HomeMy WebLinkAboutOrdinance 6446 ORDINANIff NO,,
ORDINANCE ACCEPTING iMPRUVEMENTS ON A PORTION OF
AND PORTIONS OF' SM)RY OTRER STREETS, MENUES AND PUBLIC PLACES
IN THE CITY OF FORT WOR"111, TL"S; DECLARING TliE C(MRACT WITH
J. L. BERTRAM CONSTR. & ENG. CO. FOR THE CONSTRUCTION OF SAID
IMPROVEMENTS FU1,LY C(WF[Y.TED AND PERFORM,'D, DIRECTING I'HE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL
ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN
AUTHORIZED AND ALLCUED AG'AINST SOME OF SAID ASSESSMENTS; DIRECTINCI
THE CITY SECRE"'WLY 110 ENGROSS AW) ENROLL THIS ORDINANCE BY COPYING
THE CAPTION OF SAME IN THE MI NUIT BOOK OF 'THE CITY COUNCIL OF
FORT WORTH, TEXAS, AND BY FILING TYL COMPLETE ORDINANCE IN APPRO-
PRIATE ORDINANCE RECORDS OF SAID CIT'?'; AND PROYVIDING AN EFFECTIVE
DATE,
WHEREAS, thou: Gity of Fort Worth, Texas,, has heretofore entered into a contract.
with J. L. Bertram Construction & Co. fcr the making and construction of certain
street improvements on the hereii,,,haftei,, described portions of streets, avenues and
public places in said City,
UNIT I-A: SHAMR(X,K AVENUE Froa� University Drive to Foch Street,
kno%na and designateiJ as Project No.
104-24000-L85, Unit 1-A.
UN'l,"r 1-B: SHAMROCK AVENUE From Foch Street to Vacek Street ,
known and desily'nated as Project No. 104-
24000-185, Unit I-B.
UNIT 1-Cl: SHAMROCK AVENUE From Vacek Street to Rupert Street,
it.nown and designated as Project No. 104-
24000-185, Uyait- I-C.
ITNIT 2: RU"Nrl' STREET 1?roat Shamrock Avenue ro Ci,illen Str(,,�eL,
1(nown and designated as Project No. 104-
24000-185, Unit 2.
UNIT 3: VACI.K STREET' Froni Cullen Street to Shamrock Aveniic-�,
known and designated as Project No. 104-
24000-185, Unit- 3.
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
47'ity of Fort Worth, Texas, including Ordinance No. L31�L,_, a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council, of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial Justice
and equality, it is desirable an(l necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. .. 6314 , and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in ccniiplete accordance with the contract therefor;
NOW, THEREFORE,
BE I T ORDAINED BY THEE CITY COUNCIL OF THE GITY OF FORT WORTH,
TEXAS, THAT-
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance- with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall. describe the property againat which the assessment has been levied, shall,
where known, state the n'ame or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount: equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with tt�e property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any,, are ho�reby enumerated and itemized as follows.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City,
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS day of 19
APPROVED AS TO FORM AND LEGALITY:
City Attorney
_PROJECT Cl. 104-24000-38.5 UNIT tCy "waahL% I STtILI rROM CIIP STREET p SwIIIIDrId AVENUE
�.o be .improved by constructing a six-inch thick reinforced concrete pavement, on a six-Inch
thick lime stab� l-,I zed su,bgra de with a seven-,inch h hf,gh superimposed cur-b, so that the f.l.nlsh-
ed street will consist of one forty 1"oot wide rt,,wad ayr.
BLOCK
K
OW'NE'R LOT ZONING FRONTAGE RATE AflyOUNTI' A S S,ES S ME 'T
REGINNI C AT SOUTIWESR CORNER OF VACEE, STREET AND C17LLEN S°y"umIr
'ST SIDE OF STREET BAILEY'S INDUSTRIAL ADDITION
Lemno, Inc. 6-Tt III 343.4' Adjusted to
700 Throckmorton TI" . 332.4' Pavement $15.61 $5,188.76
76102 303.4' Curb .96 251..26
SHAMROCK VENUE INTERSECTS
EAST SIDE OF STREET
3ah,ns SUPPlyu CO. 1 R 19 :3:33.4' �"adJusted to
��� $5,,032.66
P.C. Box 1717 y.8 InR. ;�2�'2 �a' I!"e�vear�w�erat "�.3.Q��'�..
