involved in,or is threatened with,litigation with a subcontractor or vendor as a result of such direction by the administering agency the Contractor may request the United States to enter into such litigation to protect the interests of the United States. FCP-14 STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY CONSTRUCTION CONTRACT SPECIFICATIONS 1. As used in these specifications: a. "Covered area"means the geographical area described in the solicitation from which this contract resulted; b. "Director" means Director, Office of Federal Contract Compliance Programs (OFCCP), U.S. Department of Labor, or any person to whom the Director delegates authority; c. "Employer identification number" means the Federal social security number used on the Employer's Quarterly Federal Tax Return, U.S. Treasury Department Form 941; d. "Minority" includes: Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 13 of 23 (1) Black(all persons having origins in any of the Black African racial groups not of Hispanic origin); (2) Hispanic(all persons of Mexican,Puerto Rican,Cuban,Central or South American,or other Spanish culture or origin regardless of race); (3) Asian and Pacific Islander(all persons having origins in any of the original peoples of the Far East, Southeast Asia,the Indian Subcontinent, or the Pacific Islands); and (4) American Indian or Alaskan native(all persons having origins in any of the original peoples of North America and maintaining identifiable tribal affiliations through membership and participation or community identification). 2. Whenever the Contractor, or any subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and the Notice which contains the applicable goals for minority and female participation and which is set forth in the solicitations from which this contract resulted. 3. If the Contractor is participating (pursuant to 41 CFR part 60-4.5)in a Hometown Plan approved by the U.S. Department of Labor in the covered area either individually or through an association, its affirmative action obligations on all work in the Plan area(including goals and timetables) shall be in accordance with that Plan for those trades which have unions participating in the Plan. Contractors shall be able to demonstrate their participation in and compliance with the provisions of any such Hometown Plan. Each contractor or subcontractor participating in an approved plan is individually required to comply with its obligations under the EEO clause and to make a good faith effort to achieve each goal under the Plan in each trade in which it has employees. The overall good faith performance by other contractors or subcontractors toward a goal in an approved Plan does not excuse any covered contractor's or subcontractor's failure to take good faith efforts to achieve the Plan goals and timetables. 4. The Contractor shall implement the specific affirmative action standards provided in paragraphs 7a through 7p of these specifications. The goals set forth in the solicitation from which this contract resulted are expressed as percentages of the total hours of employment and training of minority and female utilization the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. Covered construction contractors performing construction work in a geographical area where they do not have a Federal or federally assisted construction contract shall apply the minority and female goals established for the geographical area where the work is being performed.Goals are published periodically in the Federal Register in notice form, and such notices may be obtained from any Office of Federal Contract Compliance Programs office or from Federal procurement contracting officers. The Contractor is expected to make substantially uniform progress in meeting its goals in each craft during the period specified. 5. Neither the provisions of any collective bargaining agreement nor the failure by a union with whom the Contractor has a collective bargaining agreement to refer either minorities or women shall excuse the Contractor's obligations under these specifications, Executive Order 11246, or the regulations promulgated pursuant thereto. Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 14 of 23 6. In order for the non-working training hours of apprentices and trainees to be counted in meeting the goals, such apprentices and trainees shall be employed by the Contractor during the training period and the Contractor shall have made a commitment to employ the apprentices andtrainees at the completion of their training, subject to the availability of employment opportunities. Trainees shall be trained pursuant to training programs approved by the U.S. Department of Labor. 7. The Contractor shall take specific affirmative actions to ensure equal employment opportunity. The evaluation of the Contractor's compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The Contractor shall document these efforts fully and shall implement affirmative action steps at least as extensive as the following: a. Ensure and maintain a working environment free of harassment,intimidation,and coercion at all sites, and in all facilities at which the Contractor's employees are assigned to work. The Contractor, where possible, will assign two or more women to each construction project. The Contractor shall specifically ensure that all foremen, superintendents, and other onsite supervisory personnel are aware of and carry out the Contractor's obligation to maintain such a working environment, with specific attention to minority or female individuals working at such sites or in such facilities. b. Establish and maintain a current list of minority and female recruitment sources,provide written notification to minority and female recruitment sources and to community organizations when the