Contract 44208-CO2 (2)
City of Fort Worth Change Order Request CITY SECRETARY; �,�r��'CD� CONTRACT NO. Change Order No. Date 2 (two) 5/23/13 Facility and Project Description WRMC Richardson Bass Exhibit Area Renovation TPW Project No. Funding (FAG) C291 541200 247060207880 City Secretary Contract No. 44208 ORIGINAL CONTRACT AMOUNT $1,571,000 EXTRAS TO DATE.. $ 31,810 CREDITS TO DATE $ 0 CONTRACT COST TO DATE $ 1,602,810 AMOUNT OF PROPOSED CHANGE ORDER $ 29,666 REVISED CONTRACT AMOUNT $ 1,632,476 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS $ 249,000 REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ......... $ 187,524 ADDITIONAL FUNDING (IF NECESSARY) 0 IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Provide all labor and materials as per attached PCR's: 9, 10, 11, 12, 13 and ASI 4. Summary attached. ADD $29,666 TOTAL ADD $ 29,666 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order Contractor's Name Modern Contractors, Inc. Original Contract Time 115cd Additional Approved Time To Date 0 cd Contractor- Modern Contractors, Inc '.��� (14)L 7/�(613 rchite tlaLServfpes Manag roject Architect /Hahnfeld Hoffer Stanford Assi Distribution: File Construction Manager Project Manager Contractor RECEIVED JUN 11 2013 Approved Contract Time To Date Additional Time For This Change Order 115 cd cd C©) Date Co tructio anager Dj(ect• Transportation and Public works Assistant •S y Manager Date Council Action (If Required) Appro ' 0 (� ❑ rov G 11]Oth�fY E, ,p��ed ti "Ike �s4 o n o FFFICIAL RECORD.' Date Date Date 64,43 /o/A- poo- �ITY SECRETARY yyo►ooa TPWChangeiOrderaForm (3/20/12)entDi, A► rc Fr' WORTH, TX Change Order 2 WRMC Richardson Bass Exhibit Area ASI 4- Add additional AV cabling for campus operability ADD $ 11,831 PCR 9 — Add additional masonry ties at storefront windows ADD $ 829 PCR 10- Relocate water line at front canopy ADD $ 2,521 PCR 11- Additional concrete demo and replacement at Entry 112 PCR 12- additional demo and concrete replacement At west side entry PCR 13- Additional asphalt tie ins at aisle ways At stall areas to main corridor ADD $ 5,164 ADD $ 3„373 ADD $ 5,948 Total This Change ADD $ 29,666 O)1 ) t �` O►T`•�'�`R (. -rC)0KS PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 via email DATE: 5/7/2013 RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 8v(revised), HHS # ASI 4 We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scope Of Work AV changes per ASI 4 Revised per site meeting with Owner and Architect See attached Sub Total Markup - 10% Sub Total Bonds and Insurances $10,442.00 $10,442.00 $1,044.20 $11,486.20 $344.59 Net Change This Proposal ADD 11,830.79 Net Change in Days This Proposal Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner Date For the /Architect Date For Modern tontractors Date PROPOSAL ESTIMATE Item # Description QTY UP Lsum Total Changes per ASI 4 Remarks AV changes per attached $7,967 Able communication Additional conduits from AV rack to new control room $2,475 Stufflebeam Electric TOTAL COST $10,4421 CONNECTING COMPANIr3-- ABLe Communications, Inc. Connecting You! 1413 East Avenue H Grand Prairie, Texas 75050 Phone972.660.2253 Fax 972.660.2254 www.ablecomm.net To: Modern Contractors 2008 Plaza