HomeMy WebLinkAboutContract 44779-CO2 (2)FORT WORTHP City of Fort Worth Change Order Request Project Name' HMAC Surface Overlay 2013-14 Client Project #(s)I CP#: 02141, DOE #: 7085 Dept. TPW Original Contract Amount $1,051,922.60 Extras to Date $10,350.00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date 'Go to ADD & DEL Tabs to Enter CO Backup Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) $1,062,272.60'. $0:00 $.1,062,272.60 I CONTRA NO L/L)(7r7q- (OL I City Sec # I 44779 Change Order Submittal # I 2 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) Additonal time is required to defray delays by Atmos Energy and unperceived subgrade issues on Lantana Ln. Upon stabilization, several soft spots emerged in the subgrade. After several investigations, soil retests and proof -rolling the subgrade firmed up, over time, and allowed the paving operation to commence. Date I 5/9/2014 I Contract Time Totals (CD) $1,051,922.60 150 $10,350.00 5 $1,062,272.60 155 50 $1,062,272.60 205 $0.00 098% $1,314,903.25 ir'1 Ronald P. Gonzales, Ass OFFICIA7. RECORD CITY SECRETARY FT. WORTH, Tlt City of Fort Worth Change Order Additions - I I EM Project Name 1 HMAC Surface Overlay 2013-14 Client Project # 1 CP#: 02141, DOE #: 7085 1 City Sec# 1 44779 Change Order Submittal # 2 Date 1 5/9/2014 1 ADDITIONS DESCNIP I ION DEP I (Ity Unit Unit Cost I otal TPW Sub Total Additions $0.00 $0.00 1 Change Order Additions Page 1 of 1 N/A `M/SBE;Sub MISBE Breakdown for this Change Order Type of Service . Amount for this CO ;� Previous Change Orders co # " DATE 1 10/22/2013 Total AMOUNT $1,800.00 Total $1,800.00 CFW Change Order Approval St-COApp03 Page 1 of 3 Routing Assigned To: Assigned By: Due Date: Due Time: Links (1) fortworthoov/Infrastructure Proiects/02141 - HMAC Surface Overlay (2013-14)/Contractor/Chance Orders/Chanae Order Breakdown - co2.xis Attachments (0) No Attachments have been added to this form. ittps://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId=327&Active... 5/20/2014 CFW Change Order Approval St-COApp03 Page 2 of 3 FORT WORTH® City of Fort Worth �-.„ fir•-�=-- Change Order Request Approval (Change Order Breakdown Available in Links) For Change Order Submittal No.: 2 Change Order No.: St-COApp03 City Sec. No.: 44779 Project Name: HMAC Surface Overlay (2013-14) 02141 DOE Numbers: Project Numbers: DOE 7085 Date Started: 2014-05-12 Date Due: 2014-07-01 Project H2013-14 Surface Overlay; pulverization and stabilization of Description: existing pavement and an overlay with 2" surface course HMAC. Project Manager: Kristian Sugrim Contractor: JLB Contracting, LLC. COUNCIL ACTION (If Required): M&C Log Name: M&C Number: COST AND DAYS SUMMARY: City Inspector: Mike Glover M&C Date: Requested Department: Cost($) Fund Account Center: Days: Transportation & Public Work C293-541200-205620214183 50 Total Cost: $ 0.00 Approval Status: Total Requested Days: 50 Zttps://projectpoint.buzzsaw.com/ bzweb/Forms/FormPrint.aspx?SiteId=51500&ProcessId=327&Active... 5/20/2014 CFW Change Order Approval St-COApp03 Page 3 of 3 Approved: Yes Comments: User: Tara Fishback Date: 2014-05-12 9:28 AM Approved: Yes Comments: User: Sam Davis Date: 2014-05-12 12:40 PM Approved: Yes Comments: User: Kristian Sugrim Date: 2014-05-12 1:09 PM Approved: Yes Comments: User: Najib Fares Date: 2014-05-12 2:16 PM Approved: Yes Comments: User: Andy Anderson Date: 2014-05-16 3:41 PM Approved: Yes Comments: User: Doug Wiersig Date: 2014-05-19 9:20 AM Approved: Yes Comments: User: Grant Jordan Date: 2014-05-19 9:52 AM Approved: Yes Comments: User: Fernando Costa Date: 2014-05-20 2:44 PM Action Required: ittps://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessId=327&Active... 5/20/2014