HomeMy WebLinkAboutContract 55216���� �����
�
CONTRACT
FOR
THE CONSTRUCTION OF
�a°`� S��i��. i �s�,`�
��i�`�'����' i�{�... .. �� — __,
202�. Sidewalk Unit Px�ce Construction Can�ract
City Projeci No. l D2520
,� .
�� �;
,�
:;:�� . .
..� ���
Betsy Price
Mayor
David Cooke
City Manager
William Johnson -
Director, Transportatian and Fublic Warlcs Department
Prepared for
The City ofFort �orth
Tr�.x►sportation and Pnblic Works Depat-�menf
Ocfiober, 2020
.
a cP�� �� rE�q� !�
�B 5 - '�'
'� ..... ........ .. ................... **+f�
SHAMM! RAHMAN �
a:;...... ..� 3651 p� .......... ...�
; �'•. � ��
��°` ��/��wsEN�\��i.m�
l�s O L � � d�����
� ,1
�. _ �
_. . , = a�
y .« �, ' (� pp,� ��y(
� ... ,'.d4���MR1N4�
,.., .� ����� ���
i
��� � �l
i � I�rl a
C�� of �����''IIo���
�
Standard Construction Spec�fication
Documents
Adopted Septezxtber2011
0o aa ao
STANDARllCONST'RtTCT10N SPECIFICATIONDOCUM�,NTS
Page ] oi9
sECT�an� oa oo ao
TABLE OF C�NTENTS
Division 00 - Ge�eral Conditions
Lasi Revised
00 OS 10 Ma or and Council Communication 07/01/2011
00 OS IS Addenda 07/01/2011
00 1� I3 Invitation to Bidders 03/09/202fl
Ofl 2I 13 Instructions to Bidders 03/09/2020
nn�� n� ���n�
00 32 15 Construciion Pro�ect Schedule 07/20/201$
Ob 35 13 Ca�aflict of interest Statement 02/24/2020
00 41 OQ Bid Fonx� 03/09/2020
00 42 43 Pro osal Form Unit Frice 01/20/2012
00 43 13 Bid Bond 09/11/2017
QO 43 37 Vendor Com liance to State �aw Nonresident Bidde�� 06/27/2011
nn��i n� fn��-
00 45 12 Pre ualif"rcaiio� Statetnent �7/01/201 I
nn�� n� rn�IIn
00 A5 26 Contractor Com. liance with Workers' Com ensation La�v 07/0X/2011
00 45 40 M�iz�orit Busin�ss Fa�ter rise Goal 06/09/2015
nno ��r n�rn��
QQ 52 43 reement 09/06/20I9
00 61 13 Performance Bond 07/01/2011
DO 61 14 Pa ment Bond 0710 1 120 1 1
00 61 19 Maintenance Bond 07IO112011
00 61 25 Certificate of Insurance 07/01/2011
00 72 00 Generai Canditions 03/03/2020
00 73 00 Su lementar Canditions 03/09/2020
Di�ision 01 - General Re uzxements Last Revised
41 1100 Sumrnar of Work 12/20/2012
dI2S00 SubstitutionProcedures 07/01/2011
O1 31 J.9 Preconstruction Meetin 08/17/2012
O 1 3120 Pra'ect Meetin s 07/01/2011
O1 32 16 Construction Pra ess Schedule 0 710 1 /20 1 1
O1 32 33 �'reconstruction Video 07/0i/20I1
O 1 3 3 00 Submittals 12/20/20 T 2
O1 35 13 S ecial Pro'ect Procedures 12/20/2012
Ol 45 23 Testin and Ins ection �ervices 03109/202Q
01 50 00 Tem oxax �'aciIiti�s and Contro�s - 07101/20l l
01 SS 26 Street Use Permit and Modifications to Traffic Control 07/01/2011
O 1 57 13 Storm Water Poltution Pre�ention Plan 07/01/2011
01 58 13 Tem orar Pro'ect Si na e 07/01/2011
O1 60 40 Product Re uirements 03/09/2020
O1 6b 00 Froduct Stora e and Handlin Re uirements 07/01/20ll
O 1 70 00 Mobilization and Remobilization 11/22/2016
Ol 7l 23 Construction Stakin and Surve 02/14/201 S
CITY OF FORT WORTH 2O21 SidcwalkUnitl'rice Conslruction Cant��acY
STANDARD CONS'fRUCTION SP�CIFICATION DOCUMEN'TS 102526
Rcvised March 9, 2020
Division 03 - Concrete
T3ivis�on 2fi - F�ectrical
00 00 00
STANDAKD CONS`I'RLICTION SPECIFICATION DOCUMEN'I'S
Page 2 of 9
Date
Modified
Technical Specifications which have been modified by the E�gi�neer specificaIly for this
Project; hard copies are included in fhe Project's Confract Docn�aents
Div'rsion 31 - Earthwork
C1TY OP PORT WORTT� 2621 Side�valkUnitPrice Consh'uction Contract
STANDARD CONSTI2UGTION SPECIFICATIOIV DOCUMENTS 102520
Rcvised March 9, 2020
Di�ision 33 - Utiiities
� ��� ��
�� C-�s�6
�8
�-84�A ��a
.,
�, „ Y.
�, - .. . , - —
� �i'fiiiL}��•�•'�""
. . � . ...�� �.n�.
...���::.r:::iii:��
� '.iiii�.�'. ��� .i �i �
� ��.:�..y �•r -
���
1'.���- � .'.,�
: ; - �R.����,�...��,._.,.�.....�.,..
0
�
�
� �
�
�
�
�
�
: !
�
�
�
�
�
�
�
0
�
�
0
� ■ �
�,�fi�
.�,:. f �i,Z
T,,...-.,.17.« .. Tll„+„
txr„+o.- c e....,,. �� r ,.�, t„ �. „�
CITY OF PORT WOTZ'i'H 2O1,1 Sidewa[k OrtiEPricc Consiruction Contract
STANDARD CONSTRUCTTOIV SPECIF3CAT[ON DOCUMENTS 102520
Reviseci Mai�ch 9, 2020
00 fl0 00
S TANDARD CONSTRUC'f IOI+l S P ECIF �CAT ION DOC LiMENT S
Pagc 3 of 9
00 00 00
STATIDARD CONSTRUCT IOhI 5PBCIFICAT ION DOCUMENT S
Page4of9
Technical Specifications listed belov►rare incl�ded for this Project by reference and can be
viewedldovvnloaded from the City's website at:
http: ll fortworthYe xas.go�/tpwlcontracto rs/
CITY OF FORT WORTH 242I SidewalkUnitPrice Conshucfion ConYract
STANDARD CONSTRUGTION SPECIk'ICATION BOCUMENTS 102520
Revised Manch 9, 2020
DO 00 00
STANDARI� CONST12i7CT101�! SPECII^ICATION DOCUMENTS
Pagc 5 of 9
or
https ;//a�ps. foxtworthtexas.�ovlProj ectResourcesl
Division 02 - k�istin Conditions
02 41 l 3 Selecti�e Site Demolition
02 41 14 j Utility Reinoval/Abandonrraent
42 41 15 Pavin� Remaval ���
Division 03 - Concrefe
Division 26 - Electrical
Division 3l - Earthwork
Last Revised
12/20/2012
12I2012012
02/02J2016
31 IO 00 Site Clearin 12/26/2012
3I 23 16 Unclassified Excavatian �1/28/2013
31 23 23 Borrow 01/28/2013
� ,�� �� A�t�, �, �
31 25 00 Erosion and Sediment Cantrol 1 2/20120 1 2
� ,�o �rie� �9/-39�3
31 37 00 Ri ra 12/20/2012
T!___•___._ �f�1 1':� �. . . .r
Cl?'Y OF FORT WORTH 2O2I SidewalkUnitPrice Conshuction Conk•act
STANDARD CONSTEZUCTION SPECIFICAT[QAI DOCUMENTS 1D2520
Revised IVlu�ch 9, 2020
Division 33 - Util�ties
�-B-I �B
3.r3-9-T-�
�'�
��-9�-�9
2 ��-vzR �..
� �� n�z
� � n.t � n
�-v-r-�v
�-84,48
�-e4�-�s
33 OS 10 UtiIi Trench Excavation, Embedment, and Backfill
33 OS 12 Water Line Lowerin
��_-��
�
33 05 13.10 Frame, Cover and Grade Rin s— Cam osite
33 OS 14 Adjusting Manholes, Inlets, Valve Boxes, and Other St�-uctures ta
Grade
�� �„�,...,.�,. «r„+,,,. �T,,,,i+.,
33 OS 17 Concrete Co]Iars
�$
�� nc _� rr,..��..t r .,-. �. nt..+o
�-oTti� v
�� nc ��
-ra-o�-zz
� 1��
�4
33 OS 26 Utilit Markers/Locators
33 05 �0 Location oiExistin LTtilities
�-�11� > >
33 11 10 Ductile Iron Pi e
33 11 I 1 Ducti�e Zron Fittin s
33 11 12 PoI ix� 1 Chloride PVC Pressure �'i e
�� � �
�4
33 12 l 0 Water Services 1-iunch to 2�inch
�-%
33 12 20 Resilient Seated Gate Valve
� ��-'�_
33 12 25 Connectian to Existin Water Maiz�.s
�8
33 ] 2 40 Fire H drants
'��
�
33 31 12 Cured in Place Pipe (CrPP) __
12/20/2012
03/03/2016
12/20/2012
12/20/2012
12/20/2012
12/20/2012
Q2/�6�2�13
� �zo�2aiz
12/12/2Qlb
12/20/2012
nrr���,��nT�
01/22/2016
12,/20/2012
���
12/20/2012
� � r�,:�,�r�,��
��
nr.ri�, o�.r�i�n�z
12/20/2012
t � r�,� n�
12/20/2012
I2/20/2012
I1/1612018
�3
02/14/20I7
t ���,�
i2�zo�zai�
���
02/06/2013
i � r���r�n»
Q1/03/2014
�3�39�39�3
n�r,�i�
12J20/2012
CiTY DF FOA1' WORTH 2O21 SidewalkilnitPrice Conshvc�on ConhBct
STA3vDARD CONSTRUCTTON SPECIFJCAT[ON DOCUMEN'T'S 102520
Itevised Marcii 9, 2020
00 OOOD
STANDARD CONSTRi1CTION SPECIFICATION DOCUMENTS
Page 6 of 9
oa oa o0
STANDARD CONSTRUC'TION SPECIFICATION L70CUMENT5
Pagc 7 of 9
CiTY D�' FOTtl' 1NORTH 2O21 SidetvalkUnitl'rice ConshvcYion Cantz'act
STANp/�ZiI� CONSTRLIGT[ON SPECIFICATION DOCUMEI�ITS i42520
Re�ised March 9, 2020
oa o0 on
STANLIARD CONSTRUCTION SPECIRICATION DOCUM�NTS
Page8of9
Appe ndix
��1�� c„t,�,,,-�'.,,,� nr,� n�,..�.;,,�t r�„.-.a:t,,,,,�
6� . � rr.,,�e.-,�,.,,,,�a ��,.;r..;o�_
GC-G.06.D Muiority and Women Owned Business Enterprise Coznpliance
GC-6.07 Wage Rates
�r � nn n,,,-,,,;+„ ..H,� r r+;r..;,,�
w .
�—��4 �.r,.Ka;r,,..:�...:.,,,,.,.�
SD 1.00 ,Standard Cor�struction details
�ND OF ST.CTION
CITYOPPORT WORTH 2O2I SidewatkUnitPrice Construcfion ContlncC
STA�V�ARD COIVSTRLJCT'ION SPEC�ICATION I30GUMEi�iTS 102520
Revisad Much 9, 2020
11I3412020
��-r�r Cv�n���L �I��t���.
DATE. '[111712020 R���R�I1IC� **M&C 20- LOG
NO,: 0849 NAIV��:
�fficial sitA oi ttie Cib� of F�rrt Wasth Texas
��ORT �'V�R7H
��
20-202'! Sf�EWALK UNIT PRIG�
CONSTRUCTION CONTRACT
CODE: G TYPE: CONSENTPUBLIC NO
HEARING:
SUBJ�CT: (ALL} Auff�orize Execution af a Unit Price Cantract with Ti-Zack Concrefe, Inc. in an
Amount Not to Exc�ed $1,OOD,000.00 and Ken-Do Co�tracfing LP in an Amount Not to
Exceed $1,000,000.00 for Task Orcfer Construction Services for the Installaiion a�
Sidewalks and Americar�s with Disabilities Act Ramps, with Two Renewal �ptions
RECO�ilIAAENDATIOR�:
It is recomme�d�d that the City Council:
1. A��i�orize execution of a unit price contract with Ti-Zack Concrete, Inc. in an amoun� not to
exceed $�,Q00,000.00 For task order canstruc�ion services for the installa�ion of projects
relating to sidewalks and Americans with Disabilities Act ramps, with two options for
renewa[; and
2, Authorize execution of a unit price contract with Ken-Do Contracting LP in an amount not to
exceed $1,000,000.00 for tas�C order constructian services for the installation of projects
rela�ing to sidewaifcs and Americans with Disabilities Act ramps, with two options for renewal.
DISCUSSION:
The purpose o� this Mayor and Councif Cammunication (M&C) is ta authorize the award of contracts to
Ti-Zack Concrete, Ir�c. and Ken-Da Contracting �P. This contract wifl provide for canstruction services
on an as-needed (task order) basis for the construction of projects related to sidewalks and Americans
wiih Disabilities Act (ADA) ramps within the City Gmits of Fart Worth. Th� contract amount is capped at
$1,OOO,DOO.QO each for Ti-Zack Concrete, Inc. and Ken-Do Contracting LP, The confract terrr� is 365
days and may be renewed up ta two {2) additianai terms upon the expiraiion af co�tracf funds under
fhe same terms, conditions, and unit prices. The project was bid in a low bid format to deferrnine unit
prices to b� paid when task arders are issued.
Notice of bids was published in the Forf Worth Star-Telegr'am on July 23 and July 30, 2�20. On August
27, 2020, three companies submitted the foflow�ng bids�
Contractor
Cam�Cre#e Contracting, ]nc.
i�Zack Concrete, Inc.
Bid
$410,��o.aa
ki �� �ii ��
............ .. ...
Ken-Do Contracting LP $862,0� a.ao
Cam-Crete Contractin�, Inc. is being rejected far submEtting an incomplete �aid. The unit prices of the
remaining contractors were compared ta other simi[ar projec�s and were determined to be fair and
campetitiv�. Task orders wi[I be paid at the esfal�lished unifi prices. Projecfs identified initially inciude
sidewalk insta�(ations on W. Long Avenue and E. Berry Str�et.
Ti-Zack Concrete, Inc. is in compliance wifh the City's BDE Ordinance by committing to 151% MBE
participation on this proj�ct. The City`s M�3E goal on this project is 151%.
Ken-Do Contrac#ing LP is in compliance with the CE#y's BDE Ordinance by committing io 151% MBE
participatian on this project. The City's MBE goal on this project is 1�1%.
FISCA�, IiV�ORIVIATIONICERTIFICATIDPl;
The Direcfar of Finance certifies that funds are a�ailable in the curr�nt capital budget, as pr��io�sly
M&C Review
apps.cfwnet.org/counci l�acketlmc_review.asp?l �7=2849 8&cou nci Idate=1 1 19 71202 0 '� 12
1'E134I2024 iVl&C Review
appropriated, in the Generaf Capital Projects Fund for the FY21 Paygo ADA & Sidewalk (City Project
No. 102995} and the FY20 Paygo ATP !mp (City Project No. 102520} projects to sup�or� the approval
of th� above recorrimendations and execution of fih� contracis. Prior to any expendit�re being
incurred, the Transportation & Public Works Depar�meni has the r�sponsibility to validate the
a�ailability of f�nds.
Fund Department ACCDlltli Project Program � Acti�ity I Budget � Reference # Amount
[D 1D Year Chartfield 2
Fund Department Account Project Program I Aciivity � Budget I Reference � Amount
Ip Ip L Yea�' {Chartf�eld 2
Submitted for City Manager's Office by_ Dana Burghcfo�F (80�8)
Originating Depar�men# Head: William Johnson {7801)
�►ddifional lnfarmation Contaci: Tanya Brooks (7861)
ATTACHIVIEP]TS
M&C Map E Berry�pdf
M&C Map _ W Lor�g Ave.pdf
apps.cfwnet.orglcounci I_packetlmc_review.asp?I D=28418&councildate=i 1l1712020 2�2
(li6 �5 I S - I
hF}['�PhPli,�
�F.1�'I; f €P� �
1
��i�� I't��'+� Iltl M7� 15
� ��.�}�]T�!]�U,�i I'a0. �
:t �[f3:! ,�'�.�1L+�'�Ax_�{� ���'1'�'.Yit��.�'. �:t:��i:a'£�tU�f.'i���li�i
�I ��.�i"�'Y'd��� +C."i': � f��ti��9
H
�
7
�
�1
I 41
II
I�
13
I ap
k�
' fa
i7
J$
��
�[!
��
��
��
�+�
�5
2G
�4e1{��Mrc��iri� T�lc�_ I Tssuet�: Jnn��[�ry 3€�, 241?{.}
Tf�a [:�m�tr�3ct �,i�i �o�:��ira.,�t� Far� �}�i� ��'+;ajea�# ��'e P�e`�.by ra�Y���tM €�r t�rli��ssiuei I�i ��fls`ifj� tkrs:, t��il�wii��Y�
I. E�fiio���+�� �T�:aC'�'141(Kl Ildi i:l d?�i1`��Jf'�'��'V"I�.l��I'"�'(! T�����ii+�1C��+ ia.i�cl re.�l�ai.d°,s�ii#�
i��lur.li�a� rivisrta� 5����'�Qlk'� 11[i. �i 1,�-- ll.['� i�+:�'�r�x"�(l�1`�'i'fD �l�j1�IDk�� x�'�i
I`I�.+��� �c�crM,p+'�1c�iN+� r�t�uf��G a.ai" �l�i.� ��ricT�dtr�E�fi�r ��y sJg�ttr��� ryrkil Jas�,�r,t�n�. lor��.r yu��r �ka�u�,i�s��l �l ilte il�Kra t7f
��Vid�lke��. !i€��l�es G[�a ���l��� �i :e si�ric;� �s��ay �,1'tEio� sEal�lrsiiil��t�t �it�qy I�u ���suM�ris #�r re�kiCt.� ���g, �It� Lritl H:�
�� ri�t��:::�� G�I�;:� �'tP,
L'��:�;e�jrl ���icSl+���dIL�{��;�9 :
}��,: �� .� � �
_�
C�
� �:�� ���.����� �����,�����.
�� _
�;�rl�r�uEai 1�n}4r��n��
4�['a�e+Ct tv�a���;e��
�]�D �.?�' �CCl�I�f�
�il� f stf�c�,s�i: unrr Pr1cr �'on�rr��t
Li'P Y C]F �f3f��' �C�f�'i3-E
57°�4.'M1[7Ai#C? C�f7*J�TT[8llLFflfxN 3PL��i�°tlC:l{'flf.�, 9 I'��JCI.pNJf:i�7fi� PR�S�.�i
Ft,e.vistid �Eily !, �fl] 1
rl[pai,, T'7 i
r'�111a7�1�!I?,'1
k"u+;,• J i � I t
�
�
;t
iJ
�
�
!
�#
R�
�{4
C�
1:�
��
� fl
i'S
I ��
IJ
N fl
!+�
�[�
�I
i�
1;i
�1�
�:�
�r�
��r
t�i
:;?+a
;�ta
�M
��
�_�
;��k
;°i���'"�I�QI� �EF�J #I'i �'�;
,+�I.�.�)I°;�NW ��
.�S�Yia!� 1 1'� W�� R�a A`4`� IR �I a if�� N t� p�i � 7&�4 II �� PF� �.��� �]'I y7� �� B�.l:�� �,! F� 5�� �.�# 1'M �J�'IF� �� .��i �;
��k��il�l ,����I�y�teyew�rh I"+�+r�. Z M++;c�q����; �tr�;kw�>� 4!"i, �!��f!
'�'f4u �:'�,iiE►'a��;l t��i�� r����:wn�ia.t��.;, i��i' 111�i: �sa'�rj�:csf 7�'�� ��c?i°��I}�r r'c;��i��:;�i c�r' r�6�«,iici�;t! f{� a,l�wi-if"y fl�z�
� i ��RE r�,V» 1�!;� e
l.. F��:e��r�v�ts :�ill��d_:"�'�� b�+f Il1� ��:� f�'� ..�'A�P4.�q"+i�;��1,i, t�'�l�B{��+'i1 ��p��tl �°cipaW:xA.��� �e�ii`Ir
��44'a���Yl�° e� �'d��+���sai'����+f '���d�f bl� ���4 f� �: 4;S • ��"4"*d ��°�S �"ih�� � �+� ��� �il
:�. I��aM�M�Vs :-;q�,�:��'n�:��l Ik4p 1tiiF V�4E �'�'�. G� �.�p+: ����i' �.a � I`�J'b`k{��'�'tl'� d���o�p w�t����ii�sa� +��kd Co
��d#.����r�!rJ ra�ui��,rl �5��:� °'�"w+[;�I`� ���D iGi� ��41 '�'1�.1��.�R{: �_a�+ �t.'?�!�'N°p�3�"N"�'ti
,`�. �`at��N;����.+la���a;�:�. !'i t�p t.'#}I'+l+�:ali�j�'M'��s�;�l��+,�1�.1,�£, ��{��'1'Y��'4VA�' �l''�1�
�F14��Il�1 ���k� �+'�������. l���� ��, a►�E�� eN���r��i`����1��►ia�.
��. ��llN `7�S°�°�ier���.�� ��� p�3 ��'SIJM�:��A!�+II�����...I�AR%��/'�I'�#�/������q�.�A�L�af�,.`4�1111.�
�'l�N.fl�l+��1" +l:�l'�"7'f�;���� ���alla ������li�e��a�l��a���.
� �
� I'��.rM�a-��ar:lf�������f�a��;t: r's��;�.ir����l �il�"11�3� ����IE�as��tlMaEh� ���'t�i��F�w�r��, ����ir! iwr���r'liG��.�; iw���x }�����t' �,rr���r�a�:al ;
��tl i�a�: li�����ti� ����f�.[�C�ii���;a I��"rfi�E����r, i.�> p��t��w'�� r� t�3�n�°�i�l �:�i�ty ��f'iiMi�;: str��P�.at��Mp��� ���fiy Iw�: ����+�ioai�t�.; ;
�
; I�[�r rc;il�i�s��i�r�; l�M�: 11G[� �r;; �l��rkl'�'���tUl�r,,a'V�.. i
����.'��,� �"i' ��.'. k� ��lv�rp,��!����rw��;;�:
ii�; ������'F � � �
r
.�
�:
�.
�`3�'l.rz�.�i�,�- r����'�,i�r..c'�t.
l� �f: -- —.� _
;:I I �, ��hr� I I��► f{��1�'r'
#�i�t:�,�L�s'1' M�t�lf�(e��l�.
[=C1°Y �F1� ],[11#1 #'TC1�tY'!I
;l11�1 C�Ii1���a�II�UtM11 C"�itn �f`�ir�l���:t
I�YX`r�[I
w'C' �5� I*Il]/s I{ i) 4;{ St�l.i I'I� 111."I` I f}I"1 i� �'1 of :II'!Y' h'�' fi7i G 13I1C:1![ti11:�+i T�
I�cvil�r;C MM+I}� I, 'l.�l I I
ti•,a fh5 ls -z
,11 }1'��:'J13+1
I'n�,�u � nf 3
� �l��l:d�f�ll�v1:� f�U���'I��� n r��M �tit�� ��IEit�
�
� .� i� , I ,, . , . • �� , i . � �
'i
�S
5 ii � I� ;� ill��
C�
� � °, i ,: ��VI ��I• I��� I� i� lel,� � �II� � i" � � �li i� �.�..�i� �:i,n��� I! ��i�� i', �J'r��l pi�lilit. �;It �,py�w i.
i]
� � ,I f9 ll �� I� ir ue�:i��•� ii;'� e_�'i�;it'i I' riiy'P;IF.iii� I i�, o I��
� V° r� I�, �I il i �� iii N� � �i' .� �� . �,�
� �� �
I�
�i'. i• .I� � E �� �� , ' i� � I � — I i � I �. �.
13 � i'�'��` w�ii�� ���°�ai',
E4
tS ,,+,��r: �1��
l �fi
�Ri '".,�ucu'� �� I �' E��,�ar :9ii1t �r��P7�^ �.drf ir"�7�.. rf� ^��''i lk'� ;�1�7 I I�+ IT'�—{� a�� ItiG�� ���r�,' �*r' .'ilm1���0"�
��i i i ���
1 t�
Ll! � . y.. �- i� ,,� i. . i0. ii ylllh . �,lerl�ll :il �.i �. �I' II �I lil- I�., i ���'�.� < ��,
�4
� . Iro��k. �In�rr 1�, �i ltX�a� �lc_�rM liti ii,lurr�tir�. :f[r���. 1�W'�1�uk titi��IV ��� �;+�;1�1,, I�.���'E; K�� itl �0'��4'�+'
7`� � ��,�K.wG�+a'�
�
�� ��� i`��r�r fl tiN��"1'Iy1�� ini iC��� wJ�i� `;�rr�x�.- ;I�H�r iiri,.� ri��l Ilr-rr� �ri 1��� Ir-fil`I�r��t�a't ��CN�ai=r�� i'�'��l�t'1"��_
�6 .,� . ;� , I:
.�7
:7q , F
Li"1 ' � �II � i� � li,��' .! I�I� II� I��: �, n �� Iri +, . I �+il� .I.,� iiM,i I�i� . �'. �II'�. �6�• . �li�'� � i� �
�� �." iJl �il�;..�
��
�� .�, � I ,� i �II �����
�� ,
�3 ����� i� � I I�� �� � n�� �Iriai� I'rri `tlrtisPda± a,si��r�,k r„ 'f��rllr�. �'r�rr�r�,M C'�A�i +��,�a'ti�� 1rTN 61���
�� I � , „ .
��
�fi , • i i ��, �. i, I I�" �"sti11M1�M�, ,�,��I�, °�I�tIN�Ml4�� -� � I �'�M iF� ij..� �G^ Ir� M'1"
,l! ���I��,II �li � ��pi ���I ili I,'.� ��.. � � II� ' ��"iiP�,F�,i��t I,:1 ';1 I'T
J�
��
��
�91'Y�FFUi�T'4Vf�r�lT�! �$�i Si�Ievv�ikllr�E�T'ricn �`��ylrnct
I G29�.�
S T.n,�f F�r1I� D C.'�11Y5'r,� l[1G�' I(3hf S P FC 0.�'TC*�� [Uh t]€iCUM��l7''�
R�ulucyl 1�sl�r I, 7t1� I
Cl l� �U5 I 5- I
r�J�t3���1�,r1
I`�gv I lal' I
:s��:"x`I�ralr�i tlu li:�t l�
� ����t�,��r�! �!�t�.,�
3 �:��x SI����Yr�i.�l� lIIV�'�' ��i�+L'��: �f:��NS�'I��l�"�"��?1'�
•� �:"t:)I�'f"F�t�C:�; _f���r,Tll
5
�
7
�
�
�U
I1
I�
�3
I �M
I�
I�
17
18
l'�
��
�1
7�
i3
.��
��5
��
,�cl�d�n�lur� �ln, � �sr�a�c:�1; ��x��r�t �_�, ���U
',C�� C;`�ir�trec� �xn� d��wa�nt:nt� I'r��� I#`i� pr�j�:l �ra ���+�b�+ ��Y����{ c�r pr�����xi t4 clurf�y G;k�� ft�Il[��v�n�,sa
�. ��xr�r�v���F��"f��hd.�i_�_1 f 1� ��tVVI'�'�'��'M,�±1.'['�l��l���'.,i�� �4aiR! ra p�c� ►+�it�
� t��te��ti. r�ul,c�tl �.�'�`t"�`���'� ��1 � 1 X� � �'Y 4". � j"�S,'�'�!C?1� �"t.� �� 1�1��t;.��
I'I�u�s� n�c]c�E�Fxt�ledl�u r���i�� �r:"'d�#s ��I�l�nclu�,� lay �I���i��� a���rJ �ai;s�s��is��; Jr��t� yd�ue �rrc���s�ti9 r�t lls� �i�rtc �rl'
LrR�[c[diM�;, �aift��� t� r�tur�s n�i�rr€�� a���}r+��' 11�J� rtir��e�'d�,r�x rrar��+br: ��,�iE�rls i'+}r ��arid�ele��, �1�� k�icl t►x
�i�,i5xusp�atearva.
'��{;Lt���7L 1�,H�4.IIW5'�Z�.11�ryc'.�: ..
,,� �
� 3y, _ .r��` ,� �:-� `�
.�::
�
�i`}��ll'�P.1/�.�. ,�{.��1-I�I.�,1e
��. —.
tilw�n�s���� l�n���,�iu�
f'ro��s�l IV�ano��r
���, �r �:��c,�
CI7' Y 4Er l��1#� 1'lii�[{7 f E
�'rnr�ia��rM +c��+sxa��-�ca:� s�e�Fr•tc�n�r��a� r�r�c��r�4��
x������ �uGy i, aai �
�u�� ������i��,�r�,i�a�,�� c�a������r
inas�a
00I113
INVITATION TOBTDDERS
Page 1 of 3
SECTf ON �0 1I 13
INVITATION TO BIDDERS
RECIIPT OF BIDS
)}lrr �c� f17c. �'Cli,'E��l�l �::i���:r�;��c�c.y �icc+�:ar�ci lr}�� t�yt: i=�ev ��f [�c+r[ �'����t�a zGn�; �Fniil 11,4� cs�ier��e�tt.�,+
cfec �i, r�ti«i�, �s �7�7��.i7r�e�J, :i� R-c-�i.i�ac�i�c�, sealed bids for tlle construction of �0�1 Sidewalk Unit
�rice Contract , CPN 14�5�0 will be received by the City of Foi-t Worth Purchasiu�g O�fice
until �:30 P.M CST, Thu�•sday, August 2i ,2020 as further described below:
City of Fort Worth
Pu��c�aasing Division
200 Texas Street
Fort Worth, Texas 76102
�1L;S 1Yllk �?[, ;:�'�4-�:;�}��L:{'� t1�:P;
�. �_I� �'�;�i.i ::i il�� :rtii�l��t�, .�4�t�t�e,
"', Zt}� c,�7�ir��;�, f°'��i I�;� ���� 17��«ai ticla�e��}�� �i�eaii� �; �fi- I;3t� ��n ��°h��r�tl=f��. r�,rJy ;�t t}7e SauLti T�7d
Lui,1��� �,fC°i�v �.i�l Icsci�tea� ��f �t7{�T�.+��s �its�e�:l_ F�iart �4��r1�, ���:x���i�o-��.1'' AF`«��cl��sii7�
D�C�����F��cs�s ���#�C` ��c� w��a� ��� ill f�c. av��lala€c. tr� �c�.�.�d kfte. h�� arir� �,rtr��itl� :� tin�e wt.�ir����.c�
a �l��i��ti ur
� ��tf�c ��fdiier c��,sF�'c.� i+� wuki���it IJ��, E�ril +�3� r� tl„�� c,� t�a��e �tfi�r [��si� 11�� ��.�iy;+;s�t���
�I 17��� wc:�k�, �.he C�i�J€��r r���E4s �:��r�lrr��[ Ihc: l'i.is�€�I�,�si,r�, �]eE�r���tnaciii r�uE�in� r�rF�-mail �v��r�ito�
I�c���e� ��[ � I?-= t�?-?-6�`iL �ti, r>>,::Ic� ;kn .i��d�rslfl� 113er�! L�+ r�l�,s�E :i Pui c I1t�s irs� �1.,.,���i-rm�ra�
tt�j.�}la?y�:� ar t�i+' :��n;17 f:97rk ��.-rk7l�� �F'C:i�y f-I,�II Ic�t-����r�:l� �?#�4t1 `�e�€�:� �t�-��.�, I��.irR �4�c�rlk�.
_� �.�;s:� 7ri;�i`?, ti��l�e��� 1f�� �.7i���� 1���iIP h� rc.��:iv�:�� ,3ric� 4ii�ic„`�1:��� ,t:��a�07�c� �� al�ks���:,
Bids �will be opened publicl_y and read aloud at 2:04 PM C�T iri [��c C:ity �:.�stac�e:il +��f��iz}is�i°s 1r�ti
la�'��,�rt�:��i �i3r�ru�h &i��c sE�-�.;�i�i :�rs�C �.P�` �.�a�L�lic: Lcl�vi�i�n ���l�ic�a r::�n 1�+� i�r;�:�wc:�l i�t
tt ���:i�r������:rrr.l�ter��,��_sv,+9�vivJ,'['f4�� ��:�a�r,�� �a�i'�Csc ��oll i�s�� i7� �ill��v�tl iR 113� (�'iiy {'tkuti�.�l
(,Itnii7i�ei��.
���r�r4ltlilit�Gr. i�i Itt� ��l �ciiv�t'i�1�� c��,i���Flc.t�:tl h�16:�[ l,iG�iiti �'[3t' 1li.e.,yi sa.;�;;::? t�.n t1��� 1'ait�c�l�;dwif��; ��lf'�i��;
},�iciclvr� til�:i�l �� iri.�sl il�� cc�i7i��r����P ub�lE�}. e;,sa itti� 1{f Ilr�• ��'il�� �,.i.,rj�.�t P��i����.�<:e�:�° aia� la���t' IRt:i�r ?,�}i�
�a°ir�. ��� �lti� ��:et,�i�l ��'ity #>rt:���ti�ss ri�y.at`t�r ll��: I�i�-I �a��cnir�� tla�t�. ���lu�i+re ��i'tlte �,ic� a�ei��n�;
ii atc.
GENERAL DFSCRIP'1�ON OF WORK
This contract is a unit pt-ice consiruction can�t�et where the City wilt issue wor� oxders fo��
speci�c prajects. The major work will consist of the (approximate) following: u�siailation of
concrete sidevvallc, cuti� ramps, driveways, curb and gutter.
Tl�is bid caIl is to estabiish unit prices for work orde.ts. The quantities s�ecified are not
necessarily �lie actual amounts of work. Contract{s) will be awarded based on available fundin� at
the tnne of awat�d.
PRT�Q UALIFI CATI ON
CITY OF FORT WORTII
STAN17AR3� GOIVSTRUCI'ION SPEC]FICA"fI03V ]IOGiJfvfENT
Terttpoi�rily Revised April C� 202d due to COVIDI9 8mergency
2021 5idervalkUnitPz'�ce Constn�clion Cont��aM
102520
00 11 l3
INViTA1'IOA1 TO BIDDERS
Page 2 nf' 3
TI�e unpro�einents included in this project �nust be peffarmed by a contractor who is pre-
qualified by t17e CiEy at the time of bid opening. The procedu�-es for qualification aa�d pre-
qualification are outlined in the Section 00 21 13 — INSTRUCTIONS TO BIDDERS.
DOCUMENT' EXAMINATTON AND PROCiJRI+,MENTS
The Bidding and Contract Documents may be examined or obtain.ed o�n-line by visiting the City
of Fort Worth's Pufchasulg Division website ai http:/lwww.fortwoi�hEexas.�o�lp�zecllasin�/ and
clicking on ihe link to the advertised project foJ.ders on th� City's efecf� onic document
management and collabaration sysie�xi site. T13e Contract Documents may be downloaded,
�viewed, and printed by interested contractors andlor suppliers. 'Ihe cantractor is required to fill
out and naEarize fhe Certificate of Interested. Parties Form 1295 and the form must be
s ub��ited to the Projec� Manager before the contract will be presented to the City Council,
Tbe form can be obtained at htt sJ/�vw��.et��€cs.state.tx.uslfili�«info/129S/
Copies of the Bidding and Contract Documents will not be made available for purchase.
PREBID CONFERINC�
A prebid confcrence may be held as discussed in Section 00 21 13 - INSTRUCTIONS TO
BIDDERS at the following date, andtirne �,�=.:6 .t k+�c:l� �:���,i�c�r�nc�in,4 a���,li��:�tic,n;
DATE: �lugust 5, 2020
TIME: 1 p. 30 AM
�1���:is�.kal�1 €:t�jsl��•�,�ics�:vv�i[ili� Ii�l�i t�i�liitc: ui�i .� �4�����c:i�n#��rc;r��:;s��;�t���iii�.�iir3��., I1lVlifl�lC313S kY1� L�L'
;iiseyti��e�d�f�r°�cliv sc� �1����;� wC�a, ����+c.�ui,nut��;cl �•;x�r�.�wi{���w �.�F'1stil�.r�sl i�s �l�e }}r$aje.�:l�u �fie.�.;i�y
I'raFje.Ll �4��tak���,t�r;��ecli�sT 113� flw�s�,a� k-'=n�'sF��r��, '1'��� �a�•e���:t�l:4�n €����rE ao tls� �.�r�L,i�l �:cj�if�.���ssa�e
:a�reJ ���iy ��iii:��ictiiEr; ta�ul .�ru�+��e��� ��r;�vifi��l at �li� �ror��ss! c�n�'�r�eu�.� w�ll I:A� �.s�u�.� a�� �e� A���l�a��l�<<r
�d�I.f�t',�rilf ft,J-�i�a�.
I��s {nrel,i{I ��c7rtl�e�-c°�c� is r�c�i bein,� li�Ir3, pr��pec�i:r� h4dsders c�.r� cai5ail c��ic��t���s cra- ��rk��a�r�ut��� in
b�c����a-c�r�i��:€s u�rith ��c#i«» �r r��'khc �a��;�n�ct�c7�1� �� E��r��e�r� �cfet•e�icecf a�tia.xvt t�: �.f�c ��G't:�,�ec�
an;siiw��.;�r�;,j �r ifi��-rt�ai�ad�r���e:; E�st�d bein��. ��t:;�i�ed t����siia��s� ���ifl �tif�i'ac�;��"e�et�,�tie�ix�3 it�
�a� rit�n�7" ;oi3�l � Eie ��c,c�<<u-Em�.s11 tr� �`�f.ma��+ ����il �.�ue.�€i�k�is �s s��I�i.��rJr�]_ f C ii�a,��w:iry,
�{lt��°nc�� u�all I,� i�sue�] ��w'wr�aYni f�� t�te il�st.e�cli�3rs tc� r3irl�es��.
CITY'� RIGHT TO ACCEPT OR REJECT SIDS
City reserves the riglit tq waive i�regularitzes and to accept or reject bids.
AWARn
City zzaay award contracts to more than one bidder,lowestto highest, hut is not required to avaa�d
to all, oz� any biddcrs.
RENEWALS
An awarded contract may be renewed up to two (2) additional terms at tlae earlier of t.he
expiration of cantract funds or contract time under the samie terms, conditions, and unit prices.
'The contract duratian, including renewaL�, shalE u1 no eve�t exceed five years from the original
effective date.
INQUIRIFS
All inquiries reIative to this procut•enaezat should be addressed to #he following:
CITY OF �'ORT WORTH
STANllA1tD COIYSTRl1CC]ON SPECIFICATTON nOCUM�NT
Temporarily Itevised Aptil 6, 2020 due to CO'V1D19 Einergency
2021 Side�valkUnitPrice Canstnic[iqn Contract
xazszo
noili3
INVITATION TO BIDDERS
Page 3 of 3
Atin: Sha«�mi Rallman, City of Fot�t Worth
EmaiI: sharr�illirahman@fortwo�thte�as.gov
Phone: 817-392-bb l f
�.11'[�N:��+ici�! i�E�-ll�[T��+L+.�+'i'
T�3 �.t:;�arre I�icic��.��:� :�� G ke��i ���� ii� �1atc,:�f ;�riy` r��:�t i�3fi�s�°ir5:�l�nr� p�i��ir���ni ecr I�i�.� ��r��je�C ��r� t}�c
L'�l'�E if.p 1�,.=r���.i-�hc��t�y [lc;�:lar:t�€��i7, �s � ni�:e��ic�i, �{r� ii it�s�}� r�s:��t� tr� t�ti� �rojec�, l�xrEtici�w :i���
r��.�tre���:di�>�:;��if E,�,�,e�.��tsiii� c�;'liit�.:°�sr i,� 91�i� G�rc,��:��Ei`[��r�c:r�� c4�r �l�e�`Gty I'rr�j�.c�t i�•�:�r�i,�;er a«�1
IR�� g���yi�.si E�.i��i�t�cr, ']���u �.a��=�i' �Et��tE�[ ��cluc�� IhG� �}ial�����'s Ucr�E�F.s��t_y nanie�, c�_�n�:�ct ����'�{:�r�, tlYat
IEI��I'4'2��ll.iQti �`S77t3i� �lC��f�-w� �314�j �7�Lc][6�.tliLllllll�l". ��fC I4i.�if4'11i.�:1 l�'i�l ?1t,{1LS�1`3�]LliE:L�+LGJI"C:Gk�}' ti;i 1�1i,}�i;
'V.'�1i,1 �1;3'�'� �h��'�I'�.�S�L �li 7#1�C�'�4��1 74ti d�?�. �`t9'�FGI�a'�L:�]l�ll� �l�b'�� �4+I��.�r�ti�1 �}C: ��c]�ti�t;C� �1 l�1C {�ff}�' �:5� ��D]'L
'sJV�+rk14'� C}:��'x;]�����;i3��, kk�eLaific;:�[ htCp://fari��rof-thtexas.go�/p�.ii�chasin�/
ADVERTISEMENT DATES
7uly 23, 2Q20 _ .
�uly 30, 2020
END OF SECTION
CI'1'Y OF FORT WORTT�
STANT)ARD CONSTRiiCTION SP�ClFICATIOA! �OCUMENT
Tempoi�u'ily Revised April C� 2020 due to COVID19 Emergency
2021 SidetivaikLTnitPrice Conshvction Contcact
102520
OQ 21 13
]NSTRUCTIONS TO BIDD�:lt5
Pagc 1 of 13
�ECTION 00 2l 13
INSTRUCTION� TO BIDDERS
1. Defined Terms
1.Terms used in these INSTRUCTIONS T� BIDDERS, which are definecE in Section 00 72
00 - GENE�I_, CONDITIONS.
1.2.Certain additional terxzas used in these INSTRUCTIONS TO BIDDERS have the
xneanings indicated below whicI� are applicable to both the singuIa�r and plural thereof.
].2,1. Bidder: Any person, furrr�, partnership, company, association, or corporaf�on acting
directly through a duly auth�rized xepz•eseniative, submitting a l�id for pe� farming
the worlc contemplaied under the Contract Documents.
Z.2.2. Nonresident Bldder: Any person, �rm, partnership, eompany, association, or
corporation acting directly through a duly auLhorized representative, submitting a
bid for perfarming the work contemplated under the Contract Documents whose
principal place of buszness is not in the State of Texas.
i.2.3. Successful Bidder: The lowest responsible and responsive Bidder io whom Ciry
(on the basis of City's evaluation as hereinafter provided) makes an award.
2. Copies of Bidding Documents
2. I.Neither City nor Enguneer shall assume any responsibility for errors or misinterpreiations
resulling from the Biddex's Lise of incomplete se#s of Bidding Docutnenfs.
2.2. C�ty aad Engineer in mak�g capies of Bidding DocumenCs ava�able do so only for the
purpase of obtaining Bids for the Work and do not authorize or confer a]icense or grant
far any othet� use.
�:
. _ _ -
.
�- -
_ �
-��:. - —
. . .�
.�.reeJ.,. -
� _ � . � _ � � � A
•r • � � � \ ' � 1 ! ��� �a�r_ i�.s�aur�
� , j 1 � �• 1 � . •l� �'��� _ � � � l ■ �
� �INt�����1�_ �_R�la� � � � � LIIA�I����R�
1 �•_1• _a � �_i� �� a■. 1 � A. i a i.
C1T'Y OF FORT WQFZTH
STANDAIZD CONSTRUCTION SPECIF'ICATTON I70CUM�NT
Temporarily Itevised A�ril 24, 2020 due Eo COVIDI9 ��tteigency
2U21 SidewalkUnitPrice Construction Contract
I02520
00 2 ] 13
[NSTRUCTIONS TO BTDDERS
� �
Page 2 of 1 l
n � �. � � � i
„y:.. �
�� � i ■. � � r i �.
� •- .� � � � .� i v�
�iS� .r�.» nt�r.ya.....R,... ,.� � - -
� _(� f � _• � � � _�i�
►[ifeiCfl.Sl�:Rl�t • '
� ���'r�R� :..+
:, J. �.�.'IiT6'17�•�.�.�i.r�.� � ' ■ . � ! l
� a � ■ � 1 s � � .
r �
1 � \ �� �� ■. �_
'�ThZ.'" � - � � �
' , � �
Vie�e a.►� .i.�iaes.r�n"...�
�
• 1 � ■ ■ \ �
� ■ � ■ �
+t,,, r�;k., „r,.,,+ ;a„a n„ �U c i
�.�—z�—.—��:��-����„�j�'w' ��tre�.-s.i�� �i�t� i�,vtl��l.(r-�_stirrr.i,�„��a-�, n� r,:,�.a,..� .,7..,..,,,
z�. ,,...v� . �.
� . �:� d��r*s-rr*�-r� : . 1.. . ,.ti .. �,t
�� �.I�.,. � .::; �, �� �;'.,, i��" - s.,ss « F '�
r, ., , . _ '?E��iiE]'v"rr'dx-i,cic
�3ie! �,_��� �v i1 H, � hE , � �sr i h i _. �- ,' ;,=�'; �;,.. e., .a.. �. � ° .. ,.�..a ;ir „F �..
.�i: II r7 l{' L'. l. a�L+- Ty,�p����� 41 �` 95 •I i.a
uu t.iiiu�t.t.0 _ vo.��. . .. . .".'f_.A'S7`v"ti'I�i�j�� u.r� . r —IITfv�7i'_'c-i�
, n-�-;� N��..�..��F�� M iri-, � � e ,,... a,. �.., .� i..� o i i i.. _.� s
t! LiLiV 11 SlilT�
it�`4`��'i'��:�^l�.i .k`-r��i-��,-'��,,,�.�'�i.'-�3'S3'+i:3�' S�`� . �
r�'i7$W-!'�Ff?rw;r-..,�,tL"i I°T'tR�S.�'�.�''�+c�' _� . . , . � . . .. i . ,i .. . . `�
f 7,,_� �
�,'*'n�ii�t`}".i�r's''-�Ftl4'1` t. .iu—rs"P ui .il�ir-��:.�.i1'.'ri-i�'�ti..'EF il�_ �_ _! l.,...,a.-.....,... �� 1=l
I`
r��'4,`,,,� :' �;.' �.r tirxt W. i.�: a �# !� �,,,:1�'}'�;��ti`.�,.",�'a3£�i3—
°r�.�Ti" _, t � ��a. . ��, �.� �-� .;
�4^;T;ka`7.`i"}�', ',��7. ��� _ .9. '•i . . .. . ��^k'� ���i`�¢`piiFrn�iticQa
� l. �'4. C. 7 „. ti 5 t 4 . 7 �J .•J,1t�i�:'� ,�
t . e.:4"T'Tra.;T[F-`Ti uC:ST.. .. � ... �. .v� ., ., ... , :1':.�#^!7 � t�.� �r�� r:i;..
*-:i- . .: , , . . . � .:::... � : .11: F t
�k`-�.- . . _ . .
�
� � � A �
E�weer.ff K�a��F
�.
CITY OF FORT WORTII
2021 Sidewa]kUnitPricc Construction Contract
102520
STANDARD CONSTR[JCTTON SPEC�'ICATION DOCUMENT
Tempna•atily Revised April 24, 2020 due to COVIDI9 rmergency
00 21 13
13dSTRUCTIONS Tb BIDD�.lZS
Pagc3of11
, �
p,l� l
�"
4. F�camination of Bidding and Contract Documents, Other ReIated Data, and Site
4.1.Before submittirig a Bid, eack� Bidder shall:
4.1.1. Examine and carefully study tk�e Contract Doc�rrients and other reIated data
identified ar� the Bidding Documents (i�cluding "technical data" re%rred to in
Paragraph 4.2, below). No information given by City or any representative of the
City other than that contained in the Contract Documents and officially
promulgated adder�da thereto, shall be binding upon the City.
4.1.2. Visit the site to becox�rze �amiliar with and sat�sfy Bidder as to the general, Iocal and
siie conditions that may affect cost, progess, perfoimance or fi�tx�ishing of the
Work.
4.1.3. Considez' federal, state and Local Laws a�ad Regulations that may affect cost,
progress, perfoemance or furnishing of Che Wor�C.
4.I.4. Be advised, Cziy, in accordance with Title VI af the Civil Rights Act of 1964, 78
Stat. 252, 42 U.S.C. 20dOd to 2000d-4 and Title 49, Cade af Federa112eguIaiions,
Department of Traaasportation, Subtitle A, Of�ce of t�ae Secretary, Part 2I,
Nondiscrimination in �'ederal�y-assisted programs of t7ie Depa�rtnaent of
Traz�spartation issued pursuant to su.ch Ac t, hereby r�otif"ies all bidders that it wil�
affirx�atively insure that in any contract entered intfl pursuant to tk�is advertisement,
minority business enterpi�ises wiIlbe affoz'ded full opportunity to sub�it bids in
response ta this invitation and wi)1 not be discri�ninated against on the grounds of
race, color, �r �nationalorigin in consideratio� o�award.
4.1.5. Study a11: (i) reports of explorations and tests of subs�.�rface conditions at or
contiguous to the Site and all drawings ofphysical conditions relating to existing
surface or subsurface structures at the Site {except Undergt'ound Facilities) thai
have been identif'ied in the Contz'act Documents as containing reliable "technical
data" and {ii) reports and drawixags of Hazardous Environmenial Canditions, if any,
at the Site that have been ic�entified in the Contract Documents as co�taining
reliable "technicaldata."
4.1.6. Be adv�sed that the Contract Documents on �le with the City shall constitute all of
the infarmaCion wk�ieh the City wi1� furnish. AlJ additional information and data
�rvhich the City will supply afier promuIgation oitbe �ormal Contract Documents
shall l�e issued in the foxm of �written addenda and shall became part of the Contract
Documents just as though such addenda were actually written into the original
Cont�ract Docutnents. No it��ormatian given by the City other t�an that contained in
the Contract Documents and of�cially promulgated addenda ik�ereta, shall be
binding upon the City.
CTI'Y OF FORT WORTI-J
STANDARD CONSTIZUCTI071 SPECiFICATION DOCCJMENT
Tempora�ily Revised Apri124 2020 due to COVID19 Emergency
2UZI SidewalkUnitPrice Canshvction Con[ract
�azszo
0o z� t3
IIVSTRUCTIONS TQ BIDD�,RS
Pagc 4 of 11
4.1.7. �'erforin independent research, investigations, tests, borings, and such other meaets
as may be necessary to gain a conaplete knowledge of the conditions which willbe
encountered durir�g the constructio� of t11e project. On request, City may pravide
each Bidder access to the site to co�ducf such examinations, investigations,
explorations, tests and studies as each Bidder deems necessary �or submission of a
Bid. Bidder must fill aU holes az�d clean up and restore �e site to its %rmer
conditions upon completion of such explora#ions, in�estigations, tests and studies.
4.1.8. Determine f:he difficulties of the Work and all attending circumstances affecti�lg the
cost o� doing the Work, time required far its completion, and obtain all information
required ta ma�e a proposal. Bidders shall rely excl�sively and solely upon their
own estirnoates, investigation, research, tests, explorations, and other data wk�ich are
necessa.ry %r fuli and complete information upon which the proposal is to be based.
Tt is understood that the submission o,f a proposal is prima�facie evidence that the
Bidd�r has made the investigatio�, examinations and tesis herein req�ffed. Claims
%r additional compeilsation due �o va�-iations befween canditioz�s actually
encountered in constx'uction and as indicated in the Contrac� Doc�ments wi]Inot be
allow ed.
4.1.9. Promptly noti�y City of a�l conflicts, errors, ambiguities or discrepancies in or
betvveen the Cantz-act Documents and such other re�ated documents. Tne Contractox
shall not iat�e advantage of any gross error or arx�ission in the Contract Documents,
and the City s�aall be permitted to mai�e such cozxections or interpretat�ons as may
be deemed necessary for fulfillment of ihe intent of the Contract Documents.
4.2. Reference is made to Section d0 73 00 --- Supplexnentary Coiiditions �or identifzcation of:
4.2.1. those reports of exploratians and tests of subsurface conditians ai oz conCiguous to
the si�e which have been utilized hy City in preparation of the Contract Documents.
The logs of Soii Borings, if any, on �he pZans are for general infoxmation on1y.
Neither the City nor t17e Engineer guarantee that thc data shown is representative of
conditions whic� actualIy exist.
4.2.2, those drawings of physicalconditions in or relating to e�isting surface and
subsurface si�-uciunes {except Underground Facilities) which are at or contiguous to
the siie that have been utilized by City in preparat�on of the Contract Documents.
�.2.3, capies of such reparts and drawings vaill be made available by City to ariy Biddez�
oz� z�equest. Those reparts and drawings zz�ay not be part of the Contract
Docu�nents, but the "�echnical data" co�atained therein u�on which Bidder �s entitied
to rely as provided in Para�raph 4. 02. of ihe General Candrtions has been identit�ied
and established in Faragraph SC 4.02 of the Supplementar� Canditiaz�s. Bidder is
xesponsible for any interpretation ar conclusian drawn from any "tecIxnical data" or
any other data, interp�-etations, opinions or infarmaiion,
CITY OF FORT WORTH
STANDARn CONSTRUCTIOI�! SPECIFICATION DpCUMI;N'f
Tempqrarily Revised April 24, 202Q due to COVIDI9 Emetgency
2U21 SidewalkUnitPiice Construcfinn Contract
102520
pp 21 13
INSTRi7CT'IONS TO RIDDERS
Pagc 5 of 1 I
A.3.The subniissian of a Bid will constitute an inconti•overtible represeniation by Bidder (i)
f11at Bidder has coxnplied with every requirernent of this Faragraph 4, {:ii) thaf withot�t
e�ception th� Bid is premised upon perfonrxaing and furnishing the Worlc required by the
Contract Docume�ts and applying the specific means, rnethods, tecluiiques, seque�ices or
procedures of construction {if any) that may be slaow:n ar indicated or expressly required
by the Contract Documents, (iii) that Bidder has given City vvritten notice of alI
con�7�€cts, error�, ambiguities and discrepancies in the Co�tx'act Documents arid �he
written resolutions thereof by Czty are acceptable to Bidder, and when said conflicts,
etc., have x�ot been resolved tl�rough tk�e interpretations by Ciry as desct•ibed in
Paragraph 6., and (iv) that the Contract Documents are generally sufficient fo indicate
and convey understanding of all terins and canditions for performing and furnishing the
Work.
4.4.Tk►e �rovisions of this Paragraph A, incIusive, do x�ot apply to Asbestos, Polychlorinated
biphenyls (PCBs), Petroleum, Hazardaus Waste or Radioactive Material covered by
Paragzaph 4.06. of the General Conditions, unless speciuF'zcally rdentif"ied in the Contraci:
Doc uments .
5. AvailabiEity of Laz�ds for Work, �tc.
S.1.The lands upon whick� the Work is to be perfor�ned, rights-of-way and easemenis for
access thereto and other lands designated for use hy Confractor in performi�ag the Work
az-e identifed in the Contract Documents. All additional lands and access thereto
required for tempora�y construction facilities, construction equipment or storage of
materzals and equipment to be incorporated in the Wo�'lc are to be ob#ained and paid for
by Coniractor. Easements for permanent st�zctures or pernoanent changes in existing
faci�ities are to be obtained and paid �ox by City unless o#herwise provided m the
Contract Documej�ts.
5.2.Ouistanding right�of way, easements, andlor permits to be acquired by the Cify are listed
in Paragraph SC 4.01 of the Supplementary Conditions. In the eveni tlae necessary right-
o� wa�+, easements, aaad/orpermits are not obtaivaed, the City reser��s the z-ight to cancel
the a�vard of contract at any t�tne before the Bidder begins any constructioxa work on the
project.
5.3. The Bidder sha]I be prepared to commence construct�on wiihout all executed right-of
way, easements, and/orpermits, and shaIl submit a schedule to the City of how
construction will proceed in the othez areas af the project that do not rec�uire permits
and/or easem�nts.
6. I�terpretations and Adde�►da
CTI'Y OF' FORT WORTH
STANI]ARD COI*ISTRUCTION SPECIFICATTON DOCUM�.NT
Temporarily Revised April 24, 2020 due to COVID19 Emergency
2p21 SidetivalkUnitPiicc Construciion Contract
102520
aa zi �3
INS'1'RUCT [ONS T 0 B IDDEC25
Page6oi'LI
6. I.AII questions ahout the meaning or intent of the Bidding Docunaents are to be directed to
City in writing on or be�oxe 2 p.rn., the Monday prior to ihe Bid opening. Questions
received after this day may not be responded to. Inter�areiations or cTarif"ications
cansidered necessaryby Ciry ix� z-esponse to such questions wiJl bc issued by Addcnda
delivered !o aIl parties recoz�d�d by City as l�aving recei�ed the Bidding Documents.
Only questions answered by fo�ma� written Addenda will be bincling. Ora2 and other
interpretations or clarifications will be without Iegal effect.
Address questions ta:
City ofFort Wofth
20� Texas Street
Port Worth, TX 7b 102
Attn: Shalnini Rahman
Email: shammi.rahman a�fortworthte�as.gov
Phone: 817-392�6016
b.2.Addenda may also bc issued to modify the Bidding Documents as deemed advisable by
City,
6.3.�Ldenda or clariiications may be posted via the City's electronic document managament
and coliaboration system at h�sJ/apps.fartwozihtexas.�ov/ProjectResources/}.
6.4.A prebzd confarence may be held at the tirne and place indicated in fhe Ad�ertisem�nt or
iNVITATION TO BIDDERS. Representatives of City will be present to discuss the
Project. Bidders are encouraged to att�nd and participate in the conference. City will
transmit to alI prospective Sidders of record such Addenda as City considers necessary
in t�esponse to questions arisizxg af: the conference. Oral state�ents may nat be reIied
upon and will not be hinding or legally effective.
7. Sid Security
7. I.fiach Bid must be accaznpanied by Bid L�ond made payable to City in an ama�ni of five
(5} percent of Bidder's maximum Bid price on faztx� aitached, issued by a siuety meeti�ag
the requ�remezats of Paragraplis S.d1 of the General Conditions.
7.2.The Bid Bond oi all Bidders will be retained until the conditions of the Notice of Award
k�ave been satisfied. If the SuccessfulBidder fails to execute and deliver tlae complete
Agxeem�nt within 10 days after the Noizce of Award, City may eonsider Bidder to be in
default, rescind the Notice of Avvard, and the Bid Bond of that Bidder will be for£eited.
Such forfeiture shallbe City's exclusive remedy if Bidder defauits. The Bid Bond of all
other Bidders whom City helieves to have a reasonable chance of recei�ving �he award
wiIl be retained by City until iinal contract execution.
C1TY QF FORT WORTT�
STA�ARL7 CONSTRi7CTiON SPECIFICATION DOCUMENT
'['emporarily Re��secl Ap�il 24, 2020 due to COVIDI9 �it�ergency
2021 5edewallcUnitPrice Construclion Cantract
102520
00 21 ] 3
TNSTRUCTIONS TO BTDD�RS
Page 7 of 1 l
8. Contract'�''imes
The number of days within which, or tlae dates by which, Milestones are to be achieved in
accordanc� with the General Requirexnents and the Work is to be completed and ready for
Fu1a1 Acceptance is set forth in the Agxeernent or incorporated therein by reference to tlae
attached Bid Form.
9. Liquidated Damages
Provisio�as for liquidated darnages are set farth in the Agreement.
10. Substitute and "Or-Equal" Items
The Contract, if avcrarded, will be on the basis of materials and equipment described ix� the
Bidding Documents without consideratiax� o�posslble substitute o;r "or-equal" items.
Whenever it is indicated or specified in the Bidding Documenls that a"substitute" or "or-
equal" item of material or equiptnent may be furnished ar used by Contractor if acceptable to
City, application for such ac ceptance wil� not be cansidered by City untz� af#er the Effec�ive
Date of the Agreement. Tk�e �rocedure for subm�ission of any such application by Contractor
and consideration by City is set farth in �aragraphs 6.OSA., 6.OSB. and GOSC. ofthe General
Conditions a�zd is supplemented iva Section O1 25 00 of the Genefal Requirements.
ll. Su6contractors, Suppliers and Others
1 J.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020-
12-201 I(as a�ended), the City has goals for theparticipatio� of minoriry business
and/or small b�siness enterpr�ses in City contracts. A copy of ihe Ordinance can be
obtained fi om the Office of the City Secreiary. The Sidder shall submit the MBE and
SB� Utilization �orm, Subeonkractor/Supplier Utilization Form, Prixne Contractor
Waivex Form and/or Good Faith Effort Form wit� documen#ation and/or Joint
Ventuz�e Form as appropriate. The Forms incIuding documentation must be received
hy the City no later than 2:00 P.M. CST, on the second business day afterthe bid
apening date. The Bidder shall obtain a receipt from the City as evidence the
documentation •uvas received. Failure to comply shallrender the bid as non-
responsrve.
11.2. No Contractor shalf be required to employ an� Subcontractor, Supplier, other person
or o�'ganization a�ain�st whom Contractor has reasonable abjection.
12. Bid Form
12. l. The Bid Fo�m is included wit� the Bidding Documents; additional copies rx�ay be
obtained from the City.
CITi' OF FORT WORTH
STANDART] CONSTRUCTION SPHCIFICATIOA! DOCUMEI+�T
Temporarily Revised Apiif 24, 2020 due to COVIDI9 �mergency
2021 SidcwalkUnitPrice Constructian Contract
1d2S20
a02[ 13
INSTRUCTIONS TO F3IDD�RS
Pagc 8 of 1 I
12.2, All bIanks on the Bid Form nlust be coznpleted by printing in ink a�ad the Bid Form
signed 'ui ink. Trasures or alteratio�s shall be initialed in ink by the person signing
the Sid Form. ABid price sha11 be indicated for eac� Bid item, alternati�e, and unit
p�-ice item listed thercin. In ihe case of optional alternati�ves, the words "No F3id,"
'No Change," or "Nof Applicable" may be entered. Bidder shall s�ate the prices,
wrilten in ink in both,svords and numerals, forwhich the Bidder proposes to do the
work conteinplated or furnish �rx�aterials require�. All prices sl�ail be written Iegibly.
In case of cliscrepancy between price in written words and the price in written
numeraIs, the price in written words shallgovern.
12.3. Bids by corpaxations sliall he executed in the cozporate name by the president or a
�vice-president or other corporate offcef accompanied by evidence of authority to
sign, Tk�e corporate seal shall be affixed. The corporate address and state of
incorporaiion shall be shown belovv the signature.
12,4. Bids by partnerships shall be executed in the partnership nar�►e and signed by a
partner, whose title t�nust appcar under the signafure accompanied by e�idence of
authority to sign. The official adcfress of the partnerslaip shall be shown belovv the
s ignaturc.
I2.5. Bids by limited Iiability companies shaIl be executed in the name of the f"�rm by a
merriber and accompanied by evidence of authority to sign. The state of formation of
the firin and the official address of the fi�m sha�l be shown.
12.6. Bids by individuals shall show the Bidder's natne and official address.
12, 7, Bids by joint ventures shall be executed by each joint venture in the zr�anner indicated
on the Bid Form. The official address of the joint venture shalE be s�own.
12.8. A11 nanies sha]] b,e typed or printed in ink below the signature.
12.9. The Bid shall contain an ac�arzowl�dgexnent of receipt of all Addenda, the numbers of
which shall be fil�ed in on the Bid Form.
12.10. Postal and e-mail addresscs and teiephone number �or cominunications regarding the
Bid shal� be shown.
12.11. E�vidence of authority to conduct business as a Nonresident Bidder it� the staie o�
Texas shal� be pro�ided in accordance wzik� Section 00 43 37 — Vendor Coz�r►pliance
to State Law Non Resident Bidder.
13. Submissian of Bids
Bids shall be submitted on the prescribed Bid �'orm, provided with the Sidding Documents,
at the time anc� place indicated in the Advertisement or INVITAT��N TO BTDDERS,
addressed to Furchasing Managez- of tY�e City, and shall be enciosed iva an opaque sealed
envclope, mat•lced with �e City Project Number, Project title, the narx�e and address of
Biddei�, and accompanied by the Bid security and other t•equired documents. If the Bid is sent
thrflugh the mail or other delivery system, the sealed envelope shall be enclosed in a scparate
en�elope wifh the notatio� 'BID ENCLOS�D" on the face of it.
CITY OF FORT WORTIJ
STAI�IDARD CO1VS"�iL7CTiON SPECIFtCATION DOCUMENT
Temporarily Revised April 24, 202Q due to COVIDI9 Emctgency
242I SidewalkUnitYrice Constrpctppn Contract
102520
p0 21 l3
INSTRT]C'fIONS TO BIDDSRS
Page9ofL1
14. Modi�cation and Withd�ravval of Sids
14.1. Bids addressed to the �'urchasing Manager and filed vvith the Purchasing Office
cannat be withdrawn prior ta the time set for bid openin�. Arequcst fnr withdrawal
musi be mad� in writing by ar� appropriate document duly executed in the manner
that a Bid �nusi be executed and delivet�ed to the pIace where Bids are to be submitted
at any time prior ta the openin� of Bids. After all Bids not requested for withdrawal
are opened and publicly read aloud, the Bids for which a wit�drawalrequest has been
properIy �iled rrzay, at thc option of the Ciiy, be returned unopened.
I4.2. Bidders may modiiy tk�eir Bid by electronic cammunication at any tune prior to the
time set for the closing of Bid receipt.
l 5. Opening of Sids
Bids will be opened and read aloud publicly at the place where Bids are to be subzaaitted, An
abstract of the amounts of the base Bids a�d major alternates (if any) wiIl be made avail�ble
to Bidders after the opening af Bids.
16. Bids to Remain Subject ta Acceptance
All Bids will remain subject to acceptance forthe titr�e period specified %rNotice ofAward
and executioza and delivery of a complete Agreement by Successful Bidder. City may, at
City's sole d�sczetion, release any Bid and nullify the Bid security prior to that date.
li. L+�aluation of B�ds and Award of Contract
17.1. City reseives the right ta reject any o� all Bids, u�cluding without limitatian the rights
to reject any oz- all nonconforming, nonresponsive, unbalanced or conditionalBids
and to reject �he Bid of any Bidder ii City be�ieves that it wauld not be in the best
uaterest of the Project to make an award to that Bidder, whether because the Bid is
not responsive or the Bidder is unqualified o� of doubtful financial ability or fails to
meet any other pertinent standard ar criteria established by City. City also reserves
the right to waive in%rnnali�ies not involvuag price, contract time or changes in the
Work with the SuccessfulBidder. Discrepancies between the multiplzcation of units
of Wor� and unit prices will be resolved in fa�or ofthe unit prices. Discrepancies
between the indicated sum of any colurnn of figures and the correet sum thereofwill
be resolved in ,favor of the correct sum. Disca-eparicies between words and �gures
�rvilI be resolved in favor of the wozds.
17.1.1. Any or aIl bids will be rejected ii City has reason to beIieve that collusion exis�s
among the Bidders, Bidder is an mterested party to any litigatian against City,
City or Bidder may have a claim aga�st ihe other or be engaged in litigation,
Bzdder is in arreaxs on any existing contract ar has defauIted on a prcvious
contz-act, Bidder has performed apriot- cox�ti�ctin an unsati�iactory inanner, or
Bidder has uncompleted work which in ihe judgment of the City will prevent or
hinder the pro�npt completion of additional wark if awarded.
CTI'Y OF FORT W ORT C3
2021 Side�vaIkUnitPricc Construction Co�tract
102520
STANDAItD CONSTRUCTTON SPEC�'ICATION T]OCUMENT
Temporarily Revised April 24, 2020 due Eo COVTDL9 Emergency
00 21 I3
I%IS"I'RUC'i'TONS TO I3IDDERS
Pagc 10 of 11
17.2. City may consider the qualifi'ications and cxperience of Su6contractors, Sup�liers, aad
other persons and organizations proposed for those portions of the Work as to which
the identity of Subcontractors, SuppIiers, and other persons and organizatians rnust
be submitted as provided in the Contract Documents or upon the request af the Ciry.
City also nlay consider t1�e operating costs,lnaintenance require�nents, perfoeznance
data anai guarantees of znajor items of materials and cquipment proposed for
incorporation in the Work when such data is zequired to be subinitted prior to the
Notice af Award.
I7.3. City nr�ay conduct such investigations as City deems necessary to assist in the
evaluation of any Bid and to establish the responsibility, qualifications, and financial
ability of Bidders, �roposed Subcontracfors, Suppkers and other persons and
organizations ta perform and furnish the Work in accorda�ace with the Contract
Documents to City's satisfactzon within the prescribed tinr�e.
� 7.4. Contractor s�ali perfoxrn with his own organization, work of a �alue not less than
35% of t�e value emhraced an the Contract, unless otherwise appro�ed by Che City.
17.5. If the Cantract is to be awarded, it will be awarded to lowest res�onsible and
respo�sive Bidder whose evaluation by City indicates that the award will be in the
best interests of the City.
17.6. Pursuant to Texas Government Code Chapter 2252.001, the City wi11 not award
contract to a Nonresident Bidder unless the Nonresident Bidder's bid is Iower than
the lowest bid submitted by a i•esponsible Texas Bidder by the satne amaunt that a
`I'exas resident bidder vvou�d be required Eo undcrbid a Nonresident Bidder to obtain a
comparable contract in the state in which the nanresident's principal place of
business is located.
17.7. A contract is not awaxded until farmal City Cauncil authorization. If the Cont��act i,s
to be awarded, City w�iJi award the Cantract within 90 days after the day of the Bid
opening unless extended in wa�iting. No othe�� aci of City or others will canstatute
acceptanee of a Bid. Upon the contrac�or award a Notice of Award �cvill be issued by
the Cify.
17.7.1.T�e cozztractor is required to irll out and sign the Certificate of �nterested
Paxties Form 1295 and the for�a maust be submiited to fhe Project �Vlanager
before the contract wiIl be presented to the Ci#y Council. The form can 6e
obiained at https://wvvw.ethics.state.tx.us/data/formsC1.29�/1�95.pdf
17. $. �'ailure or refusal to com}�ly with ihe requirements lnay result in rejection of Bid.
18. ,S3gning oiAgreement
15.1. Wl�en City i.ssues a Notice of Award to Y11e Successful Bidder, it will l�e acca�x�panied
by the rcqui�ed nurr�ber oFunsigned counterparts of the Agreement. Within 14 days
thereafter Contractor shall sign and deliver the required number of counterparts of fhe
Agrcement to Ciry with the required Bonds, Certificates of Insurance, and all otlier
requi�ed dacumentation.
CTf Y OF FORT WOI2TH
STANDARTa CONSTRUCTiON SPECINICATTON DOCCJMEI�IT
TempnA�nily Rev�sed April 24, 2020 due to GOVID[9 Emergency
2021 SidewalkIIqifPrice Construction Confract
I02520
00 2f 13
INS1"RUCTIONS TO eIDllERS
Pagc 11 of 1 L
182. �'ailure to execute a duly awarded contact may subject the Contractnr to penalties.
18.3. City shalI thereafter deliver ox�e �ul[y signed counterpart to Contractor.
IIVII OF SECTION
CITY OF FORT WORTII
2021 Sidc�valkUnitT'ricc Canstrqc[ion Contract
102520
STANDAltl7 CDNSTRUCT'I03�! SPECIFTCATip1V DOCUMTNT
Temporarily Revised Apirl 24, 2020 due to COVIDI9 Emea�gency
003215-0
COMSTRUCTION PROGR�,SS SGFiEllULE
1'age 1 of 10
SECTION 00 3215
CONSTRUCTION 1'ROJECT SCHEDULE
PARTI- GENERAL
1.� SUMMARY
A. Section Includes:
1. General requirements fox ihe preparation, subr�aittal, upda�ing, status reporting and
management of the Constiruction Project Schedule
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Speci�cation Sections include, �ut are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract �'orms and Con.dxtions of the Co��'act
2. Division 1— General Requuements
D. Purpose
The City a�Fort Worth (City) is committed to delivering quality, cost-effective
infrasiructw'e to its citizens in a timely ma�aner. A key tool to achieve this purpose is a
properly structured schedt�le with accu�ate updates. This supparts effective monitoring
of progress and is iz�put to critical decision making by the �rojeet manager throughout
the life of the project. Data froxz� the updated project schedule is utilized in status
rcporiing to various levels of the Ciry organization and the citizenry.
This Document complements the City's Standard Agreement to guide the construction
contractor (Cox�tractor} in preparing and submitting acceptable schedules for use by the
City in project delivery. Ti�e expectation is the perfor�nance oit�e vvork follows the
accepted schedule and adbere fo the contractaal timeline.
The Contractor will designate a qualified representative (Project Scheduler) responsible
for developing and updating the schedule and preparing sta#us reporting as required by
the City.
1.2 PRICE AND PAYMENT PROCED[1RES
A. Measueement and Payment
1. Work associated with this Ztem is consider�d subsidiary to tbe various items 6id.
No separate payment u+ill be allovc�ed for this Item.
2. Non-coxz�pliance with this specification is g�tiunds for City to withhold payxnent of
the Contractor's invoices until Contractor achieves said campliance.
1.3 R�FERENCES
A. Project Schedules
Each project is represented by City's master praject schedule that encompasses the
entire scape of activities envisioned by the City to properly deliver the work. When the
City contracts with a Contractor to per�orm construction of the Work, the Contractor
C1TY O�' FORT WORTH 2Q21 $idewalk i3nit 1'rice Construction Contract
STANDARD SPECIFICATION 102520
Revised JL1T.Y 20, 2018
003215-0
COIVSTRiICTION 1'ROGRLiSS SCHEDULIs
Pagc 2 of 10
will de�elop and maintain a schedule for their scope of work in alrgnment with the
City's standard schedule requirements as deiined herein. The data and information of
�ach such schedule wi�i be leveraged and becozne integral in the master projecf
schedule as deemed app�opriate by t�e City's Praject Control Specialist and approved
by the City's Project Marsager.
1. Mastez S'rojeci Schedule
The mastex project schedule is a holistic represei2tation of the scheduled activities
and milcstones for fhe total projeet and be CriticaI Path Method {CPM) based. The
Ciry's P�-oject Manager is accoixntable for oversight of the development and
mainiaining a master project schedule fox each project. When ihe City cnntracts far
the cEesign and/or constn�ction of tY►e project, the master project schedule will
incarporate elements of the Dcsign and Construction schedules as dee�ned
appzopriate by the City's �'rojec# Coiitral Speczalist. The assigned City Project
Contro� Specialist creates and �a�aintains t�e master project schedule in P6 (City's
scheduling soitware).
2. Constructzon Schedule
The Contractor is responsible for developing and maintaining a schedule far the
scope of the Contz-actor's contractua2 requirements. The Con�actor will issue an
initial schedule for revi�w and accep#arice by the City's Project Control Specialist
and the City's Project Manager as a baseline schedule for Contractor's scope of
�rork. Contractor will rssue cu�xcnt, accurate updates of their schedule (Progress
Schedule) to the City at the end o�each inonth throughouC the life of their wozk.
B. Schedule Tiers
The City has a pot�tfolio of projects that vary widely in size, complexity and confent
requiring different scheduling to effectively deliver each project. The City uses a
"tiered" approach to align tlae proper schedule with the criteria for each project. The
City's Praject Manager determines the appxopriate schedule tier far each project, and
includes that designation and the associated requirements in the Cantractor's scopc of
work. The following is a summary af the "tiers".
1. Tier 1: Smail Size and Short Duration 1'roject (design nat required)
The City develaps and maintains a Master Proj ect Schedule for Ehe proj ect. No
sclaedule submittal is required fram Contractor. City's Projeci Cantrol Specialist
acquires any necessa��y sched�Ie status data ar infozxnatian through discussions with
the respective party on ati as-needed basis.
2. Tier 2: Small Size and Short to Meditun Duration Project
The City develops and maintains a Master Proj ect Schedule for the projcct. The
Contractor identi�es "start" and "finish" za�ilestone dates on key elements of their
work as agreed with the City's Project Manager at the kickoff of their work effart.
The Cantractor issues to the City, updates to tne "start" and "�nish" dates for such
mil�stones at the end of each month throughaut the life of their work an the project.
3. Trer 3: Medium and Large Size andlor Complex Projects Regardless of Duration
The City develops and maintains a Master Proj ecf Schedule for the proj ect. T�e
Contractor develaps a Baseline Scheduie and maintains the schedule of their
respective scope of work an the proj ect at a level of detail {generally Level 3} ancE in
CT`I'Y OI' PORT WORTH 202 ] Sidewa[k Unit Price Construction Contract
STANDA.RD SPE.CIFTCATION 102520
Revised7L1T,Y 20, 2018
003215-0
CONS"IRUCTION 1'TiOGRESS SCHEDULE
Page 3 or 10
alignnnent with the WBS structiu�e in Section 1.4.H as agreed by the Project Manager.
The Contracto�• issues ta the City, updates of theit• respective scheduIe (Pr-ogress
Sc�edule) at the end af each month tba-oughout the life of their �n+ork an the projecl.
C. Schedule Types
Project cfelivery for the City utilizes two types of scheduIes as noted below. The City
develops and maintains a Master Project Schedule as a"baseline" schedule and issue
manthl�+ updates to the City Project Manager {end of each manth) as a"progress"
schedulc. The Contractor prepares a�d submits each sc�edule type to ful�ll their
contractual requirements.
Baseline Schedule
The Con�'actor develops and submits to the City, an initial schedule £or their scope
of work in alignment wzih this specification. Once reviewed and accepted by the
City, it becomes the "Baseline" scheduFe and is the basis against which aIl progress
is measured. The baseline schedule will be updated when tbere is a change or
addition to the scope of work impacting t1�e duration of the wark, and only aftez�
receipt af a duly autY�orized change order issued by the City. In the event progress is
significanily behind schedule, the Cif:y's �'roject Manag�r may authorize an update
to the baseline schedule to facilitate a more practical evaluation of progiress. An
example of a Baseline Sc�edul� is provided in Speci�catian 00 32 15.1
Canstruction Praject Scl�eduie Baseline Example.
2. Progress Schedule
The Contraciar updates thezr schedule at the ex�d of each monfih to represent the
progress achieved in �l�e worlc which includes any impact from authorized changes
in the worlc. The updated schedule musl accurafely reflect the current status of the
work ai thai point in tirne and is refert•ed to as the "Progress Schedule". The City's
Project Manager and Project Cont�•ol Specialist reviews and accepts each progress
schedule. In the event a progress schedule is deemed not acceptable, t�e
unacceptable issues are identified by the City wi�in 5 warking days and ihe
Cantractor �nust provide an acceptable progress schedule �vithin 5 working days
after receipt o�non-acceptax�ce notification. An example of a Progress Schedule is
provided in Specification QD 32 15.2 Construction Project Schedule Pro�ress
E�ample.
1.4 CITY STANDARD SCHEDUL� REQ[7IREMENTS
The following is an averview of the methodology for de�+eloping azad maintaining a
schedule for delivery of a project.
A. Schedule Frameworlc
The schedule wi11 be based an the defined scape of work and follow the {Cxitical Path
MethodoIogy) CPM method. The Contracior's schedule will align with the requi�'ements
of this specifica�ion ax�d will be cost loaded to reflect theiz' plan for execution. Overall
schedule duration will align witli the contractual requirements fflr the respective scope of
work and be reflected in Ciry's Master I'roject Schedule. The Project Numher and Name
o�the Project is required on each scheduIe and musi match the City's project data.
B. Schedule Fil� Name
C1TY ON PORT WORTH 2O21 Sidewalk lJnit Price Constraction Coutract
STANBARD SPECIFICATI03�! ]02520
Revised JULY 2U, 201 S
003215-0
CONSTRUCTION PROCrRESS SCHEDUT,E
Page 4 of 10
A11 schedules submitted to the City for a project wiI� ha�e a f1e narrae �at begins with the
City's project numl5er foltowed by the raame of the praject followed by baseline (if a
baseline schedule) or the yeur r�nd ►nonth (if a p�-agress schedu2e), as shav� below.
� Baseline �ck�edule File Name
Format: City Project Number Proj�ct Name Baseline
Example: 141376 North Montgazxiery Street IIMAC BaseIine
� Progress Schedule Pile Name
P'ormat: City �'roject Number Project Name YYYY-MM
Example: 141376 North Montgomery Stzeet HMAC 20I S O1
o Project Schedule Propress Nazxati�e File Name
k'oz�mat: City Project Nuxx�be�� Praject Name PN YYYY�MM
Exaxnple: 101376 North Montgomery Street HMAC PN 201$ O1
C. Scheduie Temp�ates
The Contractor wi�l utilize the relevant sections from the City's templates pro�vided in the
City's document man�agement systcm as the basis for creating iheiz respective project
schedule. Specifica�ly, Ehe Contractor's schedule will align with the layout of the
Construction section. The teznplates are identified by type of p�-oject as noted below.
+ ArteriaIs
o Aviation
o Neighborhaod Sireets
o Sidewalks {later)
� Quiet Zones (later)
m Street Lights {latcr)
� i�tersection X�pro�ements {later)
� Parlcs
• Storm vcrater
• Street Maintenance
o Txaffic
� Watex
D. Sehedule Calendar
The City's standard calendar far schedule development purposes is based on a 5-day
workweek and accounts for the City's eight standard holidays (New Years, Martin Lutlaer
King, Memorial, Independence, Labor, Thanksgiving, day aftez- Thanksgiv�ng,
Chrisimas). The Contxactor will establish a scheduIe calendar as par! ofthe schedule
development process and provide to the Proj ect Control Specialist as part of the basis for
tk�eir schec�uIe. Varrations beiween the City's calenc� and the Contractor's calendar
must be resolved prior to the City's acceptance of thezr Baseline project schedule.
E. WBS & Milestone Standards far Schedu�e Developrnent
The scope of work to be accompIisk�ed by the Contractor is represented in f11e schedule in
the form of a Work Breal�down Struct�ire {��IBS). The VJBS is the basis far the
development of the schedule activities a�ad sha1l be imbedded and depicted in the
schedule.
CETY OP FORT WORTH 202 [ Sidewalk Unit Price Conslruction Contract
STAI�IDARD SPECIF'TCATION ]02520
Revised 7L11r,Y 2Q, 20] S
oa 32 is - o
CO�T3TRUCTION PROGRESS SCHI:�ULE
Page 5 of 10
The following is a summa.ty of the standaxds to be follo�oved in preparing and maintaining
a schedule for proj ect delivery.
Contraciar is required to �tilize tk�e City's WBS structure and respecti�e project type
tennplate for "Construction" as shovwn in Section 1.4.H below. Additional activities
may be added to Levels 1- 4 to accotnmodate the needs of the organization executing
the worlc. Sp�cifically the Co�atz-actor vvill add activities uixde,r WBS XXXXXX.80.83
"Construction Execution" that delineates the activities associated with the various
camponents of the wo��k.
2. Contractor is f�equired to adhere to the City's Standard Milestones as shown in
Section i.4.I below. Contractor will include addi�onal milestones representing
intermediate deliverables as required to accurately reflect their scope of work.
F. Schedule Activities
Activities are the discrete elements of wor1� that make up the schedule. They wi11 he
organized under the umbrella of the VdBS. Activiry descriptions should adequately
describe tkxe act�vity, and in some cases the extent of the activzry. All activities are
logicaIly tied with a predecessor and a successor. The only exception ta this rule is foz-
"projeci start" and "project finish" milestones.
The activity duration is based on thc physical amount of work to be performed �or the
stated activity, with a xinaximum duration oi 20 worlcing days. If the work for any one
ac�ivity exceeds 20 days, break that activiry down inerementally to ack�ieve this duration
constraint. Any e�cepf�on to t�is requires review and acceptanc� by tk�e City's Project
Control Specialist.
G. Change Orders
When a Change Order is issu�d by the City, the impact is incor�orated into the previously
accepted baseline schedule as an update, to clearly show irnpact to the project tirrieliz�e.
The Cont�actor submits this updated baseline schedule io the City for review and
acceptance as described in Section 1.5 below. Updated baseline schedules adhere to the
foltowir�g:
1. Time extensions assaciated with approved contract modifications axe limited to the
actual amount of time the project activziies are anticipated to be delayed, unless
otherwise approved by the Progaixi Manager.
2. The re-baselined schedule is submi�ted by the Contractor within ien worladays after
Lhe date of receipt of thc approved Change Order.
3. The changes in logic or durations approved by tne City are nsed to anaiyze t�►e impact
of the change and is included in the Change Order. The coding for a new activity{s)
added to the schedule for the Change Order includes t�e Change Order �aumher in the
Activity 1D. Use as many activities as needed to accurately show the work of the
Change Order. Revisions to the bas�liz�e schedule are not effective unti� accepted by
the City.
H. City's Work Brcakdown Structure
CLTY OF FORT WORTH 2O21 Sidewa[k Unit Price Conshuction Contract
STANDARD SPECIPICA'I'ION ]0252d
Rer+ised JULY 24, 201$
• 0032I5-0
COl�lSTRL7CTiON PROGRESS SC�1�Ur.�
Page 6 of ] 0
WBS Code WB� Name
XXXXXX Project Name
XXXXXX.30 Design
XXXXXX.30.10 Design Contractor Agreement
XX��XXX.30.20 Conceptual Design {30%}
XXXXXX.30.30 Preliminaty Design (60%)
XXXX��X.30.40 Final Design
XXXXXX30.50 Er�vironmenta]
XXXXXX.3d.b0 Permits
XXXXXX.30.b0.10 Permits - Identification
XXXXXX30.60.20 Pez�nits - Review/Appro�ve
XXXXXX.40 ROW & Easements
XXXXXX.40.10 ROW Negotiations
XXXXXX.40.20 Condemnation
���XXXX.70 Utility Relocation
XXXXXX,70.10 UtiIziy Relocation Co-ardinatioz�
XXXXXX.SO Construc�ion
XXXXXX.80.81 Bid and Award
XXXXXX.$0.83 Construction Execution
XXXXXX.80.85 Inspection
XXXXXX.8Q.86 Landscaping
XXXXXX,90 Closeaut
XXXXXX.90.I0 Constructian Confract Close-out
X�XXX.9Q.40 Design Cont�act Closure
1. Ciry's Standard Milestones
The �olIowing milestone activities {i.e., i�xiportant events on a project that xz�.ark critical
pnints i�a time) are of particular interest ta t�e City and must be rcflected in the proj ect
schedule far all �hases of worlc.
Acti�c�it�ZD
Design
3020
3D4�
3100
3120
3150
3160
3170
3220
3250
3260
CITi? OF FOR1"V,rORTH
STANDARD SPECIFICATJOIV
Revised JLILY 20, 20[8
Activity Name
Award Design Agfeement
Issue Notice Ta Pxoceed - Design Engineer
Design Kick-off Meeting
Submit Conceptual Plans to Utilities, ROW, Traffic, Farks, Storm Water,
Water & Sewer
Peer Revierxr Meeting/Deszgn Review meeting {technical}
Conduct Desigr� Publzc Meeting #1 {required}
Conceptual Design Complete
Subz�it Preliminary Plans and S�eci�cations to Utilities, ROW, Traffic,
Paxks, Storm Water, Water & Sewer
Conduct Design 1'ublic Meeting #2 {required}
Freliminary Desi� Complete
2021 Sidevva[k Unit Price Coastruclion Cont��act
]02520
0032IS-0
CONSTRUCTTO�i PROGRESS SC�ICDULE
Page 7 of 10
3310�
3330
3360
Subinit Final Design to LTtilities, ROW, Trafiic, Parks, Storzx� Water,
Waier & Sewer
Conduct Design Public Meeting ##3 (if required}
Final Design Connplete
ROW & Ease�teents
4000 Right of Way Start
4230 Rig;ht of Way Complete
Utility Relocation
700U Utilities Start
7120 Utilities Cleared/Complete
Construcfion
Bid and Award
8110 Start Advertisement
8150 Conduct Bid Opening
8240 Award Canstructian Contract
Construction Egecution
$330 Conduct Construction Public Meeting #� Pre-Canst�ction
8350 Construction Start
8370 S�bstantial Completion
8540 Canstn�.ction Coxnpletion
9130 Notice o� Completion/Green Sheet
9150 Constructzon Contract Closed
9420 Design Cont�ract Closed
1.5
SiTBMITTALS
A. Schedule SubnuttaI & Review
The City's Project Manager is responsible �ar reviews and acceptance of the Contracior's
schedule. The City's Project Control Specialist is responsible for er�suring alig�ment of
the Cont��actor's baseline and progress scheduies with the Master Project �chedule as
support to the City's Project Manager. The City reviews and accepts or rej�cts t�e
schedu�e witlaxn tefa workrlays of Contractor's submittal.
Schedule Format
The Contractor will submit each schedule in two electronic forms, one in native file
forriaat (.xer, .xml, .mpx} and the second iz� a pdf format, in the City's document
rxzanagement system in tlae location dedicated for this purpose and identified by the
Proj ect Manager. In the event the Contractor does not use Primavera P6 or MS
k'roject for scheduIing purposes, the schedule infoz�mation must be submitted in .xls or
.xlsx fot�nnat in complzance with the sample layout (5ee Specification 00 32 115.1
Construciion Projeci Schedule Baseline Example), including ac�ivity predecessors,
successors and totai float.
2. Initial & Baseline Se�edule
The Contractor will develop their schedule for their scope of worlc and submit their
initial schedule in elecri•anic forin (in the �ile formais noted above), i�a the City's
document management system in the location dedicated for this purpose within ten
workdays of the Notice of Award.
CITY OF FORT WORTH 2O21 Sidewalk Unit Price Const�uction Conteact
STANAAItD 5PECIFICATION 102520
Revised JULY 20, 20i8
QO32IS-0
CON5IRUCTiON 1'ROGRRSS SCHEDULE
Pagc 8 of 1 a
The City's Project Manager and Prpject Control Specialist �e�iew this initial schedule
to deiermine alrgnment with the City's M�st�r Project Schedule, including format &
WBS sir�zcCure. Following the City's revrew, feedback is provided to the Contractor
for fheir use in finalizing theix initial schedule an�d issuing (with�n five warkdays) their
Baseline Schedule for final re�view and acceptance by the City.
3. Progress Schedule
Tk�e Contractor will update and issue their project schedule (Progress Schedule} by the
last day of each manth througliout the life of their work on the proj ect. The Progess
Schedule is submitted in electranic forrn as noted abo�v�, in the City's dacument
management system in tl�e Iocation dedicated foz� this purpose.
The City's Project ControI team reviews each Progress ScheduIe for data and
information that suppart thc assess�nent of the update to the schedule. In the event
data or informatio� is missing or incoxnplete, the Project ControIs Speciaiist
comrnunicates clirectly with the Co�ztractor's sched.uler for providing sanrze. The
Contractor re-subnaits the corrected Progress Schedule wtthin 5 workdays, following
tk�e submittal process noted abave. The Cily's Project Manager and Project Contral
Specialzst review the Contractor's pragress schedule fo�- acceptance and to monitoz�
performance and progress.
The following �ist of items are required to ensure proper status informat�on is
contained in the �'rogress Schedule.
o Baseline �tart date
� Baseline Finish Date
� % Complete
+ Float
• Activity Logic (dependcncies)
• Critical Path
� Activities added or deleted
� Expected Ba�eline Finish date
� Variance to the Baseline �'inish Date
B. Monthly Constructzon Status Report
The Contractor submits a written status raport (referred to as a progress narrative) at the
end of each month to accompany the Progress Schedule submittal, using the standard
format pro�ided in Speci£'ication 00 32 15.3 Construction Praject Schedule Progress
Narrative. The content of tlae Construction Project Schedule Progress Narrative should
be concise arzd complete to:
o Reflect the c�arrent status af the work for the reporting period (including actual
acti�ities started and/or cornpletecE during fhe reporting periad)
� Explain variances from the baseline on critical path activities
o Explain any potential scbedule conflicts or delays
• Describe recovezy plans wl�ere appz-opriate
� Provide a summary farecast of the wark to be achieved in the next repqrting period.
C. SubmittaT Process
CITY OF FORT WdRTH 2O21 Sidewalk Unit P�ice Constr�zction Con��act
�TAIVT�AR.D SPECIFICATIOTI ]02520
Rcvised JIJLY 20, 2018
00 32 [ S - 0
CONSTRUCTION P120GRESS SCHEDUi,E
Page 9 of ] 0
o Schedules and Monthly Consh�uction Status Reparts are submztted 'm Buzzsaw
following fhe steps outlined i� Specification 00 32 15.4 Constx-uction P�•oject
Schedule Submittal Process.
• Once the project has been completed and �'inal Acceptance has been issued by the
City, no fiirther progress schedules or construction status reparts are required from
the Contractor.
1.6 ACTION SUBMITTALSIIN�'ORMATIONAL SUBMITTALS [NOT USEDJ
1.7 CLOSEOUT SUBMYTTALS [N4T USEDJ
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT L1S�D]
1.9 QUALITY ASSIIR.ANCE
A. The person preparing and revising tlxe Contractor's Project Schedule shall be
experienced in the preparation of schedules of similar complexity.
B. Schedule and supportin.g documents addressed in this Speci�cation shall be prepared,
updated and revised to accurately re£lect the perforrnance of the Contx-actor's scope of
work.
C. The Conkractor is respansible for the quality of all submittals in this section meeting ihe
standard of care �or the construction indUstry �or similar proj ects.
]1U DELIVERY, STORAGE, AND HANDLYNG [NOT USED]
1.11 FIELD [SITE] CONDITIONS �NOT USED]
�.12 WARRA.NTY [NOT iTSED�
1.13 ATTACHMENTS
Spec 00 32 IS.1 Construction �roject Schedule Baseline Exannple
Spec 00 32 15.2 Construction �'roject Schedule Progress Exaanple
Spec 00 32 153 Construction Project Schedule Progress Na�-t'a�ve
Spec 00 32 15.�F Coi�sl�-uction Project Schedule Submittal l'rocess
PAR.T 2 � PRODUCTS [NOT US�D]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
CITY OF FORT WORTH 2O21 Sidewalk LTnit Price Construction Coutract
STAI�DARD SPECTFICATION ]02520
Revised NLX 20, 201$
003215-p
CONSTRUC'fiOIV PROGftESS SC�£llULE
Page ]Oof]D
CITY OF FdRT WORTI I 2021 Sidewalk Unit Price Canstrnction Conhact
STANDARD SPECIFICATIdN ]02520
Revised JUZY 20, 2018
003215.] -0
CONSTRUCTION PROGRESS SCHEDi7LE -- BASELITIE EXAMPLE
Page 1 of 5
SECTION 00 32 I5.1
CONSTRUCTION �'RO�ECT SCHEDULE -- BASELINE �XAMI'LE
PART1- GENERAL
The following is a�a exaaxiple of a Contz-acior's pz-oject sck�edule that illustrates ihe data and
e�pectatian for schedule content depicting the baseline far the project. 'I"his versian of the
scheduIe is referred to as a"baseline" sched�xle. This e�ample is intended to provide
guidance for the Contractor when developing ai1� submitting a baseline schedule. See CFW
Specification 00 32 15 Construction Project Schedule for detaiis and requirements regarding
the Contractor's project schedule.
�
CITY OF FOKT WORTH 2O21 Sidewalk 1LTnit Price Construct�on Contract
STANpARD CONSTRUCTION SPECIFICATION DOCUMENT5 102520
Revised NLY 2Q 2U18
ao 32 is.i -a
corrs�ur.�zoz� �z�ocurss sc�zr:nuz�z� — r��srz.�rr r•.xaM�r.r
Yage 2 of 5
�
� �
� �
�? cu
� � nl
�
�
�
�
�
a,
�
d
'��+'x.�:y'
�
�
�
�
�
�
��
�
�
� �
��
�
��
�7 0—
µ "f �:L
�. �=
(� Q"
� �
�
�
� '�
� J
�.,�� .yO6, „-�-.
�i
.I.
b
wi �;.
.;
�I iI
`_��'�`c,, _ ....¢.��....._._ _.
„ � .� ,� — _ � i ., �, ,, ,, ,, , " , i , , „
�� : ;� '�i � �
_ �li '/ : J �
. � .. � . i} ..�} o % ss �4 iry ..ti rn rs .� . e�� � t � � i � . ..�
� �
` u 3 .. u u� o �❑ o u u €, c �u ct as � ci o ���cJ , c. �ca
'+.; i{jti r�i r5 �,a� �'�. q 5:� G :i-�.� � o e {� �.a: �n��i
. ��r i
� A�-+5 i�. tpy . p i4� iAi .i J�
L� . ...�i � F i �� . � � iJ i e � Ti ,� .'f I {'I { i� {�I { � I e �� � ,,1
; . - r. [� �ti �� � i� � y .�v . {I e4 � ay- -C �l L Ei .. �'� A S ;y
q - y e�� �i _ �. i�.��cr�i u c�. � w uu �f r2i.�uu Fu
.� .'S T�.- �+. ��5 .A � �� � � ,� _ v� � d, a : .S
y r � i � �� i _ i r f�i ei +{ T— i'] .} - r 4{ ', £s J i� {�1 ft — r__. —� iH
�� w � r1 ,� Hy Fii � � I i's } ` '�
s f I I"I � " . . �
� f �y�� I -�rl N �1�� M 1 �J, �° IA �� 1 i# ! .�j1 . .� 1 ;.
V .�� I 6 `I !" ni � r '� �'1 �4 'l w' � � � t �j �' �, � i' �I I �}'.. vf �
1� I r i ��,.. � r� �� * �' � '� �, µ � � 9 ��' t T' `� f
_ s.� .. i .. r. ��0. "� �.d} �I C��(4 f�l ... el � Ci {1.r`5 �... T � O RI i1
� t_ f3 _ �.. S � ` � j'�4 �I u �� �;� 4: �y �a ua 37 �� 1] � U R I� 4� i'1� �u ai �.s� � i� �w �-� �'{ �� TJ :.i ��
.. r . . . }� � .. i�. a� "" .�� �� � 3� 4. +`� ��� � - � � . �Lr - r � � ��� � � � ��� �i' 1! � �? � G".
z_
;�°
�
^ �.
,i �
i� �
;. ;�
� i� �
}LS iq � -
F r � ^
{ t ik �
.
�t��
�n ,�4I
r' � � � u I a
, _�,r �',1
i i �� i� N �. �
1� { f1 � T � r
I
S ! �I
I
�
�i
�""
�
a
�
�
�
�
�
Ki �
Q �
� ��
� F,
na �4�-+
� '�
� �
� �
� �
.� �
n �
�H ��r�.J�
� �
��
� �
�q� �
FSxI
�
�
�
�
�
� �
� �
� � �
v �
� .� �
� � ��
Q � �
� '� '� �
J � � � ai �� ., � ' [�S
�� ? ci '� i' is �"�� �
�r ,`. �K �i � ,^ e .,.� �.. aK G
�L � i� � '� � �' � iz � �
�; ���„, 'r��ry rqt� �* � 1 W � ���,� � � '�
��� �a � E:x� � �
` � :� � � F � n � L � � � � ' F i �S � K �i l�+ �' � s�
�� �t�H 9� � r3n ¢�i ii F��fF i ei �n�cd�; �' '�
rv] �N
� � � � � � �
� � ... �� . M, � � � .� n r.�.i � � ,. ti rs .N� i. C .� t� . �T ,.a ri U L.
� � �i � � �
M1 �
�i � I� � � � I
CITY OF FOR1' WORT�I 2021 Sidewalk fJnit Price Constructinn Cont��act
STAIVDARD CONSTRLTCTION SPECIFICATION DOCUMENTS 102520
Revised JULY 20, 2018
00 32 15.1 - 0
CONSTRUCTION PILOGRESS SCHLDULE — ]3AS�I.II*TE EXAIvIPLT:'
Page 3 of 5
�
� �
�
� ry
� �
[�'v m
pi �'
(�
�
.�
R
�
�
t�.
�
�
�
�
+�r
�
�
�
4�
.�
�
�
.. � i e i ee nll �i il� � v i�i lu ��.
..� �_ i,i , i ry i �i'1 s� i I:
- ---, ---- -
-------- -,----- -------•�------
[. � T:1 P.a S%'.a Fi .i, u
Y �il
�
� I
� � .'! � . � �:. i 1 � �I � . C] � f�Y n
.� . � [ ., i�l
i� il ��i���F i� r�i . � ri I�� Id���S ia n ir, �.S �. �� W. r. +h
. _
{� ea
ip ^' 'L
�{
! _P'�I �1 G❑ J M � f I �-i 6 F I� ��y � P�:] O 1�
�} � u � � G
�: �� � [a �� �n� :} ii i � 5 h .5 n r _ �il rye
il e . �� - � I .. i . . ,m � �n u. . .
� �n m �' �i�
r� u� i.� �� �� a� 'I ���i i i r� r�i s � i`� i i � 1 i� �
'a 5
c; � �i �i i�+ � f� z n n h f v u, 4 ��' �� r r }.��' :� � ��°F T�, � ��n
� 7 � r ? oS
,t � _ w � i �n . Ja...i1 � . . _ _ — � :.-
ri - 2x. .. a y� f i�l ie u i. f. i..I � ii , ,_ . i�
c. n .I R �'� � 4] "� ;� .-t�� 1 �.ii � �^I� _ ; � �: � F' i
� y �. �r. � T � � � � � ! i � A i� . x f 1� _ L 5 � � � �n �
',+'�, `'i �u — � —' :i . � r� i�� s� ;; `i �'. � � � � '� �, — o � � �'� i� �, <a u o :-i r-,.
. -� +.' - e: �%� ,;�� ' n - in t- _ -.'I:�.- „ -' ra � n.
� �, �r..�� ;i s, ' ;a .a' . u ��� zn �i
�, i �, � ill F"� v1 i i .. '° I �u. ' " I fi r ip �, r Gi f't �•_ i. . . ! .� .�� �:
�
�
�
.�
�
`�'
� rr�
� �
� �
� �
� �
� p
� ��
� �
� �
�� �..�jJ
d? �
�� �
I �
�
r--i
�
�
�
N I I
�
� �
� �'
� �
_ 83
� �
� Q°
� �
l
� QrY
r �
�
�' �
ry� �[j � da�
N N � Y] LJ �
I � ' � � � �
� � � �
1
� � � m �? � t�V �
�: FS
� al �' � �
� .
� � L
: .ti a
� i U � i9
� . � ro i 6 n C+ � � ��
� u � � C � Y O',�.' �L� 5_
�� � ''•' ��� . � � � � { � n � �
3 �• ; � J � .� � � F� �
W � �J r 3 1-. }y � . s „U
� ' � � °', � � � G
'd� �� � � ,i � p i ii` � � � _ .4 � � s_:. '�
I� 9��: �, � ir # k� �c-e �, r n° � y � Gt
y� �, - C � t� I� n � Y: 1:� l` a ��. n H i �� ii a� � � Ci1
'• � i � , i +� u IF o �J -€ � � o r �
r, � � �' a i � n , . u Ff'. M w $ �i - � °j ° � ' Q � �
[ F �� ' A �y d� �- f s- � F i r1 i p.q �. k a } ��.. .� � �� =�+ �
� il -"� {' �.I 6i � I� . i �� �'F`� �'. F i'� �� i i i i � C � � �� �a __ fi' r i ri + r. �, a_ I.F ii +� �C
f9
� I � J Cr* � � !-~ � � r�i oYi �` � Y ~ o� � `i.. r� 1} � ^ s�i d�l'� ��S�5,
I i'�. y �!
� in r { l � ri � : Y� � s� � � ma �.i T .+. .. q iw n n �l T ti �] • � � � � � � �.f
� � GE
h � � � t� �.� A'
pjr� — — � 1 �C V� �l . I � I'
C1TY OF FORT WORTI� 202] Sidewalk Unit Price Construction Contract
STANDARD COMS`1 RUCTIO�T SPECIFICATION DOCUMET3TS t 02520
Revised JULY 20, 2D1$
003215.1 -0
CONS"iRiJCTION PROGItESS SCi1T:]�UL.H, — BASELiNL: EXAMPLE
Page �F of S
CTTY OF FOR1' WORTII 202i Sidewalk Llnit Price Construction Coniract
STAIVDARD CONSTRI[7CTION SPECIFICATION DOCUMENTS �p252p
Rcvised NL'Y 20, 2018
UO 32 I5.1 - 0
CONSTRUCTION PROCrRESS SCHEDULE — BAS�.T,1NT EXAMPLE
Pagc S of 5
�ND OF SECTION
Revision Log
DATE NAME SUMMARY OF' CHANG�
7uly 20, 2018 M. Jarreli Itutial Issue
C1TY OF FORT WORTH 2O21 Sidewalk Unit Price Construction Cont�'act
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 102520
Ltevised JULY 2D, 201$
00 32 15,2 - p
CONSTRUCTION YTLOGitESS SCHrDUL�; — PROGRrSS �XAMPLE
Page 1 nf 4
S�CTION 00 32 �5.2
CONSTRUCTION PROJECT SCHEDULE — PROGRESS EXAMPLE
PART 1 � GENER.AL
The following is an exampie of a Contractor's project schedule that iihistrates the data and
expectation for scheduJe content depicting the progress �or the project. This version o�the
schec�ule is re�'erred to as a"progess" schedui�. This exampl� is intended to provide
guidance iar the Contractor when developing and submitting a progress schedule. �ee
CFW Specification 00 32 �S Construction Froject Scbedule for details and requirements
z�egaxding the Contractor's project schedule.
CITY dF FpRT WORTH 2O21 Sidewalk Unit Price Construction Contract
ST.AIIDARD COAISTAUCTION SPECIFICATION DOCUMENTS 102520]
Revised JCILY 20, 2018
00 32 15.2 - 0
CONSTRiICTION PROGR�55 5C1�EIJU�E — PROGR�SS EXAMPLL.
Page 2 of 4
zv
�
� �
ti
c �
:9 r
� �
� {�
� �
�9
❑
.�
��
L�
�
�
�
N
� �
�
�{�\ �
t.f' �
� �-
� �
Q
� �
w n v i�n
� _....�.._
�' . � r ._�03
ro3m
`� �� � � ���
�' r f i �l f
� ,,,r_�
a; �
f��krt� �
;+ hry � �` � r�
� J, r� [� ., ._ .�
W I� ,
' ' � ri s ; KI
, � '� a" '� �
�
"@ : .� _ '�� �.- � �
R � ' � � . � .' Y . .' q ~ k l3 . Y ��.
' r� G � � { I
i i� I I . i , 9 1� F I �. ` . i �� � � 1 L C 4 j' F i �i
h G ` .i
�� ���'�'��I ��"'��`�;ti �y� � � �(���s������ �����
�! J ' ' � � .'�. � � � '- �I 14 �' � i fil rJ �kl : � r „ . f I � � 5i „'
u � � Y.; '�c , ��° �[i � � � ., . i v� u P.'3 a o � � a�u �u .x.,�
ri�3� - `� . , o u ., . .. -
f�i ii.:i ii �� �s �i �� a� „ e� r... a� .. �� �i .� r ry c1 rdEn t� �
I P , � 1 � n i� ^ — ^ :.!} 'Y;j t.} I�_ �P ' 'rn �� �e �- .L f �, � :� .4 i'.'i ri ..
fJi -r rtl i �� r .. .� .l..Y I 1'� ..�
i� il �f,] u • � 4j c :.I !� + ' j1 � r� ,�: � �� .� J �a � �� � ri ri s� i � h �
s+ i }' �� h u� � �� ( � n, si �j � ,a � � �+ +� �' � { � � �
,`, �:� , e :'� 'r a� �_ — � � � �..�s .� � =? t, � .; ry, `, � �� � �a �; :�. �, � ��; r
r � - a .� �� R �� � +.q � ✓ M Oa !A " . ._ �:
f1�1�fr r,t .� ,kh r � �1�h�`,��" . '���r:
�^ � f" IC �'y u.. '�e � � 5 �I �3�. J i � � �i �� � � � � i.
; � � ' � � � �. i � I � � T � r h � � 4 3 4
_ Ll A f s s.3 �, r � Z r r � � o- . G-4 ��t r i � � _� �J � � . � 1��� e �'I
_ I ........_..r ,. _ __.
� .. � . � - c I hr - i{ _ ` _
��� � . �p 't I t� + Y I . I i � i� f o� " i [ 1! ii IS u�
ti .� s � � i 4y � 4" � a i n � �! � � � � "� , � � �' i +� � � Y' ;
c'�ry a c..o � s�
�'. �.' i_ - ..�i: � , ��;r , .i . . n �:� -' � , ;j el. �: r5 . �c � d r�� h � 3 i.-.
l�
�
�
�
� �
� �
,w�. �
�J W
p�]q
Vi �
� �
� �7
� �
v�
�
�"� �
1 �
�
�
�
�j��
IF�'
`�Y�
.. �I.. ...._ � � . . -
.�e, [:i {A .i i� � � R, �, .4 �.F i II �,.a �..I ui �al �.� � I F� �.- � 4u ii��Yi. S.f �:�I a, i� i'4 r�CS � � R ci
:� i � ,
ii [p g ^ " _" " ''�.a i ^'ili +�r . i{�,.i � ..i �.i� �i:fi � �y',1, � , iir �'Yii �� ry..Yl .. ,� 1_ �I!l.a� rl I i
� M� Y 1
���
�
5�,�
�}
�
�T
�
�
C�
L
t}
��
�
�
c.
u
c _�
�
�
�
L_I
:�
��
��
?n
3 L3
��
3�
d �' �
� � �
� C .
