HomeMy WebLinkAboutContract 46343-CO1 (3)CITY S C TAY City of Fort Worth CONTRACT NO. ' .. CD 3q'3- CQi Construction Change Order Change Order No. Date Prepared TPW Project No. 1 4/29/15 Project Description Terminal Building Renovation Meacham International Airport Funding P240 541200 552810152780 City Secretary Contract No. 46343 ORIGINAL CONTRACT AMOUNT $15,872,750 EXTRAS TO DATE $ 0 CREDITS TO DATE $ 0 CONTRACT COST TO DATE $15,872,750 AMOUNT OF PROPOSED CHANGE ORDER ... $ No Cost REVISED CONTRACT AMOUNT $15,872,750 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS NA REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS NA ADDITIONAL FUNDING (IF NECESSARY) NA IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Revise Glazing Specifications to revise all glass to new Glazing Type ETIG and other miscellaneous changes required by this revision as per ASI 2 issued 3/18/2015 by HHS Architects, copy attached. This is a NO COST Change Order for all work required by this revision as per attached summary breakdown. Attachments: Ref: ASI 2 PC-006-R1 Total Cost This CO1 $ 0.00 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order Contractor's Name Imperial Construction Original Contract Time 407 cd Contractor ItAdditional Approved Time To Date 0 cd Architectural S7'ices Project Architect Assistant-C;i,y Attorney eptember 30, 2002 nager 7I2'/5— Approved Contract Time To Date 407 cd Date Date Date bate J7- �/> - A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Additional Time For This Change Order 0 Project Manager aa- 1104E fie\ I >.Afrj Director/Property ManYnent De Date 2oMy Al L, ooao �o Date Council Action (If Required) No:pli�ble $ ISt{ M.. 8 0 Yam. ..'-�''��yj ser, City Secre oaoo0oo Imo. it 6/PERIAL Proposed Change CONSTRUCTION Project: I PC No: i Submitted To: Mike Milam City of Fort Worth - T & P/W 401 West 13th Street Fort Worth, Texas 76102 Meacham Terminal Building 006-R1 Reason: IDesign Revision Scope/Mod ification/Description: ICI Job Number: Date: Submitted By: Jennifer Collins Imperial Construction, Inc. 305 NE Loop 820, Ste 320 Hurst, Texas 76053 14-0644 I 8/10/2015 Per ASI-002, Replace all scheduled exterior glazing type CTIG/GTIG with glazing type ETIG, Delete all rolling window shades, Furnish and Install Blackout Shades in Conference Room 306A, Modify Curtainwall Mullion spacing as to not to exceed maximum size limits of ETIG Glazing, Provide dedicated electrical circuits for the control system included with the new glazing type ETIG, Provide new power transfer at Exterior Glazed Doors. Notes: 1.) Should View, Inc. default on their contract obligations with Texas Commercial Glass, the glazing will revert back to specification section 088000. 2.) All Warranties and requested service associated with the View, Inc. products during warranty period (5 years) will be handled by the owner directly (no glazing warranty provided by Imperial) The Subcontractor (TCGC) will still provide the standard warranty for all labor and wokmanship as specified. 3.) This proposal is not valid until all contract documents are in place between Texas Commercial Glass and View, Inc. 4.) The (19) additional Von Duprin EPT-10 Power Transfers to be furnished by View Glass. Description TCGC (View Glass) Add View Glass Material Imperial Legal Fees Direct Cost (PM & Supervision) HHS/Campos Design Fees Credit All Window Coverings Electric Shades - Conf Room Only FSG Electric (Ded Circuits Only) Add Power Transfers (by View) Sub -Total without GC Markup Add Contractor Fee Sub -Total with GC Fee Add P&P Bond Qty UM 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS Other (A) Lab (B) Mat (C) Eq (D) Sub (E) $ 100,000.00 $ 1,500.00 $ 6,990.00 $ 4,250.00 $ (40,000.00) $ (27,260.00) Add lnsurance Add Sales Tax SUB -TOTAL Amount to be