Contractor or its unions have employment opportunities available, and maintain a record of the organizations' responses. c. Maintain a current file of the names, addresses, and telephone numbers of each minority and female off-the-street applicant and minority or female referral from a union,a recruitment source, or community organization and of what action was taken with respect to each such individual. If such individual was sent to the union hiring hall for referral and was not referred back to the Contractor by the union or,if referred,not employed by the Contractor,this shall be documented in the file with the reason therefore along with whatever additional actions the Contractor may have taken. d. Provide immediate written notification to the Director when the union or unions with which the Contractor has a collective bargaining agreement has not referred to the Contractor a minority person or female sent by the Contractor, or when the Contractor has other information that the union referral process has impeded the Contractor's efforts to meet its obligations. e. Develop on-the-job training opportunities and/or participate in training programs for the area which expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor's employment needs, especially those programs funded or approved by the Department of Labor. The Contractor shall provide notice of these programs to the sources compiled under 7b above. f Disseminate the Contractor's EEO policy by providing notice of the policy to unions and training programs and requesting their cooperation in assisting the Contractor in meeting its EEO obligations; by including it in any policy manual and collective bargaining agreement; Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 15 of 23 bypublicizing it in the company newspaper, annual report, etc.; by specific review of the policy with all management personnel and with all minority and female employees at least once a year; and by posting the company EEO policy on bulletin boards accessible to all employees at each location where construction work is performed. g. Review, at least annually, the company's EEO policy and affirmative action obligations under these specifications with all employees having any responsibility for hiring, assignment, layoff, termination,or other employment decisions,including specific review of these items,with onsite supervisory personnel such superintendents, general foremen, etc., prior to the initiation of construction work at any job site. A written record shall be made and maintained identifying the time and place of these meetings,persons attending, subject matter discussed, and disposition of the subject matter. h. Disseminate the Contractor's EEO policy externally by including it in any advertising in the news media,specifically including minority and female news media,and providing written notification to and discussing the Contractor's EEO policy with other contractors and subcontractors with whom the Contractor does or anticipates doing business. i. Direct its recruitment efforts, both oral and written, to minority, female, and community organizations, to schools with minority and female students; and to minority and female recruitment and training organizations serving the Contractor's recruitment area and employment needs. Not later than one month prior to the date for the acceptance of applications for apprenticeship or other training by any recruitment source, the Contractor shall send written notification to organizations, such as the above, describing the openings, screening procedures, and tests to be used in the selection process. j. Encourage present minority and female employees to recruit other minority persons and women and,where reasonable,provide after school, summer, and vacation employment to minority and female youth both on the site and in other areas of a contractor's workforce. k. Validate all tests and other selection requirements where there is an obligation to do so under 41 CFR part 60-3. 1. Conduct, at least annually, an inventory and evaluation at least of all minority and female personnel,for promotional opportunities and encourage these employees to seek orto prepare for, through appropriate training, etc., such opportunities. in. Ensure that seniority practices, job classifications, work assignments, and other personnel practices do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the EEO policy and the Contractor's obligations under these specifications are being carried out. n. Ensure that all facilities and company activities are non-segregated except that separate or single usertoilet and necessary changing facilities shall be provided to assure privacy between the sexes. o. Document and maintain a record of all solicitations of offers for subcontracts from minority and female construction contractors and suppliers, including circulation of solicitations to minority Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 16 of 23 and female contractor associations and other business associations. p. Conduct a review, at least annually, of all supervisor's adherence to and performance under the Contractor's EEO policies and affirmative action obligations. 8. Contractors are encouraged to participate in voluntary associations, which assist in fulfilling one or more of their affirmative action obligations (7a through 7p). The efforts of a contractor association, joint contractor union, contractor community, or other similar groups of which the Contractor is a member and participant may be asserted as fulfilling any one or more of its obligations under 7a through 7p of these specifications provided that the Contractor actively participates in the group, makes every effort to assure that the group has a positive impact on the employment of minorities and women in the industry, ensures that the concrete benefits of the program are reflected in the Contractor's minority and female workforce participation, makes a good faith effort to meet its individual goals and timetables, and can provide access to documentation which demonstrates the effectiveness of actions taken on behalf of the Contractor. The obligation to comply, however, is the Contractor's and failure of such a group to fulfill an obligation shall not be a defense for the Contractor's noncompliance. 