Drive Bedford, Tx 76021 Project: Richardson Bass Exhibits Area =CHANGE ORDER REQUEST NUMBER M012810-08 CHANGE-ORDER"REQU-E DATE 4/18/2013 P.ROVAL REQUIRED_ 5/8/2013 Description of Proposed Change: This revision will add patch panels to the Exhibit Space audio system to provide source and destination patching capability between the Exhibit Space rooms and the Control Room. The intent is to allow the owner to patch source to and from other areasof the facility to and from the Exhibit Space. Equipment Total:$ 3,295.64 Engineering: $ 266.70 Labor: $ 4,404.66 Total : $ 7,967.00 *Pricing does not include applicable sales and use taxes. Applicable taxes shall be billed at the time of invoicing. This Change Order Request is valid thru 5/8/2013. If acceptance has not been received by that date, ABLe reserves the right to reassess the impact of this Change Order Request. If requested, ABLe will provide another Change Order Request after 5/8/2013 which considers the projects progress, any changes to ABLe'scosts detailed above and the project schedule as of that date. The above work is subject to the same conditions as specified in the original contract unless otherwise stipulated above. By accepting below, the sum of $7,967.00will be added to the contract price. Authorized Signature: Authorized Signature: ABLe Job No: CFW12810 ABLe Communications, Inc. Modern Contractors Date: Date: CHANGE ORDER REQUEST' CONNICEINO COMPANIES„ ABLe Communications, Inc. Connecting Youf 1413 EastAvenueH Grand Prairie, Texas 75050 Phone972.660.2253 Fax 972.660,2254 www.ablecomm.net To: Modern Contractors 2008 Plaza Drive Bedford, Tx 76021 Project: Richardson Bass Exhibits Area Modern Contractors Protect No. 12-810 2008 Plaza Drive Bedford, TX 76021 Richardson -Bass Exhibits Area ASI #4-Rev 6 (Quote Valid for 60 days) Change Order No 12-810-08 Qty Manufacturer Model Description Sell Price Sell Ext. 1 Able Corrm 2 AVP 6 AVP 6 AVP 1 West Penn 6 West Penn ADDITION KEYNOTES DEDUCTION KEYNOTES Field Labor ADDITIONS TO CONTRACT Terminate Tie Lines at OFE Patch Bay AP-A226E2-L-FN-RFT LONG FRAME PATCH PANEL LPC-2-C BLACK 2' PATCH CABLE LPC-4-C BLACK 4' PATCH CABLE 4246 CATEGORY 6 CMR4 PAIR 452 BLACK 2 COND. 22 (7x30) TINNED SHIELDED ABLe Job No: CFW12810 1,023.61 26.71 30.16 176.40 86.98 Equipment Total: Consumable Installation Supplies: Tax: Freight: AutoCAD Drafting and Engineering: Project Management: Programming: Shop Labor: Field Labor: Final Test & Balance: Operational System Training: Project Administration: Grand Total:l 8.9 63.5 1.27 1.27 $ - $2,047.22 $ 160.27 $ 180.94 $ 176.40 $ 521.86 $3,086.00 $ 77.17 $ 132.47 $ 266.70 $ 270,30 $ - $ 489.50 $3,492.50 $ 82.55 $ 69.85 $ - $7,967.00 STUFFLEBEAM ELECTRIC Change Order #4 REVISED Date: April 30, 2013 PROJECT: Will Rogers Memorial Center Richardson -Bass Exhibits Area 1591 Rip Johnson Fort Worth, Texas Changes and additions for ASI#4 include: Furnish two 1-1/4" conduits from the AV rack in room #116 to the communication J box in room #116 ceiling. Install one 24" gutter on the existing 4" communication conduits in the existing mechanical room and install two 1-1/4" steel flexible conduits from the new gutter to the AV control room. Material: $ 692.00 Labor: $1,451.00 Total: $2,143.00 Overhead 10%: Profit 5%: Total this C.O.: E. STUFFLEBEAM $ 214.00 $ 118.00 $2,475.00 STUFFLEBEAM ELECTRIC (817)284-7405 License Stufflebeam Electric 132 Arbol Court Ft Worth, TX 76108 817-284-7405 License # 22110 Regulated by the Texas Department of Licensing Regulation Po Box 12157 Austin, TX 78711 1-800-803-9202 1-512-463-6599 www.license.state.tx.us/complaints Hahnfeld Hoffer Stanford ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS Proiect Name: Will Rogers Memorial Center Richardson Bass Exhibits Space ASI No.: 04 Owner: [x] Architect: [ ] Issue Date: 4/11/13 Consultant: [x] Contractor: [x] Owner: Pro►ect No.; 12042-00 Field: [x] City of Fort Worth Other: [ ) TPW - Facilities Mgmt Group/Architectural Services Contractor: Modern Contractors, Inc. 2008 Plaza Drive Bedford, TX 76021 Contract For: General Construction File: [x] Contract Date: 2/05/13 Submit an itemized proposal for changes in the Contract Sum and/or Contract Time for the proposed Supplemental Instruction modification(s) to the contract documents described herein. Within fourteen (14) days, the Contractor shall submit the proposal or notify Hahnfeld Hoffer Stanford, in writing, of the date which the proposal will be submitted. The Work, when approved, shall be carried out in accordance with the described Supplemental Instructions and in accordance with the Contract Documents. THIS IS NOT A CHANGE ORDER, A CONSTRUCTION CHANGE DIRECTIVE, OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE PROPOSED MODIFICATION(S). Description: This revision will add patch panels to the Exhibit Space audio system to provide source and destination patching capability between the Exhibit Space rooms and the Control Room. The Intent is to allow the owner to patch sources to and from other areas of the facility to and from the Exhibit Space. Attachments: Revised drawing sheets AV3.0 and AV4.0, catalog equipment cuts AVP25v1-1 enpgl 3 and AVP25v1-1 engp54 and BAI Written Description Iss feld Hoffer tanford: Lee Hill, AIA Project Architect Signature)" (Printed Name 1 Title) CONSULTANTS IN ACOUSTICS, A UDIOVISUAL, AND I N FORMATION T EC#I NOLOGI ES 4006 SPEEO`+/AY AUSTIN, TEXAS 78751-4628 voice 512-476-3464 fax: 512-476-9442 Will Rogers Memorial Center ASI No.: 4, Revision 6 Richardson Bass Exhibits Space Sound Reinforcement Systems www_baiaus1 n.com This revision will add patch panels to the Exhibit Space audio system to provide source and destination patching capability between the Exhibit Space rooms and the Control Room. The intent is to allow the owner to patch audio sources to and from other areas of the facility to and from the Exhibit Space. Additionally, a control wire will need to be added to the network switch located in the Main Audio Equipment Rack located in AV 116 and a DSP control connection point will need to be installed in the Control Room. This will provide remote control capability of the Exhibit Area DSP in the Control Room. Additional audio wire and control wire will need to be run between AV 116 and the Control Room. Coordinate wire routing with the owner. Wire all patch panels according to standard audio wiring practices with full normals. Use best practices in terminating