AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No. 44392
WHEREAS, the City of Fort Worth (CITY) and CH2M HILL Engineers,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 44392,
(the CONTRACT) which was authorized by M&C C-26187 on the 2nd day of
Apri1, 2013 in the amount of $ 767,920.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $49,984 which was administratively authorized
authorized on November 10, 2014; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Village Creek Water Reclamation Facility Biosolids Implementation
and Long-Term Master Plan; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW Tf�REFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
l.
�
m
c-�
m
C
m
0
�
�
._ i
00
N
0
�
c�,
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated 2/11/2015, a copy of
which is attached hereto and incorporated herein. The cost to City for
the additional design services to be performed by Engineer totals
$176,739.00. (See Attached Funding Breakdown Sheet, Page -3-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $994,643.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
c�ry oF rorc wo�rn
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 1 of 3
�FFICIAL RECOttD
CITY S��RETARY
�% dVO1RT�i, TX
�
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth
�'i�/,�iLL� �i�---
Fernando Costa
Assistant City Manager
DATE : S �' �S
APPROVAL RECOMMENDED:
John R ert Car an
Water Director
APPROVED AS TO FORM AND LEGALITY:
� _� �
�ti1 � �� '�
D NR�S�r�- ,4.� c`z-�Zeyr��+l�S
S ��Assistant City Attorney
ATTEST:
,`� ,�no�
F1
Mary J.(/K�s`�r
City Secretary
City of Fort Worth
Professional Services AgreementAmendment Template
PMO Official Release 8/1/2012
Page 2 0( 3
0
mo a
�g S�
� � o�
� a ��
c
e�
q�T�,y� GaJ�� roG
'�.;D,�"�.��`�" .
ENGINEER
CH2M L Engineers, I .
�
Edward Motley, P.E.
Vice President
DATE : � � 23 /��5
M&�: c' - z-r L��
Date: �+ 14- � 2�1'S
OFFiC1AL G�ECOFdD
CITY SECRE3'A6tY
�Y. INORTH, '�'X
PROPOSED USE OF ADDITIONAL SERVICE BUDGET
DESIGN SERVICES FOR
VCWRF BIOSOLIDS IMPLEMENTATION AND LONG-TERM MASTER PLAN
CITY PROJECT NO.: PE45 0105008 (M&C C-26187)
Attachment A— Amendment No. 2
Proposal for Task 5: Biosolids and Energy Operations Support
FOR
VCWRF BIOSOLIDS IMPLEMENTATION AND LONG-TERM MASTER PLAN
CITY PROJECT NO.: PE45 0705008 (M&C C-26187)
Previously-issued Amendment No. 1 to this contract provided initial funding (in the amount
of $49,984) for Task 5, Operations Support, to begin. This Amendment No. 2 provides
additional funding (in the amount of $176,739) for completion of Task 5, based on the now-
defined services as outlined below. The total Task 5 amount for Amendment Nos. 1 and 2 is
$226,723.
TASK 5. Biosolids and Energy Operations Support
On a time and materials basis, CH2M HILL Engineers, Inc. (ENGINEER) will provide
engineering support to the City of Fort Worth (CITY) in developing, bidding, and transitioning
to new third party Operators for biosolids and energy operations services. ENGINEER's
services include:
TASK 5.1. PROJECT MANAGEMENT
With this amendment, project activities are assumed to continue through May of 2015.
1) Managing the Team
• Lead, manage and direct development of work products.
• Ensure quality control is practiced in performance of the work.
• Communicate among team members.
• Task and allocate resources.
2) Communications and Reporting
• Prepare and submit monthly invoices.
• Prepare and submit monthly progress reports.
TASK 5.2. BIOSOLIDS SERVICES RFQ, RFP AND OPERATION AGREEMENT
DEVELOPMENT
Develop the following documents for third party operation and maintenance of the VCWRF
Biosolids Processes.
1) Request for Qualifications (RFQ) for prospective bidders
2) Request for Proposals (RFP) for prospective bidders
3) Agreement for biosolids operation services.
Biosolids processes include:
City of Fort Worih, Texas
Attachment A
PMO Release Date: 04.09.2012
Page 1 of 4
ATTACHMENT A
DESIGN SERVICES FOR
VCWRF BIOSOLIDS IMPLEMENTATION AND LONG-TERM MASTER PLAN
CITY PROJECT NO.: <XXXX>
• Residuals holding tanks at the Project Site
• Conveyance to and from dewatering operations
• Dewatering
• Lime addition and achievement of Class A or Class AB exceptional quality (EQ)
residuals quality
• Residuals storage, loading, and handling prior to hauling
• Residuals materials tracking and hauling to land application
• Land application of residuals
• Recordkeeping and reporting to demonstrate Class A or Class AB EQ status of
treated residuals, and compliance with TCEQ reporting requirements for land
application of residuals
• Filtrate, process leakage, and process drainage management, collection, and
conveyance to the VCWRF
• Polymer addition to aid dewatering
• Stormwater collection system and pump station
• Odor and gas control systems
• All associated instrumentation, control systems, and laboratory equipment
• Building systems, such as heating, ventilation, and air conditioning (HVAC),
plumbing, and electrical systems
• Site infrastructure, site roadways, weigh scale, and entrance area
Work includes development of up to four DRAFT versions for CITY review and comment,
and up to five meetings/conference calls to discuss the documents in detail.
