NOTICE OF PROJECT COMPLETION
._.'�`��Q._�� I
D.O.E. Ns: 7075 �
� ✓
Regaxding contract 44780 for HMAC SURFACE OVERLAY (2013-8) as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on 07/23/2013'
through M&C C-2G352�the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon
the recommendation of the Assistant Dixector oE the Transportation & Public Works Depattment has accepted the
project as complete.
Original Contract Prices:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Wark Completed:
Less Previous Payments:
Final Paymen�Duen
, l � y
Recomr�Sjerided for Acceptance
Asst. Qrector, TPW - Infrastructure Design and Construction
� �...): �--� �
Accepted U � Date
Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
rL//sl�
� (..�� /�29 � S
City Manager Date �
Comments: FLTND ACCTC293-541200-206620123183
��ti/anceci `°•v`� �Gy,u;S;�tio�, L►,U
U
RECEIVED SEP 3 0 2015 �`�°
2 9 P. M. �
��C�1V�D �A� SCAN�IE�
a__ .__:
��'�'dC;:dl� ���(��dL�
�!�'� ���!'���'A���?;" �
�r �"� �1�9�T6�, '�'"�: �
_-_--_ +
$754,602.35'�
$4,453.62'�Ns 1
$759,055.97 ✓
�758,763.70�
Days @ $210.00/ Day
$0.00
✓
$758,763.70
�
$720,065.51
$38,698.19'�
/ Z -/S- 1 �---
Date
�
;:�...�;;� TPW Construction Invoice
Contract: CS44780 P.O. # PO-13-79462 Payment Date: I1l15l2014
TO: �dvanced Paving Acquisition, LTD �v # CS44780. r�N � L. Estimate No. 12 DOE: 7075
DBA Advanced Paving Company 2257 ProjManager Kristian Sugrim
Dallas TX 75229
FOR: HMAC Surface Overlay 2013-8
Contract Amount: $759,055.97
Total to Date: $758,763.70 $0.00 $758,763.70
Previous Estimate: $757,963.70 $37,898.19 $720,065.51
Eamed to Date: 5800.00 (537,898.19) 538,698.19
Payments: --- —_ —
C293-541200-206620213183 $759,055.97 CO#1 -$4,453.62
Totalto Date: $758,763.70 $0.00 $758,763.70
Previous Estimate: $757,963.70 $37,898.19 $720,065.51
Earned to Date: $800.00 ($37,898.19) $38,698.19
14CH F
I N�►L PAY
Thursday, December 18, 2014 Pa e 1 of 1
g
City Project Numbers 02131
Contract Name HMAC SURFACE OVERLAY (2013-8)
Contract Limits AT VARIOUS LOCAT[ONS
Project Type PAVING
Project Funding
Project Manager Sugrim
Inspectors RODGERS / DEYON
Contractor ADVANCED PAVING CO.
2257 JOE FIELD RD.
DALLAS, TX 75229
DOE Number 7075
Estimate Number 12
Payment Number 12
For Period Ending 11/15/2014
City Secretary Contract Number 44780
Contract Date 7/23/2013
Contract Time ll 0 CD
Days Charged to Date 124 CD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Compteted
Departm t of TPW Const. Services L�S % Retained
DOE#_��� Date Net �arned
Pro�ect Manager /%�s l �
Earned This Period `'$38;F48-�8—
Risk Management Joe Pa e -� Retainage This Period -�a:ao;
D.O.E. Brotherton i
CFA Westerman/Scanned ❑ Less Liquidated Damages
0 Days @ $0.00 / Day
The Proceeding people have been Contacted concerning the request LessPuvement Deficiency
for final payment & have released this project for such payment. Less Penalty
Clearance Conducted By Etta Bacy Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
Thursday, November 20, 2014
$758,763.70
$o.00
$758,763.69
$0.00
$0.00
$0.00
$720,065.51
$0.00
$38,698.1 Sri
Page 5 of 5
i
FORTWORT�
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name HMAC SURFACE OVERLAY (2013-8)
Contract Limits AT VARIOUS LOCATIONS
Project Type PAVING
City Project Numbers
DOE Number 7075
Estimate Number 12
02131
Payment Number 12
City Secretary Contract Number 4478U
Contract Date 7/23/2013
For Period Ending 11/15/2014
CD
�P
Project Manager Sugrim
Contructor ADVANCED PAVING CO.