FUNDED by View Glass Value Added at No Cost (View Glass and Misc Drect Cost) GRAND TOTAL (Cost to City) 1The Contract Time will be UNCHANGED by $ 1,214,535.00 $ 1,214,535.00 0 days. I$ Sub -Total $ 100,000.00 $ 1,214,535.00 $ 1,500.00 $ 6,990.00 $ 4,250.00 $ (40,000.00) 7,912.00 $ 7,912.00 11,600.00 $ 11,600.00 119,512.00 $ 1,306,787.00 10.00% $ 130,678.70 $ 1,437,465.70 1.00% $ 14,374.66 1.50% $ 21,561.99 Exempt 1,473,402.34 (251,877.35) (1,221,525.00) $0.00 $ By signing below, you agree to pay the amount submitted by either contingency fund transfer or issuance of a formal change order to the contract. If approval of this PC is not received within (5) business days from date submittetlrif is subject to change. Submitte BY: Imperial on, Inc. OFFICIAL RECORD Approved CITY SECRETARY BY: A/jVj/' FT. WORTH. TX City of Fort Worth 8•Iz•is Date TO: CO Request Texas Commercial Glass Concepts, L.P. PO Box 2048 I Weatherford, TX 76086 Office: (817) 594-4477 ( Fax: (817) 594-4484 April 3, 2015 Imperial Construction, Inc. Jennifer Collins 193 Coy Rd. Weatherford, TX 76087 I TCGC Project #: I 314 Change Order Request I 1 RE: Meacham Airport Terminal 4201 N. Main St. Port Worth, TX 76106 (i),1il °prigl4 .;��nl dg►�i ^N;,rQX�j Item Description 1 Added Drafting 2 View Glass Cost 3 Additional Aluminum Material 4 Low Voltage Contractor 5 Additional Labor Cost 6 Misc. Material 7 Credit for Original Glass 8 TCGC Fees/lnsBond The original Contract Sum Net change by previous Change Orders This Chancre Order amount !New Contract amount Additonal Requred time for the Change Order Accepted By: Texas Commercial Glass Concepts, L.P. PO Box 2048 Weatherford, TX 76086 Cost $3,000.00 $1,214,535.00 $13,000.00 $96,000.00 $78,000.00 $0.00 $120,000.00 Sub -Total $1,280,400.00 $866,000.00 $1,314,535.QQ_ $2,180,535.00 I Days Imperial Construction, Inc. 193 Coy Rd. Weatherford, TX 76087 Name: Shawn Murphy Name: Jennifer Collins Title: President Title: Project Manager Meacham Terminal Building PC-006-R1 Funding Distribution SUB -TOTAL on Proposed Change Form Compised of the following parts... Amount of Services Waived by Imperial Total Value of Materials Furnished by View Glass Total Amount Funded by View Glass (See breakdown below) *See below for Breakout of Funded Amount Due to TCGC Drafting Additional Aluminum Low V Contractor Credit - Original Glass Additional Labor TCGC Fees Total Costs to Imperial (Funded by View Glass) Funding: View Glass > TCGC DUE TO IMPERIAL: Imperial Legal Fees HHS/Campos Design Fees Credit Window Coverings Elect Conf Room Shades FSG Dedicated Circuits GC Fee Add GC Bond Add GC Ins Total Costs to Imperial (Funded by View Glass) Funding: View Glass > TCGC > Imperial *This amount will be paid to Imperial under seperate invoice by TCGC. 8/10/2015 $ 1,473,402.34 $ 6,990.00 $ 1,214,535.00 $ 251,877.35 3,000.00 13,000.00 96,000.00 (210,000.00) 78,000.00 120,000.00 100,000.00 1,500.00 4,250.00 (40,000.00) 7,912.00 11,600.00 130,678.70 14,374.66 21,561.99 151,877.35 Spec Section: 0 w n e Texas Commercial Glass Concepts, L.P. PO Box 2048 i Weatherford, TX 76086 Office: (817) 594-4477 i Fax: (817) 594-4484 TCGC Project #: www.l6x(..1*.ol i in 314 Warranty Documentation April 29, 2015 City of Ft. Worth 4201 N. Main St. Ft. Worth, TX 76107 J 0 b Meacham Airport Terminal 4201 N. Main St. Fort Worth, TX 76106 WARRANTY STATEMENT Texas Commercial Glass Concepts, L.P., the glass and glazing subcontractor for the work performed on the above project, does hereby warranty that for a period of (1) one year from the date of substantial completion, the above work will remain free from all defects in the workmanship. It is understood and agreed that in the event of defects and the necessity of making repairs, the Owner will immediately notify TCGC, L.P. in writing