HomeMy WebLinkAboutContract 44165-A7 CSC No. 44165-A7
AMENDMENT No. 7
TO CITY SECRETARY CONTRACT No. 44165
WHEREAS, the City of Fort Worth (CITY) and Bridgefarmer &
Associates, Inc. , (ENGINEER) made and entered into City Secretary
Contract No. 44165, (the CONTRACT) which was administratively authorized
on the 1st day of February, 2013 in the amount of $39,300. 00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1
in the amount of $393, 767 . 65 which was authorized by M&C C-26422 on
September 10, 2013; Amendment Number 2 in the amount of $131, 637 . 20 which
was authorized by M&C C-26846 on July 22, 2014; Amendment Number 3 in the
amount of $39, 740 . 00 which was administratively authorized on August 8,
2014; Amendment Number 4 in the amount of $478, 620 . 00 which was
authorized by M&C C-28035 on December 13, 2016; Amendment Number 5 in the
amount of $82, 436 . 60 which was administratively authorized on March 3,
2020; Amendment Number 6 in the amount of $29, 320 . 00 which was authorized
by M&C 21-0849 on November 9, 2021 .
WHEREAS, the CONTRACT involves engineering services for the
following project:
Parker Henderson Road Construction from Mansfield Highway to Martin
Street (CPN C01419) ; and
WHEREAS, it has become necessary to execute Amendment No. 7 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $1 ,010 .00. (See Attached Funding
Breakdown Sheet, Page -4-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
City of Fort Worth, Texas Parker Henderson Road Construction
Prof Services Agreement Amendment Template OFFICIAL RECORD C01419
Revision Date: November 23, 2021
Page 1 of 9 CITY SECRETARY
FT.WORTH, TX
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $1,195,831 .45.
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City' s
designated Assistant City Manager.
APPROVED:
City of Fort Worth ENGINEER
Bridgefarmer & Associates, Inc.
z7a,v"g, 3�GG -t,a44 "
Dana Burghdoff(Aug 9,202 9:31 CDT)
Dana Burghdoff M. Mansoor A an, P.E.
Assistant City Manager Chief Executive Officer
DATE: Aug 9, 2022 DATE: July 7th, 2022
APPROVAL RECOMMENDED:
La�e�r �%ems
Lauren Prieur(Aug 8,2022 09:28 CDT)
Lauren Prieur, P.E.
Acting Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements .
Aleja dra Ayala, P.E.
Senior Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
City of Fort Worth, Texas Parker He n
Prof Services Agreement Amendment Template C01419
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY:
pew, M&C: NA
DBlack(Aug 8,2022 09:56 CDT)
Douglas W. Black Date: NA
Sr Assistant City Attorney
ATTEST: FORa
as
O°°°°000 00 0
o
9ah.r�e�te-S ��x7�GG �/.o° °O�4
Jannette S.Goodall(Aug 9,2022 10:41 CDT) ° O
O O r1
Jannette Goodall ° °o d
City Secretary � °O° o *d
0000000° .O
*XASoAp
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
City of Fort Worth, Texas Parker He n
Prof Services Agreement Amendment Template C01419
Revision Date: November 23, 2021
Page 3 of 4
FUNDING BREAKDOWN SHEET
City Secretary No. 44165
Amendment No. 7
Department Fund-Account-Center Amount
TPW 39407 0200431 5330500 C01419 002332 $1, 010 . 00
Total : $1, 010 . 00
City of Fort Worth, Texas Parker Henderson Road Construction
Prof Services Agreement Amendment Template C01419
Revision Date: November 23, 2021
Page 4 of 4
��� BRIDGEFARMER &
����� ASSOCIATES, INC.
July 15, 2022 B&A Job No. 155-03-01
Ms. Alejandra Ayala, PE
TPW/City of Fort Worth
200 Texas Street, 2nd Floor
Fort Worth, TX 76102
Reference: Parker Henderson Road
From Mansfield Highway (BUS 287) to Kellis Street
City Project No. 01419
Subject: Amendment No. 7
Dear MS. Ayala,
Please accept this letter proposal for additional engineering services that are necessary to
complete the Parker Henderson Road project. Additional scope of work items include
TDLR review and inspection in order to obtain the Notice of Substantial Compliance. The
fee requested for this work is $1 ,010.00.