.8 � �'�
�s� ���
�' � � ��? �
�a �$
'� � �:
� ��'� � �.
���� ���
�Q�� � g�
[��i� r`�; ��L' � : p
� ,•yE� e�'+ P
41, �.�f� T �i+'F..
���`� � Ai�
�� .� ,�
I
III II
� � � �
�� �'}� � �
R� L �� ��
- u � r � '' �f . ��s. r�o
i L� �:� u� �— g '� : ' :� � �' �'s �'
r� �� ie a � � _ � � � �, '� � 1i "� �� �� � � N �� �
�IS` F � � r " I � � � �{�� � Fr ��—{ � KI' �7 - �
S�'2' � i� ia.' n If �� � �� r. �� F�� n 7, n r� a�s d; � F:s
�* ., . p� � . �y � . i ay � , �. , '� ..� a.
� ;% n �:r'; '� �g1Y � �o � `� � i1 �:1 � � �� �° �� , � �N v� � � €i i':
� � . � � �' ' � � �
� .�
�
� �
� .�
i"' � c�17
ti �
� � �
r�". �, � �
� � �
� � �
�
["il
X �
� ;_
� � �
� � EL
� �
� �p+ �
�C �
'G�. �i
���
C1TX OF FORT WORTH 202 ] Sidewal[c LTnit Price Construction Contract
STANI7ARD CONST'RUCTION SPECIFJCATI03+S 1]OCUMENTS 102520
Revised JUI,Y 20, 2018
00 32 15.2 - 0
C{7h1STRUC'I'ION PROGR�SS BC�TEDl1LE -- PROGftESS EXAMPi,1;
Page 3 of 4
� cv
�
� �
� ry
--� �
es �n
ry �
�
�.
�
�
�
�
�
�
�
� F
� �
� �
�� �
� �
�
a
� �
I�I i.ca .r hitr� M Cl ^a � 1e ra n�'r� c�s s. e� �� �i ev N{ry n-n�r!
�� E � .
i�_. _ ln '.:u f. Ir. 4� L G; � e, .�, � o., ., -, _ �� ., � r, s�,�
__ �, I , �4 ,�y. ,�
�l C] �� t��J 3 G{7 I'fl fl �� }�{ +�� 4+� G4 F� �� � 1.. i�
��a
i5 r I J �d, �l W tL . rl
si�wr ���y ���1�5�,�
s� 'S ' 4 . � L ,� pi � FI !a � ' � rt �. � 7 't .
o i—{+I r'1 ., �. 1. �� � r��i �I i I i� I
� . � „ , ', „
� }, F, I
�� Vw � 5 �.. S 4 Lii �� i�- F�1 Li � �� . ..
� S 4�ir i�S �, ri�i�' a��'"�i
°'- �. �' L L. a. . y? �� � l.:� � r-. ; rl -
� .:� . .: a� . .� . .
� � i � '� i' �`y '1 .- � `i •' � "i ';� � .. s7 ] a 1 x j �. f t �.
L �,� � r� � � �� ,J `� e'�_. i a � , _ 1 w � d �l � �� � c
� u � �� y� �' ���� �S-� R- � �� .�i �'� �{� �. u .5:.��. �. �., ��
y � � � �'I p
Y �1.1 T'.T T� fj �� pl �`�� � r Y : I r� 1 . f 1�'e I
�� I I t �y�,` � � * S�''��.� � 1k,,,� �
,p ;� a� ;.,, i
� YI �� _ �'
.� i, .i,' n .. n.� c�c,'
�� � .� � �.. �. � .h �. . 1 u
�t1 � .
i � '�� � � � , . I.:
., � � „ � _. ,u � ; i ;L . � „ ... � „
, 'ri iiii �.Iw-�47"'-i�':,��s'4:�:f���1-�
_, '�6.
` I
i `
i
; � www .
i � !y�;
c4j Lij
. � � �
� �; L
� �,
�, ":' ` �
� `sy 2,i' �
�� � � '� � - c;
,�l 4i � �y
�, y r f t n" ib
e E ` � � ��' € �s
� � t, ��� '� ��czr,iti F� �. � ���i
�� � ' _ �,� � � 6. � Ij � � � ���
ul �� � a .�� � �.7�.ii �ir �iS�+.ii�:a };
p r' � I r} ��F {r � � n .e-� n
�
�' l; :.! :? £i }� � � i d�� � Gi � '�! '� �� GI '3 �:$ �, �
� � � �:
n
��
�
� �[ Si �
�: n ;
� 5 j
�
,�;�y �.��
,ry
� � id �
' i I ; 4
J
f.i `� {I� py � 3
ii r� a. r� i� ra ri��ri�i'e�S� Sa!
� � E
. r, � �� =i �r c��ciF.pi.���.
� . ;
' ' ._.i
- �'a n dM1 F J r.
.�'n �i� -� �� ,>
t� �� J 3� �S �� � r i
' ` - - ={ � � �I .�� ; 4
�� -�r IJ �' ��
�1 ° i . ��i i � r' �
i, g
.� � � � ?�, � '— i �" :�"
�
�
�
�
ci
�
�
�
v�
d �
� �
q����•y �`,.y
h-I �{
��q �
4F i �
� �
� �
F+ �.1
G �
� �
; a ��i
� �
�d �
�
�J`
r
�
�
��
; � � '; i �, � " J �,� { k r : ra
'� =� � ' � �_ � , � -4 u ij g *' �,
�.. . . r� . i' V. �'� ,y ;Y „I � 4'
}� �ry x fn ri � .��
r° � 1 � �sl � V � � �� ��
3� Ji � � ' � �p� � i � 5 .� L�.
„ ,., ,i , ., :+, .. .o da .�. .o, ,.,
� _� �� �, �: , o '� �..'�:� �S'�.
'' ,� � �d
;; si ,, � _ •� „ „ , . „
�s SI+� `� r� " . i �� � .s. E� .ri -
3
��
1� i
�
� �
� �,�
F� � �_ iis
�� � '
�.�y
����a��
�� Ee 1 eM
s m f" I"i 4
E i
_ t
� •� �u �
±�� `��' r
.s.. f, ,
ry r,•'. � �
ti
� ��'. a�.��F+
� ,� , � , � � :
� ��� !` �:
LS r � r �
� F
�y ., '� a5 � � n
ri �' �j .�j �' � `R `_' ' � �
15 C� a�� i r.} . r i i
`���� ' ..0
_ �� . i
S1Y
e
� �
� .�
� � �
g �
�3 U �
� � �
� � �
� � �
+� � +�
.aE
e`�
� �
4 �
»�
� �
� � �
��
� � �
V
���
� � �
CITY OF FORT WORTT� 202I Sidewalk Unit Price Const�'uction Contract
STANDA121� CONSTRiTCTIpN SPECIFICATIOAI I30CiJMBNTS I02520
Revised JiJLY 20, 2018
003215.2-0
CONSTRUCTION I'ROGRESS SCHEDUT,E — PItOGRESS EXAMPLL
Page 4 of 4
�ND OF SECTION
Revision Log
DAT� NAME SUMMARY OF CHANGE
July20, 201& M. dan•ell Initial Issue
C1TY OF FORT WORTI�J 2021 Sidcwalk Unit Price Construction Contt'act
STAN]7ARD CONSTRCJCTION SPECIFICATION t]OCUMSNTS 102520
C2evised 7UL.X 20, 2U18
00 32 i5.3 - 0
— PRO(;RESS NA,RI2ATIVE
Page 1 of 1
SECTION 00 32 15.3
COfVSTRUCTION PRO.TECT SCHEDULE PROGR�,SS NA.]:ZIZATNE
Reparting Period: Date Issued:
Project Name: Corr�pany Name:
Ciiy Project No: Engineer's ProjecY No:
City Praj�ct Manager: �ngineer's Project Manager:
A. List of acti�ities accorx�plished in the
1. {insert text herej
2. {insert text here)
3. (insert text hereJ
4. (insert text here)
5. (insert text here)
6. (insert text here}
B. List of activities to be accom
1. {insert text here)
, 2. {inser� text here)
3. {insert text herej
4. (insert text herej
5. (insert text herej
6. (insert text herey
orting perfod.
in the nexE reportir�g period
C. List any potentia! delays and pro�ide mitigation actions
1. (insert text here)
2. (insert text here)
3. (inseri text hereJ
D. List any actual delays and
1. tinsert text here)
2. �inser� text here)
3. {inser� text herel
de recovery actions
City of Fort Worth, 7exas
Construction Projed Schedule Narrative Report for CFW Projects
TPW Official Release Date: 7.20.2018
Page 1 af 1
003215.4-0
CONSTRUCTION PROGRE.SS SCFIEDULI :— SlJ13MITTAL PROC�,SS
Page I of 7
SECTION 00 3� I5.4
CONSTRUCTION PROJECT SCHEDULE — SUBMITTAL PROCESS
PART l. - GEN�RAL
The following inforination provides the process steps for the Contractor to follow for
submitting a p�-aject baseline or progress schedule for a capital project io the City o��'art
Worth. See CFW Speciizcation 00 32 1 S Const�ctioz� Project Schedule for detaiIs and
requirements regarding the Contractor's project schedule.
If you are not a registered CFW Buzzsaw user, please email or contact:
Fred Griffin, B�uzsaw Administz-ator
Ciry o�Fort Worth
Fred. Griffin@fortwor�gov. org
$ I7�392-88G8
Using your regzstered username and password log into tbe City's Buzzsaw Sife
https://prol ecipoint.buzzsaw. com/client/fortworthgov
��--- _ __ i_s�,,l
�
:.a +g �.�+ +4e
��
Navigate to your Project k'alder. Verify that yaur Project ID and Projecf Name are
cansistent with Project Folder Name.
Navigate t� the Schedule Directary under your Project Folder. The 00701-F1aYseed
Drainage Improvem�nts project is used for illust�atzon.
CITY OH FORT WORTI � 2021 Sidewalk L1nit Price Construcfion Contract
STANDAR.D CONSTRUCTION SBECIFICATTON DOCUMENTS 142520
Revised dULY 20, 2018
00 32 I5.4 - 0
CONSTRUC"1'lON PROGRESS SCHEDUI.E — S USMIT i'AL PROCHSS
Page 2 of 7
f.lr [a4� �,k�:r *itrJ,: L?y
_ , .tf:i - ".J �` �^•ti x '.I 7� �i I,.� y� z4 � � � � 4r� • ;
�� `�� � Fart�xertf
'.ilti5 d
�
�a�.
I, i. .
��, �
��� I
�� _
9e.rd I
0 1
goY ��
' _ E �i . � . . � . . , .. � li�l�s-r i b ..
��, 40 9id Fo m�eed i3raina9e i�aia.r +[ ,� -rl�„�..�... T�,t � : , .. —i _�_ -' i
'�� �� chedules Index.�As Fred GrEffin 16 38A hliaasdft E,,.el tiV,.,
�_� Bid Respnnses �
� i,— j Conshuc6an
' :.;] consiAtants
_] Cwotracfor
�� Conesponderxe
. �_'jGeneralCoi�iradf7o�umentsantl:.
i�j pro]ecf �rar�ings
" 1..� P�I�k Meetings
_ � Real Properb/
� �
� ll�ities
I •� (� OSJilS-IJrhanYi9at�sCentraEdi.i:!���
�: {"�� �0?�l5 - Lhban Vfllages CenVai Cl�sta �
: r� OO7176 -Llrhan Vllagw SE Cluster Besrs�
�� 90706 -Lir6an YiSages 5E Cluster F+.i
� � 06330-Ssnit�y3en�erReha6ConL•a:
I t'..g 0�755-F1esq�rileRdZ0o4CIRYearli}
� t:� ao�sa - arks Ra�d - eryznt rn,��, t� �,,,
a �� 00773 -Le6aw Channel
� i :# 00736 -Summer Creek & sgramarw �..
• � O[17s7-Gran6uryRoad-A{tamesalio+
.. P* r.��n� �,.. �,o,�n.c a. ri., ,—�
i } {' �
_ _ . o, � °IriIL"fi_li 1 �....u. , �.xr I ` - Jul:� . sol ='l. �.:x.uL��, ✓_ .. � d��' �, I'FU
@lim
T�xro fiIes will be uploaded for each submittal. A native schedule file format ezther
Prima�era .�er or MS Project .znpp and a PDT' version of the schedule will be uploaded
Verify that the £'ile name contains the 5-digit Project ID, Project Name, and Submittal Data
and folIovvs the standard naming convention. �ilitial schedule submittal will be labeled as
`Baseline' for example:
00701-FlaxseedDrainageImprovements-Basetine
Sched.ude submittal updates will he labeled wzih Schedule Subxxzittal Datc `YYYY MM' for
example:
40701 �FlaxseedDrainagelmproveinents-2009 01
Expand or select the Schedules fpIder and add both tk�e native filc and PDF f le to ihe
dzz-ectory.
From the Taolbar S�lect •.`.:lAdd Daeurrcent
CIT'Y OF FORT WOR'�'H 2O21 Sidewalk Unit Price Construction Contract
5TANDARD CONS'C"RUCTION SPECIFICA7'TON DOCiJIvIENTS 1Q252a
Reaised NLY 20, 2d18
0032 [5.4-0
CONSTRUCTION PROGRESS SCH�DL7LE — SUB1ViITTAL PROCESS
Page 3 of 7
Rle !`�51 'Pr��. .c^�5 �en�
•' � }.i.' - r! � � "o-7 � � �i `4$ I }� 44a1 �� . .. I �r � . {'� .
6raeMno
7l:ryn:t f � eon � .
fEi1-L�:i�°r: �J Note ' � —._..
� ...�
�� �� 'f' �°�` �.iu7(!1-FlaxseedorainageImpravemer?:�+�- �
� � � � Folder .... T �.J �d Forms
�7L4f ' � . �� dcResponses
i J ConsVuction
. - , � Cpnsultants
i' . I Contradvr
��r J Garesponden[e
���� ;.. ��_] General Contract �oarments arsd Spec
�� i � Proje�t�ranings
- � J Publi� Meetings
�},I" , ;' � Re� Property
. �, � 53
� �- 1:�5�Schedules7ndex.xls
;"�` r..",� Lll�ities
*�.�: ;. },""� 0�7tl5-Ur6anYllagesCen�alChrster5�l
��i�, - �. �3 007�J5-llr6anV�lagesCeREr�ICB�sier5uui
[. i� O�r�]6 -Ylr6an Vdlages 5€ Cl�ss#r Berry-Ri+�
`�.� �� _. t_'y� �i0Ti15 -Urhan V�lages SE Cluster NearEa�
4•� 'y '�jj �0730 -Sanit�y Sex�er Reha6 Contract L5,
. �. �a U47755 -Mesquile Rd 7110$ CIP Year i(Oes
;y. y�'� OO7o8 -[3drks Road - Bryant Irvin ia Gran6i
�r�t + �� 0�773-1.�otisChannel
_,� `� }� �0786-SummerC7eeS€&Sycamwe5chool .,
. � t y E.
:.�:n r_..J�aldnia ,y� -�......
r1.5'iY. '"'""_ I%�!llvf � I J�P. I�4F.�
=,Sdied�Rs[ndex.xls FredGritfin 16,389 MiQomfl
�
Select Brawse and go to the location of t�ie files on your desktop.
Select O�en
�M�,r..._....., r_ � .� � �. .r_-�,uK. �_ �__ _ _�___..� �_ _�w _ __ �_._ ,.w._��..�,.
�
� F Sc=r�.t
��uw���ts
AliRli f,rvnlen+
5lMt�
Ik��nl��
�
�
. I I_�15��r,- .7:-?���e�.:-����h;ll�9•Iili:Y�:.�,t,�.Ir�..lwmn�snaRilnn[Mnr�misi,.,�.i: �.:..�;:,:
.'!
�nx:ee�.. I I I
�� fieri.un Te�xs�an I+ki1�.�� I •;�N . . .--
-�.�_�..--... . J._��. .. -- . . �
i i
�.,kr. �[�i P'aki�.0 ;sl . L`f' �J.•
' J�lYOacuments ..... . ..,�i�.krJJetM�ndMana9erPra7
'.��
I ���vCamWl� �h�s�rnotesPlayer
}F��:�iy �y Is.lyliehsorkPhces ��ActiveProjects
� L�5'»I�Ma ��n6eAvo6atSProfesslonai ;�BnardN9Pass.pdf
n:l- �a
I5 � �!` ",a� =�umCDs�6V�s o-�Cleaf�ypeTurrng
I L�' �!p 13uusa:v20�8 �CoolRemrdEdtPro
I�H��.�i��U �,;r �}{�+�HiLL§PN �Cro�nvndPMPExam5im3.3
„�'.R�Zilla cGefrt r�„yCrystal Repars 2�J8
� �GoagleFarth DeIIQ�ridcSte(ermceGuide.pdf
��Y`,r��`+� NPPho�smariF�ress �DisRD�fagmenier
�;HPphotasmartPremier ��FreeSoundRecord�
��TjYll' SoW4an Genter �FreeSnvndRecorder.eXe
, .� k� �F1�assCanned �EaA�PSecurity
t.l7l:ou[+�t+ 'J11�Funes �fo9n.]PG
'�Miaosak4i�iaVersion2G�ZNside6ute600fe �ANetMeeSng
� � �� x
*
6A'rl.i�n=��t :d-usr.� ij _ __ _.. . , _ J I �_��en_
f��rr� - I
=Je.��.i*,iti ,-''Ftesi'1 _I Ls,ces
The file will appear in the Buzzsaw Add to Project — Select Documents window
Select Next.
C1TY OF FORT WORTH 2O21 Sidewallc Unit Price Construction Contract
STANDARD CONSTRUCTION SPECTFTCATION AOCUMENTS L02520
12evised JULY 20, 2018
0032 ]5.4-0
CONSTRUC'I'ION PROGRT:SS SCHEDL]I,E — SUBMITTAL PROCESS
Pagc 4 of 7
Do not select Finish at this time.
...I �_ I i2�±! �IGo.m_.r�N ^_� n�ii! im h'�r G�n7M1rtYr_`$r JW� Y�u 2ari uhl uaAi In n Orr4�liniu qttil`�t� {tpn;itu�:.
y.`
G�E�2ct I' �TflfiS`.R-�'._ .I d ' .
Uocumenl5 .. .
ftrFlnii� ��lGr,i6_hi hfrti0�.�� :4d
arr � I � Comment — _.-. . , �_.. _. __ ��..
�]rw:1797�l�r�.a�r�(i',y�,�i?-'�tlilii�u4rmenF� t]9B_l:n.�snr .f.:�x�[I.Jnde.:BrJ... Jl1i..'_.� .h1,T�
Su}�� E�:o."
taoh�;�h,,�, ,
� � ,I r- __ . - -
I �
r
i
I.raF,�•_I _ I'v�E _� fair�l—I wti-- I
You will be placed into the Attach Conr�ment windovv to enter a recarc� into the Project
Schedule Submittal Log.
Enter the Project TI]-Project Name-Submittal in the Subject Line.
'I'ype Submittal and Company Name into the Comrrcent window along wiih Coniact Name
and Contact Phone Numbex.
Select Ne.xt.
- .,.�I �,•�'.ICrenM�9ii�rulrilll�liiLlieih[ra9if4er�sr.d=-an�,';r,iixr�lhl�:lt5§C��r,r�IL..�afih_s.6elnR:+j'{+`tl
� T:`�:strplR�lk��
�eled �acuments
f �cammrrs�rara��'r=x�•�n.ai
..:�hiLr,chCammenk I . iB .� �1 I / I71 a�''7' I� �.'� _I #�-���� . I__.I�I .�I
t I
;�yj�;�q t,��,r--t; ���7-�faxSeedOrainage7mprovEine;its-BaseGne
MG9:.4ek��ir — � .
�Ffaseline Scl�iedule Su6mftFa) fi�om'Company Mame"
�
��r�ontad Name
�GaniattPhane
6r
Llpdaie Schedule SuklmittaE from `Company F1ame' for n�ork performed up to ]anuary 31, ZOa9
Contaci Pk3me
Cantart Phone�
�
I -�.... _. �
�.'A�ir4 I e�r�; • I Fm�cll I ...l.m'-r_ I tl"1�. �
CTTY OF FORT WORTH 2621 Sidewalk Unit Price Const��uction Cont��act
STANBARD CONSTRUC"C'TON SPECIFICA7'I4N DOCUMEIITS 102520
Revised JUI.Y 20, 2018
00 32 15.4 - 0
CONST'RUGTION PROGRESS SC�iEDULE — SIJBMIT'�'AL PROCI'SS
Page 5 of 7
You will be placed info the Send Email Notification window.
Select To and tk�e Select Recipients window will appear vvitl� a list of Project Cantacts.
Select the Project Manager as the To Recipient and the Praject Coni�'ols Group as the Copy
Recipient.
r��:. .. � . � � � ��
........_ . I�..�.�e��.aL.�.uN,..�� il.,��.�.,.�..d�...�u�.� �.ii.. �. E� �.�..�H... ri�..�.,���_�e� ..-r
� .�._. .�.m i. ,,..�, I
.,-,-„� v���_ - I._.i�� � I � d'r = � R f T �
•��,��..�� +�:
� �.... __ . ..
t'u,`�iw�.ei��� r.. I � ... .
^",- � �
n���a.i li.�u.�i
I_ _ ______ ____._........_._.__.�.�._ ...
� �
N nnd 18%�-
:Jusler 5�� F
7�nke��5o�1
aa' B£.fv�W�
� Near Eas
Gonb'dC� V.
ear t �ea
Select the Paste Comment button to copy the Comment into the body �f the email
Select Finish.
CITY OF FORT WORTH 2O21 Sidewalk Unic Price Constiuction Contract
STANDARD CbNSTRUCTION SPECTT�iCATIO�IDOCUMENTS ]02520
Revised JULY 20, 2018
i. . �r�•�n���i-�r.<_--�. _I t.�„
� .e i� u . . � � � !i . �-. !-
1 � T... � 5... � -.. Prb..
i TreY51... T... �... C�... Ne... Fro...
Tii}YJa... T ]... ]ac... l�e.-. YI[...
YrPYNI... �'i... T 127... 4iz...
V.8- H... IJ... H... R 3... Ne... P�n...
I Ysid01... V,.. T... 5y... 2}�...
NCTvr... T... CF... ]/5... �ro.�-
e'�M6... h�.,. G�... H��i...
... LA'-... ]13�-.
Vetle... bl"... P . Nc... N.L.
e�.dv... . C... [P... -V2_.. ..
I Ns'JIOer..� N/dl E._. CFI... o-ie..- Pen...
YJr��am... F^1... G... P.m... Ne..- T
t'��Li� [... kV... [... cY... 52f... Ln...
Y�e�Ee.,. r.. F... PSI ]t7.-.
2acI�F... Z.. im... Ne... CIM...
r�s¢cF�l�.. al,.. Pi,.. No...
� Auhie .,. A... li... GF�... 1i0...
�c- Fre�iG'... T.., p... C... 11�... SIC,..
I.:t[4: rMlnct... .......
tl �d. ��...v�� p c.__ e___ cw___ ffz... mf... _
�
�
7,�F�eJ[. �i..
. ti� nnl.--v�arx s��
�'
I �
Ci1 I Cn'i..ti
00 3z is.a - o
CONSTILiJCTiO�T PROGRES$ SCHEDULE— SUBMTl`1'AL PROC�,SS
Page 6 of 7
- :;.I ;�so�vl�xaWaM�'s'+4,F+i�k�+�m�IlrN�sall,�oMlhr.m-y:.nrury{,�rt�fiAlv. IFessx'urqpoen�
seiect �ou�menis
a.{r,a=Iz Comment
' -- i4�:nd Ewcil
nti���i�.�t����
�
t�ai,ir cGyn��l
���
_1 I _� _I �� =f+i �I
lo ., � �..FredG7iffin -- �s. _ . .. —
;=::_J�ProjecYCanhalsTeam �
—r'�-� ,� � — . _- -
'%i'�;�E�:�', � p0701-FiaxseedD�ainagd7mpraueme'tL{�.3se�ne
6aseiine Srhedule 6�,;bmittal ironf'Cnmpariy Name` �
. Contsci Name
��''��.onta�i Phone
�7r
Jpdate Sdtedule Suhmittal from'Company Mame' fo� v�ark performed up io lanuary 3Y� 2�009
':ontad IVame
�^ontactRhone
�
�.U�rk_.�� I lrrsi_I .ii-;uw�2� I —_��.� I
The schedule file is uploaded to the directory. An etnail is sent to the City's Project
Mar�ager and Project Control Specialist.
��� ��. 4r- r..� _��, —
� E i :;� i•-1 �T E'3 8!.! k; fa wX �.t sl t� .wl �! C+i, '' ; 7J • I
r,�n_ � r�n�H,—h;�
i,i,'� ..� �S� � � � � � j� , Psldc. J
�
��
�� 1 i
�.� � I
�
%�
I�i
I
�
UpZoad the PDF file using the same guideline.
EN� OF SECTION
. ,. ..... . , .+ �
...�y�m7o1-Ra:n_eed�t¢a9e� � .W __� . m —� - .
rn r ic a I a.a lv , �:: t ti�r
� aidForms ..:. ,� - � �, �r
nl�;`,]�dRe=po�m5 �f'.� a�=1'�kldex.zls FredGn(fin .I.o �I��ftExcdl^l.. II'�I:�:�798y.
� AuhleNan... 74,257 %ERFie 1�}2(i69 9:fa
- ��] {0nsh'l![6on ..
� �� Cof�AWn6
t'� Contre�mr
� � Carespondence
� �"�zxneralCanVact�owmentsaJSpAc
� �J Pro�ectoraWlFgs
i �;] Pu�'ichketi�
."� RealPropgfy
� _�; sa,ea�des
� '� oT�trla�aeE�ra'-.v�t� u, . .�
::� Sdiedulesindex.��
_j �NNes
��OOF15-ih&an4'9frnjesCenkaltii�-; i
� � �oT75-ur�ant4lagesce.�s��Ir.Lrw ;�,�
� � PTN6-lJr6sni�aeesSE�vrtr !y�e ii:,
� �� uaT7s-urhanVd7a4es5ECf�sterplearE,:;
. �j� d�773tl-Sa�etary5exerReha6CanV;.l�,�
� � 00755�MesquieRda7�9CIPYeari�J:e�
� {°'� OOYo9-0'rYsRaad-8ryantlrrornto �-st�
� �'� 00778-Le6o�xOhamN
CIT'Y OF FORT WO1tTH 2Q21 Sidewalk Unit Price Gonstiuction Contract
STANDARD COI�ISTRUCTION SPEC�'ICATION DOCUMENTS � a252b
Revised NLY 20, 201 S
003215.4-0
COAIS'1RUCfION PROGRESS SCHI:�ULE — SUBMITTAL PROCESS
Pagc 7 of 7
Revision Log
DATE NAME SUMMARY OF' CHANGE
7uly 20, 2018 3VI. 7arrell Inifiai Tssue
CI�'Y OF FORT W012TH 2O21 Sidewalk lUnit Price Construction Contract
STANDA1217 CONST'RUCTION SPECiFICATION AOCUMENTS i 02520
Revised Ji1LY 20, 2018
U03513-I
CONFLIC'f OF INl'CRGST AFFIDAVI7'
Page I o f i
SECT�ON 00 3S t3
CON�'LICT OF 1NTCREST AFFIDAVIT
Eacl1 Uidder, offeror o�� E�espo»dent (hereinafter referred to as "Ya�i"} Co a City af Fort Worth
proctu�e�»ent il�ay be required to coi�iplele a Conflict of Ii�terest Questionnaire (the attached CIQ
Form) and/or a Local Government Officer ConfEicts Disclosu��e Statemenc (lhe attached C1S
Porm) pursuant to state law. You are urged to consult witl� counsel regarding t��e applicavility of
ti�ese forms to yc�u�• cai��pany.
Tl�e refereElced forms may be downloaded fram the linlcs provided below.
htt�://www.etl�►ics.s�ate.tx,us/for�ns/CTQ.pdf
I�ti�://w�,uu .ethi cs. state.tY.us/far•ms/CIS.udf'
A�'` CIQ Foem does nol appiy
0 C�Q Fori� is on fite with City Secretar'y
� CIQ Form is beingprovided [o rhe C�ty Secretary
�� CIQ Form does not ap�3y
0 CiS �'orm is an File with City Sec�-eta�y
0 CiS k'art�a is beiz�g provided to the Ciry Sec�-etary
BID ER:
� t
Company
��V/� V��
di�ess
�� �� ! � �
City/State/Zip
��
BY= ,����i� f ����i��
(Pleasc Print)
;�
Signat�lre: ��'``�"
Title: �� � � �'����
(Plcasc Print)
END OF SECTION
2021 Side�E�rtlk Ui�ft Price Cv��57rnctrura Contruct
CITY OF FORT WOItTiF p01 SZU
STANDARD COI+ISTRUCTIOP! SPECIFICAT[ON DDCU�v[ENTS
Revised Augtts[ ZI, 2018
0o a� oa
BID FORM
Page 1 of 3
i0: The Purchasing Manager
clo: 7he Purchasing Division
2D0 Texas Street
City of Fort Worth, Texas 76102
�OR:
City Praject No.: 102520
SECTION 00 4'i 00
BID FORM
2021 Sidewalk Unit Price Construction Contract
UnitslSections: Unik 1- General Requirements
Unit 2 - Existing Condition5
Unit 3 - Earthwork
Unit 4 - Exterior Improvements
Unit 4 - Utikitias
Unit 4 - Transportation
7. Enter into Agreement
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into a� Agreement with City ir� the form
includecE in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Contract 7ime indicated in this Bid and tn accordance with the other terms and conditions
of the Contract bocuments.
2. BIDDER Acknowledgements and Certification
2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the ENVlTATION TO BIDDERS and
INSTRUCTIONS TO BiDDERS, including without limitation those dealing with the dispositian of Bid Bond.
2.2. BicEder is aware of all costs to provide the required insurance, wiU do so pending contract award, and wil!
pro�id� a valid insurance certifcate meeting all requirements within 14 days of notification of award.
2.3. Bidder certifies that thi5 Bid is genuine and not rr�ade in the interesi af ar on behalf of any undisclosed
individual or entity and is not submitted in confarmity with any collusi�e agreement or rules of any group,
association, organization, or corporation.
2.4. Bidder has not direct[y or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2.5. Bidder has not soliciied or induced any individual or entity to refrain from bidding.
2.6. Bidder has r�ot engaged in corrupt, fra�dulent, collusive, or coerci�e practices in competing for the Contracf.
�ar the purposes of this Paragraph:
a. "corrupt practice" means the offering, giving, receiving, or saliciting of any thing of value {ikely to
influence the action of a public official in the biddir�g process.
b. "fraudulent practice" means an inteniional misrepresentation of facts made (a} to influence the
bidding process to the detriment of City (b} to establish Bid prices at artificial nan-competitive
levei5, or {c) to tfeprive City of the benefits of free and open competitian.
CITY QF FORT WORTH 2O21 Sidewalk tJnit Price Construction Contract
STANDARD CONSTRUCTION SPECIFICRTION DOCUMENTS , 102520
Form F2evised March 9, 2020 bid_proposal_workbook
00 41 OD
BI� FORAA
Page 2 of 3
c. "collusive practice" means a scheme or arrar�gement between two or more Bidders, with or without
the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive
levels.
- d. "coerci�e practice" means harming or threatening to harm, directly or i�directly, persons or their
property to influenca their participation in the bidcfing process or affect the execution of the
Contract.
3. Prequalification
The Bidde� acknowledges ihat the following work types must be performed only by prequalified contractors and
subcontractors:
a. None
b.
c.
d.
4. Tirne of Completion
4.1. The Work will be complete for Final Acceptance within 180 days after the date when the
the Contract 7ime commences to run as pro�ided in Paragraph 2.03 of the General Conditions.
4.2. Sidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete
the Work {andlor achievement of Milestones} with�n the times specified in the Agreemen#.
5. Attached to this Bid
The following documents are attached to and made a part of this 8id:
a. This Bid Form, Section 00 41 OD
b. Required Bid �ond, Section 00 43 93 issued by a surety meeting the requirements of Paragraph
5.01 of the General Conditions.
c. Proposal Form, 5ection 00 42 43
d. Vendor Compliance io State Law Non Resident Bidder, Section 00 43 37
e. MWBE Forms (optional at time of bid)
f. Prequalification Statement, Section 00 45 12
g. Conflict of Interest ��fi�i����tat�r�ent, 5ection 00 35 13
*If necessary, CIQ or C1S forms are to be provided directly to City 5ecretary
h. Any additional documents ihat may be required by Section 12 of the lnstructions to Bidders
6. Total Bid Amount
6.1. Bidder will complete the Work in accordance with the Contract Documents for the folEowing bid amount. In the
CITY OF FORT WORTH 2U21 Sidewalk Unit Price Construction Contraot
STAN�ARD CONSTRUCTIQN SP�CIFIGATION pOCUMENTS 702520
Form Revised March 9, 2020 bid�proposal_worfcbook
00 41 flU
BiD FORM
Page 3 of 3
space provided be[ow, please enter the total bid amount for this project. Only this figure will be read publicly
by the City at the bid opening.
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount enfered below is
subject to verification andlor r�odification by multiplying the unit bid prices for each pay ifem by the respecti�e
esfimated quantities shown in this proposal and then totaling all of the extended ampunts.
6.3. Evaluation of Aliernate Bic! Items �use this if applicable, otherwise delete>
Total Bid
$8&2,009.25
7. Bid 5ubmittal
This Bid is submitted on Q812712020
Respectfull � d,
BY:
(Signature)
{Print�d Name}
by the entity named belpw.
Receipt is ackRowledged of the �nitial
fallowing Addenda:
Addendum Na 1:
Addendum No. 2:
Addendum No. 3:
Addendum No. 4:
Title: �residen#
Company: Ke�Do Contracting
Address: PO Bnx 2041
Despto TX 75115
State of lncorporation:
EmaiL khalver439 aol.com
P h one: 21 �-882-1349
END OF SECTIOR!
C; ^ S�[�GARlTA CAZAR�S
Notary ip q12b29565g
qT, {Y My Cumm'sssic�n fxpires
t�F �`' April i9, 202�
CITY OF FORT WORTH 2O21 Sidewalk Unit Price Constructfon Contract
SiANDAR� CONSTRUCTION SPECIFICATIQN bpGUMENT5 702520
Form Revised March 9, 202tl bid_proposaE_work600k
un a� a;
�io i�Ronosn�
r,s� � �rx
SECTION 00 42 43
PROPOSALFORM
�idder'� Application
Pruject Ilem in1'ormaiion
fiidlisl I�em
�` Descnption
� Oi71.0101 Construction Staking
2 �171.0102 As-Built Survey
3 3217.5001 Curb Address Painting
q 3211.0122 Flez 8ase, Type A, GR-2
5 9i0�UG I:ind�.i�i�.r. �•r�,��fii_nf l�cll'����i
0241.0100 iiemove Sidewalk
6
0241.0200 Remove Step
7
$ 0241.0300 Remove ADR Ramp
0241.00.01 Remove Concrete �ri�e
N
0247.0402 Remove Asphalt Orive
i0
0241.0403 Remooe Brick Drive
i�
0241.6500 Remove Fence
12
0241.0690 Remove Wall <4'
13
l4 aZ41.0700 Remove Mailhox
�5 0291.07D1 Remove Multiple User Maifbox
D2421300 ftemove Conc Curb&Gutter
i6
� � 0241.40a1 Remwe IO' Cur6 Inlet
] g 0241A002 Remove 15' Curb Inlet
] q 0241.4003 Remove 20' Curb Inlet
2Q a241.4004 Remove 30' Curb Inlet
Z] 3110.0102 6"-12" Tree Remaval
22 3110.0103 12"-18" Tree Removal
23 3110.0104 18"-24" Tree Removal
24 3110.0105 24" and Larger 7ree Removal
2$ 3123.0101 Undassified Excavation by Pfan
3213.0301 4" Conc Sidewalk
26
3213.0311 4" Conc Sidewalk, Adjacent to Curb
27
2g 3213.0321. Conc Sidewalk, Adjacent to Ret Wall
29 3213.0322 Conc Curb at Back of Sidewalk
30 3213.0401 6" Concrete Driveway
3� 3213.0402 7" Concrete �riveway
32 3213.p403 8" Con�rete b�iveway
33 3213.OSQ1 8arrier Free Ramp, Type R-1
34 3213.0502 8arrier Free Ramp, Type U-1
35 32f3.p5p3 Barrier �ree Ramp, Type M-1
Bfdder's Proposal
Spccitication Unit of gtcl Q�inntity Uni� Pricc Ijid Vnlue
Sectinn No. Measure
Ol n 23 LS 1 $30,ODO.OD $30,000.00
01 n 23 LS 1 W�� �� -�� $20,400.Q0 $20,000.00
3217 25 EA 1 $250.U0 $250.00
---- - ___ -- - _ _. __. . _.
3z ii za cv io $35.00 $35U.OD
.... . .. ....... ... ...... ..... ...... .............. .. ...... .... .. ... .. ..
ea z $1,000.00 $2,004.OD
1 1D0
$11,00 $1,1p0.00
9z a1 i3 sF 1o1-soo . $iO.OD $5,D00.00
soi+ $1Q.OD $5,010.00
i-ioo $11.00 $1,100.04
_ _ _ --
024113 SF 101-200 $10.00 $2,000.00
zo�+ $�o.00._„ $zA410.,D0
02 a� �3 �a zo �z,000.00 $ao,aoo.00
----- --- - ---- - - -. _ _
i-io0 $13.00 �'�,300.00
�... .....
ozal i3 sF ioi-sao $11.00 $5,600.00
50z� $11.00 $5,511.00
1-l00 $1D.U0 $1,000.00
o2nii3 sF iai-saa $g.pp $4,50U.00
so1+ $g.p0 $4,509.00
i-iao� $�i2.00 $1,2DO.OD
02 41 E3 sF ip1-aoo ��$11.OD $4,400.00
........ .... . .... .... ..... ... ...... .......... ..... ... . . .....
Qo�+ _���;oo $a,a�.�.oa
�-so �sa.00 $i,5oo.00
024113 LF 51-i00 $25_OU $2,500.0�
,. _. ..._ _ . . . . .. ...... . . .. .... .
101+ $25.00 $2,525.00
�-zo - �55.00 _ $550.U0
_.. .
624113 LF 11-30 $50.DQ $7,5��.{}0
_ . .. . .. . . ,._. .. .
3zf $50.00 $1,55D.Q0
D2 41 13 ER S $500.00 $2,500.00
OZ4113 EA 5 $500.00 $2,500.00
�-�ao ��s.00 $�,aoo.00
024115 LF 101-500 $15.OD $7,50D.00
......... ........ ..... .. .. .. ....... . ..................... ....... ............... ............... ..
SQ1� $15.OD $7,515.00
__ __ __
az nx �4 EA i $3,500.00 $3,500.00
. _ .,.,.. .,.., _ , __.. . _,... _. _ .. _ __ .,._. .
02 ni ia Ea i $4,20D.00 $4,200.D0
024114 �A 1 $5,000.00 $5,DOO.DO
. ... ........ ..... ................. .... ..... ... . .... .
ozaiia �a i $7,OD4.00 $7,OOO.DO
3� io pa �a 1 $5p0.OD $500.D0
3iioao En i $1,200.00 �1,zao.oa
s�zoao �a z $�,soo.00 $�,soo.00
, .,. . ,..,. ,... . . . . .., . .. , .
3iioao Ea i $3,OOO.DO $3,OOD.00
si 2s i6 cv so $35.D0 $1,750.00
1-zsoo W�� �� gs.oa $20,000.ao
3z is zo sF zsox-s000 $7,00 $35,OOD.00
... ................. . ... ..... . .................. ...._.. . ..__. ....
soo�+ $�.00 $s5,00�.00
..._,.,... _
i-zsao $10.00 $25,000.00
az sa za s� aso�-saoo �
$9.00 $45,OOD.00
som+ $9.40 $45,009.00
_ _ ___ __ _ __ _ _
3z 13 z0 SF 10fl0 $10.00 $10,000.00
.
3z i3 zo t� laao $1D.00 $10,OUQ04
3z ia zo sF ioao $10.00 $10,000.00
32 13 20 s� zao � $11.5D $2,300.00
3213 20 SF 200 $12.00 $2,900.00
............... .. ... ...... ............... . .............. . .. ............... .... ........
3z �s zo Ea za $3,000.00 $60,400.D0
32 �3 20 [R 5 $3,5Q0.00 $17,5Q0.00
32 �s 2o EA s �a,oao.oa $zo,aoo.ao
Cll }' pF FORT WOK I H
STpNnnRU[U�STRUCTION $PGCIFl['sVTION �UCUMfN7$
F�m, r��,stia 2n i 2m zu
h id.. �rognsa I_ti��arf:looak
nuaz�;
[313� P20P05�, L
I'a�c 2 af R
SECTION OD q2 43
PROPOSALFORM
�idder's Applica�ion
Praject Itc��� Inloiv�a�ion Bidders Propas:d
Bntlis� I�em .. Specificalion llnil ol� gid uanti Uuil Price Bfd \�aluc
Dcscripnnu Q 4'
No_ Sccuon No. ivleasurc
_
36 3213.OSQ4 8arrier Free Ramp, 7ype M-2 32 13 20 EA 5 $4,���:00 $2�,000.00
--'- _._ .. ....... ,
37 3213.0505 Barrier Free Ramp, Type M-3 32 13 20 EA 1 _ �$4,OOD.00 $4,OOO.DO
3g 3213.050G Barrier Free Ramp, Type P-1 32 13 20 @A 10 $4,OOD.00 $4D,00�.00
39 3213.0507 Barrier Free Ramp, Type P-2 32 13 20 fA 1 $4,000 00 $4 000.04
_ __. . ........ .
qQ 3213.U508 Barrier Frea Ramp, Type C-1 32 13 20 EA 1 $9,0�0.00 $A OOO:DO
........... . . . _ , . . .
q j 3213.0509 6arrier Free Ramp, 7ypa C-2 32 13 20 EA � $4,OOD.O� $4,000.00
q2 32k3.0510 Barrier Free Ramp, Type G3 32 13 ZO EA 1 _$A,OOU.00 $4,D0�.�0
.. .......... ....... ..... ......... .,..,. __ __ _ _ _ , ..,.
1-zso $46.OD $11,500.00
_ _ ._ . ., .. . . .
szi6.oloi 6^ Conc Cur6 and Gutter 3z i6 xs �F zsi-soo $43.00 $21,500.U0
43
44
45
46
4?
48
A9
50
501+ $43.OD $21,543.00
i-zso _...._....... ...,. $„48.00 _ _ _$12,000.00
__
3u�.oioz �° Conc Cur6 and Gutter 3� i6 is �F zsi-soa $45:.00 $22,500.00
_ ..
soi; 45.00 _$22,545_QO
�. _
i-zo 25.OD $500.00
� ...
3216.0301 9" Conc Vallcy Gutter, Residential 32 16 13 SY 21-40 22.�� $880; 0�
... . ...................... ................................... . ._ _ .._ .,
ai+ 22.00 $902.D0
.
3232.O1W Conc Ret Wall Adjacent to Sidewalk 32 32 13 SF 50 75.00 $3,750.d�
_ ......... . .... „ _. __. �_
1-aQo 35.OD $3,500.00
3291.0100 Topsoil 32 9i 19 CY �.ol-2ao 25.OD $5,�OO.DO
zolr 25.OD $5,025.D0
_
i-i000 8.5D $8,500.D0
_. ..... .,. _.
3292.0100 Bloc& Sod Placement 32 92 13 SY 1oo1-z000 7_25 $1a,50Q00
2om+ 7.25 $14,,507.25
--
3365.0108 MISCELLANEOUS ADIUSTMEN7 �iIiILITIES] 330514 LS 1 50,000.00 . $50,D�O:UO
__ _
9999.0096 Canstruc[ionAllowance ER � , ,25,OD0.00 $25,000.00
_ _ __ _ __,., , ,., , . __ __ .,..,
_ .,.... __ .. ......... .. .
__ _ _ ..,..,.,. . .,.,.,..,.. __ . ..
.. . __ __ ...... __ _., ,..... , _ -
_
_ _ ., ., - ..... .. ... . ..... - _
_ - - . _.... ........ ,
_ . , , .. _ _ _ . . ....... . .. . ... .. ..... .. ... . __ __ . .
CITY OF FORT 4VDRTH
5'I'ANDARI] COYS'fRUCTION SPP:C[�ICA'I'lON DOCUMLNTS
Porin Iici iscd 2012Ui2f1
IriAJ�ropnsal, nnrkbuul.
0(i:l2 I;
OID PROPOSAI.
r,s� : arx
SECTrON 00 a2 a3
PROPOSALFORM
Bidde�'s �pplicafiion
ProjecL 1Lem Inlo�niation Tiid�icrs Proposal
E3idlisr I[cm .. Spccificalion Unil nf
Descriptinn Bid Qu�wity Unit Price Bicl Value
No. Section No. Mens�ne
__ - - - - _ _ _ _ _
. ...., ,. . ..___ _ - _ __ _ __ _ __ _
.
__ _ _ _ _ - _ __ - - - _
_.
- . ..... . . . . .. ....... . ....... . ..... ..,.. , , .,.,., , ,.,..,..,. , ., ,..,..,.... , ,., , . . ,.,.,...,.,.. .. .,.. ,.,. . ,
_ _ _- __ - - -_ . - - -_ - _ _ __
�. � .. ............. _. ......_,. . _ �..... �. �. .. . .
_ - _ _ _ __ _
.. . ........ .... . ... ... .......... ..... ...... .. . . ..,. .,
_. . .. .. _. _ _ _. _ � .. � .. ..
_. _. . .
. .,....,., , ., , , _ _- __ __ __ _ _ _ -_ _
C]TY OF' F'ORT LVORTFf
STANDARDCONSTRL1CTtONSPHCIFICATION DOClJt�1EN7S
F�o�i��I2crisa12U1201211 6id..pm�msal �mri�haai.
{IOd)J?
SlU I'ROPOS.4L
Pagc d oi x
SECT]ON 00 42 43
PROPOSALFORM
�idder's �pplic��ion
Prolec[ Itcm inFnnnatinn 13iddei's Prupusal
Bidlis[ liem Dcscripiion Spccificalion Unit oF B��Qii�������Y �Ji�it Price Bid Value
� Nu. Section No. Nle.�sure
. _ _ _ _ _- -- ---- ___ _ __- ---- ----- ----- - -___ __-- --- - — --. _ . _. _ _ ___ .
. . . ...... .. .. .. ...... .. .. . ........ ........... ......_................... . ....... . ... ... .... . .......... ...... ...._... ........... ... ......... ..... .. .... ....................... .................. .... ..........,.. .... ..... ............. .. .. .. . . .. ......... .
. .... .... .... ,. , . .. , . .. .., .... ..... . . ,. , , .... ,.,
. . ... . . ... ....... .... ........ .. . .. . .. . . . ... . ,. . ....... ... . .. . ... . .... . .. ... .
- - - - -- - � -- -- -_ -_ - _ _ _ _. .._ . . _ . _. .. . _ . _ _ . . - - - - - . _. . _
. . ... .......... . ..... . .. .. . . . ......... .. ....... ... ......... . ............ .... . . . .............. .. . . ..... ........... ..... .. ..... . . ... .. ............... . ..... . . ......... ...... . ....... . . . .........._..,., ..,.. , . ..,.., ,., ., ,....,.,... ..., , . .. . ..
. . _ . .. ..� . . .. ......... ..... ............ ... ..... .. ................_... ... .. . ....... . ... .. . ........ ........... ........ .............. .......... ... . .... . .. . ...
. . . . .... ....... .. ...... ....... .................. ..... .... ................. .... .... .... ..... ..... ............. ... ...... ...... ....... ..... .......................... ...... ...... .. . . .... .... . ... ...... .
. .. ... . .. .. ... ........... .. . .. .. . ............ ..... ........._ _ .� . ._. .... . ....... .... ....... .... . ... . . .. . .
. ._ . . _ -- - � ----- - ----- ----- ---- ---- - . - __ _. --- _ ___ _ . __�__ ____' _ ___ . . _ - --- -
. ... ...... ..... .... . .. .......... .. .............. ......... ........... .. ......... ..._ ..._... ........... .. ............ ........... . ............ ........ ... . ........ .... ........... ............ . ....
. ...... .... . .. . ... . ......... .. ......... .. .. ..... ... .. . .. ......... .. ........ ... . . . . . .. . . . ... . . .
. ,.., . ... ... .. .. ........ . .. ....... ... ..... . . ................................. ................... ........ .. ....... ... . ..... . ...... ...... ...... . . . ...
... . . . ...... .. . ......... .. . ............... . . ........ ....... ..... . . .......... . . . .......... . . . . ......... . . . ............ . . . . . . ...�...... . . ......... . . . . ............. . . ......... .. .... .... ..... . . . .... ...... .....
.. _. _ ,._ . - - - - -� ---- --- ----_ . - _ _ __--- ---- ----- ---- - --- - ----- -- -- —. _ . . . . _ . .
. . . .... . ... .. . .... ... . ........ .... ............................ ......................................... ................................ ...... ............ .................................. ...... ........ .......... . ... ...._............................................. .... ...... .. .... ..... .......... .. ... . .... ... .......
. .. , , .. ....... ... ... . ............. ....... .......... .... . ......... .. ... .. ... ...... .... ......... . .... .......... ......... ... . ....... . ..... . ... ......... . . . . ........... . ...... ... ....... .. .
CffY OF FOR'f 4VOR'fH
S�ANDAItD CONSTRUCTION SPECEfICA'f10N CJOCliPv1GNT$
Fonr� Ra��scA 21112�12� bed_pmposal_�mrAbuaA
uu az a;
�iu [�KONpSaL
Pagc? of %
SECTION 00 42 43
PROPOSALFpRM
�idder'� �►ppiicaiion
13idlisl I
No.
Yroject ltem infann.ilion Bidde�'s Propus�l
I�escrip�irni Specllicalion Unit of �3id Quan[ity Uaii Price 8�il 1�alc�e
Scction iVo. �Icasurc
...... . ..... .. . . . ........... .. . . . ........... ... . . . .................. ... ..... ..... _ ._-- -_,. _. . ___. __ _ - ---- ---_. ._ - -
. .. .. . . ........ .. . .. ................................................................. ... ......................... ..... .... . ... .......................................... ......... ................ . ... ........ ...... .............. .. ............. .... ........ ........... .. .. ... .. ... ...
.. . ..... ..... . . ........... . .............. . . . . . . ........... ..... .. ...... . . . . ............ . . ........... . . . . . . ............ ......... . ....... .. .,. ,.,. .,..,.., . ..,_,.., ,._ .__ ,.,. ,. ._..._.,
.. ...... ..... . . .......... . . . . .............. . . . . .............. .. ._._. ,. . ___ __ _. .___ ___ _ ._ -_ . -- -_ _- - - - - - - -- -
.. ........ . .... .... ....... ... . . ......... . . . . .... ........ . ...... ......... .. ..... ....... .... ... .. ........ .... .... ... . . ......... ....... . . ... ...... . .. . . .. ... ..... ..... . ... . ..... . .
. . .. . ........ ......... . . . . ............. . .. ......... . ....... ... . . .......... .... ..... . ..... ..... .... . . . ......... .. . .. ........... . . ........... . .. ._.._, .. . ._ ___ __ . _ . .
- - - _ _ _ - -- ----- - ---- -- -- __ _. __ . __ ._. �_---� ----- . _ . __._,. ,. . ,. . ... .. . ... .... ... ..... . . ,.., .
__ _ . _ _. __ _ . _. _ ,_.___ . .,___ ___ . . __.-- ---- - -- -_ _ _ _ - ---- . -_ . _ - --- -- - -_ _ . _ _ ___.
. ___. .. _ _ _. . _ . , . . .. .. , .. . .
..... ... .... .. .. .... . . .... .. .. .............. .. . .............. .......... .. .. . ... .......... ... .. ... ... . . . .. .... .... . ...... .... ..... . .... ....... . ...... .... ... . . , ,
. _ - � --- . . . _... __ . ,_. „ ... ................. ........ . .. . ........ ... ....... .. .. . . ..... .................... .... .. ......... ...... .
. .. ........ .. .. . ... .. .. ........ . ....... . ..... . . ... . , ., . , ..,.,.. ....,., , . .., ,..,..,....,. ., . . , .,. .. . .,. . ,.,_ .. ._ . _ _ ___. __ - -
. _ _ _, ____ . .. . . . .... . .. .. . .... . . . . . . . . . . �
.. ........ . . ....... ........ . . ... ............ . . . . . ........... ............ . . ......... .... ..,..,. .. , .. ., ...,.,.... , .,.... . . ..,.,.. ,..,.. , .,.,. .,.. ., __- - - __ - . __ __ -
.... .. , .. ....... . .................... ......... ... .......... ............. .... .. ...._.__ . ..�. _ . _. __ .... .. .� .. .. .. .� ........... .. .... ..... .. . . .. _._ .
. . . . .......... . . ............. . . . .......... . . ......... . . . ......... ........... . . .........., ,.. . ....,.,.., ,....,.,., .,.,.,.,.,.,., ,., ._.. ,.. .,..,..,...._. .... ---- ---- �---- ----
.,. ,.. . . .. .. ........... . ..... ..... . .... .. .. ... .. .... ...... . .. .. .. .. ... .. . ..... .. ... ...... ... ..... .. .. . ..... .. .. ... . . .. . _- - -�
. . . .. . . ... . ... ..... .. ........ .... . ..... . .. .. ._ . _. _ _ . _ . _ _ _ _ . _ . _ . _ . .
. . .. . .... . .. ........ .......... .......... .. . .............. ............ ..... . ..... ......... ...... ...... .. . . ............ . .... ...... .... .. .... . .. _, ._- - - - - -
. ... .. .. ..... ..... .. . ... ....... ... ... ....... . . ........... .. . ........ . . . ___. -- -- - - -. _ . _ . _ __ ._ . _. . __ . ..
.. . ........... . . . ............ . ......... .... ...... . . .... ...... . . .. ........ . , . ,...,..,..,.. , , ,..,..,..,. ..,. .. __.. _ __ .. _. _. ___ ._-- - -. . .._
_ _ _._ .. _ . _ - - - --- - __ _._ ._ __. . . . . . ............... ........... ... , ......... . . ........... . . . ........... . ........... .. .......,.
- - - - - - - - __ _. ____ . ........ . ..... . . ....... ........... . . ...... .. . ... .. ...... .... .. .. . . .
CIl'Y OF FORTR'OR"fH
STANDAItfJ CONSTAUC'fIUN SPCCIPIChTlON �UCUMENTS
Fann Rc, iscd 21112t112q hid_ pm��os�l_�snri;hcx�k
USI a2;:
BIDPROPOSAL
Pagc ri o[x
SECTION 00 42 43
PROPOSALFORM
�idder°'s �4pplicaf�ion
Projec! Ilem [�3Fonn�tinn Bidder's i'ropusnl
idlisi Itene Specificaiion Unit of
❑eseriptio» Bid Qunnlity Unii Price fiid Valuc
No- Scclion No. Measure
. , ....,.. ., , .... ...... . . . .... .. ....
__ _ _ - __ . ......... ........... .............. ..........
....... .......... _.,_,.... . ..._. _ ___ _ - - -
__ . .
__ __ _ - _ ., .. . . ,.,_,.,_. . ........ . . ......... ... . . .. .. .
....,., , , .,..,. , - -
_ . ... ..... .. . ............ . . . . ....... ..
. .. .. __ -
_ _ _ _ _,. .,.., . . ,,...,., , ,
. . _ .. .... ..... ... . . .,. ,. ,..,..,.,..,. , ...,.,.,. ...,
.,._. _ _ _ _ -_ _ - _ __. __ , _
� � .. . .
.., . _ _
_ - _ - - _ _
- -
_ _ _ .,.. , .,., _ ... .......... . ... ........ . . _.. ., , ,.,. ..,..,. .. , , , .,.,..,. ,
_ - - -_ -_ _ .. _ _ . . ........... . . ...... .. .. . .......... .. .. ...
.. . .,.., _ _ _ _ _ _ _ _
- _ __ _ __ _ ,
-- _. . _ __ . .,..,.. .. . _. _ _ . _
. , . _ ... . .. .. . .. ...
............ . . ........ . . - -_ _ - -__ _ _
��__... ..�_.... �..
_ .......... ...... . .......... ............ . . .
CITY OF FORT 41'ORTH
$ I AN6p RI) CONSTRIfCIl01V $PICCIFfCA'fIUN fIOCUMENTS
Furm ftn�iscJ ?u I]ul2u biJJ�myosal_«nrk6ouh
na az �;
aso rRorosn�
Pagc 7 of N
S@CTIOEV OD 42 43
PROPOSALFORM
�idder's �4pplic�iion
Projec� I�em fnlonuation Biddei's Proposai
[3icllisi Itcm pcscri�rtion Spcciticalion Unil of ��� Q�i�i�lity Uuit Piice Rid Vnluc
Na_ Sect�on No. Ivfcasurc
: .. . . _ _ _.__ . . ....... ...... . .......... ...... .. . . .......... ......... .... .. ... ..... . . .......... . . .......... .,.., ....,. ,..,_ _ _ . __ _ .. __ _- -
. . . ......... ..... .. . ... . .. .. . .... . .. .. .. ._..._ � - - -- -. _ . _ - _ _ _. __ _ _ . , , .., .. .
- - --- _ - ___ ._..-.-. ,.,._.,..,..,. . ....... . .. .......... .......... .............. .... ...... ,,. ,..,.., .,...... . _- -- ----- --- -
. . . , .. .. . . ..... ..... . ........... . . . . ...... ..... .. . .......... . . ......,.. . . , ,...,..,.., .., ,..,..,. .,..,._. . .,___ . _. _ _ . .. _ . __,.. . .,..,., .. . . ..
_ . . _ . ._ __. _.__ ----- - -- --_. . __.. _. .....- .. . ... .... . ......... .. .. . .. .......... . . ......... ........... ....... ..... . ....,.. . ... . .,.. .
. . . ........ . .. ....... . . ........ . . . ......... ....... . . . ............ . . , . ......... , ,....,. ...., ,... _..,_ ...__ - . _. _- --_ . _ _ . _ . . - - - -
_ _ . . _ . ,.. .., , . ......... ........ . ... ._........ .... .. ..... ,........, . . . .,... ... ..,..,....,.., ,_ _ _ -__ . _ - . _- - - - - - � - - - - �
.. . , . , .., .,. --- -- - -- -- - ---._ . __ _ _-__..,_ . . .... . ........ . .. . ............ . .. .... .. ..... . . .... ...
. ., .. .. .. .... .... . ... .. . . . .......... .... ....... . . . .............. , , . .........,. , , , , ,.....,..,..,. , ...,.. .,. ,._.. . _�_-- ---- - -- -- ---_ ... - -.- ,.. ,.,..... . , .. , . ....... . .. .......... ..
. . . .... ... .. ... . . , ,..,.......,.., , , , , , , ......_... .. . _.__ .__- --- --_._, . _..-. -.. ,..,.,..., ,., , ,. .,........ ... . .. . . . . . ......... . ..... ... .... ... ........ ...... .. ..
- � - -. - , . .,.. . . ...... . .......... .. . ...... .. ... . ... . . ..,..,.... - - - -
. ........ . . .. .... .... .., ,.. , . ._ ---'-- - - - _ ._ . - _ _ .. _ - _ , .. . .... .
- - � - - -_ .. , . ........... .. . _. _ . � ...._...... . . . . . , _ _ .
. . _ . _ . . . _ .. ...... . .... ....... . ........... .. ......... .... .......... .... ......, . . ,.......,..,. ,.,..,., .,..,..,_. _-_. _ _. _ ___. _ --- - -- ---
. . .. .. . ..... ... . . . . . ....... ....... .. . ........_, . ___ ----- ----- --- ----... .. -.-.,.,..,. ., , ,-..,.., ,.. ..,. . ... .... .... . . . ..... ..... ........ . . ... .... .... ..
, _ _ _ _ . ....... . . ..... . .. ............. . .......... ... . . . . . . . ........... . . ......... . . . . ............ . ........ .. .... . .. ... ....... . . . .............. ... _... _ - - - - - - ---- ----
. _ _. ____ __ . . ..... ...... . ...... . ..... ......... ............. ........... . ........ .... .... ., .,..,.. ,., , ,.,..,..,..,... . .,- -'-- --- -_ _ _- _ _ _ . _ _ _ __ -
.. . . . ....... .... .. ....... , , ,.,..,..,..,.,... .._. . -- --_ ----- --__ ._.. -.-... .. ,.,., ,._......, ,.,.,. ,.. ...... .. . . . ......... .. ...... ......... . ..... ,.,.... . .... .
,. .. .. . . .. ............... . .. .. ........ ._ . . __- ---- - ---- ----� . -,__.,....,. , , , , , ,..,..,...... ... . ....... .......... . . .......... ...... .. ... . , , , ..,....... .. __-_ _ ._
- - - - - - _ __ ._ _ -_ ................. ...... ..... .. ........... . . ............. ... .. . ... ........... ... .......,. .. , ,.,..,..,. .. . ., _ _ _ _ - ---- - . ..
. .. .. . . ,.. ,.., . ---- - _ . . _ _.
. . . .. . .. . . .... , , . . ___ . _ _ . _. _ - - - - . . .. ...
. . .._ .. ... .. ....... ..... .. - — -- - - � - - . ,... - -- - - --. .,..,.. . .... ... . .... _.� . _ .
. . ........ .. ....... .. . .. ............ . . .. .... ...... ..... ........._ .,_�__ ____ _---- --,_...-. ., , , ,.., ,..,..... ,., .. . , ,., ...... ........... .. ...... .. .... . , ......... , . ,... ... ...,. ..,_, , . ,_. .,
. __ -- - -- -_ .._ ......................... . . . . . . . . ......... . .......... ............. . . ,...,..,..,... ...... ,.,.,.,.,.... .___ --- ---- - .__..,._-..., , , , ,.,..... .. , , ,.......... . . ........... ..
... . . . - — - -- - - -- . _ . __. __ .... .... .. . . ... ...... .. .. .. .. ... . .. ...... ..... ... .. .. ..... ..,...,.., ..,. , ,. _ _ ._
. - ...... . .. ... . .... . . ..... .. ................. . . . . .. .... .... .. _ - ----- - -- -- --- - - . . _. , . . . ..
ciry or roar �voari i
5'f�SNDARI] CONSTRLICTIOIY SVGGfICA'f10N DUCUiv1LNTS
Forw RcrisM 2U12111N� �iAyrapasal_unrAbaoA
111142 a3
eiu rkoi'OSAL
N,3� x ors
SECTION 40 42 43
PROP05ALFORM
�idder's �epplicafiion
Project Ilem l�ifonna�iun E3iddc�'s Pro�osal
Bidlis[ Item . . SpeciFcation UnitoF
llescriphon . Bid Quantil�� Unil Price fiid Valuc
No. Sccuon hfo. Measure
., ... . . ....., .... . . . ............ . . ...... ..... . . .. ........ ...... ... .... ...... ._.. _. _ __ ---- __ - _. _,...,.,.., . ..,.., ....... .. .... .. .. .... .. . ,.. .. ,..
Bid Sunun:uy
13;ase l3id
. .. .. ... . .......... .. ... ..... .. ............
. _. . __ . ... . . .. ............ ........ .. _ � _. . .....
. ...... . ... .. ..... .................. ..... .................. ........................... ......................... ._.....
.. .. ..... . . .. . .. ... .. ___ - ---- - ---
............... ..... . .................. ..... .. ... . ....... ... .... . .
'1'nhd liase 13id
Alterr3f�lc 6ic!
'IbYal �Vtcrnatc 13id
DeduclivcAllcrn:etc BiJ
'i'ptfll pGluiYive Alhernxte Bid
Addilivc Altcrn�te Bid
Total Ad�litire �Vtcrnatr Sid
To�al Bid $862,009.25
END OR S�C'f[ON
CI'I'Y DF FOR i 4VORl I I
STr1NDhRDCDNS'fRIICfIONSVECIFfCATION DOCUA�IENTS
Fonn fic��isttl 2�� 1211121� bidyropasnl_«urkbuak
on aa 9s
BIQ BON6
Page 4 of 15
S�C714i� UO 4313
BED BOND
Kh101lI� ALL �Y �'t��S� PR�S�t�iS:
That we, Ken-Do Contracting, L.P. , known as
"Bidd�r" herein and Continental Casualty Company a corporate surety
duly authorized to do business in the State of iexas, known as "Surety" herein, are held and firmly bound unto the City
of Fort Warth, a municipal corporatinn created pursuant to ihe laws of Texas, known as "Gify° herein, in the penal sum
of five percenf (�%) of Bidder's rnaximum bid ppice, in iawful money of the United States, fo be paid in Fart Worth,
Tarranf Cvunty, Texas for the payment of which sum vuell ar�d truly to be made, we binti ourselves, our heirs,
executars, admfnistrators, successors and assigns, jointfy and severalty, firmly by th�s� presents.
WHER�AS, fhe Principal has submitted a t�9d or proposal to perfarm Work for the following Projec#
designated as 2021 Sidewalk Uni# Price Construc#ion Contract
Bid #1Q2520
idOW, �Fi�R�FOR�, #he condition of this obligation is such that if the City shall award
t�e Contract for the foregoing project to the Principal, and the Principal shall satisfy atl requirements and conditions
required for the executior� of the Confract and shall �nt�r ir�to the Contrac# in writing with the City in accardance with
the terms of such same, then fhis obligation shall be and become null and �oid. If, however, the Principa( fails to
execute such Confraci in accordance with fhe terms of same or fails to satisfy al! requiremenfs and conditinns required
for the execufion of the Contract, this bond shall become ti�e prope�ty of the City, wi#houf recnurse af the Principal
andlor Surety, not to exceed the penatty t�ereof, and shall be used to carnpensate City for fhe diif�renca befinreen
Princip�Ps tota! bid amount and the next selected bidders total 6id amount.
AROVfA�a �UR�'H�R, that if any legal action bs filed vn this Bpnd, �enue shall lie in Tarrant County,
Texas or the United States Disfrict Court for the �forthern District of Texas, �o�t Worth Division.
1�0 WiTNESS lE1�FiEREOF, the Principal and the 5urety have SfGNED and SEAL�D this instrument by
duly au#horized agents and officers on this t�e z7th day of August , 2p2p.
� � )��
itn ss as to inc�paE
PRINCIPAL:
Ken-Do Cnntrecting, L.p.
BY:
at
r,� �9 ��f �I� , �
Name and iitle
C�T1' OF FORT WpRTH
STAI+IDARD GDNSTRUCFION Sp�ClFECATION DOGIFNFENTS
Form k2evised 201i91d9 F2esourcesP 02- Canstructfon Oocumenls_SpeCificafions_qiv OdGaneral Conditinns 4041 QO Bid Proposal Workbook
00 4313
BI� $OND
Page 5 of 95
Ad��ss: P.O. Box 20D1
DeSoto, TX 75115
Sl1RETY:
Continental Casualty Company
BY: _,,� �
5ignature
�lena 5ells, Attorney-In-Fact
Name and Title
.�
� ��
� E�s �/ �,
\.� u �`' 4 �y�F/0
Witness as t refy !e iifer Clark, Witness
Address: 333 Svuth Wabash
ChiCago, IL 60�04
7elephone Nurnt7er: (312) 822-5000
At#ach Power of Attorney (Surety) for Attomey-in-Fact
*Note: If signed by an officer of #he Surety Campany, ihere must be on fife a certified extract frvm the by laws
showing that this person hax authority ta sign such obligation. If Suret�s physical address is different from
iis mailing address, both rnu5t be provided. The da4e of the bond s�all not �e priar ta the date the Confract
is awarded.
�Nn aF s�crrorr
CITY OF FORT WOF2TFf
STAiJDARO CO�fSTFiUCTION SPECIFICATIOlV �OCUMENTS
Form Revised 20771109 ResourtesP_Q2 - Constn�iiori pacuments_Specificallons �iv DO-General Condifions_Do 41 00 Bld Proposal WoAcbook
00 43 37
VENDOR COMPLIRNCE TO STATE !AW
Page 1 of 1
s�crioN ao a3 3�
VENDOR COMPLIANCE 1"O STAT� LAW NON RESIDENT BI�DER
Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This iaw
provides that, in order ta be award�d a con#ract as low bidder, nonresident bidders (out-of-staie contractors
whose corporate offices or principal place of business are outside the State of Texas) bid projects for
construc#ion, impro�ements, supplies or services in Texas at an amount lower than the lowest Texas resident
bidder by the same amount #hat a Texas resident bidder would be required to underbid a nonr�sident bidder in
order to obtain a comparable contract in the State which the nonresident's principal piace of business is located.
The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet
specifica#ions. The failure of nonresident bidders to do so will autamatically disqualify #hat bicfder. Resident
bidders must check the box in Section B.
A. Nonresident bidders in the State of Texas , our principal place of business,
are required to be 5% percent lower than resident bidders �y State Law. A copy of the
statute is attached.
Nonresiden# bidders in the State of Texas , our principal place of busir�ess,
are not required to underbid resident biclders.
B. The principal place of business of our company or our parent company or majority owner is
in the State of Texas. �
BIDDER:
I � r �a
BY ��°`��i��[/f������
.._ ���r �-z•
/ v�
� i���■, t!
���
( � ture}
Title. �/",�/, f' �,fl�"�"�'%�
Date: 7.l
�ND OF S�CTION
CiTY OF FORT WORTM
S7ANDARD CONS7RUCTION SPECIFICATION DOCUNEENTS
Form Revised 20i 10627
bid_proposal_workbook {1)
ooas iz-�
PRFQUALIPICATiON STATLMEN'I�
Pagelnft
1 SECTION 00 4512
2 PR�QUALIFICATION STATEMENT
3 Each Bidde�' foe a CiCy procueement as required to complete the u�formation below by
4 ide�ltifying the preqtialified Gonh�actors audlor s�tbconti�ctors whom they ir�Cend Eo t�ti[ize for the
5 major woi�k type(s) listed.
Majpr Worl< � Prequalification
T e Contractot•/,Subcontractor Company Naa�ae Ex iration Date
Sidewalk NA
InstallaCio�n.
S
9
10
11
]2
Tl�e undersigned herei�y certifies that t11e contracto��s a�ri/ar stibcontractois described in
tlle table a�ove are currently prequalif'ied for the work types listed.
BI DDER:
By:�i����- ��Gl.O��+�`���
{Please priut)
Srgnature: >,G�j � �
� . ,,F
T�t��: „�,���� � �r,��.�.
���C15C Pi'llltj
13 ,
l4 '
l5 Company
16 �'`. _ �
] 7 �..,_ . �� � �� ��} �
18 Address
Z� �� �� ��c 75 �I �__ _
zt ciey�sta�e�z�}�
ZZ
23
24
z�
z�
�'
�
Date: � � G� ��`,
u�►i �i�a���a��
C1TY pF FORT WORT�I FY2U21 ATP Sidewalk ImpruveEnents
STANBARD CONS'fRUCT10iV SPECIFICA'I'lOAl DOCLIMEN'l'S �p1�1()
Reviscd July l, 2D11
{lt)4�2C�-E
CbN'I'ftAC'TOR C0�1PLtfiNCE 4V1`i`FI 4lrC3Tt�C�R'S CO\]I�fiT�.�SfIT1Q�l LEI1V
i'age 1 uf I
}
�
3
�
S
G
7
S
9
l�
1I
i2
E3
1 �1
1S
1G
l7
[S
��
��
21
2?
23
24
ZS
26
��
28
29
30
3]
32
33
3�F
35
�G
a7
38
39
������ �� �� ��
CONTRACTOR C�MPLIANCE L�ITH WC}RI�R'S C4MPEN�ATI�NLA4�r
�'Lirs��.r�t to Texas L�l�or Code Sectioii 40�.09G(a), as ��i�et�ded, Contractoz� certifies tl�at it
�»'owic�es �varlce�''s co����ei�satioi� i3�su�'ance coverage fo�•a[l of its ei��.��foyees e�t��zlc��fed c�n City
Projecf Na. �U2�24i Caa�tracCor fiu-tljerce�stities tl�at, �tt�sz�a��tto Tex�s Labo�� Cocfe, Sectio��
4�G.09�(l�), �s �m�►�cied, it ��il) Ea�•ovicle to Gity its s��bco��tr�cto�•'s ce�•tificates ofcompliai�ce ���itl�
woi•Icer's co�i������satio�� ea�er�►�e.
�Qi� i'��.C7[`�R:
_ _ _ �. _ ._�-.-
E`�,��]�1��y
e_� . _.,
Arltiress __ .� _� .
City/St�te/Zip —
_ �' • -_
(P[ease Priiat)
S igE�atuE'�:
THE STATE �F TEXAS §
COUNT�` O� TARRAN'i' §
Title:
_._ _� (I'teas� r��t�.��...�.�• .
q pRY pUe, MARGARiTA CAZAftES
r � 3�Eotary ID /{� 26245b54
N�y Cammisslvn Expires
N'�'f nr'� *'' Apri[ 19, Zaz2
—�_ � z-�-..,._ i:.�,.-�=��- :
�'ORE N�E, tl�u�7de�rsig ied a�it[�o�'ity, on this day }�ersana]Iy ap�eared
� -�� �`�� ��� -��� ��� � =;A , �c77o�vi� to �i��e ta be t13e p�t•son �v��ose �nan�e is
s«bsci-be to ii�e fro3'��oing �i�tst�•u ��t, �nd acic��al�tfledgecE to 2ne til�t I�e/sf�e execi3ted tiae sa�tie �s
the ac C at��[ deed of �or tl-�e p1��j�oses nnd .
cc�iisiciet-atiai� tl�erei�a ex�ressect ai�d iit tl�e ca�aaczty thereiE� st�ted.
�UEN ER MY HAND' ����EE1L, DF �F��CE tl��s ���_c�ay af
� �.
Notary I'i� ' i�a a��d fot- the S e c�f Te�as
��FD �I` �E('TION
c���v oFr-c��zr woa�E�
3QZ1 SfiIClYaIIcZi�eiti'1'ICl' COliSlt'tlCr1U11 CiTllEPACt
� t�z;zo
5"fANDr�[2D CONSTRLJCI'i0N SPEGIC'ICR'1'i0i�€ pOCt�IVI�N"FS
�2evised .iu1y i, 2Ul E
DO 45 40 - l
Mino�ity Business I:nte�piise Specifications
Page I of 2
1 SECTION 00 45 40
2 TTMPORARY R.tiVI�ION�4/6/20�0 (CO'VID-19)
3 Minoriiy Business EnterpriseSpecifications
4 APPL.ICATION OEPQLICV
5 If the totaI do1lar vaIue of the contract is greater than $50,000, then a MBE subcontracting goal is
6 appIicable.
8
9 PnT,TCV �TATFM�NT
10 It is the policy of ihe City oi Fort Warth to ensure the full and equitable par�cipation by Minarity
11 B�siness Enierprises {MBE) in the procurement of all gaods and services. All requixez�r�e�nts and
12 regulations stated in the Ciiy's current Business Diversiry Enterprise Ordinance apply to this bid.
I3
14
15
16
17
1$
i9
20
21
22
23
24
25
�s
27
28
MRF PRO.TF,f'T L�
The City's MBE goal on this project i� 15°/a of the iotal bid value of the
contz'act (Base bia' applies �o Parks and CommunityServices).
Note: If boih MBE and SB� subcontracting goals are established for this project, then an Offeror
Enust submit �ath a MSE Utilization Form and a SBE Utilization Form to be deemed�'esponsive.
I
On City contracts $50,000 ar more wk�ere a MBE s�.bcontracting goal is applied, Offerors are required to
comply with the inient of the Ciry's Busi�aess Diversity Enterprise Ordinance by one of the following:
1. Mect or exceed the above statedMBE goal through MBE subcontracting participation, or
2. Meet or excecd the above stated MBE goal throngh MBE Joint Venfure participatian, or
3. Good Faith Efiort documentation, or;
4. Prinxe Waiver docurnentation.
29 SUBNIITTAL OF TJXRID D�CT]MENTATION
30 The applicable documents nr�ust be received by the assigned City of Fori Worth Project Manager ar
31 Department Designee, within the foJlawit�g iimes allocated, in order for the entire bid to be considez'ed
�2 responsive to the specifications. The Offerar shall F.MAiL the MBE documentation to the assigned City
33 of Fort Worth Project Manager or Department Designee. A faxed copy will nat be accepted.
34
35
1. Subcontractor Utilization Form, � received no later than 2:00 p.m., on the secancE City business
goal is met or exc�eded: day after the bid opening date, exclusive of tk�e bid opening
date.
2. Good Faith Effort and received no later than 2:00 p.m., an the secand City busixiess
Subcontractor Utilizatian Form, if day after the bid opening date, exclusive of the bid oper�ix�g
artici ation is less than stated oal: date.
3. Goad Faith Effort and received no Iater than 2:00 p.m., on the second City 6usiness
Subcontxactor Ut'rlizatian Form, if no day after the bid openit�g date, exclusive of the bid opening
MBE arEic' ation: date.
4. Prime Contractor Waiver Form, received no later than 2:00 p.in., on the second City business
if you will peiform all day after the bid opening date, exclusive of the bid apening
contractin /su lier work: date.
CITYpFFORT WORTH 2O21 SidewalkUnitPrice Construction Conhact
STANllAR.D CONSTRUCT ION 51'�CTI^ ICATION DpCUMENT � 102520
TemporarilyRevised April 6, 2U20due to COVIAI9 Emergency
00 45 4Q - 2
Minoiity T3 usincss P..ntcrprisc Spoci fications
Pagc 2 oF 2
5. Joini Ventuure Form, if goal zs nr�et received no later than 2,:00 p.m., on the second CiCy business
or exceeded. day after the bid opening date, exclusive of thc bid opcning
date.
Z RAILURE TO COMPLY WII'H THE C1TY'S BLTSINESS DIVERSITY INTERPRIS� ORDINANC�
3 WILL RESULT IN THE BID BIING CONSIDERED NON-RESONSIVE TO S��C`IF[CAT�ONS.
� FAILiIRE TO SUBNIlT THE REQ�JIRID MBE DOCTIlVffi\TATION WII�. RES[ILT 1N THE BID
B�J1VG CONSIDFF�ID NON-R�PONSIVE A SECOND FAILTIRE WII1L RFSULT IN THE OFFEROR
5 S�TG DIS QUAT.II;� FOR A PE[tIOD OF ONE YEAR. THI2EE FAILURES IN A FIVE VF,AR
, PII2IOD WII.L RESULT IN A DISQUAT,IFICATTDN PERIOD O�' THRFE YEARS.
7 Any Questians, Please ContacE The BDE Office af {81'� 392�2674.
8 END OF SECTION
10
11
CITYOFFOitT WORTH 2d21 SidewalkUnitPrice Canstrucfian Contract
STANDA�iD CONSTI2iICTION SPECIF'ICATIDN DOCiTM�N1'S idz52p
Tempara�tily Iie�ised April 5, 2020 due lo COVIJ�19 Emergency
RTiA�MiNE�3T 9A
Page 1 of 4
���� �Y����
�1� Qf �di'� �Ot`t�'1
� ��'fice �r ��a�in��� D�v�r��i�y�
��� Su�cvr��ra���r��/�up�li�rr� �ti[����i�n ���r�
F�ift�re #� �:Qrir�t�t€r ��7:s fr�rn�, i:=� its e::t4rni�x wi{h r�c�u����ci r�rr�.�m��k�tl�~r, �r�ci r+�ce��ive� C�y t�e Purc;h�sing
:J
Divisior� n� ka#�� tF��r� �:U�� �.m, �� t�r� �,�cr��:�d �i� �i�sin��ss +��} �ft�� �i� �p��i^g, ex�c�u�i�� of �rid a�?���!� date,
wilt r�sr��t irr ��� krid ��i�:� c�tr�sid�;��1 ns�n-�����:::�;v� tr� k��� sp�caf��at�c�r��.
Th$ �r��r�i�r��d �if�r�;r �gr��s #� �rr�r �E�±� � Es��rr�al ��r��er���t with tf�e iV}�� frrn��� I��ta� in k�ri� �rti[i�.�t=r��r
�che�u±�, c+a�nd:t����� ���� �x�:cu�i�� a� � ��rntr�ct will� iE�� �ECy �f ��ird 1�'�V��th. `T`I�� I�+�t��r��k ��dfa�r f,nc�v�+in�
r;�i�r�nrr���n���lcv� o� facts is gr��ur�e:s f�� e�rrs;c�e���i�:� r�i` ���qu�1��°���t:c�r� an�# vu�lil r�sult irr th+� �ici �eEn�
ec��r�sici�r�;� r��rr-•rew�nns�w� tcs f�€ci s�r�,�cifi���cu►�s.
�Il��s fisteci towarcl meetir�g the pro��ct gaa� mus# he Incai�d in #he six {6) aaunty rr�ar�reiptac� at the time o#
bid or the business has a Sig�ifican# Busi�ess Presence in 4he R�arFtefplace. Mar44etplace is #he �eographic
ar�a af T��'��n�, Dallas. d�r��art...Johrtson, Parker, and {�is� counties.
�ma ��ntr�;�t�r� me��t i�tir�ti�y L�y tu�� kea��l e�f ��I sub�r��tr��:�rxrsJsu�rp&�er�. T�`_ r�-r��ns �hr� I��r�i c�i
b�r�r��r��cla�:r� belc�w th� �ri�r�� c;��i�actarJ��s�ull�ni I,e, ��i��r�ck ��yrr�e�?# f�c�rn !�e �rrr�� c�r�tr��tc�r t� �
��:c�r�tr;�tcsr is ��€�sir��r�d ��k ie�r. � p�yrr7�i�t b� a s��h�c�^�f;�G'�^F '1[] 4�S 5U!��?Ii�f iS C17,^�:d���d ��"� �k�:. �`�7� �r�rn�
ntr��;#�o� is ���c�^�.be�a t� �rovl�� �,r��F cr� p�y�n�r�� c�� �!I f��r�d su�cor�trac«r� i:�e.4�t�fin� �� ����� �nr�
un�rn� thos¢ �ial!�� t�w��rls m�e#i::� th� �t�tr�ct r,�mmitter� �ud1. _
Al..L �8�� iV�US`� �3� C��tTIl���� ����12E CU�li�GT ��id�Ra.
Gerfifica��on means fl�os� frms, Eoca#ed wfthin the Ma�icetplace, that ha�e b�en determined t4 be a bonafrde rninarity
business enterprise �y th� No�th Central T�xas Regior�al Cer�ificaiinn Ager�cy {NCTRCA) and th� D�ilaslFort Wart�
Min�rity Supplier Development Counci� �C?!FW MSDC),
_ -�_--- _ __ _- _.. _ _. �.
[� t�����t�� �errric�� are uti��z�d, fl�e E�t�er,�� wilG �� c�i�r�r� ere��t �� I�►n� �s �re �B� it���� ��v�ir�s �riJ
c�}��{�t�s �� Ee�st �rr� �ui1y� lic�r���d �nd op���tior�aa �r��cl� tc� b� u��e� �r� #I�e �+�ntracl. ���� h4S� m��r I����:
#r��c�Cs� fr�rv� ���o��aer l�J;Q� f�rn�, i�ef�s�i�� ��C c�+r���er-c���;r�t��i, a�d r�e���fe #uEi �i�� cr��it. �' i�e �1C�� m�y
f��u :� trua�l�� fir�� na�:-�.+1R��, artr;f�€�ir�c� �vrr��r,���f�#�d, f�ut �v��l c�nly rec���� cr�r�►� fcxr El�r� fea�� a�r�
c��7rv�iss•:�r�� �arr��:� k� r�ff�� �1�3� �� ���tCirti��i i� #h�e I���� ��r���e_rti. __ -- — ---
Rev. 2113149
Id�ntif� �(� �u���r���a�f�rsl�u�p�i��s y�u �+itl u�e ar� ���� prt�jec�
FOR'��4RTH ATl'ACHME[QT 1A
.. --�*�� E'age 2 of 4
€3ffernrs �re requir�d to identify AU. s�bcoRtractorslsu�plie►s, regardless o# status; i,e., IVli�oriiy. an�i na^-M�� �- I:"�� �itms are to be
(isted frs#, use additionai sheeis if necessary. PEease nate th2�i anly ceri'�'isd MBEs wilE be counted to meei ti�� MBE gaal.
_ _ _ _ . . _.- ---- _ . _�_
ra
SU6C4�1�'12AC7t3R15L1Pi'I.IER °
Company Narne T ra� uV �j Retail Detail
Address i & � Subcontracteng Supplies pfl(�ar Arr�ount
7elephonelF'ax e � E '� W�r�c Purchased
�maii T � '�
Coniact 1°erson �
1 ___ --- - —
_-
� �� ���
��''� �� �� � � ,�� ,��
��a� r�� � d � �c�� � -���
.� �,-�'' ��I �t - ��
� ���� ���� ��
� � ��
� C� C�
❑ C�
❑ ❑
❑ C�
� �
Rev. 5115199
�Q�7`�O.R�`H ATTACHMENT '!A
_��'�� Page 3 of 4
�fFerors are required to identify ALL s€tbcontractorslsuppGers, r�gardless of status; i.e_, Mi�orify �^;� nc:p.= y"���. MB� firms are ta be
�isied first, use adtfitiona[ sheefs � necessary. Pfease noie t�at ortly certifed MBEs wilE be countec! to m�et ark Cv[BE goal.
-- N
SUBC�fVTRACiOWSUPF�.iER °
Cnrnpany �fame T � yy � Detail (let�ii
Adc�ress i � g Su(acontrac#ing ��I�PI��� Dallar Arnount
�'elephor�el�ax � � � M Wark Purah��ed
Emai1 � �
Contact Person _ �
� � �
� � �
� �
� �
� �
�'
� �
Rev. 5175/79
���� �Q��'�
AT!`ACHMENT 1A
Pag� � ofi 4
Totai Doilar Arnount of �f1�3� 5ubcontractorsl5t�ppiie�s � J �} ���
/� 1�� � �
To#af Dof(ar Amount nf �annMBE SubcontractQrs/Suppli�rs � �—
�f}Y�� �f,�LLl�R �d1flUP�I" O� ,ALL S[��GONi��TG1f�5l5UPPLI�RS � � � ��� -
��9 ��
_ _ __ __ _ _
— -- -- _ .
TT`l�� (lf-Fatq�„r 4V��� �7�1� Rl�'�(�' +r,"M+�r-�'-��'fnr15, C��'.siF'f±.,n,f}S C]'� �lJk]S�iiLE�l'Ci�11S �C1 ��'i�S CF,1"�!`IFu� �15� Uvt��'fC}itl� C�Y� �)�ICJ� r,°��;3wYf1V�� l�i �F?�-'
C7�"�:�� �of [��r��nQ�s �r���r�€t� #F�rc�r�c�� k�ae ���r�;rrfi#��J cai a J��c�u��t f�; Ap��c�4��� �aF �#+�n�el,��!�r��:^�
����t. ��y unJK��tln�d ch�r�c�� c�r d�l�+i�� �h�4k ��: � n��t�ri�1 �:�;��:ri �f cr€�r�lra�t ���.i r���y ����rlt i�r d�b�rr��e,�C i�
��:�.�rt� with #��� �ro�ed�ares �a�rtf�r�e� in #1�e ar�lFn�nc�_ Ti�� �f��rc�� �h�ll ;��ihma# a c�e�afl�� +�x�l�r3�tic�r� c�f
t��;�r ��ir� re���vt�d cC��rc�ePad��t��f� +�r r��i�Eiar� w�ll af���:E ���� �a�rn{n��t�d t�W�r gD��. I� �hti d���il ��plan�la�eu f�
r�^# wa1:�n�:���, i� ��„f aff��;f ��� fina� ���r�pfie�itic� rf���rr��e������.
By afffxing a signature tc� this farm, the Offero� further agre�s to provid�, directly to t�e �i#y upan requ�s�,
complete and accurate informatior� r�garding acival w�rk p�rforrr�ed by all subcor�tractors, including NlBE(s) and
any speci�l arra��ements with MBEs. The Offerflr atso agrees �a a�low �tn audit andlar �x�mination of any
boo�ts, re�ords and �iles h�ld by t�eir compa�y. TF�� Of�eror agrees to aiiouv the tra�smi�sion of intervie�s with
owrters, pri�ci�als, oi'ficers, �mploy��s and �pplicable sulacon�ra�tarslsuppliers pa�ticipati�g o❑ th� contract that
will substantiate the actu�! work performed by th� MBE(s) on �hi� �ontract, by ar� autht�r�zed officer or employee
af the Cify. Arty intentiort�i �ndlor fr�owing misr�presentatia�t of facfs wi�l be graurrds far terminating fih� contract
or debarment from City wor�s for a period of �a# i�ss #ha� three (3) y�ars and for initiating actian �rider �'eclera�,
Staie or �.ocal laws conc�rni�g faise sta�eme�ts. Any failure to ct�mply wi#h this ordin�nce creates a ma�erial
br�ach af the contract �nd may resulf i� � det�r'mEnation of �n irt'espor+sihle Offerc�r and d�barm�nt from
parti�ipating �� City wark fqr a penad of time nc�t l�ss f�ar� �ne �1) year. -
�� �
uthorixed ature
�
�
�� ��� c���___ _ - _
A���ss
� ^ �.��� .�_
c�tyrs��c�rx��
��i�. �'���� �.. ��
Priniec! Sig re
��
Cantact 1Vame1"�'itie {if differen#j
�I��'Y �1��� �-�� ���
i'elephane anctlor F2iyt
�
�-�, ; a�e��
o� _
qffice af Business �liversity
�ma3t: mwbenfP�ce@fnrtwot�texas.gav
Phone: (877') s92-267'4
f2ev. 5115If 9
oasz43-i
Agi�ccmcn�t
Pnge ! of G
SECT�OI�I 0� S2 43
AGREEMENT
THIS AG1tEQVIENT, autharized on 1 iL !�/2 o is made by and between the Ciry of Forih
Woith, a Texas home rule municipality, acting by and tYu•augh i�s dt�ly authorized City Manager,
�°City��,�� .Ken-Do Contraetin�, �,,.P3uthot•x,�ed to do busiuess tti Texas, acting by and
t ug �ts duly authorized representative, {"Coniraciar").
City and Contr�acfar, in consideration pf th� mutual cavenattts heceinafter sst forih, agree as
fnl�aws:
Article 1, WQRK
Contz'actor sltall complete all Work as speci�ed or indicated 'zn the Confract Documen#s for the
Project identified herein.
A�'ticle 2. PRUJECT
The project for which the Work unds�• the Can.k'act Documents may be the whole o�• anly a part is
generaliy desc�•ibedas ffllloWs:
2Uz1 Side�va!!c Un�� Pric,e ConstraciianContracf
102520
A��ticle 3. CONTRACT PRICE
Ciiy agrees to pay Confractor foz• pe��otmance of the Work iri accordance with the Con.�t•act
Dacuments an amo�nt, in cutrent funcis,upfo ONE MILLTOI�i Do11a1•s i$ I�Dp1�QpAQQ�
Ar#icle �4. CQNTRACT TIME
4.I �'inal Acceptance. .
Tk�e Work will6e cornplete for Fina! Aeeeptance wifhicz 36S days ai�er tiie date when the
Contract Time commences to rttt�, as provided in Faragraph 2.03 of the Gene��al Canditic�z�s,
pius any extension thereof allowed in accordar�ce wit� Article 12 of the Genei�al
C411C�It1p11S,
Renewals
This contractmay be i•enewed up ta 2(two) additional teim at the e.arl�r of the expiration
of contract funds or conttact time under the same teim, candition, and prices.
4.2 Liquidated Damages
Contractar recognizes thai tanze as of the essence for completipn of Milesiones, if any, and
ta achieve Final Acceptance af the Wark and City will suffar financial ioss if the Worit is
nat completed within the time(s) s}�ec�ed in 1'aragraph 4.1 above. The Contr•actor also
recognizes f�Ze delays, expense and diffict�lties invotved in proving in a lega� pzocseding,
the actuat loss suffered by the City if the Wo�'k is nat completed on time. Accordingly,
instead af requiring any such proaf, Cont�actor agrees that as liquidated damages for
delay {but nat as a panalty}, Cantractor shall pay Ciry Six hundred ar�� fiiiy_Dotta�•s
($bS0.00) far each day that expires after the time speciized in Paragraph 4.I for F�a!
Acceptance until the City issu�s the Final L.etter of Acceptance.
CII'Y OF FORT W�RTFi
3tl21 SidetivalkUnEt1'rice Canatrnctkan Contract
t02520
STANUARD COIVSTRUC'I'ION SPBCIFICATIQN DOCUM�NTS
Ravised 09lOG�2019
DO 5243 -2
Agreeinent
Page 2 of 6
f�H'�1C1� �. ����'�.E�a�.'�' ���
5.1 CONTENTS:
A. The Contract DocLunents wk�icb. comprise ihe entire agreement betweerz Cziy aazd
Confractor concerning the Wark consist of the following:
I. Tk�is Agxeexx�ent.
2. Attach�nents to thi� Agreement:
a. Bid Form
1) ProposalFor�'z
2) Ver�dor Corirzpliance io �tate Law Non-Resident Bidder
3) 1'requali,fication Statement
4) State and FederaT documents (project specific)
b. Ctiunrex�t Prevailing Wage Rate Table
c. Snsurance ACORD Form(s}
d. Payment Bond
e. Performance �nd
£ Maintenance Ba�d
g. Povver of Attorney for the Bands
h. Worker's Compe�asation Aifida�it
i MBE and/or SBE Utilization Farm
3. General Conditions.
4. Supplernentary Conditions.
5. Specif'ications specifzcally rriade a part of the Contract Documents by attachment
or, if r�at attached, as incorporaied by reference ar�d described ix� th� Table of
Contents of ihe k'rajecC's Contract Documents.
6. Drawings.
7. Addenda.
8. Documentation subzaaitted by Contracior prior to Notice of Award.
9. The %llowing which may be delivered or issued after the Effective Date of the
Agreement and, if issued, became an incarparatedpazt oFthe Contract Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
Article 6. iNDE19�iTIk7[CAT.iO�T
b.1 Co�iractorcovenantsandagreestoindemnify,holti�armlessanddefend, atits own
expense, the city, its afficers, ser�vanis and[ e�napXayees, frogn and against an� a�id aXl
claims arissng aut of, o� aileged to a�rise out of, fhe vvork and services to be perform ed
hy the confractor, it� officers, ageni�, ennpluyees, sabconiractors, licenses or inviiees
underthi� contxact, This i�deznnificatioai provisionis s�ecificall�yintendedto aperate
and he ef'fective er�e� if i�is alie�ed or proven that aIl or some of the dama�es bein�
so�hf vve�-e_causet�, i� whole or in parE, by any act, omission o�r zAe�li�euce oi the city.
This Sxade��€rty provision is intended ta incl[�de, vv�t�out limitation, i�zdemnity for
costs, e�penses and legaI fees incurred by the city in defenc�mg again�t such claims a�d
causes of actic►ns.
CTFY OFFORT WpRTH
2021 Side�valkUniiPi�ice Construct�on Cozxtract
162520
STANDARD CONSTRUCTIOTI SPECIFIGATION DOCU]vIENTS
Revised 09/06/20I9
00 5243 -3
Agreement
Page 3 of 6
6.� Contractor co'venants and agrees to indemnify and hold harmless, at its own expense,
the city, its 4ffice�'s, servants and ernployees, from and against any and all loss, darnage
or des�ruction of property of ��e city, arisiaag ouf of, at' alleged fo a�-iise ant of, the work
and services to be performed by the contractor, its officers, agents, ernployees,
subconiractors, Iicensees or invitees under ti�is contract. 17iis indeznnification
�rovision is specifically intendec� to operate and be effective even if it is alle�ed ox
proven �hat all or some of the dama�es i�in� sos��ht were caused, in whole or in part,
b�' any act, arnission or ne�li�encc of the city.
Article �'. NIISCELLANEOUS
7.I Teraxis.
Texms used an this Agreement which are defined in Article 1 of the General Conditions will
have the meanings indicated 'm the General Conditions.
7.2 Assignment of Contract.
This Agreement, including alI of the Contraci Documents may not be assigned by the
Contraetor vc+ithout the advanced express written cansentoithe City.
7.3 Successors and Assigns.
City and Contractor each bir�ds itself, its partners, successors, assigns and Iegal
representatives to the ather party hereto, in respect to all cove�ants, agreements and
obligations contained ui the Contract Documents.
7.4 Severability.
Any provision or part of the Contract Documents held to be unconstitutional, void or
unenforceable by a coux't of coznpeteni jurisdiction shall be deemed stricken, and all
remaining provisions shall continue to be valid and binding upon CITY and
CONTRACTOR.
7. 5 Governing Law and Venue.
Thi,� Ag�•eement, including all of the Contract Docuinents is performable in the State of
Texas. Venue shall be Tarrant Caunty, Texas, or the United States District Court for the
Northcrn District of Te�as, �'ort Warth Division.
7.6 Autharity fo Sig�,
Contractor shall attach evidence of authority to sign Agreement if signed by sozrzenne ather
than the duly authorized signatory of the Cont�-actar.
7.7 ProhibiCion On Contracts With Cornpanies Bo�catting IsraeL
Contractor acknawledges that in accordance vvith Chapter 2270 of the Texas Government
Code, the City �s prohibited from entering into a contract with a company for goods ar
services unless the contract contains awritten verification from the company that it: (1}
does not boycatt Tsrael; and {2) willnot baycott Israel during the term of #he contract.
C2T'Y OF FORT WOItTH
2021 Sidewalki7nitPrice Construction Contract
102520
STANDARD CONSTRUCI'IO�I SPECIFICATION DOCUMEIrlTS
Revised 09lO(12019
00 5243 -4
Agrezmeni
1'age4ofG
The terrxis "boycatt Israel" ax�d "ca�apany" sha11 have the meanings ascribed to those terms
in Section $08.001 of the Texas Govexnment Code. By signing this contrract, Contractor
certifies that Contractor's signatur^e provides rvritten verifieation to the City that
Cantractor: (1) does not boycott Israel; and (2) will not boycott IsraeL during the term of
the cantract.
7.8 Immigration Nationality Act.
Contractar shall vcrify the identiry and employment eligi�bility of its employees who
per�orm worlc under this Agreement, including completing the Employment Eligibility
Verification Form (I-9). LTpon request by City, Contractor shall provide City wit� copies of
all 1-9 forms and supportiz�g eligibility docixmenfation for each emp�oyee who performs
work under this Agreement. Cox�t�ractax shall adhere ta all Federal and State laws as well as
establish appropriate procedures and controls so that no sezvzces wilJ be pexfarza�ed by a� y
Contractar emplayee who is not legally eligible to perforzn such services.
CONTRACTOR S��ALL INDIIVINIFY CITY AND HOLD CITY HARMLESS
FROM ANY PINALTIF�S, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF
TT�S PAR.AGR.APH BY CONTRACTOR, CONTFtACTOR'S EMPLOYEES,
SUBCONTR.ACTORS, AGIIVT'S, OR LICINSEF�. City, upan written notice to
Contzactor, shall have ihe right to immediatel� term'rnate this Agreement for violations of
this pravision by Contractor.
7. 9 No Thi�d-P arty Benefic iaries .
This A greement gi�es no rights or benefiis ta anyone other than the City and Che Con�actor
and there are no third-party Ueneficiaries.
7.10 No Cause of Action Against Engineer.
Contractor, its subconti�acfors and equipment and mat�xials suppliers on the �'ROJ�CT ox their
sureties, shal[ maintain no direct action against the Engineer, its of%cers, ex�aployees, a�d
subcontractors, for any claim arising out of, in connection with, or resulting froxn tk�e
engineering services performed. Only the City will be the heneficiary ofany undertaking by
the Engineer. The presence or duties of the Engineer's personnel a�; a construction site,
vvhefher as on-site representatives or otherwise, do nat malce the Engineer or iis personnel
in any way responsible for those duties that belong to the City and/or the City's construct�
contractors or other entities, and do not relieve the construction con#ractors or any other
eniity o� their abligations, duties, and responsi`bilities, including, but not limited to, all
cox�stzuction methads, means, techniques, sequences, and praccdures necessary for
coordinating and con�pl.etiz�.g all poxtions of the construcfion �work in accordance with the
Contract Documents and azay health ax safety precauiions required by such constructian
work. Thc Engineer and its pez-sox►nel have np authority to exercise ariy can�•ol o�ver any
construcfion contractor or ather entiry or their employees ixa carnneciio�t with fheir w ork ar
any health or safety precautions.
SIGNATURE PAGE TO FOLLOW
CITY OF TORT WORTH
2U2I SidewAllcTJnitPnice Canstrucfion Contract
102520
STA�fDARD CONSTRUCTTON SPL.CIf+TCA7'TON DOCUMENTS
Revisad 0 910 6 /20 1 4
DO 5243 -S
Ag��eement
Page 5 nf b
ZN WITNF�SS W�REOF, Ciiy and Contractor have each executed this Agreement to be
effective as of the date subscribed by the City's de.,signated Assistant City Manager ("Effective
Date").
Cont�acto�: Ken-Dn �ontracti�g, LP
;�
�' � � � � �� ,,� � �
A�d� A� �, �;.
.
� ��
�
gna�re �
Ke�r�rh e�Fon -�
(P t dap me �
President
City of �'ort Worth
�: `� �
� � �, �
DanaBui' dq �
Assistant Ciiy! anag�i- �
. s
�. � ,,
_�w. �� �:�-� �..� �
Date '
Titie
PO BOX 2001,
Address
n�o�,Tx7sz�5
Ciiy/State/Zip
�
v � �, .�� A
Date
CITY OF FORT"�TORT�I
STANI7ARD COI�ISTRUGTiOTi SPECIF�CATION AOC�TMEI�ITS
Revised 09/06/2019
Attest:
���
� �
„ � R
�
� ,� � �� w�� �
.
� � a M�. � � .,.»,,. ,� a �. , .
�ty S enretary �, �� � �� ;
. :<:�, ', ��.� �•,
: ` -� � ,� � � .� �
:_.'� �� ��`�,' °,��
{sea�} � : �� " .,:�`
f,.j :,#.. r
zv�&c: � o - 0 8w 9 ��� `� ,...o .. .
Dafe: r a ,. � ;' ",�, z ; �'Q ..��
�'orm 1295 Na.: L� d�" �' `�' "�R � -
Contract ComplianceManagex:
By s igning, � ackaawledge that I am the pe�•san
respans�le for tb.e monitor�g ax�d
adx�aini�s�'ation ofthis cont�ac#, fncluding
ensuring all peY�form.ance and reporting
requix'ements. . � fr.!
, ¢
,, �, ��v.� .� ,.. ,.
� �_ ,
.�.,������'.� �'�a. �.. _
�'�
Shammi Ralunan
Praject Manager
Appzoved as ta Fox� and Legali�.y:
��1
Douglas W. B1aclt
Assistant City Aitomey
AP R AL OM
�^s
Wr"lliam Jahnson, Due ar
Transportatzon &Pu 1'rc'Works De�tm�.�t - �`
. . �o���
202I Side►tralkTJnitPrice C�nscraction C'.outw.cct �,
:��
10252Q
— P�p ��
' _....�----W—�---".�_
40 5243 -b
Agreement
Page6afG
CiT'Y OF FORT WORTEI
202� SidewalicUnitPrice Consduciaion Contract
102S2D
STAlVIlAl2D CONSTRUCTION SPECIFICATION !]OCUIviEhITS
Revised 09/p6l2019
SECTION 00 61 13
PERFORMANCE BO D
Bond No . 30098679
00611J-1
l'EltFORMANCE BOND
Page I of2
2
3
4
5
6
·nu-: S"li\'11-: OF TE.,\'.AS
COUN'lY OF TARRANT
§
§
§
~ow ALL B\' THESE PRESEl'flS:
7 That we, Ken-Do Contracting, L.P.
8 "Principal" herein and Continental Casualty Company
, known as
a corporate
9 surcty(surctics, if more than one) duly authori7.cd to do business in the State of Texas, known as
10 "Surety" herein (whether one or more), arc held and firmly bound unto the City of Fort Worth, a
11 municipal corporation created pursuant to the laws of Texas, known ,L'i "City" herein, in the penal
12 smn of, Two Hundred Fifty Thousand Dollars & No/100-----------------------------
13 ($250,000 .00 ), lawful money of the United States, to be paid in Fort Worth,
14 Tarrant County, Texas for the payment of which sum well and truly to be made, we bind
15 ourselves, our heirs, executors, administrators, successors and assigns.jointly and severally,
16 firmly by these presents .
17 \\'HEIU:.\S, the Principal has entered into a certain wri11cn contract with the City
18 awarded the 17th day of November , 20 20. which Contract is hereby referred to and
19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equ ipment
20 k'lbor and other acccsso,ics defined by law, in the prosecution of the Work, including any Change
21 Orders, as provided for in said Contractdcsignatedas 2021 Sidewalk Unit Price Construction
22 Project, CJ>NI 02520.
23 NOW, HIE.REFORE, the condition of this obligation i.-; such thal if the said Principal
24 shall faithfully perform it obligations under the Contract and shall in all respects duly and
25 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
26 specifications, and contract documents therein referred to, and as well during any period of
27 extension of the Contract that may be granted on the part of the City, then this obligation shall be
28 and become null and void, otherwise to remain in full force and effect.
29 PROVIDED FUR'lllEI~, that if any legal action be filed on this Bond, venue shall lie in
30 Tarrant County, Texas or the United States District Court for the Northern District ofTcxas, Fo11
31 Worth Division .
CITY OF FORT WORTII
ST AND,\RO COXSTRUCTION Sl'ECD'ICATION DOCUMEl\TS
Revised July I. 201 I
2021 Sidrw~lk t:nil l'ricc Cons1ruc1ion Conlr~ct
102520
Bond No . 30098679
006113 -2
rF.RFORMANCE BONO
Page 2 or:?
This bond is made and executed in compliance with the provisions of Chapter 2253 of tl1e
2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
3 accordance with the provisions of said statue.
4 IN WI1NFSS WHEREOF, the Principal and ihe Surety have SIGNED and SEALE D
5 this instrument by duly authorized agents and officers on this the 17th day of __ _
6 November , 20 20 .
7
8
9
10
11
12
13 ATTFST:
14
15
16 (Principal) Secretary
17
18
19
20
21
22 W ilness as to Principal
23
24
25
26
27
28
29
30
31
32
!~ 1JJMJJt
37 Witness as to Surety Elena Sells
38
39
Address: P.O. Box 2001
--=oc-e-=sc-o-,-to--=r =x,...,7=5:-:1-,-1-=5----
Steven W. Lew is , A
Name and Title
Address: 333 South Wabash
Chicago , IL 60604
TelephoneNumber: (312 ) 822-5000
40
41
42
43
44
*Nole: If signed by an officer of the Surety Company, there must be on file a certified cxtrac t
from the by-laws showing that this person has authority to sign such obligation . If
Surety's physical address is different from its mailing address, both must be prov id cd .
The date of the bond shall not be prior to the date the Contract is awarded.
45
CITY or FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Rev ised July I, 201 I
2021 Sidewalk Unit Price Construction Contr.1d
102520
2
3
4
5
6
7
8
9
SECTION 00 61 14
PAYMENT BOND
Bond No. 30098679
()() (,I 14 -I
PAYMENT BOND
Page I uf2
TIIE STATE OF TEXAS
COU IVIY OF TARRANT
§
§
§
Ki'iOW ALL BY UIESE PRESENl'S:
That we, Ken-Do Contracting, L.P. known as
"Principal" herein, and Continental Casualty Company a
10 corporate surety (sureties), duly authorized to do business in the State of Texas, known as
11 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a
12 municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein,
13 in the penal sum of~ Two Hundred Fifty Thousand Dollars & No/100--------------------------------
14 ($250 ,000 .00 ), lawful money of the United States, to be paid in Fort Worth,
15
16
17
18
19
20
21
22
23
Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves,
our heirs, executors, administrators, successo1s and ,Lc;signs,jointly and severally, fit mly by these
presents:
WIIEREAS, Principal has entered into a certain written Contract with City, awarded the
...!2.!!!._day of November , 20~, which Contract is hereby referred to and
made a part hereof for all purposes ac; if fully set forth herein, to furnish all materials, equipment,
labor and other accessmies as defined by law, in the prosecution of the Work ,Le; prov idcd for in
said Contract and designated as FY 2021 ATP Sidewalk lmprnvcmcnts, /02.'i20.
24 NOW, 'lllEREFORE., THE CONDITION Of THIS OBLIGATION is such that if
25 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
26 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
27 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
28 force and effect.
29 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
30 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
31 accordance with the provisions of said statute .
32
CITY OF FORT WORT!!
STANDARD CONSTRUCrJON Sl'ECD'ICATION DOCUME1\TS
Rc,·ised July I. 2011
FY 2021 ,\Tl' Sidewalk lmprovcmcms
102520
Bond No. 30098679
00 61 14 -2
rAYMENT BOND
r age 2 of2
IN WllNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
2 this instrument by duly authorized agents and officers on this the 17th day of
3 _N_o_v_e_m_b_e_r ____ • 20 2Q_.
4
ATTEST:
(Principal) Secretary
Witness as lo Principal
PRINCIPAL:
Ken-Do Contracting, L.P.
BY:
~~~~~\cl~
Name and Title
Address: P.O . Box 2001
DeSoto, TX 75115
SURETY:
Cantin ....... --
ATTEST:
N/A
(Surety) Secretary
Witness as to Surety Elena Sells
5
. -·, _....._ ... -----~~---i'\--11~-r-----'::" ~ -· .... ::
-.:....
