Form 2146-L
(Rev.09/10) CONSTRUCTION CONTRACT CHANGE ORDER NUMBER: 3
Page 1 of 1
1. CONTRACTOR: The Fain Group
2. Change Order Work Limits: Sta. 13+00 to Sta. 33+00
3. Type of Change (on federal-aid non-exempt projects): Minor (Major/Minor)
4. Describe the change and the reason for the change order. When necessary, include
exceptions to this agreement.
Storm Water Pollution Prevention Plan (SW3P) Report.
For full explanation of this change order is on the attached description page.
5. New or revised plan sheet(s) are attached and numbered: N/A
Each signatory hereby warrants that each has the authority to execute this Change Order.
By signing this change order, the contractor agrees to waive any and all
claims for additional compensation due to any and all other expenses;
additional changes for time, overhead and profit; or loss of compensation
as a result of this change. Further, the contractor agrees that this agreement
is made in accordance with Item 4 and the Contract. Exceptions should be
noted in the response for It5 above.
CCSJ: 0902-48-825
Project: Near East Side UV
Highway: City Street
County: Tarrant
Fort Worth
Contract
Number: 00706/43800
The following information must be provided
Time Ext. #: N�A Days added on this C.O.: �
Amt. added by this change order: �
For TxDOT use only:
THE CON R TOR Date Days participating:
By Amount participating:
Typ d/ r' ed me Larry Frazier
Signature Date
Typed/Printed Title President
RECO MENDED FOR EXECUTIO :
�� � ��3 ��3
ame it e Date
.-�
�`� . � ����,.�� �
` ���3 ��� �
ame it e Date
`„
Engineer's Seal:
�
� I:7' 1
ZP r , ; /I
,,, .t �
f�,.� � �,- � ,; . l
Dae�
NamelTitle
> y� .-� 5 -r�-r3
N it e Date
�APPROVED �w-- � REQUEST APPROVAL
�---;=9�1� ��
�:T �.�lo �.�. d'/�s�iJ
�
% 3'��C.�iL / �
Narn� it e � S� j L ��
r :GanvFn
� APPROVED
��
n
APPROVAL
� � 7
Z 1 I�
i •�_i ate
�
��D ��.
�aa� ��
at Q�°o�y�
�
o�j
!
a°� �
oo° -�( �
0000 ,�
r,��..��
M
..
�
W
m
�
�
�
W M
� �
C�. O
O�
W `^
� N
Z �
� V
�
T. '"�
�
V E
N �
V W
a
�
H
Z
�
V
Z
O
H
u
�
�
�
N
Z
�
V
�
�
J
�
�
�
_
�
z
W
�
a
�
W
�
�
J
z
�
0
s
�
O
m
�
z
�
m
z
�
z
�
�
�
�
N
ll1
2
F
F
Z
a
�
a
�
N O
� w
O F
W 0
� W
a =
-1� W
¢ °�
z �
� �
O a
_
a
W
V
�
a
�
z
�
�
Z
�
�
J
F
O
Z
0
a
�
v
�
c
G
W
F
O
w
rn
a
0
rn
0
v
�
m
¢
�
J
�
d'
N
�
O
LL
F
�
�x
F-�
M
..
�
W
mC
G
_
Z
�
W
0
�
O
W
�
Z
Q
_
V
N
V
a
oc
�
z
�
V
Z
�
H
V
�
�
H
N
Z
0
V
Z Z
� _
� �
� �
W W
� �
OZ
�
H
�
O
U
�
FW-
W
Z
�
H
Z
a
�
c�
H
�
� U
� �
O �
W �
y W
a'_^
t W
J �
Q �
z
l9 H
Z
O =
d
w
U
a �,
� �
Z �
= o
3
�
0
.�
� a
z c.
� v �
w ¢
o �
m O
w
�
H
E
z o
O "'
� VI
a �
� F
U -
W ,_
� F
�
{�.�
�
�
GI
7
e
e
V
H
�
N
�+
�
i
a+
C
O
V
w
0
�
o,
a
O
�
0
w
¢
m
Q
h
J
�
d'
N
�
`o
LL
h
�
�x
I"'
FORT�+�ORTHd City of Fort Worth
\��� Change Order Request
Project Name Near East Side Urban Viliage City Sec # 43800
Ciient Project #(s) 6058 - GR76-022456168730
Project Description The Construction of Pedestrian & Streelscape improvements in the Near East Side Urban Viilage on East Lancaster Street
from Kentucky Street to Pine Street (COUNCIL DISTRICT 8)
Contractor Fain Group Change Order #� Date 04/10/2013
City Project Mgr. Paul Roach City Inspector Adilda Cazorla/ Jay P. Lozes
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
TPW
5,6&1
Wat�r � Sawer
Toiais
1
�. ._..1,.. �� 0 �.,._.,-,_.