2257 JOE FIELD RD.
DALLAS, TX 75229
Inspectors RODGERS / DEYON
Thursday, November 20, 2014
Contract Time .1-�D t2
Days Charged to Date 124
Contract is 100.00 % Complete
Page 1 of 5
l.� 1 �
CHECKED DEC 0 2 Z014
City Project Numbers 02131
Contract Name HMAC SURFACE OVERLAY (2013-8)
Contract Limits AT VARIOUS LOCATIONS
Project Type PAVING
Project Funding
PAVING
DOE Number 7075
Estimate Number 12
Payment Number 12
For Period Ending I 1/15/2014
Item Description of Items Estimatcd Unit Unit Cost EsHmated Completed Comp►eted
No. Quauity Total Quanity Total
--- ----- _ ----------. _.._---------------------- ---- ----------- _ __ -
1 MISCELLANEOUS ADJUSTMENTS (U1'II.ITIES) i LS $6,000.00 $6,000.00
2 REMOVE/REPLACE CONCRETE CURB & 3450 LF $22.60 $77,970.00 2271.74 $51,341.32
GU'ITER
4 REMOVE / REPLACE CONCRETE DRIVEWAY 6960 SF $6.60 $45,936.00 2974.06 $19,628.80
6 REMOVE/REPLACE 4" CONCRETE SIDEWALK 1732.97 SF $5.00 $8,664.85 1732.97 $8,664.85
(CO # 1)
7 REMOVE/REPLACE CONCRETE VALLEY 50 SY $88.00 $4,400.00 19 $1,672.00
GUTTEIZ
8 8" PAVEMENT PULVERIZAT'ION 4850 SY $4.20 $20,370.00 4800 $20,160.00
9 ROADBOND ENl SOIL STABILIZER 38 GA $120.00 $4,560.00 40 $4,800.00
10 CEMENT MODIFICATION (13LBS/S17 32 TN $100.00 $3,200.00 32.19 $3,219.00
I 1 ASPHALT PAVEMENT AND BASE REPAIR (CO 44.8 CY $220.00 $9,856.00
#1)
12 ASPHALT PAVEMENT LEVEL-UP 30 TN $140.00 $4,200.00
13 PAVEMENT WEDGE MILLING (2" to 0") DEPTH, 7054 SY $1.65 $11,639.10 7336.66 $12,105.49
5' WIDE
14 2" PAVEMEN'I' SURFACE MILLING 23840 SY $1.65 $39,336.00 42253.07 $69,7I7.57
15 BUTI'JOINT-MILLING 6 EA $275.00 $1,650.00 6 $1,650.00
16 CRACK SEALING OF EXISTINC PAVEMENT 122 GA $36.00 $4,392.00 478 $17,208.00
17 2" ASPHALT PAVEMENT TYPE D(CO #1) 52961.51 SY $7.93 £419,984.77 66135.85 $524,457.29
18 WATERVALVEBOXADJUSTMENTS 9 EA $I50.00 $1,350.00
(W/STEEL RISER)
19 WATER VALVE BOX ADJUSTMENTS 5 EA $250.00 $1,250.00 2 $500.00
(W/CONCRETE COLLAR)
20 MISCELLANEOUS STRUCTURE 6 EA $40.00 $240.00
ADJUSTMENTS WATER METER BOX
21 MANHOLE ADJUSTMENTS W/STEEL RISER 10 EA $300.00 $3,000.00
22 MANHOLE ADJUSTMENTS W1TH CONCRETE 10 EA $400.00 $4,000.00 7 $2,800.00
COLLAR
23 PAINTINGHOUSEADDRESSES 80 EA $15.00 $1,200.00 90 $1,350.00
24 BLOCK SOD REPLACEMENT 355 SY $4.95 $1,757.25 303.1 $1,500.35
25 REMOVE / REPLACE 30' SPEED CUSHIONS 15 EA $2,500.00 $37,500.00 4$10,000.00
WITH STRIPPING
26 UNCLASSIFIED STREET EXCAVATION 130 CY $25.00 $3,250.00
27 CRUSHEDLIMESTONE 30 CY $45.00 $1,350.00
Thursday, November 2Q 2014 Page 2 of 5
City Project Number
Contract Name
Contract Limits
Project Type
Project Funding
02131
HMAC SURFACE OVERLAY (2013-8)
AT VAR[OUS LOCATIONS
PAVING
DOE Number 7075
Estimate Number 12
Payment Number 12
For Period Endiog I1/IS/2014
28 MISCELLANEOUS CONSTRUCTION 1 LS $42,000.00 $42,000.00 0.190215 $7,989.03