of its conditions and shall give the contractor reasonable time in which to make said repairs. Such repairs will include faulty workmanship only. In the event of a repair, TCGC, L.P. will furnish all the labor, materials, tools and equipment required to perform such work. If any person, firm or corporation other than TCGC, L.P., performs or attempts to perform any repairs to the property then this warranty could become null and void. This warranty does not cover any repairs made by anyone other than Texas Commercial Glass Concepts, L.P. or one of its authorized representatives. Texas Commercial Glass Concepts, L.P. PO Box 2048 Weatherford, TX 76086 Name: Title: C. Shawn Murphy Pres. TCGC Mgmt, LLC, General Partner, Texas Commercial Glass Concepts, L.P. (Seal) This Day _xx_ of _MONTH_, _2015_. State of: Texas County of: Parker Notary Public: Danielle Whatley Expires: 08/29/16 Hahnfeld Hoffer Stanford March 30, 2015 Jennifer Collins Project Manager Imperial Construction, Inc. 4001-20 West, Suite 200, Weatherford, TX 76086 RE: Meacham Terminal Building -- Design Fees Associated with ASI No.2 Replacement of Exterior Glass with View Glass Jennifer: Per your request I am presenting the design fees associated with the revision of the construction documents and specifications to replace the specified exterior glazing with View Glass, an electro- chromatic glazing system. Our fee includes the revising the building glazing frame elevations to not exceed the maximum glass unit size, revision of the project manual specifications for glazing, addition of 2 new specification sections for View Glass and the proprietary control system, revisions to the electrical drawings to provide 6 dedicated circuits to power the glazing, and revisions to the hardware for the exterior glazed doors. FEES We have provided these services at the project contract hourly rates of: SENIOR PROJECT MANAGER $160.00 PROJECT COORDINATOR $ 85,00 Our fee for Architectural services is $3,660.00 (Three Thousand Six Hundred Sixty Dollars and No Cents). The total fee including the fee from the contract electrical engineers for the services mentioned above is $4,250.00 (Four Thousand Two Hundred Fifty Dollars and No Cents). Please let me know if you questions or additional information. Sincerely, HAHNFELD HOFFER STANFORD ARCHITECTS PLANNERS INTERIORS Eric L. Claycamp, AIA DEED AP BDr+C Associate Principal Attachment: Fee Letter, Campos Engineering Cc: Eric Hahnfeld - Hahnfeld Hoffer Stanford CEI CAMPOS ENGINEERING, Inc. Consulting Engineers MEMORANDUM —INVOICE LETTER DATE: 2015/03/27 TO: Eric Claycamp FROM: Mark Toussaint RE: Meacham Airport Renovation — View Glass Invoice Eric, eclaycamp@hahnfeld.com CEI has provided engineering services under for ASI-02 related to the replacement of the original exterior glass with the new "View Glass". CEI has performed the following design activities under our scope for the above project. The activities represent 100% design and issuance for ASl-02 associate with our contract as reflected in the attached invoice. 1. Reviewed vendor specification cut sheets and installation drawings. Time required to finish tasks was 1.5 hours. 2. Revised electrical power plans and schedules to provide the necessary power requirements for the "View Glass". Time required to finish the tasks was 2.5 hours, 3. Reviewed final drawings for accuracy and completeness. Time required for the task was 1 hour. Campos has provide the above Engineering Services at the hourly rates set forth on the attached Campos Professional Fee Schedule from 2010 for a sum of Five Hundred Ninety Dollars ($590). os, -litu 466 If you have any questions, or if I can be of any assistance, please contact me at our office. Thank you, Mark Toussaint [ Campos Engineering Inc. 1331 River