Original Funds Available for Change Orders ���,�t��,� j w���'
Remaining Funds Available for this CO ��{�t��p:� � �4,�;
Adtlitional Funding (if necessary)
.1
CHANGE ORDERS to DATE (INCLUDING THIS ONE� AS % OF ORIGINAL CONTRACT �,�7a/,�
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%J ' �"��,�'j;{j��,� j'
�u�TI�1��`�rtir� ���k�Qt�s� ���c+ ��'T�ira�•i�R��R ';
For projects disturbing a surface area of more than 1 aae The Cify specifications require the contractor to submit a project specific storm water
pollution prevenfion plan (SWPPP). TxDOT has a predesigned SWPPP under its general storm water permit in its standard detail sheets. Both
stipulations are contained in the project contract documents with bid items for the TxDOT pian, but no bid item for the proje `f lan. The
contractor and City inspection understood that TxQOT wanted the project specific plan to be implemented from a resp e�r �� �`
preconstruction conference. After the contractor proceeded in good faith, it was determined that the specific SWPPR���� daht arKDaefw ,
........ �� J
„9 a
�a �v � a o 4
��� (_ /� ''19, .�.� ����ov��s��oo4Q��ooa�
. �ornz�,t�s, A�St� ��t�,
It is understood and agreed that the acceptance of this Change Ortler by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above f;hanna n��P.
N
C
s ,o
o�
�Q
'L L
� �
u. '�
� O
N
� �
(U �
cv
�
U
x
�
�
Q
��
F
C4
O
�
0
0
�
M
V'
�k
�
U�
�`
U
C
N
�
�
�
'n
�
ro
W
c6
�
Z
� �
� �
Z �O
N d'
'o �
a. -
�
I �
�
N
�
b
�
�
N
N
U
C
R
_I
N
(B
W
c
O
a>
�
cu
>
c
�
.o
�
�
�
�
�
m
w
�
�
Z
�
�
�
.�
�
N
> �
o U
E �
— F—
cB �
� �
' a> U
mz
u) �
O
�23 c�
c "�
�a �
N �
N Cn
N �
d .c
v- CL
O Q
C "'
O � I
a �
� �
h T
O '�
U �
(U C
.G 47
F-- Y
�
0
d
.�
N
�
�
�
�o
a`
C'7
O
N
O
V
O
N
R7
�
`o
N
M (O
U
cv
a
�t Q
a`>
-v
O
� o`
Q1 U
N p_
U �
c
�
v
o �,
U �
(II
C V
O �
U 'o
�
�
�
N
4—
O
N
N
t]A
c0
n.
�
c
0
,�
�
�
Q
�
v
-o
�
O
a�
an
c
�
t
u
N
_
.�. .O
� �
� �
� �
`� L
� �
IJ. �
a- �
O
+7' O1
V =
�
.L.
U
�,'
H
�
C
Y?' ;
i'�
c�
�
�
0
0
�
M
d'
�
U
�
A
V
�
.D
�
N
�
�
N
(6
W
c�
�
Z
�
O
v=
N
�
�
�
�
m
U
C
N
J
N
ta
W
c
0
�
�
N
>
c
N
.a
�
�
� I
N I
N
W
R
N
Z
N
C
.0
�
� �
o U
E �
�a� �
! ca'n p
� V J
� _
� N C�
��
0
ozf U
� a�
'� �
N Cn
'a d
d c
v-- O..
O Q
G "'
O �
U �
� �
N �
C
O V
U �
N C
L N
F�- `�
0
M
ti
�
�
�
�
N
N
O
�
�
�
�
�
�f7
O
�
a� Xt c
� o
Z °� �
� U
N �" N
o � o
d °� v
U �
.�
a.
M
O
N
O
�
O
�
m
�
M
�
�
�
�
�
�
�
c
ca
L
V
�
t�
O
�
U
N
a
Q
O
�
�
C
�
U
`o �
m �
"5 U
C �
U �O
a
T
U
:
�
�
s
•
.i
•
•
•
�
•
:�
i
•
•
�
►
�
Z
�
W
J
W
0
N
4�-
�
N
v
en
m
a
�
c
0
:�
a�
a`i
�
`
a�
-a
L
�
Q7
GA
C
l0
i
�
Near East Side Urban Village - 0902 48 825 — Change Order 3 Change Description
1. For projects disturbing a surface area of more than 1 acre The City specifications require the
contractor to submit a project specific storm water pollution prevention plan (SWPPP). TxDOT
has a predesigned SWPPP under its general storm water permit in its standard detail sheets.
Both stipulations are contained in the project contract documents with bid items for the TxDOT
plan, but no bid item for the project specific plan. The contractor and City inspection understood
that TxDOT wanted the project specific plan to be implemented from a response from TxDOT at
the preconstruction conference. After the contractor proceeded in good faith, it was
determined that the specific SWPPP was redundant and not required.
O1 i7 13 - I
S'LC)RM WA'I'FR POLT UTION P121:VI;N'PTON
Pa�;c I of 3
�
SF.CTIC)N 01 S7 l3
STORM WATER POLLU"I'ION PRLVENTION
3 PART 1 - GENERAI,
4 1.1 SUMMARY
5
6
7
8
9
10
11
12
13
A. Section Includes:
f. Procedures for Storm Water Pollution Prevention Plans
B. Deviations f'rom this City of Fort Worth Standard Speciticatian
t. None,
C. Related Specification Sectiovs include, but are not necessarily (imited to:
1. Division 0— Bidding Requirements, Contraet Porms and Conditions oF Che
Contract
2. Division l— General Requirements
3. Section 3 l 25 00 — Erosion and Sediment Control
t4 1.2 PRICE AND PAYMENT PROCEDURES
15 A. Measurement and Payment
16 1, Construction Activities resulting in less than 1 acre of disturbance
17 a. Work associated �vith this Item is considercd subsidiary to the various Items
t8 bid. No separate payment will bc allowed for this Item.
