Loading...
HomeMy WebLinkAboutContract 44782 (2)ELECTRONICALLY SEALED 4/23/2013 The seal of William D. Wendland, PE is for Water and Sanitary Sewer Replacement Contract PROJECT MANUAL FOR THE CONSTRUCTION OF CITY SECRETARY L7 cor�rrsaclNO. . )1`� ...... Water and Sanitary Sewer Replacement Contract 2010 STM-E Ashland Avenue Birchman Avenue El Campo Avenue Libbey Avenue City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 Betsy Price Tom Higgins Mayor City Manager S. Frank Crumb, P.E. Director, Water Department Douglas W. Wiersig, P.E. Director, Transportation and Public Works Prepared for The City of Fort Worth Water Department And Transportation and Public Works Department 2013 OF %Ft►i P•........ i ov SCOTT K. HUBLEY 105025 .'u- <v— O It1;s� •.....••'�G= PREPARED BY: BURGESS & NIPLE Engineers • Plann Burgess & Niple, Inc. 3950 Fossil Creek Blvd., Suite Fort Worth, TX 76137 TBPE Firm Registration No. F-10 4 B & N No. 50285 A 112 6/1, The seal of Scott K. Hubley, PE is for CAH Ashland Drainage Improvements meSFIIISE ICNOLS 4055 Internotionol Plaza, Su.te 200 Fort Worth, Texas 76100-4895 Phone — (817) 735-7300 Fox — (817) 735-7491 Freese and Nichols, Inc. Texas Registered Engineering Firm F-2144 RECEIVED SEP 11 2013 000000-1 TABLE OF CONTENTS 1 SECTION 00 00 00 2 TABLE OF CONTENTS 3 4 Division 00 - General Conditions 5 00 05 10 Mayor and Council Communication 6 00 05 15 Addenda 7 00 11 13 Invitation to Bidders 8 00 21 13 Instructions to Bidders 9 00 35 13 Conflict of Interest Affidavit 10 00 41 00 Bid Form 11 00 42 43 Proposal Form Unit Price 12 00 43 13 Bid Bond 13 00 43 37 Vendor Compliance to State Law Nonresident Bidder 14 00 45 11 Bidders Prequalifications 15 00 45 12 Prequalification Statement 16 00 45 13 Bidder Prequalification Application 17 00 45 26 Contractor Compliance with Workers' Compensation Law 18 00 45 40 Minority Business Enterprise Goal 19 00 52 43 Agreement 20 00 61 13 Performance Bond 21 00 61 14 Payment Bond 22 00 61 19 Maintenance Bond 23 00 61 25 Certificate of Insurance 24 00 72 00 General Conditions 25 00 73 00 Supplementary Conditions 26 27 Division 01 - General Requirements 28 0111 00 Summary of Work 29 01 25 00 Substitution Procedures 30 01 31 19 Preconstruction Meeting 31 01 31 20 Project Meetings 32 01 32 16 Construction Progress Schedule 33 01 32 33 Preconstruction Video 34 01 33 00 Submittals 35 01 35 13 Special Project Procedures 36 01 45 23 Testing and Inspection Services 37 01 50 00 Temporary Facilities and Controls 38 01 55 26 Street Use Permit and Modifications to Traffic Control 39 01 57 13 Storm Water Pollution Prevention Plan 40 01 58 13 Temporary Project Signage 41 01 60 00 Product Requirements 42 01 66 00 Product Storage and Handling Requirements 43 01 70 00 Mobilization and Remobilization 44 01 71 23 Construction Staking and Surve 45 01 74 23 Cleaning 46 01 77 19 Closeout Requirements 47 01 78 23 Operation and Maintenance Data 48 01 78 39 Project Record Documents 49 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Page 1 of 3 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 000000-2 TABLE OF CONTENTS Page 2 of 3 1 Technical Specifications which have been modified by the Engineer specifically for this 2 Project ; hard copies are included in the Project's Contract Documents 3 4 Division 33 - Utilities 5 33 05 10 Utility Trench Excavation, Embedment and Backfill 6 33 41 10 Reinforced Concrete Storm Drain Pipe/Culverts 7 8 Division 99 — Additional Specifications 9 99 99 00 Additional Specifications 10 99 99 00.12 Special Specification — Vibration Monitoring 11 12 Technical Specifications listed below are included for this Project by reference and can be 13 viewed/downloaded from the City's Buzzsaw site at: 14 15 https://nroiectpoint.buzzsaw.com/fortworthgov/Infrastructure%20Proiects/01494%20- 16 %20W%20and%2OSS%20Ren1%20Contract%202010%2OSTM- 17 1✓ id%20Documents%20Package/Referenced%20Technical%20Specifications?p ublic 18 19 Division 02 - Existing Conditions 20 02 41 13 Selective Site Demolition 21 02 41 14 Utility Removal/Abandonment 22 02 41 15 Paving Removal 23 24 Division 03 - Concrete 25 03 30 00 Cast -In -Place Concrete 26 03 34 13 Controlled Low Strength Material (CLSM) 27 03 34 16 Concrete Base Material for Trench Repair 28 29 Division 31 - Earthwork 30 31 10 00 Site Clearing 31 31 23 16 Unclassified Excavation 32 31 24 00 Embankments 33 31 25 00 Erosion and Sediment Control 34 35 Division 32 - Exterior Improvements 36 32 01 17 Permanent Asphalt Paving Repair 37 32 01 18 Temporary Asphalt Paving Repair 38 32 01 29 Concrete Paving Repair 39 32 11 23 Flexible Base Courses 40 32 11 29 Lime Treated Base Courses 41 32 12 16 Asphalt Paving 42 32 13 13 Concrete Paving 43 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 44 32 13 73 Concrete Paving Joint Sealants 45 32 14 16 Brick Unit Paving 46 32 16 13 Concrete Curb and Gutters and Valley Gutters 47 32 91 19 Topsoil Placement and Finishing of Parkways 48 32 92 13 Hydro -Mulching, Seeding, and Sodding 49 32 93 43 Trees and Shrubs 50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 000000-3 TABLE OF CONTENTS 1 Division 33 Utilities 2 33 01 30 Sewer and Manhole Testing 3 33 01 31 Closed Circuit Television (CCTV) Inspection 4 33 03 10 Bypass Pumping of Existing Sewer Systems 5 33 04 30 Temporary Water Services 6 33 04 40 Cleaning and Acceptance Testing of Water Mains 7 33 04 50 Cleaning of Sewer Mains 8 33 05 12 Water Line Lowering 9 33 05 13 Frame, Cover and Grade Rings 10 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 11 33 05 17 Concrete Collars 12 33 05 22 Steel Casing Pipe 13 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 14 33 05 26 Utility Markers/Locators 15 33 05 30 Exploratory Excavation for Existing Utilities 16 33 11 10 Ductile Iron Pipe 17 33 11 11 Ductile Iron Fittings 18 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 19 33 12 10 Water Services 1-inch to 2-inch 20 33 12 20 Resilient Seated Gate Valve 21 33 12 25 Connection to Existing Water Mains 22 33 12 40 Dry -Barrel Fire Hydrants 23 33 12 50 Water Sample Stations 24 33 31 15 HDPE Pipe For Sanitary Sewers (Gravity and Force Mains) 25 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 26 33 31 23 Sanitary Sewer Pipe Enlargement 27 33 31 50 Sanitary Sewer Service Connections and Service Line 28 33 39 10 Cast -in -Place Concrete Manholes 29 33 39 20 Precast Concrete Manholes 30 33 49 10 Cast -in -Place Manholes and Junction Boxes 31 32 Division 34 - Transportation 33 34 71 13 Traffic Control 34 35 Appendix 36 GC-4.02 Subsurface and Physical conditions 37 GC-6.06.D Minority and Women Owned Business Enterprise Compliance 38 GC-6.07 Wage Rates 39 GC-6.09 Permits and Utilities 40 GR-01 60 00 Product Requirements 41 42 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Page 3 of 3 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 I I 1 I I I u 1 I I 000510-1 MAYOR AND COUNCIL COMMUNICATION (M&C) Page 1 of 1 1 SECTION 00 05 10 2 MAYOR AND COUNCIL COMMUNICATION (M&C) 3 4 5 6 [Assembler: For Contract Document execution, remove this page and replace with the approved 7 M&C for the award of the project. M&C insert shall be on blue paper.] 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2010 STM-E CITY PROJECT NO. 01494 CAH ASHLAND DRAINAGE IMPROVEMENTS CITY PROJECT NO. 01918 ADDENDUM NO. 5 June 4, 2013 The time for the submission of bids is unchanged. The location for the submission of bids is unchanged. The following additions, deletions, modifications, or clarifications shall be made to the appropriate sections of the Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided on the Bid form. DRAWINGS: THE FOLLOWING SHEETS HAVE BEEN REVISED: • 32 13 13-D502 RESIDENTIAL CONCRETE STREET SECTION (L) • 32 13 13-D508 PAVEMENT STEEL REINFORCING GENERAL LAYOUT • 32 13 13-D511 CONSTRUCTION JOINT/32 13 13-D512 CONSTRUCTION JOINT (BETWEEN EXISTING AND PROPOSED PAVEMENT) • 32 13 13-D513 EXPANSION JOINT/32 13 13-D514 EXPANSION CONSTRUCTION JOINT (BETWEEN EXIST AND PROP PAVEMENT) • 32 13 13-D515 CONTRACTION JOINT/ 32 13 13-D516 SAWED DUMMY JOINT • 32 13 13-D517 REDWOOD EXPANSION JOINT DETAIL/32 13 13-D518 SAWED JOINT DETAIL • 32 13 13-D519 LONGITUDINAL PAVING SECTION END OF ADDENDUM NO. 5 Addenda 01494 — Water and Sanitary Sewer Replacement Contract 2010 STM-E 01918 — CAH Ashland Drainage Improvements June 4, 2013 'Co( (-(( / A3-1 AIG — 06/04/13 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2010 STM-E CITY PROJECT NO. 01494 CAH ASHLAND DRAINAGE IMPROVEMENTS CITY PROJECT NO. 01918 ADDENDUM NO. 4 June 3, 2013 The time for the submission of bids is unchanged. The location for the submission of bids is unchanged. The following additions, deletions, modifications, or clarifications shall be made to the appropriate sections of the Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided on the Bid form. BIDDING REQUIREMENTS: 00 42 43 — Proposal Form Modification: Delete this section and replace it with the Proposal included with this Addendum. The revised form is to be attached to the contract documents and submitted with the Bid. The entire form must be completed. The new excel sheet has been uploaded to Buzzsaw. This Addendum issued: BURGESS & NIPLE, INC. June 3, 2013 TBPE FIRM REGISTRATION NO. F-10834 �Po �OF."TF:++,I 4, .1\*Irei WILLIAM D. WENDLAND �• o 67958 �2 r en ,I �'`F'� C, STER�:���$'i i0 6. fixia/A4411 William D. Wendland, P.E. END OF ADDENDUM NO. 4 Addenda 01494 — Water and Sanitary Sewer Replacement Contract 2010 STM-E 01918 — CAH Ashland Drainage Improvements A4 - 1 J M M — 06/03/13 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2010 STM-E CITY PROJECT NO. 01494 CAH ASHLAND DRAINAGE IMPROVEMENTS CITY PROJECT NO. 01918 ADDENDUM NO. 3 May 31, 2013 The time for the submission of bids is unchanged. The location for the submission of bids is unchanged. The following additions, deletions, modifications, or clarifications shall be made to the appropriate sections of the Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided on the Bid form. CLARIFICATIONS: A document containing the engineers' responses to contractor questions has been posted on Buzzsaw and is available for download. BIDDING REQUIREMENTS: 00 21 13 — Instructions to Bidders Modification: Paragraph 4.5 shall be added to this section and shall read as follows: "Prospective bidders are hereby notified that the successful responsible and responsive low bidder must have sufficient crews/manpower and equipment available to commence and complete construction of the water main improvements on Lloyd Avenue added to the project scope via Addendum No. 2 prior to, or simultaneous with, commencement of work on the original project scope (at the time the project was first advertised for bid). All water main improvements work on Lloyd Avenue must be completed and accepted by the City within 45 calendar days of the Notice to Proceed Date to allow for pulverization and asphalt overlay of the roadway." 00 42 43 — Proposal Form Modification: Delete this section and replace it with the Proposal included with this Addendum. The revised form is to be attached to the contract documents and submitted with the Bid. The entire form must be completed. The new excel sheet has been uploaded to Buzzsaw. Addenda 01494 — Water and Sanitary Sewer Replacement Contract 2010 STM-E 01918 — CAH Ashland Drainage Improvements A3 - 1 SKH — 05/31/13 DRAWINGS: MODIFY THE FOLLOWING SHEETS: Sheet 27: The note that the eight (8) trees along Clover Lane are to be removed and replaced has been modified to read as follows: "Remove the eight (8) trees along Clover Lane and replace them with 6" cedar elms as directed by the city." REPLACE THE FOLLOWING SHEETS: Sheet 52 — Paving Plan and Profile: Replace with attached sheet. Sheet 53 — Paving Plan and Profile: Replace with attached sheet. Sheet 63 — Drainage Details: Replace with attached sheet. Sheet 68 — Residential Concrete Street Section (L) 32 13 13-D502: Replace with attached sheet. This Addendum issued: BURGESS & NIPLE, INC. May 31, 2013 TBPE FIRM REGISTRATION NO. F-10834 Pia .OF.• � TF.... Ar • ,, � WILLIAM D. WENDLAND g 0 -t‘ 67958 : fiar x •S�'� 6,..,/ ST l... \ 4 ''h.IONAL _r' 104.440/ b. kit-44441 William D. Wendland, P.E. END OF ADDENDUM NO. 3 Addenda 01494 — Water and Sanitary Sewer Replacement Contract 2010 STM-E 01918 — CAH Ashland Drainage Improvements A3 - 2 SKH — 05/31/13 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2010 STM-E CITY PROJECT NO. 01494 & CAH ASHLAND DRAINAGE IMPROVEMENTS CITY PROJECT NO. 01918 ADDENDUM NO. 2 May 24, 2013 The time for the submission of bids has been postponed. Bids are due by 1:30 P.M. CST, Thursday, June 6, 2013. The bids will be opened publicly and read aloud at 2:00 PM CST in the Council Chambers. The location for the submission of bids is unchanged. The following additions, deletions, modifications, or clarifications shall be made to the appropriate sections of the Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided on the Bid form. BIDDING REQUIREMENTS: 00 42 43 — Proposal Form Modification: Delete this section and replace it with the Proposal included with this Addendum. Bid quantities for construction of a new water line along Lloyd Avenue have been added to the proposal form. The revised form is to be attached to the contract documents and submitted with the Bid. The entire form must be completed. The new excel sheet has been uploaded to Buzzsaw. TECHNICAL SPECIFICATIONS: No changes. DRAWINGS: MODIFY THE FOLLOWING SHEETS: Sheet 0, Joint Cover: The following section shall be added to the index of drawings: "Sheets 89- 92: Water Main Rehabilitation Village Creek" ADD THE FOLLOWING SHEETS: Sheets 89-92, attached to this addendum. Addenda 01494 — Water and Sanitary Sewer Replacement Contract 2010 STM-E 01918 — CAH Ashland Drainage Improvements May 24, 2013 A2 - 1 J M M —05/24/13 This Addendum issued: BURGESS & NIPLE, INC. Mav 24, 2013 TBPE FIRM REGISTRATION NO. F-10834 P�� �..�� TF 11 dipliA Ott a c Ar, 6) irt WIWILLIAM D. WENDLAND g wen 67958 �:�r .�F ;fc�'. STE;:. tudPix•ot 11.10,4441 William D. Wendland, P.E. END OF ADDENDUM NO. 2 Addenda 01494 — Water and Sanitary Sewer Replacement Contract 2010 STM-E 01918 — CAH Ashland Drainage Improvements Mav 24. 2013 A2 - 2 J M M — 05/24/13 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2010 STM-E CITY PROJECT NO. 01494 CAH ASHLAND DRAINAGE IMPROVEMENTS CITY PROJECT NO. 01918 ADDENDUM NO. 1 May 20, 2013 The time for the submission of bids is unchanged. The location for the submission of bids is unchanged. The following additions, deletions, modifications, or clarifications shall be made to the appropriate sections of the Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided on the Bid form. BIDDING REQUIREMENTS: 00 00 00 — Table of Contents Modification: Delete this section and replace it with the Table of Contents included with this Addendum. 00 42 43 — Proposal Form Modification: Delete this section and replace it with the Proposal included with this Addendum. The revised form is to be attached to the contract documents and submitted with the Bid. The entire form must be completed. The new excel sheet has been uploaded to buzzsaw. TECHNICAL SPECIFICATIONS: ADD THE FOLLOWING SECTIONS: 99 99 99.0012 Vibration Monitoring DRAWINGS: MODIFY THE FOLLOWING SHEETS: Sheet 25: The note stating that there is no separate pay to preserve and protect the existing 30" storm drain has been deleted. Sheet 27: A note shall be added that the eight (8) trees along Clover Lane are to be removed and replaced with 12" trees as directed by the city. Addenda 01494 — Water and Sanitary Sewer Replacement Contract 2010 STM-E 01918 — CAH Ashland Drainage Improvements May 20.2013 Al - 1 SKH — 0520/13 REPLACE THE FOLLOWING SHEETS: Sheet 88 — iSWM Construction Plan: Replace with attached sheet. This Addendum issued: BURGESS & NIPLE, INC. Mav 20, 2013 TBPE FIRM REGISTRATION NO. F-10834 1+ q i * %\ */� tWILLIAM D. WENDLAND a/ 'fl‘, 67958 Q ��fir,xFeFc ST�R�°••$'. N ,� Ss�ONAL ��" dip tudg(.0.0, 6• AlitaiAti William D. Wendland, P.E. END OF ADDENDUM NO. 1 Addenda 01494 — Water and Sanitary Sewer Replacement Contract 2010 STM-E 01918 — CAH Ashland Drainage Improvements May 20, 2013 Al - 2 SKH — 0520/13 0011 13-1 INVITATION TO BIDDERS Page 1 of 2 1 SECTION 0011 13 2 INVITATION TO BIDDERS 3 4 RECEIPT OF BIDS 5 Sealed bids for the construction of Water and Sanitary Sewer Replacement Contract 2010 STM-E 6 (City Project No. 01494) & CAH Ashland Drainage Improvements (City Project No. 01918) will 7 be received by the City of Fort Worth Purchasing Office: 8 9 City of Fort Worth 10 Purchasing Division 11 1000 Throckmorton Street 12 Fort Worth, Texas 76102 13 14 until 1:30 P.M. CST, Thursday, May 30, 2013, and bids will be opened publicly and read aloud 15 at 2:00 PM CST in the Council Chambers. 16 17 GENERAL DESCRIPTION OF WORK 18 The major work will consist of the (approximate) following: 19 20 5140 LF of 8" PVC Water Line 21 1780 LF of 12" PVC Water Line 22 181 Water Meters and Service Connections 23 1100 LF OF 16" PVC Sanitary Sewer Pipe 24 1300 LF of 8" PVC Sanitary Sewer Line 25 21 Sanitary Sewer Manholes 26 45 Sanitary Sewer Service Connections 27 660 LF of Box Culvert 28 1 Storm Diversion Structure 29 3300 SY of Asphalt Pavement Replacement 30 31 PREQUALIFICATION 32 The improvements included in this project must be performed by a contractor who is pre- 33 qualified by the City at the time of bid opening. The procedures for qualification and pre- 34 qualification are outlined in the Section 00 21 13 — INSTRUCTIONS TO BIDDERS. 35 36 DOCUMENT EXAMINATION AND PROCUREMENTS 37 The Bidding and Contract Documents may be examined or obtained on-line by visiting the City 38 of Fort Worth's Purchasing Division website at http://www.fortwortheov.or2/purchasins/ and 39 clicking on the Buzzsaw link to the advertised project folders on the City's Buzzsaw site. The 40 Contract Documents may be downloaded, viewed, and printed by interested contractors and/or 41 suppliers. 42 43 Copies of the Bidding and Contract Documents may be purchased from William D. Wendland 44 (817-306-1444) at Burgess and Niple located at 3950 Fossil Creek Dr. Suite #210, Fort Worth, 45 Texas, 76137. 46 47 The cost of Bidding and Contract Documents is: 48 49 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 0011 13-2 INVITATION TO BIDDERS Page 2 of 2 1 Set of Bidding and Contract Documents with full size drawings: 100$ 2 3 Set of Bidding and Contract Documents with half size (if available) drawings: 60$ 4 5 PREBID CONFERENCE 6 7 A prebid conference may be held as described in Section 00 21 13 - INSTRUCTIONS TO 8 BIDDERS at the following location, date, and time: 9 DATE: May 16, 2013 10 TIME: 9 am 11 PLACE: Water Department Conference Room 12 Fort Worth, Texas 76102 13 LOCATION: City Hall, Second Floor, Southwest corner 14 15 CITY'S RIGHT TO ACCEPT OR REJECT BIDS 16 City reserves the right to waive irregularities and to accept or reject bids. 17 18 INQUIRIES 19 All inquiries relative to this procurement should be addressed to the following: 20 Water and Sewer Improvements Contract 2010, STM-E 21 Attn: Robert Sauceda, City of Fort Worth 22 Email: Robert.Sauceda@FortWorthTexas.gov 23 Phone: (817) 392-2387 24 AND/OR 25 Attn: William D. Wendland, Burgess and Niple 26 Email: bwendland@burnip.com 27 Phone: (817)306-1444 28 CAH Ashland Drainage Improvements 29 Attn: Scott Hubley, Freese & Nichols 30 Email: skh@freese.com 31 Phone: (817)735-7300 32 33 ADVERTISEMENT DATES 34 35 May 2, 2013 36 May 9, 2013 37 38 39 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 00 21 13 -1 INSTRUCTIONS TO BIDDERS Page 1 of 9 1 SECTION 00 21 13 2 INSTRUCTIONS TO BIDDERS 3 4 1. Defined Terms 5 6 1.1. Terms used in these INSTRUCTIONS TO BIDDERS, which are defined in Section 00 72 7 00 - GENERAL CONDITIONS. 8 9 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the 10 meanings indicated below which are applicable to both the singular and plural thereof. 11 12 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting 13 directly through a duly authorized representative, submitting a bid for performing 14 the work contemplated under the Contract Documents. 15 16 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or 17 corporation acting directly through a duly authorized representative, submitting a 18 bid for performing the work contemplated under the Contract Documents whose 19 principal place of business is not in the State of Texas. 20 21 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City 22 (on the basis of City's evaluation as hereinafter provided) makes an award. 23 24 2. Copies of Bidding Documents 25 26 2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations 27 resulting from the Bidders use of incomplete sets of Bidding Documents. 28 29 2.2. City and Engineer in making copies of Bidding Documents available do so only for the 30 purpose of obtaining Bids for the Work and do not authorize or confer a license or grant 31 for any other use. 32 33 3. Prequalification of Bidders (Prune Contractors and Subcontractors) 34 35 3.1. All Bidders and their subcontractors are required to be prequalified for the work types 36 requiring prequalification at the time of bidding. Bids received from contractors who are 37 not prequalified (even if inadvertently opened) shall not be considered. Prequalification 38 requirement work types and documentation are as follows: 39 40 3.1.1. Paving — Requirements document located at; 41 https://proiectpoint.buzzsaw.com/fortworthgov/Resources/02%20- 42 %20Construction%20Documents/Contractor%20Prequalification/TPW%20Paving 43%20Contractor%20Preuualification%20Program/PREOUALIFICATION%2OREQ 44 UIREMENTS%20FOR%20PAVING%2000NTRACTORS.PDF?public 45 46 3.1.2. Roadway and Pedestrian Lighting — Requirements document located at; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 00 21 13 -2 INSTRUCTIONS TO BIDDERS Page 2 of 9 1 https://projectpoint.buzzsaw.com/fortworthgov/Resources/02%20- 2 %20Construction%20Documents/Contractor%20Prequalification/TPW%20Paving 3%20Contractor%20Prequalification%20Program/PREOUALIFICATION%2OREO 4 UIREMENTS%20FOR%20PAVING%2000NTRACTORS.PDF?public 5 6 3.1.3. Water and Sanitary Sewer — Requirements document located at; 7 https://projectpoint.buzzsaw.com/fortworthaov/Resources/02%20- 8 %20Construction%20Documents/Contractor%20Prequalification/Water%20and%2 9 OSanitarv%20Sewer%20Contractor%20Prequalification%20Prog ram/WSS%20pre 10 uual%20requirements.doc?public 11 12 13 3.2. Each Bidder unless currently prequalified, must be prepared to submit to City within 14 seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 15 45 11, BIDDERS PREQUALIFICATIONS. 16 17 3.2.1. Submission of and/or questions related to prequalification should be addressed to 18 the City contact as provided in Paragraph 6.1. 19 20 21 3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low 22 bidder(s) for a project to submit such additional information as the City, in its sole 23 discretion may require, including but not limited to manpower and equipment records, 24 information about key personnel to be assigned to the project, and construction schedule, 25 to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to 26 deliver a quality product and successfully complete projects for the amount bid within 27 the stipulated time frame. Based upon the City's assessment of the submitted 28 information, a recommendation regarding the award of a contract will be made to the 29 City Council. Failure to submit the additional information, if requested, may be grounds 30 for rejecting the apparent low bidder as non -responsive. Affected contractors will be 31 notified in writing of a recommendation to the City Council. 32 33 3.4. In addition to prequalification, additional requirements for qualification may be required 34 within various sections of the Contract Documents. 35 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 36 37 4.1. Before submitting a Bid, each Bidder shall: 38 39 4.1.1. Examine and carefully study the Contract Documents and other related data 40 identified in the Bidding Documents (including "technical data" referred to in 41 Paragraph 4.2. below). No information given by City or any representative of the 42 City other than that contained in the Contract Documents and officially 43 promulgated addenda thereto, shall be binding upon the City. 44 45 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and 46 site conditions that may affect cost, progress, performance or furnishing of the 47 Work. 48 49 4.1.3. Consider federal, state and local Laws and Regulations that may affect cost, 50 progress, performance or furnishing of the Work. 51 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 00 21 13 -3 INSTRUCTIONS TO BIDDERS Page 3 of 9 1 4.1.4. Study all: (i) reports of explorations and tests of subsurface conditions at or 2 contiguous to the Site and all drawings of physical conditions relating to existing 3 surface or subsurface structures at the Site (except Underground Facilities) that 4 have been identified in the Contract Documents as containing reliable "technical 5 data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, 6 at the Site that have been identified in the Contract Documents as containing 7 reliable "technical data." 8 9 4.1.5. Be advised that the Contract Documents on file with the City shall constitute all of 10 the information which the City will furnish. All additional information and data 11 which the City will supply after promulgation of the formal Contract Documents 12 shall be issued in the form of written addenda and shall become part of the Contract 13 Documents just as though such addenda were actually written into the original 14 Contract Documents. No information given by the City other than that contained in 15 the Contract Documents and officially promulgated addenda thereto, shall be 16 binding upon the City. 17 18 4.1.6. Perform independent research, investigations, tests, borings, and such other means 19 as may be necessary to gain a complete knowledge of the conditions which will be 20 encountered during the construction of the project. On request, City may provide 21 each Bidder access to the site to conduct such examinations, investigations, 22 explorations, tests and studies as each Bidder deems necessary for submission of a 23 Bid. Bidder must fill all holes and clean up and restore the site to its former 24 conditions upon completion of such explorations, investigations, tests and studies. 25 26 4.1.7. Determine the difficulties of the Work and all attending circumstances affecting the 27 cost of doing the Work, time required for its completion, and obtain all information 28 required to make a proposal. Bidders shall rely exclusively and solely upon their 29 own estimates, investigation, research, tests, explorations, and other data which are 30 necessary for full and complete information upon which the proposal is to be based. 31 It is understood that the submission of a proposal is prima -facie evidence that the 32 Bidder has made the investigation, examinations and tests herein required. Claims 33 for additional compensation due to variations between conditions actually 34 encountered in construction and as indicated in the Contract Documents will not be 35 allowed. 36 37 4.1.8. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or 38 between the Contract Documents and such other related documents. The Contractor 39 shall not take advantage of any gross error or omission in the Contract Documents, 40 and the City shall be permitted to make such corrections or interpretations as may 41 be deemed necessary for fulfillment of the intent of the Contract Documents. 42 43 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of: 44 45 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 46 the site which have been utilized by City in preparation of the Contract Documents. 47 The logs of Soil Borings, if any, on the plans are for general information only. 48 Neither the City nor the Engineer guarantee that the data shown is representative of 49 conditions which actually exist. 50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 Water and Sanitary Server Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 0021 13-4 INSTRUCTIONS TO BIDDERS Page 4 of 9 1 4.2.2. those drawings of physical conditions in or relating to existing surface and 2 subsurface structures (except Underground Facilities) which are at or contiguous to 3 the site that have been utilized by City in preparation of the Contract Documents. 4 5 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 6 on request. Those reports and drawings may not be part of the Contract 7 Documents, but the "technical data" contained therein upon which Bidder is entitled 8 to rely as provided in Paragraph 4.02. of the General Conditions has been identified 9 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 10 responsible for any interpretation or conclusion drawn from any "technical data" or 11 any other data, interpretations, opinions or information. 12 13 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder (i) 14 that Bidder has complied with every requirement of this Paragraph 4, (ii) that without 15 exception the Bid is premised upon performing and furnishing the Work required by the 16 Contract Documents and applying the specific means, methods, techniques, sequences or 17 procedures of construction (if any) that may be shown or indicated or expressly required 18 by the Contract Documents, (iii) that Bidder has given City written notice of all 19 conflicts, errors, ambiguities and discrepancies in the Contract Documents and the 20 written resolutions thereof by City are acceptable to Bidder, and when said conflicts, 21 etc., have not been resolved through the interpretations by City as described in 22 Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate 23 and convey understanding of all terms and conditions for performing and furnishing the 24 Work. 25 26 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated 27 biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by 28 Paragraph 4.06, of the General Conditions, unless specifically identified in the Contract 29 Documents. 30 31 4.5. Prospective bidders are hereby notified that the successful responsible and responsive 32 low bidder must have sufficient crews/manpower and equipment available to commence 33 and complete construction of the water main improvements on Lloyd Avenue added to 34 the project scope via Addendum No. 2 prior to, or simultaneous with, commencement of 35 work on the original project scope (at the time the project was first advertised for bid). 36 All water main improvements work on Lloyd Avenue must be completed and accepted 37 by the City within 45 calendar days of the Notice to Proceed Date to allow for 38 pulverization and asphalt overlay of the roadway. 39 40 5. Availability of Lands for Work, Etc. 41 42 5.1. The lands upon which the Work is to be performed, rights -of -way and easements for 43 access thereto and other lands designated for use by Contractor in performing the Work 44 are identified in the Contract Documents. All additional lands and access thereto 45 required for temporary construction facilities, construction equipment or storage of 46 materials and equipment to be incorporated in the Work are to be obtained and paid for 47 by Contractor. Easements for permanent structures or permanent changes in existing 48 facilities are to be obtained and paid for by City unless otherwise provided in the 49 Contract Documents. 50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 0021 13-5 INSTRUCTIONS TO BIDDERS Page 5 of 9 1 5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed 2 in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- 3 of -way, easements, and/or permits are not obtained, the City reserves the right to cancel 4 the award of contract at any time before the Bidder begins any construction work on the 5 project. 6 7 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 8 way, easements, and/or permits, and shall submit a schedule to the City of how 9 construction will proceed in the other areas of the project that do not require permits 10 and/or easements. 11 12 6. Interpretations and Addenda 13 14 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to 15 City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions 16 received after this day may not be responded to. Interpretations or clarifications 17 considered necessary by City in response to such questions will be issued by Addenda 18 delivered to all parties recorded by City as having received the Bidding Documents. 19 Only questions answered by formal written Addenda will be binding. Oral and other 20 interpretations or clarifications will be without legal effect. 21 22 Address questions to: 23 24 City of Fort Worth 25 1000 Throckmorton Street 26 Fort Worth, TX 76102 27 Attn: Robert Sauceda, Water Department 28 Fax: 29 Email: Robert.Sauceda@FortWorthTexas.gov 30 Phone: (817) 392-2387 31 32 33 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by 34 City. 35 36 6.3. Addenda or clarifications may be posted via Buzzsaw. 37 38 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or 39 INVITATION TO BIDDERS. Representatives of City will be present to discuss the 40 Project. Bidders are encouraged to attend and participate in the conference. City will 41 transmit to all prospective Bidders of record such Addenda as City considers necessary 42 in response to questions arising at the conference. Oral statements may not be relied 43 upon and will not be binding or legally effective. 44 45 7. Bid Security 46 47 7.1. Each Bid must be accompanied by Bid Bond made payable to City in an amount of five 48 (5) percent of Bidder's maximum Bid price on form attached, issued by a surety meeting 49 the requirements of Paragraphs 5.01 of the General Conditions. 50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 0021 13-6 INSTRUCTIONS TO BIDDERS Page 6 o19 1 7.2. The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award 2 have been satisfied. If the Successful Bidder fails to execute and deliver the complete 3 Agreement within 10 days after the Notice of Award, City may consider Bidder to be in 4 default, rescind the Notice of Award, and the Bid Bond of that Bidder will be forfeited. 5 Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all 6 other Bidders whom City believes to have a reasonable chance of receiving the award 7 will be retained by City until final contract execution. 8 9 8. Contract Times 10 The number of days within which, or the dates by which, Milestones are to be achieved in 11 accordance with the General Requirements and the Work is to be completed and ready for 12 Final Acceptance is set forth in the Agreement or incorporated therein by reference to the 13 attached Bid Form. 14 15 9. Liquidated Damages 16 Provisions for liquidated damages are set forth in the Agreement. 17 18 10. Substitute and "Or -Equal" Items 19 The Contract, if awarded, will be on the basis of materials and equipment described in the 20 Bidding Documents without consideration of possible substitute or "or -equal" items. 21 Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or- 22 equal" item of material or equipment may be furnished or used by Contractor if acceptable to 23 City, application for such acceptance will not be considered by City until after the Effective 24 Date of the Agreement. The procedure for submission of any such application by Contractor 25 and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General 26 Conditions and is supplemented in Section 01 25 00 of the General Requirements. 27 28 11. Subcontractors, Suppliers and Others 29 30 11.1. In accordance with City Ordinance No. 15530 (as amended), the City has goals for 31 the participation of minority business and women business enterprises in City 32 contracts. A copy of the Ordinance can be obtained from the Office of the City 33 Secretary. The Bidder shall submit the MBE/WBE Utilization Form, 34 Subcontractor/Supplier Utilization Form, Prime Contractor Waiver Form and/or 35 Good Faith Effort Form (with "documentation) and/or Joint Venture Form as 36 appropriate. The Forms including documentation must be received by the City no 37 later than 5:00 P.M. CST, five (5) City business days after the bid opening date. The 38 Bidder shall obtain a receipt from the City as evidence the documentation was 39 received. Failure to comply shall render the bid as non -responsive. 40 41 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person 42 or organization against whom Contractor has reasonable objection. 43 44 12. Bid Form 45 46 12.1. The Bid Form is included with the Bidding Documents; additional copies may be 47 obtained from the City. 48 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 0191 S 0021 13-7 INSTRUCTIONS TO BIDDERS Page 7 of 9 1 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form 2 signed in ink. Erasures or alterations shall be initialed in ink by the person signing 3 the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit 4 price item listed therein. In the case of optional alternatives, the words "No Bid," 5 "No Change," or "Not Applicable" may be entered. Bidder shall state the prices, 6 written in ink in both words and numerals, for which the Bidder proposes to do the 7 work contemplated or furnish materials required. All prices shall be written legibly. 8 In case of discrepancy between price in written words and the price in written 9 numerals, the price in written words shall govern. 10 11 12.3. Bids by corporations shall be executed in the corporate name by the president or a 12 vice-president or other corporate officer accompanied by evidence of authority to 13 sign. The corporate seal shall be affixed. The corporate address and state of 14 incorporation shall be shown below the signature. 15 16 12.4. Bids by partnerships shall be executed in the partnership name and signed by a 17 partner, whose title must appear under the signature accompanied by evidence of 18 authority to sign. The official address of the partnership shall be shown below the 19 signature. 20 21 12.5. Bids by limited liability companies shall be executed in the name of the firm by a 22 member and accompanied by evidence of authority to sign. The state of formation of 23 the firm and the official address of the firm shall be shown. 24 25 12.6. Bids by individuals shall show the Bidder's name and official address. 26 27 12.7. Bids by joint ventures shall be executed by each joint venturer in the manner 28 indicated on the Bid Form. The official address of the joint venture shall be shown. 29 30 12.8. All names shall be typed or printed in ink below the signature. 31 32 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of 33 which shall be filled in on the Bid Form. 34 35 12.10. Postal and e-mail addresses and telephone number for communications regarding the 36 Bid shall be shown. 37 38 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of 39 Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance 40 to State Law Non Resident Bidder. 41 42 13. Submission of Bids 43 Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, 44 at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, 45 addressed to City Manager of the City, and shall be enclosed in an opaque sealed envelope, 46 marked with the City Project Number, Project title, the name and address of Bidder, and 47 accompanied by the Bid security and other required documents. If the Bid is sent through the 48 mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope 49 with the notation "BID ENCLOSED" on the face of it. 50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 0021 13-8 INSTRUCTIONS TO BIDDERS Page 8 of 9 1 14. Modification and Withdrawal of Bids 2 3 14.1. Bids addressed to the City Manager and filed with the Purchasing Office cannot be 4 withdrawn prior to the time set for bid opening. A request for withdrawal must be 5 made in writing by an appropriate document duly executed in the manner that a Bid 6 must be executed and delivered to the place where Bids are to be submitted at any 7 time prior to the opening of Bids. After all Bids not requested for withdrawal are 8 opened and publicly read aloud, the Bids for which a withdrawal request has been 9 properly filed may, at the option of the City, be returned unopened. 10 11 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 12 time set for the closing of Bid receipt. 13 14 15. Opening of Bids 15 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 16 abstract of the amounts of the base Bids and major alternates (if any) will be made available 17 to Bidders after the opening of Bids. 18 19 16. Bids to Remain Subject to Acceptance 20 All Bids will remain subject to acceptance for the time period specified for Notice of Award 21 and execution and delivery of a complete Agreement by Successful Bidder. City may, at 22 City's sole discretion, release any Bid and nullify the Bid security prior to that date. 23 24 17. Evaluation of Bids and Award of Contract 25 26 17.1. City reserves the right to reject any or all Bids, including without limitation the rights 27 to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids 28 and to reject the Bid of any Bidder if City believes that it would not be in the best 29 interest of the Project to make an award to that Bidder, whether because the Bid is 30 not responsive or the Bidder is unqualified or of doubtful financial ability or fails to 31 meet any other pertinent standard or criteria established by City. City also reserves 32 the right to waive informalities not involving price, contract time or changes in the 33 Work with the Successful Bidder. Discrepancies between the multiplication of units 34 of Work and unit prices will be resolved in favor of the unit prices. Discrepancies 35 between the indicated sum of any column of figures and the correct sum thereof will 36 be resolved in favor of the correct sum. Discrepancies between words and figures 37 will be resolved in favor of the words. 38 39 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists 40 among the Bidders, Bidder is an interested party to any litigation against City, 41 City or Bidder may have a claim against the other or be engaged in litigation, 42 Bidder is in arrears on any existing contract or has defaulted on a previous 43 contract, Bidder has performed a prior contract in an unsatisfactory manner, or 44 Bidder has uncompleted work which in the judgment of the City will prevent or 45 hinder the prompt completion of additional work if awarded. 46 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 0021 13-9 INSTRUCTIONS TO BIDDERS Page 9 of 9 1 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and 2 other persons and organizations proposed for those portions of the Work as to which 3 the identity of Subcontractors, Suppliers, and other persons and organizations must 4 be submitted as provided in the Contract Documents or upon the request of the City. 5 City also may consider the operating costs, maintenance requirements, performance 6 data and guarantees of major items of materials and equipment proposed for 7 incorporation in the Work when such data is required to be submitted prior to the 8 Notice of Award. 9 10 17.3. City may conduct such investigations as City deems necessary to assist in the 11 evaluation of any Bid and to establish the responsibility, qualifications, and financial 12 ability of Bidders, proposed Subcontractors, Suppliers and other persons and 13 organizations to perform and furnish the Work in accordance with the Contract 14 Documents to City's satisfaction within the prescribed time. 15 16 17.4. Contractor shall perform with his own organization, work of a value not less than 17 35% of the value embraced on the Contract, unless otherwise approved by the City. 18 19 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and 20 responsive Bidder whose evaluation by City indicates that the award will be in the 21 best interests of the City. 22 23 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award 24 contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than 25 the lowest bid submitted by a responsible Texas Bidder by the same amount that a 26 Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a 27 comparable contract in the state in which the nonresident's principal place of 28 business is located. 29 30 17.7. A contract is not awarded until formal City Council authorization. If the Contract is 31 to be awarded, City will award the Contract within 90 days after the day of the Bid 32 opening unless extended in writing. No other act of City or others will constitute 33 acceptance of a Bid. Upon the contractor award a Notice of Award will be issued by 34 the City. 35 36 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 37 38 18. Signing of Agreement 39 When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the 40 required number of unsigned counterparts of the Agreement. Within 14 days thereafter 41 Contractor shall sign and deliver the required number of counterparts of the Agreement to 42 City with the required Bonds, Certificates of Insurance, and all other required documentation. 43 City shall thereafter deliver one fully signed counterpart to Contractor. 