Loading...
HomeMy WebLinkAboutContract 45771-CO1 (2)FORTwORTH�� City of Fort Worth CITYS�CRETARYt >�'�j�� _-��� CONT�4�T Nt�, � Change Order Request Breakdown Project Name HMAC 2014-5 HIR Street Rehabititation City Sec # 45771 Client Project #(s) 02297 Contractor Cutler Repaving, Inc. PM Kristian Sugrim Inspector William Mason Change Order Submittal #�1 Date 212812017 Dept. � TIPW Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Go to ADD & DEL Tabs to Enter CO Backu� Revisetl Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) ,986,315.00 ,986,315.00 $0.00 ,986,315.00 $0.00 Contract Time Totals CD $5,986,315.00 290 46 $5,986,315.00 336 ,986,315.00 336 $0.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORI('i1NAL CONTRACT 0.00% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTR,4CT COST+ 25%) $7,482,893.75 JUSTIFICATION (REASONS) FOR CHANGE ORDER This Change Order is to request additional time to the contract for the following reasons: 35 days delay in getting striping plans and 11 days delay for abnormal amounts of Spring rain. �= '� � �'``��1 . r �� � I 1 ���,,. . `� � ,11'��.. ` � =�= S�ANN�� �� �F�IClA4� �� �is� ��Cr � �'T• �A��' � " �a RECEIVED AUG 1 4 2011 CITY OF FORT WORTH ciN sECREraav a � Foar Woirrrj City of Fort Worth Change Order Additions Project Name HMAC 2014-5 HIR Street Rehabititation City Sec # A5771 ClientProject# 02297 Contractor Cutler Repaving, Inc. PM Knstian Sugnm Inspector William Mason Change Order Submittal # �1 Date 2/2812017 ADDITIONS y mt nit ost ota T/PW $0.00 Sub Total Additions Change Order Additions Page 1 of 1 FoKrWoxi�H City of Fort Worth Change Order Deletions Project Name HMAC 2014-5 HIR SUeet Rehabititation City Sec # 45771 ClientPraject# 02297 Contractor CutlerRepaving, Inc. PM� Kristian Sugrim Inspector Wlliam Mason Change Order Submiital #�1 Date 2/2812017 DELETI�NS ty nd nit ost ota T/PW $0.00 Sub Total Deletions Change Order Deletions Page 1 of 1 Previous Change Orders co# DATE AMOUNT Total $0.00 MISBE Breakdown for this Change Order CFW Change Oi•der Approval St-COApp02 Page 1 of 3 Routinq Assigned To: Due Date: Assigned By: Due Time: Links 1 fortworthaov/Infrastructure Proiects/02297 - HIR Street Rehabilitation (HMAC 2014-5)/Contractor/Chanqe Orders/HIR 2014-5 Chanae Order 1 Breakdown.xis Attachments (0) i No Attachments have been added to fhis form. i _ _ _ _ https://projectpoint.buzzsaw.com/ bz_web/Forms/For•mPrint.aspx?SiteId=51500&ProcessI... 8/14/2017 CFW Change Order Approval St-COApp02 O�RT i�RT�� City of Fort Worth Change Order Request Approval (Change Order Breakdown Available in Links) Page 2 of 3 For Change Order Submittal No.: 1 ; Change Order No.::St-COApp02 Date Started: 2017-07-07 City Sec. No.: 45771 Date Due: 2017-08-26 Project Name: 02297 - HIR Street Rehabilitation (HMAC 2014-5) ; _ �229� :DOE Numbers: Project Numbers: DOE No. PI"Oj2Ct Removal and replacement of nonfunctional curb and gutter, Descripti0n:';driveways and sidewalks; followed by wedge milling / surface ,milling, then hot-in-place recycle and overlay with 1" virgin , HMAC . Project Manager: Kristian Sugrim City Inspector: ,William Mason Contractor: Cutler Repaving, Inc. !; COUNCIL ACTION (If Required): M&C Log Name: M&C Number: : COST AND DAYS SUMMARY: M&C Date: , Requested Department: Cost($) Fund Account Center: Days: TPW 46 Total Cost: $ 0.00 Total Requested Days:'46 Approval Status: https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&Pi�ocessI... 8/14/2017 CFW Change Order Approval St-COApp02 Approved: Yes Comments: User: Bob Veskerna Date: 2017-07-10 10:54 AM Approved: Yes Comments: User: Kristian Sugrim Date: 2017-07-11 9:30 AM Approved: Yes Comments: User: Najib Fares Date: 2017-07-17 10:03 AM Approved: Yes Comments: User: Kim Arnold Date: 2017-07-26 11:45 AM Approved: Yes Comments: User: Doug Wiersig Date: 2017-07-26 1:47 PM Approved: Yes Comments: User: Doug Black Date: 2017-08-10 5:56 PM Approved: Yes Comments: User: Jay Chapa Date: 2017-08-14 9:51 AM Page 3 of 3 Action Required: https://projectpoint.buzzsaw.com/ bz_web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 8/14/2017 Contract Compliance Manager: By signing I acknowledge that I am the person �•esponsible for the monitoring and administration of this contract, including ensurin�; all perfoi-mance and 1•eporting requi�•ements. ICristian Sugrim / 1'�S Name of Employee/Signat�u•e Project Mana�er Title ❑ This form is N/A as No City Funds are associated with this Contract I<ristian Su rim � 4 Printed Name Signature