I9 2. Consquetion Activities resu(ting in greater than l acre of disturbanez
2U a. Measurement and I'ayment shall be in accordance witi� Section � 1 25 00.
2t 1.3 REFEItENCES
22
23
24
25
2b
2'7
28
29
30
31
32
33
A. Abbceviations and Acronyms
1. Notice of Inte��t: NOI
2. Notice of Termination: NO'['
3. Storm Water Pnllution Prevention Plan: SWPPP
4. Texas Comtnission c�n Environmental Quality: 'I'CEQ
5. Notice of Change: NOC
A. Refer•ence Standards
t. Reference standards cited in this Specification refer to the current reference
standai•d published at the time of the latest revision date logged at the end of this
Specitication, unless a date is specifically cited.
2. Integrated Storm Management (iSWM)'Technical Manual for Construction
Coritrols �
34 1.4 ADMIN[STRATIVE REQUIREMENTS
35 A. General
36 1. Coiitractor is responsible for resolution and payment of any fines iss�zed associated
37 witl� compliance to Starmwater Pollution Prevention Plan.
('PI'Y OP PORT WORTEf
STANDARI) CONS"iRiJC'I90N SPF,CI�ICAT[ON DOC[.tiviEN"fS
Revised .luly i, 20l I
N6'AR GAST SIDE U�tI�AN VILI..AGE
CSJ: 0902 43 825
CI'I'Y PROJEC"f N0. 00706, DOr: bOS8
oi s7 �� -?
STORiN WA7'F,R Vdi.LU'CTON YKGVLN'PION
Paoe 2 of 3
ii. Construction Activities resulting in:
1. l.ess than 1 acre of disturbanee
a. Provide �rosion and sediment control in accordance with Section 3l 25 00 and
Drawings.
5 2. 1 to less than 5 acrzs of dishirbance
6 a. Tex�s Pollutant Discharge Elimination System (TPDES) General Constrc�ction
7 Permit is requiced
S b. C:omplete SWPPP in accordance with TCEQ requiremants
9 I)'I'CEQ Small Construction Site Notice Required under general permit
to �rxr� 7 s0000
1 I a) Sign and post at_job site
12 b) Prior to Preconstruction Meeting, send 1 copy to City Department of
!3 Transportation and Public Works, Environmentat Division, (8l7) 392-
l4 6088.
t 5 2) Provide erosion and sediment control in accordance with:
16 a) Section 31 25 00
17 b) The Drawings
18 c) TXR1S0000 General Permit
19 d) SWPYP
24 e) TCLQ requiretnents
2l 3. 5 acres or rnore af I�islurbance
22 a. 'I'exas Pollutant Discharge Elimination System ("1"PD�;S) Geneial Const�uctian
23 Permit is reqtnred
24 b. Complete SWPPP in accordance with TCEQ requirements
25 l) Pi•epare a"I'CFQ NOt foem and submit to 'l'CFQ along with �•equired fee
26 a) Sign a��d post at job site
27 b) Send copy to Cily Departme�lt of Transportation aild Public Works,
28 Environmental Uivision, (817) 392-60$8.
29 2) TCEQ Notice of Change t•equired if malcing changes or updates to NOI
30 3) Provide erosion and sediment contyol in accordance witl�:
31 a) Section 31 25 00
32 b) 'I'he Drawings
33 c} 'i'XR150000 General Pern�it
3�� d) SWPPY
35 e) TCEQ cec{uirements
36 4) Once the project has been completed and all the closeout rec�uirements aF
37 TCEQ have been met a TCEQ Notice of'Termination cai7 be submitted.
38 a) Send copy to City Department of Transpartation and Pub(ic Woeks,
39 Environmental Division, (8 ( 7) 392-6088.
40 1.5 5UI3MITTALS
at A. SWPPP
42 l. Submit in accordance with Section O l 33 00, except as stated herein.
43 a. Prior to the Preconstruction Meeting, submit a d�•aft copy of SWPPP to the City
4�4 as folto�vs:
�4� t) 1 copy to thc City Project Managcr
46 a) City Project Mana�er will tbrwai•d to the City Department of
47 Transportation and Public Works, Environmenta) Division for review
crrY or ror.T waaTtt N�,��rt �.Asr s»� urtr�nry vri.r,nc�
STi1NDARD CONSTRIfCTtON SPF.CIPCCA'I'IbN DbClJtiiGN'CS CSJ: 0902 43 82>
Revised tuly I, 201 I C('CY PL20JGC� NO, 007UG, DOfi: GOSR
o�sris-3
S'['ORM WA'I'EK PC�LLUTION PREVENTIUN
Page 3 of 3
t B. Modi6ed SWPPP
2 1. If tlle SWPPP is revised during construction, resubmit moditied SWPPI'to the Cily
3 in accordance with Section 01 33 00.
