Loading...
HomeMy WebLinkAboutContract 41324-A1 CITY S MY CONTRACT r ..- ANENDMENT No. 1 EL TO CITY SECRETARY CONTRACT No. 41324 WHEREAS,, the pity of Fort Worth (CITY) and P&Y, Inc, (ENGINEER) made and entered into City Secretary contract No. 41324 , (the CONTRACT) which was authorized y M c C-24653 on the 14th day of e em er, 2010 in the, amount of $292, 213 . 00; and WHEREAS, the CONTRACT involves engineering services for the following project . South Holly High Service Pump Station Motor and Switc hgear. Replacement Project and ED' S, it has become necessary to execute Amendment No 1 to the CONTRACT to include an increased scope of work and revised fee NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives,, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a Proposal dated Mays, 2013, a copy of which is attached hereto and .incorporated herein. The cost to city for the additional des,i n services to be performed by Engineer totals $10f072 . 00 # 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under. the contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $302,285. 00. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect EXECUTED and EFFECTIVE as of the date last written by a signatory, below. City of Fort Worth Professional services Agreement Amendment Template OFFICIAL RECORD PMO Official Release 8/1/201 Pagel oaf 2 CITY SECRETARY' FTv WORTH, T CEI YED JUN,. 2 0 2013 M. APPROVED: City of Ford Worth Inc'. Z4).low Fe.r ,,ndo Cos to William E. :a rol Assistant. City Manager Senior Vice President DATE.- /Zo DATE �?4-Z6 APB AL RE OMM_ N ED S. Frank Crumb, P.E. M Director Water Departrrient f, APPROVED AS TO FORM AND LEGALITY. &C: ILIA 1 Date: . � k Assistant City Attorney ATTEST-. FO oo 0 Mary J. K �, City Secre� 0000 1 S City of Fort Wor+ t Professional Services Agreement Amendment Template O Official Release,8/1/2012 Page 2 of 2 ISE R A ORD e o CP , +.w r"artn rs�far a Batter ualit I f e May 15, 2013 Mr. Ch,r st pher Harder Eng,in erinig Manager Fort Worth Water Department 1511 111h Avenue Fort Worth, TX 761 012 REDS South Holy "Water Treatment Plant Hligh Service P" rnp Station Motor and Switchgear Replacement and El ctr"cal Improvements Project Request for S ecl*a' S ry c s Authlorlizatiffilon Dear Mr. Harder: As we discussed recently, C &Y requests a supplemental agreement for additional work performed during the design and construction phases of the Motor r and Switch e r Replacement and Electrical Improvements project at the South Ill Wester Treatment plant Dino to unforeseen utility restrictions provided her Oncor towards the end of the design phase, CAP Y had to perform additional efforts during, design and construction r as described in the attached' exhibit A. The fee associated with the additional effort is presented �n exhibit R., Should these arrangements he acceptable to the City, we would like to request a supplemental agreement for the work performed ith fee not to exceed $10,072.010. We appreciate your consideration of this re ulest. If you have any questioins, please do not hesitate to contact, me., CP&Y,, Inc. Timothy E. Campbell, PE ice President cc: Agate Ristow-cP Y e-mail) FIe copy 1820 Reg,al Row,Suite 200 Dallas,Texas 75235 214.638.050*214. 38.3723 fax ,ill. o Exhibit A, South H Water Treatment Plant High Service Pump Station — Motor and Swig hgear pI m nit and Electrical Improvements Scope of Services Supplemental Ag�reemeint No. 1 May 15, 2013 A. General The scope of' this supplemental agreement includes additional design efforts required to complete the South Holly Water Treatment Plant High Service; Pump Station Motor and S,witchgear Replacement and Electrical Improvements Project (Contract No 413124). Th,is scope includes professional services to redesign the electrical distribution system based on unforeseen utility starting requirements. Thi's scope also includes fees for pr fessiona,l services during the construction phase of this project related to contractor questions that were not in the original scope of work. B. Tasks and Requirements 1) Additional Design Phase Services. This task 'includes the efforts associated with additional design work, beyond the original scope of the Motor and Sw itch gear Replacement', and Electrical Improvements Project: a .`valuation of the starting kVA of the new motors to assess if the motors start di across the line would comply with the new starting requirements, b) Simulation (motor starting study) us,ing SK M power tools to see what reduced voltage solution would be the most appropriate to meet the utility starting requirem,ein�ts. c) Report summarizing results, of the above mentioned motor starting study. d) Additional coordination with manufacturers to determine footprints, costs and weights of the new selected equipment. e) Modifications to one lines, and site plans based on characteristics of new equipment., f) Additional structural design for new outdoor switchgear based on the fact that the new equipment, could not fit in the existing electrical room. Supplemental Agrcement No I Page I of 2 2) Construction Phase Services The scope for th,is,task includes construction phase services related to the Additional Design Phase Services and services, related to additional cons,t�ructioln concerns,. a) Structural review of'outdoor switchgear submittal and modification to, outdoor switchgear pad based on d�ifference in dimensions b) Review of structural RFIs (qt ►. 1) that were not included as, part of the design services. The contra�ctor noticed a low point in, the,driveway and requested a, proposed solution to fix the problem. Siupiplemental Agmcment No. 1 Page 2,of'2 wAd ., %yy rI IX CY CN I in cz 69 69 ioil r to I - N CL V C] M ' cu Tv CL� C ttu CL m f' .�. ui uj lr It CL u V [ml 0 µ^ � L i. G c 1 tr 5 J 1, P 0) qi an is F I W ..