Loading...
HomeMy WebLinkAboutContract 44752-A1 (2)AMENDMENT No . 1 '��A�' q�p������1�p�°A�j�I �i 1� ' I� � �il1�f A Ifl6''!4l' @ �Iq�v 't'O C17`Y SI�:Cltl�ll`111tY CO�''Plt.1C1` . WIII�:ItI::��, the City of Fort Worth (CITY) and Dunaway Associates, L.P., (ENGINEER) made and entered into City Secretary Contract No. 44752, (CONTRACT) which was authorized by M&C C-26378 on the 6�' day of August, 2013 in the amount of $196,487.00. N'II1�;It1�.;�5, the CONTRACT involves engineering services for the following project: Water Main and Sanitary Sewer Relocations Along F.M. 156 from State Highway 114 to Martin Ranch Road; and W[I1�71t1�]A�, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW 'l`III��RI:I�`ORI:, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: E� Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated December 10, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $15,834.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for___�11_-�ao- k and services sh�aYl be an amoux�t of $212 , 321 �,�0/4�r(� �„r ,I`�`�r��'` >;[�,� � �' \ 'ly I1� I�;�:J�(hiL� ��lL+�k.:kJlf\t- . � C:,�`u�� �ECREVA��.�' !� P��$ -�;�'.'�II�itTH,� ���CEIV�n JAN �� 8 2Q1� 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. 1�7YI�:CU'1`1�7D :titd l�l�`l� I:CI'IVI: as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Dunaway Associates, L.P. ..�---.�- � �� � Fernando Costa Brian S.Da y, P.E. Assistant City Manager Associate DATE : / /.� APPROVAL RECONlD�NDED : L� � S. Frank Crumb, P.E. Director, Water Department DATE: APPROVED AS TO FORM AND M&C: N/A LEGALITY: ��� � ��� ��� � Date : N/A . � W��c.�e��ct^'�.k�� Assistant City Attorney � ATTEST: Mary J. Ka(v)��r f� City Secre ary - "� �� ) � �� �, o � 0 �.�"Opoa000°° ���� � �g� do�� �� Cc�FFIC�AL R�CO�t� � C��'TY SECRETI#IRY �I �'� �N�Ri9�9 � � ���� —�— _--_--- - �, �� 4"�. DA No. BQ00155.003 December 10, 2p13 Mr. Robert Sauceda, P.E. Project Manager City af Fort Worth Water Depai�tment Fort Worth, Texas 76102 Referonce: Amendment Na 1 State Highway 114 Water i_ine Refocakion Part 3 City Project No. 015�5 Dear Mr. Sauceda: -;:����,; Dunaway Associates, l..P. is pleased to present this Amendment Na. 1 for the foilowing additionai services that are beyond aur original scope of services. Relocatian of the City utilities in the area around State Highway � 14 and Farm to Market 156 is to occur prior to TxDOT's road canstruction; however, TxDOT has revealed that kheir schedule for ROVV acquisitian wiil nat be campiete prior to the City's utility construction. This presents a situation where an additionai Permanenf V1/ater Easement and Temparary Construction Easements wilt be needed for the property parcels that have not yet been procured by TxDOT. Additionally, TxbOT has revealed proposed drainage grading outside of fheir future ROW limits which will aff�ct the City's Sanitary 5ewer relocation limits. Dunaway proposes to provide additional easemenk preparation to address TxDOT's RC3W acquisikion timing, We also propase tv provide additional survey and design for the sanitary sewer re-routing needed to address TxDOT's propased drainage grading. These are depicted in the atkached exhibits showing the additional scope beyond the work we already have in our contract, SCOi�E C�F WORK 1. �'ield Topographic Survey for additionai 550 L� oP Sanitary S�wer Line. 2. Design af additional 55Q LF of 5anitary Sewer �.ine. 3, F'r�par�tion of C3n� (�I) �ddiiional Perrnanent Water �a�ement. 