44 45 46 47 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 27, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 0035 13 BID FORM Page 1 of 1 SECTION 00 35 13 CONFLICT OF INTEREST AFFIDAVIT Each bidder, offeror, or respondent (hereinafter also referred to as "you") to a City of Fort Worth (also referred to as "City") procurement are required to complete Conflict of Interest Questionnaire (the attached CIQ Form) and Local Government Officer Conflicts Disclosure Statement (the attached CIS Form) below pursuant to state law. This affidavit will certify that the Bidder has on file with the City Secretary the required documentation and is eligible to bid on City Work. The referenced forms may also be downloaded from the website links provided below. htto://www.ethics state.tx.us/forms/CIQ.odf http://www.ethics.state.tx.ustforms/CIS.Pdf 111 CIQ Form is on file with City Secretary ❑ CIQ Form is being provided to the City Secretary ❑ CIS Form is on File with City Secretary ❑ CIS Form is being provided to the City Secretary BIDDER: Woody Contractors Inc By: Troy Wood 650 Tower Drive Signature: Kennedale Tx, 76060 Title: END OF SECTION President CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 STM-E_&_CAN Ashland 00 41 00 00 43 13 00 42 43 00 43 37 00 45 12 00 35.13_Bid _Proposal_Workbook TO: The City Manager c/o: The Purchasing Department 1000 Throckmorton Street City of Fort Worth, Texas 76102 FOR: City Project No.: 01494 & 01918 Units/Sections: 1. Enter Into Agreement SECTION 00 41 00 BID FORM Water and Sanitary Sewer Replacement Contract 2010 STM-E Ashland Ave. From El Campo Ave. to Camp Bowie Blvd. Birchman Ave. from Ashland Ave. to Clover Ln. El Campo Ave. from Clover Ln. to Sutter Ln. Libbey Ave. from Faron St. to Prevost St. & CAH Ashland Drainage Improvements Ashland Ave. from El Campo Ave. to Bryce Ave. Unit 1 A - Water Improvements Unit 1 B - Sanitary Sewer Improvements Unit 2A - Ashland Ave Drainage Unit 2B - Ashland Ave Paving 00 41 00 BID FORM Page 1 of 3 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive levels. d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 50285 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook.xls 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Water Improvements b. Sanitary Sewer Improvements c. Paving Improvements d. 4. Time of Completion 00 41 00 BID FORM Page 2 of 3 4.1. The Work will be complete for Final Acceptance within 290 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work (and/or achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 *If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 50285 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal W orkbook.xls 00 41 00 BID FORM Page 3 of 3 6.3. Total Bid 7. Bid Submittal This Bid is submitted on June 6th 2013 Respectfully sub By: frSi.e) Troy Woody (Printed Name) Title: President Company: Woody Contractors Inc Address: 650 Tower Drive Kennedale Tx, 76060 State of Incorporation: Email: twoodv20200aol,com Phone: 817-483-4787 Texas CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 END OF SECTION $2,996,884.55 by the entity named below. Receipt is acknowledged or the following Addenda: Addendum No. 1: _ Addendum No. 2: Addendum No. 3: (Addendum No. 4: I / ,I.gt ii rt/n S" Corporate Seal: Initial STM-E_&_CAH_Ashland 00 41 00 00 43 13 00 42 43 00 43 37 00 45 12 00 35 13 Bid Proposal Workbook Revised by Addendum 3 00 42 43 RID PROPOSAL Pagc l of 3 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Bidlist Item No. Project lien Information Bidder's Proposal Description Specification Unit of Section No. Measure Aid Quantity Unit Price Bid Value Unit 1 - Section A - Water Improvements 1 3311.0061 4" PVC Water Pipe 3311 12 LF 25 $27.00 $675.00 2 3311.0161 6" PVC Water Pipe 34 11 12 LF 40 $30.00 $1,200.00 3 3311.0151 6" DIP Water 34 11 10 LF 70 $46.00 $3,220.00 4 3311.0261 8" PVC Water Pipe 33 11 12 LF 6940 $36.00 _.. $249,840.00 5 3311.0251 8" DIP Water 3311 10 LF 42 $50.00 $2,100.00 6 3305.2002 8" Water Carrier Pipe 33 05 24 LF 60 $42.00 $2,520.00 7 3311.0461 12" PVC Water Pipe 33 11 12 LF 1765 $62.00 $109,430.1)0 8 3311.0451 12" DIP Water 33 11 10 LF 11 $82.00 S902.00 9 3305.1102 16" Casing By Other Than Open Cut 33 05 22 LF 60 $200.00 S12,000.00 10 0241.1302 Remove 6" Water Valve 02 41 14 EA 9 $100.00 S900.00 11 0241.1305 Remove 12" Water Valve 02 41 14 EA 3 $100.00 S300.00 12 0241.1510 Salvage Fire Hydrant 02 41 14 EA 5 $150.00 5750.00 13 0241.1512 Salvage 1" Water Meter 02 41 14 EA 1 $75.00 57.5.00 14 0241.1511 Salvage 3/4" Water Meter 02 41 14 EA 178 $75.00 _..- 513,350.00 15 0241.1205 12" Water Abandonment Plug 02 41 14 EA 4 $300.00 51,200.00 16 3312.0001 Fire Hydrant 33 12 40 EA 5 $2,800.00 $14,000 00 17 3312.3005 12" Gate Valve 33 12 20 EA 3 $1,900.00 $5,700.00 18 3312.3003 8" Gate Valve 32 12 20 EA 27 $1,100.00 529,700.00 19 3312.3002 6" Gate Valve 33 12 20 EA 4 $800.00 $3,200.00 20 3312.3001 4" Gate Valve 33 12 20 EA 1 $600.00 S600.00 21 3311.0001 Ductile Iron Water Fittings 33 11 11 TON 4.63 $7,000.00 S32,410.00 22 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 22 $1,400.00 S30,800.00 23 3304.0101 Temporary Water Services 33 04 30 LS 1 $110,000.00 SI H0,000.00 24 3304.0102 2" Temporary Water Services (Misc Only) 33 04 30 LF 1910 $6.00 Si 1,460 00 25 3312.2001 1" Water Service, Meter Relocation 33 12 10 EA 213 $200.00 542,600.00 26 3312.2101 1 1/2" Water Service, Meter Relocation 33 12 10 EA 1 $500.00 $500.00 27 3312.2003 1" Water Service 33 12 10 EA 213 $950.00 $202,350.00 28 3312.2103 1 1/2" Water Service 331210 EA 1 $2,000.00 S2,000.00 29 3201.0400 Temporary Asphalt Paving Repair 32 01 18 LF 9780 $10.00 S97,800.00 30 3214.0200 Brick Pvmt Repair 32 14 16 SY 10 $150.00 $1,.500.00 31 3201.0614 Conc Pvmt Repair, Residential 32 01 29 SY 100 $75.00 $7,500.00 32 3216.0102 7" Conc Curb and Gutter 32 1613 LF 710 $28.00 S 19,xx0.(x) 33 3213.0401 6" Concrete Driveway 3213 20 SF 360 $6.00 $2,160.00 34 3213.0301 4" Conc Sidewalk 32 13 20 SF 240 $5.00 $1,200.00 35 3292.0100 Block Sod Placement 32 92 13 SY 320 $12.00 S3,840.00 36 3305.0109 Trench Safety 34 05 10 LF 273 $1.00 S273.00 37 3471.0001 Traffic Control 33 71 13 MO 7 $2,100.00 S14,700.00 38 3305.0103 Exploratory Excavation o1 Existing Utilities 33 05 30 EA 2 $800.00 51,600.00 Unit 1 - Section A - Water Improvements $1,034,235.00 CRY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION t>OCUIIENSS For. Revised 20120120 Excel Low &dder xis Revised by Addendum 3 0042 43 BID I'ROI'OSAI. Page 2 of 3 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Bidlisl Lem No. Project Item Information Description Unit 1 - Section B - Sanitary Sewer Improvements 1 3331.4101 4" Sewer Pipe 2 3331.4108 6" Sewer Pipe_ 3 3331.4115 8" Sewer Pipe 4 3331.4201 10" Sewer Pipe 5 3331.4208 12" Sewer Pipe 6 3331.2104 12" CIPP 7 3331.4218 16" Sewer Pipe 8 0241.2201 Remove 4' Sewer Manhole 9 3339.1001 4' Manhole 10 3305.0112 Concrete Collar 11 3331.3101 4" Sewer Service 12 0330.0001 Concrete Encase Sewer Pipe 13 3301.0001 Pre -CCTV Inspection 14 3301.0002 Post -CCTV Inspection 15 3341.0302 30" RCP, Class III 16 3301.0101 Manhole Vacuum Testing 17 3305.0109 Trench Safety 18 3201.0400 Temporary Asphalt Paving Repair 19 3213.0301 4" Corm Sidewalk 20 3213.0401 6" Concrete Driveway 21 3216.0102 7" Conc Curb and Gutter 22 0241.2001 Sanitary Line Grouting 23 3110.0103 12"-18" Tree Removal 24 3110.0104 18"-24" Tree Removal 25 3293.0106 Plant 6" Tree 26 3339.1101 5' Manhole 27 3339.1003 4' Extra Depth Manhole 28 3339.1103 5' Extra Depth Manhole Specification Uni) of Section No. Measure Bid Quantity Bidder's Proposal Unit Price Bid Value 33 31 20 LF 35 856.00. S1,960.00 33 31 20 LF 30 $61.00 S1,830.00 3331 20 LF 1305 $66.00 S86,(30.00 33 31 20 LF 420 $69.00 S28,980.00 33 31 20 LF 380 ---- $76.00 S28,880.00 33 31 12 LF 165 $100.00 S16,500.00 33 11 12 LF 1090 $200.00 $218,000.00 02 41 14 EA 17 $400.00 56,800.00 33 3910 33 39 20 EA 18 $3,500.00 S63,000.00 33 05 17 EA 23 $100.00 52,300L00 33 31 50 EA 45 $750.00 533,750.00 03 30 00 CY 4 $350.00 51,400.00 33 01 31 LF 2261 $3.00 56,783.00 33 01 31 LF 3437 $2.00 S6,874.00 33 41 10 LF 195 $120.00 S23,400.00 33 01 30 EA 21 $100.00 52,100.00 33 05 10 LF 3430 $1.00 53,430.00 32 01 17 LF 1298 $18.00 $23,364.00 32 13 20 SF 2149 $5.00 51(1,745.00 31 13 20 SF 308 $6.00 51,848.(0 32 16 13 LF 379 $28.00 510,612.00 02 41 14 CY 20 $500.00 510,000.00 31 10 00 EA 6 $800.00 $4,800.00 31 10 00 EA 2 $1,000.00 52,0(10.00 32 93 43 EA 8 $1,200.00 59,600.00 33 39 10 33 39 20 EA 2 $6,500.00 513,000.00 33 39 10 33 39 20 VF 38 $125.00 54,750.00 33 39 10 33 39 20 VF 27 $200.00 55,400.00 Unit 1 - Section It - Snnitnry Server Improvements $628,236.00 CFIY OF FORT W ORI B STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Rol.' 20121)120 Eecci Low Bnidsr.els Revised by Addendum 3 00 42 43 BID I'ROI'OSAI. Page 3 of 3 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE BID Bidder's Application Bidlist Item No. Project Item Information Bidder's Proposal Description Specification Unit of Section No. Measure Bid Quantity Unit Price Bid Value Unit 2 - Section A - Ashland Ave Drainage 1 3125.0101 SWPPP a 1 acre 31 25 00 LS 1 $5,000.00 $5,000.00 2 0241.4001 Remove 10' Curb Inlet 02 41 14 EA 2 $3,300.00 $6,600.00 3 3441.3502 Relocate Street Light Pole 34 41 20 EA 1 $4,000.00 $4,000.00 4 3341.2201 12x4 Box Culvert 33 41 10 LF 290 $1,000.00 $290,000.00 5 3341.2203 12x6 Box Culvert 33 41 10 LF 160 $1,060.00 $169,600.00 6 3341.2206 12x9 Box Culvert 33 41 10 LF 210 $1,250.00 $262,500.00 7 3349.0102 4' Manhole Riser 33 49 10 EA 6 $1,800.00 $10,800.00 8 3305.0109 Trench Safety 33 05 10 LF 660 $1.00 $660.00 9 9999.0001 Storm Diversion Structure 33 49 10 LS 1 $172,000.00 $172,000.00 10 9999.0002 Box Culvert Cross Connection 33 41 10 EA 3 $1,500.00 $4,500.00 11 9999.0010 Pressure Transducer Housing 99 99 00 EA 2 $1,500.00 $3,000.00 12 9999.0011 Storm Water Field Order Allowance 99 99 00 LS 1 $35,000.00 $35,000.00 13 9999.0012 Vibration Monitoring 99 99 00.12 MO 3 $4,000.00 $12,000.00 Unit 2 - Section A - Ashland Ave Drainage $975,660.00 Unit 2 - Section B - Ashland Ave Paving 1 0241.1300 Remove Conc Curb&Gutter 02 41 15 LF 1295 $1.40 $1,813.00 2 0241.1800 Remove Speed Cushion 02 41 15 EA 2 $33.00 $66.00 3 0241.0100 Remove Sidewalk 02 41 13 SF 8523 $1.00 $8,523.00 4 0241.0300 Remove ADARamp _.. 02 41 13 EA 3 $65.00 $195.00 5 0241.0401 Remove Concrete Drive 02 41 13 SF 5218 $1.00 $5,218.00 6 0241.1100 Remove Asphalt Pvmt 02 41 15 SY 2492 $4.00 $9,968.00 7 3110.0108 Remove and Transplant 4" Tree 31 10 00 EA 7 $1,200.00 $8,400.00 8 3123.0401 Unclassified Excavation 31 23 16 CY 1591 $17.00 $27,047.00 9 3124.0101 Embankment 31 24 00 CY 33 $10.00 $330.00 10 3211.0400 Hydrated Lime 321129 TN 57 $145.00 $8,265.00 11 3211.0502 8" Lime Treatment 3211 29 SY 3166 $2.00 $6,332.00 12 3213.0103 8" Conc Pvmt 3213 13 SY 2992 $40.00 $119,680.00 13 3213.0301 4" Conc Sidewalk 32 13 20 SF 7136 $5.00 $35,680.00 14 3213.0401 6" Concrete Driveway 3213 20 SF 5923 $5.50 $32,576.50 15 3213.0451 6" Concrete Driveway, Exposed Aggregate 3213 20 SF 200 $6.50 $1,300.00 16 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 5 $500.00 $2,500.00 17 3232.0100 Conc Ret Wall with Sidewalk, Face 32 32 13 SF 240 $15.00 $3,600.00 18 3232.0101 Conc Ret Wall with Sidewalk, Sidewalk 32 32 13 SF 741 $5.00 $3,705.00 19 3291.0100 Topsoil 32 91 19 CY 336 $15.00 $5,040.00 20 3292.0100 Block Sod Placement 32 9213 SF 18141 $0.55 $9,977.55 21 3471.0001 Traffic Control 34 71 13 MO 5.5 $2,100.00 $11,550.00 22 3471.0003 Traffic Control Details 34 71 13 EA 1 $2,000.00 $2,000.00 23 9999.0003 Concrete Step 99 99 00 SF 280 $15.00 $4,200.00 24 9999.0004 Curb Stamp Saw Cut Removal 99 99 00 EA 28 $15.00 $420.00 25 9999.0005 Modular Speed Cushion 99 99 00 EA 2 $1,500.00 $3,000.00 26 9999.0006 Sign -Ceramic Tile Street Names- Install 99 99 00 EA 1 $250.00 $250.00 27 9999.0007 Stone Fascia for Retaining Wall 99 99 00 SF 77 $7.50 $577.50 28 9999.0008 Irrigation Adjustment Allowance 99 99 00 LS 1 $10,000.00 $10,000.00 29 9999.0009 13" Conc Pvmt • Approach Slab 99 99 00 SY 174 $210.00 $36,540.00 Unit 2 - Section 1t - Ashland Ave Paying $358,753.55. Bid Summary Unit I - Section A - Water Improvements Unit 1 - Section 1S - Sanitary Sewer Improvements Unit 2 - Section A - Ashland Ave Drainage Unit 2 - Section B - Ashland Ave Paving Total Unit I (Sections A & itt Total Unit 2 (Sections A & B) Total Bid (Unit 1 & Unit 2) $1,034,235.00 $628,236.00 $975,660.00 $358,753.55 $1,662,471.00 $1,334,413.55 $2,996,884.55 CITY OF FORT WORTH STANDARD CONSORUCTION SPECIFICATION DOCUMENTS Form Rn,se,t 20120120 Excel Low B,ddcr xis SECTION 00 43 13 BID BOND KNOW ALL BY THESE PRESENTS: 00 43 13 BID BOND Page 1 of 1 That we, (Bidder Name) Company Name Here hereinafter called the Principal, and (Surety Name) Surety Name Here a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the City, hereinafter called the Obligee, in the sum of Spell Out Numbers Here and No/100 Dollars ($ Numerals Here .00), the payment of which sum will be well and truly made and the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firm by these presents. identified as WHEREAS, the Principal has submitted a proposal to perform work for the following project of the Obligee, Water and Sanitary Sewer Replacement Contract 2010 STM-E Libbey Ave. from Faron St. to Prevost St. NOW, THEREFORE, if the Obligee shall award the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the Obligee in accordance with the terms of such proposal, then this bond shall be null and void. If the Principal fails to execute such Contract in accordance with the terms of such proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate Obligee for the difference between Principal's Total Bid Amount and the next selected Bidder's Total Bid Amount. SIGNED this By: Company Name Here *By: Surety Name Here *Attach Power of Attorney (Surety) for Attorney -in -Fact CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20110627 day of , 2013. (Signature and Title of Principal) (Signature of Attorney -of -Fact) Impressed Surety Seal Only END OF SECTION 50285 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook.xls 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 1ofl SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders, This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of State Here or Blank , our principal place of business, are required to be 7. Hee percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of State Here or Blank our principal place of business, are not required to underbid resident bidders. B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. El BIDDER: Woody Contractors Inc 650 Tower Drive Kennedale Tx, 76060 ENt) OF SECT)ON CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20110627 By: Troy Woody--) gnature) Title: President Date: 6 r' v 3 STM-E_&_CAH Ashland 00 41 00 00 43 13 00 42 43 00 43 37 00 45 12 00 35 13 Bid_Proposal_Workbook 1 2 SECTION 00 45 11 BIDDERS PREQUALIFICATIONS 004511-1 BIDDERS PREQUALIFICATIONS Page 1 of 3 3 4 1. Summary. All contractors are required to be prequalified by the City prior to submitting 5 bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification 6 Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is 7 not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder 8 Prequalification Application in accordance with the requirements below. 9 10 The prequalification process will establish a bid limit based on a technical evaluation and 11 financial analysis of the contractor. The information must be submitted seven (7) days prior 12 to the date of the opening of bids. For example, a contractor wishing to submit bids on 13 projects to be opened on the 7th of April must file the information by the 31 st day of March 14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's 15 Prequalification Application, the following must accompany the submission. 16 a. A complete set of audited or reviewed financial statements. 17 (1) Classified Balance Sheet 18 (2) Income Statement 19 (3) Statement of Cash Flows 20 (4) Statement of Retained Earnings 21 (5) Notes to the Financial Statements, if any 22 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 23 of Incorporation, Articles of Organization, Certificate of Formation, LLC 24 Regulations, Certificate of Limited Partnership Agreement). 25 c. A completed Bidder Prequalification Application. 26 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 27 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 28 number visit the Texas Comptroller of Public Accounts online at the 29 following web address www.window.state.tx.us/taxoerinit/ and fill out the 30 application to apply for your Texas tax ID. 31 (2) The firm's e-mail address and fax number. 32 (3) The firm's DUNS number as issued by Dun & Bradstreet. This number 33 is used by the City for required reporting on Federal Aid projects. The DUNS 34 number may be obtained at www.dnb.com. 35 d. Resumes reflecting the construction experience of the principles of the firm for firms 36 submitting their initial prequalification. These resumes should include the size and 37 scope of the work performed. 38 e. Other information as requested by the City. 39 40 2. Prequalification Requirements 41 a. Financial Statements. Financial statement submission must be provided in 42 accordance with the following: 43 (1) The City requires that the original Financial Statement or a certified copy 44 be submitted for consideration. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 00 45 11-2 BIDDERS PREQUALIFICATIONS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital = current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequalification Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 (2) A minimum of five (5) references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility to Bid 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 2 3 4 5 6 7 8 9 00 45 11 -3 BIDDERS PREQUALIFICATIONS Page 3 of 3 d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid the prequalified work types until the expiration date stated in the letter. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 00 45 12 BID FORM Page 1 of 1 SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Contractor/Subcontractor Company Name Water Improvements Sanitary Sewer Improvements Paving Improvements 0 Woody Contractors Inc Woody Contractors Inc McClendon Construction Prequalification Expiration Date Aprl. 2014 Aprl. 2014 Aprl. 2014 Company Name Here or space Date Here or space The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Woody Contractors Inc 650 Tower Drive Kennedale Tx, 76060 END OF SECTION Title: President Date: 6 - A- ?0 3 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 STM•E & CAH Ashland_00_41 00 00 43 13 00 42 43 00 43 37 00 45 12 00 35 13 Bid Proposal Workbook FORT WORTH ---"°..../.111°."-N—.' SECTION 00 45 13 BIDDER PREQUALIFICATION APPLICATION Date of Balance Sheet Name under which you wish to qualify Post Office Box City Mark only one: Individual Limited Partnership General Partnership Corporation Limited Liability Company State Zip Code Street Address (required) City State Zip Code ( ) Telephone Fax Email Texas Taxpayer Identification No. Federal Employers Identification No. DUNS No. (if applicable) MAIL THIS QUESTIONAIRE ALONG WITH FINANCIAL STATEMENTS TO: CITY OF FORT WORTH TEXAS 1000 THROCKMORTON STREET FORT WORTH, TEXAS 76102-6311 AND MARK THE ENVELOPE: "BIDDER PREQUALIFICATION APPLICATION" 00 45 13 - 2 BIDDER PREQUALIFICATION APPLICATION Page 2 of 9 BUSINESS CLASSIFICATION The following should be completed in order that we may properly classify your firm: (Check the block(s) which are applicable — Block 3 is to be left blank if Block 1 and/or Block 2 is checked) Has fewer than 100 employees and/or Has less than $6,000,000.00 in annual gross receipts OR Does not meet the criteria for being designated a small business as provided in Section 2006.001 of the Texas Government Code. The classification of your firm as a small or large business is not a factor in determining eligibility to become prequalified. MAJOR WORK CATEGORIES Water Department Augur Boring - 24-inch diameter casing and less _ Augur Boring - Greater than 24-inch diameter casing and greater _ Tunneling — 36-Inches — 60 —inches, and 350 LF or less _ Tunneling - 36-Inches — 60 —inches, and greater than 350 LF _ Tunneling — 66" and greater, 350 LF and greater _ Tunneling — 66" and greater, 350 LF or Less _ Cathodic Protection _ Water Distribution, Development, 8-inch diameter and smaller Water Distribution, Urban and Renewal, 8-inch diameter and smaller _ Water Distribution, Development, 12-inch diameter and smaller _ Water Distribution, Urban and Renewal, 12-inch diameter and smaller _ Water Transmission, Development, 24-inches and smaller _ Water Transmission, Urban/Renewal, 24-inches and smaller _ Water Transmission, Development, 42-inches and smaller _ Water Transmission, Urban/Renewal, 42-inches and smaller _ Water Transmission, Development, All Sizes _ Water Transmission, Urban/Renewal, All Sizes _ Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches — 36-inches _ Sewer Bypass Pumping 42-inches and larger _ CCTV, 8-inches and smaller _ CCTV, 12-inches and smaller _ CCTV, 18-inches and smaller _ CCTV, 24-inches and smaller _ CCTV, 42-inches and smaller CCTV, 48-inches and smaller CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 & CAH Ashland Drainage Improvements City Project No. 01918 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 004513-3 BIDDER PREQUALIFICATION APPLICATION Page 3 of 9 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 & CAH Ashland Drainage Improvements City Project No. 01918 004513-4 BIDDER PREQUALIFICATION APPLICATION Page 4 of 9 MAJOR WORK CATEGORIES, CONTINUED _ Sewer CIPP, 12-inches and smaller _ Sewer CIPP, 24-inches and smaller _ Sewer CIPP, 42-inches and smaller _ Sewer CIPP, All Sizes _ Sewer Collection System, Development, 8-inches and smaller _ Sewer Collection System, Urban/Renewal, 8-inches and smaller _ Sewer Collection System, Development, 12-inches and smaller _ Sewer Collection System, Urban/Renewal, 1 2-inches and smaller _ Sewer Interceptors, Development, 24-inches and smaller _ Sewer Interceptors, Urban/Renewal, 24-inches and smaller _ Sewer Interceptors, Development, 42-inches and smaller _ Sewer Interceptors, Urban/Renewal, 42-inches and smaller _ Sewer Interceptors, Development, 48-inches and smaller _ Sewer Interceptors, Urban/Renewal, 48-inches and smaller _ Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement, All Sizes Sewer Cleaning , 24-inches and smaller _ Sewer Cleaning , 42-inches and smaller _ Sewer Cleaning , All Sizes _ Sewer Cleaning, 8-inches and smaller _ Sewer Cleaning, 12-inches and smaller _ Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less _ Sewer Siphons All Sizes _ Transportation Public Works _ Asphalt Paving Construction/Reconstruction (LESS THAN 10,000 square yards) _ Asphalt Paving Construction/Reconstruction (10,000 square yards and GREATER) _ Asphalt Paving Heavy Maintenance (UNDER $1,000,000) _ Asphalt Paving Heavy Maintenance ($1,000,000 and OVER) Concrete Paving Construction/Reconstruction (LESS THAN 10,000 square yards) Concrete Paving Construction/Reconstruction (10,000 square yards and GREATER) Roadway and Pedestrian Lighting CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 & CAH Ashland Drainage Improvements City Project No. 01918 00 45 13 -5 BIDDER PREQUALIFICATION APPLICATION Page 5 of 9 1. List equipment you do not own but which is available by renting DESCRIPTION OF EQUIPMENT NAME AND DETAILED ADDRESS OF OWNER 2. How many years has your organization been in business as a general contractor under your present name? List previous business names: 3. How many years of experience in construction work has your organization had: (a) As a General Contractor: (b) As a Sub -Contractor: 4. *What projects has your organization completed in Texas and elsewhere? CLASS LOCATION NAME AND DETAILED CONTRACT OF DATE CITY -COUNTY- ADDRESS OF OFFICIAL TO AMOUNT WORK COMPLETED STATE WHOM YOU REFER *If requalifying only show work performed since last statement. 5. Have you ever failed to complete any work awarded to you? If so, where and why? 6.Has any officer or owner of your organization ever been an officer of another organization that failed to complete a contract? If so, state the name of the individual, other organization and reason. 7.Has any officer or owner of your organization ever failed to complete a contract executed in his/her name? If so, state the name of the individual, name of owner and reason. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 & CAH Ashland Drainage Improvements City Project No. 01918 004513-6 BIDDER PREQUALIFICATION APPLICATION Page 6 ot'9 8. In what other lines of business are you financially interested? 9. Have you ever performed any work for the City? If so, when and to whom do you refer? 10. State names and detailed addresses of all producers from whom you have purchased principal materials during the last three years. NAME OF FIRM OR COMPANY DETAILED ADDRESS 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12. What is the construction experience of the principal individuals in your organization? PRESENT MAGNITUDE POSITION OR YEARS OF AND TYPE OF IN WHAT NAME OFFICE EXPERIENCE WORK CAPACITY 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee, please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the same household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 & CAH Ashland Drainage Improvements City Project No. 01918 CORPORATION BLOCK If a corporation: Date of Incorporation Charter/File No. President Vice Presidents Secretary Treasurer LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation Date of organization File No. Officers or Managers (with titles, if any) 004513-7 BIDDER PREQUALIFICATION APPLICATION Page 7 of 9 PARTNERSHIP BLOCK If a partnership: State of Organization Date of organization Is partnership general, limited, or registered limited liability partnership? File No. (if Limited Partnership) General Partners/Officers Limited Partners (if applicable) Individuals authorized to sign for Partnership Except for limited partners, the individuals listed in the blocks above are presumed to have full signature authority for your firm unless otherwise advised. Should you wish to grant signature authority for additional individuals, please attach a certified copy of the corporate resolution, corporate minutes, partnership agreement, power of attorney or other legal documentation which grants this authority. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 & CAH Ashland Drainage Improvements City Project No. 01918 004513-8 BIDDER PREQUALIFICATION APPLICATION Page 8 of 9 14. Equipment $ ITEM QUANTITY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Various - ITEM DESCRIPTION TOTAL BALANCE SHEET VALUE TOTAL Similar types of equipment may be lumped together. If your firm has more than 30 types of equipment, you may show these 30 types and show the remainder as "various". The City, by allowing you to show only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment. The equipment list is a representation of equipment under the control of the firm and which is related to the type of work for which the firm is seeking qualification. In the description include, the manufacturer, model, and general common description of each. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 & CAH Ashland Drainage Improvements City Project No. 01918 004513-9 BIDDER PREQUALIFICATION APPLICATION Page 9 of 9 BIDDER PREQUALIFICATION AFFIDAVIT STATE OF COUNTY OF The undersigned hereby declares that the foregoing is a true statement of the financial condition of the entity herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized to supply each party with any information, while this statement is in force, necessary to verify said statement. , being duly sworn, deposes and says that he/she is the of , the entity described in and which executed the foregoing statement that he/she is familiar with the books of the said entity showing its financial condition; that the foregoing financial statement taken from the books of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification Application are correct and true as of the date of this affidavit. Firm Name: Signature: Sworn to before me this day of Notary Public Notary Public must not be an officer, director, or stockholder or relative thereof. CITY OF FORT \NORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 & CAH Ashland Drainage Improvements City Project No. 01918 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 1 2 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 3 4 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 5 provides worker's compensation insurance coverage for all of its employees employed on City 6 Project No. 01494 Contractor further certifies that, pursuant to Texas Labor Code, Section 7 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 8 worker's compensation coverage. 9 10 CONTRACTOR: 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Wangle) C. o ✓, tro G h'r 47, Company 44S O I ow-cr U r. Address k -e n he.dale � k 7tWe City/State/Zip THE STATE OF TEXAS COUNTY OF TARRANT § By: /'o ti 4 e 14.7 (Plea�sePrint) Signature: Title: (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared "TierL►/o o oil-, , known to me to be the person whose name is subscribed to the foregoinglins/trument, and acknowledged to me that he/she executed the same as the act and deed of 1A/0 odh Con'i,'o t>1or f, for the purposes and consideration therein expressed'and in the capacity therein stated. GIVEN J DER MY HAND AND.. SEAL OF OFFICE this *4.)day of 20/ SHARON RIDDLE Notary Public STATE OF TEXAS My Comm. Exp. 02/28/2015 ihi,e),g;ez6J Notary Public in and for the State of Texas END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 004540-1 MINORITY AND WOMEN BUSINESS ENTERPRISE GOAL 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 Page 1 of 1 SECTION 00 45 40 MINORITY BUSINESS ENTERPRISE GOAL APPLICATION OF POLICY If the total dollar value of the contract is greater than $50,000, then the MBE subcontracting goal may be applicable. If the total dollar value of the contract is $50,000 or less, the MBE subcontracting goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. MBE PROJECT GOAL The City's MBE goal on this project is 14% of the total bid (Base bid applies to Parks and Community Services). Note: If both MBE and SBE subcontracting goals are established for this project, then an Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. COMPLIANCE TO BID SPECIFICATIONS On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are required to comply with the intent of the City's Business Diversity Ordinance by one of the following: 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or 3. Good Faith Effort documentation, or; 4. Waiver documentation. Failure to comply with the City's M/WBE Ordinance, shall result in the Bid being considered non- responsive. Any questions, please contact the M/WBE Office at (817) 392-6104. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. "he feror shall deliver the MBE documentation in person docurnerrtatiorx`iti the t <me a 1. Subcontractor Utilization Form, if goal is met or exceeded: 2. Good Faith Effort and Subcontractor Utilization Form, if participation is less than stated goal: 3. Good Faith Effort and Subcontractor Utilization Form, if no MBE participation: 4. Prime Contractor Waiver Form, if firm will perform all subcontracting/supplier work: 5. Joint Venture Form, if utilizing a joint venture to meet or exceed goal. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 & CAH Ashland Drainage Improvements City Project No. 01918 005243-1 Agreement Page 1 of 4 1 SECTION 00 52 43 2 AGREEMENT 3 l 4 THIS AGREEMENT, authorized on /4 I 1 is made by and between the City of Fort 5 Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, 6 ("City"), and Woody Contractors Inc 7 authorized to do business in Texas, acting by and through its duly authorized representative, 8 ("Contractor"). 9 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 10 follows: 11 Article 1. WORK 12 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 13 Project identified herein. 14 Article 2. PROJECT 15 The project for which the Work under the Contract Documents may be the whole or only a part is 16 generally described as follows: 17 Water and Sanitary Sewer Replacement Contract 2010 STM-E. City Proiect No. 01494 18 CAH Ashland Drainage Improvements. City Proiect No. 01918 19 Article 3. CONTRACT TIME 20 3.1 Time is of the essence. 21 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 22 Documents are of the essence to this Contract. 23 3.2 Final Acceptance. 24 The Work will be complete for Final Acceptance within 290 days after the date when the 25 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 26 The following additional time restraints apply as well. All work along Birchman Ave., 27 Clover Ln., Thomas Pl., and the I-30 frontage road, shall be completed and accepted prior 28 to the start of the school year (August 27, 2013). Once construction starts on CAH 29 Ashland, all Work for CAH Ashland including water, drainage, and paving improvements 30 along Ashland Avenue between El Campo and Bryce shall be completed within 165 days. 31 In addition, the contractor will only be allowed 75 of the 165 days to complete all CAH 32 Ashland drainage improvements. 33 3.3 Liquidated damages 34 Contractor recognizes that time is of the essence of this Agreement and that City will 35 suffer financial loss if the Work is not completed within the times specified in Paragraph 36 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the 37 General Conditions. The Contractor also recognizes the delays, expense and difficulties 38 involved in proving in a legal proceeding the actual loss suffered by the City if the Work 39 is not completed on time. Accordingly, instead of requiring any such proof , Contractor 40 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay 41 City six -hundred and fifty Dollars ($650.00) for each day that expires after the time CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 17, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 005243-2 Agreement Page 2 of 4 42 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 43 Acceptance. 44 Article 4. CONTRACT PRICE 45 City agrees to pay Contractor for performance of the Work in accordance with the Contract 46 Documents an amount in current funds of Two Million Nine Hundred Ninety Six Thousand Eight Hundred Eighty Four and 55/100 Dollars 47 ($ 2,996,884.55 ). 48 Article 5. CONTRACT DOCUMENTS 49 5.1 CONTENTS: 50 A. The Contract Documents which comprise the entire agreement between City and 51 Contractor concerning the Work consist of the following: 52 1. This Agreement. 53 2. Attachments to this Agreement: 54 a. Bid Form 55 1) Proposal Form 56 2) Vendor Compliance to State Law Non -Resident Bidder 57 3) Prequalification Statement 58 4) State and Federal documents (project specific) 59 b. Current Prevailing Wage Rate Table 60 c. Insurance ACORD Form(s) 61 d. Payment Bond 62 e. Performance Bond 63 f. Maintenance Bond 64 g. Power of Attorney for the Bonds 65 h. Worker's Compensation Affidavit 66 i. MBE and/or SBE Commitment Form 67 3. General Conditions. 68 4. Supplementary Conditions. 69 5. Specifications specifically made a part of the Contract Documents by attachment 70 or, if not attached, as incorporated by reference and described in the Table of 71 Contents of the Project's Contract Documents. 72 6. Drawings. 73 7. Addenda. 74 8. Documentation submitted by Contractor prior to Notice of Award. 75 9. The following which may be delivered or issued after the Effective Date of the 76 Agreement and, if issued, become an incorporated part of the Contract Documents: 77 a. Notice to Proceed. 78 b. Field Orders. 79 c. Change Orders. 80 d. Letter of Final Acceptance. 81 82 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 17, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 005243-3 Agreement Page 3 of 4 83 Article 6. INDEMNIFICATION 84 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 85 expense, the city, its officers, servants and employees, from and against any and all 86 claims arising out of, or alleged to arise out of, the work and services to be performed 87 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 88 under this contract. This indemnification provision is specifically intended to operate 89 and be effective even if it is alleged or proven that all or some of the damages being 90 sought were caused, in whole or in part, bv anv act, omission or negligence of the city. 91 This indemnity provision is intended to include, without limitation, indemnity for 92 costs, expenses and legal fees incurred by the city in defending against such claims and 93 causes of actions. 94 95 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 96 the city, its officers, servants and employees, from and against any and all loss, damage 97 or destruction of property of the city, arising out of, or alleged to arise out of, the work 98 and services to be performed by the contractor, its officers, agents, employees, 99 subcontractors, licensees or invitees under this contract. This indemnification 100 provision is specifically intended to operate and be effective even if it is alleged or 101 proven that all or some of the damaues being sought were caused. in whole or in part, 102 bv anv act, omission or negligence of the city. 103 104 Article 7. MISCELLANEOUS 105 7.1 Terms. 106 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 107 have the meanings indicated in the General Conditions. 108 7.2 Assignment of Contract. 109 This Agreement, including all of the Contract Documents may not be assigned by the 110 Contractor without the advanced express written consent of the City. 111 7.3 Successors and Assigns. 112 City and Contractor each binds itself, its partners, successors, assigns and legal 113 representatives to the other party hereto, in respect to all covenants, agreements and 114 obligations contained in the Contract Documents. 115 7.4 Severability. 116 Any provision or part of the Contract Documents held to be unconstitutional, void or 117 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 118 remaining provisions shall continue to be valid and binding upon CITY and 119 CONTRACTOR. 120 7.5 Governing Law and Venue. 121 This Agreement, including all of the Contract Documents is performable in the State of 122 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 123 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 17, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 005243-4 Agreement Page 4 of 4 124 7.6 Other Provisions. 125 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 126 classified, promulgated and set out by the City, a copy of which is attached hereto and 127 made a part hereof the same as if it were copied verbatim herein. 128 7.7 Authority to Sign. 129 Contractor shall attach evidence of authority to sign Agreement, if other than duly 130 authorized signatory of the Contractor. 131 132 IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple 133 counterparts. 134 135 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 136 137 138 139 140 141 142 143 144 145 146 147 Contractor:/ _ (A/'ood, . Conira ors -I n C C. By: Title: Address: (Signatur ib le/oody Printed Name) �50 �vcr I f. City/State/Zip: &ArcelQX� / T Date OFFICE CARD OFFICIAL SECRETARY Ft WORT% TX CITY $ City of Fort Worth Y d Fernando Costa Assistant City Manager Date ,9/0/13 Attest: t City Secretary (Seal) M&C C-2- CP3ts3 Date: .S h, //3 ti P D %i,gp ia Approved as to Form and Legalit ``:���. `14,1- (/ / 4 fl-t 141*2fi W. Mack as m; cise c t? Assistant City Attorney S. Frank Crumb, P.E. Director, Water Department ROVAL RECOMMENDED: Dougls W. Wiersig, P.E. Director, Transportation and Pub ' Works CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 17, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 u u u i 1 2 3 4 THE STATE OF TEXAS 5 6 COUNTY OF TARRANT 7 SECTION 00 61 13 PERFORMANCE BOND § 00 61 13 - 1 PERFORMANCE BOND Page 1 of 2 Bond No. 8219-06-11 KNOW ALL BY THESE PRESENTS: 8 That we, Woody Contractors, Inc. , known as "Principal" herein and 9 Vigilant Insurance Company , a corporate surety(sureties, if more than one) 10 duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or 11 more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created 12 pursuant to the laws of Texas, known as "City" herein, in the penal sum of, Two Million, Nine 13 'Hundred Ninety -Six Thousand, Eight Hundred Eighty -Four Dollars and Fifty -Five Cents Dollars 14 ($2,996,884.55), lawful money of the United States, to be paid in Fort Worth, Tarrant County, 15 Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, 16 executors, administrators, successors and assigns, jointly and severally, firmly by these presents. 17 WHEREAS, the Principal has entered into a certain written contract with the City 18 awarded the ' day of , 20 1 ` , which Contract is hereby referred to and made 19 a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor 20 and other accessories defined by law, in the prosecution of the Work, including any Change 21 Orders, as provided for in said Contract designated as Water and Sanitary Sewer Replacement 22 Contract 2010 STM-E, City Project No. 01494 & CAH Ashland Drainage Improvements, City 23 Project No. 01918 24 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 25 shall faithfully perform it obligations under the Contractand shall in all respects duly and 26 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 27 specifications, and contract documents therein referred to, and as well during any period of 28 extension of the Contract that may be granted on the part of the City, then this obligation shall be 29 and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 006113-2 PERFORMANCE BOND Page 2 of 2 Bond No. 8219-06-11 1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 3 Worth Division. 4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 6 accordance with the provisions of said statue. 7 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 8 this instrument by duly authorized agents and officers on this the ' ' day of 20 .' 9 10 11 12 13 BY: 14 �-� '� S. cure 15 16 17 18 "(Principal) Secretary 19 20 21 23 `/( ahAJ22 >1� 24 25 26 27 28 29 BY: 30 31 32 33 34 35 36 II// ' 38 CZ l '? �,� �� Il .! Q 39 Witness `asp to Surety Elizabe Gray Telephone Number: 214-754-0777 37 40 41 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 42 from the by-laws showing that this person has authority to sign such obligation. If 43 Surety's physical address is different from its mailing address, both must be provided. 44 The date of the bond shall not be prior to the date the Contract is awarded. Witness as to Principal CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 PRINCIPAL: WOODY CONTRACTORS, INC. Troy Woody, President Name and Title Address: 650 Tower Drive Kennedale, Texas 76060 SURETY: VIGILANT INSURANCE COMPANY g .ture Kyle W. Sweeney, Attorney-in-F ct Name and Title Address: 2001 Bryan Street, Suite 3400 Dallas, Texas 75201 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 SECTION 00 61 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS 5 6 COUNTY OF TARRANT 7 § 006114-1 PAYMENT BOND Page 1 of 2 Bond No. 8219-06-11 KNOW ALL BY THESE PRESENTS: 8 That we, Woody Contractors, Inc. , known as "Principal" 9 herein, and Vigilant Insurance Companv , a corporate surety (sureties), 10 duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or 11 more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created 12 pursuant to the laws of the State of Texas, known as "City" herein, in the penal sum of Two 13 Million, Nine Hundred Ninetv-Six Thousand, Eight Hundred Eightv-Four Dollars and Fiftv-Five 14 Cents Dollars ($2,996,884.55), lawful money of the United States, to be paid in Fort Worth, 15 Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves, 16 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these 17 presents: 18 WHEREAS, Principal has entered into a certain written Contract with City, awarded 19 the '` day of , 20 t ` , which Contract is hereby referred to and made a part 20 hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and 21 other accessories as defined by law, in the prosecution of the Work as provided for in said 22 Contract and designated as Water and Sanitary Sewer Replacement Contract 2010 STM-E, City 23 Project No. 01494 & CAH Ashland Drainage Improvements, City Project No. 01918. 24 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 25 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 26 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 27 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 28 force and effect. 29 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 30 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 31 accordance with the provisions of said statute. 32 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 I I 11 I I I I I I I I 00 61 14 - 2 PAYMENT BOND Page 2 of 2 Bond No. 8219-06-11 1 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the 1, day ofiu S t , 20_. 3 ATTEST: Principal) Secretary rtn ss as to Principal PRINCIPAL: WOODY CONTRACTORS, INC. Troy Woody, President Name and Title Address: 650 Tower Drive Kennedale. Texas 76060 SURETY: VIGILANT INSURANCE COMPANY ATTEST: BY: (Surety) Secretary a_A 11? Witness as to Surety Elizab h Gray Kyle W. Sweeney , Attorney- ie -Fact Name and Title Address: 2001 Bryan Street, Suite 3400 Dallas, Texas 75201 Telephone Number: 214-754-0777 4 5 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 6 bylaws showing that this person has authority to sign such obligation. If Surety's physical 7 address is different from its mailing address, both must be provided. 8 9 The date of the bond shall not be prior to the date the Contract is awarded. 10 END OF SECTION 11 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 2 3 4 THE STATE OF TEXAS 5 6 COUNTY OF TARRANT 7 8 9 10 11 12 13 14 15 16 17 18 19 That we herein and 006119-1 MAINTENANCE BOND Page I of 3 Bond No. 8219-06-11 SECTION 00 61 19 MAINTENANCE BOND KNOW ALL BY THESE PRESENTS: Woody Contractors, Inc. Vigilant Insurance Company , known as "Principal" , a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the sum of Two Million, Nine Hundred Ninety -Six Thousand, Eight Hundred Eighty -Four Dollars and Fifty -Five Cents Dollars ($2,996,884.55), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the City awarded 20 the I day of A,4 qt.! S , 20 ; ' , which Contract is hereby referred to and a made part 21 hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and 22 other accessories as defined by law, in the prosecution of the Work, including any Work resulting 23 from a duly authorized Change Order (collectively herein, the "Work") as provided for in said 24 contract and designated as Water and Sanitary Sewer Replacement Contract 2010 STM-E, City 25 Project No. 01494 & CAH Ashland Drainage Improvements, City Project No. 01918; and 26 27 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 28 accordance with the plans, specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two (2) years 30 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 31 32 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 33 upon receiving notice from the City of the need thereof at any time within the Maintenance 34 Period. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 00 61 19 - 2 MAINTENANCE BOND Page 2 of 3 Bond No. 8219-06-11 1 2 NOW THEREFORE, the condition of this obligation is such that if Principal shall 3 remedy any defective Work, for which timely notice was provided by City, to a completion 4 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 5 full force and effect. 6 7 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 8 noticed defective Work, it is agreed that the City may cause any and all such defective Work to 9 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 10 the Surety under this Maintenance bond; and 11 12 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 13 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 14 Worth Division; and 15 16 PROVIDED FURTHER, that this obligation shall be continuous in nature and 17 successive recoveries may be had hereon for successive breaches. 18 19 20 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 00 61 19 - 3 MAINTENANCE BOND Page 3 of 3 Bond No. 8219-06-11 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the day of 't-' 'i - s f , 20 . 