4 1.6 AC'I'IVN SUE3MITTALS/INFORMATIONAL SUI3MITTALS [NnT USED)
5 1.7 CLOSEOUT SUBMITTALS [NOT USED�
6 1.8 MAINTGNANCG MATERIAL SUBMITTALS (NOT USED�
7 1.9 QUALITY ASSURANC� [NOT USED]
8 1.10 DELtYERY, STORAGE, AND NANDLING ENOT USEDj
9 1.11 FIELD [SITEj CONDITIONS jNOT US�D�
t0 1.12 WARRANTY [NOT USEDj
tl
12
13
14
PART 2 - PRODUCTS [NOT USED�
PART 3 - EXECUTION (NOT USEDj
E1YD OF S�CTTON
Revision {.og _
DATL NA�riL: StIMMARY (�F CHANGE
IS
CITY UP POR"I' WOR'1'1{ NF:AR GAS"f SlDL URBAN VILLAGE
STANDAPD CONS'1'RUC'I'ION SPF,CIFTCATION DOC[1NfGN"l�S CS.0 0902 43 R25
R�visecf July 1, 2U1 ! C1TY PROJLCT N0 00706, C)QE: CQ�B
�.,;
�.;°
F�IN
Building Relationships
ConsUucting Futures
P.O. Box 750
Fort Worth, TX 76101
817•927•4388
817•927-4389 Fax
�wnv.faingp.com
April 10, 2013
Paul Roach
City of Fort Worth
115 West 7th Street, Suite 1500
Fort Worth, TX 76102
Re: Near East Side - Urban Village
PCO#lA SWPPP Revised
Mr. Roach:
We have revised PCO#1 for the SWPPP to reflect the actual inspection costs that were incurred.
Below is the breakdown of costs associated with the SWPPP and inspections.
S WPPP
S WPPP Inspections (2 @ $100.00 Ea)
Subtotal
Overhead 10%
Profit 5%
Bond (1.07%)
Total
$1000.00
200.00
$1200.00
$120.00
$66.00
$14.83
$1400.83
Please contact me if you have any questions.
Sincerely,
C%��
� �
Larry Frazier
� STORM WATER POLLUTIDN
PREVENTION
` ,►
for
Near Eastside Urban Village
City of Fort Worth
Oaerator - Day-to-dax Qperator - Plans and S�ecs
The Fain Group, Inc. City of Fort Worth
1616 North Sylvania Avenue 1000 Throckmorton
Fo�t Worth, TX 76111 Fort Worth, TX 76102
817.927.4388 817.871.5458
Secondary �perator
11 /7/2012
Prepared by:
Todd Webster
C/O Project Compliance, LLC
P.O. Box 16406
Fort Worth, Texas 76162
866.228.1586
www.projectcompliance.com
,:.
Ccpyr(ght � 2012 PraJect Cempiiance,LLG. NI Rtghts Reserved. 868,21.8.158B 2
�� '• � •
IVlan��em�nt Sa�rvic�s� DELIVERTO:
5100 Eidorado Parkway, PM8 520 The Fain Group, In�.
1616 North Sylvania Avenue
McKinney, Texas 75070 Fort Worth, Tx �6 � � 1
t@�. �72 /$� 6-�527 Attn: Ed Masscy
fax �69 / b45-1189
To: The Fain Group, Inc,. DAte: 11/12/2012
.
From: Todd Webster Incl: SWI'3 Binders
RE: Near Eastside Urban Villa e
Fain Group,
Included are 2 SWI'3 binders-one for the field, one for your office. Also included is a non-
bound copy for the owner, They are not connpliant as delivered. They will �aeed signed copies
of the CSNs, SWP3 Certification Statements and Delegation of Authority letters insei•ted in
their respective locatians with'tn the binders. Please let �ne know if you have any questions
Thank you for your business.
Sincerely,
Todd Webster
I'roject Compliance, LLC
Ylease Note: Unless otherwise noted above, tl�is SWP:i meels all TCEQ SWP3 content
requirements as of its delivery date. As required by the regulations, the ECP developed by
Contractor to comlete the erosion control locations dated 11/19/12 has been included in this
SWP3. Project Compliance makes no representations as tv the adequacy or effectiveness of the
ECP design.TCEQ regulations require the SWP3 to be updated as construction progresses. All
of tl�e inspections performed m«st be kept with the SWP3 throughout the cou�se of the project
and the SWP3 must be kept for three years after the termit�ation of your Pet�mit.
• i f ' •
i1�an�c��ment S+�rerites�
S10Q Eldorado Parkway, PMB S20
M�Kinney, Texas 75070
tel. �72 / 816-��27
fax 459 / 645-1189
SWP3 documents transmittal
To: The Fain Group, Inc.
From: Ed Massey
Cmail: Edward.masseyCAtt.net
Date: 11 /7/2012
Re: Near Eastside Urban Village
Please send the CSNs to the MS4 via the address listed below:
Pages: 5
City of Fort Worth
Environmental Management Division
J 000 Throckmortan
Foi•t Worth, TX 76102
Attn: Dennis Kohlhoff
Once I have received the faxed copies I will make arrangements to post the required signage and get the project set
up for compliance inspections.
Tf you have any questions, please call me. Thank you again for your business.