Sub-Total of Previous Uuit $759,055.97 $758,763.69
Thursday, November 20, 2014 Page 3 of 5
City Project Numbers 02131
Contract Name HMAC SURFACE OVERLAY (2013-8)
Contract Limits AT VARIOUS LOCATIONS
Project Type PAVING
Project Funding
Contract Information Summary
Original Contract Amount
Chan�e Orders
Change Order Number 1
Thursday, November 20, 2014
Total Contract Price
DOE Number 7075
Estimate Number 1z
Payment Number iz
For Period Ending I1/IS/2014
$754,60235
$4,453.62
$759,055.97
Total Cost of Work Completed $758,763.70
Less % Retained $0.00
Net Earned $758,763.69
Earned This Period �38,698.18
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement DeSciency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
so.00
$0.00
$720,065.51
$0.00
$38,698.18
Page 4 of 5
ate / 2 - �5- ��
Direct PW - nfrashucture Design and Construction
L-J- �i✓ ate � z�ls" i�
Director Contracting Dep t
BuySpeed Online
https://bso. fortworthgov.org/bso/document/approval/docApproval. sdo
���
�_� 4 7 11 I� C' Accounts Payable Department Access
NIGP Code Browse � My Account � Customer Servke � Current Organization: CITY OF FORT WORTH January 19, 2015 11:16:44 AM CST /1!! e�
A6out ��
I'o1
Home Doaments l BrandyCrane
�--- -J
Invoice #: CS44780-FINAL Vendor #:0000023239 Vendor Group #:01 Status:41R-ReadyforApprovat [?j
General Items Credffs Subcontractors Accounts Routing Attachments Notes Reminder Change Order Summary Back to PO
. _ _ _ --- - -- - - - -- - -- -- -- - _ - - - ----- - �
- - - -- --. _. _.._--- - _. _ _
General Validation Wamings j
f • Account code 13-C293-541200-206620213183 is in the red by $4,453.00. I
• You are going to final pay the following paRially paid po items :[1, 2]. I
' __ _. -- - ___ _
- _. -- - __ _ i
Header InfoRnation
Invoice Number: CSQa�saFiNn� IfIVO1C0 S�tUS: 41R - Ready for �nvoice Type: 3 way
Approval matching
IIIVOICe D@SCI'IptlOn: CS44780-FINAL HMAC Surface Overlay II1VOlC2 DBtC: 11/15l2014 Effect Date: o�i�sizo�a
201&8
Pa ment Amount: Sse,698.19 Handlin COde: ACH (DIRECT payment Date: �v�oi2o�a
Y 9 DEPOSI�
Payment Terms: Payment Term
Day:
Paid-Bank/Check: Alternate Id:
Entered By: srandy crane Entered Date:
CreditAmount: So.00
Updated By: Brandy Crane
ReceivedDate: osi22i2o�a��:�s:ooaM
Purchase Order Information
Purchase order
Number: Po-�s-000�sasz
PO Amount: $�ss,055.97
PoVendor Information
V211d0I': 0000023239 - ADVANCED PAVING
COMPANY
Vendor Remit-to B�kY Seale
Address: zz57 JOE FIELD RD
ACH ONLY
DALLAS, TX 75229
us
Email: bseale@advancedpavingco.com
Phone:(972)245-0000
Id: 39092
Misc & Freight Invoice Account
0
01/19/2015
Payment
o.o�io
Discount:
Updated Date: ov�sizo�e
PO Description csa47so
Remaining To
Invoice: $Z92_2� Buyer:
Address Grp: o�
Fed ID: •`•"'9367 Remit Te�ct:
