HomeMy WebLinkAboutContract 56746-A1 AMENDMENT NO. 1 TO AGREEMENT
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
WRMC Auditorium Roof
STATE OF TEXAS
CITY SECRETARY CONTRACT NO. 56746-A1
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and The Chadwell Group, LP d/b/a ROOFTECH,
(Consultant) made and entered into City Secretary Contract No. 56746 (The Contract)
which was authorized administratively, the 29th day of November, 2021 , for the WRMC
Auditorium Roof; and
WHEREAS, further amendment is necessary to reimburse the Consultant as part of the
design services agreement for additional design services for Construction Documents
and Administration.
NOW THEREFORE, City and Consultant, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1 .
Article I — Scope of Services, Paragraph (3) shall be added to read as follows:
(3) Provide additional design services for the design and detailing of Construction
Documents and Administration. The cost of this additional service is $52,300.00
plus $0.00 in reimbursable expenses. The scope of services is described more
fully in ROOFTECH Letter dated July 29, 2022, subject: "Roof and HVAC
Repairs at Auditorium and Associated Roof Areas, Will Rogers Memorial Center,
3401 Lancaster Ave., Fort Worth, TX, Letter of Proposal for Professional
Services".
2.
Article 11 — Compensation, first paragraph, is amended as follows:
"Consultant shall be compensated in accordance with the Fee Schedule shown
in Attachment "A". Payment shall be considered full compensation for all labor,
materials, supplies, and equipment necessary to complete the services
described in Attachment "A". However, the total fee paid by the City shall not
exceed a total of $59,050.00 unless the City and the Consultant mutually agree
upon a fee amount for additional services and amend this Agreement
accordingly."
City of Fort Worth,Texas OFFICIAL RECORD
Standard Agreement for Professional Services AMENDMENT
Revision Date:3/20/2020 CITY SECRETARY
Page 1 of 2
FT.WORTH, TX
Executed effective as of the date signed by the Assistant City Manager below.
FORT WORTH:
City of Fort Worth Contract Compliance Manager:
By signing I acknowledge that I am the person
responsible for the monitoring and
g,�A administration of this contract, including
By: Dana Burghdoff( g9,202 6:41CDT) ensuring all performance and reporting
Name: Dana Burghdoff, AICP requirements.
Title: Assistant City Manager
Date: Aug 9, 2022
Approval Recommended: Name: Brian Glass
Title: City Architect
Approved as to Form and Legality:
By: Steve 5,202213:37 CDT)
Name: Steve Cooke
Title: Director, Property Management Dept. St��
By:
Attest: Name: John B. Strong
Title: Assistant City Attorney
Contract Authorization:
By: J nette S.Goodall(Aug 9,2022 08: DT) �pvbU�b M&C: n/a p
Name: Jannette Goodall apF F°Rr*ad
Title: City Secretary *o, 00
°
°°od
4 *�
a �'EXA5o4p
VENDOR: �uanaoo
The Chadwell Group, LP d/b/a ROOFTECH
By.
"-
Name: Cindy L. Chadwell
Title: President/CEO
Date: Aug 5, 2022
OFFICIAL RECORD
CITY SECRETARY
City of Fort Worth,Texas FT.WORTH, TX
Standard Agreement for Professional Services AMENDMENT
Revision Date:3/20/2020
Page 2 of 2
ROOFTECH ROOFING and WATERPROOFING SPECIALISTS
1944 Handley Drive,Fort Worth,Texas 76112 8151 Broadway,Ste.109-b,San Antonio,Tx 78209
PROPOSAL FOR PROFESSIONAL SERVICES
July 29, 2022
Mr. Ronald Clements
Registered Architect
Property Management Department
401 West 131" Street
Fort Worth, Texas 76102
817.392.8014 Office
ronald.clements(a)fortworthtexas.gov
Project: Roof and HVAC Repairs at Auditorium and Associated Roof Areas
Will Rogers Memorial Center
3401 Lancaster Ave.
Fort Worth, TX
Re: Letter of Proposal for Professional Services
Mr. Clements,
We propose to provide architectural / engineering services inclusive of the following professional
services for Design, Bidding, and Construction Administration for the above referenced project.