Sincerely,
Ed Massey
,.i'#! , , , �.f,i'a. ,.,�y�,�
Copyright �rJ 2012 f'roject Cnmpli�mce.l_LC. A�I F2igh�s kteserved, SC�228.1586
The following is the required paperwork for the above mentioned project. It contains CSNs far both the contractor
and the owner of your project to execute. Please review the follawing chart for destinations for each of the forrns
once they have been signed by OFFICERS of each respective company.
SWP3 ��rtificatian Statement
Storm Water Pollution Prevention Plan Certification
Certification Statement
Project Name Near Eastside Urban Village - Fort'Worth
This certificarion is prepared for compliance with the General Permit to Disch�u-ge Waste untter provisions of Section 402 of the
Clean Water Act vid Chapter 26 of the I'exas Water Code and may be used in the Storm Water Pollution Prevention Plan (SWP3),
All parties that either individually, or taken together, mcct the definition of "operator," must be permitted and sign a S�VP3
certificarion. Each of thcse parties must have sep�rate a�id distinct`I'PDE.S permit mimbers (e.g. a separate permit is typically ��eeded
for each OwnerlDeveloper, General Contractor, and/or Builder).'I'his form was prepared as a guideline and it is not a required form
for use �vith the permit.'I'his information may be displayed in aiternative form or formats within guidelines set forth in the permit.
"I certify under penalty of law that this docunnent and all attachments were prepared under my direction or
supervis�on in accordance with a system designed to assure that gualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the infarmation, the information submitted is, to the best of my
knawledge and belief, true, accurate, and complete. I un aware there are significant penalties for submitting
false information, induding the possibility of fine and imprisonment for knowing violations."
*Persons signing this certification must do so in cornpliance �vitli the signatory requirements of the permit as found at Part VIT.6, of
the permit:
For a corporation: by a responsible corporate officer. This means a Yresident, Vice-President, Secretary, Treasurer, Manager of one
or more facilities employing 25�+ persons, or Manager for expenditures exceeding $25,000,000 (in 2nd Qu�-ter 198Q dotlacs)).
For a parmership or sole proprietoiship: by a general partner or the proprietor.
For a Municipality, State, Federal, or other pt�blic agency: a principal execurive officer or ranking elected official.
���PY^6ht � 2012 SUrrm Woter Mwngemenl, lnc, All Rights Reserved:
Dele�ation of Auth_ oritv
"Executive Director"
torrn Water & General Permits Team; MC-228
P.O. Box 13087
Austin, Texas 78711-3087
TPDES Storm Water General Permit No.
Delegating an "Authorized Representarive"
Project Namc Near Eastside Urban Village - I�'ort Worth
Dear Director:
This letter serves to designate either a person or specifically described position as an authorized person for
signing reports, storm water pollution prevention plans, certifications or other inforination requested by the Director
or required by the permit. This authorization cannot be used for signing an TPDES permit application (e.g. Notice
of Intent (NOI)) in accordance witl� 30 TAC Section 305.128. The following person or position is hereby attthorized
to sign reports, plans or certifications nther than the NOI application:
By signing this authorization, I confirm that I meet the following requirements to make such a designation
as set focrth in 30 TAC Section 305.128.
(1) For a co�poration, the application shall be signed by a responsible corporate officer. For purposes of this paragraph, a
sponsible corporate officer means a president, secretary, treasurer, or vice-president of the coiporation in charge of a principal business
.unction, or any other person who performs similar policy or decision-making functions for the corporation; or the manaber of one ar more
manufacturing, production, or operating facilities employing more than 250 persons or havii�g gross anmial sales or expenditures
excecding $25 million (in second-quarter 1980 dollars), if autliority to sign documents l�as been assigned or delegated to t}►e m�nager in
accordance with corporate procedures, Corporate procedures governing authority to sign permit or post-closure arder applications may
provide for assignment or de(egation ta applicable corporate positions rather than to specific individunls.
(2) For a partnersliip or sole proprietorship, the application shall be signed by a general partner or the proprietor, respectively.
"I certify uncier penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the inFormation submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware there are significant penalties for submitting false infarmation,
including the possibility of fine and imprisonment for knowing vialations."
Copyrish[ �12012 Storm Nx�cr Mnoagemrnt, [nc; All Riglus Reserveda
FORTWORTHo
May 8, 2013
Iftekhar Ali
Texas Department of Transportation
South Tarrant County Area Office
2501 Southwest Loop 820
Fort Worth, TX 76133
RE: Near East Side Urban Village Streetscape Project, CSJ: 0902-48-825, Change Order 3
Dear Iftekhar:
Please find enclosed Change Order 3 for the Near East Side Urban Village streetscape project,
CSJ: 0902-48-825.
This change order results from a Storm Water Pollution Prevention Plan (SW3P) report that was
prepared for the project. A full explanation of the change order is on the attached Change Order
3 Description. The entire SW3P report is on the enclosed CD.
The cost of this change order is $1,400.83 as outlined in the contractor's (The Fain Group) letter
dated April 10, 2013. The cost of this change order will be covered by City funds and not the
FHWA grant.
If additional information is needed, please contact me at 817-392-8068 or Paul Roach at 817-
662-1211.
