HomeMy WebLinkAboutContract 44387 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
�
�
City Secretary
Contract No. �"� �'� �)� �
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "AgreemenY' in
connection with the Improvements.
Developer Information:
Developer Company Name: Westover Chisholm, LP
Address, State, Zip Code: 301 Commerce Street, Suite 2040 � Fort Worth, TX 76102
Phone, E-Mail: (817) 886-3000 � sbrous@westovergrp.com
Authorized Signatory/Title: Sam Brous, Manager
Project Name: Chisholm Trail Plaza
ect Location: 7429 Oakmont Boulevard
Plat Case No.: FS-012-034 Plat Name: River Hills Ph. 1
Mapsco: 88U
CFA:2012-086 DOE:6927
Council District: 3 City Project No: 02002
To be con�pleted by staff.• ,
Received by: � � �(�, �,(� � ,t � Date: �l 5 � � �
��,. �— .o
��a��4��u��) �PR � 3 ��i� 1
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractars hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub-contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City-
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A, A-2�X �
Sewer (A-1) JX, Paving (B) X, Storm Drain (B-1 — B-3) X_, Street
Lights & Signs (C)e.
2
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be adininistered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer-awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
3
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre-Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City-issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are ar may be in conflict with any of the
community facilities to be installed hereunder.
4
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whethef� or not such iniuries, death or
danta�es are caused, in whole or in part, by the alle�ed ne�liQence oi
the Citv of Fort Wof•th, its of�cers, servants, or e�rtployees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or� not such
injuries, death of• dama�es are caused, in whole or in part, by tlze
alleQed neQli�ence of the Citv of Fort Worth, its officers, servants, or
e��zployees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
5
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
�
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
0
Cost Summary Sheet
Project Name: Chisholm Trail Plaza
CFA No.: 2012-086
DOE No.: 6927
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 8,750.00
2. Sewer Construction $ 17,493.50
Water and Sewer Construction Total $ 26,243.50
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub-Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub-Total for TPW Construction Fees
Total Construction Fees:
choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125°/
Cash Escrow Pavinq/Storm Drain = 125%
I ettar nf Crariit - 19.r,�/ w/9vr amiratinn nor
$ 1,040.00
$ 8,970.00
$ -
$ 10,010.00
$ 36,253.50
$ 524.87
$ 524.87
$ 1,049.74
$ 400.40
$ 200.20
$ -
$ -
$ 600.60
$ 1,650.34
Choice
36,253.50
32, 804.38
12,512.50
45.316.88
8
IN TESTIMONY WH�REOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and sa'd D�v��loper has execute this �
instrument in 9�uadruplicate, at Fort Worth, Texas this �%— day of - �� Z.�
, 20'l `'�-�.
�-
CITY OF FORT WORTH - Recontmendetl by:
Water Department
�
Wendy Chi- abulal, EMBA, P.E.
Development Engineering Manager
Appr�oved as to For�n� & Legality.•
�. /
�
�
�� \V ��`�1��
Douglas W. Black
Assistant City Attorney
I
Transportation & Public Works Department
v. �.1
Douglas W. Wiersig, P.E.
Director
Appr•oved by City Manager•'s Office
�
Fernando Costa
Assistant City Manager
sholm, LP
By: Westover Chisholm GP, LLC
its general partner
ATTEST:
Signature
(Print) Name: Melissa Kulig
By: The Brous Family Partnership, Ltd.
its manager
By: Hanna Belle, LLC
its eeneral nartn r
// j � ;
Signature
Print Name: Sam Brous
Title: Manager
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included Attachment
� Location Map
� Exhibit A: Water Improvements
� Water Estimate
� Exhibit A-1: Sewer Improvements
� Sewer Estimate
� Exhibit B: Paving Improvements
� Paving Estimate
� Exhibit B-1: Storm Drain Improvements
� Storm Drain Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
10
�
CITY PROJECT NUMBER - 02002
DOE NUMBER - 6927
� � � � � �
COMMUNITY FACILITIES AGREEMENT - vICINITY MAP
CHARLES CROOK
CONSULTING, INC.