If you have any questions, please call me at 972-231-8800.
Very truly yours,
BRIDGEFARMER & ASSOCIATES, INC.
fit,
M. Mansoor Ahsan, P.E.
Chief Executive Officer
MMA: GPC
Attachments
Bridgefarmer&Associates.Inc. Headquarters: Offices In: Phone Number:
THUNDERING HERD 2350 Valley View Lane Little Rock,Arkansas Toll Free: 1-855-222-4845
www.bridgefarmer.com Dallas,Texas 75234 Denver,Colorado Headquarters:(972)231-8800
Austin,Texas Fax: (972)231-5900
C01419-EPAM-Parker-Henderson Road
Mansfield Amendment No. 7
Final Audit Report 2022-08-08
Created: 2022-08-05
By: Andrea Munoz(Andrea.Munoz@fortworthtexas.gov)
Status: Canceled/Declined
Transaction ID: CBJCHBCAABAAPpsP_g87avDaE1zNxE_d_RQgsJx97kSP
"C01419-EPAM-Parker-Henderson Road Mansfield Amendment
No. 7" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2022-08-05-5:17:33 PM GMT-IP address:209.194.29.100
Document emailed to Sara.Cox@fortworthtexas.gov for filling
2022-08-05-5:34:05 PM GMT
Email viewed by Sara.Cox@fortworthtexas.gov
2022-08-05-7:32:35 PM GMT-IP address:204.10.91.100
Signer Sara.Cox@fortworthtexas.gov entered name at signing as Sara Cox
2022-08-05-7:46:49 PM GMT-IP address:204.10.91.100
Form filled by Sara Cox(Sara.Cox@fortworthtexas.gov)
Form filling Date:2022-08-05-7:46:51 PM GMT-Time Source:server-IP address:204.10.91.100
Document emailed to Alejandra.Ayala@fortworthtexas.gov for filling
2022-08-05-7:46:53 PM GMT
Email viewed by Alejandra.Ayala@fortworthtexas.gov
2022-08-05-9:43:38 PM GMT-IP address:209.194.29.100
OIQ Signer Alejandra.Ayala@fortworthtexas.gov entered name at signing as Alejandra Ayala
2022-08-05-9:43:56 PM GMT-IP address:209.194.29.100
,Og Form filled by Alejandra Ayala (Alej and ra.Ayala@fortworthtexas.gov)
Form filling Date:2022-08-05-9:43:58 PM GMT-Time Source:server-IP address:209.194.29.100
Document emailed to Raul.LopezRoura@fortworthtexas.gov for filling
2022-08-05-9:44:00 PM GMT
FORT WORTH.., Powered by
`� Adobe
i Acrobat Sign
Email viewed by Raul.LopezRoura@fortworthtexas.gov
2022-08-05-10:14:38 PM GMT-IP address:209.194.29.100
�a Signer Raul.LopezRoura@fortworthtexas.gov entered name at signing as Raul E Lopez
2022-08-05-10:17:09 PM GMT-IP address:209.194.29.100
Form filled by Raul E Lopez (Raul.LopezRoura@fortworthtexas.gov)
Form filling Date:2022-08-05-10:17:10 PM GMT-Time Source:server-IP address:209.194.29.100
Document emailed to Martin.Phillips@fortworthtexas.gov for filling
2022-08-05-10:17:12 PM GMT
Email viewed by Martin.Phillips@fortworthtexas.gov
2022-08-08-1:24:46 PM GMT-IP address:209.194.29.100
�a Signer Martin.Phillips@fortworthtexas.gov entered name at signing as Martin A Phillips
2022-08-08-1:25:51 PM GMT-IP address:209.194.29.100
�a Form filled by Martin A Phillips (Martin.Phil lips@fortworthtexas.gov)
Form filling Date:2022-08-08-1:25:52 PM GMT-Time Source:server-IP address:209.194.29.100
Document emailed to Lauren.Prieur@fortworthtexas.gov for filling
2022-08-08-1:25:54 PM GMT
Document canceled by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2022-08-08-1:27:06 PM GMT-IP address:209.194.29.100
FORT WORTH.., Powered by
`� Adobe
i Acrobat Sign