9. A single goal for minorities and a separate single goal for women have been established. The Contractor, however, is required to provide equal employment opportunity and to take affirmative action for all minority groups,both male and female,and all women,both minority and non-minority. Consequently, if the particular group is employed in a substantially disparate manner(for example, even though the Contractor has achieved its goals for women generally),the Contractor may be in violation of the Executive Order if a specific minoritygroup of women is underutilized. 10. The Contractor shall not use the goals and timetables or affirmative action standards to discriminate against any person because of race,color,religion, sex, or national origin. 11. The Contractor shall not enter into any subcontract with any person or firm debarred from Government contracts pursuant to Executive Order 11246. 12. The Contractor shall carry out such sanctions and penalties for violation of these specifications and of the Equal Opportunity Clause, including suspension, termination, and cancellation of existing subcontracts as may be imposed or ordered pursuant to Executive Order 11246, as amended,and its implementing regulations,by the Office of Federal Contract Compliance Programs.Any contractor who fails to carry out such sanctions and penalties shall be in violation of these specifications and Executive Order 11246, as amended. 13. The Contractor, in fulfilling its obligations under these specifications, shall implement specific affirmative action steps, at least as extensive as those standards prescribed in paragraph 7 of these specifications, so as to achieve maximum results from its efforts to ensure equal employment opportunity. If the Contractor fails to comply with the requirements of the Executive Order, the implementing regulations, or these specifications,the Director shall proceed in accordance with 41 CFR part 60-4.8. 14. The Contractor shall designate a responsible official to monitor all employment related activity to ensure that the company EEO policy is being carried out,to submit reports relating to the provisions Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 17 of 23 hereof as may be required by the Government,and to keep records. Records shall at least include for each employee, the name, address, telephone number, construction trade, union affiliation if any, employee identification number when assigned, social security number, race, sex, status (e.g., mechanic,apprentice,trainee,helper,or laborer),dates of changes in status,hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in an easily understandable and retrievable form; however, to the degree that existing records satisfy this requirement, contractors shall not be required to maintain separate records. 15. Nothing herein provided shall be construed as a limitation upon the application of other laws which establish different standards of compliance or upon the application of requirements for the hiring of local or other area residents (e.g. those under the Public Works Employment Act of 1977 and the Community Development Block Grant Program). FCP-15 SOLICITATION CLAUSE All contracts and subcontracts that result from this solicitation incorporate by reference the provisions of 29 CFR part 201,the Federal Fair Labor Standards Act(FLSA),with the same force and effect as if given in full text. The FLSA sets minimum wage,overtime pay,recordkeeping, and child labor standards for full and part- time workers. The Consultant has full responsibility to monitor compliance to the referenced statute or regulation. The Consultant must address any claims or disputes that arise from this requirement directly with the U.S. Department of Labor—Wage and Hour Division. FCP-16 CERTIFICATION REGARDING LOBBYING The Bidder or Offeror certifies by signing and submitting this bid or proposal, to the best of his or her knowledge and belief,that: (1) No Federal appropriated funds have been paid or will be paid,by or on behalf ofthe Bidder or Offeror, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress,an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract,the making of any Federal grant,the making of any Federal loan,the entering into of any cooperative agreement,and the extension,continuation, renewal, amendment,or modification of any Federal contract,grant, loan,or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress,or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying,"in accordance with its instructions. (3) The undersigned shall require that the language of this certification be included in the award documents for all sub-awards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all sub-recipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into.Submission ofthis certification is a prerequisite for making or entering into this transaction Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 18 of 23 imposed by section 1352,title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. FCP-17 PROHIBITION OF SEGREGATED FACILITIES (a) The Contractor agrees that it does not and will not maintain or provide for its employees any segregated facilities at any of its establishments,and that it does not and will not permit its employees to perform their services at