...... •-I
-:--------. -
Steven W . Lewis, Attorney-In-Fact ---------------·,. Name and Title
Address: 333 South Wabash
Ch icago , IL 60604
Telephone umber: (312) 822-5000
6 ote: If signed by an officer of the Surety, there must be on file a certified extract from the
7 bylaws showing that thi per on has authority to sign such obligation. If Surety' phy ical
8 address is different from it mailing addre , both must be provided.
9
10 The date of the bond shall not be prior lo the date the Contract is awarded.
I I END OF SF.CTI ON
12
CITY OF FORT WORT II
STANDARD CONSfllUCTION SPECIFICATION DOCUMENTS
Revised July I, 2011
FY2021 ATP Sidewalk lmprovcm.:nts
/02520
..
2
3
SECTION 00 61 19
MAINTENANCE BOND
Bond No. 30098679
00 <,I 19 -1
M ,\INTENANCE BOND
rage I ofJ
4 TIIE STATE OF TEXAS ~
5 § KNOW ALL BY THESE PRESENTS:
6 COUN'IY OF TARRA.t~T §
7 That we Ken-Do Contracting.'L.P. ,known as
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
"Princinal" herein and Continental Casualty Company , a corporate surety
(sureties, if more than one) duly authorized to do business in the State of Texas, known as
"Surety" herein (whether one or more), arc held and firmly bound unto the City of Fort Worth, a
municipal corporation created pursuant to the laws of the State of Texas, known as '•City" herein,
in the sum of Two Hundred Fifty Thousand Dollars & No/100---------------------------------------------
($250,000 .00 ), lawful money of the United States, to be paid in Fort Worth,
Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its
successors, we b ind ourselves, our heirs, executors, administrators, successors and assigns,jointly
and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the City awarded
the 17th day of November , 20 20 , which Contract is hereby
referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all
materials, e-iuipmcnt labor and other accessories as defined by law, in the prosecution of the
Work, including any Work resulting from a duly authorized Change Order (collectively herein, .
the "Work") as provided for in said contract and designated as 2021 Sidewalk Unit Price
Construction Contract 102520 and
WHEREAS, Principal binds itself to use such materials and to so constmct the Work in
accordance with the plans, specifications and Contract Documents that the Work is and will
remain free from defects in materials or workmanship for and during the period of two (2) years
after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
32 •
33 upon receiving notice f1 om the City or the need therefor at any time within the Maintenance
Period.
34
CITY OF FORT WORTH
STANDARDCONSTRUCrION Sl'ECIFICATION DOCUMENTS
Rcvisc'll July I, 2011
2021 Sidewalk t.:nit r,icc Construction Contr.1ct
102S20
.. Bond No. 30098679
006119-2
MAINTENA 'CE BOND
Page 2 of3
OW TifEREFORE, the condition of this obligation is such that if Principal shall
2 remedy any defective Work, for which timely notice was provided by City, to a completion
3 sate factory to the City, then this obligation shall become null and void; otherwise to remain in
4 full force and effect.
5
6 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
7 noticed defective Work, it is agreed that the City may cause any and all sue h defective Work to
8 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and
9 the Surety under this Maintenance bond; and
10
11 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall Lie in
12 Tarrant County, Texas or the United States District Court for the Northern DL~trict of Texas, Fort
13 Worth Division; and
14
15 PROVIDED FUR1HER, that this obligation shall be continuous in nature and
16 successive recoveries may be had hereon for successive breaches.
17
18
19
CITY OF FORT WORTH
ST AND,\RD CONSTilUCT IO SPECIFICATION DOC UMENTS
lkvi .oo Jul y I, 201 1
2021 Sidewalk nit PriC'C Construction Contract
102520
2
3
4
5
6
7
8
9
10
II
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
Bond No. 30098679
006119-3
MAINTENANCE BONO
Page J of 3
IN Wl lNF.SS WHEREOF, the Principal and the Surety have each SIGN ED and SEALED this
instrument by duly authorized agents and officers on this the 17th clay of _____ _
November 20 20 .
ATIF.ST:
(Principal) Secretary
Witness as to Principal
Address: P.O . Box 2001
DeSoto , TX 75115
BY: ...._...ci,,LJILLJl..llLLlµ/.:-1/+~~
Signature
....... -~-·• .. :·--. .,,~
'v ·---
--✓-_....._ -_ --
.· -Steven W. Lewis , Atta ney-ln,.Fa ci: ·-.... -:.:-__
ATfEST:
N/A
(Sure~llA
Witness as to Surety Elena Sells
Name and Title
Address: 333 South Wabash
Chicago , IL 60604
Telephone Number: (312) 822-5000
*Note: Tf signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to ign such obligation. If
Surety's physical address i different from its mailing address , both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded .
CITY OF FORT WOlffM
STANDARD CONSfRUCTION SPECIFICATION DO CUMUNTS
Revised July I, 2011
2021 Sidewalk Unit 1'1itc Construction Contt'llct
102520
-··
Figure : 28 TAC §1 .601 (a)(3)
1 IMPORTANT NOTICE
To obtain i nformation or make a complai nt:
2 You may contact Continental Casualty Company ,
National Fi re Insurance Company, American
Casualty Company or Continental Insurance
Company at 312-822-5000.
3 You may call Contin ental Casualty Company ,
National Fire Insurance Company, American
Casualty Company or Continental Insurance
Company's toll-free telephone number for
information or to make a complaint at
1-877-672-6115
4 You may also write to Continental Casualty
Company , Nati ona l Fire Insurance Company ,
A me rican Casualty Company or Continental
Insura nce Company at:
CNA Surety
333 South Wabash
Ch icago , IL 60604
5 You may contactthe Texas Department of
I ns urance to obtain infonnation on compan ies,
coverages , rights or complaints at:
1-800-252-3439
6 You may write the Texas Department of
Insurance :
P .O . Box 149104
A ustin , TX 78714-9104
Fax : (512) 475-1 771
Web: http ://www.tdi .state .tx .us
E-Mail: ConsumerProtection@td i.state . tx .us
7 PREMIUM OR CLAIM DISPUTES:
Should you have a di spute concerning your
p remium or about a claim you should contact
Continental Casualty Company, National Fire
Insurance Company, American Casualty Company
or Co ntinental Insurance Company first. If the
dispute is not resolved , you may contact the Texas
Department of Insu rance .
8 ATTACH THIS NOTICE TO YOUR POLICY:
This noti ce is for information on ly and does not
become a part or condition of t he attached
document.
Form F8277
AVISOIMPORTANTE
Para obtener informacion o para someter una queja :
Puede comuni Ci:lr,,e con Continental Casualty
Company, National Fire lnsuran.ce Company ,
American Casua lty Company or Continenta l
Insurance Company .al 312-822-5000.
Usted puede llamar al numero de telefono gratis de
Continental Casua_lty Company, National Fire
Insurance Company, American Casualty Company or
Continental Insurance Company's para informacion o
para ·someter una queja al:
1-877-672-6115
Usted tambien puede escribir a Continental Casualty
Company, National Fire Insurance Company ,
American Casual1y Company or Contine nta l
Insurance Comparw:
CNA Surety
333 South Wabash
Chicago , I L 60604
Puede comunicarse con el Departamento de Seguros
de Texas para obtener informacion acerca de
companias , coberturas, derechos o quejas al:
1-800-252-3439
Puede escribir al Departamento de Seguros de
Texas :
P.O . Box 149104
Austin , TX 78714-9104
Fax : (512) 475-1771
Web: http://www.tdi.state.tx .us
E-Mai l : ConsumerProtection@tdi .state.tx .us
OISPUTAS SOBRE PRIMAS O RECLAMOS:
Si tiene una disputa concerniente a su prima o a
un rec lamo, debe comunicarse con el Conti nental
Casualty Company , National Fire Insurance
Company, American Casualty Company or
Continental Insurance Company primero . Si nose
resuelve la d isputa , puede entonces comunicarse
con el departamento (TOI).
UNA ESTE AVISO A SU POLIZA: Este aviso es
solo para proposito de informacion y nose
convierte en parte o condicion del documento
adjunto .
' .
POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT
Know All Men By These Presents, That Continental Casualty Company , an Illinoi s insurance company, National Fire In suran ce Company of
Hartford,an lll!nois insurance company , and American Cas ualty Company of Re ading, Pennsylvania, a Pennsylvania insurance company (herein called
"the CNA Companies"), are duly organized and ex isting insurance companies havin g their principal offices in the City of Chicago, and tate of Illinois,
and that they do by virtue of the signatures and seals herein affixed hereby make, constitute and appoint
Kathy Sells, Steven W Lewis, Lanny Land, Jennifer Upton, Elena Sells, Individually
of Grapevine, TX, their true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred to s ign , sea l and execute for /and on their
behalf bond s, undertakings and other obligatory instrum ents of similar nature
-In Unlimited Amounts -I
and to bind them thereby as fully and to the same extent as if s uch instruments were signed by a duly authorized officer of their insurance companies and
all the acts of said Attorney, pursuant to the authority hereby given is hereby ratified and confirmed .
1 This Power of Attorney is made and executed pursuant to and by authority of the By-Law and Resolution s, printed on the reverse nereof, dul y
adopted , as indicated , by the Boards of Directors of the in surance companies.
In Witness Whereof, the CNA Companies have caused these presents to be signed by their Vice President and their corporate seals to be hereto
affixed on this 12th day of March , 2021. .---. ----7' I
Continental Casualty Company
National Fire Insurance Company of Hartford
American Ca lty Company of Re ing, Pennsylvania
Paul T . Bruflat
State of South Dakota, County of Minnehaha, ss:
On this 12th day of March, 2021 , before me personall y came Paul T. Brufl at to me known, who , being by me duly swo rn , did depose and say: that
he resides in the City of Sioux Falls, State of South Dakota; that he is a Vice President of Continental Casualty Company, an Illinoi s in ~urance company,
National Fire Insurance Company of Hartford , an Jllinoi s insurance company , and American Casualty Company of Reading, Pennsy lvdnia, a
Pennsylvania insurance company described in and which executed the above instrument; that he knows the seals of said insurance combanies; that the
seals affixed to the said in strument are such corporate sea ls ; that they were so affixed pursuant to authority g iven by the Boards of Directors of said
in s urance companies and that he signed his name thereto purs uant to like authority , and acknowledges same to be the act and deed of said insurance
companies.
• ................................................ + ! M. BENT i
:~NOTARY PUBLIC~:
f~SOUTH DAKOTA~:
............................................... +
My Commission Expires March 2 , 2026 M. Bent Notary Public
CERTIFICATE
I, D. Johnson, Assistant Secretary of Continental Cas ualty Co mpan y, an Illinoi s insurance company , National Fire Insurance Company of Hartford ,
an Illinois insurance company , and American Casualty Company of Reading, Penn sy lvani a, a Pennsy lvania insurance company do hereby certify that the
Power of Attorney herein above set forth is sti ll in force , and further certify that the By -Law and Re so lution of the Board of Directors of the insurance
companies printed on the reverse hereof is still in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said
insurance companies this 1'1Wt day of ('Jo\}Oy\ b</'1 2-,oZJ).
_forrn:F585.3 -4 /20 l 2'
Continental Casualty Company /
National Fire Insurance Company of Hartford
American Casualty Company of Reading, Pennsylvania
Assistant Secretary
Go to www.cnasurety.com >Owner/ Obligee Services> Validate Bond Coverage, if you want to verify bond authenticity.
Authorizing By-Laws and Resolutions
ADOPTED BY THE BOARD OF DIRECTORS OF CONTINENTAL CASUALTY COMPANY :
This Power of Attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the Board of Directors of the Company at a
meeting held on May 12, 1995 :
"RESOLVED: That any Senior or Group Vice President may authorize an o fficer to sign specific documents , agreements and instruments on behalf of the
Company provided that the name of such authorized officer and a description of the documents, agreements or instruments that such officer may sign will be
provided in writing by the Senior or Group Vice President to the Secretary of the Company prior to such execution becoming effective."
This Power of Attorney is signed by Paul T . Bruflat, Vice President, who has been authorized pursuant to the above resolution to execute power of attorneys on
behalfofContinental Casualty Company.
This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of the Company by
unanimous written consent dated the 25 th day of April , 2012 :
"Whereas, the bylaws of the Company or specific resolution of the Board of Directors has authorized various officers (the "Authorized Officers")to execute
various policies , bonds , undertakings and other obligatory instruments of like nature ; and
Whereas , from time to time , the signature of the Authorized Officers, in addition to being provided in original , hard copy format, may be provided via facsimile or
otherwise in an electronic format (collectively, "Electronic Signatures"); Now therefore be it resolved: that the Electronic Signature of any Authorized Officer
shall be valid and binding on the Company . "
ADOPTED BY THE BOARD OF DIRECTORS OF NATIONAL FIRE INSURANCE COMPANY OF HARTFORD:
This Power of Attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the Board of Directors of the Company by
unanimous written consent dated May IO , 1995 :
"RESOL YEO: That any Senior or Group Vice President may authorize an officer to sign specific documents, agreements and instruments on behalf of the
Company provided that the name of such authorized officer and a description of the documents , agreements or instruments that such officer may sign will be
provided in writing by the Senior or Group Vice President to the Secretary of the Company prior to such execution becoming effective."
This Power of Attorney is signed by Paul T . Bruflat, Vice President, who has been authorized pursuant to the above resolution to execute power of attorneys on
behalf of National Fire Insurance Company of Hartford .
This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of the Company by
unanimous written consent dated the 25 th day of April , 2012:
"Whereas, the bylaws of the Company or specific resolution of the Board of Directors has authorized various officers (the "Authorized Officers")to execute
various policies, bonds , undertakings and other obligatory instruments of like nature; and
Whereas , from time to time , the signature of the Authorized Officers, in addition to being provided in original , hard copy format, may be provided via facsimile or
otherwise in an electronic format (collectively , "Electronic Signatures"); N9w therefore be it resolved: that the Electronic Signature of any Authorized Officer
s hall be valid and binding on the Company. "
ADOPTED BY THE BOARD OF DIRECTORS OF AMERICAN CASUAL TY COMPANY OF READING , PENNSYLVANIA :
This Power of Attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the Board of Directors of the Company by
unanimous written consent dated May I 0, 1995 :
"RESOL YEO: That any Senior or Group Vice President may authorize an officer to sign specific documents , agreements and instruments on behalf of the
Company provided that the name of such authorized officer and a description of the documents , agreements or instruments that such officer may sign will be
provided in writing by the Senior or Group Vice President to the Secretary of the Company prior to such execution becoming effective."
This Power of Attorney is signed by Paul T . Bruflat, Vice President, who has been authorized purs uant to the above resolution to execute power of attorneys on
behalf of American C asualty Company of Reading, Pennsylvania.
This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of the Company by
unanimous written consent dated the 25 th day of April , 2012:
"Whereas, the bylaws of the Company or specific resolution of the Board of Directo rs has authorized various officers (the "Authorized Officers")to execute
various policies , bonds , undertakin gs and other obligatory instruments of like nature ; and
Whereas , from time to time , the signature of the Authorized Officers, in addition to being provided in original, hard copy format, may be provided via fJ c~mile or
otherwise in an electronic format (collectively, "Electronic Signatures"); Now therefore be it resolved : that the Electronic Signature of any A uthorized-0fficer·-
shall be valid and binding on the Company. " j -· -· · ..-\
-,.,. -
:--:::.-: , 2
-·'"""::::-
STAI�TD�2.D GEl�ERAL COl�TI�YTyOI�TS
OF THE C01iT�TRUCTx01� CO�TRACT
GITY OF FORT WORTH
STANDARDCONSTRl1CTI0M SPGC[F[CATIOM DOCUMENTS
Revision: Macii 9, 20?A
ST�NDARD GENER_AI_, CONDITIONS OF THE
CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1 —Deiulitions and Tez-t�ology ......................................�--�--..............................................................1
1.01 Defined Tezxxis ..............................................�--�------�--�........................................................---�--�----1
1.02 Tezxxzn�ology ..............................•---------��----�--...................................................-�-------�------.-............6
Article 2-- PreIn7�inary Mat�ers ......................................................................................................................... 7
2.OI Copies oiDocuments ....................................................................�----�-.........................................7
2.02 Commencement of Cont�ract Time; Noiice to Proceed ................................................................ '1
2.03 Starting thc Work .......................................................................................................................... 8
2.04 Before Starting Construction .................................................................................................:...... 8
2.05 Preconstruc�ion Conference .......................................................................................................... 8
2.06 Public Meeting ....................................................................
.......................................................... 8
2.07 7nitial Acceptance of Sched�ales .................................................................................................... S
Article3—ContractDocuzxzents: Inient,Amending, Reuse ..............................................................•---.------.--8
3.01 Intent ....................................................�--�---------�-..................................................-----�--�---�---�--�--�--$
3.02 Reference Standards ..............�-�-�-�-�----...........................................................--�--...----�--.-...............9
3.03 Report�ng and Resolving Discrepa�czes ..............................................�---�....................................9
3.04 Amendmg and Supplement7iz�g Cont�act Docurnents .................................................................10
3.05 Reuse of Docutzaents ...................................................................................................................10
3.06 Electronic Data ......................................................................................................................�.....11
Article 4— Avai�ability of Lands; Subsurface and Physical Conditions; Hazardous Environmental
Conclitions; ReferencePoints-• ......................................................................................................... �I
4.01 A�railabiiity oi Lands ............................................................................. ..................................... I 1
4.�2 Subsurface and �hysical Conditions ......................�--��----........................................................... T2
4.03 Differing ,Subsur�ace or Physical Conditions .............................................................................12
4.04 Underground Facilities ..........................................................................................�-�------�--�---�--•-13
4.05 Reference Points .........--�-�-� .......................................................................... .................... �4
4.06 Hazardous Environmental Canditian atSite ..............................................•---............................ I4
Ar�icle 5 ----Bonds and Insurance ...............................................................��-�----�-
5.01 Licensed Sureties and Insurers ........................................................
5.02 Performance, Payment, and Maintenance Bonds ............................
5.03 Certif"rcates of Insurance ..................................................................
5.04 Contractor's�nsurance.------�-� ...........................................................
5.05 Acceptance ofi Boncis and Insiu-ance; Option to Replace ................
Articl� 6 — Conti-actar's ResponsiE��ilities ................................................
6.01 Supervisioz� and Superir�tendence .......................................
........................................... I6
...........................................16
................................�---�-�-�-- 1�
..........--�-------�----� ................. �6
.......-----� ..............................18
�----�---� .................................19
..............................19
.............................19
CITY OF FORT WORTH
STANDARDCONSTRUCf[ON SPHCIFICATION DOCUNfiFNTS
Rcvision: Mad� 9, 2Q20
b.02
6.03
6.04�
6.05
6.06
6.07
6.08
6.09
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6_ 17
6.18
6.19
6.20
6.21
6.22
6.23
6.24
Labar; Working HoLurs ................................................................................................................20
Services, Materials, and Equipment ...........................................................................................20
ProjectScheduie .............................�-�-----..............................--------............................-----..............21
Substitutes and "Or-Equals" .............................................................................................� �---.....21
Concerning Subcontractors, Suppl�ers, az�d Others .................................................................... 24
WageRafies .............................................................. .... ................................................................ 25
PatentFeesandRoyalties ...........................................................................................................26
Pernutsand Uiilities ..................................................................�---..............................----............27
LawsandRegula�ons .......................................�-�--..................................................................---27
Taxes..........................................................................................................�------..........................2$
Useof Site and Other Areas ...-�--� ...............................................................................................28
RecordDocuments ...................................................................................................................... 29
Sa%ty and Protect�on .................................. .................................. . .. ... ... ........ ............................. 29
SafetyRepresentative .................................................................................................................. 30
Hazaxd Cammunication Progra�ns .............................................................................................30
Emergencies and/or Rectification.---� ..........................................................................................30
Submittals.................................................................................................................................... 31
Continumgthe Work ...................................................................................................................32
Contractor's General Wa�anty and Guarantee ..........................................................................32
Indeli�r�if'icatzon ...................................�----.............................------.............................----.............33
Delegation of Professional Design Sez-vices ..............................................................................34
Rz�hht �o Avdit .......................................................................................�----............................-----.34
Nondis c r irnina tio n . . . . . . . . . . . . . . . . . . . . . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. . .. .. . .. 3 5
Article 7- Oiher Woxk at the �ite .......
7,01 Related Worl� at Site .......
7.02 Coordination ....................
...............................................................................•--�--.......................35
............................................................................................................35
............................................................................................................ 36
Article8 - City's Respansibilities ......................................................�--............................_.............................36
8.01 Comm�uucations to Contractor ...................................................................................................36
8.02 F�rnish Data ................................................................................................................................36
8.03 PayWh�nDue ............................................................................................................................36
8.044� Lanc�s and Easements; Reports and Tests ...................................................................................36
8.05 Change Oxders ................................................................�-----...........................---.........................36
8.06 Ins�ections, Tests, and Approvals ..:.............. ................36
......................
8.07 Limitations on Czty's Respansibilities ....................................................................................... 37
8.08 Undisclosed Hazardous Enviranmental Condition ...........................................................-------..37
8.09 Compliance with SafetyProgram ............................................................-�----..............................3'1
Article 9- City's Obsezvation Status Durzng Construction ...........................................................................37
9.O1 City's Pro�ect Manager .....................�--...............................-----..........................----..................
9.02 Visits ta Site ................................................................................................................................37
9.03 Authorized Variatior�s in Work ..................................................................................................38
9.{}4 R�jecting De�ectiveWork ..........................................................................................................38
9.05 Deternlinations �or Wor�C Perforr�xied ..........................................................................................38
9.06 Decisions on Requirements of Coniract Documenis and Acceptability of Work ..................... 38
c t� Y or r• oRT wox�x
STAi1DARDCONSTRUCTION SP�CIrICATIOM DOCUM�NTS
Revision: MatE� 9, 202p
ArticIe 10 -� Changes in the Wark; Cia�iz�as; Ext�a Work ................................................................................38
l 0.0I Authorized Changes in the Work ...............................................................................................3$
I0.02 Unauthorized Changes in the Work ...................................................�--.....................................39
10.03 Executia� of Change Orders .......................................................................................................39
10.04 Extra Work ...........................��--�---.......................................---�-----...................................-----�---�--39
10.05 Nati�cation to Surety..-------�--�-� ....................................................................................�---�--�-�.....39
10.06 Contract CIaims Process .............................................................................................................40
Article 11 �- Cost of tY�e Work; AlIowances; Unii Price Work; Plans Quantiry Measur�meni :......................41
11.01 Cost of the Woxk ................................�---�-----....................................---�--�--..................................41
11.02 Allawances ................................................................................�-------..........................................43
11.03 Unit �rice Work ...............�-�--�--�-....................................-�---�--�---.................................................44
11.04 Ylans Quantity Measuremeni ......................................................................................................45
Article 12 - Change of Contract Price; Change of Coniract Tirne ................................................................. 4b
12.01 Change o#� Contract Price ............................................................................................................ 46
I2.02 Change o� Cont�•aci Tirne ............................................................................................................9�7
12.03 Delays ................�-------........................................----�--�--�................................-----�-�-�--...................4-7
Article I3 --Tests andInspections; Correction, Removal or Acceptance ofDefecti�e Work ......................4$
i3.01 Notice of Defects ...............................�-----------..................................--�------�.................................48
13.02 Access to Work ..............................�---.........................................----�---�---....................................48
13.03 Tests and �xaspectio�s ..................�---�-----.................................-•-�------�--........................................48
I3.04 Uncovez•ing Work ...............................................................�--�---�-�.....................................-�-�------49
13.05 City May Stop the Work----� ............................................�----�-�......................................----�------...�9
13.06 Correction or Remova1 of Defeciive Work ................................................................................50
13.07 Correction Period .................................•--�---�--�-...................................--�----.................................50
13.48 Acceptance ofDefective Work ...................................................................................................51
13.49 City May Correct Def�ctive Work .............................................................................................51
Article lA -�'aymenis io Contractor and Con�pletian ....................................................................................52
14.OI ScheduIe of Values ......................................................................................................................52
I4.02 Progress Payments ..............................................•---....................................................................52
14.03 Coniractor's Warranty of Title ....----�---� ............................................�-----....................................54
14.04 PartiaX Utilization ........................................................................................................................ 55
14.05 Final Ir�pection ..............�---�--�......................................---��--�---.......................................---------.... SS
14.06 F�nal Acccptance .........................................................�-�....................................-•--�----------.......... 55
14.07 Final Payment ........................................................................................... .. 56
.................................
14.08 Final Completion Delayed and Partial Retainage Release ........................................................ 56
14.09 Waiver of Clazz�ns ...........................�---�---�....................................----�---�---.................................... 57
Article 1 S- Suspension of Work and Terminatzon .......... ................ ....... ....................................................... S7
15.OI Ciiy May �us�end Work .............................................................................................................57
15.02 City May Terminate £ox Cause ................................................................................................... 58
15.03 City May Terminate For Canveni�nce ....................................................................................... 60
Ariicleib -Dispute Resolution ......................�-�---.-...................................-�---�--�-...........................................6�
16.01 Methods andProcedures-� ....................................................�---..............................................._...61
C17'YOFFORT WORTfI
STAIVDARDCONSTRUCTIdN SPECIPICATION DOCUMENTS
Revision: Madi 9, 2020
Article17 — Miscel�aneous .............................................................................................................................. 62
17.01 Giving Noiice ..............................................................................................................................62
17.02 Comp�xtation ofTimes ............................�---�---..................................................................---�--....f2
17.03 Cumulative Remedzes ...-� ....................................�-----..................................................................62
17.04 Survzval of Obliga�ions .............................................�--�---............................------.........................63
17.05 Headings ......................................�--�--..................................................................--------................b3
C1TYdFPORT WORTH
STAI�IDARDCONSTi2UCTi0N SPGC�TiCATION DOCUM�NTS
Revision: MacE� 9, 2D20
oo�zoo-�
GENERAL CQNp li ION 5
Pagc 1 of 63
ARTYCLE 1— DEFINITION� AND TERM�NOLOGY
Z.Ol Defined Terms
A. W�ereverl�sed in these General Conditions or iri other Contract Documents, the tena�s listed below
have the meanings indicated which are applzcable to both the sitlguJ�r and plu�'al thereaf, and
words denoting gender shall include the rnasculine, ferninine and neuter. Said terms are generally
capitalized or �rriiten in italics, bui noi always. When used in a coniext consistent with ihe
de�niiion of a listed-defined tezxn, the te�n shall have a meaning as deflned below whether
capitalized or italicized or ot�erwise. Ir� addition to t�r�n� specifically defined, tez-zx�s wiih initial
capital Zetters � ihe Cont�act Documents include xeferences to ident.ified arrticles and paragraph�,
and the titles of oiher documents or forms,
1. Addenda--Written or grap�zc ansi�unents issued prioz to the opening of Bids wkuich clarify,
correct, or change ihe Bzdding Requircinents Qr the proposed Con�ract Docuzxients.
2. �4g�eement—The written instrument which is evidence ai the agreezx�e�t betwe�n Ciry and
Contractor covering the Woric.
3. Application for Payment—The �orm acceptable to City which is to bc used by Conixactor
during the course oi the Wark in; xequesting progress or �nal payments and which is to be
accoinpanied by such supporti��g dacumentaEion as is requ.ired by ihe Contraci Docuznents.
4. Asbestos Any materzal �hat contains more t�an one percent asbestos and is friable or is
releasing ashestos �bers into the air above c�ent aciion levels establ�shed i�y the United �tates
Occupational Safety and Health Administraiion.
5. Award — Authorization by the City Counc�l for the City ta enter into an Agreement.
6. Bid—The offer or proposal o� a Bidder subinitted on the prescribed form setting forth the
prices �'or the Wor�{ to be pez7formed.
7. BiddeN—The i�dividual or entity who subnnits a Bid dir�ctly ta City.
8. Bir�ding I�ocuments The Bidcling Requiz•ements and the propased Contract Documents
(includizig all Addenda}.
9. Bidding Requirements—The advertisement or Invitatioz� to Bid, Instructions to Bidders, Bid
security of acceptable fo�-nn, if any, and t1�e Bid Foz-tn with any supplements.
10. Business Day — A busir�ess day is defined as a day that the City conducts normal business,
generally Monda� through Friday, except for federal or state holidays observcd by the City.
11. CalendarDay —A day consistirig of 24 hours meastu-ed from z�zaidnight to the nex� midnight.
CITYOF�'Olt1' WORTH
STANDARDCONSTRUCT[ON SPCCIFICAT[ON DDCUMEIVTS
Revision: Mad� 9, 2020
ao �z oo- t
G�NERAL CONDITION S
Page 2 of 63
12. Change Order A document, whi�ch i� pr�pared an�. approved by the City, vvh�ich is signed
by Cont�ractor and City and authorizes an addition, deletion, or revi�ion in the Work flr an
adj�xstment in th� Contract P�-ice or Y.he Contract Time, issued on or after the Effective Date
of the Agreezrzent.
13. CiZy-- The City of Fort Wor�1i, Texas, a home-t-uJe municipal coxporation, authorized and
chartered under ihe Texas Staie Statutes, acting by its goverivng body through its City
Manager, his designee, or agents authorized under his behalf, each of which is requi:red by
Charter to pexform spccif"ic duties with respons�bility for �ZnaI eniarcement of the cant�acts
involving tlie City of Fart Worth is by Charter vested in the City Manager and is the entiry
with �vhozn Contractox has e�tered inta the Agreeixaent and for who�n tlie Work is to be
performed.
14. City Attor�ney — The officia�ly appointed City Attamey of the Ciry of Fort Worth, Texas, or
his duly authorized representa�ive.
15. City Council - The duly elected and qUalif'ied governir�g body of the City of Fort Worth,
Te� s.
16. Ctty Manager -- The afficially appoirited and authorized City Manager of the City of Fort
Worth, Texas, or his duly authorized representative.
17. ContNact Claim A demand or assertio� by City or Contracior seeking an adjusttx�.ent oi
Contract Price ar Contract Time, or bo�, or other relief with respect to the te�s of the
Contract. A de�and for rnoney or services by a thu-d party is n.ot a Contraci Claim.
18. Cont�-act The entire and integrated written document between the City and Contractor
concerniz�g the Wor1�. The Contract contains the Agreement and aU Contract Documents and
supersedes prior negotiations, representations, or agreennents, wheY.her written or oraL
19. Contract Documents—Those items so designated in the Agreement. All items listed irn ihe
A�eexnent a�e Contract Documents. Approved Submittals, other Contractor submittals, and
�the reports and drawrngs of subsurface and physical conditions are not Contract Documenis.
20. Contract Price=I'he moneys payable by City to Contracior for corxzpletion of the Work in
accordance wiih the Contract DocLunents as stated in the Agreement {subject to t1�� provisions
of Paragraph 11.03 in the case ofUnit Price Wor�).
21. Contract Time The number of days or the dates stated in the Agreement to: (i} achieve
Milestones, if any and {iz} compleie Y.he Work so that it is ready for Final Acceptance.
22. ContrczctoN The ind�idual or entity with whom City has entered �to fhe Agreemeni.
23. Costof the WorkW—SeeParagtapk� 11.01 ofthese General Condiiions for defi�ition.
C1TY OF PORT WORTH
STANDARDCONSTR[1CT[ON 3PECIFlCATION DOCUMENTS
Revision: Mad� 9, 2b20
oo�zoa-i
��r�Ew�� caNniriar� s
Pagc 3 of 63
24. Damcage Claims — A deinand for money or services arising from tlie Project or Site from a
third party, City ox Contractor excluszve af a Contract Claim.
2S. Day or day—A day, unless otherwise ciefined, shail mean a Caiendar Day.
26. Director ofAviation — The of�cially appointed Director of ihe Aviation Depaz-tment of the
City of Fo�t Worth, Texas, ox his duly appointed representaii�e, assistant, or agents.
27. Director of Parks and Communiiy Se�ices — The offcially appointed Direcior of the Parlcs
and Communi2y Services Department of the City of k'oxt WoYth, Texas, or his duly appointed
representat�ve, a,ssistant, ar agents.
28. Directnr of Planning and Developrnent— T�e af�ciaIly appoit�ted Director af the Planning
and De�elopment Department of the City of Fart Warth, Texas, or his duly appainted
xepresentative, assistant, or agents.
29. Directo� of Transpor•tation Public Works — The officially appointed Directar of fhe
Transporta�ion Public Works Department of the City of Fort Worth, Texas, ox his duly
appointed representative, assistant, or agents.
30. Director of WaterDepr�rtmeni — The of£�zcially appointed Director oi the Water Departmeni
of the Criy af �'ort Worth, Texas, or his duly appomted representat�ve, assistaz�t, or agents.
3J. Drawings—That part of the Contract Documents prepared or approved �y Engineer wl�rch
graphicaliy shows ihe scope, extent, and character of �he Worl� to be performed by Contractor.
Submittals are not Drawings as so defined.
32. EffectiveDate of theAgYeement�The date zndicated in the Agreement on whxch i� becornes
effective, but if no such date is ir�dicated, it means the date on vvhich tlie Agreement is sigried
and delivered by the ]ast of the two parties to sign and de�er.
33. Engineer The licensed professional engineer or engineering fi�rn registered in the State of
Texas pexfarming prot�essianal servic�s for the City.
34. Extrc� Work -- Additional work made necessary by changes ox aiterations of the Contract
Documents or of quantities or for other reasons for which no prices are provided in the Contract
Documents. Ext�a worl� shaI� be part of the Work.
35. Field OrdeY—A written order issued by City whick� requires changes in the Warl� but which
do�s not involve a change in ihe Contract Price, Contract Time, or the inient oi the Engineer.
Field Ozders are paid froz� Field Order Al[owances incorporated into the Contract by funded
woz-k type at the time of a�vard.
36. Final Acceptance — The written notice given by the City to the Contractor that the Work
specified in the Contract Documents 1�as been cQmpleted to the satisfaction of the City.
CI'f Y OF i' ORT WORTH
STANDARDCONSTkUCTiON SPEL'IFICAT[ON DOCUMEDiTS
Revision: Ivlaiah 9, 2�p
007200-1
GENERAL COND�T[ON S
Pagc 4 of 63
37. Final Inspection -- Inspectron cazxied out by tk�e City to vexify that the Contractor has
completed t11e Work, and each and every part or appurtenance thereof, fully, entirely, and in
canfomlance witli ihe Contract Doct.rments.
38. GeneYal Requi�ements�ections of Division l of ihe Contract Docutnents.
39. HazaNdous Environmental Condition—The presence at the Si�e of Asbestos, PCBs,
Petroleutn, Hazardous Waste, Radioactive Material, ox other materials in such quant�fies or
czrcumstances that may presenf a substantial danger to persons or properrty exposed tbereto.
40. Hazcardous Waste Hazardous waste is defin.ed as any soiid waste listed as hazardous or
possesses one or more hazardous charact�ristics as defined in the federal waste regulations,
as amended from time to time.
41. Laws and Regulations Any and all applicable laws, rules, regulaY�ons, ord'mances, codes,
and orders of any and all govez�nrner�taI bodaes, agencies, authoriiies, and courts having
jurisdiction.
42. Liens�harges, secYuiry interests, or encumbrances upon Project funds, real propei-ty, or
pexsonal property.
43. 1Vlajorltem—AnItem of work included in the CantractDocuments that has a iotaI cosi equal
to or greaier than S% o� the original Contract Price or $25,fl00 whichever is less.
44. Milestone A principal event specif'ted in the Contract Documents reIating to an i�atermec�iate
Contract Tiirie prior to Final Acceptance of t�ie Work.
45. Notice of Award—The wriiten notice by City to ihe Successful Bidder stating that upon
ti�nely compliance by the Successfii� Bidder wi�h the condrtions precedent lisied therein, City
will sign and deliver t.�e Agreerr�ent.
46. Notice to PNoceed A�rarittennotice given by Ciry to Cor�iractor %x�ag the date on which the
Contract Time wi1l comrnence to run and on which Contractor shall start ta perform the Work
specif'xed in Cont�eaci Documents.
47. PCBs—Polychlorinated biphenyls.
48. Petroleum—Petroleum, including crude oil or any fraction thereof which is liquid ai standard
conditions of tennperature a�d �ressure (b0 degrees FaY�renheit and 14.7 pounds per square
inch absalute}, suc� as oil, pe�roleutn, fuel oil, oil sludge, oil refuse, gasoline, kerasene, and
o�l m�ed with other non�Hazardous Waste and ca-ude oils.
49. Plans -- See deiinition of Drawings.
CITY OP FOR1' WORTH
STA�iDART7CdtJ5TRUCTlON SP�CiF[CATION DOCUM�NT5
Re�ision: Ma�d� 9, 202(1
oo �a oo- i
GENERA� CONa1TI0N S
Page 5 of 63
50. Project Schedule—A scheduIe, prepax•ed and mai�tazned by Contractar, in accordance vvith
the General Requireznents, describing Yhe sequence and duration of t.�e activities cotxzprising
the Contracfior's plan io accainplis� the Work withitz the Cantract Tame.
51. PNoject—The Workto be perfornaed under the Contract Documents.
52. Project Manager—The authoxized representatrve ot' the City vvho will he assigned ta the
Site.
53. Public Meeting — An announced zx�.eeting conducted by the Czty io facilitate public
parEicipation and to assist the pub�ic in gaining an ir�formed view af the Projecf.
S4. Radioactive Material--�ource, special nucIear, or byproduct materia� as de�ined by the
Atomzc Energy Act oi 1954 (42 USC Section 201 T�t sey.) as amended frozn iime to time.
55. Regular Working Hours — Hours bco nning at 7:d0 a.m, and ending at 6:00 p.m., Monda y
tkiru Friday (excluding Zegal holidays).
56. Samples—Physical examples of materials, equipment, or �rvorkmanship that are
re�resentatzve of sorne poi�ion of the Work a�d �which establt,sh ihe standards by vahich such
portio� of xhe Work will be judged.
57. Schedule of Submittals—� schedule, prepared and xnaintained by Contractor, �f requ.ired
submitiaLs ana the tzme requirements to support �scheduled perFormance of related construction
ac�iviti�s.
58. Schedule of Values—A schedule, pre�ared and maintained by Contractor, aliocat�itlg portions
of tl�e Contraci Price to various portions of the Wark and used as the basis for reviewing
Coniractor'sApplications forPayment.
59. Site—Lands or a.reas ztzdicated m the Con�ract Documents as being fuz-nxshed by City upon
which the Work is to be per%rmed, including righis-of-vuay, permits, and easeinents foz- access
f,hereto, and such other lands fur�ished by City which are designated for thc �ase of Contractor.
60. Specifications—That part of the Contract Doctunents consisting of written requirements for
materials, equipment, systems, standards and �workmanship as applied to t�ie Work, and certa �n
adz�ainistraiiv� requireznents and procedural inatters applicable Ehereto. Specifications may be
spec�cally ir3ade a part of the Coni�racf Documents by attachment or, if not attached, z�:aay be
incorporated by reference as indicafed m ihe Tab1e of Contents (Divisian 00 00 00) of each
Project.
61. Subcontractor An indivi�dual or entity haeing a clirect contract with Contractor ar with any
othex Subconn-actor faz- the per%rmance of a part of the Wo�•1� at t%e Site.
CIT Y OF P ORT WORTH
S'TANDARDCONSTRUCT[ON SPTCIh[CATION I?OCUIVII'sNTS
Revision: Ma� 9, 2(�0
007200-1
GENERAL CON�ITEON 5
Pagebof63
62. Subrnittals—All d�awings, diagrarns, illustraiions, schedules, and other data or inf'oi�rz�ai�on
which axe specifically prepared or assembled by ox �or Contractor and submitted by Coni�actor
to illustrate some portion af the Worlc.
63. Successful Bida'er T�e Bidder submitting the lowest and most responsive Bid to whom City
makes an Award.
64. Superintendent--- T�e xepresentat�ve o� the Contractar who is available at a11 times and able
to receive instructior� frona the City and to act for the Contractor.
b5. Supplernenta�y Conditions—That part of the Contract Documents which arnends or
supplennents these Generai Conc�tions.
66. Supplie� A manufacturer, fabricator, supplier, dists�butor, r�aterialman, or vendor having a
direct contract wilh Con(ractar or with any Subcontractor to furnish rnaterials or equipment
io I�e iricorporated in i1�e Work by Cont�actor or Subconiractar.
67. Underground Faeilities AIl uzaderground pipelines, conduits, ducts, cables, wires,
manl�oies, vaults, tanl�s, tunnels, or other such facilities or attachments, and any encasemenis
co�ta�ning such faciliiies, iz�cluding but not limited to, those ihat canvey electriczty, gases,
steam, liquid pef�oleum products, telephone or of.hex communzcat�ons, cable t�levision,
waier, wastewater, storm water, other liquid� oz' chemicals, or traific or ot.�er control systems.
68 UnitP�ice Work—See Paragraph 11.03 of these General Conditions for defuution.
69. Weel�end Worl�ingHours—Hours �egin�aing at 9:00 a.rri. and endizxg at 5:00 p.rna., Saturday,
Sunday or legal hoIiday, as appraved in advance by the City.
70. Work---I'he entire constniction or the various separately identif'�able parts thereof t•equired to
he pro�vided under t�ie Contract Documents. Work includes a�d is the result af performitag or
providit�g all labor, services, and documenfation necessary to produce such constructzon
inc�ding any Change Order or �'ield Order, and firrnis�mg, installitag, and incorporating a11
materials and equzpment into such construction, all as requtt'ed by the Contract Docu�ents.
7l . Worizing Day — A�rvoxking day is defined as a day, nofi including Saturdays, Sundays, or Iegai
k�olidays auihorized by the City far contract putposes, in which weather or other conditions
not under the control af the Contractor will pern�it the performance of tYie prir�cipal urut of
work underway for a continuous periad of not less than 7 hours be�een 7 a.m. and 6 p.in.
1.02 Terminology
A. The words and terms discussed in Parag�raph 1.02.B through E are not defined but, when used in
the Bzdding Requirements ar Con�ract Docurnents, have the ir�dicated zaaeaning.
B. 1`ntent of Certain Terms ar fldjectives.•
GITY OP FORT WORTH
STAN[3ARDCONSTRUCT[Ol� SP�CIF[CATION DpCUMEIVTS
Revision: Mardi 9, 2(p0
ao�2oo-�
�ErvE��cor�oiTior�s
Page 7 of 63
1. The Cont�ract Documents in�clude the tenns "as alIowed," "as approved," "as ardered," "as
directcd" or tem�s of like effect or impaxt to authorize an exercise of judg�me�i by City. It�
aclditzon, ihe adjectivcs `�easonable," "suitable," "acceptable," `�ropex," "satisFactory," ar
adjectives of l��e ef�ect or import are used io describe an aciion or detex-txiinaiion of City as to
ihe Work rt is zntcnded that suck� exercise of professional judgment, action, or deiez-�x�ination
will be solely to evaluate, in general, 1:he WarI� for compliance wi�h the infoz�afion in i:he
Contract Documents and witla f,he design cozacept ot' the Pxoject as a functioz�g whole as
shawn or inc�icated in the Contract Documents (unless ihere is a specif'ic statemeni indicating
othervcri�e).
C. Defective:
�. The word "de�ective," wk�en mod.ifying the word "Woz-k," refers to War1� that is
unsati�factory, faulry, or deficient in that i�:
a. does not confo�n to the Contract Documents; or
b. does not meet the rcquu•ements of any applicable ins�ection, xeference standard, tesi, or
approval z•eferrEd ta in the Contract Docurz�ents; or
c. has been damaged prior to City's written acceptance.
D. Furnish, Install, Perform, Provide:
1. The �word "Furnis�" or the word "iz�stall" or the word "Periarm" or th.e �ard "Provide" or
the word "Supply," or any cornbination or simi[ar directive or usage thereof, shall mean
funiishing and incorporating in the Work including all necess�ry �abor, materials, equipment,
and everytbing necessary to perform the Work itidicated, unless spec�cally ]ux�ited in the
context used.
E. Unless stated otherwise in the Con�i-act Docurnents, wards or phrases that k�ave a we�l-lcnawn
tecka�icaI or construction industry or trade rneaning az•e used in the Contract Documents in
accordance with such recogi�izsd zneaning.
ARTICLE � -- PRELIM�NARY MATTERS
2.01 Copies afDocuments
City shall fi�iivsh to Contractor one {1) arig�al executed copy and one {1} elect�onic copy of tlae
Contract Documents, and four {4) additional copies of the Drawmgs. Add�itional copies wil� be
fiaxxzished upon request at the cost of zeproduction.
2.02 Commencementof Contract Time; Notice to Proceed
The Contract Time �vill commence fo run on ihe day indicated in tk�e Noiice to Proceed. A Notice to
Proceed may i�e gi�en na eaxlier than 14 days af�er the Effect�ve Daie of the Agreerricnt,
unless ag�reed to by bot.� pax ties in writin�.
C1TY OP FORT WOZi1'H
STANDAADCONSTRUCTIOh SPECTFtCAT[ON DOCCi�+fEIV'I'S
Revision: Fv1ad� 9, 2020
007200-I
G�NERAL CON� I710N S
Page 8 of 53
2.03 St��ting the Wor1z
Cont�actor shall start to perfoz-m the Work on the date when �he Contract Tune com�mences to z-un.
Na Work sha11 be done at the Site prior to ihe date on which the Cont�•act Tirx�.e commences to run.
2.04 13efo�'e Stariing Coytsiructio�z
Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the
�7Lrark.
2.05 Preconstructian Conference
Befoxe any Work ai the Site is started, the Con.tractor sha� attend a Precansfruction Conferrence as
speci#ied in the Contract Docurnents.
2.06 Public 11�feeting
Contractor inay not rr�obilize any equipment, materials or resources to tl�e Site prior to Co�itracior
attending the Public Meeting as scheduled by the City.
2.07 1"n itial Acceptance of Schedules
No progress payrnent shall be made io Contractor until acceptable schedules are submiited to City iz�
accordance wiih the Schedule Specification as provided iza the Contract Doctunents.
ARTICLE 3— CONTRACT D�CCIMENTS: INTENT, AMENDING, REUSE
3.01 1`ntent
A. The Contract Doc�unents are complementary; vc�laat is required by one is as binding as if requirred
by all.
B. Ii is the intent of the Cont�aci Documenis to describe a funetionally complete project (or part
thereof} to be constructed in accardance with t�e Contract Documents. Any labox, documentatian,
services, materials, or equipzx�eni ihat reasonably zx�ay be inferred from the Con�ract Documents
or from prevaiIing custom or trade usage as being required to produce the indicated resuit wi]I be
pravided whether or zaot specif'zcally called for, at no additional cost to City.
C. Clarificatio�,s and interpxetations o�the Coniract Documents shall be issu�d by City.
D. The Spec�cation� may vary in form, format and style. Some Specification sections zxiay be �vritten
in varying degrees of streaznlined or declara�ive style and some sections may be relatively
narrative by comparison. Omissinn of such words and phrases as "the Cantractor sha�l," "in
C011�OTi2ll� Wlt�l," "aS S�lOWYI," OI ���5 S�]eCl�le{I" aTe mtentional 111 streamlined sections.
Omitted words and phrases shall be supp�ied f�y in%rence. SirniIar types of pravisions may appear
in various parts of a section or articles within a part depending on Y.he format of the
CITY OF FORT WOR'I'H
STANDARDCOlVSTRUCTION 3I'EC[�[CATION DOCUMEN'I'S
Revision: Mach 9, 2(120
oo��oo-i
c�NER,a�coNoirio�s
1'age 9 of 63
section. The Contractor �hal1 not iake advantage of any �ariation of fortn, format ar style zt�
malfing Contract Claims.
3.02
E. The cross referez�cmg oi spec�cation sections under the subparagraph heading "Rclated
Sectzons include but are nat necessarily limited to:" and elsewhere within each Specification
section is provided as an aid and convezuence to the Cont��actor. The Coni�ractor sha�l noi rely on
f�he cross referencing provided and shall be responsible to coordinate the entire Worl� under t1�e
Contract Documents and provide a compleie Project whether or not �he cross refere.ncing is
provicl�d in �ach section or whether or not the cross referencing is corz�plete.
Reference Standrrrds
A. Standards, Specifications, Codes, Laws, and Regulations
I. Reference to standards, specifications, rnanuals, or codes o� any technical socieiy, organization,
ox a�socia tion, ox io Laws or Regu]afiions, whether such ref�rence be specific ox by implication,
shall mean the standard, speci�cation, manual, code, or Laws or Regula.tzoz� in effect at the
time of opening oi Bids {ar on f1�c Effective Date of the Agreement i#' there were no Bids),
except as may be otherwise speci#"zcaIly stated in the Contract Docume�ts.
3.43
2. No provision of any such standard, specificatian, manual, or cad.e, or any instr�ction of a
Supplier, shall be e�feciive to change the du�ies or responsibilities of City, CQntractor, or any
of flleir subcani�actors, consultants, agen�, or employees, from thase set forth in the Contract
Documents. No such provi,sion or instruction shall be effective to assign to City, or any of iis
officers, directors, mezxibers, partnexs, employees, agents, consultants, ox subcoz�tractors, any
dury or authority to supervise ar direct the per%rmance of the Work or any duty or authority
to undertake respoz�ibility incoz��stent with t�e pro�isions of the Contract Docunaents.
Reporting and ResolvingDiscrepancies
A. ReportingDiscrepancies:
Contractor's Review of Contrr�ctDocuments Before Starting Work: Befaxe undertal�it�g each
part of the Work, Contt-i-actor shall carefully study and campare the Contzact Docurnents and
check and verify pertin�nt figt�z•es therein against alI applicable field measurexnents and
conditions. Contractor sha1� promptly repoz-t in wriEing to City any cant7ict, erroz-, ambiguity,
or discre�aney which Contractor discovers, or has actual knowtedge of, and shall obtain, a
wzitten interpretation or clarification from City before proceedzng wit11 ��y Work affecfed
thereby.
2. Cantractar's Review of Contract Docuanents Du�ing Pe�f'ofrnance of Work: I�, during the
perfoxmance of the Worl�, Contractor discovers any co�f�rct, error, ambi�zity, or d�screpancy
wzt�in the Conf�act Docurnents, or between tI�e Corztract Docurnents and (a) any appficable
La�nr or Regulation ,{b} any standard, ,specification, manua�, or code, or {c) any inst��ction of
any Supplier, then Contractor shall p�omptly report it to Cify zn writing. Contractor skzall not
proceed with ihe Work affected thereby (except in an emez-gency as required by Paragraph
CITYON'FORT WORT�I
S'TANDARDCONSTRUCT�ON SPECIFICAT�ON DOCUMENTS
Revisian: Mar.h 9, 202p
00720U-1
GENERAL. CON� IiION S
Page €Oof63
6. �7.A} until an a�nendment or supplement to the Contract Doc�unents k�as been issued by
one of the z�ethads indicated 'm Para�raph 3.04.
3. Contractor shall no� be Iiable to City for faihu-e to report any conflict, error, amUiguity, or
discrepancy in tl�.e Contraci Documents unless Contractor had actuall�owledge �hereaf.
B. ResolvingDiscrepancie,s:
1. Except as may he otherwise specifically stated in tk�e Contract Documents, the provisions of
the Contraci Documents shaI� take precedence in resolving any co�£lict, error, ambiguity, ar
discrepancy between the provisioz�s of the Contract Documents and �e pravision:s of any
standard, specif�icatiion, manual, ar tkze instructian af any Supp�ier (whethex ar not specifically
incorporated by reference in the Contz�act Documents}.
2. In case oi discrepancies, figured dimen.�ions shall govert� o�+er scaled dimensions, Plans sha11
govern over Specifications, Supplementary Conditions sha� govern over General Conditions
and Specifcations, and quantities shown on the PIans shall govern ovef those shovvn im the
p�oposal.
3.04 Anzending and Supplerr�enting ContractDocuments
A. The Contract Docu�nents may be anaended to provide for addrtions, deletiaris, and revisions in
the Work or to modify the tez�ms and conditions thexeofby a Change Order.
B. The requirements of fihe Cont�act Docurnents may be supplemented, and �riinorr variations and
deviations in the Wark nat involving a change in Cont�act Price or Coniract Time, may be
authorized, by one or rxaore of the follawing vvays:
1. A Field Order;
2. City's review of a SubnaittaI (subject to the �rovisions oiParagraph 6.1$.C); or
3. City's written interpretation or clarification.
3.05 Reuse ofDacuments
A. Coniractor and any Subcontractor or Suppl�er shall. not:
1. have or acquire any title to or ownership righis in any of the Drawings, Specificatians, or
atherr docurnents {or copies of any i:hexeo fl prepared by or bearring the seal of Engineex,
including electronic �edia editions; or
2. xeuse any such Dravc�a:ags, Specifcatians, ather documents, ox copies thereof an extensions of
the Project or any other pxoject wi�out written cozasent ofi City and specific writ�en verif�icatian
or adapiation by Engineer.
ci�� or �oxT wox�rx
STAAIDARDCON5TRUCTION SPECIFiCAT10N T70CUMENTS
Revision: Madi 9, 2Q20
U07200-I
GENERAL CONDITIOiJ S
Pagc 1 f of {3
B. The prohib�tions of this Paragrap� 3.OS will sureive fitaal payment, oz- terrr�nation af the
Contract. Nothing herein. shaIl preclude Contractor from retaining copies oF the Confract
Docunrzents for record punposes.
3.06 Eleeironic Data
A. Unless otherwtse stated in the Supplementary Cozzditrons, the data furnished by Ciry or Engineer
to Coniracioz-, or by Contractor to City or Eng�eer, that may be reiicd upon a�t•e Iimitcd ta the
printed copies included in. the Contract Documents (a]so lcnown as haxd copies) and other
�pecifications re%renced and located on the City's an-Iine elecironic dacumeni rr�anagement anc�
collaboration systezx�. �ite. Files in e�ectronic media formai of text, data, graphics, or other types
are furnished oz�iy far the canvenience of' #he receiving �arty. Any concliasion oi- informafion
obtained or deri�ved from such electronic files wi11 be at �Iie usex's sole risk. 7fihere is a discrepancy
between the electronic fi�es and the hard copies, the haz-d copies govern.
B. When transferring documents in electronic media format, the transferring party znakes na
represcnta�ions as to long term coznpaiibilify, usability, ar readability of documents res�ting from
the use of software application packages, operating systems, or carnputer hai•dware differing frorra
those used by the data's creator.
ARTICLE 4— AVAILABILrTY QF LANDS; SUB SURFAC`E AND PHYSICAL CONDITIONS;
HAZARDOIIS ENVIRONMENTAL CONDIT�ONS; REFERENCE POINTS
4.01 Availability af Lands
A. City shall fuz-t�ish fhe �ite. City sl�all notify Cantractor of any encurnbrances or restrict�ons not of
genera� appJication but speci_f'zcally relafed to use of the Site with which Contractor rnust comply
in perfoz�n�ing the Work. City �vill obtain in a timely mannez- andpay for easexnents forpermanent
stractuz�es orpern�anent changes in e�sting facilities.
l. The City has obtained or anticipates acquisition of and/or access to right-of way, and/or
easements. Az�.y outstanding right-of-way and/ar easements are an%cipated to be acquircd in
accordance vcrith the schedule set forth in the Supplementary Conditians. The Project Schedu�e
su�mitted by the Coniractor in accordance vvith the Contract Documents zxiust consider any
outstanding right-o� way, and/or easements.
2. The City has ox anticipates removing and/or relocating utilities, and obstructions to the Site.
Any outstanding removal or relocat�on of utilitzes or obstruc#iaz�s is anticipated � accordance
with the schedule set forth iz� the Suppleme�tary Conditions. The Project Schedule submitted
by the Contractor in accordance with tk�e Contract Docurzients rnust canszder any o�tstanding
utilities or obstructions to be rem�ved, adj�astecl, and/ox relacatedby others.
B. Upon reasonable written request, City s�a]I fui��ish Co�atractor with a current statement of record
�egal title and legal description of the lands upon which f,he Warl� is to be performed.
CITY Or FORT WOT2TH
STANDARDCONSTRUCTIdN SPi?CIF1CATi0N T70CL7MT:NTS
Revisioii: Madi 9, 2D20
ao�aoo-�
G�NERAL CONQ ITION S
Page l2 of G3
C. Contractor shall provide for all additional lands and access thereio ihat rnay he required for
consin�cfaon faciiities or storage af materials and equipznenf.
�.a2 Subsurface andPhysical Conditians
A. Repopts andDrawings: The �upplementary Conditions identify:
I. tl�ose reports known to City of explorat�ons and tests of subsurface conditions at ox
contiguous to the Si�e, and
2. tlaase drawin.gs l�own to City af physical conditions reIatting io e�sting suz��ace or
subsurface structures at the Site {except Und�rground Faci[i�ties).
B. Limited Reliance by Cantracto� o�a Technical Dr�ta Authorized: Con�ractor ixaay rely upon t�e
accuracy of the "technical data" contained ii� such reports and drawzngs, but such reports and
dra�cuitxgs are not Contract Documents. �uch "tecl�nical data" is identi�'ied in the S�pplermentary
Conditions. Contractor may noti rnake any Con�ract Claim against City, or any oi their officers,
direciors, xxae�nl�ers, pa��ttaers, employees, agents, consultants, or subcontractors with respect tio:
l. the completeness of such reports and drawings fox Contractor's purposes, including, but not
1i�x�ited to, an.y aspects of the means, methods, technzques, sequences, and procedures of
construction tio be ernployed by Contractox, and safety precautions and prograrns incident
thereta; or
2, other dala, interpre�ations, opinions, and informatzon contained in such reports or shown or
indicated in such drawings; or
3. any Contractor znierpretation of or conclusian drawn from any "techn�ical data" or az�y such
o�her data, interpretations, opit�ions, or information.
4.03 Differing Subsurface o� Physical Conditions
A. Nolice: If Cont�actor believes that any �ubs�face or physical conditian that is uncovered or
revealed either:
1. is of such a nature as to esiablish that an� "technical data" on wh�ch Contractor is entziled to
rely as provided in Paragraph 4.02 is mafierially inaccurate; or
2. is of such a nature as to require a change in the Conlxact Docurnents; or
3. differs materially from that �hown or indicated in the Contract Documents; or
�. is of an unusual nature, and differs materially from conditions ordina�y encauntered and
genera]Iy recognized as inherent in work of ihe character pravided for in the Coniract
Dacurnents;
CITY OF FORT WOR'1'H
STANDA12llCatJSTRUCT[ON SPECIEICAT[O1� AOCUMENTS
Revisian: Ivfad� 9, 2020
00�2oo-i
GENERAL CONDfT101� S
1'agc 13 of 63
then Cont�acior shall, pronapfly after becoining aware thereof and befox•e further distut�bing the
subsurface or physicaI canditions or pez-foiming any WorIc in connection therewiih (except m an
emergency as required by Paragraph 6.17.A}, noiify City in writing about such candition.
B. Possible P�ice and Time Adjustment,s
Contractor shal! not be entitled to any adjustment in the Contract Price or Contract Time if:
1. Contractoz• l�new of the exist�nce of such conditions at the time Contt•actor made a fina I
comtx�itment to CiLy wit13 respectto ContractPrice and Cantract Ti�me by the subn�ission of a
Bzd or becoming bound under a rzego�iated contract; or
2. the existence af such condiiion couZd reasonably hav� been dzscovered or revealed as a result
of the examination of the Contract Docuznents or ihe Site; or
3. Coniraci:ar failed to �e the written notice as required l�� Paragraph 4.03.A.
4.04 UndergroundFacilities
A. Shown or Indicated: The inforzxzatron and cIata shown or indzcated in �e Coz�t�-aci Documents
wit�. respectto existing Underground Facilities ai o� contiguous to the Site is �ased on infot-mation
and data fut`�isl�ed to City ar Engit�eer by the ownexs of such U�dergral�nd Paczlitzes,
inclucling City, or by others. Unless it is otherwrse e�pressiy provided in tI�e Su}�plementary
Conditions:
1. City and Enginecr sl�all not be responsible fox the accur-acy ar completeness of any such
informa tion oz' daYa provided by others; and
2. the cost of aI� of the following will be included in the Cont�act Price, a�d Contractor sha11
have full r�sponsibility fox:
a. reviewir�g and checking a�l such irzformation and data;
b, locating ail Undexground Facili�ies shown or indicaCed in fihe Coniract Documcnts;
c. coordinatioza and adjustzx�ent of t}�e Work with the owners of such Undergound
Facitities, incIuding City, during constzuction; and
d. tlie safety and protect�on of all such Underground Facilities and xepairing any damage
tl�ez-eto resulting frozn the Wark.
B. NotShown orindic�ted:
1. If an Underground Facility wbrch canilicts with the Work i� uncovered or rrevealed at or
contiguous io �he �ite which was not shown or rndicated, or r�ot shown or indicated with
reasonable accUracy in th:e Contract Documents, Contractor shalI, promptly afier beconnang
aware thereaf and before further dFshzrbing conditians affected thereby or performing any
CT1'Y {)F POR'1' WORTT�
ST.AI�lDARDCONSTRUC'iION SPECIF[CAT10?J ]]OCUIvIFNTS
Revisio�a: Niadi 9, 2ff20
oo�z oa- �
GENERAL CONDITION 5
Page 14 of 63
Wark in connection therewith (except in an em�rgency as required by Paragraph 6.I7.A),
iden�ify the owner of such Ur�de�ground Facility and give notice �o that awner and ta City.
City will review the discovered Underground Facilily and determine t:he extent, if any, to
which a change may be requi�ed in the Contract Documents io reflect an.d document the
consequences af the e�stence oz• locaiion of the Under�•o�nd Facilzty. Cont�actor shaIl be
responsible for the safety andproiectian of such discovered Undergrround Facility.
2. If City concludes that a change in ihe Confract Documents is required, a Change Order may
be issued to reflect and docuznent such consequences.
3. Verification of e�sting utilities, structures, and service Jines shall include notification of a11
utility cornpanies a miaimum of 4$ hours in advance of canstruction includir�g exploratory
excavation if necessary.
4.45 Reference Points
A. City sl�all provide eng-�neering siu�veys to establish reference paints for construction:, which in
City's judgment are necessa�ty to enable Cont�-actor io ptoceed with the Woxk. Ciry wi�l provide
construction stakes ar other customary method oimarkaag to establisk� line and grades for roadway
and ut�lity canslructzon, centerIines and bene�marks for bzidgework. Contracior shal� pratect and
preserve the established reference poinis and property �nonuments, and shall make no changes or
relocations. Contractor sha11 report to City whenever any refexence poini ox property rzaonument is
lost o�• destroyed ox rec�uires relocation because of necessary changes � grades ar locations. The
Ci�y shall be r�sponsxble for the replacement or relocation of re�erence poitats or properiy
znonumenfs nat carelessly or wi�fully des�oyed by the Contractor. The Contractor shali notzfy
City in advance and wiY� suffici�nt titx�.e to avoid delays.
B. Whenever, in the opinion of the City, any reference point or zxaonument has be�n careiessly or
willf�lly destroyed, disturbed, or removed by the Contrractar or any af his employees, the full cost
�ar replacing such points plus 2S% will be charged against the Contractor, and the fu�l arr�ount wi11
be deducied from payment due the Contractor.
4.06 Haza�dous Environmental Candztion at Si�e
A. Repo rts and Drawings: The Supplementary Canditions identify those reports and drawings laaown
to Ciry relating to Hazardous Environm�ntal Conditions that have been identified at the �ite.
B. Lzmited Reliance by Contractoron TechnicalDataAuthorized: Conirractor may rely upo� the
accuracy oi the "technical data" contained in such reports and drawings, but such reports and
drawings are not Contract Docum�nts. Such "tec�wical data" is identified in the Supple�entary
Conditions. Con�ractor znay not malce ar�y Contraci Claitxx against City, or any of their officers,
directors, menabers, partners, employees, agents, consultants, or subcontractors witb respect to:
l. the completeness of such reports and drawings far Conta•actor's purposes, including, but not
lirnzted to, any aspects of the means, mcthods, techniques, sequences and procedures of
c�TY oF �aR�r woR�rx
STANAARDCONSTC�UCTION SPECIFiCAT10N DOCC[ME3�lTS
Revision: Madi 9, 2U20
007200-]
GEN�RALCONdITIONS
Pagc 15 of G3
const�-ucfion: to be employed by Cozatracior and safety precautions and programs incident
ihereto; or
2, other data, interpreta�ions, opinions and 'mformation contaitzed in such reparts or shown or
indicated in such dravt+ings; or
any Contractor interpretation of or concluszon drawn froin any "technicai data" ox any such
other data, it�terpretations, opinions or i��f'ormaiion.
C. Contractor shaIl not be responsible for any Hazardous En�ironzxzenial Condiizon uncavezed or
revealed at ihe Site which �;vas not shown or ind�caied in Drawzugs or Speci�cations or identified
in the Contract Docurnentis to be wit.Eun the scope of th� Wark. Contractor shaIl be respons�ie t'or
a Hazardous Environ�nental Condition created with any inateria.ls brought to the Site by
Contractor, Subcontractors, Suppliers, ox anyone else for whom Contractor is responsible.
D. If Contractor encauniers a Hazardous E�vironmental Condition or if Contractor or anyone for
whom Contractor is responsible cz-eates a Hazaxdous Envi�oz�mental Conc3�tion, Contractor shall
irnmediately: (i) secure or atherwise isolate such condilion; {ii) stop a1I Work in cant�eciion with
such condition and in any area affected thereb� {except in an �mergency as reqiaired by Paragra�.
6. �7.A); and (iii) notify City {and �romptly thereafter confir-rn suc� notice ir� writmg). Ci�y may
consider the necessiiy to retain a qualified expert io evaluate such condition or iake carrective
action, if any.
E. Contractor shall not be required to resurne Wor1� �. connection with such condition or in any
affected area uritil after City has obtained any xequired per�zazts related there�o and delieered written
notzce io Coniractor: (i) specifying lhat such condition and any affected area �s or has been
xendered suitable for tl�e resumption of Work; or (ii} specifying any special conditions under which
such Work xnay be resuined.
F. If a�ier receipt oi s�ch writien noficc Contractor does not agree to resume such Work based on a
reasonable beIief ii is �nsafe, or does not agree to resiune such Workunder such specia� conditions,
then City tnay order the portion of the Work that is in the area affectedby such condition to be
deleted from the Wark. City znay have such deZeted portion of the Work perfarmed by City's own
farces or others.
G. To the fullest extent per^fnitted hy Laws and Regulaiions, Conlracior shall indemnify and hold
ha�nzless Cily,, from and against c�ll claims, cosis, losses, and damages (including but not limited
to all,fees and char^ges of engineers, architects, attorneys, and otherprofessionals and all court
or c�rbitraiion or oiher dispute resolutio�a costs) arising out of or r�elating to tc Hazardous
Environmental Condition created by Contractoror by anyoneforwhomCont�actor is Nespon,sil�le.
Nnthing in this Paragraph 4. 06.G shall obligate Goniractor to indemn � any individual o�' eniity
from and against the co�zsequences ofthat individual's o� eniity's own negligence.
H. 'The pxovisions of Paragra�hs 4.02, 4.03, and 4.04 do not apply to a Hazardaus EnvironmentaI
Condition uncav�xed or revealed at the Site.
CI'1'Y pF FORT WORTH
STANDARiICONSTRUCT[QN SPEL'[FiCATION DQCUM1sNTS
Revision: Maid� 4,2a20
00 72 QD -1
GENEF2AL CAND�TION S
Page lb of 63
ARTICLE �— B ONDS AND INSURANCE
5.01 Licensed Su�'eties andlnsurers
All bonds and insurance requit'ed by the Contract Documents to be purchased and maintained by
Cantrractor shali be obtained from suz'ety or insurance connpanies ibat are duly licensed or authorized
in the State of Texas to issue bond� or insurance palicies far the lamits anc� coverages so required.
Such. surety and insurance companies shall also meet such additional requiremen.ts and qualifications
as may be pro,vided in ihe Suppler�x�entaiy Conditions.
5.02 Pe�-forrnance, Payment, andMain�enance Bonds
A. Contractor shall fiu-nish performance and payment bonc�s, in accordance with Texas Governzxzent
Cade Chapter 2253 or successor statute, each in an axnount equal to the Coniract Price as
security for ihe fai� perfortnance and payrnent af all o� Cor�tractar's obligations under the
Contract Docuznents.
B. Contractar shall �urnish �aintena�ce bonds in an a�nount equal to the Contract Pr-�ce as security
to protect the City against any def�cts m any portion af t�e Worlc descxibed in the Contract
Documents. Mainienance bo�ds shall remain it� effect for two (2) years after the date of Final
Acceptance by tlae City.
C. All bonds shall be in the forrn prescr�bed by the Conts�act Documents except as provided atherwise
by Lavas or Regulations, and shall be executed hy such sureties as are named in the Iist of
"Companies Holding Certif"icates of Authority as Acceptable Sureties on Federal Bonds and as
Acceptable Reinsuring Companies" as published in Circu7ar 57Q {ainended} by the Financial
Managemeni Service, Surety Bond Branch, U.S. Department of tlie Treasury. All bonds signed by
an agent ar attarney-in-fact must be accompanied by a sealed az�d dated power of at�orney which
shall show that it is eifective on ihe date the agent or attorney-in fact signed each bon,d.
D. If the surety an any bond fiu��ished by Caniractox �s declared banl�-upt or becomes insolvent or its
right ta do business is terrninaied in the State of Tcxas or it ceases to meet I:he rec�uirernents of
Paragraph 5.02.C, Contractor shall prornptly notify City and shal�, wrthin 30 days after the eveni
giving rise to such notificatian, provide anot.�.er bond and surety, both of which shall comply with
the requirem�ents of Parageaphs 5.01 and 5.02.C.
5.03 Ceriifica�es of Irt,surance
Contractor shall deliver to Czty, witla copies to each addit�anal insured and loss �ayee ideniified in the
Supplementairy Conditions, certiiicates of insurance {other evidence af insurance requestedby City or
any o�er additional insured) in at least �e rninin�um amount as specifed in t�e Suppleinenta�ty
Conditions whicla Contractor is required to purchase and mainta.iri.
1. The cert�f'icate of insurance shall documen� the Ciry, and all identified entities named in ihe
Supplementa7ry Condi�ions as "Addiiional Insuxed" an a]I liability policies.
C1TY OT FORT WORTII
STANDAIiDCONSTROCTION SPEC[FICATIflN 17aCUMENTS
12evision: Ma�d� 9, 207_0
oo�zoo-�
c�rv��,� coNnirioNs
Yage 17 of fi3
2. The Contraciox's general liabifity insurance sk�all include a, `�er project" or "per location",
endoi•sement, which shali be ideni�fied in the certi�caie of insutance provided to the City.
3. The certificate shali be ,signed by an agent authortzed ta 6ind co�erage on beha�f' of the insured,
be complete in ii� entiz-ety, and show compleie insurance carrier natnes as Iisted in the current
A.M. Besi Property & Casualty Guide
4. The ulsurers for aIl policies must be ficensed and/or approved to da business u� ihe State of
Texas. Except �or wor�ers' campensation, all u7surers mu�t �ave a minimum rating of A-:
VII in khe current A, M. Best Key Rating G�ide or have reasonably equivalent finaz�.cial
strength and salvency to the satisfaction of Risl� Management. If the rating is below that
required, written approvaZ af City �s required.
5. AlI applicable policies sk�all include a Waieer of �ubrogation {Rights of Recovery) in favar
of Yhe City. In adclition, the Coniractor agrees to waive alI a-ights of subrogaiioli against ihe
Engineer {if applicable}, and each additional insured identified in the Supp�ernentaiy
Conditzons
6. Failure af the City to demand s�ach certificaies or other evidence of fu1l compliance wiih the
insurance requiz-ements or failure of the City to identify a de�ciency from evic�ence that is
pro�vided s�all not be conatrued as a waiver of Cont�-actor's obligation to maintain such ]ines
of insurance coverage,
7. If insurance policies ara not written for �pec�ed coverage Jitr�its, an Umbrel�a ox Excess
Liability insurance for any differences is required. E�tcess Liability shaJl foIlow form of the
prirnaay cflverage.
8. Unless otherwise stated, aI� required ��urance shall be u�itten on the "occurrencebasis", If
coverage is underwritien: on a claitns�made basis, the retroactive daie shall be coincident wi�h
or �rior to the date of the effective date of the agreement and the certificate of it�urance shalI
siate that the coverage is claims-made and tl�e r�kroacti�re date. The insurance coverage shall
be maintaieied fox thc duration of the Conlract and �or tk�ee (3} years followzng Pinal
Acceptance provided undex the Contract Documents or for the warra�typeriod, whicheeer is
longer. An annual c�rtifrcate af insurance submitted to the City shall evidence such
iz�urance coverage.
9. Policie,s shaIl have no excluszons by endorsements, which, neither nullify or amencl, the
required lines of coverage, nor decrease the limits of said coverage unless such endorsements
are appraved in writang by the City. In the event a Contract �ias been bzd or executed and the
exchzsions axe detennined to be unacceptable or the City desires additional msurance coverage,
and the Ciry desires the contractor/engineex to obfiain such coverage, fhe contractprice shall
be adjusted by the cost of the pxerniam for such additioz�al coverage plus 10%.
10. Any seLf-insured xetention (SIR}, in excess of $25,000.00, affecting required insurance
coverage sha�i be approved by the City in regards to asset vahze and stocicholders' equity. In
C1TY0�'FORT WD1tTH
STANDAIZDCOMSTRUCT20N SFECTP[CATION DpCUMEI�lTS
Revision: Madi 9, 2D20
0072DO-1
GEN�RAL COND ITiON S
Page 18 of 63
keu of traditional insurance, aliernative covez-age inaintained tbxough insurance pool.s or risk
retenfion groups, must also be approved by City.
1 I. Any deductible iza excess of $5,000.00, for any policy that does not provide coverage on a
first�dollar basis, must be acceptable tio and appraved by the Ci�y.
12. City, at its saie discreiion, reserves the right to review the insurance requirenr�.ents and to
�nnake reasonat�le adjustmenis to izasurance coverage's and fiheir l�ruis when deemed neces�ary
and prudent by the City based upon changes in statutozy law, court decision or the clainas
histozy af the industry as well as of the contracting pariy to the City. The City shall be requu�ed
fio provide pxior notice of 90 days, and the insurance adjustmenis shall be incorpoxated into the
Worlc by Change Order.
13. City shall be entitled, upon written request and vcrithoui expense, to receive copies of pokczes
and endorsements thereta and may make any reasonahle rec�uests for deletion ar revision or
modifica�ions of particula7r pol�cy tern�.5, conditions, limita�ons, or exclusions necessary to
conform the po�icy and endorsezxients to the requiurements of the Contract. Deletions, revisions,
or madifications s�aall not be required where policy provisions a�•e established b� Iaw ar
regulat�ons binding upon either parry or the underwri�er on any suchpolicies.
i�-_ City sha�l not be responszble fior the direct payin�nt of iz�surance prerniuzxa. costs for
Contractor's insurance.
5.0� ContNactot- s �nsurance
A. Worke�s Compensalaon and EmployeNs' Liabilily. Contractorr shaIl purchase a�nd maintai�i suc�
insurance coverage wi�h limits consistent �crith statutory benefits outlined in the Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as aznended}, and minirYutn liiruis for Employers'
Liability as is ap�ropzaate %r the Work being performed and as will provide protection frozx� clauns
set for� 6elow which naay ar�se out of or result fram Contractor's perfor�nance oi the Worrk and
Contractox's other obIigations under the Cantract Documents, whether it is to be performed by
Contractar, any �ubcontractor ox Supplier, or by a�yone d'u-ectly ox indirectly �mployed by any o�
them to per-t�orm any of the Wark, or by anyone for whose acts any of them may be liable:
1. claims under workers' compen�ation, disability benefits, and oiher similar employee be�efit
ac�s;
2, claims for damages because of bodily injury, occupational sickness or disease, or death of
Cantractor's ernplayees.
B. Commercial GeneralLiability. Coverage shall mclude but nat be limited ta covering Iiability
(bodily injury or property damage) arisin� from: premises/operations, independent contractoxs,
products/completed operations, personal injtuy, and liability ut�der an insured co�tract. Insurance
sfaall be provided on an occurrence basis, and as comprehensive as the cuirent Insuz�ance Services
Office (I�O) palicy. This insurance shall apply as pximary insurance with res�ect to any other
CIT Y OP PORT WOR"I'k�
3TATfDARDCONSTRUCTION SPEC]FICAT[OM F70CCJMENTS
Revision: Nfada 9, 2A2D
oo�zoo-i
GENERAL COND 1710N S
1'age l9 of 63
insurance or seif-insuz-az�.ce pro�rams afforded to t11e City. The Commerc:ial General Liability
palicy, sha11 havc no exclusians by endarserz�ents that would alier of n�llify premises/operatio�as,
products/comp�eted operations, contractual, personal inj�uy, ar advertising injiuy, which are
normally contaitled with the pol�cy, unXess the City approves such exclusions m writing.
For construction projects ihai present a substantial completed operation expasure, ihe City may
require the con1xactor to zxxaintain completed operatzons coverage for a minit�n.um of no Iess than
three (3} years followit�g the completion of the project (if ident�ed in the Supplementary
Conditions).
C. Automobile Liability. A commercial business auto policy shall provida coverage on "any auto",
defined as autos owned, hiz-ed and non-owned and provide indemnity for clairns for damages
because bodily injUry or death of any persan azad ar praperty damage arising out of the wark,
maintenance or use of any motor vek�icle 6y the Contractor, any Subconiractar or Suppliex, or by
anyane dit-ecily or indirectly employed hy any of them io pexform any of the Work, or by anyon�
foz- vvhose acfis any af them zx�ay be liable.
D. Railroad Protective Liability. If any af the work or any warranty wark zs within the limits of
railroad right-of way, the ContracEar sha]I compIy with fhe require�nents identified in the
Supplemeniary Conditions.
E. NotificationofPolicy Cancellation: Contractor shall immediately notify City upon cancellation
ox other loss of insurance coverage. Coniractor shall stop work until replacemez�t insurance has
beenprocured. There �haJ� be no time credit for days �ot �rrorked pursuant io t�i.s section.
S,OS Accepiance ofBonds andlnsu�ance; Option to heplace
I� City l�as any objection to the coverage afforded by or other provisions of t17e bonds or insurdnce
rcquired to bc purchased and maintained �y �e Contractar in accordance �vith Article 5 on the basis
of non-canformance with the Contract Doc�unents, the City shall so notify the Contractor zn writing
within 10 Business Days afterreceipt of the certi�cates {or other e�vidence requested}. Coza�:actor shall
provide to tl�e City suc�i additronal infornla.tion in xespect of insurance provzded as the Ciiy may
reasonably request. I�Confracior does not purchase or rnaintain all of the bands and insurance required
by the Contract Documenis, the City �hall noti�`y the Coniractor in writzng oF such failure prior to the
start of tk�e Wor�C, or of such failure to maintain prior to any change in the required caverage.
ARTrCLE 6 — CONTRACTOR'S RESPONSIBILITIF..�
6_01 Supervisian and SupeYintendence
A. Conhactor sk�all supervise, mspect, and di�rrect Y1ze Work compeicz�tly and ef�ciently, devot�ng
such attention thereia and applying such sl�iIls and �a�ertise as z�nay be necessary to perfo� tne
Work it� accordance with tlie Contract Documcnts. Contractox shall be solely resp�nsible fof the
means, methods, techniques, sequences, and procedures of construction.
CiTY Or POR'1' WORT�i
STA1�tDAi2DCONSTitUCTIflN SPGCIFICATION DOCLJM�,I+ITS
Ftevis ion: Madz 9, 2020
ao n oo-�
GEf�ERA� C01�� ITIOiJ S
Page 2D af 63
B. At all fi�nes duz-ing the progress of the Work, Con�ractar shall assign a campeieni, Engli,sh-
speal�g, Superintendent who shall not be xeplaced without written notice to City. The
Superintendent wili be Contractar's representat�ve ai the Site and shall have authority to act on
behalf of Contractor. All cbmmunication given to or received from tl�e Superintendent shall be
binding on Contractar.
C. Contractox shall notify the Ciiy 24 hours prior to movit�g areas during the sequence of constructio�.
b.02 Labar; WorkingHou�s
A. Contractor shall provide cornpetent, suitably qualified personnel to perform constz�tc�ion as
required by ihe Coz�tract Docuznents. Coi�traciar shall at alI tzt�es mainYain gaod discipline and
order at the Site.
B. Except as ot�aerwise requi�ced �or t�e safety or protection of persons or the Work or property at
ibe Site or adjacent thereto, and except as otherwise �tated in the ConYract Documents, all Work
at �e Site shall be perforrned during Regulaz Wor1�g Ho�az-s. Contractor will not pertnit the
perforn�ance of Work beyond Re�ular Working Hours or for Weekend Worl�g �-Iours witl�out
City's wi-ztten consent (whic� will not be unreasonably withheld). Written request (by letter orr
elecironic coz�amunication) to perform Work:
l. for beyand Regular Working Hours request must be made by noon at least two {2} Business
Days prior
2. for Weekend Working Hours request must be made by noon of the preceding Thursday
3. for legal holidays request musi be zxzade by noon two Busmess Days pr�or to ihe legal
k�ofiday.
b.03 Se�vices, Mc�teriuls, and Equipment
A. Unless athez�vise specifed in the Contract Documents, Contracior shall provide and assLune ful�
respansibility for all ser�vices, materials, equipmeni, labor, t�ansportation, construction equipment
and machinery, �ools, appIiaz�ces, fiie�, power, l�ght, heat, telephone, water, sanitary facilities,
tempora�ry faciliiies, and all oiher iacilities a�d incidentals �ecessary for the performance,
Contractor required testing, start-up, a.nd completion of the Wark.
B. All materials and equipment incorporated into the Worrk shall be as specif'ied or, if nat speci#ied,
shall be oi good quality and new, excepi as otherwise pz'ovided in ihe Contract Documents. All
speczal warran�ies and guarantees required by the Specif"ications shall expressly run to tlae benefit
of City. If required by Cily, Cont:t-actor shaIl fiu�nish satisfactory evidence {including reports of
required tests} as to the source, kind, and quality of materials and equipinent.
ciT�or Fox•r woRTx
S`I'AArDAItDCONSTklJCT10N SP�CIFICATION DOCT]MENTS
Revision: Madi 9,?_02U
an�2ao-1
GEN�RAL CONQ ITION S
I'age 21 of 63
C. AIE materials and equi�ment to be incaxporated into the Worl� shall be stored, a�pi�ed, �izastalled,
connected, erecied, protected, u�ed, cleanecI, and condi�ioned in accor�ance wiih instructions of
the a�plzcable Supplier, excepl: as otherwise may be provided in the Coniract Docuz�ents.
D. AIl itezaas of standard equipznent to be incorporated into the Worlc sha�l be the latesi model at the
tinne of bid, unless otherr�vi�c specified.
{.04 ProjecifSchedule
1�. Contractot shall adh�re to the Project Schedu�e established ir� accordance witl� Paragraph 2.07
and the C�eneral Requiremenis as it may be adjusted from time to time as pro�ided b�lo�.
Cont.ractor sha.lI subrnit io City ror acceptance (to t7ie extent indicated in Paragraph 2.47 and
�he General Requirements) pro�osed adjustments iz� trie Praject Schedule that will not re�ult
in changing the Contract Time. Such adjustrnents wil� comply wif11 any provisiaz�:s of the
General Requirements applicable thereto,
2. Coni�•actor shall subzxzit to City a monthly Project Schedule with a monthly progress payment
for tl�e chuation of the Contract in accordance with the scheduIe specif'ication O1 32 16.
Proposed adjustments in the Projecf Sch�dule that will change the Contract Tiine shaXl be
subrnitted in accordance wiih the requirements of Article T2. Adjustcxzent� � Contract Tiu�ae
rnay o��iy be made by a Change Order.
6.05 Substitutes and "Or-Equc�ls"
A. Whenever an item of zx�.aterial ar ec�uipme�t is spec�ed or described in fihe Contract Documents
by using ihe name of a proprietary iterxa or Yhe name of a particular Supplier, the specif'ication ox
descriptioi� is intended to establish the type, function, appearance, and quaXity required. Unless the
spec�cat�on o� description contaizas or is followed by words reading ihat no like, equivalezai, or
"or-eqi.ial" item or no substitut�on is pernuttect, o�er iteir�s of material or equipment of oiher
Supplzexs rnay be submitted to City for review under the ci�ctunstances described be�ow.
"Or-Equal"Items: If it� C�fy's so�e discretion an item o� xxiaterial or equipz�nent proposed by
Contractar is f�nctionally eq��ai to that named and sufficientiy similaz- so ihat no cha.nge in
related Work wiIl be required, it may be considez-ed by City as an "or-equal" item, in which
case�evievv and approval of ihe proposed itena znay, in City's sole discretion, he accomplished
without com�liance wit� soine or all of the requirements for approval o�'proposed subst�iuie
iteins. For the purpases of th�s Paragrap� 6.a5.A.1, a pro�osed itern of material or equipment
vaill i�e considered functionally equal to an item so named if:
a. fhe City determines that:
1} it is at Ieast equal in materia�s of cozis�t-uction, quality, durabifity, appcaz-ance,
sY.eength, anddesign characier�siics;
crr� nF �ox1� wo�Tx
sT�rroari�co�sr�iucTroN sr�c«rcnr�oN Docuna�rrrs
Revision: Macfi 9, 20�0
007200-1
G�NEI�AL CON� ITIOiJ S
T'age 22 of 63
2} it will reliably per�orm at least equally well the funciian and achieve the resulls
nnposed by the design concept oithe completed Project as a functior�ing whole; and
3} it has a proven record of pezfoz-mance and avai�ability of responsive service; and
b. Contractor certifies that, i�#� approved and incorporated into the Wark:
1) there vvill be no increase in cost to tlze City or increase in Contract Time; and
2) it will confoxxn substantially ta the detailed requirernents of the item named in i:lie
Contract Docurnents.
2. Subs�itute I�erns:
a. �f in Ciry's sole discretion an item of material oz- equipment proposed by Contracior does
not qualify as an "or-equal" itezn under Paragraph 6.OS.A.I, it naay be submitted as a
proposed subsiitute iiem.
b. Contractar shall submit suffcient information as provided below to aliow City to detern�ne
i�f the iiem of r�aaterial or equzpn�ent proposed �s essentially equivalent io that �amed and
an acceptable subsiitute therefox. Requests for review of proposed substitule iterns of
matexial or equipmen.t will not be accepted by City from anyone othex than Contractor.
c. Contractor shall make �vrritten applica�ion to City for re�view of a proposed substitute item
of material or equipment that Contractor seeks to fun�ish orr Use. The app�acation shaIl
coznply with Secizon O1 25 00 and:
I) shall certify that the proposed substitute item •ovill:
a) perfonn adequately the f�rnctions and achieve t�e results called for by the general
design;
b} be sirnilax in substance to ihat specified;
c) be suited to i�ae same use as t�at speci�ed; and
2} will state:
a} the extent, ii any, to which the use of the praposed substitute item will prejudice
Contrac�or's achievement of final completian on �une;
b) whether use of ihe proposed substifiute tiem zn the Work r�vilJ require a change in
any af the Co�tract Documents (or in the provisions oi any other direct cont7ract
with City %r other work on the Praject) to adapt the design to the proposed
substitute item;
C17'�YOF FORT WORTT�
STANDARDCONSTA[1CT[OAf SPP.CIF[CATION DOCUMEhI'l'S
Revision: Marh 4, 26�
007200-I
GENERAL CONDITION S
Page 23 of 63
c) whetl�er incarpoz��t'ron ar use of the proposed subsiitute item in connection vaith
the Warlc is subject to payment of any license fee or royalty; and
3} wilt identify:
a) alI varia�ions of the proposed substitute item from that specified;
b} available engineer�ng, sales, rnaintenance, repair, and replaceznent ser�ices; and
�} sha11 cantain an itemized estTmate of all cosY� or credits tk�at vvill result directly or
inclirectly from use oP such substitute item, including costs of redesign and Dama�
CIauns of othez- contractars affected by any resulting change.
B. Substitute ConstYuctionMethoc�s orProcedures: If a specifzc �.�neans, method, techtliq�e, sequence,
or procedut�e of construction is expressly required by t1�e Contract Docutnnenis, Contractox z�nay
fizrnish or utrlize a substitute zneans, method, technique, sequence, ox procedure of co�nstt�ction
approved by City. Contractor shall subir�it sufficient informatioza io allow City, in Ciry's sole
di�scretion, to deternaine f�at the subsiitutc proposed is eqLiivalenti to that expressly caIled fior by
the Contract Docutxzents. Contractor sf�all make written application to CiEy for review in the same
manner as those provided in Paragraph 6.�S.A.2.
C. City's Evaluation: City wilI be aIlowed a reasonable tirne within which to evaluate each
proposal oi• submittal made pursuant to Paragraphs b.OS.A and 6.OS.B. City may require Cantractor
ta furi�ish additional data about th� proposed substiitute. Ciry wilt be the sole judge o£accepiability.
No "or-equal" or substitute wi11 be ordez-ed, installed or utiliz,ed until City's review is complete,
vvhich will be evi.denced by a Change Order in the case of a subs�ituie and an accepied Submittal
for an "or�equaL" City wi11 advise Conteactor in writing of iis dcterrnination.
D. Special Guarccntee.• City may reqt�ire Coniractoz- to furnisl� at Cantractor's expense a special
perfarz�ance g�arantee, warraniy, or other surety with respect to any substitute. Contractor shall
indemnify and hold ha�rtles,s City and anyone directly or indirectly employed by them fYom and
against any and all claims, damages, losses and expenses (i�aciuding attorneys fees� ccrising out of
the use of substiiuted maie�ials or equipment.
E. City's CosiReimbursement: City wiIl record City's costs in eval�atitxg a suhstitute propos�d or
submitted by Contractar pursuani to Paragraphs 6.OS.A.2 and 6.OS.B. Whether ar �ot City
ap�roves a substitute so proposed or subz�ui�ted by Contractor, Cont�actor may be required to
reitnt�urse City far evaluating each such proposed substitute. Contractor rnay a�so be required to
reimburse City for the charges for making changes in the Confraci Documents {or in the provi�ions
of any aiher direct contractwiih City) resulting iro�x�. the acceptance o�eachproposed subst�tute.
F. Contractor's Expense: Coniractor shall provide all data in support of any proposed substituie or
"ox�equaP' at Contractox's expense.
ClTY OF FORT WOliTH
STATTTJAItDC01�TRUCTlON SPGCIF[CATIOM DOCUMENTS
Ttevision: Mach 9, 202D
oo�2oa-i
�E�ER,a� car�d irio� s
Pagc 24 of 63
G. City SubstituteReimbursement: Casts (savings orr charges) attribu.table to acceptance of a substitute
shall be incorporated to tl�e Conteact hy Change Oz�der.
H. Time ExZensians: No additzonal time wiJl be granted for substitutions.
6.06 Concerning Subcontractors, Suppliers, and Others
A. Contractox s�all perfaz-m with his own organization, wark of a �alue not Iess than 35% of the
value embraced on the Cont�-aci, unless othe�-wise approved by the City.
B. Coniractor shall not employ any Subcontractor, Supplier, or ather it�dividual or entity, whefhex
initially or as a replacement, against whom City may have reasonable o�jectian. Contz'actor shall
not be xequired to ezx�ploy any Subconiractor, Supplier, or other individual or entity to futnish or
perform any a� the Wor� against whozn Contractor has reasonable objection {excluding t,�ose
acceptable to City as mdicated in Paragraph 6.Ob.C).
C. The City may fronn time to tinne require ihe use of certaiza Subcontractors, Supp1'rers, or other
individuals or cntities on the project, and will pxovide such requirements in the �upplemeniary
Conditians.
D. Minority Business Enierprise Compliance: It is City policy to ensure ihe fu11 and equitable
participation by Minority Business Enterprises {MBE) in ihe procuremeni oi goods and services
on a contrac�l basis. Zf the Contract Dociunenis provide for a MBE goal, Contrac�or is required
ta comply wit� the inteni af the City's MBE Ordinance {as amended) by the following:
1. Coniractor shall, upon request by City, provide coznp�ete and acctarate infarm.ation regardir�.g
actual wor� perfonned by a MBE on tk�e Contract and paymcnt therefor.
2. Contractor vvill not make additions, deletior�s, or su�stitut�ons of accepted MBE without
written consent of the Cit}r. Any unjustified change or deletion shall be a material t�reach af
ConYract and may result in debarment in accordance wit�a ihe procedures outlined in the
Ordinance.
3. ContY'actor shall, upon requesiby City, allow an audit andlor examination of any boo�s, records,
or �"iles in the possession of the Contractor that will substantiate the actual work peri'orzx�ed by
an MBE. Materiai �misrepresentaiion of any nature will be grounds fox termination of ihe
Contract in accordance with P aragraph 15.02.A. Arny such rnisrepresentatron rz�ay be grounds
for clisqualif�ica�ion of Cont�actor to bid an future contracYs with the Ci�y fox a period of
not less than three years.
E. Contractor shall be fully �esponsible ta City for aIl acts and oznissions of tk�e Subconiractors,
Suppliers, and other indivzduals or ezatities perforniing or fiu�nishing any of the Work just as
Cont�-actor is responsihle for Contractor's own acts and omissions. Nothing it� the ConY�act
Docunaents:
CITYOF FOItT WORTH
STANDARDCONSTRUCTION SPECIFiCA7'ION DOCUMEhi'['S
Revision: Madi 9, 2020
oa �z oa - i
GENEF�AL COND I710N 5
1'age 25 of 63
I. shall creatc for the benefit of any such Subconfractor, Supplier, or other zradividuai or entity
any cont�actual rela.tionskuip befween City and any slich Subcontracior, Supplier ar other
indi�idual or cntiry; noz-
2. shall create any obligation on the part of City to pay or to see to the payment of any znoneys
due any such,Subcontractor, Supp�er, or othef indivzdual or entity excep# as may atherwise be
required by Laws and Regulatior�s.
F. Contractor shall be soIely respot�si�ble for schedu�rng and coordinating the Work of S�bconteactoz-s,
Suppliers, and other mdividua ls or entities perfoX-rning or furnishit�g any of the Work under a direct
or indirect contract with Contractor.
G. All Subcontt'actors, Suppliers, and such oiher inc�ividuals or entities perforrtvng or fia.r�shing any
of the Worl{ shall communicate with City through Contractor.
H. AlI Work performed For Contractor by a Subcontractor or Su�plier will be pursuant to an
appropriate agreement between Contractor and the Sul�coniractor ar Supplier which specificaIly
binds the Subcontracto� or Supplier to �e applicable �ern�s and conditions of ihe Contract
Documents for the benefii of City.
6.07 Wage Rates
A. Duty to pay Prevailing Wage Rates. The Contractor sha�I comply wit1� all requirements of
Chapter 2258, Texas Goveznment Code {as amended), including the payr�raent of not less than the
rates detextnuled by the City CounciI af t�e City oFFort Worth to be the prevaiIing wage rates in
accaz-dance with Chapter 2258. Such prevailing wage rates are included in these Contract
Documents.
B, Penaltyfor Violation. A Cantractor or any Subcontractor who does not pay the prevailing wagc
shal� u�on demand made by t�e City, pay io tlle City $60 �or each worker employed %r each
caIendar day or part of the day that the workex• is paid less �i�an the prevailing wage rates stipulate d
in these contract documents. This penalty shaIl be retained by the City to offset its admitai,strative
costs, pursuant to Texas Government Code 2258.023.
C. Complaints of Violrxtions and City Determincation of Good Cause. On receipt of infarmatio�,
incIuding a complaint by a vcrark�r, concerning an alleged violatian o� 2258.023, Te�as
Government Cod�, by a Contractor or Subcont�actax, t�e City sha11 make an ix�itial
defermination, be%re the 31st day afte� the date the City receives the information, as to wheiher
good cause e�sts to believe that the violaiion occur�-ed. The City shaIl notify in writing the
Contractor or Subcontractor a�d any affected worker af its iniEial determinatian. Upon the City's
deteiYiinlation that there is good ca�se Eo be�eve the Coniractor or Subcontxactor has violated
C�►apter 2258, the City shall retain �he fuIl amounts claimed by the cla.imazzt or claimants as the
difference betweenwages paid and wa�es due under the p�e�ailing wage rates,such amounts being
subtracted from successive progress paynlents penciing a final determic�ation of the �ioIatzon.
CITY OF FORT WORTH
STAAIDARDCdNSTRUCTION SPF.CIFICATiOId DOCLJNIFNTS
Rcvision: Mat�t 9,?L12D
007200-I
GENEF2AL CON[l ITION S
Yagc 26 af 63
• i'
D. AYbi�ration Required �Violation NntResolved. An issue relating to an a�leged violation of Section
2258.023, Texas Govemment Cade, including a penalty owed to the City or an affected worker,
shall be submitted to binding axbitration in accordance rx�ith the Texas General Arbitzat�on Act
{ArEicle 224 et seq., Revised Statutes) if tl�e Co�t�actar or S�bcont�actor and any affectedworker
does not resolve the issue by agree��nentbe�ore the 15th day afterthe datethe Ciry �xaal�es its uutial
determination pu�rsuant to Paragraph C above. If the persons required ta arbitrate under this
seciion da nat agree on an arbitrator before the 1 Ith day afterr the date Y�at arbitration �s requu-ed,
a disirict cou�t shall appaint an arbitrator on the �etition of any of the persons. The City is not a
party in ihe axbitration. The decision and award of the arbit�'ator is fit�al and binc1i�ng on all parties
and may be enforced in any court of competent jurisdicrion.
E. Records to be MainZained. The Contractor and each Subcontractor sha11, for a period of ihree (3)
years following the date of acceptance of the �vorlc, maintai� arecords ihat show (i) the naxne and
occupation of eachworkez• emp�oyed by the Coni�actor in the constxuct�on of the Worl�pro�vided
for i�n this Contract; and (u) the actual per diem wages pazd to each �,vorker. The records shall be
open at all reasonable hours fox inspectian by kx►e City. The provisions of Paragraph 6.23, Right
to Audit, shall pertain to this inspection.
F. Pr ogress Payments. With each progress paymeni ox payroll periad, wluchever is less, tk�e
Contractor shall submii an affdavit statin.g that the Cont�actor has conapIied with t�e requirements
of Chapter 2258, Texas Governznent Code.
G. Posting of Wage Rates. The Contractor shall post pz'evailing �,vage rates in a conspicuous place at
all times.
H. Sul�contracto� Camplic�nce. The Contx�actor shall include in its subcontracts ancl/or shall
otherwise require all of its Subcontraciors to camply with Paragraphs A through G above.
Patent Fees and Royalties
A. Contractor shall pay a1l license fees and royaliies and assume aIl costs incid�nt to the use �n the
pez-£orrnance of the Wark or the incarpoxatian in the Work o� any in�ention, design, process,
product, ar device which is tb.e subject of patent righis ot� copyrights held by others. �f a particular
invention, design, process, product, ar device is specified in the Contract Documer�ts for use in the
per%rmance of the Work and if, to the a.ctual I�awIedge of Cziy, its vse is subject to patent rights
or capyrights calling for the payment of any license fee or royalty �o others, the existence of such
rights shal� be disclosed by City in �he Contract Dacuments. Failure of the City to disclose such
infornaatian does not relieve t�►e Contractoz- frorn its obligations to pay for the �rse of said fees oz
royaI�ies io others.
B. To ihe fullest extentperrnitted by Laws and Regulatian,s, Contracto� shail indemn� and hold
ha�'mless City, f�'om and against all claims, costs, losses, and damages �inclzuiing butnot Zimiied
to all fees and charges of engineers, archi�ects, attorneys, and olher professionals and all court
or arbilration or aiher dispuie �esolution costs) arising out of or relating to any infringement af
patent rights ar copyrights incident% the use in the perfo�manee of the Work or resultingf�'om
C1T'Y OF FORT WOItTH
STANDARDCONSTRUCTION SPEC[FICATION DOCiJMENTS
Revision: NEt�di 9, 74?A
007200-1
C7��lERA� CONn IT ION S
f'agc 27 of 63
the incorporation in ihe Work of any inveniion, d�sign, p�acess, product, or device not specified
in the ConiractDocuments,
6,49 Pertnits and Utiliiies
A. Contractnr obiained permits and licenses. Contractor shaIl obtain a�d pay fior aI� const�uction
perxxaits and �icenses e�cept tl�ose pro�ided for in the �u�plementa�y Conditians or Contract
Documents. City shall assist Co�tractor, when necessa�-y, in obtaining sucn permits and �icenses.
Contractor shal.i pay all governtx�.enf;al charges and it�spection fees necessary for tl�e prosecution af
the Work which are applicable at the time of opening of Bids, or, if ihere are no Bids, on the
Effective Dat� o� t11e A�eement, except �or permifis provided by the City as spec�ed in b.09.B.
City shaIl pay aIl ch�arges of utility owners for coruaections for providing parmanent ser�vice to the
Wo�lz.
B. City obtainedpermits and licenses. City will obtain and pay for all permits and licenses asprovide d
%r it� the �upplemeniary Conditions or Contract Documents. It will be ihe Contractor's
respor�.�ibility to carzy out the provisior�s af the pe�it. If the Cont�actor initiates changes io the
Contract and the Crty approves the cha�ges, fhe Contractar is respons�ble for obtait�rng clearances
and coordinating with the apptopriate reguIatoiy agency. The City will not reimburse ihe
Cant�-actor �or any cost associafed with these reqlurements of any City acquired �ermit. Tkie
foliowing are permits the City wiIl obtain if zequired:
1. Texas Department of Transportatio� Permits
2. U.S. Army Cozps of Engineers Permits
3. Texas Coxx�niissian on Environmeniai Quality Permits
4. Railroad Company Permits
C. Outstanding permits and licenses. The City anticipates acqu.isition of and/or access to perz�nit�
and Iicenses. Any outstandirig permits anc� licenses are ant�cipated to be acquired in accordance
with fhe schedule set forth in tlie �upplementary Condi�ions. The Project Schedule ��ibmitted by
�ie Confractor itz accordance with the Contract Dacuments must cornsider any outstanding permits
and licenses.
b.1 Q Laws and Regulations
A. Contractor shall give all notices required by and sha�1 corr�ply with all Laws and Regulations
applicable to the performance of tk�e Work. Except s;vhere othet-wise expressly �equired by
applicable Laws and Regulatiozas, the City sha�l noi be responsible for monitorzt�g Contractor's
compliance wi�h any Laws ox Re�alations.
B. I�Cantractor p�r%rms any Woi•k knowing oz- having reasat� to l�now thai it zs contrary to Laws or
Re�lations, Conlractax shall bear alI clazms, costs, losses, and damages (z�cluding but nai �uted
to all fees and charges of engineers, axchitects, atta�-r�eys, and other professionals and all
crrY or rox�r wo�trx
STAT;DARDCONSTItIICTION SPEC�FICATION DOCUMENTS
Revision: Madi 9, 2D20
00�200-�
GENEf2ALC0iJDITiON S
Pagc 28 of 63
coiu-1 oz- arbitra�ion. or oiher dispute resohxtion costs} arising oui of or relating ta such Worl�.
However, it shall not he Contracto�•'s �csponsibility to �make certain that the Specifications and
Drawings are in accorda�ce with La�s az�d Regulations, but this shall not �elieve Contractor of
Contractor's obligations under Paragraph 3.02.
C. Changes in Laws oz- Regulaiions not knawn ai the tzme of opening of Bids haviz�g; an effect on
the cost ar tirz�ze of perfoz�aance of ihe Woxk may be the subject of an adjusfrnent in Con.tractPrice
or Contract Time.
6.11 Taxes
A. On a contract awarded by the City, an organization which qual�f'zes for exernptian plusuant to
Texas Tax Code, Subchapter H, Seciiorr� 151301-335 {as amended}, the Contractar may purchase,
rent or lease a1� material�, supplies and equip�naent used or consumed in the performance o� this
contx�act by isst�ing to his supplier an exemption certificate irn lieu of the tax, said exemption
cert�ficate #o comply with State Co�x�pt�aller's Ruling .QO'1. Ar�y such exemp�ion cextifcate issued
to tl�e Contt-actor iri lieu of the tax shall be subject to an.d shall cornply with the provision of State
ComptroIler's Rul'mg .O1 I, and any othet� appficable rtzl�t�gs pertaining to the Texas Tax Code,
Subchapter H.
B. Texas Taxperrtiits and inforrnation �r�aay be al�tained from:
1. Comptroller of Public Accounis
Sales Tax Division
Capitol Station
Austin, TX 787J ]; or
2, htip•//www windor�.state.tx.us/taxinfo/ta�'orms/93-forms.htmI
6.12 Use ofSite and Othert4reas
A. Limitation on Use of Site and Othe�Areas:
1. Contractor shall confine constructzon equipment, the storage of �xaaterials and equipment, and
the operations oi workers to the Siie and other areas pez-rnitted by Laws and Regulatioz�s, and
shall noi unreasonably encuznber the Si�e and other areas with construction equi�ment or otl�er
rx�aterials or equipment. Con�ractar shall assume full r�sponsibility for any darr�age to any such
land or area, or to the owner or occupant �hereo£, or of any adjacent land or areas r�sulting
from the perforrnance of the Work.
2. Ai any iime when, m the judgment of the City, the Contractor has ol�stxucted or closed ar is
cax-tying on opexations it� a portion of a street, right-of way, or easement greater than is
necessary %r proper execution. of t11e Work, ��.e City may require the Contractor to fmish th�
seciion on which operations are ru� progress before work is coz�nmenced on any additianal
area of t�e Site.
CITY OH PORT WORTH
STANT]ARDCOMSTRUCTION SPECIFTCATION DOCUMENTS
Revision: Madi 9,?�Y1(l
oa�zao-i
GENERALCONDITIONS
Page 29 of 63
3. Should any Damage Claim be made by any such owner oz- occUpant because of the performance
of fhe Work, Contractor shall promptly attempt to resoive the Damage Claim.
4. Pursuant to Pa�agraph 6.21, Conirc�ctor shall indernnify and hold harmless Ciiy, from and
against all claims, costs, lvsse,s, anddamages arisingnut ofor Yelating to any claim or action,
legal or equitable, brought by any such owney� ot� occupant againsi City.
B. Rerrtoval of Dehris Du�ing Perfnrrnance of the Work: D�u'ing the progress of the Wot'k
Contractor shall keep the Site and other areas free from accutx�.uIations of waste rnaterials, rubbi�h,
and other debris. Removal and disposal of such waste matertats, rubbish, and other debris shall
canform to applicable Lavvs and Regulatroils.
C. Site Maintenance Cleaning; 24 hours after wz-iiten natice is given to the Contractor that the
cl�an-up on the job site is proceeding in a�nanner unsat�sfactory to the City, if the Contractor fails
to correct the unsatisfactory procedure, the City may take such direct action as the City deems
appropriate to co�z-ect the clean-up deficiencies cited to t�e Ca�.t�actor in the wz-itten notice
(by Ietter or electrotuc communzcation), and the costs of such dzrect action, pl�as 25 % of such
costs, shall be deductcc� I'rom the monies due o� to become due to t�ie Con�ractor.
D. �inal Site Cleaning.• Priox to Fir�al Acceptance o�' �he Wor� Contractor shall clean the Site arad
tl�e Work and make ii ready for utiIizatian by City ar adjacent property ownex•. At thc compleizon
of the Work Contractor shall reinove froz�a the �ite all tao�s, appliances, construcfion equipnrzent
az�.d machinery, and surp]us materials and shaIl resiore to original condition or better all property
dist�irbed by the Work.
E. Loading Structures: Coniractar shall nat Ioad nor p�rmit any part af any str'ucture to be loaded
in any mar�aner that wiIl endanger the structure, nar shall Cont�actar subject any part of lhe Woxlc
or �djacentproperty io stresses ar pressures illai will endanger it.
6.13 kecord Documents
A. Contractor shal( maintain in a safe place at the ,Sitc or in a place designated by the Con�•aciar and
approved by the City, one {1) record copy of all Drawings, Spec�cations, Addenda, Change
Orders, Field Orders, and wiritten interpretatiazls and cla.rificat�ons in good order and annotated to
show changes made duri.ng construction, These record documents together vuith all approved
Sar�zples and a countezpa�� of a11 accepied �ubmittals will be available to City for reference. Upon
completion of the Wark, these recoz-d documents, any operation and znaintenance manuals, and
�ubmittals wil[ be delivcred to City �riar to Final Inspection. Contractor shall include accurate
locations fox buried and imbedded iiems.
6.14 5'afety and PNoiection
A. Contractor shall bc ,�olely responsible for mitiating, �nainiaining and supervising al.l safety
precauiions and prograrns in conncction with the Work. Such responslbiliiy does not relieve
Subcon�ractor,s of �heir respons�biiily for the safety of persons ar properLy in the pexformance of
thcir work, nor for compliance with appl�cab�e safety Laws a�d Regulaiion.s_ Cantractor shalI
CITY OF FORT WOTtTH
STANBARDCdNSTRUCTIdN SPECIFICAT[ON llOCiTMFNTS
Re�isioil: Maiit 9,2(Y20
oo�z ao- �
GENERAL CON� ITION S
Page 30 of G3
talce all necessary �recautzons for �he safety of, and shall provide the necessazy protection to
prevent damage, li1JLiTjT OP 1055 t0:
1. alI persons on the Site ar r�vho zxzay be affected by t.�e Worl�;
2. all �he Work and materials and equipment to be incorporated therein, whether in storage on
or off the Srte; and
other propexty at the Site ox adjacent ihereto, including tirees, shtlzbs, lawns, walks,
pavements, roadways, st�uctures, utili�ies, and Underground Faciliiies not designated for
removal, relocation, or replacement in tbe course of construction.