�SinSerely,
� ! 1c,�' `'. `t- `,'''��; �`,' ��
� �
Patrina Newton
Senior Planner/ Project Manager
c: Paul Roach, CP&Y, Inc.
Eric Fladager, City of Fort Worth, P&D Dept., Comprehensive Planning
Tony Host, City of Fort Worth, TPW Dept., Inspection Division
Adilda Cazorla, City of Fort Worth, TPW Dept., Inspection Division
Jay Lozes, City of Fort Worth, TPW Dept., Inspection Division
Enclostn�es
Fort Worth
�
AI�-amerloacttY
�II����
1964 • 1993 • 2011
PLANNING AND DEVELOPMENT DEPARTMENT
THE CITY OF FORT WORTH * ZND FLOOR * IOOO THROCKMORTON STRGGT * FORT WORTH, TGXAS %6102
817-392-8000 * S 17-392-8016
R��,��Vi�� !�'i�,�1 � � %I�I��
�r Prin[ed on recycled paper
._ .__._ .. . .. ... . :.. . . .. . . . . :. ,.. .. ,,,
_ _ ... , . .. ;..., ,::
�� ..
_ _ , , -. .,,
_ ,.. ,. ; ,,
. . , _ _.. , . __��
I
:
i
�' S
a
s
x
�
B
��
��.
� �_�
3����.
,�
���
� �
o��.dM
SA,
���Q�.
>YgYfv-
� �
$"`�p.
E
���.«.
�wa�w�8
A, GENERAL 51TE DATA B. ERO�ION AND SEDIMENT CONTROLS C. 07HER REQUIREMENTS & PRACTICES
1, PROJEC7 UMITS� NlghWay; E.LANCASTER AVENUE 1. $OIL STABIUZATION PRACTICES� t. MAINTENANCE�
From: KENTUCKY STREET All eros/on on0 sedlment controls shail be matnlolned !n good workJng oraer. !f o repotr Js necessary,
To: PINE STREET (Seiect T- Temporory or P� Permonent, os opplicable) !t SMI! b2 �tormed ot ilt8 eor!lesf dole
Ae /x�ss/ble but no loler !!an 7 calendar doys after the surroundlnq
LATTITUOE� 32° 43'32J5"N LONGITUDE� 97° 19'S3.64"W _ TEMPORARY SEEDWG ,___; PRESERVATION OF NATURAL RESOURCES exposed ground las drled sufflcleNiy to prevent fu��her domaye from heavy equTpment, Dls�urbed oreas
- _ MUICHING (Noy or Strow1 ^ F�EXIBLE CH.4NNEL �INER on whfch Construction activltles have Ceosed,temporortly or p�rmonenfty,ShOUbC StODIlIZ@d wliNll (4
' 2. PROJECT SITE MAPS� _ BUFFER ZONES .� RIGIO CHANNEI LINER colendar days w�less lhey are scheduled to ond do resume wl1Mn 21 calendar days. The oreos adJoceM
_ PLANTWG — SOIL RETENTION BLANKET
• ProJeCt Laca�lon Mop: T/de Sl�et (Sl�et !1 lo creeks ond droinoqeways shnfl hove prlorlty follaved by devices proiect/ng storm sewer !n/els.
� D�alnoge Porierns; Oroinoge Areo Mo/zs !N/Al — SEEDwG .�.�, COMPOST MANUFACTUREO TOPSOIL
_ SOODING � OTHER� 2. INSPECTION�
� Approx.Slopes MIicJ/wled After MaJor G�adtngs and Areas of Sol101slurGnnce:
Typlco! Sections f5t�ets 41 2, STRUCTURn� PRAC7iCEs� An lnspection shot! be perfor�d by a TxDOT fnspecfor every 14 colendar doys as well os ofter every
= Mo/or Cuntro/s ond Labtlons of Sloblltzatlon Proctices: (N/A1 ho/f Inch or more rofn as reco�ded on o r�an•freezl� raln yauge to be locoled oI Ihe proJect site.
SW3P SIIE Mop SheetS (Select T� Temporory or P- Permonent, os opplicoble)
M Inspect/on ond MolntenonCe Report sholl be f11ed ior eoCh lnspectlon. Bosed on the Inspecilon results,
- ProJect Speclflc Locatlons: 1he conlrols slnU be revlsed os per the lnspectlon �epori.
T SILT FENCES � DIVERSION, INTERCEPTOR, OR PERIMETFR OIKES
To be spec!(ied by ProJeci Fteld Offlce ond 1pcoied In the P�oJect SW3P F!!e _ HAY BALES ,_,,..... OIVERSION, INTERCEPTOR, OR PERIMETER SWA�ES 3. WASTE MATERIAIS:
• Surfoce Woters ond Dlschorge �ocoNons: Storm Oroin SI�/s _ ROCK fILTER DAMS .� DIVERSIUN D�KE AND SWALE CUMBINATIONS EXCEp) OS lrolBd bElOw.al/ wasta moierlols sholl be co/lected In o metol dumpster /bving o seCure cover,
�N�Q� _ PIPE SLOPE DRAINS _ ROCK BEDOWG AT CONSTRUCTION EXIT The dumpster sholl mee� alf s�ote ond laco! solid wosle monogement re�ulollons. Alllrosh and debrfs from
_ PAVED F(.UMES .�: TIMBER MATTING A7 CONSTRUCTION EXIT constructlon sho!!be deposile0 in �i� dumpster. The dumpste� sho!/be emptled,os necessory vr as
_ CHANNEI LINERS ._ STONE OUTLET STRUCTURES required by Iocoliegulotion,and lbWed to o locvioppra�ed lond f!!lsife.The burying of Consiruction
_ SEDIMENT TRAPS VELOCITY CONiROL OEVICES
3. _ PROJECT OESCRIPTION� _ SEDIMEN'f BASINS ...�, CURBS AND GUTTERS waste on the proJect 5lte shall nof be permltted.