Karen Striker
Event Type Fiscal Year Account Code Transadion Amount
Misc 13 C293-205000-000000213100 $37,898.19
Total: $37,898.19
Item Information
Invoice Item #IPO Item #: 1 HMAC Surface Overlay 20138 C293-541200-206620213183 CS44780 M&C: C-26352 Date:072313
1 of 2 1/19/2015 11:16 AM
BuySpeed Online
PO
�tem Status
3PPR - Partial Receipt
MAKE:
ASSET MODEL:
ASSET MANUF:
ASSET SERIAL:
ASSET VIN:
ASSET TA�:
Eve�t Type Fiscal Year
Exp. 15
Enc. 15
https://bso.fortworthgov.org/bso/documendapprovaUdocApproval.sdo
Permit Invoice Discount % Original F(nal
To Pay Amount PayAmount Pay
$0.00 $0.00 0.0% $0.00 Yes
Account Code
C293-541200-206820213183
C293-541200-206620213183
Transaction Amount
$0.00
$0.00
Invoice Item #/PO Item #: 2 CO#1 -$4,453.62 - HMAC Surface Overlay 201&8 C293-54'1200-206620213183 CS44780
PO Permit invoice Discount % Original Ffnal
Item Status To Pay Amount Pay Amount Pay
3PPR - Partial Receipt $0.00 $800.00 0.0% $0.00 Yes
MAKE:
ASSET MODEL:
ASSET MANUF:
ASSET SERIAL:
ASSET VIN:
ASSET TAG:
Event Type Fiscal Year Account Code Transaction Amount
Exp. 13 C293-541200-208620213183 3800.00
Enc. 13 C293-54120a206620213183 -$800.00
Approval Path:
Oelete Approver Order Approval Levei Approver Date Date Approved/D(sapproved Comment
Sequence Path 7ype Requested Approved/Disapproved lCanceled View
IU /Canceled by
Add Primary
New
Add/Delete Apprpver
Print i
Copyright � 2015 Periscope Holdings, Inc. - Ali Rights Reserved. default
2 of 2 1/19/2415 11:16 AM
Page: 1 Document Name: untitled
BC AVAILABLE FUNDS TNQUIRY 162
NEXT FUNCTION: ACTION:
------------------------------------------------------------------------------
------------------------------------------------------------------------------
COMP / ACCT / CNTR ALTERNATE COMP / ACCT / CNTR
C293 205000 000000213100
ACCT DESC: RETAINAGE ORIG APPROPRIATION: 0.00
CNTR DESC: HMAC 2013-8 SURFACE OVERLAY LAST ACTIVITY: 01/17/2015
0.00 NA 0.00
- 0.00 NA - 0.00
- 0.00 NA - 0.00
- 37,898.19- (LIABILITY ) - 0.00
--------------------- ---------------------
= 37,898.19 (AVAIL BAL) = 0.00 (AVAIL BAL)
L OVEREXPEND A E C G
V TOLERANCE BDG YTD P EST N L R ACTIVE INACTIVE
L POST AMT PCT GRP LTD P REV EXP C COMM S P STAT DATE DATE
1 Y 9999 999 L N N Y N N 2 9 0
Date: 01-19-2015 Time: 11:14:02.
AFFIDAVIT
STATE OF Texas
COUNTY OF Dallas
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Sam L. Ganett,
Owner Of Advanced Paving Company, known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
`� i �I
Fort Worth has been paid in full; Q�7ti �i1. �5��j L���CC� �i"1 fi�.
That there are no clauns pending for personal injury and/or
property damages;
On Contract described as;
HMAC Surface Overlay 2013-08
BY v
Sam L. Garrett
Subscribed and sworn before me on this date 1 st of December, 2014.