B. Contractor s�all comply with a11 applicable Laws and Regt�lat�ons relating to ihe safety of
persons or properiy, or to the proteciion of persons or property f'rom daz�age, injury, or loss; and
shall erect and maintain all necessary sa�eguards for such safety and protectzon. Contractor shall
notify ow�ers of adjacent property and of Underground Facilities and other utzlity owners when
prosecut�on o� the Work may affect them, and shall cooperate with tl�em in ihe protecfion,
xemaval, relocation, and replacezx�ent of their property.
C. Contractar shall comply with the applicable requirements of City's safety programs, if any.
D. Contraciox s�all inform City of the specif'ic requirernents of Contractor's safety program, if any,
with which City's employees a�d representatives zxaust comply while at the Site.
E. All. damage, injtuy, ar loss to a�y properry referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused,
directly or ind�cctly, in whole or in part, by Contractor, any Subcontractorr, Supplier, ar any other
�dividual ar entity directly or indirectly e�nnployed by �ny of them to perFarn� any of the Worlc, ox
a�yone for whase acts any of tl�em may be Iiablc, sliall be remedted by Contractox.
F. Con�i-actor's dut�es and respor�asibilities for safety and for �roiection of the Wor1� sha�l cont�ue
until such time as ail the Work is completed and City has accepted the Work.
b.IS SafetyRepresenlative
Contractor shall inform City in writing of Cont�•actor's designated safety representative at tne Si�e.
6.16 Hazard CamrraunicationPrograms
Coniractor shall be responsible for coordanating any exchange af material sa£ety data sheets or other
hazard comnaunicafiion infor.rzaation required to be made available ta or cxchanged bettiveen or arr�ong
employers in accordance with Laws or R�gula�ons.
6.1'7 EmeYgencies and/orReclification
A. In eznergencies affecting the safety ox protec�ion of persons or the Wor�C or property at the �Srte or
adjacent thereto, Conbractor is obligated to act to prevent threatened damage, injuty, ar loss.
Coniractor shall give City prornpt written notice if Contx-acto�' beIieves t�ai any sign�icant
CITYOFFOR`1' WORTH
STANDARI7CONSTRUCTION SPECIPTCATION DOCTJMEZ�lTS
Revision: Ma� 9, 2020
aa�zoo-i
GENERAL CONn 1730N 5
Pagc 31 of 63
changes in the War� ar variaiions from the Conh-act Docuinents have been caused th�reby or �re
requited as a result thereof. If City deter�nines that a cl�ange in the Contract Documents is requixed
because of the actian iaken by Contractor =izi response to such aza emergency, a Change Ordez• rnay
be issu�d.
B. Should f�e Contractor fai� to z-espond to a request from the City to rectify any discrepancies,
ornissions, or carrection necessary to conforin with l.he requirements o� the Cont�act Documents,
the City shaIl give the Contractor written notice that such work or changes are to be perfort�ned.
The written notice shall dir�et ai�ention to the discre�ant condition and request fil�e Contractox• to
take rezxz�dial action to correct the condition. In the evez�t the Contractor does not tal�e positive
steps to fiulfill this written request, or does not show just cause for not taking t,�e proper action,
wit�l�in 24 hours, the City nlay take such remedia� action with Ciry forces or by cont�act. The City
shali deduct an amount equal to �e entire costs for such remedial act�on, pIus 25%, from any
fi�nds due or become du� the Cantractor on tlze Project.
6. �8 Submitials
A. Contractor shall submit required Submittals to City �or review and acceptance in accordance
with the accepted Schedule of Submittals (as xequired by Paragraph 2.07). Each submittal will be
ideniified as City may requir�.
1. Submit number of copies spec�ed izz the General Requirezxzents.
2. Datasho�crn on the Submitials will be complete with respectto quantities, dimensiozas, specificd
performance and desig� criteria, materials, and sinvlar data to show Ciry �e services,
rnater�als, and equiipznent Coniractor proposes to provide and to enable City to review t.�e
m�ormation foz- tlie limited �urposes requr�red by Paragraph �.18.C.
3. S�abmittals sub�nitted as herein provided by Coiitractor and reviewed by City for
canfox-�x�ance with the design concept shall be executed in corzformify with #he Contract
Documents unless otl�erwise required by Ciiy.
4. When �ubmitta]s are submitted �or the purpose of showing the installation it� greater de#aii,
theff review shall not excuse Contractox fi•om r�quirements shown. on the Drawings and
Specif'tcations.
5. For-Information-Only submittals upon which the City is not expected to conduct review or
ta1�e responsive action may be so identified in the Contract Documents.
6. Submit required numberr of �amples specified in the Specifications.
7. Clearly idcnt�fy each Sample as to material, Supplier, pertinent data such as catalog ntunbers,
�e use for which intcnded and otk�er data as Ciry may requi�re to enable Ciry #o review the
subnaittal far the ]imited purpose,s required by Paragraph 6.1$.C.
ciTY oF r oxT wo�t�rx
STANDARDCONSTR[1CTIDN SPECIFICATiON DOCUMENTS
Revision: Marh 9, 2020
D07200-1
GENERAL COND I710N 5
I'age 32 of 63
B. Where a Submittal is required by the Contract Documents orr t�e Schedule of S�abmittals, any
reIated Work perfoi•med prior to City's review and acceptance of the p�rtinent submittal vvili be
at the sole ex�ense and responsibiltty of Coniractor.
C. City's Review:
1. City will provide timely review o� requued Submitta�s in accardance with the Schedule of
Subm�ttals acceptable to City. City's xeview and acceptance will be only to determine i.f the
iteins covered by the submittal� wilI, aftex insiallation or incorporation in the Work, conforzxa
ta the i�formation given in the CaniractDocuments andbe compatible with the design concept
of the conapleted Project as a fiuictioning whole as indicated by the Coniracfi Documents.
2. City's review and acceptance will n.ot extend to rrzaeans, met�ods, techniques, sequences, or
procedures of construction {except �rvhere a pariicular �neans, metl�od, technique, sequence,
or procedure of construction is specif'rcally and expressly called for by t�e Cantract
Docurnents} or ta safety precautions or programs incident t�ereto. The z�eview and acceptance
of a separaie item as such wifl not indicate approval of ihe assembly in which the �iem
fianctions.
3. City's review and accepYance shalI not re�ieve Contractor �'ronn responsibi.lity for any
variation from the requirements o� the Contract Documents �aniess Contractor has complied
with the requirements o� Section Ol 33 00 and City has girven wriiten acce�tance o� each
suc� variation by specific written natation thereof incorporated in or accornpanyitig ihe
SubmittaL City's review and acceptance shall nat rel�eve Coniractor from respons�ility fox
complying with the requirements of the Contt'act Documents,
6.19 Continuingthe Work
Except as o�herwise provided, Contractor shaIl carry on the Work and adhere to t.�:e Project Schedule
during all disputes or disagreements with City. No Work shal� be delayed or postponed pending
resoiution of any disputes ar disagreements, except as City and Contracior may otherrw�.se agree zn
writing.
6.20 Cont�actor's Gene�-al Warranty and Gunrantee
A. Contractor warrants and guarantees to City that all Worrk will be in accordance with thc Cont�ract
Dacuments and will not be defective. City and its off'icers, directors, mer�.bers, parh�iers,
eznployees, agents, consuliants, and subcontractors shaIl be entitled to xeIy on representation of
Con�ractor's vc�az�ranty and guarantee.
B. Contractor's warran.ty and guarantee hereunder excludes defecis or darrnage caused by:
�. abuse, modif'ication, or improper mainienance or operaiion by persons other t1�an Contractorr,
�ubcaniractors, Suppliers, ar any other individual ox entity for wham Contractor is
xesponsible; or
C11"Y OF FORT WO1tTH
S'TAN�ARDCONSTRUCTION SPECIFICATION DOCUMF.NT5
Revision: Mad� 9, 7420
OD 72 OQ - I
GENERALCONDITIONS
Pago 33 of (3
2. norinal wear and teaf� under nannal usage.
C. Coniractor's obligation to perform and complete ihe Work in accordance with the Contract
Dociunents shall be absohzte. None of tlze following w7i11 constitute az�. acceptance of Work that is
not in accordance with the Contraci Documents or a release of Cantractor's obligation to perfarzn
f11e WorIc rn accordance wikhthe ContractDocur�aents:
1. obs�rvations by City;
2. r�commendatron ar paynnent by Ci�y of any progress or final �ayment;
3. tlie issuance of a certif'icate of F�nal Acceptance by City or any payment related thereto by
City;
4. use or occupancy of the Work or any part thereof by City;
5. any review and acceptance of a Submittal by City;
b. any inspection, test, or approval by otl�ers; or
7. any correction of defectiv� Work by City.
D. The Contractor shall reinedy any defects or danaages in the Woric and pay for any damage to
other work or pxoperty resulting therefrom which shall appear within a period of itivo (2) years
from the date of Final Acceptance of the Wori� unless a loz�ger period is specif�ied and sha11 furnish
a good and sufficient maintenance bond, com�lying wit� tI�e rec�uirernents af Art�cle
5.02.B. The City will give notice oFobser�ved de%cis with roasonable promptness.
6.21. Indemnificano��
A. Contractor cove�ants and agxees to inde�nify, hold harmless and defend, at its own
expense,the City, its ofificexs, servants and employees, from and against any and aII clai�
arising out of, or alleged to arise out of, the work and services to �e perforrned by the
Contractor, its officers, agents, employees, subcontractors, licenses ar invitees under this
Contract. THI� TNTIFMNIFYC,'ATif)N PR[�VTfiTON I� �PF('TFif"�T T Y TNTFNDFD TO
OPER TE AND B FFFf"`I'IV + EVF'N IF iT I� AT T(�Fn OR PRQV N THAT AT T
OR SOMF nFTUF naMa�:F�BETNr�O i YHTwFRF rari�Fn 7 y�{�i OAIN
PART. RY ANY ACT. nMT� SInN (�R NF . TCFN OF THF iTV. This indemnity
provision is intended to include, withou� lim�tatian, indemnity for costs, expenses and legal
fe es incurred by the C�ty in defending against suc� claiims and causes of actio�s.
B. Contractorcovenantsandagreestoindemnifyandholdharnnless,atitsowxiexpense,theCity,
its officers, servants and emp�oyees, from ancl against any and all loss, c�amage or destxucfron
af property ofthe City, arising out o� or alleged to arise out o� the work and services �o be
performed by the Contracior, ifis of�'icers, agents, exnployees, subcontractors, licensees ar
invitees under this Cont�-act. THIS INDEMNIF`I ATT�N PROVI��nN i�
crrYor �ox-r wox�rx
STAI�lDARDCOIVSTRIICT[ON SPEC]F[CATiON Df]CUMENTS
ftevision: Ma� 9, 2D20
007200-1
GENERAL COiJpiTION S
Page 34 af G3
' �\�_. � 1 �..�--�� .:_\� i_—_�. .---- — I-, --
_�.- .._ - - -
- - - - � � - - .-_ . . . . � � � [
• � �� ; � � � .__ � G_ i � . ►_ . � ._. 1 —r. �- -.. � s ���..G_ _ � ___ _,
.. _.r._� - - . . _— -
�- �- -�-__ � � ■I�_� ..�.�—� _�i' � �-- - , ----�r ��
� � + �_
�.22 Delegation of P�ofessional Design Servic�s
A. Coz�tractor will not be required to provide professional design services unless such services a�e
specifcally required by the Contz�act Documents for a portion of the Wor� or unl�ss such services
are requiz�ed to carryout Contractor's responsibilities for consialiction means, nnethods, techzazques,
�equences andprocedures.
S. If prafessional design services or certifzcations b� a design professional related to systems,
materiaJs or equipment are specifically required of Contractor by the Contract Doc�ux�ents, City
will specify all perforzxaance and design criteria t�at such services must satis�y. Contractorr shall
cause such services or cez-afications to be provided by a properly licensed professional, r�vhose
si$nature and seal shall appear an all drawirigs, calculations, spec �ications, certifications, and
Subixaittals preparedby such pxofessional. Submittals related ta the Wox'� designed or certifed by
such professional, if prepared by others, sha1� bear such pz•ofessional's written approval when
submitted to City.
C. City s�all be entitled to rely upon xhe adequacy, accuracy and completeness of the services,
cea•tificatioi�s ar approvals performed by such design professionals, provided City has specified
to Cont�acior performance and design criteria that such �er�vices rnust satisfy.
D. Pursuant to this Paragrap�i 6.22, City's review and acceptance of design calculafiions and design
d�rawings will be oniy far the limited purpose of checking for con%rmance with performance and
c�esign criteria given and the desigr� concept expressed zn the Cont�act Documents. City's review
and accep�ance of Submittals (except design calculations and design drawings) �will be only far
the purpose stated in Paragraph 6.18.C,
b.23 Right ta Audit
A. The Contractox� agrees �hat the City s�all, until the expiration of three (3} years after fit�al
payment under this Canfiract, have access to and the righ� to examine and photocopy any directly
pertinent baoks, documents, papers, and records of the Cont��actor involvzng transactions relating
to this Contract. Contractar agrees that the City shall have access during Regular Working Hours
to all necessary Contractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compIiance with the provisians of this Paragraph. The City s�all
give Contz-actor reasonable advan.ce notice of iz�tended audits.
B. Cont�actor fiirther ag�'ees to include in all its subcontracts hereunder a provision to the effect that
t�e subconf.ractor agrees that the City shall, until the e�iratio� of three (3) years afte�• f�nal
payz�r�ent under llais Coniract, have access to and the right to examin.e and photocopy any directly
pet��nezat books, documents, papers, and records of such Subcontractor, involving tx'ansactions to
the subcontract, and fiu'ther, that City shall ha�e access during ReguIar Worlcing IIo�z's to all
C1T'Y OF FOR'I' WORTH
STANDAADCONSTRLfCi'ION SPECIFICA'I'ION llOCUMENT5
Revision: Madt 9, 2iD20
oo�zao-1
GENERAL CONDiTIpN S
Pagc 35 of b3
S�bcontractor facilities, and shall be provided adequate and appropria.te worlc space in order to
conduct audits iu compliance wzth the provisions o� �is Paragraph. The City shall give
�u6contractox zeasonable advance notice o� intended audits.
C. Contractor and Subconiractor agree to photocapy such documents as z�ay be requested by f�e City.
The City agrees to reimburse Cantractor for the cost of the copies as follows at the rrate published
in the Texas �ldminist�ative Cade in e�fect as of ihe time copying is performed.
b.24 Nondiscrimination
11. The City is xespons�b�e for operating PubIic Transporiation Pragrams and implementing transit-
related projecis, w�uch a.re �unded in part witk� Federal financial assistailce awarded by ihe U.�.
Department of Transportation and the Federal Transit Adniulisiration (FTA}, without
discriminatmg agaznst anyperson in ihe United States on the basis of race, color, or rtational oxigin.
B. Title T�1; Civil Rights Act of 1964 as amended.
the Aci and �e ReguIations as fizrther defined
receiving Federal assistaz�ce.
Contractor shall compiy vcrith the requirez�rzentis af
in the Supplementazy Conditions for any project
ARTICLE 7--� OTHER WORK AT THE S�TE
7.01 Related Work atSite
A. City inay perfarm other work re�ated to the Project at the Site with Ciry's empioyees, or other
Ciry contx�actors, or through ot�cr direct contracts therefar, or have other vvork per%rmed by utility
owners. If such other war�C as not noted in tkze Contract Documents, then written �otzce tI�ereoi
wi� be given to Coniraciar prior to starting any such other wo�k; and
B. Contracior shall afford each other contractor who is a party to such a direct cont�act, eacY�utiliiy
owner, and City, if City is performing other work with City's employees or other City contractoxs,
proper and safe access to the Site, pxovide a reasonable opport�nity for the u�troduciion and storage
of materials and equipment and the execution of such other work, and praperly cooz-dit�ate thc
Work with the�rs. Contractor shall do alI cutting, fitting, and patching oi the War� that may be
required to properly connect or otherwise make its several parts came together and properly
integrate with such other work. Cont�actor shall not endanger any work of others by cutting,
excavating, or otherwise altering such work; provided, howevcr, t.�at Cont�actor may cut ox aiter
ati�ers' work with the wriften co�sent of City and the others wnose woxk will be aifected.
C. 7f ihe proper execution ar results of any part of Contractor's Worl� depends upon woxl� perfonned
by others urider this Article 7, Contracio� shall insp�ct such other wark and proznptly report to
City m writing any delays, defects, ar deficicncies in such oiher work that render it unava�lable
or unsuitable far the proper execution and results of Contractor's Work. Contractor's failure to so
report will consiitutE an acceptance of such athez- vvork as iit and proper for integatian with
Contractor's Wark except �ox latent dcfects in the work provided by others.
CT`i'Y OF FORT WORTii
STANllARDCONSTRUCT[QN SPECiF[CATIDN DOCUMri�TTS
Revision: Mad� 9, 2020
fl072QO-1
GENERAL CONDITION S
Page 36 of G3
7.02 Coo�dination
A. If City intends to coniract with others for the perFormance af othex worI� on the Project at the
Site, the following will be setforth in Supplernentary Conditions:
1. the individual or entity who w� have authoriry and respansibiliry for coordination of the
actzaities among the vaxious contractors wz11 be iden�fied;
2. the specific matters to be covered by such auihority and responsx�bzGty will he iiemized; and
3. the extent of such authority and r�spons�iliiies rx�i11 be provided.
B. Unless otherwise pravided in the Supplez�nentary Conditions, City shaIl have auihority �or such
coordirzatzon.
ARTICLE 8 — CITY'S RESP�NSISILITIES
$.O1 Conzmunications to Cont�'actor
Except as otherwise provided in the Suppleinez�tary Conditions, City shall issue all co�munications
to Contractorr.
8.02 Furnish Data
City shall timely fiuYiish tbe data required under the Contract Documen�s.
8.03 Pr�y When Due
City shall make payments to Contt-actor in accordance with Article 14.
8.04 Lands and Easemenis,• Reports and �'ests
City's duiies with respect to providing lands and easements and providing engiz�eering surveys to
estabiish reference points are set forth rn Paragraphs 4.01 and 4.05. Paragaph 4.02 xefers to City's
identifying and znaking available to Cont�actar copies of �eports of expJora�ions and tests of subsurface
cond'ztians and drawings oP physical conditions relating to e�sting surface or subsurface structu�res at
or cozatiguous to ihe Site ihat have been utilized by City in preparing the Cont�ract Documents.
S.OS Change Ot�ders
City shall execute Change Ordexs in accordance with Paragraph 10.03.
8.06 Inspectians, Tests, and App�-ovals
City's xesponsibility wiih respect io cextain insp�ctions, tests, and approvals is sei forth m Paragraph
13.03.
C11"YO�FpRT WORTH
STAiVDARDCONSTR[1CTION SPF.CIF[CA�iON 1JOCUMENTS
Revision: Madt 9, 7_(Y�0
oo�zoo-�
G�NERAL COND li ION 5
1'age 37 of 63
8.07 Limitations vn City's Responsibilities
A. The City shall not supervise, di�•ect, or have cantroi or authority ove�•, noz- be responsible for,
Canttactor's ineans, methods, iechniques, sequences, or procedlu�es of construciion, or the safety
precautions and prograzx�s zncident thereto, or �ox any faiinre of Contiractor io comply with Laws
and Regulations applicable to the pexformance oi tlie Woxk. City will not be responsible for
Contractor's failut•e to periarm the Work in accordance with the Cont��act Documents.
B. City will notify the Cor�tractax of applicable safetyplans pursuant to Paragraph b.14.
8.08 Undisclosed Hc�zardau,s Environnxentc�I Conditian
Ciiy's responsibility with respect to an undisclosec� Hazardous Enviz-onmentaI Condition is set forth
it� Paragraph 4.06.
8.09 Compliance with Safety Prog�am
While at the Site, Cily's e�rnployees and representati�ve� shall comply wit� the spec�c a�plicable
�requirern�nts of Contractar's safety progra�s of which City has been informed pursuant to
P aragraph b_ 14.
ARTTCLE 9— CYTY'S �BSERVATION STATUS DURING CONSTRUCTION
9.01 City'sProjectManager
City wiJl provide one or more Project Manager(s) during the constructio�n period. Tha duties and
responsrbilities and tl�e limitations of authority o� City's Project Mana�er during construction are set
forth in the Contract Documents. The City's Project Manager for tk�,s Contract is identified �n the
Supplemen�ary Condiiions.
9.Q2 T�isits to Site
A. Czry's Proj�ct Managex will make visits to the Site at iniervals appropriate to the various stages
of constn�ction as City deems necessary ita order to observe the pxogress tl�ai has been made and
t1�e quaiity a� the various aspects of Con�ractor's executed Work. Based on ixaformation
obtained d�ing such visits and observations, City's Project Manager will deterrnine, in general, if
the Work is proceed'nig in accoz-dance with t�e Contract Dacuments. City's Project Manager will
not be req�.iired to make e�austive or continuous inspections on the Site to check t�►e quality or
quant:ity of the Work. City's Project Manage�r's effort� wifl be directed toward proeiding City a
greater degree of confidence that ihe completed Work will canforrm generally to �e Cont�act
Documents.
B. City's Project Manager's vi�its and ohservations are sUbject to all the Iimitations on authoriry and
responsibility in the Con6ract Documents includin.g f�hose sei %rth in �'aragraph
s.a�.
Cl`TY OF FOR"I' WOiZTH
STATiI7AftDCONSTRUCTION SPECIFICAT[ON DQCiTMENTS
Revision: Madi 9, 2020
007200-1
GENERALCONQITI4N S
Page 38 of 63
9.03 Authorized Tlrxriations in Wark
City's Project Manager may authorize minox variations in the WorI� from the requirements of the
Contract Documents which do not involve an adjustment in ihe Cont�'act Price or the Contracfi Time
and are compatible with the design concept of the completed Project as a func�o�ing whole as
indicated by the Cont�ract Documents. These inay be accomplished by a Field Order and will be
binding on City and al�o on Contractor, who shall perform the Work involved prornptly,
9.04 I�ejectingDefective Wariz
City will have authority to reject Wozk which City's Project Manager believes to be defective, ar will
not procl.uce a compleied Project that conforms to the Cont�ract Documents ar t�at will prejudice the
integriry of the design concept of ihe completed project as a functioning whole as indicated by the
Contract Docuxzaents. City will have authoriiy to conduct special inspection or tes�ing of ihe Work as
provided in Article l 3, whether or not the Work is fabrzcaied, installed, or completed.
9.05 DeteYminations, for Work Perfornted
Contractox will deternline tl�e acival quantities and ciassi�cations of Work perforn�.ed. City's Project
Managerwill xcview with Cont�actor fih� preliminazy detei-minations on suchma�ters before rendering
a wriEten recornn�endation. City's wr'itten decisian will be final (excepi as moclif'ied to reflect changed
factual condi�ions or tnore accurate data).
9.06 Decisians onRequi�emen�s ofContractDocuments andAcceptability of Work
A. City will be the initial interpz'eter oi the requirenaents of the Cont�act Docurnents and judge of ihe
acceptability of the Wark thereunder.
B. City will render a written decision or� any issue referr�d.
C. Ciry's writien �ecision on fihe issue referred wi11 be �'inal and binding on the Contractor, subject
to the provisions of Paragrapk� 10.06.
ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK
Ip.01 Authorized Changes in the Wor1i
A. Without invalidating �e Contract and without notice to any surety, CiLy may, at any time or from
time io ti�ne, order Extra Work. Upon notice of such �xi�a Work, Contractor shall promptly
proceed with the Work involved which will be performed under the applicable conditzans of the
Conbract Documents (exc�pt as oiherwise specifically provided}. Extra Wark shall be
memori�alized by a Chang;e Order which may or may not precede an order of Extra work.
B. For minor changes of Work not reqLtiring ck�anges to Conf�act Time or Cont�act Price, a Field
Order may be issued by the City.
CITY OF FORT WORTT�
STANDARDCONSTRUCT[OAf SPECIF[CATIOM DOCUMENTS
Revision: Mad� 9, 2(Y�0
00 �2 oa - i
GENERALCAN�ITIONS
Page 39 of G3
I0.02 Unauiharized Changes irt the YYork
Contractor shall not be entitIed to an increase in ihe Contract Price or an extension of the Contract
Time with respect to any work performed that is not required by the Cont�-act Docu7ments as amendcd,
znodified, or supplexnented as provided in Paragraph 3.04, except in the case of an emergency as
provided in �aragraph 6.17.
10.03 Execuizon of �Change Orders
A. City and Contractox shali execute appropxiate Change Ordexs covering:
changes in the Work which are: {i} ordered by City puz-suant to Paragrap� IO.OI.A, {u) req�ired
because of acceptance o� defective Work under Paragraph 1�.08 or City's correction af
defective Wor�c under Paragraph 13.a9, or {iu) agreed to by tk�e parties;
2. changes in ihe Contract Price or Conttact Time which aze agreed to by thc parties, includ.ing
any uriclisp�rted suln or amount of time for Wark actually performed.
10.�4 Exl�^a Work
A. Should a differance ai-ise as to whai does or does noi constitute Extra Worl�, or as to the pay.ment
tl�ereo�, andthe City insists �pon its performance, the Contractor shall proceed with the woxk after
mal�ing written request for writt�n ordexs and shall keep acc�urate account oi1:he actual reasona.ble
cosi thereo£ Coniract Claims regarding Exfra Work shall be made pursuant to Pazagraph 10.0�.
B. The Contractor shaIl fiu��ish the City such installatia� xecords of all deviations from t1�e original
Contract Documents as may be necessary to enable tlle City to prepaxe for pernlanent record a
corrected set of plans show�ung the actual insiallat�on.
C. The comper�saiion agreed upon for Extra Work vvhether or not initiaied by a Change Order shall
be a fiall, complete and final payment fox a11 costs Contractor incu�s as a result or z-elati�g to t11e
change ar�xt�ra Work, whefher said costs are knawn, �xil�o�,�rn, foreseen or unforeseen at that
time, includ'zng without limitation, any costs for deIay, exiended overhead, ripple or impact cost,
or any oi�ier effect on changed or �nchanged work as a result of the change or Exfi-a Work.
I0.05 Notificatinn to 5'urety
�f the provisions of az�y bond require notice to be given ta a surety of any change af�ecting ihe general
scope o� the Wor�C or the provisions of the Cantract Documents (including, buf not limited to,
Coniract Price or Contract Tune), the grving of any such notice wi11 be Cont�actor's respons�bility.
The amount of each appficabie bond will be adjusted by the Contractor to reflect t7ie effect of any
suck� change.
CT'I'Y OF FORT WORTH
STAN]7AT2DCONSTRUCTION SPI;CIHICATIOTJ ]�OCUMENTS
Revision: Madi 9, 2020
oo�zoo-i
GEN�RAL CONI] ITION S
Pagc 40 of G3
lO.Ob Contract Claims Process
A. City's Decision Required: All Contract Clairns, except ihose waived pursuant to Paragraph
14.09, shall be re%rred to the City for decision. A decisian by City shall be requi�red as a co�dition
pxecedent to any exercise by Contracior of any rights or remedies he may otherwise have undex
�he Co�tract Docu�ments or l�y Laws and Regulations in respect of such Coz�tract Cla�ns.
B. Natice:
1. WriLten notice staiit�g the general nature of each Conlract Claizx� shall be delivered by the
Contractor to Ciry no later than 15 days afterthe start of the event giving rise thereto. The
responsibility to substantiate a Contract Clairn shall rest witli the party mal�g the Contraci
Claim..
2. Notice of the amount or exteni of the Contract Clai�m, with suppoxting data shali be delivered
to the City on ar before 45 days from the start of �he event giving rise thereto {�ualess ihe Ciiy
a�lows additional time for Contractor to subzz�it additional or more accuz-ate data in suppart of
such Contract Claixx�).
3. A Contract Claim forr an adjusY.tnent in Contract Price shall be prepa��ed in accordance with
the provisions af Paragraph 12.01.
4. A Contract Claizxz far an adjustment in Coniract Time sk�ali be prepaxed in accordance with
the pravisions of Paragraph 12.02.
5. Each Contz'act Claim shall be accainpanied by Contractorr's written statement that the
adjustrnent claimed is the entire adjust�ent to which ihe Contractox believes it is entitled as a
result of said event.
6. The City shal� submit any response to the Contractor within 30 days after receipt of the
claimant's last subm�ittal (unless Cantract allows addi�ional t�me}_
C. City's Action: City will revzew each Con.tiracf Claim and, within 30 days after receipt of the Iast
submittal of the Co�tractor, if a�ny, take one af the followin.� actions in wx'iting:
1. deny the Contract Cla.im in whole or u� part;
2, approve the Contract Claim, or
3. natify the Contractor that the City is ur�ble to resaive the Contract Claim zf, in the City's
sole discretion, it would be inappropriaie for the City to do so. Far purposes of further
resolution of tl�e Coz�tract Clai�xx, such notice sha�l be deemed a denial.
CITY OF FORT WORTH
STANI7AADCONSTRUCTION SPECIFICATION DOCUMLNTS
Revision: Mac¢h 9, 202�
007200-1
GENERAL COND ITION S
Page 41 ot� 63
D. City's written action under Paragraph 10.06.0 will be fmal and binding, unless City or
Cor�t�tactor invoI�e the dispute resalution procedure set forth in Article 16 within 30 days of such
action or denial.
E. Na Coniract Clainri for an adjustzneni in Cantract Price or Cantiract Time will be valid if noi
submitted in accordance with this Paragraph �0.06.
ARTICLE ll— COST OF THE WORK; ALLOWANCES; U�VIT PRICE W4RK; PLAN�
QUANT�TYMEASUREMENT
11A1 Costofthe Work
A. Casis Included.• The term Cost of ihe Work zx�.ear�s the sum of all cosis, except those excluded it�
Paragt-aph 11.0].B, necessarily incurred and paid by Confractor in the proper perfon�r�azlce of tlie
Woz-k. When the value of any Work covered by a Change Order, the costs to be reimbursed to
Conf�actor will be only ihose additzonal or mcreme�tai costs required because of the change in the
Work. Such costs sI�all nat include any of the costs itemized ix� Paragaph 11.O1.B, and shalt
include but z�ot be li�nited to the foIlowing itezx�s:
1. Payrol� costs for enrzployees in t�ie direct emplay of Contractar in the performance of the
Work under schedules af job class�ifications agreed upon by City and Coniractor. Such
ernployees s�all include, withoLat ]unitaiion, superintendents, forennen, and otlier personn�I
employed �ull fime on fhe Work. Payroll casts for employees not employed �ull time on the
Wark sha1� be apportionec� on the basis o£ their iime spent on the Work. Payroll costs shal.l
include;
a, salaries wiili a 55°/o markup, or
b. salaries and wages pius the cost of fringe bene�ts, which shal[ includc social security
conlributions, unern�loyment, excise, and payxoll taxes, wor�ers' compensation, health
and retirezxzent benefits, boz�.uses, sicic leave, vaca�ion and ho�Zclay pay applicable ihereto.
The expenscs of performing Work outside ot' Regular Workin� Haurs, Weekend
Working Hours, ox legal holidays, shall be mcluded in the abave to ttae extent a�thorized
�y c�.
2. Cost of all materials and equipznent furtiished and incorporated in. the Work, including costs
of iranspartatxon and storage tk�ereof, and Suppliers' �eld services rec�u'n-ed in conn�ction
tY�erewiih.
3. Rentals of all constnzction equi�ment an�d machinery, and the parts thereof whether rented
frozn Contracior orr others in accoz-dance with t•ental agreements approved by City, and the
costs oi iransportation, Ioading, unloadrng, assembly, dismantling, and removal thereof. All
such costs shall be in accordance with the terms of said rental agreernents. The rentai oF any
such equipzxient, machinery, or parts shall cease when the use thereof is na [onger necessary
for ihe Work.
CITY OF F072T V�10RTA
STAZ�TTJARDCONSI'RUCTION SP�,CIftCA'fION BOCUMEI�ITS
Iievision: Mach 9, ZD20
pQ7200-I
GENERAL CANllITION S
Page 42 of 63
4. Payment�s rxzade by ConYractar to Subcon�ractors for Work perfoz�med by Subcantractors. If
required by City, Contractor shall a�iain competitzve bic�s fi-om subconi�'actors acceptable to
City and Contracioz- and shall delivez such bids ta City, who will then determin�, which bids,
if any, will be acceptab1e. If any subcont�ract provides �hat the Subcontractorr is to be �aid on
the basis of Cost of the Woxk plus a fee, the Subconiracior's Cost af the Work an.d fee shall
be determined in the same rnanner as Contractor's Cost of the Work and fee as provided in
this Paragra�h 11.01.
S. Costs of spec�aI consultants (itrncluding 6ut not liinited to engineers, axchitects, testing
laboratories, surveyors, attorneys, and accountants) em�loyed fox services specifically related
to the Wor�.
6. Supplemental costs including the following:
a. The praportion of necessary transpoxtation, travel, and subsistence e�enses of
Coniractor's employees incurred in discharge of duties cannected with the Work.
b. Cost, including transpor�ation and mamtenance, of alt materials, supplies, equipznent,
machinery, appliarnces, office, azad temporary facilities at the Site, and hand tools not
owned by the workex s, which are consumed in the perforrmance of the Wor�C, and cast, less
market value, of such itezns used but not consurned w�iuch remain fhe property of
Contractor.
c. Sales, consumer, use, and other similar
Contractor is liahle not covered under
Regulatiozas.
taxes related to the Work, and for vvhich
Paragraph 6. � 1, as irnposed by Laws and
d. Deposits lost for causes other than neglige�ce oi Coniractor, any Subcontx�actor, or
anyone directly or i►�directly en�ployed by any of them or for whose acts any o�'the� may
be liiable, and royalty payments and �ees for permits and licenses.
e. Losses and damages (and related exp�nses) caused by damage to tk�e Work, not
compensated by insurance or otherwise, sustained by Contractor in connection with the
performance a� the Work, pz•ovided such losses and damages have resulted froXxa causes
other t1�an th� neg�gence af Contractor, any Subcontiractor, or anyone directly ar indirectly
etnployed by any of ihem or for whose acts any of therm may be liable. Such losses sha�1
ir�clude settlements made wi�h thc written consent and approval of City. No such losses,
damages, and expenses shall be included in the Cost of fhe Work for the purpose of
deteribi�irig Contractor's fee.
f. The cost of utilities, fuel, and sanifary facilities ai the Site.
g. Minor e�penses such as telegratns, long distance telephone calls, telephone and
communication services at the Site, express and courier ser•vices, and simiiar petty cash
items in cannection with the Work.
CITY OF FORT WORTI�
STANDARDCOIVSTRUCTiON SPiC[FICA1'IdN DOCUMENTS
Revision: Madi 9, 2020
00 72 00 - l
GENERAL CONpITION S
I'age 43 oP G3
h. The costs oipremzunas for al[ bonds and izlsurance Contractor is requircd by the Contract
Documents to purchase and maultain.
B. Costs Excludecl.• The tez-m Cost of the Woxl� shal� noi �clude any of ihe following ztezns:
l. Payroli costs and other compensation of Contractor's officers, executives, principals (of
�ar�ierships and sole proprietorships), general zx�anagers, safety zxzanagers, engmeexs,
architects, est�tnators, atiortleys, auditors, accountants, purchasin.g and contracting agents,
expedriers, timekeepexs, clerks, and othex personnel employed by Contractor, wk�eiher at th�
Site or m Contractor's principal or branch office for general adininisirafiion of t�e Work and
not specifically included in the agreed upon schedule of job class�f'ications referred to in
Paragraph 11.O1.A.1 or specifcal�y covcred by �'aragraph 1I.01.A.4, a1I of which are io be
considered ac��riir�istrative cosis cov�redby t1�e Contraciar's fee,
2. Expenses of Contxactar's principal and branch of�ce� oth:er than Contracior's of�ce at the
Site.
3. Any paz-t of Conn-actar's capital expenses, including interest on Coniractor's capital
employed far the Work and charges againsi Contracior for delinquez�t payments.
4. Cosis due to the negligence of Contractor, any Subcontractor, or anyone directly or indurectly
employed by any of them or for whose acts any af 1:hem zx�ay be ltable, includi�ng bui not
limited to, ihe correciion of defecti�e Work, disposal of materials or equipmeni wrongly
supplied, and lnaking good any clarnage to property,
5. Othez overhead or general expense casts of any kin.d.
C. Contractor'.s Fee: When all the Work is performed on the basis of cosi-plus, Contractor's fee
shall be deterniined as set forYh in the Ageexxzent. WY�en the value of any Work covered by a
C�ange Order far an adjustment in Contract Price is determined on ihe basis o� Cost of the
Work, Contractor's fee shall be detennicxed as sei forth in Paxagraph 12.OI.C.
D. Documeniation: Wheneaer the Cost af the Work for any pz�'pose is to be determit�ed pufsuant to
Paragraphs 11.01.A and J 1.Ol.B, Contractor wi]1 establish and zz�aintain records thez'eof in
accordance with generally accepted accounting pxactices and submit zn a forfn acceptable to City
an itemized cost breakdown together with supporting data.
11.02 Allowances
A. Specified Allawance: It is ut�der,stood that Contractox has included in ihe Contract Price aI�
allowances so named in the Contract Documents and shaI� cause t�e Work so covered to be
perforined for such snrn,� and by such persons or entities as may be acceptable to City.
B. P�e-bid Allowances:
1. Contractar agrees that:
CITY O�' FORT WORTH
STAAIDARDCdNSTRlICT10N SPEC1r1CAT[ON DOCUMSNTS
Revision: Ma��i 9, 2pQU
007200-I
GENEFiAL CONDfTIDN S
Page 44 of 63
a. the pre-bid al�owances inciude t�e cast to Contractor of materials and equipment required
b� the allawances to be delivered at the Site, and all applicable taxes; and
b. Coniractor's costs for� unloading and hand�ing on ihe Site, labor, installation, overhead,
proi"it, and other expenses contemplated for �ze pre-bid allowances have been include� in
the allawances, and no demand for additional payment on account oi any of the
foregoix�g will be valid.
C. ContingencyAllowance: Contractor agrees that a contirigency allovvance, if any, is for the sale use
of Ciry.
D_ Prior io f�al payment, an appropriate Change Order will be issued to reflect actual amaunts due
Contractor on account of Work covered by allowances, and tlie Contract Price shall be
correspondingly adjusted.
11.03 UnitPrice Work
A. Where the Coniract Documents provide t�at alI or part of the Work is �o be Unit Price Work,
initially the Contract Price will be deemed to inchide for aIl Unut Price Wark a� amount equal to
tlae sum of the unit price %r each separately ident�f'ied item of Unit Pxice Work times t11e estgnated
quantity of each ite�z� as indicaied in the Agreement.
B. The esfamated quantities of items of Uiut Pxice Work are not guaranieed and are solely for the
purpose of comparison of Bids and detertnining an initial Contract Price. Detezx�inations of the
actual quantities an.d classificatiozas of Unit Price Work performed by Contractor wil� be made by
City subject to the provisions of Paragraph 9.05.
C. Each unit price will be deeined to include an amount considered by Contractor ta be adequate to
cover Contractar's overhead and profit for each separately identified item. Work described 'zt� the
Contract Dacu�xaents, or reasonably inferred as required for a functionally cozx�plete �siallation,
but not ideniified iva the listing of Linit pi-�ce items shaIl be considexed incidental to unit price work
listed and the cost of incidental worl{ included as parl of the �.uut price.
D. City may make an adjustrizent in the Con��act Price in accoxdance with Pa�agraph 12.�1 if
1. the quantity of any iter� of Unit Price Warl� performed by Contractor differs materiaIly and
significantly frona the estirnaied qua.ntiry of such item mdicated in. the Agreement; and
2. there is no corresponding adjusiment with respect to any other item o� Vilork.
E. .Ine�eased or Decreased Quantities: The City reserves the right to order Extra Woz•� in
accordance w'iYl� �aragraph 10.01.
If the changes iz� quant�ies or the alteraiions do not significantjy change t�e character of
woik under the Contract Docutx�ents, the altered worl� will be paid for at ihe Contract unit
price.
CTI'Y OF PO1tT WORTH
STANDARACONSTRUCT30N SPP.CIF[CATTOM DOCiJMENTS
Itevision: Macd� 9,2D20
oo�zoo-�
GENERAI. COND IT ION S
Pagc 45 of 63
2. If the chaz�ges in c�uantities or alteraiio�� significantly change the characier of �work, the
Contract wi11 be am�nded by a Change Order.
3. If no unit prices cxist, this wi� be considered Extra Wor1� and the Contract vail� be ainended
by a Change Order in accardance with Article I 2.
4. A significant change zt� the character af wor� ocet�'s when:
a. the character ofwork far any Itena as altered differs materially in l�nd or nature from ii�at
in the Contract or ,
b, a Major Ite�n of work varz�s by inore than 25% from the original Contract quantity.
5. When the quan�ity af worl� to be done under any Major Item of ihe Cantract is more than
125% of the original quan�ity stated iz� the Con�ract, then either party to the Contract may
req�.est an adjustrnent to the u�it pxzce on the portion of tkze work t�at is abo�e ] 25%.
6. Whcn the quaniity of wor�C io be done under any Majox Item oi the Contract is less than 75%
o�` the original quantity stated in the Contract, then either �arty to the Contract may request
an adj�astment to the unzt pfice.
11.fl4 PlansQuantityMeasurement
A. PIans quantities znay or may not represent the exact quantity af work perforined or material moved,
handled, or placed during the e�ecutroi7 of the Contract. The estimated bid quantities are
designated as final payinent quaz�tities, unless rev�sed by the governing Section or this Article.
B. Ifihe quantity measured as outlined under "Price and Payrnent Procedures" varies by �nore t.�an
25% (or as stipulated uzader "Price and Paymez�t Procedures" fof� specifrc Items} from t.he total
eslirnated quantity for an individual Item originally shown in the Cantract Docu�nents, an
adjustment may be made to the quantity of auihorized work done for payment purposes. The party
to the Contract requcstmg the adjusi.ment will providc field measurements and calculations
show�g the final quantity for which payment wiIl be made. Payment for revised quantity will be
mdde ai fhe unit price bid fox tl�at Item, except as provided for in Article 10.
C. When quantities axe xevised by a change in design approved by the City, by Change Order, or to
corr�ct an error, or to correct an error Qn the plans, the plans qua�tity wiIl be increased ox decreased
t�y the amouzit involved ��e change, and the 25% variance will apply to the new plans quantity.
D. Iithe total Cantract c�uantity rnultiplied by the unit price bid far an individual Item is iess than
$25� and the Item is not originally a plans qua�atity Itern, then the Itezn may be paid as a piaz�s
quantity Item if the Ciiy and Coniractor agrce in �vriting to fiY the fitzal quant�ty as a plans quantity.
CiTYOFPORI' WORTE�
STANDARDCONSTRUCTION SPECIFICATION DOCUMEAITS
Revision: Madi 9, 2020
ao�2oo-�
GENERAL COND ITION 5
Page 46 of 63
E. For callout work or nan-site specific Cantracts, the plans qttantity measurement reqirirements are
no� applicable.
ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTR_ACT TIME
12.01 Change ofContr^actPrice
A. The Contract Price may only be changed by a Change Order.
B. Tl�e value of any Work covered by a Change Order wili be deter�nined as follows:
J, where tbe Work involved �s covered by ulr�it prices contained � the Contract Documenis, by
application of sUch uzait prices to the q�an�iCies of the iterns involved (subject to the provisions
of Faragraph 11.03); ox
2. where the Worl� involved is not covered by unit prices contained an the Contract Doc�ur�ents,
by a mutual�y a�reed hunp suzn or unit price (which may include an allowance fo� overhead
and profit not necessarily in accordance with Paragraph 12.01_C.2), and shall icicJude the cost
of any secondary impacts that are foreseeable at the time of pricing the cost of E�tt'a Work;
or
3. where t,�ae Work involved is nat covered by unit prices contained in the Con�ract Documents
and agreement to a l�u�ap sum or unit price is not reachedunder Paragraph 12.O1.B.2, on the
basis of the Cost of the Work (deter-xxained as provided in Paragraph 11.OJ ) plus a Contractor's
fee for overhead and profit (detern�ined as provided in Paragraph 12.OT.C).
C. Contractor ;s Fee: The Confracior's additional fee %r ovexhead and pro�t shall be determined as
Fal.lows:
1. a mutually acceptable f�ed f�e; oz
2. if a fi�ed fee is not agreed upon, then a fee based on the following percentages of the various
poriions of the Cost of the Work:
a. %r costs incurred under Paragraphs 11.01.A.1, 11.01.A.2. and 11.01,A.3, tlae
Cont�'actor's additional fee slaal� be 15 percent except for:
1} rental fees for Con�ractor's own equipment using stanclard r�ntial rates;
2} bonds and insurance;
b, for costs incurred under Paragraph 11.O1.A.4 and 11.01.A.5, the ContractoX•'s fee shaIl be
five percent (5%);
].) where one or more tiers of subcontracts are on the basis af Cost of the Work plus a
�ee and no f�ed fee is agreed upon, the intent of Paragraphs 12.O1.C.2.a and
I2.01.C.2.b is that the Subcor�tractox who actually perfornns the Woxk, at whatever
CITY OF FORT WORTtI
S�'AMF3ARDCONSTRUCTION SPECIFICATlON DOCiJMENTS
Revision: Maid� 9, 7020
00 �z oo - i
GENERAL CONp ITION S
Page 47 o P 63
tiez, vvill be paid a fee of 15 �ercent of the costs incurt-ed by such Subconf�actor under
Paragra�hs 11,01.A.1 and 11.Oi.A.2 and tl�at any higher tier Subcon�-actor and
Contractor will each be paid a fce of fivc percent (5%) ot' the amount paid to the next
lower tier Subcontractor, however in no case s�all f,he c�arriulative total oi fees pazd be
m excess of25%;
c. no fee shall be payable oz� the basis of costs iteir�ized under Paragraplls 1I.Qi.A.6, ana
11.O1.B;
d. ihe aznouni of credit to be aliowed by Contractor ta City for any change which results in
a nei decrease i� cost will be the a��aount of fhe actual net decrease i� cosi plus a deduction
in Contractox's fee by an ainount equal to f"ive percent (5%} of such nei decrease.
12.02 Change of Contract Time
A. The Contz-act Time rnay on�y be changed by a Change Order.
B. Na e�tension of the Contraci Time will 6e allowed for Extz-a Work or for claimed deiay unless the
Extra Work conterr�plated or cIaimed delay is shown to be on the cz-itical path of thc Project
Schedule or Contractor can show by Critical I'ath Method analysis how t1�e Extra Worl� or claitne d
delay adverseIy affects the critical path.
12.03 Delays
A. Where Contractor is reasonably delayed in the performance or completio� of any part of the
Work r�vithin the Contracl Time due ta delay beyond ihe control of Contractor, the Contract Time
rzaay be extended z� an amount equal to the time lost due i:o such delay �if a Contract Clairz� is rna.d�
therefor. De3ays beyond the cont�ol of Contractor shall include, hut not be limited to, acis or
neglect by City, acts or neglect of utility owners or other contractors performir;g other worl� as
contemplated by Ar�icle 7, fres, flaods, epidefxzics, abnormal weather conditians, or acts of God,
Such an adjustr�nent shall be Contrac�or's sole and exclusivc X•eined.y for the deiays descri�ed xn
this P aragraph_
B. If Contractor is delayed, City shall noi be liable to Contractor foz' any clairns, costs, losses, or
damages (inciudang but not Iimited to al] fees and charges of engineers, architects, attorneys, and
at�er professronals and aIl court or arbitraiion or other dispute resolu�ion costs) sustained by
Coniractor on or in connection wiih any other project or anticipated project,
C. Contractor shall not be entitled to an adjustrneni in Coz��ract Price or Contract TIlne far delays
witfuri the controI of Contractor. Delays attributable to and within the control of a�uhcon�-actar
or �upplier sha1l be deemed to b� delays within tk�e control of Coniractor.
D. The Contt-actor shall receive z�o compensation for deIays or hind�rances to the Worl�, exce�t when
direct and unavoidable extra cost to the Coz�tractor is catised by ihe failure o� the City to provide
infotxx�.a�ion or rna.terial, if any, which is to be fiirnished by the City.
CTTY OF POR'1' WpRTH
STA1VllARDCONSTRl1CTI0N SPEC[FiCAT10N DOCUMP,NTS
Revision: Mada 9, 2020
007240-1
GENERAL CONDITION S
Page 48 of 63
ARTICLE 13 — TESTS AND INSPECTYONS; CORRECTION, REMOVAL 4R ACCEPTANCE OF
DEFECTIVE WORK
13.01 Notice afDefects
Notice of alI defective Worl� of which City has actual knowledge wi31 be given to Contractor.
Defective Work may be rejected, correcied, or accepted as provided in thas Arlicle 13.
13.02 Access to Wo�k
City, independent testit�g laboratories, and goverrmr�ental agencies wif:h juriscl�ctional intexests will
have access to the Site and the Work at reasonable times far their observatian, inspection, and testing.
ConYractar shall pz-ovide them proper and safe conditians for such access and advise therr� of
Contractor's safeiy procedures and programs so tl�at they may comply therewith as applicable.
13.03 7'ests and In,spections
A. Contractor shall give City timely notzce of rcac�iness oi the Woxk for all required inspections,
tests, or approvals and shall coope�aie with inspection and testing pexsonne� to facilitate requured
inspections or iesis.
B. If Contract Documents, Laws or Regulations of any public body having ju7risdiction reguire any
of the Work {oz- part thereof} to be inspected, tested, or approved, Contractor shall asstune fu11
responsibility for arranging and obtaining such independent inspecYions, tests, retests or appro�vaJ.s,
pay all casis in connection therewith, and fiarnish City the required ceztificates of inspeciion or
approval; excepting, laowever, ihose fees specrfcally identifzed in the Supplem�niary Conditions
or any Texas Department of Licensuxe and Regulation {TDLR) inspeciions, which shall be paid as
described in tk�e Supplementary Condi.tions.
C. Contx'actor shall be respon.sible for arranging and abtazning and shall pay aIl costs in connect�on
with any inspections, tests, re-iests, or approvals required far City's acceptance o� materials or
equipment to be ir�carporated in the Work, or acceptance ofm�aterials, mix designs, or equipment
submitted forr approval prior to Contractor's purchase thereo£ for incorpozation in the Wotk.
Such inspections, tests, re-tests, or approvals shall be performed by organiza�ons acceptable to
Ciiy.
D. Ciry rnay arrange for the services of an independent testing laboratozy (`°I'esting Lab") to
perform any i�pections or tests ("Testing") for any part of the Wark, as determined so�ely by
City.
1. City will caordinate such Testing to the exten� possible, with Cont�actor;
2. Should any Testing under this Section 13.03 D resuli in a"fail", "did not pass" or other
similar negative resuIt, the Contractor shall be responsible for paying for any and alI retests.
Contractor's cancellation without cause of City initiated Testing shall be deemed a rzegative
result anc� require a retest.
CI1' 4' OF FORT WOR"1'H
STANDARDCON3TRUCTION SP@C[FiCAT10N DOClJMENTS
Revision: Madi 9, 2020
ao�2oo-i
GENERAI. CON� ITION S
Page 49 of b3
Any amounts owed for any retest under this Section 13.03 D sk�all be paid directly to the
Testing Lab by Contractor. Ciiy wil2 farward all in�oices for retests to Coili�•actor.
4. IfContractor fails �o pay the Tcsting Lab, City wiIl not issue Final Payinentun.ti� the Testing
Lab is paid.
E, If any Work (or the wor1� of others} t11at is to be inspected, tested, or approvEd is covexed by
Contractox r�vithout writien cancurrence of City, Contractor shall, if xequested by City, uncover
such Work for observation.
F. �T�covering Work as provid�d in Paragraph I3.d3.E shall be at Contractor's expense.
G. Contractor shall have the rig�t to makc a Cont�act Claun regarclin� any retest or invoice issued
under Sectzon 13.03 D.
13.04 Uncovering WorTc
A. If any Work is covei•ed cantra.iy io the Cantract Docu�ments or specif'ic a�t�uctions by the City, it
�x�ust, if requested i�y City, be unco�ered far City's obser�ation and replaced at Contractor's
exp�nse.
B. If Ciry considers i� necessa�y or advisable that covered Worlr be observed by City or inspected or
testedby others, Contractar, atCiry's request, shali uncover, ex�ose, or otherwise make availab�e
for obser�atiai�, inspection, or testing as City may require, that portion of the Wor1c in question,
futx�ishing a�i necessary labor, �naterial, and equip�ent.
l. If it is fouz�d that the �ncovered Worlc is defective, Coz�tractor shall pay all claims, costs,
losses, az�d damages {including but not lmnited to al� fees and charges o� engineers, architects,
attorneys, and other pro�essionals and all court or oihez- d�sp�ite resalution costs) arising out of
or re�at7ng to such uncovering, cxposurc, obse�vation, inspection, and testing and oi
satisfactory replacennent or reconsir�etion (including but not linnzted ia all casts of repai� or
replacement of work of others); or City shall be eniiticd to acceptdef�ctive Wor1r in accorclance
with Paragraph 13.08 in w�ich case Contracior shall still be responsible for all costs associated
with exposing, obser�ing, and testing Lhe defective Woz-k.
2. If t�e uncovered Work is not found to be defective, Contractor shall be allowed an mcrease
in tlae Contract Fz7ice or an extensian of the Contract Tim�, or bath, directly attrabutable to such
uncovering, e�posure, observation, inspection, testulg, replacement, and recozasiruction.
13.05 City May Siop the Work
If the Work is defective, or Contractor iai�,5 to suppIy sufficient sIalled worl�ers or suitable zx�aterials
or equipinent, or fails to per�orm the Work iui such a way t�aat �he com�leted Worl� will conform to
thc Contract Doc�u�nents, Czty may order Contractor to stap the Work, or any portion thereof, tantil the
cause for ,such order ha,s been elnn.inated; however, this right of City to stop the Woxk shail not give
rise to any duty on the part of City to exercise this right for the benefit of Coz�t�-actor, any
Cl`T Y OP FORT WOR'fH
STANDARDCONSTRUC7'lON SPIiCIh'ICAT[DN D�CUMSNTS
Revision: M�di 9, 2020
00720Q-1
GENERAL CONQ IT�ON S
Page 50 of 63
Subcontractar, any Supplier, any other individual or entiiy, or any surety for, or employee or agent of
a�y af them.
13.06 Cop�'ection orRemoval ofDefective Work
A. Promptly after receipt of wx•ztten noiice, Cantractor shall correct all defeciive Work pursuant to
an acceptable schedule, whethex or not fabricated, installed, or completed, or, if Y.he Wark has been
rejected by Ciry, renaove it frorm the Project and repIace it with Wox� that is not de%ctive.
Contractor shall pay all claims, costs, additional testing, losses, and damages (incIuding bui not
limited to all fees and chaxges of engitxeers, architects, a�torneys, and other professionals and all
court or arbit�'a�ion. or oiher di�pute resolution costs} ar�sing out of or relating �o suc� correction
or remova� {incluc�ing but not liznited to all casts of repair or r�placeznent of vvorrk oi at�lers).
Failure to require ihe rerrzxoval of any defective Woxk shall not constitute acceptance of such Wark.
B. When correcting de%ctive Worlc under tk�e ter�r� of this Paragraph 13.Ob ox Paragraph 13.0'7,
Contractor shail take na action that wauld void or otherwise impair City's special warranty and
guarantee, i� any, on said Work.
13.07 Correctian Period
A. Ifwitl�in two {2) years after the date of kinal Acceptance (or such longer period of time as may be
prescribed by the terms of any appIicable special guarantee r�quired by the Contz-act Documents),
any Work is found to be defective, or if ihe repair of any dainages to the land or areas rnade
available for Contractor's use by City or permitted by Laws and Regalations as contemplated in
Paragraph 6. IO.A is %und to be defective, Con�ractor shall promptly, without cost to Ciry and in
accardance with City's written insi:ruciions:
1. repair such defect�ve land or areas; or
2,. correct si�ch defective Work; or
3. if ihe defective Wark has been rejected by City, remove it from the Pxoject and replace it
wiih Work Yhat is not defective, and
4. saiisfactorily correct or repair or rernove and replace a�.y damage to other Wor�, to the wor�C
of others or other Iand or areas resulting there�irom.
B. If Contractor does not pronaptly cornply with the terms of City's writien instructions, or in an
emergency where delay would cause serious r�sk of loss or damage, City may have t�e defective
Work corirected ar repaired or xnay have th� rejected Waric rcrnoved and replaced. All claims,
costs, Iosses, and dainages (inclucling but not lu�ited to aIl fees and charges of engineers,
architects, at�ortxeys, and other professzanals and all court or other disp��e resolution costs) arisitig
out of or rela.ting to such corn'ection or rrepair or such removal and replacement {including but not
limited to all cosis of repair or replacemeni af work of others} will be paid by Cont�-acior.
CiTY OP FORT WORTH
STAT]DARL7CON5TRUCT[ON SPECIFICATEON DOCUMENTS
Revision: Madi 9, 2620
00 �2 00 - i
�EN�R,a�coNo�rior�s
Page 51 of G3
C. In special circ�axx�siances where a particular itezxx oP equipment is pIaced in contit�uous service
before PinaI Acceptance of aIl the Woric, the coxrection period for that item rz�ay start to run frotn
an earlier daie if sa provided in. tIze Contract Documents.
D. Where de�Ceciive Work (and damage to ot�Zer Work resulling therefrom) has been corrected or
remaved and replaced under this Paragraph ] 3.07, the correction period hereunder wzt� respect
io such Work may be required to be e�tended for az� additional pez-iod of one yeax after ihe end of
the initial correction period. City shaIl provide 30 days written notice ia Contractor should such
additionai wa�anty coverage be required. Contxaciar inay dispute t1�is requrrezneni by filing a
Cantract Claim, pursuant to Paragraph 10.06.
E. Contractor's obligatiozas under this Paragraph 13.Q7 are in addition to any other ob�igafion or
warranty. The provisions of this Paxagrapl� 13.07 shall not be cor�strued as a subs�ztute for, ar a
waiver o% t�e pro�isions af any applicable statute of lirnitation or repose.
13.08 Acceptance ofDefective Wa�'k
If, instead af rcquiring correction or rerr�oval and repIaceinent of defective Work, City p�efers tn
accept it, City may do so. Contractor shall pay aIl claims, costs, losses, and damages {�itzchuling but
not Jimitad to a11 fees and charges of engineers, architects, attofneys, and other professionals and ail
court or other dispute resohition cost�s) atiributab�e to City's e�aluation af and detern�inaiion to accepi
such defective Work and for the du�uriished value of the Work to the extent not oiherwise paid by
Coniractor. If any such acceptance occurs pxior to Fina� AccepYance, a Change Order wili be issued
incorpora�ing the necessary revi�ions in the Cantract Documents with z'espect to the Waz'k, and City
shall be entitled to an appropriale decrease in the Contraci Price, reflecting the ciitninished �alue of
Wor1c so accepted.
13.d9 CityMay CorrectDefective Worl�
A. If Cantractor fails within a reasonable tirne a�ier written notice from City to correct defectzve
Work, oz• to remove and rreplace rejected Work as requtred by City ir� acco�dance with Paragraph
13.Ob.A, or if Contracior faiIs to perform the Work zn accordance with the Contract Doc�ments,
or if Contractor fails to cornply with any other pxovision of the Contract Documcnts, Cify may,
after seven (7) days written notice to Contractoz, correct, or remedy any such de£'zciency.
B. In exercising the rights and remedies under this Paragraph 13.09, City shall pxaceed
expeditiously. In connectzon with such carreciive or remedia� action, City zxiay exchzde Cont�actor
from all or part of t�e Site, take possession of all or part of the Wox1� anc� suspend Contractor's
services related thereto, and incorporate in the Work all materials and equipment incorporated in
the Work, stared at the Site or for �Iuch City has paid Contracior but which are stored elsew�iexe.
Contractor shall allow Czry, City's representatives, agents, consultants, employees, and Ciry's
othex contractors, access io the Site to enable City to exercise ihe rights and remedies ��nder this
Paragraph.
C. t-1.]I clamis, costs, losses, and damages {including b�Yi not limited to all fees and charges of
engineers, architecis, attorneys, and otner�professionals and all cot�rt ar other d�,spt�te resohztion
CITY �F FORT WORTi�
STAI�!]]ARDCONSTRUCTIOtJ SPECfF1CA1'[ON DOCilivlBI�ITS
Revisipn; �ch 9, 7_{)2p
00�200-�
GENERAL C01�� ITION S
Page 52 af 63
cosis) incunred or sustained by City in. exercisin� ihe xighfis and re�aedies under this Paragraph
13.09 wiil be chai-ged agaiu�st Contractor, and a Change �rde� will be isstied inco�porating the
necessaty revisions in the Conta•act Documents with respect to the Work; a�d City sha]I be entitled
to an appropriate decrease in ihe Contract �rice.
D. Cantracior shall not be allowed an extension of the Contract Time h�cause of an.y delay in the
perfot-mance of the Work att�'ibutable to the exercise of City's righis and remedies nnde� this
P aragraph 13. 09.
ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION
14.01 Schedule of Values
The Schedule of Values for lump sum contracts established as pzovided in Paragraph 2.07 will serve
as the basis for progress payments and will be incozporated into a�orrn of Application for Payimerit
acceptable to City. Progress payments on account of Unat Price Worl� will be based on the number of
units completed.
14.02 Progress Paymenis
A. Applicaiiansfo�Payn2en�s.•
X. Contractor is responsible for providix�g all inFormation as required to become a vendor or the
City.
2. At least 20 days before the date established in the General Requirezxzents for eac�. progress
payment, Contractor shaIl subzxut to City forr review an Application for Payment filled out and
signed by Con�ractor covering the Work completed as of the date of t�e Application and
accompanied by such supporti�g documentaiion as is required by the Cantract Documents.
If payment is requested on the basis of materials and equipment not incorporated in the Work
but delivered and suitably stored at the Site or at another location agreed to in writing, the
Applacation for Payment shall a1�o be accompanied by a bill of sale, invoice, ar othet
documentation waix anting that City has received the materials and equipment free and clearr of
a�l Liens and evidence th.at the materia�s and equipment are covered by appropriate insurance
or other arrangements to pratect City's interest therein, all of vvhich must be satisfactory to
City.
�4. Beoinning wi�h the second Applicaiion for Payrxzent, each Application shall include an affidavit
of Contractor stating that previous progess payxzaents r�ceived on account of t1�e Work have
been applied on account to discharge Contractor's legitzmate obligations associated with priar
Appl�cations fox Payment.
5. The amotiult of retainage r�vith resp�ct to pz'ogress paytnents will be as stipulated irn the
Contract Documents.
CITY OF PORT WORTH
STANDARDCONSTRi1CTI0N 3]'ECiFICATION T70CU11�iENTS
Revision: Mad� 9, 2020
00 �z oa - i
G�NERALCONDITIQNS
1'agc 53 of 63
B. ReviewafApplications:
1. City wil�, afier receipt of each Applicatian for Payment, either indicate in writing a
x•ecammendation of payinent or retutn �e Appiicatian to Coniractor ix�.dicating reasons for
refiising �ay�a�eni. In the latter case, Contractor rnay znake fhe necessary carrections and
resubmit the Applicaiion.
2. City's processing of any paymer�t requestcd in an Applieation for Payment will be based on
Czty's abser�ations ofthe executedWorl{, and on City's revicw ofthe Application farPaynnent
and ihe accampanying data and schedules, t.hat to the best of City's I�owledge:
a. the Woxk has progressed to ihe point indicated;
b. the quality oithe Work is generally in accordance with the Contract Documents {sub�ect
to an evaluation of the Work as a fiincfianin.g whole przor ta or upon Fuaal Acceptance, the
results o�any subsequent tests called fox in the Contract Doc�unents, a fu�al deterrx�znation
of c�uantities and classi�f'zcations for Work performcd undcr Paragraph 9.05, and an� other
qual�f'zca�ions stated in the recomrxzendation).
3. Processing any such paymeni will not ihereby be deemed to have represented tk�ai:
a, inspections made to check the quality or the quantity o� the Work as it has been
performed have b�en ex�austit�e, extended to every aspect of the Wark in progress, or
invol�ed detailed ulspections of the Worl� beyond the responsibilities specifically assigned
to City it1 tI�e Contract Documents; or
b. ihex•e may not be other matters oz- issues beiwe�n the parfies that rr�ght entitle Contractor
to be paid additionally by City or entitle City to vviihhold payxnent to Contractor, or
c. Contractor has colnplied with Laws andRegulatians applicable to Contractor'sper�ormance
of the Work.
4. City may refi�e to praces,s the whole ox any part of any payment because of subsequently
discovered e�vidence ar t�e resuits of subsec�uent inspections or iests, and revise or revoke
any such paymer�t pz-eviously made, lo such extent as may be necessary io proiect City frazx�
loss because:
a. tI�e Work is defective, ar the corn�leted Work has been damaged by the Contractor ox his
subcantracfors, requiring correct�on ox replac�meni;
b. discrepancies in quantities contained in pre�ious applications �or payment;
c. t�e Cont��act Price has been reduced by Change Orders;
d. City has been required to coxreci defective Work or camplete Work in accardance with
Paragraph 13.09; or
CITYOFFOR'T WOIZTH
STANDARDCOMSTRIICTION SP�,CIFfCA7'ION DOCUME%TTS
Rc�ision: Mazi� 9, 2020
oo72ao-i
GENERAL CaNDlTION S
Pagc 54 of 63
e. City has act�.ial knowledge of the occurrence af any oi tk�e events enurncxated in
Partagraph I5.�2.A.
C. Retainage:
1. For contracts less ihan $400,000 at the time of execution, retainage shall be ten percent
{ 10%).
2. For coniracts greater Y�an $�400,000 at the t�me of execution, retamage shall be five percent
(5%}.
D. Liquidated Damages. For each calendar day that any work sha1l rezx�ain uncornpleted a.fter the
time specif'zed in the Contract Document,s, the sum per day spec�ed in the Ageernent, will be
deducted from t�e monies duc tk�e Contractor, not as a penalry, but as liquidated damages suffcred
by the City.
E. Paymen�: Con�iactar will be paid pursuant to the requirements of ihis Article 14 and payment
will become due in accardance with the Coz�tract Documents.
F. Reductian in Payment.•
1. City rnay refuse to make pa�nne�zt of the amflunt xequested because:
a. Liens have been £'�led in connectian with the Work, except where Contractar has
delivered a s�ecif'ic bond satisfactory t� City to secure the satisfaction and dischaxge of
such Liens;
b. there are other items en�itling City to a set off against the aznaunt recomrr�ended; ar
c. Ciiy has actual. knowledge o� the occurrence of ar�y of the events enumerated in
Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A.
2. If City refiises ta make payment of the arrzount requested, Ciry wi1] give Contractor wrtitten
notice stating ihe reasons for such action and pay Contractor any amount remaining after
deduction oi the arrx�oUnt so wit�l�eld. City shall pay Contracior the amount so wiihheId, ar any
adjustment thereio agreed to by City and Contractor, when Contractor remedies the xeasor�s
�ar such actzon.
14.03 Contractor's Wa�runtyofTitle
Contractor vva�txants and guaxantees that title to all Worl�, znaterials, and equipment covered by any
Application for Payment, whet�aer incorporated iri tlie Project or not, will pass ta City no latex than the
time of payrnent fi•ee and clear af all Liens.
CITYQP PORT WORTH
STAN[3ARDCONSTR[1CT[ON SPECIFICATI�N DOCUMENTS
Re�ision: Madti 9, 207_0
Od7200-I
GENERAL CON� ITION S
Page 55 of 63
14.04 Parlial Utilization
A. Prior to Final Accepta�ce of all the Work, City may use or occupy any substantialIy co�pletcd
part of the Wark whzch has specif'ically been identified in the Cozat�act Doctunents, or wl�ch City,
determines constiiutes a separately fiu�;ctioning and usable par� of the Work that can be used
by City for zts intended purpose wzt�out signiiicant intexferencc with Contractor's performance of
the remaz�der af the Work. City at any time may notify Contractor ir� writzng tio pern�it City to use
or occupy any such part of the Work which City determines to be ready �or its intended use, subject
to the following conditioz�s:
I. Contractor at any ti�ne may notify City in writing that Contractor co�iders any such part of
the Worl{ ready for its intended use.
2. Within a reasonable tim� after not�cation as entunerated ir� Para�aph I4.05_A.1, City and
Contractor sha�1 make an inspection of that part of the Work to determine its stat�s of
completion. If City does not consider Y.hat part of the Wor1� to bc sub�tantial[y completc, Cify
will not:ify Contractor in wrztic�g giving ihe reasons therefor.
3, PartialUtitization will noi constiiute �inal Acceptanc� by City.
14.05 Finallnspection
A, Upan vvritten notice from Contractor that the entire Work is cozxzplete in accordance with the
Contract Docuzx�ents:
l. within 1� days, City will scl�edule a Final Inspection witl� Contractor,
2. City will notify Cont�actor i�n writing of all partzculars in wY�ch this inspection reveals that
ihe Work is mcompleie or defectivc. Coiltractor sl�all immediateiy talce such measures as are
necessary to complcte such Work ar remcdy such deficiencies.
B. No time charge wi1l be made again.st the Contractor between said date of notif"ication of i:he Cify
and the date of Final Ins�ection, Should the City determine that the Worlc is not z•eady for F'inal
Inspection, City vvill notify the Cantractor i�-� writing of the reasons and ContractTirne wr11 resume.
14.0b Final Acceptance
Upon compleiion by Con�ractar to City's satisfaction, of any additional Work identified in tkz� Fir�al
�nspection, City wil� issue to Cor�tractor a letier of Final Acceptance.
CxI"Y OF FORT WOR'1'H
STANT�ATtDCONSTRUCT[ON SPHC�PiCATIdN DOCUMENTS
Revision: Ma�h 9, 2020
0072oo-t
GENERAL COND ITfON S
1'agc 56 of 63
14d7 FinalPayment
A. ApplicationforPayment.•
1. LTpon �inal Acceptance, and in the opinion of City, Cozatractor may make an application for
final payment foIlowing the proced�t�e for pxogress payments in accordance with ihe
Contx�act Docurnrzents.
2. The frnaI Application for Payment shall be accompanzed (except as previously delivered) by:
a. aIl docLunentation called far 'vn the Contract Documents, includr�.g but not lirnited ta the
evidence of insurance required by �'aragraph 5.03;
b. consent of the surety, if any, to final payment;
c. a lisi of all pend'zng or released Damage Claims against City that Contractor believes are
unset�led; and
d. affidavits of payments and coznplete and legally effective xeleascs or waivers
{satisfactory to City) of all Lien riglais arismg out of or Liens f�led in connection with the
Wor�.
B. PaymentBecomes Due:
1. Afterr Ciry's acceptance of the Application for Payment and accornpan.yir�g docurr�entation,
requested l�y Contractor, less previous payrnents made and any sum. City is entitled,
includitig but not lim.ited to liquidated damages, wili become due and payable.
2. After all Damage CIau�x�s have been resolved:
a, directly by the Cantractor or;
b. Contractor provides e�vidence that tl�e Damage Claim has been repoxted ta Cont�actor's
insurance provider for resolution.
3. T1ne making of the �nal payment by the City shall not relieve the Contz'actor of any
guarantees or other requiremen�s of the Contract Docu�aents which specifically continue
thereafier.
14.08 Final Completion Delayed and Partial Retainage Release
A. If final completion of the Work is significantly deiayed, and if City so canf�irrns, City may, upon
receipt o�Contractor's fmal Application �ar Payment, andwithout temiinating the Contract,mal�e
payment of the balance due for that portzan of the Work fu11y completed and accepied. If the
re�mainiilg balance to be held by City for Wark not fulJy completed or corrected is less than ihe
retainage s�ipulated i� Paragrap� 1A�.02.C, and ii bonds have been fiuziished as required in
Paragraph 5.02, the written consent af the surrety to the paymeni of the balance due for tk�at
crrY or ror�T woRrx
STANDAIt17CONSTRUCTION SPECIFICATION DOCiJMENTS
Revision:lVla� 9, 207A
00�2oo-i
GENERAL COND ITIOiJ S
Page 57 of 63
portion of tk�e Work fully completed and accepted sha11 be subinittcd by Contractor ia Ciry with
the Applzcation for sucEa payrnent. S�ch payment sk�all be made under the ie�-rxas and conditions
governm,g ftnal paymezat, except that it shal! not consiitute a waiver of Contract Claims.
B. PaYtial RetainageRelease. �or a Contract t11at provides far a separate vegetative estabIrsk,unent
and maintenance, and test and perfoiznance periods follo�ving the completion of aIl other
construction in. the Contract Documents for all Work locaiions, ihe Ciry may release a portion of
the amouni retained provided that all ot�Zex work is conczp�eted as c�etermined by the City. Before
ihe release, all submittals and final quantities must be completed and accepted foz all other worl{.
An at�rzount suf�cient to ensure Contract compliance will be retained.
14.09 WaiveYof�Claims
The acceptance of #"�nal paymen� wi11 coz�tiiute a release of ih� City from alI claizxis or Iiabilti ie s
under the Contract fox anything dan�. or fiunished or rela�ing to the work �der ihe Cant�act
Docurnents or any act or neglect of City related to or connected wiih the Contract.
ARTICLE 1� — SLTSPENSION OF WQRK A'�TD TERMINATION
IS.OI City May S'uspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by wrilten
notice to Contractor and which may �x the date on which Work wi11 be resumed. Cantractor skaall
resume ihe Work on t�e c�aie so f�ed. During temporary suspension of the Woxk coveredby these
Cont-�act Documents, for any reason, the City w�l make no extra payment for stand-by time of
coz�structio� equipment and/or construction crews.
B. Shouid the Co�t�actor not be able to complete a portion of the Project due to caUses �e�ond the
control of and without the �au1t or negligence of the Contractor, and should it be determined by
rnutual consent of the Coz�tractor and City that a solution to a11ow consiruction io proceed is not
available within a reasonable period of time, Contz�actor may request an extez�ion in Contiract
Time, directly attributable to any such suspension.
C. Zf it sl�auld become naces�ary to suspend the Work for an indefinite pexiod, the Co�tractor shall
store all materials in such a rnanner tl�at they �nril] not obst�r-�tct or impede the public urat�ecessarily
nor becozxze damaged in any way, and he shall ta�e every precaution to preveni damage or
deterioration of the work performed; he shall prov�ide suitable dra�age about the wark, and erect
temporary structures where neces,sary.
D. Contractor may be reimbursed for the cast of r�xioving his equipment off the job and returtaing the
necessa�y equipment to the joh when it is detei�nined by t�e City tl�ai const-�-uction may be
resumed. Such reunburseznent shall be based on actual cost to the Cont�-aciar of moving the
equipment and no pro�it will be allowed. Reimburserment may not be allowed if the ec�ilipment is
moved to another construction project far the City,
CITYOP FORT WOI2TH
STANDARI7CONSTRUCTION SPECIFICAT[ON DOCUML;N'I'S
Revision: Ma�dt 9,2(1�f7
ao 7z aa - i
GEN�RAL CONDITION S
1'agc 58 of 63
15.02 City May �'erminate for Cause
A. The accurrence of any one or more of the �ollowing events by way of e�ample, but noi of Iimitation,
may��stify term�aation for cause:
1. Cont�actor's persistent failure io perforrri the Woxk in accordancewith the Cont�act Dac�un.ents
{a�cluc�g, but not li�z�ited to, failLue to supply suf�xcient sk�lled warkers or su7itable materia�s
or equipme�►t, faiture to adherc to the Project Schedule established under Paragraph 2.07 as
adjusted frorn time ta time pursuant to Paragrapl� 6.04, or iailure to adhere to ihe City's
Business Diverrsity Enierpz�ise Orditiance #20020-12�2011estabiished under Paragraph
b.06.D};
2. Contractor's disregard ofr Laws or Regulations of any public body havu�g jurisdictzon;
3. Contractor's repeated disregard of the authoz-ity oi City; or
A�_ Contracto�-'s violation in any substantial way o£ any provisions of the Contract Documents;
ar
5. Con�iactor's failure to promptly mal�e good any defect in rnatezials or worl�anship, or
defects of any nature, the correction af which has been directed in wri�ing by the Ciry; ox
6. Substantial indication that the Contractar has znade an unautharized assignrnent of the
Contract oz- any funds due therefroin �or fihe benefit of any creditor or for any ot�er purpose;
or
7. Substanfial e�vidence tl�at tlae Contractor has become iz�solvent or bankrupt, or otherwise
financially unable to carry on the Work satisfactorily; or
8. Contractor commences legal action in a court of competent juY'isdiction against the City.
B. If one or more of ihe events identifed in Paragraph 15.02A. occur, Ciry will provide written notice
to Co�tractor and Surety to arrange a conference wit.� Cont�actoi� and Surety to addtess
Contractox's fai�ure to perform t1�.e Wark. Confez'ence shaIl be heId not later than 15 days, after
receipi of notice.
1. �� the City, tlne Contractox, and the Sturety do not agree to allow the Contractar to prflceed to
pex�orm the coz�truction Cantract, the City rnay, to tlie �xtent permi�ted by Laws and
Regulations, declare a Contractor default and formally terminaie the Con#�actor's xzgh# to
compiete t11e Cant�act. Contractor deiault shall not be declared earlier than 20 days after the
Coni�actor and Surety have received notice of conference to address Con�-actor's faihzre to
perforrn the Work.
2. If Contractor's services are terminated, S�a�rety shall be obligated to take over and perform the
Work. If Surety docs not co�nz�aence perforriaance thereof witEiin 15 consecutive calendar days
af�er daie of an additional written notice demanding Surety's performance oF iE�
CITY OF PORT WORTH
STANDARDCONSTRUCTiON SPECiFICA'CI�N 170CUME3�i'['S
Revision: r3attEt 9, 2(1�l
ao�2oo-i
cE��Ra�. co�otrior� s
Page 59 of 63
obligatzons, ihen City, without process az acfian at law, may take over any por�ion of t:he
Work and complete it as described belaw.
a. If City completes tlle Worl�, City xnay exclude Contractor and �urety from the si#e and
take possession of the Work, and all material� and eqtaiprnenf incorpoxatecl into the Work
stored at ttze Site or for whzch City has paid Coniractor or Suz�ety but which az-e stored
elsewhere, and finish tk�� Work as City may deem expedient,
Whether City or �urety completes the Worlc, Contractor sha11 not Ue entitled to receive any
further payment unti] the Work is fu�shed. If Y.he �anpaid balance of the Coniract Price exceeds
all claitns, costs, losses and da�ages sustained by City arising out of or resulting fram
cornpleting the Work, such excess will be paid to Contractor. rf such clavns, costs, losses and
damages exceedsuch unpaid balanc�, Contractor shall pay the difference to City. �uch cIaims,
casts,losses and damages incurred by Ciry wi11 be incarporated in a Change Order, pro�ided
that when exercisizkg any rights or remedies under thi,s Paragraph, City sha11 not be required to
abtain the lowest price for the Work performed.
4. Neither Czty, nor any of its z-especti�e consultants, agents, of�acers, directors or employees
shalI be in any way liable or accountable to Contractor ar �urety for the method by �which the
coznpleiior� of the said Work, or any portion thereof, may be accarnplished oz- for ihe price paid
therefor.
5. City, notwiihstanding the meihod used in completit�g the Contract, shall not forfeit the right
to recover daznages from Contx�actor or Surety fox Contractor's faih�re to timely cot�p�ete the
entire Cantract. Contractor shali not be entitled to any claim on accourtt of the naethod used
by City in campleting ihe Contract.
6. Maintenance oi the Worl� shau caniinue to be Contractox's and Surety's responsybiIaties as
pxovided for in thc 6ond requirements of the Contract Documcnts or any ,special guaranices
provided for under the Contract Docurrients or any other obligations other�;vise prescrbed by
Iaw.
C. Notwithstanding Paragt-aphs �5.02.B, Contractor's services wiIl not be tern�inated if Contractof
begins wiY.�un seven days of receipt of notice of inient to termizxate to correct its faihr�e to perForm
and pz-oceeds ciiligently to cure such failure within no more tlaan 30 days of receipt of said noiice.
D. Where Contractoz-'s ser�ices have been so ier�ninafed by City, the termination will nat affect any
rights or remedies of Ciiy against Contractor tlien existu7g or which nnay ihereafier accz-ue. Any
retcntion or payment of moneys due Contractor by City will not release Contractor froxx�.liability.
E. If and to the extent i�at Contractor has provrded a perforrnance bond under the provisions of
Paxagraph 5.02, the tex•x�.��tion procedlures of thafi bond shall noi supersede the provisions of this
Az-ticle.
CITY OF FORT WOT2'1'H
STANDARDCONSTBUCT'ION SPF,CIFICAT[ON I�OCUMENTS
Re�ision: Madi 9, 2Q20
007200-1
GENERAL CONQITIpN 5
Page 60 of G3
15.03 Cily May Te�minate For Convenience
A. City nrzay, wi�hout cause ancl. without prejudice to any other right or �emedy of City, tern�inate f,he
Contract. Any termination sk�all be effectedbyz�ailing a notice ofthe termination to tk�e Caniractor
specifying the extenfi to which performance of Work under the contract is tenrunated, and the date
upon which such tez-mination becoznes effective. Receipt of tl�e no�ice shaIl be deenaed
conclusively presumed a�d e�tabiished �rhen the letter is placed in the United StatesPostal Service
Mail by the City. Further, it sha�l be deemed conclusively presumed and established that such
ter-m�ation is rnade with just cause as thereita stated; and no proof in any claim, dertaand or suit
s�all be required of ihe City regardit�g such discret�onary action.
B. After xeceipt of a notice of terrriination, and except as otherwise directed by the City, the
Contracior shall:
I. Stop work undex the Contract on the da te and io the extent specif�ied ir� the notice of termiunation;
2. place no further orders or subconiracts for mat�ria�s, services or faciliti.es except as rnay be
necessary for complet�on of suchportion of the Work under the Contrac� as is not tenninated,
3, terminate a�l orders and subcontracts to the extent thai they relate ia the performance oi ihe
Work iermrnated by notice o� termination;
4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any,
directed by the City:
a. the fabricated or unfabricated parts, Woxk in progress, completed Work, supplies and
other maierial produced as a part of, or acquired in connection with the perfozxaaance of,
the Work texrninated by the notice af tl�e termiz�atiai�; and
b. the com�letecl, or partially co�.ap�eted plans, drawings, in%rmation. and other property
which, if the Contxact had been coznpleted, would have been required to be furnished to
the City.
5. complete perfaz'mance of such Worlc as shall not have been ternninated by the notice oi
terixzi�nation; and
6. take suck� action as may be necessary, or as the City may direct, for t11e protection and
preservation af the property related to its contract which is in the possession of il�e
Contractor and in which �he owner has or may acquire the res�.
C. At a i.it�.e not later than 30 days after the terrnination date specified in the nofice of ter�nu��tion,
the ConYractor rnay submit to the City a 1ist, certified as to quant�ty and quality, o� any or all iiems
of tennination inventory not previously disposed of, exclusive of items the disposition of which
has been d�rected or authorized by City.
CIT Y QF FORT WORTH
STANDARDCON3TkUCT10N SPECIFICATION DOCUMENTS
Revision: Mad� 9, 2020
0072DO-I
GENEF2AL CONDITIOfJ 5
Page 61 of 63
D. Nat Iater than 15 days thereafter, the City sha1l accept title ta suck� items provided, that the 1��t
submitted shall be subject to �erif'ication by the Ciiy upon removal of the itcros or, if the iieir� are
stored, within 45 days from the date of subir�ission of the Iist, and any necessary adjustments to
correct the ]i,st as submitted, shaIl be znade prioi� to %nal settle�nent.
E. Not Iater than 60 days after tkae notice oi termi��ation, the Contractor shaIl submit his terniination
claim to the Ciry in the form and with �he certification prescribed by the Ciry. Unless an extension
is made in wri�ing withiiti such 60 day period �by ihe Contractor, and granted by the City, any and
alI such claims shall be conclusively deenaed vvaived.
F. In such case, Contractor shaIl be paid for (without dupIicaiion of any items):
1. completed and acceptable Work executed in accordance with the Contract Documents priar
to the effective date of ternlination, inc�uding fair and reasonable sunns for overhead and pro£'it on
such Work;
2. expczases sustaincd priar io the effective date af tez-mina�ian in perfarming services and
furnisbit7g labor, ma�erial,�, oz equ�ipment as required by the Contract Docutx�enis in connec�ion
with uncompleted Wr�rk, plus fair and reasonable su�ns far overhead and profit on sucl� expenses;
and
3. reasonable e�pe�zses cl�rectly attributable io termit�atiorL
G. In fihe event of ihe faiIure oi the Contractor and Ciry to agree upon the whole amotu�t to be paid
Eo the Cozatractor by reason of the tetinination o1'the Worl�, the City shall determine, on the basis
of information available to zt, the amount, if any, due to the Cantractor by reason of the tenriina#ian
and shall pay to the Coaatraclor ihe amounts detez7nined. Contractor shali noi be paid on account
of loss of anticipated profi�s or revenue or ot�ier economic loss arising out of or resulting from
such tei���ination.
ARTICLE 16 — DISPUTE RE�OLUTION
1C�.Ol Meihods and Procedu�es
A. Either City or Contractor may request mediatioz� of any Coniract Claim submitted for a deci�sion
under Paragaph lO.Ob beFore such decision becomes frtial and bu�ding. The request �or mediation
shall be submitted to the oih�r party to the Contract. TIlnely subzx�ission of the request shall stay
the effect of Paragraph 10.06.E.
B. City and Contractor shall participate in the media.tion process in good fail:h. The proce�s shall 6e
commenced within 60 days of filing of the rec�uest.
C. If the Cantraci Claim is not resolved by mediation, City's action under Paragraph 10.06.0 oz- a
denial ,pursuant to Paragraphs 10.06.C3 ox 10.O6.D sha�l become �zna1 and bindmg 30 days after
ter�nination of ti�e mediation unless, within Yhat time period, City ar Confractor:
CiTY OF FORT WORTH
STAN]]ARDC(3NSTRUCTION SPEC[PICATION DOCUM�,IVTS
Revision: DTadi 9, 2Da0
00 �a oo - �
GENERAL CONO I710N S
Page G2 of 63
I. elect,s in writing to invoke any other dispute resolution process prrovided for � the
Supplezxzentary Conditions; or
2, agrees with the other party to �ubzxxit the Contt�act Claim to another dispuic resolution
pxocess;or
3, gives written notice ta the other party of the intent to submit the Cant�act Claim to a court of
competent jurisdiction.
ARTrCLE 1`� — MT�CELL,ANEOUS
17.01. Giving Notice
A. Whenever any provision of the Contx�act Documents requires ille g,iving of ovrztten no�ice, it wiil
be deemed ta have heen validly given if`:
1. del�ivered i� perrson to the itadividual or to a member of the �rm ox ta an officer of t�ie
corpoxation far whom it is intended; or
2. delivered at or sent �y registered or certified mail, postage prepaid, to tk►e last bus:a�ess
address knawn to the giver aithe notice.
B. B�iness address chan�es must be prompfly made in writing to the other party.
C. Whenever the Contraci Documents specif'ies givzrzg; notice by elecironic means such electroiuc
n:otice shall be deemed sufficient upon conf�'�rrnafion o� receipt by thc receiving party.
17.02 Computatian afTimes
When any period of tuxae is refe�-�•edta in the Contract Docurnnents by days, it will be computed to
exclude the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or an a day made a�egal holiday the next Working Day shall become the �si day
of the periad.
17.03 Cumu2ative Remedies
The duti�s andobligations izx�pos�d by these GeneralConditions an.d the rights az�d remedies available
hereunder to the parties hereto are in additzon to, and are not to be coz�strued in any way as a li�nitation
of, any rights and reznedies available to any ar all of ihern which are otherwise imposed or available
by Lavus or Regulations, by special warranty or guarantee, or by other provisions of the Contract
Documenis. The provisions of this Paragraph �rvill be as effective as if repeated specif�ically in the
Contz�act Documents in cor�nection vcTith each particulax dury, obligatzan, right, and remedy to wl�ich
they appiy.
CITY OF PORT In70RT13
STANDARDCONSTRUC7'IOM SPECIF{CATiOM IIOCUMEIVTS
Revision: Madti 9, 20�;1
oa�zoo-�
GENERAL COND ITION S
Pagc 63 of 63
17.04 Survival ofObligctiion,s
All representations, indernniiications, warranties, and guarantees made in, required by, ar given in
accordance with the Cant�-act Documents, as well as all continuing obligations indicated in the
Contract Dacuments, will survive final payment, completion, and accepiance of tlle Work or
termination or cornpleiion ofthe Contract or tez•n�iation of the set-v�ices af Confi-acior.
17_OS Headings
Ariicle and paragraph headings are inserted for conveniez�ce only and do not constitute parts of these
General Conditions.
CITYOFFORT WOR1"I�
STANDARDCONSTRUCTION SPECIF[CAT10N DOCUMN,NTS
Revision: Marh 9,?.02D
00 73 00
SUPPLrNf�NTARY CONDITIONS
Page 1 of 7
SECTION 00 73 04
SUPPLEMENTARY CONDITIONS
TO
GENERAL CONDITIONS
Su�plementary Conditions
'I'hese SupplennenCary Conditions modify andsupplement Section �072 00 - Gene�-alConditions, and ather
provisions ofthe ContraciDocumenfs as indicated below. Allprovisions ofthe GeneralConditions thatat�
modified or supplementedremain in full force and effect as so modiiied or suppiemented. Allprovis ions
of the Generai Conditions which are not s o modified or supplementedremain in full force an d effect.
De�ined Terms
Thetenns usedin these Supplem�r�tary Conditior�swhich are defined in the GeneralConditions haaethe
meani�ng assignedto thernin the General Conditions,unless s�ecifically notedherein.
Modiixcations and Supplements
The following are i�structionstk�atmodify orsuppiement speciflc paragraphs in the GeneralConditions and
other Contract Do cuments.
SC 3.[i3E.2,"ResolvingDiscrepancies"
Plans govemoverSpecifieations.
S C-4.01 A
Eas ement Jimits shown on the Dx�wing are appro�tnate and were provided to establish a basis for bidding.
Upon receiving the finaieasements descriptions, Con�actorshalicompare themto the lines s�ownon ti�e
Con[ract Drawings.
S C�4.O 1.A.1., "Avaiil abiiify of Lands"
Tl�e following is a l�st ofknown outstanding right-of-way, andlor easements to be acqurred, ifany as of
06129/2020:
OutstandingRightOf-Way,andlor EasementstoBeAcquered
PARCEL OWNER TARGET DATE
NUMBE[Z OF POSS�SSION
i�iD�'I� �
The Contractor understands and agrees that thedates lis ted above are estimates only, are n o t g u arant e ed,
and da noibindthe City.
If Contractor considers lhe final easemen�s provided to differmaterially from ihe xepre s en tatio ns o n the
Contr�act Drawings, Con�actorshallwithin five (5} BusinessDays andbeforeproceeditigwiih the W or�C,
notiiy City in writing associatedwith the differing easementline locations.
CITY OF' FORT WORT�3
STAN17ARi] CONSTRUCi'lON 5PBGIFICATTO�i DOCiiME3�1TS
Revised March 9, 2024
2Ult SidewalkTlnitPrice Const�'pction Cantract
lazszo
OQ 73 06
SUPPLEMENTAIZY COND[T�ONS
Pagc2of7
S C-4 A 1 A.2, ��Avai Iability of Lands "
Ui�lities or obs txuctio�s to be removed, adjus ted, and/or relocated
The following is lis t o f uti�ities and/or obstnlctions that 13 a�e notbeen removed, adjusted, and/or relo cated
as of�6/2912020
��'ID U"I'ILTTY AND LOCATION TARG�,'I' DATE QF
��� ADJUSTMENT
T�Tone
The Contractarunderstands andagrees that thcdates listed ahoveare estimat�s ozaly, arenotguaranteed,
and do not bindthe City.
S C�.02A., "S u�surfacc and�hys ical Conctit�ons"
Tl� e following ai�e rep arts o f eap lorations and tests of s ubse�rface conditions at the s itc ofth e W rnrk:
None
The fo�lowing are dxawin�s ofphysicaI conditions in orrelating to ex�sting surface and s�bsurface
s tructures (e�ept UndergraundFacil�ties} which are at ar contiguous to the site ofti�e W ork:
None
SC-4.06A.,"Hazardous ��vrronmentai Conditions at Site"
The followulg are reports and drawit�gs afe�sting hazardous environznental conditions l�ownto the City:
None
5C-5.Q3A.,"Certif'icates ofInsurauce"
The entitzes lis ted b eto w are "additional in s�areds as their interest may appear" in cludin� theu res p ecCi�e
officeis, duectars, agents and empIoyees.
(1} City
(2) Consultant: None
(3) Other: None
S C�S.09 A., �� Contractor's Tns urance"
The limits o f liahility for th e insuran ce required by Paragi�ap h C,C-5. (34 s hall pro�+ide the fo ltowing
coverages fornot Ies s thanthe fol[owing amounL� orgreaterwhere requircd bylaws and i•e�ulations:
5.04A. W arkers' Comp en sation, under Paragraph GG5.04A.
Statutory limifs
Employer's liability
$IOO,ODD eachaccident/occurrence
$100,OQ0 Disease-eachemployee
$500,000 Disease-policylimit
crr�r oF �oizT wor�r�
Z021 SidervaikiJnitPrice Consh•uctio�► Cantract
102520
STAI�ARD CONSTRUCTTON SPECIFICA,TTdN ➢OCUMENTS
Revised Marcli 9, 202d
OU 73 DO
SUPPLEME]�iTARY COI�IDITIONS
Page3of7
SC-5.04B.,"Confractor's Insurance"
5.0�45. Commercial General Liability, underParagraph GC-5.048. Contractor`s Liability Ins u�ance
underParagraphGC-5.(}GB., which shallbeon aperprojectbasiscoverijlgtheContractorwith
minixrrum limits of
$1,000,000 each occurrence
$2,000,000 aggregate7imit
The policy must have an endorsement (Amendrnent—Aggregate Lixnits oiInsurance) mal�ng the
General Aggregate I,imits apply separately ta eachjob site.
The Commercial Genet�al Liabilrty Jnsurance policies shallprovide "X", "C", and "U" coverage's.
Verification ofsuch coveragemusibe shownin theRemarks Article afihe CerYif�cate oflnsurance.
S C 5.04 C., "Contractor's ins urance"
5.0�4C. AutomabileI,zability,underParagraphC�G5.Q4C. Contractoz''sLiabilitylnsuranceuncier
Para�ranh GG5.04C., wk�ich shallbe in� an amountnoi less thanthe followingamounts:
(1} Automobiie Liiability - a con�mercial business poIicy shallprovidecoverage on "AnyAuto",
defined as autos owned, h ired an d non-owned.
$I,000,000 each accidentona combined single Litnit basis. Split limits are acceptable iflimits are at
least:
$250,000 Bodilylnjuryperpersonl
�'S00,000 Bodilylnjuryperaeerdent/
�'100,000 PropertyD�mage
S C-5.04D, "Contractor's Ins urance"
"I'he Contractor's construction activities will require its ernployees, ageni:s, subcontraciors, equipment, and
znaterial deliveries to cross railroad properties and tracics None.
The Coniraciorshallconduci its operatians onrailroad propeKties in such a n�nner as notto interfere wiih,
h inder, or o bstrnct the railroad company iva any mannerwh atsoever in the use or operation a f itsltl�eirtrains
or otherproperiy. Such operations on ��ailxoad properties zx�ay requfre thatCont��actorto execute a"Right of
Faztry Agreement" witt� the pazticularrarlroad company or cornpanies involved, andto this e� dthe
Contractor should s atisfy its el�as to the requiremenfis ofeach z~aii�oad company and be prepared to exec�te
the right-of-entry (if any} r•equired by a railro ad company. Therequirernents speciiied herein likewise relate
to the Contractor's use ofprivat� and/or construction access ro ads cro ssing s aid railraad company's
properties.
The ContractualLiability coveragerequiredbyParagraph 5.04D ofthe GenexalConditions shallprovide
coverage fornot les s than the following amounts, is sued by companies s atisfactory to the City and to the
Railra ad Company for a term th al: continues �or s o Iong as the Contractor's operations andwork cros s,
o ccupy, ar to uch railroad prop erty:
(1} G�neral Aggregate:
(2} �ch Occurrence:
_ Reqaued forthis Conti�act
CITY OFFORT 4V70RTH
STA]�DARD CONSTRUCI'IOI� SPECIFICATCON DOCUMENTS
Ttevised iVlazdt 9, 2020
$Con�rmLimits wiiliRailroad
$Co n�rm Limits with Ra ilraad
x Nat requiredforthis Cantract
2D2I SidewalkUnitPrice Canstt'uctian Contract
102520
oa �3 00
SLTP PLBMENTARY CONDITIONS
Pagc4of7
W ith res p ect to the ab ove outlined ins uran c.� requirements, th e fol[o wing sh a[i go vez-n:
1. Wh�reasinglerailroadcompanyisinvolved,theConfractorshallprovideoneiusuxancepolicyin
the naz�ne of the railroad company. Howe�er, if more than ozle gradc separation or at-grade
cro s s ing is affected by the Pro ject aE entirely sepaz-ate lo cations on the line o r lin e s o f th e s a me
railrc�ad company, separate coveragcmaybe rcqun-ed, each in the amount statedabove.
2. Whcre ax�are than one raih-oad companyis opez-ating on the satne �-ight-of-way or wka ere s everal
railro ad cornp anies are inv olaed and operated on their o wn s eparate rights-of way, th e Contrac to r
may be z�equued to providcseparate insurancc policies in the name ofeach railroad company.
3. If, in additian to agrade separationoran at-grade crossing, othcrworkoractivity is pxoposedon a
railro ad coinpany's right-of way at a lo cation entirely s eparate fro m the g��ade s ep a rat i o n o r a t-
grade cz-ossing, insurance co�erage forthis waxkmust be includedin the policy cove�ing the grade
separation.
�. Ifno grade separatianis involvaibutothexworkis proposedonarailroadcompany's right�of-
way, a 1l such otherwark may b e cov ered in a single po licy for th at rarlroad, evcn tk�ough the work
n�ay be at Cwo armore separate ]ocations.
No work or activities on a railro ad co mpany's propefty to b e p ei�formed by the Contractor s hallbe
comtnenced.unti�the Contractorhas �rnished the City with an originalpalicy orpolicies oftk�e insurance
for eac11 railroad company natr�d, as required above. Ali such insurance mus t be approvedby the City and
each affecfedRailroad Cornpanyprioz'to the Contractor's beginning work.
The iuisuraizce specified abo�ve ir�ustbe carried until alI Workto be performed on therai3roadright-of way
has been completed andfhegrade crossing, ifany, is no lo��gerusedby the Gontractor. In addition,
it� s uran ce mus t be carried during all maintenance and/or repair work p erformed in the railro ad ri�;h t�o f-way.
Such insurance musi name the raih�oad co�nnpany as the insured, togetherwith any tenantor lessee alFthe
railroad company operatingovertracks involvedin theProject.
SC-6.04., "ProjectScheduIe"
Projcct schedule shallbe tier3 for the project.
SGbA7., "WageRa�es"
The following is theprevailing wageratetable(s) applicable ta thisprojectandis p�-o�ided in the
l�ipp endrxes :
2013 PrevailfngWageRates {Horizontal)
2013 PrevailingWageRates (Ver£ical)
A copy ofthe #able is a�so available by accessing the City's website at:
htt s:lla s.fartwort�texas. ovlPro'ectResources/
You can access the file by follow�ng the directory patla:
02-Construction Documents/Specifications/Div00 — General Conditions
SC-G.09., "Permits and Ul�lities"
SC-6.09A.,"Contractorobtainedg�rnRats and licenses"
CITY OF FORT WORTH
2021 SidewalkIInifYrice Conshucann Conh�act
102520
STANDARD CONSTRTJGTION SP�.CIF'ICAiION DOCUMI.NTS
Rc�ised March 9, 2020
00 73 00
Si71'PLEMENTAR'Y CONDITIONS
Page 5 of 7
The following are lrnown per�nnits and/orlicenses required by the Contractto be acquuedby the Contractor:
"None".
SC-6.09B. "Cityobtained permits and licenses"
The foliowing are Irnown permits and/orlicens es required by t�►e Contractto be acquiredby the City:
None
SC-6.09C."Outstanrlingpermits andlicenses"
The following is alisi ofknown outstar�divgpernuts and/orIicensesto be acquired,ifany as of06/2912020
Oats tantling Permits andloe Licens es to Be Acquired
OWNER 1'IItMIT OR LIC�NSE AND LOCATION TARGET DATE
O�' POSSESSTON
f►C�7iLa
SC-G.2�4B.,"'IYt1eVI,C�vi1 Rights Actof 1964 as amended"
During the perfot�nance o fthis Coniract, the Contractor, far its elf, its ass ignees and s uccessots in interest
(hereina�terreferred to as the "Contractor" ) a�rees as follows :
1. Conapiiance with Regulai�ons: The Coniractorshallcomply with tl�e Regulationrelative to
nondiscrimination in Federally-assistedprogram5 of the Depar�ment oiTransportation (hereinafter,
"DOT") Title 49, Code ofFederalReguJations, Pait 21, as they may be amendedfromtime to time,
(hereinafterreferred to as tk� e Regulations}, which are hereir► sncorporated by reference and �made a p att
ofthis contr-act
2. Nondis crimination: The Contractor, with regard to theworkperfortned by it during the contract, shall
not discrirni�late on the grounds ofrace,color, ornationalorigin,in the selection andretent�on oi
s ubcontractors, inciudin g procurements ofmaterials a�d leas es of equipment. The Contractor s hall nat
participateeitherdirectlyorindirectlyit�thedisci'uni3�ationprohibitedby�9CFR, section21,5oithe
Regulations, including emplayment practices when tl�e contract covers a progra�n s et forth i�rx
Append�B ofthe Regulations.
3. Solicita�ions for Subconlxactors, Ynclucling Procurements ofMaierials and Equiptr�ent: In all
s alicitaiions eithea� by cornp etitive bidding or negotiation made hy the contractorfor work to be
p erfor�ned under a sub contract, including procurer►zents afmaterials or leas es of equipment, each
po Cential subcontactor or s upplier s hall be noti�'ied by the Contractor of the Contractor's ohligations
underthis contractandthe Regulations relativeto nond�sci��nination on the grounds ofrace, color,or
national origin.
4. Inforxnation and Reports: T�e Contractarshallpro�ide allinformation andreportsrequiredby the
Regulations or dvrectives is sue�i pursuant thereto, and shallp ernut acces s to its bo oks, records,
accounts, othersources ofinforn�ation andits facilities as may be detennined byCity orthe'I'exas
Dep artment o f T'ransparhation to be p ertiuient to ascertain comp liance with s uch Regulatians, arders
and instructions. Whereanyinfoimationrequiredofacontractaris inthee�elusivepossessionoi
anotherwho fails orrefuses to furnishthis tniam�ation the contractoz'shallso ceztify tothe City, orthe
Texas Depart►nent ofTi�nsportation, as appropriate, and shall s ct forth what efforts it has made to
obtain the inforn�ation.
CITY OF FORT WORTI�I
STANDAItD CONSTRUCTTON SPECTFIGATIOI�! 170Gi7MENTS
Revised Marcli 9, 2020
202I Sit�c�valkUnitPricc Canshvction Confi�act
102520
00 73 00
SUP P LEME?�]TARY C ONDI'T IONS
Pa;e 6 of 7
5. Sanetions foe NoncompIianee: In the cvent oft� e Contractor's noncamp�iance with the
nondisciiminationprovisions ofthis Contract, City shal� impose sucl�contractsanctions as it orthe
Texas Department ofTransportationrr�y defeimine to be appropriate, incluciing, butnot Iirnited to:
a. withhoiding ofpayments to theContractorunderthe Contraciuntilthe Contractnr
complies, and/or
b. cancellation,terminatio�arsuspensionofthe Contract, in wholeorinpart.
6. Intcorporation c��Provisians:TheContractorshaElincludethepro�isionsofpara�-ap1�s(1)through
(6} in every subcontrac�, including proc�ements oft�aterials andleases ofequipment,unless e�;empt
by tha Regulations, or directives issued pursuant Chereto. The Contracior shall take s uch act�onwith
res� ect to any subco ntract o r pro curezxzent as City or the Texa s Dep artrnent of Transp ottation ma y
direct as a means afenforcingsuchprovisions inciudirzgsanetions fornon-carr�liance: Provided,
however•, that, in the event a contractar becomes involved in, or is threaiencd with, litigation with a
sub contractor or s upplier as a res u lt o f s uch direciion, the cantractc�r ir�y request City to en ter into
s uch ]itigation to protect th e interests of City, and, in addiiio n, the contractor may request tn e United
States to enter into such litigation to protect the interests ofthe Unitacl States.
Additional Title VI requirements can befound in the Appendix
SC-7.Q2., "Covrcbinatzon"
The individuals orentities Iistedbelowhave contracts with the City forthe pez�'o��rnance ofotherv�rorkat
the Site;
Vendar Sco Of WOY� Coordit�aiion
Nane
S C-8.01, 4L Corntt��nications to Cantractor"
Nane
SC-9.01., °� Czty's Pro,ject Manager"
The City's ProjectManagerforthis Contractis Shaztuiv Rahman or kusllier successorpurseaantto wx�itten
noYrfication irom the Director ofTranspnrtation and P�blic Work Departmen�
SC-13.03C., "Tests andIns�ctions"
Nane
S C-16.0 1 C.1, ��Methorls and Procedures"
None
END OF �ECTION
CITY QF FORT WORTH
2027 SidewalkLJnitP�ice Constraction Cont��act
102520
STANI)ARD CONSTIZUGTION SPFCIE�iCATION DOCUMN'NTS
Ravised Maoch 9, 2020
Cl'I'Y OF FOTiT WOIt'PH
STANDAI2I� GONSTRUCTION SPECIFICA'I'iQN DOCUMENTS
Revised March 9, 2U20
00 73 00
SILTPFLEM EAiTARY CONDIT [ONS
T'agc 7 of 7
2021 Sidewalki7nitPrice Conshvctian Caxtrnct
IU2520
U] 1100-1
SUMMAI2YOP WORK
i'age 1 of 3
�
2
3 PART I - GENERAL
sFCTTON aa �x o0
SUMMARY OF WQRK
4 1.1 SUNIlVIARY
5 A. Section Includes:
6 1. �ummary of Work to be perforrn�d in accordance witli the Contract Doc�nent�
7 B. Deviaiions from thi� City ofFort Worth Standard Specifica#ion
S 1. None.
9 C. Related Specification Sections include, but are not necessarily Jirxii�cd to:
i0 1. DiviSion 0- Bidding Requirements, Contract Forms, and Condiiions of the Contract
11 2. Division i- General Requirements
12 1.2 PRICE AND PAYII�IIVT PROCIDrIRF�
13 A. Measurement and Payment
1� 1. Worlc assaciated with this Item is considered subsidiary to the various items bid.
I5 No separate payment will be allowed for this Ite�n.
16 1.3 R�EREI�TCES [NOT iTSED]
17 1.4 AD1VC�I�ISTRATTVE REQti`�REMQ�ITS
18
I9
20
21
22
23
24
25
26
27
28
29
3b
31
32
33
34
35
A. Work Covered �y Contract Documents
1. Worlc is to include furnishing all ]abar, znaterials, and equipment, and perforrnixag
a1l Work necessary for this constructian project as detailed in the Drawings and
Specifications.
B. Subsidiary Worlc
1. Any and a�l Work specifically gaverned by document�ry requireinents for the
project, such as conditions imposed by the Dravvings or Contract Documents in
which no specific item for bid has been pro�ided �'ar ir� t�e Proposal and the it�m is
nat a typical u�azi bid item included on the standard bid itcm list, then the item shali
be considez-ed as a subsidia.ry itezn of Worl�, the cost of which shalibe iu�cluded in
the price bid in the Proposa[ for various bid iteins.
C. Use ofPremises
1. Coardi�ate us�s of premises under direction of the Ciiy.
2. Assume fi�ll responsibility for protection and safekeeping of materials and
equipment stored an the Site.
3. Use and occupy only portions of the public streets and alleys, or other public places
or other righis-of-way as provided �ar in the ordinances oithe City, as shown in the
Contract Docum�nts, or as may be specif"ically auf.�oxized in writing by the City.
C1TY OF FORT WORTT�
2D21 SidefvalkUnitPrice Construchon Contract
102520
STANDAItD CONSTAiJCTION SPEGIFICATIOAI DOCUME.NTS
Reviccd December 20, 2012
Ol 11 00 -2
SUMMAI2YOT WORK
Yage2of3
1
2
3
4
5
6
7
9
la
11
T2
13
a.
b.
c.
A reasonable amoumt af tools, materials, and equipment for constructzon
purposes may be siored in such space, but no rno�re than is necessary to avaid
delay in the construction operations.
Excavated and waste materia]s shall be stored in such a way as not to interfere
with the use of spaces that may be designated to be left iree and unobstructed
and so as x�at to inconvenience occupants of adjacent property.
if the street is occupied by rai]road tracks, tihe Work shall be carx'ied on in such
manner as not to �itaterfere with the operation o�t�e raiIroad.
1) All Work shall be u1 accordance with rail�road requirements set forth in
Division 0 as well as the rai�oad pet�mit.
D. Wark vvithin Easements
1. Do zaot enter upon private property for any purpose without having previously
obtaaned permission fram the awner of such property.