Work will include development of a bid alternate that will include only those services
necessary for hauling and land application of the biosolids (no dewatering or lime
application).
TASK 5.3. ENERGY SERVICES RFP AND OPERATION AGREEMENT DEVELOPMENT
Develop an RFP and Operation Agreement Documents for third party operation and
maintenance of the VCWRF Energy Processes. These processes include:
• HRSG
• Steam blowers,
• Gas powered turbine/generator.
•(Oversight of Renovar landfill gas purchase is not included).
It is assumed that the Agreement and RFP will be very similar to the documents developed
for Task 2, with the Agreement Exhibits modified for the Energy Services scope of work.
For budget development, it is assumed that ENGINEER will develop up to two DRAFT
versions for CITY review and comment.
To support this effort, ENGINEER will attend up to three'h-day meetings/conference calls
with CITY staff to identify key provisions in the RFP and Agreement, discuss the existing
agreement and how it should be revised when reissued, and review work products.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 04.09.2012
Page 2 of 4
ATTACHMENT A
DESIGN SERVICES FOR
VCWRF BIOSOLIDS IMPLEMENTATION AND LONG-TERM MASTER PLAN
CITY PROJECT NO.: <XXXX>
TASK 5.4. BIOSOLIDS BIDDING SUPPORT AND PROPOSAL EVALUATION
Provide bidding support to the CITY. These services will include:
1) Attendance at one'h-day mandatory pre-bid meeting for prospective bidders. At this
meeting ENGINEER will support the CITY in developing the technical
presentation/discussion of services to be provided, and will assist with a tour of the facilities
to be operated and maintained.
2) Develop responses to technical Request for Information's (RFIs) received by the CITY
during the bidding process.
3) Review proposals received from prospective bidders. Advise the CITY during proposal
review and scoring regarding proposed Agreement modifications submitted by bidders, and
also regarding the bidders' experience and ability to perform the proposed scope of work.
TASK 5.5. ENERGY PROCESSES BIDDING SUPPORT AND PROPOSAL EVALUATION
Provide bidding support to the CITY. These services will include:
1) Attendance at one'/z-day mandatory pre-bid meeting for prospective bidders. At this
meeting ENGINEER will support the CITY in developing the technical
presentation/discussion of services to be provided, and will assist with a tour of the facilities
to be operated and maintained.
2) Develop responses to technical RFIs received by the CITY during the bidding process.
3) Review proposals received from prospective bidders. Advise the CITY during proposal
review and scoring regarding proposed Agreement modifications submitted by bidders, and
also regarding the bidders' experience and ability to perform the proposed scope of work.
TASK 5.6. ADDITIONAL SUPPORT
ENGINEER will support the CITY as requested during the procurement and/or transition
processes. These services will include attendance at up to three'/z-day meetings at VCWRF
or City Hall to advise the CITY.
TASK 5.7. COST ESTIMATING
Develop an "ENGINEER's Estimate" of the anticipated cost for the proposed operations
services to be performed in-house by CITY staff. ENGINEER's Estimates estimate will be
developed for:
• Biosolids lime and dewatering operations
• Renewable Energy Processes.
TASK 5.8 ADDITIONAL SERVICES.
Additional services pertaining to this Project will be performed with specific direction from the
CITY Project Manager on a task by task, time and materials basis.
City of Fort Worth, Texas
Ariachment A
PMO Release Date: 04.09.2012
Page 3 of 4
ATTACNMENT A
DESIGN SERVICES FOR
VCWRF BIOSOLIDS IMPLEMENTATION AND LONG•TERM MASTER P�AN
CITY PROJECT NO.: <XXXX>
LEVEL OF EFFORT/COST
Attachment B summarizes the attached estimated level of effort and cost estimate for
assisting the CITY with these services.
Task 5.0 Sum
Amendment 1
Fee
Previous Amendment $49,984
Amendment 2
Total CH2M HILL Labor $164,285
Total Expense $11,980
Sub Markup $474
Total Cost, Amendment 2(this amendment) $176,739
Task Total 5.0 $226,723
City of Fort Worth, Texas
Attachment A
PMO Release Date: 04.09.2012
Page 4 of 4
Z
Q
J
a
� �
v w
E �
w Q
o. �
a �
� � r
w
o � a
wZ Z�
� o N
° O y �J U
> Y u Z
�
J � w Z U
m m � O �
c� c�-,v_
a,�•ca o
u O � W m
m�'rn� ,
�(A cw
aFi"a�
N � y
O ry
Z 0 H
C J
E v�i
v p
m ro
E u.
Q �
�
U
>
��
�$m
�o
E s�� �� a U
E � � � o -
y 2 S� a � N m F
Y�� F N N W O
�= S W W m F
N
UU �3N�
r F � �
Z
E
�
Y
�
wW
F N
Y �
3m
Y '�
lL E
��
U Q
FUND CENTERS:
TQ Fund/Account/Centers
GERTIFICATIONS:
Submitted for Citp Manager's Office b�
Originating Department Head:
Additional Information Contact:
ATTACHIVIENT5
FROM Fund/Account/Centers
PE45 539120 0705008
Fernando Costa (6122)
Andy Cronberg (5020)
Farida S. Goderya (8214)
1. Ch2m Hill En,gineers Amend no 2 MWBE Com�liance Memo.�df
2. PE45 539120 0705008.PNG
3. SAM search for CH2MHi11 Engineers Inc.�df
4. VC WRF Biosolids Implementation and Lon� term Master Plan.pdf