3 4 5 6 7 8 9 10 ATT 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ATTEST: 29 30 31 32 33 34 Witness it 35 36 37 38 39 40 (Principal) Secretary AM -it) ) Witness as to Pr 1c1n pal (Surety) Secretary �lA 1 fyL Yl (dL r o Surety Elizabeth Gray PRINCIPAL: WOODY CONTRACTORS. INC. Troy Woody. President Name and Title Address: 650 Tower Drive Kennedale, Texas 76060 SURETY: VIGILANT INSURANCE COMPANY BY: ignat Kyle W. Sweeney. Attorney -in - Name and Title Address: 2001 Bryan Street, Suite 3400 Dallas, Texas 75201 Telephone Number: 214-754-0777 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 Policyholder Information Notice IMPORTANT NOTICE To obtain information or make a complaint: You may call Chubb's toll -free telephone number for information or to make a complaint at 1-800-36-CHUBB You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at 1-800-252-3439 You may write the Texas Department of Insurance P.O. Box 149104 Austin, TX 78714-9104 FAX # (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede llamar al nnmero de telefono gratis de Chubb's para informacion o para someter una queja al 1-800-36-CHUBB Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companfas, coberturas, derechos o quejas al 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas P.O. Box 149104 Austin, TX 78714-9104 FAX # (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us DISPUTAS SOBRE PRIMAS 0 RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente primero. Si no se resueve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. Form 99-10-0299 (Rev. 1-08) Ur— Chubb POWER Federal Insurance Company Attn: Surety Department OF Vigilant Insurance Company 15 Mountain View Road Surety ATTORNEY pacific Indemnity Company Warren, NJ 07059 CHUM Know All by These Presents, That FEDERAL INSURANCE COMPANY, an Indiana corporation, VIGILANT INSURANCE COMPANY, a New York corporation, and PACIFIC INDEMNITY COMPANY, a Wisconsin corporation, do each hereby constitute and appoint Elizabeth Gray, Charles D. Sweeney, Kyle W. Sweeney and Michael A. Sweeney of Fort Worth, Texas each as their true and lawful Attorney- In- Fact to execute under such designation In their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise, bonds and undertakings and other wnfings obligatory in the nature thereof (other than bail bonds) given or executed in the course of business, and any Instruments amending or altering the same, and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness Whereof, said FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY have each executed and attested these presents and affixed their corporate seals on this / r day of 1 STATE OF NEW JERSEY 1 County of Somerset SS. it r" L.,..tetcherda, Jr, ,Vm PteSids nl On this 26th day of April, 2011 before me, a Notary Public of New Jersey, personally came Kenneth C. Wendel, to me known to be Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY, the companies which executed the foregoing Power of Attorney, and the said Kenneth C. Wendel, being by me duty sworn, did depose and say that he is Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY and Knows the corporate seals thereof, that the seats affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of the By- Laws of said Companies, and that he signed said Power of Attorney as Assistant Secretary of said Companies by like authority; and that he is acquainted with David B. Norris, Jr., and knows him to be Vice President of said Companies; and that the signature of David B. Norris, Jr., subscribed to said Power of Attorney is In the genuine handwriting of David B. Norris, Jr., and was thereto subscribed by authority of said By - Laws and in deponent's presence. Notarial Seal KATHERINE J. ADELA.AR NOTARY PUBLIC Of NEW JFRSFI No,2316685 Commission ispiros July 16, 2014 CERTIFICATION Extract from the By- Laws of FEDERAL. INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY: 'All powers of attorney for and on behalf of the Company may and shall be executed in the name and on behalf of the Company, either by the Chairman or the President or a Vice President or an Assistant Vice President, Jointly with the Secretary or an Assistant Secretary, under their respective designations. The signature of such officers may be engraved, printed or lithographed. The signature of each of the following officers: Chairman, President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary and the seal of the Company may be affixed by facsimile to any power of attorney or to any certificate relating thereto appointing Assistant Secretaries or Attomeys- in- Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such power of attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shalt be valid and binding upon the Company with respect to any bond or undertaking to which tt Is attached.' I, Kenneth C. Wendel, Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY (the 'Companies') do hereby certify that (i) the foregoing extract of the By- Laws of the Companies is true and correct. (ii) the Companies are duly licensed and authorized to transact surety business In all 50 of the United States of America and the District of Columbia and are authorized by the U.S. Treasury Department; further, Federal and Vigilant are licensed In Puerto Rico and the i1 S. Virgin Islands, and Federal is licensed in American Samoa. Guam, and each of the Provinces of Canada except Prince Edward Island: and (iii) the foregoing Power of Attorney is true, correct and in full force and effect. Given under my hand and seals of said Companies et Warren, NJ this Notary Public IN THE EVENT YOU WISH TO NOTIFY US OF A CLAIM, VERIFY THE AUTHENTICITY OF THIS BONO OR NOTIFY US OF ANY OTHER MATTER, PLEASE CONTACT US AT ADDRESS LISTED ABOVE, OR BY Telephone (908) 903- 3493 Fax (908) 903- 3656 e-mail: suretyAchubb.com Form 15.10- 022513- U (Ed. 5- 03) CONSENT 1 ® DATE (MMIDD/YYYY) AW CERTIFICATE OF LIABILITY INSURANCE 8/14/2013 I THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). IPRODUCER The Sweeney Company 1121 E. Loop 820 South P 0 Box 8720 !Fort Worth INSURED Woody Contractors, Inc. 1650 Tower Drive TX 76124-0720 Kennedale TX 76060 (CONTACT NAME: PHONE o Fxt (817) 457-6700 IADDRESS: FAX (817) 457-7246 /A/C. Nol: I INSURER(SI AFFORDING COVERAGE NAIL # IINSURERA:Continental Insurance Co INSURER B :Continental Casualty Co INSURER C : I INSURER D : I INSURER E : I INSURER F : COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ADDL SUBR ' POLICY EFF POLICY EXP INSR LTR TYPE OF INSURANCE INFR wvn POLICY NUMBER (MMIDD/YYYY) �MM/DD/YYYY) LIMITS GENERAL LIABILITY X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE X OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: —1 POLICY I X I .PIRt° S I 1 LOC AUTOMOBILE LIABILITY X ANY AUTO ALL OWNED _ AUTOS HIRED AUTOS X UMBRELLA LIAB EXCESS LIAB DED I X I RETENT ON $ SCHEDULED AUTOS NON -OWNED AUTOS X IOCCUR CLAIMS -MADE 10,000 WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below Y/N N/A C 2093042147 4/30/2013 4/30/2014 C 2093042116 4/30/2013 4/30/2014 C 2093042133 WC 2093042150 4/30/2013 4/30/2014 4/30/2013 4/30/2014 EACH OCCURRENCE DAMAGE TO RENTED PREMISES (Ea occurrence) IMED EXP (Any one person) I PERSONAL & ADV INJURY I GENERAL AGGREGATE I PRODUCTS - COMP/OP AGG $ $ $ $ $ 1,000,000 300,000 5,000 1,000,000 2,000,000 2,000,000 COMBINED SINGLE LIMIT (Ea accident) $ 1,000,000 BODILY INJURY (Per person) $ I BODILY INJURY (Per accident) $ PROPERTY ent) DAMAGE (Pe EACH OCCURRENCE AGGREGATE X I WC TORY STATU-LIMITS I E.L. EACH ACCIDENT IOTH- FR E.L. DISEASE - EA EMPLOYEE $ E.L. DISEASE - POLICY LIMIT $ 4,000,000 4,000,000 $ 1.000.000 1,000,000 1,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2010 STM-E, CITY PROJECT NO. 01494 & CAH ASHLAND DRAINAGE IMPROVEMENTS, CITY PROJECT NO. 01918. ALL POLICIES INCLUDE A BLANKET AUTOMATIC WAIVER OF SUBROGATION ENDORSEMENT & THE GL, AUTO & UMB POLICIES INCLUDE A BLANKET AUTOMATIC ADDITIONAL INSURED ENDORSEMENT PROVIDING ADDITIONAL INSURED & WAIVER OF SUBROGATION STATUS TO THE CERTIFICATE HOLDER ONLY WHEN THERE IS A WRITTEN CONTRACT BETWEEN THE NAMED INSURED & THE CERTIFICATE HOLDER THAT REQUIRES SUCH STATUS. THE GL ADDITIONAL INSURED ENDORSEMENT CONTAINS SPECIAL PRIMARY & NONCONTRIBUTORY WORDING. THE POLICIES INCLUDE AN ENDORSEMENT PROVIDING 30 DAYS NOTICE OF CANCELLATION (10 FOR NON -PAY OF PREMIUM) TO THE CERT HOLDER. CERTIFICATE HOLDER CANCELLATION CITY OF FORT WORTH 1000 THROCKMORTON ST FT WORTH, TX 76102 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE Charles Sweeney/JOYCE ACORD 25 (2010/05) © 1988-2010 ACORD CORPORATION. All rights reserved. INS025 (201005)01 The ACORD name and logo are registered marks of ACORD STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1 — Definitions and Terminology 1 1.01 Defined Terms 1 1.02 Terminology 6 Article 2 — Preliminary Matters 7 2.01 Copies of Documents 7 2.02 Commencement of Contract Time; Notice to Proceed 7 2.03 Starting the Work 8 2.04 Before Starting Construction 8 2.05 Preconstruction Conference 8 2.06 Public Meeting 8 2.07 Initial Acceptance of Schedules 8 Article 3 — Contract Documents: Intent, Amending, Reuse 8 3.01 Intent 8 3.02 Reference Standards 9 3.03 Reporting and Resolving Discrepancies 9 3.04 Amending and Supplementing Contract Documents 10 3.05 Reuse of Documents 10 3.06 Electronic Data 11 Article 4 — Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points 11 4.01 Availability of Lands 11 4.02 Subsurface and Physical Conditions 12 4.03 Differing Subsurface or Physical Conditions 12 4.04 Underground Facilities 13 4.05 Reference Points 14 4.06 Hazardous Environmental Condition at Site 14 Article 5 — Bonds and Insurance 16 5.01 Licensed Sureties and Insurers 16 5.02 Performance, Payment, and Maintenance Bonds 16 5.03 Certificates of Insurance 16 5.04 Contractor's Insurance 18 5.05 Acceptance of Bonds and Insurance; Option to Replace 19 Article 6 — Contractor's Responsibilities 19 6.01 Supervision and Superintendence 19 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 6.02 Labor; Working Hours 20 6.03 Services, Materials, and Equipment 20 6.04 Project Schedule 21 6.05 Substitutes and "Or -Equals" 21 6.06 Concerning Subcontractors, Suppliers, and Others 24 6.07 Wage Rates 25 6.08 Patent Fees and Royalties 26 6.09 Permits and Utilities 27 6.10 Laws and Regulations 27 6.11 Taxes 28 6.12 Use of Site and Other Areas 28 6.13 Record Documents 29 6.14 Safety and Protection 29 6.15 Safety Representative 30 6.16 Hazard Communication Programs 30 6.17 Emergencies and/or Rectification 30 6.18 Submittals 31 6.19 Continuing the Work 32 6.20 Contractor's General Warranty and Guarantee 32 6.21 Indemnification 33 6.22 Delegation of Professional Design Services 34 6.23 Right to Audit 34 6.24 Nondiscrimination 35 Article 7 - Other Work at the Site 35 7.01 Related Work at Site 35 7.02 Coordination 36 Article 8 - City's Responsibilities 36 8.01 Communications to Contractor 36 8.02 Furnish Data 36 8.03 Pay When Due 36 8.04 Lands and Easements; Reports and Tests 36 8.05 Change Orders 36 8.06 Inspections, Tests, and Approvals 36 8.07 Limitations on City's Responsibilities 37 8.08 Undisclosed Hazardous Environmental Condition 37 8.09 Compliance with Safety Program 37 Article 9 - City's Observation Status During Construction 37 9.01 City's Project Representative 37 9.02 Visits to Site 37 9.03 Authorized Variations in Work 38 9.04 Rejecting Defective Work 38 9.05 Determinations for Work Performed 38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work 38 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21,2012 Article 10 - 10.01 10.02 Unauthorized Changes in the Work 10.03 Execution of Change Orders 10.04 Extra Work 10.05 Notification to Surety 10.06 Contract Claims Process Article 11 - 11.01 Cost of the Work 11.02 Allowances 11.03 Unit Price Work 11.04 Plans Quantity Measurement Article 12 - 12.01 12.02 Change of Contract Time 12.03 Article 13 - 13.01 13.02 13.03 Tests and Inspections 13.04 Uncovering Work 13.05 City May Stop the Work 13.06 Correction or Removal of Defective Work 13.07 Correction Period 13.08 Acceptance of Defective Work 13.09 City May Correct Defective Work Article 14 - 14.01 14.02 14.03 14.04 14.05 14.06 14.07 14.08 14.09 Delays Changes in the Work; Claims; Extra Work 38 Authorized Changes in the Work 38 39 39 39 39 40 Cost of the Work; Allowances; Unit Price Work; Plans Quantity Measurement 41 41 43 44 45 Change of Contract Price; Change of Contract Time 46 Change of Contract Price 46 47 47 Tests and Inspections; Correction, Removal or Acceptance of Defective Work 48 Notice of Defects 48 Access to Work 48 48 49 49 50 50 51 51 Payments to Contractor and Completion 52 Schedule of Values 52 Progress Payments 52 Contractor's Warranty of Title 54 Partial Utilization 55 Final Inspection 55 Final Acceptance 55 Final Payment 56 Final Completion Delayed and Partial Retainage Release 56 Waiver of Claims 57 Article 15 - Suspension of Work and Termination 57 15.01 City May Suspend Work 57 15.02 City May Terminate for Cause 58 15.03 City May Terminate For Convenience 60 Article 16 - Dispute Resolution 61 16.01 Methods and Procedures 61 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 Article 17 — Miscellaneous 62 17.01 Giving Notice 62 17.02 Computation of Times 62 17.03 Cumulative Remedies 62 17.04 Survival of Obligations 63 17.05 Headings 63 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 1 of 63 ARTICLE 1 — DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda —Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement —The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award — Authorization by the City Council for the City to enter into an Agreement. 6. Bid —The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder The individual or entity who submits a Bid directly to City. 8. Bidding Documents The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Buzzsaw — City's on-line, electronic document management and collaboration system. 12. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 2 of 63 13. Change Order —A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 14. City The City of Fort Worth, Texas, a home -rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 15. City Attorney — The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 16. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 17. City Manager — The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 18. Contract Claim —A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 19. Contract —The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, whether written or oral. 20. Contract Documents —Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price —The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 22. Contract Time —The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance. 23. Contractor —The individual or entity with whom City has entered into the Agreement. 24. Cost of the Work —See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December 21, 2012 007200-1 GENERAL CONDITIONS Page 3 of 63 25. Damage Claims — A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 26. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 27. Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Parks and Community Services — The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Planning and Development — The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Director of Water Department — The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 32. Drawings That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 33. Effective Date of the Agreement —The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 34. Engineer The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 35. Extra Work — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 36. Field Order — A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 37. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-I GENERAL CONDITIONS Page 4 of 63 38. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 39. General Requirements —Sections of Division 1 of the Contract Documents. 40. Hazardous Environmental Condition —The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 41. Hazardous Waste Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 43. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 44. Major Item — An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 45. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 46. Notice of Award The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 47. Notice to Proceed —A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 48. PCBs Polychlorinated biphenyls. 49. Petroleum Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non -Hazardous Waste and crude oils. 50. Plans — See definition of Drawings. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 00 72 00 - I GENERAL CONDITIONS Page 5 of 63 51. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 52. Project —The Work to be performed under the Contract Documents. 53. Project Representative —The authorized representative of the City who will be assigned to the Site. 54. Public Meeting — An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55. Radioactive Material —Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 56. Regular Working Hours — Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 57. Samples —Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule of Submittals A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 59. Schedule of Values —A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 60. Site Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 61. Specifications That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 62. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 6 of 63 63. Submittals —All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 64. Successful Bidder The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities —All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69. Unit Price Work —See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Deceanber21, 2012 00 72 00 - 1 GENERAL CONDITIONS Page 7 of 63 1. The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 — PRELIMINARY MATTERS 2.01 Copies ofDocurnents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 14 days after the Effective Date of the Agreement. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 00 72 00 - 1 GENERAL CONDITIONS Page 8 of 63 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 h?itial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3 — CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation , (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December 21, 2012 00 72 00 - 1 GENERAL CONDITIONS Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-I GENERAL CONDITIONS Page 11 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's Buzzsaw site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4 — AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsuiface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated: 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 00 72 00 - 1 GENERAL CONDITIONS Page 14 of 63 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 00 72 00 - I GENERAL CONDITIONS Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnift and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December 21, 2012 00 72 00 - 1 GENERAL CONDITIONS Page 16 of 63 ARTICLE 5 — BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December 21, 2012 007200-1 GENERAL CONDITIONS Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-I GENERAL CONDITIONS Page 19 of 63 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be perforated during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-I GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 01 32 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or -Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-I GENERAL CONDITIONS Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnib) and hold harmless City and anyone directly or indirectly employed by their from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 00 72 00 - 1 GENERAL CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Minority Business Enterprise Compliance: It is City policy to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE goal, Contractor is required to comply with the intent of the City's MBE Ordinance (as amended) by the following: Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE. Material misrepresentation of any nature will be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 25 of 63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 26 of 63 D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11 th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December2l, 2012 007200-1 GENERAL CONDITIONS Page 27 of 63 the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sales Tax Division Capitol Station Austin, TX 78711; or 2. httu://www.window.state.tx.us/taxinfo/taxforms/93-forms.html 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December 21, 2012 007200-1 GENERAL CONDITIONS Page 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-I GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Work Except as otherwise provided, Contractor shall cany on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.B. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 00 72 00 - I GENERAL CONDITIONS Page 34 of 63 SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December 21, 20I 2 00 72 00 - 1 GENERAL CONDITIONS Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7 — OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Worlc that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8 — CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easements; Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. The Project Representative(s) will be as provided in the Supplementary Conditions. 9.02 Visits to Site A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21,2012 007200-I GENERAL CONDITIONS Page 38 of 63 9.03 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Per formed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December 21, 2012 00 72 00 - I GENERAL CONDITIONS Page 39 of 63 10.02 Unauthorized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 40 of 63 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Deceanber21, 2012 007200-1 GENERAL CONDITIONS Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11 — COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.01.B, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.01.B, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 00 72 00 - I GENERAL CONDITIONS Page 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.01.A.1 or specifically covered by Paragraph 11.01.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.01.B, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre -bid Allowances: 1. Contractor agrees that: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 44 of 63 a. the pre -bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre -bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. 1. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December 21, 2012 007200-1 GENERAL CONDITIONS Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 46 of 63 E. For callout work or non -site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.01.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.01.B.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.01.C). C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.01.A.1, 11.01.A.2. and 11.01.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 11.01.A.4 and 11.01.A.5, the Contractor's fee shall be five percent (5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.01.C.2.a and 12.01.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.01.A.1 and 11.01.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.01.A.6, and 11.01.B; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-I GENERAL CONDITIONS Page 48 of 63 ARTICLE 13 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 1 3.0 1 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 49 of 63 3. Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. 1. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Reinoval of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-I GENERAL CONDITIONS Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: 1. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as stipulated in the Contract Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 53 of 63 B. Review of Applications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor, or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors, requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-I GENERAL CONDITIONS Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the City. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment: 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December 21, 2012 007200-I GENERAL CONDITIONS Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification of the City and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 56 of 63 14.07 Final Payment A. Application for Payment: 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 00 72 00 - 1 GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 — SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December2l, 2012 007200-1 GENERAL CONDITIONS Page 58 of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-201 1 established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December 21, 2012 00 72 00 - 1 GENERAL CONDITIONS Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a, If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.B, Contractor's services will not be terminated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-I GENERAL CONDITIONS Page 60 of 63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 61 of'63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16 — DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claire is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.D shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 62 of 63 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17 — MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: December21, 2012 007200-1 GENERAL CONDITIONS Page 63 of 63 17.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decemberr21, 2012 1 2 SECTION 00 73 00 SUPPLEMENTARY CONDITIONS 00 73 00 - 1 SUPPLEMENTARY CONDITIONS Page 1 of 5 3 TO 4 GENERAL CONDITIONS 5 6 Supplementary Conditions 7 8 These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other 9 provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are 10 modified or supplemented remain in full force and effect as so modified or supplemented. All provisions 11 of the General Conditions which are not so modified or supplemented remain in full force and effect. 12 13 Defined Terms 14 15 The terms used in these Supplementary Conditions which are defined in the General Conditions have the 16 meaning assigned to them in the General Conditions, unless specifically noted herein. 17 18 Modifications and Supplements 19 20 The following are instructions that modify or supplement specific paragraphs in the General Conditions and 21 other Contract Documents. 22 23 SC-3.03B.2, "Resolving Discrepancies" 24 25 Plans govern over Specifications and Specifications shall govern over standard details. 26 27 SC-4.01A 28 29 Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. 30 Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the 31 Contract Drawings. 32 33 SC-4.01A.1., "Availability of Lands" 34 35 The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of 36 February 19, 2013: 37 38 Outstanding Right -Of -Way, and/or Easements to Be Acquired PARCEL OWNER TARGET DATE NUMBER OF POSSESSION NONE 39 The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, 40 and do not bind the City. 41 42 If Contractor considers the final easements provided to differ materially from the representations on the 43 Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, 44 notify City in writing associated with the differing easement line locations. 45 46 SC-4.01A.2, "Availability of Lands" 47 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 007300-2 SUPPLEMENTARY CONDITIONS Page 2 of 5 1 Utilities or obstructions to be removed, adjusted, and/or relocated 2 3 The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated 4 as of February 19, 2013: 5 EXPECTED UTILITY AND LOCATION TARGET DATE OF OWNER ADJUSTMENT NONE 6 The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, 7 and do not bind the City. 8 9 SC-4.02A., "Subsurface and Physical Conditions" 10 11 The following are reports of explorations and tests of subsurface conditions at the site of the Work: 12 Geotechnical Investigation, Pavement Reconstruction and Storm Water Detention Vault, Ashland Avenue, 13 Fort Worth, Texas, Report # E12-0603, dated July 16, 2012, prepared by Mas-Tek Engineering & 14 Associates, Inc., a sub -consultant of Freese & Nichols, a consultant of the City, providing additional 15 information on geotechnical information around the proposed storm water detention vault. 16 17 The following are drawings of physical conditions in or relating to existing surface and subsurface 18 structures (except Underground Facilities) which are at or contiguous to the site of the Work: None 19 20 SC-4.06A., "Hazardous Environmental Conditions at Site" 21 22 The following are reports and drawings of existing hazardous environmental conditions known to the City: 23 None 24 25 SC-5.03A., "Certificates of Insurance" 26 27 The entities listed below are "additional insureds as their interest may appear" including their respective 28 officers, directors, agents and employees. 29 30 (1) City 31 (2) Consultant: Burgess & Niple, Inc. & Freese & Nichols, Inc. 32 (3) Other: None 33 34 SC-5.04A., "Contractor's Insurance" 35 36 The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following 37 coverages for not less than the following amounts or greater where required by laws and regulations: 38 39 5.04A. Workers' Compensation, under Paragraph GC-5.04A. 40 41 Statutory limits 42 Employer's liability 43 $100,000 each accident/occurrence 44 $100,000 Disease - each employee 45 $500,000 Disease - policy limit 46 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 007300-3 SUPPLEMENTARY CONDITIONS Page 3 of 5 1 SC-5.04B., "Contractor's Insurance" 2 3 5.04B. Commercial General Liability, under Paragraph GC-5.04B. Contractor's Liability Insurance 4 under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with 5 minimum limits of: 6 7 $1,000,000 each occurrence 8 $2,000,000 aggregate limit 9 10 The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the 11 General Aggregate Limits apply separately to each job site. 12 13 The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. 14 Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. 15 16 SC 5.04C., "Contractor's Insurance" 17 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability Insurance under 18 Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: 19 20 (1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", 21 defined as autos owned, hired and non -owned. 22 23 $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at 24 least: 25 26 $250,000 Bodily Injury per person / 27 $500,000 Bodily Injury per accident / 28 $100,000 Property Damage 29 30 SC-5.04D., "Contractor's Insurance" 31 32 The Contractor's construction activities will NOT require its employees, agents, subcontractors, 33 equipment, and material deliveries to cross railroad properties and tracks. 34 35 The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, 36 hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains 37 or other property. Such operations on railroad properties may require that Contractor to execute a "Right of 38 Entry Agreement" with the particular railroad company or companies involved, and to this end the 39 Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute 40 the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate 41 to the Contractor's use of private and/or construction access roads crossing said railroad company's 42 properties. 43 44 The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide 45 coverage for not less than the following amounts, issued by companies satisfactory to the City and to the 46 Railroad Company for a term that continues for so long as the Contractor's operations and work cross, 47 occupy, or touch railroad property: 48 49 (1) General Aggregate: $Confirm Limits with Railroad 50 51 (2) Each Occurrence: $Confirm Limits with Railroad 52 53 Required for this Contract X Not required for this Contract 54 55 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 007300-4 SUPPLEMENTARY CONDITIONS Page 4 of 5 1 With respect to the above outlined insurance requirements, the following shall govern: 2 3 1. Where a single railroad company is involved, the Contractor shall provide one insurance policy in 4 the name of the railroad company. However, if more than one grade separation or at -grade 5 crossing is affected by the Project at entirely separate locations on the line or lines of the same 6 railroad company, separate coverage may be required, each in the amount stated above. 7 8 2. Where more than one railroad company is operating on the same right-of-way or where several 9 railroad companies are involved and operated on their own separate rights -of -way, the Contractor 10 may be required to provide separate insurance policies in the name of each railroad company. 11 12 3. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a 13 railroad company's right-of-way at a location entirely separate from the grade separation or at- 14 grade crossing, insurance coverage for this work must be included in the policy covering the grade 15 separation. 16 17 4. If no grade separation is involved but other work is proposed on a railroad company's right-of- 18 way, all such other work may be covered in a single policy for that railroad, even though the work 19 may be at two or more separate locations. 20 21 No work or activities on a railroad company's property to be performed by the Contractor shall be 22 commenced until the Contractor has furnished the City with an original policy or policies of the insurance 23 for each railroad company named, as required above. All such insurance must be approved by the City and 24 each affected Railroad Company prior to the Contractor's beginning work. 25 26 The insurance specified above must be carried until all Work to be performed on the railroad right-of-way 27 has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, 28 insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. 29 Such insurance must name the railroad company as the insured, together with any tenant or lessee of the 30 railroad company operating over tracks involved in the Project. 31 32 SC-6.04., "Project Schedule" 33 34 Project schedule shall be tier 3 for the project. 35 36 SC-6.07., "Wage Rates" 37 38 The following is the prevailing wage rate table(s) applicable to this project and is provided in the 39 Appendixes: 40 41 Heavy & Highway Construction Prevailing Wage Rates 2008 42 2008 Prevailing Wage Rates Construction Industry 43 44 SC-6.09., "Permits and Utilities" 45 46 SC-6.09A., "Contractor obtained permits and licenses" 47 The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: 48 None 49 50 SC-6.09B. "City obtained permits and licenses" 51 The following are known permits and/or licenses required by the Contract to be acquired by the City: None 52 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 007300-5 SUPPLEMENTARY CONDITIONS Page 5 of 5 1 SC-6.09C. "Outstanding permits and licenses" 2 3 The following is a list of known outstanding permits and/or licenses to be acquired, if any as of February 4 19, 2013: 5 6 Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION None 7 8 SC-7.02., "Coordination" 9 10 The individuals or entities listed below have contracts with the City for the performance of other work at 11 the Site: 12 Vendor None Scope of Work Coordination Authority 13 14 15 SC-8.01, "Communications to Contractor" 16 17 None 18 19 SC-9.01., "City's Project Representative" 20 21 The following firm is a consultant to the City responsible for construction management of this Project: 22 23 None 24 25 SC-13.03C., "Tests and Inspections" 26 27 None 28 29 SC-16.01C.1, "Methods and Procedures" 30 31 None 32 33 34 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 2 3 PART 1- GENERAL 4 1.1 SUMMARY SECTION 01 11 00 SUMMARY OF WORK 011100-1 SUMMARY OF WORK Page 1 of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED) 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Work Covered by Contract Documents 19 1. Work is to include furnishing all labor, materials, and equipment, and performing 20 all Work necessary for this construction project as detailed in the Drawings and 21 Specifications. 22 B. Subsidiary Work 23 1. Any and all Work specifically governed by documentary requirements for the 24 project, such as conditions imposed by the Drawings or Contract Documents in 25 which no specific item for bid has been provided for in the Proposal and the item is 26 not a typical unit bid item included on the standard bid item list, then the item shall 27 be considered as a subsidiary item of Work, the cost of which shall be included in 28 the price bid in the Proposal for various bid items. 29 C. Use of Premises 30 1. Coordinate uses of premises under direction of the City. 31 2. Assume full responsibility for protection and safekeeping of materials and 32 equipment stored on the Site. 33 3. Use and occupy only portions of the public streets and alleys, or other public places 34 or other rights -of -way as provided for in the ordinances of the City, as shown in the 35 Contract Documents, or as may be specifically authorized in writing by the City. 36 a. A reasonable amount of tools, materials, and equipment for construction 37 purposes may be stored in such space, but no more than is necessary to avoid 38 delay in the construction operations. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 11 00 - 2 SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 11 00 - 3 SUMMARY OF WORK 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 13 14 Revision Log DATE NAME SUMMARY OF CHANGE Page 3 of 3 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage lmprovemenls City Project No. 01918 1 2 3 PART 1- GENERAL 4 1.1 SUMMARY SECTION 01 25 00 SUBSTITUTION PROCEDURES 01 25 00 - 1 SUBSTITUTION PROCEDURES Page 1 of 4 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defined by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 11 c. Trade name 12 d. Catalog number 13 2. Substitutions are not "or -equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1 None. 16 C. Related Specification Sections include, but are not necessarily limited to: 17 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 18 2. Division 1 — General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. 22 No separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. Request for Substitution - General 26 1. Within 30 days after award of Contract (unless noted otherwise), the City will 27 consider formal requests from Contractor for substitution of products in place of 28 those specified. 29 2. Certain types of equipment and kinds of material are described in Specifications by 30 means of references to names of manufacturers and vendors, trade names, or 31 catalog numbers. 32 a. When this method of specifying is used, it is not intended to exclude from 33 consideration other products bearing other manufacturer's or vendor's names, 34 trade names, or catalog numbers, provided said products are "or -equals," as 35 determined by City. 36 3. Other types of equipment and kinds of material may be acceptable substitutions 37 under the following conditions: 38 a. Or -equals are unavailable due to strike, discontinued production of products 39 meeting specified requirements, or other factors beyond control of Contractor; 40 or, CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 012500-2 SUBSTITUTION PROCEDURES Page 2 of 4 1 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution, including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with 11 Contract Documents 12 2) Data relating to changes in construction schedule, when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product, including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including, but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Location of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved, the resulting cost and/or time reduction 46 will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 012500-3 SUBSTITUTION PROCEDURES Page 3 of 4 1 4. No additional contract time will be given for substitution. 2 5. Substitution will be rejected if: 3 a. Submittal is not through the Contractor with his stamp of approval 4 b. Request is not made in accordance with this Specification Section 5 c. In the City's opinion, acceptance will require substantial revision of the original 6 design 7 d. In the City's opinion, substitution will not perform adequately the function 8 consistent with the design intent 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE 13 A. In making request for substitution or in using an approved product, the Contractor 14 represents that the Contractor: 15 1. Has investigated proposed product, and has determined that it is adequate or 16 superior in all respects to that specified, and that it will perform function for which 17 it is intended 18 2. Will provide salve guarantee for substitute item as for product specified 19 3. Will coordinate installation of accepted substitution into Work, to include building 20 modifications if necessary, making such changes as may be required for Work to be 21 complete in all respects 22 4. Waives all claims for additional costs related to substitution which subsequently 23 arise 24 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 25 1.11 FIELD [SITE] CONDITIONS [NOT USED] 26 1.12 WARRANTY [NOT USED] 27 PART 2 - PRODUCTS [NOT USED] 28 PART 3 - EXECUTION [NOT USED] 29 END OF SECTION 30 31 IRevision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 012500-4 SUBSTITUTION PROCEDURES Page 4 of 4 1 EXHIBIT A 2 REQUEST FOR SUBSTITUTION FORM: 3 4 TO: 5 PROJECT: DATE: 6 We hereby submit for your consideration the following product instead of the specified item for 7 the above project: 8 SECTION PARAGRAPH SPECIFIED ITEM 9 10 11 Proposed Substitution: 12 Reason for Substitution: 13 Include complete information on changes to Drawings and/or Specifications which proposed 14 substitution will require for its proper installation. 15 16 Fill in Blanks Below: 17 A. Will the undersigned contractor pay for changes to the building design, including engineering 18 and detailing costs caused by the requested substitution? 19 20 21 B. What effect does substitution have on other trades? 22 23 24 C. Differences between proposed substitution and specified item? 25 26 27 D. Differences in product cost or product delivery time? 28 29 30 E. Manufacturer's guarantees of the proposed and specified items are: 31 32 Equal Better (explain on attachment) 33 The undersigned states that the function, appearance and quality are equivalent or superior to the 34 specified item. 35 Submitted By: For Use by City 36 37 Signature Recommended Recommended 38 as noted 39 40 Firm Not recommended Received late 41 Address By 42 Date 43 Date Remarks 44 Telephone 45 46 For Use by City: 47 48 Approved Rejected 49 City Date CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 2 3 PART 1 - GENERAL SECTION 01 31 19 PRECONSTRUCTION MEETING 013119-1 PRECONSTRUCTION MEETING Page 1 of 3 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Coordination 20 1. Attend preconstruction meeting. 21 2. Representatives of Contractor, subcontractors and suppliers attending meetings 22 shall be qualified and authorized to act on behalf of the entity each represents. 23 3. Meeting administered by City may be tape recorded. 24 a. If recorded, tapes will be used to prepare minutes and retained by City for 25 future reference. 26 B. Preconstruction Meeting 27 1. A preconstruction meeting will be held within 14 days after the execution of the 28 Agreement and before Work is started. 29 a. The meeting will be scheduled and administered by the City. 30 2. The Project Representative will preside at the meeting, prepare the notes of the 31 meeting and distribute copies of same to all participants who so request by fully 32 completing the attendance form to be circulated at the beginning of the meeting. 33 3. Attendance shall include: 34 a. Project Representative 35 b. Contractor's project manager 36 c. Contractor's superintendent 37 d. Any subcontractor or supplier representatives whom the Contractor may desire 38 to invite or the City may request CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 & CAH Ashland Drainage Improvements City Project No. 01918 013119-2 PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives 2 f. Others as appropriate 3 4. Construction Schedule 4 a. Prepare baseline construction schedule in accordance with Section 01 32 16 and 5 provide at Preconstruction Meeting. 6 b. City will notify Contractor of any schedule changes upon Notice of 7 Preconstruction Meeting. 8 5. Preliminary Agenda may include: 9 a. Introduction of Project Personnel 10 b. General Description of Project 11 c. Status of right-of-way, utility clearances, easements or other pertinent permits 12 d. Contractor's work plan and schedule 13 e. Contract Time 14 f. Notice to Proceed 15 g. Construction Staking 16 h. Progress Payments 17 i. Extra Work and Change Order Procedures 18 j. Field Orders 19 k. Disposal Site Letter for Waste Material 20 1. Insurance Renewals 21 m. Payroll Certification 22 n. Material Certifications and Quality Control Testing 23 o. Public Safety and Convenience 24 p. Documentation of Pre -Construction Conditions 25 q. Weekend Work Notification 26 r. Legal Holidays 27 s. Trench Safety Plans 28 t. Confined Space Entry Standards 29 u. Coordination with the City's representative for operations of existing water 30 systems 31 v. Storm Water Pollution Prevention Plan 32 w. Coordination with other Contractors 33 x. Early Warning System 34 y. Contractor Evaluation 35 z. Special Conditions applicable to the project 36 aa. Damages Claims 37 bb. Submittal Procedures 38 cc. Substitution Procedures 39 dd. Correspondence Routing 40 ee. Record Drawings 41 ff. Temporary construction facilities 42 gg. M/WBE or MBE/SBE procedures 43 hh. Final Acceptance 44 ii. Final Payment 45 jj. Questions or Comments CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 & CAH Ashland Drainage Improvements City Project No. 01918 01 31 19 - 3 PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 13 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 & CAH Ashland Drainage Improvements City Project No. 01918 1 2 3 PART 1 - GENERAL SECTION 01 31 20 PROJECT MEETINGS 013120-1 PROJECT MEETINGS Page 1 of 3 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for project meetings throughout the construction period to enable orderly 7 review of the progress of the Work and to provide for systematic discussion of 8 potential problems 9 B. Deviations this City of Fort Worth Standard Specification 10 1. None. 11 C. Related Specification Sections include, but are not necessarily limited to: 12 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 13 2. Division 1 — General Requirements 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Coordination 21 1. Schedule, attend and administer as specified, periodic progress meetings, and 22 specially called meetings throughout progress of the Work. 23 2. Representatives of Contractor, subcontractors and suppliers attending meetings 24 shall be qualified and authorized to act on behalf of the entity each represents. 