HomeMy WebLinkAboutContract 29370-A2 C'rrY SECRETARY
AMENDMENT: No.2
CONMCT NO,
TO CITY SECRETARY CONTRACT
WHERFASI the Clay of Fort t Worth (CITY) and Klmley_H rn
and Associates,, Inc. , ENGINEER made and entered into, City
Secretary Contract N' . 29370, the CONTRACT) which was
authorized by M&C C-19873 on the 2nd day of December, 2003 in
the amount of $391, 900. 00; and
EFLEAS, the CONTRACT was subsequently revised by
Amendment No. 1 in the amount of $380, 3451 . 00, which was
authorized by M&�C C-24129; and
MUE R ASj the CONTRACT ACS" nvolve 3 engineering, services for,
the following project
Water and Sanitary Sewer Main Relocations on Vickery
Boulevard; and
W EREAS, it has become necessary to execute Amendment
'N o.2 to the CONTRACT to include an increased scope of work and
revised fee.
NOWTHEREFORE, CITY and ENGINEER, acting herein by and
through their duly authior,ized representatives, Winter into the
following afire ent, which amends the CONTRACT.-
1 .
Article I of the CONTRACT is amended to include the
additional engineering services specif ied in a proposal dated
May 31, 2 13, a copy of which is attached hereto and,
incorporated herein The cost to City for the additional
design services to be performed by Engineer totals $42 , 030 . 0101
2
Article II of the CONTRACT is amended to provide for an
increase in the fee to he paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall be
an amount of $814 ,1275 . 00 .
OFFICIAL RECORD
D]
CITYSECRETARY
s WORTHo,TX
Page
4
All other provisions of the Contract,, which are not
expr'essly amended herein, shall remain in full force and
effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below'.
APPROVED: ENGINEER
City of Fort Worth Kimley-Horn and Associates, Inc.
Fernando Costa Glenn Gary, P.E .
Assistant City Manager Senior Vice-PresIdent
DATE low- DATE
PRO D o
S. Frank Crumb, P.E.
Director, Water Department
APPROVED AS TO FORM AND LEGALITY: M&C %-1 N/A
Date: N/A
17 ttw
Assistant City Attorney
00000)*
ATTEST: %4�
40
IC
beary J., Ya se
10
000 09
City Seer to 100000
OFFICIAL RECORD
I LFF101011
ijG T a
vilry SECRETARY
F 0, .
page To WORTHil Tx
PPP' KOey-Horn
kbhb, =F,1 and Ass,ociates, Inc.
May 31, 2013,
Suite 950
801 Cherry Street,Unit 11
Fort Worth,Texas
Mr. Robert Sauceda 76102
C,ity of Fort Worth
Water Department
"1000 Throckmorton St,
Fort Worth, TX 76102
Re: Vickery Boulevard Water and Sanitary Sewer Improvements
Additional Services—Amendment No. 2
KHA No�. 06 1 01 1 80123
Dear Robert:
Kirnley-Hom and Associates, Inc,. (Kimley-Flom or ENGfNEEC) is pleased to
provide the City of Fort Worth (CITY)with Amendment No. 2 for the Vickery
Boulevard Water and Sanitary Sewer Improvements contract. The CITY has
asked Klmley-Horn to perform additional services under this contract for the
exte,nsio�n of a 24-,inch and 12-inch water line. This amendment will include the
8Th
additional design for the relocation of a 24-inch and 1.2-inch water line ne a I ong
Ave from Windsor P1 to Jessamine St as shown in Exhibit 1). ENGINEER will
perform the work outlined in the following items for the Amendment:
ItemI (Desl*gn Management)-$2,400
ENGINEER will complete the following services for up to an additional three(3),
months:
• Communications and Reporting
o Prepare invoices and submit monthly in the format requested by
the CITY
o Prepare and submit monthly progress reports in the for
provided by the respi ect ve CITY Department
ol Prepare and submit baseline Project Schedule initially, and
Project Schedule updates with a schedule narrative monthly
according to the City of tort Worth's Schedule Guidance
Document
0 Complete M(r)Pthly M/WBE Report Form and Final Summary
Payment Report Form at the end of the project
• Deliverables,
o Monthly invoices
TEL 8173356511
F,A X 81 335 50 7 0
Kimley-Horn Mr.Robert Sauceda,May 31,2013,Page 2
and Associates, Inc.
o Monthly progress reports
o Baseline design schedule
o Monthly schedule updates with schedule narrative describing
any current or anticipated schedule changes
o Monthly M E Report Form and Final Summary Payment
Report,Form
Item 2 (Addidionai" Water and Sanitary Sewer Design) - $22,100
The CITY has requested ENGINEER to perform the following additional water
relocations for the Vickery relocation project in accordance with the scope of
services in the original contract.,
24-inch Water Line along 8" Ave from Windsor P1 to Jessamine St for
1 1500 LF
0 12-inch Water,Line along 80'A.ve from Arlington Ave,to Mitchell Ave,
600 LF
The ENGfNEER will also prepare up to 2 traffic control details
associated with the water relocations
Item 3 (Survey)—$8,030
Due to the changes in the design listed above, the ENGfNEER will perform
1,600 LF of survey.