76101 260.4,' Curb .96 249.98
$5,282.64
COST TO PROPERTY OW EM . ASSTS"an" L '"IS . . . . . . . $1,0,762.66
COST "r,'p CITY OF I°OR',,I WORTH . . . . . . . . . . . . a
ESTIMATED C ON TRUM.'10N (,OS"1,` - MIT 3 . . . . . . . $10,326.21
7
PROJECT N0, 104-24000:185,L
I���1T NC
. . 4: FOCH STREET STREET FROM, C ALLEN S HEET TO SIiA MROCK AVENUE,
to be improved by constructing a six-inch thick reinforced concrete pavement on a six-inci�t
thick lime stabilized sabdrade with a seven-inch 1°tigh superimposed curb, say that the finish-
ed street will consist of one forty food: wide roadway.
BIOCK
OWNER LOT ZONING FRONTAGE RXrE AMOUNT ASSESSMENT
BEGINNING AT SOUTHWEST C(:RNER OF 'FOCH STREET AND CUUEN STREET
WEST SIDE OF STREET BAILEVS INDUSTRIAL ADDITION
Merchants Fast 7 6 340.8' Adjusted to
Motor Lines Ind,� 323.8' Pavement $15.6,1 $5,054.52
P.O. Eon: 270 298.8' Cur's .SS 286.85
Abilene, Texas 79604 $5,341.37
SHANRUCK A ENT,I'E INTERSECTS
EAST SIDE OF ST'UET
Fort Worth 1-R G 11 338.5' Adjusted to
Associated 10,-R Ittd. 334.5' Pavement $15. 51 $:;x,221..55
Properties, Inc. 3,02.5' C'ur'b .SS 290.4
200 N. Poch Street $51)511.91)
Fort Worth, Texas
78107
COST "'2O PROPERTY (M EIS - ASSESSMENTS . . . . . . . . . 10,853.32
COST TO CITY OF FORT WORTH . . . . . . . . . . . . . . . 901.81
ESTIMATED CONSTRUCTION COST - U141T 4 . . . . . . . . . . .$11,755.13
8
--......
PROJECT N0. 104-24000-185, CY1�"" CD._...5._ .. I?*ILRI.Y STREET FROM CULLEN s,rVU E " TO SITAMROCK AVENUE
to be improved by constructing a six-inch thick reinforced concrete pavement on a six-inch
thick lime stabilized subgrade with a seven-inch high superimposed curb, so that the finished
street will consist of one forty foot w:6,de roadway, and by constructing six-inch thick concrete
driveways where specified.
BLOCK
OWNER LOT ZONING FROq'rA E RATE A14OU ASSESSI S"'f
BEGINNING AT SOITrHWEST CORNER OF W:11111F,RLY STREET AND CULLEN STREET
"ST S117E OF STREET 1:12.Y'S INDUSTRIAL ADD'IT1.011
Southwestern 2-E A 175.7' Pavement $15.61 $2,711.46
Laboratories 1;n1. 179.7' Curb .96 166.75
2901" Cullen Street 20 Sq. Ft. Drive .85 16.60
76107 $ 2,894.1$1,
Forbes Electric Co. 2-D A 173.8' Adjusted to
2712 White Settlement Ind. 165.8' Pavement $15.61 $2,588.14
76107 1.65.8' Curb .94 1.59.17
303 Sq. fat. Drive .83 251.49
$ 2,998.80
SHAMROCK AVENUE 1111T111S'ECT'S
EAST S117E OF STREET
11,r. ind Mrs. George 1 6 Pavement $1.5.61 $5,265.25
.25
T. Smith and 1:a°aa1. 5:17.11' Curb .96 12":.1.5'1.
F Joseph Coffman $ 5.589.1'11:",
P.O. Box 1-719
76101
COSp,11 TO PROPERTY OWNERS ASSESSMEMrs . . . . . . $i1.,41:12.67
COST TO ('11Trf OF FORT RT 11011".1°11 . . . . . . . . . . 041.2 .
EST 114A"'M1D CONSTRUCTION COST - 1111IT S . $12, 527.9,2
9
PROJECT NO. 104-24000-185 IM11" NO. 6: ri'LIAR STREET FROM WIMBERLY STREET TO FOCH STREET,
to be improved by constructing a six-inc1,i thick reinforced concrete pavement on a six-inch
thick lime stabilized subgrade with a seven-inch high superimposed curb, so that the fin-
ished street will consist oil one forty foot wide roadway, and by constructing six-inch
thick concrete driveways where speci.fied.