FIRM REGISTRATION NO. F-10812
1606 W. PIONEER PKWY., SUIiE 207
ARLJNGTON, TEXA6 76073
817-2747788 OFFICE
817-2743285 FAX
www.CCrookCons ulti ng.com
VI C I N ITY MAP
\
APPROXIMATE LOCATION
UNDERGROUND TELEPHONE
UTILIlY
16 X 2"
WI TH 2"
AND 2�
TAPPING SADDLE
WA TER LINE SERVICE
METER BOX
, _'._._ _._-------`\\
' �• .�
� � � �
_,-=-� -�-----
�� ��
04, PG 1900, VOL. 8004, I� ��
G 1822, P.R.T.C.T. ��
CAB. A, �I
.C.T. I'
� �
, , , , ,
..... _
..... - -
. ..,, .:__, ��k
16 X 1�
WI TH 1 »
SERVICE
� _�_�
� \
�2"- IROt�RBD-ivIA1;KED
BRITfAIN-CRAWFORD SEf
_� 1
�
I''
�
I�
w.
�
II
w�
�I
I I �
� '
I)
�.
I�
w�
��
����
��
C�2
�
�
�
�
� � `= -- � = _ =
COMMUNITY FACILITIES AGREEMENT - EXHIBIT A
WATER IMPROVEMENTS
CHARLES CROOK
CONSULTING, INC.
FIRM REGISfRA710N N0. F-10812
1508 W. PIONEER PKWY., SUITE 207
ARLINGTON, 7D(AS 78073
81 7-27 47 7 8 8 OFFICE
817,2743285 FAX
www.CCrookCo nsultf ng.com
TAPPING SADDLE
WATER LINE
AND 1 " METER !
�FIRE
_, _ __--�
� __ ------'--
�DFFN�9� �-�BN@X 16�� W - �
STREEf � // �RIM=715.03 �
` LIGH � // L L_702.25- --- J
� //
� � i
/� _"
PPROXIMATE LOCATION I /� _ . � - � - �
NDERGROUND GAS LINE _ �, /�,.... . . - • - T � �_�,,5- _ . _.._ � � - -'
' ' y GAS _ �
�, �. . ' --� O �� -_"""_ GAS ,�._ .
S S �S G�5'__�--� 6A5
GAS__.-.-- Cl�S GAS_.---- Gl�S —_ �__ I
GAS-- GAS— GAS �- -_'_ --' ' �
_-- -- _ _ _ I \
_, _- --- = - . APPROXIMATE LOCATION
� UTIDi�RGROUND TELEPHONE
47 LF OF 8� DIP SANI TARY ��
SEWER LINE BY BORE WI TH �, �
24� STEEL CARRIER PIPE �, :
� I
4' DIAMETER SANI TARY � 7 LF 6" PVC SANI TARY
SEWER MANHOLE � SEWER LINE
-_______ � -- - �FIRE
-�� / �_ - -�
_'--------- \ // /----- \ --
- �
...... �- __ --- -
- - - - - �
ECTRIC TRAFFIC SIGNAL » w _
METER ___GON�9L -B6�iC 16
�- � �I ��� _� BR?TTA Nfl CRAWF RD SEi' -
� .
I ��
04, PG 1900, VOL. 8004, �� �� �
G 1822, P.R.T.C.T. � Ii �
CAB. A, �I I �. I
.C.T. � / I I
10 0 10 20 30
GRAPHIC SCALS — FEET
�
w.
, �.
� i!
� �.
�
� I��
��
� �;�
� �. �
� �
��
�� �
SIGNAL I � �
L BIOX w:'
I ��
I �
CHISHOLM TRAIL PLAZA
COMMUNITY FACILITIES AGREEMENT - EXHIBIT A1
WASTEWATER IMPROVEMENTS
CHARLES CROOK
CONSULTING, INC.
FIRM REGISTPATiON NO. F-10812
1506 W. PIONEER PKVYY., SURE 207
ARt1NGTON,TEXAS78�13
817-2747788 OFflCE
817,274-3285 FAX
www.CCrookConsukf ng.com
_.._..—.._.._.._...._ . STRE� � // �RIM=715.03 �
LIGHT�„ � // L L=702.25— --- J
.r� i �,
,�
�PPROXIMATE LOCATION I /� - '""
NDERGROUND GAS LINE _ �. /_ . . - • - ' T �_�AS- _
. . �_ � GAS"'"�_ GAS �. � .
�_ �— . . —_� O �� GAS ' ' �--
SS�nS GAS
_. _ . .-_ __ �5�—�-- GAS�--- G�S'_"--- GAS �_ ._� '_'= '_' _"=I _— .
