Loading...
HomeMy WebLinkAboutContract 43800-CO6FORT WORTH Cit of Fort Worth C1TY SECR�i'�t' �,,, � Chanye Order Re uest ���� ��� , 1,� � 9 q Project Name Near East Side Urban Village City Sec # 43800 Client Project #(s) 6058 - GR76-022456168730 Project Description The Construction of Pedestrian & Streetscape improvements in the Near East Sitle Urban Village on East Lancaster Street from Kentucky Street to Pine Street (COUNCIL DISTRICT 8) Contractor Fain Group Change Order #�6 Date 9/24/2013 City Project Mgr. Paul Roach City Inspector Adilda Cazorla/ Jay P. Lozes Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Atlditional Funding (if necessary) TPW 56,011.13 $7,081.83 $5,562.51 $0.00 57,530.45 -$91.50 1.11 1.79 Contract Time Water Sewer Totals (CD) $556,011.13 104 $7,081.83 75 $5,562.51 0 0 $557,530.45 179 $0.00 $0.00 -$91.50 2 $557,438.95 181 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $55,601.11 $54,081.79 0.26% $695,013.91 JUSTIFICATION (REASONS) FOR CHANGE ORDER 1. 162 2002 BLOCK SODDING - At the final inspection on August 19, 2013 TxDOT requested sodding of an area adjacent to a newly installed sidewalk for erosion control purposes. Attached is the contractor's proposal to install Bermuda grass along a 33 square yard area. One pallet of sod is estimated to cost $152.09. In adtlition the contractor will use three persons for 8 hours to remove the excess topsoil, fine gratle, pick up antl lay the sod, and perform the initial watering. The landscape contractor will remobilize to the jobsite. The total unit price is $23.30/SY for a total price of $768.90. The average low bitl unit price as list ion TxDOT's website is $5.75/ SY and the 12-month moving average is $3.13/ SY with the following quantities of 228.00 and 33, 2. 247 2064 FL BS (CMP IN PLC)(TY A GR 4) (6") -� �.�b�se bid item is due to the widening and addition of driveways on the north side of Lancaster between Cypress Stree tre nee� ��quately serve the adjacent property. This resulted in an overall reduction of curb antl gutter �long with the sup rti it. °v';A � ______ 3. TI�' �� a T contractoF will require iti I ca n d�r�lo the work. s— -=--a �- ---- --- � � o � �; a wir � ,� �� % / `� a F� OFFf�0/�L GBEC��t� / � � � � � � �'' $ _n�° �,d`� CI'�lf �ECRETAlt�( � It is untlerstood and agreetl that the acceptance of this Change�7td���tli'e contractor constitutes an'��c� payment in full (both time antl money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor (Name) � C�Ontrac Fain Group �p��' ���j��.��, '-� Inspector � - Assistant Supervisor, _ ` �\ Director (D ,�'-- ��ty,`�� ; , Date Project f�('ana'g�f %• i' "� f' i 1, � ��;; i�!� � Date .%�?i 9ct , �p krac ��'' Council Action .�-,-- �-�J �� � �� ��� �� ���� ���� IZECEIV�D QGT �. Q "�ui� FORT WORTH �_- M&C Number City of Fort Worth Change Order Request M&C Date Approved � 0 0 � M � N i s� �� O� �Q � L 0 � LL � `~ O 0 w, W �� � CU � s U � U � .--�'`� U i � � � � N � � C6 W a`IIi Z 0 M � � � � � � N N O � ti � � w L!") O � � O � � � N U C (6 J � (E W C O a> m � > � � � a� � � N cII W il z I a� ' � .