� l�-t ,:
Not Pu lic
Dall , Texas
,,,,,,,,,
`��RPRYPUB�`r BECKY SEA
:s,� s Notary Public, State of Texas
'��.,c My Commission Exp�res
'�';;Sp��„� 401ober 11, 2016
CONSENT OF
SURETY COMPANY
TO FINAL PAYMENT
Conforms with the American Institute of
Architects, AIA Document G707
OWNER ❑
ARCHITECT ❑
CONTRACTOR ❑
SURETY ❑
OTHER
Bond No 4391993
PROJECT:
(name, add�eSs)HMAC Surface Overlay (2013-8), 02131
Fort Worth, TX
TO (Owner)
�
CITY OF FORT WORTH
1000 Throckmorton Street
Fort Worth TX 76102
� ARCHITECT'S PROJECT N0:
CONTRACT FOR:
HMAC Surface Overlay at Various Locations (2013-8)
� CONTRACT DATE: 7/23/2013
CONTRACTOR: ADVANCED PAVING CO.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(here insert nama and eddress of Surety Company)
SURETEC INSURANCE COMPANY
1330 Post Oak Blvd.
Houston TX 77056 , SURETY COMPANY
on bond of Ihara Insart name and address of Contractor)
ADVANCED PAVING CO.
2257 Joe Field Rd.
Dallas TX 75229-3326 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (hare insert name and address of Owner�
CITY OF FORT WORTH
1000 Throckmorton Street
Fortworth Tx 76102 , OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS, WHEREOF,
the Surety Company has hereunto set its hand this
24th day of October, 2014
�� ���� �
Attest: Don E. Cornell ~��
(Seal): -
SURETEC INSURANCE COMPANY
Su Company
L!/lL� %7LC�7 f %2
Sign ture of Authorized Representative
Sophinie Hunter Attorney-in-Fact
Title
NOTE: This i�rm is to be used es a companion documant to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Currant Edition
ONE PAGE
POA �: 4221097
Sure'I'ec Insux ��c� Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presenis, That SURETEC INSURANCE COMPANY (the "Company"), a corporarion duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Lisa M. Bonnot, Don E. Cornell, Ricardo J. Reyna, V. DeLene Marshali, Sophinie Hunter
its �ue and lawful Attomey-in-fact, with full power and authority hereby conferred in its name, place and stead, to execute, aclrnowledge
and deliver any and all bonds, recognizances, undertakings or other inshuments or con�acts of suretyship to include waivers to the
conditions of contracts and consents of surety for:
Five Million and 00/100 Dollars ($5,000,000.00) ,.
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President, sealed with the corporate
seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attomey-in-Fact may do in the
premises. Said appointment shall continue in force until tvs»zo�s and is made under and by authority of the following
resolutions of the Board of D'uectors of the SureTec Insurance Company:
Be it Resolved, that the President, any Vice-President, any Assistant Vice-President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full po�ver and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company, to execnte, aclrnowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or teaninating the Company's liability thereunder, and any such instruments so executed by any such
Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signahue of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which i[ is attached. (Adopted at a meeting he/d on 20�' of April,
1999.)
In Wimess Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, and its corporate seal
to be hereto affixed this 21 st day of March, A.D. 2013.
����� SURETEC INSURANCE COMPANY
�,y+s'SVRANp�a,r
�� \� ,... .. �
��Ur, X �, tO� �y•
~� i n� John os Jr: resident
State of Texas ss: �� W� `� ;'�:
County of Harris �,rs
'^^.m.,ti .a"d'a .
On this 21st day of Mazch, A.D. 2013 before me personally came John Knox Jr., to me ]rnown, who, being by me duly swom, did depose and say, that he
resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed the above
instrument; that be lmows the seal of said Company; that the sea] affixed to said instrument is such corporate seal; that it was so affixed by order of the
Boazd of D'uectors of said Company; and that he signed his name thereto by like order.
��n++ue�, JAC�UELYN MALDONADO
n
Nolary Public
State ot Texas
�''•f or.E*' My Comm. Exp. 5l1812017
Jacq elyn Maldonado, Notary Public
My commission expires May 18, 2017
I, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and coaect copy
of a Power of Attomey, executed by said Company, which is still in ful] force and effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attorney aze in full force and effect.