BLOCK
OWNER L(Yr ZONING' FRONTAGE RATE AMOU14T ASSESSEEK
BEGINNING AT NORTHWEST CORNER OF TILLAR s,rum AND WIMBERLY STREET
NORTH SIDE OF STREET BATLE S Y' INDUSTRIAL ADDITION
............... -
Fort Worth 2 4 188.5' Pavement $4.44 $836.94
Independent 'Yra. 1,88.5' Curb .96 180.96
School District $1,017.90
3210 W. Lancaster '76107
Fort Worth 1, 7, 7 501.4' Pavement $4.44 $2,226.22
Ind. School Dist. 8, 9 Ti—id'. 65.6' Curb, .96 62.98
3210 W. Lancaster & 10 $2,289.20
76107
FOCH STREET INTERSECTS
SOUTH SIDE OF STREET
State Reserve Life 1 & 2 8-R 463.35' Pavement $11.37 $5,268.29
Insurance Co. I.ed. 452.35' Curb .96 434.26
301. W. First Street 113 Sq. Ft. Drive .83 93.79
76102 $5,796.34
Obie P. Leonard, Jr. 3 8R 226.73' Pavement. $11.37 $2,577.92
C/o Leonard Enterprises Ind. 226.73' Curb .96 217.66
200 Houston Street $2,795.58
76102
COST TO PROVERI."Y OWNERS - ASSESSMIMS . . . . . . . . $ 11,899.02
COST TO CITY OF' 'F01,C` WORTIT . . . . . . . . . . . . . _j:3,0_'
L4-6
ESTIMATED CONSTRUCTION COST - UNIT 6 . . . . . . . . 24,933.6
10
PIWECT CIO. 104- 000-: 85 UNIT W. 7. TILIAR S1S C'r FROM VACEK STREET TO RUPEXT STREET
'6e
improved by constructing a sfx-�ine6 thick n.ozn:nfanrced cm.noan.rete pavement on a six-inch
thick nn e stabllized subgrade i t.wh a seven-inch, h.t, h superimposed curb, so that tie f ire she
street will consist of one forty, foot w.a.de roadway and by asnaist.ructin six-inch tivick
concrete driveways inhere specified,
BLOCS
OWNER LOT ZONING FRON AM:,. lUTE AMOUNT ASSESSNENT
3SGIN1D0 T NORTIRWEST CORNER OF TI LLAR STREET AND VACEK STREET
N(kTR SIDE OF STREEI" W 1:1aE s S INDUSTRIAL IA D11100'
� " .. `'�30' 'llaveweant $10,85 $5,750,50
"c.��€. F. Runyon . a tin.°ts.a �
3537 W. Seventh 18 64' Curl-) .96 61.44
76107 $5,811.94
Texas Sash arid U.) tuna a 18 430' 9'ave nnennt .$1.().85 $4,665.50
Door &.wiparty 13 Ind. 43U' Curb .96 412.80
201 X. Rupert $5,078.30
76107
SCPERT ST1 ET ZN1USSC''1S
SOUTH SIDE OF STREET
Sinnsn anger & Co. 9 & F. 5' 17 135' Pavement $10.85 $1:,4,64.7'5
of Texas of 8 Ina . 135' Corn 96 129.60
P.O. Box 847 $1,594.35
76107
Texas Driv--On~--Self, W. 95' of 1�7 145' Pavement $10.85 $1,573.25
Inc. 8, & 1q". 145' Curb .96 139.20
411 S.Bellinger St. 50' of 7 113 S . tat. Drive .83 9:3.73
76106 $1,.806.24
Lottie B. Johnson 5, 6, V . . 250' Pavement $1,0.85 $2,712.50
6216 Green way oad & W. 50, IanB. 250' Curb .96 240.00
76116 of 7 $2,952.50
1.1
PROJECT NO. 104-24000-185 KLNTj (L. 7: TILLAR STREET FROM VACEK STREET TO RUPERT S-rREE'r,
CONTINUED
E' CE
C34NER LOT ZONING FRO MIAGE RATE AMOUNT ASSESSIMT
SOUTH SIDE UF STREET BA I LE Y'S INDUSTRIAL ADDITIUN
II.C.S. Company 3 & 4 17 200' Pavement $10.85 2,170,00
c/o Judd Cramer 1 n7l—. 200' Curb .96 192.00
2510 White Settlement $2,362.00
Road 76107
Cook Paint I & 17 230' Pavemeat $10.85 $2,495.50
& Varnish Co. 2 i7lj-. 219' Curb .96 210.24
P.O. Box 271 $2,705.74
7'6101
COST TO PROPERTY MINERS - ASSESSMENTS . . . . . . . . . $22,311.07
COST TO CITY OF FOR WORTH . . . . . . . . . . . . . . . 7,747.00
ESTIMATED CONSTRUCTION COST - UNIT 7 . . . . . . . . . . $30,058.07
17
PROJECT NO. 104-24000-185 UNIT... O 1 SHAMROCK AVENUE FROM UNIVERSITY DRIVE TO A POINT
105' ST OF EAST PROI 111.Y LINE OF LOT.._...I�._B K. .1..2 ACT) TO A POINT 7 1' EAST OF EAST PROPERTY
..... �.�,... _ a � '� .DUSTR AL ADDITION, to be improved by constructing �a six-
inch OF LOT 7 BLOCS 6 BAI�`'"� � IND�:1SfB`1 �... .