__ � N > � � � C � � � �o U J � — � U � z � � O x5 U c " m � '� � N Cn � �, � � a � 0 0 O � U � � � N T C y O U � L � H Y M O N V' N � N N � J cu � � f� O N tD (O U m � �k Q a`� � O � `o � U C (6 Q L (n U � a U d L � U O � O c � L.L �... x I-� N �k o o � U V O z � Q �y � 3 �� � U � tA � N E„� •o C � (� O � p � v � �, �+ �o U � � � s • . : � • . . � i � i ► • .. ► ► � Z O 0 � Q � � 0 M N bA (O a � ;o � � ¢ N � L � � � � � � U � � 0 � v � c� a � c 0 .� � � Q L � � L � � � � � � U O O W ch � N i � O � � O � � � '� L o� �� w 0 O d � � U = � i c.i � U � .-�'`-� U � c m � � � � � NI w cv N Z 0 M � � � � � � N N O � ti � i.� � � O � � O � � � � � � U C (6 J � C6 W C O a� � ca > � � � a� C7 Cn � N W � a� z a� � � .� � >� o U E � — � a� uJ I � Q V J � _ � U �Z �� 0 ot3 U c " � � 'N � N (n � � � c � � 0 0 C """ O � U � � � � T C U � � c L UJ H Y M O N � N � � N � J cu 0 � N O N �O N U m � �# Q a`� � O � `o � U m Q � N U � a U � Z � � w no d L � U O � U � C � N (6 LL � � H � � � � ' U V � � z � Q. � � O V F� � � � U � .o � � � � � n d U i� � Lz. � �o U � • � � ► � s ■ . ► . i • • � � � ► ■ i ► u ► n � O � N UA (O a � c 0 � v a� 0 � � L O v on c � t U � � 0 � v en c� a � c 0 '� v v � L � � L 0 Qi � c co � U Previous Change Orders Co # DATE AMOUNT Total $0.00 MIWBE Breakdown for this Change Order ,PeV �U���� CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 6 Page I of 1 — 1. CONTRACTOR: ��e Fain Group, Inc. 2. Change Order Work Limits: Sta. 30+50 to Sta. 31+40 3. Type of Change (on federal-aid nomexempt projects): Minor (MajorlMinor) 4. Describe the change and the reason for the change order. When necessary, include exceptions to this agreement. t. Sodding - Remove excess topsoii, fine grade, pick up and lay the sod (Bermuda grass), and perform initial watering. For a fuli explanation of the above change, please refer to the attached Change Order 6 description. 5. New or revised plan sheet(s) are attached and numbered: N/A Each signatory here6y warrants that each has the authority to execute thiz Change Order. 6y zigning this change order, the mntractor agrees to svaive any and all daims for additional compensation due to any and all other e�penzes; additional changes for time, overhead and pro(iC or loss of mmpensation as a result o( this change. "rurther, the convacror agrees that this agreement is made in acm�dance with Item 4 and the Contract. Er.wptions should be noted m the response for a5 at�ove. CCSJ: 0902-4&825 Project: Near East Side UV �I� Highway: City Street � County: Tarrant Fort worth District: Contract Number: 00706/43800 lon must be provided Time Ext. #: 4 Days added on this C.O.: 2 Amt. added by this change order: -$91.50 For TxDOT use only: THE CO�a rR�TOR Date Days participating: / / By '� Amount participating: Typ d/P;rin ed Na Larry Frazier ignature Date Typed/Printed Tille President Name/Title RECOMMENOED FOR�EXECUTION: . �\�,�/ , � � � � L �J I % � ame rt e t��ii "L�i �.�! J ���> �� ��2) a e rte � ✓ APPROVED � REQUEST APPROVAL ame it e Date f� APPROVED � REQUEST APPROVAL f � � c��`�`'' �f' � i _�"_____ ___'__ �3 ._ � .^./_'____._� _... ________—_—_—___'___— _ i � 1tTiE•%i if,F . __ [;.Itt'—_ r 1 AVi'RiJV('D i J REQUE�T AP�'RC4'AL IVame%Tit� Uate � APPROVED � �� `_.\ �V\ f�ECEIV�� �C1� � U �Gi3 ��•�� '1 � � , � .