4� (�rep�ration r�f Five (5) �rlc�ifional Temporary Canstructi�n Easements. 550 tk�i!�3yAv�nuc�, Sullo 400 -� Fo�t�A'orlh. Tnxas 7G107 ? Tel; a11..33Ci.t 1?.l � Fc�x: OL/,335.7Aa7 � dunrn�nyassoclat�S.com v���rep � Ai�iendmont No. 2 State Highway 114 Water Line Relocation Part 3 December 10, 2013 Page 2 ��E Dun�way proposes to provide the above described scope of work for a LUMP SUM fee of $1 S,a34. Only those servic�s specifically mentioned ln the Scope of Work section are offered as a part of this proposal. A summary of the total praject is as fallaws: Origin�l Contract $196,487 Amendment #1 $ 15 834 Totai Project $212,321 Please r�view the enciosed information and do not liesitate to call m� if you have ar7y questions or require additionai information regarding this praposal. Sincerely, Dl1N�WAY ASSOCIAiES, L.P. � � Br�an Dar y, P.E. Associate f3155•3 Amendinent l!1 Llr • bsd 13-1210.docx _ _ — ___ __.. �ifi� !?ailc>y Avr�nuc, Suilo 4U17 3 Foii `iJodii, fuxc�s Ib 107 y IeC � 1 7 13�i� 1 I 21 ,� P�v,� fi 11.3�6Jd37 ? dunnsyoyc�; c�riqte,s.�ont Task No. Task Description 1-0 Project Management 12.0 I 3.0 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.7 3.1.8 3.1.9 3.2 3.3 I4.0 15.0 16.0 17.0 7.1 18.0 Survey 8.1 Design Survey (550 LF) Description Conceptual Desp (30%) Prelimina Design (60 0) Final Design (10%) Survey Subtotal Total City of Fort Worth. Texas Attachment B - Level of Effort Supplement FWWTR TR Official Release Date. 6.092012 Conceptual Design (30-Percent) pretiminantDesi n (60 Percent) Preliminary Design Package Cover Protect Control Sheet Proiecj Easement Layout Sheets Overap Layout Abandonment Sheets Plan and Plan/Profile Sheets iSWM Construction Plan Detail Sheets Specificaajjt((io(ns QQ ConstructabilityReview Utility Clearance Final Design pid Phase Construction Phase Services Principal Rate $235 0 0 2 Easement Services Additional Easement Documents (6 parcels - 1 PE & 5 TCE`s) Totals (A) (B) (Cl 2 0 0 0 0 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for State Highway 114 Water and Sanitary Sewer Relocation Part 3 Amendment #1 City Project No. 01515 Project Manager $150 0 0 1g 12 0 0 0 4 4 4 4 2 20 Water Line Footage Sewer Line Footage Total Fee Survey Fee Total Fee (-jj survey Fee Water Fee (0% of C) $0.00 WP 31 32 33 51 Water 50.00 50.00 $0.00 $0.00 $0.00 $15,833.00 Labor (hours) Project Engineer $135 $130 O 0 EIT 0 0 0 0 0 6 CADD Administrative Total Labor Cost $125 588 O Q O 6 6 O 24 0 0 O 0 O 0 01 0% 5501 100% 550t 100% $15,834 -$8,513 $7.322 Sewer Fee (100% of C) 1 $7,322.00 1 Sewer $2,196.00 $4,393.00 $731.00 $8.513.00 $15.833.00 Subconsultant MWBE Non-MWBEJ $o s6 s6 50 s0 s0 $5,270 50 50 SO $0 $0 SO $0 24 $5.270 50 50 56 S0 50 S0 O 0 50 S0 6 0 56 s6 O 0 50 s0 6 0 $600 $4,800 $600 $4.800 O 0 $600 $3``713 $600 $3,713 24 0 $6,470 $8.513 Eiippnse Total Expense Task Sub Total Travel Reproduction Cost 50 S0 S0 S0 S0 S0 sd s0 50) s0 so! s0 50 $6 50 s6 SO S0 s0 s0 50 s0 s6 s0 so 50 10 50 50 $5,270 S0 S0 S0 SO SO 50 S0 50 S0 50 SO SO S0 55.270 S0 S0 S0 50 S0 S0 S0 SO S0 SO $0 So s0 s0 s6 s0 s0 s0 $4.800 $5.400 $4,800 $5.400 $3.713 $4t313 58,513 $14,9852,5500 Protgct Summa Total Hours Total Labor Total Expense MBE/SBE Subconsultant Non-MBEJSBE Subconsultant 10% Sub Markup MBE/SBE Participation Total Project Cost 46 56.470 58.513 58,513 S0 S851 54% $15,834.00