any location under its control where segregated facilities are maintained. The Contractor agrees that a breach of this clause is a violation of the Equal Employment Opportunity clause in this contract. (b) "Segregated facilities,"as used in this clause,means any waiting rooms,work areas,rest rooms and wash rooms, restaurants and other eating areas,time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation,and housing facilities provided for employees that are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, sex, or national origin because of written or oral policies or employee custom. The term does not include separate or single-user rest rooms or necessary dressing or sleeping areas provided to assure privacy between the sexes. (c) The Contractor shall include this clause in every subcontract and purchase order that is subject to the Equal Employment Opportunity clause of this contract. FCP-18 OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 All contracts and subcontracts that result from this solicitation incorporate by reference the requirements of 29 CFR Part 1910 with the same force and effect as if given in full text. The employer must provide a work environment that is free from recognized hazards that may cause death or serious physical harm to the employee. The employer retains full responsibility to monitor its compliance and their subcontractor's compliance with the applicable requirements of the Occupational Safety and Health Act of 1970 (20 CFR Part 1910).The employer must address any claims or disputes that pertain to a referenced requirement directly with the U.S. Department of Labor—Occupational Safety and Health Administration. FCP-19 CERTIFICATION OF OFFERER/BIDDER REGARDING TAX DELINQUENCY AND FELONY CONVICTIONS The Engineer must complete the following two certification statements. The Engineer must indicate its current status as it relates to tax delinquency and felony conviction by inserting a checkmark ( 0 ) in the space following the applicable response. The Engineer agrees that, if awarded a contract resulting from this solicitation, it will incorporate this provision for certification in all lower tier subcontracts. Certifications 1) The Engineer represents that it is ( D ) is not(2) a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability. Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 19 of 23 2) The Engineer represents that it is ( D ) is not ( W ) is not a corporation that was convicted of a criminal violation under any Federal law within the preceding 24 months. Note If an Engineer responds in the affirmative to either of the above representations, the Engineer is ineligible to receive an award unless the sponsor has received notification from the agency suspension and debarment official (SDO) that the SDO has considered suspension or debarment and determined that further action is not required to protect the Government' s interests. The Engineer therefore must provide information to the owner about its tax liability or conviction to the Owner, who will then notify the FAA Airpolts District Office, which will then notify the agency's SDO to facilitate completion of the required considerations before award decisions are made. Term Definitions Felony conviction: Felony conviction means a conviction within the preceding twcntyfour(24)months of a felony criminal violation under any Federal law and includes conviction of an offense defined in a section of the U.S. code that specifically classifies the offense as a felony and conviction of an offense that is classified as a felony under 18 U.S.C. § 3559. Tax Delinquency: A tax dcl inqucnc y is any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted,or have lapsed, and that i s not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability. FCP-20 TERMINATION FOR CONVENIENCE (PROFESSIONAL SERVICES) The Owner may, by written notice to the Consultant,terminate this Agreement for its convenience and without cause or default on the part of Consultant. Upon receipt of the notice of termination,except as explicitly directed by the Owner, the Contractor must immediately discontinue all services affected. Upon termination of the Agreement,the Consultant must deliver to the Owner all data, surveys,models,drawings, specifications,reports, maps, photographs, estimates, summaries, and other documents and materials prepared by the Engineer under this contract,whether complete or partially complete. Owner agrees to make just and equitable compensation to the Consultant for satisfactory work completed up through the date the Consultant receives the termination notice. Compensation will not include anticipated profit on non-performed services. Owner further agrees to hold Consultant harmless for errors or omissions in documents that are incomplete as a result of the termination action under this clause. FCP-21 TERMINATION FOR DEFAULT (PROFESSIONAL SERVICES) Either parry may terminate this Agreement for cause if the other party fails to fulfill its obligations that are essential to the completion of the work per the terms and conditions of the Agreement. The party initiating the termination action must allow the breaching party an opportunity to dispute or cure the breach. The terminating parry must provide the breaching party [7] days advance written notice of its intent to terminate the Agreement. Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 20 of 23 The notice must specify the nature and extent of the breach, the conditions Guidelines for Contract Provisions for Obligated Sponsors and Airport Improvement Program Projects Issued on June 19, 2018 Page 67 necessary to cure the breach, and the effective date of the termination action. The rights and remedies in this clause are in addition to any other rights and remedies provided by law or under this agreement. a) Termination by Owner: The Owner may terminate this Agreement in whole or in part,for the failure of the Consultant to: 1. Perform the services within the time specified in this contract or by Owner approved extension; 2. Make adequate progress so as to endanger satisfactory performance of the Project; or 3. Fulfill the obligations of the Agreement that are essential to the completion of the Project. Upon receipt of the notice of termination, the Consultant must immediately discontinue all services affected unless the notice directs otherwise. Upon termination of the Agreement,the Consultant must deliver to the Owner all data, surveys,models,drawings, specifications,reports, maps, photographs, estimates, summaries, and other documents and materials prepared by the Engineer under this contract,whether complete or partially complete. Owner agrees to make just and equitable compensation to the Consultant for satisfactory work completed up through the date the Consultant receives the termination notice. Compensation will not include anticipated profit on non-performed services. Owner further agrees to hold Consultant harmless for errors or omissions in documents that are incomplete as a result of the termination action under this clause. If, after finalization of the termination action,the Owner determines the Consultant was not in default of the Agreement,the rights and obligations of the parties shall be the same as if the Owner issued the termination for the convenience of the Owner.b)Termination by Consultant: The Consultant may terminate this Agreement in whole or in part,if the Owner: 1.Defaults on its obligations under this Agreement;2.Fails to make payment to the Consultant in accordance with the terms of this Agreement; 3. Suspends the Project for more than [180] days due to reasons beyond the control of the Consultant. Upon receipt of a notice of termination from the Consultant, Owner agrees to cooperate with Consultant for the purpose of terminating the agreement or portion thereof, by mutual consent. If Owner and Consultant cannot reach mutual agreement on the termination settlement, the Consultant may, without prejudice to any rights and remedies it may have, proceed with terminating all or parts of this Agreement based upon the Owner's breach of the contract. In the event of termination due to Owner breach, the Engineer is entitled to invoice Owner and to receive full payment for all services performed or furnished in accordance with this Agreement and all justified reimbursable expenses incurred by the Consultant through the effective date of termination action. Owner agrees to hold Consultant harmless for errors or omissions in documents that are incomplete as a result of the termination action under this clause. FCP-22 TRADE RESTRICTION CERTIFICATION By submission of an offer, the Offeror certifies that with respect to this solicitation and any resultant contract, the Offeror— 1) is not owned or controlled by one or more citizens of a foreign country included in the list of countries that discriminate against U.S. firms as published by the Office of the United States Trade Representative (USTR); 2) has not knowingly entered into any contract or subcontract for this project with a person that is a citizen or national of a foreign country included on the list of countries that discriminate against U.S.firms as published by the USTR; and Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 21 of 23 3) has not entered into any subcontract for any product to be used on the Federal project that is produced in a foreign country included on the list of countries that discriminate against U.S. firms published by the USTR. This certification concerns a matter within the jurisdiction of an agency of the United States of America and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18 USC Section 1001. The Offeror/Contractor must provide immediate written notice to the Owner if the Offeror/Contractor learns that its certification or that of a subcontractor was erroneous when submitted or has become erroneous by reason of changed circumstances. The Contractor must require subcontractors provide immediate written notice to the Contractor if at any time it learns that its certification was erroneous by reason of changed circumstances. Unless the restrictions of this clause are waived by the Secretary of Transportation in accordance with 49 CFR 30.17,no contract shall be awarded to an Offeror or subcontractor: 1) who is owned or controlled by one or more citizens or nationals of a foreign country included on the list of countries that discriminate against U.S. firms published by the USTR or 2) whose subcontractors are owned or controlled by one or more citizens or nationals of a foreign country on such USTR list or 3)who incorporates in the public works project any product of a foreign country on such USTR list. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render,in good faith,the certification required by this provision. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. The Offeror agrees that, if awarded a contract resulting from this solicitation, it will incorporate this provision for certification without modification in all lower tier subcontracts. The Contractor may rely on the certification of a prospective subcontractor that it is not a firm from a foreign country included on the list of countries that discriminate against U.S. firms as published by USTR,unless the Offeror has knowledge that the certification is erroneous. This certification is a material representation of fact upon which reliance was placed when making an award. If it is later determined that the Contractor or subcontractor knowingly rendered an erroneous certification, the Federal Aviation Administration(FAA)may direct through the Owner cancellation of the contract or subcontract for default at no cost to the Owner or the FAA. FCP-23 VETERAN'S PREFERENCE In the employment of labor (excluding executive, administrative, and supervisory positions), the Contractor and all sub-tier contractors must give preference to covered veterans as defined within Title 49 United States Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 22 of 23 Code Section 47112. Covered veterans include Vietnam-era veterans,Persian Gulf veterans,Afghanistan-Iraq war veterans,disabled veterans,and small business concerns(as defined by 15 USC 632)owned and controlled by disabled veterans. This preference only applies when there are covered veterans readily available and qualified to perform the work to which the employment relates. Amendment No.3 to CSC No.54648 Between the City of Fort Worth and Jacobs Engineering Group Inc.for Noise Mitigation Services Page 23 of 23 Create New From This M&C DATE: 11/9/2021 REFERENCE **M&C 21- LOG NAME: 55AFW NOISE MITIGATION NO.: 0863 PROJECT AMENDMENT III CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: (CD 7) Authorize the Execution of Amendment No. 3 to City Secretary Contract No. 54648, a Standard Agreement for Engineering Related Professional Services with Jacobs Engineering Group Inc, to Increase the Contract Amount Up to $13,668,220.35 for the Noise Mitigation Project at Fort Worth Alliance Airport RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 3 to City Secretary Contract No. 54648, a standard agreement for engineering related professional services with Jacobs Engineering Group Inc., to increase the contract amount up to $13,668,220.35 for the Noise Mitigation project (City Project Nos. 102901 & 103131) at Fort Worth Alliance Airport. DISCUSSION: On September 15, 2020, Mayor and Council Communication (M&C)20-0667, the City Council authorized the execution of an engineering services agreement with Jacobs Engineering Group Inc. (Jacobs) in the amount of$3,340,573.00 for the Noise Mitigation project (Project) at Fort Worth Alliance Airport(Airport). On February 4, 2021, Amendment No. 1 to City Secretary Contract No. 54648 was executed in the amount of $24,871.15 with Jacobs for additional services to the original agreement for software and website development services to allow for virtual public meetings and the creation of a new website for the Project. On May 4, 2021, Amendment No. 2 to City Secretary Contract No. 54648 (M&C 21-0319) was executed in the amount of$100,950.45 with Jacobs for additional acoustical testing of homes in the Rivers Edge subdivision (Rivers Edge). Amendment No. 3, if approved, will include costs associated for the five noise mitigation methods further described in the original agreement, as well as a live Town Hall event that occurred in June of 2021. If eligible, property owners will be able to select one of the five noise mitigation methods, which consist of the purchase of avigation easement rights, sound insulation of non-compatible structures, purchase assurance, sales assurance and transaction assistance. The live Town Hall event provided an opportunity for homeowners to come and learn more about this program and ask questions with Project staff. At the start of this Project, it was unknown how many properties would be eligible for noise mitigation measures. The original agreement and Amendment No. 2 included funding for acoustical testing of homes in Rivers Edge to determine which homes were eligible. As of September 2021, 227 properties meet the eligibility requirements under the noise mitigation program. Project staff have begun discussions with property owners regarding their mitigation options. To date, 127 homeowners have selected sound insulation, eight have selected transaction assistance and three have selected avigation easements. Approximately seventeen properties still require acoustical testing, and further discussions with homeowners are still required. The proposed Amendment No. 3 provides a reasonable estimate of the funding required to address the remaining noise mitigation measures for eligible properties. Funding for this project has been provided by Federal Aviation Administration (FAA) grants from Fiscal Years (FY) 2019, 2020 and 2021. A total of $19,111,110.00 has been given to the City for this project, with $888,888.88 in land credits used for the City's match in 2019. No match was required for the FY 2020 and 2021 grants. Jacobs Engineering Group, Inc. is in compliance with the City's DBE Program by committing to 35\% DBE participation on this Project. The City's DBE goal on this Project is 35\%. Since no City salaries will be charged to this grant, indirect cost recovery does not apply. Fort Worth Alliance Airport is located in Council District 7. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Muni Airport Grants Federal Fund for the AFW Noise Mitigation Grant 2019 and AFW Noise Mitigation 2020 projects to support the approval of the above recommendation and execution of the amendment. Prior to an expenditure being incurred, the Aviation Department has the responsibility to validate the availability of funds. This is a reimbursement grant. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference # Amount L ID ID I Year (Chartfield 2) Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Roger Venables (6334) Additional Information Contact: Tyler Dale (5416) ATTACHMENTS 102901 & 103131 AFW Noise Mitigation Project Amendment 3 Compliance Memo 09302021 WN.pdf (CFWlnternal) 55AFW NOISE MITIGATION PROJECT AMENDMENT III FID Table.xlsx (CFW Internal) 55AFW NOISE MITIGATION PROJECT AMENDMENT III funds availability.dou (CFW Internal) 55AFW NOISE MITIGATION PROJECT AMENDMENT III Map.pdf (Public) Form 1295 Certificate 100806056.pdf (CFW Internal)