� �l� � � � /': �� �� ' --- - Nam�it e , � Date 1� Engineer's Seal: 0 oc W m � � Z � W � � 0 W � Z Q _ V H V Q GC N Z � V Z O � v � oc � � z 0 v � d � � � 0 V 9C uJ ..! m 4` F^ � ? �] � W m � � Z � W 0 � � W � z Q _ V H U Q � H Z O V Z O F- u � � � � z 0 u ;, � � 0 U Nc G � V �9 C O V � W J m 6 � Near East Side Urban Villa�e - 0902 48 825 — Chan�e Order 6 Chan�e Descriptions 1. 162 2002 BLOCK SODDING At the final inspection on August 19, 2013 TxDOT requested sodding of an area adjacent to a newly installed sidewalk for erosion control purposes. Attached is the contractor's proposal to install Bermuda grass along a 33 square yard area. One pallet of sod is estimated to cost $152.09. In addition the contractor will use three persons for 8 hours to remove the excess topsoil, fine grade, pick up and lay the sod, and perform the initial watering. The landscape contractor will remobilize to the jobsite. The total unit price is $23.30/SY for a total price of $768.90. The average low bid unit price as listed on TxDOT's website is $5.75/ SY and the 12- month moving average is $3.13/ SY with the following quantities of 228.00 and 33,069.00, respectively. 2, TIME EXTENSION The contractor will require an additional 2 calendar days to do the work. AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - FORT WORTH DISTRICT __ __ _ _ _ _ _ _. _ _ Last Update: Tuesday, July 30, 2013 ITEMS 100 2001 TO 193 2007 Items Items Bid Code Range 0100 - 0193 1003 - 1137 100 2001 - 193 1007 0216-0275 2036-2079 0305-0361 3035-3268 0400-0496 4013-4116 0500-0560 5049-5912 0610-0690 6006-6834 0764-0780 7622-7622 8020 - 8932 July 31, 2013 Twelve Month Moving Item No Description Units Quantity Avg Bid Quantity Avg Bid Usage 100 2001 PREPARING ROW AC 2.900 500.00000 1 100 2002 PREPARING ROW STA 10.000 782.00000 1,938.470 3,581.02981 13 100 2003 PREPARING ROW EA 3.000 1,000.00000 1 (TREE)(5" TO 12" DIA) 104 2001 REMOVING CONC SY 65.000 35.37000 4,263.000 7.92495 2 (PAV) 1042007 REMOVINGCONC SY 6.000 10.00000 1 (PATI OS) 104 2009 REMOVING CONC SY 3,499.880 8.80761 4 (RIPRAP) 104 2011 REMOVING CONC SY 10.000 15.00000 1 (MEDIANS) 104 2015 REMOVING CONC SY 45.000 15.00000 2 (SIDEWALKS) 104 2017 REMOVING CONC SY 1,159.980 11.23097 4 (DRIVEWAYS) 104 2019 REMOVING CONC SY 44.000 85.00000 1 (OTHER APPURTENANCES) 104 2021 REMOVING CONC LF 517.500 11.81643 2 (CURB) 1042022 REMOVINGCONC LF 1,627.000 6.78058 2 (CURB AND GUTTER) 104 2023 REMOVING CONC LF 2,785.000 3.90000 1 (CTB) 104 2028 REMOVING CONC SY 10.000 15.00000 1 (MISC) 1042029 REMOVINGCONC LF 20.000 15.00000 1 (CURB OR CURB & GUTTER) 104 2032 REMOVING CONC SY 19.540 51.78966 1 (WHEELCHAIR RAMP) 105 2011 REMOVING STAB SY 290.000 17.25000 290.000 17.25000 1 BASE AND ASPH PAV (z�� _ 6�� 105 2015 REMOVING STAB SY 40,913.000 2.60000 1 BASE & ASPH PAV (8" - 10") http://www.dot.state.tx.us/insdtdot/geodist/ftw/cserve/bidprice/s_O l O l.htm 08/26/2013 COMPOST 1612014 COMPOST MANUF SY 101,800.000 1.25000 1 TOPSOIL (BOS OR PB) (4��) 1612017 COMPOST MANUF SY 450.000 1.00000 1 TOPSOIL (BIP) (4") 1612027 GENERAL USE SY 666.000 2.00000 1 _ .