HomeMy WebLinkAboutContract 57283-AR1 CSC No. 57283-AR1
FORT WORTH® City of Fort Worth
`1� Construction Allowance Request
Project Namel Park Vista Boulevard and Keller Haslet Road Intersection City Sec# 1 57283
Client Project#(s)l 101020
Project FParkVista Boulevard and Keller Haslet Road Intersection Improvements
Description
Contractor XIT Paving and Construction,Inc. CA#1 1 Date 7/29/2022
City Project Mgr.1 Mitch Aiton City Inspectorl Travis Overstreet
UNIT or DEPT Unit 1 Totals
Original Contract Amount $1,580,011.10 $1,580,011.10
Extras to Date
Credits to Date
Current Contract Amount $1,580,011.10 $1,580,011.10
Amount of Proposed Allocation $355.52 $0.00 $0.00 $0.00 $355.52
Original Allowance Available to Allocation $100,000.00 $100,000.00
Allowance Funds Previously Allocated $0.00
Revised Allowance Balance $99,644.48 $0.00 $0.00 $0.00 $99 644.48
JUSTIFICATION(REASONS)FOR CONSTRUCTION ALLOWANCE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACT SHALL: Furnish all labor and material as per
attached proposed Construction Allowance Request(with attachments):
This construction allowance is to add item 11A for tree pruning. After reviewing the grading with the contractor and city forrester,it was
determined that 7 of the 9 trees called out to be removed could remain in place,but they need to be pruned for the project. Documents attached
for reference.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and
satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Construction
Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and
administration of this contract,including ensuring all performance and reporting requirements.
ontract7s Company Na Contractor(Name)9q Contractor Signature Date
XIT Paving and Construction,Inc. Riley Gilfeather Jul 29,2022
Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date
Ta�irO�eert�eet Jul 29,2022 nab ACb t Jul 29,2022
�a zs,zozz.a3,�n onQ,Iz1 3-1
Date Senior Capital Project Officer Date
Bboz� Jul 29,2022P Jul 29,2022
Assistant Director(Dept) Date Director,Contracting Department(Dept) Date
zlza /411", Jul 31,2022 43A6 , Aug 1,2022
Assistant C ity Attorney 1 Date 1Assistant o nager
Aug 2,2022 Dana R neon Aug 2,2022
ATTEST: oA�FORr�a�A
,7ahhotta.CGao�lalG �.D000000c'% 4( Y
Jannette Goodall,City Secretary p�o �°��f1��
/r oo
00o o=d
o
o
0 o
*000 oo 'd
*XASaAp
OFFICIAL RECORD
CITY SECRETARY
Construction Allowance SUMMARY FT. WORTH, TX
Page 1 of 4
FORT WORTH City of Fort Worth
Construction Allowance Additions
Project Name I Park Vista Boulevard and Keller Haslet Road Intersection City Sec#
Client Project# 1 101020
Contractor XIT Paving and Construction,Inc. PMF Mitch Aiton Inspectorl Travis Overstreet
Construction Allowance Submittal# F—T-� Date
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
ree Pruning 7nit
Unit 1 $355.52
$0.00
$0.00
$0.00
Total Additions 355.52
Construction Allowance Additions
Page 2 of 4
FORT WORTH, City of Fort Worth
Construction Allowance Value
Project Name Park Vista Boulevard and Keller Haslet Road Intersection City Sec#
Client Project# 101020
Contractorl XIT Paving and Construction,Inc. PmJ Mitch Aiton Inspector Travis Overstreet
Construction Allowance Submittal# Date
CONSTRUCTION ALLOWANCE VALUE BEING USED
ITEM DESCRIPTION Qty Unit Unit Cost Total
37 9999.0220 Miscellaneous Utilities Force Account 355.52 EA $1.00 $355.52
Construction Allowance Value
3of4
MISBE for this Construction Allowance Request
M/SBE Sub Type of Service Amount for this CAR
Total $0.00
Previous Construction Allowance Requests
CAR# DATE AMOUNT
Total
Construction Allowance MSBE Data
Page 4 of 4
REQUEST FOR INFORMATION REPORT (RFI) 1!! •
1777,
CONTRACT • NO. PRIME CONTRACTOR
Park Vista Boulevard at Keller Haslet Road Intersection 57283 XIT Paving and Construction, Inc.