wire and insulating shields. Coordinate patch tie line terminations to and from AV 116 with existing owner furnished patch panels located in the Control Room. Furnish and install a Category 6 connection on RJ45 connectors from the network switch in the rack in AV 116. This connection is to provide remote control of the Exhibit Space DSP's. Coordinate the termination point of this connection in the Control Room with the owner. Project Manual: 1. Specification Section 27 41 00 — Sound Reinforcement Systems add two (2) AVP AP- A226E2-L-FN-RPT patch panels. Longframe patch panels are specified. Verify frame type (Bantam or Longframe) with the owner and furnish patch panels that match the existing panels. (See cut sheet furnished as a part of these documents) 2. Specification Section 27 41 00 — Sound Reinforcement Systems add six (6) AVP V-PC3 Black 3' patch cords. Standard size connectors are specified. Verify connector type (Microsize, Midsize or Standard Size) with the owner. (See cut sheet furnished as a part of these documents) 3. Specification Section 27 41 00 — Sound Reinforcement Systems add six (6) AVP V-PC6 Red 6' patch cords. Standard size connectors are specified. Verify connector type (Microsize, Midsize or Standard Size) with the owner. (See cut sheet furnished as a part of these documents) trrnwar who.. mantic amlc= o 1 i ; fI-1 1 2mfr..,a. 1 crmmolretm i4�.taN. OCONTROL ONEI.INE DIAGRAM 4 tAa .a 109 vx SOUND SYSTEM ONELINE DIAGRAM wt: °' I 0 I I 8 o z O • �wso e'um O 1N ..a .Nrt _p«sis �m M, [Weis 101 u.-^„a ,a. NrnSONS HahnfelJ Hoffer Stanford 200 ('inl107 Ave . Sotto !, Fort Worth. TV030 7610T 817.921.5928 817.302.0692100 CONS.XTN.TS oUtowth wcnres.L. ox rtR :.resSTRUCTUPPI mucrauuw ENGINEER uc 30. NORTH,. LCC,,pa sCltL aa/ sl nxa: tw.t 5075 TA o.lnc EG 107.,31,1 ;re^m 6.13 tN+.4iWPM wweel9 1av �1114 Cps .Xet)AewaS o ,N.h.,,. BA1 „L Consonants In Acoustics d Auc,o-Visual Technologies .16 ..r m 751 sortsx iw.s .1 u-ata.1.1 .r9 .. ERIC L W HNFELD. AA TEXAS REGISTRATION. 13978 RICHARDSON - BASS EXHIBITS AREA WILL ROGERS MEMORIAL CENTER FORT WORTH, TEXAS SOUND REINFORCEMENT SYSTEM - ONUNE DIAGRAMS SHEET AV3-0 0 SHEETS 608ER, 5E0UENCEK �. BLANK PANEL BLANK PANEL . BLANN_PANEL. _,,.,,- ...ESH GROMME?t i0K BRUSH GROMMET PANED" .jjjj.rK` 0SP 1" BUNK PANEL 1 x.... BLANK PANEL__ _- BUNK PAN — BUNK PANEL - - BUNK PANEL ........... - BUNK PANEL BLANK PANEL - Pu1E1 .� BL ANK PANEL PANEL - BIANK PANEL - B1ANK PANEL - OEQUIPMENT RACK 'SR" oria v 9 (0 O EKMMT ROW 101 MEETNG MEETING MEET1NC YEERNG MEETN0 ROOM 103 ROOM 104 ROOM 105 ROMA 106 ROOM 109 O0O0®-0O0OvOO®UOOIOCOvOO®C 0+0 050 0 0 0.0 0.0 0.0 0To 0 0 0 o wog a ao vassal o>Qo yes QQQCa?b�©OO®� OO ©©Obi 0 Pi PO OSP 1 11 NY.a L{Bra Mc ®OOOOOO4OOC OPATCH PANEL 1 OSP 2 OSP 3 1el UNE L1NC 3 UNC • UNE 1 UNE 2 LINE 3 LINE • UNE 5 L1NC 0 UNE 7 LINE 0 LINE ONE 1N UNE 11 L. 12 UNE 13 UNE 1.1. LUNE 0 ®0000000®00 ®000000 o�©000©b�oo°�o�o© O WrRNM c IFOOM ROW ROMP ROps ROOM ROOMEXNB¶]ROOM 6 XI'. c Wr> our a Wr 0 WI ,0 W1 t ROOM ROOM � } 0B0.T f 1030N108 1103 10a 105 los 0R W i J%MNITSCRow 101 104J 10S jI PATCH PANEL 2 OSP 2 PTA 0 0 (0) TIE LINES FROM CONTROL ROOM 0 000000 O8ObOO THE LNES TO 0 1 ( CONTROL R00M J!