Bend Dr., Dallas, Tx. 75247-4962 * Email: mtoussaint@camposengineering.com * T: 214.696.6291 * F: 214.696.0633 MAREK BROTHERS SYSTEMS, INC. 112 NW 24'4 STREET, SUITE 407 - FORT WORTH, TEXAS 76164 PHONE 817-740-8624 - FAX 817-624-1328 SEPTEMBER 19, 2014 Imperial Mark Tucker 817.341.8(386 REFERENCE: MEACHAM GENERAL AViATION TERMINAL BUILDING FT WORTH, TX Morel( Brothers Systems, inc. proposes the following pricing and scope of work for the above referenced project: Our proposal is based on drawings prepared by HHS, Base Old Shades Only: $42,882. (includes tenant dwg TD-0A.1 rm L01/L02) Scope of Work: Furnish and install 181 manual and 8'banded' (8 motors/28 shades) motorized MechoShades using 1000 and 0700 series fabrics. Motorized shades shall have 1Q2 low voltage motors with interfacing capabilities. Line voltage wiring is required and is ja included in this bid. Low voltage wiring is, shown as an add to base bid and includes plenum rated cable from motors to 2 local wall switches in Conf Rm 306A, Shades can interface with 3^I party system if that system is a dry contact system w/o any additional relays. If not then additional relays will be required at additional cost. Mike, gl" InGhD ions: 1. Custom product cannot be canceled after placement of order. 2. Delivery time will be approximately 4 to 6 weeks after placement of order. 3. Colors to be determined. 4. All work to be performed during normal hours. 5. Proposal valid for thirty (30) days. 6. We reserve the right to negotiate a mutually agreeable addendum to subcontract terms and conditions. 7. Workers Compensation and General Liability are Included in this bid. 8. Drywall hanger's wage rates. J3xrluslonsz 1. Drywall pockets. 2. Aluminum pockets. 3. Wood blocking. 4. Structural support for shades, 5. Extra Work requested by customer rate of $50 per man per hour + m 6. Ail line voltage wiring. 7. Attic stock. 8. Tax. Sincerely, Aowsaa t-fatu( Donna Hand Estimator/Project Manager C 972.304,3035 3539 Oak Forest Drive Houston, TX 77018-6121 713/681-2626 f will be charged at a straight time rate of $35 per man per hour & OT s & Equipment obo Lae 44,,,f) 0, h avlok. m aye K.b ros . co-l& 638 Commercial Drive Buda, TX 78610 512/312-2756 11003 Iota Drive San Antonio, TX 78217-2609 210/657-4437 1233 Lakeshore Drive Coppell, TX 75019 972/393-4343 SOL Shading Solutions, LLC 3364 Gardenbrook Dr, Farmers Branch, TX 75234 Wee: 972. 444. 09 25 Fax: 972.444.0926 Email: babide@solshading.com Proposal Date: March 27, 2015 Attention: Jennifer Collins Project: Meacham General Aviation Building Expansion SECTION 12 24 16 — ELECTRIC ROLLER SHADES We hereby propose to furnish and install all the materials and provide labor necessary for the completion of: -Installation of 4 MechoSystems motorized roller shades with a total of Tshade hands, installed at locations as indicated by Note 12.24.16.A1, Sheet A7-3, Reflected Ceiling Plan and as amended by AS1-02, Tlectro/1 bracket mounted in extruded aluminum pocket with closure, 1Q2 Intelligent motors controlled by 5 button switch;'0700 \ Series blackout fabric with side and sill channel. GENERAL QUALIFICATIONS: 1) Line voltage wiring by others. 2) Low voltage wirin supplied and installed by Sol Shading Solutions in dedicated conduit supplied by others. 3) Blocking by others. 4) ocket provided and installed by Sol Shading Solutions. 