DESIGN PHASE (Based upon a preliminary estimate of$700,000 for roofing)
Schematic Design (35% Submittal)
• Site observation by PE to review existing mechanical systems and roof
penetrations. Note any equipment to be abandoned.
• Evaluate the existing insulating value and determine the new R-value according to
the current code and project requirements.
• Determine wind uplift pressures to meet current code requirements.
• Modify primary and overflow drainage systems as required.
• Evaluate mechanical, electrical, plumbing requirements.
• Provide a 35%Design Submittal package to Owner for review including
recommendations for the appropriate roof system based upon the results of the roof
assessment.
• Provide a preliminary opinion of probable construction cost.
• Deliverables will include a roof plan with general details for replacement and a
general description of the scope of work, materials, and the standards.
• Meet with Owner to make any necessary modifications to the documents.
PROPOSAL FOR CONSULTING SERVICES PAGE 1 WRMC Auditorium
Design Development (75% Submittal)
• Provide a 75% Design Submittal package to Owner for review.
• Documents will include a roof plan with details for each specific condition for
replacement and specifications including a detailed description of the scope of work,
materials, and the standards including any necessary Electrical, or Plumbing work.
• PE will develop an alternative design for outside air intake hood at AHU, and
provide a report with recommendations, photos, and opinion of probable cost.
• Meet with Owner to review report and determine a scope of mechanical work and
make any necessary modifications to the documents.
Construction Documents (100% Submittal)
• Provide Final signed and sealed contract documents and contract forms required by
the Owner.
• Provide Project Manual and Drawings to Owner for review and acceptance.
BIDDING PHASE
• Conduct a Prebid Conference with the contractors on site.
• Make any clarifications and/or modifications in addendum form during the bidding
process.
• Provide a bid review summarizing the bids, review and qualify bids, and include a
recommendation for the successful contractor.
CONSTRUCTION ADMINISTRATION PHASE
• Conduct a Preconstruction Conference at the jobsite.
• Review and approve contractor submittals and shop drawings. One (1) initial
submission and two (2) resubmissions included in this proposal.
• Provide project management services including coordination between Owner and
contractor, respond to Requests for Information, review and approve payment
requests, and process any contract modifications.
• Provide site observations at critical points as scheduled during the progress of the
work as determined by the Architect (maximum of one (1) roof observation per week
for roofing). Provide a report with color photographs electronically.
• Provide (1) one site observation as scheduled during the progress of the
mechanical work as determined by the PE (Provide a report with color photographs
electronically.
• Provide a Substantial Completion Inspection with a punch list. Provide a report with
color photographs.
• Provide a Final Inspection to verify punch list items have been completed in
accordance with the contract documents. Provide a report with color photographs.
• Assemble close out documents and warranties and provide to Owner.
PROPOSAL FOR CONSULTING SERVICES PAGE 2 WRMC Auditorium
WE PROPOSE TO PROVIDE THE SCOPE OF WORK DESCRIBED ABOVE ACCORDING TO
THE FOLLOWING FEE SCHEDULE:
Professional services including Design, Bidding/Negotiation, and Construction Administration
will be provided for a lump sum fee equal to Fifty-Two Thousand, Three Hundred Dollars and
No/100's ($52,300.00) as stipulated below including reimbursable expenses. The fee shall be
paid based upon the following schedule:
Design Phase $ 32,800.00 Billed upon phase completion
Schematic Design 11,480.00
Design Development 13,120.00
Construction Documents 8,200.00
Bid Evaluation $ 2,500.00 Billed upon completion
Construction Administration $ 17,000.00 Billed monthly according to
percent complete
Thank you for considering Rooftech, and we look forward to working with you in solving your
roofing problems. Please read the attached Conditions of the Contract before signing this
proposal.
o
Respectfully Submitted By
Cindy L. Chadwell, AIA,
RRC Rooftech,
President/CEO
PROPOSAL FOR CONSULTING SERVICES PAGE 3 WRMC Auditorium