14 2. Do not store equipment or material on private property �nless and until the
15 specified approval of f11e praperty owner �aas been secured in writirzg by fhe
16 Contractor and a copy furnished to the Ci�y.
17 3. Unless specificalty provided otk�erwise, clear all rights-of way oreasements of
1 S obstruct�ons which rnustbe rcmoved to make possibl� proper prosecution of the
19 Work as a paxt of the project construction operations.
2fl
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
4. P reserve and use every precaution to prev�nt damage to, aIl trees, shrubbery, plants,
lawns, fences, culverts, curbing, and all other types of structures or impz�avements,
to all water, sewer, and gas lines, to aIl conduits, overheadpale lines, or
appurtena.nces thereof, including t�e construction of temporary fences and to all
oCher public or private property adjacent to the Work.
5. Notify the praper representatives oi the owners or occupants of the public or priva�:e
Iands of interest in lands which might be affected by the Work.
a. Such notice shall be made at least 48 hours it� advance of the beginning of the
Work.
b. Notices shall be applicable to both public and private utility companies and any
corporation, compa�ay, individual, or other, ezther as owners or occupants,
wk�ose land or interest in land might be affected by the Work.
c. Be responsible for all da�aage or inj�u'y to properry of any character resulting
from azay act, omission, neglect, or misconduct in the naanner or method or
execution o�the Work, or at any iiux�e due to de%ctive woz�, material, or
equipment.
36 6. Fen.ce
37 a. Restore all fences encountered and removed duruag construction oithe Pxoject
38 to the original or a betier than original condition.
39 b. Ereci temporary fencing ixa place of the fencing re�oved whenever the Work is
q0 not in progress and wh�n tI�e site is vacated overnight, and/or at alltimes to
ql provide site security.
42 c. The cost for all fence warlc within easements, including removal, temporary
43 closures and replacement, shal[ be subsidiary to the vai�ious iiems bid in the
44 project proposal, unless a bid item is specifically provicied in the proposal.
CITY OF FORT W012TH
2021 SidewalkiinitPtice Constr¢ction Conh�act
Z02520
STANDARD CONSTREICTIOT! SPECIFICATION DOCUMENTS
Revise� December 20, 2Q12
o� iiaa-3
SUMivIARY OF WORK
Page 3 oF3
1 ].5 SUBMTTTALS [NOT LTSED]
2 1.6 �CTION SiIBMCTTALS/INFORMATTONAL SUSMITTALS [NOT USED]
3 1.7 CLOSEOUT SUBIVIIT`IAL� [NOT [TSEDj
4 1.8 MA�N'1`INANCE MATERIAL SUBNIITTALS jNOT US�D]
5 1.9 Q[7ALITY ASSURANCE �NOT USED]
6 110 DII,IVEE�Y, STORAGF, AND IIANI)LX1'�iG [NOT USED]
7 1.11 FIELD [SXTE] CONDITIONS [NOT IISi.`D]
8 1.12 WARRANTY [NOT USID]
9 PART 2- PRODUCTS [NOT USID]
IO PART 3- EXECUTiON [NO'I' LTSID]
11
12
END OF SECTION
Revision L.og
DA1'E NAM�, SUMMARYOF CHANGE.
13
CiTY OF FORT WORTH
2021 SidewalkUnitPrice Constz�uction Conh•aci
102520
STANDARD CpNST12UCT'ION SPECIFiC11TION DOCUIVIENTS
Itevised Decem6er 20, 2012
oi zsoo-�
S UB STTI'UTION PROC�I7URE5
Page 1 af 5
2
3 �ART 1 � GENERAL
� 1.1 SYINIMARY
5 A. Sec�ion includes:
6
7
8
9
10
11
I2
I3
14
15
SEC'I�ON O1 25 OQ
SUBSTITUTION �ROCEDURES
1. The procedure for request�g the approval of substitu#ion of a product that is not
equivalent to a product which is speciiied by descriptive or perfo;rmance criteria or
defined by re�erence to i or nr�are of the followzrzg:
a. Name of manufacturer
b. Name of vendar
c . '�� ade name
d. Catalag number
2. Substitutions are not °ot--equals".
B. Deviations fro�n this Ci�y of Fort Worth Star�dard Speciiicatzon
1. None.
16 C. Related Specif�ication Sections include, bui are not necessarily limited ta:
17 1. Di�+ision 0— Bidding Rec�uirex�rients, Contract Forms and Conditions of the Coni�ract
18 2. Division 1— Gex�eral Requirements
19 1.2 PRICE AND PAYMENT PROCEDiTI2FS
20 A. Measurement and Payment
21 1. Work associated with this Item is considered subsidiary to the �arious items bid.
22 No separate payment will be allowed for this Item.
23 1.3 REFERENCFS �NOT USED]
24 1.4 ADMIN[STRATIVE RF�QUIREl1�III�TTS
25
26
27
28
29
30
31
32
33
34
3S
36
37
A.. Request for Substitution - General
1. Within 30 days after awaz�d o£Contract (unless noted otl3ei-vvise), the City will
e onsider %r�rz�al requests from Cantractor iar substitution of pz'oducts in place of
t�aose specif"ied.
2. Certain types o� equipment and kinds of material are described in Specif'�catians by
rr�eans of references to names of rnanufacturers and vendors, trade names, ar
catalog numbers.
a. When this metk�od of specifying is t�sed, it is not intended to exchide from
consideration other products bearirzg other manuiacturer's or vendor's names,
trade names, oi catalog numbers, provided said pr-oducts are "or-equals," as
detenmined by Ciry.
3. Other types of equipment and kinds of material may be acceptable substitutzons
underthe%llowing conditions:
CITY OF FORT WORTH
2021 SidewalkUnitPricc Construction Canfract
I02520
STAN�AItD CONSTRUCTION SPECIFICATION AQCUMENTS
Revised 7uly 1, 20ll
oi2soa-z
St�BST1TU1'lON PEZOC�,DURES
I'age 2 of 5
1 a. Or-equals are una�ailab�e due to strilcc, discontinued production of products
2 meeting specified requirements, or oiher factors beyond contro] of Contractor;
3 or,
4 b. Contractor propose� a cost and/ar tiume reduction incentive to the City.
5 �.S SIJBMITTALS
5 A. See Request fax Subst�tution Form (attached)
7 B. �rocedure far Requestmg Substitution
8 l. Substitution shall be considered only:
9 a. After award of Cont��act
IO b. Under the conditions stated herein
11
12
13
14
I5
lb
17
18
19
2Q
21
22
23
24
25
26
27
28
29
30
3I
32
33
34
35
36
37
38
39
40
41
42
43
44
A5
2. Submit 3 copies of each written request for substitution, it�cluding:
a. Documentatzon
1) Coinplet� data substanliating compliance of pxopased substitutio� with
Contract Documents
2) Data relating to cl�ar�ges in consi�uction schedule, when a reduciion is
proposed
3) Datarelating to claange� in cost
b. For praducts
1} Product identifzcation
a) Manufacturer's name
b) Telephone number and re�resentative contact na�nne
c) Specification Sectian or Dt•awing reference of originally specified
product, inciuding discz•eie naine or tag number assigned to original
�roduct in Ehe Contract Documents
2} Manufacturer's literature clearly marked to show compliance of praposed
product with Cantract Documents
3) Itemized comparison of original and proposed product addressing pxoduct
chaxacteristics including, but not necessarily limi�ed to:
a) Size
b} Composition or materials of construction
c) Weight
d) Electrical or meclaanical requrrements
4) Product experience
a} Location ofpastprojects utilizing product
b) Name and telephone nunlber of persons associated with referenced
projects 1rnowledgeable co�cerning proposed pz'oduct
c} Available iield data and reports associated with proposed product
5) Samples
a) I'roeide at request of Ciry.
b} Saaa�ples become the property of the Cify.
c. For constxuction metl�ods;
1) Detailed description af proposed method
2) Zllustratian drawir��s
C. Approval or Rejection
i. Written approval or rejection of substiiution given by the City
C1TY O�' FO1ZT WORTH
2021 SidewalkUnitPrice Constt�c�ion Contract
102520
STA�fDlsRD COhISTRUCTION SPEC]FICATION DOCiIMEN'I'S
Revised July 1, 2D1]
Ol 25 QO - 3
SiJgST1TCITION PROCEDLTR�.S
Page 3 of 5
1
2
3
4
5
6
7
8
9
10
11
12
2. City reserves the right to rrequir� proposed product to camply with color and pattern
of spec�ed praduct if necessary to secure c�esign inteni.
3. In #he event the substitution is approved, the resulting cost and/or time reduction
will be documen#ed by Change Orde�' in accordance with the GeneralConditions.
4. No additional contract tinae wilibe given for substitution.
5. Substitution will be rejected if'.
a. Sub�nittal is not through the Cantractor wiih his stamp of approval
b. Request is not made in accordance with this Specification Section
c. �n the City's opinio�n, acceptance willrequire substantialreviSion of the original
design
d. In the City's opinion, substitution will not perfox-na adequately t.�e function
consistent with the desig� intent
13 1..6 ACTION SUBNIITTALS/IN�'ORMATIONAL SUBM[TTALS [NOT USID]
14 1.7 CL�,�TALTi' SUSNIITTALS [NOT USED]
15 1.8 MATNTENANCE MATERIAL SiIBMITTALS [NOT �CTSID]
16 1.9 QUALITY ASSLIRANCE
17
18
19
20
21
22
23
24
25
26
27
28
29
30
A. In malcing request for substitution or in using an approved product, tlze Contractor
represenis that the Contractor:
l. Has investigated proposed produci, and has determined that zi is adequate or
superior in all respects to that speci�ied, and that ii rvill per%zm �unction for vvhich
it is intended
2. Will provide same guarantee for su6stitute item as for �roduct specified
3. Will coordinate installat�an of accepted s�bstitution into Warlc, to inclu�de building
modifrcations if s�ecessat�y, nnal�ing such changes as may be required for Wark to be
complete in all respects
4, Waives a11 claims %r additional costs related to substitution which subsequently
arise
1.10 DELIVII2Y, ,ST'ORAGE, AND HANDLING [NOT USEDJ
1.11 F�ELD [SYTEj CONDY'T[4NS �NOT USID]
1.I� WARRAN'i`Y [NOT USID]
31 PART 2- PR�DUCTS [N4T USID]
32 PART 3- EXECUTION �NOT USID�
33
34
END OF SECTION
Revisio� Log
CITY OF FORT WORTH
2021 SidewalkUnitT'x'ice Cmistrucflon Conlract
142520
STANDARD CONSTRUCI'IO1�I SPEC�'ICATIOI� DOCUMENTS
Revised duly 1, 2011
Ol 25 QO -4
STIBS T1T UT10N PRQCEDIJRES
Pagc4of5
DATE � NAME � SUMMARYQF CIIANGE
C1TY OP FORT WORTH
2021 SidewalkUnitPrice Conshvctioq Contract
102520
STANDARll CONSTRUCC[ON SPECIF[CATION I30CUMENTS
Revised July 1, 2011
Ol 25 QO -5
SUBSTITUTION PROCEDUTtES
Pagc 5 af 5
X
2
3
�
5
6
7
8
9
10
I1
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
��BIT L�
REQU�ST FOR SUBSTITUTION FORM:
TO:
PROJECT: DATE:
We hereby submit foz yot�r consideration the following product instead of the specifi�d item for
the above project:
SECTION PA.R_AGRAFH SPECIFIED ITPM
Praposed Substitution:
Reason for Substitution:
Include corx�plete information on changes to Drawings ancVor Specifications which proposed
substitution wiJl require for its proper installation.
Fill in Bianks Below:
A. Will the unde�signed contractor pay for changes to the building design, including engineering
and detailing costs caused by the requested subsiatution?
B. What effect daes substitu�ion ha�re on other brades?
C. Differences between proposed substitution and specified item?
D. Differences an pro uct cost or pro uct de very t�e?
E. Manufacturer's guarantees of the proposed and specified items are:
Equal Better {explain on attachment)
The undersigned states that the funcfion, app�arance and quality aze equivalent or superiar to the
spec ified item.
Submitted By: Fox Lise by City
Signature
as noted
Recommended Reconamended
Firm
Addres s
Date
Telephone
Not recammended Received late
�YY J
Date
Remarks
For Use by City:
Approved
City
Date
Rejected
C1TY OF FOR1' WORTH
2U21 SidewalkUnitPrice Constrt�cflon Contract
10252�
STANDART7 CONSTRUCTION SP�CIFICATION DOCUMENTS
Revised 7uly 1, 20ll
01 31 i4 -1
PR�COAIST RUCTION M EET I1VG
Pagc 1 of 3
1
2
3 PART 1 - GF.1�iII2AL
SEC7�ON O1 31 19
PRECONSTRUCT�ON MEETING
4 1.1 S UNIMARY
5 A. Section Includes:
6 I. Provisions for the preconstructiox� m�eting to be held prior ta the start of Work ta
7 clarify construction con�act adz�ninistratian procedures
8 B. Deviations from this City of Fort Worth �iandard Specii'ication
9 1. None.
10 C. Related Specification Sectzons include, but are not necessarily limited ta:
11 I. Divisio� 0— Bidding Requirezxients, Contract Forzns and Conditions of tk�e Gontract
12 2. Division 1— General Requirements
13 l.2 PRICE AND PAYIV�IIVT PROCII}U.I�k'S
14 A. Measuremenf and Payment
15 I. Work associated with this Item is considered suUsidiaxy to the various items bid.
lb No separate payment will be a�lowed for this Item.
17 1.3 RF��itENCF� (NOT USED)
IS 1.4 ADMZI�IISTRATIVE REQUIR�:MENTS
19
20
2I
22
23
24
25
2b
27
28
29
3a
31
32
33
34
35
36
A. Coordination
I . Attend preconstruction meeting.
2. Represet�tatives af Contractor, subcontractors and suppliexs attending meetings
shall be qualiiiec! and autharized to act on behalf of tlae entity each rept•esents.
3. Meeting adrninistered by City may be tape recorded.
a. I�recorded, tapes will be used to prepare minutes and retained by City tor
future referer�ce.
B. Preconstruction Meeting
1. A preconstruc�ion meeting will be held within 14 days after the execution of the
Agreement and befoxe Work is started.
a. The rneeting wi11 be scheduled and administered by the City.
2. The Project Representative will preside at the meeting, prepare the notes of tlae
meefing and distribute copies o� same to all participants who so requcst by fuliy
completing the attendance faxm to be cieculated at t�ie beginning af the rtzeeting.
3. Attendance shalI include:
a. Froject Represexatative
b. Contractor's project manager
c. Contractor's superintendent
C1TY O�' F01tf WORTH
2021 SidewalkUnitPrice Construclion Contract
102520
STANDf1i217 CONBTRUCTIOI+I SPECIFICATTON DOCUMEI�ITS
Revised August 17, 2012
Ol 31 19 -2
PRECONSTRUCTION MEETING
Pa$e 2 oi 3
1
2
3
�4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
2,9
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
4G
47
4.
5
d. Any subcontractor or supplier representatives rxlhom the Contractor rnay desire
to invite or the City may request
e. Othez' City representatives
f: Others as appropriate
Construction Schedule
a. Pcepare baseline construclion schedule in accordance vvith Section O1 32 16 and
provide at Preconstruction Meeting.
b. City v�ill notify Contractor of any schedule changes upox�Notice oi
Precox�structian Meeting.
Preliminary Agenda may incl��de:
a. Introduction af Project Personnel
b. General Description of Project
c. Status of righi-of�vvay, utiIiry clearances, easements or other pertinent permits
d. Ca�ntractor's workplan and schedute
e. Contract Time
£ Notice to Proceed
g. Construction Stalcing
h. Progress Paytnents
i. Extra Wark and Change Order Proceduz'es
j. �ield Orders
k. Disposal Site Letter for Waste Material
L InsuranceRenewals
m. Payroll Certification
n. Mater�al Certifications and Quality Control Testing
a. Public Safety ar►d Convenience
p. Documentation of Pre-Constructiox� Conditions
q. Weelzend WorkNotiiicatian
r. �.egalI-�olidays
s. TrencY� Safety Plans
t. Confined Space Entry Standards
u. Coardination with the City's representative for operations of existing water
systerns
v. Stor�m Water Pollu�ion Prevex�tion Plan
w. Coordination with other Contractors
x. Early Warning Systezn
y. Contractor Evaluation
z. Special Co�ditions applicable to the pxoject
aa. Damages Claims
bb. Submittal Procedures
cc. Subs�tution Procedures
dd. Coxx'espondence Routing
ee. Record Drawings
fF. Tempo;rary construction facilities
gg. M/WBE or MBE/SBE procedures
hh. Final Ac c eptanc e
ii. Pina1 Payznent
jj. Questions or Comments
C1TY OF FORT WORTH
2021 Sidewa]kUnitPrice Canstructio� Conh'act
102520
STANDARI? CONSTRCJCTIQN SPECIFICATION DOCTJIVIENTS
Revised August 17, 2012
O1 31 19 -3
PRECONSTRUCTIDN NfEETING
Page3of3
1 1.5 SUBM[TTALS [NOT LTSEDJ
2 t.6 ACTTON SUBMITTALS/IN�'ORMATTONAi, SUEMITTALS [NOT USED]
3 1.7 CLOSEOi]T SUBMITTALS �NOT USID]
4 1.8 MA,�NTINANCE MA7'ERiAL SUI3M[TTAL� jNOT USID)
5 1.9 QUALITY ASSi1R.ANCE [NOT USLD]
6 1.10 DII,�VERY, STORAGF, AND HA.NDLING �NOT USID]
� i.11 FIELD [SITE] CONDITIONS [NOT USL'll]
S 1.12 WARR.ANTY [NOT USID]
9 �'ART 2 - PRODUCTS [NOT USED]
� o PAHT 3 - ��acv�rror� �NOT us�u�
ii
12
13
IND QF SECTION
CITY OF FORT WOlZ�'H
2d21 SidewalkiTnifPrice Construction Conh•acE
102520
S'FANDARB CpNSTRUGT[ON SPECIFIC�ITION DOC[JMENTS
Revised August 17, 2012
013120-L
PROJFCT ME�TI7VGS
Page 1 of 3
1
2
3 PART 1 - Gl.'NII2AL
4 1.1 SiTMMAItY
5
b
7
8
9
i0
il
f2
13
14 1..2
SECTION OI 3] 20
PROJECT MEETINGS
A. Section Includes:
1. Provisiox�s for project xneetings througbout the construction period to enable orderly
review of the progress of ttie Work and to provide for systematic discussion of
potential prablems
B. Deviations this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Di�+ision 0—Bidding Requvre�cnents, Cont�-act Forms and Conditions of the Cantract
2. Division 1— General Requiremcnts
PRICE AND PAYlVIE�TT PROCEDIIRF�S
IS A. Measurement and Payment
Ib 1. Worl� associated with this Itern is eonsidered subsidiary to tk�e various items bid.
I7 No separate payment will be allowed for this Ytem.
IS 1..3 REFIIZ.1`.NCF� [NOT LTSID]
I9 1.4 ADMCNCSTRATIVE RTIQLIIREM�TTS
2a
21
22
23
24
25
26
27
2,8
29
30
3I
32
33
34
35
36
37
A. Coordination
1. Schedule, attend and ad�ninister as specified, periodic progxess meetings, and
specially called meetings throughautprogress of the Work.
2. Represe�tatives of Contractor, subcantractors and suppliers attending meetings
shall be qt7alified ar�d authorized to act on behalf of the entity each represents.
3. Meetings administered by City may be tape recorded.
a. Zf recorded, iapes will be used to prepare xninutes and retained by City for
future reference.
4. Meetings, in addition to those spec�ed in this Section, may be held when requested
by the Ciiy, Engineer or Contractor.
B. Pre-Construction Neighborhoad Meeting
1. After the execution ofthe Agreement, but be%re const�uction is allowed to begin,
attend l Public Meeting with affected residents to:
a. Present projected schedule, including canstruciio� sta�'i date
b. Answer aaay construction related questions
2. Meetvr�g Location
a. Location of ineeting to be determined by the City.
3. Attendees
CITY OFFO�LT WORTH
2021 SzdewalkUnitPjice Construcfion Cond'act
iU2520
STANDARA CONSTRUCT'ION SPECIFICATION DOCUMENTS
Revised 7uiy 1, 2011
Ol 31 2Q -2
PI207�,CT MEP,TINGS
P�e2af3
1
2
3
4
5
6
7
8
9
10
11
I2
13
14
15
16
17
I8
19
20
2i
22
23
2�4
25
2b
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
a. Contractor
b. Project Representative
c. Other City representatives
4. Meeting Schedule
a. In general, the neighborhood meeting will occur within the 2 weeks followrng
the pre-construction conference.
b. In no case will construction be allow�d to begin until thzs meeting is held.
C. Pragress Meetings
1. Formalproject coordination meetings wiJl be held periodically. Meetings will be
scheduled and administered by Project Representative.
2. Additional pragress meetings ta discuss specific topics will be conducted on an as-
needed basis. Such additional meetings shalE include, but not be limited to:
a. Coofdir�ating shu:tdowns
b. Installatian of �iping and equipment
c. Coordinatian between other construclion projects
d. Resolution of construct�on issues
e. Equi�ment approvai
3. The �'roject Representative will preside at pragress meetings, prepare the noies of
the rr►eeting and distribute copzes of the same to all participants w�a so request by
fully compieting the attendance form to be circulated at the beginning of each
meeting.
4. Attendance shal% include:
a. Contractor's project manager
b. Conlractor's superintendent
c. Any subcar�tractor or supplier repz�esentatives whom the Contractor may desire
to invite or fhe City may request
d. Engineez's representatives
e. City's representatives
f. Others, as requested by the Project Represenfative
5. Preliminary Agenda may z�riclude:
a. Re�iew of Work progress since prcviaus meeiing
b. Field observations, problems, conf7icts
c. Items which innpede construcf�an schedule
d. Review of aff-site fabrication, delivez-y schedules
e. Revievtr of construction interfaczrzg and sequencing requi�ements with otizer
construciion contracts
f. Correct�ve measures and procedures to regain projected schedule
g. Rev�sions �o construction sck�edule
h. Progress, schedule, during succceding Work period
i. Caordination of schedules
j. Review subrnittal sehedules
�C. Maintenance of quality standards
]. Pending c�anges and substifutions
�. Re�iew proposed changes for:
1) Effect on consir�zction schedule and on completion date
2) Effect oi1 other contracts of the ProjecC
n. RevievcT Recoz-d Documents
ciTY or roRT wortxx
2021 SidewalkUnifl'rice Constxuchon Contract
1025z0
STANDARD COI�ISTI2UCI'IOIV SPECIFICATION DOCiTMENTS
Revised .Tuly ], 201I
Ol �120-3
PROJECT MEETR�TGS
Pagc3of3
1
2
3
4
5
6
7
8
9
10
11
12
i3
14
15
16
o. Review monthly pay request
p. Review status of Requests for Infoxix3ation
6. Meeting Schedule
a. Progress meetings will be held periodically as determined by tlae Project
Representative.
l} Additional meetings may be held at the request of the:
a) City
b) Engineer
c} Contractor
7. Meeting Location
a. The City will establish a meeiing location.
1} To the extentpracticable, meetings will be held at the Site.
1.5 SUEll�[TTALS [NOT CTSID]
1.6 ACT10N SUBMITTALSIINF'ORMATIONAL SUSMITTALS [NOT USED]
1.7 CLOSEOUT SLIEII�TTALS [NOT USID]
�.S MAIN�'ENANCE MA'ITRIAL SUBMITTALS [NOT iTSED]
17 �9 QUALITY ASSUR.ANCE [NOT CTSID]
18 1.10 DELIVERY, STORAGF, AND IIANDLING [NOT USID]
19 1.11 FIELD [SITE] CONDITIONS �NOT IISED]
20 1.1� WARRAIVI'Y [NOT IISIDj
21 PART 2- PRODUCTS [NOT LTSID]
22 PART 3- A'�CIJTTON [NOT U�SID]
23
24
25
IND OF SECTION
CiTY O�' FpR1' WOItTT�
2021 SidewalkU�itPrice Consir'uctian Conh•aci
10252U
STAIIAARD CONSI'RUCI'�ON SPECIF'IC.4TION DOCUNIEN'FS
Revised .�uly 1, 2011
O1 321b -1
CONSTR[ICTIOAIPROGRFSS SCI[EDULE
Pagc 1 of 5
�
3 PART 1 - GINERAL
4 11 SUMMARY
SECTIQN 01 32 ] 6
CONS1'RUCTI4N PROGRESS SCH�DULE
S A. Section Inc�udes:
b 1. General requirements for t.�e preparation, subaa�i.ttaI, updating, status r�porting and
7 managez�ent of the Construction Progress Schedule
S 2. Specif"ic requirements are presented. in the City of Fart Worth Schedule Guidance
9 Document
IO B. Deviations from this City o��ort Worth Standaxd Specif'ication
11 1. None.
12 C. Related �pecif'ication Sections include, but are not necessarily limited to:
13 1, Divi�ion 0— Bid.ding Requirements, Contract Forms and Conditions of f11e Cantract
14 2. Division 1— Gene��al Requirements
15 1.� PRICE AND PAYMENT PROCIDL]RF�S
16 A. Measurement and Payrrtent
17 1. Woxk associated �with this Item is considered subsidiary to the various items bid.
I8 No separate payrrzent will be allowed for this Item.
19 ] .3 REF�RENC ES
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
3b
37
38
A. Definitions
1
2.
Schedule Tiers
a. Ter 1- No schedule submittal required by contract. Small, brief duration
projecfs
b. Tier 2- No schedule submittalrequired by contract, but willrequire some
milestone dates. Sma11, brief duration projects
c. 'I�er 3- Schedule submittal requiz-ed by contract as described in the
Specification and herein. Majority of City prajects, including all bond program
projects
d. Tier 4� Schcclule submittal rec�uired by cor�tract as descr�bed in the
Speci�catian and herein, Large andlor complex projects with long durations
1} Examples: large �water p�np station project and associated pipeline with
interconnection to anather governmental entiry
e. T'ier 5- Schedule subt�ittal required by contract as descrihed in the
SpecificatEon and hex'ei�. Large and/or very complex projects with long
durations, high pubIic �isibility
I) Examples might include a water ox wastewatertreatrnent plant
BaseIine ScheduXe - Initial schedule submitted befare work begins that willserve
as the baseline for measuring progz-ess and departures from the schedule.
CITY OF FORT VJORTH
2021 SidewalkUnitPrice Constt�ection ConG-act
ia2sao
STANDARD CONSTCtUCTION SPECIFICATTO'11 DOCUMENTS
Revised 7uly I, 2011
Ol 32 16 -2
CONSTAUCTIONPFLOGRESS SCIIE�ULE
Yagc 2 of 5
1 3. Progress Schedule - Monthly submittal of a progress schedule docutnentuag
2 progre,ss on the project and any chat�g�s anticipaied.
3 4. Schedule Narrative - Conc�se narrative af the schedule �ncluding schedule
4 changes, expected delays, �e}r schedule issues, criticalpath items, etc
S B. Ref�rence Standards
6 1. City of Fort Worth Schedule Guidance Document
7 1.4 ADMCNISTRATiVE REQUIR�VIEPITS
g A. BaseIine �chedule
9 1. General
10 a. Prepare a cost-loaded baseline Schedule using approved software a�d the
11 Critical Patla Method (CPM) as required in the City of �'ort Worth Scheduie
12 Guidance Document.
13 b. Review the draft cost-ioaded baseline Schedule with the City to demonstrate
14 understanding of the work to be performed and known issues and constraivats
15 related to the sch�dule.
15 c. Designate an authorized representatzve {Project Scheduler) responsible for
17 developing and updativag the schedule and prepari�g reports.
18 B. �'rogress Schedule
19 1. Update the progress Scheduie monthly as required in the City of Fart Worth
2p Schedule Guidar�ce Docume�at.
21 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule.
22 3. Change Orders
23 a. Incorporaie approved change orders, resulting in a change of contract time, in
Zq the baselu�e Schedule izz accordance with City of Fort Worth Sclaedule
25 Guidance Document.
26 C. Responsjbi]iEy �oi• ScheduIe Compliance
27 1. Wlaenever it becomes appazent from the cutrent progress Schedule and CPM Status
2g Report that delays to the critzcalpath have resulted and t�e Cantract completion
29 date wili noi be x�aet, or when so directed l�y the City, make s ome or all of the
3p following actions at no additional cost to the City
3 z a. Subxnit a Recovery Plan to the City for approval revised baseline Schedule
32 outlinixzg:
33 1) A written statement of the steps intended to take to remove or arrest the
3� delay to the critical path in the approved schedule
35 2) Increase const.�-uction manpower in such quantities and crafts as will
3(, subsiantially eliminate the backlog of work and return current Schedule to
37 meet projected baseli�ne completion dates
38 3) Increase the number of working hours per shift, shifts �er day, working
3g days per week, the amount of constr�uction equipment, or any cox�rzbination
40 of the foregoing, sufficien.tly to substan.tial[y eliminate the backlog of vvark
41 4) Reschedule activities to achievemaximum practicalcancurrencyof
42 accomplishment of activities, and co�nply with the revised scbedule
CITY OF PQRT WORTH
2021 SidewallcUnitPrice Construcdon Contract
1D2520
STANDARD CONSTTZUCTION SP�CIFICATION DOCiJ[vIENTS
iZevised JuLy 1, 2011
Ol 32 16 -3
CONSTRUCTIONPROGRESS SCHEDLiI,E
1
2
4
Pagc3of5
2. If na written statement of the steps iz�tended to fake is su6mitted vvhen so requested
by the City, the City may direct the Contractor to ir�crease the level af et�fort in
zxaanpower (trades), �quipmer�t a�d work schedule (overt�ne, weelcend and holiday
work, etc.} to be e�x�.ployed by the Contractor in ordez- to remoee ar axrestthe delay
to the critical path in ihe approved schedule.
a. No additianal cost for such work will be considered.
7 D. The Coz�iract coinpletion time wi1l be adjusted only for caus�s specifie�. in t�is
S Cantrac t.
9 a, Requests for an extension of any Contract completion date must he
10 supplemenfed with the follovvi�g:
l I 1} Furnish justification and supporting e�vidence as the City nr�ay deem
12 necessary to determitae whether the requested extensian of tune is entitled
13 under tlie provrsions of this Contract.
14 a) The City will, after receipt of such j�stification and supporting
15 evidence, make iindings of fact and wi11 advise the Contractox, in
16 writing thereof.
�7 2) If the City finds that tY;e requested extensian oitime is entitled, the City's
Ig determinatzon as to the total nurnber of days allowed for tt�e exCensions
19 shall be based upon the approved total baseline schedu�e at�d on alI data
2Q relevant to the extension.
�1 a) Such daia shaIl be included in thc next updating of the Progress
22 sck�edule.
23 b) Actual delays in activities which, according ta the Baseline schedule,
24 do not affect any Contract completian date shown by the critical path in
25 the network will not be the basis �For a change thererri.
26
27
28
29
30
3I
32
33
34
35
36
37
38
39
40
�Gl
42
43
44
45
46
47
48
2. Subrtzit each request �or change in Contract completion date to the City wit1� 30
days after the begi�7ning of the delay faz which a time e�tension is requested but
befor� the date of fi�tzal payrnenf undex this Contract.
a. No time exfension will be granted for requests whzch are nat submitted within
the foregoing tinne limit.
b. From time to t:ane, it rnay be necessary for the Contract schedule or completion
time to be adjusted by the City to reflect the effects of job conditions, weather,
technical difficulties, strikes, unavoidable delays on the part of tha City ar its
representatives, and other un%reseeable conditions which may indicate
schedule adjustments or completion time extensions.
1) Ut�der s�ch condit�ons, the City r�ilI direct the Contractor to reschedule the
work or Contract completion time to zeflect the changed conditions and the
Conta�actor shall revise his schedule accordingly.
a) No additlonal corr�pensation will be made to the Cantractor for such
schedule changes except for unavoidable overall contract time
extensions beyond the actual completion of unaffected vvorlc, in which
case the Contractar shall take all possible action to minimize any time
extez�sion and any additional cost to tlae City.
b} Avai�able float titne in the Baseline schedu�e may be used by the Cif�y
as well as hy the Contractor.
3. Float or slack time is defined as the amount of tune between the earliest start date
and the laiest start date qz between the eariiest i"mish dafe and the latest finisk� date
of a chain of activities on the Baselinc Schedu7e.
CITY OF FOR'I"1�VORTH
STANDARD CONSTRUCTION SPECL�'ICATION DOCUMENTS
Rev�sed 7i�y 1, 2011
2021 Sidewal[cUnitPrice Constraction Contrtict
i ozsza
O1 32 16 -�4
CONSTRUCTION PROGR%SS SCHE]�IJLE
Page 4 of S
1
2
3
�
5
6
7
8
9
10
11
12
13
1�4
15
16
17
1$
19
20
21
a. �'ioat or sfack ti�me is not for the exclusive use or benefit af either the
Contractor ar the City.
b. Praceed with work according to early start dates, and the Cziy shall have the
right to reserve and apportion float time according to the needs of the project.
c. Acknowledge and agree that actual delays, affecting paths of activities
containiz�g float time, will not have any effect upon contract completion times,
providing that the actualdelay does not exceed t�e float time associated with
those activities.
E. Coordinating Schedule wi�li Otk�er Contract Schedules
1
2.
Where work is to be performed under this Contract cancurrently with or contingent
upo� work performed on the same facili�ties or area under other contracts, the
Baseline Schedule sY�all be coordinated with the schedules of the other contracts.
a. Obtain the schedules of the other appropriate contracts frona the City for the
prepa�'ation and updating of Baseline schedule and make tlie xequired changes
in his schednIe when indicated by changes in corresponding schedules.
In case of interference between the operations of differex�tcanf�actors, the City will
deterxnine the work priority of eac� contxactorand the s�que�ace of work n�cessary
to expediYe the completion of the entire P��oject.
a. In such cases, the decision of the City shall be accepted as final.
b. The temporary de�y of any work due to such circumstances sk�aIl not be
considered as justificatian for claims for additional compensation.
22 1.5 SUBNIITTALS
23 A. Baseline Schedule
24
25
2b
27
2$
29
1
2.
Submit Schedule in native �le format and pdf format as required in the City of Fort
Worth Schedule Guidance Dacument.
a. Native f�le format includes:
1) Primavera (P6 or Primavera Contractor}
Subznit dt�aft baseIine Schedule ta City p�'ior to the pre-construction me�ting and
bring in hard copy to the meeting for review and discussion.
30 B. Progress Sch�dule
31 1. Submit progress Schedule in native file format and pdf fornnat as required in the
32 Crty oiFoi� Worth Schedule Guidance Document.
33 2. Submit progress Schedule mox�thly no later #han tk�e last day of the xx�onth.
34 C. Schedule Narrative
35 1. Submit the schedule narrairve in pdf format as requu ed in the City af Fort Worth
36 Schedule Guidance Document.
37 2. Submit schedule narx'ative manthly no later than the last day af the month.
38 D. Submittal Process
39 1. The City administ�rs and manages schedules throug� Buzzsaw.
40 2. Contractor shallsubmit documents as requnr'ed in the City of Fort Worth Schedule
41 Guidance DocLunent.
42 3. Once the projeci k�as been completed and Fina1 Acceptance has heen issued by the
43 Ciiy, no fiirth�r progress schedules are required.
CITY OF FORT WOR'I'H
2tl21 Side5valkUnitPrice Constracf�on Canfract
10252U
STANDARI] C031STILUCTION SP�CIFIGATION DOCTTMENTS
Revised July I, 2011
Ol 32 1G -S
CONSTRUCTIOIVPROGRESS SCHEI]i1LE
1'age 5 of 5
1 l.b ACTION SUBMITTALSlINFO.l2.MATIONAL SUBMITTALS [NOT USED]
2 1.7 CLOSEOUT SUEMI'I'TALS �NOT USID]
3 1.8 MAiNTENANCE MA1'ERiAL SUBNIITTAL� [NOT USID]
4 1.9 QUALITY ASSiTR.ANCE
5 A, The person preparing and rev�sing the construction Progress Schedule shalibe
6 experienced in the preparation of schedules of similar complexity.
7 B. Schedule and supporting documents addressed in this Sp�cification shall be prepared,
8 u�dated and re�ised to accurately reflect th� perfornnance of the construction.
9 C. Contractar is responsible for the qualiry of all submittals it� t�is section meeting the
10 standard o� care for the constructioz� industry for sicnilar pzojects.
11 1.10 DELIVERY, STORAGE, AND �IANDLING [NOT [TSID]
12 1.1]. �'YELD [SITE] CDNDZTTONS [NOT USEU]
13 L12 WARRANTY [NOT LTSED]
14 PART 2- PRODUCTS jNOT USID�
15 PART 3- EXECUTION [NOT LTSED]
16
17
IND OF SECTiON
Revisian Log
DATE NAME SUMMARYOF CHANGE
18
C1TY OF FQRT WORTH
2021 SidewalkUnitPiice Consh-uction Contr�aci
142520
STANDARd CONSTRLTCI ION SPECIFICATION DOCLIMENTS
Ttevised July 1, 2011
Ol 32 33 -1
PRP,CONSTRUGTION VIDEO
Page 1 of 2
1
2
3 PART 1 - GINII�AL
4 1.1 SUMMARY
SECTION Q1 32 33
PRECONSTRUCTION VIDEO
5 A. Section Includes:
6 1. Administrative and proc edural requirements for:
� a. Preconstruction Videos
8 B. Deviations from this City of Fort Warth Standard Specification.
9 l , None.
10 C. Related Specif"ication Sections include, but ax'e not necessarily limifed to:
I1 I. Division 0—Bidding Requuemex�ts, Contract Forms and Conditions of the Contract
12 2. Division 1— General Requirements
I3 1.2 PRICE AND PAYNIIIV'�` PROCIDUR�S
14 A. Measurement an.d 1'aytnent
15 1. Work associated with this Item is coi�sidered suhsidiaxy to t.�e various items bid.
16 No separate payment will be allowed for this Item.
17 ]..3 RL+'E`ERENCFS [NOT iTSID]
18 1.4 ADNIINISTRA'TIVE I2.�'�QUIRIIVIINTS
19 A, k'reconstruction Video
20 1. Produce aprecon.struction video o�the site/aligiunent, including all areas in the
21 vicix►ity of and to be affected by cor�struction.
22 a. Provide digital copy of video upon request by the City.
23 2. Retain a copy of the preconstruction video until the end of tlae �cnaintenance surety
24 period.
25 1.� SUBNIITTALS [NOT USID]
26 1.6 ACTION SUBNIITTALSIINFORMATIONAL SUBNIITTALS [NOT USID]
27 1.7 CLOSEOUT SUBNIITTALS [NOT USED]
28 1.8 MAIN'I'ENANCE MA1'ERiAL SUSMCTTALS (NOT USID]
29 1..9 QUAI.TTY ASSURANC� �NOT USID]
30 1.10 DELIVF1tY, STORAGE, AND HANDLING [NDT IISID]
31 L 11 FIELD [SITE] CONDITIONS [NOT USED]
32 L 12 WA1tRANTY jNOT USED]
CITY OF POR"F 1�JORTH
2021 SidewalkUnitPrite Co�strucfion Contract
ID2520
STANDARD COAISTRUCTION SPECIFICATION ]�OCUM�NTS
Revised 7uly 1, 2011
dl 3233 -2
FRECONS TRL]CT ION VIDEO
Page 2 of 2
1 PART 2- PRODUC'� �NOT USID]
2 �'ART 3 - EXF�UTTON [NOT USID]
3 IND OF SECTTON
4
Revis ian Lo g
DATE NAME SUMMARYOF CHANGE
CiTY OP F'ORT WORTI�
2Q21 S3dewalkUnitPrice Canstiuction Contract
1425�0
STANDARD COIVSTI�UCTIOI�I SPECIF'ICATIOIV DOCiTME1VT5
I2evised .TuIy t, 201]
oi 33oa-i
SUBMITTALS
Page ] of 8
1
2
3 PART 1 - GIIVIIZAL
4 1.1 STTMMA1tY
5
6
7
8
9
10
11
12
13
14
15
16
17 1.2
SECTION Q1 33 04
ST T�M[TTALS
A. �ection Includes:
1. General methods and requirements of submissions applicable to the following
Work-related submittals:
a. Shop Drawings
h. Product Data (includrng Standard Product List submittals}
c. Samples
d. Mack Ups
B. Deviations %om this City of �ort Worth Standard Specific ation
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1— General Requirements
PRICE AND PAYIVILNT PROCEDTTRF�S
18 A Meas�rement and Payment
�9 1. Work associated with this Iiem is cansidered subsidiary to tlie vat'ious items bid.
2p No separate payment wi�l be allowed for this Ytexn.
21 1.3 REFEIUNCF� [NOT LTSED]
22 1.4 ADMII�STRATIVE REQUIR�TS
23
24
25
2b
27
28
29
30
31
32
33
34
35
36
37
3$
A. Coordination
1. Notify the City in writing, at the time oi submittal, of any cfeviations in the
subnnittals from the requirements of the Contract Documex�ts.
2. Coordination of Subnr�ittal Times
a. Frepare, prioritize az�d transmit each suhmittal sufficiently in advance of
perfornr�ing the related Work or other applicable activities, or wzthin the time
specif"i�d in the individtial Work Sectzons, of the Specifications.
b. Contractor is responsible such that ihe installation will not be delayed by
processing tsmes incIuding, but not liznited to:
a} D�sapproval and resubmiita� (if z-equired)
b) Cooz'dination wit�. other submittals
c) Testing
d) Purchasing
e) Fabrication
� Delivery
g) Sitnilar sequenced activities
CTI'I' OF �'ORT WORT�I
2021 SidewalkTlnitPrice Construcdon Conh�act
10252fl
STANDARD CONSTRUCTION SP�CIFICATION DOCUMEI+ITS
Revised Decamber 20, 20I2
a133 ao -z
SUAMIT'TALS
Page 2 of 8
1 c. No extension of ti�ne wi]1 be autharized because of the Coniractor's failure to
Z transmit su6mittals suffzciently in advance oi the Work.
3 d. Make suhmittals proz�r�ptly in accordance with appro�red sehedule, and in such
4 sequence as ta cause no delay in the Work ar in the vcrork ofi any other
5 contractor.
6 B. Submittal Numbering
7 1.
8
10
11
I2
13
14
15
16
17
rs
19
20
2l
When submitting shop drawings or samples, utilize a 9-characier submittal cross-
reference identification numbering system ir� the f'ollowing manner:
a. Use the first 6 digits of the applicable Specification Section Number.
b. �'or the next 2 digits number us e nuniabers O 1-99 to sequentially number each
inrtial separate �tem or drawing submitted under each specific Section number.
c. L,ast use a lettez, A-Z, indicating thc resubmission of the same drawing (i, e.
A 2nd subznission, �3rd submission, C=4Eh submission, etc.}. Atypical
submittal nu�mber would be as follows:
1 1 ! 1 1: :
1) U3 30 DO is the Speci�cation Section for Concrete
2} 08 is the eighti� initial submittal under this Specif"ication Section
3) B is the third submi�sion (second resubmi�sion) of that particular shop
drawing
22 C. Con�ractor Certification
23 ,1. Review shop drawings, product data and samples, including those by
24 subcontractors, prior to subznission to determine and verify the follawing:
25 a. Field rneasurements
26 b. Field construction crzteria
27 c. Catalog numbers and similar data
28 d. Conformance with the Contract Docu.ments
29
30
31
32
33
34
35
36
37
38
39
40
1. Fold shop drawings Iarger tlaan 8% inches x 11 inches to 8%z inck�es x i linches.
2. Bind shop dt•awings and product data sheets together.
41 3. Order
42 a. Co�ver Sheet
43 1) Descriptian of Packet
� 2) Cor�tractor Certif'icatian
45 b. List of ztems / Tablc of Contents
4b c. ProductData/ShopDz-awings/Samples/Calculations
CITY OF' FORT WORTH
2. Provide each shop drawing, sample and product data submitted by the Contractor
with a Certif"icatiox� Statement affi�ced incTuding:
a. The Contractor's Company narne
b. Signature of submittal re�viewer
c. Certif"ication Statement
1) "By this submittal, I hereby represent that I have determined and verified
�ield measurefnents, field construction criteria, materia[s, dimensions,
catalog numbers and similax data and T�aue checked and coordinated each
i�em with other applicabTe approved shop drawings."
D. SubmittaI Format
2021 Side�valkUnitPrice Construcfim� Contracf
xuzsza
STANDARil CON3TRUCTIOI�T SPECIFfCATION DpCUMENTS
Reeised Dccember 20, 2012
01 33 00 - 3
SLTI3MT'1'TALS
Page 3 of 8
2
3
4
5
6
7
8
E. Submrttal Content
L The date of submission and the dates of any previous submissions
2. The �roject title and numher
3. Contractor identification
4. The names of:
a. Contractor
b. Supplier
c . Manufactui er
9 5. Zdenti�'ication of t�e product, with the Specification Section number, page and
10 paragraph(s}
11 6. Ficld dimensions, clearly identif'zed as such
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
7. Relation to adjacent oz� critical features ofthe Work ar materials
8. Applicable standards, such as ASTM or Federal Specification numb�rs
9. Identification by hi�hl�ghting af deviatians from Co�tract Doc�ur�ents
i0. Identif'�cation by highlightir�g of revisions on resuhmittal�
11. An 8-inch x 3-inch blank space for Contractor ax�d Ciry stamps
F. Shop Drawings
1. As specified in individual Work Seetions includes, but is noi necessarily li�xzited to:
a. C�stom-pt�epared data suchas fabrication and erecfion/installation (working)
drawings
U. Sck�eduled information
c. Setting diagrams
d. ActuaI shapwork manufacturing ins�vctions
e. C�astom templates
i. Special w�ing diagrams
g. Coordination drawings
h. Individual system or equipxnent �nspection and test r-�ports including:
1.) Performa�r�ce c�uves and certifications
i. As appficable to the Work .
2. Details
a. Relation o�ihe various pat'ts to the main members a�d lines of ihe structure
b. Where correct fahrication of the Work depends upon field measurements
l} Provide such measure�nents and note on the drawizags prior to submitting
for approval.
G. Product Data
1. For subt�ittals of praduct data far products iz�cluded on the City's Standard Product
List, clearly identzFy each item selected fot- use on the Project.
2. For submittals of product data for products not included on the City's Standard
Product List, submittal data may include, but is not necessarily limiied ta:
a. Standard prepared data £or manufactu�ed products {sometimes re£e�'ed to as
catalog data)
I) Such as the manuiacturer's product specification ax�d installation
instructions
2) Availability of colors and patterns
C1TY OF FOItT WORTH
z02I Sidc�valkUnitPtRce Constructio� Coniract
102520
STANDARA CONSTRLTCTION SPECIFICATION DOCTJMENTS
Revised Aecember 20, 2012
oi 33 oa -a
SUBMITTALS
Page 4 01'8
I 3) Manufacturer`s printed statements ofcompliances and ap�licability
2 4) Roughing-in diagrams and templates
3 5) Catalog cuts
4 6) i'roduct photographs
5 7} Standard wiring diagrams
� $) �'rinted performance curves and operational-range diagratns
7 9) Producfion or qualiiy control inspecfio� and test reports and certifications
8 1 D} Mill reports
9 11} Product operatizag and maintenance instructions and recommended
10 spare-parts �sting and printed pxoduct warrantres
1 I 12) As applicable to the Work
f2 H. Samples
13 l. As specified in ifadividual Sections, ir�clude, but are not x�ecessaxily limited to:
14 a. Physical exatt�ples of the Work such as:
15 1) Sectians of manufactured or fabricated Work
16 2) Srnall cuts or cantarners ofmaterials
17 3) Complete units of repetitively used products colar/texture/pattern swatches
I g and range s efs
19 4) Specirnens for coordination of visual effect
20 S} Graphic symbols and units of Work ta be used by the City for independent
21 inspection and testing, as applicable to the Wark
22 I. Do not start Work requiring a shop drawing, sample or product data nor any rx�aterial to
23 be fabricated ar instaJ�ed prior to the appxoval or quaIif"ied appraval of such item.
24 1. Fabrication performed, rnaterials purchased or on-site construc#ron accoiriplished
25 which does nat confornn to approved shop drawings and data is at the Contractor's
26 risI�.
27 2. The City wilf not be liable for any e�pense or deIay due to corrections or rexnedies
28 required to accomplish confarmity,
29 3. Complete project Work, material�, fabrication, and installations in conformance
30 witb approvad shop dra�rvings, applicable satnples, and product data.
31 J. Submittal Distribufion
32 1. Electronic Distribution
33 a. Coniirm development of Project directo��y for electronic s�b�ittals ta be
34 uploaded ta City's Buzzsaw site, or ariather external FTP site approved by the
3s Czry.
3b b. Shop Drawings
37 1} Uplaad s�zbmittal to designated project directory atid z�otiiy appropriate
38 City representatives via email of submittal posting,
39 2) Hard Copies
40 a} 3 copies for all submittals
41 b} I� Contractor requires znare than I hard copy of Shop Dravait�gs
�2 reiu�rned, Contractor shall submit more thazi the number of copics Iisted
43 above.
44 c. ProductData
45 1) Upload submittal to designated project directory and notify apprapriate
46 City representatives via �mail of submittal posting.
CITY Oh FORT WORTH
2021 SidewalkUnitPrice Coz�struction Confr�act
� ozsxo
STAN1]ARD CONSTRUCT[ON SPECIFYCATION llOC[lNIENTS
Ravised December 20, 2012
O1 33 00 -5
SUgMITTALS
Pagc 5 of 8
K Submittal Review
g 2. Hard Capy Distribution (if required in lieu of electronic dish'ibution)
6 a. Shop Drawings
� 1) Distz'i�uted to the City
g 2) Copies
9 a) S copies foz mechanical submittals
10 b) 7 copies for all other submittals
11 c) If Contractor requ�res more than 3 copies of Shop Dravvings returned,
�2 Contractor shall submit xnore than the number of copies listed abave.
�3 b. Product Data
14 1) DistributedtotheCity
15 2) Copies
16 a) 4 copies
I� c. Samples
lg 1) Distfibuted to ihe Project Representative
�9 2) Copies
zp a) Submit the nuxnber stated in tl•►e respective Specification Sec�ions.
21 3. Distribute z'eproductions of approved s�op drawin.gs and copies of approved
22 product data and samples, where required, to the job site file and elsewhere as
23 d�rected by the City.
Zq a. Proeide number af copies as directed by the Ciry but not exceeding the number
25 pre�iously specified.
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
3.
4
5
2} Hard Copies
a) 3 copies far all subxnitials
d. Samples
1) Distributed to the Project Representative
The review of shop draw�lgs, data and samples willbe for general conforXnance
with tl�e design concept and Contract Documents. This is not to be construed as:
a. Permittir�g any departure from tk�e Contract requirernents
b. Relieving the Contracior of responsbility for any ezxors, including details,
dimensions, and materials
c. Approving departures from details furnished by the Ciiy, except as otherwise
provided herein
The review and approval of shop dravvings, samples or product data by the City
does not relieve the Contractor from hislher responsibility with regard to the
fulfillrnent of the terms of the Contz�act.
a. All risks of error and o mission are ass�med by the Contractor, and tne City wiIl
have no responsibility therefore.
The Contractor remains responsible for details and accuracy, for coordinating ilae
Work with all ather associated work and trades, for selecting fabrication processes,
for techniques af assen:zbly and for performing Work in a safe znanner.
Ifi flie shop drawings, data oz' samples as submiited describe variatio�s and shot� a
departure fram the Contract requirements whicla City finds to be in the interest of
t1�e City arid to be so minor as not to involve a change in Contract Price or time for
performance, the City may retw'n the reviewed drawings without noting an
exc eption.
Submitta�s will be returned to the Contractor u�nder 1 of the follovving codes:
CITY OP FORT W OItTH
2021 SidewalkUnitPrice Consfrucfian Canlract
102520
STANDARD CONSTRUCTTON SPECIFIC.4TION DOCUMENTS
Revised December 20, 2012
oi 33 oa -6
SUD1vIITTAI,S
Page 6 of 8
1 a. Code 1
2 1) 'NO EXCEPTIONS TAI�N" is assrgned when tllere are no notatzons or
3 camznents on the submittal.
� a} When returned under this code the Contractor raaay release tlae
S equipment and/or material for manufacture.
6 b. Code 2
� 1) 'BXCEPTIONS NOTED". This code �s assigned when a confirmation of
g th� notatians and comments IS NOT r�quired. by the Contractor.
g a) The Cont�-actor may release the equipment or material for manufacture;
Zfl ha�ovever, allnotatzans and comments musi be incorporated into tk�e
1 X fulal product.
1 Z c Code 3
13
14
15
1f
I7
18
19
20
2]
22
23
24
25
26
27
28
29
1) "EXCEPTION� NOTED/RESUBMIT". This combinaiion of codes i�
assigned when notations and comments are extensive enough to require a
resubmittal of the package.
a) The Conit�actor may release the equipment or znaterial for znanufacture;
however, all notatrons and comr�ents must be incorporated into the
final product.
b) This resub�nittal is to address all comments, omissions aald
non-conforming items that vvere noted.
c) Resubrz�ittal is to be received by the City within 15 Calendar Da�s of
the date of the Crty's transmittal requiring the resubmittal.
d. Code 4
]) 'NOT APPROVEI]" is assigned when the subxnittal does not meet the
intent of th� Contract Documents.
a) The Contractor mnst resubmit the entire package revised to bring the
submittal into conformance.
b) It may be necessaiy to resubmit using a different �nanufacturer/vendor
to meet the Conixact Dacuments.
30 6. Resubmitta�s
31 a. Handl�d in the same manner as i'�rst sub�rxiitta]s
32 I) Corrections other than requested by thE City
33 2} Marked with revision triangle ar other similar rnethod
34 a) At Contractor's xisk if not rnaz�ked
35 h. Submittals for each item wi11 be re�viewed no more than tvvice at the Crty's
3� expense.
37 1} All sub,sequent reviews wilI be perfarmed at times convenient to Y11e City
38 and at the Contraeior's expense, based on the Ciiy's or City
34 Representative's then prevailing rates.
4fl 2) Provide Contraetor reimhursement to the City within 30 CaIendar Days far
41 all such fees invoiced by the City.
�2 c. The need %r mare tlaan 1 resubnnission or any other delay in obtaining City's
43 review of submittals, wi11 not entitle the Contractor to a� extension of Contract
� Turae.
45 7. Parti�al Submi�tals
46 a. City reserves the right to not review submittals d�emed partial, at ti�e City's
47 discretion.
CITY OF rORT WOIZTH
STANDA32D COI+ISTRUiCi'ION SPECIFTCATION DOCiJMENTS
Revised December 20, 2012
2021 SidewalkflnitPiice Conshvction Conlract
102524
Ol 33 OU - 7
SUBMIT"i'Ai�3
Pagc 7 of 8
1
2
3
4
6. Submittals deerned by the City to be x�oi complete vvi�1 be returned to the
Contractor, andwillbe considered'NotApproved" until resubrnitted.
c. The City :may at its option provide a list or mark t�e submittal directuag the
Contractor to the axeas that are ineomplete.
S 8, If the Contractor considers any correciion indicateci on the shop drawings to
(, constitute a change �o the Contract Docuinents, then written notice riaust be
� provided thereaf to the City ai least 7 Calendar Days prior to release for
g manufacture.
g 9. When the shop drawings k►ave been completed to the satisfaction ofthe City, the
�p . Contractar may carry aut t�ae construction in accordance therewith and no furiher
z� changes therein e�cept upon written instt-uciions �rom the City.
12 10. Each submittal, appropriately coded, willbe returned within 30 Calend�r Days
p3 following receipt af submittal by the City.
14 L. Mock ups
15 1. Mock Up units as specified in individual Sections, include, but are not necessarily
16 limited to, complete units of the standard of acceptance far that rype of Work to be
�� used on the Froject. Remove at #he completifln of the Wark or when d�rected.
18 M. Qualifications
X9 1. IFspecif'ically requ�red in other Sections of ihese Spec�icakions, submit aP.E.
20 Certification for each item required.
21
22
23
24
25
26
27
2$
29
30
31
32
33
34
35
36
37
N. Request �ar Inforxnation {RFI)
1. Contractor Request for additional information
a. C1ar�cation or interpretation of the contract documen.ts
b. Wl�en tk�e Coniractor befieves there is a conflict between Contract Docume�ts
c. When the Cont�actor believes there is a conflict between the Drawings and
Specifications
l) Identify the confJict and xequest clarification
2. Use the Request for Information (RF'I) foim provided by the City.
3. Numbering of RFI
a. Prefix with "RFI" followed by series number, "-�x", beginning with "O1" and
increasing sequentially with each additional transmittal.
4. Suf�cient inforxx�ation shali be attached to permit a written response without further
informaiion.
5. The City wi�1 Iog each request and w ill review the request.
a. If review of the project infarmation request indicates that a change to the
Contract Documents is requ�red, the City wilf issue a Field Order or Change
Order, as appropriate.
38 1.5 SUBNIITTALS [NOT USID]
39 L6 ACTION SUBNIITTALS/INF�RMA.TIONAL SUBMITTALS [NOT IISID�
40 1.'� CLOSE4UT SUBMITTALS [NOT USID]
4J. 1.$ MAINI�NANCE MA'1��RIAL SUBMITTALS [NOT USID]
42 1.9 QUAL�TY ASSiTRANC� [NOT USID�
CPI'Y QFFORT WORTH
2021 SidewalkUnitPrice Construc�ion Contract
102520
STANDARD CONSTRUCT[ON SPEC1FiCAT[ON DOCUMEI`!T5
Revised December 20, 2012
O] 3300-8
S U13MTTTALS
Pagc 8 of S
l 1.i0 DII,IVERY, STORAGF.� AND HANDLTNG [NOT II�ED]
2 1.11 FrELD [SITE) CONDIT�[ONS [N4T USID]
3 1.12 WARRAN'Iy [NOT USED]
4
5
G
7
PART 2 - PRODUCTS [NOT USED]
PART 3 - E�CLITXON [NOT IISED)
DATE f NAME
$
12/20/2012 I D. Johnson
C1TY OF FORT WpR1'H
END OF SECTTON
Revis ion Lag
SUMMARYOF CHANGE
1.4.K.8. WorkingDays �nodified to Calendar Days
STAhlDARD CONSTRi1CTION SP�.C1F'TCATIpN DOCUMENTS
Revised December 20, 2012
2021 SidewalkCiniEPrice Co�Estruciion Cantract
102520
Ol 35 13 - l
SPECIALPROJECTPROCEDURES
Pagc 1 of S
2
SECTION Ol 35 l3
SPECIAL. PROJECT PROCEDURPS
3 PART l - GENERAL
4 1.1. SLTMMARY
5 A. Section Includes:
6
7
8
9
10
11
12
13
J.4
IS
lb
17
18
19
The procedures for special project circumstances that includes, hut is not liimited to:
a. Coordination wiih the Texas Departme�t of Transportation
b. Work near High Voltage Lines
c. Confined Space Entry Progranr�
d. klir' Pollutian Watch Days
e. Use of Explosives, Drop Weight, Etc.
f. WaterDepar�nentNotifzcation
g. Public Notification Prior to Beginning Construction
k�. Coordination with United States Army Corps oiEngir�eers
i. Coordix►ation witi�in Railt-oad permits areas
j. Dust Co�trol
k. Employee Parlcing
B. Deviations from this City of Fort Worth Standard 5pecification
1. None.
20 C. Related Specification Sections incl�de, but a�re not r�ecessarily limited to:
21 1. Diviszon 0— Bidding Requirements, Contrack �orms and Conditions of the Contract
22 2, Division 1— General Requi�rements
23 3. Section 33 12 25 — Connectioz� to Existing Water Mains
24
25
26
27
28
29
30
31
32
33
3�
35
36
37
38
39
40
41
1..2 PRICE AND �AYIVICNT PROCIDURFS
A. Measurexnent and Payment
1. Coordination within Railroad permit areas
a. Measuxement
1) Measuremeni for this Ttem wi11 b�by lump suzn.
b. Payment
1) The work performed a.nd znaterials fiirnished iz► accordar�ce with this Item
will be paid for at the lump sum price bid for Rai�road Coordination.
c. The price hid shall irnclude:
1} Mobilization
2) Inspection
3 ) S afety training
�4) AdditionalInsurance
5) Insurance Certificates
6) O�er requirements associated with general coordination r�vith Railroad,
including adc�itional emplayees required to protect the right-of-way and
property of filae Railroad from damage arising out of andlar from tk�e
const�ruci�on of the Project.
CLT'Y OF FORT WORTH
2021 Side�valkUnitPrice Construcflo� Canfract
102520
STAIVDARD CONSTRUGTTOI�f SPECIFICATION DOCUN(ENTS
Revised DecemUer 20, 2012
Ql 35 23 -2
S P�CTAL PRO]ECT PTLOCEDL➢R ES
Page 2 nf 8
1
2
3
4
S
b
7
8
9
za
11
12
13
14
2. Railroad Flagmen
a. Measurement
1) Measurement for �his Item will be per working day.
b. Payment
I) The wor1� perfox�med and materials furn�shed in accordance vtrith this Item
wili be pard faz� each working day that Rai�-oad Flagmen are present at the
Site.
c. The price bid shall include:
1} Coordination for scheduluig flagmen
2) Flagmen
3) Other requirements associated with Railroad
3. All other ite�s
a. Work a,ssociated with these Itet�as is considezed subs'rdiary to the various Items
bid. No separate payment vvill be allowed for this Iterr�.
15 1.3 REFERENCES
16 A. Reference Standards
I7
18
19
20
21
22
23
2.
3
Reference standards cited in this Specification refer to the current reference
standard publi�hed at the time of the latest reviszon date logged at the end of this
Specification, unless a date is speci�i'ically cited.
Health and �afety Code, Title 9. �afety, Subtitle A. Public Safety, Chapter 752.
High Voltage ovenc�ad Lines.
Noxth Centraf Texas Council of Governzaaents (NCTCOG) — Clea�n Constructzon
Spec�f'ication
24 1.4 ADMTNIS7'RA,TIVE REQUIRTII�;NTS
2S A. Coordination with the Texas Depart•tnn�nt of Transpartation
26 1. When work in the right-of-way which is under the jurzsdiction of tk�e Texas
27 Department of Transportation (TxDOT}:
zg a. Notify the Texas Departcxien# of Transportation priar to corr�mencing any work
29 therein in accordance with the provisions of f11e permit
30 b. A31 work performed in the TxDOT right-of-way shal] be performed in
31 compliance with and subject to approval fronn the Texas Depaxttnent of
32 Transportation
33 B. Work �ear High Voltage Lines
34 1. Regulatory Requiremenis
35 a. AIl Wozk near Hig�a Voltage Lit�es (more ihan 600 volts �easured betw�en
36 conductors or between a conductorand the gxound} shal�be in accordance with
37 Health and Safety Code, Title 9, Subtitle A, Chapter 752.
38 2. Warning sign
39 a, Provide sign of sufficient size meeting all OSHA;requirements.
�40 3. Equipment operating within ] 0 feet ofhigh vo�tage lines wi11 xequire the following
�I safety features
�2 a. Insulati:ng cage-type of guard ahout the boom or arm
43 b. Insulator links on the lift hoolc connect'rons for back hoes orc�ippers
crrY or F��RT woRT�
STANDARD GflNSTRUCTIOIV SPECIFICATIpN DOCUMENTS
Revised Deceinber 2Q, 2012
2D21 SidewalkUnitYrice Canshvction Contract
162520
Ql 3S L3 -3
SPECIALPROJECT PROCEDURES
Page3of8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
�6
17
18
19
20
2I
22
23
2A
25
26
27
28
29
30
31
32
33
34
3S
36
37
38
39
�40
41
A�2
c. Ec�uipment must meet the safety requirements as set forth by OSHA and tk�e
saFety rcquirements of the owner of tIae high voltage lines
�. V�orlc withiva 6 feet of high voItage eIectric lines
a. Notif"icaiion sI�all be given to:
I) The power coxaapany (e�ample: ONCOR)
a) Maintain aaa accurate log af all such ca11s to power coxnpany and record
action taken in each ease.
b. Coordination with power company
1} After notification coordinate with Chepower campa�y to:
a) Erect temporary mechanical barriers, de-energize the lines, or raise or
�ower the lines
c. No persannel may work within 6 feet of a high voltage 13xie befoi�e the above
requirem�nis have been met.
C. Confined Space Entry Program
1. Provide and folIow approved Canfined Space Ent�y Program in accordance with
OSHA requirements.
2. Confined Spaces include:
a. Manholes
b. All other confixaed spaces in accordance with OSHA.'s �'errr�it Required for
Confined Spaces
D. Air Pollutzon Watch Days
1. General
a. Observeth�%llowing guidelines reIating to working on City construction sites
on days designated as ",AXR POLLLJTION WATCH DAYS".
b. TypicalOzone Season
1} May 1 through October 31.
c. Critical Emission Time
1) 6:00 a.m. to 10:00 a.m.
2. Watch Days
a. The Texas Coxn�aaission on Environmental Qualiry {TCEQ), in coordination
vvikh the National Weather Service, will issue the Air Pollut�ot� Watch by 3:00
p.m. on the afternooza prior ta the `JVATCH day.
b. Requirements
1) Begin work after 10:00 a.m. whenever canstruction phasing requires the
use of motorized equipment for periods in e�cess of 1 hour.
2) Hflwevez, ihe Contractor may begin work prior ta 10:00 a.m. if:
a) LTse of motorized equipment is less thaa� 1 hour, or
b) If equipnrzent is new and certified by EPA as "Low Emitting", or
equipment burns LTltra Low Sulfur Diesel (IJLSD}, diesel emulsions, or
alternaiive fuels such as GNG.
E. TCEQ Air Permit
1. Obtain TCEQ Air Permit for consiruction activities per requu-eme�ts of TCEQ.
43 F. Use of Explosives, Dro� Weight, Etc.
44 ]. When Contract Doc�unents permit on the projecf the following wrll a�ply:
45 a. �ubIic Notification
CTTY OF FORT WV012TI�
2021 SidewalkUnitPricc Construcdon Contract
102520
STAAlDATtD CON,STRUCI'[ON SPECIFICATION DOCUMEN'I'S
lZevised Dacember 20, 2012
O] 3513-4
SPECIALPROJECT PI20C�L7URES
Page 4 of 8
I 1) Subrnit notice to Ciry and proof of adequate insurance co�verage, 24 hours
2 �rior to commencix3g.
3 2) Minit�au� 24 hour public notif'ication in accordance with Section 01 31 X �
4 G. Water Depaxtment Coordiriation
5 1. During the constructian of tlais project, it wiIlbe necessary to deactivate, for a
6 period of time, existing Iines. The Contractor shall be required to coordinate vvith
7 the Watez� Departrnent to def;ermine the best times for deactivafulg and activati�ag
8 those Ji�aes.
9
14
11
12
�3
I4
15
lfi
17
18
19
20
21
22
23
Z. Coordinate any event that will require connecting to or tk�e operation of an existing
City water �ine system with the City's representaiive.
a. Coordination shall be it� accoxdance with Section 33 12 25.
b. If needed, obtain a hydrant water x�rzeter from tlie Water Department for use
during the life of named project.
c. In the e�ent that a water valvc an an existing live system be turned off and on
to accoznrnodate th� const�-uction of the project is requi�ed, co�dinate this
acti�ity through the appropriate City rcpresentative.
Ij Do not operate water line valves of existing water syste�rx�.
a} Failure to comply will render• the Coniractor ion violation of Texas Penal
Code Title 7, Chapter 28.03 (Crirninal Mischie� and the Contractor
wiIl be prosecufed to t�e full extent of the �aw.
b) In addition, the Con�•actor wili assume aJ] liabilities and
responsibiIities as a resuli of these actions.
I-� Public Notification �'rior to Beginning Canstruction
24 F. Prior to beginning cons truction an any blocic in the praject, on a block by block
25 basis, prepare and deIiver a notice or flyer of the pending consiruction to the frant
26 door of each residence or business that willbe impacted by construction. The natice
27 shall be prepared as follaws;
28 a. Post notice or fl�er 7 days przor to beginning any construction activity on each
29 b�ock in the project area.
30 1) Prepare flyer on t�ae Contractor's letterhead and include the following
31 information:
32 a} Name of Project
33 b} City Project No (CPI�
34 c) Scope af Project {i.e. type of constructian activrty)
3S d} Actual construction duration within the block
3b e) Name of the contracto�'s foreman and phane nuzxiber
37 fi� Name of the City's inspector and phone nurnber
38 g} City's after-hours phane number
39 2) A sample of the `pre-consttuction not�£zcation' fly�r is at�ached as Exhibit
40 A.
41 3) Submit schedule showing the construction start and finish time for each
42 block of the pxoject to the inspector.
43 4} Deliver flyer to t11e City Inspector for review prior ta distribution.
44 b. No const�-uctzon wi11 be allowed ta begin on any block until the flyer is
45 delivered to aIl residents of the block.
46 I. Public Notification of Temporary Water Service Tnterruption during Construction
CITY OP FOItT WOTiTH
2021 SidewalkUnitP�ice Constnecfiott Contract
102520
STANDARD COIISTRUCTION SPECIFTCATTON DOCUMENTS
Revised Decembar 20, 2012
013513-5
SPECIALPROJECT 1'ROCEAURES
Pagc5of8
1
2
A
S
6
7
8
9
10
11
I2
I3
14
15
16
1'7
18
19
20
2I
22
23
1. Ix� ihe event it becomes �aecessary to tempoi�arily shut down water service to
residents or businesses during construction, prepare and deliver a notice or flyer of
the pe�adang interrupiion to the fz'ant door of each af%cted resident.
2. Prepared notice as foIlows:
a. The notification or flyer shall be posted 24 hours prio�• to the temporary
interruption.
b. Prepare flyer on the contractor's letter�ead and include t.�e %llowing
information:
1) Name of the projec�
2) City Project Numb�r
3} Date of t.�e it�terruption of service
4} Period the interruption will take place
5) Name of the contractor's %rernan and phone number
6) Name of the City's inspector and phone n�rriber
c. A sample of the temporary water service interruption notificatiox� is attached as
Exhibit B.
d. DeJiver a copy of the temporary interruption notification to the City inspector
for z-eview prior to being distrl�buted.
e. No intenrUption of water service can occur until f,he flyer k�as been delivered to
al[ affected residents and businesses.
f. Electronic versions oithe sample flyers can be obtained from the Project
Construction Inspector.
.F. Coordinatzo� with United States Army Corps of Engineers {USACE)
24 1, At locations in t�ae Prpject where cons�iruction activiiies occur i� areas where
25 USACE permits are required, meet all require�ents set forth in each designated
26 pez'mit.
27 K Coordination within Rail�oad FermitAreas
28 I. �t locations in the pz-ojeci where construction activities occur in areas wherc
29 railroad permits are r-equired, meet all requaernents set forth in each designated
30 razl�oad permit. This includes, but is not Limited to, provisions for:
31 a. �'lagmen
32 b. Inspectors
33 c. Safety t�rair�ing
34 d. Atiditional izasurance
35 e. Insurance cer#ificates
36 �. Other employees required to protect the right-of-way and property of the
3'7 Railroad Company from damage arisi�n.g out of andlor from the construction of
3g the project. Proper utility clearance procedures shaIlbe used ir� accordance
39 with the permit guidelines.
�0
�1
42
43
44
45
46
2. Obtain any supplemental information needed to comply with the railroad's
requirements .
3. Railr�ad Flagmen
a. Submit receipts to City for verification af working days that raiIroad flagmen
were present on Site.
L. Dust Control
1. Use acceptabie measurres to controt dust at the Site.
CITY OF FORT'WO�ZTH
2021 SidewalkUnitPrice Consi�'uction Contract
1p2520
STANDART] CONSTItUCTION SPECIFICATION DOCUMEi�lTS
Revised Dacember 20, 2012
O1 3513 -C
SP�CL4I,PTtO]BCT PROCP,DURES
Pa�e 6 of S
1 a. If waf:er is used ta confral dust, capture and properIy dispose of waste water.
2 b. Ifwet saw cutting is pe�•formed, captune and properly dispose of slurry.
3 M. Employee Parking
4 1. Provide paa'king far err�ployees at locations appro�ed by the Cit�.
5 1.5 SUBMITTALS [NOT USED�
G 1.6 ACTiON SUBM[TTALS/INF4RMATIONAL �UEMITTALS [NOT USID]
7 1.7 CLQSFALIT SUBMITTAI�S [N4T USED]
8 1.$ MAINTENANCE MATERIAL SUBM7TTALS [NOT USEU]
9 1.4 QUALITY ASSURANCE [NOT USID]
IO 1.10 DELIVERY, S'1�RAGE, AND HANDLING �NOT USED]
11 1.11 FIEI�D �SITE] C4ND�TiONS [NOT USED]
12 1.12 WARRANT�' [NDT USk�]
13 �ART 2 - PRODUCTS [N�T USED]
14 PART 3� EXECUTION [NOT LTSED]
15
16
17
�1 ` 1 !];T.Y� � .�i�i
Revision Log
DATE NAME SUMMARYOF GHANGE
1.4.B— Added requirement ofcompliance witl� Health and Safety Code, Title 9.
8/31/2012 D. Jolinson Safety, 5labtitle A. Pnblic Safety, Chapter 752. High Voltage Ovea�headLines.
1.4.F,—Added ContracEoA�responsibi]ityforobtaini�gaTCEQAixPermit
Cl'I'Y dF FORT WOR'i"T�
2021 SidewalkUnitPrice Cottsixuction Conh•act
102520
STANDARD COiNSTRUCT'ION SPECIF[CATION BOCUMENTS
Reviscd Deceinber 2Q, 2012
fll 35 13 -7
SPiCJAL PR03ECT PROC�1]URES
Page 7 of 8
1
2
3
4
5
b
7
8
9
JO
11
12
13
14
15
16
17
18
19
20
2l
22
23
24
z5
26
27
28
29
30
31
32
33
34
35
36
37
FXHiBXT 11
(To be printed on Contractor's Letterhead)
Date:
CPN No.:
Project Name:
Mapsca l.ocatiort:
Limits af Construction:
i
-�
�
�
i I ,
I I
THIS iS TO IN�OR�ii YOU THAT UN9�R A COhlTFt�4CT W[�H TH� CITY OF F�RT
WOR`�H, OUR CO�iI PANY Vl�ILL WORFC ON UT[LITY L[NES ON OR AROUND YOUR
PROP�R`�Y.
CONSTRUC�'IOiV WILL B�GIN �►PPROXI�!➢/�T�SLY 51�VEN DAYS FR�M 7'HE DAi�
OF T'H15 IVOTlCE.
IF YOU HAVE QUESTIOI�S ABOU`� ACCESS, SECURITY', SAFETY OR AF�Y OTHER
ISSl1E, PLEAS� CALL.:
M C. <CQNTRACTORS SUPFRIWTENDEM'� AT �TELEPHONE NO.�
OR
IV1P. CCI7Y IIVSPC-CTOR� AT � TEI.EPHONE NO.�
r4FT�R 4:30 PIU� OR OW 1IVEEKEfVDS, P��ASE CALL (81 �) 392 8306
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
C1T Y O�' P'ORT WORT�I
2021 SidewalkUnitPrice Consh-uc6ion Conb•acE
1025z4
STANDABI] CONSTRUCTIOAI SPECIFICATION DOCUMENTS
Revised December 20, 2012
O1 3S 13 -$
SPECIALPR07ECT PROCEDURES
Page 8 of 8
1
�
T,XHfBIT B
F���T �QRTH
�:
�� �o. �
�,� �:
i��7���� g� T�[�����`� �'�`��� ������
�'�:���`�'���
DUE 3'O UTTLITY IMPROVEMENTS T1�T YO�R N�YGI�B�RHAOA, XOi3R
WATER SERVICE WILL BE Il�'TER.TtC}P1'�Il QN
BE1'W��1V "�'�E HOUitS 4F AND
IF "YOU HAVE QUESTIO1�tS .A.BOCi"I' '1'HIS SHUT-Oi3T, PLEA3E CALL:
mx. aT
(Cph�TRAC'I'ORS SiJPEHINTENDENT) (TE��PHQIVE NUIVIB�R)
OR
MR AT
(CI'I'X iNSPECTdR} ('FEL�PIIQ�iE NUI4IBER}
TI3IS INCOI�TV�N�'dYCE WILL BE AS S�IE3RT A5 PO$SIBLE.
THAN[C YOTJ,
CONTi2AC'FOR
3 --
4
CTI'Y OP FORT W ORTH
2021 SidewalkUnitP�ice Canstructian Contrs�ct
1U2520
STt1N]�ARD CONSTRiJCTION SPECIFIGATION I]OCUMEi�lTS
Revised December 20, 2012
fll 4523 -1
TESTTNG ATii� INSPECTION SERVICES
Page 1 of 3
1
2
3 PART 1 - GENEI�_.
4 11 SUMMARY
5
6
7
8
9
10
11
SECTION 01 45 23
TESTING AND ZNSPECTION SERVICES
A. Sectian Includes:
1. Testing and inspection services procedux'es and coordination.
B. Deviations frozn this City of Fari Worth Standard Speci£'ication
I. Nane.
C. Related Specifacat�on Sections include, but are not necessa►'ily limited to:
1. Divisian 0— Bidding Requirements, Contract Forms and Candiiions of the Contract
2. Division 1--- General Requirezrzents
12 L2 PRICE ANl] PAYMEIVP PROCIDiJRFS
I3
I4
15
16
17
18
19
20
21
22
23
24
A. Measurement and Pay�aaent
1. Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Ite�rn.
a. Cont�ractor is responsible for performing, coarclinating, and payment of all
Quality Control testir�g.
b. Ciry is responsible for perforxxzing and payment for firsi set of Quality
Assurance testing.
1) If the first Qua�ity Assurance test performed by tbe City fails, the
Contractor is responsible for payment of subsequent Quality Assurance
testing tuitil a passing test occurs.
a} Finai acceptance will not be issued by City until all required payments
for testing by Contractor have bee�a paid in full.
25 1.3 REI+ERENCES [NOT USED]
26 lA ADNIIIVIS'I'RAT�VE REQUIRI%M�1VTS
27
2$
29
30
31
32
33
34
35
36
37
38
A. Testing
1. Complete testing in accardauce wi� the Contract Documents.
2. Coardination
a. When testing is requu-ed to be performed by the CiYy, notify Ciry, sufficiently
in advance, when testing is need.ed.
b, When tesCing is required to be completed by the Contractor, notify City,
sufficiently izi advance, that testing will be perfor�ned.
3. Distribution of Testing Reports
a. Elecironic Distribution
1) Co�a£��rm developxnent of Project directory for electronic submi�tals to be
uploaded to City's Buzzsaw site, or anQther e�ternal FTP site approved by
the City.
CITY OF FORT VVOILTH
2021 3idewalkUnitPrice Conshucfion Coniract
1D2520
STANDARD CONSTRUCTION SPECII'ICATION DOCI[JIvIENTS
Revised July 1, 2011
Ol 45 23 - 2
TBSTII�IG ANDINSPECTIOIV SERVTCES
Yage 2 of 3
1
2
3
4
5
b
7
8
9
10
I1
12
13
14
15
16
17
18
19
�a
21
22
23
2A
25
2} Upload iest reports to designated project directory and notify appropriate
City represer�tatzves via einai] of submittal posting.
3) Hard Copies
a) I co�y �ox alI submittals submiited to t�ae Project Representative
b. Hard Copy Distx�`butian (if required in lieu of electronic distribuiion)
1) Tests perfoz�zned by City
a) Distribuie 1 hard copy to the Contractor
2} Tests performed by the Contractor
a) Distribuie 3 hard copies to Ciry's Project Representative
4, �'rovid� City's Project Represex�tative with trip tick�ts for each d�livered load of
Concrete or Lime material including the foliowing iriforrRaatzon:
a. Name of pit
b. Date of delivery
c. Material delivexed
B. Inspectian
1. Inspectfon or Iack of uispection does not reueve the Contractor from obligation to
perform vvork in accordance with the Contract Documents.
1.5 SUSNIITTALS jNOT USID]
i.S ACTION SUSMITTALS/INFORMATJONAL SUBMITTALS [NOT USID]
�.7 CLOSEOUT SUBNIITTALS jNOT USEU]
1.8 MAINT`ENANCE MATERIAL SLTBMITTALS [NOT USID]
1.9 QUALITY ASSITR.ANCE [NOT iTSED]
1.10 DELIVERY, STORAGF, AND HANDLING [NQT USED]
1.I1 FIEr,D [SITEJ CONDITIONS [NOT USID]
1.12 WARR.AN'l`Y [NOT iTSED]
26 PART 2- FRODUCTS [NOT USID]
27
28
29
PART 3 - I+A'ECUTION [NOT USID]
IND OF SECTION
Revrsion L.og
DATE NAME ,SUMMARYOF CHANGE
CITY QI'�'OI2T WOf2TH
202T SidewalkUnitPrice Consttvcfion Conia'act
i02520
STAhlDAR� CONSTRUCTIDN SPECIFICATION DOCUMBivTS
Revised 7uly 1, 2011
0 [ 45 23 - 3
TEST CNG AND INSP EC'1'ION S ERVIC�S
Page 3 af 3
CIT'Y OF FORT WORTF3
2021 SidewalkUnitPrice Consh'uction Contract
io2szo
STANAARD CO3+ISTIZUCTION SPECIFICATION DOCUMENTS
Revised 7uly 1, 2011
ai saoo-i
TEMPORARYFACIL[TiES AND CONTROLS
Page 1 of 4
I
2
3 PART 1 - GENER.AL
4 I.1 S UMMARY
5
6
7
8
9
IO
11
12
13
14
15
16
17
l8 1.2
SECT[ON 01 50 00
TEMPOR.ARY FACILITIES AND CONTROLS
A. Section Includes:
1. �'rovide temporary facilities and controls �eeded for the Work inclucling, but not
necessarily limited ta:
a. Temporary uti�iizes
b. Sanifary facilities
c. Storage Sheds and Build'ulgs
d. Dust con�-ol
e. Temporary fencing o�tbe construction site
B. Deviations from this Ciry of Fort Worth Standard �pecif'ication
1. None,
C. Related Specification Sections include, but are not necessarily limited to:
1. Division Q— Bidc�ing Requiremex�ts, Contract Forms and Conditions of the Contract
2. Divi�zon 1— General Requirexnents
YRXCE AND PAYMENT PROCEDIJRF�
f9 A. M�asurement and 1'ayxzient
20 1. Work associated with this Item is considered subsidiaxy to the various Items bid.
21 No separaie payment wiIl be allawcd for this Ite1n,
22 i.3 R�+�1��Fl�CFS [NOT USED]
23 1.4 ADNIIIVCS'�RATIVE RF�QLTI�tE1V�TTS
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
A. Temporary Utilities
1. Obtaining Temporary Service
a. Make art7�angements with utiiity ser�ice companies for teznporaty services.
b. Abide by ruies and regulations of utiliry service companies or authorities
having juzisdiction.
c. Be ��esponsible for utility ser�ice costs until Work is approved for FinaE
Acceptance.
1) Included are fuel, power, light, heat and othez- uEility services necessary for
execution, completion, testing and initial opez-ation of Work,
2. Water
a. Contractor to provide water required for and in connection with Work to be
perfortned and for specif�ied fests of piping, equipment, devices or other use as
required fox the completion af the Work.
b. Pro�vide a�d maintain adequate supply of potable water far domestic
cans�mptzon by Contractorpersonnel and City's Project Representatives.
c. Caordina�ion
ciTY or FOKT woR�rx
2fl21 SidewalkUnitFrice Constructian Contract
102524
S'tAI�DARD COI�iSTRUCTION SPECIFICATIO7+I pOCUMEIVTS
Re�ised .Tuly 1, 2011
oi s000-z
T EMPORA[i'Y FACILITILS AND CONT ROLS
Pagc 2 of 4
1
2
3
4
5
6
7
8
9
10
11
12
13
].4
J5
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
�43
1) Contact City 1 week before water for canstruction is desired
d. Contractor Payment for Cons�'uction Water
1) Obtain cox�struction water zneter from City for payrnent as billed by Ciiy's
established z'ates.
3. Eiectricity and Lighting
a. Provide and pay for electric powered service as rcquired for Work, inciuding
testing of Work.
1) Pro�ide power for Lighting, operation of equipment, or other use.
b. Electric power ser�vice includes temporary power se�vice or generaior to
maintain operatians during scheduled shutdown.
4. Telephone
a. Provide enaergency telephone service at Site for use by Contractor personnel
and oth�rs performing work or furnishin.g; services at Site.
5. Temporar� Heat and Ventilation
a. Provide temporary heat as necessary forprotection or completion of Work.
b. Provide temporary heat and ventilatian to assure safe warking conditions.
B. Sanitary Facilities
1. �'rovide and znaintain sanitary facitities for persons on Site.
a. Comply with regulations of State and lacal departments of health.
2. Enforce use of sanitary facilities by construction personnel at job site.
a. Enclase and anchor saniiary faciIities.
b. No discharge will be al]owed fram tl�ese facilities.
c. Collect and store sewage andwaste so as not to cause nu�sance or health
problem.
d. Haul sewage and wasie off-site at no less than weekly intervals and propei�ly
dispose in accordance with applicable regulation.
3. L.ocate facilities �ear Wark Site and keep clean and maintaivaed throughout Project.
4. Remove facilities at cornpletion of Project
C. Storage Sheds and Buildings
J.. Provide adequately ventilated, watertight, weatherpraofstorage facilities with floor
above ground level %r materials and equipment susceptible to weather damage.
2. Storage of matezials not susceptible to weat�er damage may be on blocks off
ground.
3. Store materials in a neat and arderly �nanner.
a. Place nraaterials and equipment to permit easy access for identi�ication,
inspecti�n and invex�iory.
4. Equip building with locicable doors and lighting, and provide electrical service for
equipix�ent space heaters and heating or ventilation as necessary to provide storage
environments acceptable to specified manufacturers.
S. Fill and grade site for ternporary structures to prfl�ide drainage away from
temporary arzd existir�g buiidings.
6. Rerr�ove building from site prior to Final Acceptance.
D. Temparary Fencing
C1T i' OF FORT W O1ZT�I
2021 SidervalkUnitPrice Canstrucbon Contract
10252D
STANAARD CONSTRUCTION SPEC]FiCATION DOCUMENTS
Revised 7uly 1, 2011
Ol 5040-3
TEMPORARYFA,CILTI'TES ANDCONTROLS
Page 3 of 4
1 1. Provide and maintain for the duration or constz-«ctian when required in contract
2 documents
3 E. Dust Control
4 1. Contractor is responsible for maintaining dust co�trolthrough the duration of the
5 project.
6 a, Contractor remains ax�-cali at a1I times
7 b. Must respond ir� a iimeTy manner
8 F. Temporary Proteciion oi Constructzon
9 1. Contractor or subcontractors ai-e responsible foz- protecting Work from damage due
10 to weather.
11 l .5 SUI3MITTALS [NOT IISID]
12 1.6 ACTION SUBM[7TALS/INFORMATIONAL SUSMITIALS [NOT USID]
13 1.7 CLOSEOUT SUBMITTALS [NQT USED]
I4 1.$ MAiNTENANCE N1A1`IIZIAL SUBMTTTALS [NOT USED]
15 �9 QUALITY ASSi.1R.ANCE [NOT USID]
16 1.10 DII,TVERY, STORAGF, AND HANDLING [NOT USIDj
17 1.11 FIELD [SYTE] CONDITTONS �NOT USED]
18 l.� 2 WARRAN`�' [NOT IISED]
19 1'ART 2- PRODUCTS [NOT USID]
20 P.A.RT 3- E�CL]TXON [NOT USID]
21 3.I INSTALLERS [NOT IISED]
22 3.2 EXAlVIINATTON [N�T LTSID]
23 3.3 �REPAI2ATION rNOT U�Ell]
24 3.4 INSTALLATiON
25 A. Te�nporary Facilities
26 1. Maintain all te;rxiporary faciIities for duration of construction acti�ities as needed.
CITY OF FOAT WORTH
2021 Side�valkiJnitP�vice Canstxvcfion Contract
102520
STr1NBARD CONSTRT_➢CTION SPECIFIGATION DOCTIMENTS
Re�ised July 1, 2Q11
o� so na -a
TEMPORACt'Y FACILITIES AND CONTROLS
Pagc 4 of 4
1 3.5 [RT,PAIR] 1 [RESTORATYONJ
2 3. G R�I NSTALLATI �N
3 3.7 FIELD [o�] SITE QUALITY CON'I'ROL [NOT USID]
q 3,$ SYSTF.�M STARTUP [NOT USE�]
5 3.9 ADJUSTXNG [NOT USID]
6 3. � 0 CLEAIVING [NOT U�ID]
7 3.11 CLOSFAUT ACTIVITIES
$ A. `�emporary �acilities
9 1. Remove all temporary facilities ax�d restore a�rea after con�pletion of the Woric, to a
�p condition equal to or better than priar ta start af Work.
11 3.12 PROTECTION [NOT LTSID]
12 3.73 MAINT�N�NCE [NOT USID]
13 3.14 ATTACIIMENTS [NOT CTSID]
I4
15
1b
IIVD OF SECTION
Revision Log
DATE NAME SUMMARYOF CHANGE
CITY OF FORT WOitTH
2p21 SidewalkIInitPrice Construction Conh•act
zozsaa
STANDARD CONSTRUCTIdhI SPECIFICATIOt*! DOCUIviENTS
Revised .lu1y I, 2011
O1 55 2b -1
STREET USB PERMTT A�1D MODII'ICATJONS TOTRAFFIC CONTROL
Pagc I of 3
� SECTTON Ol 55 26
2 STREE�' USE PERMCT AND MODZFICATIONS 'I'O TRAFFZC CONTROL
3 PART 1 - GENER.AL
4 1.1 S UMMARY
5 A. Secfion Includes:
6 l. Ad�ministrative procedures for:
7 a. Street Us e�ermit
$ b. Modification of approved traffic contxal
g c. Removal oi Street Sig�s
10 B. Deviatia�as from this City of Fart Worth Standard Spacificatiolx
11 1. Nflne.
12 C. Relaied Specification Sections includE, but are not necessarily ]imited to:
I3 1. Division 0-- Bzdding Requirements, Contz-act Farms and Conditions of the Contract
14 2. Divrsion 1—General Requirements
15 3. Sectzon 34 71 13 —`I'raffic ControI
1h 1.2 PRTCE AND PAYNIENT PROCIDURE�
17 A. Measurement and �'ayment
l8 I. Work associated with this Item is considered subsicliary to the various Items bid.
19 No separa�e payment will be al�owed for this Item.
20 l.3 RTI+'ERFNCES
21 A. Reference Standards
22 1, Reference standards cited in �is specification refer tq the current reference stanc3�-d
23 published at the time of the latest reeiszon date Iogged at the end of this
24 specif'ication, unless a date is specifica.�ly cited.
25 2. Texas Manual on Uniform Traf�c ControlDevices (TMiFTCD).
26 1.4 ADIVIINISTRA'I7VE REQUIRE�I�TS
27 A. Traf�c Control
28 1. Genera]
zg a. When traffic cont�rolplans are it�cluded in the Drawings, provide Tra.�'fic
3d Contral in accardance with Drawings and Section 34 71 13.
31 b, When traffic contro�plans are not included iun the Drawit�gs, prepare traffc
32 control plans i�a accordance with Section 34 71 13 and submit to City �or
33 review.
�4 1) Allow :minirnum 10 working days �or review of proposed Traffic Control.
35 B. Street Use Permi�
36 1. Prior to instaliation of Traffic Control, a City Street Use Permit is required.
C1TY O� FORT WORTH 2O21 SidewalkUnitPrice Constr�ictian ContracE
102520
STAND?RI7 CONSTRUCTION SPEC]FICATION DOCd1MENTS
Revised ]u(y 1, 201 ]
ai ss z� -2
STItEET USEPE�LIv1I'P ANDMOIa1FICATIONS TOTRA�'PIC CO3�1T'ROL
Page 2 af 3
� a. To abtain St�reet Use Permit, submit Traffic Cont� ol Plans ta City
2 Transportation and Public Worlcs Depa.rhnent.
3 1) Aliow aminimum of 5 worlcing days for pexrnit review.
4 2) Contractor's responsibility ta coordinate review of Traffic Control plans for
5 Street Use Permit, such that construction is noi delayed.
6 C. Modification to Approved Traf�ic Control
10
I1
32
13
14
15
16
17
18
1. Priar to installation traffic control:
a. Submit revised traf�c control plans to Ciry Department Transportation and
Public Works Depa�rtment.
1} Revise Traffic Control plans an accordance with Section 34 71 l 3.
2) Allow minimum 5 working days for review af revised Traffic Control.
3) �t is the Contractor's responsbi�ity to coordi�ate review af Trafize Control
plans for Street Use �'et�mit, such that construction is not delayed.
D. Remaval of Street Sign
1. �f it is determined that a street sign must be remo�ed far construction, then contact
City Transportation and Public Works Depaz'tment, Signs and Markings Division to
rex�rzave the sign.
E. Temporazy Signage
19 1. In tlie case o£regulato�r signs, replace permanent sign with temporary sign rr�eeting
20 requirements of the latest edition af the Texas Manual on Uniform Traffic Cox�trol
21 D�vices (MUTCD).
22 2, Install tetnporary sign before the removal of permanent sign.
23 3. When constrt'uction is complete, to the extex�t that the pe�'manent sign can be
24 reinstalled, contact the City Transpartation a�d Public Works Depaz-�ment, �igns
25 and Markings Division, to reinstall the permax�ent sign.
2b F
27
Tra�fic Control Standards
Traffic Control Standards can be found on the City's Buzzsaw website.
CITYOFFOItT WORTH
202I SidewalkUnitl'rice Constructinn Contract
102520
STAI�DARI� CONSTRUCCION SPECIFICATION DOCUME�lTS
Revised July 1, 2QI1
ai ss z6 -3
�TREET iISEPF.RMIT AND MODIFICATTOfVS TOTR,AF'FIC CONTROL
I'age 3 of 3
1 1.5 �L'BNIITTALS [NOT USIDj
2 l.b ACTION SUBMITTALS/INFORMATIONAL SUBIV�TTALS �NOT USID]
3 1.'7 CLOSEOUT SUBNIITTALS [NOT USED]
4 1.8 MAINTINANCE MATERiAL SUB1VUT1'ALS [NOT USID]
5 1.9 QUALITY ASSUI2ANCE [NOT USED]
6 1. �0 DEL[ VERY, STORAGE, AND I3ANDL.iNG [NOT USID]
7 1.11 FIELD �SITE] COND�TIONS [NOT USEDJ
8 1.Z2 WARRAN'I`I' [N�T IISED]
9
�0
11
�2
I3
PART 2 - PRODUCTS [N�T USID]
PART 3 - EXECUTION [NOT USID]
nvn oF sECTTorr
CITY OF FORT WORTH
STAl�IDARD CONSTRUCTION SPECIF[CA'I'ION DOCUMENT$
Rev�sed July 1, 2011
2021 SidewalkUnitk'rice Constructio¢ Contract
102520
01 5713 -1
STORM WATERPOLLUTlaNPREVENTIDN
Pagc 1 of 3
1
2
3 PART 1 - GINERAL
4 1.1 SUMMARY
5
6
7
8
SECTION O1 57 13
ST�RM WATER POLLUTION PREVENTION
A. Section Includes:
1. 1'rocedures for Storm Wate� Pollution Preventio�n Plans
B. Deviaiions from thi5 City of Fort Worth Standaz'd Specifcat�on
1. None.
9 C. Related Specificatian Seciions incl�de, but are not neces,sarily limited to:
10 l. Division 0-- Bidc�itzg Requiz'ements, Contract �'orms and Condi�ions of the
t 1 Contract
12 2. Di�ision 1— General Requirements
13 3. Section 31 25 00 — Erosiox� and Sediment Contx'oI
i4 1.2 PRICE AND �'AYMENT PROCEDURFS
15
16
17
I8
19
20
A. Measurement and Payment
1. Construction Activities resuliing in less than 1 acre of disturbance
a. Woxlc associated with this Item is considered subsidiary to the various Items
bid. No separate paymex�t wi11 be allowed foz' this Itenn.
2, Construction Activities resulting in greater than 1 aere of disturhance
a. Measurement and Payment shall be in accordance witli Sectian 3] 25 00.
2I 1.3 Fl.F:FGREI�TCF�S
2z
23
24
25
26
27
28
29
30
31
32
33
n
A.
Abbreviations and Acronyms
1. Notice of Intent: NOI
2. Notice of Termitiation: NOT
3. Storm Water Pollution Prevention Plan: SWPPP
4. Texas Commission on �,nviroiu�aental Quality: TCEQ
5. Notice af Change: NOC
Reference Standards
1. Reference standards cited in this Specif'ication refer to the current reference
standard published at the tirne of the lates# revision date logged at the end of this
Specification, unless a date is speeifically cited.
2. Integ�'ated Stor�n Management (iSWM) TechnicalManual foz' Construction
Cont�roLs
3�4 1.4 ADMIPTISTRATIVE REQUIREMENTS
35 A. Gene:ra�
CiTY OF FOI2T WORTH
2021 SideFvalkUuitPa'ice Coushvcfion Contract
102524
3'I'AI•IpARD CONSTRUCI'ION SPECIFICATION AQCIJMENTS
Revised July l, 2011
QI 5713 -2
STORIvI WA'TERPOLLUTIONPR�.VEN1'InA1
Page 2 of 3
1 1. Contractor is respanszble for resolution and paymcnt of any fines issued associated
2 with corz-�pliance to Starmwaier Pollution Prevention �'lan.
3 B. Canstruction Activities resultixig in:
4
5
6
IO
11
12
13
1�
15
16
I7
18
19
20
21
22
1. T.ess tl�an 1 acre of disiurbance
a. Provide erasian and sediment cont-�ol in accordance with Section 3 i 25 00 and
Draw �izigs .
2. 1 to less than 5 acres of disturbance
a. T�xas Pollutant Dischaz-ge Elimrnation Systenn {TPDES) General Constructrqn
Permit is required
b. Complete SWPPP in accordance with TCEQ i�equirernents
�) TC}�Q SmaIl Construction Site Notice Requirec! under general permit
TXR150000
a) Sign anc! post at job site
b) Prior to Preconstruction Meeting, send 1 copy to City Departenent of
TransportatianandPubIic Works, fin�vu•onmentaZDiv�sion, ($17}392-
6088.
2) Provide ez-osion and sediment cantrol in accordance with:
a} Section 31 25 00
b} The Drawings
c) TXR150000 GeneralPer�nit
d) ,S WPPP
e} TCEQ requirexnents
23 3, 5 acres ar�nore ofDisturbance
24 a. Texas Pol[utant Discharge Elimination System ('I'�DES) General Construction
25 Perrr�it is required
�6 b. Complete SWPPP in accordance with TCEQ requirements
27 1) Prepare a"I'CEQ N01 form ancf submit to TCEQ along with required fee
2S a) Sign and post at job site
29 b) Send copy fo City Depariment aiTra.iasportation and Public Worics,
3a Environmental Division, {817) 392-b088.
�� 2) TCEQ Notice of Change rec�uis�d rf maktng changes or updates to NOI
3� 3) Provide erosion and sediment control in accordance with:
33 a) Section 3125 OD
34 b) �'he Drawings
35 c} TXR1500D0 GeneralPermit
3b d) SWPPP
37 e) TCEQ requirements
3S 4) 4nce the project has been compieted and aIl the closeout requirements of
39 TCEQ ha�re b�en met a TCEQ Notzce of Terr�ir�ation can be submitted.
40 a} Send copy to City Deparhnent of Transportation and Public Works,
`�1 Environrnental Division, {817) 392-6088.
42 1,5 SiISMCTTALS
43
44
�5
�Fb
A. S WP�'P
Submit in accordance with Sectio� O1 33 d0, except as stated herein.
a. Prior to f:he Preconstructroi-� Meeting, submit a drt-aft copy af SWPPP to ilae City
as folIows:
CITY OF FOI2T WOTtTH
2021 Sidewalki7nitPrice ConsYruc�on Contract
102520
STAi�IDARD COl�(S'�'RUCTION SPECIFICATION DOCUMENTS
Revised diily i, 2Q11
O E 57 13 - 3
STORM 1rVATE2 POLLLITION PREVENTIQN
Page 3 oF 3
X 1) 1 copy to the City Project Manager
2 a) City Project Manager wili forward to the City Department of
3 Transportation and Public Works, ��vironmental Division for review
4 B. Modified SWPPP
5 I. If the SWPPP is revised during consiruction, resubmit modified SWP�'P to the Ciiy
6 in accordance with Sectio� O1 33 00.
7 1.6 ACTION SUBII�TTALS/INFORMATIONAL SUBNIITTALS �NOT U�ID]
8 1.'� CLOSI'AC]T SUBMCTTALS [NOT USED]
9 I.8 MAIN1k.TTANCE MATIIUAL SUB11uTTAL� [NOT USID]
10 1.9 QUALXTY ASSURANCE [NOT IISED]
11 1.10 DELIVERY, STORAGE, �ND HANDLING [NOT USED]
12 i.l l FIELD [��TE] CONDITIONS [NOT USED]
13 1.12 WARRANI'Y [NOT IISED]
14 PART 2- PRODUCTS [NOT USID]
15 PART 3- EX�Ci3TI�N [NOT U�IDJ
16
17
18
END OF SECTION
CITil OF FOTZT WORTH
2U21 SidewalkUuitPiice Construcaon Contract
I0252d
5TANDARD CONSTRUCTION Si'ECIFTCA'I'ION DOCUME�1'TS
Revised 7uly l, 2011
Oi 58 L3 -1
T�,MPQRARYPROJECT SIGAIAGE
Page 1 of 3
�
2
3 PART 1 - GIIVIIt.AL
SECTION OI SS 13
T�MPORARY PROJECT SJGNAGE
4 L1 SUMMARy
5 A. Sectian Includes:
6 1. Temporary Project Signage Requirements
7 B. Deviations from th�s City ot�Fort Wortk� Stanc�ard Specification
S I. Noxae.
9 C. Related Speci�fication Sectians incIude, but are not necessarily lunited to:
10 1. Div�sion 0— Bidding Requiret�rients, Contract Forms and Conditions of the Contract
1 I 2. Division 1— General Requirements
12 1,2 PRICE AND PAYMEi�]'i' PROCIDURT.0
13 A. Measurement and Payrr►ent
1� 1. Work associated with this Iierr� is considered subsicliary to the various Items bid,
15 Na separate payrnent will be aIlowed for this Item.
16 1.3 REl?'ERL'NCFS [NOT USEU]
17 1.4 ADMINISTR.A.TIVE REQiyCREM�IVT� [NOT USID�
I& 1.5 SUBMITTAL� �NOT iTSED]
19 �.6 ACTION SLTBMITTALS(INFORMATIONAL SUSMITTALS [NOT TJSID]
2(1 1.7 CLOSEQUT SUBMITTA,LS [NOT IISID]
21 1.8 MAiN7�NANCE MATER�AL SUBMTTTALS [N4T IISED]
22 1.9 QUALITY ASSURANCE [NOT USID]
23 L1Q DELZVERY, ,STORAGF, AND HANDLING [NOT USID]
24 i.11 FIELD [SITE] CONDITIONS [NOT USID]
25 1.12 WARR.ANI'Y [NOT USID]
2b PART 2 �- PRODUCTS
27 2.1 OWNER-�`URNISH�',D [o�] OWNER�SUPPLZIDPRODUC'TS �NOT USID]
28 2.2 EQUIPM�'NT, PRODUCT TYPFS, AND MA�T,RIALS
29 A. Design Criteria
C1TY pF FORT WORTH 2O21 SidetivalkUnitk'rica Conshvction Conlract
102,520
STANDARD CONSTRUCTION SPHCIFICATION DOCUMENI'S
Ttevised .Tuly 1, 20] 1
1
2
3
4
S
6
7
O1 58 l3 -2
TEMI'012ARYPROJECT SIGIVAG�
Page 2 of 3
1. Provide free standing Project Designation Sign in accordance with City's Standard
Details �or project signs.
B. Materi�ls
1. Sign
a. Constructed of 3/a�inch f�r ply�vood, grade A-C {exterior) or better
�..3 ACCFSSORIFS �NOT USED]
2.9 SOURCE QUALITY CONTROL [NOT USID]
S PART 3 - EXTCUTION
9
10
11
12
13
14
15
16
17
IS
19
20
21
22
23
2A�
25
26
27
28
29
30
31
32
33
3.� INSTALLERS [NOTUSID]
3,2 EXANIINA'ITON [NOT LTSID]
3.3 PREPARATI�N [NOT USED]
3.4 INSTALLATION
A. General
1. Provide verticai jnsiallation at extents of praject.
2. Relocate sign as needed, upon request of the City.
B. Mounting options
a. Skids
b. Posts
c. Barricade
3.5 REPA�R / RESTORATI ON [N�T USED]
3.6 R�XNSTALLATION [NOT USED]
3.7 FIELD [au] SXTE QUALITY CONTROL [NOT USED]
3.8 SYST�M STARTCIP [NOT USID]
3.9 ADJUSTING [NOT iJ�SED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTiVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINT�iANCE
A General
I. Maintenance vt+ill include painting and repairs as needed or directed by the Ci�y.
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
CITY OP FOliT WORTH
2021 SidewalkUnitPrice Conshvcfion Conh�act
102520
STA�iDARTl COIJSTRUGTION SPECIFICATION DOCUMEAiTS
1Zevised .Tuly 1, 201 i
CIT1' OF FdAT' WOI2'1"H
STAN�ARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised duly 1, 2011
Ql 58 13 -3
TEMPORARYPROJEC'T S[GNAGE
Page 3 of 3
2021 SidewalkUnitPrice Conshvc�ion Conh�act
iozszo
oi �oao-�
rxot�ucT xrQunz���rrrs
1'agc i of 2
1
2
3 PART 1 - GINIIL4T�
4 L1 SY]MMAIt�i'
SEC'TION O1 60 00
PRODUCT REQUIREMCNTS
$ A. �ection Tncludes:
6 1. References for Praduct Requirements and City Standard Products List
� B. Deviations fi-om thi� City of Fart Worth Star�dard Specification
g I. None.
9 C. Related Specification Sections include, but are not necessarily lirnited to:
10 1. Division Q— Bidding Requirerriants, Con#ract Forms arid Conditions oithe Contract
] 1 2. Division l— General Reyuirements
I2 L2 PRXCE A1VD PAYMENT PROCIDiJRFS [NOT i7SIDI
13 1.3 I21{F`ERINCFS [NOT USIDr
14 1.4 A.DNIIlVIS'�'RATIVE REQU�RTNIINTS
15 A. A list of City approved products for use is located on Buzzsaw as foliows:
16 1. Resources102 - Canstruction Docu�mentslStandard Products List
17 B. Only products specifically included on City's Standard Yroduct List in these Contract
1g Dacur�ents shallbe allowed for use ori the Project.
1g ]. Any subsequently approved products will only be allowed for use upon specific
ZQ approval by the City.
21 C. Any specif'ic product requirements ir� the Contz'act Docu�xients supersede similar
22 products included on the City's Standard Product List.
23 1. T��e City reserves the right to not allow products to be used for cer�ain projects ev�
24 though the product is listed or� the City's Standard Product List.
25 D. Although a specific product is 'rncluded on City's Siant�ard k'roduct List, not all
2b products from that manufactu�rer are approved for use, including but not limited to, that
27 manufacturer's standard product.
28 E. See Section O1 33 00 for submittal requirements of Product Data included on City's
29 Standard kroduct List.
30 L5 SUBMITTALS [NOT USED]
31 1.6 ACTION SUBMITTALS�YNI'�RMATIONAL SUSMITTALS [NOT USID]
32 1.'� CLOSEOUT SUBMITTAT�S [NOT USED]
33 1.$ MAIN`iIlVANCE MA1k;RIAL SUBMITTALS [NOT USID�
34 1.9 QUALITY ASSURANC� [NOT USE�]
C1TY Ok' FORT 'UVDRTH
2021 SidcwalkiJnitPrice Construction Coab�act
102Sz0
STANDARD CONSTRUCTION SPECIFICATIQN DOCUM�i�iTS
Revised Aecember 20, 2012
oi �oao-z
PROT]C7CT REQUIR$MEAITS
1'agc 2 of 2
I 1.10 DELIVERY, STORAGF, AND HANDLING [NOT USID]
2 i.11 �'IELD �SITEj CONDITTONS �NOT USID]
3 I12 WARR_ANI'Y [NOT ITSED]
4 PART 2- PR4DUCTS [NOT IISIDj
5 PART 3- EXECUTIQN [NOT USEDJ
�
7
END OF SEC'I�ON
Revrs ion L.og
DATE NAME SUMMARYOF G�IANGE
8
10/12/12 I D. Johnsort I Modi£ied Location o£City's Stanciard Product List
CITY OF FORT W dRTH
202I SidewalkiTnitPrice Consfruciion Caniract
102520
STANDARD CONSTRUGTION SPECIFICATION DOCl1IvIENT5
Revised DecemUer 20, 2012
oi 6� ao - i
PRODUCTSTORAGEANDHANI)L1NG REQUTREMBNTS
Pagc 1 af4
1
2
SECTION O1 66 00
PRODUCT STORAGE AND Z-�ANDLING REQUIREMENTS
3 �ART 1 - GINERAL
4 l.l. SUMMARY
S
6
7
8
9
10
11
12
13
lA
15
16
A. Section Zncludes:
1. Scheduling of praduct delivery
2. Pacicaging ofproducts fordelivery
3. Protection of products against damage from:
a. Handling
b. Exposure to elements or hat'sh environri►ents
B. Deviations from this City oiFort Worth Standard ,Specification
1. None.
C. Related Speci�'icatian Sections include, but are not necessarily limited to:
1. Division 0— Bidding Requirements, Contract Forrns and Conditions af the Co�tt'act
2. Divi�ion 1— General Requ�rements
1.2 PRICE AND PAYNIQVT PROCIDCTRF�
17 A. Measurement and Payxnent
lg 1. Work associated with tlais Item is considered s�xbsidzary to the various Items bid.