5)All manual shades deleted by ASI-02.1 -Work as qualified to be performed FOR THE SUM 01 : $7,912.00 Addendunis: ASI-02 Noted Tax Status: Not Included Quotes: Valid for 30 days and will become a part of and in addition to any contract or purchase order issued between parties. Pricing: Based on single stage measuring and installation unless noted otherwise. use of dumpsters without fees, and a clear working space. elevator facilities, and electrical power. A Freight: Included Terms: Monthly draws to be paid within 30 days of draw request. Remainder of contract to be paid upon completion of work. Contract projects: materials and labor to be paid within 45 days of draw request. Retainage to be paid within 30 days of planned project completion date. Delivery: Allow 4-6 weeks from date of field measurement and is subject to manufacturer lead times and freight time. All material is guaranteed to be as specified, and the above work to he performed in accordance with the drawings and specifications submitted for the above work and completed in a substantial workmanlike manner. Any alterations or deviation from above specifications involving extra cost will necessitate an extra charge. All agreements contingent upon strikes and accidents beyond our control, Respect hilly, Bill Abide Chief Estimator IF AP AP i�ii�i electric Imperial Construction POB 967 Weatherford, TX 76086 Contact: Ms. Jennifer Collins Change Proposal CCN # Date: Project Name: Project Number: Contract #: Page Number: default 4/2/2015 Meacham Terminal 30j3793 140644FSGT002 1 FSG Electric 2525 Walnut Hill Lane Suite 100 Dallas, Texas 75229 Telephone: (214) 357-5697 Fax: (214) 357-5794 E-mail: kent.kirbv0fsai.com Work Description This change notice includes all labor, material, and supervision for the below scope of work. We reserve the right to correct this change notice for errors and omissions. This price is good for acceptance within 14 days from date of receipt. Scope of Work: 1. Per ASI 2 detailed notes on electrical drawings. Exclusion: 1. Any utility/permit costs. 2. Any sheetrock cutting, patching, and/or painting required. 3. Any concrete cutting or patching. 4. Overtime. Itemized Breakdown Description 3/4" EMT CONDUIT 3/4" EMT STL SS CONN 3/4" EMT STL SS CPLG 3/4" EMT 1-H STEEL STRAP 1f12 THHN BLACK B2-1 RED WIRE CONN 4x2 1/8" SQ BOX COMB KO 4" SQ BLANK COVER 1/4x 1 1/4 CONCRETE SCREW HEX HEAD - BLUE Totals Summary General Materials Material Total Labor Supervision Project Management Material Handling Safety Clean -Up Estimating Labor Burden (160.00 Hrs @ $26.00) (40.00 Hrs @ $29.00) (20.00 Hrs @ $55.00) (8.00 Hrs @ $16.00) (8.00 Hrs @ $16.00) (8.00 Hrs @ $16.00) (1.00 Hrs @ $75.00) (@ 42.000 To) Qty Net Price U Total Mat. Labor U Total Hrs. 53 66.54 C 35.27 6.00 C 3.18 302 33.70 C 101.77 7.20 C 21.74 5 34.83 C 1.74 7.20 C 0.36 6 11.05 C 0.66 3.60 C 0.22 187 121.44M 22.71 7.20 M 1.35 703 18.95 C 133.22 7.20 C 50.62 151 144.67 C 218.45 27.60 C 41.68 151 37.95 C 57.30 3.00 C 4.53 308 59.30 C 182.64 11.70 C 36.04 1,866 753.77 159.70 753.77 753.77 4,160.00 1,160.00 1,100.00 128.00 128.00 128.00 75.00 2,889.18 Change Proposal FSG Electric 2525 Walnut Hill Lane Dallas, Texas 75229 Summary (Cont'd) Overheaoi Markup Subtotal Final Adj. Final Amount (@ 5.000 %) (@ 5.000 %) CCN # Date: Project Name: Project Number: Page Number: default 4/2/2015 Meacham Terminal 30j3793 2 526.10 552.40 11,600.45 -0.45 $11,600.00 VON I)I IPRIN Electric Power Transfer for exit devices - Door Alarm and Warning Acce... Page l of 2 9'1'. How can we unprove our Li Compare Technical Specs t tr r. ,rti Electric Power Transfer for exit devices Electric Power Transfer for exit devices Vora DUPFIN Price $i12.50/each ® Deliver one time only r l MoilN v Add to Ckrt ft IJ Add t ir,th n ftr hl<„ t nu ni t t,vrt tit for$129.00 each. bt tt,i. first t„ v.1.0 :, a vu yr I /114, 6. /oswr Confirm ZIP Code to determine avadatnhly ZIP Code 76043 4,i'er Item !t 1 RAK6 Mtr Model # EPT 10 SP28 UNSPSC # 46171604 Catalog Page # 278h Shipping Weight 2.25 lbs. Country of Origin China I Country of Origin is subject to change Note Product avadabildyis real -brae updated and adjustedeenrmuously The product w11 be reservedtor you alien you complete