25 3. Meetings administered by City may be tape recorded. 26 a. If recorded, tapes will be used to prepare minutes and retained by City for 27 future reference. 28 4. Meetings, in addition to those specified in this Section, may be held when requested 29 by the City, Engineer or Contractor. 30 B. Pre -Construction Neighborhood Meeting 31 1. After the execution of the Agreement, but before construction is allowed to begin, 32 attend 1 Public Meeting with affected residents to: 33 a. Present projected schedule, including construction start date 34 b. Answer any construction related questions 35 2. Meeting Location 36 a. Location of meeting to be determined by the City. 37 3. Attendees 38 a. Contractor CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 31 20 - 2 PROJECT MEETINGS Page 2 of 3 1 b. Project Representative 2 c. Other City representatives 3 4. Meeting Schedule 4 a. In general, the neighborhood meeting will occur within the 2 weeks following 5 the pre -construction conference. 6 b. In no case will construction be allowed to begin until this meeting is held. 7 C. Progress Meetings 8 1. Formal project coordination meetings will be held periodically. Meetings will be 9 scheduled and administered by Project Representative. 10 2. Additional progress meetings to discuss specific topics will be conducted on an as- 11 needed basis. Such additional meetings shall include, but not be limited to: 12 a. Coordinating shutdowns 13 b. Installation of piping and equipment 14 c. Coordination between other construction projects 15 d. Resolution of construction issues 16 e. Equipment approval 17 3. The Project Representative will preside at progress meetings, prepare the notes of 18 the meeting and distribute copies of the same to all participants who so request by 19 fully completing the attendance form to be circulated at the beginning of each 20 meeting. 21 4. Attendance shall include: 22 a. Contractor's project manager 23 b. Contractor's superintendent 24 c. Any subcontractor or supplier representatives whom the Contractor may desire 25 to invite or the City may request 26 d. Engineer's representatives 27 e. City's representatives 28 f. Others, as requested by the Project Representative 29 5. Preliminary Agenda may include: 30 a. Review of Work progress since previous meeting 31 b. Field observations, problems, conflicts 32 c. Items which impede construction schedule 33 d. Review of off -site fabrication, delivery schedules 34 e. Review of construction interfacing and sequencing requirements with other 35 construction contracts 36 f. Corrective measures and procedures to regain projected schedule 37 g. Revisions to construction schedule 38 h. Progress, schedule, during succeeding Work period 39 i. Coordination of schedules 40 j. Review submittal schedules 41 k. Maintenance of quality standards 42 1. Pending changes and substitutions 43 m. Review proposed changes for: 44 1) Effect on construction schedule and on completion date 45 2) Effect on other contracts of the Project 46 n. Review Record Documents 47 o. Review monthly pay request 48 p. Review status of Requests for Information CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 31 20 - 3 PROJECT MEETINGS Page 3 of 3 1 6. Meeting Schedule 2 a. Progress meetings will be held periodically as determined by the Project 3 Representative. 4 1) Additional meetings may be held at the request of the: 5 a) City 6 b) Engineer 7 c) Contractor 8 7. Meeting Location 9 a. The City will establish a meeting location. 10 1) To the extent practicable, meetings will be held at the Site. 11 1.5 SUBMITTALS [NOT USED] 12 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 13 1.7 CLOSEOUT SUBMITTALS [NOT USED] 14 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 15 1.9 QUALITY ASSURANCE [NOT USED] 16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 17 1.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY [NOT USED] 19 PART 2 - PRODUCTS [NOT USED] 20 PART 3 - EXECUTION [NOT USED] 21 END OF SECTION 22 23 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 2 3 PART 1- GENERAL 013216-1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 5 SECTION 01 32 16 CONSTRUCTION PROGRESS SCHEDULE 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation, submittal, updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 — General Requirements 15 1.2 PRICE AND PAYMENT PROCEDURES 16 A. Measurement and Payment 17 1. Work associated with this Item is considered subsidiary to the various items bid. 18 No separate payment will be allowed for this Item. 19 1.3 REFERENCES 20 A. Definitions 21 1. Schedule Tiers 22 a. Tier 1 - No schedule submittal required by contract. Small, brief duration 23 projects 24 b. Tier 2 - No schedule submittal required by contract, but will require some 25 milestone dates. Small, brief duration projects 26 c. Tier 3 - Schedule submittal required by contract as described in the 27 Specification and herein. Majority of City projects, including all bond program 28 projects 29 d. Tier 4 - Schedule submittal required by contract as described in the 30 Specification and herein. Large and/or complex projects with long durations 31 1) Examples: large water pump station project and associated pipeline with 32 interconnection to another governmental entity 33 e. Tier 5 - Schedule submittal required by contract as described in the 34 Specification and herein. Large and/or very complex projects with long 35 durations, high public visibility 36 1) Examples might include a water or wastewater treatment plant 37 2. Baseline Schedule - Initial schedule submitted before work begins that will serve 38 as the baseline for measuring progress and departures from the schedule. 39 3. Progress Schedule - Monthly submittal of a progress schedule documenting 40 progress on the project and any changes anticipated. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 2 3 01 32 16 -2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 5 4. Schedule Narrative - Concise narrative of the schedule including schedule changes, expected delays, key schedule issues, critical path items, etc B. Reference Standards 4 I. City of Fort Worth Schedule Guidance Document 5 1.4 ADMINISTRATIVE REQUIREMENTS 6 A. Baseline Schedule 7 1. General 8 a. Prepare a cost -loaded baseline Schedule using approved software and the 9 Critical Path Method (CPM) as required in the City of Fort Worth Schedule 10 Guidance Document. 11 b. Review the draft cost -loaded baseline Schedule with the City to demonstrate 12 understanding of the work to be performed and known issues and constraints 13 related to the schedule. 14 c. Designate an authorized representative (Project Scheduler) responsible for 15 developing and updating the schedule and preparing reports. 16 B. Progress Schedule 17 1. Update the progress Schedule monthly as required in the City of Fort Worth 18 Schedule Guidance Document. 19 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 20 3. Change Orders 21 a. Incorporate approved change orders, resulting in a change of contract time, in 22 the baseline Schedule in accordance with City of Fort Worth Schedule 23 Guidance Document. 24 C. Responsibility for Schedule Compliance 25 1. Whenever it becomes apparent from the current progress Schedule and CPM Status 26 Report that delays to the critical path have resulted and the Contract completion 27 date will not be met, or when so directed by the City, make some or all of the 28 following actions at no additional cost to the City 29 a. Submit a Recovery Plan to the City for approval revised baseline Schedule 30 outlining: 31 1) A written statement of the steps intended to take to remove or arrest the 32 delay to the critical path in the approved schedule 33 2) Increase construction manpower in such quantities and crafts as will 34 substantially eliminate the backlog of work and return current Schedule to 35 meet projected baseline completion dates 36 3) Increase the number of working hours per shift, shifts per day, working 37 days per week, the amount of construction equipment, or any combination 38 of the foregoing, sufficiently to substantially eliminate the backlog of work 39 4) Reschedule activities to achieve maximum practical concunency of 40 accomplishment of activities, and comply with the revised schedule 41 2. If no written statement of the steps intended to take is submitted when so requested 42 by the City, the City may direct the Contractor to increase the level of effort in 43 manpower (trades), equipment and work schedule (overtime, weekend and holiday 44 work, etc.) to be employed by the Contractor in order to remove or arrest the delay 45 to the critical path in the approved schedule. 46 a. No additional cost for such work will be considered. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 32 16 -3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 5 1 D. The Contract completion time will be adjusted only for causes specified in this 2 Contract. 3 a. Requests for an extension of any Contract completion date must be 4 supplemented with the following: 5 1) Furnish justification and supporting evidence as the City may deem 6 necessary to determine whether the requested extension of time is entitled 7 under the provisions of this Contract. 8 a) The City will, after receipt of such justification and supporting 9 evidence, make findings of fact and will advise the Contractor, in 10 writing thereof. 11 2) If the City finds that the requested extension of time is entitled, the City's 12 determination as to the total number of days allowed for the extensions 13 shall be based upon the approved total baseline schedule and on all data 14 relevant to the extension. 15 a) Such data shall be included in the next updating of the Progress 16 schedule. 17 b) Actual delays in activities which, according to the Baseline schedule, 18 do not affect any Contract completion date shown by the critical path in 19 the network will not be the basis for a change therein. 20 2. Submit each request for change in Contract completion date to the City within 30 21 days after the beginning of the delay for which a time extension is requested but 22 before the date of final payment under this Contract. 23 a. No time extension will be granted for requests which are not submitted within 24 the foregoing time limit. 25 b. From time to time, it may be necessary for the Contract schedule or completion 26 time to be adjusted by the City to reflect the effects of job conditions, weather, 27 technical difficulties, strikes, unavoidable delays on the part of the City or its 28 representatives, and other unforeseeable conditions which may indicate 29 schedule adjustments or completion time extensions. 30 1) Under such conditions, the City will direct the Contractor to reschedule the 31 work or Contract completion time to reflect the changed conditions and the 32 Contractor shall revise his schedule accordingly. 33 a) No additional compensation will be made to the Contractor for such 34 schedule changes except for unavoidable overall contract time 35 extensions beyond the actual completion of unaffected work, in which 36 case the Contractor shall take all possible action to minimize any time 37 extension and any additional cost to the City. 38 b) Available float time in the Baseline schedule may be used by the City 39 as well as by the Contractor. 40 3. Float or slack time is defined as the amount of time between the earliest start date 41 and the latest start date or between the earliest finish date and the latest finish date 42 of a chain of activities on the Baseline Schedule. 43 a. Float or slack time is not for the exclusive use or benefit of either the 44 Contractor or the City. 45 b. Proceed with work according to early start dates, and the City shall have the 46 right to reserve and apportion float time according to the needs of the project. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 32 16 - 4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 5 1 c. Acknowledge and agree that actual delays, affecting paths of activities 2 containing float time, will not have any effect upon contract completion times, 3 providing that the actual delay does not exceed the float time associated with 4 those activities. 5 E. Coordinating Schedule with Other Contract Schedules 6 1. Where work is to be performed under this Contract concurrently with or contingent 7 upon work performed on the same facilities or area under other contracts, the 8 Baseline Schedule shall be coordinated with the schedules of the other contracts. 9 a. Obtain the schedules of the other appropriate contracts from the City for the 10 preparation and updating of Baseline schedule and make the required changes 11 in his schedule when indicated by changes in corresponding schedules. 12 2. In case of interference between the operations of different contractors, the City will 13 determine the work priority of each contractor and the sequence of work necessary 14 to expedite the completion of the entire Project. 15 a. In such cases, the decision of the City shall be accepted as final. 16 b. The temporary delay of any work due to such circumstances shall not be 17 considered as justification for claims for additional compensation. 18 1.5 SUBMITTALS 19 A. Baseline Schedule 20 1. Submit Schedule in native file format and pdf format as required in the City of Fort 21 Worth Schedule Guidance Document. 22 a. Native file format includes: 23 1) Primavera (P6 or Primavera Contractor) 24 2. Submit draft baseline Schedule to City prior to the pre -construction meeting and 25 bring in hard copy to the meeting for review and discussion. 26 B. Progress Schedule 27 1. Submit progress Schedule in native file format and pdf format as required in the 28 City of Fort Worth Schedule Guidance Document. 29 2. Submit progress Schedule monthly no later than the last day of the month. 30 C. Schedule Narrative 31 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth 32 Schedule Guidance Document. 33 2. Submit schedule narrative monthly no later than the last day of the month. 34 D. Submittal Process 35 1. The City administers and manages schedules through Buzzsaw. 36 2. Contractor shall submit documents as required in the City of Fort Worth Schedule 37 Guidance Document. 38 3. Once the project has been completed and Final Acceptance has been issued by the 39 City, no further progress schedules are required. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 32 16 - 5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 5 1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.9 QUALITY ASSURANCE 5 A. The person preparing and revising the construction Progress Schedule shall be 6 experienced in the preparation of schedules of similar complexity. 7 B. Schedule and supporting documents addressed in this Specification shall be prepared, 8 updated and revised to accurately reflect the performance of the construction. 9 C. Contractor is responsible for the quality of all submittals in this section meeting the 10 standard of care for the construction industry for similar projects. 11 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 12 1.11 FIELD [SITE] CONDITIONS [NOT USED] 13 1.12 WARRANTY [NOT USED] 14 PART 2 - PRODUCTS [NOT USED] 15 PART 3 - EXECUTION [NOT USED] 16 END OF SECTION 17 18 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 2 3 PART 1 - GENERAL SECTION 01 32 33 PRECONSTRUCTION VIDEO 013233-1 PRECONSTRUCTION VIDEO Page 1 of 2 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstruction Videos 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment, including all areas in the 21 vicinity of and to be affected by construction. 22 a. Provide digital copy of video upon request by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY [NOT USED] 33 PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 013233-2 PRECONSTRUCTION VIDEO 1 PART 3 - EXECUTION [NOT USED] 2 END OF SECTION 3 4 Revision Log DATE NAME SUMMARY OF CHANGE Page 2 of 2 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 2 3 PART1- GENERAL SECTION 01 33 00 SUBMITTALS 01 33 00 - 1 SUBMITTALS Page 1 of 8 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following 7 Work -related submittals: 8 a. Shop Drawings 9 b. Product Data (including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES JNOT USED) 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Notify the City in writing, at the time of submittal, of any deviations in the 25 submittals from the requirements of the Contract Documents. 26 2. Coordination of Submittal Times 27 a. Prepare, prioritize and transmit each submittal sufficiently in advance of 28 performing the related Work or other applicable activities, or within the time 29 specified in the individual Work Sections, of the Specifications. 30 b. Contractor is responsible such that the installation will not be delayed by 31 processing times including, but not limited to: 32 a) Disapproval and resubinittal (if required) 33 b) Coordination with other submittals 34 c) Testing 35 d) Purchasing 36 e) Fabrication 37 f) Delivery 38 g) Similar sequenced activities 39 c. No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 33 00 - 2 SUBMITTALS Page 2 of 8 1 d. Make submittals promptly in accordance with approved schedule, and in such 2 sequence as to cause no delay in the Work or in the work of any other 3 contractor. 4 B. Submittal Numbering 5 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- 6 reference identification numbering system in the following manner: 7 a. Use the first 6 digits of the applicable Specification Section Number. 8 b. For the next 2 digits number use numbers 01 -99 to sequentially number each 9 initial separate item or drawing submitted under each specific Section number. 10 c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. 11 A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical 12 submittal number would be as follows: 13 14 03 30 00-08-B 15 16 1) 03 30 00 is the Specification Section for Concrete 17 2) 08 is the eighth initial submittal under this Specification Section 18 3) B is the third submission (second resubmission) of that particular shop 19 drawing 20 C. Contractor Certification 21 1. Review shop drawings, product data and samples, including those by 22 subcontractors, prior to submission to determine and verify the following: 23 a. Field measurements 24 b. Field construction criteria 25 c. Catalog numbers and similar data 26 d. Conformance with the Contract Documents 27 2. Provide each shop drawing, sample and product data submitted by the Contractor 28 with a Certification Statement affixed including: 29 a. The Contractor's Company name 30 b. Signature of submittal reviewer 31 c. Certification Statement 32 1) "By this submittal, I hereby represent that I have determined and verified 33 field measurements, field construction criteria, materials, dimensions, 34 catalog numbers and similar data and I have checked and coordinated each 35 item with other applicable approved shop drawings." 36 D. Submittal Format 37 1. Fold shop drawings larger than 8 ''A inches x 11 inches to 8 '/2 inches x 11 inches. 38 2. Bind shop drawings and product data sheets together. 39 3. Order 40 a. Cover Sheet 41 1) Description of Packet 42 2) Contractor Certification 43 b. List of items / Table of Contents 44 c. Product Data /Shop Drawings/Samples /Calculations 45 E. Submittal Content 46 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 33 00 - 3 SUBMITTALS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of: 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product, with the Specification Section number, page and 8 paragraph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 F. Shop Drawings 16 1. As specified in individual Work Sections includes, but is not necessarily limited to: 17 a. Custom -prepared data such as fabrication and erection/installation (working) 18 drawings 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 f. Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. Where correct fabrication of the Work depends upon field measurements 31 1) Provide such measurements and note on the drawings prior to submitting 32 for approval. 33 G. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List, clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List, submittal data may include, but is not necessarily limited to: 38 a. Standard prepared data for manufactured products (sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation 41 instructions 42 2) Availability of colors and patterns 43 3) Manufacturer's printed statements of compliances and applicability 44 4) Roughing -in diagrams and templates 45 5) Catalog cuts 46 6) Product photographs CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 33 00 - 4 SUBMITTALS Page 4 of 8 1 7) Standard wiring diagrams 2 8) Printed performance curves and operational -range diagrams 3 9) Production or quality control inspection and test reports and certifications 4 10) Mill reports 5 11) Product operating and maintenance instructions and recommended 6 spare -parts listing and printed product warranties 7 12) As applicable to the Work 8 H. Samples 9 1. As specified in individual Sections, include, but are not necessarily limited to: 10 a. Physical examples of the Work such as: 11 1) Sections of manufactured or fabricated Work 12 2) Small cuts or containers of materials 13 3) Complete units of repetitively used products color/texture/pattern swatches 14 and range sets 15 4) Specimens for coordination of visual effect 16 5) Graphic symbols and units of Work to be used by the City for independent 17 inspection and testing, as applicable to the Work 18 I. Do not start Work requiring a shop drawing, sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 1. Fabrication performed, materials purchased or on -site construction accomplished 21 which does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 2. The City will not be liable for any expense or delay due to corrections or remedies 24 required to accomplish conformity. 25 3. Complete project Work, materials, fabrication, and installations in conformance 26 with approved shop drawings, applicable samples, and product data. 27 J. Submittal Distribution 28 1. Electronic Distribution 29 a. Confirm development of Project directory for electronic submittals to be 30 uploaded to City's Buzzsaw site, or another external FTP site approved by the 31 City. 32 b. Shop Drawings 33 1) Upload submittal to designated project directory and notify appropriate 34 City representatives via email of submittal posting. 35 2) Hard Copies 36 a) 3 copies for all submittals 37 b) If Contractor requires more than 1 hard copy of Shop Drawings 38 returned, Contractor shall submit more than the number of copies listed 39 above. 40 c. Product Data 41 1) Upload submittal to designated project directory and notify appropriate 42 City representatives via email of submittal posting. 43 2) Hard Copies 44 a) 3 copies for all submittals 45 d. Samples 46 1) Distributed to the Project Representative 47 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 33 00 - 5 SUBMITTALS Page 5 of 8 1 a. Shop Drawings 2 1) Distributed to the City 3 2) Copies 4 a) 8 copies for mechanical submittals 5 b) 7 copies for all other submittals 6 c) If Contractor requires more than 3 copies of Shop Drawings returned, 7 Contractor shall submit more than the number of copies listed above. 8 b. Product Data 9 1) Distributed to the City 10 2) Copies 11 a) 4 copies 12 c. Samples 13 1) Distributed to the Project Representative 14 2) Copies 15 a) Submit the number stated in the respective Specification Sections. 16 3. Distribute reproductions of approved shop drawings and copies of approved 17 product data and samples, where required, to the job site file and elsewhere as 18 directed by the City. 19 a. Provide number of copies as directed by the City but not exceeding the number 20 previously specified. 21 K. Submittal Review 22 1. The review of shop drawings, data and samples will be for general conformance 23 with the design concept and Contract Documents. This is not to be construed as: 24 a. Permitting any departure from the Contract requirements 25 b. Relieving the Contractor of responsibility for any errors, including details, 26 dimensions, and materials 27 c. Approving departures from details furnished by the City, except as otherwise 28 provided herein 29 2. The review and approval of shop drawings, samples or product data by the City 30 does not relieve the Contractor from his/her responsibility with regard to the 31 fulfillment of the terms of the Contract. 32 a. All risks of error and omission are assumed by the Contractor, and the City will 33 have no responsibility therefore. 34 3. The Contractor remains responsible for details and accuracy, for coordinating the 35 Work with all other associated work and trades, for selecting fabrication processes, 36 for techniques of assembly and for performing Work in a safe manner. 37 4. If the shop drawings, data or samples as submitted describe variations and show a 38 departure from the Contract requirements which City finds to be in the interest of 39 the City and to be so minor as not to involve a change in Contract Price or time for 40 performance, the City may return the reviewed drawings without noting an 41 exception. 42 5. Submittals will be returned to the Contractor under 1 of the following codes: 43 a. Code 1 44 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or 45 comments on the submittal. 46 a) When returned under this code the Contractor may release the 47 equipment and/or material for manufacture. 48 b. Code 2 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 33 00 - 6 SUBMITTALS Page 6 of 8 1 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of 2 the notations and comments IS NOT required by the Contractor. 3 a) The Contractor may release the equipment or material for manufacture; 4 however, all notations and comments must be incorporated into the 5 final product. 6 c. Code 3 7 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is 8 assigned when notations and comments are extensive enough to require a 9 resubmittal of the package. 10 a) The Contractor may release the equipment or material for manufacture; 11 however, all notations and comments must be incorporated into the 12 final product. 13 b) This resubmittal is to address all comments, omissions and 14 non -conforming items that were noted. 15 c) Resubmittal is to be received by the City within 15 Calendar Days of 16 the date of the City's transmittal requiring the resubmittal. 17 d. Code 4 18 1) "NOT APPROVED" is assigned when the submittal does not meet the 19 intent of the Contract Documents. 20 a) The Contractor must resubmit the entire package revised to bring the 21 submittal into conformance. 22 b) It may be necessary to resubmit using a different manufacturer/vendor 23 to meet the Contract Documents. 24 6. Resubmittals 25 a. Handled in the same manner as first submittals 26 1) Corrections other than requested by the City 27 2) Marked with revision triangle or other similar method 28 a) At Contractor's risk if not marked 29 b. Submittals for each item will be reviewed no more than twice at the City's 30 expense. 31 1) All subsequent reviews will be performed at times convenient to the City 32 and at the Contractor's expense, based on the City's or City 33 Representative's then prevailing rates. 34 2) Provide Contractor reimbursement to the City within 30 Calendar Days for 35 all such fees invoiced by the City. 36 c. The need for more than 1 resubmission or any other delay in obtaining City's 37 review of submittals, will not entitle the Contractor to an extension of Contract 38 Time. 39 7. Partial Submittals 40 a. City reserves the right to not review submittals deemed partial, at the City's 41 discretion. 42 b. Submittals deemed by the City to be not complete will be returned to the 43 Contractor, and will be considered "Not Approved" until resubmitted. 44 c. The City may at its option provide a list or mark the submittal directing the 45 Contractor to the areas that are incomplete. 46 8. If the Contractor considers any correction indicated on the shop drawings to 47 constitute a change to the Contract Documents, then written notice must be 48 provided thereof to the City at least 7 Calendar Days prior to release for 49 manufacture. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage hnprovements City Project No. 01918 013300-7 SUBMITTALS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications 11 1. If specifically required in other Sections of these Specifications, submit a P.E. 12 Certification for each item required. 13 N. Request for Information (RFI) 14 1. Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. When the Contractor believes there is a conflict between Contract Documents 17 c. When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Use the Request for Information (RFI) form provided by the City. 21 3. Numbering of RFI 22 a. Prefix with "RFI" followed by series number, "-xxx", beginning with "01" and 23 increasing sequentially with each additional transmittal. 24 4. Sufficient information shall be attached to permit a written response without further 25 information. 26 5. The City will log each request and will review the request. 27 a. If review of the project information request indicates that a change to the 28 Contract Documents is required, the City will issue a Field Order or Change 29 Order, as appropriate. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] 35 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 36 1.11 FIELD [SITE] CONDITIONS [NOT USED] 37 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 PART 2 - PRODUCTS [NOT USED] 2 PART 3 - EXECUTION [NOT USED] 3 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days 013300-8 SUBMITTALS Page 8 of 8 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 013513-1 SPECIAL PROJECT PROCEDURES Page 1 of 8 1 SECTION 01 35 13 2 SPECIAL PROJECT PROCEDURES 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 f. Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Ariny Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 — General Requirements 23 3. Section 33 12 25 — Connection to Existing Water Mains 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Coordination within Railroad permit areas 27 a. Measurement 28 1) Measurement for this Item will be by lump sum. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 will be paid for at the lump sum price bid for Railroad Coordination. 32 c. The price bid shall include: 33 1) Mobilization 34 2) Inspection 35 3) Safety training 36 4) Additional Insurance 37 5) Insurance Certificates 38 6) Other requirements associated with general coordination with Railroad, 39 including additional employees required to protect the right-of-way and 40 property of the Railroad from damage arising out of and/or from the 41 construction of the Project. 42 2. Railroad Flagmen CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 35 13 -2 SPECIAL PROJECT PROCEDURES Page 2of8 1 a. Measurement 2 1) Measurement for this Item will be per working day. 3 b. Payment 4 1) The work performed and materials furnished in accordance with this Item 5 will be paid for each working day that Railroad Flagmen are present at the 6 Site. 7 c. The price bid shall include: 8 1) Coordination for scheduling flagmen 9 2) Flagmen 10 3) Other requirements associated with Railroad 11 3. All other items 12 a. Work associated with these Items is considered subsidiary to the various Items 13 bid. No separate payment will be allowed for this Item. 14 1.3 REFERENCES 15 A. Reference Standards 16 1. Reference standards cited in this Specification refer to the current reference 17 standard published at the time of the latest revision date logged at the end of this 18 Specification, unless a date is specifically cited. 19 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 20 High Voltage Overhead Lines. 21 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 22 Specification 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Coordination with the Texas Department of Transportation 25 1. When work in the right-of-way which is under the jurisdiction of the Texas 26 Department of Transportation (TxDOT): 27 a. Notify the Texas Department of Transportation prior to commencing any work 28 therein in accordance with the provisions of the permit 29 b. All work performed in the TxDOT right-of-way shall be performed in 30 compliance with and subject to approval from the Texas Department of 31 Transportation 32 B. Work near High Voltage Lines 33 1. Regulatory Requirements 34 a. All Work near High Voltage Lines (more than 600 volts measured between 35 conductors or between a conductor and the ground) shall be in accordance with 36 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 37 2. Warning sign 38 a. Provide sign of sufficient size meeting all OSHA requirements. 39 3. Equipment operating within 10 feet of high voltage lines will require the following 40 safety features 41 a. Insulating cage -type of guard about the boom or arin 42 b. Insulator links on the lift hook connections for back hoes or dippers 43 c. Equipment must meet the safety requirements as set forth by OSHA and the 44 safety requirements of the owner of the high voltage lines 45 4. Work within 6 feet of high voltage electric lines CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 35 13 -3 SPECIAL PROJECT PROCEDURES Page 3 of 8 1 a. Notification shall be given to: 2 1) The power company (example: ONCOR) 3 a) Maintain an accurate log of all such calls to power company and record 4 action taken in each case. 5 b. Coordination with power company 6 1) After notification coordinate with the power company to: 7 a) Erect temporary mechanical barriers, de -energize the lines, or raise or 8 lower the lines 9 c. No personnel may work within 6 feet of a high voltage line before the above 10 requirements have been met. 11 C. Confined Space Entry Program 12 1. Provide and follow approved Confined Space Entry Program in accordance with 13 OSHA requirements. 14 2. Confined Spaces include: 15 a. Manholes 16 b. All other confined spaces in accordance with OSHA's Permit Required for 17 Confined Spaces 18 D. Air Pollution Watch Days 19 1. General 20 a. Observe the following guidelines relating to working on City construction sites 21 on days designated as "AIR POLLUTION WATCH DAYS". 22 b. Typical Ozone Season 23 1) May 1 through October 31. 24 c. Critical Emission Time 25 1) 6:00 a.rn. to 10:00 a.m. 26 2. Watch Days 27 a. The Texas Commission on Environmental Quality (TCEQ), in coordination 28 with the National Weather Service, will issue the Air Pollution Watch by 3:00 29 p.m. on the afternoon prior to the WATCH day. 30 b. Requirements 31 1) Begin work after 10:00 a.rn. whenever construction phasing requires the 32 use of motorized equipment for periods in excess of 1 hour. 33 2) However, the Contractor may begin work prior to 10:00 a.m. if: 34 a) Use of motorized equipment is less than 1 hour, or 35 b) If equipment is new and certified by EPA as "Low Emitting", or 36 equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or 37 alternative fuels such as CNG. 38 E. TCEQ Air Permit 39 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. 40 F. Use of Explosives, Drop Weight, Etc. 41 1. When Contract Documents permit on the project the following will apply: 42 a. Public Notification 43 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 44 prior to commencing. 45 2) Minimum 24 hour public notification in accordance with Section 01 31 13 46 G. Water Department Coordination CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 013513-4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1 1. During the construction of this project, it will be necessary to deactivate, for a 2 period of time, existing lines. The Contractor shall be required to coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line system with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named project. 10 c. In the event that a water valve on an existing live system be turned off and on 11 to accommodate the construction of the project is required, coordinate this 12 activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. 14 a) Failure to comply will render the Contractor in violation of Texas Penal 15 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 16 will be prosecuted to the full extent of the law. 17 b) In addition, the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 H. Public Notification Prior to Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis, prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction. The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a) Name of Project 29 b) City Project No (CPN) 30 c) Scope of Project (i.e. type of construction activity) 31 d) Actual construction duration within the block 32 e) Name of the contractor's foreman and phone number 33 f) Name of the City's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 36 A. 37 3) Submit schedule showing the construction start and finish time for each 38 block of the project to the inspector. 39 4) Deliver flyer to the City Inspector for review prior to distribution. 40 b. No construction will be allowed to begin on any block until the flyer is 41 delivered to all residents of the block. 42 I. Public Notification of Temporary Water Service Interruption during Construction 43 1. In the event it becomes necessary to temporarily shut down water service to 44 residents or businesses during construction, prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2. Prepared notice as follows: 47 a. The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 013513-5 SPECIAL PROJECT PROCEDURES Page 5 of 8 1 b. Prepare flyer on the contractor's letterhead and include the following 2 information: 3 1) Name of the project 4 2) City Project Number 5 3) Date of the interruption of service 6 4) Period the interruption will take place 7 5) Name of the contractor's foreman and phone number 8 6) Name of the City's inspector and phone number 9 c. A sample of the temporary water service interruption notification is attached as 10 Exhibit B. 11 d. Deliver a copy of the temporary interruption notification to the City inspector 12 for review prior to being distributed. 13 e. No interruption of water service can occur until the flyer has been delivered to 14 all affected residents and businesses. 15 f. Electronic versions of the sample flyers can be obtained from the Project 16 Construction Inspector. 17 J. Coordination with United States Army Corps of Engineers (USACE) 18 1. At locations in the Project where construction activities occur in areas where 19 USACE permits are required, meet all requirements set forth in each designated 20 permit. 21 K. Coordination within Railroad Permit Areas 22 1. At locations in the project where construction activities occur in areas where 23 railroad permits are required, meet all requirements set forth in each designated 24 railroad permit. This includes, but is not limited to, provisions for: 25 a. Flagmen 26 b. Inspectors 27 c. Safety training 28 d. Additional insurance 29 e. Insurance certificates 30 f. Other employees required to protect the right-of-way and property of the 31 Railroad Company from damage arising out of and/or from the construction of 32 the project. Proper utility clearance procedures shall be used in accordance 33 with the permit guidelines. 34 2. Obtain any supplemental information needed to comply with the railroad's 35 requirements. 36 3. Railroad Flagmen 37 a. Submit receipts to City for verification of working days that railroad flagmen 38 were present on Site. 39 L. Dust Control 40 1. Use acceptable measures to control dust at the Site. 41 a. If water is used to control dust, capture and properly dispose of waste water. 42 b. If wet saw cutting is performed, capture and properly dispose of slurry. 43 M. Employee Parking 44 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 013513-6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 13 Revision Log DATE NAME SUMMARY OF CHANGE 1.4.B — Added requirement of compliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E — Added Contractor responsibility for obtaining a TCEQ Air Permit CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 013513-7 SPECIAL PROJECT PROCEDURES Page 7 of 8 1 EXHIBIT A 2 (To be printed on Contractor's Letterhead) 3 4 5 6 Date: 7 8 CPN No.: 9 Project Name: t0 Mapsco Location: it Limits of Construction: 12 13 14 NQIICE Of CQNSTROCTIQI 15 16 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23 24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> 29 30 OR 31 32 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 36 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 37 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 013513-8 SPECIAL PROJECT PROCEDURES Page 8 of 8 EXHIBIT B FQ4ORT DOE PM. 71.Z7[R Project Mecum NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION FLUE TO UT1I.1TV IMPROVEMENTS IN YOUR NE1t'1ILNORHOOU, YOUR WATER 9Ft4VICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OFAND IFYOU HAVE. QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL; MR. AT _ (CONTRACTORS SUPERINTENDENT} (x ludr.PTIONE NUMBER) MR. AT (CITl' INSPECTOR) (TE1.FPHONENUMIWR) THIS INCONVENIENCE WILL DE AS -SHORT AS POSS111LE. THANK YOU, .CONTRACTOR CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage hnprovements City Project No. 01918 1 2 3 PART 1- GENERAL 014523-1 TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 01 45 23 TESTING AND INSPECTION SERVICES 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails, the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City, notify City, sufficiently 31 in advance, when testing is needed. 32 b. When testing is required to be completed by the Contractor, notify City, 33 sufficiently in advance, that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another external FTP site approved by 38 the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 014523-2 TESTING AND INSPECTION SERVICES Page 2 of 2 1 2) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution (if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered load of 11 Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS [NOT USED] 27 PART 3 - EXECUTION [NOT USED] 28 END OF SECTION 29 30 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 2 01 50 00 - 1 TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1 — General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c. Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 1) Included are fuel, power, light, heat and other utility services necessary for 32 execution, completion, testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping, equipment, devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage hnprovements City Project No. 01918 01 50 00 - 2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 1 d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work, including 6 testing of Work. 7 1) Provide power for lighting, operation of equipment, or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off -site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner. 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting, and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 015000-3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1 1. Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a. Contractor remains on -call at all times 4 b. Must respond in a timely manner 5 F. Temporary Protection of Construction 6 1. Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2 - PRODUCTS [NOT USED] 17 PART 3 - EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR] / [RESTORATION] 25 3.6 RE -INSTALLATION 26 3.7 FIELD loR] SITE QUALITY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 015000-4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work, to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION [NOT USED] 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 2 015526-1 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 SECTION 01 55 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 — General Requirements 15 3. Section 34 71 13 — Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. When traffic control plans are included in the Drawings, provide Traffic 30 Control in accordance with Drawings and Section 34 71 13. 31 b. When traffic control plans are not included in the Drawings, prepare traffic 32 control plans in accordance with Section 34 71 13 and submit to City for 33 review. 34 1) Allow minimum 10 working days for review of proposed Traffic Control. 35 B. Street Use Permit 36 1. Prior to installation of Traffic Control, a City Street Use Permit is required. 37 a. To obtain Street Use Permit, submit Traffic Control Plans to City 38 Transportation and Public Works Department. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 015526-2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1 1) Allow a minimum of 5 working days for permit review. 2 2) Contractor's responsibility to coordinate review of Traffic Control plans for 3 Street Use Permit, such that construction is not delayed. 4 C. Modification to Approved Traffic Control 5 1. Prior to installation traffic control: 6 a. Submit revised traffic control plans to City Department Transportation and 7 Public Works Department. 8 1) Revise Traffic Control plans in accordance with Section 34 71 13. 9 2) Allow minimum 5 working days for review of revised Traffic Control. 10 3) It is the Contractor's responsibility to coordinate review of Traffic Control 11 plans for Street Use Permit, such that construction is not delayed. 12 D. Removal of Street Sign 13 1. If it is determined that a street sign must be removed for construction, then contact 14 City Transportation and Public Works Department, Signs and Markings Division to 15 remove the sign. 16 E. Temporary Signage 17 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 18 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 19 Devices (MUTCD). 20 2. Install temporary sign before the removal of permanent sign. 21 3. When construction is complete, to the extent that the permanent sign can be 22 reinstalled, contact the City Transportation and Public Works Department, Signs 23 and Markings Division, to reinstall the permanent sign. 24 F. Traffic Control Standards 25 1. Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] 34 PART 2 - PRODUCTS [NOT USED] 35 PART 3 - EXECUTION [NOT USED] 36 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 015526-3 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 2 3 PART 1 - GENERAL 4 1.1 SUMMARY 015713-1 STORM WATER POLLUTION PREVENTION Page 1 of 3 SECTION 01 57 13 STORM WATER POLLUTION PREVENTION 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the 11 Contract 12 2. Division 1 — General Requirements 13 3. Section 31 25 00 — Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than 1 acre of disturbance 17 a. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 a. Measurement and Payment shall be in accordance with Section 31 25 00. 