CONSTRUCTION OF lLLUMlNATlON,SIDEWALK,CURB & 6UTrER, — STORM SEwERS _.�: STORM WLET SEDiMENT TRAP Concrete woshoutoreos slplfbe re,quired ond slbllconslslof o p1i,flned w1/h an lmpervious mnterlal,of
DECORATNE CROSSWAtXS.AND PAVEMENT AfARKlN65 — OTHER�
5ufflcient size to contaln,unlll evapaatlon.oll woler used ond woshout maiertot prorluced durfng concrete
MAJOR SOIL DISTURBING ACTIVITIES� waslpuf operoilOns. The concrefe wosfbut IocalJons shall De as dlreCted by it�s englneer.
4.
Oniy so!/ dlslurbed !s from tlie new conef�uction of sldewolks ond curb Llme slok/ng tonks shv/1 be surrounded by o eorthen berm,ca/wble nf contolning any aerflay.
(n !he parkway.
4. HAZAROOUS WASTE (INCLUDING SPILL REPORTING)�
5. EXISTING CONDITION OF SOIL & VEGETATIVE ;�
COVER AND / OF ExiSTWG vEGE7nTNE COVER� As o mfnlmum,any products In ihe follaving cofegarles ore cons/dered to be hazordous: poTnts,ac(ds,
Exlsiing oreo las roughty 5% vegefolion wllh 95% concrete or osplbN covered. 3. SroRn� WATER MANAGEMENT: (ExO01p(B Belav - Moy t� used os appl)coble,revlsed or expondedl solveNs,aSphalt produCls.chemicol oddlltves for so1/stoltrlllzoflon and concrete curing compounds or
/. Slorm woter droinage wil! be prwJded 6y tnlets und slorm water oddifvtves./n itas event of a spl/! wMch may De /xazardous.it� spip coordlnator slwl! be conlocted immedlotery.
6. TOTAL PRQJECT AREA� �,20 Acres ,ryslems /hot wTU carry drolnage wTth/n tt� RA.W.tO fte low �IntS w7ihln t/7C 5. SANITARY WASTE�.
roadway and proJect slte whlch droTn to naturol facllTtles. All son/lary wosle sholl be colleCted from the porfoble units.as necessory o� os requJ�eO by locol
7. TOTAL AREA TO 8E DiSTURBED= 297 Acres f4! '/. OF TOTAL PROJECT AREA) regulatlon,by 0/ICB/�SBd sanitary wosle managemen/ contraclor.
6. OFf SITE VEHICLE TRACKING:
B• WE�GHTED RUNOFF COEPPICIENT Ti� Contractor sholJ be requlred.on o regular bosls or os may be dire�;ied Ay ll� E�lr�eer.lo dampen
BEfORE CONSTRUCTION� 090
4. STORM WATER MANAGEMENT ACTIVITIES� (Sequence of Construction) haul�oads for dusicontrol,slobJlize constructlon entrances a�d lo remove excess dirtfrom the ro0dway,
AFTER CONSTRUCTION: 0.� 7, MANAGEMENT PRACTICES�
Exlsfing Storm D�oln Sysiem will hnndle water.
I.Dlsposol o�eos,stockpl/es ond Iwul ioods slwll be constructe0 !n a monrte� tha7 wlll minim/ze ond
9, NArnE OF RECEivING wArER5� control fhe amount of sedlmant thai may eNe� recelving woters. Dispasol oreos slbl! no1 be tocated
�,y/q� !n any welland,woJerbody or streamDed.
5. NON-STORM warER oisCHnttGEs: 2.Construcilon sraging oreas and veMcie maintenonce areos sta!! be cons�rucied by Ihe ConiraGor
Non-storm waier dlscrarges sipuld be fl/tered,or he/d In retent/on bos/ns,before deing /n o monner to minlmTze the runoff of po!/utpnis.
ollv,ved to mtx wllh storm woter. These dlsefbrges conSJst af non-polluied 9�ound woler, 3. AIi walerw s Shsl! be cteared as soon os
spring woter.foundatlon orrd/or foolinq droln woter; ond woter used for dust contral, �Y procBCable of lemporory embonkment,tem/wrory b�ldges.
,oavement woshtng and vehlcle woshwoter caniolning no delergenis. motting,falsework,plling,debrls or otl�r obshucllons placed durinq Constructlon operatlons thol are nol
10. ENDANGEREO SPECIES. DESIGNATED CRITICAL-HA8ITAT ANO HISTpRIC PROPERTY: : � a portOf ti� fJnlshed wOrk.
A No Endongered 5pecie5, Deslgnated Crltical Nabl�at or HIsloric ProFerty 8- �.
hos been found on thls proJect s!/e. l.Llsting of construcilon mofe�iols stored on slie 10 be pralded by Projeci Fleld Ofl"ice.