Item 4(Geotechnical,Services)- $3,850
The ENGINEER will perform two (2)bores to a total depth of 35 vertical for this
project.
Item 5(Corrosl'on Englineerling)-$1,100,
For,the proposed 24-inch water main along 8h Ave from Arlington Ave to
Jessamine St, the ENGINEER will perform the following services for the
Corrosion Engineering:
0 Soil Coffosi'vity Evaluation-- review previously completed soil
resistivity results,and chemli,cal analysis to obtain minimum resistivity,
chloride ion concentration, sulfate ion concentration, and soil pH on two
(2) of the samples obtained during geotechnical investigations. Review
previous field investigation to identify existing metallic pipelines,
cathodic protection systems and high voltage AC or DC systems as
sources for stray current interference.
Kimley-Horn Mr Robert Sauceda,May 3 1,2,01 ,Page 3
and Associates, Inc.
0 Data Analysis and Letter Report—Analyze the results ofthe soil
resistivity testing, chemical analysts and stray current investigation with
respect to corrosivity and prepare a letter report with the results and
recommendations for corrosion control.
Corrosion Control System Design—prepare details and technical
s "f I I
peci icafions for Cathodic Protection system.
Item 6(Additional B*Iddl*ng and Construct or Phase Services)-$4,550
The ENGINEER will provide additional bidding and construction phase services
for this project. These services will b�e provided for the following in accordance
with the scope of services M the original,contract-.
0 Preparation of a bidding package as required by the City.
0 Reproduction costs for the additional unit and set of bidd,ing documents
required by the City.
Pre-construction assistance for the additional unit and set of bidding
documents, required by the City,
Construction phase services for the additional unit and set of bidding
documents required by the City,,,
Review 2 additional shop,drawling submittals
We recommend that the City increase the budget by$42,030 for these additional
services. From the additional services listed above, the recommended break do n
for water and sewer services is as follows:
FDescri'Ption Water Sewer Total
Desc',
Item I —Design Management $2A0 $0 $21400
Item 2 —Additional Water and
Sanitary Sewer Design $22)100 $0 $22,100
Item 3 ,—Survey and SUE $810310 $10 $8,030
Item 4—Geotechnical Sc $3,850 $0 $3,850
..............
Item 5 —Corrosion Engineering $1,100 1$0 $It 1 1 1 00
Item 6—Additional Bidding and, $4.550 $0 $41,550
Construction Phase Services
rota) $42,030 $0 $429IO30
L .......... MLM����
The t1ollowing table summ rizes the Fee per Work Phase breakdown:
'01
Opp, Kimley-Hoirn Mr Robert Sauce dal,May 31,2013,Page 4
a,nid Assoiciates, 11n,
Work Phase Water Sewer Total
31
10 1 419 $0 $101419
32 1
$20,838 $0 $201,8 3 8
33 $3,473 $0 $31473
51 $7,3010, $7,300
Total $4129030 $0.00 $429,030
The following table summarizes our recommended budget revisions and shows
the revised contract amount:
Descrj* ►fion Origilinal Amend No I Amend No. 2, Revi'sed
Contract Contract
Pre-En $- $167100 $21,400 $18,500
Conceptual Engineering $1331900 $1 601,295 - $294,1
Preliminary Construction 230
$17,930 $1771)
Plans $10455010 $547800
FD
esc'
Pre-E
Concl
Final Construction Plans, $1373650 $126)450 $171150 $281)250
Pre-Construction Service $11)500 $1 0,500 $550 $121550
Construction Phase $14,350 $12�2001 $4)010:0 t $307,550
Services
Total Pro7jject $391,900 $380,345 $429030 $814,1275
1111 1111111 iiiiiiiiimm
The ENGINEER will subcontract a portion of these services to Gorrondona, Inc.,
and CMJ Engineering, Inc MBE and SBE subconsultants. The amount we will
be subcontracting is $11,300. This represents an M/WBE participation
percentage of 26.,91%, for these,additional services. With these Additional
Services, our revised contract amount will be $814,275. This will revise our total
contract MBE and S participation from $167,450(21.7%) to $1178,750
(22.0%).
The following,table summarized the water and sewer design fees:
Revised
Contract
Contract./Amendment Water Fee Sewer Fee Survey Fee Total Fee Amount
Original Contract $297)844 $0 $941105161 $391)900 N/A
Amendment No 1 $3051,425 $0 $74)9120 $380,345 $772,245
Amendment No. 2 $421030 $01 $0 $421030 $8141275
TOTAL $1645499 so $168,976 1 $814475 $814t27'5
-Horn May 31,2013,Page,5
Kimley Mr Robert Saucedal,
and Associates, Inc.
We app reds te the opportunity to be of continued service to the City. Please
contact us 1f we need to provide:,any further information.
Very truly yours,
KIML.EY-HORN AND ASSOCIATES, INC.
Glenn A. Gary, P.E.
Sr.Vice President
GAG/SRM:srm
Attachments-.
K,'VqW—Utilities\061018023\.,-Medi,caI District'TP P\A mend rnen1#2Drat12\Amend2-"dicker-Ur doc