� GAS-- GAS— GAS --_ ---' "'"—� ' �
-- —_ _ _ _ __ I \
- - -- _ _ - . APPROXIMATE LOCATION
i UNDERGROUND TELEPHONE
/ UTILITY
�+ � �
16 � x 6� TAPPING � �
�
SLEEVE AND VAL VE FOR \ i
FIRE SERVICE LINE
- _ _ _ _ _ _ _ � \
- - - - - - - - - - �
u.. ...
� � � � �
- --- ��
--_- --- - -
� -�-------
�� �)
04, PG 1900, VOL. 8004, �� ��
G 1822, P.R.T.C.T. I� ��
CAB. A,
.C.T. ��
t�=---- �
10 0 10 20 90
GRAPHIC SCALE — FEEC
� _ _
_�_\ �FIRE
• \\
�- --• - -�
� --�_-_ -_--
TRAFFIC SIGNAL » �-
_.CO�e� -ee� 16 W —
'� - 2"-IRfl�ROD-KAA��D \
BRITfAIN-CRAWFORD SEf
_) 1
I� �
I �'
w.
�.
II
w�
�I
I� �
��
li �
�
u�
>'
I
9� '
C�
�fJ
�
�
�
CHISHOLM TRAIL PLAZA
COMMUNITY FACILITIES AGREEMENT - EXHIBIT A2
FIRE LINE IMPROVEMENTS
CHARLES CROOK
CONSIJLTWG, INC.
FIRM REGISTRATION NO. F-10812
1508 W. PIONEER PKWY., SURE 207
ARLINGTON, 7EXA5 78013
817-2747788 OFFICE
817,274-3285 FAX
www.CCrookCo nsulti ng.wm
�� �---
�RIM=715.03 �
L L=702.25— — — — J
\
APPROXIMATE LOCATION
UNDERGROUND TELEPHONE
UTILITY
REMOVE AND REPLACE
54 SF OF EXISTING
CONCRETE SIDEWALK
--_______ ,\
---------- 0
' •• ...
— — � � �
— — --_--� — -� — — —
�� ��
)04, PG 1900, VOL. 8004, �� ��
'G 1822, P.R.T.C.T. II ��
CAB. A,
.c.T. �,
, , . , ,
..... _
..... - -
��
,__
�,
i
�—
ECTRIC
ER _
� � —
� _ �
�
��
_ �
� ---
R_\ `TRnFFN�9L I-GBN�-X 16 �� w — �
L
- IRfltd-RHD�AA�KED
'AIN-CRAWFORD SEf
� ;I �
� �� I
i �i �
w.
I '
I ��
I '�
I II
��
� �I
� ���
� _. �
� �
i �
�� �
I BOXL I I �
I ;� �
I ��
I .
CHISHOLM TRAIL PLAZA
COMMUNITY FACILITIES AGREEMENT - EXHIBIT B
PAVING IMPROVEMENTS
CHARLES CROOK
CONSULTING, INC.
FIRM REGISTRATION N0. F-10812
1508 W. PIONEER PKWY.. SURE 207
ARLINGTON, 7D(AS 78U13
817-2747788 OFFlCE
817,274-3285 PAX
www.CCrookConSulti ng.co m
���e �
BOXL I I �
I �)
I '
I
E TRIC
"' RMER
� '
�
� �
LOT 6, BLOCK C,
CAB. A, SLIDE 1853, P.R.T.C.T.
LOT 6B, BLOCK C,
CAB. �, SLIDE , P.R.T.C.T.
10' UTILITY EASEMENT, CAB. A,
SLIDE 1853 P.R.T.C.T. & VOL.
8616, PG. 1822, D.R.T.C.T.
i
i
/
/
/
/
/
/
i
i /�
i i�
�
�
,
�
,
�
�
NG� i �
i
i
i
i
/
— �, .,�
�
� 6 SY OF
� CONCRETE �
� � PAVING
DRAINAGE EASEMENT
CAB. A, SLIDE 1853 P.R.T.C.T.
ABANDONED BY
CAB. __, SLIDE _____ P.R.T.0
i �
/ Ii
I
�,. .,.
.�
..'.h;:
..j
. •• ��,, :
��• .�� .
•I : ' �.
d : : �I �.�.�:.. .
. ` � •'
\�.••w •
� . :
�" _ A'.� .:a �
�� � '- '. �i / '` .