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent: NOI 24 2. Notice of Terinination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 57 13 -2 STORM WATER POLLUTION PREVENTION Page 2 of 3 1 B. Construction Activities resulting in: 2 1. Less than 1 acre of disturbance 3 a. Provide erosion and sediment control in accordance with Section 31 25 00 and 4 Drawings. 5 2. 1 to less than 5 acres of disturbance 6 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 7 Permit is required 8 b. Complete SWPPP in accordance with TCEQ requirements 9 1) TCEQ Small Construction Site Notice Required under general permit 10 TXR150000 11 a) Sign and post at job site 12 b) Prior to Preconstruction Meeting, send 1 copy to City Department of 13 Transportation and Public Works, Environmental Division, (817) 392- 14 6088. 15 2) Provide erosion and sediment control in accordance with: 16 a) Section 31 25 00 17 b) The Drawings 18 c) TXR150000 General Permit 19 d) SWPPP 20 e) TCEQ requirements 21 3. 5 acres or more of Disturbance 22 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 23 Permit is required 24 b. Complete SWPPP in accordance with TCEQ requirements 25 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee 26 a) Sign and post at job site 27 b) Send copy to City Department of Transportation and Public Works, 28 Environmental Division, (817) 392-6088. 29 2) TCEQ Notice of Change required if making changes or updates to NOI 30 3) Provide erosion and sediment control in accordance with: 31 a) Section 31 25 00 32 b) The Drawings 33 c) TXR150000 General Permit 34 d) SWPPP 35 e) TCEQ requirements 36 4) Once the project has been completed and all the closeout requirements of 37 TCEQ have been met a TCEQ Notice of Termination can be submitted. 38 a) Send copy to City Department of Transportation and Public Works, 39 Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 A. SWPPP 42 1. Submit in accordance with Section 01 33 00, except as stated herein. 43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 1) 1 copy to the City Project Manager 46 a) City Project Manager will forward to the City Department of 47 Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 015713-3 STORM WATER POLLUTION PREVENTION Page 3 of 3 1 B. Modified SWPPP 2 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City 3 in accordance with Section 01 33 00. 4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS (NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE (NOT USED] 8 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2 - PRODUCTS [NOT USED] 12 PART 3 - EXECUTION [NOT USED] 13 END OF SECTION 14 15 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 58 13 -2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 1 B. Materials 2 1. Sign 3 a. Constructed of 3/4-inch fir plywood, grade A-C (exterior) or better 4 2.3 ACCESSORIES [NOT USED] 5 2.4 SOURCE QUALITY CONTROL [NOT USED] 6 PART 3 - EXECUTION 7 3.1 INSTALLERS [NOT USED] 8 3.2 EXAMINATION [NOT USED] 9 3.3 PREPARATION [NOT USED] 10 3.4 INSTALLATION 11 A. General 12 1. Provide vertical installation at extents of project. 13 2. Relocate sign as needed, upon request of the City. 14 B. Mounting options 15 a. Skids 16 b. Posts 17 c. Barricade 18 3.5 REPAIR / RESTORATION [NOT USED] 19 3.6 RE -INSTALLATION [NOT USED] 20 3.7 FIELD IoR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING [NOT USED] 24 3.11 CLOSEOUT ACTIVITIES [NOT USED] 25 3.12 PROTECTION [NOT USED] 26 3.13 MAINTENANCE 27 A. General 28 1. Maintenance will include painting and repairs as needed or directed by the City. 29 3.14 ATTACHMENTS [NOT USED] 30 END OF SECTION 31 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 58 13 -3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 2 SECTION 01 60 00 PRODUCT REQUIREMENTS 016000-1 PRODUCT REQUIREMENTS Page 1 of 2 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. References for Product Requirements and City Standard Products List 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A. A list of City approved products for use is located on Buzzsaw as follows: 16 1. Resources\02 - Construction Documents\Standard Products List 17 B. Only products specifically included on City's Standard Product List in these Contract 18 Documents shall be allowed for use on the Project. 19 1. Any subsequently approved products will only be allowed for use upon specific 20 approval by the City. 21 C. Any specific product requirements in the Contract Documents supersede similar 22 products included on the City's Standard Product List. 23 1. The City reserves the right to not allow products to be used for certain projects even 24 though the product is listed on the City's Standard Product List. 25 D. Although a specific product is included on City's Standard Product List, not all 26 products from that manufacturer are approved for use, including but not limited to, that 27 manufacturer's standard product. 28 E. See Section 01 33 00 for submittal requirements of Product Data included on City's 29 Standard Product List. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION 7 8 DATE NAME 10/12/12 D.Johnson 016000-2 PRODUCT REQUIREMENTS Page 2 of 2 Revision Log SUMMARY OF CHANGE Modified Location of City's Standard Product List CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 016600-1 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 1 SECTION 01 66 00 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Scheduling of product delivery 7 2. Packaging of products for delivery 8 3. Protection of products against damage from: 9 a. Handling 10 b. Exposure to elements or harsh environments 11 B. Deviations from this City of Fort Worth Standard Specification 12 1 None. 13 C. Related Specification Sections include, but are not necessarily limited to: 14 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 15 2. Division 1 — General Requirements 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 24 1.7 CLOSEOUT SUBMITTALS [NOT USED] 25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 26 1.9 QUALITY ASSURANCE [NOT USED] 27 1.10 DELIVERY AND HANDLING 28 A. Delivery Requirements 29 1. Schedule delivery of products or equipment as required to allow timely installation 30 and to avoid prolonged storage. 31 2. Provide appropriate personnel and equipment to receive deliveries. 32 3. Delivery trucks will not be permitted to wait extended periods of time on the Site 33 for personnel or equipment to receive the delivery. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage hnprovements City Project No. 01918 016600-2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 1. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C. Storage Requirements 11 1. Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a. Arrange storage to provide easy access for inspection. 22 4. Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5. Provide off -site storage and protection when on -site storage is not adequate. 25 a. Provide addresses of and access to off -site storage locations for inspection by 26 City's Project Representative. 27 6. Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 016600-3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 ERECTION [NOT USED] 9 3.5 REPAIR / RESTORATION [NOT USED] 10 3.6 RE -INSTALLATION [NOT USED] 11 3.7 FIELD LoR] SITE QUALITY CONTROL 12 A. Tests and Inspections 13 1. hnspect all products or equipment delivered to the site prior to unloading. 14 B. Non -Conforming Work 15 1. Reject all products or equipment that are damaged, used or in any other way 16 unsatisfactory for use on the project. 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION 22 A. Protect all products or equipment in accordance with manufacturer's written directions. 23 B. Store products or equipment in location to avoid physical damage to items while in 24 storage. 25 C. Protect equipment from exposure to elements and keep thoroughly dry if required by 26 the manufacturer. 27 3.13 MAINTENANCE [NOT USED] 28 3.14 ATTACHMENTS [NOT USED] 29 END OF SECTION 30 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 DATE 016600-4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 2 3 PART 1- GENERAL 4 1.1 SUMMARY 017000-1 MOBILIZATION AND REMOBILIZATION Page 1 of 4 SECTION 01 70 00 MOBILIZATION AND REMOBILIZATION 5 A. Section Includes: 6 1. Mobilization and Demobilization 7 a. Mobilization 8 1) Transportation of Contractor's personnel, equipment, and operating supplies 9 to the Site 10 2) Establishment of necessary general facilities for the Contractor's operation 11 at the Site 12 3) Premiums paid for performance and payment bonds 13 4) Transportation of Contractor's personnel, equipment, and operating supplies 14 to another location within the designated Site 15 5) Relocation of necessary general facilities for the Contractor's operation 16 from 1 location to another location on the Site. 17 b. Demobilization 18 1) Transportation of Contractor's personnel, equipment, and operating supplies 19 away from the Site including disassembly 20 2) Site Clean-up 21 3) Removal of all buildings and/or other facilities assembled at the Site for this 22 Contract 23 c. Mobilization and Demobilization do not include activities for specific items of 24 work that are for which payment is provided elsewhere in the contract. 25 2. Remobilization 26 a. Remobilization for Suspension of Work specifically required in the Contract 27 Documents or as required by City includes: 28 1) Demobilization 29 a) Transportation of Contractor's personnel, equipment, and operating 30 supplies from the Site including disassembly or temporarily securing 31 equipment, supplies, and other facilities as designated by the Contract 32 Documents necessary to suspend the Work. 33 b) Site Clean-up as designated in the Contract Documents 34 2) Remobilization 35 a) Transportation of Contractor's personnel, equipment, and operating 36 supplies to the Site necessary to resume the Work. 37 b) Establishment of necessary general facilities for the Contractor's 38 operation at the Site necessary to resume the Work. 39 3) No Payments will be made for: 40 a) Mobilization and Demobilization from one location to another on the 41 Site in the normal progress of performing the Work. 42 b) Stand-by or idle time 43 c) Lost profits 44 3. Mobilizations and Demobilization for Miscellaneous Projects 45 a. Mobilization and Demobilization CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 70 00 - 2 MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel, equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include, but are not necessarily limited to: 22 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 — General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Mobilization and Demobilization 27 a. Measure 28 1) This Item is considered subsidiary to the various Items bid. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 are subsidiary to the various Items bid and no other compensation will be 32 allowed. 33 2. Remobilization for suspension of Work as specifically required in the Contract 34 Documents 35 a. Measurement 36 1) Measurement for this Item shall be per each rernobilization performed. 37 b. Payment 38 1) The work performed and materials furnished in accordance with this Item 39 and measured as provided under "Measurement" will be paid for at the unit 40 price per each "Specified Remobilization" in accordance with Contract 41 Documents. 42 c. The price shall include: 43 1) Demobilization as described in Section 1.1.A.2.a.1) 44 2) Remobilization as described in Section 1.1.A.2.a.2) 45 d. No payments will be made for standby, idle time, or lost profits associated this 46 Item. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 017000-3 MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 3. Relnobilization for suspension of Work as required by City 2 a. Measurement and Payment 3 1) This shall be submitted as a Contract Claim in accordance with Article 10 4 of Section 00 72 00. 5 2) No payments will be made for standby, idle time, or lost profits associated 6 with this Item. 7 4. Mobilizations and Demobilizations for Miscellaneous Projects 8 a. Measurement 9 1) Measurement for this Item shall be for each Mobilization and 10 Demobilization required by the Contract Documents 11 b. Payment 12 1) The Work performed and materials furnished in accordance with this Item 13 and measured as provided under "Measurement" will be paid for at the unit 14 price per each "Work Order Mobilization" in accordance with Contract 15 Documents. Demobilization shall be considered subsidiary to mobilization 16 and shall not be paid for separately. 17 c. The price shall include: 18 1) Mobilization as described in Section 1.1.A.3.a.1) 19 2) Demobilization as described in Section 1.1.A.3.a.2) 20 d. No payments will be made for standby, idle time, or lost profits associated this 21 Item. 22 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 23 a. Measurement 24 1) Measurement for this Item shall be for each Mobilization and 25 Demobilization required by the Contract Documents 26 b. Payment 27 1) The Work performed and materials furnished in accordance with this Item 28 and measured as provided under "Measurement" will be paid for at the unit 29 price per each "Work Order Emergency Mobilization" in accordance with 30 Contract Documents. Demobilization shall be considered subsidiary to 31 mobilization and shall not be paid for separately. 32 c. The price shall include 33 1) Mobilization as described in Section 1.1.A.4.a) 34 2) Demobilization as described in Section 1.1.A.3.a.2) 35 d. No payments will be made for standby, idle time, or lost profits associated this 36 Item. 37 1.3 REFERENCES [NOT USED] 38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 39 1.5 SUBMITTALS [NOT USED] 40 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 41 1.7 CLOSEOUT SUBMITTALS [NOT USED] 42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 43 1.9 QUALITY ASSURANCE [NOT USED] 44 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 017000-4 MOBILIZATION AND REMOBILIZATION 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION [NOT USED] 5 END OF SECTION 6 7 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Page 4 of 4 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 2 3 PART 1 - GENERAL 01 71 23 - 1 CONSTRUCTION STAKING AND SURVEY Page 1 of 4 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Construction Staking 15 a. Measurement 16 1) This Item is considered subsidiary to the various Items bid. 17 b. Payment 18 1) The work performed and the materials furnished in accordance with this 19 Item are subsidiary to the various Items bid and no other compensation will 20 be allowed. 21 2. Construction Survey 22 a. Measurement 23 1) This Item is considered subsidiary to the various Items bid. 24 b. Payment 25 1) The work performed and the materials furnished in accordance with this 26 Item are subsidiary to the various Items bid and no other compensation will 27 be allowed. 28 1.3 REFERENCES [NOT USED] 29 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 30 1.5 SUBMITTALS 31 A. Submittals, if required, shall be in accordance with Section 01 33 00. 32 B. All submittals shall be approved by the City prior to delivery. 33 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 34 A. Certificates 35 1. Provide certificate certifying that elevations and locations of improvements are in 36 conformance or non-conformance with requirements of the Contract Documents. 37 a. Certificate must be sealed by a registered professional land surveyor in the 38 State of Texas. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 4 1 B. Field Quality Control Submittals 2 1. Documentation verifying accuracy of field engineering work. 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE 6 A. Construction Staking 7 1. Construction staking will be performed by the City. 8 2. Coordination 9 a. Contact City's Project Representative at least 2 weeks in advance for 10 scheduling of Construction Staking. 11 b. It is the Contractor's responsibility to coordinate staking such that construction 12 activities are not delayed or negatively impacted. 13 3. General 14 a. Contractor is responsible for preserving and maintaining stakes furnished by 15 City. 16 b. If in the opinion of the City, a sufficient number of stakes or markings have 17 been lost, destroyed or disturbed, by Contractor's neglect, such that the 18 contracted Work cannot take place, then the Contractor will be required to pay 19 the City for new staking with a 25 percent markup. The cost for staking will be 20 deducted from the payment due to the Contractor for the Project. 21 B. Construction Survey 22 1. Construction Survey will be performed by the City. 23 2. Coordination 24 a. Contractor to verify that control data established in the design survey remains 25 intact. 26 b. Coordinate with the City prior to field investigation to determine which 27 horizontal and vertical control data will be required for construction survey. 28 c. It is the Contractor's responsibility to coordinate Construction Survey such that 29 construction activities are not delayed or negatively impacted. 30 d. Notify City if any control data needs to be restored or replaced due to damage 31 caused during construction operations. 32 1) City shall perform replacements and/or restorations. 33 3. General 34 a. Construction survey will be performed in order to maintain complete and 35 accurate logs of control and survey work as it progresses for Project Records. 36 b. The Contractor will need to ensure coordination is maintained with the City to 37 perform construction survey to obtain construction features, including but not 38 limited to the following: 39 1) All Utility Lines 40 a) Rim and flowline elevations and coordinates for each manhole or 41 junction structure 42 2) Water Lines 43 a) Top of pipe elevations and coordinates for waterlines at the following 44 locations: 45 (1) Every 250 linear feet CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 71 23 -3 CONSTRUCTION STAKING AND SURVEY Page 3 of 4 1 (2) Horizontal and vertical points of inflection, curvature, etc. (All 2 Fittings) 3 (3) Cathodic protection test stations 4 (4) Sampling stations 5 (5) Meter boxes/vaults (All sizes) 6 (6) Fire lines 7 (7) Fire hydrants 8 (8) Gate valves 9 (9) Plugs, stubouts, dead-end lines 10 (10) Air Release valves (Manhole rim and vent pipe) 11 (11) Blow off valves (Manhole rim and valve lid) 12 (12) Pressure plane valves 13 (13) Cleaning wyes 14 (14) Casing pipe (each end) 15 b) Storm Sewer 16 (1) Top of pipe elevations and coordinates at the following locations: 17 (a) Every 250 linear feet 18 (b) Horizontal and vertical points of inflection, curvature, etc. 19 c) Sanitary Sewer 20 (1) Top of pipe elevations and coordinates for sanitary sewer lines at 21 the following locations: 22 (a) Every 250 linear feet 23 (b) Horizontal and vertical points of inflection, curvature, etc. 24 (c) Cleanouts 25 c. Construction survey will be performed in order to maintain complete and 26 accurate logs of control and survey work associated with meeting or exceeding 27 the line and grade required by these Specifications. 28 d. The Contractor will need to ensure coordination is maintained with the City to 29 perform construction survey and to verify control data, including but not 30 limited to the following: 31 1) Established benchmarks and control points provided for the Contractor's 32 use are accurate 33 2) Benchmarks were used to furnish and maintain all reference lines and 34 grades for tunneling 35 3) Lines and grades were used to establish the location of the pipe 36 4) Submit to the City copies of field notes used to establish all lines and 37 grades and allow the City to check guidance system setup prior to 38 beginning each tunneling drive. 39 5) Provide access for the City to verify the guidance system and the line and 40 grade of the carrier pipe on a daily basis. 41 6) The Contractor remains fully responsible for the accuracy of the work and 42 the correction of it, as required. 43 7) Monitor line and grade continuously during construction. 44 8) Record deviation with respect to design line and grade once at each pipe 45 joint and submit daily records to City. 46 9) If the installation does not meet the specified tolerances, immediately notify 47 the City and correct the installation in accordance with the Contract 48 Documents. 49 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 017123-4 CONSTRUCTION STAKING AND SURVEY Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 APPLICATION 9 3.5 REPAIR / RESTORATION [NOT USED] 10 3.6 RE -INSTALLATION [NOT USED] 11 3.7 FIELD [oR] SITE QUALITY CONTROL 12 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 13 City in accordance with this Specification. 14 B. Do not change or relocate stakes or control data without approval from the City. 15 3.8 SYSTEM STARTUP [NOT USED] 16 3.9 ADJUSTING [NOT USED] 17 3.10 CLEANING [NOT USED] 18 3.11 CLOSEOUT ACTIVITIES [NOT USED] 19 3.12 PROTECTION [NOT USED] 20 3.13 MAINTENANCE [NOT USED] 21 3.14 ATTACHMENTS [NOT USED] 22 END OF SECTION 23 24 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 017423-1 CLEANING Page 1 of 4 1 SECTION 01 74 23 2 CLEANING 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Intermediate and final cleaning for Work not including special cleaning of closed 7 systems specified elsewhere 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various Items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Scheduling 21 1. Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will not fall on newly painted surfaces. 23 2. Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 STORAGE, AND HANDLING 31 A. Storage and Handling Requirements 32 1. Store cleaning products and cleaning wastes in containers specifically designed for 33 those materials. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 74 23 - 2 CLEANING Page 2 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS 4 2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 A. Cleaning Agents 7 1. Compatible with surface being cleaned 8 2. New and uncontaminated 9 3. For manufactured surfaces 10 a. Material recommended by manufacturer 11 2.3 ACCESSORIES [NOT USED] 12 2.4 SOURCE QUALITY CONTROL [NOT USED] 13 PART 3 - EXECUTION 14 3.1 INSTALLERS [NOT USED] 15 3.2 EXAMINATION [NOT USED] 16 3.3 PREPARATION [NOT USED] 17 3.4 APPLICATION [NOT USED] 18 3.5 REPAIR / RESTORATION [NOT USED] 19 3.6 RE -INSTALLATION [NOT USED] 20 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING 24 A. General 25 1. Prevent accumulation of wastes that create hazardous conditions. 26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of 27 governing authorities. 28 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in 29 storm or sanitary drains or sewers. 30 4. Dispose of degradable debris at an approved solid waste disposal site. 31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an 32 alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 017423-3 CLEANING Page 3 of 4 1 6. Handle materials in a controlled manner with as few handlings as possible. 2 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with 3 this project. 4 8. Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 10. Do not burn on -site. 9 B. Intermediate Cleaning during Construction 10 1. Keep Work areas clean so as not to hinder health, safety or convenience of 11 personnel in existing facility operations. 12 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 13 3. Confine construction debris daily in strategically located container(s): 14 a. Cover to prevent blowing by wind 15 b. Store debris away from construction or operational activities 16 c. Haul from site at a minimum of once per week 17 4. Vacuum clean interior areas when ready to receive finish painting. 18 a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 19 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which 20 may become airborne or transported by flowing water during the storm. 21 C. Interior Final Cleaning 22 1. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and other 23 foreign materials from sight -exposed surfaces. 24 2. Wipe all lighting fixture reflectors, lenses, lamps and trims clean. 25 3. Wash and shine glazing and mirrors. 26 4. Polish glossy surfaces to a clear shine. 27 5. Ventilating systems 28 a. Clean permanent filters and replace disposable filters if units were operated 29 during construction. 30 b. Clean ducts, blowers and coils if units were operated without filters during 31 construction. 32 6. Replace all burned out lamps. 33 7. Broom clean process area floors. 34 8. Mop office and control room floors. 35 D. Exterior (Site or Right of Way) Final Cleaning 36 1. Remove trash and debris containers from site. 37 a. Re -seed areas disturbed by location of trash and debris containers in accordance 38 with Section 32 92 13. 39 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object 40 that may hinder or disrupt the flow of traffic along the roadway. 41 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, 42 junction boxes and inlets. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 74 23 - 4 CLEANING Page 4 of 4 1 4. If no longer required for maintenance of erosion facilities, and upon approval by 2 City, remove erosion control from site. 3 5. Clean signs, lights, signals, etc. 4 3.11 CLOSEOUT ACTIVITIES [NOT USED] 5 3.12 PROTECTION [NOT USED] 6 3.13 MAINTENANCE [NOT USED] 7 3.14 ATTACHMENTS [NOT USED] 8 END OF SECTION 9 10 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 2 3 PART 1- GENERAL SECTION 01 77 19 CLOSEOUT REQUIREMENTS 017719-1 CLOSEOUT REQUIREMENTS Page 1 of 3 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees, Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 77 19 -2 CLOSEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 A. Prior to requesting Final Inspection, submit: 10 1. Project Record Documents in accordance with Section 01 78 39 11 2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23 12 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 13 01 74 23. 14 C. Final lnspection 15 1. After final cleaning, provide notice to the City Project Representative that the Work 16 is completed. 17 a. The City will make an initial Final Inspection with the Contractor present. 18 b. Upon completion of this inspection, the City will notify the Contractor, in 19 writing within 10 business days, of any particulars in which this inspection 20 reveals that the Work is defective or incomplete. 21 2. Upon receiving written notice from the City, immediately undertake the Work 22 required to remedy deficiencies and complete the Work to the satisfaction of the 23 City. 24 3. Upon completion of Work associated with the items listed in the City's written 25 notice, inform the City, that the required Work has been completed. Upon receipt 26 of this notice, the City, in the presence of the Contractor, will make a subsequent 27 Final Inspection of the project. 28 4. Provide all special accessories required to place each item of equipment in full 29 operation. These special accessory items include, but are not limited to: 30 a. Specified spare parts 31 b. Adequate oil and grease as required for the first lubrication of the equipment 32 c. Initial fill up of all chemical tanks and fuel tanks 33 d. Light bulbs 34 e. Fuses 35 f. Vault keys 36 g. Handwheels 37 h. Other expendable items as required for initial start-up and operation of all 38 equipment 39 D. Notice of Project Completion CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 77 19 - 3 CLOSEOUT REQUIREMENTS Page 3 of 3 1 1. Once the City Project Representative finds the Work subsequent to Final Inspection 2 to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). 3 E. Supporting Documentation 4 1. Coordinate with the City Project Representative to complete the following 5 additional forms: 6 a. Final Payment Request 7 b. Statement of Contract Time 8 c. Affidavit of Payment and Release of Liens 9 d. Consent of Surety to Final Payment 10 e. Pipe Report (if required) 11 f. Contractor's Evaluation of City 12 g. Performance Evaluation of Contractor 13 F. Letter of Final Acceptance 14 1. Upon review and acceptance of Notice of Project Completion and Supporting 15 Documentation, in accordance with General Conditions, City will issue Letter of 16 Final Acceptance and release the Final Payment Request for payment. 17 3.5 REPAIR / RESTORATION [NOT USED] 18 3.6 RE -INSTALLATION [NOT USED] 19 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 20 3.8 SYSTEM STARTUP [NOT USED] 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 29 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 2 3 PART 1 - GENERAL 4 1.1 SUMMARY 017823-1 OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 01 78 23 OPERATION AND MAINTENANCE DATA 5 A. Section Includes: 6 1. Product data and related information appropriate for City's maintenance and 7 operation of products furnished under Contract 8 2. Such products may include, but are not limited to: 9 a. Traffic Controllers 10 b. Irrigation Controllers (to be operated by the City) 11 c. Butterfly Valves 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Schedule 24 1. Submit manuals in final form to the City within 30 calendar days of product 25 shipment to the project site. 26 1.5 SUBMITTALS 27 A. Submittals shall be in accordance with Section 01 33 00 . All submittals shall be 28 approved by the City prior to delivery. 29 1.6 INFORMATIONAL SUBMITTALS 30 A. Submittal Form 31 1. Prepare data in form of an instructional manual for use by City personnel. 32 2. Format 33 a. Size: 8 %2 inches x 11 inches 34 b. Paper 35 1) 40 pound minimum, white, for typed pages 36 2) Holes reinforced with plastic, cloth or metal 37 c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 017823-2 OPERATION AND MAINTENANCE DATA Page 2 of 5 1 d. Drawings 2 1) Provide reinforced punched binder tab, bind in with text 3 2) Reduce larger drawings and fold to size of text pages. 4 e. Provide fly -leaf for each separate product, or each piece of operating 5 equipment. 6 1) Provide typed description of product, and major component parts of 7 equipment. 8 2) Provide indexed tabs. 9 f. Cover 10 1) Identify each volume with typed or printed title "OPERATING AND 11 MAINTENANCE INSTRUCTIONS". 12 2) List: 13 a) Title of Project 14 b) Identity of separate structure as applicable 15 c) Identity of general subject matter covered in the manual 16 3. Binders 17 a. Commercial quality 3-ring binders with durable and cleanable plastic covers 18 b. When multiple binders are used, correlate the data into related consistent 19 groupings. 20 4. If available, provide an electronic form of the O&M Manual. 21 B. Manual Content 22 1. Neatly typewritten table of contents for each volume, arranged in systematic order 23 a. Contractor, name of responsible principal, address and telephone number 24 b. A list of each product required to be included, indexed to content of the volume 25 c. List, with each product: 26 1) The name, address and telephone number of the subcontractor or installer 27 2) A list of each product required to be included, indexed to content of the 28 volume 29 3) Identify area of responsibility of each 30 4) Local source of supply for parts and replacement 31 d. Identify each product by product name and other identifying symbols as set 32 forth in Contract Documents. 33 2. Product Data 34 a. Include only those sheets which are pertinent to the specific product. 35 b. Annotate each sheet to: 36 1) Clearly identify specific product or part installed 37 2) Clearly identify data applicable to installation 38 3) Delete references to inapplicable information 39 3. Drawings 40 a. Supplement product data with drawings as necessary to clearly illustrate: 41 1) Relations of component parts of equipment and systems 42 2) Control and flow diagrams 43 b. Coordinate drawings with information in Project Record Documents to assure 44 correct illustration of completed installation. 45 c. Do not use Project Record Drawings as maintenance drawings. 46 4. Written text, as required to supplement product data for the particular installation: 47 a. Organize in consistent format under separate headings for different procedures. 48 b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 017823-3 OPERATION AND MAINTENANCE DATA Page 3 of 5 1 5. Copy of each warranty, bond and service contract issued 2 a. Provide information sheet for City personnel giving: 3 1) Proper procedures in event of failure 4 2) Instances which might affect validity of warranties or bonds 5 C. Manual for Materials and Finishes 6 1. Submit 5 copies of complete manual in final form. 7 2. Content, for architectural products, applied materials and finishes: 8 a. Manufacturer's data, giving full information on products 9 1) Catalog number, size, composition 10 2) Color and texture designations 11 3) Information required for reordering special manufactured products 12 b. Instructions for care and maintenance 13 1) Manufacturer's recommendation for types of cleaning agents and methods 14 2) Cautions against cleaning agents and methods which are detrimental to 15 product 16 3) Recommended schedule for cleaning and maintenance 17 3. Content, for moisture protection and weather exposure products: 18 a. Manufacturer's data, giving full information on products 19 1) Applicable standards 20 2) Chemical composition 21 3) Details of installation 22 b. Instructions for inspection, maintenance and repair 23 D. Manual for Equipment and Systems 24 1. Submit 5 copies of complete manual in final form. 25 2. Content, for each unit of equipment and system, as appropriate: 26 a. Description of unit and component parts 27 1) Function, normal operating characteristics and limiting conditions 28 2) Performance curves, engineering data and tests 29 3) Complete nomenclature and commercial number of replaceable parts 30 b. Operating procedures 31 1) Start-up, break-in, routine and normal operating instructions 32 2) Regulation, control, stopping, shut -down and emergency instructions 33 3) Summer and winter operating instructions 34 4) Special operating instructions 35 c. Maintenance procedures 36 1) Routine operations 37 2) Guide to "trouble shooting" 38 3) Disassembly, repair and reassembly 39 4) Alignment, adjusting and checking 40 d. Servicing and lubrication schedule 41 1) List of lubricants required 42 e. Manufacturer's printed operating and maintenance instructions 43 f. Description of sequence of operation by control manufacturer 44 1) Predicted life of parts subject to wear 45 2) Items recommended to be stocked as spare parts 46 g. As installed control diagrams by controls manufacturer 47 h. Each contractor's coordination drawings 48 1) As installed color coded piping diagrams CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 78 23 - 4 OPERATION AND MAINTENANCE DATA Page 4 of 5 1 i. Charts of valve tag numbers, with location and function of each valve 2 j. List of original manufacturer's spare parts, manufacturer's current prices, and 3 recommended quantities to be maintained in storage 4 k. Other data as required under pertinent Sections of Specifications 5 3. Content, for each electric and electronic system, as appropriate: 6 a. Description of system and component parts 7 1) Function, normal operating characteristics, and limiting conditions 8 2) Performance curves, engineering data and tests 9 3) Complete nomenclature and commercial number of replaceable parts 10 b. Circuit directories of panelboards 11 1) Electrical service 12 2) Controls 13 3) Communications 14 c. As installed color coded wiring diagrams 15 d. Operating procedures 16 1) Routine and normal operating instructions 17 2) Sequences required 18 3) Special operating instructions 19 e. Maintenance procedures 20 1) Routine operations 21 2) Guide to "trouble shooting" 22 3) Disassembly, repair and reassembly 23 4) Adjustment and checking 24 f. Manufacturer's printed operating and maintenance instructions 25 g. List of original manufacturer's spare parts, manufacturer's current prices, and 26 recommended quantities to be maintained in storage 27 h. Other data as required under pertinent Sections of Specifications 28 4. Prepare and include additional data when the need for such data becomes apparent 29 during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 017823-5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION 7 8 9 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 — title of section removed CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 017839-1 PROJECT RECORD DOCUMENTS 2 3 PART 1 - GENERAL 4 1.1 SUMMARY SECTION 01 78 39 PROJECT RECORD DOCUMENTS Page 1 of 4 5 A. Section Includes: 6 1. Work associated with the documenting the project and recording changes to project 7 documents, including: 8 a. Record Drawings 9 b. Water Meter Service Reports 10 c. Sanitary Sewer Service Reports 11 d. Large Water Meter Reports 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE 30 A. Accuracy of Records 31 1. Thoroughly coordinate changes within the Record Documents, making adequate 32 and proper entries on each page of Specifications and each sheet of Drawings and 33 other Documents where such entry is required to show the change properly. 34 2. Accuracy of records shall be such that future search for items shown in the Contract 35 Documents may rely reasonably on information obtained from the approved Project 36 Record Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 017839-2 PROJECT RECORD DOCUMENTS Page 2 of 4 1 3. To facilitate accuracy of records, make entries within 24 hours after receipt of 2 information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work, both concealed and 4 visible, to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements 8 1. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. 13 a. In such case, provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2 - PRODUCTS 18 2.1 OWNER -FURNISHED [on] OWNER -SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no 22 charge to the Contractor, 1 complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection, provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3 - EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION [NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A. Maintenance of Job Set 34 1. Immediately upon receipt of the job set, identify each of the Documents with the 35 title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 7839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time, the probable number of occasions 3 upon which the job set ]must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed, devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City, until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum, in accordance with the intervals set forth in Section 01 71 23, 11 clearly mark any deviations from Contract Documents associated with 12 installation of the infrastructure. 13 4. Making entries on Drawings 14 a. Record any deviations from Contract Documents. 15 b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the 16 change by graphic line and note as required. 17 c. Date all entries. 18 d. Call attention to the entry by a "cloud" drawn around the area or areas affected. 19 e. In the event of overlapping changes, use different colors for the overlapping 20 changes. 21 5. Conversion of schematic layouts 22 a. In some cases on the Drawings, arrangements of conduits, circuits, piping, 23 ducts, and similar items, are shown schematically and are not intended to 24 portray precise physical layout. 25 1) Final physical arrangement is determined by the Contractor, subject to the 26 City's approval. 27 2) However, design of future modifications of the facility may require 28 accurate information as to the final physical layout of items which are 29 shown only schematically on the Drawings. 30 b. Show on the job set of Record Drawings, by dimension accurate to within 1 31 inch, the centerline of each run of items. 32 1) Final physical arrangement is determined by the Contractor, subject to the 33 City's approval. 34 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in 35 ceiling plenum", "exposed", and the like). 36 3) Make all identification sufficiently descriptive that it may be related 37 reliably to the Specifications. 38 c. The City may waive the requirements for conversion of schematic layouts 39 where, in the City's judgment, conversion serves no useful purpose. However, 40 do not rely upon waivers being issued except as specifically issued in writing 41 by the City. 42 B. Final Project Record Documents 43 1. Transfer of data to Drawings 44 a. Carefully transfer change data shown on the job set of Record Drawings to the 45 corresponding final documents, coordinating the changes as required. 46 b. Clearly indicate at each affected detail and other Drawing a full description of 47 changes made during construction, and the actual location of items. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 01 78 39 - 4 PROJECT RECORD DOCUMENTS Page 4 of 4 1 c. Ca11 attention to each entry by drawing a "cloud" around the area or areas 2 affected. 3 d. Make changes neatly, consistently and with the proper media to assure 4 longevity and clear reproduction. 5 2. Transfer of data to other Documents 6 a. If the Documents, other than Drawings, have been kept clean during progress of 7 the Work, and if entries thereon have been orderly to the approval of the City, 8 the job set of those Documents, other than Drawings, will be accepted as final 9 Record Documents. 10 b. If any such Document is not so approved by the City, secure a new copy of that 11 Document from the City at the City's usual charge for reproduction and 12 handling, and carefully transfer the change data to the new copy to the approval 13 of the City. 14 3.5 REPAIR / RESTORATION [NOT USED] 15 3.6 RE -INSTALLATION [NOT USED] 16 3.7 FIELD loR] SITE QUALITY CONTROL [NOT USED] 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION [NOT USED] 22 3.13 MAINTENANCE [NOT USED] 23 3.14 ATTACHMENTS [NOT USED] 24 END OF SECTION 25 26 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 2 330510-1 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 1 of 20 SECTION 33 05 10 UTILITY TRENCH EXCAVATION, EMBEDMENT AND BACKFILL 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Excavation, Embedment and Backfill for: 7 a. Pressure Applications 8 1) Water Distribution or Transmission Main 9 2) Wastewater Force Main 10 3) Reclaimed Water Main 11 b. Gravity Applications 12 1) Wastewater Gravity Mains 13 2) Storm Sewer Pipe and Culverts 14 3) Storm Sewer Precast Box and Culverts 15 2. Including: 16 a. Excavation of all material encountered, including rock and unsuitable materials 17 b. Disposal of excess unsuitable material 18 c. Site specific trench safety 19 d. Pumping and dewatering 20 e. Embedment 21 f. Concrete encasement for utility lines 22 g. Backfill 23 h. Compaction 24 B. Deviations from this City of Fort Worth Standard Specification 25 1. 1.1.C, 3.4.D.6, 2.2.A.12 26 C. Related Specification Sections include, but are not necessarily limited to: 27 1. Division 0 — Bidding Requirements, Contract Forms, and Conditions of the 28 Contract 29 2. Division 1 — General Requirements 30 3. Section 02 41 13 — Selective Site Demolition 31 4. Section 02 41 15 — Paving Removal 32 5. Section 02 41 14 — Utility Removal/Abandonment 33 6. Section 03 30 00 — Cast -in -place Concrete 34 7. Section 03 34 13 — Controlled Low Strength Material (CLSM) 35 8. Section 31 10 00 — Site Clearing 36 9. Section 31 25 00 — Erosion and Sediment Control 37 10. Section 33 05 26 — Utility Markers/Locators 38 11. Section 34 71 13 — Traffic Control 39 12. Section 33 46 00 — Subdrainage CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 3305I0-2 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 2 of 20 1.2 PRICE AND PAYMENT PROCEDURES 2 A. Measurement and Payment 3 1. Trench Excavation, Embedment, Underdrain and Backfill associated with the 4 installation of an underground utility or excavation 5 a. Measurement 6 1) This Item is considered subsidiary to the installation of the utility pipe line 7 as designated in the Drawings. 8 b. Payment 9 1) The work performed and the materials furnished in accordance with this 10 Item are considered subsidiary to the installation of the utility pipe for the 11 type of embedment and backfill as indicated on the plans. No other 12 compensation will be allowed. 2. Imported Embedment or Backfill a. b. Imported fill shall only be paid when using materials for embedment and backfill other than those identified in the Drawings. The work performed and materials furnished in accordance with pre -bid item and measured as provided under "Measurement" will be paid for at the unit price bid per cubic yard of "Imported Embedment/Backfill" delivered to the Site for: a) Various embedment/backfill ]materials The price bid shall include: 1) Furnishing backfill or embedment as specified by this Specification 2) Hauling to the site 3) Placement and compaction of backfill or embedment 28 3. Concrete Encasement for Utility Lines 29 a. Measurement 30 1) Measured by the cubic yard as delivered to the site and recorded by truck 31 ticket provided to the City 32 b. Payment 33 1) The work performed and materials furnished in accordance with this Item 34 and measured as provided under "Measurement" will be paid for at the unit 35 price bid per cubic yard of "Concrete Encasement for Utility Lines" 36 delivered to the Site. 37 c. The price bid shall include: 38 1) Furnishing, hauling, placing and finishing concrete in accordance with 39 Section 03 30 00 40 2) Clean-up 41 4. Ground Water Control 42 a. Measurement 43 1) Measurement shall be lump sum when a ground water control plan is 44 specifically required by the Contract Documents. 45 b. Payment 46 1) Payment shall be per the lump sum price bid for "Ground Water Control" c. Measurement 1) Measured by the cubic yard as delivered to the site and recorded by truck ticket provided to the City Payment 1) 47 including: 48 a) Submittals CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-3 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 3 of 20 1 b) Additional Testing 2 c) Ground water control system installation 3 d) Ground water control system operations and ]maintenance 4 e) Disposal of water 5 f) Removal of ground water control system 6 5. Trench Safety 7 a. Measurement 8 1) Measured per linear foot of excavation for all trenches that require trench 9 safety in accordance with OSHA excavation safety standards (29 CFR Part 10 1926 Subpart P Safety and Health regulations for Construction) 11 b. Payment 12 1) The work performed and materials furnished in accordance with this Item 13 and measured as provided under "Measurement" will be paid for at the unit 14 price bid per linear foot of excavation to comply with OSHA excavation 15 safety standards (29 CFR Part 1926.650 Subpart P), including, but not 16 limited to, all submittals, labor and equipment. 17 1.3 REFERENCES 18 A. Definitions 19 1. General — Definitions used in this section are in accordance with Terminologies 20 ASTM F412 and ASTM D8 and Terminology ASTM D653, unless otherwise 21 noted. 