Loading...
HomeMy WebLinkAboutContract 44392-A1 (2)AMENDMENT No.l �IY[� U 4de�l��� ������� �,o � ���/ ;�� � — . TO CITY SECRETARY CONTR.ACT No. 44392 WHEREAS, the City of Fort Worth (CITY) and CH2M HILL Engineers, Inc., (ENGINEER) made and entered into City Secretary Contract No. 44392, (the CONTRACT) which was authorized by M&C C-26187 on the 2nd day of April, 2013 in the amount of $ 767,920.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Village Creek Water Reclamation Facility Biosolids Implementation and Long-Term Master Plan; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTR.ACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTR.ACT: l. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated 10/13/2014, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $49,984.00. (See Attached Funding Breakdown Sheet, Page -3-) � Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $817,904. � All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 3 � C�FF@C��� i�E�ORD i �1'T� SEC�E'�AR�7 Ih ��o ����ii'ig �00 N_ _ a�CEIVED NOV 11 2Q1� APPROVED: City of Fort Worth ��...,� �,�-, Fernando Costa Assistant City Manager DATE : / � /.p� APPRQ_AL RECOMMENDE � � ��/ � � % ,:'L �J, � �-- Andy Cronberg Acting Director, Department APPROVED AS TO FORM AND LEGALITY: , � � Douglas W. Black Assistant City Attorney ENGINEER CH2M HILL Engineers, c. C�/��f /����� _ Edward Motley, P.E. Vice President DATE M&C: Date: ATTEST : � ys-'�;`'^ J f"� ,��;��` , <���"�r .. a ��;�'... � �/�'� %7/,/��-- � o � �.�. �.. C�- ���.� :' Mary J. K�ys�eY City Secretary City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 3 O . G� .., 0 Q i O¢�p �U i-��' � O � Z��, ��,, o� � ��.y ' �4�' �::�� � D�6�� ��' 4���' . ..i�� i G 2C/� ��� �FFICIAL RECORD �I'�y SECRETARY � �. �t�I� 1 If7� � PROPOSED USE OF ADDITIONAL SERVICE BUDGET DESIGN SERVICES FOR VCWRF BIOSOLIDS IMPLEMENTATION AND LONG•TERM MASTER PLAN CITY PROJECT NO.: PE45 0705008 (M8C C•26187) Attachment A— Amendment No. 1 Proposal for Task 5: Biosolids Contract Support FOR VCWRF BIOSOLIDS IMPLEMENTATION AND LONG-TERM MASTER PLAN CITY PROJECT NO.: PE45 0705008 (M&C C-26187) TASK 5. Biosolids Contract Support On a time and materials basis, CH2M HILL Engineers, Inc. (ENGINEER) will provide engineering support to the City of Fort Worth (CITY) in developing, bidding, and contracting for biosolids operations services. These services, at the CITY's discretion, can include: 1) Development of Request for Qualifications for prospective bidders 2) Development of Request for Proposals for prospective bidders 3) Development of Contract for biosolids operation services. 4) Support during bidding 5) Evaluation of RFQ and RFP responses. 6) Transition support to new contract 7) Negotiations with current biosolids operations contractor. 8) Cost Estimating 9) Other Contract Support related tasks as directed by the CITY. All work will be performed with specific direction from the CITY Project Manager on a task by task, time and materials basis. Level of EffortlCost Attachment B summarizes the attached estimated level of effort and cost estimate for assisting the CITY with these services. Task Fee 5.0 Biosolids Contract Support $49,984 Total $49,984 City of Fort Worth, Texas Attachment A PMO Release Date: 04.09.2012 Page 1 of 1 Amendment No. 1, Attachment B- Level of Effort Supplemental TASK/HOUR BREAKDOWN Engineering Services for VCWRF BIOSOLIDS IMPLEMENTATION AND LONG-TERM MASTER PLAN Task 5.0 - Biosolids Contract Support Labor(hours) Expense Task Description Project Manager Senior Operations Biosolids Task Lead & Project Total Labor Total Task Sub Task No. (Ken Hall) Admin Specialist (Heller) Technologist Engineer Subconsultant (Forbes, Bauer) (Berg) Cost Travel Reproduction Expense Cost Total Rate $255 $120 $234 $203 $158 MWBE Non-MWBE 1.0 Project Management 0 0 0 0 0 $0 $0 $0 0 0 $0 $0 2.0 Long-Term Biosolids Master Plan 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 3.0 Contract Process Improvements 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 4.0 Additional Services 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 5.0 Biosolids Contract Support 60 14 50 50 60 $48,330 $0 $0 $1,200 $454 $1,654 $49,984 $0 $0 $0 $0 $0 $0 Totals 60 14 50 50 60 $48,330 $0 $0 $1,200 $454 $1,654 $49,984 City of Fort Worth, Texas Attachment B- Level of Effort Supplement 1 of 1