� � � DRAINAGE EASEMENT ,�� "' ''� � •'••' •'•:
.•:.,•.i.•
A8. _, SL1DE P.R.T.C.T.
� � -'
_ _
• A ' � ' '� . • � � � • . i' ,
. . :� .y� j ••1.
.��'•� , I , �(,,,�.r�'�
� • J
. '• !,p ; •.a, . •l, "• , ,', ..
. ' .4v . � • .. . /
.�4•. ' 't'
. .' y '.
. . � . . . ' ' � .4 _
LOT 11, BLOCK C
RNER HILLS ADDRION
cnaiNEr e, SL1DE 1727
P.R.T.C.T.
io o Io zo so
GRAPHIC SCALii — FEEf
"' - ---•-.....
.. _.
I
I
I
I
�
V �
Y�W
G h
m=W��/1U
h
o�°-ma
F� �
o z
�
129 SY OF
CONCRETE
RIP-RAP
10 SY OF
STONE RIP
RAP
�
CHISHOLM TRAIL PLAZA
COMMUNITY FACILITIES AGREEMENT - EXHIBIT 63
DRAINAGE CHANNE� IMPROVEMENTS
CHARLES CROOK
GONSULTING, INC.
FIRM REG15fRATION NO. F-10812
150B W. PIONEER PKWY., SUITE 207
ARLJNGTON, Tfl(AS 78013
817-2747788 OFFlCE
817-274-3285 FAX
www.CCrookConsuiti ng.co m
/ � GHARLES CROOK
, � CONSULTING, ING.
ENGINEER'S OPINION OF PROBABLE COST
CLIENT: The Westover Group DATE: 1/2/2013
PRO]ECT: Chishoim Trail Plaza (Total Project) CCC ]OB NO: 12-034
ITEM NO. DESCRIPTION OFITEM QUANTITY UNIT UNIT PRICE COST
WATER (Exhibit'A')
1 2" Water Service 1 EA $ 2,200.00 $ 2,200.00
Z 1" Water Service 1 EA $ 800.00 $ 800.00
WASTEWATER (Exhibit'A-1')
1 4' Diameter Sanitary Sewer Manhole 1 EA $ 3,200.00 $ 3,200.00
2 4' Extra Depth Manhole 2.1 VF $ 175.00 $ 367.50
3 8" DIP Bored Sewer Service 47 LF $ 180.00 $ 8,460.00
4 24" Carrier Pipe 47 LF $ 100.00 $ 4,700.00
5 6" SDR-26 PVC Sanitary Sewer Line 7 LF $ 50.00 $ 350.00
6 Post CCTV Inspection 54 LF $ 4.00 $ 216.00
� Manhole Vacuum Testing 1 EA $ 200.00 $ 200.00
FIRE LINES (Exhibit'A-2)
1 16" x 6" Tapping Sleeve and Valve 1 EA $ 5,500.00 $ 5,500.00
2 6" Water Line 5 LF $ 50.00 $ 250.00
PAVING (Exhibit'B')
1 Remove Sidewaik 54 SF $ 4.00 $ 216.00
Z 4" Concrete Sidewalk 54 SF $ 6.00 $ 324.00
3 Hydromulch Disturbed Areas 1 LS $ 500.00 $ 500.00
DRAINAGE CHANNEL (Exhibit'B-3)
1 Concrete Riprap 129 SY $ 60.00 $ 7,740.00
Z Medium Stone Riprap, dry 10 SY $ 75.00 $ 750.00
3 6" Concrete Paving 6 SY $ 80.00 $ 480.00
TOTAL: $ 36,253.50
_ _
The Engineer's Opinion of Probable Cost is based on data availabie to this Engineer's office from a variety of sources. This opinion is not intended to '.
represent a comprehensive estimate of all costs associated with a particular project but should be considered an opinion regardi�g an aspect of the
� project based on the Engineer's experience. The total costs shown herein may or may not include such Items as raw land costs, carrying costs,
attorneys fees, zoning or platting services, jurisdictionai water determinations, Phase 1 or Phase 2 Assessments, feasibility studies, surveying costs,
i tree mitigation, geotechnical reports or testing, utility adequacy studies, EPA or Corps of Engineer's studies induding Floodplain analyses, City
I assessment or impact fees, taxes, fiiing fees, inspections, insurance, bonds, construction administration or management fees, condemnatlon
! procedures or other such associated fees.
lofl