inch thick reinforced concrete pavement on six-inch-.. �..
n a thick lime stabilized su1b1t„rade with a
seven-inch high superimposed curb, so that the finished street will consist of one forty foot
wide roadway and by constructing six-inch thick concrete driveways where specified.
BLOCK
OWNER LOT ZONING F11ORrAGE RATE A OU I~ ASSESSMENT
BEGINNING AT NO11'l`MAST CORNER OF SHAMROCK AVENUE AND UNIVERSITY DRIVE
NORTH SIDE OF STREET R, G„"ROWLEY SURVEY
Tarrant County Water Part of 663' No Benefit
Control Board "bract 1-A No Assessment
Danciger Building �., .�.... $, -0—
76102
BAILEY'S INDUSTRIAL ADDITION
Trinity Concrete W. 776.6' 1.2. 776.6' Pavement $14.89 $11,563.57
Products Co. of 'Lot 'ti l''nd. 760.6' Curb .116 730.111
F.O. Boer 47524 2365 Sal. Ft. Drive .113 1,962.95
Dallas, Texas 75247 $14,256.70
FOCH STREET INTERSECTS ON 'SOUTH
SOUTH SIDE OF STREET
Merchants Fast 1fotor 4, 5, 6 400' Pavement $14.89 $ 5,956.00
Lines 6 & 7 I
nd. :174' Gratis .116 159,04
P.O. Box 270 $ 6,315.04
Abilene, Texas 79604
Mr. & Mrs. George 1 , 2 6 290' Pavement $14.89 $ 4,318.1.0
T. Smith and & 3 2110' Curb .96 278.40
E1. Joseph Coffman $ 4,596.50
P.O. Box 1719
76101
WIMBE:RLY STREET INTERSECTS ON SOVrR
SOUTH SIDE OF STREET BAILEY'S INDUSTRIAL ADDITION
Forbes Electric Co. 2-D A 1.56.8' l'.s ement. $14.89 $ 2,334.75
2712 White Settlement Ind. 1.56.6' Curb .96 1.50-53
76107 715 ,Sq. Ft. Drive .83 593.45
$3,078.73
1
UNIT NO. IAS PROJECT NO. 104-24000-185 CONTINUED
BLOCK
OWNE R LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENr
SOUTH SIDE OF snEET BAI LEY"S 'INDUSTRIAL ADDITION
Tossco, Inc. 2-1c A 100.8' Pavement $14.89 $1,500.91
P'.0. Box 9404, 100.8' Curb .96 967.68
76107 688 Sq. Ft. Drive .83 '571.04
$ 3,039.63
Forbes Rebuilt 2-B A 100.4' Pavement $14.819 $1,494.96
Auto Parts, Inc y F1(f. L00.4' Curb .96 963.84
2712 White Sett;enient $ 2,458.80
76107
Tom-Ben 2,A A 1,03.4,' PaN�ement $14.89 $1,539.63
1000 Foch Street $ 1,539.63
761()7
George E. Grimes 1 A 135' Favement $14.89 $2,010.1.5
300 N. University Dr. Ian. 128' Curb .96 I22.88
76107 155 Sq. Ft. Drive o83 128.65
$ 2,261 .68
COST TO PROPERTY OWNERS - ASSESSMENTS - UNIT 1-A $37:,546.71
2
PROJECT NO._W 104-24000-L85, .UNIT-.NO. ..I�B.... ..SHAMROCK U PRO) A POI 1"0 ° WEST OF ,EAST,
i`lROPERTY LINE OF L° 1?, _ -W.A�__.....-- V T O LAST PROPERTY L11M OF
.-.