�9 No separate payznent will 6e allowed for fihis Item.
20 1.3 Itl'ETR_II�TCT� [NOT IISED]
21 L4 ADNIIIVISTRATIVE REQUIRIII'I�NTS [NOT iTSID]
22 1.� SUBIVIITTALS �NOT USED�
23
24
2S
26
27
28
29
30
31
32
33
1.6 ACTION SUBMITTALS/�NF'ORMATIONAL SUBMITTALS [NOT USID�
1.'� CLOSEOUT SUBMITTALS [NOT USID]
1.8 MAINTINANC� MA'IERIAL Si1BNII'�T�� [NOT USED]
1.9 QUALITY ASSi3RANCE [NOT iSSID]
� .10 DELTVERY AND HANDLING
A. Delivery Requirements
1. Schedule delivezy of products or equipment as reguired ta allow timely instailation
and to avaid prolonged storage.
2. Provide appropriate personnel and equipment to receive deliveries.
3. De�ivery truc�s wi11 nai be permitted to wait extended periods of time nn the Site
for persannel or equipment to receive the delivery.
CiTY OF�'012T WORTi�
2021 SidewalkUnitPz'ice Construction Cont�'act
102520
STANDARD CONSTRUCTIOTi SPEC]FICATION DOG1J1vjENTS
Revised 7i�ly 1, 2011
ai 6soo-z
PI20DUCT STORAGEANDiZANDLING R$QUIREMENTS
Page 2 pf 4
] 4, Deliver products or equipment in rnanufacturer's original unbro�cn cartons or other
2 contarners designed and constructed to �rotect the contents fi•om physical or
3 environt�aentaZ damage.
4 5. C1earIy and ful�y mark and idcntify as to manufactul-er, iterr� and installation
5 loc ation.
6 b. Provide manufacturer's ir�structions �or statage and hac�dling.
7 B• Handlir'ig Requirements
$ 1. Hazidle products or equipment in accordance with t�ese Contt�act Document� and
9 �anufacturer's recomna�ndations and instructions.
10 C. Storage Requirerr�ents
11 1. Stofe materiaLs in accoz�dance with manufacturer's recommendations and
T2 requirements of these Specifications.
13 2. Make necessary provisions for safe sto�rage of materials and equipment.
i4 a. P1ace loose soil materials and materials to be �corparated into Work to prer�ent
Z� damage to any part of Work ox existing facilities and to maintain free access aC
�6 all times to all parts of Work and ta utiliiy service cornpany installatians in
X� vicinity of Work.
18 3. Keep materials and equipmcnt neatly and compacfly stored in 1pcations thai wilt
19 cause miniumum incor�venience to ather ca�atractois, public tra�vel, adjoining owners,
2a tenants and occupa�ts.
2� a. Arrange storage to provide easy access for ins�ection.
22 4. Restrict storage to areas available on construction site for stoxage of material and
2� equipment as shown on Drawings, or approved by City's Project Representative.
24 5. Provide off-site storage and protection when on-site storage is not adequate.
25 a. 1'ro�ide addresses ofand acc�ss to off site storage locations for inspectzon by
2� City's Praject Representative.
27 b. Do not use lawns, grass pla#s or ather private pt�operty for stozage purposes withoui
2S written permission af ovcrner or other person in possession Qr conirol of premises.
29 7. Store in manuiacturers' unopened containers.
30 8. Neatiy, safely and corr�pactly stack materials deiivered azid stored along Iine of
31 Work to avoid znc onvenience and damage to property owners and general public
32 and maintain at least 3 feet frozn �re hydxant.
33 9. I�ep pub�ic and private driveways a�d street crossings opezz.
34 10. Repair or repiace darnaged lawns, sidewallrs, streets or other impravements to
35 satisfactton of City's k'roject Representatr�e.
3b a. Totai length which materials may be distributed a�ong route oiconstruction at
37 one time is 1,000 linear feet, unless otherwise appz-oved in writing by City's
38 Project Representative.
CITi' OF FORT WORTH
202I SidewalkUnitPiice Cansfruction Contract
102520
STANDARD CONSTRUCTION SPECIFICATTON DOCUMEI�iTS
Revised Juiy 1, 2011
Ol 66 DO -3
PRODUCT S1'ORAGEANDHANDLING REQUIREM�+NTS
Page 3 of 4
1 1.11 FIELD [SITE] CONDTTTONS [NOT USID]
2 1,12 WARRAN'i'Y [NOT LTSED�
3 PART 2- PRODUCTS [NOT USID]
4 PART 3 - EXECUTION
S
6
7
8
9
10
11
12
13
14
15
16
i7
18
19
20
21
22
23
24
25
2b
27
28
3.1 INSTAL.LERS [NOT LTSID]
3,2 EXAMINATION [NOT USIDJ
3,3 PRE�'ARATiION [NOT U�IDJ
3,4 II�.FCTION [NOT USID]
3.5 RF.�'.AIR 1 RFSTORA'i�ON [NOT IISED]
3.6 R�XNSTALLATION [NOT USID�
3.7 FXk3.D [ox� SITE QUALITY CONTROL
A. Tests and Inspechons
1. Inspect all products or equipment delivered to the site prior to unloading.
B. Non-Conforming Work
1. Reject ali products or equipment t�at are daza�aged, used or in any other way
unsatisfactory far use on the project.
3.g SYSTEM STARTUP [NOT LTSID]
3.9 ADJUSTiNG [NOT USID]
3.10 CLEANING [NOT USID]
3.11 CLOSEOUT ACTIVITiFS [NOT USED�
3.1� PROTECTION
A. Protect aIl products or equipm.ent in accordance with manufacturer's varitten d�rections.
B. Store products or equipment in location to avoid physical damage to items while in
storage.
C. Pratect equipnraent from exposure to ele�nents and keep thoroughly dry if required by
the manufacturer.
3.13 MAINTENANCE jNOT USID]
3.14 ATTACHMENTS [NOT iTSID]
29 END OF SECTION
CTI'Y OF PORT WOI2TI�
20zI SidecvalkUnitPrice Canshvction Conh-act
iazsaa
STANDARD CONSTRUCI'ION SPECIFICATI�N DOCLFMENTS
Revised 7uly 1, 2011
CITY OF FORT WORTT3
O] GG 00 -4
PRO77UCT S1'ORAGEANDHAIVDLTI�G REQ[dIR$ME�I'1'S
Pagc h oF 4
20z1 SidewalkUnifPrice Consh'uction Conh�nct
1DZ520
STANDt1RD COI�iSTR�JCTIQN SPE.CIFICATION I70CLTMENTS
Re�ised 7uly 1, 2011
o� �oaa-�
MbSTE.IZATION AND REMOSILIZATION
Page 1 of 9
I sFCTXON o� �o oa
2 MOBILIZATION AND RCMOBILIZATION
3 PART 1 - GIIVIIt.AL
4 1.7 SYTMMA.RY
5 A. Section Includes:
b
7
9
1D
11
12
i3
14
15
16
17
18
19
20
21
22
23
24
1. Mobilization and Demobi.lization
a. Mobilization �
1} Transportation of Contx�acior's personnel, equipment, and operating supplies
to the Site
2) Establishment of necessary general facilities for the Con� actor's aperation
atthe Site
3) Premiums paid for perfortnance and paymen�t bonds
4) Transportation of Contractor's personnel, equipment, and operating supplies
to another locatio�a within the designated Site
5) Relocation of necessaxy general faciIities for the Cont�'actor's operation
from 1 location to another locafion on the Site.
b. Demohilizatian
1) Transportation of Coniractor's personnel, equipment, and operatnlg supplies
away from the Site including disassembly
2) Site Clean�up
3) Rernoval of all b�zildings and/or otI�er iacili�ties assembled at the Site far tlais
Contract
c. Mobilization and Demobilization do not include activities for specific items of
vcrork t�ai are for which payment is provided elsewhere in the contract.
25 2. Rexnobilizafion
26 a. Reaa�obilizafion for Suspension of Warlc specifically requi�ed in i�ae Cantract
27 Docu�rraents ar as required by City includes:
28 1) Demobiliza�ion
29 a) Transportation of Contractor's personnel, equipment, and operating
30 supplies from the Site including disasse�bly or temporarily securing
31 equipment, suppiies, and ather faciliti�s as designated by the Contract
32 Dacuments necessary to suspend the Work.
33 b) Site Clean-up as designated iti the Cantract Docunnents
34 2) Remobilization
35 a) Tratisportation of Coz�tr'actor's personnel, equipment, and operating
36 supplies to the Site necessaxy to resume the Work.
37 b} Establishment ofnecessairy generaI facilities for the Contractor's
38 operation at the Site necessary io zesume the Work.
39 3) No Payments will be made for:
40 a) Mobilizat�on and Demobilization from one location to another on the
41 Site in the x�ormal �rogress of pei-farmirig tk�e Worlc.
42 b} Stand-by or idle iime
43 c) Lostprofits
44 3. Mobilizations and DemobiIization %r Miscellaneous Projects
C1TY OF NO1ZT WDRTH
2021 SidewalkIInitPjicc Construction Cantract
102524
STANDARD CONSTRUCTION SPECIFICATIOIV DOCUMENTS
Revised Nove�nber 22, 201G
Ql 7000 -2
MOBILIZATION ANI] REMOB�,TZAT[ON
Page 2 ot 4
1
2
3
4
5
6
7
S
9
10
11
12
13
l4
15
I6
17
18
19
20
21
a. Mobilization and Demobi.lization
1) Mobil�ation shall consisi of the acti�ities and cost on a Work Qrder basis
necessary for:
a) Transportatian of Contractor's personnel, equipment, and opexating
supplies to the Site %r the �ssued Work Order.
b) Establishmex�t of necessary general facilities for the Co�tractor's
operation at the Site for the issued Worlc Order
2) Dern�obilization shall consist of the acti�i�ies and cost necessary for:
a} Transportation of Contractor's personneJ, equipment, and operating
supplies from the Site including disassembly for each issued Work
Order
b} ,Site C1ear�-up far each issued Work Order
c) Removal of all buildings or other faciiities assembled at fhe Site for
each Worlc Oder
b. Mabilization and Dezxaobilization do not include acti�ities for specific items of
work far vvlaich payment is provided elsewhere in the contract.
4. Exxaergency Mobilizations and Demo6�iization for Miscellaneous Projects
a. A Mobi�ization for Misccllaneous Projects when directed by the City and the
mobilizatian occut�s wifhin 24 houz-s of ihe issuance of the Work Order.
B. Deviations from this City of Port Worth Standard Specification
l. None.
22 C. Related Specificatiion Sectiorts iu�clude, but are not necessarily limited to:
23 1. Di�vision 0— Bidding Requirements, Contract Forms and Conditions of the Coniract
24 2. Divi�ion 1— General Requiremenis
25 1.2 PRICE AND PAYMFN'i' PROCIDURFS
26 A. Measurement and Payment [Consult City Department/Division for drrectioz� on if
27 Mobilization pay item to be ix�cluded or the item s�ould be subsrdiary, include the
28 appropriate Section 1.2.A.. 1.]
29 1. Mobilizaiion and Demobilization
30 a. Measiare
31 1) This Item is considered subsidiaxy to the various Items bid.
32 b. �ayment
33 1} The work performed and materia�s furnished in accordance with this Ttemi
34 are subsidiaty to the various Items bid and no other compensat'ron vvill be
35 allowed.
36
37
3$
39
40
41
42
43
44
45
� n„ ,.t.; ,.:�:,,.,ti. „a ,.�,,. r,.��.. .,+
ri��, ,,t,.
��
�:-�� .
»
«
�
Tl,.,,,.r;.,., �L,.,11 : .,1.,,�,,.
C1TY OF FORT WORTH
2021 SidewxlkUnitPrice Construc6ion Conh•act
10252fl
STANDARD CONSTRUCTION SPECIFICAT[QN DOCUMENTS
RevisecE Novembef� 22, 2016
oi �000-s
MOBILTZA'fION ANA REMOSII.IZATTON
Pagc3of4
� . . . .
Z')z�_.,� ..,.,.,,.l..:t:r,,,r:,.., ., .�fe�tii;T....,1 �A c,,.,4�,.., t t A'1_., �1
3 . � a
4 �
5 .
G, r,r,. ..f �.,a n„
� i� mi.,• t� u �. ,.t,,.,;F«oa r t u.,� ��uu:. u� u.,..��,a.,�.,.,....;+�, nr+s,.ro�n
g „F �,,,,+:,.�, nn �� nn
gZ ,. ,..� ��v � 1.,..,,...,. u.,.,...,_..�..�
Ifl •
11 .
12 �, r,r� �,t
l3
iA
I5 �
16
�.7 ,7 ,] '.�,.a ,....�10 «T.i ����� :,'".i.t �� t,u�,I F y 4f rl. �...� i+
1 � �� »
19 •
20
21 s. -rt,,, ..r;..,, ,.e,,,ai ; ,.r,,,�o,
22 . . . .
23 • • • •
24 . � 5
25 ��r.
26 .
27 '� �� "'�
2$
29
30 �
31
32 " 'x�ta-i�E&"stt�EF�-3�3-j3�8�fi�EE� 1.�i3u�' "�Li39lacrir�3*�� "�r ti•,, �:`a � � u< <::� •• _:�
33 b, «Z�T,,,.ir n,-ao,-T=-- - --r.��,__�:�,..:�r.�s �,. .,......:'��--.,� .:.��.
34 -
35
36 e. -r�.,, ,.w.,y1 ; ,..�uu..
37 . . .
38 �ktt2r ;r.,,,t;,. -� '�.,u u� �:,:,�;.-,H r.' .�" �.w.�i
39 . a � �
40 rt�Tr
4I l.3 REFERII�TCES �NOT USID]
42 �.4 ADMIIVIS�RATIVE REQiTIREM�TTS jNOT USID]
43 I.� SUBNIITTALS [NOT USID]
44 1.6 INFORMA.TIONAL SiJBNIITTALS �NOT USID]
45 1.7 CLOSEOUT SUI3MITTALS jNOT USID]
CIT"Y OF FORT WORTH
2fl21 SidewalkUnitPiice Conslr¢ction Caniract
1U2520
STANDARD CONSTKUCfION SPECIFICATiON DOCUMEtVTS
Revised Novemher 22, 201 G
a� 7oao-a
MOB]Z.TZA�']ON AND RSMQ�ILiZ,A.TION
Page4of4
1 1.$ MAIN'1'ENANCE MATERTAL SUENIITI'ALS [NOT USED]
2 I.9 QUALITY ASSLJRANCE [NOT USEDJ
3 1.10 DELIVFI2Y, STORAGE, AND IIANDLTNG �NOT USED]
4 1.1I FIELD [SITE� CONDiTiONS [NOT USID]
S 1. �� WARRANTY [NOT USED�
6 PART 2- PRODUCTS [NO'I' USED]
7 PART 3- EXECTITION [NOT USID]
:
9
END OF SECTf ON
Revis ion T.og
DATE NAME SUMMARYOF CFIANGE
1 U22/I6 Michae] Owen 1.2.Pz�tce and Payinent Procedvres-Re�ised specif�cation, including blue tex�, to
makc speca�cation ffexible for e[fher subsidiary or paid bid itcm for Mobilization.
IO
CIT�' OP FOiZT W ORTH
2021 SidewaNkCJnitPrice Consfruciion Canh•aci
10252fl
STANI�ARD CONSTRUCTION SPEC]FICATION DOCIUMEIdT5
Revised Novexnber 22, 2016
-�
�- �, � -,
, �
Sectio� 01 i1 23.01 - A��ach�n�n� �
Surv�y S�akin� S�andards
February 2�17
\\chisilon\t�wdept\TCMCQ3-Share\Sidewalks-2018Band�Sidewalk2018 Program�S9dewaikContract�Div01�0171
z3.1fi.01 AttachmentA SurveyStakingStandards.dacx
Page 1 of 2�
These procedures are intended to �ro�ide a standard method for canstruction stakingser�ices
assaciated with the City of �ort Worth projects. These are not to be considered all incfusi�e, l�ut only as
a genera I guideline. For projects an 'TXDOTriyht-af-way or through jaint 7XDOT participption,
adherence ta the 7'XDOTSurveyManual shal! �e follnuved and if a discrepancyarises, the 7XDOT
manual shall prevail. {http://onlinemanuals.txdot.�o�/txdotmanuals/ess�ess.pd�
If ypu ha�e a unique circurristance, please consuit w�th the project manager, inspector, or survey
department at $17-392-7925,
Table of Con��nts
f. City o�F Fort Worth Contact Inforrr�ation
IL Constructian Cofars
III. StandardStaking5upplies
1V. Sur�ey Equipment, Control, and Datum S�andards
V. WaterStaking
VI. SanitarySewerStaking
VII. Storrn Staking
Vlll. Curb and GutterStaking
IX. Cut Sheets
X. As-built Sur�ey
\�chi silon�tpwde�t�TCMC03-Share�Sidewalks-20�8 Bond�Sidewalk2018 Program�Sidewalk Cantract�DivQ1\0171
23.16.01_AttachmentA Survey5takingStandards.docx
Pa ge 2 of 22
�
�
�
Sur►�e1� Depa�men� Contacrr In�ormation
Physical and mailing address;
8851 Camp Bowie West BouEe�ar�
Suite �DO
Fort Worth, �'exas76�.16
Office: (817j 392-7925
5urvey Superintendent, direct [ine: (8�.7) 392-8971
Construc�ion Colors
The following colors shall be used for s�aking or identifying features in the felcl. This
includes flagging, paint of laths/stakes, paint of hubs, and any identifica�ian such as pin flags
if necessary.
Utility
PROPOSED EXCAVATION
ALL ELECTRICAND CONDUITS
POTABLE WATER
GAS O R OI L
T�LEPHONE/FIBER OPTIC
SURVEYCONTROl.POlfVTS, BENCHMARK5,
PROI'ER�Y CORIVERS, RIGHT-OF-WAYS, AND
ALL PAVfNG INCLU�lNG CURB, SIDEWALK, BUILQING CORI�Ef�S
SANITARY S�WER
ERRIGATION AND RECLAIME[? WATER _
Sfandard Siakin Su lies
CDIOr
U�,+'HfTE
�=':�r�t
E:� �..
���L�.��,�,wr
�RJ'-+�C�
�II�I[
�.�,, ���I.
\�chisilon\tpwdept�TCMC03-S�are�Sidewalks-2Q�.SBond�Sidewalk2018 Program�Sidewal�CContract�Div01\0171
23.16.Q1 AttachmentA_S�[rveyStaking5tandards.docac
Page 3 nf 22
Item 1111inimum size
Il/. Surve � uE ment Control and Dafum Standards
A. City 8enchrnarks
All city benchmarks can be found here: http://fartworthtexas.go�/itsolutions/GIS/
Look for'Zoning Maps'. Under `Layers', expand 'Basemap Layers', and check on �
`Bencl�marks'.
B. Con�entionalorRohaticTotal5tation Equipment
I. A minimum of a 10 aro-second instr�ment is required.
il. A copy of the latest caiibration report may �e rec�uested i�y the City at any tirne.
It is recommended that an instrument be calibrated by certified technician at
least 1 occurrence ��ery 6 months.
C. Network/V.R.S.andstaticGPSEquiprr�ent
I. It is critical that the surWeyor �erify the carrect F�orizonta! and �ertical datum
�rior commencing wark. A site calibration maybe required and shall cansist af
at least 4 contral points spaced e�enly apart and in �arying quadrants.
Additionaf field checks ofthe horizantal and Werticalaccuraciesshail be
compieted and the City may ask for a copy of �he calibration report at any time.
I I. Network GPS such as the Wes�ern Qata Systerr�s or SmartNet systems may be
used for staking of praperty/R.O. W, forced-main water lines, and ro�gh-grade
only. Na GP5 stakin fartoncrete san�tar sewer storrndrain firoai racle ar
anyth ing that needsverticaf gradin,� with a folerance of 0.25' or less is
allawed. �
D. Control Points 5et
I. All control points setshall be accompanied by a lath with the appropriate
Northing, �asting, and Ele�ation (ifapplicable) ofthe point set. Control points
can be sei rebar,'X' in concrete, or any other appropriate item wi�h a stable
base and of a semi-permanent nature. A rebar cap is optional, f�ut preferred if
the cap is marked `control point' or simifar warding.
II. Datasheetsare required for all controf points set.
Datasheetshoufd include:
A. HorizontalandVer#icalDatumused, �xarr7ple: N.A.D.83,NorthCentralZone
42fl2, NAVD 88 Ele�ations
B. Grid or ground distance. — If ground, provide scale factorused and base
point coordinate, Example: C.S.F.=0.999�Z5, Base point=North: 0, East=O
C. 6eoid model used, Example: GEOiD12A
��c h i s i I o n�tpwdept�TCMC03-Sh a re�S id ewa I ks-2418 B o n d�5 i d�wal k 2018 P rag ram�Si d ewa! k Ca ntra ct�D iv 01�017 �
23.16,Q�_AttachmentA 5urvey5takingStandards.dacx
Page4 af 2Z
E. Preferred Grid #]atum
Although many p[an sets can f�e in surface caordinates, the City's preferred grid datum
is listed belaw. Careful consideration must be taken to v�rify what datum each praject is
in prior to beginning work. It is ess�ntial the surveyor be familiar with coardinate
transformations and how a grid/surface/assumed coordinate system afFect a project.
Pro"ected Coordinate
5ystem: NAD_1953_StatePlane_Texas_North�Central_RPS_4z02_Feet
Prajection: Lambert_Conformal_Conic
Fa fse_E a sti ng : 196850D.00000000
False_Nort�ing: 6561666.66f 66667
Central Meridian: -9$.50000000
Standard Paraliel 1: .�2.13333333
5tandard ParalleE 2: 33.96666667
Latitude_Of Origin: 31..65666667
LinearUnit: Foot U5
Geographic Coordinate System: GCS_North_American_2983
Datum: D North American 1983
Prime Meridian: Greenwich
Angular Unit: Degree
Nate: Regardlessof whatdatum each particuiarproject is in, deliverables ta�heCity
must be canverted/translat�d intn this preferred grid datum.l copy of the deliverable
should be in the praject datum (whatever it may be) and 1 copy shauld be in the NAD8�,
TX North Centra 142Ei2 zane. See Pre erred File Namin Conveniion 6elow
F. Preferred Deli�erable Format
txt .csv .dwg .job
G. Preferred Data Format
P, N, E,z, D, N
Point Number, Narthing, Easting, Elevatian, Description, Notes (if applicablej
H. Preferred File NarningCon�ention
This isthe preferred format: City Project Nurt�ber_Description_Datum.csv
Exam le far a ro'ect �hat has surface coordina�es which must be translated:
File 1: C1234 As-built of Water on Main Street_Grid NAD83TXSP 4202.csv
\\chi silon�tpwdept\TCMC03-Share\Sidewalks-2Q18 Bond�Sidewalk2018 Program\Sidewalk Contract�DivD1\017�.
23.16.01_AttachmentA Sur►reyStakingStandards.docx
PageS af22
Fife 2: C1234_As-buift of Water on Main Street_ProjectSpecific Datum.csv
Example Control Stakes
\�chisilon\tpwdept�TCMC03-Share�5idewalk5-2018 Bond�Sidewalk2018 Program�Sidewalk Contract\Di�01�0171
Z3.16.01_AtfachmentA Sur�eyStaking5tandards.docx
Page 6 of 22
�
�
�
�
�
�
�
L�
I�
�
�
�
�
� �
w �
m �
� �
�
� w
�
� �
� �
O �
� �
e,_�_ .- . .. _- � ___..- ____�_.�.�_�...._�.��___
�_�_.�. __ ______�....__.._.
E
' 1Q1�
...y'
�
W
�
�
�—
�
�
�
�
w
EL. _ � 0�. �i�'
m �
_ � �
.,.=;. � �
__. � � �
�..�. F-- T
_ �
_-. ."_ C� �r' C17
l�l
� � �
� � �
_:_: J �
� W
� J C�
I-- CO E�
� � �
Q C� C�
f__) [� C_�
. �P �1 �=�ooa.ao E=�oaa.00
3..__ .._._...._.._... ..__.._.. .____ _ . ..__ . _ ........ ...... ________. ....._.....,__ ._... .__....,______. _._...�..._.._....._._............
� �
�-y �
._._.! �
� �
� �
C_7 �
T C"7
F— �'
� �
_
U'7 =
� �
�l �
�. �
�n
� �
❑C3 �
W �
� �
��
V, lhla�er S�akin� 5�andards
\\chi silon\tpwdept\TCMC03-Share�Sidewalks-2018 BandlrSidewalk2�18 Pragrarn�Sidewalk Contrace�Div0�.�01'71
23.16.01 AttachmentA Survey5takingStandards.docx
Page 7 of �z
A. Centerline5taking—StraightLineiangents
I. Offset [ath/stakes e�ery 200' on e�en stations
ll. Painted bfue lath/stake only, no hub is req�ired
fll. Grade is to top of pipe (T/P) for �.2" diameter pipes ar smaller
IV. Gradetoffow line (F/l.) for 16" and largerdiameterpipes
V. Grade sho�ld be 3.50' below the pro�osed �top of curb line for �,Q" and smaller
diameterpi�es
Vf. Gradeshould be 4.p0' belowthe proposed tap ofcurb line far 12" ar�d larger
diameter pipes
VIL Cut Sheets are required on all staking and a copy can be receiWed from the
sur�ey superintendent
Optional: Actual stpkes shall consis� of a 60D nail or hub set� with a whisker
B. Centerline Staking- Cur�es
I. If arc fength is greaterthan 10Q', POC (Point of Cur�ature) ofFset stakes should
be set at a 25' interval
II. Same grading guic��lines as aba�e
IIl. S�aking of radius points oFgreater�than 100' rr�ay be omitted
C. Water Meter Boxes
I. 7.0' perpendicular offset is preferred to the center of t�e box
I I. Center of the meter should be 3.0' behind the proposed face o� curb
I I1. Meter shauld be staked a minimum of 4.5' awayfrom the edge af a dri�eway
IV. Grade is ta top of box anc! shoulc! be fQ.�6' higher than the �aroposed top of
curb uniess shown atherwise on the plans
D. Fire Hydrants
I. Center of Hydrant should be 3.Q' behind �roposed �ace of curb
I I. Survey ofFset stake should be 7.0' from the cen�er and perpendicuiar �o the curb
line or watermairt
III. Grade of hydrants shoufd be +0.3Q higher than the adjacent top af curb
E. Water Val�es & Vaults
I. OfFsets shou�d be perpendicular io the proposed water main
fl. RlMgradesshould only be provided ifon pfans
Exam ple IAlater Stakes
�\chi silon�tpwdept�'fCMC03-Share\Sidewalks-2018 Bond�Sidewalk2618 Program\5iclewaik Contract�Div01�0�. 71
�.3.16.O1�Attac�mentA Sur�ey5takingStandards.docx
Page8 of�2
�
� �
� �
� � 7`dfS�W�L
� w
� �
v7
v
� �
�
� �
��
�
�
� u,
L� +�
�
�
F=-
�
�
W �
CC �
�
�
� �
�
�
� �
��
Ch �
��
� �
Q �
� J
�
�' ❑/s � v�r
L7
Y
�
f/! �
� �
2 �
F p��}
4 J
C} w
r�Ww
� � '}
`��ii1
i,_=��
��t�-O
ak'�c°�i
a �
�� �
�� �� � ia» p�- iot.t�'
m '� �
a
v �
�
� �
� �
� �
�
� �
� W
�
�
�/
Lil
V
�
�
{ry
O
W
�
�
��
��
�
i��
S �
� -ry}
p ��c
�
�
N���
� c—�.s2
�
�
�
ti ? ��s
STA=1+T2_81 � C-3_8'f �
�
� �
Y � ���
� � �
J � �
W ��
Cl. g
ti. � 3C
O � �r
I � �
�
H
�' a c�i = -
�� � [n m-r � ��
� W � d
� �l,.1 � Z � � i �
W S � o p A= S7
U a � �S-r�i'
/ {�� j''� ���~� J-
p�' L . sTA-Q+�4 a. C-3.T8 �
y YV {�F "`k,_,�' �-- � � �
� fB Y
�
� �3��
� � £���
��' ��WJ
z 1016 �L•• ISk6❑ ����
� W � � ����
o E � °- w �"
� n w =�a
m
�
�
s
!!I. Sani�ar�SewerS�akin�.
��ch i silon\tpwdept�7CMC03-S�are�5idewal[cs-2018 Bond�.5idewalk2018 Pragram�5idewalk Contract\Div0�.�0171
23.16.01 AttachmentA_Survey5taking5tandards.docx
Page 9 af 22
A. CenterlineStaking—StraightLineTangents
I. Inverts shall l�e field �erified and compared againsC the plans before staking
I!. Painted green lath/stake WITH hub and tack ar �-narker dot, no flagging requir�d
III. 1 offset stakebetween manholes if manholes are400' or less a�art
IV. Of#set stakes should be located at even distances and perpendicular to the
centerline
V,
VI.
VI l.
VIII.
Gradeswif] be per plan a�d thedate ofthe pfans used should be noted
If mul�ipfe lin�s are at one manhafe, each line sha�l ha�e a cut/fill and direction
noted
Stakes at e�ery grade br�a�C
Cut sheets are required on all staking
Optional: Actual stakes shall consist of a 60D nai! ar hub set with a whisker
B. CenterlineStaking—Curves
I. if arc length is greaterthan 100', POC (Pqint of Cur�ature) offset stakes should
be set at a 25' inter�al
I I. Staking af radius points of greaterthan 100' rnay be ornitted
C. SanitarySewerManholes
I. 2 offset stakes per manhole for the purpose of pro�iding alignment to th�
contractor
II. Flow[ine grade should be on the fathJstake for each flowline and direction noted
lll. RIM gradeshould only be on the stake when pro�ided in t�e plans
��c�i silon�tpwdept\�CMC03-Share�Sidewalks-2018 Bond�Sidewaf k2018 Program\Sidewalk Contract�Di�O1�D171
23.15.p1 AttachmentA SurveySiaking5tandards.docx
Page 1Q of 22
�xample Sani�an� SewerSiak�s
��
�
� �
� �
� w
�
Va
v
w
��
�i �
C� � � �
z
� ���
� � r��
ti.1 � I.�.,�f � � ��� � II STk=3t-7'Im �.....�' � C�4—il �•y _ �,-A9
� ____._ aG L_
=� W
u�i 2 �--F— �
��� �
��z �
�
a�
9��
� � p .,.._..�___""_____. .....-� r. ..�...,.. __
r--�_ _.._.,m.�.� _—........�.___ r_.+
; 12' O/S � S5 II�_�_S7A-3+7i� ��.v, C-3°Q .�,� C-3�� � G-0� I i
� � �
Y /�1
x � �
� � _W.W.._____...,_
��� Q � � �' �/s � �s �
_ __�L� _.
�
�I.
I__L
`'- o�,� �
:�� ��� � w
;,
c, _� �a �
�,,
��; � �
; ;�
�,I
f, �
aP, �
4'-�� -� y�} � �
�� � �
�, �
;�_ �� � _ e�
_ r,-t�I C' a r � �
i�' � � � A � �
- � � � � �
� ��� � a �
Q � +�f � SS = _ �
� � .............�._._��. -��
� � �
d �
�_�I tr ��
[' �+' t�; !
�
� � p
— �..�,;, ,,,, _....... _ '___'_'_' _.._._ ��_.. ._. �
� ,.��{i�'r�„ �� = srl�-a-Foo � c'-s� �1� rrs� � c-Q� ��
�� .-
�. _.__ _� �_ _.� ��II�.-��1�� d_._ _ _a� ti .� .._ __� _I � _____. �'w = m
J
LJ-� � W = � � W �
� � ` �
�Z� �rr~i Y
��JJ W
'-' [l5�4 �� �H
u- �� a�
v� �� ��
�
ri � ¢�.�
��- m�
�a
x [�
U^
� ��qra
� ���
��,
��
��
�_-�
��a� �
x ._ _
� �� „
�
� '
- � �
�j
��' �j H
��I 1' �7 �
r �'CA�q �
�S7Q�
qS�y-''��
r�i�z�z
I�fl W� W
� �
�����
mm_ r�
W
d
d
�� �
1 �
�� r�
�� �
a �
wa ��
�� ��
O��
�p
�
a
�
� �
0
W �
9
� � ] Sn
�
�� �
��, ��
�� �+
z� F�
� � d d
�
�
_ a��
��
�J
��]�
ti
�
,�
� �
� �
� '�
a �a
� ���
W W y
�
� ���
� ���
i
�
�
�
"�:. _
��
��f��Q�
��
Wo�
a�rri�
� q � J
0.�G�m
��$�
�W�
m�-�
�mZ
\\chisilan\tpwdept\TCMC03-Shar��Sidewalks-20S8 Bond�5idewalk2018 Program�Sidewalk Contract�Div01\0171
23.16.01 Attac�mentA_Survey5takingStandards.dacx
Page11 of22
VIl. Storm Sewer & Inlet Stakin�
A. Center�ine5tafcing—StraightLineTangents
I. 1 affset stake every 2,00' on e�en stations
I1. Grades are�o flowline of pipe ur��ess otherwise shown on plans
f il. S�akes at e�ery grade break
IV. Cut sheets are required on alf staking
Optional: Acival stakes shall consist of a 6C1D nai! or hub set uvith a whisker
B. CenterlineStaking—CurUes
I. If arc length is greaterthan 100', POC {Point of Curvature) offset stakes shauld
be set ata 25' inter�af
IE. Staking of radius points ofgreaierthan 100' may be omitted
C. 5torm Clrain Inlets
I. Staking distances should be rneasured firam end of wing
ll. Standard 10' Inlet = 16.00'total length
III. Recessed 10' In�et = 20.00'total length
f V. Standard double 1�' inlet = 26.67' total length
V. Recessed double 10' inEet = 30.67'total length
D. Storm prain Manhofes
I. 2 offset stakes per manhole for the purpose of pro�iding alignmenttio the
contractar
IL Flawline grade sho�ld be on the lath/stake for each flawline artd direction noted
[11. RIM grade should only �ae on the stake wh2n provided in the plans
\\chisilon�tpwdept�TCMC03-Share\Sidewalks-20188ond�5idewafk2018 Program�5idewalk Contract�DivQ1�07.71
23.16.01 AttachmentA SurveyStakingStandards.docx
Pa ge 12 of 22
�xample Storm Inlet Stakes
B�CK
�ne �,wcane x.aw.j
FLYlff # �
�
i`
HU� D.E4A7"ICJt1 � m
��
E �
�
E e
I•
FR �N T
�sin� Fac��� ��
3�.�4�
Q
�
�
n
m
0
�
�
r-
. �
I�
; � t IDEEtT1FlE5 4i'WICH
ENi? OF THE 1�1PJ�
� � BEIC{G STPHEfJ
; �
.... ... .. ...:. . ., . ..
�-. �� ,
. .� . �. ...� _...
. . � .., -� •.�
__ __ �_ . _ . .
_..��._.........�. ,_ --'--...4Y.- __,._. ,. �.v._.._.. _.�.�._
e __
..�. . �.... r_ . �� .�.
. „ .
, . ... . � � -� ,... . - .._.
, , � .
. _. . ,_ __�"_,...._�_...__��_....__,..... --_ `.:s. .....-..p��.__._._..
� II 1MiET STh,710h!
° � p� raa�n ora ��nNs)
T�£ 3C'�N71FlES �RAC�
7Q T7P GF C1JR8
'�l
�
�
�''�� ioEr�nFl�s aR��e
n
ro �ov�r��
I
�
� �
����
�oE FaAnc R.�w_)
PpNT � 314i
�.�c.
i
I
Hue �vx-�o� .,
�
�
I
-A
�
RISTkNCFS FOR INLETS ' _�,
•���--.�—?� �"�-"---� STkHdARD 16' � 16' �
R�CE55Ep i0" � 20�`
Sf.4N[}PRd qS7J9E.E 70� — Pfi.67 �.�_.,.�_
"�.�.� .. R�CESSE6 OW&LE 7Q` � 36_5Y
iIUB �Niki TP�CY. � — — � _.,.. ....Y. W — — — — — — �,. ._... .._._ — — — — — � .... ...._ — — — —
_� — � :
� �
� ekrx c� ma�r �.I
� � ,�. � _ _ - -a� :;;: ' �WI
�I �# .,..: :; oti
� k1ATEi{QL� "x• � �
�I rei� '
4� ..°� ,` I
BP.CiC CF �.1F+�
..» ..�.. — FL�+hLINE _.._. �,.Y.
— —�1'i� OF PAYQdENT
: .{ ".: _� k.. .
� F��t£ UF ItaLE�
ED6£ C7F F'Ak+f}AFF1T
"' - ' ,i. __
FRce � �ir��r
QF PAVEIAEM7
�F� C� f� T
(�i �� F��i r�� �)
� �--�
�a
, � ,
� � E
��j
��'yf
irf i
�`
��
: � �
����
�16Eh7lIFlE5 341iICH
ENU CF l7iE N7hlG
�1 � aor.�� sr��eo
�
-i
. � .
+ R
��
FfC
<�
+
O
6?rCK 4F �:URS
— — Fil}Vr1..1hIE �..�. �
�EtlGE �F PkYEM�Ni
�\chisilan\tpwdept\TCMCd3-Share�Sidewalks-2Q18 Bond�.Sidewa[k2018 Program�Sidewalk Contract�Div01�0�.71
23.16.01 AttachmentA_SurveySYakingStandards.docx
� Page13of22
VI11. �urb and CutterStakin
A. Centerlin�Staking--5traight LineTangents
V. 1 offset stake e�ery 5Q' on even stations
Vi. Grades areta tap of curb unless oti�erwise shown on plans
Vf I. Stakes at e�ery grade break
VI Il. Cut sheets are required on all staking
Optional: Actupl stakes shal! consist of p 60D nail or hub set with a whisker
B. Center[ir�eStaking—Curr►es
IIl. ff arc �ength is greaterthan 100', POC (Point of Cur�atureJ offset stakes shouid
be set at a 25' inter�al
IV. Staking nf radius points af greaterthan 100' may be pmitted
��ct�isilon�tpwdept\i'CMC03-Share\Sidewalks-2018Bond�SidewafkZ018 Program�S[dewalkContract�Di�01�0171
23.16.0� AttachmentA SurveyStaking5tandards.docx
Page14of22
Exam le Curb � Cu�terStakes
FF�DNT
(SIaE FRCIMG �]
Q
f�` 4
��V� � {�fl
Eor�nr��3 or�s�r is ra
(61DE FACEh7G R.O.'ll.) �/ an+� o� aupA rx� FJe
FpR F.hl-"E QF CUPH
POIN7 �'
HUB ELEVATION
FRDNT
�si�� F,�cin�c �.)
f�. �,:-
,o
0
�
'8 jG
EOENT7FI�S 57AR7 ��
eoriT cf w�vani�e
�
I �
� �
� r�
FR�NT
(�pE FACI�7G �)
c �,, -�
,o
� 70
L7 a
-a �
' � E
FRONT �oQan�Es �n
(5�E FkCRIC �} F'aINT {?i
.._ �w�c�r
.. 4
�
ec� m
�
PT'I �
��. �
Z E31 1
�� � , � ���c€ N ' ! I I I
� � �
—� � EII I
� IGE71l1FlE5 GTtr4f1E I� �
i � � � � �
•� v TI�i 'Tt% T�]P �F GUFH #.7 Ga"I.E' 4ii'.
r�
-n Raaius rr�N�s' --
�
'o',, E� : � ._-.��i � �
; ti�
1' � - � , . ;;.;. � ..,.__, ; --��---._--�-- � � i i
) . �. : -� �� � � . � __ __- __ _-_� � ; �--�-�--- �� �� � � ,
B , •�?a-.� f 1 f � ,
, ; '�b�--ti, / } 1 � �
° i — __ .— —.. � 'b�' ! �` 1 t 1
' E ��O✓ f f f �
j ���- E` % % � �
€ �~~� A'��. � � / �� f
� '`�`�. � r f J �
-�---^- - j �`s � � �.s r' 'f .f ! !
€ � � �.
�... � '„� � �#' � �!
_� � �
T�P i�� CLiRE ��� ��,— } �si
'._v.._.—__� � � � �` �- � � � - I � � �
��� ,� - y � ,,�
�`��r - � �'` � ��
BA�K C�F �URE� x-r'.- ,.�-` —� `ry
_``��."�' - _ __��
E � _�—_ _--� � �,1��
�-�c� �F cu�e ��_i � i � �.-�—� �� � �J��
� ___.�.�- ���
���,��r,�
�o�e c�� ��v�r��raT
��ample Curb � Gutter S�a�es at Intersec�ion
\\chisilon\tpwdept\TCMC03-5hare\5idewalks-2018 Bondl�5idewalk2018 Program�S�dewalk Contract�Di�01�0171
Z3,16.01 AttachmentA SurveyStakingStandards.docx
page 15 of 22
, �
` =' �i Lry p
ly' � F
�W m
� � WM�rc
�i Z �0�5[)
�4._.
�} -..::. . _.. . .._... :..� .rv.
` � � �ia'^o/s � srx z+sall � ��o�
i-- � W ____._.
��
�
�
�Q� hI
N�� _ F�iF
� �� - �. .
� �� .�..
O � �j �
N
�
d
�
�
m
_.. W
�
�
�
�
_ �,
4
�
d
�
�
�
. �
�
�
�
�
�
0----
�
�
�
�
u�i
_ cx
a
�
[a
�
x
�
Y � � ^G�
u�
N W� ..
����' _ ;a� �
4 U�
b ��
�_
�a
�Wa
�°� ����
.._. O {fi � t
� � �
Q �
r
d
Lry �
�
� Of'�
q2t�
� � � 4
� a�
........, - � �
`�� -�. jp�,:
��'�a � �
�a�i�¢ ��f '�"o
� �� � � F
�/ ���a
.�<].� � � � rn
f � �}
j�� �� ��._.. _ W
a�n:'.��� ;�q_
� I I�
� �f 3'JFlW18l0 '}^C, Y{ ,pS I [7
.W
Vl�q�
W
¢ ��u��
� ��Wm�
��
p �
� ��Q�
����
m � � a'n
�d
9Ef11� j4 7i0h'9
p IE 3���+15E0 '�'Pi9 .OS I �3
W � f � �
O
a � � a .�., _..a...
� bv�i�4�_ ___.
z
�, — � � O
\ '`n�..� w a
15'�� "F4[n
'�l : am�z
�� � v ����ti �
a� ¢ci , \
a uFi � a �s� �
,��- \ ..
�..�� �
� j d
� �r�
¢ ¢ ? S7
+~n �°o
0 4' �,t
� '� �
a
�
o ��
� �
�-9� QK�V�]
,[j.� - b�n�9�
�W
��chEsifon�tpwdept�TCMC03-Share�Sidewalks-2D18 Band�Sidewalk2.p18 Program�Sidewalk Contract�Di�01�0�. 71
23.16.01 AttachmenYA Sur�ey5takingStandards.docx
Page16of2Z
IX. Cu� Sheets
A. E}ate of fielcf work
B. Staking Method (GPS, total stationj
C. Projec� Name
p. City Project Number (Example: C01234)
E. L.acation (Address, cross streets, GPS coardinatej
F. 5ur�ey campany name
G. Crew chief na me
H. Ablanlctempfatecanbeob�ainedfromthesur�eysuperintendent{seeitemlabor�e)
S�andard City Cu� Sheet
Date.
City Project
Number:
Project 1Vame:
❑ TOTAL.
Stal�ing Method: ❑ GPS STATION
LOCATION:
CO NS U LTA�lTICONTRACTOR
SURVEYCREW CNIT[AL5
❑ OTHER
ALL GRADES ARE T� F'LOWLINEORTOP OF CURB UNLESS OTH�RWIS� NOTED.
OFFSET !'ROP. STl�KED
PT# STATION _�T�+RT DESCRIPTION GRADE ELEV. ' CUi + FI�L
\\chisilon\tpwdept�TCMC03-Share\Sidewalks-2018 Bond�Sidewalk2018 Program�SidewalkContract�Div01\fl171
23.16.01 AttachmentA Survey5takingStandards.dacx
page 17 of 2Z
X. As-be�iit Surrrev
A. Llefinition and Purpose
The purpase of an as-buiit sur�ey is to �erify the asse� was installed in the proper location
and gracfe, fiurthermore, the information ga�heredwill be used to supplement the Cit�s G15
data and must be in the proper format when submitted. Seese�tionlV.
As-built sur�ey shouid ir�clude the following (additional items rrtay be requestedJ:
Manholes
Top of pipe elevations every250 feet
Norizontal anc! vertical paints of inflection, curvature, etc, (All FittingsJ
Cathadic protection testsiqt'ions
Sampling stations
Meter boxes/vaults (All srzesj
Fire lines
Fire hydrants
Gate valves (rim and tap of nut)
Plugs, stub-outs, dead-end Iines
Air 14elease valves (Manhole rim and vent pipeJ
Blow off valves (Manhole rim and valve lidJ
Pressure plane valves
Cleaning wyes
Clean outs
Casing pipe (epch end)
Invert'saf pipQs
Turbo Meters
��chisi�on�tpwdept�TCMC03-Share�Sidewallcs-2018 Bond�Sidewalk2018 Program�SidewaikContract�pi�01�0171
23.16.61 AttachmentA_SurveyStaking5tandards.docx
Page 18 of 22
B. Example DeliVerable
A hand written red lir�e by thefield surveyor is acceptabfe in mast cases. This should be
a copy of the plans with the point number noted by each asset. If the asset is missjng,
then the surveyor should write "iVOTFOUND"to nat[fy the City.
\�chisilon�tpwdept�TCMC03-Share\Sidewalks-2018 Bond�Sid�walk2018 Program\Sfdewalk ConYract�Div0�.�0171
23.16.01 AttachmentA_5urveyStakingStandards.docx
Page19 of22
�..�..
: FR J �_ � i�. % g
� }I ._ �.
I1 � ; I ���1�, �$ as
� ' . : �k�
. , Ey � {�e��.. �� �
: �� � i� 4�5, �
i- � , � tiT3 � � �; ��
' � .,2 r ��:i � � �i '�
I i � � � S_ �� � � p�.
�°�� y�p �I�` ' aiFi� #x �L �sl a�
i' Yi ]il 8 4!� � $�3 �! [4 �I�� �,.yt i
i� i� L�— c� F � 0-i�, � r��� M�f�'i
�� 05� Y15
� _ �\�1s�TS��
'
I
k r
a �� ��
"Y°��5t�s � I
� ��'
� II
�
�
�
�
�
;�
; � . �;
1}� 6
; #!
�o-�
k
9.6 Qi
�°� �
� � U�
�
�� � �
�--___ ;
�� ��
�` �
�; Ag �
� F' I
�� �# j--
� " - r .
r
, Il�j���. � f` II 1i4,
�,
J I '� I�,
��:°� � � ... ...._.
. � , .
.�Iy (1oL�
fi� �_
Y �' I . � .•\.
a� ,�. ;,
_ 6 ` �
I '� . ;' .%' .
' e . °� � � •__ �
����'. ' � �� �a
�I I � �i '�_ � �y;�F
, � —� � —�—��� �
C
i I ! ��
. I ." �� Fr
ii � � �.
�.:�' ��! �;;
,� ; � ��_ ' ��-
� 1 k k�'
I� ���t � .� I� �-
r �`
' � —�"�-!,II �
�_��5�' � t '�� � "-R
,'r �. w.,� � � �. ���� � I� 3�4�
�: , � � . i I ir'i :I,
li� � �f �� \ r 1..'+ �� I .
��
�� � � r ' I �E �� �
h; � � i� 9 �
����f, � , � w � ! � � �' �� �
�i� .• s � � � , I �� ��-;
iY1�a�RF �� ��,t�_.� ., a� �,J ,� �S.
� -�9 i'',
�3 `- k --- � � .
Yp� ��'.
��s .' S �
�� �g � � g�� � �
�d �%['�L� .> ����g� ��M .'' \
`.. . .. � 3 4 $w � �'�`-� � � � i� `�
i `�\
�r
�—
. ��jj 6�HJ�
�§ 2�6�i
�, I �
�� ff
�� � �<
�M a ` I�
�a r ��� �4���
YP �
E I Y
` E ��� ��lx��'i
�� 1
rt a'� �i
s r E n� ,I . F�I
� !� � I
�,�' ; I I `:� 7r iF���q'c=i�e�;
� � j ���
I li'�i. . �� g.'a. ;
�rtl � �' �' � � � d
.� ,
.. . .�rJ 'Si3r 7M'i � Jl� � � �,.
I 'I� .. �T .. �� �`-.
� � � �
�.f± 1 i , E i .
r��� r �� �:� -0
C` — . - � -�,!: - 1�- �s
_ � _ �
_ . _. t ��r __ � —
� °� � —
;
,
y3 . .. ... Sf+�; ' ' •I I . "
5 ''
� � � j�r � �r�
� j..�_ ��r �.I _ 1,
� ��._
I �" ' .� t .�'-
:P i �:
r��g�. �� ..,. �.�� -I,,.i�?;3
� ! + � � i �'{��� . L I I _ . -
� 4�— e���� w�' r�a �r
�.. ���- .S��I
' �I. _' �; =, _ {� ��?;�
�� --� _ r �.: .,
�� _; a �,� z
� ._,.
�� � � � h,��' � .
ft
r�y ! i ' !'
I ` � I �� '
� � ��J -
. L � _ __ I.. �J�. I i ..
.... � ' � .
I ff��"_ �
� _�; � I ,
� {
i � ... - I�+ L.�eF '�.� l� �I
�,' .. ' ��= � � � —
� _�..�—y�y,.,�y:�: _ �_�— �--, =.;c
. � `s��, �_� �.
�,} � r-- �
i}.�`,r � �, + i �
! "r +' !� � � _? a� � c�r�
K i i
� ' I.. �� k.y x � _
.s:_ a � _
.�..., z e257�' i ,° � ��[�a .:-�
� � � Sp�' �1i.i If" ,
-=—,����r�—: r � :��± i;�"� �_ F _��::�
..; 'y . I �'_
a _ , ,
. , _ I �p Z-����:y
" — �I
�'} 1 _ a
� ', ! � ` _ ,.� T ,_: I
=1 +
�—._.�� . ��� ��.�i..-!
— .-_. i . .. .7. ,i ' '
�\chisilon\tpwdept�TCMC03-Share�5idewelks-2018 Bond�Sidewalk2018 Program�5idewalk Contract�Di�01�0171
Z3.16.01_AttachmentA SurveyStakingStandards.docx
Page 20 of 2Z
�no � rxw� rw crwrrcw �rw
ff.�,.op .- r2�i rFmrn ttv�
PhY�P 7�'W�S1'Ek
G
1�'T�E �-- ,.
� L BENV E A J��1
ACif
�� � �"
� �
s+� wrea�ra+ntranevat
rewon �.�rr w
R �,' lX11'3'rRYi
e�JmvE �tsr. -�
�WATER
yN�N�A �S_
���� V
��
�.% �.
srti o-srm - rxwt rFrrno aa�
xFu�v� & s.�wlCE Fxrsr.
BAY'�' VNYE` G RED�R
LTkYN,�CI" Tl1 �XISI: &'WAFFJ?
IkSTXL Ff2'SYYIAS[E�V�
F!8'%S'REGUC�It ._ f
r-rza,v� vxv� a, I N
N�r9f£D'JSl.�A-fQ ��;„.��L�
E•27SG.7ilF19� � .,,.�
llisl3�u.
YfZ4j VE�;BEND
N�i997ilA751R5
� 22�".3!!.5(/0
LAI' !6 '§. ' �,� '' _. �j 4CL?
�
F w eR0" � " � ���`�`
: w�`,m;,'xa % g.3 ,pl re
, ?' �
�' �,. �
� �
�r
� sr
�
fi �` �e
\� s, �,,
�` 1
i8;1 '
��• ��,,¢ - ,
� ,s� �� .
��� �' ��
SI'h iTA]" 'S - B"li'L � ' �.
1N57"/!L. �
hi2'X &'+l47'JXa4.7':EE
!-8`$iU''� YNyE":.�;q.
h F7RE hY11Fi.f,yf=�'�-
!!iF' G'fA'LYtA,'IT 1£AD
1-18'GR"E Y+IWE
N�694103'01J2&9
E�7��3P�
L(Yf 1
31GCYMx•' fl1 W.FadWa'I.h
A+WT r-wu�.qn R Era t1o'n n
N�f1YA?9�'fm �'.�nt��m
E�..97ct0
El,�V, T2.3.30
l �'"'�'ry
r`�°w.ar�Fi
-I�i�av� � suv,tse
�rrsr c�r� u,�tve
r�r a
�u ro� em,r vnv.r�orwvm
CafJN+M IdC
wq.•�g�n'9�f
57'A n�a1,� — 12�t rFuxn L
/ASI.tI�e
F7G'HJ.S�YJt7 SIFEYE
5� Lf' DF lgiY.(T,�R 1'lYY�
CG1lNE4T 'iR�E7fl51".f�'W�PER
N a�t'94Jl45949
E-2�1I07A136
rnvar.� ^ rcR SlRiTbS�Li � l�wl
INsYdr[L M3Thi,i:
FIE�� !Y FiZ'45VEAl.l,i�N,P
N�S�
:�€a�
�.� . �`v
Pfs�FC7S�D
SrSAl1T'Af7Y :
SEE �'tli��
\\
��chisi[on�tpwdept\TCMC03-Share�5idewalks-2018Band�Sidewalk2018 Program�SidewalkContract�Div01�0171
23.16A� AttachmentA_Sur�reyStakingStandards.docx
Page21 of 22
\�chl
,.t.� .I_ . . �: � { �
�� t}�!� 'I' .r- il�, ��8 L��
, 3 � t � $�g
�! �t� I .,� i � rGY� �� S.l,
� + d � ;� � ���� � � ��y fi
•E �
j' � .� ��? � y��a`� � � � ?��F, ��
� °:� E - � ����� :i '� �� ��� r!�
� 1 I,, ,:,° � Ei �r• i`� °E°3 t�Y;,, ii��
, P' 3 p"� a ¢_ I t�l'':�
I � � . .�. � �-- �.�. � 4.,i �
I�
� a �r�; �� � '� § rg F ` �{ ! �
�
�a {f� c� � m a �� �
�� IE` � � � . �y � � �� ����G�������� ��! � I��
r2� i I� �� ��j r� I I � L f _ i '� _�
f i '1 I Yv I �S.
t;'�� °��� _ i� i;� r k��, '����'
� 5_ �� J ��� �,
�� � e l 4''� � I� 3� � .:� -,
� e q ` �u _
i i �� � a � `a
i i �
� �. � �: � c.
4'� ��i4i,�� �I ,�,'S �, � �a iyF.
��! �, �,���=
'� ,� �, r� "i : �� ^r .
� ___. � , '
d.. , . . .-- - � _.,. ..,.. � ., .
. V .3N17 ,SS "dOMd 05_0 '4'.tS 7N17 NJ14'!Y =: :
1 — � . . i �{{{ 5 .. �.___.._ .
�-�, 'j� 0 � I ��
. � � �a� `.:
k� _' I . _ � � k ��_ � � '� _ f _ �
; I@I � a C ff�. 7' ai
�5 I . I' ��'! li
�z� � ��. !ti f ' �.
��= �� ;.,� ��, � �;
� 1 : �'� � I ,I ', � f � .,
�
� .•�� � � I.i _ , � � �=a� �1
_'
'� � ��' 1',Q � � � � � �a���A
�
�� ' �' I �;"`�+� : +; �'�s ,�i
,r: r , � � � ' _ ._
St � � .
� ' '� i�p �� ...� �`,
� .,�\
��. �� '� ��; � �
� ��� � ��_
�� � a
�F`� � `'Y ; ' ''� j �'
:' .� o � "� '
I�� � � .
� � ; �� � ,
�� � I 4 ' �� at� � M1.
i�� � "� _�' �+ �IY `�,' • �'' �,'
� �iii � '' I �" 5'I $ . �. . � 15.�
� � � / � i�
�� `! I �Sg � � � � :'�
�� li ,[ �� gi/' ��
� �g'z ..��?pl I-�: �j r
E
� � �
�• , � a
��:�u �.. ! � — r� a � � � �i � €
\ lliE= I,' 4 I 1�I -��
+��' I la I � r�';"
�� _'' , �
ir � ���
� r
�a � k.; � . ' �"f
� � ,. } , �� � f
,f � g
S r� �Bq� �
� � � �' �ka G�:
�'� � . �, \ �'� � 1' � 6I i�t� 'ss��
4 I
i _ I�` +1'��1.. �I� Y . . \ i..'.frs,a�-:�
r a.. C� 4'� � 63� ' a„��� �
_. � �j.: J "��;`g����\` \
�� � 3 `
�&a1%g��Eiqp �, ; �� ���10�•, ta '\
�� 3tii �I } � .� t � � �4��f \� �
� ' � 'a�`
i.rr.tiii�i,P4�a� "� �� liti��+��� �`� ��� I
�j' � y;� ,.{�i )! _—
b L jA�7, NrJ�rr� �' ;�'.,r-,
��itlf� Yl � i� �—��r I
1�9... � � . � i i �..
I �� '; �' �I � :I
i �
� i+Ci � 3 �et i�� �� �
. r �I s . L ii �•i
� I II �i�. iI±� �� ^� �� qi '6 .� �
� 3. 'Jl o u � e I
�i f t. i nr i
u ..l. � + L`:°I, �
r� ti. � i I... 'I � i 1.'�
i. '
��,� ���
� � � ��� � �, i� . ��
—� �_ �1#�'�R9.
. ,� ��' P� ' I :._I_.
i ,4''� ' � ' ' ! . �:
Z .4i��i � ; ���_i I � ._ �.
"�t�� � � - ' I � ' yL� �'
t �'a�z � 1� I i I �.:
, f;".r �.. .. ..
�,, � _
P i- - 1 —r —�— �:Pn;:
F. a i�. ,�
;� tl I,� II
i . �" . ,
� �
:�5� �'. I� lL� ,
`� ��--,II r� �— f� ��'1 ���FI��
� e I + r a �.. _,
�� � � i � � �i�
, '� p �I � ,, �'��� -,- :''
I i� � �-
V._ i �� i : �
f�� . i } .
f, i,f Kx^,
�Jr
�'� .��,k � i�,�� � r.� ..�
��� � ��,�
�� . , —
� . ��i :�� .
i i i ��: ' ��� �
LI� � �" ' I , �'
y
'� i
1 . r �i 4 f. _. Ii
J i
� � ni f � �`': �-'
� ,�,�_�,�{
_ . �_ z � �� ,,� � �. ;;�
�t��� �'';�.
I I�rt
E � � ���3 ..i i� �..li -:i
i ,
I I : �
� ' � C I � i �: I�
1 rr. �
'�, �� J�:-�.i �ti a . .��..-. �
��i:; � L:..:�. ;�
;� i' �'I � u
� - —
___ • . `�;� . "'� ,.- f_.
�.. -. ,
71
23.16.01 AttachmentA Survey5takingStandards.docx
Page �z of 23
Ob�iously the .cs� or .txt file cannot be signed/sealed by a surUeyor in the format
requested. This is just an example and all this information should be noted when
deli�ered to the City sa it is clearto what coordinate system the data is in.
PdIiVT NO
1
z
3
h
5
6
7
8
�
10
11
12
13
lA
15
16
17
18
19
zn
za
22
Z3
24
ZS
26
?.7
Z$
29
30
31
32
33
3A
35
36
37
sa
39
A4
43
42
43
44
45
96
NpRTfi I NG
fi946257.189
fi946250.893
6946307.399
69A6220.5$2
69�5195.�3
6946190.528
6946136.O�Z
&9A6flp2.267
69q6003.05G
6945984.G77
6945986.�73
6945$95.Q77
69A589fi.591
5945939.286
6945935.727
6945835.678
69R5817.488
6945759.776
69457fi8_563
690.57�3.318
ssas�rzsz�.9
5945682.21
69n5621,902
6945543.407
6945�71.059
6945539.498
6945513.834
694547.7.879
S54S456.557
594538%.356
6945370.688
6945383,53
694532,1.2�8
6945319.365
6y45�42.289
Ci945233.67_4
694520&.483
fi94��.42.U15
6R45113.445
fi945049.02
6445041.OZ4
6945�38.87&
G9456�6.397
69�IA9R4.787
69449A3.432
6944fi60.416
EASTIf�3G E�EV
229b079.165
22950S2.1A1
229fi(338.3Ub
2296011.025
2296015.116
2296022.771
2295992.115
22959�9.133
2295933.91A
2295880.52
2295$6�.892
2295860.962
2295862.158
2295&41.925
2295830.441
2295799.707
zz�sszi.oaz
2z9S75$.643
2295778.424
229578$.392
2295754.394
229574R.22
2295659.471
2295735.Q3
2295655.495
2295667.803
2295619.49
22R5580.27
2295543.10.5
2295597.1(}1
22956�s.793
229561Q.559
2295551.105
2295539.72$
2295570.715
2295544.625
2295529305
2295557.5Es6
2295520.335
Z295527.345
2295552.675
zassss2.sa�
2295518.135
�Z9S520.635
2295556.479
2295534397
#JE5CRI PTIOI
726.69 SSfV1H RIM
725.668 GV RIM
726.$5 GV RIM
723.358 S5MN RIM
722.123 GV RIM
722.325 �H
719.448 WM RINt
713.331 WM RIM
7]3.652 CQRIfY
31S.G62 SSMM RliVf
710.046 WM RIM
707.72 WM iIIM
708.265 WM RIiVI
709.457 WM RIM
710.084 CO iilM
707.T7�E SSMH Rlhlf
708392 SSMH RIM
711.238 SSMH RIM
71D.086 GV RIM
710.531 GV ftlM
712.844 GVRIM
%15.6$6 WM R1M
723.76 WM RfM
77.9.737 C6 RtM
727.514 SSMH RIM
729.123 WNt RI1L1
73�.fi&9 WM RItV�
740.527 WM RIM
736.451 CO RIN!
74p.756 GV RINr
7qp.976 Gv RIM
740.4U8 Fii
746.34 WM RIM
746.777 CQ RIM
748.454 WP/ RIM
749.53 SSRAH RIM
751,p58 WM RIM
750.853 WM R1N1
751.871 WM R#M
752.257 SSMH iilA/i
751.79 VJM RIM
751.88 WM RIM
752.615 WM RIM
752.803. WM iilM
752.156 WM RIiVI
752.986 SSMN RIM
�r��,��?.��,��`; :�� °:�.
�_`�L i��-� iti., �`�"s t= � .
i P.-�
%) , .� S', { `! <`,�
1 � � � , �_w: ; .���NP� �.�
xa'•i,j( ..{� Z"� f3.s;J �..
l-'� . �'t fi `�.
� F r. u. , � �. i'i � � ��y `�
? P,.:
{.� ,�� ;.It..._ �'.�,��
,,. �`,
E`"
��: t... i�(�a�� i r'- f.�
_7 g.:.
"a .
f � C 1 _t i �..�. ;.. �- �,, f � j -�
�w. i �, � � r A-�
"�i r+ a.._ E` � t'��a �
r
f-npf:»- -+�,fW-�}"[ �-
� i-�� � : _r
r�� j'��1✓�i ���
�, �
�� '-'�=7£
��' ��
��.� � z��•L��
�53�=-Sfi F�
� E F-a
�'-i'i ��,6 Sv
�.1 � -` , %i.��'/t�{� � � �f ?�:��a��.
��ch isilan\tpwdept�TCMC03-Share�Sidewalks-2018 Bond�Sidewalk Z018 Program�Sidewalk Contract�Qi�01�0171
23,16.OZ AttachmentA 5�rveyStaking5tandards.clacx
Page 24 of 25
C. Other preferred as-built deli�erable
Some vendors have indicatedthat it is easier to deliver this information in a d�fFereni
format. Below is an example spreadsheet that is also acceptable and can be obtain�d by
request from the sur�ey superintertdent.
�\chi silon�tpwde�t\TCMC03-Sl�are\5idewalks-2018 Bond�Sidewalk2018 Program�5�dewalk Contract�Di�01\0171
23.16.01 At�achmentA Survey5takir�gStandards.docx
Page25 of �.6
��� o � � � � , —
,�:� - �' S � „ � �
- z
I '_____ _____ ______ '_"" ___ _ _ _ __
,. _ -_. .."' ___ __'_ _'_' ""__ __
' � -
' �� � � � � � � �
�� �. -_ `� � � � � � � �
� �r � A�
� z- s- -
; _ _ �: s
� �r_� � z„W z�W 'w m
� � m
. s E ii � `��' " � ...
4 �
cl �' � - '
k �
i '
_. . � „ w. � � � � m ` `� S�'. � �
- � � � � I � `��, � �
� � � _ _
- � � M
�t � d r
-- ---- -.'-' -'_- --- - -
� � - .' -"' ----- -- ----- " --- -- -- -'
� � � - � q �, � � r � S � � z�
yi ;� � � �z � � � � � � � � � � � � � �
�� � i 4 � �' }'3 � d �' F � s' ;i � � �_ �
�—�. t c � ..� 7 ' _
..EGy �`F � �� �� �g z� z� �� ��.�
g
� �
�
. ' �
a�
,� T I �W
� �
v a x I� � s
� � �
� z �
.,, . - "-- --- --- ----'- '---- ------ ------ ------ --'--` --- --- ---- '---`- ----- -----
Y �I �p
' �ti _ui�, , ., � I
` Im i�N� � �
a � �r
uo m� �
� �K I P
�� �
+� � I Y
. a � ^� �
� �
_ g. ,� � �
' ' I i � r. �' ,o
J � '� �
' _ �' � � R � � � � a �: � �. A � � 5� �'
� � . �. � � � �, :g � ,� � � m ti �. '^ '.x.ms
, I � �: � � p � - � � � � � g� � R
� � �� _ _ �z � �. � sz
F �
5 e , — � � �„ a � �., z � ,., z $ �.
� �. � ,.� ' ' . 2 ' S P R � ^ .�
ti rv, ti
� -' ... m a. "
. � + ^
5 �
�I G
� ., :, .. .' n
��-,E�. . . . , � I __
� ._-..-.-_ �_ ' ' . � .... .. � - �. :�i A :.i .-� .-.
��c h i s i I o n�tpwdept�TCMC03-Sha re�Sid ewa I[cs-2018 6 o n d�S i d ewa I k 20 �$ P rogram�Si d ewal k Co ntra ct�D i� 01 �0171
23.16.01_Atta chment A_Survey5ta king Sta ndards.docx
Page 26 of 26
Of ?I 23 - 1
COIISTRUCTION STAI�IlVG AND SUR'VEY
Page 1 af $
1
2
3 PART 1 � GINIIZAY.
SECTION 01 7123
C4N�TRUCxZON STAHING AND SURV�,Y
A l.l SiIMMARY
5 A. �ectian Includes:
6 l. Requuements for construction staking and construction survey
7
8
B. Deviations from this City oi Fori Worth Standard Specificatzon
l. None.
9 C. Related Spec�cation Sections izaclude, but are nat necessarily litr�ited to:
10 ]. Division 0— Bidding Requirements, Cojitract �'orms and Conditions of the Contract
11 2. Division 1— General Requirements
12 1.2 PRICE AND PAYMEN'I' PROCEDURFS
13
14
15
16
17
18
19
20
2J
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
.A. Measurexnent and Paynzent
J.. Constructian Staking
a. Measurement
1) Measu.re�nent for this I#em shalibe by lump su�a.
b. Payment
1) The work performed and the materiais furnished iz� accordance with this
Item shall be paid for at the lump sum price bid for "Construction Stalcing".
2) Payment for "Consf.ruciian Staking" shall be �nade in partial payments
prorated by work completed compared io total wo�k included in the luzx�p
stun item.
c. The price bid shall include, but not be limited to the followiz�g:
1} Verificatian of contrai data provided by Ciry.
2} Placement, maix�ienance and replacement of required sta.kes and marlcings
in the field.
3} Preparation and submittal of construction staking documentation in the
form of "cut sheets" using the City's siandard tetx�plate.
2. Construction Survey
a. Measuremeni
1) This Item is considered subsidiary to the va�rious Items bid.
b. Payinent
1) The workperfor�med and the materials furnished in accordance with this
Item are subsidiary to the various Iiex�as bid and no other compensation will b�
allow ed.
3. As-Built Survey
a. MeasuY ement
1) Measurement for t�is Item shall be by Iump sum.
b. Payment
1) The work performed and the materials furnished in accordance with this
Item shall be paid %:r at the lump sux� price Uid foz "As�Built Sut'vey".
CI'iY OF x'ORT WORTH
2027 SidewalkUnitPrice Cmistruction Conh•act
IU2520
STANDARD COIVSTRUCTION Sl'ECIFICATiON ➢OCLrME�i'I'S
Revised Febneary 14, 2018
O 1 71 23 - 2
CON5TRi1CTION STAKING AND S[1RVEY
Page 2 of 8
1
2
3
4
5
6
7
8
9
2} Payment for "Constxuction Staking" shall be made in partial payments
prorated by wor� co�apl�ted compared to total work ir�cluded in the lunr�p sum
item.
c. The pxice bid shaIl include, but not be lixnited to the fol�owing::
1} �'ieId measurements and survey shots to identify �ocatzon of completed
faci�ities.
2) Documentation a�d subinittalof as-built surve� data onto con�•actor redline
plans and d.igital ,sur�ey files.
10 1.3 RI;�+`IIZL'1�TC FS
11
12
13
14
IS
1b
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
A. Deiinit�ons
1. Construction Survey - Tha survey measurements made prior to or while
constxuction is in progress to contral elevation, horizontal posit�on, dime�asions and
configuration of struciures/improverr�ents it�cluded in the Project Drawings.
2. As-built Survey --The measurements made a�ter the canstructzon of the
improvement feature� are complete to provide position coordinates for the features
of a project.
3. Construction Stakin� — The placement of stalces and maz-kings ta provide oifsets
and elevations to cut and fill in order to Iocate on the �round the des�gned
structures/improvemients included in the Project Drawiu�gs. Const�uction staking
sk�a�l include staking �asements and/ox right ofway if indicated on �fie plans.
4. Sur�e "Field Checks" — Measurezncnts made after construction sta�ing is
completed arid befoi•e construction work begins to ensure that structures marked an
the ground are accuratel� located per Project Drawings.
B. Teck�nical References
1. City of For�t Worth — Construction Stak�ng Staz�dards (available on City's B�zzsaw
website) — O 1 71 23.16.01_ Attachment A Survey Staicing Standards
2. City of Fort Worth - Stax�dard Survey Data Collector Librazy {fxl} files (availabTe
on City's Buzzsaw website).
3, 'X'exas Department of Transportation (TxDOT') Survey Manual, latest re�ision
4. Texas Society of Professianal Land Sur�eyors {TSPS), Manual of Practice for I.and
Surveying in the State of �'exas, Categot�y 5
3� 1.4 ADMII�TISTRATIVE RI+�QLIIRENIEl�TTS
35 A. The Contractor's seIection of a surveyor must coxnply with Texas Government
36 Code 2254 (quaIifications hased selection) for this projec#.
37 L� SUBNIITTALS
38 A. Subnr�ittals, if required, shall be in accaxdance with Sect�on O1 33 00.
39 B. All subrnit�als shall be recezved and revies�ved by the Cify prior to delivery of work.
40 1.6 ACTXON BUBNIITTALS/INFORMATIONAL SUBNIITTAL�
41 A. F'reld Quality Control Submit�als
GI'FY OF FORT WORTH
2021 SidewalkTlnitPrice Conshvction Cantract
102520
STANDARD CONSTRUCTION SPHCIFICATION DOCUMEAITS
Ravised �'ebruary 14, 2018
pI 7123 -3
CONS TRUCT ION STAKIt�IG AN]] SURVEY
Page3of8
1 i. Documentation verifying accuracy of field engineering work, includix�g coordinate
2 conversions ifplar�s do not inc�icaie grid or ground coordinates.
3 2. Submit "G�t-Sheets" conforming to the standard template provided hy the City
4 (refer to d 1 71 23.16.01 — Attachment A-� Survey Staleing Siandat'ds).
5 l.7 CLOSEOUT Si)BMITTALS
6 B. As-buiJti Reciline Drawing Submittal
7 1.
8
9
10
11 2.
i2
I3
14
IS
Submit As-Built Surv�y Redline Dravaings documenting the locations/eleva�ions of
constructed improvements signed and sealed by Registered Professional Land
Surveyor {RPLS} responsible for the work (refer to O 1 71 23.16.01 — Attachment A
— Survey Sta�ing Standards} .
Coz�tractor shall submit the proposed as-built and completed redline drawing
subxxaittal one {1) week prior to schedul�ix�g the project final inspection for City
review and comment. Revisions, if necessary, sha11 be made to the as-built red�ine
drawings and resubmitted to the City prior to scheduling the cons�'ucfion final
inspection.
16 1.8 MAiNTENANCE MATERiAL SUBMITTALS [NOT USIII]
17 1.9 QUALITY ASSTTRANCE
1$
19
zo
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
1. Construction Si.0 vey wili be performed by the Cont�-actor.
2. Coordination
a. Contractar to verify that horizontal and vertic al c ontrol data established in the
design suz`vey and requi�red for construction survcy is available and in place.
3. General
a. Construction survey will be p�rformed in order to construct the worlc shown
on tk�e Construction Drawings and specif�ied in the Contract Documents.
b. For construction methods otherthan open cut, the Contractor shallperforrn
construction survey and verify cont��l data including, but not limited ta, the
following:
1) Verifi"xcafion thai established benchmarks and contra� are accurate.
CITY OF PORT WOTtTH
A. Canstiruction Staking
1. Constructzan staleing will be performed by the Contractor.
2. Coordination
a. Contact City's Project Rep�esentative at least one weelc in advance notifying
the City ofwhen Construction Staking is scheduled.
b. It is ihe Contractor's responsibility ta coordinate stalcing such that
construction activities are not delayed or negatively ixnpacted.
3. General
a. Coniractor is responsable for preserving and maintaining stalces. If City
surveyors art'e required to re-stake for any reason, the Contractor voill be
responsihle for costs to pezform staking. If in the opinion of the City, a
sufficient zaumber of stakes or markings have been Iost, destroyed disturbed or
omitted that the cantracied Work cannot take place then the Caniractorwill be
required to stake or re-stake the de�cient areas.
B. Construction Survey
2021 Side4valkUnitPrice Construction Conh•act
�azsza
S"I'ANDARD CONSTRUCTION SP�CIFICATION DOCCTMENTS
Revised Febniary 1�}, 2018
Ol 71 23 -4
CONS TRUCTION ST A[CING AND SURVEY
Page4of8
1 2) Use of Benchmarks to fur�ish and maintain all re�erence lines and grades
2 �ar iun�r� eling.
3 3) Use of line and grades to estabTish the location of the pipe.
4 4) Submit to the City copies of field notesused to establish a111ines and
5 grades, if requested, a�d allow the City ta checic guidance system setup prior
6 to beginnuig each tunneling drive.
7 5} Provide access for the Ciry, if requested, to verif'y Che guidance systezn and
S the I�ne and grade of the carrier pipe.
9 6) The Confractor remains fuliy responsible �or the accuracy of the work and
10 correction of it, as z�equired.
11 7) Monitor Iipe and grade continuously during construction.
12 8} Record deviation with respect to design line and grade once at each pipe
13 joit�t and submit daily records ta th� Ciry.
1�4 9) If the insta�lation does nat x�eet the specified tolera�ces (as outlin�d in
�5 Sections 33 OS 23 and/or 33 05 24), immediately notify t11e City and correct
16 the installation in accordaz�ce with the Contract Dociunent�.
17 C. As-Built Survey
18 1. Required As-Built Survey will be performed by the Contractor.
19
20
21
22
23
24
25
26
27
28
2. Coordination
a. Contractor is to cooz-dinate with Cif� to confirm which features require as-
built surveyrng.
b. It is the Contractoz�'s responsibility to caordinate the as�built survey and
required measurements for items that a�re to be buried snch tk�at construction
activities are not delayed or negatively i:mpacted.
c. For sewex rz�.ains and water mains 12" ancf under in diarrzeter, �t is accep#able
to physically measure deptl� and �nark the location during the progress of
construciion and take as-built survey after the facility has been btu-ied. The
Conixactor is responsible �or the quality controlneeded to ensure accuracy.
29 3. General
30 a. The Contractor shallpro�ide as-built survey including the ele�ation and
3I location (and provide written documentation to the City) of constxuction
32 features during the progress of the canstruction including the foIlowing:
33 1) Water Lines
34 a) Top ofpipe elevations and cooz�d�ates for waterlines at the following
35 locatioxas:
36
37
38
39
40
41
42
43
4�
45
4b
47
�48
(1) Minunum evezy 2501inear feet, including
{2) HDrizantal and vertic aI points of inflection, cut-vature,
etc .
(3} Fire line tee
(4�} Plugs, stub-outs, dead-end lines
(5) Casing pipe (each end) and all buried fittrngs
2) Sanitary �ewe�
a) Top of pipe elevations and coordinates for force mauls and siphon
sanitary sewer limes (non-graeity �acilities} at the follovving Iocations:
(1) Minimum e�very 250 linear feet and any buried fittings
{2) Hor�zontal and vez-iicalpoints of inflection, curvature,
etc.
3) Stormwater—NotApplicable
CITY OF FORT WOIt"I'H
2021 SidewalkUnitl'rice Construcfion Conh•act
� ozsza
STANDARD CONSTRUCT70N SPECIFICATION DOCUMENTS
Re�ised Fc6ruaiy 19, 261R
0� 7! 23 -5
CONS7'IZUCTION STAKING AND SCJRVEY
Page 5 of R
I
2
3
4
S
6
7
8
9
10
1�
12
13
14
15
I6
17
18
19
20
2�
22
23
2�F
25
26
27
b. The Cont�-actor shall provide as-built s�.uvey i�nc�uding the elevation and
location (and provide written documenta�ion to t�e City) of construction
features after ihe constraction is co�npleted including the following:
1) Manholes
a) Rim and flowline elevations and coordinates %r each manhole
2) Water Lines
a) Cathodic protection test staiions
b} Sampling siations
c) Meter boxes/vaults (All sizes}
d) Fire hydraaats
e) Valves (gate, butterfly, etc.)
� Ait� Release valves (Manhole rim and vent pipe}
g) BIow off valves (Man�ole rim and vatve lid)
h) �ressure plane valves
i) Underground Vaults
(1) Rim and flawline elevations and coordi�t�ates for eac�
Underground Vault.
3) Sanitary Sewer
a) Cleano�ts
(1) Rim ac�d flowline elevations and eoordinates far each
b) Manholes and Junction Structures
(1} Rim ar�d flovvline eIevations and coordinates for each
manhole and junction structure.
4) Stornrzwater—NotApplicable
l.lQ DELIVERY, STORAGL, AND L1NG [NOT LTSID]
l.. X 1 FIELD [SITE] CONDITIONS [NOT USID]
1.12 WARRAN'I'Y
28 PART � - PR�DiTCTS
29 A. A constructian survey will producc, but will noi be ]i�nited to:
30
3�
32
33
34
35
36
37
38
39
40
41
42
43
1. Recovery of relevant controlpoints, points of curvature andpoit�ts of intersection.
2. Fstablish temporary hoxizontal and vertical con�rol elevations (benchrnarks)
suf£'iciently permanent and Iocated in a manner to be u.sed throughout co�astruction.
3. The location of planned facilities, easements and improvexx�ents.
a. Establishing final line and gxade siakes for piers, flooz-s, grade beams, park�g
areas, ntilities, st�eets, highways, tunnels, and other eonsi�uction.
b. A recard of revisions or corrections noted in an orderly manner for reference.
c. A drawing, when required by the client, indicating the horizontal and vertical
location of iacilities, easements and imp�rovements, as built.
�4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all
construction staking projects. These cut sheets shallbe on the standard city tez�plate
which car�be obtained from the Sur�ey Superinteudent {8I7-392-7925}.
5. Digital survey files �z the foIlowing formais shaIlbe acceptable:
a. AutoCAD (.dwg)
CITY OF FORT WORT'H
202,1 SidewalkUnitPrice Construction Conh�act
102520
STANDARD CONSTRUCI'ION SPECIFICATION AOCUMENTS
Revised February L4, 2018
Ql 7L 23 -6
CONS"I'ILUC'I'TON STAKING A1VD SURVEY
Page 6 of S
2
3
b. ESRI Shapefile (.shp)
c. CSV file (.csv), fortnatted with X a��d Ycoordinates ui separate coliimns {use
siandard templates, if a�vailabte)
4 b. Survey files shall include vertical and horizantal data tied to oz-iginaI projeci
5 control and benchmarks, and shall include feature descriptions
b PART 3 - EXECUTION
7 3.1 INSTALLERS
8 A. Tolerances:
9 1. The staked location of any inrzprovcment or facility sh�uld be as accuraf;e as
10 practical and necessaiy, 'I'he degree of precision required �s dependent on many
I 1 factors alI o� which must remain judgmental. The tolerances lisf;ed hereafter are
12 based on generalities and, under certain circumsta�ces, shall yield ta specific
13 require:nr�ents. The surveyor shall assess any sit�iation by review of the overall plans
14 and tlu-ough consultation with responsx�le parties as to the need for specific
15 tolerances.
lb a. Earthwork: Grades for earthwork oz rough cut should nat exceed 0.1 ft. vertical
17 tolerance. Horizontal aiignment for �arthworlc and raugh cut should not exceed
18 I.0 ft. tolerance.
19
20
21
22
23
24
25
26
27
28
29
30
3l
32
33
34
35
3fi
37
38
39
40
41
b. FIor�zontal alignment an a structure shallbe within .0.1ft tolerance.
c. Paving or conct•ete for streets, c�ubs, guttei-s, parking areas, dz-ives, alleys and
walkways shall be Iacated withiul the con�ines af the site baundaries and,
occasionally, alon� a boundary or any other rest�•ictive li�rze. Away from any
restricti�ve line, these facilities should be staked with an accuracy producing no
more than 0.05ft. tolerance from their specified locations.
d. Underground and overhead utilities, such as sewers, gas, water, telephone and
eIec�ic lines, shall be Iocated harizontally within theix prescribed areas or
easemexats. Within assigned areas, these utilities should be staleed with an
accuracy producing no more than 0.1 ft tolerance from a specified location.
e. �'he accuracy required for the vertical location of utilities varies widely. Ma�ay
undez-ground utilities require only a minimun� cover and a tolerance of 0.1 ft.
should be maintained. Underground and overhead utilities on planned profile,
bnt not depending on gravity flow for p�rformanc e, should not exc eed 0.1 ft
tolerance.
B. Sur�veying it�st�uments shallbe kept in close adjustment according to manu#'acturer's
specif"ications or rn compliance to standards. The City reserves the right to request a
calihratio� report at any time and recommends regular maintenance schedule be
�erfornrzed by a certified technician e�rery 6 months.
1. Field measurements of angles az�d distances shall be done in such fashion as to
sati�fy the closures ancI tolerances expressed in Part 3.1.A_
2. Vertical locations shaU be established from a pre-established benchmark and
checiced by closing to a differeiit bench inark on the same datum.
42 3. Construction survey field wark sk�all correspondto the client's plaris. Irregularities
�F3 or conflic#s found shalE be reported pramptly to the Ciry.
44 4. Revisions, corrections and aiher pertinent data shallbe logged %r future reference.
CITY OP FOI2T WORTH
202I Sidewa]klJnitPr�ce Consfrucfion Canhact
102520
STANDIIRD CONSTRUCTION SPECIFICATION DOCUMGNTS
Revised February l4, 201$
Ol 7123 -7
CONSTRlJC7'ION STAKEiVG AND SUAVEY
Pege7of8
1
2 3.2 EXAMINAT[�N [NOT IISID]
3 3.3 PREPARAT[ON �NOT U�ID]
4 3.4 APPLICATI�N
5 3.5 REPATR / REST'ORATION
6
7
8
9
10
11
I2
13
14
15 3.6
A. Tf the Contrac#or's work damages or destroys one or xno:re of the control
monurnents/points set by the City, the monuments shall be adequately referenced for
expedient xestoration. �
1. Notify Ciry if' any control data needs to be zestored or replaced due to damage
caused during cans�t�uction opera�ions.
a. Contractor shallperfortn replacements a�d/orrestoratians.
b. The City may require at any time a survey "Field Check" of any monurnent
or benchmarlcs that are set be verified by the City surveyors before further
associated worlc can move forwa►'d.
RE-�NSTALLATION [NOT USID]
16 3.'� FXELD �oR] SI'TE QUALXTY CONTROL
17 A. It is the Cani:ractor's responsibility to maintain all sta�es and cont�ol dataplaced by the
18 City in accordance with this Specification. This inchtdes easements and rzght of �vay, if
19 noted on kheplans.
20 B. Do not change or relocate stalces or control data without approval from the Ciry.
27 3.8 SYSTEM START[7P
22
23
24
25
26
27
28
29
30
31
32
33
34
35
CTf'Y OFPOI2T WORTH
A. Survey Checks
1. The City :reserves the right to perform a Survey Check at any trme deemed
necessary.
2. Checks by City persannel or 3'�d party cont�t'acted snrveyor are not inte�ded to
relieve the contractor of his/her responsibiliry for accuracy.
3.9 ADJUSTING [NOT USED]
3.I0 CLEANiNG [N�T USID]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MA.INTINANCE [NOT USID]
3.1� ATTACIIlV�NTS [NOT USID]
END OR SECTION
2021 SidcwalkUnitPricc ConstrucHpn Cantract
Ip2520
STANDARD CONSTRLTCTION SPECIE'ICAT[ON DOCi]11�iENTS
Revised Febcuary 14, 2018
Ol 71 23 -8
CONSTRUC'fION STAKING AND SUft'UEY
P age 8 of 8
Aevision l,og
DATE NAME SUMMARYOF CHANG�
8/31/2412 D.7ohnson
Added insCruction andmodified measzu•emeni & paymertt undet� 1.2; added
8/31/2017 M. O�en definitions and references ttnder 1.3 ; madified 1.6; added 1.7 closeottt submittal
requirements; modi�ed 1.9 Quality Assurance; added PART 2—PROI]TJCTS ;
Added 3.1 Installers; added 3.5 �epair/ResCoration; andadded 3.8 5�stem Startup.
Renioved"blue text";��eviscdmeasurement andpaymenl sectionsforConstruction
Staking and As-Built Sur�ey; atided reference to selection complaance with T GC
2/1A/2018 M Owen 2254; revised action andClaseout suEnnitta[ requirements; addcd acceptable depih
measurement cri#cria;re�ised 3ist of itemsrequicing as-huilt survey "during" and
"after" cnnstr�ictian; andrevisedacceptable digta] survey file format
C1TY QF FORT W012`i�fi
2021 SidetivalkUnitPrice ConsLruction ConfracE
I02520
STANDARD CONSTRUCTIOAI S�'EC�'ICATION DOCUMENTS
Rc�ised Febmary 14, 2018
01 74 23 - I
Ci,EANQ�iG
Pagc l uf4
�
2
3 PART 1- GENIIi. AL
4 1.1 SUMMARY
sFc�oN oi �4 z�
CLFANING
5 A. Section Includes:
6 I. I�termediate and final cleaning for Work not including special cleaning of closed
7 systems specified elsewhere
8 B. Deviations froxn this City of Fort Woxth Standard Specification
9 1. Nane.
10 C. Related Specilficatian Sections incIude, but are not necessarily ]imited to:
11 1. Division 0— Bidding Requirements, Contract �orms and Conditions of the Contract
12 2, Di�ision 1�- General Requiremex�is
13 3. Section 32 92 13 -- H�dro-Mulching, Seeding and Sodding
14 1.� �RICE AND PAYN�NT PROCEDL1rRFS
15 A_ Measureme�nt and Payment
16 1. Wor1c associaied with this Itern is considered subsidiary to the vario�is Items bid.
17 No separate payment wi�1 be allowed for this Item.
18 1.3 RF.�FT.RFNCFS [NOT USED]
19 1.4 ADMIIVISTRATxVE RF�QUIREMENTS
20
21
22
23
2A
25 1.5
A. Schedulzng
1. Schedule cleaning operations so that dust and other corltaininants distuzbed by
cleaning process r,villnot fall on newiy painted surfaces.
2. Schedule final cleax�ing upon completion of Work and unmediately prior to finaI
inspection.
SLTSNIITTALS [NOT USID�
26 1.6 ACTION SUENIITTA.LS/INFORMATIONAL SUBMITTALS [NOT USID]
27 l.'� CLOSEDUT SUBMZTTALS [NOT USID]
28 1.8 MAINTINANCE MATIItIAI. SUBMITTALS [NOT USID]
29 �.9 QLTALITY ASSiJR.ANCE [NOT �.TSID]
30
31
32
33
1.10 STORAGEy AND IIANDLING
A. Storage and Handling Requirements
1. Store clea�ning products and cleaning wastes in cox�tainers specificaIly designed for
those rnaterials.
C11'Y OF FORl' WORTH , FY2020 ATl' SidcwalkLnp�nvemcnts
STANDARD CONSTELUCTION SPECIFICATION DOCUMENTS [�nsert ProjectNumber]
Revisad 7uly 1, 2011
O1 7923-2
CLFAN�IG
Page2of4
] 1.11 1�'IELD [SITE] CONDITIONS [NOT USID]
2 i.I2 WARItANTy [NOT U�SED]
3 PART 2 - PRODUCTS
4 2.1 OWNIIZ-FLJRNISIIID �a�j QWN�R-Si]PPLlEDPRODUCTS [NOT L]5ID]
S 2.2 MA`IEItIALS
6 A_ Clean�g Agents
7 1. Compatible with surface being cleaned
8 2. New and ux�contaminated
9 3. For manufactured surFaces
10 a. Material recommended by manufacturer
11 2.3 ACCF,SSORIES �NO'1' U�ID]
12 2.4 SOURCE QUAL�TY CONTROL [NOT USED]
13 PART 3 - EXTCUTION
14 3.I IN�TALLERS [N4T USID�
15 3.2 F,XAMINATION [NOT LTSED�
16 3.3 PREPARATION jNOT USEDJ
17 3.4 AP�']C,ICATION [NOT USID]
18 3.5 REPAIR / RFSTORATION [NOT USID]
19 3.G RE-INSTALLATXON [NOT USED]
20 3.� FIELD [or�] SITE QUAY,XTY CONTROL [N4T U�ID]
21 3.8 SYSTEM START[TP [NOT iJSID]
22 3.9 ADJUSTING [NOT USID]
23 3.10 CLEA,NING
24 A. General
25 1. Prevent accumulation of wastes that create hazardous conditions.
26 2. Conduct cleaning and disposal opera.tions to comply with laws and safety orders of
27 go�ver�ing authorities.
28 3. Do not dispose of voIatile wastes such as mineral spi�its, oil or paint thinner in
29 storm or sani�ary drains or sewers.
30 4. Dispose of degradable debi�is at an appt�oved so�d waste disposal site.
37. 5. Dispose of nondegradable debris at a�a approved solid waste disposal site or in an
32 aiternate rnanner appraved by Ci�y and regulatory agencies.
CiTY OF FOR1' W�RTH FY 202U A'1'1' Sidewalk Tm�mvements
STANDARD CO�lSTRUCI'IQN SPECIFICAT[ON DOCLJIvIENT3 [Tnsert PtnjcetNumber]
Revised 7uly 1, 20] 1
Ol 7423 -3
CLEANING
Page 3 of 4
1 C�. Handle materials in a controlled manx�er with as few ha�idliz�gs as possible.
2 7. Thoz'aughly cfean, sweep, vvash and polish al� Work and equipmeni associated with
3 this project.
4 S. Remove all signs of teinparary cor�struct�on and activities incidental to construction
5 of required perr�anent Work.
6 9. If project is not cleaned ta ilie satisfaction of the City, the City resexves the right to
7 have tlae cleaning completed at the expense of the Contractor.
8 10. Do nat b�-n ox�-srte.
9
10
11
12
13
l4
15
I6
I7
18
19
20
21
22
23
2�
25
26
27
28
29
30
31
32
33
34
35
36
37
38
B. Intermcdzate Cl�aning during Construction
I. K�ep Work az'eas clean so as not to Iainder �eaIth, safety oz' cnn�enience of
personnel in existing facility operations.
2. At imaximum weekly intervals, dispose ofwaste materials, debris and rubbish.
3. Confine construction debris daily �n strategically located container(s}:
a. Cover to prevent b�owing by wit7d
b. Store debris away from construction or operational activities
c. Haul from site at a minimiun of once per vveek
4. Vacuum clean interior areas when ready to receive fivaish painting.
a. ConCinue vacuum cleaning on an as-needed bas�s, until Final Acceptance.
S. �'rior to storin events, thoroughly clean site of all loose or unsecured items, which
�nay become auboxne or transported by flowing water during the stonn.
C. Interior Final Cleaning
1. Renaove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and ot7�er
foreign materials fro�x� sight-cxposed surfaces.
2. Wipe aIl lzghting fixture reflectars, lenses, lamps a�d tt'ims clean.
3. Wash and shine glazing and mirrors.
4. Polish glossy surfaces to a clear s�ine.
S. Ventilaiing systems
a. C1ean perrrianent filiers and replace disposable fi�ters if units were operafed
during construction.
b. Cleau cEucts, blovvers and coiLs if units were operated wikhout filtei-s during
construction.
6. Replace all hurned out lamps.
7. Broom clean process area floors.
8. Mop office and control room floors.
D. Exterior (Site or Right of Way) Final Cleaning
1. Re�x�ove trash and debris containers from site.
a. Re-seed areas disturbed by location of trash and debris containers in accordance
with Seciion 32 92 13.
39 2. Sweep roadway to remove allrocks, pieces of asphali, conerete or auy otIaer abj�ct
4p that may hinder or disrupt the flow of traffic along the roadvaay.
41 3. Clean any interior areas including, bui noi limited to, vaults, manholes, structures,
A�2 junetiox► boxes ar�d inlets.
CITY OF FOTtf WORTH PY2020 ATP SidcwalkI�npmvcments
STANDARD CON$TRUCTTON SPECIFICATIDN DOCiJMEI1TS [Insert Pro�ecti�Iumber]
Rcvised 7uly 1, 2D11
Ol 7423 -4
CLEANING
Page4oF4
1 4, Jf no longer required far maintenance of erosion iacilities, and upon app�-o�val by
2 Ciry, rcmove erosion control froin site.
3 5. C1ean signs, lights, srgnals, etc.
A 3.11 CLOSEOUT ACTiVITIFS �NOT USED]
5 3.12 PROTTCTION [NOT USED]
6 3.I3 MAINTTNANCE [NOT USED]
7 3.1�4 ATTAC.IIMENTS �NOT USID]
�
9
II�ID OF SECTION
Revisian Log
DATE NAME SUMM�RYOF CHANG�',
10
CIT'Y OH FORT WORTH FY2020 ATP SidewalkLnproveinents
STANDARD CONSTE2[JCT10N SPECIFICATION DOCUNIENTS []nsert PeojectNumber]
Revised Iuly 1, 2011
o� ��i9-�
CLpSEOUT REQUIREMLNTS
Page I of 3
i
2
3 PART 1 - GENEFtAi,
4 1.1 SUMMARY
SECTION 01 77 l9
CLOSEOUT REQUIREMEN`I'S
5 A. Section Izacludes:
6 I. The procedu:re for closing aut a contract
7 B. Deviations from this City ofFort Worth Standard Specif'ication
S I. None.
9 G Related Specification Sections include, but are not necessarily liiniied to:
10 1. Division 0—Bidding Requiretnents, Contracti Forms and Conditions of ihe Contract
l l 2. Divisian I—General Requirements
12 1.2 PRICE AND PAYNIENT PROCEDLTRT�
13 A. Measurement and Payment
14 I. Work associated with this Item is considered subsidiary to the various Itenr�s bid.
�$ No separate payment wi1l be allowed for this Itexn.
lfi 1..3 RLFERENCFS [NOT USED]
17 1.4 ADM[NXSTRATIVE REQUIR�:NTS
1$ A. G�aarantees, Bonds and Af�davits
19 1. Na appfication for �'inal payment will be accepted until a1I guarantees, bands,
20 certi�cates,licenses and af�dauits required for Work or equipment as specified are
�� satisfactorily filed with the City.
22 B. Re�ease of Liens or Claims
23 1. No application for final payment will be accepted until satisfactory evidence of
�4 release of liens has beer� submitted to the City.
25 1.5 SUBII�TTALS
26 A Submit all required documentation to City's Px'oject Representative.
CITY OF FORT WOR'i'H
2021 Side'�valkUnitPricc CansEruction Contract
10252D
S'I'ANDARD CONSTRUCI'ION SPECIFICATION DOCUMENTS
Revised 3uly 1, 2011
oi �� �s -z
CLOSL.OiJT REQUIItEMENTS
Yage 2 pF 3
1.6 INFORMATIONAL SUBMITTAC,S �NOT USID]
2 1,7 CL�SEOUT SUBMITTALS [NOT USED]
3 PART 2 � PRODUCTS [NOT USIDj
� PART 3 - EXECLlTI4N
5 3.1 INSTALLERS [NOT LTSID�
6 3.2 F.XAMINATION (N�T IISID]
7 3.3 PRF._,PARATION jNOT USID]
�'•�
9
IO
17
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
3$
3.4 CLOSEOUT PROCIDURE
A. Prior to requestrng Final inspection, submit:
1. Froject Record Documents in accordance with Section 01 7$ 39
2. 4pera�ion and Mainfenance Data, if required, in accordance with Section O1 78 23
B. Prior to requesting F�irial Inspecfion, perform final cleaning in accordance-with ,Sectzon
O I 74 23.
C. Final Tnspection
2.
3
4,
After final c�eaning, provide notice to the City Project Representative that the War�C
is campieted.
a. The City will make an initial �'inal Inspection with the Contractarprese�tt
b. Upon coznpletion of this inspection, the Ciry wil[ raotify the Contractqr, ion
writzt�g within 10 business days, of any particulaxs in which this inspection
reveals that the Work is defecti�e or incomplete.
Upon receiving written notice frorri the City, immediately undertal�e tlle Work
requixcd to remedy deficzencies and complete ihe Work to the satis�action of the
City.
Upon completian of Work associated with the items iisted iu7 the Ci�y's written
notice, infor�n the City, �at the required Work has been com�leted. Upon receipt
of this notice, the City, in the presence of the Contractoz-, will make a subsequent
Fina[ Inspection of the pfoject.
�rovide all special accessories required to place each Ztem of equipment in full
opera�ion. These special accessory items include, but are not limited to:
a. Specified spare parts
b. �Ldequate oil and grease as required for the first Iubrication of the equipment
c. Initial fill up of all chemicaltanks and fiiel tanks
d. Light bulbs
e. Fus es
f. Vault �eys
g. Handwheels
h. Otk�ex �xpendable items as rec�urred for initial start-up and operation oia11
equ�pment
C]TY OP FORT W ORTH
201,1 SidewxlkUnitPrice Constnection Contract
102524
S'1'ANDARD COIVSTRUCTION SPECIP'ICATIdN DOCUMENTS
Revised luly 1, 2011
01 7719-3
CLOSEOUT REQUIREtvIENTS
Pagc 3 of 3
1 D. N�tice of Project Completion
2 1. Once the City Project Representative �inds the Work subsequent to Final Inspection
3 to be satisfactory, the City will issue allotice of Prroject Cornpletion (Green Sheet).
4 E. Supparting Docunaentation
5 1. Coardinate with the Cziy Project Representative to complete the %llowing
6 additional forms:
'7 a. Fuial Payment Request
g b. Statemex�t af Contract Time
9 c. Affidavit of Paymen� and Release of Lzex�s
1p d. Consent of Surety to Final Payment
11 e. Pipe Report (if required)
12 f. Cantractor's Evaluation oiCity
13 g. Perfo�7nance Evaluation of Contzactor
]�4 F. Letter of Final Acceptance
�g 1. Upon review and acceptance of Notice of Project Completion and Sup�arting
F(, Dncumentation, in accordance with General Conditions, City will issue L.etter of
�'7 Rinal Acceptance and release f11e Final Payment Request for payment.
IS 3.5 R�.PAIR 1 RF,STORATION [NOT USID]
I9 3.6 R�INSTALLATION [NQT USED]
20 3.'� FIELD [ox) SITE QUAL�TY CON'1'ROL [NOT LTSID�
21 3.8 SYSTEM STARTUP [NOT USID]
22 3.9 ADJUSTING [NDT USID]
23 3.10 CLEAN�NG [NOT USID]
24 3.11 CLOSEOUT AC'1�VITIES [NOT USID]
25 3.12 PROTECTION [N�T USID]
26 3.13 MAINTTNANCE [NOT USID]
27 3. i4 ATTACIINI�NTS [NOT USED]
zs
2�
30
END OF SECT� ON
CITY OF PORT WORTH
2021 SidewalkUnitPrice Construcdon Conh•act
1D2520
STANDARD C031ST[tUCTION SPEG�'ICATTON DOCUMENTS
Revised July l, 20ll
01 7S 23 - I
OPEI2ATIONAND MAE�iTENANC�. DATA
1'age l aC5
I
2
3 PART 1- G+ + RAL
4 1.1 �i1M11�ARY
5
6
7
8
9
10
zi
12
13
14
15
I6
17 �.2
18
19
20
21 1.3
SECTION Ol 78 23
Ol'ER.ATION �ND MAINTENANCE DATA
A. Section IncIudes:
1. Product data and reIated information a�propz'iat� for City's maintenanc e and
operation ofproducts furnishedunder Contract
2. Such products may incIude, but are not limited to:
a. iraf�c Contt-ollers
h. Zrrigation ControIlers (to be operated by the City}
c. Butterfly Val�es
B. Deviations fronr� this City of Fort Wartk� Standard Specrficatia�
1. None.
C. Related Specrfication Sections include, but are not necessarily ]ixnit�d to:
1. Division 0-- Bidding Require�ents, Contract Forms and Conditions of the Contract
2. Di�ision 1— General Requirements
PRICE AND PAVME�'I' PROCIDURES
A. Measurement and Payment
1. Wor�C associated witb ihis Itex�a is considered suhsrdiary to the �arious Items bid.
No separate payment vail] be allowed for thi� Itern.
F�F�RF,NCES [NOT USID]
22 1.4 ADMIIVISTRATIVE REQUIREMENTS
23 A_ Schedule
24 1. Submit rnanua�s ixi iinal fo�•m to the City within 30 calendar days of product
25 shipment to tIae project sife.
26 1.5 SL'BMITTALS
27 A. SubmittaIs shall be in accordar�ce with Section O1 33 00 . All submittals shall be
28 approv�d by the City prior to delivery.
29 l.G INF'ORMATI4NAL SUBMITTALS
30
31
32
33
34
35
36
A. Submitial Form
1. Prepare clata in form of an instructianal manual fQr use by City personnel.
2. Format
a. Size: 8%z inche,s x 11 inches
b. Paper
1) 40 pound �rxiinimum, white, for typed pages
2) Holes xeinforced with plastic, cloth or metal
CITY OF FORT WORT�T
202I SidcwalkUnitPrice Consh`uction ConEract
102520
STAI�iDARB CpNSTRUCTTON SPECIE'ICATION DOCUM�,NTS
Revised Doceinber 20, 2012
Ol 78 23 - 2
OPBRATIONAIVD MAIlVTENAIYC� DATA
Page 2oF5
1
2
4
5
6
7
9
ID
11
12
13
14
15
16
1'7
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
3�4
35
36
37
38
39
40
41
42
43
44
45
46
47
c. Text: Manufacturer's printed data, or neatly rypevvfitten
d. Drawings
1) Provide reinforced punched Uinder tab, bind ix� wit� text
2} Reduce larger drawings and fold to size of textpages.
e. Pravide fly-lea� foz each sepaiate producf, or each piece of operating
equipment.
1} Pravide typed dese�'iption af product, and major cornponentparts flf
equipment.
2) Provide indexed tabs.
f. Cavet-
1) Identify each voIume with typed or printed title "OPEREITING AND
MAINTENANCE INSTRUCTI�NS".
2) List:
a) Title of Project
b) Identity of separate structure as applicable
c} Identity of general subject matter covered in the maz�ual
3. Binders
a. Commercial quality 3-ring binders with d�arable and cleanable plastic covers
b. When multiple buaders are used, correlate the data into related consistex�t
grouprngs.
4. If available, provide an electronic form of the O&M Manual.
B. ManuaI ContenE
1. Neatly typewritten table of cantents for each volume, arranged rn systematic order
a. Contractor, name of t-esponsible principal, address and telephone nutnber
b. A list of �ach product required to be included, ix�dexed to conient of the volt�me
c. List, with each product:
1) The name, address and telephone number o�t�e subcontractor or installer
2) A list of each pxoduct required to be included, indexed to content o�the
valu�me
3) Sdentify area oiresponsibility of each
4) Local source of supply for parts and replacement
d. Identify each product by product name and other identifying symbols as se�
forth in Contract Documents.
2. Praduct Data
a. Include only those sheets which are pertinent to the specific product.
b. Annotate each sheet to:
1) Cleariy identify specific product o:r part installed
2) Clearly identify data applicahle to i�r�stallation
3) Deleie references to it�applicable in%r�ation
3. Drawings
a. Supplement product data with ct�awings as necessary to clea�ly illust�ate:
1) Relations of component parts af equipment and systems
2) Control and flow diagrams
b. Coordinate drawings wii:h informatioz� in Pro�ect Record Documents to assu�'e
correct illustration of completed iustallaiion.
c. Do not use Project Record Drawings as r�rzaintenance drawings.
4. Written text, as requsred to supplement product data �or Yhe particula�r instalIation:
C1TY OF FOltf WORTH
2021 SidcwaikUnitPx'ice Construction ConYract
102520
STANDARI7 COIVSTRiTCTION SPECIFICATION DOCUI�AENTS
Revised Dece�nher 20, 2012
Ol 78 23 - 3
OP�.RATIONAND MAI}�ITENANCE DATA
Pagc 3 of 5
1 a. Organize in consistent forzx�at under separate headings for different procedures.
2 b. Ptovzde logica] sequence af i�structions of each procedure.
3 5. Copy of each warranty, bond and service contract issued
4 a. Provide �formatioza sheet for City persoz�nelgiving:
5 1) Aroper proc edures in event of failure
b 2} Instanccs whic� znight affect validity of warranties ar bands
C. Manuai �or Materiai� and Finishes
l. Suhmit 5 copies o£eax�aplete manual in final form.
10
ll
12
]3
�4
[5
16
17
18
2. Content, for architecturalproducts, appTied inaterials and finishes:
a. Manufact�arer's data, giving full in%rmation on products
1} Catalog number, size, conr�position
2) Color and texture d.esignations
3) Information required �or reordering special manufacfured p�•oducts
b. Inst�-uctions for care and maintenance
I) Manufaciurer's recommendation foz'types oicleaning age�zts and methods
2) Cautions against cleaning agellts andmethods which are detrunentalto
prorluct
3) Recornnr�ended schedule for cleaning and maintenance
19 3. Contezzt, %r moisture protection and weather exposure products:
20 a. Manufacturer's data, giving fu]I information on praducts
2l 1) ,AppIicable standards
22 2) Chemical composition
23 3} • Details of installation
24 b. Tnstructions far inspection, maintenance and r�air
25
26
27
28
29
30
3f
32
33
34
35
3G
37
38
39
40
41
A2
43
44
45
4b
47
D. Manual fo�� Equzpment and Systems
1. Submit 5 copies of eomplete manual in final form.
2. Conient, for �ach �nit of equipment and system, as appropriate:
a. Description of unzi and component parts
1) Function, normal operating characteristics and limiting conditions
2} Performance curves, en�ineering data and tests
3) Complete nomenclature and commercialnumber of replaceable parts
b. Operat ing prac edures
1) Start-up, break-in, rou.tine and normal aperating insixuctions
2) Regulation, control, stopping, shut-down and exir�ergency instructions
3) Siunmer and winter operaCing instructions
4) Special operating instr�actions
c. Maintenanceprocedures
1} Routine operations
2) Guide ta "trouble shooting"
3) Disassembly, repair and reassembly
4) E1Iignmcnt, adjusting and checking
d. Servicing ar�d lubrication sc�edule
I) List of lubricants required
e. Manufacturer's printed operating and maintenanc e instructions
f. Description of sequence of aperation by contral manufacturer
1} �zedicted life ofparts subjec� to wear
2) Ztetns recommended to be stocked as spare parts
CiTY OF POR'I' WORTH
2021 SidewalkllnitP��ce Constr�cdan Coa�tract
10252p
STANDARD CONSTRUCI'ION ST'�.C[F'[CATION DOClJl1��'�iTS
Revzsed Decem6er 20, 2012
O1 7823 -4
OPERATION AND MAINTENANCE DATA
Page4of5
1
2
3
4
5
b
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
g. As installed control diagrams by controls manufacturer
h. Eack� cantractor's coordination drawzngs
1) As ixistalled colar coded piping diagx'ams
i. Charts of val�e tag nutnbers, with location and function of each vaIve
�. List of orig�al nr�anufacturer's spare paxts, rnanufacturer's current prices, and
recommended quantities to be maintained ui storage
lz. Other data as required under pertinent Sections of Spec if'ications
3. Content, for each elcctric and eIec�ronic system, as appropriate:
a. Description of system and componentparts
1) Functio�, normal o,�erating characteristzcs, a�d limitirig conditions
2) Perforrna�ace curves, engineering data and tests
3} Complete nox�r�enefatm•e and commercfal number of repIaceable pat�ts
b. Circuit directories of panelboards
1) Electrical service
2) Cantrols
3) Communications
c. As installed calor coded wiring diagraxx�s
d. Operating pxocedtu'es
�) Rautine and normal operating instructions
2) Sequences required
3) Special operating ix�structions
e. Maintenanceprocedu�-es
1} Routine operations
� 2} Guide to "trouble shootiur�g"
3) Disassembly, repair and reasse;nab�y
4) Adjustxnent and checkiug
f. Manuiacturer's printed operating and maiu�tenance instructions
g. List of origiu�al manufacturer's spare parts, xzaanufachu�r's current prices, ar►d
recommended quantities to be maintained in storage
h. Other data as required under pertinent Sections of Specif�ications
4. Prepare and include aclditional data when the need for such data hecomes apparent
during ix�struction of City's personnel.