22 2. Definitions for trench width, backfill, embedment, initial backfill, pipe zone, 23 haunching bedding, springline, pipe zone and foundation are defined as shown in 24 the following schematic: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAB Ashland Drainage Improvements City Project No. 01918 330510-4 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 4 of 20 >�� �:: r',n',_CD . AY4, UNRAV:D AREAS' \ /`< , CK.F I > A i i\/ \\ \ \\\i Y, SF'rIN ; IN- \(,< -r -1 \\/ \/' �''../ \�/;HUN_ INC _J� NO \\l, /\ F'.:.. \C 11 ION \, '\\/\ \\r\\,/.i.i,!%/\• \\ i/ �� /2 \i N\i\/\\ \/ . ,&'<.‹\•/\/\/\\\ ,`, i 0; C FAP.f.Act EXCAVATE ' Et\C- ''Ad [iT- 1 2 3. Deleterious materials — Harmful materials such as clay lumps, silts and organic 3 material 4 4. Excavated Trench Depth — Distance from the surface to the bottom of the bedding 5 or the trench foundation 6 5. Final Backfill Depth 7 a. Unpaved Areas — The depth of the final backfill measured from the top of the 8 initial backfill to the surface 9 b. Paved Areas — The depth of the final backfill measured from the top of the 10 initial backfill to bottom of permanent or temporary pavement repair 11 B. Reference Standards 12 1. Reference standards cited in this Specification refer to the current reference 13 standard published at the time of the latest revision date logged at the end of this 14 Specification, unless a date is specifically cited. 15 2. ASTM Standards: 16 a. ASTM C33-08 Standard Specifications for Concrete Aggregates 17 b. ASTM C88-05 Soundness of Aggregate by Use of Sodium Sulfate or 18 Magnesium Sulfate 19 c. ASTM C 136-01 Test Method for Sieve Analysis of Fine and Coarse Aggregate 20 d. ASTM D448-08 Standard Classification for Sizes of Aggregate for Road and 21 Bridge Construction. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-5 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 5 of 20 1 e. ASTM C535-09 Standard Test Method for Resistance to Degradation of Large- 2 Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine 3 f. ASTM D588 — Standard Test method for Moisture -Density Relations of Soil- 4 Cement Mixture 5 g. ASTM D698-07 Test Method for Laboratory Compaction Characteristics of 6 Soil Using Stand Efforts (12,400 ft-lb/ft3 600 Kn-m/M3)). 7 h. ASTM 1556 Standard Test Methods for Density and Unit Weight of Soils in 8 Place by Sand Cone Method. 9 i. ASTM 2487 — 10 Standard Classification of Soils for Engineering Purposes 10 (Unified Soil Classification System) 11 j. ASTM 2321-09 Underground Installation of Thermoplastic Pipe for Sewers 12 and Other Gravity -Flow Applications 13 k. ASTM D2922 — Standard Test Methods for Density of Soils and Soil 14 Aggregate in Place by Nuclear Methods (Shallow Depth) 15 1 ASTM 3017 - Standard Test Method for Water Content of Soil and Rock in 16 place by Nuclear Methods (Shallow Depth) 17 m. ASTM D4254 - Standard Test Method for Minimum Index Density and Unit 18 Weight of Soils and Calculations of Relative Density 19 3. OSHA 20 a. Occupational Safety and Health Administration CFR 29, Part 1926-Safety 21 Regulations for Construction, Subpart P - Excavations 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Utility Company Notification 25 a. Notify area utility companies at least 48 hours in advance, excluding weekends 26 and holidays, before starting excavation. 27 b. Request the location of buried lines and cables in the vicinity of the proposed 28 work. 29 B. Sequencing 30 1. Sequence work for each section of the pipe installed to complete the embedment 31 and backfill placement on the day the pipe foundation is complete. 32 2. Sequence work such that proctors are complete in accordance with ASTM D698 33 prior to commencement of construction activities. 34 1.5 SUBMITTALS 35 A. Submittals shall be in accordance with Section 01 33 00. 36 B. All submittals shall be approved by the City prior to construction. 37 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 38 A. Shop Drawings 39 1. Provide detailed drawings and explanation for ground water and surface water 40 control, if required. 41 2. Trench Safety Plan in accordance with Occupational Safety and Health 42 Administration CFR 29, Part 1926-Safety Regulations for Construction, Subpart P - 43 Excavations 44 3. Stockpiled excavation and/or backfill material CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-6 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 6 of 20 1 a. Provide a description of the storage of the excavated material only if the 2 Contract Documents do not allow storage of materials in the right-of-way of the 3 easement. 4 1.7 CLOSEOUT SUBMITTALS [NOT USED] 5 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 6 1.9 QUALITY ASSURANCE [NOT USED] 7 1.10 DELIVERY, STORAGE, AND HANDLING 8 A. Storage 9 1. Within Existing Rights -of -Way (ROW) 10 a. Spoil, imported embedment and backfill materials may be stored within 11 existing ROW, easements or temporary construction easements, unless 12 specifically disallowed in the Contract Documents. 13 b. Do not block drainage ways, inlets or driveways. 14 c. Provide erosion control in accordance with Section 31 25 00. 15 d. Store materials only in areas barricaded as provided in the traffic control plans. 16 e. In non -paved areas, do not store material on the root zone of any trees or in 17 landscaped areas. 18 2. Designated Storage Areas 19 a. If the Contract Documents do not allow the storage of spoils, embedment or 20 backfill materials within the ROW, easement or temporary construction 21 easement, then secure and maintain an adequate storage location. 22 b. Provide an affidavit that rights have been secured to store the materials on 23 private property. 24 c. Provide erosion control in accordance with Section 31 25 00. 25 d. Do not block drainage ways. 26 e. Only materials used for 1 working day will be allowed to be stored in the work 27 zone. 28 B. Deliveries and haul -off - Coordinate all deliveries and haul -off. 29 1.11 FIELD [SITE] CONDITIONS 30 A. Existing Conditions 31 1. Any data which has been or may be provided on subsurface conditions is not 32 intended as a representation or warranty of accuracy or continuity between soils. It 33 is expressly understood that neither the City nor the Engineer will be responsible 34 for interpretations or conclusions drawn there from by the Contractor. 35 2. Data is made available for the convenience of the Contractor. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-7 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 7 of 20 1 1.12 WARRANTY [NOT USED] 2 PART 2 - PRODUCTS 3 2.1 OWNER -FURNISHED Loa] OWNER -SUPPLIED PRODUCTS 4 2.2 MATERIALS 5 A. Materials 6 1. Utility Sand 7 a. Granular and free flowing 8 b. Generally meets or exceeds the limits on deleterious substances per Table 1 for 9 fine aggregate according to ASTM C 33 10 c. Reasonably free of organic material 11 d. Gradation: Sieve Size Percent Retained I inch 0 3/8 inch 0-10 #40 20-60 #100 95 12 2. Crushed Rock 13 a. Durable crushed rock or recycled concrete 14 b. Meets the gradation of ASTM D448 size numbers 56, 57 or 67 15 c. Maybe unwashed 16 d. Free from significant silt clay or unsuitable materials 17 e. Percentage of wear not more than 40 percent per ASTM C131 or C535 18 f. Not more than a 12 percent maximum loss when subjective to 5 cycles of 19 sodium sulfate soundness per ASTM C88 20 3. Fine Crushed Rock 21 a. Durable crushed rock 22 b. Meets the gradation of ASTM D448 size numbers 8 or 89 23 c. May be unwashed 24 d. Free from significant silt clay or unsuitable materials. 25 e. Have a percentage of wear not more than 40 percent per ASTM C131 or C535 26 f. Not more than a 12 percent maximum loss when subjective to 5 cycles of 27 sodium sulfate soundness per ASTM C88 28 4. Ballast Stone 29 a. Stone ranging from 3 inches to 6 inches in greatest dimension. 30 b. May be unwashed 31 c. Free from significant silt clay or unsuitable materials 32 d. Percentage of wear not more than 40 percent per ASTM C131 or C535 33 e. Not more than a 12 percent maximum loss when subjected to 5 cycles of 34 sodium sulfate soundness per ASTM C88 35 5. Acceptable Backfill Material 36 a. In -situ or imported soils classified as CL, CH, SC or GC in accordance with 37 ASTM D2487 38 b. Free from deleterious materials, boulders over 6 inches in size and organics 39 c. Can be placed free from voids CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-8 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 8 of 20 1 d. Must have 20 percent passing the number 200 sieve 2 6. Blended Backfill Material 3 a. In -situ soils classified as SP, SM, GP or GM in accordance with ASTM D2487 4 b. Blended with in -situ or imported acceptable backfill material to meet the 5 requirements of an Acceptable Backfill Material 6 c. Free from deleterious materials, boulders over 6 inches in size and organics 7 d. Must have 20 percent passing the number 200 sieve 8 7. Unacceptable Backfill Material 9 a. In -situ soils classified as ML, MH, PT, OL or OH in accordance with ASTM 10 D2487 11 8. Select Fill 12 a. Classified as SC or CL in accordance with ASTM D2487 13 b. Liquid limit less than 35 14 c. Plasticity index between 8 and 20 15 9. Cement Stabilized Sand (CSS) 16 a. Sand 17 1) Shall be clean, durable sand meeting grading requirements for fine 18 aggregates of ASTM C33 and the following requirements: 19 a) Classified as SW, SP, or SM by the United Soil Classification System 20 of ASTM D2487 21 b) Deleterious materials 22 (1) Clay lumps, ASTM C142, less than 0.5 percent 23 (2) Lightweight pieces, ASTM C123, less than 5.0 percent 24 (3) Organic impurities, ASTM C40, color no darker than standard 25 color 26 (4) Plasticity index of 4 or less when tested in accordance with ASTM 27 D4318. 28 b. Minimum of 4 percent cement content of Type I/II portland cement 29 c. Water 30 1) Potable water, free of soils, acids, alkalis, organic matter or other 31 deleterious substances, meeting requirements of ASTM C94 32 d. Mix in a stationary pug mill, weigh -batch or continuous mixing plant. 33 e. Strength 34 1) 50 to 150 psi compressive strength at 2 days in accordance with ASTM 35 D1633, Method A 36 2) 200 to 250 psi compressive strength at 28 days in accordance with ASTM 37 D1633, Method A 38 3) The maximum compressive strength in 7 days shall be 400 psi. Backfill 39 that exceeds the maximum compressive strength shall be removed by the 40 Contractor for no additional compensation. 41 f. Random samples of delivered product will be taken in the field at point of 42 delivery for each day of placement in the work area. Specimens will be 43 prepared in accordance with ASTM D 1632. 44 10. Controlled Low Strength Material (CLSM) 45 a. Conform to Section 03 34 13 46 11. Trench Geotextile Fabric 47 a. Soils other than ML or OH in accordance with ASTM D2487 48 1) Needle punch, nonwoven geotextile composed of polypropylene fibers CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-9 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 9 of 20 1 2) Fibers shall retain their relative position 2 3) Inert to biological degradation 3 4) Resist naturally occurring chemicals 4 5) UV Resistant 5 6) Mirafi 140N by Tencate, or approved equal 6 b. Soils Classified as ML or OH in accordance with ASTM D2487 7 1) High -tenacity monofilament polypropylene woven yarn 8 2) Percent open area of 8 percent to10 percent 9 3) Fibers shall retain their relative position 10 4) Inert to biological degradation 11 5) Resist naturally occurring chemicals 12 6) UV Resistant 13 7) Mirafi FW402 by Tencate, or approved equal 14 12. Perforated PVC Underdrain conforming to Section 33 46 00 15 2.3 ACCESSORIES [NOT USED] 16 2.4 SOURCE QUALITY CONTROL [NOT USED] 17 PART 3 - EXECUTION 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION 20 A. Verification of Conditions 21 1. Review all known, identified or marked utilities, whether public or private, prior to 22 excavation. 23 2. Locate and protect all known, identified and marked utilities or underground 24 facilities as excavation progresses. 25 3. Notify all utility owners within the project limits 48 hours prior to beginning 26 excavation. 27 4. The information and data shown in the Drawings with respect to utilities is 28 approximate and based on record information or on physical appurtenances 29 observed within the project limits. 30 5. Coordinate with the Owner(s) of underground facilities. 31 6. Immediately notify any utility owner of damages to underground facilities resulting 32 from construction activities. 33 7. Repair any damages resulting from the construction activities. 34 B. Notify the City immediately of any changed condition that impacts excavation and 35 installation of the proposed utility. 36 3.3 PREPARATION 37 A. Protection of In -Place Conditions 38 1. Pavement 39 a. Conduct activities in such a way that does not damage existing pavement that is 40 designated to remain. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-10 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 10 of20 1 1) Where desired to move equipment not licensed for operation on public 2 roads or across pavement, provide means to protect the pavement from all 3 damage. 4 b. Repair or replace any pavement damaged due to the negligence of the 5 contractor outside the limits designated for pavement removal at no additional 6 cost to the City. 7 2. Drainage 8 a. Maintain positive drainage during construction and re-establish drainage for all 9 swales and culverts affected by construction. 10 3. Trees 11 a. When operating outside of existing ROW, stake permanent and temporary 12 construction easements. 13 b. Restrict all construction activities to the designated easements and ROW. 14 c. Flag and protect all trees designated to remain in accordance with Section 31 10 15 00. 16 d. Conduct excavation, embedment and backfill in a manner such that there is no 17 damage to the tree canopy. 18 e. Prune or trim tree limbs as specifically allowed by the Drawings or as 19 specifically allowed by the City. 20 1) Pruning or trimming may only be accomplished with equipments 21 specifically designed for tree pruning or trimming. 22 f. Remove trees specifically designated to be removed in the Drawings in 23 accordance with Section 31 10 00. 24 4. Above ground Structures 25 a. Protect all above ground structures adjacent to the construction. 26 b. Remove above ground structures designated for removal in the Drawings in 27 accordance with Section 02 41 13 28 5. Traffic 29 a. Maintain existing traffic, except as modified by the traffic control plan, and in 30 accordance with Section 34 71 13. 31 b. Do not block access to driveways or alleys for extended periods of time unless: 32 1) Alternative access has been provided 33 2) Proper notification has been provided to the property owner or resident 34 3) It is specifically allowed in the traffic control plan 35 c. Use traffic rated plates to maintain access until access is restored. 36 6. Traffic Signal — Poles, Mast Arms, Pull boxes, Detector loops 37 a. Notify the City's Traffic Services Division a minimum of 48 hours prior to any 38 excavation that could impact the operations of an existing traffic signal. 39 b. Protect all traffic signal poles, mast arms, pull boxes, traffic cabinets, conduit 40 and detector loops. 41 c. Immediately notify the City's Traffic Services Division if any damage occurs to 42 any component of the traffic signal due to the contractors activities. 43 d. Repair any damage to the traffic signal poles, mast arms, pull boxes, traffic 44 cabinets, conduit and detector loops as a result of the construction activities. 45 7. Fences 46 a. Protect all fences designated to remain. 47 b. Leave fence in the equal or better condition as prior to construction. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAI -I Ashland Drainage Improvements City Project No. 01918 330510-11 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 11 of 20 1 3.4 INSTALLATION 2 A. Excavation 3 1. Excavate to a depth indicated on the Drawings. 4 2. Trench excavations are defined as unclassified. No additional payment shall be 5 granted for rock or other in -situ materials encountered in the trench. 6 3. Excavate to a width sufficient for laying the pipe in accordance with the Drawings 7 and bracing in accordance with the Excavation Safety Plan. 8 4. The bottom of the excavation shall be firm and free from standing water. 9 a. Notify the City immediately if the water and/or the in -situ soils do not provide 10 for a firm trench bottom. 11 b. The City will determine if any changes are required in the pipe foundation or 12 bedding. 13 5. Unless otherwise permitted by the Drawings or by the City, the limits of the 14 excavation shall not advance beyond the pipe placement so that the trench may be 15 backfilled in the same day. 16 6. Over Excavation 17 a. Fill over excavated areas with the specified bedding material as specified for 18 the specific pipe to be installed. 19 b. No additional payment will be made for over excavation or additional bedding 20 material. 21 7. Unacceptable Backfill Materials 22 a. In -situ soils classified as unacceptable backfill material shall be separated from 23 acceptable backfill materials. 24 b. If the unacceptable backfill material is to be blended in accordance with this 25 Specification, then store material in a suitable location until the material is 26 blended. 27 c. Remove all unacceptable material from the project site that is not intended to be 28 blended or modified. 29 8. Rock — No additional compensation will be paid for rock excavation or other 30 changed field conditions. 31 B. Shoring, Sheeting and Bracing 32 1. Engage a Licensed Professional Engineer in the State of Texas to design a site 33 specific excavation safety system in accordance with Federal and State 34 requirements. 35 2. Excavation protection systems shall be designed according to the space limitations 36 as indicated in the Drawings. 37 3. Furnish, put in place and maintain a trench safety system in accordance with the 38 Excavation Safety Plan and required by Federal, State or local safety requirements. 39 4. If soil or water conditions are encountered that are not addressed by the current 40 Excavation Safety Plan, engage a Licensed Professional Engineer in the State of 41 Texas to modify the Excavation Safety Plan and provide a revised submittal to the 42 City. 43 5. Do not allow soil, or water containing soil, to migrate through the Excavation 44 Safety System in sufficient quantities to adversely affect the suitability of the 45 Excavation Protection System. Movable bracing, shoring plates or trench boxes 46 used to support the sides of the trench excavation shall not: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-12 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 12 of 20 1 a. Disturb the embedment located in the pipe zone or lower 2 b. Alter the pipe's line and grade after the Excavation Protection System is 3 removed 4 c. Compromise the compaction of the embedment located below the spring line of 5 the pipe and in the haunching 6 C. Water Control 7 1. Surface Water 8 a. Furnish all materials and equipment and perform all incidental work required to 9 direct surface water away from the excavation. 10 2. Ground Water 11 a. Furnish all materials and equipment to dewater ground water by a method 12 which preserves the undisturbed state of the subgrade soils. 13 b. Do not allow the pipe to be submerged within 24 hours after placement. 14 c. Do not allow water to flow over concrete until it has sufficiently cured. 15 d. Engage a Licensed Engineer in the State of Texas to prepare a Ground Water 16 Control Plan if any of the following conditions are encountered: 17 1) A Ground Water Control Plan is specifically required by the Contract 18 Documents 19 2) If in the sole judgment of the City, ground water is so severe that an 20 Engineered Ground Water Control Plan is required to protect the trench or 21 the installation of the pipe which may include: 22 a) Ground water levels in the trench are unable to be maintained below 23 the top of the bedding 24 b) A firm trench bottom cannot be maintained due to ground water 25 c) Ground water entering the excavation undermines the stability of the 26 excavation. 27 d) Ground water entering the excavation is transporting unacceptable 28 quantities of soils through the Excavation Safety System. 29 e. In the event that there is no bid item for a Ground Water Control and the City 30 requires an Engineered Ground Water Control Plan due to conditions 31 discovered at the site, the contractor will be eligible to submit a change order. 32 f Control of ground water shall be considered subsidiary to the excavation when: 33 1) No Ground Water Control Plan is specifically identified and required in the 34 Contract Documents 35 g. Ground Water Control Plan installation, operation and maintenance 36 1) Furnish all materials and equipment necessary to implement, operate and 37 maintain the Ground Water Control Plan. 38 2) Once the excavation is complete, remove all ground water control 39 equipment not called to be incorporated into the work. 40 h. Water Disposal 41 1) Dispose of ground water in accordance with City policy or Ordinance. 42 2) Do not discharge ground water onto or across private property without 43 written permission. 44 3) Permission from the City is required prior to disposal into the Sanitary 45 Sewer. 46 4) Disposal shall not violate any Federal, State or local regulations. 47 D. Embedment and Pipe Placement 48 1. Water Lines less than, or equal to, 12 inches in diameter: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-13 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 13 of 20 1 a. The entire embedment zone shall be of uniform material. 2 b. Utility sand shall be generally used for embedment. 3 c. If ground water is in sufficient quantity to cause sand to pump, then use 4 crushed rock as embedment. 5 1) If crushed rock is not specifically identified in the Contract Documents, 6 then crushed rock shall be paid by the pre -bid unit price. 7 d. Place evenly spread bedding material on a firm trench bottom. 8 e. Provide firm, uniform bedding. 9 f. Place pipe on the bedding in accordance with the alignment of the Drawings. 10 g. In no case shall the top of the pipe be less than 42 inches from the surface of the 11 proposed grade, unless specifically called for in the Drawings. 12 h. Place embedment, including initial backfill, to a minimum of 6 inches, but not 13 more than 12 inches, above the pipe. 14 i. Where gate valves are present, the initial backfill shall extend to 6 inches above 15 the elevation of the valve nut. 16 j. Form all blocking against undisturbed trench wall to the dimensions in the 17 Drawings. 18 k. Compact embedment and initial backfill. 19 1. Place marker tape on top of the initial trench backfill in accordance with 20 Section 33 05 26. 21 2. Water Lines 16-inches through 24-inches in diameter: 22 a. The entire embedment zone shall be of uniform material. 23 b. Utility sand may be used for embedment when the excavated trench depth is 24 less than 15 feet deep. 25 c. Crushed rock or fine crushed rock shall be used for embedment for excavated 26 trench depths 15 feet, or greater. 27 d. Crushed rock shall be used for embedment for steel pipe. 28 e. Provide trench geotextile fabric at any location where crushed rock or fine 29 crushed rock come into contact with utility sand 30 f. Place evenly spread bedding material on a firm trench bottom. 31 g. Provide firm, uniform bedding. 32 1) Additional bedding may be required if ground water is present in the 33 trench. 34 2) If additional crushed rock is required not specifically identified in the 35 Contract Documents, then crushed rock shall be paid by the pre -bid unit 36 price. 37 h. Place pipe on the bedding according to the alignment shown on the Drawings. 38 i. The pipe line shall be within: 39 1) ±3 inches of the elevation on the Drawings for 16-inch and 24-inch water 40 lines 41 j. Place and compact embedment material to adequately support haunches in 42 accordance with the pipe manufacturer's recommendations. 43 k. Place remaining embedment including initial backfill to a minimum of 6 inches, 44 but not more than 12 inches, above the pipe. 45 1. Where gate valves are present, the initial backfill shall extend to up to the valve 46 nut. 47 In. Compact the embedment and initial backfill to 95 percent Standard Proctor 48 ASTM D 698. 49 n. Density test may be performed by City to verify that the compaction of 50 embedment meets requirements. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-14 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 14 of20 1 o. Place trench geotextile fabric on top of the initial backfill. 2 p. Place marker tape on top of the trench geotextile fabric in accordance with 3 Section 33 05 26. 4 3. Water Lines 30-inches and greater in diameter 5 a. The entire embedment zone shall be of uniform material. 6 b. Crushed rock shall be used for embedment. 7 c. Provide trench geotextile fabric at any location where crushed rock or fine 8 crushed rock come into contact with utility sand. 9 d. Place evenly spread bedding material on a firm trench bottom. 10 e. Provide firm, uniform bedding. 11 I) Additional bedding may be required if ground water is present in the 12 trench. 13 2) If additional crushed rock is required which is not specifically identified in 14 the Contract Documents, then crushed rock shall be paid by the pre -bid unit 15 price. 16 f. Place pipe on the bedding according to the alignment shown on the Drawings. 17 g. The pipe line shall be within: 18 1) ±1 inch of the elevation on the Drawings for 30-inch and larger water lines 19 h. Place and compact embedment material to adequately support haunches in 20 accordance with the pipe manufacturer's recommendations. 21 i. For steel pipe greater than 30 inches in diameter, the initial embedment lift shall 22 not exceed the spring line prior to compaction. 23 j. Place remaining embedment, including initial backfill, to a minimum of 6 24 inches, but not more than 12 inches, above the pipe. 25 k. Where gate valves are present, the initial backfill shall extend to up to the valve 26 nut. 27 1. Compact the embedment and initial backfill to 95 percent Standard Proctor 28 ASTM D 698. 29 m. Density test may be performed by City to verify that the compaction of 30 embedment meets requirements. 31 n. Place trench geotextile fabric on top of the initial backfill. 32 o. Place marker tape on top of the trench geotextile fabric in accordance with 33 Section 33 05 26. 34 4. Sanitary Sewer Lines and Storm Sewer Lines (HDPE) 35 a. The entire embedment zone shall be of uniform material. 36 b. Crushed rock shall be used for embedment. 37 c. Place evenly spread bedding material on a firm trench bottom. 38 d. Spread bedding so that lines and grades are maintained and that there are no 39 sags in the sanitary sewer pipe line. 40 e. Provide firm, uniform bedding. 41 1) Additional bedding may be required if ground water is present in the 42 trench. 43 2) If additional crushed rock is required which is not specifically identified in 44 the Contract Documents, then crushed rock shall be paid by the pre -bid unit 45 price. 46 f. Place pipe on the bedding according to the alignment shown in the Drawings. 47 g. The pipe line shall be within ±O.1 inches of the elevation, and be consistent 48 with the grade shown on the Drawings. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-15 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 15 of 20 1 h. Place and compact embedment material to adequately support haunches in 2 accordance with the pipe manufacturer's recommendations. 3 i. For sewer lines greater than 30 inches in diameter, the embedment lift shall not 4 exceed the spring line prior to compaction. 5 j. Place remaining embedment including initial backfill to a minimum of 6 inches, 6 but not more than 12 inches, above the pipe. 7 k. Compact the embedment and initial backfill to 95 percent Standard Proctor 8 ASTM D 698. 9 1. Density test may be performed by City to verify that the compaction of 10 embedment meets requirements. 11 m. Place trench geotextile fabric on top of the initial backfill. 12 n. Place marker tape on top of the trench geotextile fabric in accordance with 13 Section 33 05 26. 14 5. Storm Sewer (RCP) 15 a. The bedding and the pipe zone up to the spring line shall be of uniform 16 material. 17 b. Crushed rock shall be used for embedment up to the spring line. 18 c. The specified backfill material may be used above the spring line. 19 d. Place evenly spread bedding material on a firm trench bottom. 20 e. Spread bedding so that lines and grades are maintained and that there are no 21 sags in the storm sewer pipe line. 22 f. Provide firm, uniforin bedding. 23 1) Additional bedding may be required if ground water is present in the 24 trench. 25 2) If additional crushed rock is required which is not specifically identified in 26 the Contract Documents, then crushed rock shall be paid by the pre -bid unit 27 price. 28 g. Place pipe on the bedding according to the alignment of the Drawings. 29 h. The pipe line shall be within +0.1 inches of the elevation, and be consistent 30 with the grade, shown on the Drawings. 31 i. Place embedment material up to the spring line. 32 1) Place embedment to ensure that adequate support is obtained in the haunch. 33 j. Compact the embedment and initial backfill to 95 percent Standard Proctor 34 ASTM D 698. 35 k. Density test may be performed by City to verify that the compaction of 36 embedment meets requirements. 37 1. Place trench geotextile fabric on top of pipe and crushed rock. 38 6. Storm Sewer Reinforced Concrete Box 39 a. Bedding and backfill materials and compaction shall be as indicated on the 40 Drawings. The Engineer may reauest modification of the embedment due to 41 site conditions. 42 b. Install perforated underdrain pipe on bedding per Drawings. Work shall 43 conform to Section 33 46 00 44 45 a. Crushed rock shall be used for bedding. 46 b. The pipe zone and the initial backfill �11 ✓: 47 1) Crushed rock, or 48 2) Acceptable backfill material compacted to 95 percent Standard Proctor 49 density CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-16 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 16 of 20 1 c. Place evenly spread compacted bedding material o a firm trxitth bottom. 2 d. Spread bedding so that lines and grades are maintained and that there are no 3 sags in the-t. c ocwcr pipe line. 4 e. Provide firm, uniform bedding. 5 1) Additional bedding may be required if ground water is present in the 6 trench. 7 2) If additional crushed rock is )required which is not specifically identified in 8 the Contract Documents, then crushed ro k &1frall be paid by the p b d u & 9 price. 10 f. Fill the annular space between multiple boxes with crushed rock, CLSM 11 according to 03 31 13. 12 g. Place pipe on the bedding according to the alignment of the Drawings. 13 i . T * dell Sc within +0.1 inches of the elevatkm, atxl b consistcnt with the 14 grade, shown on the Drawings. 15 i. Compact the embedment initial backfill to 95 percent Standard Proctor ASTM 16 D698. 17 7. Water Services (Less than 2 Inches in Diameter) 18 a. The entire embedment zone shall be of uniform material. 19 b. Utility sand shall be generally used for embedment. 20 c. Place evenly spread bedding material on a firm trench bottom. 21 d. Provide firm, uniform bedding. 22 e. Place pipe on the bedding according to the alignment of the Plans. 23 f. Compact the initial backfill to 95 percent Standard Proctor ASTM D698. 24 8. Sanitary Sewer Services 25 a. The entire embedment zone shall be of uniform material. 26 b. Crushed rock shall be used for embedment. 27 c. Place evenly spread bedding material on a firm trench bottom. 28 d. Spread bedding so that lines and grades are maintained and that there are no 29 sags in the sanitary sewer pipe line. 30 e. Provide firm, uniform bedding. 31 1) Additional bedding may be required if ground water is present in the 32 trench. 33 2) If additional crushed rock is required which is not specifically identified in 34 the Contract Documents, then crushed rock shall be paid by the pre -bid unit 35 price. 36 f. Place pipe on the bedding according to the alignment of the Drawings. 37 g. Place remaining embedment, including initial backfill, to a minimum of 6 38 inches, but not more than 12 inches, above the pipe. 39 h. Compact the initial backfill to 95 percent Standard Proctor ASTM D698. 40 i. Density test may be required to verify that the compaction meets the density 41 requirements. 42 E. Trench Backfill 43 1. At a minimum, place backfill in such a manner that the required in -place density 44 and moisture content is obtained, and so that there will be no damage to the surface, 45 pavement or structures due to any trench settlement or trench movement. 46 a. Meeting the requirement herein does not relieve the responsibility to damages 47 associated with the Work. 48 2. Backfill Material CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-17 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 17 of 20 1 a. Final backfill depth less than 15 feet 2 1) Backfill with: 3 a) Acceptable backfill material 4 b) Blended backfill material, or 5 c) Select backfill material, CSS, or CLSM when specifically required 6 b. Final backfill depth 15 feet or greater: (under pavement or future pavement) 7 1) Backfill depth from 0 to 15 feet deep 8 a) Backfill with: 9 (1) Acceptable backfill material 10 (2) Blended backfill material, or 11 (3) Select backfill material, CSS, or CLSM when specifically required 12 2) Backfill depth from 15 feet and greater 13 a) Backfill with: 14 (1) Select Fill 15 (2) CSS, or 16 (3) CLSM when specifically required 17 c. Final backfill depth 15 feet or greater: (not under pavement or future pavement) 18 1) Backfill with: 19 a) Acceptable backfill material, or 20 b) Blended backfill material 21 d. Backfill for service lines: 22 1) Backfill for water or sewer service lines shall be the salve as the 23 requirement of the main that the service is connected to. 24 3. Required Compaction and Density 25 a. Final backfill (depths less than 15 feet) 26 1) Compact acceptable backfill material, blended backfill material or select 27 backfill to a minimum of 95 percent Standard Proctor per ASTM D698 at 28 moisture content within -2 to +5 percent of the optimum moisture. 29 2) CSS or CLSM requires no compaction. 30 b. Final backfill (depths 15 feet and greater/under existing or future pavement) 31 1) Compact select backfill to a minimum of 98 percent Standard Proctor per 32 ASTM D 698 at moisture content within -2 to +5 percent of the optimum 33 moisture. 34 2) CSS or CLSM requires no compaction. 35 c. Final backfill (depths 15 feet and greater/not under existing or future pavement) 36 1) Compact acceptable backfill material blended backfill material, or select 37 backfill to a minimum of 95 percent Standard Proctor per ASTM D 698 at 38 moisture content within -2 to +5 percent of the optimum moisture. 39 4. Saturated Soils 40 a. If in -situ soils consistently demonstrate that they are greater than 5 percent over 41 optimum moisture content, the soils are considered saturated. 42 b. Flooding the trench or water jetting is strictly prohibited. 43 c. If saturated soils are identified in the Drawings or Geotechnical Report in the 44 Appendix, Contractor shall proceed with Work following all backfill 45 procedures outlined in the Drawings for areas of soil saturation greater than 5 46 percent. 47 d. If saturated soils are encountered during Work but not identified in Drawings or 48 Geotechnical Report in the Appendix: 49 1) The Contractor shall: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-18 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 18 of 20 1 a) Immediately notify the City. 2 b) Submit a Contract Claim for Extra Work associated with direction from 3 City. 4 2) The City shall: 5 a) Investigate soils and determine if Work can proceed in the identified 6 location. 7 b) Direct the Contractor of changed backfill procedures associated with 8 the saturated soils that may include: 9 (1) Imported backfill 10 (2) A site specific backfill design 11 5. Placement of Backfill 12 a. Use only compaction equipment specifically designed for compaction of a 13 particular soil type and within the space and depth limitation experienced in the 14 trench. 15 b. Flooding the trench or water setting is strictly prohibited. 16 c. Place in loose lifts not to exceed 12 inches. 17 d. Compact to specified densities. 18 e. Compact only on top of initial backfill, undisturbed trench or previously 19 compacted backfill. 20 f Remove any loose materials due to the movement of any trench box or shoring 21 or due to sloughing of the trench wall. 22 g. Install appropriate tracking balls for water and sanitary sewer trenches in 23 accordance with Section 33 05 26. 24 6. Backfill Means and Methods Demonstration 25 a. Notify the City in writing with sufficient time for the City to obtain samples 26 and perform standard proctor test in accordance with ASTM D698. 27 b. The results of the standard proctor test must be received prior to beginning 28 excavation. 29 c. Upon commencing of backfill placement for the project the Contractor shall 30 demonstrate means and methods to obtain the required densities. 31 d. Demonstrate Means and Methods for compaction including: 32 1) Depth of lifts for backfill which shall not exceed 12 inches 33 2) Method of moisture control for excessively dry or wet backfill 34 3) Placement and moving trench box, if used 35 4) Compaction techniques in an open trench 36 5) Compaction techniques around structure 37 e. Provide a testing trench box to provide access to the recently backfilled 38 material. 39 f. The City will provide a qualified testing lab full time during this period to 40 randomly test density and moisture continent. 41 1) The testing lab will provide results as available on the job site. 42 7. Varying Ground Conditions 43 a. Notify the City of varying ground conditions and the need for additional 44 proctors. 45 b. Request additional proctors when soil conditions change. 46 c. The City may acquire additional proctors at its discretion. 47 d. Significant changes in soil conditions will require an additional Means and 48 Methods demonstration. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 330510-19 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 19 of 20 1 3.5 REPAIR [NOT USED] 2 3.6 RE -INSTALLATION [NOT USED] 3 3.7 FIELD QUALITY CONTROL 4 A. Field Tests and Inspections 5 1. Proctors 6 a. The City will perform Proctors in accordance with ASTM D698. 7 b. Test results will generally be available to within 4 calendar days and distributed 8 to: 9 1) Contractor 10 2) City Project Manager 11 3) City Inspector 12 4) Engineer 13 c. Notify the City if the characteristic of the soil changes. 14 d. City will perform new proctors for varying soils: 15 1) When indicated in the geotechnical investigation in the Appendix 16 2) If notified by the Contractor 17 3) At the convenience of the City 18 e. Trenches where different soil types are present at different depths, the proctors 19 shall be based on the mixture of those soils. 20 2. Density Testing of Backfill 21 a. Density Tests shall be in conformance with ASTM D2922. 22 b. Provide a testing trench protection for trench depths in excess of 5 feet. 23 c. Place, move and remove testing trench protection as necessary to facilitate all 24 test conducted by the City. 25 d. For final backfill depths less than 15 feet and trenches of any depth not under 26 existing or future pavement: 27 1) The City will perform density testing twice per working day when 28 backfilling operations are being conducted. 29 2) The testing lab shall take a minimum of 3 density tests of the current lift in 30 the available trench. 31 e. For final backfill depths 15 feet and greater deep and under existing or future 32 pavement: 33 1) The City will perform density testing twice per working day when 34 backfilling operations are being conducted. 35 2) The testing lab shall take a minimum of 3 density tests of the current lift in 36 the available trench. 37 3) The testing lab will remain onsite sufficient time to test 2 additional lifts. 38 f. Make the excavation available for testing. 39 g. The City will determine the location of the test. 40 h. The City testing lab will provide results to Contractor and the City's Inspector 41 upon completion of the testing. 42 i. A formal report will be posted to the City's Buzzsaw site within 48 hours. 43 j. Test reports shall include: 44 1) Location of test by station number 45 2) Time and date of test 46 3) Depth of testing 47 4) Field moisture CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 33 05 10 - 20 UTILITY TRENCH EXCAVATION, EMBEDMENT, AND BACKFILL Page 20 of 20 1 5) Dry density 2 6) Proctor identifier 3 7) Percent Proctor Density 4 3. Density of Embedment 5 a. Storm sewer boxes that are embedded with acceptable backfill material, 6 blended backfill material, cement modified backfill material or select material 7 will follow the same testing procedure as backfill. 8 b. The City may test fine crushed rock or crushed rock embedment in accordance 9 with ASTM D2922 or ASTM 1556. 10 B. Non -Conforming Work 11 1. All non -conforming work shall be removed and replaced. 12 3.8 SYSTEM STARTUP [NOT USED] 13 3.9 ADJUSTING [NOT USED] 14 3.10 CLEANING [NOT USED] 15 3.11 CLOSEOUT ACTIVITIES [NOT USED] 16 3.12 PROTECTION [NOT USED] 17 3.13 MAINTENANCE [NOT USED] 18 3.14 ATTACHMENTS [NOT USED] 19 END OF SECTION 20 21 Revision Log DATE NAME SUMMARY OF CHANGE 1.2 — Added Item for Concrete Encasement for Utility Lines Various Sections — Revised Depths to Include 15' and greater 12/20/2012 D. Johnson 3.3.A — Additional notes for pavement protection and positive drainage. 3.4.E.2 — Added requirements for backfill of service lines. 3.4.E.5 — Added language prohibiting flooding of trench CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 2 334110-1 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS Page 1 of 13 SECTION 33 41 10 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS 3 PART 1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Furnishing and installing reinforced concrete storm drain pipe and culverts, 7 including: 8 a. Pipe or box fittings 9 b. Connection of drain lines to curb inlets 10 c. All joints 11 d. All connections to new or existing pipe or headwalls, manholes, etc., to the 12 lines and grades shown on the Drawings 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. 1.6.B, 1.3.A.k, 2.2.A.2.B 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1 — General Requirements 18 3. Section 33 01 31 — Closed Circuit Television (CCTV) Inspection 19 4. Section 03 30 00 — Cast -in -Place Concrete 20 5. Section 33 05 10 — Utility Trench Excavation, Embedment and Backfill 21 6. Section 33 05 23 — Hand Tunneling 22 7. Section 03 34 13 - Controlled Low Strength Material (CLSM) 23 1.2 PRICE AND PAYMENT PROCEDURES 24 A. Measurement and Payment 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 1. Reinforced Concrete Storm Drain Pipe a. b. c. Measurement 1) Measured along the longitudinal centerline of the pipe from the initial beginning point as shown on Drawings to the end of construction as shown on Drawings, excluding inside diameters of any manholes encountered Payment 1) The work performed and materials furnished in accordance with this Item and ]measured as provided under "Measurement" will be paid for at the unit price bid per linear foot of "RCP" installed for: a) Various sizes b) Various classes The price bid shall include: 1) Furnishing and installing the specified diameter pipe and appurtenant fittings 2) Mobilization 3) Pavement removal 4) Excavation CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 33 41 10 -2 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS Page 2 of 13 1 5) Hauling 2 6) Disposal of excess material 3 7) Furnishing, placement and compaction of embedment 4 8) Furnishing, placement and compaction of backfill 5 9) Gaskets 6 10) Clean-up 7 11) Cleaning 8 12) Jointing 9 13) Connections to all drainage structures 10 2. Reinforced Concrete Storm Drain Culverts 11 a. Measurement 12 1) Measured along the longitudinal centerline of the pipe from the initial 13 beginning point as shown on Drawings to the end of construction as shown 14 on Drawings, excluding inside diameters of any manholes encountered 15 b. Payment 16 1) The work performed and materials furnished in accordance with this Item 17 and measured as provided under "Measurement" will be paid for at the unit 18 price bid per linear foot of "Box Culvert" installed for: 19 a) Various sizes 20 c. The price bid shall include: 21 1) Furnishing and installing the specified diameter pipe and appurtenant 22 fittings 23 2) Mobilization 24 3) Pavement removal 25 4) Excavation 26 5) Hauling 27 6) Disposal of excess material 28 7) Furnishing, placement and compaction of embedment 29 8) Furnishing, placement and compaction of backfill 30 9) Gaskets 31 10) Clean-up 32 11) Cleaning 33 12) Jointing 34 13) Connections to all drainage structures 35 1.3 REFERENCES 36 A. Reference Standards 37 1. Reference standards cited in this Specification refer to the current reference 38 standard published at the time of the latest revision date logged at the end of this 39 Specification, unless a date is specifically cited. 40 2. American Association of State Highway and Transportation Officials (AASHTO): 41 a. T111, Inorganic Matter or Ash in Bituminous Materials. 42 3. ASTM International (ASTM): 43 a. A185, Standard Specification for Steel Welded Wire Reinforcement, Plain, for 44 Concrete. 45 b. A497, Standard Specification for Steel Welded Wire Reinforcement, 46 Deformed, for Concrete. 47 c. C76, Standard Specification for Reinforced Concrete Culvert, Storm Drain, and 48 Sewer Pipe. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 3341 10-3 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS Page 3 of 13 1 d. C361, Standard Specification for Reinforced Concrete Low -Head Pressure 2 Pipe. 3 e. C443, Standard Specification for Joints for Concrete Pipe and Manholes, Using 4 Rubber Gaskets. 5 f. C497, Standard Test Methods for Concrete Pipe, Manhole Sections, or Tile. 6 g. C506, Standard Specification for Reinforced Concrete Arch Culvert, Storm 7 Drain, and Sewer Pipe. 8 h. C507, Standard Specification for Reinforced Concrete Elliptical Culvert, Storm 9 Drain, and Sewer Pipe. 10 i. C990, Standard Specification for Joints for Concrete Pipe, Manholes, and 11 Precast Box Sections Using Preforined Flexible Joint Sealants. 12 j. C1433, Standard Specification for Precast Reinforced Concrete Monolithic Box 13 Sections for Culverts, Storm Drains, and Sewers. 14 k. C1577. Standard Specification for Precast Reinforced Concrete Monolithic Box 15 Sections for Culverts. Storm Drains, and Sewers Designed According to 16 AASHTO LRFD 17 1. D4, Standard Test Method for Bitumen Content. 18 in. D6, Standard Test Method for Loss on Heating of Oil and Asphaltic 19 Compounds. 20 n. D36, Standard Test Method for Softening Point of Bitumen (Ring -and -Ball 21 Apparatus). 22 o. D71, Standard Test Method for Relative Density of Solid Pitch and Asphalt 23 (Displacement Method). 24 p. D92, Standard Test Method for Flash and Fire Points by Cleveland Open Cup 25 Tester. 26 q. D113, Standard Test Method for Ductility of Bituminous Materials. 