__. __ COMPOST_(7�'a — --_ ....._ 162 2002 BLOCK SODDING SY 228.000 5.75000 33,069.000 3.12653 9 - — ----- -- -- — -- — 164 2001 BROADCAST SEED SY 4,865.000 .16000 1 (PERM) (RURAL) (SANDY) 1642007 BROADCASTSEED SY 619,363.910 .14404 3 (PERM) (URBAN) (CLAY) 1642009 BROADCASTSEED SY 137,103.960 .08362 3 (TEMP) (WARM) 1642011 BROADCASTSEED SY 137,103.960 .09380 3 (TEMP) (COOL) 164 2013 STRAW / HAY MLCH SY 101,800.000 .20000 1 SEED (PERM) (RURAL) (SAN DY 164 2015 STRAW / HAY MLCH SY 114,240.000 .15000 1' SEED (PERM) (RURAL) (CLAY) 164 2019 STRAW / HAY MLCH SY 1,500.000 1.67000 1,500.000 1.67000 1 SEED (PERM) (URBAN) (CLAY) 164 2021 CELLFBR MLCH SEED SY 355,753.570 .22367 3 (PERM) (RURAL) (SANDY) 164 2022 CELL FBR MLCH SEED AC 16.480 1,800.00000 1 (PERM) (RURAL) (SANDY) 164 2023 CELL FBR MLCH SEED SY 1,400.000 1.00000 1 (PERM) (RURAL) (CLAY) 164 2027 CELL FBR MLCH SEED SY 1,949.000 1.00000 1 (PERM)�URBAN) (CLAY) 164 2029 CELL FBR MLCH SEED SY 406,109.780 .24348 5 (TEMP) (WARM) 164 2031 CELLFBR MLCH SEED SY 405,412.780 .24619 4 (TEMP) (COOL) 164 2047 STRAW / HAY MLCH SY 750.000 2.01000 114,990.000 14226 2 SEED (TEMP) (WARM) 164 2049 STRAW / HAY MLCH SY 750.000 2.01000 114,990.000 .14226 2 SEED (TEMP) (COOL) 168 2001 VEGETATIVE MG 61.000 36.80000 44,052.240 13.60655 18 WATERING 169 2003 SOIL RETENTION SY 56,301.000 .75000 2 BLANKETS (CL 1) (iY C) 169 2006 SOIL RETENTION SY 7,794.000 130000 1 BLANKETS (CL 2) (TY F) 170 2001 IRRIGATION SYSTEM LS 5.000 50,629.68000 5 170 2003 IRRIGATION SYSTEM LS 1.000 81,309.00000 1 (TY II) 1802001 WILDFLOWER AC 38.000 1,600.00000 1 SEEDING 192 2001 PLANT MATERIAL (4" EA 1,318.000 1.57000 1 http://www.dot.state.tx.us/insdtdodgeodist/ftw/cserve/bidprice/s_O l O l.htm 08/26/2013 � �r 1' . f' �� T. � � �, �F ' - ! � . ' . � 'I _. �: y ! s , ��ii�.. ��.�'��, ,� �� � ,� • � _ d� "� �r�. ' '�"" � � � �i � . � � � ' � � � �- �� � ; , ;�`;,�' , � , i �.�� � � . • f �, , , � � � I � N � '��� !(� .�. � / • . �. � . � � �. '.i!'__ �', . _ � r . ��' i- � . , ! : � �. - _ �. � • rL � ___._._.__ r . ' .a � .�� ' . ���� . . �J .� � I � ' ... , ^i {i . , i � � {�. � ' • �. � '�7�� �— � . i.� ��� p . . �� � � � � � 1 in�i� +, �,{�� .. � � 1�{� . . r I l i Y;f �, t I� � ,, v ,�" i�f: . 1% � . /�� '�i . 7y r . � � � �; . � �;i� JI S � . ` `�rr�^ �. � � e� ' I i,4 '* � , ' � �'�,. I . . �. '� � - � ' j +! . 3% �', yi j 1 . � -� � , ` �'t.�R� P I��, i,;,,�� � �{ , � � ' � � � �}, i„' ., . �, �`I�'S,j�� �J '1' '; i . ��'� r+� 1 ' + f; } .. . �', t i ^ ' r �.�. f .�p�'�"�t, .t �� �i f �� ' �� I� � i i � ; ,� , � � � ,.: g � �u�y��t .�s, � �F '" � � � ' � n �+ i, ' .+ � L'., ')� ^y9 ;:� *�+r.�,� � � �'� wi �� 1��, � ,���� � ' � j:i � ��� � '�� � ' il C � 1� Y , f � �� ��.: �1 ��, ' ,� �°� � ,. ;�l 1, �:j! �' r � ;'y .,,r�'� ,• �� , ��"'��� r�� � -t�,�"; � 1: r r �, � i,� �.^ � • � i` , 7�.�.C� � .��i,n+� N �r�ti ( �� ����', �� ��+'' i' ��. ;�� �.. �. , :� , ` t , ' . '' ' � u•�,P4 . � , �� , �, ! �,{�' � ;+ r i ' '1' � i�,l' i R �? r i,�+, h�� i J4�� x� 'r � +` ' r � �. ♦ I ;. I � • � M,i�f ���J'"� . .�, ,� < < I.. ' ..��) .. i' � ,t I . � }..� .���y� �1�, i��., �� �. .� i: y . ..�, . re'��• . SL�N � j,� 1; � - ' :y� V�rf �`:��'�.. , . . - ; i . i. ' �f !i �.'��.��` I�r'���'t�,� .�'-,� � i �w;� �. _ , � � _ � , �� � �` �A,�,t'� � �_. ( ;• I "�' A' �"!