Loading...
HomeMy WebLinkAboutContract 44208-CO3 (2)Change Order No. Date 3 (three) 8/5/13 Facility and Project Description WRMC Richardson Bass Exhibit Area Renovation City of Fort Worth Change Order Request CITY SECRETARY' CONTRACT NO. u2fhl-?.�, TPW Project No. Funding (FAC) C291 541200 247060207880 City Secretary Contract No. 44208 ORIGINAL CONTRACT AMOUNT $1,571,000 EXTRAS TO DATE $ 64,306 CREDITS TO DATE $ 0 CONTRACT COST TO DATE $ 1,635,306 AMOUNT OF PROPOSED CHANGE ORDER (Deduct) $ (305.40) REVISED CONTRACT AMOUNT 1,635,000.60 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS $ 249,000 REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS $ 184,999.40 ADDITIONAL FUNDING (IF NECESSARY)... 0 IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Provide all labor and materials as per attached PCR's: 14,15,16,17,18,19, 20 and Contingency Reconciliation. Summary attached. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX I. (TOTAL DEDUCT) ($ 305.40) It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order Contractor's Name Modern Contractors, Inc. Original Contract Time 115cd Additional Approved Time To Date 0 cd Approved Contract Time To Date Additional Time For This Change Order 115 cd Contractor- Modern Contractors, Inc Date f NI T# (z 3 Sics//3 Architectural Services Manager d ' 4J ,//� Project Architect Hahnfel offal' tanford Distribution: File Construction Manager Project Manager I4'CEIVEd AUG 21 2013 cd ��•tructi• Inage Date q reetQr, Transportation and Public works 8/19f13 tc u, Date AssistantAity Manager 8103 e‘s••• Date Council Action (If Required) ❑ Approved LI Disapproved Ur L(-(3 ❑ Other TPW Facilities Management Divisio Change Order Form (3/20/12) aiy J yser, City Secre Date Date Date Change Order 3 WRMC Richardson Bass Exhibit Area PCR 14- Add additional plaster at entry 111.1 PCR 15 — Add additional mobilization for fire water line PCR 16- add additional steel for operable partitions PCR 17- Add additional framed openings in plaster ceiling PCR 18- Add additional electrical outlets at telecom room PCR 19- replace egg crate diffusers at restroom PCR 20- revise entrance door handles and add steel Closure strip @ overhead door Credit for Contractor carried owner contingency ADD $ 1,031.03 ADD $ 4,172.84 ADD $ 509.85 ADD $ 1,087.68 ADD $ 1,114.95 ADD $ 496.25 ADD $ 1,282.00 (Deduct) ($ 10,000) Total This Change (Deduct) ($ 305.40) c i I---4,1-<_11- (1)- T AC ~TORS PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 via email DATE: 6/7/2013 RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 14 Revised HHS # We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scone Of Work Additioanl plater work at entry 111.1 Additioanl plaster work requested by City at entry 111.1 soffit See attached $910.00 Sub Total Markup - 10% Sub Total Bonds and Insurances $910.00 $91.00 $1,001.00 $30.03 Net Change This Proposal ADD 1,031.03 Net Change in Days This Proposal Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner Date For the Architect Date For Modern Contractors Date RONPARCO EIFS — LATH & PLASTER — MASONRY 900 Marlene Dr. Euless, TX 76040 Telephone: (817) 354-8217 Fax: (817) 354-6720 www.ronparco.com CHANGE ORDER REQUEST Date: June 6, 2013 #: 0102-02 Project: Will Rogers Bass Hall Exhibit GC: Mr. Anil Jacob, Modern Contractors Requested Change: change order #2 patch repair skim and refinish existing soffit col 4 thru 5 on Col line a Estimated Labor Hours: Estimated Amount: Addition for labor and material: $ 910.03 Please note: This additional work can be executed as soon as we re- ceive the signed change order from you. Submitted by: Approved by: Date: Signature: Bill Groce Change #02 patch skim existing soffit RONPARCO — WBE, HUB, SBA RONPARCO — A Division of Ronzani, Inc. IN& )I)1 4;RN PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 DATE: 6/7/2013 via email RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 15 Revised HHS # We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scope Of Work Additioanl remob and tie in for fire water The tap for fire water was to be done by City and in place before we installed our riser. However city was budy did not do the tap before our work. We installed our lines to the tap and since City was busy to do the tap, they said they will tie in when they were able to do the tap. However when City came to do the tap several weeks later, they did not tie our our line to the tap and also filled the trench back. We had to remobilize, re dig the trench and tie the water line to the tap. See attched cost for this rework See attached Sub Total Markup - 10% Sub Total Bonds and Insurances $3,683.00 $3,683.00 $368.30 $4,051.30 $121.54 Net Change This Proposal ADD 4,172.84 Net Change in Days This Proposal Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner Date For the Architect Date For Modern Contractors Date Battson Contracting Co., Inc. Project: Fort Worth - Will Rogers Memorial Center Change Order for: Move In & Connect To Water Line Reference No.: co-1 Labor & Equipment (includes fringe benefits, insurance and iayroll taxes) Dates I Day 1 1 1 1 # of Personnel `► q V V V Superintendant Foreman 1 Driver/Operator 1 ,Pipe Layer/Laborer 1 # of Units Y 1 1 Crew Truck R.T. Backhoe Trackhoe 35 K Roller/Tamper Haul Truck&Trlr Boom Truck Steel Plating per (SF) Barricades Materials 6" 22.5* Bend 6" Sleeve Concrete Move In Fee Sub Total Deduct/Credit: 10 10 10 10 10 1 10 1 10 MATERIALS Units Unit Price Total Price 2 $182.67 $365.34 1 $162.35 $162.35 1 $160.00 $160.00 1 $750.00 $750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,437.69 $0.00 Total Rate Hours 0 $43.20 10 $29.50 10 $24.40 10 $19.15 10 $17.00 10 $44.50 0 $63.00 10 $19.00 10 $37.50 0 $49.60 0 $4.00 0 $2.00 Sub Total Subcontract Units Unit Price Sub Total Totals $0.00 $295.00 $244.00 $191.50 $170.00 $445.00 $0.00 $190.00 $375.00 $0.00 $0.00 $0.00 $1,910.50 Total Price $0.00 $0.00 $0.00 $0.00 Materials, Labor & Equipment Materials Labor & Equipment SUBTOTAL Subcontractor Overhead Profit Profit on Subcontract Sales Tax on material Bond Expense Less any credits, if applicable TOTAL CHANGE ORDER 10% 0% 0% 0% 0.0% $1,437.69 $1,910.50 $3,348.19 $0.00 $334.82 $0.00 $0.00 $0.00 $0.00 $0.00 $3,683.01 INselL:Fi__,) N:1-<:N PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 DATE: 6/7/2013 via email RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # logRevised HHS # We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scone Of Work Additional steel for operable partitions per RFI 23 Additional steel for 2 pockets at column line B W6x9 5' - 2 pieces = 901bs @$5/1b Note: This delayed measuring of operable partitions See attached Sub Total Markup - 10% Sub Total Bonds and Insurances $450.00 $450.00 $45.00 $495.00 $14.85 Net Change This Proposal ADD 509.85 Net Change in Days This Proposal 20 Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner For the Architect For Modern Contractors Date Date Date 111114SOLC) 1-4;1ZN ON TRACTORS PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 via email DATE: 7/8/2013 RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 17 Revised HHS # We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scope Of Work See drawing A7.1 for opening in plaster ceiling in corridor 107. The drawing shows 9 openings for lights. We had to frame 12 additional openings for access panels and diffusers. See attached $960.00 Sub Total Markup - 10% Sub Total Bonds and Insurances $960.00 $96.00 $1,056.00 $31.68 Net Change This Proposal ADD 1,087.68 Net Change in Days This Proposal Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner Date For the Architect Date For Modern Contractors Date RON PARCO EIFS — LATH & PLASTER — MASONRY 900 Marlene Dr. Euless, TX 76040 Telephone: (817) 354-8217 Fax: (817) 354-6720 www.ronparco.com CHANGE ORDER REQUEST Date: June 11, 2013 #: 0102-01 Project: Will Rogers Bass Hall Exhibit GC: Mr. Anil Jacob, Modern Contractors Requested Change: Frame 12 extra openings in ceiling in lieu of 9 (9 openings as per plans) Estimated Labor Hours: Estimated Amount: Addition for labor and material: $ 960.00 Please note: This additional work can be executed as soon as we re- ceive the signed change order from you. Submitted by: Approved by: Date: Signature: Bill Groce Change #01 reframe for openings RONPARCO — WBE, HUB, SBA RONPARCO — A Division of Ronzani, Inc. T14464:1) I .) ONTR_�1CTO1R._S PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 via email DATE: 7/8/2013 RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 18 Revised HHS # We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scone Of Work Additioanl electrical outlet and conduits requested by Owner See attached $984.07 Sub Total Markup - 10% Sub Total Bonds and Insurances $984.07 $98.41 $1,082.48 $32.47 Net Change This Proposal ADD 1,114.95 Net Change in Days This Proposal Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner Date For the Architect Date For Modern Contractors Date STUFFLEBEAM ELECTRIC Change Order #5 Date: June 15, 2013 PROJECT: Will Rogers Memorial Center Richardson -Bass Exhibits Area 1591 Rip Johnson Fort Worth, Texas Changes and additions include: Furnish and install one 4" conduit across corridor #107 for future use. Material: $296.00 Labor: $353.00 Total: $649.00 Overhead 10%: $ 64.90 Profit 5%: $ 35.70 Total this C.O.: $749.60 Add one quad. 120 volt receptacle in AV room #116 per Alan Bagamery. Material: $ 33.00 Labor: $170.00 Total: $203.00 Overhead 10%: $ 20.30 Profit 5%: $ 11.75 Total this C.O.: $234.47 E. STUFFLEBEAM STUFFLEBEAM ELECTRIC (817)284-7405 