27 r. D217, Standard Test Methods for Cone Penetration of Lubricating Grease. 28 4. TxDOT Test Procedures (Tex): 29 a. Tex-704-I, Making, Curing, and Testing Compression Test Specimens for 30 Precast Concrete 31 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 32 1.5 SUBMITTALS 33 A. Submittals shall be in accordance with Section 01 33 00. 34 B. All submittals shall be approved by the City prior to delivery. 35 1.6 ACTION SUBMITTALS/INFORMATION SUBMITTALS 36 A. Certificates 37 1. Furnish manufacturer's certificate of compliance that their product meets the 38 physical testing requirements of this Specification for the materials referenced 39 including, but not limited to: 40 a. Reinforced concrete pipe 41 b. Concrete box culvert 42 c. Jointing materials 43 B. Shop Drawings 44 1. Lav schedule showing stationing, pip_ e class, ioint length, ioint tv nes, and ioint 45 deflections CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 33 41 10 -4 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS Page 4 of 13 1 2. Detail drawings for all prefabricated pipe connections. 2 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING 7 A. Storage and Handling Requirements 8 1. Secure and maintain a location to store the material in accordance with Section 01 9 66 00. 10 2. Keep pipe clean and fully drained during storage. 11 3. Transport, handle and store pipe and fittings as recommended by manufacturer. 12 4. Repair or replace any damaged pipe before installation per the manufacturer's 13 recommendation. 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2 - PRODUCTS 17 2.1 OWNER -FURNISHED loll] OWNER-SUPPLIEDPRODUCTS [NOT USED] 18 2.2 EQUIPMENT, PRODUCT TYPES AND MATERIALS 19 A. Fabrication 20 1. Precast Reinforced Concrete Pipe 21 a. Provide precast storm sewer pipe that conforms to ASTM C76, ASTM C506 or 22 ASTM C507 for circular, arch or elliptical pipe respectively. 23 b. Utilize a machine made process or cast by a process that will provide uniform 24 placement of a mixture of cement, aggregate and water proportional to provide 25 a homogeneous concrete meeting the specified strength requirements. 26 c. Mix concrete in a central batch plant or other approved batching facility where 27 the quality and uniformity of the concrete is assured. 28 d. Do not use transit mixed concrete to manufacture precast concrete pipe. 29 2. Concrete Box Culvert 30 a. Cast -in -Place 31 1) Conform to Section 03 30 00. 32 b. Precast 33 1) Furnish machine made precast boxes in accordance with ASTM C1433 or 34 CI577 as specified in the drawings. 35 2) Utilize a machine made process or cast by a process that will provide 36 uniform placement of a mixture of cement, aggregate, and water 37 proportional to provide a homogeneous concrete meeting the specified 38 strength requirements. 39 3) Concrete water to cement ratio not to exceed 0.53 by weight CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 334110-5 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS Page 5 of 13 1 4) Utilize minimum 470 pounds of cement per cubic yard of concrete unless 2 mix designs with lower cement content demonstrate that the quality and 3 performance of the sections meet the requirements of this Specification. 4 5) Mix concrete in a central batch plant or other approved batching facility 5 where the quality and uniformity of the concrete is assured. 6 6) Do not use transit mixed concrete to manufacture precast concrete box 7 culvert. 8 7) Utilize welded wire fabric steel reinforcement conforming to ASTM A185 9 or ASTM A497. 10 3. Jointing Materials 11 a. Use any of the materials described in this Section for the making of joints. 12 1) Furnish a manufacturer's certificate of compliance for all jointing materials. 13 2) Cold Applied Preformed Plastic Gaskets/Flexible Joint Sealants 14 a) Provide flexible joint sealants that meet the requirements of 15 ASTM C990. 16 b) Utilize 1 continuous gasket conforming to the joint shape for each joint. 17 c) Plastic gasket shall be produced from blends of refined hydrocarbon 18 resins and plasticizing compounds reinforced with inert mineral filler 19 and shall contain no solvents, irritating fumes or obnoxious odors. 20 d) Use flexible joint sealants that do not depend on oxidizing, evaporating 21 or chemical action for its adhesive or cohesive strength. 22 e) Supply in extruded rope form of suitable cross section and size as to fill 23 the joint space when the pipes are joined. 24 f) Provide a size of the pre -formed flexible joint sealant in accordance 25 with the manufacturer's recommendations and large enough to properly 26 seal the joint and obtain the squeeze out as described under 27 construction methods. 28 g) The gasket joint sealer shall be protected by a suitable removable 2- 29 piece wrapper, and the 2-piece wrapper shall be so designed that'/2 may 30 be removed longitudinally without disturbing the other �/z to facilitate 31 application as noted below. 32 h) The chemical composition of the gasket joint sealing compound as 33 shipped shall meet the requirements of Table 1 when tested in 34 accordance with the test methods shown. 35 36 Table 1. Sealing Compound Chemical Composition Composition Test Method Percent by Weight Bitumen ASTM D4 Bitumen Content 50-70 Ash -Inert Mineral Matter AASHTO T111 30-50 Volatile Matter at 325 degrees F ASTM D6 Loss on Heating of 2.0 Max Oil and Asphaltic Compounds 37 38 i) Gasket joint sealing compound when immersed for 30 days at ambient 39 room temperature separately in 5 percent solution of caustic potash, a 40 mixture of 5 percent hydrochloric acid, a 5 percent solution of sulfuric 41 acid and a saturated hydrogen sulfide (H2S) solution shall show no 42 visible deterioration. 43 j) The physical properties of the gasket joint sealing compound as 44 shipped shall meet the requirements in Table 2 when tested in 45 accordance with the test methods shown. 46 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 33 41 10 -6 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS Page 6 of 13 Table 2. Sealing Compound Physical Properties Property Specific Gravity at 77 degrees F Ductility at 77 degrees F Softening Point at 77 degrees F Penetration 32 degrees F (300-gms) 60-seconds 77 degrees F (150-gms) 5-seconds 115 degrees F (150-gms) 5-seconds Flash Point C.O.C. Fire Point C.O.0 B. Test Method ASTM D71 ASTM D113 ASTM D36 ASTM D217 ASTM D92 Typical Analysis 1.20 to 1.35 5.0 centimeters minimum 320 degrees F minimum 75 minimum 50 to 120 150 max 600 degrees F 625 degrees F 3) Rubber Gaskets a) Provide gaskets that conform to ASTM C361 or ASTM C443. b) Meet the requirements of ASTM C443 for design of the joints and permissible variations in dimensions. Design Criteria 1. Reinforced Concrete Pipe a. Unless otherwise indicated on the Drawings, furnish Class III concrete pipe with shell thickness, circumferential reinforcement and strength conforming to the requirements of ASTM C76, ASTM C506 or ASTM C507 for circular, arch or elliptical pipe respectively, except as modified below: 1) Manufacture pipes larger than 60-inch diameter by using 2 lines of circular reinforcement. 2) For Class III pipes larger than 60-inch diameter, manufacturer may, at its option, furnish pipe manufactured with either Wall "B" or Wall "C" minimum thicknesses and the applicable minimum steel area as listed for circular cages in Table II of ASTM C76, provided test strength requirements for Class III pipe are satisfactorily met. b. Jacking, Boring, or Tunneling 1) Design pipe for jacking, boring or tunneling conforming to the requirements of Section 33 05 23. 2) When requested, provide design notes and drawings signed and sealed by a Texas licensed professional engineer. 24 2.3 ACCESSORIES [NOT USED] 25 2.4 SOURCE QUALITY CONTROL 26 27 28 29 30 31 32 33 34 35 A. Tests and Inspections 1. Reinforced Concrete Pipe a. Acceptance of pipe will be determined by the results of the following tests: 1) Material tests required in ASTM C76, ASTM C506 or ASTM C507. 2) Absorption tests in accordance with ASTM C497. 3) 3-edge bearing tests in accordance with ASTM C497. a) Testing Rate (1) If tested for 0.01-inch crack only: (a) Test 0.8 percent of pipe sections for each size included in order (2) If tested for 0.01-inch crack and ultimate load: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 334110-7 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS Page 7 of 13 1 (a) Test 0.2 percent of pipe sections for each size included in order 2 b) Pipes that have been tested only to the formation of a 0.01 inch crack 3 and that meet the 0.01 inch test load requirements shall be accepted for 4 use. 5 c) Failed Pipe 6 (1) Test 2 consecutive joints in the same mix series if a specimen fails 7 to meet test requirements. 8 (2) Entire pipe series will be rejected if 1 of the consecutive joints fails 9 to meet test requirements. 10 d) Pipes larger than 1 inch in diameter may be accepted on the basis of 11 material tests and inspection of completed product as an alternate to 3- 12 edge bearing test, at the option of the manufacturer. 13 (1) Acceptance of pipe will be determined by the results of the material 14 tests as required in ASTM C76, ASTM C5O6 or ASTM C5O7. 15 (a) Perform crushing tests on cores taken from barrel of completed 16 and cured pipe. 17 (b) Perform absorption tests on samples from pipe wall. 18 (c) Inspect finished pipe including amount and placement of 19 reinforcement. 20 (2) Manufacturer will furnish facilities and personnel for taking core 21 samples from pipe barrel and for determining compressive strength 22 of samples. 23 (3) Manufacturer will plug and seal core holes if samples meet strength 24 requirements. 25 (a) Plug and seal sections in a manner that the pipe section will 26 meet all test requirements of ASTM C76, ASTM C5O6 or 27 ASTM C5O7. 28 (b) Pipe sections plugged and sealed as described above will be 29 accepted for use. 30 4) Inspect the finished pipe to determine its conformance with the required 31 design. 32 2. Cast -in -Place Concrete Box Culvert 33 a. Provide test specimens that meet the requirements of Division 03. 34 3. Precast Box Culvert 35 a. Make test specimens in test cylinders at the same time and in the same manner 36 as the box sections they represent. 37 b. Make a minimum of 4 test cylinders for each day's production run and each 38 mix design. 39 c. Cure test cylinders in the same manner and for the same times as the boxes they 40 represent. 41 d. Test the specimens in accordance with Tex-704-I. 42 B. Sizes and Permissible Variations 43 1. Reinforced Concrete Pipe 44 a. Ensure that variations in diameter, size, shape, wall thickness, reinforcement, 45 placement of reinforcement, laying length and the permissible under run of 46 length are in accordance with the applicable ASTM Specification for each type 47 of pipe as referred to previously. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 3341 10-8 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS Page 8 of 13 1 b. Where rubber gasket pipe joints are to be used, the design of joints and 2 permissible variations in dimensions shall be in accordance with ASTM C443, 3 Sections 7 and 8. 4 2. Cast -in -Place or Precast Box Culvert 5 a. Ensure that precast sections of either type meet the following requirements: 6 1) The inside vertical and horizontal dimensions do not vary from Drawing 7 requirements by more than 1/2 inch or 1 percent, whichever is greater. 8 2) The horizontal or vertical plane at each end of the box section does not vary 9 from perpendicular by more than 1/2 inch or 1 percent, whichever is 10 greater, measured on the inside faces of the section. 11 3) The sides of a section at each end do not vary from being perpendicular to 12 the top and bottom by more than 1/2 inch or 1 percent, whichever is greater, 13 when measured diagonally between opposite interior corners. 14 b. Ensure that wall and slab thicknesses are not less than shown on the Drawings 15 except for occasional deficiencies not greater than 1/4 inch or 5 percent, 16 whichever is greater. 17 1) If proper jointing is not affected, thicknesses in excess of Drawing 18 requirements are acceptable. 19 c. Deviations from the above tolerances will be acceptable if the sections can be 20 fitted at the plant or job site and the joint opening at any point does not exceed 21 1 inch. 22 1) Use match marks for proper installation on sections that have been accepted 23 in this manner. 24 C. Workmanship and Finish 25 1. Reinforced Concrete Pipe 26 a. Ensure that pipe is substantially free from fractures, large or deep cracks and 27 surface roughness. 28 b. Ensure that ends of pipe are normal to the walls and centerline of the pipe 29 within the limits of variations allowed as stated previously. 30 2. Cast -in -Place or Precast Box Culvert 31 a. Fine cracks on the surface of the member that do not extend to the plane of the 32 nearest reinforcement are acceptable unless the cracks are numerous and 33 extensive. 34 b. Repair cracks that extend into the plane of the reinforcing steel in an approved 35 manner. 36 c. Excessive damage, honeycomb or cracking will be subject to structural review. 37 d. The City may accept boxes with repairs that are sound, properly finished and 38 cured in conformance with pertinent Specifications. 39 e. When fine cracks on the surface indicate poor curing practices, discontinue 40 further production of precast sections until corrections are made and proper 41 curing is provided. 42 D. Curing 43 1. Cure pipe/box in accordance with the applicable ASTM Specification for each type 44 of pipe as referred to above. 45 E. Marking 46 1. Reinforced Concrete Pipe 47 a. Clearly mark the following information on each section of pipe: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 33 41 10 -9 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS Page 9 of 13 1 1) Class of pipe 2 2) ASTM designation 3 3) Date of manufacture 4 4) Identification of plant 5 5) Name or trademark of the manufacturer 6 6) Pipe to be used for jacking and boring 7 b. For pipe with elliptical reinforcement, in addition to above, clearly mark 1 end 8 of each section during the process of manufacture or immediately after with the 9 following: 10 1) The location of the top or bottom of the pipe as it should be installed, 11 unless the external shape of the pipe is such that the correct position of the 12 top and bottom is obvious 13 2) Mark the pipe section by indenting or painting with waterproof paint. 14 2. Cast -in -Place or Precast Box Culvert 15 a. Mark precast boxes with the following: 16 1) Name or trademark of the producer 17 2) Date of ]manufacture 18 3) Box size 19 4) Minimum and maximum fill heights 20 b. For boxes without lifting holes, mark 1 end of each box section on the inside 21 and outside walls to indicate the top or bottom as it will be installed. 22 c. Indent markings into the box section or paint them on each box with waterproof 23 paint. 24 F. Pipe/Box Rejection 25 1. Individual sections of pipe/box may be rejected if any of the Specification 26 requirements are not met or if any of the following exist: 27 a. Fractures or cracks passing through the shell, with the exception of a single end 28 crack that does not exceed the depth of the joint 29 b. Defects that indicate imperfect proportioning, mixing and molding 30 c. Surface defects indicating honeycombed or open texture 31 d. Damaged ends which would prevent making a satisfactory joint 32 e. Any continuous crack having a surface width of 0.01 inch or more and 33 extending for a length of 12 inch or more 34 2. Mark rejected pipe/box with painted "REJECTED". 35 3. Remove rejected pipe/box immediately from job site and replace with pipe/box 36 meeting the requirements of this Specification. 37 PART 3 - EXECUTION 38 3.1 INSTALLERS [NOT USED] 39 3.2 EXAMINATION [NOT USED] 40 3.3 PREPARATION [NOT USED] 41 3.4 INSTALLATION 42 A. General CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 33 41 10 -10 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS Page 10 of 13 1 1. Conform to the requirements of Section 33 05 10 for excavation and embedment for 2 open -cut type installation. 3 2. Conform to the requirements of Section 33 05 23 when jacking, boring or tunneling 4 methods are specified on Drawings. 5 3. Establish and maintain lines and grades. 6 B. Pipe/Box Laying — Trench Installation 7 I . Ensure that pipe/box and fittings are laid and jointed in firm trench bottom 8 conditions. 9 2. Start laying pipe/box on the bedding at the outlet or downstream end with the spigot 10 or tongue end of the pipe joint pointing downstream, and proceed toward the inlet 11 or upstream end with the abutting sections properly matched, true to the established 12 lines and grades. 13 3. Provide appropriate facilities for hoisting and lowering the sections of pipe/box 14 according to manufacturer's recommendation. 15 4. Lift and lower sections of pipe/box into trench without damaging pipe or disturbing 16 the prepared bedding or sides of trench. 17 5. Carefully clean pipe/box ends before pipe is placed in trench. 18 6. Protect pipe/box open end to prevent entrance of earth or bedding material as each 19 length of pipe/box is laid. 20 7. Fit, match and lay pipe/box to form a smooth, uniform conduit. 21 8. When elliptical pipe with circular reinforcing or circular pipe with elliptical 22 reinforcing is used, lay the pipe in trench so that the markings for top or bottom are 23 not more than 5 degrees from the vertical plane through the longitudinal axis of the 24 pipe 25 9. Remove and re -lay, without extra compensation, pipe/box that is not in alignment 26 or that shows excessive settlement after laying. 27 C. Multiple Barrel Box Culvert Placement 28 I. Fill the annular space between multiple boxes with crushed rock or CLSM 29 according to 03 34 13. 30 a. Water jetting will not be allowed between parallel boxes. 31 2. Start the laying of boxes on the bedding at the outlet end and proceed toward the 32 inlet end with the abutting sections properly matched. 33 3. Fit, match and lay boxes to form a smooth, uniform conduit true to the established 34 lines and grades. 35 D. Jointing 36 1. Cold Applied Preformed Plastic Gaskets/Flexible Joint Sealants 37 a. Brush -apply a suitable pruner, recommended by the manufacturer of the gasket 38 joint sealer, to tongue and groove joint surfaces and end surfaces. 39 1) Ensure that surface to be primed is clean and dry when primer is applied. 40 2) Ensure that primer is not applied over mud, sand, dirt or sharp cement 41 protrusions. 42 3) Allow primer to dry and harden. 43 b. Attach plastic gasket sealer around tapered tongue or tapered groove near the 44 pipe joint hub or shoulder, before laying pipe in trench. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 33 41 10 - 11 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS Page 11 of 13 1 c. Remove paper wrapper from 1 side only of the 2-piece wrapper on gasket and 2 press it firmly to the clean, dry pipe joint surface. 3 1) Do not remove the outside wrapper until immediately before pushing pipe 4 into its final position. 5 d. Align the tongue correctly with the flare of the groove. 6 e. Remove outside wrapper on the gasket and pull or push pipe home with 7 sufficient force (back hoe shovel, chain hoist, ratchet hoist or winch) to cause 8 evidence of gasket material squeeze -out on inside or outside around complete 9 pipe joint circumference. 10 1) Remove any joint material that pushed out into the interior of pipe. 11 2) Ensure that pipe is pulled home in a straight line with all parts of pipe on 12 line and grade at all times. 13 f. Proceed with backfilling of pipe laid with plastic gasket joints as soon as joint 14 has been inspected and approved by the Engineer or Inspector. 15 1) Take special precautions in placing and compacting backfill to avoid 16 damage to joints. 17 g. When the atmospheric temperature is below 60 degrees F, store pre -formed 18 flexible joint sealants in an area warmed to above 70° degrees F or artificially 19 warmed to this temperature in a manner satisfactory to the Engineer. 20 1) Apply gaskets to pipe joints immediately prior to placing pipe in trench, 21 followed by connection to previously laid pipe. 22 2. Rubber Gaskets 23 a. Make the joint assembly according to the recommendations of the gasket 24 manufacturer. 25 b. When using rubber gaskets, make joints watertight. 26 c. Backfill after the joint has been inspected and approved. 27 E. Backfill 28 1. Conform to the requirements of Section 33 05 10 for backfilling pipe/box trenches. 29 F. Pipe fittings 30 1. Poured Concrete Pipe Collars 31 a. Provide collars for locations shown on Drawings. 32 b. Collar cost is considered subsidiary to bid price for furnishing and installing 33 reinforced concrete pipe. No extra payment will be made for installation of 34 concrete pipe collars shown on the Drawings. 35 2. Shop and Field -Fabricated Wyes, Tees, Crosses and Bends 36 a. Furnish and install shop or field -fabricated wyes, tees, crosses or bends as 37 indicated on Drawings or required by the Engineer. 38 b. Shop -fabricate fittings for minimum. rre size less than 21 inohes in diameter 39 for the larger pipe all round pipe to round wipe connections. 40 c. Field-%briaate fittings with 24 inch or greater diameter fog th 1er�er i*-e. 41 d. Field -fabricate fittings for box culverts. 42 e. Take care in fabrication that concrete walls of pipe are broken back only 43 enough to provide the required finished opening. 44 f. Join reinforcing mesh or bars by bending, twisting or spot welding to provide a 45 rigid connection. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 1 2 3 4 g. 33 41 10 - 12 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS Page 12 of 13 Concrete or mortar (as specified in this segment) shall be wiped over the reinforcing wires connecting the 2 pipe joints, compacted by light blows, shaped to the contour of the pipe barrels, lightly brushed for finish and cured under wet burlap. 5 3. Poured Concrete Pipe Plugs 6 a. Plug pipe ends with a fabricated unit as shown on Drawings, when conduit lines 7 terminate at locations with no connection to drainage structures. 8 b. Concrete pipe plug cost is considered subsidiary to bid price for furnishing and 9 installing reinforced concrete pipe. No extra payment will be made for 10 installation of concrete pipe plugs shown on the Drawings. 11 4. Precast Reducer Fittings and End Caps 12 a. Where shown on the Drawings, provide precast fittings at pipe size changes and 13 pipe ends. 14 b. Precast fittings are subsidiary to bid price for furnishing and installing 15 reinforced concrete pipe. 16 3.5 REPAIR / RESTORATION [NOT USED] 17 3.6 RE -INSTALLATION [NOT USED] 18 3.7 FIELD [oR] SITE QUALITY CONTROL 19 A. Field Tests and Inspections 20 1. Video Inspection 21 a. Perform post -construction TV inspection of all installed reinforced concrete 22 pipes/boxes conforming to the requirements of Section 33 01 31. 23 2. Ensure that pipes/boxes are installed correctly and are free of significant debris. 24 a. At the City's discretion, replace any pipe/box that is determined to have 25 jointing problems, cracking or significant debris. 26 3.8 SYSTEM STARTUP [NOT USED] 27 3.9 ADJUSTING [NOT USED] 28 3.10 CLEANING [NOT USED] 29 3.11 CLOSEOUT ACTIVITIES [NOT USED] 30 3.12 PROTECTION [NOT USED] 31 3.13 MAINTENANCE [NOT USED] 32 3.14 ATTACHMENTS [NOT USED] 33 END OF SECTION 34 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 33 41 10 - 13 REINFORCED CONCRETE STORM DRAIN PIPE/CULVERTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Page 13 of 13 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 2 SECTION 99 99 00 ADDITIONAL SPECIFICATIONS 999900-1 ADDITIONAL SPECIFICATIONS Page 1 of 2 3 4 9999.0003 Construct Concrete Steps 5 This item shall include constructing concrete steps in accordance with the City concrete sidewalk 6 specification for the width and dimensions specified on the plans. This unit price bid will be full 7 payment for materials including all labor, equipment, tools, and incidentals necessary to complete the 8 work. 9 10 9999.0004 Curb Stamp Saw Cut Removal 11 This item shall include saw cutting historic contractor stamps in existing concrete sidewalks or curbs 12 and providing to the property owners. The stamp shall be cut so that the entire stamp remains intact 13 without an excessive margin around the stamp. Upon completion, the stamp shall be provided to the 14 nearest adjacent property owner. If property owner declines the curb stamp, contractor shall provide 15 to the City. This unit price bid will be full payment for materials including all labor, equipment, tools, 16 and incidentals necessary to complete the work and will be paid by the each. 17 18 9999.0005 Modular Speed Cushion 19 This item shall include constructing modular speed cushions according to the specification for the 20 width and dimensions specified on the plans. Contractor shall use ROAD KOP RKP Series 2 or 21 approved equal. Visit www.roadkare.com for manufacturer contact information. Each set of three 22 units will be measured as one each for payment purposes. This unit price bid will be full payment for 23 materials including all labor, equipment, tools, and incidentals necessary to complete the work. 24 25 9999.0006 Sign -Ceramic Tile Street Names - Install 26 This item shall include furnishing and installing ceramic tiles matching the existing historic street 27 name tiles within the curb and gutter at specified locations within the project limits. This unit price 28 bid will be full payment for materials including all labor, equipment, tools, and incidentals necessary 29 to complete the work. 30 31 9999.0007 Stone Fascia for Retaining Wall 32 This item shall include constructing a stone fascia for the retaining wall in accordance with the details 33 provided in the plans. Contractor shall coordinate with owner the stone selection for use prior to 34 installation. This unit price bid will be full payment for materials including all labor, equipment, 35 tools, and incidentals necessary to complete the work. 36 CITY OF FORT WORTH CAH ASHLAND STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT NO. 01918, DOE: 6853 999900-2 ADDITIONAL SPECIFICATIONS Page 2 of 2 1 9999.0008 Irrigation Adjustment Allowance 2 This item establishes a contract allowance comparable to the final cost of making necessary irrigation 3 adjustments required due to the project. An arbitrary allowance amount has been placed in the 4 Proposal; however, this does not guarantee any payment for irrigation adjustments, nor does it 5 confine irrigation adjustments to the amount shown in the Proposal. It shall be the Contractor's 6 responsibility to provide the services of a licensed irrigator to make the irrigation adjustments 7 determined necessary by the City. No payment will be made for irrigation adjustments except those 8 adjustments determined necessary by the City. Should the Contractor damage irrigation lines due to 9 his negligence, where such lines would not have required adjustment or repair otherwise, the lines 10 shall be repaired and adjusted by the Contractor at the Contractor's expense. The payment to the 11 Contractor for irrigation adjustments shall be the actual cost of the adjustments plus ten percent 12 (1O%) to cover the cost of bond and overhead incurred by the Contractor in handling the adjustments. 13 14 9999.0009 13" Conc Pvrt — Approach Slab 15 This item shall include constructing the concrete approach slab according to the location and details 16 provided in the plans. Work shall be performed according to Section 32 13 13. This unit price bid 17 will be full payment for materials including all labor, equipment, tools, and incidentals necessary to 18 complete the work. 19 20 9999.0010 Pressure Transducer Housing 21 This item shall include installation of a galvanized steel housing for a future pressure transducer in 22 accordance with the details provided in the plans. The final location of the housing should be 23 coordinated with the City or Engineer. This item does not include the materials or installation of the 24 pressure transducer device. This unit price bid will be full payment for materials including all labor, 25 equipment, tools, and incidentals necessary to complete the work. 26 27 9999.0011 Storm Water Field Order Allowance 28 This item establishes a contract contingency allowance for unanticipated work determined to be 29 necessary in the field. This item will not be paid to the contractor unless a field order is issued. 30 Unanticipated project changes are not limited to the value of this item. Contract changes above the 31 amount described by this allowance may be processed through a change order. 32 33 34 End Section CITY OF FORT WORTH CAH ASHLAND STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CITY PROJECT NO. 01918, DOE: 6853 Special Specification 1 9999.0012 VIBRATION MONITORING 1.00 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Con- ditions and Division 1 Specification Sections, apply to this Section. 1.02 WORK INCLUDED A. Provide all necessary materials, equipment, tools and labor for monitoring vibration producing activities such as excavation activities, sheet pile driving, vibratory compaction and operation of heavy construction equipment as may be required during construction for the Project. The Contractor shall conduct all construction activities so as to preclude damage to existing struc- tures and utilities. The Contractor shall be responsible for all damage caused by his activi- ties. Vibration monitoring is only required during the construction of drainage improvements on Ashland Avenue. 1.03 DEFINITIONS A. The following definitions shall apply to the vibration controls: 1. Peak particle displacement — the peak particle displacement is the maximum movement induced by the vibration. The displacement amplitudes are in units of mils (0.001 inch), zero to peak amplitude. 2. Peak particle velocity — The peak particle velocity is the maximum rate of change with re- spect to time of the particle displacement. The velocity amplitudes are in units of inches per second (ips) or in units of millimeters per second (mm/s), zero to peak amplitude. 3. Frequency — The frequency of the vibration is the number of oscillations which occur in one second. The frequency units are given in Hertz (Hz) where one Hz equals one cycle per second. 1.04 PERFORMANCE REQUIREMENTS 1. Allowable Vibration Velocity (Peak Particle Velocity): The following are the maximum al- lowable Peak Particle Velocities (PPV) at the ground surface along both sides of the right of way in the following frequency ranges (based on USBM RI 8507): • Less than 15 Hz —12 mm/s • 15 Hz to 40 Hz — 20 mm/s • Greater than 40 Hz — 50 mm/s 1.05 SUBMITTALS A. Construction Plan: 1. At least 15 work days prior to start of construction, the Contractor shall provide a con- struction plan to the Engineer that shall include, but not be limited to the following: pro- posed trenching and shoring methods to be used, a written vibration monitoring plan, an- ticipated vibration levels and the condition survey format. 2. The Vibration Monitoring Plan shall include the name of the Vibration Monitoring Special- ist, the scheduled start date and length of construction operations that require vibration monitoring, the limits of vibration monitoring work, and the location of any underground utilities in proximity to the construction operation. The plan shall also include the maxi- mum allowable peak particle velocities (ppv) as indicated in this specification, the location of sensor(s) placements, as directed by the Vibration Specialist, appropriate details for Special Specification 2 anchoring the sensor(s) and the procedure for tracking ppv's throughout construction op- erations B. Condition Survey Report: 1 A Preconstruction (baseline) Condition Survey shall be conducted by the Contractor on the exterior of existing structures, prior to beginning any vibration producing activity. The survey shall include documentation of any existing structural or cosmetic damage of the structures. Documentation shall include sketches, videotape, photographs and/or notes. 2. The Contractor shall submit a report to the Engineer that will summarize the preconstruc- tion condition of the structures and will identify areas of concern. C. Product Data — Provide record data for vibration monitoring equipment. D. Daily Logs of Vibration Records: 1. The Contractor shall submit daily logs of the vibration monitoring results and, upon com- pletion of construction operations, a final report summarizing the collected data. The logs shall include the maximum peak particle velocity and its associated frequency, type and location of the vibration producing event, location of the geophones and closest distance from the vibration -producing event to the geophone(s). 1.06 QUALITY ASSURANCE A. Vibration Monitoring Specialist: A qualified specialist with a record of successfully performed projects of comparable size and complexity during the previous 5 years. The following com- panies employ qualified specialists although the Contractor is not limited to these companies: 1. Fugro Consultants 2517 East Loop 820 North Fort Worth TX 76118 817-284-9595 2. Mike Fann and Associates 2132 Brookgate Drive Grapevine, TX 76051 817-442-8485 1.07 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.08 GUARANTEES [ NOT USED] 2.00 PRODUCTS 2.01 VIBRATION MONITORING EQUIPMENT A. The Contractor shall furnish, maintain and operate the necessary vibration monitors (ampli- tude and frequency sensitive) during any vibration producing activities that could produce measurable ground vibrations. No vibration producing activities may be started until the ap- propriate instrumentation is provided by the Contractor and approved by the Engineer. B. The instrument shall be capable of measuring, recording and producing a hard copy of the frequency and peak particle velocity in three mutually perpendicular axes. The hardcopy shall clearly indicate the time of the readings. The instrument shall be capable of measuring Linear scale (dB-L) sound levels. C. All vibration instruments shall be powered with rechargeable batteries. Special Specification 3 D. All vibration instruments shall be supplied with current calibration documents and shall be re - calibrated on approximately a six-month use interval. At a minimum, instrument specific cali- bration curves of peak velocity input to peak velocity output shall be provided over the speci- fied frequency ranges for each instrument. E. The Contractor shall be responsible for instrument maintenance. If the Contractor does not maintain a sufficient number of instruments to monitor the vibration producing activity, the Engineer may direct that all vibration producing activities cease until a sufficient number are working. Recording tape shall be supplied by the Contractor and at least a two -week supply maintained. 3.00 EXECUTION 3.01 MONITORING A. The Contractor shall perform continuous vibration monitoring during construction when vibra- tion producing activities are ongoing. The Contractor shall perform the work in a manner that will limit construction vibration at the specified locations to within the limits set forth in this specification. B. Vibration monitoring is only required during the construction of drainage improvements on Ashland Avenue. C. Vibration monitoring is required for any of the following construction activities: 1. Digging 2. Moving heavy equipment 3. Moving loaded trucks 4. Sheet pile driving 5. Installation of shoring 6. Placing trench boxes 7. Any construction activity which can be reasonably expected to produce perceptible ground vibrations. The final determination of what activities qualify in this category will be made by the Engineer. D. Vibration monitoring equipment shall be placed near the middle of the projected vibration - inducing activities for each work day. One device shall be placed on each side of the excava- tion along the outside edges of the right of way, but at no time shall be placed in an area ac- cessibleto the public or on private property unless directed by the Engineer or City repre- sentative. Appropriate measures shall be taken to protect the devices from disturbance or damage. E. Vibration monitoring shall be continuous during construction activities except as noted below: 1. For any construction activity, if the monitored ground vibrations exceed 80% of the ground vibration limits as given above, the Contractor shall cease that activity and submit a revised construction plan. The plan shall give the construction parameter data; it shall identify the specific construction activity causing the critical vibration and include a pro- posal for corrective action necessary to ensure that the specified limit is not exceeded for future construction activities. If in the opinion of the Engineer it can be clearly demon- strated that such vibrations are due to traffic or other activities not associated with the construction activities, upon written approval by the Engineer construction activities may continue. 2. For any construction activity, if the monitored ground vibrations do not exceed 25% of the ground vibration limits given above, the Contractor may request that vibration monitoring for that activity be suspended. Upon written approval by the Engineer, vibration monitor- ing for specific construction activities may be suspended. Special Specification 4.00 MEASUREMENT AND PAYMENT 4.01 MEASUREMENT A. Vibration monitoring will be measured by each month of monitoring. 4.02 PAYMENT 4 A. Payment shall be full compensation for furnishing, placing, maintaining, adjusting, producing reports, monitoring, calibrating, storing, and removing the vibration monitoring equipment for the duration required as determined by the engineer. 4.03 BID ITEM A. Item 9999.00012 Vibration Monitoring — Per Month END OF SECTION APPENDIX GC-4.02 Subsurface and Physical Conditions GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GR-01 60 00 Product Requirements CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 GC-4.02 Subsurface and Physical Conditions THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 July 16, 2012 Mr. Scott Hubley, P.E. Freese & Nichols, Inc. 4055 International Plaza, Suite 200 Fort Worth, Texas 76109 Phone: (817) 735-7378 Email: skhafreese.com Re: Geotechnical Investigation Pavement Reconstruction and Storm Water Detention Vault Ashland Avenue Fort Worth, Texas MTE Project No. E12-0603 MAS-TEK Engineering & Associates, Inc. Dear Mr. Hubley: The project consists of the construction of a stormwater detention vault beneath a 400' long section of Ashland Avenue in Fort Worth, Texas. Excavation for the vault will range from 10' at Sta. 4+00 to 19' at Sta. 0+00. The edges of the culvert will extend to the curb line or beyond on each side of the new roadway. We understand that this section of the street will be reconstructed curb to curb after construction of the detention vault and that roadway widening will not be performed. Please find enclosed our report summarizing the results of the geotechnical investigation performed at the above referenced project. We trust the recommendations derived from this investigation will provide you with the information necessary to complete your proposed project successfully. For your future construction materials testing and related quality control requirements, it is recommended that the work be performed by Mas-Tek Engineering & Associates, Inc. in order to maintain continuity of inspection and testing services for the project under the direction of the geotechnical project engineer. We thank you for the opportunity to provide you with our professional services. If we can be of further assistance, please do not hesitate to contact us. Sincerely, MAS-TEK ENGINEERING & ASSOCIATES ,`te i 0 r/a,►. Michael D. Roland, P.E. Mark J. Project Engineer Principal cc: Aaron Cotton - MTE MAS-TEK ENGINEERING & ASSOCIATES TEXAS REGISTERED ENGINEERING FIRM F-1418 (1I / t� a• ,,~ • .9V1 ii arrow, P.E. XII it , 0 ........4 * i s K:�:.,AApO ✓ 0�1`, sy... h‘oNALEtG`a.� Geotechnical Consulting & Materials Testing 5132 Sharp Street Dallas, Texas 75247 972 709-7384 1.0 INTRODUCTION TABLE OF CONTENTS PAVEMENT RECONSTRUCTION STORMWATER DETENTION VAULT ASHLAND AVENUE FORT WORTH, TEXAS PAGE 1 1.1 PROJECT DESCRIPTION 1 1.2 PURPOSE AND SCOPE 1 2.0 FIELD INVESTIGATION 2 3.0 LABORATORY TESTING 2 4.0 SITE AND SUBSURFACE CONDITIONS 3 4.1 GENERAL SITE CONDITIONS 3 4.2 SUBSURFACE CONDITIONS 3 4.3 SITE GEOLOGY 3 4.4 GROUNDWATER CONDITIONS 3 4.5 SOIL MOVEMENTS 4 5.0 ANALYSIS AND RECOMMENDATIONS 4 5.1 PAVEMENT RECOMMENDATIONS 4 5.2 EXISTING FILL SOILS / PROOFROLLING 4 5.3 SUBGRADE PREPARATION 5 5.4 LIME STABILIZATION 5 5.5 DESIGN AND CONSTRUCTION REQUIREMENTS 5 5.6 PAVEMENT SECTION RECOMMENDATIONS 6 5.6.1 RESIDENTIAL -URBAN (HIGH VOLUME) 6 5.6.2 DESIGN REQUIREMENTS 7 5.7 PAVEMENT CONSIDERATIONS 8 5.8 SITE GRADING AND DRAINAGE 8 5.9 FIELD SUPERVISION AND DENSITY TESTING 9 6.0 RCB CONSTRUCTION 9 6.1 TRENCH EXCAVATIONS 9 6.2 OPEN CUTS 10 6.3 TRENCH BRACING / BORE PIT SHORING 10 6.4 PROTECTION OF EXISTING FEATURES 11 6.5 DEWATERING 11 6.6 CONSTRUCTION CONSIDERATIONS 11 6.7 RCB DESIGN 12 6.8 RCB BACKFILL 13 6.9 FIELD SUPERVISION AND DENSITY TESTING 13 7.0 LIMITATIONS 14 MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PLAN OF BORINGS LOGS OF BORINGS ILLUSTRATIONS FIGURES 1 LEGEND - KEY TO LOG TERMS & SYMBOLS SWELL SUMMARY SOLUBLE SULFATES TEST RESULTS OPEN CUT CONSTRUCTION TRENCH SHORING 2-3 4 5 6 7 8 MAS-TEK ENGINEERING & ASSOCIATES E12-0603 GEOTECHNICAL INVESTIGATION PAVEMENT RECONSTRUCTION STORMWATER DETENTION VAULT ASHLAND AVENUE FORT WORTH, TEXAS 1.0 INTRODUCTION 1.1 PROJECT DESCRIPTION The project consists of the construction of a stormwater detention vault beneath a 400' long section of Ashland Avenue in Fort Worth, Texas. Excavation for the vault will range from 10' at Sta. 4+00 to 19' at Sta. 0+00. The edges of the culvert will extend to the curb line or beyond on each side of the new roadway. We understand that this section of the street will be reconstructed curb to curb after construction of the detention vault and that roadway widening will not be performed. Pavement design was performed per the current City of Ft. Worth Pavement Design Standard Manual with the exception that only typical testing needed for pavement design was performed as detailed below. Proctor compaction, UU Triaxial tests and CBR tests were not performed. CBR correlations were based on soil strength, swell and index properties. 1.2 PURPOSE AND SCOPE The purposes of this geotechnical investigation were to: 1) explore the subsurface conditions at the site, 2) provide boring Togs that present subsurface conditions encountered including water level observations and laboratory test results, 3) provide thickness measurements of the existing pavements at the core locations, 4) provide subgrade and pavement recommendations for roadway reconstruction, 5) provide recommendations for the stormwater detention vault including allowable bearing capacity, excavation requirements, dewatering, backfilling, and 6) provide recommendations for open cut construction and shoring. This investigation was performed in accordance with our Proposal No. P11-1102E dated November 2, 2011. MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 1 2.0 FIELD INVESTIGATION The field investigation consisted of drilling two (2) test borings at locations shown on Figure 1. The test borings were advanced to depths of 15 to 30 feet. Prior to drilling, the existing pavement was cored. A coring machine with a diamond core barrel was used to core the existing pavements. A truck -mounted drilling rig was used to advance the borings and to obtain samples for laboratory evaluation. The boring locations were located at the approximate locations shown on the Boring location plans (Figure 1). Undisturbed samples of cohesive soils were obtained at intermittent intervals with standard, thin -walled, seamless tube samplers. These samples were extruded in the field, logged, sealed, and packaged to protect them from disturbance and maintain their in -situ moisture content during transportation to our laboratory. A split -spoon sampler was also used to obtain samples of the calcareous clay soils in association with the Standard Penetration Test. Rock hardness was evaluated by cone penetration tests. The test borings were backfilled and the pavement patched immediately with concrete upon completion of the borings. The results of the boring program are presented on the Logs of Borings, Figures 2 and 3. A key to the descriptive terms and symbols used on the logs is presented on Figure 4. The elevations shown on the boring logs are estimates provided by Freese & Nichols. 3.0 LABORATORY TESTING Laboratory tests were performed on representative samples of the soil to aid in classification of the soil materials. These tests included Atterberg limits tests and moisture content tests. Hand penetrometer tests were performed on the clay soil samples to provide indications of the swell potential and the foundation bearing properties of the subsurface strata. The results of these tests are presented on the Logs of Borings (Figures 2 and 3). The results of swell tests performed on representative samples of the clay soils at this site are shown on Figure 5. Soluble Sulfate tests were also performed on selected samples (see Figure 6). MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 2 4.0 SITE AND SUBSURFACE CONDITIONS 4.1 GENERAL SITE CONDITIONS The project consists of the construction of a stormwater detention vault beneath a 400' long section of Ashland Avenue in Fort Worth, Texas. Excavation for the vault will range from 10' at Sta. 4+00 to 19' at Sta, 0+00. The edges of the culvert will extend to the curb line or beyond on each side of the new roadway. We understand that this section of the street will be reconstructed curb to curb after construction of the detention vault and that roadway widening will not be performed. Pavement design was performed per the current City of Ft. Worth Pavement Design Standard Manual with the exception that only typical testing needed for pavement design was performed as detailed below. Proctor compaction, UU Triaxial tests and CBR tests were not performed. CBR correlations were based on soil strength, swell and index properties. 4.2 SUBSURFACE CONDITIONS Subsurface conditions encountered in the borings, including descriptions of the various strata and their depths and thickness, are presented on the Logs of Borings. Note that depth on all borings refers to the depth from the existing grade or ground surface present at the time of the investigation. Boundaries between the various soil types are approximate. 4.3 SITE GEOLOGY As shown on the Tarrant County sheet of the Geoloaic Atlas of Texas, the site is underlain by the Duck Creek Formation containing hard to very hard Limestone. At this site, the limestone is weathered and/or fractured to the proposed depth of excavation. Soils derived from the formation are typically moderately to highly plastic clays exhibiting a moderate to high shrink/swell potential with variations in moisture content. 