gout order r, Electric Power Transfer Wire 24 AWG Steel dr,ln . t a s10 Satin Chrome 1 ,ont Electrified Exit Devices 1iailsr 1-1116" 24VDC i t, 1-112" UL/cUL Listed, ANSI 156.3 Grade 1 1 http://www.graingcr.com/product/VON-D1 IPRIN-Electric-Power-Transfer-(or-1 RAK6?s_p... 4/3/2015 CITY 0 IIISECRE A CON L 1'\ r� C WQ 3 3 THE CITY OF FORT WORTH, TEXAS THIS COPY IS FOR: CONTRACTOR CITY SECRETARY SPONSORING DEPT PROJECT MANAGER TPW FILE COPY Expansion and Renovation of General Aviation Terminal Building at Meacham International Airport City Project No. 1527 BETSY PRICE MAYOR FORT WORTH® DAVID C. COOKE CITY MANAGER Douglas W. Wiersig, PE Director, Transportation & Public Works Department William B. Welstead Director, Aviation Department Hahnfeld Hoffer Stanford Imperial Construction, Inc. December 2014 RECEIVED JAN .3 A,M, City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 12/9/2014 DATE: Tuesday, December 09, 2014 LOG NAME: 55FTW ADMIN BUILDING CONSTRUCTION (01527) SUBJECT: Authorize Execution of a Construction Contract with Imperial Construction, Inc., in an Amount Not to Exceed $15,872,750.00, Authorize Execution of a Materials Testing Agreement with Terracon Consultants, Inc., in an Amount Not to Exceed $75,000.00, Rescind M&C C-27061 for Site Work Related to Temporary Modular Buildings for the Expansion and Renovation of the Meacham Administration Building at Fort Worth Meacham International Airport (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council: REFERENCE NO.: C-27131 1. Authorize the execution of a construction contract with Imperial Construction, Inc., in an amount not to exceed $15,872,750.00 for the expansion and renovation of the Meacham Administration Building at Fort Worth Meacham International Airport; 2. Authorize the execution of a Materials Testing Agreement with Terracon Consultants, Inc., in an amount not to exceed $75,000.00 for the expansion and renovation of the Meacham Administration Building at Fort Worth Meacham International Airport; and 3. Rescind M&C C-27061, approved on October 28, 2014, to perform site work related to temporary modular buildings. DISCUSSION: On May 11, 2010, (M&C C-24215) the City Council authorized an Architectural Services Agreement (City Secretary Contract No. 40243) with Hahnfeld, Hoffer and Stanford for programming and schematic design to renovate and expand the Meacham Administration Building at Fort Worth Meacham International Airport. This contract and its amendments bring the current design costs to $1,861,197.50. On March 18, 2014, (M&C G-18161) the City Council authorized the use of revenue derived from mineral leases on City -owned airports for the construction of the Meacham Administration Building (Administration Building) renovation at Fort Worth Meacham International Airport (Meacham Airport), the leasing of temporary modular buildings for occupancy by all current tenants and Aviation Administration Offices located in the building to relocate utilities and provide temporary infrastructure for the modular buildings, as well as to fund moving and storage costs to both relocate tenants to the modular buildings and back into the renovated Administration Building. The Administration Building at Meacham Airport was built in 1968 and has not been updated except for small alterations to portions of the facility, including a 1982 first floor addition. The renovation will remove the 1982 addition which will increase the size of the apron adjacent to the facility. This renovation project Will also address many deficiencies including, but not limited to, an outdated heating ventilation and air °Dame: 55FTW ADMIN BUILDING CONSTRUCTION (01527) Page 1 of 3 conditioning system, cooling towers that are under constant repair, lack of fire protection systems on the