Loading...
HomeMy WebLinkAboutContract 44155-CO3 (3)FORT WORTH, City of Fort Worth Change Order Request Project Name' North Beach Street from Vista Meadows to south of Shiver Client Project #(s)I 01292 Project Description 4-lane divided arterial street from Vista Meadows Drive to south of Shiver Road Contractor) Mario Sinacola & Sons Excavating, Inc. City Project Mgr.' Michael Weiss, P.E. Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date !Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPW $4,738,543.04 $398,820.30 $5,137,363.34 $55,200.00 $5,192,563.34 $189,456.96 $0.00 $55,200.00 Change Order # I City Sec # I 44155 3 I Date I City Inspector I Tom Miller Water $0.00 $0.00 $0.00 $0.00 $0.00 Sewer Totals $0.00 $4,738,543.04 $398,820.30 $0.00 $5,137,363.34 $0.00 $55,200.00 $0.00 $5,192,563.34 $189,456.96 $55,200.00 $0.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 9.58% $5,923,178.80 10/1/2013 Contract Time (CD) 400 400 400 JUSTIFICATION (REASONS) FOR CHANGE ORDER This change order adds temporary asphalt pavement from Heritage Glen Drive to Heritage Trace Parkway for use by emergency vehicles during the closure of N. Beach Street from July 15 through November 22 . City . , FA` Secretary tO It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Ordar. �26r ract Signature 6/ Date Mario Sinacola & Sons Excavating, Inc. Contractor's Company Name M&C Number Contractor (Name) r, ate roject Ma er/Program Manager �i6(3 7 � Date Djre tor, Contracting Department (Dept) ,'a-4 / 3 ti Date Assist t City Manager I , 01 -L ,...� ��- Council Action (if required) M&C Date Approved 1 Date '1 rIIIIIPbate 1 11/o/ 3 Date //Z/¢ RECEIVED JAN 0 8 2I)1 - ( FORT WORTH. City of Fort Worth Change Order Request Project Name! North Beach Street from Vista Meadows to south of Shiver I City Sec # I 44155 Client Project #(s)I 01292 1) UL- 1 Z 2.3 Project Description 4-lane divided arterial street from Vista Meadows Drive to south of Shiver Road Contractor) Mario Sinacola & Sons Excavating, Inc. City Project Mgr.' Michael Weiss, P.E. Change Order # I 3 City Inspector I Tom Miller Date 10/1/2013 Dept. TPW Water Sewer Contract Time Totals (CD) Original Contract Amount $4,738,543.04 $0.00 $0.00 $4,738,543.04 400 Extras to Date $398,820.30 $398,820.30 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $5,137,363.34 $0.00 $0.00 $5,137,363.34 400 (Amount of Proposed Change Order $55,200.00 $0.00 $0.00 $55,200.00 Revised Contract Amount $5,192,563.34 $0.00 $0.00 $5,192,563.34 400 Original Funds Available for Change,Orders $189,456.96 $189,456.96 Remaining Funds Available for this CO $0.00 $0.00 $0.00 Additional Funding (if necessary) $55,200.00 $55,200.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 9.58% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) I $5,923,178.80 JUSTIFICATION (REASONS) FOR CHANGE ORDER This change order adds temporary asphalt pavement from Heritage Glen Drive to Heritage Trace Parkway for use by emergency vehicles during the closure of N. Beach Street from July 15 through November 22 . It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. I Contractor's Company Name Contractor (Name) Mario Sinacola & Sons Excavating, Inc. p►LJ4/eL 511,14Auki--) Pdtor l upervisor Assistant Director (Dept) Apsistan ity`Attorney M&C Number I ;.1/ Date Oct Signature rojet Man ger/Program Manager Date Djr&tor, Contracting Department (Dept) /� Date Assistant City Manager Council Action (if required) M&C Date Approved Date Date Date o Date i/Z/i44 -(0j FORT WORTH,. City of Fort Worth Change Order Request Project Name' North Beach Street from Vista Meadows to south of Shiver Client Project #(s)I 01292 t 1; It ~ 7. Project Description 4-lane divided arterial street from Vista Meadows Drive to south of Shiver Road Contractor) Mario Sinacola & Sons Excavating, Inc. City Project Mgr.I Michael Weiss, P.E. Change Order # I 3 City Sec # I 44155 City Inspector I Tom Miller Date 10/1/2013 Dept. TPW Water Sewer Contract Time Totals (CD) Original Contract Amount $4,738,543.04 $0.00 $0.00 $4,738,543.04 400 Extras to Date $398,820.30 $398,820.30 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $5,137,363.34 $0.00 $0.00 $5,137,363.34 400 !Amount of Proposed Change Order $55,200.00 $0.00 $0.00 $55,200.00 Revised Contract Amount $5,192,563.34 $0.00 $0.00 $5,192,563.34 400 Original Funds Available for Change Orders $189,456.96 $189,456.96 Remaining Funds Available for this CO $0.00 $0.00 $0.00 Additional Funding (if necessary) $55,200.00 $55,200.