4.4 GROUNDWATER CONDITIONS The borings were advanced using continuous flight auger methods. Advancement of the borings using these methods allows observation of the initial zones of seepage. Groundwater was not encountered during drilling and the borings were dry at completion. MAS-TEK ENGINEERING & ASSOCIATES E1 2-0603 PAGE 3 The borings were backfilled and the pavement patched with concrete immediately upon completion of the borings. It is not possible to accurately predict the magnitude of subsurface water fluctuations that might occur based upon short-term observations. The subsurface water conditions are subject to change with variations in climatic conditions and are functions of subsurface soil conditions, rainfall and water levels within nearby creeks. 4.5 SOIL MOVEMENTS The subsurface exploration revealed the presence of clay soils having a moderate to high shrink/swell potential depending upon their moisture condition. In order to minimize pavement movements due to shrink/swell movement of the clay soils and settlement of the deep RCB backfill (which is estimated at 1% of the backfill height), it is recommended that the edges of the RCB extend 1' to 2' beyond the curb lines, if possible. Also, fill placed above the top of the RCB should consist of crushed on -site rock compacted in lifts. 5.0 ANALYSIS AND RECOMMENDATIONS 5.1 PAVEMENT RECOMMENDATIONS We understand that Ashland Avenue is classified as a Residential -Urban Road (High Volume) with the City of Fort Worth. The following traffic data was obtained from Table 4.1 of the City of Fort Worth's 2005 Pavement Design Standards Manual and was used in developing the pavement section recommendations. Residential Annual ESALS 35,000 % Growth 0.0% Design Life 25 years 5.2 EXISTING FILL SOILS / PROOFROLLING In order to provide adequate pavement support, we recommend that all existing trench backfill be tested for compaction. All non -compact backfill (having a compaction level below 95% ASTM D 698) should be removed and replaced in 8 inch compacted lifts. We recommend that the base of cut be compacted prior to fill placement. We recommend that a Mas-Tek Engineer or his representative observe the base of cut and compaction operations. MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 4 The contract documents should specify that the contractor is responsible to protect all existing underground utilities from damage during excavation and compaction operations. After excavation to the required subgrade elevation, the entire subgrade should be proofrolled. Proofrolling can generally be accomplished using a heavy (25 ton or greater total weight) pneumatic tired roller making several passes over the areas. Where soft, loose or compressible zones are encountered, these areas should be removed to a firm subgrade. Wet or very moist surficial materials may need to be undercut and either dried or replaced with proper compaction or replaced with suitable on -site limestone which can be properly compacted. Any resulting void areas should be backfilled to finished subgrade in 8 inch compacted lifts as specified in this report. After proofrolling is performed and any soft, loose or compressible zones are removed and replaced, compact upper 8 inches of subgrade as specified herein. Then fill to pavement subgrade using on -site crushed limestone as specified in this report. 5.3 SUBGRADE PREPARATION It is recommended that provisions be made in the contract documents to provide for proofrolling in areas where the subgrade will support new pavements. It is also recommended that an item be included for removal and replacement of soft materials which are identified by this procedure. 5.4 LIME STABILIZATION Lime stabilization is not required beneath the pavement if all fill placed above the top of the RCB consists of crushed on -site limestone having a maximum rock size of 6 inches. Compact crushed limestone in 8 inch lifts at -2% to +2% of optimum to 98% ASTM D698. 5.5 DESIGN AND CONSTRUCTION REQUIREMENTS Inspection during construction is particularly important to insure proper construction procedures are followed. All joints must be effectively seated. Ponding conditions should not be allowed in any area. Where asphaltic concrete pavement is used, a geotextile separator should be placed on the compacted rock subgrade at the contact between the flex base and the compacted rock MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 5 subgrade. The geotextile shall be as specified in the "Special Technical Specifications" in Appendix C of the City of Fort Worth's 2005 Pavement Design Standards Manual. 5.6 PAVEMENT SECTION RECOMMENDATIONS The pavement section recommendations provided below were designed based upon AASHTO Guide for Design of Pavement Structures using DARWin 3.1 computer program. A summary of the inputs are provided below: 5.6.1 RESIDENTIAL -URBAN (HIGH VOLUME) Design E 18's: Concrete Pavement 875,000 (35,000 ESALs / year for 25 years with 0.0% growth rate) Initial Serviceability: 4.5 Terminal Serviceability: 2.25 Modulus of Rupture: 550 psi (3,600 psi Concrete) Elasticity Modulus: 3,712,500 psi Effective k-value: 200 psi/in - for 8 inches of lime -stabilized subgrade Reliability Level: 85% Standard Deviation: 0.35 Load Transfer J: 3.2 Drainage Coefficient: 1.0 Asphalt Pavement Design E 18's: 875,000 (35,000 ESALs / year for 25 years with 0.0% growth rate) Initial Serviceability: 4.2 Terminal Serviceability: 2.0 Soil Resilient Modulus: 4,118 (untreated subgrade — CBR of 3) Reliability Level: 80% Overall Deviation: 0.45 MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 6 The following Table presents the recommended pavement section for the residential roads: RECOMMENDED PAVEMENT SECTIONS * CITY OF FORT WORTH RESIDENTIAL -URBAN (High Volume) PCC SECTION 7 inch Portland Cement Concrete (3,600 psi Concrete) Compacted Rock Subgrade HMAC SECTION 2 inch Type C Surface Course 4 inch Type B Binder Course (2 lifts) 8 inch Crushed Stone Flex Base or Crushed Concrete Base (2 lifts) Compacted Rock Subgrade * -The recommended pavement sections above include a small construction tolerance. 5.6.2 DESIGN REQUIREMENTS The concrete having a minimum 28 day compressive strength of 3,600 psi. Concrete quality will be important in order to produce the desired flexural strength and long term durability. Assuming a nominal maximum aggregate size of 1 inch to 1 3/8 inches, we recommend that the concrete have entrained air of 5 percent (± 1%) with a maximum water cement ratio of 0,40, Proper joint placement and design is critical to pavement performance. Load transfer at all joints and maintenance of watertight joints should be provided. Control joints should be sawed as soon as possible after placing concrete and before shrinkage cracks occur. All joints including sawed joints should be properly cleaned and sealed as soon as possible to avoid infiltration of water. The joint construction and spacing and reinforcing should be in accordance with the City of Fort Worth's 2005 Pavement Design Standards Manual based on the actual concrete thickness used for each road. We recommend that the perimeter of the pavements have a stiffening curb section to prevent possible distress due to heavy wheel loads near the edge of the pavements and to provide channelized drainage. All asphaltic concrete construction should comply with requirements of TxDOT, Item 340 (1993 Edition). The flex base should meet requirements of TxDOT Item 247, Type D, Grade MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 7 1, compacted in 4 to 6 inch lifts at or above optimum moisture content to a minimum of 95% Modified Proctor density (ASTM D1557). 5.7 PAVEMENT CONSIDERATIONS It is recommended that provisions be made in the contract to provide for proofrolling in areas where the subgrade will support new pavements. It is also recommended that an item be included for removal and replacement of soft materials, which are identified by this procedure. Proofrolling can generally be accomplished using a heavy (25 ton or greater total weight) pneumatic tired roller making several passes over the areas. Where soft or compressible zones are encountered, these areas should be removed to a firm subgrade. Wet or very moist surficial materials may need to be undercut and either dried or replaced with proper compaction or replaced with the specified subbase material. Any resulting void areas should be backfilled to finished subgrade in 6 inch compacted lifts as specified in this report. Achieving the required field density is dependent upon the adequate pulverization of the fill materials, the magnitude of compaction energy and the maintenance of field moisture near optimum. All joints and pavements should be inspected at regular intervals to ensure proper performance and to prevent crack propagation. The service life of paving may be reduced due to water infiltration into subgrade soils through cracks in the paving section. This will result in softening and loss of strength of the subgrade soils. A regular maintenance program to seal paving cracks will help prolong the service life of the paving. The life of the pavement can be increased with proper drainage. Areas should be graded to prevent ponding adjacent to curbs or pavement edges. Backfill materials, which could hold water behind the curb, should not be permitted. Flat pavement grades should be avoided, 5.8 SITE GRADING AND DRAINAGE All grading should provide positive drainage away from the proposed pavements and should prevent water from collecting or discharging near the pavements. Water must not be permitted to pond adjacent to the pavements during or after construction. MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 8 The pavements will be subject to some post construction movement. Joints in the pavements should be sealed to prevent the infiltration of water. Since some post construction movement of pavement may occur, joints should be periodically inspected and resealed where necessary. 5.9 FIELD SUPERVISION AND DENSITY TESTING Field density and moisture content determinations should be made on each lift of fill with a minimum of 1 test per 150 I.f, of pavement and/or utility backfill. Supervision by the field technician and the project engineer is required. Some adjustments in the test frequencies may be required based upon the general fill types and soil conditions at the time of fill placement. Many problems can be avoided or solved in the field if proper inspection and testing services are provided. It is recommended that all site and subgrade preparation and pavement placement be monitored by a qualified engineering technician. Density tests should be performed to verify compaction and moisture content of any earthwork. Inspection should be performed prior to and during concrete and asphalt placement operations. Mas- Tek Engineering & Associates, Inc. employs a group of experienced, well -trained technicians for inspection and construction materials testing who would be pleased to assist you on this project. 6.0 RCB CONSTRUCTION 6.1 TRENCH EXCAVATIONS It is understood that a deep open cut excavation will be performed beneath a 400' long section of Ashland Avenue to allow for construction of a detention vault. It is understood that excavation depths will range from about 10 to 19 feet below the existing ground surface. As indicated on the Boring Logs, soil conditions will vary from clay and calcareous clay soils to limestone strata. The clay soils are jointed (fissured and slickensided). The limestone strata are weathered and/or fractured to the proposed depth of excavation. It is anticipated that groundwater will be encountered within the deep excavation if construction occurs during or after a rainy period. MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 9 For excavation at this site, it will be necessary to employ either sloped excavations or temporary bracing shoring and/or rock bolts for the entire depth of excavation. General guidelines for design are discussed in the following sections. 6.2 OPEN CUTS Recommended slope ratios for the respective soil conditions are presented graphically on Figure 7. Excavations for the entire depth at this site should be cut back as described above. It should be recognized that free standing slopes will be less stable when influenced by groundwater or saturated by rain. Surcharge loads, such as those resulting from excavation spoil, or equipment, should be placed no closer than two feet from the crest of the slope, or in accordance with OSHA regulations. Vehicle traffic should be maintained at least five feet from the edge of the crest. Excavation may encounter non -compact fill soils placed during previous construction of underground utilities. If encountered, these fill soils should be sheeted, shored, and braced, or laid back on slopes no steeper than 1.5 (H): 1(V). The contractor will need to take measures to avoid undermining and damaging the existing underground utilities. See Section 6.4. Note: The temporary slope ratios shown on Figure 7 are not intended to prevent sloughing of sidewalls. They are intended to prevent a total collapse of the excavation sidewalls for the protection of workers within the excavation. See Section 6.4. 6.3 TRENCH BRACING / BORE PIT SHORING Where site limitations require excavations to have vertical side walls, an internal bracing system will be necessary. Bracing may consist of timber or steel shoring with hydraulic struts or manufactured steel trench braces. The lateral pressure distribution to be used in the design of the bracing may be determined as presented on Figure 8. It should be recognized that pressures are not included from hydrostatic pressures, surcharge loads, or traffic live loads at excavation side walls, dynamic loads, and vibration, which if present, must be included in bracing design. In lieu of a shoring system, a trench shield consisting of a prefabricated rigid steel unit adequate to withstand anticipated lateral pressures may be used. MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 10 Note: Braced excavations may be subject to some lateral movement. The purpose of the shoring is to protect workers within the excavation from a collapse of the excavation sidewalls. See Section 6,4. 6.4 PROTECTION OF EXISTING FEATURES Due to the depth of the proposed excavation and the presence of unstable soils and unstable rock (weathered and fractured limestone) in combination with anticipated groundwater levels above the excavation depths, measures must be taken to protect existing features (driveways, sidewalks, irrigation lines, and existing utility lines). Even if hydraulic struts and shoring are used, sloughing of vertical sidewalls could occur prior to installation of the shoring and securing the hydraulic struts. Where sloughing of the excavation sidewall would disturb or damage existing features, reinforced shotcrete in combination with tie back anchors, soil nails, and /or rock bolts should be used to stabilize the excavation. Note: The construction documents should require the contractor to take all necessary measures to protect all existing features and that any damaged features must be repaired and/or replaced by the contractor at no cost to the city. 6.5 DEWATERING Groundwater was not encountered within the borings at the time of this investigation. Shallow groundwater levels should be anticipated after periods of rainfall (especially near creeks or other existing utility excavations). In areas where groundwater is encountered, a system of ditches, sumps and pumping will be required to provide groundwater control. The design of the actual dewatering system required is the contractor's responsibility. This includes the control of tail -water flow through previous backfilled utility lines or from leaking existing irrigation lines or utility lines. 6.6 CONSTRUCTION CONSIDERATIONS The following guidelines are presented to aid in the development of the excavation plans: • Surface areas behind the crest of the excavations should be graded so that surface water does not pond within 15 feet of the crest, nor drain into the excavation. MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 11 • Heavy material stockpiles should not be placed near the crest of slopes per OSHA requirements. Similarly, heavy construction equipment should not pass over or be parked within 5 feet of the crest. • The crest of slopes should be continually monitored for evidence of movement or potential problems. Freestanding slopes will become less stable when influenced by groundwater or saturation by rain. 6.7 RCB DESIGN The RCB should be placed on a minimum of 8 inches of suitable clean hard durable "Chico" bedding stone from the Bridgeport Texas, area (1 inch nominal size). Compact in maximum 8 inch lifts to 80% relative density (ASTM D4253). After excavation to the required depth, the excavation should be inspected by a Mas-Tek engineer. Compact disturbed rock surface to 98% ASTM D698 at -2% to +2% of optimum. Note: If a clay layer is exposed within the limestone at the excavation subgrade, remove clay layer and replace with crushed on -site limestone (maximum 6 inch size) or crushed bedding stone. Compact in 8 inch lifts as specified herein. Allowable Bearing Capacity: Estimated Settlement of RCB: Estimated Pavement Settlement: 5000 psf Tess than 1 inch 1 inch plus 1 % of fill height below pavement The below grade RCB walls should be designed for a drained at -rest pressure of 60 pcf EFP. This assumes only crushed on -site limestone, low PI select fill (clayey sand with PI of 5 to 14) or crushed "Chico" bedding stone is used as backfill behind the walls and within a 45 degree wedge beginning at the top of the tan weathered limestone. Note: If select material is not placed in a 45 degree wedge described above, the drained at rest pressure within the upper 5 feet should be increased to 80 pcf EFP. See Section 6.8. Measures should be provided to assure drainage behind the culvert walls using a minimum of 12 inches of clean free draining "Chico" stone (1 inch nominal size). Compact "Chico" bedding stone in 8 inch lifts to 80% relative density (ASTM D4253). The select fill, crushed rock and free draining stone backfill should be covered with a minimum of 18 inches of clay soil compacted in 6 inch lifts to 95% ASTM D698 (at optimum to +3 above optimum). A free draining geotextile should be used to totally encapsulate the free draining "Chico" stone backfill. Weep holes should be provided in the culvert walls to allow drainage of the backfill. Surcharge loads and traffic live loads should be included for design of the below grade RCB walls. MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 12 If the detention vault is to be designed for undrained conditions, an undrained at -rest pressure of 92 pcf EFP should be used assuming select fill or crushed rock is used as backfill behind the walls and within a 45 degree wedge beginning at the top of the tan weathered limestone. Note: If vertical cuts are made and select material is not placed in a 45 degree wedge described above, the undrained at -rest pressure within the upper 5 feet should be increased to 102 pcf EFP. Note: If the structure is designed for undrained conditions, it should also be checked for buoyancy assuming the groundwater level rises to the ground surface (unless measures are taken to prevent the possibility of buoyancy). 6.8 RCB BACKFILL The excavated on -site crushed limestone free of rock larger than 6 inches can be used for backfill behind the walls, Low PI select fill (clayey sand with PI of 5 to 14) may also be used. In any event, free draining "Chico" stone should be used to provide drainage per Section 6.7. The backfill should be placed in thin compacted lifts as specified below. The fill materials should be free of surficial vegetation or debris. Compact in 8 inch horizontal loose lifts to at least 95 percent of the maximum dry density as determined by ASTM D-698 test method. The fill should be compacted at -2% to +2% of the optimum moisture content. For fill depths below 10 feet and 20 feet depths respectively, the compaction level should be increased to 98% and 100% ASTM D698, respectively, where it is desired to reduce post -construction settlements. The deeper fill should be compacted at - 2% to +2% of optimum moisture content. Anticipated settlements are estimated to be 1 % of the fill height. 6.9 FIELD SUPERVISION AND DENSITY TESTING Field density and moisture content determinations should be made on each lift of fill with a minimum of one test per lift per every 150 linear feet of trench backfill. Many problems can be avoided or solved in the field if proper inspection and testing services are provided. It is recommended that site preparation, concrete placement, and fill compaction be monitored by a qualified engineering technician. Density tests should be performed to verify compaction and moisture content of any earthwork. Mas-Tek Engineering and Associates, Inc. employs a group of experienced, well trained technicians for inspection and construction materials testing who would be pleased to assist you on this project. MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 13 7.0 LIMITATIONS The professional services, which have been performed, the findings obtained, and the recommendations prepared were accomplished in accordance with currently accepted geotechnical engineering principles and practices. The possibility always exists that the subsurface conditions at the site may vary somewhat from those encountered in the test borings. The number and spacing of test borings were chosen in such a manner as to decrease the possibility of undiscovered abnormalities, while considering the nature of loading, size, and cost of the project. If there are any unusual conditions differing significantly from those described herein, Mas-Tek Engineering & Associates, Inc. should be notified to review the effects on the performance of the recommended foundation system. The recommendations given in this report were prepared exclusively for the use of the client, and their consultants. The information supplied herein is applicable only for the design of the previously described development to be constructed at locations indicated at this site and should not be used for any other structures, locations, or for any other purpose. We will retain the samples acquired for this project for a period of 30 days subsequent to the submittal date printed on the report. After this period, the samples will be discarded unless otherwise notified by the owner in writing. MAS-TEK ENGINEERING & ASSOCIATES E12-0603 PAGE 14 Mtas- rEIc Engineering R Associates. Inc. Project No: E12-0603 • PLAN OF BORINGS ASHLAND AVENUE PAVEMENT RECONSTRUCTION & FIGURE NO: STORM WATER DETENTION VAULT 1 FT. WORTH, TEXAS LOG OF BORING B-1 Project: Ashland Avenue - Ft. Worth, Texas Date: 07/05/2012 Elev.: 645.5± Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: was: Depth to caving when checked: was: I ELEVATION/ I DEPTH (teet1 0 645 -5 640 10 635 - 15 630 • - 20 625 - 25 620 - - 30 615- - 35 610 - SOIL SYMBOLS SAMPLER SYMBOLS & FIELD TEST DATA 7/6 15/6 50/4" 50/5" 50/2" 50/4.75" 50/3" 50/1.25" 50/0.75" DESCRIPTION 6" ASPHALT over 5" aravellv CLAY (FILL) Brown CLAY w/ calcareous nodules, slickensided Moderately hard to hard tan weathered LIMESTONE w/ clay layers, fractured Hard dark gray shalev LIMESTONE w/ fractured tan weathered seams Boring terminated at 15' Project No.: E12-0603 MC LL PL PI -200 DO P PEN UNCON Strain % % pct. lst kst 22 11 54 17 37 2.6 3.6 3.0 3.9 Notes: FIGURE:2 MTE, INC LOG OF BORING B-2 Project: Ashland Avenue - Ft. Worth, Texas Date: 07/05/2012 Elev.: 652.5± Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: was: Depth to caving when checked: was: ELEVATION/ I DEPTH (feet) 650 - 645 640 - 635 - 630- 625 620 0 -5 -10 15 - 20 25 - 30 - 35 SOIL SYMBOLS SAMPLER SYMBOLS & FIELD TEST DATA 141 5/6 5/6 14/6 50/4 5' 50/4.25" 50/2 25" 50/0 5" 50/0 25" 50/0 25' 50/0.25" 50/0.75" 50/0.5" 50/0.75" 50/0.5' DESCRIPTION Project No.: E12-0603 MC LL PL PI -200 DO P.PEN UNCON Slraln % % pcf tsf ksf % 4" ASPHALT over 4" CONCRETE and 4" gravelly CLAY `(FILL) / 11i- 32 14 18 3.9 Tan calcareous CLAY w/ limestone fragments, 14 27 13 14 122 4.0 slickensided Moderately hard to hard tan weathered LIMESTONE w/ some clay layers, fractured Very hard light gray LIMESTONE -w/ fractured tan weathered seams to 19' Hard dark gray shaley LIMESTONE Boring terminated at 30' 4,0 Notes: FIGURE:3 MTE, INC. KEY TO LOG TERMS & SYMBOLS Symbol Description Symbol Description Strata symbols ■ Asphaltic Paving Calcareous CLAY LIMESTONE, weathered Shaley LIMESTONE Limestone Soil Samplers X Notes: Rock Core Auger Thin Wall Shelby Tube Standard Penetration Test THD Cone Penetration Test 1. Exploratory borings were drilled on dates indicated using truck mounted drilling equipment. 2. Water level observations are noted on boring logs. 3. Results of tests conducted on samples boring logs. Abbreviations used are: DD = natural dry density (pcf) MC = natural moisture content (%) Uncon.= unconfined compression (tsf) P.Pen.= hand penetrometer (tsf) recovered are reported on the LL = liquid limit (%) PL = plastic limit (%) PI = plasticity index -200 = percent passing #200 4. Rock Cores REC = (Recovery) sum of core sample recovered divided by length of run, expressed as percentage. RQD = (Rock Quality Designation) sum of core sample recovery 4" or greater in length divided by the run, expressed as percentage. FIGURE:4 MTE, INC. BORING DEPTH DRY IN -SITU FINAL LOAD NO. (FEET) DENSITY MOISTURE MOISTURE VERTICAL (pcf) CONTENT CONTENT SWELL B-1 1-2 114.1 21.6 25.4 188 3.8 B-2 2-3 121.5 14.4 14.9 313 0.5 PROCEDURE: 1. Sample placed in confining ring, design load (including overburden) applied, free water with surfactant made available, and sample allowed to swell completely. 2. Load removed and final moisture content determined. I .s TEK Engineering ECK Associates, Inc. E12-0603 DATE: 07/16/2012 SWELL TEST RESULTS ASHLAND AVENUE FT. WORTH, TEXAS MAS-TEK ENGINEERING & ASSOCIATES FIGURE: 5 SOLUBLE SULFATES PPM TEST RESULTS DEPTH SOLUBLE BORING NO. (FT.) SULFATES (PPM) B-1 1-2 292 B-2 1-2 280 K Engineering saciates, Inc. SOLUBLE SULFATES TEST RESULTS ASHLAND AVENU E FT. WORTH, TEXAS MAS-TEK ENGINEERING & ASSOCIATES E12-0603 I DATE: 07/16/2012 I FIGURE: 6 RECOMMENDED TEMPORARY SLOPE RATIOS SOIL / ROCK Gravelly sand, sand, clayey sand, silty sand, and soft clay (hand penetrometer of 0.9 tsf or less) Submerged soils, weathered rock and/or fractured rock (limestone) from which water is seeping * Stiff to hard clay, sandy clay and/or weathered Limestone above existing groundwater level Gray limestone with fractured tan weathered seams q. Short Term Long Term 11 Bedding (under 8 hours) (over 8 hours) Cut H V H V Z (ft.) 1-1,4 1 2 1 0 1-1/z 1 2 1 0 1 1 1 1 2** 1 1 1 1 2** � ax * In accordance with the best interpretation of OSHA regulations, submerged soil is defined as water bearing granular soils, fissured clay soils, fractured weathered rock (shale or limestone) or soil from which groundwater is seeping, ** Maximum bedding cut for trench excavations fess than 12 feet deep in dry soil and rock which are open less than 8 hours. NOTE: Recommended slope ratios may be subject to reduced stability under the influence of groundwater or saturation by rain. 7♦, Mi►s TFrc Engineering & Associates, Inc. ASHLAND AVENUE RECOMMENDED FT. WORTH, TEXAS SLOPE RATIOS DATE: July 16, 2012 PROJECT NO: E12-0603 FIGURE 7 LATERAL EARTH PRESSURES FOR INTERNALLY BRACED EXCAVATIONS (For excavations terminating in limestone) Excavation Bottom WHERE: I I Ground Surface li/4 s-- 11/2 sh = Lateral Earth Pressure, psf. g = Saturated Unit Weight of Soil; Use 130 pcf for Stiff to Hard Clay and 140 pcf for Weathered or Fractured Limestone H = Height of Excavation (ft.) k = Earth Pressure Coefficient, Use 0.30 for Stiff to Hard Clay and Weathered or Fractured Gray Limestone NOTES; 1) If water is not allowed to drain from behind shoring or bracing, full hydrostatic pressure must be considered. 2) Surcharge loads and traffic live loads, if present, must also be considered. 1•9ns Te►c (Engineering & Associates. Inc. ASHLAND AVENUE FT. WORTH, TEXAS LATERAL EARTH PRESSURES DATE: July 16, 2012 PROJECT NO: E12-0603 FIGURE 8 GC-6.06.D Minority and Women Owned Business Enterprise Compliance THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 FORT WORTH City of Fort Worth Minority Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is greater than $50,000, then a MBE subcontracting goal may be applicable. If the total dollar value of the contract is $50,000 or less, then an MBE subcontracting goal is not applicable. POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current Business Diversity Enterprise Ordinance applies to this bid. The City's MBE goal on this project is MBE PROJECT GOALS °A) of the total bid (Base bid applies to Parks and Community Services). Note: If both MBE and SBE subcontracting goals are established for this project, then an Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be deemed responsive. COMPLIANCE TO BID SPECIFICATIONS On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are required to comply with the intent of the City's Business Diversity Enterprise Ordinance by one of the following: 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or; 3. Good Faith Effort documentation, or; 4. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall deliver the MBE documentation in person to the appropriate employee of the managing department and obtain a date/time receipt. Such receipt shall be evidence that the City received the documentation in the time allocated. A faxed copy will not be accepted. 1. Subcontractor Utilization Form, if goal is met or exceeded: 2. Good Faith Effort and Subcontractor Utilization Form, if participation is less than stated goal: 3. Good Faith Effort and Subcontractor Utilization Form, if no MBE participation 4. Prime Contractor Waiver Form, if you will perform all subcontracting/supplier work: 5. Joint Venture Form, if utilize a joint venture to met or exceed goal. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. received by 5:00 p.m., five (5) City business days after the bid opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE, WILL RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE TO SPECIFICATIONS Any questions, please contact the M/WBE Office at (817) 212-2674. Rev. 5/30/12 ATTACHMENT 1A Page 1 of 4 FORT WORTH City of Fort Worth MBE Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime PROJECT NAME: City's MBE Project Goal: NON-M//WDBE BID DATE Prime's MBE Project Commitment: PROJECT NUMBER Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non -responsive to bid specifications MBEs listed toward meeting the project goal must be located in the six (6) county marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Dallas, Denton, Johnson, Parker, and Wise counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1st tier, a payment by a subcontractor to its supplier is considered 2nd tier ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located within the Marketplace, that have been determined to be a bondafide minority business enterprise by the North Central Texas Regional Certification Agency (NCTRCA) or other certifying agencies that the City may deem appropriate and accepted by the City of Fort Worth. If hauling services are utilized, the prime will be given credit as long as the MBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The MBE may lease trucks from another MBE firm, including MBE owner -operators, and receive full MBE credit. The MBE may lease trucks from non -MBEs, including owner -operators, but will only receive credit for the fees and commissions earned by the MBE as outlined in the lease agreement. Rev. 5/30/12 i'OR C WORTH ATTACHMENT 1A Page 2 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non -MBEs. MBE firms are to be listed first, use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE, please attach a copy of the firm's SBE certification if they have not previously registered with the City's M/WBE Office, which may be contacted for verification. Please note that only certified MBEs will be counted to meet an MBE goal. SUBCONTRACTOR/SUPPLIER Company Name Address Telephone/Fax T e Attach NCTRCA Certificate n M W B B E E LI Detail Subcontracting S M Work B B E E Detail Supplies Purchased Dollar Amount Rev. 5/30/12 FORTRT WORTH ATTACHMENT 1A Page 3 of 4 it I I I I II I I II I I �J Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non -MBEs. Please list MBE firm's first, use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE, please attach a copy of the firms SBE certification if they have not previously registered with the City's M/WBE Office which may be contacted for verification. Please note that only certified MBEs will be counted to meet an MBE goal. Attach NCTRCA Certificate SUBCONTRACTOR/SUPPLIER T Detail Detail Company Name i Subcontracting Supplies Address e M W S M Work Purchased Telephone/Fax r B B B B E E E E ❑ 1 n ❑ Dollar Amount Rev. 5/30/12 ATTACHMENT 1A Page 4 of 4 Total Dollar Amount of MBE Subcontractors/Suppliers Total Dollar Amount of Non -MBE Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office through the submittal of a Request for Approval of Change/Addition form. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed MBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) and any special arrangements with MBEs. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work performed by the MBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of the contract and may result in a determination of an irresponsible Offeror and debarment from participating in City work for a period of time not Tess than one (1) year. Authorized Signature Printed Signature Title Contact Name/Title (if different) Company Name Telephone and/or Fax Address E-mail Address City/State/Zip Date Rev. 5/30/12 ATTACHMENT 1B FORT WORTH Page 1 of 1 City of Fort Worth PRIME COMPANY NAME: PROJECT NAME: City's MBE Project Goal: % Prime Contractor Waiver Form Check applicable block to describe prime El ❑ NON-M//WDBE BID DATE Prime's MBE Project Commitment: PROJECT NUMBER OA If both answers to this form are YES, do not complete ATTACHMENT 1C (Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1 C. This form is only applicable if both answers are yes. Failure to complete this form in its entirety and be received by the Managing Department on or before 5:00 P.m., five (5) City business days after bid opening, exclusive of the bid opening date, will result in the bid being considered non -responsive to bid specifications. Will you perform this entire contract without subcontractors? If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO YES NO YES The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) on this contract, the payment therefore and any proposed changes to the original MBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. Authorized Signature Printed Signature Title Contact Name (if different) Company Name Phone Number Address Email Address City/State/Zip Date Fax Number Rev. 5/30/12 FORT WORTH PRIME COMPANY NAME: PROJECT NAME: City's MBE Project Goal: City of Fort Worth MBE Good Faith Effort Form Prime's MBE Project Commitment: ATTACHMENT 1C Page 1 of 3 Check applicable block to describe prime NON-M//WDBE BID DATE PROJECT NUMBER IIf the Offeror did not meet or exceed the MBE subcontracting goal for this project, the Offeror must complete this form. If the Offeror's method of compliance with the MBE goal is based upon demonstration of a "good faith effort", the Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 11 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Offeror. Failure to complete this form, in its entirety with supporting documentation, and it being submitted to and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a MBE or non -MBE. (DO NOT LIST NAMES OF FIRMS) On all projects, the Offeror must list each subcontracting and or supplier opportunity regardless of tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Rev. 5/30/12 ATTACHMENT IC Page 2 of 3 2.) Obtain a current (not more than two (2) months old from the bid open date) list of MBE subcontractors and/or suppliers from the City's M/WBE Office or the City's website. _R_Yes No Date of Listing 3.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? ❑ Yes (If yes, attach MBE mail listing to include name of firm and address and a dated copy of letter mailed.) —FT-No 4.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? _FEYes (If yes, attach list to include name of MBE firm, person contacted, phone number and date and time of contact) No 5.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by facsimile (fax), exclusive of the day the bids are opened? n Yes (if yes, attach list to include name of MBE firm, fax number and date and time of contact. In addition, if the fax is returned as undeliverable, then that "undeliverable confirmation" received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation and/or "undeliverable confirmation" documentation may render the GFE non -responsive.) n No 6.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? n Yes ❑ No (If yes, attach email confirmation to include name of MBE firm, date and time. in addition, if an email is returned as undeliverable, then that "undeliverable message" receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation and/or "undeliverable message" documentation may render the GFE non- responsive.) NOTE: The four methods identified above are acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Offeror must document that either at least two attempts were made using two of the four methods or that at least one successful contact was made using one of the four methods in order to be deemed responsive to the Good Faith Effort requirement. NOTE: The Offeror must contact the entire MBE list specific to each subcontracting and supplier opportunity to be in compliance with questions 3 through 6. 7.) Did you provide plans and specifications to potential MBEs? n Yes n No 8.) Did you provide the information regarding the location of plans and specifications in order to assist the MBEs? 4+Yes No Rev. 5/30/12 ATTACHMENT 1C Page 3 of 3 9. Did you prepare a quotation for the MBEs to bid on goods/services specific to their skill set? Yes (If yes, attach all copies of quotations.) No 10. Was the contact information on any of the listings not valid? Yes (If yes, attach the information that was not valid in order for the M/WBE Office to address the corrections needed.) n No 11.)Submit documentation if MBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the MBE was rejected and any supporting documentation the Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Offeror will provide for confidential in -camera access to and inspection of any relevant documentation by City personnel. (Please use additional sheets, if necessary, and attach.) Company Name Telephone Contact Person Scope of Work Reason for Rejection ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain MBE participation on this project. The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance shall create a material breach of Rev. 5/30/12 ATTACHMENT IC Page 4 of 3 contract and may result in a determination of an irresponsible offeror and debarment from participating in City work for a period of time not Tess than one (1) year. The undersigned certifies that the information provided and the MBE(s) listed was/were contacted in good faith. It is understood that any MBE(s) listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's M/WBE Office. Authorized Signature Title Company Name Address City/State/Zip Printed Signature Contact Name and Title (if different) Phone Number Email Address Date Fax Number Rev. 5/30/12 Joint Venture Page 1 of 3 FORT WORTH CITY OF FORT WORTH MBE Joint Venture Eligibility Form All questions must be answered; use "N/A" not applicable. Name of City project: A joint venture form must be completed on each project RFP/Bid/Purchasing Number: 1. Joint venture information: Joint Venture Name: Joint Venture Address: (If applicable) Telephone: Facsimile: Cellular: E-mail address: Identify the firms that comprise the joint venture: Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the joint venture MBE firm Non -MBE firm name: name: Business Address: Business Address: City, State, Zip: Telephone Facsimile E-mail Cellular Certification Status: Name of Certifying Agency: City, State, Zip: Telephone Cellular E-mail address Facsimile 2. Scope of work performed by the Joint Venture: Describe the scope of work of the MBE: ; Describe the scope of work of the non -MBE: Rev. 5/30/12 Joint Venture Page 2 of 3 3. What is the percentage of MBE participation on this joint venture that you wish to be counted toward meeting the project goal? 4. Attach a copy of the joint venture agreement. 5. List components of ownership of joint venture: (Do not complete if this information is described in joint venture agreement) Profit and loss sharing: Capital contributions, including equipment: Other applicable ownership interests: 6. Identify by name, race, sex and firm those individuals (with titles) who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: a. Estimating b. Marketing and Sales c. Hiring and Firing of management personnel d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Minority and Women Business Enterprise Office will review your joint venture submission and will have final approval of the MBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's M/WBE Office immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's BDE Ordinance. Rev. 5/30/12 Joint Venture Page 3 of 3 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work, decision -making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits, interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful misrepresentation of facts. Name of MBE firm Name of non -MBE firm Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Title Title Date Date Notarization State of County of On this day of , 20 , before me appeared and to me personally known and who, being duly sworn, did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public Signature Commission Expires (seal) Rev. 5/30/12 GC-6.07 Wage Rates THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 7/812008 DATE: Tuesday, July 08, 2008 LOG NAME: 30WAGE RATES REFERENCE NO.: **G-16190 SUBJECT: Adopt 2008 Prevailing Wage Rates for City -Awarded Public -Works Projects RECOMMENDATION: It is recommended that the City Council adopt the attached 2008 Prevailing Wage Rates for City -awarded public works projects. DISCUSSION: Texas Government Code Chapter 2258 requires that a public body awarding a contract for public works shall determine the general prevailing rate of per diem wages for each craft or type of worker needed to execute the contract, and shall specify In the bid documents and in the contract the prevailing wage rates in that locality. Each year The Quoin Chapter of the Associated General Contractors, in conjunction with the Association of Builders and Contractors (ABC) and the American Sub -Contractors Association (ASA), conducts a wage rate survey for North Texas construction. The attached 2008 Prevailing Wage Rate data was compiled from that survey. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that this action will have no material effect on City funds. TO Fund/Account/Centers FROM Fund/Account/Centers Submitted for City Manaaer's Office byi, Fernando Costa (8476) Oriainatina Department Head: A. Douglas Rademaker (6157) Additional Information Contact: Eric Bundy (7598) HEAVY & HIGHWAY CONSTRUCTION PREVAILING WAGE RATES 2008 Air Tool Operator Asphalt Distributor Operator Asphalt Paving Machine Operator Asphalt Raker Asphalt Shoveler Batching Plant Weigher Broom or Sweeper Operator Bulldozer Operator Carpenter Concrete Finisher, Paving Concrete Finisher, Structures Concrete Paving Curbing Machine Operator Concrete Paving Finishing Machine Operator Concrete Paving Joint Sealer Operator Concrete paving Saw Operator Concrete Paving Spreader Operator Concrete Rubber $10.06 $13.99 $12.78 $11.01 $ 8.80 $14.15 $ 9.88 $13.22 $12.80 $12.85 $13.27 $12.00 $13.63 $12.50 I $13.56 $14,50 $10.61 Crane, Clamshell, Backhoe, Derrick, Dragline, Shovel Operator $14.12 Electrician $18.12 Fla ger I $ 8.43 Form Builder/Setter, Structures $11.63 Form Setter, Paving & Curb $11,83 Foundation Drill Operator, Crawler Mounted $13,67 Foundation Drill Operator, Truck Mounted $16.30 Front End Loader Operator $12.62 Laborer, Common I $ 9.18 Laborer, Utility $10.65 Mechanic $16.97 Milling Machine Operator, Fine Grade $11.83 Mixer Operator $11.58 Motor Grader Operator, Fine Grade $15.20 Motor Grader Operator, Rough $14.50 1 Oiler $14.98 1 Painter, Structures $13.17 Pavement Marking Machine Operator $10,04 Pipelayer $11.04 Reinforcing Steel Setter, Paving $14.86 Reinforcing Steel Setter, Structure $16.29 Roller Operator, Pneumatic, Self -Propelled $11.07 Roller Operator, Steel Wheel, Flat Wheel/Tamping $10.92 Roller Operator, Steel Wheel, Plant Mix Pavement $11.28 Scraper Operator $11.42 Servicer $12,32 I Slip Form Machine Operator $12.33 I Spreader Box Operator 1 $10.92 I Tractor Operator, Crawler Type $12.60 I Tractor Operator, Pneumatic $12.91 Traveling Mixer Operator $12.03 Truck Driver, Lowboy -Float $14.93 Truck Driver, Single Axle, Heavy $11.47 Truck Driver, Single Axle, Light $10.91 Truck Driver, Tandem Axle, Semi -Trailer $11.75 Truck Driver, Transit -Mix $12.08 Wagon Drill, Boring Machine, Post Hole Driller Operator $14.00 Welder $13.57 I Work Zone Barricade Servicer $10.09 2008 PREVAILING WAGE RATES CONSTRUCTION INDUSTRY Classification AC Mechanic AC Mechanic Helper Acoustical Ceiling Mechanic Bricklayer/Stone Mason Bricklayer/Stone Mason Helper Carpenter Carpenter Helper Concrete Finisher Concrete Form Builder Drywall Mechanic Drywall Helper Drywall Taper Drywall Taper Helper Electrician (Journeyman) Electrician Helper Electronic Technician Electronic Technician Helper Floor Layer (Resilient) Floor Layer Helper Glazier Glazier Helper Insulator Insulator Helper Laborer Common Laborer Skilled Lather Painter Painter Helper Pipefitter Pipefitter Helper Plasterer Plasterer Helper Hrly Rate Classification $21.69 Plumber $12.00 Plumber Helper $15.24 Reinforcing Steel Setter $19.12 Roofer $10.10 Roofer Helper $16.23 Sheet Metal Worker $11.91 Sheet Metal Worker Helper $13.49 Sprinkler System Installer $13.12 Sprinkler System Installer Helper $14.62 Steel Worker Structural $10.91 Concrete Pump Crane, Ctamsheel, Backhoe, Derrick, D'Line $13.00 Shovel $9.00 Forklift $20.20 Front End Loader $14.43 Truck Driver $19.86 Welder $12.00 Welder Helper $20.00 $13.00 $18.00 $13.00 $14.78 $11.25 $10.27 $13.18 $16.10 $14.83 $8.00 $18.85 $12.83 $17.25 $12.25 $14.90 $10.00 $14.00 $10.00 $16.96 $12.31 $18.00 I $9.00 $17,43 $20.50 $17.76 $12.63 $10.50 $14.91 I 1 $16.06 1 $9.75 GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Water and Sanitary Sewer Replacement Contract 2010 STM-E City Project No. 01494 CAH Ashland Drainage Improvements City Project No. 01918