33 1.7 CLOSEOUT SUBINITTALS [NOT USID]
34 1.8 MAINTENANCE MA'1'IIUAL SUBMITTALS [l�OT USED]
35 19 QUALITY ASSURAIVCE
3b A. Provide operation and maintenance data by persozanel wit� the following criterza:
37 l. Trained and experienced in maintenance and operation of described products
38 2. Skilled as technical writer to the extent required to co�nmunicate essenti�l data
39 3. Skilled as draftsman competent to prepare requ�'ed drawings
C1TY OF FORT WORT13
202L 3idewalkT7nitPrice Canshvcho� Confe•act
I02520
STANDARD CONSTRUCTION SPECIFICATTON DOCUMENTS
Revised Deceanber 2U, 2012
Ql 7S 23 -5
OPERATION A,NI311�AIIVTENANCE DATA
Pagc 5 oF 5
1 1.10 DELIVERY, STORAG�, AND HANDLING [NOT USED]
2 1.�1 I{IELD �SITEJ CONDI'l�ONS [NOT USEDJ
3 �.12 WARRANI'Y jNOT USED]
4 PART 2 - �RODUCTS [NOT U,SED]
S PART 3- EXECUTION [NOT IISED]
�
7
IND OF SECTION
Revis ion L.o g
DATE NAME SUMMARYOF CHANGE
8/31/2012 D.7ohnson 1.5.A,.1—titleofsectionrcmoved
8
CITY OF FORT WORTH
2021 SidetivalkUnitP»ce Canstruction Conk-act
102520
STANDARD CONSTRUCTION SPECIEaICATION DOCUM�NTS
Revised Docanber 20, 2012
a� �s ss - i
PRO.TECT REC012DDOCU[v1ENTS
Pagc 1 af 5
1
2
3 PART 1 - GL�IVERAL
4
5
6
7
S
9
10
iz
12
13
14
15
I6
17
1.1 S UNIMARY
SECTCON OI 78 39
PROJECT RECORD DOC[_IMENTS
A. Section Includes:
1. Work associated with the documenting the project and recording changes to projec#
dacuments, including:
a. Record Dravvings
b. Water Meter Service Reports
c. Sanitary Sewer Service Reports
d. Large Water Meter Reports
B. Deviations from this City of Fort Worth Standard Specification
I. None.
C. Related Specification Sections include, but are not necessarily lin�ited to:
1. Division 0—Bidding Requirements, Contract Forms and Condiiio�s of the Contract
2. Division 1— General Requiremenis
1.2 PRICEAND PAYIVIEPI'I` PROCIDURF�
18 A. MeasUrement and Payment ,
19 1. Work associated with this Item �s considered subsidiary to the various Zteins bid.
20 No separate payment will be allowed for this Itexxz.
21 1.3 REI+'EftENCF� [NOT iJ�SID]
22
23
1.4 ADM[IV.[STRATIVE RF�QUIREl1�iE�TTS [NOT USID]
1.� SUBMITTALS
24 A. Prior to submitting a request for Final �nspection, deliver Project Record Docutnents to
25 City's Project Representative.
26 1.6 ACTION �UBMITTALS/INFORMATIONAL SUSMTTTALS [NOT U'SID]
27
28
29
30
31
32
33
1.� CLO�EOI]T SUBMITTALS [NOT USED]
].S MAIN'I'INANCE MA'I'ER.IAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE
A. Accuracy of Records
1. Thoroughly coo�•dinate c�anges within the Reco�d Documents, malcing adequate
and proper entries on each page af Specifications and each sheet of Drawings and
other pocuments where such entry is required to shovv the change pz-operly.
CIT'Y OT FORT WORTH
202I SidewalkUnitPrice Conshvcfion Contract
1p2520
STANAARD CO3+ISTRiJGTION SPECIF'ICATTON DOCUMENTS
Revised 7uly 1, 201 i
a� 7s3�-z
PROJECT R�,CORD DOCUMEN'fS
Page 2 oF S
1 2. Accuracy of records shall be such that future search for itezns shown in the Cantract
2 Dociunents may rely reasonably on information obtaEtted from the appraved Project
3 Record Documents.
4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of
5 information that the chailge has occurred.
6 4. Provide factual information regarding all aspects of the Work, both conccaled and
7 visible, to cnable future modification of ihe Work to proceed without lengti�y and
8 expensive site measurement, investigation and examination.
9 1.10 STORAGE �ND HANDLING
10 A. �Eorage and Handling Requirements
1 I. I. Maintain t�ae job set of Record Documents coinpletely �rotected firom deterioration
12 and from �oss and damage until completion af the Work and transfer oi a1I recardcd
13 data to the final Project Record Doc�unents.
14 2. In the event of loss of recorded data, use mea�s necessary to again secure the data
IS to the City's approvaL
16 a. In such c�se, provide replacements to the standards originally requi��d by the
17 Contract Documents.
] 8 1.11 FZELD �SITE] CONDITIONS [NOT USED]
19 1.12 WARRAN'TY [N�T USED]
20 PART � - PRODUCTS
2i 2.1 OWNIIt-FURNISHID [ox] OWNER-SLIPPLIED PRODUC`i� [NOT LTSED]
22 2.2 RECORD ll4CUNIIIVIS
23 A. Job set
24 1. Promptly following receipt of the Notice to Pi•oceed, secure froxx� the City, at no
25 charge io thc Cont-�-actar, 1 complete set of all Documents compz-ising the Contract.
2b B. Final Record Docume�ts
27 I. At a tizz�e n�aring the completion of the Work and priar to Final Znspection, provide
28 the City i complete set of all Final Record Drawings in the Contract.
C1TY OF FpRT WOR'1'T�
2021 SidewalkCJnitPeice Const��uction Conh�acE
102520
STANDARD CONSTRUCi'TON SPECIfICATION DQCIJMENTS
Revised 7uly 1, 2011
O] 7839 -3
PR07�CT RECORDDOCUMENTS
Pagc 3 of 5
2
2.3 ACCESSOR.�ES [NOT IISID]
2.4 SOURCE QU�LITY CONiROL [NOT U�ID]
3 PART 3 - EXE�UTXON
4 3.1 INSTALLERS [NOT USID]
5
�
7
8
9
10
11
I2
13
lA
15
16
17
18
19
20
21
22
23
24
25
26
z�
28
29
30
31
32
33
34
35
3b
37
38
39
40
41
3.� II�ANIINATION [NOT IISIIIJ
3.3 PxErARATtoN �NOT usEn]
3.4 MAINTINANCE DOCTJIVIEN�'S
A. Maintex�ance of Job Set
1. Irrimediately upon receipt of t�e job sEt, identify each of ihe Documents with the
tztle, 'RECORD DOCiJMLNTS - JOB SET".
2. Preservation
a. Considering the Contract completion time, the p�obable number of occasions
upo�� which the job set must be taken oui for new entries and for examination,
and the conditions under which ihese activities wi�l be performed, devise a
suitable rnethad for protectzng the job set.
b. Do not use the job set for any purpose except entry of nernr data and for :review
by the City, until start of transfer of data to final Project Reeord Documez�ts.
c. Maintain the job set at the site of work.
3. Coordination with Consiruction Survey
a. At a minimum, in accordance �vith the intei-vaJs set forth in Sectian �1 71 23,
ctearly xnark any deviations fr•oin Contract Documents assc�ciated with
installation of the infrastructure.
4. Mal�ing entries on Dra�rvings
a. Record any deviations from Contract Documents.
b. Use an erasable coloxed pencil {not ink o:r indeiible pencil), eJearly describe the
change by graphic li�e and note as requi�ed.
c. Date all entr�es.
d. Call atten.tion to the entry by a"cloud" drawn around the area or areas affected.
e. In the event of overlapping changes, use different colors for the overlapping
changes.
5. Conversion of schernatic layouts
a. In some cases on the Dra�vings, arranger�r�.ents of conduits, c�'cuits, piping,
ducts, and simifar ite�s, are shown schematically and are not iratended to
partray precise physical layout.
1) Final physical arraiagement is detei�mined by the Contractor, subject to the
Ciry`s approval.
2) However, design of future nr�odifications of the facility may require
accuraie information as to the final physicallayout of items which axe
shown only schematically on the Drawings.
b. Shavc� on the job set of Recard Drawix�gs, by dimension accivate to within l
ir�ch, the centerl�r�e of each run of items.
CITY OF �'ORT W ORTH
20Z1 SidewalkUnitPrice Conshvctian Conhack
102520
STANDAIiI] CONSTRUCTION SPECIFICATTON DOCUMENTS
Revised J�Ely 1, 2011
Ol 7839-4
P 1207ECT RFC ORD DOCUMT.?NT S
Page4of5
1
2
3
4
5
6
7
8
9
10
lI
12
13
14
15
16
17
J.S
19
20
21
22
23
2A
25
26
27
28
29
30
3i
32
33
34
35
3b
37
38
39
40
1) Final physical arrangement is deter�n�iz�ed by the Contractot•, subject to the
City's approvaI.
2) Show, by symbol or note, the vertzcal location of the Item ("under slab", "in
ceiling plenum", "exposed", and t�ae Jike}.
3) Mal�e all identificatian sufficie�tly desc��iptive that it may be xelated
reliably to the Specifications.
c. The City may waive the requirennents for conversian of sche;aaatic layouts
whe�e, in the City's judgme�t, conversion serves no use�ulpurpose. However,
do not rely upon waivers beixig issued except as speci�cally issued in writing
by the City.
B. Final Project Record Documents
1
2.
Transfer of data to Drawings
a. Carefully transfer change data shownon the job set of Record Dravcrings to the
corresponding final documents, coardinating tlae changes as required.
b. Clearly indicate at each affected detail and ather Drawing a full descriptiox� of
changes nnad� during constructian, and the actuallocation of ite�ns.
c. Call attention to each entry b� drawix�g a"cioud" arotuid the area or areas
a�fected.
d. Make changes neatiy, consistently and with the proper media to assure
Iongevity and clear reproduction.
Transfer of data to other pocuments
a. If the Documents, ot�aer than Drawings, have been Icept clean during progress of
the Wark, and if entries thereon have been orderly to the appraval of f he City,
the job set af fhose Documents, other than Drawings, wil[be accepted as final
Recofd Docurnents.
b. If any such Document is not so ap�roved by the City, secure a new copy oi that
Docunr�eni from the City at the City's usua� chatge for reproduction and
handling, and carefully transFer the c�ange data ta the nevv copy to th� approval
of the Ciry.
3.5 RE�AIR / R�'STORATION [NOT [TSEDJ
3.6 R�YNSTALLATION �NOT USEDJ
3.� �r<zn �oR� si�. Qu�,�� co�xoL �NOT usID�
3.8 �YSTT,M STARTCTP [NOT USID]
3.9 ADJUSTING [NOT IISEU]
3.14 CLEANING �NOT USID]
3.l [ CLOSEOi)T ACTIViT[FS [NOT IISED�
3.12 �ROTECTION [NOT USID]
3.13 MAI.NTINANCE [NOT YTSED]
3.14 ATTACHIVIENTS [NOT USID]
END OI+ SECTION
ciTY oF rox� wo�z�x
2021 SidewalklJnitPrice Constructinn Contract
iazsza
STAI�iDARD CONS'TRUCTION SPEC]F'TCATION DOCUMENTS
Re�ised 7nly 1, 20I 1
CITY OF PORT WORTH
Oi 7$39-5
PROJECT RECORD DOCUMENTS
Page 5 of 5
20Z1 SidcwalkClnitPrice Construction Contract
xozsao
STA3VTlARD CONSTRCJCTION SPECIFICAT[ON DOCTJMEATI'S
Revised July 1, 2011
32O1 17-1
PERIvIANBNTASPHAi,T PA,VII�TGTiEPA[R
T'age I of 5
1
2
3
4 PART I - GENERAL
SECTION 32 Ol 17
PERMI�NENT ASPHAI,T PAVING ItEPAIR
5 I.I SUMMARY
6 A.. Section inc�udes:
7 1. Fle�ible pavement repazr to include, but not ]imited ta:
8 a. Utility cuts {water, sanitary sevver, dz'ainage, franchise uti�l�ities, etc.)
9 b. Warranry work
10 c. Repairs of darnage caused by Contractor
11 d. Any permanent aaphalt pavement r�pair needed duri�ag the cout•se of
12 construction
13 B. Deviations from this Ciry of Port Worth Standard Specific ation
14 l. FOR T��S �'ROJECT PFRMANENT ASPIIAI,T PAVING REPAIR S�CTION
15 32 O 1 1'7 SHAI,L F3E MEASURF,D IN CUBIC YARD OF COMPLET�D
�6 QUANTITY.
17 C. Related Specification Sections include, but are z�ot necessarrly limited to:
18 1. Division 0— Bidding Requirements, Contract Forms, aead Conditions of the
19 Cantrac t
20 2. Division I—General Requixcments
21 3. S�ction 03 3A 16 — Cancrete Base Material for Trench Repair
22 4. Section 32 12 16 — Asphalt Pav�ng
23 5_ Sectioz� 32 13 13 — Concrete i'aving
24 b. Section 33 05 10 -- Utility Trench Excavation, Embedment and Backfil2
25 ]..2 PRICEAND �'AYMIIVT PROCEDURF�
26
27
28
29
30
3f
32
33
34
35
3b
37
38
39
40
41
A. Measurement and Payment
Asphalt Pavement Repair
a. Measurement
�j Measurement for this Item wili be by ihe CLTBIC YARD ��e�-a€
b. Payment
1) The woxk performed and inatexials iurnished in accordance wiih this Iiem
and measur�d as provided under "Measurement" will be paid for at the unit
price bid price per Iinear foot of Asphalt Pavenr�ent Repair.
c. The pz-ic� hid shaIl include:
I) Preparing final surfaces
2) Furnishing, Ioading, unloading, storing, hauling and handling alI materials
including freighi and royalty
3} Traffic control fox aIl testing
4) Asphalt, aggregate, and additive
C1TY OP �ORT WORTH 2O21 SidewalkUnitPrice Confract
STANDARD CONSTRUCTION SPECI['ICATCON ➢OCLTMENTS 102520
Revised December 20, 2012
32 01 17 -2
PERMAIVEN'� ASPHALT PAVING REPAIR
Page 2 of 5
�
5) Materials a�ad warl� needed for corrective action
6) Trial batches
7) Tack coat
8) Removal and/or sweepixig exeess material
5 2. Asphalt Pavement Repair for Utility Service Tz-ench
6 a. Measuz�emer�t
7 1) Measurement for this Item wi�l be by the linea� fooi of Asphall Pavement
8 Repair centered on ihe proposed sewer service line measured frotn the face
9 of curb to fhe ]imii of the Asphalt Pavement Repair for the maixi sewer line.
IO
11
12
13
14
15
16
17
I8
19
2a
21
22
23
24
25
26
27
2&
29
30
31
32
33
34
35
�6
37
38
39
40
�41
�42
43
44
45
45
47
48
49
h. Pa�+ment
1) The work performed and naaierials ft7rnisi�ed in accordance wiih this Xtetn
and measured as provided under "Measureinent" will be paid fot- at the u�ait
przce b�d price per linear foot of "Asphalt I'avement Repair, Service"
insialled �oz':
a) Various types of utilities
c. The price bid shall rnclude:
1} Preparing final surfaces
2) Furnishing, Ioading, unIoading, storin�;, hauling andhandling all imaterials
including freight and royalty
3) Traffc cont�ol for a11 testing
4) .Asphalt, aggregate, and additive
5) Matez�ials and work needed for corrective action
6) Trial batches
7) Tack coat
8) Removal andlor s�rveeping excess material
Asphalt 1'avement Repair Beyond Defizaed Width
a. Measu�'ement
1) Measureinent for this Item will be by tk�e square yard for asphalt pavernent
repair beyond pay limits of the defined width o� Asphalt Pavement Repair
by roadway classification specified in the Drawings.
b. �'ayment
1) The workperformed and materials furnished � accordance with t�is Item
and measured as pravided under "Measurement" wilI be paid for at the unit
price bid per square yard of Asphalt Pavement Repair Beyond Deftned
Width.
c. The price bid shall include:
1) Preparing final sut-faces
2} Furnishing, loading, unloading, storing, k�auling and handling all materials
including fireight and royalty
3) Trafficco�trolforaIltesting
4) Asphalt, aggregate, and additive
5) Materials and work needed for corrective action
6) Trial batches
7) Tack coat
S) Removal and/or sweeping excess material
4. Extra Width Asphalt Pavement Repa�
a. Measuremeni
1) Measurement �ar this Ifem will be by the square yaxd for surface repair
(does not include base repau) for:
CiT�4' OF �'ORT WOitPH 2621 8ide�valkUnitPrice Contract
STA�IARD CONSTRUCTION SPECIEICATION DOCiJMENTS 10252fl
Itevised December 20, 2Q12
32O1 17-3
PERMAI�ENT ASPHAI.T PAVIt�IGREPA,IR
Pagc3of5
1
2
3
4
5
6
7
8
9
10
I1
12
13
14
15
�
c.
a) Various thicknesses
Payment
1) The work per�'ormed and matexia]s fi�rnished in accordance with this Item
and measured as provided under "Measurement" w i11 be paid for at the unit
price bid per sc�uare yard of Exixa Width Asphalt Paveme�t Repair
The pricc bid shall include:
1} Preparing final sulrfaces
2) Furnishing, laading, unloading, storing, hauling and handling al� znaterials
including freight and rayalty
3) Traffic confrol for a11 testing
4) .Asphalt, aggregate, and additive
5) Matcrials and work needed for corrective action
6) Trial batches
7) Tack caat
8) Removal and/or sweeping e�cess material
16 1.3 REFFRENCES
17 A. Definitions
l8 1. H.M.1�1.C. — Hot M� Asphalt Concrete
I9 1.4 ADMIlvISTRA.'I�VE REQiTIRII1�ENTS
20 A. F'ermitting
21 1. Obtain Street Use Permit to malce utility cuts in the street from the Transpartation
22 and �ubl:ic Works Depa��tment in conformance with cun•ent ordinances.
23 2. The Transportation and Public Works Depaz'tment will i�spect the paving repair
24 after construction.
25 1.5 SUBM[TTALS [NOT IISID�
26 1.6 ACTION SUBNIITT.ALS/INFORMATIONAL SiJSMITTALS
2'i A. Asphalt Paecment Mix Design: subx�azt for approval: see Section 32 12 16.
28 1.7 CL�SFAUT SUBMI'I�'ALS [NOT USID�
29 1.8 MAlN1ENANCE MATEItiAL SUBMITTALS �NOT C7SED]
30 1.9 QUALYTY ASSURANCE �NOT USED]
3] 1.11 DELIVFRY, ST'ORAGF, AND HANDLING [NOT USED]
32 1.12 FIELD CONDITIONS
33 A. P1ace mixture when the roadway surface temperature �s 45 degrees F or higher and
34 rising unless otherwise appro�red.
CiTY OF FORT WORTH 2O21 Sidewal[cUnit Price Cantract
STANDARD CONSTRUCTION SPECL�'ICATIO�I DOCiJ�ENTS 10252p
Revised December 20, 2012
3z ai t� -a
PERMANENT ASI'I IALT P AVING REPAIR
Page 4 af 5
1 l.l3 WARRAN 1'Y [NOT USED]
2 �ART 2 - PRODUCTS
3 �.1 OWNII2 FiJRNIS�TID [NOT USID]
4 �.2 MATERIALS
5 A Bac 1cfill
6 l. See Section 33 05 10.
7 B. Base Material
S 1. Concrete Base Materral for Trench Repair: See Section 03 34 16.
9 2. Cox�crete Base: See Section 32 13 13.
10 C. Asphalt Paving: see �ection 32 12 16.
� 1 I. H. M. A. C, paving: Type D.
12 2.3 ACCFSSOR�F� [NOT USED]
13 2.� SOURC� QUALITY CONTROL [NOT USID]
14 PART 3 - EXECUTION
15 3.1 INSTALLERS [NOT USEO]
16 3.2 EXANIINATTON [NOT USID]
17 3.3 PRFPAR.ATION
18 A. Surface Preparation
19 1. Mark pa�ement cut fox repairs for approval by tl�e City.
20 2. Coniractor and City meet prior to saw cutting to confirm liriaits af repairs.
21 3.4 INSTALLATTON
22 A General
23 1. Equipment
24 a. Use maci�ine intended for cutting pavement.
25 b. Mi]Iing machines may be used as long as straight edge is noaintained.
26 2. Repaus: In true and sh'aight lines to dimensions shown on ihe Drawings.
27 3. Utiliiy Cuts
28 a. In a true and straight lixae o� both sides of the trench
29 b. Minimum of 12 inches outside the trench walls
30 c. If the existing flexible pavement is 2 feet or less between ihe lip of the existing
31 gutter and the edge of the trench repa�r, remove the existing paving to such -
32 gutter.
33 4. Liznzt dust and residues from sawing from entering the atmosphere or drainage
34 faci�ties.
35 B. Removal
CI'I'Y QF FORT WORT#� 2021 SidewalEcl3nitl'rice Conh•act
STANDARD CONSTRUCTION SPECIFICATTON DOCU11aENTS 102520
Reeised December 20, 2012
1
2
3
4
5
b
7
8
9
�a
I1
12
13
14
15
16
17
18
I9
20
21
22
23
32 01 I7 -5
PERMANEAIT ASPIIALT' 1'AV1NC REPA[R
Pagc 5 of 5
I. Use care to pre�ent fractuxing exisCing pavement struchire adjacent to tk�e repair
area.
C. Base
1. Instali replacement base inaterial as speciiied in Drawings.
D. Asphalt Paving
1. H.M.A.0 placement: in accordance with Section 32 i2 lb
2. Type D surface mix
3, Deptk�: as sp�cified in Drawings
4. Place surface mv� in lifts not to exceed 3 inches.
5. L.ast or top lrft sha� not be less than 2 inches thick.
3.5 R.EPAIR/RESTORATION [NOT USED]
3.b RE-INSTALLATION [NOT USID]
3.�' FIELD QUALITY CONTROL [NOT USID]
3.8 SYS`1'EM STARTGTP [NOT IIS�I}I
3.9 ADJUSTING [NOT USID]
3.10 CLEAIVING [NOT USED]
3.l I CLOSEO[JT ACT[VITIES [NOT USED]
3.12 PRO�TCTION [NOT LTSFII]
3.13 MAXN'J'ENANC� [NOT U�ED]
3.14 ATTACHMEN7S [NOT LTSID]
END OF SECTION
Revis ion Log
DATE NAME SUMMARYOF CHANGE
1.2.A—Ivlodified Itemsto be inciuded in price bid; Added blue text forclarification
1212d/2012 ll. .Eohnson of repair width on utilily trench f-e�air; Addcd a bid iCem €or utility seivice trench
repair.
24
C[TY OF PORT WOR'1'H
STANDARD CONSTRUCI'ION SPECIF[CAT[ON DOCUM�NTS
Ravised 17ecember 20, 2012
2021 5ide'�valkUTnitP�'icc Contract
zozsza
321313-1
COI*1CRETS PAV[NG
Page 1 of 21
SECTION 32 1313
CONCRETE �'AVING
PART 1 � GE�'CRAi,
i�i�C7il1 h/ /•\:�'�
A. Sectian includes:
1. Finished pave�ent constructed ofportland cementconcrete including
monolithically poured curb on the prepared subgrade or ather base course.
B. Deviations fram this City of Fort Worth Standard Specification
I. �OR THIS PROJECT CONCRETE PAVING SECTION 32 13 131NCLUDES FIIVISHED
CONCRETE OF INDIVIDUAr, PANEL 4RIAND PANEL WITHMONOLITHICALLY
P OURED CURB.
2. SA�rVING, CLEANING AND APPLYING JOINT SEALANTS INCLUDING
FURNXSHING AND INSTALLING MFITERIALS SHALL BE CONSZDERF?D SUBSIDIARY
WORK, NO SEPARAT� PAY.
3. MINIMUM COMPR�SSIVE STRENGTH OF HIGH EAR�.Y STRENGTH (HES) CLASS
CONCRETE SHALL BE 3,Oa0 PSI AT 72 HOURS.
4. TO CHECK THE COMPRESSIVE STRENGTH OF THE CONCRETE BEING PLACED
ONE CYLINDER TO BE TESTED AT 3 DAYS BY CTTY IN ADDITION TO TEST AT 7
DAYS AND 28 DAYS.
C. ReIated Speciftcation Sections include, but are not necessarily limited to:
1. Division 0- Sidding Requirements, Contract Forms, and Condifions of the Contract
2. Di�vision 1- General Requirements
3. Section 32 01 29 - Concrete PavingRepair
4, �ection 32 13 73 - Concrete Paving Joinf Sealants
1.2 PRICE AND PAYMENT PROCIDURF�
A. Measuremex�t
J . Measurement
a. Measurement for this Item shall be by the square yard af campleted and
accepted Concrete 1'avement in its fmalposition as measured from bacic of circb
for various:
J ) Cla.sses
2) Thicknesses
2. Payment
a. The work perfarmed and materials f�zrnished � accordance with this Item will
be paid for ai the unit price bid per square yard oi Concreie Pavetr�ent.
3. Thep:riee bid sha�l include:
a. Shaping and fine grading the placement area
b. Furnis�it�g and applying aIl waterrequilred
c. Furn�shing, laading and unloading, stoz-ixzg, hauling and handling a�l concreie
ingredients including all freight and royalty it�volved
d. Mixing, placit�g, fi�ishing and curing all concreie
CITYQF FOItT WORTII 2021 SidewaIkUaitPrEce Contract
ST'ANDAltD CONSTRUCTION SPECIF'ICATION DOCLTMENT S 102520
Ravised December 20, 2012
32 13 13 - 2
CONCRETEPAVING
Page 1 of 2I
e. F�rni�hing and installing alI reinforeing steel
f. Furnishing a31 materials and placing longitudinal, warping, expansion, and
contraction joints, including alf steel dowels, dowel caps and loadtransmission
units required, wire and devices for placing, holding and supparting the stcel
bar, load transmission uniis, and joint filler material in the praper position; for
coating steel bars whefe required by theDrawin�s
g. Sealing jaints
h. Monoliihically poured curb
i. Cleanup
CTI'1'OFI'ORT WORT�T 2021 SidewalkUnitPrice Contract
ST ANAARD COATSTRUCTION SPECIFICATION DOCUMF.N'I'S 102520
Revised December 20, 2012
32 13 13 -2
COAICRE"I'� PAVING
Pagc2of21
1.3 RE�+"F�F.NC FS
A.. Reference Standards
i. Reference standards cited 'u1 this specification refer to the currentref�rence standard
published at the time of the latest revision date logged at the �nd of this
specification, unless a date is specifically cited.
2. ASTM International (ASTN�:
a. A615/A615M, Deformed and P�ain Bi�let-Steel Bars for Concret�e
Reinforcemeni
b. C31, Standard Practice �or Mak�ng and G�iring Conerete Test Specimens u� the
�'ie�d
c. C33, Concrete Aggregates
d. C39, Standard Test Method for Compressive Strength o� Cylindrical Concrete
Speciznens
e. C42, Stan�dard Test Method for Obtaining and Testing Drilled Cores and Sawed
Beams of Concrete
f. C9�/C94M, Standard Specificatians for Ready-Mv�edConcrete
g. Ci50, Portland Cenae:ni
h. C 1 Sb, Water Reten�iox� by Concrete �ring Materials
i. C172, Standard Practice for Sampling Freshly Mixed Concrete
j. C260, Air Entraining Acimixtures for Concrete
k. C309, Liquid Membrar�e-Formang Compounds for Cu�-ing Concrete, Type2
1. C494, Chemical Admix�ures %r Co�crete, Types "A", "D", "F" and "G"
m. C618, Coal Fly Ash and Raw or Calcined Natural PozzoIan for use as a Mineral
Admixture in Concrete
x�. C881, Standard Specif"ication for Epoxy-Resin�Base Bonding Systems for
Concrete
o. Cl a5�, Standard Test Method for Temperature o�Freshly Mixed Hyc�raulic�
Cement Concrete
p. C1602, Standard Specification for M�ing Water Used in the Production of
Hydz-aulic Cement Concrete.
q. D69$, Laboratory Compaction C�a�'acteristics of SoilUsit�g Stiandard Effort
{12,4�0 ft-1bF/ft3)
3. Arr�erican Concretelnstitute{ACI):
a. ACI 305.1-06 Spec�cation for Hot WeatherCox�creting
b. ACI 306. T-9Q, Standas-d Specification for Cold WeatherConcreting
c. ACI 318
I.4 ADMITIIS'TR.ATIVE REQUxRIIV�ITS [NOTi7SED]
1.5 SUBNIITTALS [NOT USID]
1.6 ACTZ4N SiJBM[TTALSIINFORMATIONAL SUBNIITTALS
A. Mix Design: submit fo�' approval. See Item 2.4.A.
CITYO�'FORT WORTH 2O21 SidewalkUnitPrice ContracE
STAi�IDARD CONSTRUCTI01� SPECII'ICATiON DOCUMENT S 102520
Revised Decemher 20, 2012
32 13 13 -3
CONCRETE PAVING
P age 3 of 21
1.i CLOSE(?UT SUBMITTALS �NOT (TSIDJ
1.8 MAiN`I'INANCE MATERIAL STTSMITTA,LS [NOTUSED]
1.9 QUALZTY ASSiJItANCE [NOT USID]
1.10 DII,IVIItY, STOR.AGE, AND AANDLING �NOTU,SED]
1.11 FIELD COND�T[ONS
A. Weather Conditio�as
1. 1'lace concrete when concrete temperat�rre is between 40 and 100 degrees when
measured in accordance wi#h ASTM C1064 at point ofplacement.
2. Hot Weather Concretulg
a. Take immediate corz�ective ac�ion or cease paving �hen the azr�bzent
temperature exceeds 95 degrees.
b. Conerete pavixig operations shall be appro�ed by the City when the cancrete
ieznperature exceeds l0� degrees, ,See Standard Specification for Hat Wcather
Concreting (ACI 305.1-06).
3. Cold Weather Concrefing
a. Da not place when ambiex�t texnp in shade is below 40 degrees and fallii�g.
Concrefe may be placed when asnbient temp is abo�ve 35 degrees and rising or
above 40 degrees.
b. Concrete pa�ing operations shali be approved by the City when ambi�nt
temperafure is below 40 de�rees. See Standard Specification �or Cold Weather
Concreting (ACI 306.1-90).
B, Time: Place cancrete after sunrrse and no later than shal�permit the finis�rrig of the
paveinent in natural light, o�• as directed by th� City.
L12 W�RR.ANTY [NOT USIDJ
PART 2 - PRODUCTS
2.1 OWNER-FIIRIVISHED PRODUCT� �NOTUSF�]
2.2 MATTRIALS
A. Cementitious MateriaL ASTM C150.
B. Aggregates: ASTM C33.
C. Water: ASTM C1602.
D, Adm�turEs: When admi;�tures areu.sed, co�formto the appropriatespeci#ication:
1. Aie-Entraining Adm�tures �o r Concrete: ASTM C260.
2. Ck�etxiical Adm'v�tlues for Concrete: ASTM C494, Types "A", "D", "F" and"G."
3. FIy Ash
a. Coal F1y Ash and Raw or Calcined Natural Pozzolan for Usc in Concrete:
ASTM Cb I8.
b. Fly ash may be substituted at one pound per pound of cement up to 25% of the
specified cement content when such batch design is appro�ved by the �ngineer.
CITYOF FORT WORTH 2O2I SidesvalkUnitPrice Conh-act
STANDARD CONSTRUCTION SPEG[FICATION DOC[TMEI�TS T02520
Revised i7ecean6u 20, 2012
32 13 13 -4
CONCRETE PAVIt�IG
Page 4 oi 2I
E. Sieel Reinforcemen.t: ASTMAfi15.
�'. Steel Wire Reinforcement: Noi used for concretepavement.
G. Dowels and Tie Bars
1. Dowel and tie bars: ASTM A61 S.
2,. Dawel Caps
a. Provide dowelcaps vclith enough range ofmovement Lo allow complete closuce
of the expansion joint.
b. Caps for dowel bars sl�all be of the length shown on the Drawings and shall
ha�e an internal diameter sufficie�t to pernr�it the cap to freely slip over the bar.
c. In no case shall the iniernal diameter exceed the bar diameter by more 1/8 inch,
and one end of the cap shall be rightly closed.
3. �poxy for powel and Tie Bars: ASTM C8$1.
a. See following table for appro�ed producers of epoxies ax�d adhesives
Pre-Qualified Producers of Epoxies ar�d Adhesives
Pro duct Nanac Pro ducer
Coneresive 1420 BASF
HT�50 HiIti
T 308 -� Powers Fasteners
P E 1004+ Powels Fasteners
G6 Rams et-Redhead
Epcon CfS Ramset-Redhead
Pro-Po�ry-300 Fast'I'ube Unitex
Shep-Poxy TxIIZ CMC Consttuctian Services
Ultz-abond 1300Tubes AdhesivesTechnoiogy
Ultrabone 2300N.S. A-22-23D0 Adhesives Technology
Slow Set
Dynapoxy EP-43Q Pecora Corp.
EDOT Simpson StrongTie
�I'22 Siarpson StrongTie
SET 22 Simps on Stroa� g Tie
SpecPoxy 30DOFS SpecChem
b. Epo�yUse, StorageandHandling
1} Pac�Cage components an a�rtight containers andprotect irox�a lig�t and
moisture.
2} Include detailed instructions fo� fhe application of the material ax�d all
safety infonnationand warn�ings re�arding cantact with the components.
3} Epoxy label requirements
a} Resin or hardener componen.ts
b} Brand narne
c} Name of manufacturer
CITYOFFORT WORTH 2O�1 SidewalkU�itPricc Contract
STANDARD CONSTRUCTION SPECIFJCATI03+I DOCTJMENTS 10Z52�
Revised December 20, 2012
32 13 13 - 5
CONCRETE 1'AVING
Page 5 of 21
d) Lot or batch number
e} Temperat�re range far stoxage
f} Date of manufacture
g} Expiratian date
h) Quantity c ontained
4} Store epoxy and adhesive co�rxiponents at tempe�•atui-es zecommended by the
manufacturer.
5) Do not use damaged or previoUsly opened containers and any rnaterial that
shows e�idence of crysta�lization, lumps slcinn�izig, extreme thickening, or
settling afpigme�ais t.haf; cannot be readily dispersed with normatagitation.
6) Follo�n+ sound environmental practices when disposing af epoxy ancl
adhesive wastes.
7} Dispose of all empty containers sepaxately.
S) Dispose oi epoxy by completely em.ptying and m�ing ti�e epoxy before
disposal
H. Reinforc ement Bar Chairs
1. Reinforcement bar cY�airs or supports shall be of adequate stxex�gth ta suppartt.�e
reizaforcement bars and shall not bend or break under the weight of the
reuiforcement bars o� Contractor's personnel walking on tP�e reinforeingbars.
2. Bar chairs may be made oimef;al(free af rust), precast mortar or conerete blocics or
plas tic .
3. For appro�al of plastic chairs, representative samples of the plastic shall show no
visible indications oideterioration affer immersion in a 5-percent solution of
sodxu.nc� hydroxid� for 120-haurs.
4. Bar chairs may be rejected for failure to ineet any af the requirements ofths
specification.
I. Joint Filler
1, roint filler is the material placed zn concrete pavement and concrete structures to
allow for the expansion and contraction of �e conerete.
2. Woad Boards: Used as joint filier for concretepa�ing.
a. Boards for expansion joint filler shal[ 6e o� the required size, shape and type
indicated on the Drawings ar requrred in thespecif"icatians.
1) Boa�rds shall be of selected stoc�C o�redwood or cypress. The boards shall
ba sound heartwood and shallbe free from sapwood, kxiots, clustered
birdseyes, checksandspJits.
2} 7oint filler, boards, shall be smaoth, flat and straight thz-oughout, and shaIl
be sufficiently rigid to permit ease ofinstallation.
3) Baards shall be furz�ished in lengths equal to the width between
longitudinal jaints, and rnay be furnished in strip,s ar scored sheet of t�e
required shape.
3. Dimensiot�s. The tl�ickness of the expansion joint filler sha1l be shovvn on the
Drawtngs; the width shall be not less thaz� that shown on the Drawings, providing
for the iop seal space.
4, Rejection. Expansion joint fillex xnay be rejected far failure to meeC any of tl�e
requirements of this spec if'zc ation.
J. Joint Sealants. Provide �oint Sea]ants in accordance with Section 32 13 73.
CTT Y OF FORT WORTH 2O21 5idewalk Unit Price Cpntract
STANBARD COI�ISTRUCTION S PEC [FICATION DOCUMENT S 1pZ52p
12evised December 2Q, 2012
32 13 13 -G
CONCR�,TEPAV[[VG
Page G of 21
K Cu.ring Materials
1. Membrane-S"ormingCompounds.
a. Conform to the requirements of ASTM C309, Type 2, white pigmex�ied
compound and be of such nature that it shaIl t�ot produc e permanent
discoloratian of concrete surfaces nor t-eact deleteriously with the concreie.
b. Thc compound shall produce a firm, coniinuous uniform moisture-impermeable
film free from pinholes and shall adhere satisfactorily to the surfaces of damp
conct'ete.
c. It shall, when applied ta the daxnp conerete surface at the specified rate of
caverage, dry to touch in 1 hour and dry through in not more thaxz 4 hours under
normal conditions suitable for concrete operations.
d, it shall adhere ixa a tenacious film without runnsng off or appreciably sagging.
e. It shall not dis�ntegrate, c�eck, peel or crack duz'ing the required curingperiod.
£ The cflmpound shall not peel or pick up under traff�c and shall disappear frazza
the surface of the concrete by gradualdisintegratio�x.
g. The compound shall be delivered to the job site in the manufacturer's original
containexs only, which shallb� c%arly Iabeled with the manufacturer's name,
the trade x�atne of the material and a batch number or symbol with which test
samples may be correlated.
h. When tesCed in accordance with ASTM CI56 Water Retention by Coz�crete
Gtiu�ing Materials, tk�e liquid membrane-forming compound shall restrict tkze lass
af wa#er present in the test specimen at the time of application of the curun.g
compound to not nzore than d.01-oz.-per-2 inches of st�'Face.
�.3 ACCTSSORIES [NOT USID]
�,.4 SOLTRCE QUALITY CONTROL
.A, Mix Design
1. Concrete Mix Desig�a and Control
a. At least 10 calendaz- days prior to the sta�-t of concrete paving aperations, the
Contractor sha�l subxiait a design of the concrete xmix it proposes to use and a
full description ofthe souzce of supply of each matez'ialcomponent.
b. T�e design of the concrete mix shall prodUce a quality conerete complyingwzth
these specif"ications and shallixzclude the followingmfor�xzation:
1) Design Requirements and Design Summa�y
2) Material source
3) Dry weight of cement/cubic yaxd and type
�) Dry weight of fly ash/cubic yard and type, ifused
S) Saturated surface dry weight of fine and coarse aggregateslcubic yard
6) Design water/cubic }rard
7) Quantities, type, and name of admixtures wit� manufachirer's data sheets
8) Current strength tests oa- strength tests in accorc�az�ce wit� ACI 318
9) Current Sieve Analysis and -200 Decantation of �ine and coarse aggregakes
and date of tests
10) Fineness modulus of fineaggregate
11) Speciiic Graviry and Absorption Values of fine and coaxse aggregates
12) L.A. Abrasion flf coarseaggregates
c. Once m� design a�proved by City, mainiain intent of mix design and
m�imum water ta cementratio.
GITYOFFORT WORTH 2O21 SidewalkUnitPrice Confract
STANDARD CONSTRUCTJON SPECIFICATIDN DOCUbIENTS 102520
Revised December 20, 2012
32 13 13 -7
CONC.RETE PAVING
Pagc 7 of 21
d. No concrete may be placed an t�.e job site unti[ the m� design has bee:n
approved by the City.
2. Quality of Concrete
a. Consistency
1} In genera�, the cnnsist�ncy of concrete 1ni�tuees slaa� be suchthat:
a) Mortar shall cling to the coarseaggregate
b) Aggregate shall not segregate in concrete when it is transparted to the
place of deposit
c) Concrete, when droppcd directly �rozn thc discharge chute af the mix�,
shal[ flatten out at the center af the pile, but the edges of the pile sha�[
stand and not flow
d} Concrete and mortar sk�all show no free water when remo�ved from die
2)
3}
4}
5)
6}
7}
8}
mixer
e) Concrete shall slide and not flow into place when transparted in metal
chutes at an aaagle of 30 degrees with thehorizo�tal
f) Surface of the �nished concreie shall be fi'ee from a surface film or
lai�anc e
When iield conditions are such that additional moi�ture is needed for the
imal concrete surface finrshing operatzon, the required water shall be
applied to the sut�face by han$ sgxayer only and be held to a mibimum
amount.
The concrete shall be �workable, cohesive, possess satisfactory finishing
qualities and be of the stiffest conszstency that can be placed and vibratai
inta ahomogeneousma�s.
Excessi�e bleeding shall be avoided.
If the strength ox consistency required far the cIass of concrete being
produced is not secured with the minimum cement specified or without
exceeding tk�e maa�imum waterlcement ratia, the Cantractormay use, or the
City may requixe, an approved cement dis�ers3ng agent (water reducer); or
the Contracior shall furnish additional aggregaies, or aggregates with
dif�exe�t characteristics, or the Contractor may use additional cement in
order to produce the requiredresults.
The additional cement may be permitted as a temporary measure, until
aggxegates are changed and designs chec�ed with the different aggregates
or cement dispersing agent.
The Contractar is solely respox�sx�ble for the quality of the cancrete
produced.
The City reserves the right io independently verify the quality of the
concrete through inspection oitl�e batch plant, testing of the various
materials used in the concrete and by casting and testulg concrete cyiindeas
ar beams on the concr�te actually incorporated in ttiepavetnent.
b. Standard Class
i) Unless otl�exwise shown on th� Drawings or detailed speciiicaiions, the
standard class for concrete pa�ing for streets and alleys is shown in the
fo]lowing table:
CIT'YOFFORT WORTiI 2021 SidewaIlcT]nitPrice Contract
STAI�TDARD CONSTRUCTION SPECIFICATION DOGUM�NTS [0252D
Revised December 20, 2012
32 13 13 -S
CONCRET� PAVING
1'agc8of21
�tandard Classes oiPavement Concrete
C1ass of Mi�aitnum 28 Day Min. Maximum Course
Concretel Cementatious, Compj�essive, Water/ Aggregate
Lb./CY Strength2 Cern.entitious, Maxi�num
psi Ratio Size
inch
P 517 3600 0.49 1-1/2
H 564 4500 0.45 1.-1/2
l. All exposecl nor�zontal concrete snaiinave enEramea-air.
2. Minimum Compressive Sri•ength Requaxed.
2} Machin�-La�d cancrete: Class P
3} Hand-Laid concrete: Class H
High Ear1y Strength Cozacrete{HES)
1) When shown on the Drawings or allowed, provade Class HES concreCe foz�
vety early opening oipavex�ents area or Ieaveouts totraffic.
2) Deszgn class HES to meet ihe requirements of class specified for concr�e
paveme�t and a minimum compressive stcength of 2,600 psi in 24 hours,
unless other early st�ength and time requirements are shown on the
Drawings allowed.
3) No strength overdesign is required.
�tanr�arcl C;las�es �f Pavement Co�crete
Class of Minimuzn 28 Day Min. Maxirriutn Course
Concrete� Cementitious Compressive Water/ Aggregate
Lb./CY Stx ength2 Cementitious Ma�imum
psi Ratio Size,
�aach
HES 564 4500 0.45 1-1/2
d. Slump
l.) Slutnp requiremez�ts for pavement and reIated concrete sha11 be as specified
iz� the following table:
Concrete Pavement
Concrete Use Recommended Maximum
Design Acceptable
and klace�nent Placement
Slump, S1Unnp,
inr.h 1T1C�
Sli -Form/Forrn-Ridin Pa�ia� 1-1/2
Hax�d Formned Pavin 4
�idewallc, C�zrb and Gutter, Concreie 4
Valley Gutter and DY1ier Miscellaneous
Concrete
2) No concrete sIaall be permitted with slump ix� excess of them�irnums
shovvn.
CTI'YOF PORT WORTH 2U21 SidewalkUnitPrice Cantract
STAI�IDARD CONSTRUCTION SPECIF[CAT[ON DOCUMENTS 102520
Revised Decemher 20, 2012
32 ]3 13 -9
COAlCRETE PAVING
Page 4 of 21
3) Any concxete m� failing to meet the above consistency requirements,
although meeting �he slump require�nents, shall be considered
unsatisfactozy, and tl�e mix shallbe changed ta correc� suchunsatisfactory
eonditions.
PART 3 - EXECLITION
3.l INSTALLERS [NOT USID]
3.2 EXAMTNATTON [NOT USID]
3.3 PREPARATTON [NOT IISED]
3.4 INSTALLATION
A. Ec�uipme�t
1. Ail equipment necessary for the canstructian oftl�is item sha�l be on the pi�oject.
2. The equipment shall include spread'uig dcvices {augers), internal vibration,
tamping, and ,surface flaating necessary tb finisk� the fr�shly placed concrete in such
a manner as to provide a dense and homogeneous pavcment.
3. Machine-Laid ConcretePavement
a. Fviced-Form Faver. Fixed-foxzn paving equipment shallbe pro�ided with forms
that are uniformly supported on a vcry %rm subbase to prevent sag�ing under
the weight of machine.
b. Slip-FarmPaver
1} S1'rp-forin paving equzpment sha13 be provided with traveling side forms of
sufficient dinaensions, shape and strength so as to support ike concrete
laterally far a su�ficient length of time during placeznent.
2) City may reject use af Slip-Farm Pa�er if paver requires over-digging and
impacts txees, mai�boxes or otherim�aravements.
4. Hand-Laid Concrete Pavement
a. Machines that do not incorparate these features, such as roller screeds or
vibrating screeds, shall be considered tools to be used in hand-laid concrete
construciion, as slumps, spreading methods, vibration, and other procedu�-es are
more common to hand rneihods than to tnachinemethads.
5. City may reject equipment and stop aperation if equipment does not meet
requirements.
B. Concrete Mixing and Delivery
�.. Transit Batching: shalI not be used — ansite mixing notperxnitted
2. Ready MiYed Concrete
a. The concrete shaIlbe produced i� an approved method conforming to the
requirements of this specification and ASTM C941C94M. City shall have access
ready mix to �et sat��les ofrnaterials.
6. City shall ha�e access to ready mix plant to obtain material sar�aples.
c. When ready-ini�c cancrete is used, sample concrete per ASTM C94 Alternate
Procedure 2:
1} As the rnixer zs b�ing emptied, individual samples s�aall be taken after the
discharge oi approximately 15 percent and 8S percent of theload.
CITYOFFORT WQRTfi 2021 Side�valkUnitPrice Contruct
STANDARD CONSTRUCTION SPECIFTCATCON DOCUMENTS �py520
Revised December 20, 2012
32 13 13-10
CONCR�;T� PAVING
Pagc 1 p of 21
2) The:n�ethod of sampling shall provide that the samples are representatrveof
widely separated portions, hut not fro� �he very ends of thebatck�.
d. The mixing of each batch, after all materials are in the drum, shall coz�tir�ueuntil
it produces a thoroughl� m�ed concrete of uniform mass as determined hy
estabIished m�er performance ratings and inspection, or appropriate unifor�aity
tests as described in ASTMC94.
e. The entire contents of the dr�ux� shall be discharged before aay materials are
pIaced therein for the succeedir�g baich.
f. Retempering or remixing shall not bepermitted.
3. Delivery
a. Deliver concrete at a� interval not exceeding 30 rr�ir►utes ar as determined by
City to prevent cold joint.
4. Delivery Tickets
a. For aIl opez�aiians, the manufacturer of the concrete shall, before uz�laading,
furnish to the purchaser with each l�atch of concr�te at the site a delivery ticket
on which is printed, stamped, or written, the %llowing information io deterz� ine
that the concrete was proportioned in accordance wath the approved mix design:
1) Name of concrete supplier
2) Serial nutnber of tickei
3) Date
4) Truc1�. number
5) Naixie of purchaser
6) Spec�c designation of job {name and location)
7) Speciiic class, design identification and designation of the co�acrete in
conformance vvit�a that employed in job spec �£ications
$} Amount of concrete in cubic yards
9} Time loaded or of fiurst mixing of cement and aggregates
10) Water added by receiver o�concrete
1 I) Type and amount of ad�xxixtures
C. Subgrade
1. When rr�anipuIation or fixeatment o� subgrade is required on the Drawings, the work
shall be performed in prop�r sequence with t�e preparation of the subgrade for
pavement.
2. The roadbed shall be excavated and shaped in confarmity with the typical sections
and to the lines and grades shown on the Drawiz�gs ar established by the C�ty.
3. All holes, ruts and depressions shall be fiIled and compacted with suitable material
and, if required, the subgrade shall be tharoughly wetted and reshaped.
4. Xrregularities of more than 1/2 inch., as shown by straightedge or template, shall be
corrected.
5. The subgrade shallbe �ani%rrnly compacted to at least 95 percent oithemaximuna
density as determined by ASTM D698.
6. Moisture content sk�all be within minus 2 percent to plus 4 percent of optimLun.
7. The prepared subgrade slaall be vvetted down suf�cientty in advance of pIacizxg the
pave�naent to ensure its being ir� a firm and moist conditron.
8. Sufficient subgx'ade shall be prepar�d ix� advance to ensure satisfactory prosecution
of the work.
CTl'YOFFORT WORTI3 2021 SidewalkLfnitPrice Contract
STANT)ARD CONSTRUCTTOAI SPECIFICATION DOCUMENTS 102520
Revised December 20, 2012
321313-1]
CONCRETF PAVING
Pagc 11 of 21
9. The Contractor shall notiiy the City at least 2� hou�'s ia advance of its intention to
plac e concrete pave� en�.
10. After the specifi�d moisture and density are achieved, the Contractor shall maintain
f11e subgrade moisiure and density in accordance witl� this Section.
11. In the eveni that rain or otlier conditzons may have adverseiy affecied the condition
of the subgrade or bas e, additio nal tests may be requ�red as directed by the City.
D. Placing and Rernoving Forins
1. Placing Forms
a. Forrnsfarmachine-laidc�ncz-ete
1) The side forms shall be metal, of approved cross section and bracing, of a
height no less thaza thc prescribed edge thickness of the canctete section,
and a minitx�um aP 10 feet in leng� for each ztadieidual form.
2) Forms shall bc of ample strength and staked with adequate number of pins
capable of resi�ting the pressure of co�cx'ete placed against them and the
thrust and the vibration of the construction equtpment operating upon them
without appreciable springing, settling or deflectinn.
3) The forms shall be free fz'om warps, bends or kinks a�d sha� show no
variation frorri the true plane for face or tap.
4) Forms shall be jointed neatly and tightly and set with exactn�ss to the
established grad.e and alignment.
5} Forms shall be set to lizxe and grade at least 20d feet, where practicable, i�
advance of the paviu�g operations.
6} ln no case sha11 the base width be less than S inches for a form 8 inches or
more in k�eight.
7) Forms �ust be in firm contact with the subgrade throughout their length
and base wzdth.
S) If tk�e subgrade becomes unstable, for�as shall b� reset, using hea�vy stakes
or other additional supports may be neces,sazy to provide the required
s tabiIity.
b. �'oznis for hand-faidconcrete
1} �'orms shall extend the full depth af concrete and be a minimum of 1-1/2
inches in fhickness or equi�alent when wooden forms are used, �r be of a
gauge that shalI pro�ide equiva�ent rigidity and strength when metalfozms
are used.
2} For curves �sviih a rad�ius o� less than 250 feet, acceptable flexible metal ar
woodforms shallbeused.
3) All forms showi�r�g a�leviation of 1/8 inch in 10 feet from a straight line
shali be rejected.
2. Settling. When %rrris settle o�er 1/8 inch under £�inishing operations, paving
operations shalt be stopped the forms reset to line and grade and the pavernent then
brougk�t to the required section and thickness.
3. C�eaning. Forms shalIbethoroughly cleaned after eachuse.
4. Removal.
a. Forms shallreznain in placeuntil the concrete has taken its finalset.
b. Avoid damage to the edge of the pavement when removing forms.
c. Repa�r damage result�ng from form rerr►oval and honeycombed areas vvrth a
m€ortar m� within 24 hours after form rer�aovalunless otherwiseapproved.
CTT'Y OF FORT WORTH 2U2i �ide�valkUnitPrice Contract
S'f'AIVDARDCONSTRUCTION SPECIFICATIONDOCiJMEiVTS �pZ52p
Revised Decembei 20, 2i112
32 l3 13 -12
COIVCR�T� PAVING
P aae 12 of 21
d. Cleaxi joint face andrepair honeycombed ar damageri areas within 24 hotn-s
after a bulkhead for a transvcxse construction joint has been reinoved unless
otherwise approved.
e. When fo�-ms are removed before 72 k�ours after c oncrete plac eznent, prompfily
apply membrar�e curing compound to tk�e edge of the concretepavernent.
E. Placing Reinf�xcing Stee1, Tie, and DowelBars
General
a. When reinfarcing steel tie bars, doweL�, etc., are required they shalI be placed
as shown on theDrawings.
b. All z'ein�orcing steel shall be clean, free from rust iit� the form of laose ar
objectionable scale, and af tk�e type, size and dimensions shown on the
Drawings.
c. Reinforcix�g bars shall be securely wired together at the alternate ir�tersections
and alI splices and sha11 be securely wired at each intersectzon dowel and load-
transmission unit intersected.
d. All bars shall be installed in t�ie�r requi�ed posiiion as shown on the Drawings.
e. The storing of reinforcing or structural steel on completed roadway slabs
generally shall be avoided and, where permitied, such sYorage shall be lirnited
to quaxltzties and dist� buiion that shall not induce excessivestresses.
2, Splices
a. Provide standard reinforcement splices by lapping and tyingends.
b. Compiy with ACX 318 for minimum lap af spliced bars where not specif'iedon
the Drawings.
3. Installation ofReinfarcingStee�
a. All reinforcing bars and har mats shall be installed in the slab at the required
depth below t�e �inished surface and supported by and secux'el�+ attached to har
chait-s installed o� prescribed longitudinal and transverse ceniers as shown by
sectional and detailed drawings on theDrawings.
b. Chairs Assembly. The cha�r assembly shall be similar and equal to that shown
on the Drawings and shall be approved by the City prior to extensive
fabric ation.
c. After the reinforcing steel is securely installed abave the subgrade as specified
in Drawings and as herein prescribed, no Ioadibg shall be impased upon the
bar mats ar individual bars before or during the placing or fin�shing of the
concrete.
4. Installation of Dowel Bars
a. Znstall through �he predrilIed joint filler and rigidly support in irue horiznntal
and vertical positions by an assembly of bar chai�'s and dawelbaskets.
b. Dowel Baskets
1) The davc�els shall be held in pasition exactly parallel to surface and
centerline of the slab, by a dowel basket �hat is left in thepavemeni.
2} Tha dowel basket shall hold each dowel in exactly the coi�ect position so
firmly that tl�e dowel's position cannot be altered by concreting operations.
c. Dowe1 Caps
1) Install cap to allow the bar to move not less than 1-1/4 �ch in either
direc tian.
5. Tie Bar and Dowel Placement
a. Place at mid-depth of the paue�raaent slab, parallel to the sw'face.
CTTYOFFORT WORTIi 202i Side�valkUnitPrice Contract
STI�NAARDCONSTRUCTION SPECIFICATIONDOCUME%ITS 102520
Revised December 20, 2012
32 13 ]3 -13
CONCRETE PAVJ�TG
Page ] 3 of 21
h. Piace as shown ontheDrawings.
Epoxy for Tre and Dowel Bar I��stallation
I} Epoxy bars as shown on theDrawings.
2} Use only drilling operations that do not damage the surrounding operations.
3} Blo�w out ciriJled holes with compi•essed azr.
4) Completely filI the drilled hole wi�h approved epaxy before inserting the tie
bar into the hoIe.
S) Install epoxy grout and bar at least 6 inches embedded into concrete.
�'. Joints
1. 7oints shall be placed wliere shown on the Drawings or where directed by the City.
2. The plane of all joints shal[ �x�ake a right angle with the surface of thepavement.
3. No joints shall have aaz error in alignment of more tlaan 1/2 inch at anypoi�lt.
4. Joint Dinaensions
a. The width of the joint shali be shown on the Drawings, creating the joznt
sea�ant reser�o�r.
b. The depth of the joini sk►all bc shown on the Dravvings.
c. Dimensions of the sealant reservoir shall be in accozdance with manufacturer's
recommendations.
d. After curing, the joint sealani sha]I be 1/8 inch to l/4 inch below the pa�einent
surface at the ce�ter of the joint.
5. TransverseExpansionJoints
a. Expansion joints sha11 be insta]Ied pezpendicularly to the surface and to the
center]ane ot�tl3e pavement at the locations ,shown on the Drawings, or as
approved hy the Ciry.
b. 3aints sha11 be of the design width, and spacing sl�own on the Drawings, or as
approved by the City.
c. Dawe1 bars, shall be of the size and type shown an t�e Drawings, or as
approved by the Ci�y, and shall be installed at the spec �£'xed spacing.
d. Support dowel bars with dawelbaskets.
e. Dowels shall restrict the free opening and closing of the �xpansion join and
shaIl not make planes at�weaknesses in thepa�err►e�t.
f. Grreased Do�c�vels for Expansion Joints.
1) Coat dowels with a thin film of grease or other approved de-bonding
material.
2} �rovide dowel caps on the lubricated end af each dowelbat-.
g. 1'raxizxazry �o Exi�ting �tructures. When the pavement is adjacent to ox around
existing structures, expansions joints shalI be constructed in accordance with
the deia�s shown on theDrawings.
6. TransverseContractionJoints
a. Contraction or dummy joints shal] be installed at the lacations and at the
interval� shawn oxa the Drawings.
b. Joints shall be oFt11e design width, and spaci�ng shown on the Drawings, or as
approved by the City.
c. Dowel bars, shall be of the size and type shown on the Drawings, ar as
approved by the Ciiy, and shall be installed at the specified spacing.
d. Joints shall be sawed into the completed pa�ement surface as soor� after initial
concrete set as possible so that soxne ra�eling af the conerete is abserved in
order �or the sawing process to prevent unconlro�led shrinlcage czacking.
CITYOFPORT V�IORTFI 2U21 Side�vallcUnitPrice Cont�'acf
$TA%IDt1RD CONSTKUCTION SPECIFICAT[ON pOCUMEIVT5 102520
Revised Decem�er 20, 2012
32 i3 13 -14
CONCRETE PA�lINC,
Page 14of2]
e. The joints shall be constructed by sawing to a 1/4 inch width and to a depth of
1/3 inch {I/4 iz�ch �ermitted if Iimestone aggz�egate used} of the actual
pavement thic�ess, or deeper if so indicated on theDrawings.
f. Complete sawmg as soan as possible in hot wcather conditions and within a
tnaximum of 24 hours after savv cutting begins under cool `x�eather conditions.
g. I� sharp edge joints ar� being obtained, the sawing process shall be sped up to
the point where some raveling is abserved.
h. Dainage by blade action to the sIab surface and to the concrete �ediately
adjacent to the joint shall be�ninimized.
i. Any poriion of the curing membrane whick� l�as been d�sturbed by sawmg
operations shall be restored by spraying the areas with additiflnal curing
c nmpound.
7. TransverseConstn�ction3oints
a. Constx'uction joints formed at tiie close of each day's wark or when the plac'v�g
of concz-ete has been stopped for 30-nainutes or longer shall be constructed by
use of inetal o r wooden bulkheads cut true to the section of the finished
pavemenC and cleaned.
b. Wooden bullch�ads shall have a thickness ofnot J.ess than 2-inch stockmateriat.
c. Langitudinal bars shall be held securely in place in a plaa�e perpendicular to the
surFace and at right angles to the centerline of the pavement.
d. Edges shalI be rounded to II4 inch radius.
e. Any surplus concrete on the subgrade shall be removed upon the resumption of
the work.
8. Longitudinal Const�ructionJoints
a. Longitudinal construction joints shall be of the type sk�own an the Drawings.
9. Joint Fzlier
a. Joint filler shall be as specif'ied in 2.2.I ofthe size and shap� showx� on the
Drawings.
b. Redwood Board joints sha11 be used fox all pavement joints except for
expansion joints that are coincident with a hutt joint against existing
pavements.
c. Boards with Iess than 25-percen# of moisture at the tiine of installation shall be
thoroughly wetted on the job.
d. Gz�een lumber of much higher moisture content is d�sirable and acceptable.
e. The jaint fiIler sha11 be app�opriately drilled to admit the dowel bars wh�
required.
£ The boitom edge of the filler shaII extend to or slightly below the batiom of the
slab. The iop edge sha11 be held approximately 1/2 inch below the fia�ished
surface of the pavement in order to allow the finishing operations to be
continuous.
g. The joint filler ma� b� composed of more tk�an one Iength of board in the
length of joint, but no boa.�d of a length less than 6 foot inay be used unless
otherwise s1�own on tlaeDrawings.
h. A.fter the removal of the side �orms, the ends of the joints at the edges of the
sIab shall be carefully opened for the entire depth of the slab.
10. Joint Sealing. Routine pa�ernent joints shall be filled consistent with pa�ixig details
and as specif'ied vl Section 32 13 73. Materiais shall generally be handled and
app]ied according to the manufacturer's recor�ux�endations as specified in Sectiox�
32 13 73.
CITXOF FOR'F WORTH 2OZ1 SidewalkUniEPi•ice Contract
STt1NDARD CONSTRUCTION SPECIFICATION DOCUM�3�iTS 102520
Revised December 20, 2D12
32 13 13 - ]5
CONCRET P, PA�VING
Pagc 15 of2]
G. P�.cing Co�crete
1. Unless otherwise specified in fhe Drawings, the finishedpa�ement sha[i �e
const�uct�d monolithically and constz-ucted by rr�achined laid mefhodunle,ss
ixnpractical.
2. The concrete shaIl �e rapidly deposited on the subgrade in successive batches and
sha11 be disfrbuted to the requ�ed depth and far the enti�e width of the pave�nent
by shoveling ar other approvedmethods.
3, Arxy concrete nat placed as herein prescrbed wiih�n the time Iimits in thefollawing
table will be rejected. Time begins when the water is added to them�er.
T�m erature — Time Re uirements
Concrete Ter�perature Max Time — tr�irtutes M� Time — minutes
(at aini af lac�ment) no retardin a ent (with retardin a ent}�
Non- itated Concrete
All temperatures 45 45
Agitated Concrete
Above 4d°F Tune may be reduccd by 75
City
Above 75°F fhru 90°F 60 90
75°F and Below 60 120
1 Normal dosage ofretarder.
4. Rakes shall npt be used in handling concrete.
5. At ihe end of Che day, or in case afunavoidable interrupiion or delay of more thari
3� minuies or langer to prevent cold joints, a tzansveise cons�uction joint shall be
placed in accordance with 3.4.F.7 of this Seciion.
b. Honeycombing
a. Special care shall be iaken nn placing and spading the concreie against the
forms and at all joints aud assemblies so as to pre�venti�oneyco�xabing.
b. Excessive vaids and honeycombing in the edge of the pavemen�, revealed by
the removal af the side forms, may be cause for rejection of the section af slab
in which the defect occurs.
H. Finishing
1. Machine
a. Tolerance I.imits
1) Whi�e the concrete �s still workable, it shall be tested far irregularities with
a 10 %ot straightedge placed para��el to the centerline of the pavcmenf �o as
to bridge depressians and to touch allYii�h spots.
2,) Ordinates measured from the face of the straightedge to the surface of the
pavement shaIl at no place exceed 1/16 inch-per-foot fi•omthe nearest pou�t
af contact.
3) In no case shall the maximunn ardinate to a I0 foot straightedge be gxeatex
than 1/8 inch.
CITY OF FORT W OR'I'I� 2021 SidewaIk Unit Petice Conta�aci
STANDARD CONSTRUCTIOF�1 SPECCFICAT[bl�i ➢OCUMENTS 102520
Revised Decemtser 20, 2012
32 i3 l3 - 16
CONCRETE PAVING
Page 1Gof21
4) Any surface not w ifhin the toleranc e limits shall be reworked and
refinished.
b. Edgix�g
1) The edges of slabs and all joints requirmg edging sha�l be care�ully tooled
with an edger of the radius required by tlie Drawings at the titne the
cancrete begins to take its "set" and becomes non-vvorkaUle.
2) All such work shall be left smooth and true to lines.
2. Hand
a. Hand finishing permitted only in intersections and areas inaccessr'ble to a
finishing machine.
b. WE�en the har�d method of stz'iking off and conso�dating is permitted, the
concrete, as saon as placed, shall be approximately leveled and then strucic off
�vith screed bar io such elevation above grade that, w�en consolidated az�d
�inished, the surfac e of the pavement shall be at the grade eievation shown on
the Drawings.
c. A slight excess of material shall be kept in front of the cutting edge at a�l times.
d. The straightedge and joint finishing shall be as prescribedherein.
I. Curing
1. The curing of concrete pave�xaent shallbe thorough and continuous throughoutthe
entire c��ring period.
2. �'axlure to provide proper curing as herein prescribed shallbe considered as
suffcient cause for i�mmediate suspension af the paving operations.
3. The curi�r�g method as herein specified does not precl�de the use of any of the other
commonly used methods of curing, and the City noay apprave another ��ethod of
curing if so requested by f.he Contzactor.
4. If a�y selected method af curing does nai af�ord the desired resuIts, the City shall
have the right to order that another m�thod af curing be insiituted.
5. After removal of the side forms, the sides of the slab shall receive a like coating
before earth is banked against t1�em.
6. The solution shall be appIied, under pressure with a spz-ay nozzle, in such a manner
as to cover the entire surfaces thorouglaly and completely with a uniform iilir�.
7. The rate of application shall be such as to ensure complete coverage and shallnoi
exceed 20-square-yards-per-gallan of curing compaund.
$. Wk�en thoroughly dry, it shall provide a continuous and �Iexible membrane, free
fro�nn cracks or pinlaoles, and shall not disintegrate, check, peel or crack during the
curing period.
9. If for any z'eason the seal �s broken during the curing periad, it shall be immediately
repaired with additional sealing solution.
10. Wlaen tested in accordance with ASTM C156 Water Retention by Concrete Curing
Materials, the curing compound shallprovide a film which shaIlhave reiaivaed
within the test specimen apercentage of the moisture present in �he specimenwhen
the curiz�.g compound was applied accorciirig to the following.
1 J.. Contractor shall maintain and p raperly repair darzaage to curing materials on
exposed surfaces ofconcrete pavennent continuously �or a least 72hours.
J. Monolithic G�rbs
CTTYOFFpRT WORTH 2O21 SidewalkUnitPrice Conh-act
STAI�fAARD CONSTCtUCTIOA? SPEC�ICATION DOCUMENTS 102520
Revised DecemUer 20, 2012
3213]3-17
CONGRT:'T�, PAV]NG
Page 17 of 2l
1, Concrete for monoIithic cuxb shall be the same as for the pa�ement and, ifcat�ried
back from the pa�ing mtxer, shal� be placed wiihin 20-za�inutes after beir�g m'v�ed.
2. After the conerete has been struck off and sufficiently set, the exposed sux�aces
shall be tharaughly worked with a woaden flat.
3. The e�posed edgcs shall be rounded by t�e use of an edging iool to t�ae radius
indicated on the Drawings.
4. ALl exposed surfaces ofcurb sha11 be brushed ta a srnooth and uniform surface.
K Alley Paving
A1Iey pa�ing shall be const�ructed in accordance �with the specif"ications for conerete
paving hereinbefore descrzbed, in accordance r�ith t�ae details shawn on the
Drawings, and vvith the following addi#ional provisions:
a. Alley paving shall be constructed to the typical cross sections shown on the
Drawings.
b. Transverse expansion joints of the type shown on the Dravvings shall 6e
constructed at the praperty Iine on each end of the alley with a m�imum
spacing of 640 feet.
c, Transverse contraction and dun�liy joints shall be placed at the spacing shown
on the Drawings.
d. Contraction and dumx�y joints shall be formed in such a manner that the
required joints shall be produced to the satisfaction of the Ciiy.
e. Al� joints shall be co�structed ir� accordance with this specification and filled
in accordance vvith the requirement of Secfion 32 13 73.
L. Pavement Leaveouts
1. �'avement leaveouts as necessary to maintain and provide for local traffic shall be
pro�ided at Iocation indzcatcd on the Drawings or as directed by theCity.
2. �'he extent and Iocation af eaci� leaveout required and a suitable crossover
connecl:ion to provide for traffic movements shall be determined in the field by the
City.
3.5 REPA�R
A. Repair of concrete pavement cancrete shall be consistenf with the Drawings and as
specified in Section 32 Q1 29.
3.6 RGINSTALLAT�ON [NOT USED]
3.7 SITE QUALITY C4N'1'ROL
.A.. Concre#e Placement
1. Place concrete using a fully autot�ated paving machine. Hand pav�g only
permitted in areas such as intersections where use ofpa�ing machine is not
practical
a. All concrete pavement not placed by �and shall be placed �sing a fully
autamated pa�ing r� achine as approved by the City.
b. Screeds will not be allowed except if approved by the City.
B. Testing ofMatexials
1. Saanples of aIl materials for test shal[ be made at the expense oFthe City, unless
otherwise specified in the special provisions or in theDrawings.
CITYOFFORT WORTH 2O21 $idewalkilnitPrice Cnntract
STANDARD COAI5TRUCTION SPEC[FICATIOI�1 DOCCJMENTS 102520
Revised Dec:e��iUer 20, 2012
32 13 13 -18
CONCRETE 1'AVING
P age 18 of 2[
2. In the event the initial sampling and testirig does not comply with the speciiications,
all subsequent testin� of the material in order to determine if the material is
acceptable shall be at the Contractor's expense at the same rate charged by the
c ommerc ial lab orator ies .
3. AIl testing shall be in accordance with applicable AS7'M Standards and canerete
testing fechnician must be ACI certif'xed or equivalent.
C. Pavement Thiclrness Test
1. Upon completion of ihe work and before finai acceptance and finalpayment shaIl
be made, pavement thickness test shall be made by the Ciry.
2. The number of tests and location shall be at the discretion of the City, unless
atherwise specified in the special provisions or on the Drawings.
3. The cast for the iraiiial pavement thic�ness test shallbe the expense of theCity.
4. In the event a deficiency in the thickness of pavement is reveaIed dur�ng normal
testing operations, subsequent tests necessary to isoIate the deiiciency sha11 be at
the Contractor's expense.
5. The cost for addiiional coring tesi shall be at the same rate charged by comx�nercial
laboratories.
b. Where the average thickness af pavement in the area found to be deficient in
thickness by more than 0.20 inch, but not maz-e than 0. 50 inch, pay�nent shall be
made at an adjusted price as specified in the following table.
Deficiency in'Z'hiclmess ProportionalPart
Detern�itied by Cares Of Contract P�ice
Inches Allowed
Q.00 — 0.20 100 percent
0.2I — 030 80 percent
03I — 0.40 70 percent
0.4I — 0.50 60 percent
7. Any area of paverment found deizcient in thickness by more than 0.50 inch but not
more than 0.75 inch o�' 1/10 of the tl�ickness specified o�n the Drawings, whichever
is greaiei•, shall be evaluated by the City.
8. If, in the judgment of the Ciry the area of suc� deficiency should not be removed
and replaced, t�ere shall be no payment for the arearetained.
9. If, in th� judgment of the City, the area of such deficiency warrants removal, the
area shall be removed and replaced, at the Contractor's ent�e expense, with
concrete oitlae thickness shown on the Drawixigs.
10. Any area of pauement found deficient in thickness by znore than 0.75 inch or more
than 1/10 of the plan thicicness, whichever is greater, shall be removed and
replaced, at th� Contractor's er�tire expense, with conerete of the thickness shown
on the Drawings.
11. No additional payment over the contract unit price shall be made for anypavement
of athickness exceedi�g that requu-ed by t1�eDrawings.
D. Paverr�ent Strength Test
CTTYOFFORT WORT'H 2O21 Side�valkUnitYricc Contract
STANDARD CONSTRCTCTION SPECIF[CATION DOCUMEAITS 1025Z0
12evis«I December 20, 2012
321313-]9
CONCILEI'�, I'AVING
Page ]9 of 21
�. Durrng the progtess of the vvorlc the City shall provide trai�n.ed technicians to cast
test cylir�ders for conformu7g to .ASTM C31, ta maintain a checic on the
compressive strengths of the conczete 6eing placcd.
2, Aftex the cylinders ha�e been cast, they shall remain on the jab site and then
transported, mai�f cured, and tested by the City ia accordance with ASTM C31 and
ASTM C39.
3. In each set, I of the cylinders shall be tested at 7 days, 2 cylinders shall be tested at
28 days, and 1 cylinder sha.11 be l�eld or tested at 56 days, ifnecessary.
4. If the 28 day test results indicate def�cienE strength, the Contractor may, at its option
and expense, core the pavem�nt in question and have the cares tesfed by an
appro�ed labaratory, in accordance with ASTM CA�2 and ACI 318 �rotocot, except
the average of all coz-es must meet 100 pet-cent of the minimum specified s�-ength,
with no individua] core resulting in less iha� 90 percent of design strength, to
averride the �-esuits of ihe cylindertests.
5. CSylir►ders and/or cores must meet minimum specified strength. If cylindcrs do not
rx�ee� minimum sp�cif'�ed strength, additional cores shall be taken to ident�y the
liumits of deficient conct'ete pavement at the expezase of the Contractor.
6. Cylinders and/or caz�es must meet minimum specified strength. Pave�x�ent not
meeting the minimunr� specif'ied strength shall be subject to the maney penalties or
remoeal and pla.cenrient at tihe Contractar's exp�nse as show in f11e fallowingtable.
7. The amount of penalty shall be deducted fi�om payment due to Contractor; such as
penalty deducted is to defray the cost af e�tramaint�r�ance.
8. The strength requirer►�ents for siructures and ather concrete work are not altered by
the special pro�visian.
9. No additional payment over the contract unit price shall be made for any pavement
of strength exceedan� that required by the Drawings and/or specifications.
E. Cracl�ed Concrete Acceptance �'ol�cy
1. If c�•acks exist in concrete pavement �.pan completion flf the project, iheProject
Inspectar shall make a determination as to the need for action to address the
cracking as to its cause and recomme�aded remedial wark.
If �he rec ommended remedial wox�C is routing and sealing of th� cracks to protect
the subgrade, the Inspector shall make the determination as to whether to rout and
seal the cracics at the time of final inspection and acceptance or at any time priox io
the end of the praject maintenance period. The Contxactor shallperform the z�ouCing
and sealing work as directed by the Froject Inspectox, at no cost to the City,
regardless of the cause of the cracking.
CTTYbFI'ORTWORTH 2fl21 Side��valkUnitPiice Cantract
STAhIDftRD CONSTIZUCTION SPECIFICATION DOGUM�.NTS 102520
12evised December 20, 2012
32 13 13 -20
CONCRETE PAVIl�ICr
Page 20 af 21
3. Ifrenx�edial vvork beyond routing and seaIing is determinecl. to be necessary, the
Inspector and the Contractor will atiempt to agree on the cause of the craclang. Z£
agreement is reached that the cracicing is due to deficient �aaateriaLs or workmansk�ip,
the Contractor shallperform the rez�aedial work at no cost to t�e City. Remedial
work in ihis case shall be limited to rernaving and replacing the deficient work with
�ew material and workmanship that meets the requirements of the cantt�ct
4. Ifi renaedial work beyond routing and sealing is deterx�nined to be necessary, a�d the
Inspecior and the Contractor agree ihat the cause of tlae cracking is not deficient
materiaLs or workmanship, the City may request the Contractor to provide an
estimate oitbe cost of the necessa�y rernedialwork and/or additional work to
address the cause of the cracking, and tl�e Contractor will perforxn that work at th�
agreed-upon price if the City elects to do so.
5. If remedial worlc is necessary, and the Inspector and the Contractor cannot agree on
the cause of the cracking, the City may hire an independeni geotechnicaI engi�eer
to perform testing and analysis to determine the cause of the cracking. The
contractor will escrow 50 percent of tk�e praposed costs of the geoiechnical contract
vc+ith the City. The Contractar and the Ciry shall use the services of a geotechnica�
��rm acceptable to bothparties.
6. If the geotechnical engineer determines that the pr�in �ary cause of the cracking is the
Contrac#or's deficient matex'ial or vworkmanship, th� reix�edial worlc will be
performed at the Contractor's entire expense and the Cox�tractor will also reimburse
the City for tk�e balance of the c�sE of the geotechnical invesiigation over and above
t�e amount ihat has previously been escrovved. Retriedial woz�� in this case shall be
Iimited to rernoving and replacing t�e deficient work with new material and
workrnanship ihaC rneets the requ�rements of the contract.
7. If the geotechnical engineer determines that the primary cause of the cracl�ag is nof
the Con�r'actor's deficient maierial ar workmanship, the City will return the
escrowed funds to the Contractor, The Contractor, on z-equest, will provide the City
an estimate o�the costs of th� necessa�y remedial work and/or additional wor� and
wiIl perform the wark at the agreed-upon price as directed by the City.
3.$ SYSTEM STARTCiP [NOTUSED]
3.9 ADJiTS1�NG [N�T U�ID]
3.I0 CLEAIVING [NOT USED]
3.11 CLOSFAUT ACTIVITIFS [NOT iTSED]
3.12 PROTEC'�`10N [NOT USED]
3.13 MAIN'I.'ENANCE �NOT USID]
3.14 ATTACIIIVIEN'TS [NOT USED]
CITYOF FORT WORTH 2O21 Side�valkIInitPiice Conti'act
STAT]DARD CONSTRIJCTION SPECIFICATION AOCUMEI+!'I'S 10Z5z0
Revised Bacem6er 20, 2012
32 13 ]3 -21
CONC1tBTE PAVC%TG
Page 2l of 21
ENll OF SECTION
Revision Log
DATE NAME SUMMARYOF GZIANC'�E
12120I2U12 1.2.A—Modified itexnstobe inc[uded inpricebid
05/21/2014 Doag Radernaker 2.2.D--Moditied to clarify acceptable fly ash substituCion in concretc paving
CITYOFFORT WORTH 2O21 Sidewail{TJnitPiice Con#ract
STANDARD CONSTRUCTION SPECIF[CATION DOCLTMENTS T02S20
TLevised Deceml�er 20, 2012
321320-I
CONCR�'I'E 3lDEWALKS, DRIVP.WAXS AND BARRIER FitEE RAMPS
Page 1 of 6
SECTION 32 13 20
C�NCRETE SIDEWALKS, DRNEWAYS AND BARR�R FREE RAMPS
PART1- GEN�RAL
1.1 SUMMARY
A. Section Includes:
1. Concrete sidevvalks
2. Driveways
3. Baax�ier fi•ee ramps
B. Deviations from this City of �art Worth �tandard Speci�cation
Prov�ide 9" HMAC transitio� to Driveway tie into existing asphalt pavement. The HMAC
transition is subsidiary to driveway construction.
C. Related Specificatian Sections include, but are r►ot necessarily limited to:
I. Division 0- Bidding Reguiremen#s, Contract Forms, and Conditions of the
Cont� act
2. Division 1- General Requireinents
3. Section d2 41 13 - Selecti�e Site Demolition
4. Sectian 32 13 13 - Concrete Paving
5. Section 32 13 73 - Concrete Paving Joint SealanYs
1.� PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
I. Concrete Sidewallc
a.
b.
c.
Measurement
1) Measu►'ement for this Item shalI be by the square foot of conapleted and
accepYed Concr�te Sidewalk in its imal posi�ion for various:
a) Thicknesses
b} Types
Payment
1) The work perForn�ed and nnaterials furnished in accordance with this Item
and measured as provided under "Measure�r►ent" will be paid for at the unit
price hid per sqtxare foot of Concrete SidewaIk.
The price bid shall include:
1) Excavating and prepaxir�g the subgrade
2) Furnishing and placing all materiais
2. Concr•ete Curb at Back of Sidewalk {b to 12 inc� max)
a.
b.
c.
Measu��ement
1) Measurement for this Item sha11 be by the linear foot of completed and
accepted Concrete Curb at the Back of Sidewalk within the 6 to 12 inch curb
height at back of walk in its final position.
Payment
1) The work pez`formed and materials �nished in accoxdance with this Item
and measu�red as provided under "Measurerrient" will be paid for at the u�it
price bid per linear foot of Concrete Curb at the Back of Sidewalk.
The price bid shall include:
1) Excavating and preparing the subgrade
C1TY OP FORT WORTH 2O21 Side�vaik Unit Przce Construction Contract
STEINDARD COT�iSTRUCTION SPECIFICATION DOCUMENTS
ltevised Jtu�e 5, 2018 1 �25�0
3zi3za-�
CONCI2P,TE SIDEWALKS, T]RIVEWAYS AIVD 13AR_R1Ei2 FRTi�: RAMT'S
I'age 2 oP 6
2) Furnishing arid pIacing all materials, including concrete and reinforcing
steel
3) Exca�ation in back of "reta.ining" curb
4) k'uzx�ishing, placing, and compacting bac�fill
3. Cancrefe Driveway
a. Measurement
I) Measurement for this Item shall be by the square foot of completed and
accepted Conerete Dz-iveway in its fmaI position for various:
a) Thicknesses
b} Types
2) Dimensions will be taken frozxz the back af the projected curb, including the
area of the curb radii and will extend to i:he limits specified in the Drawings.
3) Sidewalk portion of drive will be included in driveway measuremer�t.
4} Curb on drive will be included in ihe dz�veway measurement.
b. Payment
1} The woz-k per%rmed and materials furnished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price bid per square foot of Cancrete Driveway,
c. The price bid shall include:
1) Excavating and preparing the subgrade
2) Furnishing and placing all materiais
Barriez- Free Ramps
a. Measurement
1} Measure�.ent �or this Item shall be per each Bazrier Free Ramp completed
and accepted far various:
a) 7'ypes
b. Payment
1) The work perfqrmed and materials fui�nished in accorda�c� with this Item
and measured as provided under "Measurement" will be paid far at the unit
pnice bid per each "Barrier Free Ramp" installed.
c. The price bid shali include:
I) Excavating and preparing the s�b�•ade
2) Ft�nishing and placing all materials
3) Curb Ra�np
4} Landing and detectable warning surface as shown or� t1�e Drawings
5) Adjacent flares or side curb
� .3 REFERENCES
A. Abbre�iations and Acronyrns
1. TAS -- Texas AccessibiIity Stanclards
2. TDLR -- Texas Department of Licensing and Regulation
B. Reference Standards
1. Reference standards cited in tliis Specification re�er to the current reference
standard published at the time of the latest re�vision date lo�ged at the end of this
�pecifica�ion, unless a date is specifically cited.
2. A�nerican Society for'�'esting and Materials {ASTIVI}
a. D545, Test Methods for Preforrz�ed Expansion Joint Fillers for Concrete
Consixuction (Non-extruding and Resilzent T'ypes)
CiTY OF FORT WORTH
STANDARD CONSTRUCTTON SPECIFICATION DOCUMEIVTS 2021 Sidewalk Unit Price Const��uction Contract
Revised Jixne 5, 2�18
1��5�0
321320-3
CONCRETE STllEWALKB, DRNEWAYS AND BAIZRICR FREE RAMPS
Page 3 ofi 6
b. D698, Test Methods foi� Laboa�atory Compaction Characteristics of Soil Using
Standard Effoit (12,400 it-lhf/ft3)
1.4 ADMINISTRATIVE REQUIR�MENTS [NOT U�ED]
l.5 SUBMITTALS [NOT USED]
1.6 ACT�ON SUBMITTALSIINFORMAT�ONAL SUBMiTTALS
A. Mix Design: snb�nit far approval. Section 32 13 13.
B. Product Data: submit product data and sample for pre-cast detectahle warni�g far
barrier free razz�€p.
I.7 CLOSEOUT SUBMITTALS jNOT USED]
1.8 MAXNTENANCE MATERIAL SUSMITTALS [NOT US�D]
1.9 QUALXTY ASSURANCE [NOT USED]
1.10 DELXVERY, STORAGE, AND ��ANDLING [NOT USED]
1.11 FIELD CONDITIONS
A. Weather Conditions: Placement af concrete slaall be as specified in Section 32 13 1.3.
1.1� WARRANTY [NOT TJSED]
PART 2 - PRODUCTS
2.1 OWNER-FiIRNISHED PRODUCTS [NOT USED]
2.2 EQUIPMENT AND MATERIALS
A. Forins: woad or �netai st�raight, free from watp and of a depth equal to the ihic�ess of
the finished work.
B. Concrete: see Section 32 13 13.
1. Unless otherwise shown on the Drawings or detailed specifications, t�e sYandard
class for concrete sidewalks, driveways and barrier free rarnps is shown in the
following table:
Standard Classes of Pavement Concrete
Class of Minimurn 28 Day Min. Maximurn Course
Concrete" Cementitious, Cornpressive Water/ Aggxegate
Lb./CY Strength2 Cerz�enti�ious Maximum
psi Ratio Size,
znch
A 470 3000 0.5$ 1-1/2
C. Reinforcement: see Sectian 32 3 3 13.
1. Sidewalk, driveway and barrier free ramp reinforcing steel shail be #3 deformed
bars at 18 inches on-center-both-ways at the center plane of all slabs, unless
otherv�ise shown on the Drawings or detailed speciiications.
D. Joint Filler
1. Wood Filler: see Section 32 13 13.
2. 1're-Molded Asphalt Board Filler
a. Use only in areas where not �ractical for wood boards.
CIT'Y OF FQRT WO�iTH
STANDARD CONSTRUCTTON SPEGIFICATTON DOCUMENTS
Revised 7une 5, 2ois 2021 Sadewalk Unit Price Construetion Contract
102520
32132U-4
CONCI�;TE SIDEWAI,KS, L]RIVEWAI'S Al�lD BARRiC;R FREP, Rt1MPS
Page A o£ 6
b. Pre�moIded asphait board fiIler: ASTM D545.
c. Instail the rec�uired szze and uniform thickness and as specified in Drawings.
d. IncIude 2 liners of Q.016 asphalt impregnated kraft paper filled with a mastic
mixture of asphalt and vegetable fiber and/or mineral filler.
E. Expansion Joint Sealant: see Section 32 13 73 where shovon on the Drawings.
2.3 ACCESSORIES [NOT USED]
2.4 S4URCE QUALITY CONTROL [NOT USED]
PART 3 - EXECUTION
3.1 INSTAT,LERS [NOT USED]
3.2 EXAlVIINATION [NOT U�ED]
3.3 PREPARATION
A. Sut�face Preparation
1. Excavation: Excavation required for the construction of sidewalks, driveways and
barrier free ramps shall be to the lines and grades as shown on the Drawings or as
estabiished by fhe Ciiy,
2. Fine Grading
a. The Contractor shall do all neces,saxy filling, leveling and fine grading required
to b�ng the subgrade ta the exact grades specified and compacted to at least 90
percent of zr�aximum density as defermi�ed by ASTM D648.
b. Moisture conte�t shall be within minus 2 to plus 4 of optimum.
c. Any over-e�cavation shall be repaired to tlae sa#isfaction of the Cify.
B. Demolitior� / Removal
1. Sidewalk, Dfiveway andl or Barrier Free Ramp Removal: see Section 02 41 13.
3.4 �NSTALLATION
A. General
1. Concrete sidewalIcs shail ha�ve a minrmu�x� thicicness of � inches.
2. Sidewalks cons�ructed in drivewa}� approach sections shall have a minimum
ihickness eq�al �o that of drivewa� approach or as caIIed for by Drawings and
spccifications within the limits of the driveway approach.
3. Driveways shall have a minimum thickness of 6 inches. Standard cross-slopes foz�
waIks shall be 2 percent max in accordance with cuzxen� TASITDLR guidelines.
The canstruction of the driveway approach sY�all inclL�de the variable height radius
curb in accordance with the Drawings.
4. Al1 pedestrian faci]ities shall cornply with provisions of TAS including location,
slop�, width, shapes, texture and coloring. Pedestrian facili�ies i�stalled by the
Cor�tractor and not meeting TAS must be reznoved and replaced to me�t TAS {no
separate pay).
B. Forms: For�ns s�all be securely staked to line and �ade and maintained in a tzue
position during the depositing of concrete.
C. Reinforccme�t: see Section 32 13 13.
D. Cancrete Flacement: see Section 32 13 13.
C11'Y OH PORT WORTH ,
S'I'AI�D� CONSTRUCTION SPEC[FICf1TION DOCTJMENTS
Revised June 5, 2ois 2021 Sidewalk Unii Pxice Construction Conf:raet
102520
3zt3ao-s
CONCRETE SIDEWALKS, DR1V�'WAYS AND BA.R.RIF.R PREE ILfiMP�
Page 5 of 6
E. Finishing
1. Concrete sidewalks, d�•iveways and baarier free raenps shall be finished to a true,
even su�rface.
2. Trowel and then brush transversely to obtain a smooth uniform br�sh finish.
3. Provide exposed aggregate finish if specified.
4. Edge joints aild sides shali with suitable tools.
F. Jaints
1. Expansion joints for sidewaIks, driveways and bxrrier free ra�nnps shall be formed
usix�g redt�ood.
2. Expansion joints shall be placed at 40 foot intervals for 4 fooi wide sidewalk and 50
foot intervals far 5 foot wide and greater sidewalk.
3. �xpansion joints shall also be placed at a�l intersections, sidewalks with concrete
drivevvays, curbs, forix►ations, othe� sidewalics and other adjacent old concrete wo�k.
Similar matei�ial shall be placed around all obstiuciions pz'oi� uding into or t.ku-ough
side�valks or driveways.
4. AIl expansion joints shall be 1/2 incY� in thicicness.
Edges of all constiruction and expansion joints and auter edges of all sidewal�s shall
be fnished to approximately a 1/2 inch radins with a suitable finishing tool.
Sidewalks shall be marked at intervals equal to the �vidth of the walk with a
marking iool.
When szdewalk is against the curb, expansion joints sha11 match those in the curb.
G. Barrier Free Rarnp
�'urnish and install brick red color pre-cast detectable waxning Dome-Tile,
manu�actured by SirongGo Industries or approved equal by t�ae Cit�.
2. Detectable warning surface shall be a minimum of 24-inch in depth in Ehe direction
of pedest�ian travel, a�id extend to a minimum of 48-inck� along the curb ramp or
landing where the pedestrian access route enters the street.
3. Locate detectable waixxing surface so that the edge �aearest the curb line is a
minimum of b-inch and maximum of $-inch from the extension of the face o�the
curb.
4. Detectable warning Dome-Tile surface may be curved along the corner radius.
5. Install detectable warning surface according to manufacturer's instxuctions.
C1TY OF FORT WORTH 2O21. Sidewalk Unit Price Constzlzction Contract
STANDAI2D COI�STItLTCTION SPECIFICATTON DOCUIV�ENTS I OZSZO
Revised June 5, 2U 18
32 l3 20 - 6
CQ�TCRr'I'�; S]I]�:WALKS, Di2NI:WAYS AND BARRTT:R FRL�, it/tA+iPS
Pagc 6 of 6
3.5 REPAIR/RESTORATION [NOT USED]
3.6 RE-INSTALLATION [NOT USED]
3.7 RIELD QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP rN4T USED]
3.9 ADJU�TING �NOT USED]
3.10 CLEANING [NOT U�ED]
311 CLOSEOUT ACTIVITIE� �NOT USED]
3.12 PROTECTION [NOT USED]
3.I3 MA�NTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF �ECTTON
Revision Log
DATE NAME SUMMARY OF CHANGE
[ 2/20/2012 D. Johnson 1.2.A.3 — Measurement and Payment for Batrier Free Ramps axiodified to match
updated Cety Detai[s
4/30/2013 F. Griffin cOtTected Part 1, 1.2, A, 3, b, 1 Yo read; from ... square foot of Concrete Sidevc�alk.
to . . .each "Batrier Free Ramp" instal�ed.
7une 5, 201 S M Owen Revised Measureinent and Payme�t.section.
2021 Sidewalk Unit Arice Consructian Contract
c�TY o� �oxT woxrx 10252D
STANDARb CONSTRUCTIQN SPECIFICATION DOCUMHNTS
Re�ised lune 5, 2018
321373-1
CONCI2ETT PAVIIVG 70INT SEALAN`TS
Page l of4
SECT.[QN 32 13 7'3
CONCR�TE PAVING JOINT ,SEALANTS
PART 1 - GFTTI+.RAi,
L 1 SUMMARY
.A. �ection Includes:
1. Specif"ication for silicone jaint sealing for concrete pavement and curbs.
B. D�viations irom thrts City of Fort Worth �tandard Specif'icaiion
1. FOR THIS PROJECT CONCRE'�E PAVING JOINT S�AT.ANTS SECTION 32 13 73
SIIALL BE �'AYBLE FOR SEALING COURTESY 70INT ON �XISTING PAVEMEN`I'
ONLY. SEALING JOINT ON REPLACED CONCRETE PAVING SHALL BE CONSIDERED
SUBSIDIARY TO CONCRETE PAVING SECTION 32 13 13.
2. SAWING, CLEANING I�ND APPLYCNG JOINT SE�NTS UPON PLACING OF
BOND BAKER ROD AND L�F�AKFR TAPE SHALL BE �UBSIDZARY TO JOINT
,SEALANT�.
C. Related Specif�ication Sections include, bu.t are not necessari�y limited Eo:
1. Division 0- Bidding Requirements, Cant�'act Fnrms, and Conditions of the Contract
2. Division 1- General Requirements
3. Sectioi� 32 13 13 - Concrete Pavi�g
1.2 PRICE AND PAYMENI' PROCIDiJRE�
A. Measurement andPayment
l. Measurement
a. Measurement for this Ite�n shall be by the linear foot of 7oint Sealani compleied
and accepted only when specified in the Drawings to be a pay item.
2. Payment
a. The work performed and materials fUrnis�aed in accordance with ihis Item are
subsidiary to the various items bid and no othet' coi�pensation will be allavwed,
uxaless specifically speci�f�ied onDrawings.
1.3 REFERINC ES
A Reference Standards
l. Reference standards cited in fhis Specification refer to the current r�%rence
standard published at the time of the latest revision date logged at the end af this
Specificaiion, unless a date is specif'ically cited.
2. ASTM IntErnatio�al {AST1Vn:
a. D5893, Standard Spccif"ication for Cold A�aplied, Single Coxx�panent,
Chemically Curing Silicone Joint Sealant �or Portland Cement Concrete
Pavements
1.� ADMIlVISTRATIVE REQUIRENIINTS [NOTUSID]
1.5 ACTION SUEMCTTALS [NOT USED]
�.6 ACTION SL7BM7TTALS/INrORMATIONAL SUSMITTALS
CTTYOF FORT WORTH 2O21 SidcwalkUnitPricc Confract
STANDARD CONSTRUCTIQN SPECIP'ICATION ]]OCUMENT S ] 02520
Revised December 20, 2012
A. Test and Evaluation Reports
32 l3 73 - 2
CDAICRETEPAVING ]OINT SEALANTS
Page 1 ofA
1. Prior to installation, f�rnisl� certification by an independent tesfing laboratoz-y that
the silicone joint sealant meets the requirements of this Section.
CTI'YOF FORT WORTI�
STANDARD CdNSTRUCTION SPECIx'iCAT[ON DOCUMENTS
Reviscd ➢ecem6er 20, 2012
2021 SidewalkUnitPiice Cnntract
102520
32 13 73 -2
CflNCRETE PA�NG 70INT SEALANTS
Page 2 of 4
2. Subn�it verifiab�e docum�ntation tk�at the manu#'acture� of the silicone joint sealant
has a xx�inimum 2-year demonstrated, dacumented successful field performance
wiih coz�crete pavement silicone joint sealantsystems.
1.7 CLOSEOUT SUBMITTALS [NOT �CTSID�
1.S MAiNTFNANCE MAZEI2IAL SUBMITTALS [NOTiISED]
1.9 QUALITY ASSURANCE �NOT USID]
1.10 DELXVERY, STORAGF� AND I-IANDLING [NOTUSED]
1.11 FIF,LD CONDITIONS
A. Do not apply jflint seaIant when the air and pa�ement temperature is less thaza 3S
degrees F
B. Concrete surface must be clean, dry and frost free.
C. Do not place sealant fn an expansion-type joint if s�rface temperature is belaw 35
degrees F or above 90 degrees F.
Ll� WARRANTY �NOT USID]
PART � - PRODUCTS
2.1 OWNEIt F[]R1VISflm PRODUCTS [NOT USID]
2.2 MATERTALS & EQLJIPMI`NT
A. Materials
1. Joir�t Sealant: ASTM DS$93.
2. Joint Filler, Backer Rod and Breaker Tape
a. The joint filler sop sha11 be of a closed cell expanded polyethylene foam backer
rod and polyethylene bond breaker tape of sufficient size io provide a tight sea1.
b. The back rod and breaker tape shall be ra�.sialled in the saw-cut joizxt to prevent
the joint sealant %rom flowing to ihe bottom of the�oint.
c. The backer rod and breaker tape s�all be compatible with the silicone joint
sealant and no bond or reaction shaIl occur between them.
2.3 ACCESSORIES [NOT �CTSID]
�.4 �OURCE QUALITY C4NTROL [NOT USED]
PAR.T 3 - II�ECL)TION
3.1 TNSTALLERS [1VOT YJSED]
3.2 EXANIINATION [NOT USID]
3.3 PREPARATION [NOT iTSID]
CITYOFFORT WOTtTH 2O21 SidewalkUnitPrice Contract
STANDARD COi�lSTRUC'I'ION SPECII'ICATTONDOCUIV[ENTS 10252U
Revised December 2a, 2012
32 13 73 -3
CONCf2ETEPAViNG 70INT SEALANTS
Page 3 oF4
3.9 INSTALLATION
A. General
1. Tk�e silicone sealant shall be cold appfied.
2. Allaw concrete to ciue for a�inimum of 7 days to ensure it has sufficient strength
prior to sealing joints.
3. Perform jo:a�t xeser�oir saw cutting, cleaning, box�d �reaker installation, and joint
sealant placement in a continuous sequence ofopez-ations.
4. Se� Drawings for the various jaint detazls wilh their respective dimensions.
B. Ec�uipment
1. Provide all necessary equipment and keep equipment in a satisfactory working
condition.
2. Equipir�ent shall be :inspect�d by the City prior to the begix3ning o� the work.
3. The minimum requi�ements for construction equipment shall be as follows:
a. Concrete Saw. The sawing equipxnent shall be adequatc in size and power to
complete the joint sawing to the required dimensions.
b. Air Compressots. The de�ivered compressed ai� shall have a pressurc in excess
of 90 psi and shall be suitable for the remaval of all free water and oil from the
campressed air.
c. Extrusion Pump. The output sha1l be capable of supplying a sufficicnt volume
of sealant to the joi�t.
d. Injection Tool. This zx�echanical device shaIl apply the sealant uniformly into
the joini,
e. Sandb�aster. The design shall be for colnrnerczal use with air campressors as
speeified in this Section.
f. Backer Rod Roller and Taoling Insirument. These devices shallbe clean and
free of contamination. Th�y shal! be conr�patible with the joint depth and width
requirements.
C. Sawing Joints: see Section 32 I3 13.
D, Cleax�ing joints
1. Dry saw in 1 di�ectioil with rev�rse cuf;ting blade then sandblast.
2. Use compressed air #a remove the resulting dust from the joint.
Sandblast joints after completedrying.
a. Attach nozzle to a mecha�ical auning device so that the sand biast will be
directed at an angle Qf 45 degrees and at a distance of 1 to 2 inches froxn the
face of the joint.
b. Sandblast bath joint faces sandblasted in separate, 1 d'u•ectionaIpasses.
c. When sandblasting is complete, blow-out using eqmpressedai�.
d. The hlow tube shaIl fit into the joints.
4. Check ihe blown joint for residual dust or oth�r containination.
a. If any dust or conta�nination is found, repeat sandblasting and b�or�ving vntil the
jaint is cleaned.
b. Do noi use salvents to rerr�ove stains andcontamination.
5. Place the bond brea�cerr and sealant in the joint immediately upon cleaning.
b. Bor1d Breaker Rod and Tape: install in the cleaned joint prior to the application of
the joint seaIant.
CITYOFFORT WOI2TH 2O21 SidewalkUn�tPricc Co►eiract
S TAI�IDARI� C ONSTTtTJCT TON 5 PECIFICATION DOCUM E�lT S 102520
Revised December 2p, 2d12
32 E 3 73 - 4
COI�C1tETEPAV➢+IG JOI3+fT SEALANT$
ra�� a or a
7. Do not Ieave open, cleaned jaints unsealed avernight.
E. ]ort�t Sealant
1. Apply t�e joint sealant upox� placernent of the bond bz'eaker rod and tape, usingthe
mechazzical injection tool.
2. Do not seaI joi�ats unless they are cIean and dry.
3. Remove and d�scard excess sealant left on ihe pavetzaent surface.
a. Do not e�cess use to sealtl�ejoints.
4, The pavemcnt surface shall pi•esent a clean final condition as determined byCiry.
5. Da not allow traffic on ti�e fresh sealant until it becomes tacic-free.
F. ApprovaI of Joints
1. The City may request a representative of the sealant manufacturer to be present at
the job site at the beginnixxg of the finai cleaning and sealing of joints.
a. T�e representative shall demonstrate to the Cozztractor and the City tk�e
acceptable method for sealant iinstallation.
b. The representative sha11 approve the ciean, dry joints before the sealing
operaiion cornx�r�ences.
3.5 REPAIR/RFSTORATION [NOT USED]
3.6 R�INSTALLATION [NOT USID]
3.7 FIELD QUALITY CONTROL [NOT U�E�]
3.8 SYSTEM STARTUP [NOT USID]
3.9 ADJUSI�NG [NOT USID]
3.10 CLEAlYXNG [NOT USID]
3.11 CLOSEOUT ACTIVIT�FS [NOT USIDJ
3.12 PROTECTION [NOT USEQ]
3.13 MA�iNTENANCE [NOT USED]
3.1�# ATTACI3MENTS [NOT USED]
END OF SEC'1�ON
Revis ion Lag
DATE NAMB SUMMARYOk' CHANGE
CITYOFFORT WORTTC 2021 SidewvalkUnitPrice Canixact
STANAARD CONSTRUCTION SPECIFICATTON DOCUMENTS 10252�0
Revised December 20, 2012
32ffi13-1
CpNCItET'E CURB ANll GUTTERS ANi� VALL3�Y GU'I'TERS
Page l of G
SECTI�N 32 16 13
CONCRET� CURB AND GUTT�R,S AND VALLEY GUTTERS
�'ART 1 - GENERAL
11 SUNIlVIARY
A. Section Includes:
1. Concrete Curbs and Guttexs
2. Concrete Valiey Gutters
B. Deviations froxaa Chis City af Fort Worth Standard Specification
Provide 9" HMAC transition to curb a�d gutter into existing asphalt pavement.
The HMAC transition is subsidiary ta cur� and gutter construc#ion.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0- Bidding Requizements, Contracf Farnas, and Canditions of the
Contract
2. Division 1� General Requirements
3. Section 02 41 13 � Selective Site Demolition
4. Section 32 I3 13 - Concrete Paving
5. Sectio� 32 13 73 - Concrete Paving .Toint Seafants
1.2 PRICE AND PAYMENT �ROCEDURES
A. MeasnrEment and Payment
1. Concrete Curb and Gutte�
a. M�asurement
1} Measurcment for this Item shall be by the linear foot of Concrete Curb and
Gutter.
b. Payment
1} The work per�ormed and materials �uzx�ished in accordance witk� this Item
and measut�ed as provided tuider "Measurement" wi11 be paid for at the unit
price bid per lineaz- foot of Cone��ete Curb and Gutter complete and in place
by curb height.
c. The pz�ce bid shall include;
1) Preparing ihe subgrade
2) Furtiishzng and placing all materials, including foundat�on course,
rcinforcing steel, and expansion r�aterial
2. Concrete Valley Gutter
a. Measurement
1) Measurement for thzs Item sha11 bc by the square yard of Concrete Valley
Gutter.
b. Payment
1) The work performed and materials fu�-nished in accordance with this Item
and measured as provided under "Measurement" will be paid for at the unit
price bid per square yard of Concrete Valley Gutter coxrapiete and in place
for:
a) Various sireet types
2021 Sidewallc Unit �'rice Constr�ction Contract
C[TX OF FORT WORTH X O2SZO
8TAAIDARD COI�ISTRUCTION SPECIFICATIOhI DOCUMENTS
Revised October O5, 201b
32 16 13 - 2
CONCItHTE CUItS AND GUTT�.RS ATID VALL�Y GUTTEitS
Pagc 2 of b
c. The price bid shall include:
1) Prepat�ing the subgrade
2) Furnishing and piacing all materials, including foundation couxse,
reinforcing steel, and expansion material
1.3 REFERENCES [NOT USEDJ
1.4 ADMINISTRA,TPVE REQUIREMENTS [NOT LTSED]
1.� ACTION SUBMXTTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMAT�ONAL SUBNIITTALS [NOT USED]
]..7 CLOS�OUT SUBMITTALS [NOT USED]
l.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
l.9 QUALITY ASSURANCE [N�T USED]
�.�Q DELIVERY, STORAGE, AND HANDLING �NOT USED�
J.11 FIELD CONDITIONS
A. Weather Canditions: See Seetion 32 13 13.
1.12 WARR.ANTY [NOT USED]
PART � - PRODUCTS
2.I OWNER FURNISHED PRODUCTS [NOT USED]
2.2 EQUIPMENT AND MATERTALS
A. Forms: See Section 32 13 13.
B. Conerete:
I. Unless otherwise shown on the Drawings or detailed speci�ications, the standard
class foz- conerete curb, gutter, and curb & gutter is shown in the following table:
Cranr�arrl (-'IaG�Pc nfPavement C;nncrete
Class of Minimum 28 Day Min. Maxinr�um Course
Concrete Cementitious, Coznpressive Waier/ Aggregate
Lb./CY Strength Cementitious Maxinaum
psi Ratio Size,
inch
A 470 3000 0.58 1-1/2
C. Reitaforcement: See Section 32 13 13.
D. Joint FiIler
1. Wood Filler: see Section 32 13 13.
2. Pre-Molded Asphalt Boat-d Filler
a. Use only in at•eas whe�-� �ot pracfical for wood boards
b. Pre-nnolded asphalt board �ller: ASTM D545
crrY oF �o�tT woRTx 2021 Sidewalk Unit Price ConstrucYion Contract
STANDARD CONSTRUCTION SPECIFTCATiON ]�OGUMENTS
Revised Octaber O5, 2016 1025z0
321G13-3
CO%TCRETE CURB AND GUT"I'N;it5 AND VALLEY GUTTERS
Page 3 of 6
c. Tnstall the required size and uniform thickness and as speci�ed in the Drawings.
d. Include two Iiners of 0.016 asphalt impregnated kraft paper filled with a mastic
mixture of asphalt and vegetable fiber and/pi• mineral filier.
E. Expansion Joint Sealant: See Secfion 32 13 73.
2.3 ACCES�ORIES [NOT USED]
2.4 SQURCE QUALITY CONTROL �NOT USED]
PART 3 - EX�CUTION
31 INSTALLERS [NOT USED�
3.2 EXAMINATION [NOT USED]
3.3 PREPARATION
A. Demolition / Removal: See Section 02 41 13.
3.4 INSTALLAT30N
A. Forms
I. Extend forms the full depth of concretc.
2. Wood forms: minim�m of 1-1/2 inches in thickn�ss
3. Metal Forms: a gauge that shall providE equivaIent rigidity and strength
4. Use acceptable wood or 117eta1 for�x�s for cuives wrth a radius of lass than 250 feet.
5. All forms showing a deviation af 1/8 inch in 10 feet from a st�aight line shall be
rej ected.
B. Reinforcing ,Steel
I. Flace all neces�ary z-eznforcement for City ap�ra�al prior to depositing cancrete.
2. AIl steel must be free from paint and oil and aII loose scalc, rust, dirt and ofher
%reign substances.
3. Remove foreign substances from steel before placing.
4. Wire aIi bars at their rntersections and at a111aps or splices.
5. Lap all bar splices a minimum of 20 diameiers of the bar or 12 inches, whichever is
greater.
C. Concrete Ptacement
l. Deposit eancrete to inaintain a horizontal surface.
2. Work conerete into all spaces and around any rein�oz-cement to form a dense mass
free from voids.