• • FOR • •
REQUESTING PARTY NAME REQUESTING PARTY TITLE REQUESTING PARTY ORG, PHONEDATE OF
Riley Gilfeather Project Manager XIT 214-980-0805 05/18/22
RFI SUBJECT SECTION(S)REFERENCED
Tree Removal and Planting
POTENTIAL • POTENTIAL
NO CHANGE NO CHANGE
INCREASE IN COST $ 355.52 INCREASE IN TIME #of Days=
DECREASE IN COST DECREASE IN TIME #of Days=
INFORMATION REQUESTED
There are 9 trees to be removed and replaced, please confirm which trees are to be planted in their place.
CONTRACTOR RECOMMENDATION
Please provide direction.
GOVERNMENT •
RESPONDING PARTY NAME RESPONDING PARTY TITLE PHONE ��Ljg� DATE OF RESPONSE
Mitch Aiton Sr Professional Engineer 682-715-9424 05/18/22 05/20/22
GOVERNMENT • TO CONTRACTOR
Contractor met with City Forrester and found they could save 7 of the 9 trees that were to be removed. The existing trees will
need be pruned however,which will be added to the contract as a bid item.
While we're adding the$355.52 item via this Construction Allowance, we'll be removing$10,899.00 from the cost of construction
since 7 trees don't need to be removed and replaced anymore.
ATTACHMENTS FROM •
Please see attached sheet 18 for reference on trees that remain and to be removed.
NOTE:THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR INFORMATION. IT
DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS THE RFI RESPONSE A CHANGED CONDITION,
PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE IN ACCORDANCE WITH CONTRACT PROVISIONS.
• • DATE
Mitch Aiton,Sr Professional Engineer �_ 07/28/2022
9s�z x ozo[ot ON iiaroli<i ui� Ud lJlSVH llJllJ?I/QA El VISIA NUVd
� - N •n Z� � [� N
w u wz wmN W O �� o
x b a _ mo �oa8w F z o 3 o zw "m
o f r N N N d m ayy q
b f N s�x� `� Z N
a N OY i N rc �N
> O_ Kw2s-tt aozo N a oai o
Z N
<Z
w _ a..��1 3 Q z^• h Q
v. - W > w w w �_ > > > w z_ x o 3 oN asic: 6'z� O
z z z z am i i z z �u fps+ r: l�l+ 47 w a 0 Off,_' ~r
0aE)S(B(D(E)aaT)G Y FIT I osp i �I Qam z� wu w _�
X u Z` uo� �w ioi fi F O W vW a N a
5rc�15 oo ���"��� O Gz U Z:J a:
a o ;o o - Z
' sa mo Q
op w zaw azz
aaaa ww� �$w wo p
arcl.Na
O
Z� ry n
a
09+£l `d1S 3114I1 H0lVW o 09+11 `d1S 3NII HOIVW 3m
o- o �.
o71
z m _ oa3pw�x�wp youal as ono
m w� m� �Wz wz-W 'F�' w z
O OQ Or I w w� J f�� K O� N m I _
_� j o F= wry� x - - xo
ro ova \
wooz o
<£
wa zm
(6 0
laf q aw z rc
ozoIga o�uz ¢�Naz za — _—_ _ wIMOa X3 v
0 a) ai a ww z F
wO wz¢�O -
N _ wl p� "Ix �OUp> w�w�p6
a _
r :t'.:':•�::
S
c=Nio r N m z a z a
I .m O _ N r
CN 3 �n w.'I;•..
rv =
p
I _ a�,e N
N atl1SIA Na.d oGA-1e dl iA ratl
wM =w o �W.