`O ED ei O vArc iN:cuulwlTtiErargrtlµ' e e e UNE N () UNE OUT (/) OWALL PLATE 'SUP' _© r 0 WALL PLATE 'C. e e UNE N (/) UNE OUT (/) e OFLOOR POCKET "FP" e NLN00Ns Hahnfeld Hoffer Stanford 200 13o119y Amy . SUll9 i- •0 11. T001076107 817.9211.0928 81 7.302.069210K 0.0.TILTANTS WNAweT ASGGCMTFAL• _ OVI ENCNEER tiaTLITONT w�1L AVENUE. In Sm CMUL ENGINEERS. LLC Sm C UR8 ENOINEFe ie+ AIONITLASI LOOP 020 SUITE e4, c',ILW EIVX., OITO UL 90. NS075 •AGGENONEEWNG.NC. OLCOBVL w 131 SUTE:IO AINNGION, TEXAS MT 71111740,37e KwNON sexam /PLuwNG EON' ILMST01T6 TET e1-0R 1m „BA i C Onsultnnls In Accoellcs 6 Audlo.V11v61 Technologies 40061P.,+.y ACIN, m 1e161 512-06-361 011-061111 1wldNaan ERIC L I-(AHNFELD, AIA TEXAS REGISTRATION: 13978 RICHARDSON - BASS EXHIBITS AREA L ROGERS MEMORIAL CENTER CIJ LU LU CC CC LL CC 0 SOUND REINFORCEMENT SYSTEM - DETAILS SHEET AV4-0 OF SHEETS A Mosaic Co. tt T Mosaic (Black CIS) 24 2x24 Jacks 26 2x26 Jacks 1 1 Rack Unit 1.75", 44mm 15 1.5 Rack Unit 2.62", 66mm 2 2 Rack Unit 3.50", 89mm Model AP-A224E2-L-NT-RPT AP-A224E2-L-FN-RPT AP-A224E2-L-HN-RPT AP-A224E1-L-FN-RPT AP-A224E1-L-HN-RPT 2', 600mm 3', 900mm 4', 1200mm IIh6YIIVIIIIYiIidlnYilll I Imtluil VI'I illlllywiilltllVlllilllllililllll'Itll IVVIII'II�Vgldlol nVl I VId10 �I d 61I11�� FN FR HN HR NN NT NTS 1 Rapid Punch Terminal Jacicfields Full Normals installed at jacks Normals Out, with Full Normals installed on the Punch Block Half Normals installed at jacks Normals Out, with Half Normals installed on the Punch Block No Normals Normals Out Sleeve Normals Out to -XL -XS -BGHJ -SGVJ Jackfield Depth, Extra Deep, 21.75", 552.45mm Jackfield Depth, Shallow, 10.75", 177.80mm Bussed Grounds at jacks, horizontal Strapped Grounds at each vertical jack pair Description 2RU, 2x24 Longframe Jacks, Normals Out, RPT Punch Block 2RU, 2x24 Longframe Jacks, Full Normals, RPT Punch Block 2RU, 2x24 Longframe Jacks, Half Normals, RPT Punch Block 1RU, 2x24 Longframe Jacks, Full Normals, RPT Punch Block 1RU, 2x24 Longframe Jacks, Half Normals, RPT Punch Block LPC-2-BLACK LPC-3-BLACK LPC-4-BLACK 110 Ohm AES/EBU Digital and Analog Audio Application sv<5wjackfields.com LPC-2-RED LPC-3-RED LPC-4-RED LPC-2-GREEN LPC-3-GREEN LPC-4-GREEN Designation Layouts... page 15 LPC-2-BLUE LPC-3-BLUE LPC-4-BLUE LPC-2-YELLOW LPC-3-YELLOW LPC-4-YELLOW ...more patchcords available on page 54 , Partners in Broadcast, Telecom & Satellite Solutions 13 Longframe Full Enclosure Ordering Information Patchcords Patent information' see inside back cover. BNC Patc Video Patchcords A4—' -.41Z:,„,1„Pg!!!!ti • fatotwordT 0 jp K Microsize M Midsize V Standard Size cords Patchcord Len tr- 2' [600mm] 3 3' [900mm] 5 5' [1.52m] 10 10' [3.05m] 25 25' [7.62m] 50 50' [15.24m] 00' [30.48m] Patchcord Length 1 1' [300mm] 1.5 1.5' [450mm] 2 2' [600mm] 3 3' [900mm] 4 4' [1200mm] 6 6' [1800mm] 10 10' [3.05m] Audio Patchcords tc r s Audio / Video / Digital /Data BLACK 41111111111111111111, RED GREEN UMW BLUE YELLOW PURPLE =VIM ORANGE ar WHITE example... MPC-2-RED ' 0.01100!e EngTeranatioi) BLACK RED GREEN BLUE YELLOW PURPLE MEMO ORANGE 614.!.: WHITE PatchcOld *Pip B Bantam L Longframe Stereo Bantam Patchcords Polarized Datacords Patcheint Length 1 1' [300mm] 1.5 1.5' [450mm] 2 2' [600mm] 3 