License Stufflebeam Electric 132 Arbol Court Ft Worth, TX 76108 817-284-7405 License # 22110 Regulated by the Texas Department of Licensing Regulation Po Box 12157 Austin, TX 78711 1-800-803-9202 1-512-463-6599 www.license.state.tx.us/complaints 1/Lc I .) N;JRN c iu niu c i PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 via email DATE: 7/8/2013 RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 19 Revised HHS # We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scone Of Work Additioanl eggcrate requested by Owner in bathrooms See attached Sub Total Markup - 10% Sub Total Bonds and Insurances Net Change This Proposal Net Change in Days This Proposal $438.00 $438.00 $43.80 $481.80 $14.45 ADD 496.25 Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner Date For the Architect Date For Modern Contractors Date Walker Drywall Inc. Extra work Commercial Interiors 4117 Murray Fort Worth, Texas 76117 (817) 485-3134 Fax (817) 485-3314 blake(8 walkerdrvwall.com Bill To: Modern DATE: June 20, 2013 INVOICE # T&M 1 Bass Hall For: Bass Hall Attn: Anil Jacobs DESCRIPTION QUANITY RATE (Journeyman Hours 7 $30.00 2'x4' White Eggcrate 72 $2.20 12' Wall Angle 96 $0.31 SUBTOTAL MATERIALS LABOR TOTAL LABOR+MATERIALS MARK UP 10% TOTAL THANK YOU FOR YOUR BUSINESS! AMOUNT $210.00 $158.40 $29.76 $188.16 $210.00 $398.16 $39.82 $438 TIVET.4(1)0 ONAC� TOSS PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 via email DATE: 7/31/2013 RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 20 Revised HHS # We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scone Of Work 1 Add Door Handles per Owner 2 Add steel plate at overhead door to cover exist brick deficiency -Owner 3 Replace thermostat on existing unit per Owner See attached Sub Total Markup - 10% Sub Total Bonds and Insurances $430.00 $702.00 $185.00 $1,317.00 $1,317.00 $131.70 $1,448.70 $43.46 Net Change This Proposal ADD 1,492.00 Net Change in Days This Proposal Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner Date For the A hitect Date / C U-•_.•�c 7/.3i /h3 For Modern Contractors Date Date: 7/10/2013 ADS Job # : 2769 ADVANCED DIVERSIFIED SERVICES 7461 W. VICKERY BOULEVARD FORT WORTH, TX 76116 Phone: 817-763-8223 CHANGE ORDER # 2 Project: WILL ROGERS MEMORIAL CENTER RICHARDSON BASS EXHIBIT Contract: MODERN CONTRACTORS Contact: ANIL JACOBS "A1" Qty 1 Reason for Add: Added Plate Per Keith Farmer Descrip P L1 /4X16"X10'-0 Total $ I Materials $175 Shop Labor $75 Detailing $50 Equipment $0 Freight $0 Subs Erection $300 Engineering $0 Inspection $0 Paint $10 Deduct Subtotal $610 10.00% Burden $61 Cost $671 5.00% Profit $31 Tax $0 Total for this INVOICE ( $7021 Prepared by: Jeremy Long Accepted by: LB 142 0 0 0 0 0 0 0 142 I Date: Phone: 817/831-6423 WOODARD Builders Suppy P.O. Box 161849 6419 Midway Road Fax: 817/831-6547 Fort Worth, Texas 76161-1849 Fort Worth, Texas 76117 ♦ Quote • Date: July 23, 2013 To: Attn: Phone: Modern Contractors AJ From: Shelby Boren Re: Will Rogers We wish to quote you the following prices to furnish material listed below as an extra to the contract. Finish Hardware: $320.00 4 Each Offset Pulls BF157 613 Tax: $0.00 This price is net FOB the jobsite for material only and does not include sales tax or installation. * If we are to proceed as outlined above, we must have a signed purchase/ change order agreement prior to ordering and/or fabricating any material Should you require additional information, please let us know. 1 Jul 24 13 05:31p Pete Door & Hardware 8177310510 p.1 zq%i3__. TaSieO Imo► OAT C' TORS PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 via email DATE: 7/31/2013 RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 20 Revised HHS # We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scone Of Work 1 Add Door Handles per Owner 2 Add steel plate at overhead door to cover exist brick deficiency -Owner 3 Replace thermostat on existing unit per Owner See attached Sub Total Markup - 10% Sub Total Bonds and Insurances $430.00 $702.00 $1,132.00 $1,132.00 $113.20 $1,245.20 $37.36 Net Change This Proposal ADD 1,282.00 Net Change in Days This Proposal Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner Date For the Architect Date For Modern Contractors Date PROJECT SUMMARY SHEET (Change Order Attachment) PROJECT NAME: WRMC Richardson Bass Exhibit Area Renovation CS# CS44208 Attachment to Change Order No.: 3 Today's Date: 8/19/2013 TOTAL Original Contract Amount: $ 1,571,000.00 Extras to Date: $ 64,306.00 Credits to Date: $ Contract Amount to Date: $ 1,635,306.00 Amount of Proposed Change Order: $ (305.40) Revised Contract Amount: $ 1,635,000.60 Contingency Funds Avail. for Admin. Change Orders: $ 249,000.00 Remaining Funds Available for Change Orders: $ 184,999.40 Additional Funding (if necessary): $