3. Work coarse aggregate away from contact with the fornns
4. IIand-Laid Concrete -- Curb and gutter
a. Shape and compact subgz-ade to the lines, gades and cross section shown on the
Drawings.
b. Lightly sprinkle subgrade rnaterial immediately before epnc�e�e piacement.
c. Deposit conci-ete into forms.
CITY OF FORT WORTI� 2021 ,Sidewalk Unit Price Consti-uction Contract
STANDARD COI�ISTRUCT[ON SPk,CLFICATION DOCCJMENTS E OZS2O
itevised dctober O5, 201 b
321613-4
CONCft�T'E CURB ATID GUTTERS AND VALi,EY GUTTERS
Page 4 of 6
d. Strike of� with a ternplate 114 to 3/$ inch less than the dimensions of the
finished curb, unless otherwise approved.
5. Machine-Laid Concrete — Cu�b and Gutter
a. Hand-tamp and sprinkle subgrade maierial before concrete placement.
i�. Provide clean surfaces �ar concrete placement.
c. Place the concrete with approved self-propelled equipment.
1) The Forming tube of ��e extrusion machine or the forrr� of the slipform
machine must easily be adjustable vertically during the forward m�tion of
the machine to provide variable heigl�ts necessa�y to confo�-rn to the
established gradeline.
d. Attach a pointer or gauge to the machzne so that a continual comparison can be
made between the extruded or slipfo��n work and the �ade guideline.
e. Brush finish surfaces iirunediately afier extrusion or slipforming.
b. Hand-Laid Concxete -- Concrete Valley Gutter: See Section 32 13 13.
7. Expansion joints
a. Place expansion joints in the curb and gutter at 200-foot intervals and at
intersection. returns and other rigid stt�xctures.
b. Place tooled joints at I S-foot intezvals or matching abutting sidewalk j oints and
pavement joints to a depth of 1-1/2 inches.
c. Place expansion joints at alI infersections with conerete driveways, curbs,
buildings and other cux'b and gutters.
d. Make expansion joints no Iess than 1/2 inch in thickness, extending the full
depth of the concrete.
e. Make expansion joints perpendicular and at right angles to the face of the curb.
f. Neatly trim any expansion material extending above the iinisk�ed to the surface
of the finished warlc.
g. Maice expa�nsion jornts in the cuz-b and gutter coincide wzth the concrete
expansion joints.
h. Longitudinal doweis across the expansion joints in the curb and gutter az-e
requixed.
i. I�ista113 No. 4 round, smooth bars, 2�4 inches in length, for dowels at each
expansion joint.
j. Coat 1/2 of the dowel wiih a bond break�r and terminate with a dowel cap that
provides a minimum of 1 inch free expansion.
k. Su�port dowels by an approved method.
D. Curing: see Seetion 32 13 13.
3.5 R�PAIR/RESTORATION �NOT USED]
3.6 RE-INSTALLATION [NOT USED]
3.7 FIELD QUALITY CONTROL
A. Inspections
l. Sieel reinforcement placement
2. Headed bolts and studs
3. Verification of use of required design mixture
4. Concrete place�nent, includin� conveying and depositing
S. Curing procedures and maintenance of curing temperature
GITY OT FORT WORTH 2O21 Sidewalk Unit Price Constraction Contract
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS jO2S�O
Revised October O5, 2D16
32 l6 L3 - 5
CONCRETE CLT1Zl3 AND GUTTERS AND VALLB'Y GIITTERS
Pagc 5 af b
B. Concrete Tests: Perform testing of fresh concrete sample obtained according to
ASTM C 172 with tkie following ��equirements:
1. Testing Frequency: Obtain ] fi•esh concrete saznple for each day's pour of each
concrele nlixtute exceeding 5 cubic yard, but �ess than 150 cubic yard, pIus 1 set for
each additional 150 cubic yard or fraction thereof.
2. Slu�np: ASTM C1A�3; 1 test at point af p�accment for each concrete sample, but not
less than 1 test for each day's pour of each canerete mixture. Perform addi�ionaI
tests when concrete consistency appears to change.
3. Air Conieni: ASTM C231, pressure method, for normal-wei�t eoncrete; 1 tesf for
each samp�e, but not less than 1 test fox each day's pour of each concrete mixture.
4. Concrete Temperature: ASTM C1064; 1 test for each concrete saxxaple.
5. Compression Test Specimens: ASTM C31.
a. Cast and Iaboratary cure 3 cylinders for each fresh conerete sample.
1) Do not transport field casf cylinders until they have cured for a
t7lTpimum of 24 hours.
Compressive-S�rength Tests: ASTM C39;
a. Test 1 cylinder at 7 days.
6. Test 2 cylinders at 28 days.
7. Upload test results into Buzzsaw wi�in 48 hours of testzng. Reports of
compressive-strength tests shall contain Project identification narz�e and nurttber,
date of concxcte placement, name of concrete tester and inspector, location of
concrete batch in Work, design compressive stxen�th at 28 days, concrete mixture
proportions and rnaterials, compressi�e breaki�g strength, and type of break for
both 7- and 28-day tests.
8. Additionai Tests: Additional tests of concrete shall be made when test results
indicate that sliu7lp, air entrainment, compressive strengths, or other City
specification requirements have not been met. The Lab Sez-vices division may
conduct or request tests to determine adequacy of co�crete by cored cy]inders
complying with ASTM C�F2 or by oiher x�nethocis as directed by the Project
Manager.
a. When tl�e stren�gth le�el of the concrete foz- any pflriion of the structure, as
indicated by cylindez- tes�s, falls below the specified requirements, provide
improved curing conditions and/or adjustments to the mix design as required to
obtain the required strength. If the average strength of the laboratory control
cylinders falls so low as to be deemed unacceptable, folIow the care test
procedure set forth in ACI 301, Chapter ]7. Locations o�cote tests shall be
approved by the Project Engineer. Core sampling and testing shall be at
Contractors expense.
b. If the results of the core tests indicate that the strength of the strucC�re is
inadequate, any replacement, load testing, oz- strengthening as may be ordered
by the Project �ngineer shall be provided by the Contractor without cost to the
City.
9. Additionai testing and inspecting, at Conlractor's expense, will be performed to
determine compliance of replaced or additional vvork wzth specified requirements.
10. Cozxect deficiencies in the Work tl�at test reports and inspections indicate does not
comp�y wzih the Cantract Documents.
3.8 SYSTEM STARTUP [NOT USED]
2021 SidewaIk Unit Price Construct�on Contract
ciTv or Foxr woR���i 102520
STANbARD CON$'PRUCTION SFECIFICATION DOCUMEIVTS
Revised October O5, 2Q16
a2�6�s-�
CONCRL;T� ClTRF3 A,NI� GiJT"1`�,LtS ANll VALT,EY GU'i"f�RS
Page 6 o f G
3.9 ADJUSTING [NOT US�D]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTNITiES jNOT L7SED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USEDj
3.14 ATTACHMENTS [NOT USEDJ
END OF SECTION
Revision T�og
DATE NAM� SUMMARY OF CHANGE
12/20/2012 D_ Johuson ].2.A.2. �vlodified payment item to vary by street type
10/05/2DI6 Z. Arega Added Subsection 2.2.B1 and Subsection 3.7
2Q21 Sidcwalk Unit Pricc Construction Coniract
l02520
CITY OP FOR'I' WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised October 05, 2016
APPENDIX
GC-6.06.D Minority and Women Owned Business Enterprise Compliance
GC-6.07 Wage Rates
GR-01 60 00 Product Rec�uirements
CIT'Y OF FORT WORTH FY 2Q21 ATP Sidewalk Improvements
STANDARD CONSIRUCTION SPECIFICATIbN DOCUMENTS 102520
���s�a ruiY �, zo � �
�C-�o�6�1� I1�][i�m��� arn� �o�en ��ned �us��es �
���e��ri� e �o���ian�e
�'�[S IPAG]E �LE�7[' l[l'�7['EI�T�'�Ol�TA][��� �]LA�TI�
CITY OF FORT WORTH FY 2021 ATP Sidewalk Impravements
STAATDARI] CONSTRUGTION SPEC�'ICATION DOCUMENTS 102520
Revised 7uly !, 2D11
���.� . €����
�Y��_
�l=_,€ '��3����`�r T�� ��'�����T �-16f2���1 f�"�� �' � i�--.�9�
G[ty of Fort �vrth
�inarity �usiness �nterprise �p�cifications
SP€GIAL Ii�STRUCTIONS �OR OFFEI�Qf�S
A����caT�or� o� Pa�icv
Ef the tatal dollar �aiue of the cantraCt is �50,OOE}.01 or mare, then a MBE subcontracting goal is applicaf�fe.
F�O�ICY STATEIVIEN�
li is tl�e policy of the Ciiy af Fort Worth to ensure the full and �quitable participation by Minoriry Business �nEerprises
(MBEj in the procurement of all goods and setvices. Ai[ requireme.nts and regulations stated in the City's current
Business Diversity �nierprise drdinance applies ta this bid.
;� . , � �
Th� �it+�'s �sFlF�� gaa) a3-i ihis ���o�ect is _._.._�.�,._% af l�� l�as� �icl value af the con�r�et,
1�3o�e; If k�oth �B� ��rc� SSE sut�csnt�sciinc� r�c�als ar� esi,�ks(islte�f f�,r tfiis �rdjeci� th�n an Clffer�€�r m�s� st�k�r�yii tao�h a
�IB� 1�tilix�tion ��+rrn ar��i a S�� �itili�atian �cerm to i�� dee�ec� r�spcs�asiv�.
GUMRLIANCE TO BID SPECI�ICATIONS
On City cantracts $50,O�f1.0'# or tnore where a MBE subcontrac#ing goal is applied, �fferors are required to comply
with the intent af the Ciky's Business Di�ersity Enterprise Qrdinance by one nf the fnllowing:
1. Meet or exceed the above stated MBE goaf through MB� subcontracting participa#ion, or
2. Meet ar exceed the above stat�ci MBE goal ihrough MB� Join# Venture participa#ion, or;
3. Gnod Faith �ffort doeumen#atibn, ol';
4. Prime Wai�er documen#ation.
SIiRMiTTAL QF REQUIRE� �DCUMEfVTATICiN
The app{icabl� documents m�st be received by the by the assianed City of Fort Worth PraEect Manager or
departrner�t Desiqnee, snrith�n the following times allacated. in r..rrsr�� fi�� k�ra ��r�.iir� ;ai�f ;a�� h�±•� r,c,a7 it1�F,:�j rQv��n�+i'�� to
thi_ �_�1�i i:iFIi:391.�r�G�. Tiw� a�f�a�r�ar 5•3t�ll �I'��If_ fli� hr�;.3� ii�ci.��r�ert;��l'r[�� i[� �Il� ;3s�lr�r��r,1 City ai Fc�rt tiNi;�th
�'ic:�rr��;l fti�`�il+��� c�� C�s��:��tMNki4.�41 f�r=,r�pm�ni.9, J4 f�xr�d �:,cr�,� wili �+�t �ta acc£�t4�
9. Subcontractor !1#ilization Form, if goal is received no lafer than 2:00 �.m., on tha second City busir�ess day
met ar exceeded; after the bid opening date, exclusive of tf�e bid open�n date.
2. Gand Faith Effort and Subcontractor rec�i�ed no later #han 2:Op p.m., on the sec.ond City business day
iJtilization Form, if participatson is less fhan after the bid opening date, exclusiVe af.khe bid opening date.
staf�d goal:
3. Goad F�ith �ffart and 5ubcantractor received np latar than 2:00 p.m., on the second City business c€ay
Uiiliaation Form, if no MBE articipatio�: after fhe bid opening date, exclusive of the 6id ope�ing date.
4. Prime Cantractor Waiv�r �orm, if you will receivecl no later than 2:00 p.m., on tF�e second City business day
perform all subconiractingfsup�lier work: �fiter the bid opening daie, exelusive of the bid opening date.
5. Joint Venture Form, if goal is rnet or recei�ed na later than 2:0£l p.m., on the second Gity business day
exceeded: aff�r the bid opening date, exclusive of the bid op��ing daEe.
FAILURE TO COMPLY WITH THE CITY'S SU51�lE5S [31VERS�TY �N`C�RPRIS� C3RbIt�ANC�, WILL f2ESULi" IN
Tl-I� BEp B�ING CONSii7�1��D N�N-RESPONSIVE TO SPECIFICATIONS.
F'AILiJI�� 70 5U8ME7 ?'H� R��lUIF��D MBE bDGUiVI�NTAI"iCl�i Wll,� R�SIJL'I" IH THE BID BEING CONSI�ERE�
NOhi-RESPOI�SIV�. A SEC01�� FAILUR� WILL I2ESClL7 IN TFi� QF��RUR B�ING I]15QUALI�I�C3 �'UR A
FERiOD OF 01dE YEAR. ��-IRE� FAILi.iRES IN A FIVE YEAR F�RIOD WILL RES[l.LT (IV A ElESt�UA�.I�ECA710t�[
PERIDD OF �"HREE YEARS_
Any questions, please confact the Office caf Business Diversity at �8'17j �92-2674.
Office of Business Diversi[y
Email: t��wbeoffi�e@foriworthtexas.gov Temporjrily Reviseci �ps�il G,?U�0 dtre �o CQVCi�i9 F.���er��nc�f
f'hone: (817) 392-2674
ATTACHMENT1A
Page 1 of A
F�C� RT` '�� RT H
-�.�.,�.�-�
�i�y o� For� VIlorih
�'Jrfice o� Business Diversi�y
lVIBE SubContracfiorsl�uppliers U�ili�afii�n Forr�
Failure to complete this fia�m, �� its entirety wi#h requested documentation, and received by the Purchasing
Divisian no ]ater tha� 2:a0 p.rn. on the seco�d City business day after bid apening, �xclusiva of bic� opening date,
wil� resuit in the bid being consider�d non-respor�siue to �id specifications.
Tl�e undersigned �fFeror agrees ta enter into a forr-nal agre��ent with ihe MBE firm(s) iisted in this utilization
schadule, conditioned �pon execution of a cantract with t�� City of �ort Worth. The inter�tional andlar knowing
misre�resentatior� of facts is grounds for consideration af disqualification and will result in tl�e bid being
considered non-responsi�e to bid �pecifications.
MBEs listed #award meeting the project goa! must be focated in the six (6) county rr�arketplace a# ihe firne of
bid or the busirtess has a Signifcant Business Presence in ths Marketplace. Marke#place is f�e geographic
area of Tarrant �alEas �entart Jo�nsor� F'arker and Wise counti�s.
- - --
''�Prime contractors must identify by tier leuel af alI subcontractors/suppliers. Tier: r�eans the levei of
'subcontracti�g below thc pr�me contraetarlconsu[tant i.e. a direct payment frqm the prirr}e ca�#racta� ta a
subcon�ractor is considered 15t tier, a paym�nt by a subcontractar to its su�pfier is considerec� 2n`' tier. The prime
contractor is respnnsible to pra�ir�e pro�f af �ayrnent of all tiered subcor�tractors identified as a MBE and
counting those dollars torrvards meeting #h� confract comrriitted gaal. _ _
ALL MBEs NlUST BE C�RTiFIED BEFORE CONTRACT AVIlARi3.
Certifcation rneans those firms, focated within the Marke#p�ace, that hav� been determin�d to be a bonafide minority
business enterprisE by the E�orth Central Texas Regional Ceriifica#ion Agency {NCTRCA) and the Dallas/Forl Wort�
Minority Suppiier Development Cour�cil (DIFW MSDC).
If hauling servic�s are utiliaecl, the Offeror wiEl �e gi�en credit as iong as the MBE fisted owns and
operates at least one fully licensed and operatianal truck t� be t�sed �n the contract. The MB� rnay lease
trucks firom ar�other MBE firm, incl�cEing MBE owner�operatec{, and receive full MBE cred�t. The MBE rnay
lease trueks from non-MBEs, including owner-ap�rafecf, but will only receive credt far the fiees and
corr�missions earned by the MBE as outlined in th� lease agreer�ent.
Rev. 2113199
Identify all subcon�ractorslsuppliers yau wili use on tnis projec�
�[)�iC�VC1R�i'F{ A7TAGNMENT iA
�--�� -+�r��.-� Page 2 of 4
Offerors are required to identify AL�. subcantractarslsuppliers, regardless of status; i.e., Minority and npn-MBEs. MBE firms are to be �
lisEed fixst, use additional sheets if necessary. i'lease ttate that anly certified M��s +n�ill b� co�nted to me�t an MBE goal. �
�
5l3BCQ�ITRACT()R15UPPLf�R °
Company �Vame T � w �' Betai� I]etafl �
Address i g g Subcontracting Sup}�iies i
Te�epf�onelFax � � E hn Work Purc�ased �Q�lar Amount i
Email r B �
Cor�tact �erson � i
�
� �pL,��41,� �� �'�'�'
� �Y��( ��,.� .
� b�� �����
����- Y�����
� �l�-�5�-��i� - r��� �1���
���CbW�ti � ��Db. Cc'�
� �� � �
�t�f� .�.��� '��iv�
, ���-�b�� � ��
. � �'ia-3�9 - ����
���� �
��� ��be�� cm,
� ! �
��
�
rc��r �
C�c��� �
� ���� ���
r y s�3 �"t„J
�.,
��
�L�
���
�► ;
�
���,����'�
� `�.�� �� . ����
€2e�. 5;15?19
�'�hT�'�'Q(t7'H RTTAGHMENT 1A
'��`�'i'�`W Psge 3 af 4
Offerors are requirad ta identify Al,L subcontractorslsuppliers, regardless of sEatus; i.e., Minarity and non=NiBEs_ M8E firms are ro be
lisled first, use additianaf sheets if necessary. Please note fhat only certified MBEs will be counted to rxieei an NIB� gaal.
N
SUBCONTRACTORlSUPPE�I�R °
Gampany Name �- M � '� Detail [letai!
Address i � g Subcontracting SupPlies pollar Amaunt
Teiephonel�ax � E � M Wprk PurChased
Emai1 r B
Conkact Persoi� �
� ❑
�
� �
� �
� �
� �
� �
Rev. 5115119
�`o�� r ��'o�'r�
,e ��,��^'�-_
ATTAC€�Nr�NT 1A
Page 4 oi 4
Total Dollar Amaunt of MBE 5ubcontractors/Suppliers $���� �6 �f�'�G
Totai Dollar Arno��# of Nan-MB� 5ubcantractarslS�ppliers � ����"°�
TOTAL DOLLAR AMOUN7 OF A�.l. SUBC{]N�'RACTORSISUPP�.�ERS $��� �� ���
! �
The Offeror will not make additions, dele�ions, ar substitu�ions to this certified list without the prior appro�al of t�e
Dffice af Business Diversity through the suf�rr�ittal of a Request for Apprava] of Change/Addition
form. pny unjustified change or deletio� sha�l iae a materiaf E�reach of contract ar�d rrzay res�lt ir� debarment in
accord with the procedures outlin�d in the ordinance. The Offeror shall submif a detailed explanation of
how the requ�sted cha€�geladdition or deletion will af�ect t�e con�mittec� MBE goal. ff ihe detail explanatiors is
n�t subrr�itted, it will affect the final eornplianc� cletermit�ation. '
By affixing a signature to this form, the Of#eror further agrees ta provicfe, directfy ta the Cify upon request,
complete and acc�raie information regarding actual work performed by alf su�contractors, i:7cfuding MB�(s) and
any special arrangements with MBEs. The Offsrar also agrees ta allow an audit andlor exarr�inatian o� any
boaks, records and files i�eld by tneir cornpany. The C)fFerar agrees to allow the transn�issio� of interviews with
owners, principals, ofFicers, err�play�es artc€ applicabf� subcontracfiarslsup�liers partieipating an the cantr�ct that
vvill substantiate the acfival work perforr�ed by the MBE(s) nn this cont�-act, by �n a�thorized officer or emplayee
of the City. Any intentional andlar knnwing r�isrepreseniation of facts will b� grounds for terr��nat€ng th� contract
ar d�barm�nt frorn Gity work for a p�riod of nc�t less tf��n three {3} years ar�d for ir�itfating action ur�d�r ��d�ral,
State ar Local lavvs co�zcernirtg faIse �tatem�nts. Ar�y failure to cornp[y with this ordinanc� crea�es a rr�aterial
breach af khe contrac# and may result in a de#ermina#ion of an irresponsihle Offeror and c�ebarrnent from
participatir�q in Citv work for a period o# time not less than one (1) vear.
��,�n� '��al � �
Cityl5tatelZip
�ffice o€ Business Diversity
Email: mwbeoffice@�ortwortiitexas.gpv
Phone: {817) 392-2674
����� Q���
Printed Slgnature
�.��1� ����. �,�� ���- � �� �i� � I�
Cohtact rrtelTitie (if different) �
� ��-�-�� �
7elephnne andlor Fax il ��i�� �,�� � �4� . ��
V"� �
�
��c n���,_ �� -- - - ,
�-mail Address
L}ate �
Rev. 5115119
�
CampanyName
Adrlress
A�"iACFlME�[T 1C
Page i of 4
__ __ ----
]f the Offeror cEid not meek er exceed the M8E subconfracting goal for this prnject, the Offernr m�st cornplefe this
fn rrn.
If t[�e Offeror's methc�d of compliar�ce with the MRE goai is based u�on derr�anstration of a
"good fai#f� �ffort", the Offeror wi�l �ra�e the I�urden af correctly and acce�rately pre�aaring and
submitting the dacumen#a�io� req�ired by ih� City. CompEiance wi�h eac� ifem, 1 thru 71 below,
shafl satisfy the Goad Faith Effort raquirement absent proof of fraud, intentian�l ar►dlor knawing
misrepres�nfiakian of the facts nr intentional discrimination by fhe Offerar.
F'aflur� to complete this farm, in iis entirety with supporting documen#at€on, aE�d receivecf by the
Purchasing Division n� laker than 2:00 p.rn. on th� second City business day after bid o�rening, exclusi�re
of bid openir�g date, will result in th� bid b�ing considered non-respansive to hid speeifieations.
- -- -- __ -
1.) Please list each and every subcontrac#ing �ndlor supplier appor�unity for #he campl�tion of this
projec#, regarc[less of whether it is ta 6e provided by a M8E or nan-MBE_ DO NOT LIST NAM�.S O�
FlRMS 4n all projects, ihe �fferar I7ill5t IfSt each subcontracting and or supplier opportunity
r�gardless of tier.
(Use additronal sheets, if necessary}
List af Subcantracting Opportunities List of Supplier Oppor�unities
Rev. 51'1.��f� A
�� T ����� �i�y of For� i!Ilorth
ii�finor�ty Business �nterpr+se
�B€ Cood �'aith I��for� Form
ATTACHM�NT 1C
Paga 2 of 4
2.} O�tain a current (nat rriare than two (2� months ald from the laid open datej list ofi M�� subcontractors
andlar suppiiers frarn the City's Office o'F �usiness D[versity.
Yes Date vf Listing
❑ No
3.j aid you sdlicit bids frain M8� firms, within the subcontracting andlor suppliar ar�as pr��iousfy listed,
ai least ten calendar days prior ta hi.d o�aening by mail, excEusi�e of #he day ti�e bids ar� opened?
❑ Yes (If yes, attacl� 14f(BE rnail listing in incEude name af ftrm and address and a daked capy pf letter mailed.)
�N o
4.) �?id you solicit bids from MBE firms, within the subcontracting andlor supplier areas �reviously iisted,
a# least ten calendar days prior io bid apening �y telephar�e, exclusive of th� day the bids are o�aened?
���5 (lf yes, attach tisf tn include name o� MBE firm, ep rsnn contacYed, phone numirer and date and time of contact.j
I✓I f�C1
S.) Did you solicit bids frorr� MBE firms, within the subcontraciing anc�lar s�pplier areas pre�iously listed,
at least ten cafendar days prior to bid opening by #�csimile (fax), exclusiue af the day f€�e b[ds ar�
opened?
❑ Yes (If yes, attach list to inctude name of MSE firm, fax number and daie and time of contact, In addition, if the €ax
is returned as ��n!�Qtiverabls, then thaf "undeliverahle canfirmaEion" received must be printed directly from the
facsimlle for nrom�r documentation. Fallure to submit confirmation andlor "undefiuerable con�irmation"
documentaclon o�ay render the G�'� non-respansi�e.)
�ND
B.) Dic4 ycsu salicit bids fram MB� firms, within khe sub�antractir�g andlor s�pplier areas pre�iously lisied,
at least ten calendar c�ays ��rEor to bid opening E�y email, exc��sive af the day tha bicis are openad?
� Ye5 [Ef yes, attach email confirmation ta include narn� of M�E firm, tEate and time. ln addition, if an email is re#urnad
as undeiive�;'�le, :9�en that "undefiverable message" reeeip# trtust ba printed directly frorri the emait system for
proper doc��rn��tatlon. FaiEure to submit cbnfirrnatian andlor "undalivera6fe message" documentation may
render the �F� nu.�-respor�si�e.}
o% N O
NOT�� TE�e #our methads identified above are acceptable far soliciting bids, and eaeh selected methacf
i must be applied to the applicable contract. Tlie Offeror rr�ust dncurnent that either ai least iwo atterr�pts
were made �asing t+nlo of the four methods ar t�at at ieast ane succes5f�ii contac# was inad� using one af
the four methods in order �a deerned responsiva to +�P Gcand F�:t� E�io� t requirament.
NOTE: The Offeror must cantact the entire MBE list specific to each s�bcontracting and supplie
npportunity ta he in compliar�ce with questions 3 thru B.
7_) Di yo� pra�ide �lans and speci�ications Yo potential MB�s?
� es
N4
8.j C�id yau provide the infarrnatian regarding t�e lacation a# plans and specifications in nrder tn assist
the M�Es'�
� Yes
� Na
Rev. 51951i:9
ATTACNMENT1C
Page 3 of 4
9.) Did you prepare a�uotation for the MBEs to bid on goodslservices specific to their skill set?
(If yes, atfach all copies of q�otatians.)
Yes
No
'i0.} Was the contact information on any a# the listings not valid?
{If yes, a#tach the �nformation that was noi valid in order for the pffice af Business �iversity ta address
❑ Yes the carreCkior�s needed.}
I.�t"'Mv
�1.jSubmit dacurr�enfatfon if MBE quotes were rejecied. 7he docurnentatiar� submitted should be in the
f4rms nf an affidavif, include a detailsd explanaEion of why the MBE was rejected artd �ny supporting
dvcumentaiinn the dfferor wishes to ba co�sidered by #he City. In the event of a bona fide dispute
concerning quotes, the Offerar will pravide for canfid�ntiaE in-ca,rraet'a access to an inspection of any
relevant docume�tation by City personnei.
(Please use addrtiane! sheets, rf necessa , and attach.
Gompany Name Telephone CantaCt Perspn Scope of Work Reasan for Rejection
ADDITIONAL INF(3RMATfON:
PEease provide additional informa#ion you feel will #e�rtE�er explain your good and honest effarts ta obtain
MB� participation on this �rojsct.
The �fiferor further agrees io provide, directiy to the City upon req�est, eo�nplete and
accurate �nfarmatinn regarding actual work perF'ormed on fhis contract, the payment
thereo# and any proposec! changes to the original arrangernents submitied vurtt� this bid.
The C7ff�ror alsa agr�es to allow an audit andlar examir�atian a� any E�oo�cs, rec�rds ar�d
fi[es held by their cornpany that wilt substantiate the actual wark perforrr�ed on this
contract, by an autl�orized o#fic�r or er�ploy�e Qf ihe City.
Any intentior�al andlor i�r�owing misrepres�r�tatic�n �f fiacts witl b� grour�ds for
terrnina#ing th� cor�tract or dek�arment from City work for a period of not less than three
(3) years ar�d for initiating actian under Fer�eral, Stafe or Locaf Iaws �oncerning fa�se
statements. Any fiail�are ta comply with this ordinance shall creat� a material 6rea�h Qf
contract and rr�ay resul� in � determination of an irresponsi�le Dfferor and debarmen#
from participating in City work for a perivd of iime not less thar� one ('1) year.
Rev. .ril�l5�19
A7TACHME�TIC
Page � of �4
The undersigned certif��s t�afi �he informa�ion pro�ided and the MBE(s} lisfecf waslwere
cor�tact�d in �ood faith. �t is unct�rsfiood fhat any MBE(5j I�sted in Attachmer�t '�C wili be
cantacted and the reasorts for not using them will be v�rified by th� City's Office
of Business aive
Authc�zed 5i�n
Title
�
Company {Varne
��
adcfress
CitylStatel�ip
� � I �c .��m
Printed Signatur�
����-� — ���� ���v�r"
Cantac ame and Title (if different) �
�� ���� ���� x �
PhanF Atumb� Fax �lurn�er
���r�i �["�3� � �O I. Cc�'I
,
�-.
�rnaiE Address
� ��� �����
����
Office af Business Di�ersity
Ema#l; mwbeoffice@fortwort�texas.gov
Phone; (817} 392-2�74
Rev_ 51i 5119
�C�6m�7 W��e ��tes
T�fI� ���� l�E�"�` I1�7['�E10�7['��l�A.][�1�� I3�LA��
C1TY OF FORT W ORTH FY 2021 ATP Sidewafk Improvements
STANDARD CONSTRUCI'iON SPECIFICA'I'iON DOCUMEIYTS 102510
Revised luly l, 2011
201� PREVAILENG WAGE RA7'ES
(Hea�y and Highway Construction Projectsj
CLASSIFICATION DESCRIPiION
AspF�alt Distributor Operator
Asphalt Pa�ing Machine O�erator
Asphalt Raker
Broom or Sweeper Operatar
Concrete F�nisher, Aa�ing and Strucfiures
Concrete Pavement Finishing Machine Operator
Concrete Saw pperator
Crane Qperator, Hydraulic 80 tons or �ess
Crane 4perator, Lattice Baom 80 Tons or l.ess
Crane Operator, Lattice Boom O�er SD Tons
Crawler 7ractor Operator
Electrician
�xca�ator Opera#or, 50,00� pounds or less
Exca�ator Operator, Q�er 50,OD0 pounds
Flagger
Farm Builder/5etter, Structures
Farm 5etter, Paving & Curb
Foundation Drill Operator, Crawler Mounted
Faundation Drill Operator, Truck Mounted
Front �nd Loader Operatar, 3 CY or Less
Front End Loader Operator, Over 3 CY
Laborer, Common
Laborer, Utility
Loader/Backhae Operator
Mechanic
Mi!]ing Machine Operator
Motor Grader �perator, Fine Grade
Motor Grader Operator, Rough
�ff Road Hauler
Pavement Marking iVlachine Operator
Pipelayer
Reclaimer/Pulverizer �perator
Reinforcing Steel Worker
Roller Operatar, Asphalt
Ro[ler Operator, Other
5craper OperaYor
Servicer
5mall Sfipform Mac�ine 4perator
5preader Box Operator
Truck Dri�er Lowboy-Float
Truck Dri�er Transit-Mix
Truck Driver, Single Axle
Truck Driver, 5ingie or Tandem Axle Dump Truck
Truck Driver, Tandem Axle 7ractor with Semi Trailer
Welder
Wark Zone Barricade Servicer
Wage Rate
$
$
$
$
$
$
$
$
$
$
$
$
�
$
$
$
$
$
$
�
�
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
15.32
13.99
12.69
11.74
14.12
16.05
14.48
18.12
37,27
20.52
14.07
19,80
17.19
16.99
10.06
13.84
13.x6
17.99
21.47
13.69
14.72
1a, 72
12.32
15.18
17.68
14.32
17. � 9
�.�.oz
12.25
13.63
13.24
i1.a1
i6.18
13.08
11.51
12.95
14.58
15.96
14.73
] 6.24
14.14
12.31
12.62
12.86
14.84
11.68
The Da�is-Bacon Act prevailing wage rates shown for Heavy and Highway constructinn projects were determined 6y
the United States Department of Labor and current as of September 2013. The titEes and descriptions for the
classifications listed are detailzd in ti�e AGC of Texas' SYandard Jo6 Classifications and Descriptions for Highway,
Hea�y, Utilities, and Industriaf Construction in Texas.
Page 1 of 1
2U13 PREVAILING WAGE RAiES
(Commercial Construction Projects)
CLASSIFICA7EON D�SC�2IPTION
AC Mechanic
AC Mechanic Helper
Acous�ical Ceiling Installer
Acoustical Ceiling Installer Helper
ericklayer/Stone Mason
Bricklayer/Stone Mason Trainee
Bricklayer/Stone NEason Helper
Carpenter
Carpenter Helper
Concrete Cutter/Sawer
Concrete Cutter/Sawer NeEper
Concrete Finisher
Concrete Finisher Helper
ConcreYe Farm Builder
Concrete Form Buiider Helper
Drywall Mechanic
Drywall Helper
Drywail Taper
Drywa[I Taper Helper
Electrician (Journeymar�)
�lectrician Apprentice �Helper)
Electronic Technician
Floor Layer
Floor Layer Helper
6lazier
GEazier Helper
Insulator
Insulator H�Iper
Laborer Common
Laborer Skilled
Lather
Metal Building Assembler
Metal euilding Assembler Helper
MeYal Installer {Miscellaneousj
Metal Installer Helper (Miscellaneous)
Metal Stud Framer
i1/letal Stud Framer Helper
Painter
Painter Helper
Pipe�Fitter
Pipefitter Helper
Plasterer
Plasfierer Helper
Plumber
Plumber Helper
Reinforcing Steel 5etter
Wage Rate
$
$
$
$
$
$
$
$
�
$
$
$
$
$
$
$
$
$
$
$
$
$
$
�
$
$
$
$
$
$
$
$
$
$
$
$
$
$
�
$
$
$
$
$
$
$
25.24
13.67
16.83
12J0
19.45
13.31
1fl.91
17.75
14.32
17.00
11.00
�.5.77
11.00
15.27
11.00
1536
12.54
15.00
1J..50
19.63
15.64
20.00
18.00
io.00
21.03
12.$1
16.59
11.2]
10.89
14.15
12.99
16.40
sz.oa
l3.a0
11.�0
1b.12
12.54
16.44
9.98
21.22
15.�9
16.17
12.85
21.98
15.85
12.87
Page 1 of 2
Reinforcing Steel Setter Helper
Roafer
Rnofer Helper
5heefi Metal Worker
S�eet Metal Workerliefper
Sprinkler 5ystem �nstalfer
Sprinkler 5ystem Insialler Helper
Steel Worker Structural
Steel Worker StrucYuraf Heiper
Waterproofer
Equipment Operators
Concrete Pump
Crane, Clamsheel, Backhoe, Derrick, D'Line 5ho�el
Farklift
F�oundation Drill Operator
Front End Loacler
Truck Dri�er
Welder
Welder Helper
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
x�..os
16.90
1.1.15
16.35
13.11
19.17
14.15
17.00
7.3.74
15.00
].8.50
19.31
16.45
22.5fl
16.97
16.77
] 9.96
13.00
The prevailing wage rates shown for Commerciaf construction projects were based on a salary survey conducted
and published by the North Texas Construction Industry (Fall 2012} Independently compi[ed hy the Lane Gorman
Frubitt, PLLC Construction Group. The descriptions for the classifications listed are provided on the TEXO's (The
Construction Association) website. www.texoassociatian.org/Chapter/wagerates.asp
Page 2 of 2
�Il� �.0� S�a�r�d�r� �o��tru��tion �e�anls
T�S ]P.A��� L]E]F'� �l\T'�'EN'�`��I�A.I��L�' ]��L�T�
CiTY OF FORT WORTI� FY2021 ATP SidewalkImprovemcnts
STANDART3 CONSTRUCTION SPECIFICATION DOCUM�NTS I02520
Revised July I, 201 l
om
�£
�
k€
m�
�w
o��
9��
� �
I�' � an
�v� ��¢
xm�
�JN
.�I' o AM
-� �z
� �ro�
n �i �ii
�
u
N �
g ¢
z
P .
F
� �
N o [
r .
3
� �
O �
z ,� � �
¢
� � �
4 Z �
} �
- U ~
� � y _
K 4i .
� `" w E
P � z -
k a � <
� � � H
o m � u
� z o S S
�3 � � � _
z .- a � .
�
X
�
9
�l
O
�
7
O
L5 F
a �
� w
3 =
O i
f
I .
....�
•Iv., : I
�
I
$o
8�m
�g�
�M�o�a
� — ,,-�-----
�YJUN II � I�Y
�n j i
��w^ I
�! ��"`Y'
3 I
� !��i.
q I � �i �
0. n r �
� `�z
o I '�^l', m
f I v�i ���I . UaV��j$
�F� ail" �i4zaM
ow�
2 ¢ �' �: � 1
Fw� }� I
���� 1 �1
,
'�"-,` iT.-:�." n
��.�_ i �`�o.�
� ��'� �'_�i �
°°�4o f. - . . o n
�^ , � j :,j:�., ���
HQ �= I II ���
z! i � f,i Y�o
� � �
� i� � ��
�� �.C. �w�
4' � a U F
" �;�� � � a��
� �.�,
a 1; e �;
� ,
I� '� `� ����;'�
� :�:,,' �.
l � ��'�
_ ;
; �i L
�
i� I
v i �I �^� rc
�I i �F�
ii � z�
� �
n ���
�<►I -,�'`'. S�Y
6
� �"
7e _
� � I E� U��
J��
�� 7
d w'� � ` I'_ I .
����I .
o�M, .
�a� j �� ��I,
x -_�_:
� , r ��L�
z X �j
rc�
WU �Z
N
g ���
`� � �a�
0
� �d ���
�� y�
m "
� � i� 3aU
� z� �W�
�.i �-' � z
. � � w� ��o
m � (ry.. �W z�d
� Kp oY� 4�f
� � �k ��� ���qz
� � Wxq [�if�0 pa"
� 33 �
� ��} y��
VJ< <� U �Zm�
�i G n� �pN FZN
Ie.e � zN 2�� � �
� � �m� �a4
z� xu
\ �' FM w�s �"'3
w �y 5 a�
� FNtn �F�� P3SP
� x �i 4l� j� �`
� m � c�i� �'i � ozY
� p U5�� V�� otZ3�
� � U -V -ao i��
Y � n n v n
} �
°�d �
� �
� �
�
o �
� o
�� �
i '
I �O�n
�
� 1 �
11
N �.
.,
$a z Y'Ali i
��m V�. fli,
x
��� ��jf,:,��
q . a a � li:�._
� � ~ FI��'
� � a�. `il:' _
���, �
6 � " +�•
� �� '1:'
��n_ i pIIY:
A�� J
I r.11
_�.�
� — —
0z
�F� I
8��
���
,.�, x
! , �
�
::1.�, �
� �'. �ti
�'--}. 1
�t
�Y
i�
�rm�o
$���;
LL'm
��
>i�
m�
��
O
aS�
�xw
� N��
a�
U d r
D �
H o
Z d' W
� x � � � U
�
O
O � Z �[1 � z0
(�11� OA �X
U �
O � _ � � �
N M
m w � � x �
K d'�� � Z � a
U yt p �U � 0]
�
Z
C'1
W
�
�
�
O
Z
�
a
J
m
Z
�
X
�
J
J
4
Y
!s
[L'
W
7
0
�
0
z
a
�
Y
Z
J
m
J
�
�
�
�
n
�
z
�
�
�
a
d
U
z
�
w
a
r LV
C7
Z
U
4
a
� N
� H
� z
X O
Q '�
� Z
-IO
F
U
Q
�
Z
O
U
1 N
_�
'�
>n
��
io
��
�
K �
r
��
� N
cs r�
X �
X d'
� m
cn n �
� �wp
m3 Ma.
xU x4X
�O �O �1
NOTES TO ��SIGNEft:
1. FILL W 6LANK5 AND/ OR VERIFY ALL TEXT IN BLUE.
2. REVISE �ETAfL AS NECESSARY T4 i�1ATCH ACiUAL ROADWAY DESIGN.
9" --
ASPHALT PAVEMENT
PER PAVING TYPICAL
�}4 BARS SEC710N
:1 —�
i � : � �� � ���_.,.. -0,.,_,: y,.�..
T g . �
= PVMi. ��,'-I I � ." xa; s.�
THICKNESS r .'A ���.� ' ' � .'
4R 6" AdIN. ' � � '
.',�,�•j'
: m.`.� , -
k�.
,��. .CJ ... . . .,�1� '�:r-' :'_ —. ,.. ��..
�.��' � �?. =�J.� �3. . %a,. r`�3' ?-�i,_' ':�' ..
'�- 'r...�^ " ;��-;':o' •,4'j .� �d.`: .
,''�, ::. 'c'"' _ , ' A;;. ,.' :'.- . .�-,,.:
' �;--
. r,�: `�-y�..: :c�:., '.��.,�:cc.. ..,"��°'S$�'sa�- �., ?.�. }`�'_ .
12"
�— STA9ILIZE� SUBGRADE
PER PAVING TYpICAL
COMPACTED SUBGRADE SECTION
PER SECTIQN 32 13 26
N QTES:
1. PLACE CONCRETE T1PE H PER SECTIbN 32 13 73.
2. PLACE EXPANSION JOIN'FS AT 200—FOOT INiERVALS ANU AT INiERSECTION RE7URNS AND pTHER RiG1D STRUCiURES.
3. PiACE TOdLED JOIN75 AT 15—FOOT INTERVALS TO A OEP7H �F 1 X� lNCHES.
4. FLAC� EXPANS]ON JOINTS AT ALL INTERSEC710N5 WIiH CONCRETE �RIVEWAYS.
5. MAKE EXPANSION JqINiS NO LESS THAN J¢ INCH IM THICKNESS, EX'fE1�EDiNG THE FULL DEPTH OF THE CONCRE7E,
B. NEA7LY TRIM ANY EXPANSI4N MATERIAL EXTEN�ING ABOVE TH� FlNISHE� TO THE SiJRFACE OF THE FINISW�p WpRK.
7. PI..ACE LONGIIU�INAL �OWELS ACROSS THE �XPANSION JOINTS.
8. INSTALL 3 N4. 4 RdLJN�, SIAOOTH BARS, 24 ]NCHES IN LF�G7H, FOR DOWELS AT �ACH EXPANSION JOINT.
9. COAT J� QF THE DOWEL 1NiH A BON6 BREAKER AN� TERMINA7E W1TH A �OWEL CAP THAT PROVfD�S A MINIMUM OF
1 INCH FRE� EXPANSIDN.
�0. SUFAORT d6WEL5 BY AN APPR6VED A�ETHDD.
������y� CITY QF FORT WORTH, 7�XAS
�,� CONCRET� �,DG�lR��'AIfV��
�'OR ASPHr4LT P�1/'li��
RE�isEo: os-s�-za�z
32 '� 3 '13����10
NOTES 70 DESIGNER:
1. FILL IN BLANKS AND/ OR VERIFY ALL lEXTS !N BLUE.
FIRST PQUR SECOND PdUR
CONSTRUC710N JDINT WITH
� r SILICONE JOINT S�ALAN7
PER 32 13 13-D518
i B�� - �
,- . - . �g."• ' I �:a-, ;� y- '.3- a' '�� =."F�.'.. � ��:.=' � T�Z
,; A r - _ . '_�•.' � •� - ' -a.:F - : ,•, • . �
['�,°' • �q ! �•. +z' V �a.. • �� -' '•e'�a: ,a.:•y,a� I i
� �
�:- d'� -:C3:'`.. _ .�dc, _ ` '- •Q J - '.'6 _ .9
.. _ _ _ - - .'Q ','y" .� _ _ _ ' _
� . � �' -��` • _ _ _ - �=�.
_"�� ' " ' ` _ '_' _ ` � � . '_ '_ "` _ . _
#X7( BARS � XX'
O.C.B.1N.
TYP� 1
FERST POUR SECON❑ POUR
CONSTRUCTIDN JOINT WITM
SILfCONE JOINT SEAIANT
P�R 32 13 13-D518
T/2 I
� T
�
�4 x 36' pEFORM�D L pEl2PTYPICALUBGRADE
BARS � XX'� O.C. ROAaWAY SECTION
PROYOS�D SEIBGFtADE
PER TYPICAL ROADWAY
SEC170N
7Yf'E 2
�o�� �%���
C17Y OF FORT WORTH, 7�XAS
�ONSTRLICTI�� JOINT
REVISED: OS-31-2012
3� � 3 � 3��g'� 'f
��� �r,�w o .,.. � ..... ......�
O.C.B.W. F'RO�A FIRST POUR
A MINIMUM OF
40 BAR DIAMETfRS
NOTES TO pE51GNER:
1. FIL.L IN BLANKS AN�/ OR VEREFY ALL 7�XTS IN BLl1E.
#5 x 1$" DEFOR?�E� BARS
DOW�LED AND EPDXYE� INTO �
EXISTING PAVEMENT � X7C" O.C.
CONSTRUCTIO�I JOINT WI7H
SWCONE Jfl1NT SEALANT
PER 32 i3 ]3-D518
#XX BARS � %X' O.C.B.W.
EXISTING CDNCRETE
PAVEMENT
PROPOSED -
PAVEMENT
PER SECTION
32 13 13
. . . . ... . , ". .'_ . . . . . . . ... . . . * � - T�2
" . . �_ � - , . � � _.��
. _. .. ... .. . .
:. .a.n.-.^..:. .; ar� _. �.. .....-:.._ _ - -- -- - -
,: .___... -, . . � . _'.::'� y-� .
.-.
' = ... �=� ,..e , _ .; .
,, . . .,- - .' . � . ._.�-.��:'-_.'y _,.:. . - �e"Cy
. rJ � d3 . '
� G �'d � �
�� ��' '.� � ' u- � c�):
I_._.— '�� E F--- �E E— I_.I .._� :"`�.. �E _` EY �:. ..I; . � E _ . -.,� � . . ': : ,
.__.; i I'--�!'t I E—� i i--�� I,--1 I_..W- I I—� ��� _--�--E I€..— . i�-'� i E=i�3 i� i I I � i-- Ef j �i .� ,._i I. i[_-l�� `..
) � � i �--� � --1 1 �_._ .
EXI571NG 6" PR4POSEn SUBGRADE PER
SUBGRqD� MfN TYPICAL ROAdWAY SECTION
�i���+ ����+� C[TY OF FOR7 WORTH, TEXAS
CONST'��I�iI�tV JOIN7' ��E1°�V��R�
_ �XISiING AN� PRO����� ��#l��Il�V�Pli}
REVISED: 08-31-2012
3� �3 '93�D512
ND1E5 TO I]ESIGNER:
1. FlLL IN BLANKS AN�/ OR VERiFY ALL 7EXTS IiJ BLL1E.
EXPANSIOT! J41iJT, FORM�D GROOVE
#XX BAftS � XX" ROUNDED TO Ya' f2ADIU5 WITH
D.C.B.W. SILICONE JOITlT SEALER AND
6" 6" RE�W00� EXP. JOINT FlLLER
2" PER 32 13 �3—�St7
2"
/ 1Ya" MIN. CLEARANCE
� �.
-��2 . s,• _ : �.� , �=n , .
3�:
T � i ,. a+ � .' � e . ;.',' PROF'O5ED
� •' � :m�R' ` . `' . ..- _ : e � '_ '`• SLIBGRADE PER
�- ��• m• ' � � tu.' � ��� TYP]CAL RDADWAY
a._ i'•�`5 - .:� ..tv ;• _ Q" �'�; _ • _ - : _ .= : . o � oQ.:.� SECTION
. . �- .. . ..'� � . ¢ �. �'"5 .�;� �' �.�
�— DOWEL SLEEV� OR
#XX x 24" SMd07H 76" CAP TO FIT �OWEL
DOWEL � 12" O.C. DOWEL COATING AN� B� SECUftED
W/GREAS�
8AR STOP
DOWEL SiJPPOltT
OR 6ASKET
FOR���R,THi CITY OF FORT WOR'fH, TEXAS REvisE�: oa-31-za12
�)CPANSI�h� J�IRIi 32 13 '13�Q��3
NOTES TO pE51GN�R:
1. FILL IN BLANKS AN�/ OR VEI2EFY ALL TEXTS IN B�UE.
#XX x 2D" SMOOTH
�6WEL � XX" D.C.
INTP EXISTING
PAVEMENT
EXPAN5EON JOiNT WITHQUT
[7(7WEL SUPPORT BASKET
PER 32 13 13—[}S17
/jXX BARS c� XX"
�.C.B.W.
PROPOSED PAV�MENT
PER SECTION 32 13 13
EXISTING CONCRE7E
PAVEHIENT
1Y4" MIN.
GLERRANCE
2" MIN.—
� :. : : .... .. ...�_ �.. .. : ::.. . _ _ �9 C�L':;� ;�. ..
. ' _ _ . . . . . . . . ' ' _ ' _ _ ' . . . . . . . . . . . .. . . . . . . . . . . . . O� � _ . . • .
� ..��: ,�.� . _
_ .�'''. .o - � o•_. s' :
_ '`� ' _ �.. `�,: _ �
- ��: � - _ _ `� _ 'p-'' .`�
' . 6: �"C . :.
. .
. - : � . . . ; a...
. . . . .. _
. ,;� ��
, . :'.
- . - .....� . . .. _
j� �
i il—€li�i =�3:1�—�ill-----1 il—�--�ii�IN—'�I� `�t�:.........lil�! lei—I—II� .�—I��iil—t�ll---i.l � ��l.�—=�-1ii-----i�3�—`._i�i�Ii--'I�i1--�=�—�I•i'f—
s� DOWEL SLEEVE OR CAP
EXISTING MIN TO FIT pQWEL AND BE
SUBGRAQE SECURED
BAR STOP
����+���►�+� C�TY OF FORT WOR7H, TEXAS
� �i���i����� ������������ .�����
(��iL�l��N ��IST .Af�D �F�O� �A1l��l�f
i/2
� T
�
PROPos�o
SUBGRADE
f'ER TYPICAL
ROADWAY
S�CTION
REVISED: 08-31-24�2
32 '�3 �3�9��4
� fF�
___,� �
.'�Q: �_:_ � � �
_-_ i
— I
:: , ,: _ -
- _,;::'� �
�=-.�,. . � �
:�=di�i�
s
n
�
�
�
O
�
g
�
�
� Z
O
ri �
� �
7
E
�
I
�
�
�
�
<
�
i
0
<
� X
ti �
�
� -
� �
O
Y r
��
g�
Sg
���
W��
sM
z�
��
��
S�
i
� "'
s�
€�
NM1
m
O
X
0
�
_ �
o �
�
�
g
�
>
3
�
a
an
O
O �
� ••� :� :
'�. 'H• .
F �
(� d•
, o�: �.
- - '�':
�`-
; :4: e
= a.,':
- '.� ti
- 9'
�P
r. •o:�'.
' : :r �' -��,
3 .R
'�._6
_ �,�s.
..1T •¢frG�.
•+ff "_`�
`��'.
C... �A : :;.
i .i:..- � ''�_
a,� :
; F', '
t �, t.a3.
-F_..
t P-
� � r� `-
,'�.
�. p.
d.:
' _ ' ,-�,,�,
U a:
- q�
n ��
.�; k_
f•` � 0
. _ : . "� .
• 11``�
�V
o�
;<
v
v�i a
0
�a
RU
0.�
�
N
�
J
4
dz
�om
ow`_"
���
���'
H d n ^)�T_-' (�
� I -._._.
�
I
�
�
� �
�--
�
Z
�
�
z
C'�
�
D
H
�
r
O
Z
�
2
�
x
r�-
a
r
[C
�
�
0
�
0
z
¢
�
x
z
Q
�
z
J
J
IL
N
W
J
m
H ltl
� � O
U J tl
UJy'
¢ Y N
� Q i7
a�0
�Fv
o¢w
U � Vl
� � I
Z F--
OW
��
Q
7
Q�Z
WOF
c�
�
� Z �
�F'z
�a�
�,.__ -E_' ; ,......._..� �` � I ! � 1--- i i---�-I
�' �I .� -��- . =-! I;� I I Im
- ��` .`- :` '=
� � � `�`� :~~• � .
� l� ` �U
----- ~. �~ �� �
� --_ � � �. � � ` _
- _.-�-� _ _ ����ti_ \l� \ -(a o
� - . . ":� �_.
�.,y�`. -} . � " �
�'
R,�
. G I
_�: _�
��` - .� L" - � � ���
�iO1133S 3=
lb�ld,ll 2�3d :. , - ` '�
821f1� „L 210 -` � .r�fJ_
„9 �?.:.':' • I-
<' � ..-� - .. � 1
�_ � � i-
' g p, �
: �. .• a'�' ��~� . . �� � � ' � I�
n
�z
wo c
W L1 �' •4 .� ._ . .
O (n
�� p. �'
�
0
_ . D° �
- - �.z ' . Y � " . �
'-°.'. ' h ' . . -
Id
zQ
�or
dw
F=o
Wwa
��¢
�rw
�'��
¢ o H-
aow
o�W
o¢¢
�Ud
d�O
�
}�
o��
�Q�
�
m�QJ
� R -
�na�a
w
W V 0
v��z�
O�Ud
�www
acLv��
�
0. r
J ¢
,,uf 3
N0
a
a�
(�pJZ
oao
a��
o��
d��
w z
� F
� z
m o
�
�J o
V 4 �
r �
00 �
�o �
�� o
�
o} �
� z
o� o
�
KH
�¢ o
� = 3
� ~ 4
� � �
z F
ao
�� w
�z
n. � v�
a—
a� _ ,
c� m
FF ra
�' U� �U
O
Z � N
iJOTES TO DESfG3+lER:
1. FILL I�! BLANKS ANp/ Oft VERIFY ALL TEXT IN BLUE.
2. SET GRA�ES Td CONVEY STORMWATER WITHIN R.O,W. aR EASEIAEI�TS.
3. REVISE �ETAIL A5 NECESSARY TO MATCH ACTUAL. ROq�WAY DESIGN.
4. MODlFY �ETAIL TO t�AEET SPECIFIC CDNDITlOIV5.
5. UEVELOP 57AN�AR� PARKWAY U�TAIL FQR FACH CONOITION ENCOUN7ERED ON PRdJECT.
6. U�SIGNER TO COMPLY WITH 7HE MAS7ER THOROUGHFARE PLAN A�4PTE� MAY 2015.
��d
�
PARKWAY WIDTH
�
1' MIN. -
i
0.59; {MIN) Ya ` PER FT. (MIN.)
I 2% (MAX) 4:1 (�_AX.)
MAX. SLOPE 4:1
PROPOSED
GROUND LIN�
STAN[�ARD X" SI�EWALK
PER SEC110N 32 13 20
cuT
�
� r.-��-_- �.
I 1' MITE.
MAX. 9LOPE 4: i
PaRkwAY wio�
0.5$ (MIN)
2� (MAX)
PROPOSED
GROUN� LIN�
Ya � PER FT. (luli�f.)
4:1 (MAX_)
�.
STAiJUAR� X" SIDEWALIC
PER SECTION 32 13 20
FI LL
F��� ���T�
C1TY OF' FORT WDRTH, 7EXAS
��v�� �,���w��r s�c��a��
TYPIC�� I�AFtKl�►,�Y ��CiI�NS
TOP OF
CURB
TOP OF
�- _.
R�VISED: 07-28-2016
3� 13 20dD5�6
�
� �q�
�� �
���o �
- •� y
�� � �
��s�= _
� o�� � E
w���� �
� f��,� �o
—I"i f!� € ' � �
� � ! er�a
"i�
, �• tif� a
!� q��
:II �� ���
, �: ' ��
�-�r-�� — ��
r
�
�#
�o
��
��
��o
���
�;— ���
�i" �m �
oaa �d
�U �
�
�� -----
avrvi � z
�ww� xa�a
�a i
�� � �
S� ¢ �i _`-_
�N �3bm
I ���o
�
� fxvrv) aao'a z x
(NIN) %5'0 f �
�� I � o`-' �`n
k� ��>� M� r
� Ig� o�_ o
�1�,_ ��M
_—i ��� ��
• ' — .9
- �
�� � 3
wx � F
�� m � � � x
a � � x p �
�' 3
> J W � V
a� T 3 . � -
2z N f
�V � z
�� V
}a a
w Y p � �
w �r m o� o �
� '} - ' __ -
xa ��
� �rc �. �n rco � a
�
0
z
O
�
Z
a
a
�
lL'
0
m
�
� '�' ��
��
�o
+ I.
ii
��
gmn
�oM t� { _
o� �q
��a ''o � . ' .:.t
�u
�WF'
o�N�
���d
��
d! m
'r
-�I.�
I �I ��
�
03 '�P1•� a_
_� is q<z
w� w' o��
i���
_.,.�_ �'�
� �.�:� �ao
�� �i a� �a�
z
o �,
aW
��
U j
� Q
�a
z0
ua
z ai
o�
�X
a�
az
��
W
a�
W
Wm
a"
a
a
I �-�-�
ean aana
jD N�Y9 � 30 N�tla `
3 � �� �
1 � I � 5h,1.
�. �� I , �- „v � � I
° m �� jl � •�,r-.. � � �
'��� rt �+ i";; j� I
o- ¢�� 1��� �
� �� �o I r I
a� 3 - �� ,� I��' 9�,� I
� 3�F � � Q �.i �� F�m a � I
rc6 � �� �
�°. � 3 r I `J',.1� �w �� ° �< f
- a � � � 'i " �� U �, j
� '. I a U��ryUao N am �
�m �,�� I �; � ov �
� �� ( ; _ ,� ,
— "� �"�� � ��', �
� , �
11�� � � '
� ,
I"
_! �B I"� � i �
�
.*.o.a �— �
m�
U
3�+q U `!r ��� '
O �' w t�41
-aaa - ��N aw
N � �� Q%
€w��z4 6KG �aa
i�� ��� -
�.K�o� ��} z
� z w
w3=mGi� 4ti4v�-i �[.
�np" a�'z 30
1��`�'� �Q-a� �'Fn 2
a�wwmn 33,F' �QiB �
OQaX� �jQi �� �¢ V
� �pirc �� a0� <p �
?F� ��
�! �uw�n��" �oz u"'i�a� i
o z���x §> �` 4 �
} ��p��o� ��� �r�� � �
� xo�o��� oo� ��o� ��� -
- O
1
�
�z
f nF
4�
��
�o
K
V
O
Q
�
�
� �
J � �
tfl z
� �
� �
6 V
1 �
� -
m
� m
z
� a
•- �
U
�
�
��o�o���
�»h !�
LL� � q
�ou+ �
aj�F U
o���� �
za��n ?=
z�
& OJ19i �
zm
\
m � \
8
��
�o
m ;
z .
� '
a �
�
� �
� x �
O � �
� � �
2 � I
g�w
— w��
��� �
�
= 1=
1 4�
� �Wt3
0
� ��
.:�i�'� ���
I �� S'�
'',i o 0
.i; � �
�� w ��
3�
��N �
� � �
oz
�o �
:�
;�
. (
1 F
[ '
i
: �
i
[
I
� �
> [r
f i
3 �
��
�
� ...
�w
€m�
4�n
��N
4
wog
DO�
��Rb
=�o�
�i.c?a
p� o
� U
��� aq2
F�o U�o
y�Y � Q FT.
m�# � TU�lvl
al} 2 J
Kma � ndv4�
Z� �m W
�� �� Q
�3 3 J
b o n'
F I •�•i
br NN
i r-��_1 �� � � ,�o
� �� � ��
.9 zn
• o�
,— ��
6a
�
3
�
i O
�
. �
�r-=1
��B
~-_ ��p�
�'� oFN
�< f� ��
a � �
�V N
__ m
�
8�
F�
� h
_� ��
�az
�mV
S��i
�UZOG
�gW
dsa
r
z
P
z
P
Uo
aa
� ,ss
Z F
O
U X
z�
o�
mw
a "!
a�
x�
W
Q m
w
�
�
�
o��
.I.O
OF`in
u��
�M�
$�'�aa
J ��
�
lW� � �dp �
F�O �r ���
' ��� �
n�� �
O �,;� p
� _ - �
ean� �
�a �va .. - do >pve
�� � �', �
'- �. �
ON p� �ryl f . ' � �
� row�
j� Um � E � .i� N �
� �` � I N ¢ �
� �� °�o � a� z �
> � P
�p
� _ I. �II�U6qZQ �
} € � -��� �m�i w
� a cg m iii (n
o � � --� Y
� 2X � {I �
3 �u� I�
w n t
� o N i
.�
�
�
-� f m1-
�__
Mro�e
o�i� qN �`� ��� � F� �p z Q�
`��p ��"���go z�z So� Fzo�� �S € '�r'�
��p �ayzFiz prc< $a4 atia`a <� `Ji �c'�
a8� i �Li�<q� F�`� 'Cd�� �ix �z � ��
�€� J���� gn�i � ��.r ��Og W .
�� ti� � ��
� � q���$�_ � a�� rc�F ��7 : rp
��� ��w`i�N� �K� ��z. z��� �F � �i�
�+�a�� r�^m '$�B y3+Z�`i' w?' W �'—
��� �WV���� � Yy� 4� ��u�'° �O m w
€�� �z��` '1U �Z'S �yii� �u��an Y� q �Z
j� o}rCaSN s�� Oo02 4a��N �n � a�i
q�� �a��� �o ~zp �NC4 � ��O w � ���
d€riA5 %o o� y. SQ � W��m LL�€� � M
��4Z �[JR �� 3<;yk- q�45 WiNB� lf�W� {�,� �BN
�YK� 5317i0��q ��O �U�a �� �� Sp 6N ���
� OOV �Ti�Om p��K6 F6� d3R
� � �} uS N h
�
Z
�
�
Q
�
Q
a
�
¢
�
�
a
a
�
$�
o'`Fq�
�Q¢Yr 4
Nj� �
Y�ti •�
y�Ol�m �
Tilw�On �
zz�o
Li�Ia�a �
\ �
� �
�
NIX
m �
MLi
9R0
o3w
���
N�� �'
J�m N
^ : rO3
� �
_ I � I
. �. '� an
'� ��o
S��
�� � �
��
00
� yo
Qo
��'�
3� H �m
x� �'�^1� ��a
a�m ��^� ��3
��p �m� `mmG
��I �- ---� ��.o H—t�
-ii� _ ..
�` ----
I (%Yi'Q �pZ
(kIW) YS'd
� /
�� ¢ i � .¢ �� ��
�m M � -__ C � � W� �im
zp� f I �m
No N� Np
���h' � oo�, 1� ` iz iz
i � °�° ` . s� s�
u�� I �j I
•�•i �se� o�"' M ,i`i ,i,i
�oma i ��� �z r`v
� \
3 i%YIY) i6a'L � ��
�� I (MIW) Y51p 5
��
� W���
+ z �
xa �
�� �
_i.si_ �� �r
aaN
--� N�-� ��'�
���
0 ' �q"^�
N
} V�LO
� I
�
q �
i�
\ '
'a� �
�1 � €
� � �
� � L
Y � t
1 �
vl �
F �
0 0
V �
w �
� z
N
Y
ti �
�o
d �
I M _ I�
�
'M'O'2�
��miG �#�� � v�� � d »
YKo F��w�� ��e �`V=! �i i! R
�S LS � S G �[ q�q�qyy
�IUF �41����Z 7�Y aapZ ll0. Qjjy�jj''((({ �
��z ��o�€< <¢a ad_ PIw 0... �
�p� w � qo �%
��� �a��ppp<�1i ��� �«; i'`p �� �
6 ��^ yIZZ Uo �u 5
W [] � 0.�S ( � �W '
� fA
��� ��pA�N K2Z ��2 U �j N
Y F ) V
��In CSn T�UI a<N �F W
��� ��8�m� �'a= ��w qi �� '�'
�m� zok�"�o�z� o��' ��'"� � c�+ �
Liia�[��izsc�,� zyZ€ �Fo�a �o �� aWi
dU�S �u�L�l3F'Z YUZ GS�Q� u�� I.�
t��4 ��U� �Td YJ�.i4 V� Wor U
��o `��¢���2p8 ���C �35S�� �� � � �
CaK xG��i.G�[�% GGL] mFo� �F ��p G
N •E yj
�
�3 Q
� �'�'r
oon
a�
��
n
�o�i
€ V
SoV
� a��
x�w�
��n.?n
� ��
�
�
8�
��
�m
OQ
�O
� m
. �
la
a�o
im�
ginN
�� ��
U 4 �
eam
�o H�ne � -
z
�
ie �m �! 1}l
�� �� 41M11
�� �m3� �
y� 2�� f
ql�l ¢30O
Va
�
a �+ �
y r
� } :_
a � � ,
�
ix '
�i V �
�ce _
_ �H+�
"I
�
Ob�
� q
9�n
�n�
��.'n CrS�
un � ��
NOTES TO IIESIGNER:
1. DfTAIL pEFINE5 PAY L1MfT5 OF HMAC 7RRI�SITiON SUBSIpIARY TO 7HE CONCft�TE UAILEY GU�TER CONSTRUCTl0A1.
/
/
/
�24 FiMAC [
TRANSITI ON
EXPANSlON / PER SECT1dN �XPANSIOiJ �
���E�S A� 32 12 16 �� JPIERS
32 13 13-D593 v4- \ 32 13 13-U513
O=
U
R
' � - - � - � -- - - � �
A� � ,
9" HMAC / SEE NOTE 4
TRAN5111 ON /
PER SECTION
32 12 16 1NTER5ECTING VALLEY
PLA�[ VIEW
9..9..
N�� 4 #4 BARS � �" MAX OR AS DIREC7ED BY N07E 4
18� p•�•B•w• TNE ENGENEER
-{-. - i ....b. _
��.__3__ , ' . i . ' .-W-I��_"�_,.,..,._�
� I I-�-1 � I-=1 I I�� I-14�---I I—I_ � I�—� -— i I[,=1 I� 1=
�_- ;
CO�APACTE� I 8'-0" MIN.
SUBGRA�E (R�SI�ENTIAL STREETS)
(5�E NOTE 2)
SECTION A-A
N OTES.
i. THE 7" f2EINFORCED CONCRETE VALLEY SHAIL REPLACE 7HE TOP 7" OF TIiE PANEMEN7 WITH iHE REMAINING
PORTION OF PAVEM�iJT 70 BE CONSIRUCTED INCLUDWG SUBGRA�E TREATMEN7, iN ACCORDANCE WITH THE TYPICAL
PAViNG SECl70N.
2. 6" FLEX BASE, �YI'E A, GR-1 �R MATCH THE PREPARED SUBGRA�� REQUIREMENTS FOR THE PAVE�AEhlT SECTION.
TYPE ❑ OR TYF'E B ASPNALT OR PREPARED SIJBGRADE MAY BE USE�_
3. PAY LIMITS FROM EXPANSION JOINT 70 EXPANSION JOINT.
q, 9' AN❑ 24" HMAC TRANSITION SUBSI�IARY TO CONCRETE VALLEY GUTTER. CITY MAY APPROVE AppI710NAL HMAC
TRANSI710N BEYONn THESE L1MT5 UNDER SEPARATE PAY ITEM FOR HMAC iRAN51Tl�N PER SECTION 32 12 i6.
5. GllTfER TO BE SHAPED 7fl CONFORM WITH COiJCR�7E VALIEY (QR PAVEMENT}.
��R7� ���.�'�I[
CITY OF FORT WORTH, TEXAS
CON1C��i� VALL�Y ��liil�l�
R�v�sEo: oa-��-20�2
32 16 � 3��530
�i
�
h �
F y
��
�
� ?3
�
�
z :
� �
� '
a �
�y
O �
\ :
a �
� � �
Q � €
� � c
Q � c
�
, o
' o
U
�
�
F
�
�
�
ao
B�T
�g�
�
Fw
ey��
�
��g a�z
�a F
<sH ya
�m �aU
� W�
��F
�z[wil ��
30V
�.WI I��;� f_I ��� �ti.-�� , � � � �W
� i_- � . _ _ `�..`� t� ` ;e' ,
i._,-_€ '.W] � _ �.
�'',_ -i j ] w �\`l�,'�: ¢, --•' � �
. _. I � -_ ` ` -
I 1 ````, ` 9���I)ir
I� 3 I, � 1 I\�`�\L l-
i��.-�` \ yl jj;�;y��`
_-.� .._.. �.�� � � �. � I
" �!
'*ti¢;��-_` �: ,- i
_ `�� �-.A.�, �-'W�
r�'� ° .o !� �
ean� - " '-� - i �
— .[ ao .e � �;
a � ���.€
� 4�
�� - '•'k•'•�
r17 ���d i1 I f
i-
�: =a:. ��'
�� e� -I
�s �. !_
. �
� _"_a���,��� �
S�
Ga ���q=�' ��; 2
� C-ww .91 �
�
�� ��
�� Q�Z
Y� �
��O
�mM ���
4 � ���
�`z1h' go3
�
y�;"��,�
_�_ii ;�.f � ,, ,��-_,��,
,` .� � �� _
1 E �_ � I \.`` `` - Q_ O. I�
; � _ �, —�
���
� I=�; i;`_� ��. I i i:
� : ,,`.�`�� a --
�= :, � , � IiI
-:-I I :�� : ; ;� a �.. A � �
r�—_.. �:.
F��
�w � i
� .a � �=
�� �, $',� ,��' �
earn �" � �
ao ,s
_ :.:�.� 'u..�_� I��
- �'3
O�-
� - .� - . . 3 -�
a ,r� `�
: �_—
� �-�!�
— . +.
a :' , j=
� -i
'_ % �.
� .. F
.� '=
' G ' . i I
; �' — �3
1 ��
['NIVi �9� B s z
531lIYA �aF
�gu
a �i
Vp
�F
a��F
OSt�
aa�i
H
�
�
�
C9
Z
F-
�
w
�
���
�Z
ey��
oo��
o���
� o
�e
q��O
p �
�ircain
x r
� m
a
„� �
�O �
z
0
�
�
�
�
Z
O
U
�
W
�� Um
I��
� <
1 � ��
0
lY �p�
_ j� i ���
;. �
1 �
1 "
_,�
� i �o�a=
�� 30
E� om�4�
� d�a��
_,_�
�
��
�z
�O
Y
y�
��
��
� ��
�
0
n
�
Z
Q
d
X
W
�
�
(7
O
Z
Q
m
�
�
�
y� �}
Orc��3d�
� mu �I � J����
W
�
¢
�
�
�
N
C'J
z
Y
�
�
z
p
Z
Z
0
z
O
�
Z..
a
0.
W..
� � � �
7 7 � %
X
��e�i�4�ais N �
m
K
�
U
O
W
Q
Ei.
�
41
�'
m c'�
� W
U �
�
[O av
/ � � 7
�Id� ����� o
�
�
f � X '�iw ��oz
� N � �xdw � �z �
� driea�
I
I
lc� __� �_
w � �� Z
� � U�
� tr �- a
�[� a �Z
c� a � �
io� oa z'�
�a Z�X
� D t�- v
�li
F-
z
0
�
Z
a
�
Z .-ti
4 a
a�
w ...
�
�
Q
�
�
�
�
0
N
� �
Z
� N
aM
� �
JW
a
m W
a U
Ua
L�
� �
a s �
a + 3 \
�°*�i$e+�'�+�� �\
�*a�M %���o�t , �`
♦ ��++�*'+'+'+ ��
� '+ . . + �.
� r a r r t� `
„4.
�a§r++�+aa� � `
>�,�..*
�Y 9 + 4 +
} ¢ 4
i+A� ♦
♦a4�Jg�M�h
�\ �p}�++ f
� *t*+
1 4 R
�`��. � pT~i;3%f
�
�
X
a¢�
��
¢ � •--
� o
N N
'XHW _
' �Z
� 'XVW_P
�z
Y
J
¢
3
0
�
�
�
�
� �
�
� �
�', �
7
%
�
�
�
i
�
�
�
i
�
�
�
0
¢
�
�
�
�
ma
�W
a�
U �
[D v
to
z
Y
J W
a U
�a
I�
z�
o�
Z�
m
�
_
�
�
0
�
U
a
�
�
Z
Y
J W
a U
� Q
I �
O j
z�
a
�
a
�
m
�
�
U
c�
z
0
¢
J
Z
�
u]
m
�
�
U
L�
0
U
�
Q
�����
e�n�e�
r��W�
—� .s
��
�� %
�� ` s
'�b'�. .. �'. % F Y s ``�� � 8d'f,
� � p • � � �
Q� �%y `y �*'*�+� * `
i �y. �� � �� `�
M� �
�"x� • ♦
g Q Z kbW
�Q � � l.al
I ryN �
-� �� a � 1
/ / � /
� l � �
�
>i idhh30i5 N �
�
U
� �
�a
No
FK Z � N
= d X
U � a
L� Q �
o �
U
Q
L�
W
O
d�
� X
� �
m
��
�
U N
S� ¢
N �
/
Z
� ��
z
/ o �
2
� a x
Z �_ �
O �`
� �
Z �
� `\
� � Q � ``�
Q^ z � �
n- � a � z
w.'_". � � `� �
� �
� � Z �n
W-- � _a, x
� � u
f1I .._. � t
� ; '�
�
W bI
�
Q
a
��
�
oa �
%"� o Z
�� � o
�p z z
a a o
� � z..
o Y a a
�al J Q'
X
d � � Is1 v
� W�0 0
Q Ul .._.
�
L�7 �
U a
Q �a
I ��
Q u' ao
��
O �
U
z 0. O
0 p F-
J �
� � Z
W
w � Q
7
�a
a
U
�
Q
a
�
Q
_
C�
�
O
�
Q
�
[3
F-
a
�
W
�
2
H
�
r
J
. a
w �
z �
[� c'
U3 O
Q ~
K
0 W
N Z
Uf (?[L}
l+1 WO
� p C�!
O
Z .--
� �
�
� � �
� �
� � �
�
! �6
b `d
[.�
Z
Z
�
¢-�
3�w�
mW
� U
w �-
��
w �
o�
I *�*r� �
a+ + i
t i
+ k#} ,
`+w "e
"'x '
•y • �' k 1
e�
�P°t'MPX• � �; x�`; p. 1
�2'•� �,�N• • ;
{ hk'x
Z�., i
1
� �
/� � � � �
� � �
\
� � �'� � f
�_
f �
7 �
� �
-�� �
�Z
Y
J
4
$
w
d
�
F"
z Z
O p
F- `�
� z
z p
Q N
� Z �
Y � �- -� X%ii�i F
Q W � %Z
� ^ \
W
0
L!1 ...J
�
0
N
a
�
0
a
0
Q
V
W V
� O
�
� �
O �
F �
� �
O
z .-
I
I
I
I Z
' Z �
� o �n
' Z
aX
' J �
I ~'
I
I
�_ �0000.
�
z
0
�
z
0
�
z..
aa
a
w�
�xvw �
�ua
x
�
a
3
w
0
�
�
d'
U7
0
N
('I �
�
� N
q M
��
�0.
�w
� U
WQ
�
W �
� �
F-
Z
Wg
Y
Q
a
� n"
d �
¢
� �
��
�
��
� �`
� �
U
p Q �
� � �
i
I
�+�� �
A F A
♦ M Y
•�IW1AI �'�Z ��+�,�,;� I
•Xidl, �•Z� i i #
I �
dwva - ;+;�:;; �
+,� ++ �
2 • T
�t.. f
..,
, .f.#-. �
.�*. , , �
k I
q j I
�, �Ix I
'IQ
c� �
z4
��
a�
3�
o� i �
�
' U
I
a�
�
�
U
L�
O
W
U
Q
L�
�
z
wg
}
a
�
� 0.
O 4
� �
N
� �
� O
n:
W
2
�
N
w
a
0
F
N
W
F-
0
z
z
Q
J
il.
W
�
Q
li„
�
l.'1
�
�
d'
0
2
F--
�
w
�
N
�
W
2
H
H
3
�
..,I
d �U
o�
U N
n >-
r- �
�
�Q
w�
z�
y�
1.1 L]
R Q
�
Z
0
�
�
Z
¢
W
Y
Q
��
W �0
��
�
z
D
�
O
�
Z �
Q �
� }
W v
F-
Z
�
�
z
n
�
zn
a �2
W �.�i
Y
�
Q
3
i�
m
�
�
U
�
O
W
U
�
0
w
�
�
0o c�
� w
U �
�
�a
C7 �
z d
z �n
� p
� o
N
W
J M7
m
¢ � �
U�j'7
W
H � �
W �I.J
O[!1�
3 � lsJ
O �
� Z
Y
J W
� U
� �
z �
O �
Z N
Z Y
O J
� � a
� Z �
a � v�
� o
Y u� 'XVW _
a r, a � ' �Z
w °- x }
a� w�
�� �
L� �
Z � �
Z in '
� � '
� N I
J r, I
W �
�a� ;
���
waw �
o cn a
E
I
�
N �
a j
� �
W y I
� g I
a z "' I
z �x I
Q z_ �
d J v i
�
�Q� �
��� '
Q�r �
N � ' �
r N � �
I "
I
'N[W ,5 j
m
�
�
U
L� �
o w
w �
¢ a
� a
J �a
o�
a
��
��
�o
��
s a + �
fi • f
i ♦ +
i++++}+ f
F 4 4 9
* * k � �
♦i+++*,l I � w2_
i�dw _ ��++ 4 I
�� t�+���t I
e++}34+ I
....� ,
XZ I
��� I �
a T '� � �
��"N �
�
�
�
�
o I �
�
� �
� � �oo.
� � �
U �
[U v
F-
�
O
�
Z
O
�
z..
¢a
d �.
w .�.
a ia
!il U
2
E7 O
y ~
W �
A W
O Z
F .�+
�
N W
W F1
F
O
2 .�r
�xdw _
�` °�z
Y
J
Q
�
a
�
(9
Z
Y
J �
4 V
� Q
�
Z U71
� �a
� �
� 3
�
i
� 711dM3Q15 N � �
� �
1
—._- -_ . _�.
Z
� O
���
�, Z �
oa
irt�ti.
a
�
�
a
ff
0
�
�
Q
i
s
r
x
�
30
T. N
.-.! �,
� q�
Z U p
�-�+ r F�-
d.
� � Q
Z
M N(/� .�
L1 W J
C.1 !� 4.
F
O
Z .-�
F--
�
W
� O �
� °`-
U UIK ��
ip lac. U ¢
'�lk� ��
��
,S � �
� �
� a � �
� � � � ;
,,.,
.
�•.•fF�
.. •,•
� �a�s +' � �
Z � 'NIfN 1 �OZ +.' ' . w .
Q' 'XVY'� l�Z.l ' +'*� �':
z� � ++
� x dWtl21 • { �a
��
� ,+.�� . .:
i;i;+ a
4.�1 �l;Y �`•
� 1 rr-��r�� �
� �
� � �
0
a
� a
r�s � � c�
z.. "�n z`�
a� io� zu�
�" 3 0
� N
4�
��
�'
d a
Z
O
�
G
U
C7 �J
Z
�a
¢ O
�F-�
�or
� ru�
o �a �
� w
�
,_ n u�i �
l 3'J.ON 33S
r�.iw „�ws �x��m
wr 1iZwmoamz�
�o��n� W�a�o�
o~�xa����pxa�
I�QUk-��'' (=»�aQ�1hZz
� � c� c� o
z �? F
��YQWIqiU�U���W
M U W F- oCa Z � 1il
I!)LL..4d' W �.-!a l�Z dtA��
�O�[?�fndJOialONO
w
�
��
0
z .=
z a x�
� �d
;n a �
m
�
U
O
U
Q
�
z
� NltlM301S N �
�n
'NISN
,5
r ���...,"oa
I
� z
1 � �
� Z
I z "'
I JX
I �
' v
I
600mm�s� �
�
z
0
�
Z
O
�
Z i.
a
X
W �
�
Z
W
�
}
Q
d
� �-
O a
� �
� �
J �
ND111SNVS'1
ean�
__ -�
,°, �"� -
.a —
»'.
RA�! i
'NIW L �OZ , , •�, __
'Xtl�^I L �Z! ;,+;+;*; �
dw'da� �ss
i 4 a
4#
1TH�9»
# 4 4 i
Y 4 #
a
w
�
�
m ('J
� �I
U �
�
�a
W
a
t,_
a
�
N
C? �
Z a
4 �
30
N
m �
F N
U MI
� �
A 0.
2
O
F-
Q
U
t9 Q
Z J
Z Q
� y
Q
���
W Q,--
�O�
m
� V O
U� �
� � W
W�tp
���
� z a�
\
�
``�```1� � � �
1 31QN 335
K �
laA
Zpwlaf���6�
W y�,�UO�yN
Wx�l¢iJU�1i1
2QiCld'lJL�Z!'�
~00zai���oZ
p�TU' ZUw O
��r-zo¢�aF
� 00 H U
V� W a U 2 W��
zaa3a�-� �
Faa1.�Q.H�ZJ
v_,�c�mWa Za
o �namc�Zw
WW—� �0.Z
F-���Q�OWX
'�ij�'-OUOVfJQ��
O
Z �
m
a
�
U
�
O
li1
U
Q
W
� �
Z �
z �n
� o
¢^. I
3 }o
N
J F�t7
m W �
UU
W a r`N1
F IY d'
W � W
� � d
' � X
I O �
�
I
�
' A i F 4
� *��;+¢� 'NIfH 4 �4Z
`�"A°k" 'X'dW l�Zi
�I�tlMSSO�I� I ° ` . > dWVi!
�'�°.°�
� ��>
Ii4440 L
I 4gRR N
4��
�
�
m
�
�
U
�
O
W
U
Q
�
H
Z
W
�
}
Q
�
��
�a
��
H�
�
J O
' I �
� � ~
�
�a I V 6
r � i �
�
♦ f . + i
d 9 d
.� • r ka, '
Z 'NIW 4�OZ '>'a`a' �
Z� 'XtlW L�ZL s+��+"+` z
a � - '. > ," � ;n
z dv�va . ; $ . � �
ax o" I
J + r { i
�J ¢ia4a'�' I
¢3 E 3
4 4 3 A '
S f i
.00000� I
raiw
,S
Q�2�
Z
0
m F
a �
� z
U Q
�
m
a
�
U
V, �`
Z � O
7 �
Z � v
� � a
a^ I �
3 n. d
N ��' --M
m W r
� U cV
U � �
k' � �
W�W
o vr a
71lVMSS02i�
� � � � � � �
"� \ 7 'NfN! � � �
7
) -� '� � � -� i
� � � � � � i �
�_
��S�
a y J
� ¢
m J �
� J (!1
V d'O
_ Q �
c0 d U
W
U
��
�a
�w
��
a
c� p
ZW ~ m
�a w a
3� r =
I� a �
Zz a Q
2U pa v
� � �
H �
� O
J L�
-� � � � � � 3 ) -�
i � � -i ) �` 3 �
�) � � � i � '� � f
� 3 _.� �.�. �� � _3_� � -
� � � �
� r a+ i ei� F �
� s e o-+ a+ T r I
� „.+�*�*; ��iw � �oz � Z -Nivu G �az >:•Q};t; �
� *,�"�'; �xaw ��z� Z� •xdw ��z� 't��°.•.
� *- �' dwva a� dvuva b*E*F.+ I`� �
y r •�`a I
I a+ � x r p+
r s , +
I'rt1+f v 4 ¢tr¢+ '
' > 4 Y t,d}+ i '
4 } 1 i 3 �F } {
I P! f P I
L�, _ o� o 0 0 �
� �
z
z �
K U
a^. I
�ao
W �N
J �T7
00 w r
U
UaM
HL�
K �
W � W
O [/1 0.
xidMssoa�
m
a
m �
� U
U 'NIW �
0
p g w
U
w ¢
¢ �
W
'N�7i
I d< r i �— ��� I
r r ��t
I + � m � f *� �
�, °� �, " 3 � t r
I * a 4 b v I
.�. t`�t"� . +
� r
I "` e. m� � z
s¢rrap � q�y1 I � �
I �t 1 4
4 �` '
I•'t`�" °`�'°'� I
� r,., P. �
4 �
I �
I
J
W
J
J
Q
[K
Q
a�
Y
Z J
c� a
J s}
Q �
v �(}
m p
� U
�
U �
ia 3
�
Z
�,
�
}
a
Q
S.r_ �
O �
a
��
�
��
J O
Y
3
w
�
�
m
�
U
0
w
U
�
m
�
m �`
0
J
4
H �
U
Q
¢
a
r
f/1 Z H W N � J
z F� a
�� ��� o ��w¢ �` z z aJ c�.� `�cn
�n �aa a z�aw � r-���- � � W¢
z��'u�iA o � -Uii�Z� �cn azr� ¢ vi z c_Yi �wui
oo�za � Ti'' �°° �¢ ��Wo � � o
c�c�a-wZQ i'' r�=o� Z o��� w F= t- m o�
��c=i�za��-- ���-F"3w �o c�jc'''ia m a z Z d�
��=�WQ O ��a+TQ �� FdJI/1 ¢ 0.' � � Qa
�pV1U1VI p�' Z��f Vj�i''i (/�(��UA h� Y (!7 d'�
U azc��z ¢ �n�rop��� zz=� w � � w �c�
�o��zza a N�Wa�oaa ��t-r � w m � �Z
°"�o�'�-��.,z "``�Y�c'��w v,'s�a u Z � m�a
�p�w�iv~i � �w���Zc�3 ��Zz a W i � �a
?W�a�w� w��u�i�`'�o�� Waw� z m w � a�
�ur��mu�� aw� waac��Y ��i,�,W � 0. a a�
¢�w �wa �w�r��'c�m wcn �w= � a M
w � zc�p a� �n � k-`' r r a�
w����W� �c�i�aNaJ=c�cnc° �owo cai +� n° a �z
J (x W L�, � WxZ W F"'Z�'� U O F- O J Z
a��oo�� wrm��m�a�� mv�w �bio �[�1 W Z�
UJIe.1�W�U1 iOQQ�QZ � p ali F--aU 7 �. �'
W��cJi�vs� oarxn �rzn�Q�� �Zw�z_.-�.r�� a � 3m�
�Qr:Z��.�iVl OZV77a�wja} ��Q�JOWU� ¢ �' W�¢
¢UI Q(1i�Z U �� U awU~ V�m O J fn � J�a J J � m V W
W vlal a Q� Q� Q W Z � J JO�'- O U Q Q�q
z� c�a � cia�~�� my� �aw¢��n- a rw
ao�¢o � z��ZW�w a� � �r-�az � c�a
Zoa���� �¢�a��x>-a �aa�za�� � � rw�
� w�n �u�-w��a3a ti � w�aa
v����"za��zurs�z¢��ZW���wwaw�z� � � z
���?m�a��r�wz��n�����~vai�o�nr� �,�, � �¢ra-
���^ Y a��zaa-a a��z ��o�- �� W�f--o�n
v���a¢w�c�io��1��z�za`'�c��rNw3p�?a��a �z��w
� 30�' W 4�-` S 1�J0 J W J� W�m ��O [ip� � W Q� W ��
Q�mZa�QO�mQO�Q�U'Orn�JNQ ...1DQ�Q� U�dmZ
�Q fnUOZU� �Y U~ODUZ�U~LL r[•y � a O� �J 4� �� a J�
��U�a����w�-''w��w�a��''raz�zi,i�¢�t-zozw¢o
uj��c�aaowa�aw�aw a�cn� i,,inaa a xx
wc�oaaa�o�arocaaao���ao���d��� - N „� ��nvs
r
O ao m u0
z � cv ri a �ri cu r ofi ai
U
a
a �.
� �
�a wN
m
a c�
rz
� wZ
z �
�
a a�
� ooaao
ooaao
00000
00000
aooao
aooao
�3/1b'N1. oa000
NVIillS303d o°o°ao°a
a �o�l��ai aoaaa
aooao
a
�
¢
�
�
Z
0
a
J
'NIW
u�Z
J
Q
�
W
0
�
U
�
�
w�
m
14- Z
U Z
K
O �
atlab0
00000
00000
04000
�3ntl�l o0000
oaaao
i�JF/1a15�03d dWya ooaao
�0 N011�3Nl0 aaoao
Q0000
000ao
'N1W
.,'yZ
�
Q
lJi �
W ��
U} �.
�
�"
�
U
O
w
U
�
�
x
z
�
U
Q
a
r
H
O
U � �
¢
� f/] m � Z
Q
Z � Q V O �
Y � Z
Z UI LJ �
Q � ¢ � � p ¢ p � Z
�� �p a pC �O
� o m m � p p N Q o Q
Q 2
Q� a' X l�li � w� Uf O W
UCa] g 131 ��c� ��i�
�� �v � J Z W M a-
Is.l � � � U Z � �
�� ZXa UM
� �-- ��� ppp
F� VZ F-�
a � O U
Q 1- �
�
��j Vl[�VJ N
�Z aNz
Q
W� C�]HU�
d �
�
W
�
U
�
.... (!1
�
�
j u'
aw
a�
0
c� � �I�
Z �€ U
Z W
QQ ��
�W Z � Q
J � ^ �
H
Q W 0 W a�
U H m 1-W-' Q ��
w Q m
F- �i � V � m
a ac� wr
� PC � � � Q
� UN ��
F
�
�a
�
�
&E
�
�
�
�
�
�
�� 4'���I'�a-' .�ii< i�� in .I� _ i�,�� li .,i �
��I i�� II� `II 'f � If �II��! '
. X,� ' i" ij �' ��ti � 5` � � i u�'
� ��I ��� �dl4 I+rl�� �I��II �� i�
� �� 1 �� �� r.`�_ 5�.1 :�-�il � L!' _�.
a �° �
� ��
�
�
�Iz � `� a � �o a �
aa �� � �
cs � �•� ��
'� •f �°
�` "�' � m t�� -
� �� ��� �m
�. �
� � � � ii �
+� � iT ����
�� � — � �
��� � �
��
���
��
��� �
t �
m
U �
��
Ra � �
� �� � '-' �
� � � ���
� _ ���
a
�� � o � �a�
� )
� �� o �� � �
� �
� �� � � � �
�, '� ��� m�
a ��
�
� 1 �� �
� f F
�
�I � �
u ��
� � �� � ��
�_
��
�� � �g�
� � ���
� � �'��
U
� � ,�� �
S� �.* �}' ° S�
�
�� � "� mm� �o
Wa � ��s
�� �
� �
f �,
J� 6
x �
�
� ��
���
� ��
� � w
� y^�i,
3 �
�a
�
Za
0
�z
��
-- 1 �a
�' �_�
R Y.� � �
m
�_ � ��
� �e
� � I F,; --�
��
4 BARS (DIAGONAL) AS
SHOWN, �ACH FAG�
CUT 8AR5 WHERE BEN� IS
GREATER THAN 1/4 0.�. OF PIPE �
NOTES:
i. MATERIAL ANp WORKMANSHIP SHALL CDNFORM WITH
iHE REQUIREMEN75 OF CI7Y OF FORT WORTN SiANDAR�
SPECIFICATION 33 49 i0, CAST—IN—PLACE STOftM
DRAIN MAIVHOLES AND JUNCTION 60XE5.
2. ALL REfNFORCENG 5TEEL 5HACL BE GRADE 60.
3. DIAGONAL BAR Slz� SHA�.L MATCH THE LARGER SIZE OF
HORIZONTAL OR VEft71CAL WALL REWFORCING.
. .� �� — — —�— — � �' � � —�—
I I —1 i �—�----�--- �
I I f__\ 1� 1 I
—� �—� � � ~�`�� � —f—
� _ ._. � I � ���: .b �� f � __. _ �
I �� �� ��� I
I %�!/ d. §�~ �\ G�� I
_ 1 �! �� Q�Q� "", `: � � � 1
j, 1� � a_` oo ,,:. �� � j�
V I -�� '� 1 �I
�h l y ;�.f� ; _: � I il�
— � �� 4� �;s.� i ,� L� i� � —
I � � ;;� ,: � /�� I
� �� � ; //� 1
I i�`�<: a .�' J/�� I
I I��� �� �� I I
—� --I—�\���-:.�;` °�-_ -���_�__ ._I�
_i� �
I I �� _�—�� � �
� � � I I
�----i--- i—�� I----�� __i—.
n
BEND NOftIZ. & � � gAR (CIRCLIMFERENTIA�)
VER7. BARS WHERE AS SHOWN, EACH FACE
AP?LICABLE
TYPICAL ELEVATION
r � �_ f
� � / � i � , 3
���
f � 1�
_� �\� .
I �\� ; �
� ��\�. �-- f:
; .-
;�°
1 ���ID � �t� i
--�_— _
� PIAE, 7YP
TYPICAL WALL
REINFDRCING
_ �,
. �
f.�p� � I \�
::� 11 ��I
:�-;-: t� �— —� —
:. /j � �
ltl :� �
i �
z°—a-
N
7Y!'fCAL BOTT0�1 7Yp BOTTOM DIAGONAL BARS SHALI
SLAB REINFORCING BE BENT TO FIT WFfEN BOTTOM
TYPICAL WALL SLAB IS ENCOUNTERED
REINFORCING SLAB ELEVATION
���r�, ����r�,, CITY OF �ORT WORTH, TEXAS REVISED: 08-31-2012
1� �l
TYPIGA� �A�H��� 1�I�� ��R���F�e4YlOft! 33 49 � Oo�4�� �
�� � � ao
o� oZ n� w a� �i'�'
c�o r��n Y}- a0. �vi �a
zQ00 �� �c� na ��
¢U�z-' a� �z a�w wc�
¢N � �`�Z �� Hl�i
Q 2�Qlal WQ
� Z W� U a� d� p �� Z 4 Y
Q oQ0.
1�iUl�lax.lxl �U' r7� r a W W �w
� H � � � O M � Z � � � 0 �
n W Z w� p Z 4 O�\� 2� Z � 2
�O U W: F� Q U Q
¢o�t'�n?�m?i'�� j �oo I av'
��aQ I U Qin� �
N M 00 4 1-
� O Vl � N O. J� d.' � N�� � Irj 43 W
oWZooO��aZ�O�����'U
owaoo�v>�� Z��zZ�?o
�jj�x���wo� p� _ W��_r��z
Is1d��d�JJi JQ ��11Q-]�M.,�
r
a .
Z � [V r) d ili to i�
�
L.L�
�
O
U
I
�
�.IJ
�
�. La
J
Li
Q
�
�
�
�
Q
�
�
7
O
U
W
�
Q
d'
�
il.�
�
Q
�
t�
I
�
�
i�..i
J
�
0
�
�
a J J
O
Q
Q Z W
J40
O � }
U � J
i'F'am
w
Z R 4
0 7
0. o
�
�
�
� --
o Z � • ,,
� 4' ��� • ., O
z? - - ,
� � .�"': :.;;y';� -- �'. : -
::p� y3 . �h�'<.'�<�
_ =lj.; SF; ��':
� -.R < � 8e i '..�_; ." ' _ _ y���
I r- �
��� wi.iPo �z
a-
�a� ��¢� �a
�Oa �Z�K O0
�q O--w
X a' W U}r 0. J w
¢ U' K W W w O d
� Qm�pp �
U J 2 Q
�aw �
¢ � If7
� � �
� W
Z�=
- Z �
� O
!C
\ Q
,�. ��
; ;,a. _
,� : a:
4�� -� .
;;�� ."�'� q`�''•;' -
.; �'
,'; `.`�, , q � .�
�� . .��
�Wow�
m ~ .� J
J-��Q
Z ZDW aj�� d
��NW �O'Ol`AOO�
xa r.�w a
wMoz ���o�p
�Fy� wow w
Q aza wzw¢w"'
4 �Q� ��
f=j7 �� 42¢�ap
� �� �~���
a o r� rn �
J W W
W W W --1
� m �w�o�z
�a�z�a
oc�oao�
�j A.:,;F' ; 'K
- :.p r
9 `}..d d
- Sw � S ' 9a�`� _ '
Ss' tiY:w�^.a� . '-• -"
a � f. . . � ���
/ »"' � �:�
- :�:,
w�
m�
a¢
��
�w
��
wZ
�-
apw
p�Q
�
O ¢ W
� Ssl �
. �m:
_- f. P� e'.
�.�+ :-a :
� fi, �
.q .•��•, k� �� n 4 �� .
., � � ".� -
`4' e '�'ti
s�.9 � a�hrv,:
"r} .
• �_ v _
.��: - _
�.�� .�>_ Q �'�•
� � y a.R:-
'r.i•' �a •�'•w'R � 8;'.
�°4 -k ._L•,
1/4 I.�.
LARGE PIPE
� ' ,: �� , :
� �. t �a �p- 1 - �
.y '
� f
� s-� \' s _�� `• 1
'� , �. � -. '� ��' ,r
V - `"�~i,�'�� _��� - %
\ �
� � �, ' � �
� • - " /
�
v� �
� / �� �.— �� \
� �� -.�� .�� ��
ci °- � - � � . �� �
� � � '.'�<. e\QF`A �.,'. `�
\ � G�
i
0.�. LARGE PIPE PLUS 1'-a"
EL�VATION
3w o
TYP �
a
- a
a
�
�
J
0
d
I� ,
io �
�/3 ilE BAR, TYP
� LARGE PIPE
��� ����
1'-6" I
2 �
TYP �
• � 5MALL PIP�
:y.
R �
.~ .a_ •._ ^. A' � �. - d _ a. . _ . _ " A a
NOTES:
.' �,, 1. MATERIAL AND WORKMANSH]P SHALL CONFORM
� .'_; ;':- WITH 7HE REQUIREMENTS OF CITY OF FORT YVORTH
� - ° 33 0 C �
I 9e 9.. I
I I
� � — — —
-- —� I
CONCRETE FILL I I
5LDPE 2:] I
� ..�.�n .
2- #3 `v
(C3RCUMFERENTIAL} SEC�ION
�3 T1E BAR SPACEO
CIRCUMFERENTIAL
AT 12" MAX
STANDARD SPECiFICAlidN 41 �4, R�IIVF R E
CONCRETE S7QRM dRAW PIF'� CULVERTS.
2. ALL CONCRETE SHALL HAVE A MINIIviUM
COMPRESSIVE S1R�NG7}{ i'c � 3,000 PSI AT 26
DAYS.
3. ALL REINFORCING STEEL SHALL BE GRA�E 60.
4. PIPE INVERT ELEVATIONS SHALI. �� SHQWN IN
STORM �RAIN PLAN AND PROFILE. ENGINEER la[AY
MATCH PIPE R1M5, PI?E INVERTS, 4R PIPE
G�iVT�RS, 7HE LARGEST OF PIPE OIAME7ER5 WILL
CON71tOL CONCRETE COLLAR QlMENSIDNS AS
SHOWN IN THIS DETAIL
CITY OF FORT WORTH, T�XAS
�O�CR��� �IP� C�LL�eFZ
CIRCUMFERENTIAL BARS
- � PlPES
REVISED: 08-39-2012
33 41 10��4�� 6
�
}" 6,C,
. . . o
aa� aA zm No�> � -
icm� icy �p �m�� �. -
��
�'iii w� a� yzms
ai �� ioxz
plmn zD y �� �
�D Cb Zy '�T.y�l
wz az ��n�c -
�5. a o �`" C�z
m q�
i� o�
nl b yyy r
0
a r �� nzm �
s� N a
'�-`o � ��y I
ny opy ,
m � p;p 1
09 0 � A�o _
Z--I �
C � �A
�� � � �nn -
p5 � s 4�
M-
� o�
mr i O
yp ti m
� �c
�
� �!
i 4;
��
' m�s
A�
Aa
��
4�
��c
d
❑
n
p ��
i
�
�NLY
❑ -
N
�
�
���
� ��
yn
r� :
3
n � o
m
y 7
z � z
� a �
� I �
�
a
�
a
�
�
X �
�
D
$ m
r
Z
m
� I
�
h
a� m :
�£m m �
'^T z �
�1 �
't D
AA � n
a �-
� z f
� N��
��i
� :
�ov
�so
Aeo
g
4' o,C,
� 4�
�
❑ ❑
�
0
�
Q
�
� A�
�
A Z_
� �->
� A �
yl �ry�� I
4" o.c.
� �
z � �,
� �
I o
�
�'
4'
61„
2
�� 12„
-� }
4��� � �� � �� � 1 ��
} .„,___ _ - _ .�,,.- � 4
e .
1" TYP.
3" F�� �� � �����
J 1"
f
82„ i� � �� � �
�
1
� 2��
22
12"
, 2��
12"
R1" TYP.
Contractor:
_�ont���t�rps fi�a�rle�
� C�u�stions on this F'roject Call:�
(817) 392 � XXXX
A��er i�ours Call: (817} 392 � XXXX
FONTS:
FORT WORTH LOGO IN CH�LTINGHAM BOLD
ALL 07F{�R LE7T�RING IN ARIAL BOL�
GOLOFZS:
FORi" WORTH - PMS 288 - BLUE
LOIVCHORN LOGO - PN1S 725 - BROWN
L,�TTERING - PMS 2$8 - BLU�
BI�ICKGFtOUND -WH1TE
BORDEF7 - BLUE
�
3"
1„
2
�2
1"
1"
���
2
NaTES:
IF APPLICABLE 70 THE P170,iECT,
GdNTliACTOR 5HALL OBTAIN VIiJY�
STfCFCEFi "CITY GAS LEASE REVENUE.
IN ACTION" 1 LOGO AT CDfi SIGN AND
�NGRAVING, 6317 �AST LANCASTEFi
AVE (S'l7-451-4684), PEELAND PLAC�
IN FUNDIIVG SEC710N.
PROJEGT D�SIGNATION SIGN
-,, I
Gonzales, Ronald
From:
Sent:
To:
Subject:
Blac k, Doug
Thursday, Ma y 20, 2021 8:56 AM
Gonzales , Ronald ; Rahman , Shammi
RE : KenDo Bond
Ron -No , this does not need to go back to Council.
We are substituting bonds for bonds . Only the amount of the bonds is changing , not the contract's award amount.
Thanks ,
Doug
Douglas W Black
Se ni o r Assistant C ity Attorn ey
2 00 Texas Street
Fort Worth , Texas 76102
81 7-392 -7615 D irect
D o ug .B lack @ fortwo rthtexas .gov
Due to the ongoing coronavirus pandemic, the Fort Worth City Attorney's Office has implemented a
department-wide telework and all staff, except the City Attorney, are working remotely. You may
communicate with me by using my customary email address and telephone extension number.
City of Fort Wort h -Workin g to ge th er to bu ild a s trong co mmunity.
FORT WO RT H.
~
REC IP IENTS -PLEASE CON TACT ME PRIOR TO FORWARD ING MESSAGES D ES I GNATED AS
ATT ORN EY-CLIENT COMMUNI CATIONS .
T hi s e-m a il and a ny fil es t ra ns mi tted w ith it ar e co nfid entia l a nd a re inte nd ed so le ly for th e use of th e indi v idu a l or e nti ty
t o w hi c h t hey ar e a ddressed. T hi s comm uni catio n m ay co nta in m ater ia l protecte d by t he atto rn ey-c li ent pri vi lege. If yo u
are not the inte nd ed rec ipi e nt o r t he pe rso n respo n s ibl e fo r d e li vering t he e -m a il t o the intend e d rec ipi ent, be adv ise d th at
yo u have received thi s e-mai l in error an d that any use, di ssemin at io n , forward in g, pr in t in g , or copy in g of thi s e-m a il is
strict ly pro hib ited . If yo u have received t hi s e-m a il in error, pl ease im m e di at e ly notify Doug Bl ack at t he C ity of Fort
Worth C ity Attorney's Office (8 17) 392-76 15 .
From: Gonzales, Ronald
Sent: Thursday, May 20, 2021 7 :42
To: Rahman , Shammi <Shammi.Rahman@fortworthtexas.gov>; Black, Doug <Douglas .Black@fortworthtexas.gov>
Subject: RE: KenDo Bond ·
Doug,
Since the bonds were not approved when the contract w as approv ed, do y ou approve
a tta chin g th e m to the curre n t contract? I thought t h e re w as a qu es tion w hether it had to
go back to Council to approve the change. Plea s e a dv is e.
1
I.
Ronald P. Gonzale s, TRMC, MMC
Ass istant City Secret ary
2 00 Texas Street, Fort Worth , Texas 76 102
(817 ) 392 -6 164
City of Fort Worth -Working together to build a
Strong community
FOR T WORTH ®
From: Rahman, Shammi <Shammi.Rahman@fortworthtexas.gov>
Sent: Wednesday, May 19, 2021 9 :01 PM
To: Gonzales , Ronald <Ronald .Gon zales@fortworthtexas.gov>
Subject: Fwd : KenDo Bond
Mr Gonzales
Please see the email from Mr Doug Black.
He approves the bond .
Please let me know if 10.30 AM, Thursday is a good time to drop of the bond papers.
Thank you
Get Outlook for iOS
From: Black, Doug <Douglas.Black@fortworthtexas.gov>
Sent: Wednesday, May 19, 2021 6 :07 PM
To: Rahman , Shammi; St . Louis, Chelsea 0
Cc: Conlin, Marisa
Subject: RE: KenDo Bond
The revised bonds are acceptable.
Thanks ,
Doug
Douglas W Black
Se ni or Ass istant C ity Attorn ey
2 00 Texas Street
Fo rt W ort h, Texas 7610 2
81 7-392-761 5 Direct
D o ug.Bl ack@fortwo rthte xas.gov
Due to the ongoing coronavirus pandemic, the Fort Worth City Attorney's Office has implemented a
department-wide telework and all staff, except the City Attorney, are working remotely. You may
communicate with me by using my customary email address and telephone extension number.
City of Fort Worth -Working together to build a strong community.
fORTWORTH .
~
RECIPIENT S -PLEASE CONTACT ME PRIOR T O F ORWARDING MESSAGES D ESI GNATED AS
ATT ORNEY-CLIENT COMMUNICATIONS .
2
Th is e-m ai l and any fi les transmitted with it are confidentia l and are intended solely for the use of the individual or entity
to which they are addressed . T hi s comm uni cation may contain material protected by the attorney-cli ent privilege. If yo u
are not the intended recipient or the person responsible for delivering the e-m ail to the intended recip ient, be advised that
you have received this e-mai l in error and that any use , dissemination , forwarding , printing, or copy in g of tl\is e-mai l is
str ictly prohibited. If you have received thi s e-m ail in error, please immediately notify Doug Black at the Ciiy of Fort
Worth C ity Attorney's Office (8 17) 392-7615.
From: Rahman, Shammi
Sent: Wednesday, May 19, 202115 :45
To: Black, Doug <Douglas.Black@fortworthtexas.gov>; St. Louis , Chelsea O <Chelsea.St.Louis@fortworthtexas.gov>
Cc: Conlin , Marisa <Marisa .Conlin@fortworthtexas.gov>
Subject: KenDo Bond
Doug
Ken Do submitted the revised bond . Pease see attached . I have attached the older Bond too.
City Secretary office is reluctant to accept the revised bond unless you confirm. Please let us know how to proceed with
this.
Thank you .
3
Gonzales, Ronald
From:
Sent:
To:
Cc:
Subject:
Black , Doug
Thursda y, May 6, 202 1 2:14 PM
Gon zale s, Ronald
Rahman , Shammi
RE : Payment Bond for Contract 55 2 16
Ron -just to confirm -since we 're now routing and hosting contracts electronically -does CSO still maintain the hard
copies of the contracts-or some relevant portion of them , such as bonds, which might be needed in future disputes?
As to these specific PPM bonds for Ken -Do Contracting, LTD , yes , please release them to staff. We have agreed to allow
these bonds to be reduced to an amount closer to that which will be actually performed. Ken -Do will be providing new
original PPM bonds which will be returned to you for safekeeping . The filed contract will need to be updated (perhaps a
separate MISC posting of the bonds for convenience?)
Thanks,
Doug
Douglas W Black
Seni or Assistant C ity Atto rn ey
2 00 T ex as Street
Fo rt W orth , Texas 7 6102
81 7-3 9 2-76 15 D irect
D o u g .B lack@fortworthtexas .gov
Due to the ongoing coronavirus pandemic, the Fort Worth City Attorney's Office has implemented a
department-wide telework and all staff, except the City Attorney, are working remotely. You may
communicate with me by using my customary email address and telephone extension number.
City of Fort Wort h -Work ing together to build a strong comm un ity.
FORT \VORTH .
~
REC IPIENTS - PLEASE CON T ACT ME PRIOR T O F ORWARDING MESSAGES D ESIGNATED AS
ATTORNEY-CLIE NT COMMUNIC ATI ONS .
Thi s e-m a il and any fil es trans mitted w ith it a re co n fi denti a l a nd are inte nd ed so le ly fo r th e use of t he indi v idu a l o r e ntity
to w hich t h ey ar e addressed . T hi s co mmuni cati on m ay co ntain m ate ri a l pro te cted by th e atto rn ey-c li e nt pri vi lege. If you
are not th e intend ed rec ipi e nt or th e perso n respon sibl e fo r de li verin g th e e-mail t o th e intend ed rec ipi ent , be advised th at
yo u h ave rece ive d th is e-ma il in error and th at any use, di ssemination , fo rwardin g, print in g, or co py ing of th ~s e -m a il is
st rictl y pro hibited . If you have rece ive d thi s e -m a il in error, pl ease im me di at e ly noti fy D o ug Bl ack at th e C ity of Fo rt
Wo rth C ity Attorn ey's Office (81 7) 392-7615.
From: Gonzales, Ronald
Sent: Thursday , May 6, 202113 :47
To: Black , Doug <Douglas .Black@fortworthtexas .gov>
1
. -
Cc: Rahman, Shammi <Shammi.Rahman@fortworthtexas.gov>
Subject: Payment Bond for Contract 55216
Doug,
Shammi advised that the original payment bond for the above contract is needed by TPW
for business with Kendo. Since we maintain the original record copy of the contract and
usually do not release any part of a contract without Law approval, would you ~lease send
an email authorizing the CSO to release the original payment bond. We will make a copy
of the original for our file but we need your approval to release the original.
Thank you.
Ronald P. Gonzales, TRMC, MMC
Assistant City Secretary
200 Texas Street, Fort Worth , Texas 76102
(817) 392-6164
City of Fort Worth -Working together to build a
Strong community
FORT WORTH ®