2. The P�oJeci SW3P Ftle Iccoted ot the proJect fIeld office s/xi!/ conloin Ihe NAJ_CGP Coveroge
Notice,TCEO TPDES Form,Slgnoture Auihor)zotion,Certlflcotlon/QuolTficotlon Stotemenfs.lnspecilon
Re/�rfs,Requlred Mo/xs,ond a copy of the TPDES General Peimlt No.TXR150000.
Tl� documenloilon sotlsfytng NPDES ConstrucNon Gene�ol Permlt ellglb!/ty /xsr�alning
to tl� exJstnnce or of ony proteclive octlon taken wlih regards !o endangered o�5iyn co�s�na�i �ogo �ere - delele block cr not upp6coDia
specles or designoted crltical habitat or hlstorJcol property In this proJec! oreo
ts conlatned Jn lhe proJecYs Env/romenta/documen�(EA or E15)and can Ds vlewed �
under ll� Siale Open Records Act at /he add�ess shown belowr �" Texas Deportment of Tronsportotion
� 0 iiip� �l'61i'stnU�7ii}N �:
TEXAS DEPARTMENT OF TRANSPORTATION �'�isvi� � � Fort Worth District
� FOR1' WORTH DISTRICT NEADQUARTERS
� D�STR�CT OES�GN SECT�ON i�rt uu, r�+ ce�uur ,�rcrata a� r� oan�r ;r,�s S T O R M W A T E R P 0 L L U T 10 N
a 250/ SW LOOP ic t'xiRNw°9isi�� a��ie°••'azi'mlra+�
3 �� � ii�C+tt�M}+! � i1E Ff��+i �� y0D4R
FORT WORTH, rx �s�ss '� E� �q ,� i�k� ����� �a��� ��i. P R E V E N T 10 N P L A N ( S W 3 P)
�' PHONE: 8f7-370-6500 Feo�en� nio FRo,iecr Nos
� , F�w��� �ovr�io � t+x:t�'hv �
Z' gi02 6 DM02007t20$) VA
F' REVISIONS STATE O�STRICT COUNTY StN Y
"i'' TEXAS FTW TARRANT
U --
m�.�,. .. .. o.E... . CONTftOL SECTipN � JOB 14
a' Signoture Dote 0902 48 825
�
�.
;;
3
:
Olfce�Fort wo�ln rTw00a20 Dola ll�Ot�7o�4 • 09��7�45 Ne Vear• tlI0 Fdn� N�\il\[Iro�inq6�TrD0T\SfrJplN.dqn
_...
r_ _. __ .
�
, ..... ,, �. _ _ , , _ _ ., _ _ ., _ _ , . . . . _ . .___.�_�
Where proposed 4vork is in proximity to historic buildinys or other structures (walis,retair�ing walls, fences, stone morl<ers), planting �eds, and
vegetation/groundcover, follow the procedures listed below for demolikion and construction at these c�ddresses�
1212 E Lancaster /�ve., SW corner of Lancaster Ave. and Poplar St..
1324 E Lancaster Ave., SW corner of Lancaster l�ve. and Cedar St..
1. To minirnize potential damage to histc,ric striactures and materioi, eontractor to saw cut existinq sidewolk 8 to 12 inches away frorn the
historic structure, fence, or retaining wall.
?_.. Contractor to construct new sidewafl< r��;xt to the sow cut edge with installation of expansion joint in between. If existing sidewalk is to be
removed entirely, the remaininc� 8-12. inches next to the historic structure, material, fence, �r retaining wall will be removed by hand.
Expc�nsion joint to be placed between historic structure, material, fence, or retaining wall and new sidewolk.
3. Contractor is responsible for preventing dam�ge to historic structure, materials, fences, retaining walls, including gorden elements (planting
beds, plantings) during the entire construction project, especially during removol of existing pavement, curb, or sidewalk. During the saw cut
and hand removal pracess, contractor will exercise utmost caution and �Nill physicaliy protect historic structure faur}dotion, materials, eievations,
entryways with decorotive flooring, fences, retaining walls, and landscape elements.
4< Coritractor to repair or replace in kind, at his owr� exE.>ense, any historic materials damaged in the course of executing the work. Contraciar
is responsible for locoting replocement source for historic materit�ls damage� in the course of the worl<. TxD�JT-Environmentai Affairs
Division to be informed of propased rep�irs to faci(ita,e consultation with Texos Historical Commission prior to execution of repair work.
' $
�
r
�.
�.
��
k���
4�t�
���,3
o. � �
v �e�
S%H��g
'z��R
40-� n
�����:
�ta°�8
0200� ey ra.o� oayo.�m.�t oi r.o�svono�m�:
on�iyhts rn�rvad
- 011ise• �ort Wo.lh FTW08a20 Oa1e� u\0��20�2 - 09N7:19 MI User� dlh Pue� N��it�0�a.ings�T.UU7�EPtClFW.dgn