CSC No. 57957
UPRR REMS
Project 785653
REIMBURSEMENT AGREEMENT
PRELIMINARY ENGINEERING SERVICES
Effective Date: 8/8/2022
Estimate: $25,000.00
THIS REIMBURSEMENT AGREEMENT (Agreement) is made and entered into as of the
Effective Date, by and between UNION PACIFIC RAILROAD COMPANY, a Delaware
corporation (Railroad), and CITY OF FORT WORTH, TEXAS (Agency).
RECITALS
A. Agency desires to initiate the project more particularly described on Exhibit A
attached hereto (Project).
B. The Project will affect Railroad's track and right of way at or near the Project area
more particularly described on Exhibit A.
C. Railroad agrees to collaborate with Agency on the conceptualization and
development of the Project in accordance with the terms and conditions of this Agreement.
AGREEMENT
1. NOW THEREFORE, the parties hereto agree as follows:
2. Railroad, and/or its representatives, at Agency's sole cost and expense, agrees to
perform (or shall cause a third-party consultant to perform on Railroad's behalf) the preliminary
engineering services work described on Exhibit B attached hereto (PE Work). Agency
acknowledges and agrees that: (a) Railroad's review of any Project designs, plans and/or
specifications, as part of the PE Work, is limited exclusively to potential impacts on existing and
future Railroad facilities and operations; (b) Railroad makes no representations or warranties as
to the validity, accuracy, legal compliance, or completeness of the PE Work; and (c) Agency's
reliance on the PE Work is at Agency's own risk.
3. Notwithstanding the Estimate (Estimate), Agency agrees to reimburse Railroad
and/or Railroad's third-party consultant, as applicable, for one hundred percent (100%) of all
actual costs and expenses incurred for the PE Work. During the performance of the PE Work,
Railroad will provide (and/or will cause its third-party consultant to provide) progressive billing to
Agency based on actual costs in connection with the PE Work. Within sixty (60) days after
completion of the PE Work, Railroad will submit (and/or will cause its third-party consultant to
submit) a final billing to Agency for any balance owed for the PE Work. Agency shall pay Railroad
(and/or its third-party consultant, as applicable) within thirty (30) days after Agency's receipt of
any progressive and final bills submitted for the PE Work. Bills will be submitted to the Agency
using the contact information provided on Exhibit C. Agency's obligation hereunder to reimburse
Railroad (and/or its third-party consultant, as applicable) for the PE Work shall apply regardless
whether Agency declines to proceed with the Project or Railroad elects not to approve the Project.
OFFICIAL RECORD
CITY SECRETARY
1 FT.WORTH, TX
DocuSign Envelope ID:52E2A6BB-3EF3-477D-BF71-34CA98612EB7
4. Agency acknowledges and agrees that Railroad may withhold its approval for the
Project for any reason in its sole discretion, including without limitation, impacts to Railroad's
safety, facilities, or operations. If Railroad approves the Project, Railroad will continue to work
with Agency to develop final plans and specifications, and prepare material and force cost
estimates for any Project related work performed by Railroad.
5. If the Project is approved by Railroad, Railroad shall prepare and forward to
Agency a Construction and Maintenance Agreement (C&M Agreement) which shall provide the
terms and conditions for the construction and ongoing maintenance of the Project. Unless
otherwise expressly set forth in the C&M Agreement, the construction and maintenance of the
Project shall be at no cost to Railroad. No construction work on the Project affecting Railroad's
property or operations shall commence until the C&M Agreement is finalized and executed by
Agency and Railroad.
6. Neither party shall assign this Agreement without the prior written consent of the
other party, which consent shall not be unreasonably withheld, conditioned, or delayed.
7. No amendment or variation of the terms of this Agreement shall be valid unless
made in writing and signed by the parties.
8. This Agreement sets forth the entire agreement between the parties regarding the
Project and PE Work. To the extent that any terms or provisions of this Agreement regarding the
PE Work are inconsistent with the terms or provisions set forth in any existing agreement related
to the Project, such terms and provisions shall be deemed superseded by this Agreement to the
extent of such inconsistency.
IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the
Effective Date.
CITY OF FORT WORTH, TEXAS UNION PACIFIC RAILROAD COMPANY,
a Delaware Corporation
D—Signed by:
06L W1�/t�A fib�ewiy
Dana Burghdoff(Afg 2,202 6:03 CDT)
r=e
Signature igna E u0reFT
Dana Burgdoff Erik Lewis
Printed Name Printed Name
Assistant City Manager Manager I, Engineering — Public Projects
Title Title
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
2
DocuSign Envelope ID:52E2A6BB-3EF3-477D-BF71-34CA98612EB7
APPROVAL RECOMMENDED:
By: William johnson.(AL 2,202211:35CDT)
William M. Johnson, Director
Transportation and Public Work
APPROVED AS TO FORM AND LEGALITY:
0/1
By: Mack(Aug 2,2022 15:43 CDT)
Douglas W. Black
Senior Assistant City Attorney
FORM 1295: N/A
CONTRACT AUTHORIZATION
M&C: N/A
Date Approved: N/A
d °0000000� Y
ATTEST: p�a°° 00 0
0
�o o-+
By: J ette S.Goodall(Aug 3,2022 18: DT) v o o
0
° o 'J
Jannette Goodall k� °°° o �`City Secretary �� 0000000 0�
EXA a�
CONTRACT COMPLIANCE MANAGER:
By signing, I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting
requirements.
By: David J.Kastendick(WI,2022 16:20 CDT)
David J. Kastendick, P.E.
Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
3
DocuSign Envelope ID:52E2A6BB-3EF3-477D-BF71-34CA98612EB7
Exhibit A
Project Description and Location
Project Description
City of Fort Worth, TX proposes to construct a pedestrian pathway across Railroad's tracks at
the crossings referred to below.
Location
Midlothian Subdivision
Crossing
DOT Type Milepost Street Name
912112T Public 47.49 Campus Drive
765265R Public 47.10 Seminary Drive
DocuSign Envelope ID:52E2A6BB-3EF3-477D-BF71-34CA98612EB7
Exhibit B
Scope of Project Services
Scope of work includes, but is not limited to the following
• Field diagnostic(s) and inspections
• Plan, specification, and construction review
• Project design
• Preparation of Project estimate for force account or other work performed by the
Railroad
• Meetings and travel
DocuSign Envelope ID:52E2A6BB-3EF3-477D-BF71-34CA98612EB7
Exhibit C
Billing Contact Information
Name David J. Kastendick, P.E.
Title Project Manager
Address 200 South Texas Street, Fort Worth, TX, 76102
Work Phone (817) 392-5448
Cell Phone (682) 213-0723
Email David.Kastendick@fortworthtexas.gov
Agency CPN 104218
Project No.