Given under my hand and the seal of said Company at Houston, Texzs ibis �_ day of (J �c�' , t�U1� , A.D.
. 1, Bre t Beaty, Assistant ecretary
Any instrument issued In excess of the penalty stated above is totall; ��id a�id :without �ny validity.
For verification of the authority of this power you may call (713) 812-Do00 �ny business day between 8:00 am and 5:00 pm CST.
SureTec insurance Company
THIS BOND RIDER CONTAINS IMPORTANT COVERAGE INFORMATION
Statutory Complaint Notice
To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to
make a complaint at: 1-866-732-0099. You may also write to the Surety at:
SureTec Insurance Company
9737 Great Hills Trail, Suite 320
Austin, Tx 78759
You may contact the Texas Department of Insurance to obtain information on companies, coverage, rights or complaints
at 1-800-252-3439. You may write the Texas Department of insurance at:
PO Box 149104
Austin, TX 78714-9104
Fax#: 512-475-1771
Web: http://www.tdi.state.tx.us
Emaii: ConsumerProtecfion@tdi.state.tx.us
PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim, you should
contact the Surety first. If the dispute is not resolved, you may contact the Texas Department of Insurance.
Terrorism Risks Exclusion
The Bond to which this Rider is attached does not provide coverage for, and the surety shall not be liable for, losses
caused by acts of terrorism, riot, civil insurrection, or acts of war.
Exclusion of Liability for
Mold, Mycotoxins, Fungi & Environmental Hazards
The Bond to which this Rider is attached does not provide coverage for, and the surety thereon shall not be liable for,
molds, living or dead fungi, bacteria, allergens, histamines, spores, hyphae, or mycotoxins, or their related products or
parts, nor for any environmental hazards, bio-hazards, hazardous materials, environmental spills, contamination, or
cleanup, nor the remediation thereof, nor the consequences to persons, property, or the performance of the bonded
obligations, of the occurrence, existence, or appearance thereof.
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR & PROJECT DATA
Nanre ofContractor
Advanced Paving Co.
DOE Inspector
G�OLlnspector
❑ Water ❑ Waste Water❑ Storm Drainag� Pavement
Inilia! Caitrac! Anrotm!
$754,602.35
Frnal Contract Anrowr�
$759,055.97
II) PERFORMANCE EVALUATION
Projecf Name
HMAC Surface
DOE N:nnber
7075
Projecl Manager
Kristian Sugrim
Project D�culry
� Simple
1-Dec-14
13-8
QQ Routine
REV: 02/20/07
� Compiex
0- Inadequate 1- Deficient 2- Standazd 3- Good 4- Excellent
�LGMENT WE►GHT ( x) APPLICABLE (Y / N) RATING (0 - 4) MNC SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 3 20 15
3 Plazis on Site 5 Y 3 20 15
4 Field Su ervision I S Y 3 60 45
5 Work Performed I S Y 3 60 45
6 Finished Product IS Y 3 60 45
7 Job Site Safety I S Y 3 60 45
8 Traffic Control Maintenance IS Y 3 60 45
9 Dai(y Clean U 5 Y 3 20 I S
10 Citizen's Complaint Resolution 5 Y 3 20 I S
I1 Property Restoration 5 Y 3 20 IS
12 After Hours Res onse 5 Y 4 20 20
13 Pro'ect Com letion 5 Y 3 20 15
TOTAL ELEMENT SCORE (A) 343
BONUS POINTS (25 Maximt�m) (B)
TOTAL SCOR� (TS) 343
III) CONTRACTOR'S RATING
Masimum Score (MS) = 448 or sum of applicable element score maYimums which = 448
Rati�lg ([TS / MS] * 100%) 343 / 448 = 77%
Performance Category Good
<20% = Inadeqtrate 20% to <40% = Deficient 40% to <60% = Standar•d 60% to <80% = Good >80% = l�ceUent
Inspector's Comments (INCLUDING E�PLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector Signature Contractor
J
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
'TRc1NSPORT�,TION r1ND PUBLIC WORIiS
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
PROJECT INFORMATION
nte ofContractor
ivanced Paving Co.