_. _. _-
_lYT BliiC1C. �2 -.AND FROM A �01111"
LOT 7 L,BLOC �6BAII.,EY'S INDUSTRIALADDITION TO EAST PROi" ,R,:... LINES- OF LOT 10L LOO µ 12,
A' Lt's 6 P y P a
_..w .� 1t BLOC. .1 a,.. All . .'S INDUSTRIAL ADDITION to he improved V� constructing
sixr��inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade
with seven-inch high superimposed curb, so that the finished street will consist of one
forty-five foot wide roadway, and by constructing six-inch thick concrete driveways
where specified.
BLOCK
.._�,;.OMR _Lt..,.T Z O.N. I1 iO F. .1..0NTAGE PATE AHOUNr ASSESSMENT
_.
BEGINNING AT STATION 15+30.5 OF SHAMROCK AVE 111°V W. OF ;ti:',T 2, 1'4iLK. 12, BAIi<EY's
INDUSTRIAL ADD,
NO 1H.SIDE Of'..,STREET BAILEYS TNDUSTRIAL mADDITION
Trinity Concrete E. 101 ' 12 105' 'Pavement $15.44 $1,621.20
Products Co. of loot. 1.tt���� . 105' Curb .116 100.810
P.O. Box 47524 1 51.0 Sal. Ft. Drive .83 423.30
Dallas, Texas 75247 $2,'x.45.30
Gachman Metals Co. 2 12 900' Pavement $15.44 $13,896.00,
P.O. Box 308 thru I . 600' Curb .116 576.0 '1
76101, 1.0 $14,47 ?.00
VACEK STREET INTERSECTS ON SOUTH
SOUTH SIDE OF STREET
Lemno, Inc. 4-R 14 700' Pavement $1e5.44 $10,808.00
200 Throckmorton & Ind '700' Curb .96 672.00
7 $11,4811.0 '1
61.02 6-'i1
Fort Worth 1.-R, 1.1 305' Pavement $15.46, $4,7()9.20
Associated 2-R T��j. 280' Curb .96 277*44
Properties, Inc. & 3_,R 394 Sq. 'ft. Drive .83 32.7.02
200 N. Foch Street $5'313.66
76157
d:Gs"I TO PRC11T1'RTY OWNERS - ASSESSWWTS - UNIT 1B $33,41.0.116
3
l RODE' 1 NO� 04 24(' ,i0-185� UNIT IC: SHMUtOCK AVENUE FROM FAST PROPERTY L S OF 1 r 10,
. . .�� �. . _ . .., BLOCK .. .._..m .S .RIA1..ADDITION� ,.. � ....UTE P 'P i k' LINE Off"
SLOG 1 � LOT im S � 1ilGbii�7 � 1� � P1i ��.,.�.
LiJ °r, BLOC -13 AND TIT, NC RTMA11"
,A ... a1PJER.w_ O.�.. �L..mO..�.�1"S.a.a 1iO1'K 19 A.�.I,.LE. ''S. INDUSTRIAL
L
A�II��1N to 1e improved b constructing
a siam-i.rnc.i°a thick concrete pav mm"--mrt
on .ma six-inch thick lime stabilized m+mmkagrade with a seven,—mtimtc'h high superimposed curfir,.
so tlr t tiarrs finished street .i.'ll, consist of w.re orty . i.%, foot w[de roadway and by
constructing siren imrcir thick concrete a1ra_rrewarlt where inrrc.i5ied,
tr1i5'S1i LOT ZONING in°i111'NTAG'E RATE AMOUNT ASSES11i'ENC
BEi111i'ti'ING AT STATION 25 .i.. ..156 OF SHAMROCK ii i:ailiiii(tat. 1,1"NE OF LOT :11, 'BLK. 1.2, BAILEY'S 1Pi1.