ground level and second floor and Americans with Disabilities Act accessibility concerns. The construction portion of the project was advertised for construction in the Fort Worth Star -Telegram on August 28, 2014 and September 4, 2014. On September 25, 2014, seven Offerors submitted proposals, and on October 2, 2014, four of the seven Offerors submitted the required Post Proposal PreAward documents. The following seven proposals were received (Base Proposal): Thos S. Byrne, Ltd. dba Byrne Construction Services Imperial Construction, Inc. Sedalco, Inc. Steele Freeman/Howard Joint Venture Satterfield & Pontikes Construction, Inc. J.E. Dunn Construction Company Balfour Beatty Construction, LLC $14,125,000.00 $14,475,000.00 $14,528,240.00 $14,825,000.00 $15,400,000.00 $16,054,092.00 j$18,224,492.00 On October 17, 2014, the Best Value Selection Committee met and addressed the four proposals. The committee members included representatives from the Aviation Department, M/WBE Office, project's design architect and Transportation and Public Works Department. The four Offerors were evaluated and ranked as follows: Evaluation Criteria Price Schedule MBE Experience and Reputation Relationship with City TOTAL RANK Imperial Sedalco, Balfour Beatty Thos S. Byrne Construction Inc. Construction Inc. 60 53 51 0 10 10 10 10 2 2.5 2 5 9 9 7 7 10 9 7 5 91 83.5 77 27 1 2 3 4 Based on a weighted matrix including price, schedule, MBE participation, reputation and experience, Thos S. Byrne, Ltd. (Byrne), was initially determined to offer the best value for the City, but Byrne subsequently withdrew itself from consideration. Negotiations with the second -ranked offeror, Imperial Construction Inc., were concluded successfully. Imperial Construction, Inc., is determined to offer the best value for the City. The overall project cost is expected to be: Design $ 1,861,197.50 Construction and Owner's Contingency (9%) plus Alternate 1 $ 15,872,750.00 Materials Testing, Utilities, ITS, FF&E, Contingency, Staff, Art $ 1,264,600.50 Total $ 18,998,548.00 The construction contract in an amount not to exceed $15,872,750.00 is based on the base proposal, Alternate No. 1 LEED Certification and general contingency allowance for use by the City only. The Owner's Contingency is being increased from 5 percent to 9 percent to perform the trailer site preparation work that was previously authorized to be performed by Williams Scotsman Inc., in M&C C-27061. Williams Scotsman Inc., withdrew itself from consideration for the site preparation. Any remaining allowance at the end of construction will be retained by the City. M/WBE OFFICE - Imperial Construction, Inc., is in compliance with the City's Business Diversity °Dame: 55FTW ADMIN BUILDING CONSTRUCTION (01527) Page 2 of 3 Ordinance by committing to 24 percent MBE participation on the base bid price plus identified alternates inclusive of the contingency allowance. Terracon Consultants, Inc., is in compliance with the City's BDE Ordinance by committing to 25 percent SBE participation. The project is physically located in COUNCIL DISTRICT 2, but will serve Fort Worth residents in ALL COUNCIL DISTRICTS, Mapsco 48T. FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Airports Gas Lease Project Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers (1&2)) P240 541200 552810152780. $15.947.750.00 CERTIFICATIONS: Submitted for City Manaaer's Office by: Oriainatina Department Head: Additional Information Contact: Fernando Costa (6122) Bill Welsted (5402) Jeff Kloska (5406) ATTACHMENTS 1. 01527 RPT 09 20141117.pdf (CFW Internal) 2. FTW Admin Blda Map 01527.pdf (Public) 3. Revised Imperial Compliance Memo.pdf (CFW Internal) 4. Terracon MBE Compliance.pdf (CFW Internal) Jogname: 55FTW ADMIN BUILDING CONSTRUCTION (01527) Page 3 of 3