3' [900mm] 4 4' [1200mm] 6 6' [1800mm] 10 10' [3.05m] ]r(00:000011.1151111,16111101" SBPC Stereo Bantam DATPC Polarized Datapatch vmvjacdelds tom Pakticirotenglh 2 2' [300mm] 3 3' [450mm] BN BNC termination K Microsize plug termination M Midsize plug termination V Standard Size plug termination BLACK 4111111111111. RED .1111111111111111 GREEN MINIM BLUE YELLOW PURPLE ORANGE CI.W.11M) WHITE For 110 Ohm AES/EBU Digital and Analog Audio Application example... BPC-2-GREEN Stereo Bantam AVP Datacord ...see page 32 & 42 Partners in Broadcast, Telecom & Satellite Solutions 54 Video Patchcords BNC Patchcords Audio Patchcords Stereo Bantam Patchcords Datapatch Polarized Datacords Patent information: see Inside back cover JE...L_ i C J S PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 via email DATE: 5/7/2013 RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 9, HHS # We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scope Of Work Additional anchoring of CMU to precast requested by Owner and Architect at CMU precon meeting. See attached Sub Total Markup - 10% Sub Total Bonds and Insurances Net Change This Proposal Net Change in Days This Proposal $731.50 $731.50 $73.15 $804.65 $24.14 ADD 828.79 Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner Date For th chitect Date / For Modern Contractors Date PRYOR & PRYOR MASONRY, INC. 4732 Meadowview Dr., Mesquite, Texas 75150 Office: (972) 613-2036 Fax: (972) 613-2556 CELL 214-577-2952 ATTN: AJ Date 4-30-2013 Fax: Pages (1) RE: Will Rogers Wall Anchors CHANGE ORDER REQUEST 41 This change order request is for anchoring the emu wall to concrete tilt wall per the architect. Material Labor Labor $ 100,00 Hip pins (550 units) $ 100.00 $ 25.00 (Labor Burden 25%) DW 10 Anchor (200 units) $ 100.00 $ 125.00 Slides (200 units) $ 300.00 Bits (7) $ 40.00 $ 540.00 $ 540.00 $ 125.00 $ 665.00 $ 66.50 $ 731.50 SEVEN HUNDRED THIRTY-ONE DOLLARS & FIFTY CENTS a►Z`�•T T` ( T t 1- 5 PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 DATE: 5/7/2013 RE: via email Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 10, HHS # We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scone Of Work Relocate waterline from front entry pier line and alo install cutoff valve per Owner request See attached Sub Total Markup - 10% Sub Total Bonds and Insurances $2,225.30 $2,225.30 $222.53 $2,447.83 $73.43 Net Change This Proposal ADD 2,521.26 Net Change in Days This Proposal Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner Date For the Architech Date j For Modern Contractors Date PIPE CONNECTION PLUMBING CO., INC. TO: Modern Contractors 2008 Plaza Drive Bedford, Texas-76021 PROJECT: Will Rodgers DATE 4/26/2013 DESCRIPTION OF CHANGE Relocate existing 1 1/2 waterline in the front entrance. We then installed a cut off valve. Materials pipe & fittings $630.00 Equipment F Rental Labor $1,056.00 Labor Burden $337.00 Subtotal $2.023.00 OH&P 10% $202.30 Total change -order $2.225.30 Respectfuly-Andrew Rodriguez 4811 MOTLEY DRIVE MESQUITE TX 75150 PH 972/279/2709 FAX 972-686-7195 PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 via email DATE: 5/7/2013 RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 11, MIS # We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scope