>E Inspector
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
Date: December
Project Name
HMAC Surface Overla 201
Projecl tifanager
PLANS & SP�CIFICATIONS
1 Accuracy of Plans to Existing Conditions
2 Clarity & Su�ciencv of Detai(s
DOE Ntanber Projecf D�culry Type of Contract
7075 � Simple QQ Routine Q Complex ❑ Water� Waste WaterO Storm Drainag� Pavement
Inilia! Contrnct Ainount Firia! Conb•acl Anrounl
$754,602.35 $759,055.97
II) PERFORMANCE EVALUATION
0- Inadequate 1- Deficient 2- Standard 3- Good 4- Excellent
ELEMEN'C �RA1'ING ELEMENT
ro_a�
INSPECTION EVALUATION
1 Availability of Inspector
2 Knowledge of Inspector
3 Accuracy of Measured Quantities
4 Display Of Professionalism
5 Citizen Complaint Resolution
6 Performance - Setting up Valve Crews, Labs
ADMINISTRATION
1 Change Order Processing Time
2 Timliness of Contractor Payments
3 Bid Opening to P►•e-Con Meeting Timeframe
III) COMMENTS & SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
4 3 Applicability of Specifications
4 Accurac of Plan Quantities
¢ PROJECT MANAGER EVALUATION
1 Knowled e And/Or Problem Resolution
2 Availabilit of Pro'ect Mana er
� 3 Communication
4 4 Resolution of Utilitv Conflicts
REV: 02/22/07
14
RATING
ro_a�
4
TR�INSPORT�ITION t1ND PUBLIC ��ORI{S
���° T1ie City of Fort Wordi • 1000 Thiockmoxton Street • Fort Worth, TX 76012-6311
(817) 392 - 7941 • Fas: (817) 392 - 7845
FORTWORTH�
TRANSPORTATION AND PUBLIC WORKS
STATEMENT OF CONTRACT TIME
STATENIGNT#
FINAL STATC�IGNT# 12
NAME OF PROJECT: HMAC Surface Overiay (2013-8)
YEAR: 2014
PROJECT NO.:
21131
DOE � 7075
Advanced Paving
�INAL INSP�CTION DATE �
j�,(p _ \VD C�
CONTRACT T[ME �
PGRIOD TROD'L• 11/1/2014 TO: 11N5/2014 B�G - blonth DEVELOPNEN7 (1' / l� N
R'ORI< ORDER ErTGCTIVE: 10/15/2013 BEG / n MID / n n
DAY OF MONTH DAYS R�ASON FOR DAY OI' bIONTH DAYS REASON FOR
CHARGGD DAYS CREDITED CHARGGD DAYS CRGD[TGD
1 Sat 0 na 16
2 Sun 0 � na 17
3 Mon 0 na 18
4 Tue 0 na 19
5 Wed 0 na 20
6 Thu 0 na 21
7 Fri 0 na 22
8 Sat 0 na 23
9 Sun 0 na 24
10 Mon 0 na 25
11 Tue 0 na 26
12 Wed 0 na 27
13 Thu 0 na 28
14 Fri 0 na 29
15 Sat 0 na 30
31
NA Wkn 8 Hol Wea Ufl Oth
Not Applicable SAT,SUN,and 4�BATHER UTILITIES OTHERS DAYS TOTAL DAYS
HOLIDAYS RELOCATG CHARGED
THIS PERIOD 0 0 0 0 0 0
PRGVIOUS P�RIOD 0 124 124
TOTAL TO DATE 0 0 0 0 124 124
RGNIARICS: �
All Paving Completed on 2/17, waiting for speed humps and utility concrete pad . Decided not to do speed humps. Project
completed 2/17/14. Will need a Change Order for time (16 days) i r. Next estimate will be final. Change Order
submitted in early August, and has been sitting in fiscal staff's queue. Change rder �pproved on October 20, 2014.
a� fio�a �5 i�wa1 �`� �a �� `�r'