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 9.58% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) I $5,923,178.80 JUSTIFICATION (REASONS) FOR CHANGE ORDER This change order adds temporary asphalt pavement from Heritage Glen Drive to Heritage Trace Parkway for use by emergency vehicles during the closure of N. Beach Street from July 15 through November 22 . It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Mario Sinacola & Sons Excavating, Inc.) Inspector/Inspection Supervisor Assistant Director (Dept) Assistant City Attorney M&C Number Contractor (Name) ic-;JiIL- :t^II\( Date Date Date Contract Signature I ' Project Manager/Program Manager' Director, Contracting Department (Dept) Assistant City Manager Council Action (if required) M&C Date Approved I Date Date Date Date FORT WORTH: City of Fort Worth Change Order Request Project Name' North Beach Street from Vista Meadows to south of Shiver I City Sec # I 44155 Client Project #(s)I 01292 Project Description) 4-lane divided arterial street from Vista Meadows Drive to south of Shiver Road Contractor) Mario Sinacola & Sons Excavating, Inc. City Project Mgr.' Michael Weiss, P.E. Change Order # I 3 City Inspector I Tom Miller Date 10/1/2013 Dept. TPW Water Sewer Contract Time Totals (CD) Original Contract Amount $4,738,543.04 $0.00 $0.00 $4,738,543.04 400 Extras to Date $398,820.30 $398,820.30 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date ' $5,137,363.34 $0.00 $0.00 $5,137,363.34 400 !Amount of Proposed Change Order $55,200.00 $0.00 $0.00 $55,200.00 Revised Contract Amount $5,192,563.34 $0.00 $0.00 $5,192,563.34 400 J Original Funds Available for Change Orders $189,456.96 $189,456.96 Remaining Funds Available for this CO $0.00 $0.00 $0.00 Additional Funding (if necessary) $55,200.00 $55,200.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 9.58% I MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) I $5,923,178.80 JUSTIFICATION (REASONS) FOR CHANGE ORDER This change order adds temporary asphalt pavement from Heritage Glen Drive to Heritage Trace Parkway for use by emergency vehicles during the closure of N. Beach Street from July 15 through November 22 . It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor (Name) I Contract Signature Date Mario Sinacola & Sons Excavating, Inc. Inspector/Inspection Supervisor Assistant Director (Dept) Assistant City Attorney M&C Number I :{Ji 1V I Date Project Manager/Program Manager Date Date Director, Contracting Department (Dept) Date Date Assistant City Manager Date t-it/ Council Action (if required) M&C Date Approved FORT WORTH City of Fort Worth Change Order Additions Project Name 1 North Beach Street from Vista Meadows to south of Shiver I City Sec # I 44155 Client Project # 1 01292 Project Description 1 4-lane divided arterial street from Vista Meadows Drive to south of Shiver Road Contractor Mario Sinacola & Sons Excavating, Inc. City Project Mgr. 1 Michael Weiss, P.E. Change Order # 3 City Inspector I Tom Miller Date I 10/1/2013 ADDITIONS I I EM DESURIP I IUN UEP I Qty Unit Unit Cost I otai 9999.000U 2" I emp. HMAC h'vmt. tor Emergency Vehicles trom H. Glen to H. I race I F'W 1.UU LS Sbb,2UU.UU $bb,2UU.UU Change Order Additions Page 1 of 2 T�W $55,200.00 Water $0.00 Sewer $0.00 Sub Total Additions $55,200.00 Change Order Additions Page 2 of 2 FORT WORTH City of Fort Worth Change Order Deletions Project Name 1 North Beach Street from Vista Meadows to south of Shiver Client Project # 1 01292 Project Description I I EM 4-lane divided arterial street from Vista Meadows Drive to south of Shiver Road Contractor Mario Sinacola & Sons Excavating, Inc. City Project Mgr. Michael Weiss, P.E. Change Order # 3 City Inspector I Tom Miller I City Sec # I 44155 Date I 10/1/2013 DELETIONS DESCKIP I ION DEP I Uty Unit Unit Cost I otal Change Order Deletions Page 1 of 2 TFW $0.00 Water $0.00 Sewer $0.00 Sub Total Deletions Change Order Deletions Page 2 of 2 MWBE Sub MIWBE Breakdown for this Change Order Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00