Of Work Additional demo and concrete at entry 112, per Owner request See attached Sub Total Markup - 10% Sub Total Bonds and Insurances $4,558.00 $4,558.00 $455.80 $5,013.80 $150.41 Net Change This Proposal ADD 5,164.21 Net Change in Days This Proposal Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner For the chitect For`Mocfern Contractors Date Date Date r5/>1'i:? Item # PROPOSAL ESTIMATE Description I QTY I UP Additional demo and concrete at entry 112 per owner Lsum Total Demo and haul off $2,958 Concrete and earthwork TOTAL COST 200 sft $8 $1,600 $4,558 Remarks X:111TEGDRI Specialties March 7, 2013 Mr. Anil Jacobs Modern Contractors 2008 Plaza Drive Bedford, TX 76821 1421 Perry Street Irving, Texas 75060 972-438-DEMO (ofc) 972-438-4466 (fax) Re: Will Rogers Fort Worth, TX - Demolition Dear Mr. Jacobs: Please accept this letter as our instrument of proposal to complete the work at the above referenced project as described below. ➢ Inclusions and clarifications: Furnished all labor, material, equipment and disposal for the additional work as detailed herein: m04)/7241 ■ Remove plumbing trench ■ Remove additional concrete at drive 2/18/13: Saw cut trench $ 450.00 2/20/13: Labor: 2 men 8 hrs @ $ 25.00/hr. $ 400.00-1 Electric jack hammer $ 50.00 Labor: 1 man 8 hrs @ $ 25.00/hr $ 200.00 Mini excavator with hammer $ 475.00 Mini excavator delivery/return $ 400.00 pegd 2/21/13: Labor 2 men 3 hrs @ 25.00/hr $ 150.00 \-a t 5 7 Electric jack hammer $ 50.00 ,' ' i1_._12t-6 ---'' Labor: 1 man 8 hrs @ $ 25.00/hr $ 200.00 Mini excavator with hammer(1/2 day) $ 237.50 ; (J Large excavator -loading (1/2 day) $ 200.00 ?zit U ,rnontn-�) Load of concrete $ 150.00 G��� Subtotal $ 2,962.50 15%Mark Up $ 445.00 e,j`J' y c2/ 967'SI) Total Additional Work $ 3,407.50J _____::.::a' We trust you will find this proposal in order, but should you have any questions, please do not hesitate to call. Respectfully, M. 7"oddIntersoCC Speciaiiieo ANIL JACOB From: ANIL JACOB <ajacob@modernctrs.com> Sent: Tuesday, February 19, 2013 4:50 PM To: 'Todd Ingersoll' Cc: 'Keith Farmer'; Alan.Bagamery@fortworthtexas.gov Subject: Will Rogers additional work As per the directive from City of Fort Worth, please proceed with the additional demo at entry per field discussions. Please track this work on T&M. Please make sure to get Keith sign the labor hours each day. Thanks Anil Jacob "AJ" President 1\60DER.N ONTRACTORS 2008 Plaza Drive Bedford, Texas 76021 www.modernctrs.com Office 817.571.2320 Fax 817.571.5805 Cell 214.883.2626 aiacob@modernctrs.com 1 C) I i- i it ()-1\T' 1 ' ` TOE R S PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 via email DATE: 5/14/2013 RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 12 Revised HHS We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scone Of Work Additional demo and concrete at sidewalk near trailer per RFI 19 See attached Sub Total Markup - 10% Sub Total Bonds and Insurances $3,330.00 $3,330.00 $333.00 $3,663.00 $109.89 Net Change This Proposal ADD 3,772.89 Net Change in Days This Proposal Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner Date For the Ar hitect For Modern Contractors Date Date I PROPOSAL ESTIMATE Item # Description I QTY Sidewalk remove and replace per RFI 19 Demo and haul off Sawcut Jack Hammer - 8hrs labor+equip Bobcat - 2 days Hauloff - 70 cft - Concrete and earthwork TOTAL COST UP Lsum Total Remarks 1 $600 $250 $1,000 4 loads $250, $1,000 60 sft $8 1 $480 $3,3301 PROPOSAL To: Hahnfeld Hoffer Stanford 200 Bailey Ave, Suite 200 Fort Worth, TX 76107 via email DATE: 5/16/2013 RE: Richardson Bass Exhibit Area Renovations - Will Rogers Memorial Center Modern Proposed Change Order (PCO) # 13 Revised HHS # We hereby propose to supply all supervision, labor, materials, and equipment necessary to complete the following described work. All work will be performed in a professional manner with quality craftsmanship Scone Of Work Asphalt work at stalls 1. Saw cut and remove 2' entire length as directed by owner - see attached from concrete coring $900.00 2. Saw cut and remove ramps as directed by owner - see attached $750.00 from concrete coring 3. Asphalt patch as directed by owner - see attached from Amardillo Sub Total Markup - 10% Sub Total Bonds and Insurances Net Change This Proposal Net Change in Days This Proposal $3,600.00 $5,250.00 $525.00 $5,775.00 $173.25 ADD 5,948.00 Acceptance This proposal is accepted and agreed to this date as indicated by the signatures below: For the Owner Date For t e Architect For Modern Contractors AVE_ T /Yro Date 111 b3 Date f-1KIVIAUILLv rNKt\livv LI..)I IVl/-i11V 1 CIVNINL, 253 WINDSOR LANE SPRINGTOWN, TX 76082 .817-220-0778 office 817-220-1498 fax QUANTITY 1 MODERN CONTRACTORS(WILL ROGERS MC) 2008 PLAZA DRIVE BEDFORD, TEXAS 76021 KEITH FARMER 817-226-6175 L_ DESCRIPTION INVOICE DATE 5/16/2013 INVOICE#MC100 TERMS DUE UPON COMPLETION SALESPERSON BRAD STONE TACK COAT AREA 8'X10' INSIDE AND PLACE AND COMPACT TYPE D ASPHALT FOR RAMPED AREA AND DRAINAGE. 1 TACK COAT AREA 5'X10' INSIDE ADN PLACE AND COMPACT TYPE D ASPHALT FOR RAMPED AREA AND DRAINAGE. 1 1 1 1 TACK COAT AREA 5'X10' INSIDE AND PLACE AND COMPACT TYPE D ASPHALT FOR RAMPED AREA AND DRAINAGE TACK COAT AREA 5'X10' INSIDED AND PLACE AND COMPACT TYPE D ASPHALT FOR RAMPED AREA AND DRAINAGE. PRICE AMOUNT 600.00 600.00 600.00 600.00 600.00 600.00 600.00 600.00 TACK COAT CENTER AREA 120'X2' INSIDE PLACE AND COMPACT TYPE 600.00 600.00 D ASPHALT FOR DRAINAGE. APPROACH TIE IN TO CONCRETE APRON ON OUTSIDE OF BUILDING. PLACE FLEX BASE TO HELP WITH DRAINAGE OF STANDING WATER. TYPE D ASPHALT COMPACT, WE APPRECIATE YOUR BUSINESS. 600.00 600.00 0.00 0.00 Subtotal iE00.00" " Tax 0.08 28 TOTAL 38.00 ?CONCRETE 9 CORING &COMPANY, INC. 9738 Abernainy'Ae: (214) 357-9334 (Phone) Dallas, Texas 75220 (214) 357-9402 (Fax) 7 MODERN CONTRAC1ORG 2008 PLAZA OR. BEDFORD TX 76021 \s„ iNVO 47.57-N- Associated Bader, and Contractors, Inc. Jobc:ito Info,/P0 1501 EP 3OHNOON ETD TX DATE , NUMBER PAGE DUE DPirl / 2 2/ 13 /i627 1 Ob729/-.L3 CORE DRILLING - 027290 ELFCT SAWING/RFNOWIL DATE RECI1 05bi /0 SUPVR. I t PROJ. MGR. DATE PAID CHECK NO. AMOUNT 2.0 @ 45.0000/EA. 300.0 q_3.0000/EA. REMIT PAYMENT TO - 9738 ABERNATHY AVE., DALLAS, TX 75220 MEMBER NORTH TEXAS CONTRACTORS ASSOCIATION 90.00 900.A. to i Lc 6'2 t-vz_ P 0" tit-r tptobott._ (r---) /2 5. SUB TOTAL TAX TOTAL liMN\ 11110% I - NET TO PAY Y90.00 (.)00 990 00 ',190 00