fp MngmN
m.� M SI gaw♦ u.( a
F.0 rcz
ry mmmmm a
N IOP
I
O YlO �Yi O I wwN Z ¢O 1f1'-r IO p
-
7w u ��t7 rc Q
FK.I mOU F- l.'I
w � y K;
- —� COI I O ? iz�' J OOz 1F�.:.. m
o�p m xo MOa X3 �-gyp
oQli_J
-—M — Q > p - p WW --- Moa k3�. ,� P V —————- N N
U in �
of
wm 2 rc _
F
gyp. Iry LL wLL a P � N
W z� o r u��mu o m z—
� J ~ —— H ml oz Iz .� Sc
w Y ON moo a p � oN c
z
N
_ _ I
>o Y a
"'_ 4 la J 1 wi
"Moa x3 -i Moa x3� NJ�a w I
gym. umP o a 11 N
1 w ry Lu i sw °J o N.0
rn
J
I s � c
F
AtlM H1tld3N015 W N I.w (6
Jt/M H1tld3N 1 I Y I _ N E
w ld� O N
® SS of 4
J x
—MOa X3 _ ti' M08_X3 t
I
1
o= ry �m1
I
z m --
ry O wI�Q -_ N "�
r wQ I= Nry. Q z QI ,� I
ZZ� mmNmm Q= -
3� 3�v I c - > �-ol�II ry Iry
maw = fz
_ Z -
z q wp
z u
w Nw 'f o n rvw I _
d
mFp afp p �i"
I I JI
�a
Wf r
U �oz
p
u � oho
- - 1 a
Z O w z frcw F�wx�
O•' N w
$ O r J � � � paz
m
az�uz� _ U �WO O�N ~p
2 N -OV ry
=wI -Im ! J I' o
o _ .�
o oZo
o — _
7 J uf
m�a I
I
W�p J Z a au F
O'er
3 O 3 zZ OJ
fp & N I _
Iw p-
w�� W 00�
fN
I p~O~ `I
I
z-
p% w
I 3wa
I" III II 09+£1 ViS 3114I1 HOiVW
WV LS90:6 lzoz/LUzF �PI,S'd a P'l0-o�a0-Z06L1\slonowaa-£0\Slaa45\u 0\LO\d06ll\s}�a.oad\saaoyso9\lowa�ui aaw�o�a p,q\\
CHANGE ORDER REQUEST
COR# 1
PAYING&CONSTRUCTION,INC. DATE: 07/28/22
PRIORITY: High
MIT PAVING AND CONSTRUCTION,INC.
3934 H WV 287
WAXAHACHIE,TEXAS
ATTN: Mitch Aiton
PROJECT NAME: Park Vista and Keller Haslet Intersection
PROJECT#: P22-32
CDR DESCRIPTION: Tree Pruning and Removal Adjustments
Original Contract Value: $1,580,011.10
This Change Order: ($2,073.48)
Previous Change OrderAmts: $0.00
Proposed Contract Amount: $1,577,937.62
COR 1-Tree Pruning and Removal Adjustments
DEDUCT:
ITEM No. DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
11 6"-12"Tree Removal -7.00 EA $ 347.00 $ (2,429.00)
DEDUCT SUBTOTAL: ($2,429.00)
ADD:
ITEM No. DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
1 Tree Pruning 1.00 LS $ 355.52 $ 355.52
ADD SUBTOTAL: $ 355.52
CDR-1 TOTAL: ($2,073.48)
Qualifications:
2 EA Trees to be Removed&Paid Per Contract Line Item#11,Remaining 7 EA to be Deducted from Contract
Please sign and return as an agreement and notice to proceed.
Owner: Contractor:
City of Fort Worth MIT Paving&Construction,Inc.
Accepted By: Pricing By:
bl/d/ -Aa4ine.5,5
Will Harkness,Construction Manager
Pagel of 2
Change Order Request Cost Breakdown
County Tarrant Project Park Vista Control Highway
Description of Work: Adjust contracted number of trees to be removed from 9 to 2,added tree pruning of existing limbs. This was agreed to during anon site meeting held between Craig
Fox(COFIN),H McMullen(TreeNewal),and Joe Money(XIT)held on 711412022.
Date: 7/28/2022
Equipment Labor
Hours Rate
Description Hrs Rate Amount Amount
Reg. O.T. Reg. O.T.