�' .yy7'.�I '�a :"• , si" ! � H•.�'. �.. `� a 4:^� ° t'� ��a >> >� � •� � ,e ,� ��;.. ,�,� �! `„ } . � r': , '.;�' '! t � � ji� � ��� � '�k'�i�Flr'A� .� L �, �:ti: ��Irl �� �l�f � �' . 1 ��,�, �r� ,� ��`1ti� �� " " ��t .:uli ��3� '�� �, � ' '\ q 2 ( 1 � `. ! )/.' '4� . .• r� .M � / .� . i r �� '',��i �� ,�i��1y� .'�j''_ � . t , �� � �` i � ^ � ,�' ,�� � t x 4��' �<' � ; - � Fa�'j� )�� '�: � � y �' ,. � �,iF,F �.+J�i';: �=��� ��'(I` .'�#. �� Y } .t�� •��� �, t � ( r ,.T � ��� ` 4� r '�,�� : � • � f '} �j �r I �S ' � z ?= �'. � �r � r ' ! �r� r! . {+ � � �1 .'> r ���,� .:��f 4 . . tCL` . � ( ;ii's . . �� � � %'��/ r _ �M�"� C ir'Jt �, ,.7� � ...�1, � �Gj":•� � '� . �.,�fi� ����� ��;-,,ij�� I � r� . Ir .r_� � ! � a . � . i �o� . : �, f y �. . r.vL/ ' � s1� 1�- ��� 9� � ' 1 ., � '� r l'i' ,;�.�+��� 4 ,i � e' �i, �p; FY ��r l � - ' "" '��._: ��' �I �•�� �`A i �?• 1 � -` r:�. j�t�� c7". - i ' .. �;. r - .1� 'T`s_. � y ,L" t- +} M T' ,i . . . 1 ..� .'�,�.� y ` ..'.,� �k i �,r �If �A� � � �, - �t�,�♦ ��. �� l , '', ; n 4 �� .�� �� � ,�:,;. �� �-`.' ,�,y� �i_.,, � .z i�5 �ri F � � � .i' 'nh ' � s}' . d.'�� .. ,�f f . � 's)'r J �. L� ��� ' � -T�1` � , . � �d�� 1 � -- ,� . �t ' ' :1, , f :�' .� �;;�a �� �,"�,, .,.. -'�' -r;aGs " � � - . . ��,�, '„ _ � �; ` ,��.-'s4.:r' "� �:S.v.�^Si"v �yt.'. - . . . .� . � � ' „���' ' �- � � t r�: ; 7;' - - }' �� i � ,[)ti . �H l . r � �I ✓ v4. �,'�"�..`. . }'`-�' ' - �' ' , +Y �; ..:i �I{r . . ° '�,,,. -� , ,� � .�''�. S . '' � �: ;�,� ,;w ` - ` ' . -, € � � � " � !�� �." 1 � „��, . '�v�, � � , .'� .. , � �' 3 y ,. , q1. �.. .5�,�: �7 , � '�,���'' .r '�r� - , ,'�'.l� ��.. � � -� . ■ FAI N Building Rela�onships Constructing FuWres P.O. Box 750 Fort Worlh, TX 76101 817•927•4388 817-927-4389 Fau www.faingp.com August 22nd, 2013 Paul Roach City of Fort Worth 115 West 7th Street, Suite 1500 Fort Worth, TX 76102 Re: Near East Side - Urban Village PCO#7 Grass Mr. Roach: Below are the costs associated with the grass installation at the east end of the project adjacent to the T station that we had discussed. Description Qty Unit Unit Price Total Bermuda Grass 33 SY $ 23.30 $ 768.90 Watering 28 MH $ 40.26 $ 1,127.28 1, 896.18 It is cheaper to buy a full pallet of sod for 33 sy than it is to by enough for just 33 sy by the individual piece. We have made no accommodation in the price to continue water the grass. We will install the grass and water it upon installation. We provided a price to water the area for a period of two weeks if it is required. We can complete this work immediately upon approval within the time frame of the punch list, however, if the approval takes longer and watering is required we will require the addition of 16 days to our contract time to complete this work. The sod cost is $152.09. I have included 3 guys for 8 hours to remove the excess topsoil to accommodate sod, pick up and place the sod and water 1 time for the initial installation included in the price of the bermuda grass. The watering price includes 1 man for two hours per day plus a truck and water trailer for a two week period. Please contact me if you have any questions. Sincerely, � Larry Frazier