$ $ $
$ $ $
Sub-Total $ Sub-Total $
15% $ 15% $
0% $
Total Equipment: $ Total Labor: $
Material-Supply Subcontract
Description Quantity UOM Rate Amount Quanity UOM Rate Amount
$ Tree Pruning 1.00 LS $ 320.000 $ 320.00
$ $
2 EA Trees to be Removed&Pail $ I $
$ $
$ $
Sub-Total $ Sub-Total $ 320.00
15% $ 10% $ 32.00
Total Material: $ Total Subcontract: $ 352.00
Summary
Approved: Date Labor $
AT Paving&Construction,Inc. Equipment $
Date Material $
City of Terrell Subcontract $ 352.00
Bond 1% $ 3.52
Total This Sheet $ 355.52
W OO&P
40
�/� , •�
TREE EWAL
Nurturing Trees&Plants
Estimate # 08329-E
(817) 329-2450
Client Information
Client: XIT Paving Client Phone: (817) 228-6009
Client Address: 3934 South Highway 287, Waxahachie TX Client Email: h.mcmullen@treenewal.com
75165
job Site Location: 4369 Keller Haslet Road Fort Worth
job Site Contact: H McMullen
Proposed Work
DESCRIPTION PRICE
6.15 Tree Removal $ 950.00
Tree Removal for Park Vista Blvd/Keller Haslet Rd
Change Order per city forester and city PM
Remove 1 oak and 1 Crepe Myrtle. Prune remaining trees up from work zone in ditch for vertical
clearance for construction.
Bid Item No.: 11 3110.0102 6"-12" Tree Removal, Qt 2: $315 each. = $630
Pruning - $3201 Original contract item,OTY
New item add- adjustment from 9 EA to 2 EA
RG RG
-Follow all ANSI safety standards and take extreme care when removing L
pieces that could damage any surrounding targets/structures
-Remove all created debris from job site
-Rake chips into hole.
Subtotal: $ 950.00
Tax 0%: $ 0.00
Total: $ 950.00
Project Requirements
[ ✓ i Clean Up
] Dispose Brush
[ v/ ] Dispose Wood
All services are performed in accordance with ANSI A300 Tree Care Standards and ANSI Z133,and OSHA Safety Standards.**This
Estimate is valid for 30 days from the date of Estimate.**
For every tree we service,we donate one tree planted through the National Forest Foundation.TreeNewal Donations:
2017-1,250 Trees Planted 2018-2,600 Trees Planted
2019-4,200 Trees Planted 2020-16,440 Trees Planted
2021-21,581 Trees Planted
We thank you for the opportunity to be a part of your tree care and hope you will join us in our mission of sustainability.
Estimator: 08329-E, Rev 3 Date: Jul 14, 2022
,ACCEPTANCE OF ESTIMATE: H McMullen
Your signature acknowledges you have read and
agreed to the TERMS&CONDITIONS herein and
accept the pricing and work specifications listed
within this Estimate. XIT Paving / Signature
Please sign and email to info(cptreenewal.com or click Date:
on the link within the email this Estimate was sent.
1712 FM 407 East,Argyle,TX 76226
(817) 329-2450 www.TreeNewal.com info@treenewal.com
From: H McMullen <h.mcmullen@treenewal.com>
Sent: Thursday,July 14, 2022 10:45 AM
To: Riley Gilfeather
Subject: Park Vista/Keller Haslett
Riley...
I met the city forester and Joe on site over on Park Vista this morning. The plan is now to remove 2 of
the trees and prune back the others for construction vertical clearance.
Attached is the changed estimate (from $2,835 to $950). Joe already gave the verbal, however, I need
something in writing. If you can give me the ok, I'll get us scheduled.
Thanks...
H McMullen
Government Contracts Manager
Oak Wilt Qualified -TOWQ-467
TreeNewal, LLC
MBE Certified - HMMB88877N0624
SBE Certified - HMSB71654N0624
1712 FM 407 Argyle, TX 76226
(817) 228-6009 Cell
h.mcmullen(aDtreenewal.com
https://www.youtube.com/watch?v=vnK46hLuuFA&authuser=O
ti!//
IF ip#
TREE EWAL
Nurturing Trees&Plants