NORTH SSIDE OF S i1P'1 BAILEY'S INDUS iUL ADDITION ul i ii)
.achrrnarmr Metals Co. 11 & 12 200' Frrvemrent; $3.5.15 $ ,t 3" 0.00
P.O. Box 308 12 ir 11:5' ilarr:.L .96 108.48
76101 $ ,138..48
G cirman Steel Co. 1.3 & 1 2 200' Pavement :35.'15 $3,�r30.00 1.
P.O. Bo 308, 13-C imId. 200' barb .96 1.92.00
76101 588 Simi• Ft. Drive .83 1488..t9
O'Grady ConR:ainmrr..s_ , 13 30' Pavement $15.1.5a 4,999.50
1�ii U
11xC. 2--B yc Frr„i«. :330' Curb .96 316.80
P.31. Box 5466 3mm'Bi $5,31.6.5�':B
76107
O'Grady Cantainers, 4,-B 269,3' Adjusted to
Inc. Ind. 2101 Pavement $1.5.15 $3,181.50
P.O. Box a,�466 ;iii'r' Curl) ,96 7311.60 $3,383.10
5,, �i'GS.i_ii
Stafford M. Page 5 less i 8..._ 181.8' Pavement $15.15 2,354. i7
7ir15'1 Trail Lake Dr. i'tO Ind. 1.733,x1' Curb' .96 3.83. 7
u 7.,' �.$. ia.
4
PROJECT NO. 104-24000-185 SHAKROCK AVENUE COO CINUED
BLOCK
OWNER LOT ZONIM"; FRONT GE RAI I AMOUNT ASSESSNEITr
STATION 36 + 92.2 - END OF MM'ROCK AVENUE PA VI NG
SOUT'll SIDE OF STREET BAILEY'S INDUSTRIAL ADDITION
W. E. Sbielcls, Jr. 91-A 19 106.9' Adjusted to
P.O. Box 9047 Ud—. 1.00' Pavement $15.15 $1,5 1,5.10
76107 95.9' Curt) .96 92.06
413 Sq. Ft. Drive .83 342.79
1,949.8 5
Harry Rubin, Et al Residue 19 57 .9' Adjued tee to
3704 Autumn Dr.
of 9 30' Pavenient $15.15 $ 456.50
76109 30' Curl.) .96 28.80 $ 483.3()
Harry Rubin, et al 7 & 19 200' Paveuwmt $15.15 $3,030.00
37014 Autumn Dr. 8 1 200' Curb .96 19MO
76109 219 Sq. Ft . Drive .83 I6I.77 $3 4 03.7 7
Stanley & Prior, 4, 5 19 300' Pairement $15.15 $4,545.00
Incorporated & 6 300' C urb .96 288.00
2416 Cullen Street 353 Sq. Ft. Drive .83 292.99 $5,12'15.149
76107
Jahn s SUpply CO. 1, 2 19 330' Pavenient $15.15 $4,999.50
P.O. Box 1717 & 3 3�30' Curl) .96 316.80 $5,316.30
76101
COST TO PROPERTY OWNERS - ASSESSMIMTS - ONIT 1--C $34,745.37
5
1C.1 aE R " 'w 1 Nr 1.1 �' 1 1 u H � 118 ....°�`w �IIA�1,RQ( 1 AVE 1 3a a "1
�aiJ111'.� si" ccii X11 1' ud1 �. ( P�1, G" � �" +"G r( �� l '.D�`�Cf 1��.`%� "r ,( .. 'm_ " �r � `�.�mm"P LIL � `^
�k""�1"u"1„h��1�� I!n��" ������i� 61' �m ,�� � V1� �b �� '��1ri � S � w:uJ 1 nH nn.�;l,r�upreu1 ryr7�, uurr�rutruu"t1.wng a s;(.x w.zaa^1n ur1,,,n:1.c1an
° 1.wifor ed coy.'ocue . pavement n v, a°�wR sr��wch Chic �urad ��n
� .1r lime wna,w� > �:em�°D.� � �,�,rv�re� ��w���� "� lrt. a sevww....
£.ndi hie; sunluuuu.1uA41ua~xsed curb, uu,o that the finished street will, (',. ownPrist or uuuwnu forty foot
wide roadway and by constructing ng s -:-luuch tfluPuu'k n.uuwuaruun~te i've ays wl'iere specifted.
1 1..111"' 2Z 21H 1 ;','w F 1'w' w " `w." MU'U2 ESSME
BEGINNINCo XT 111111 mom.ST CORNER OF 1..uYr 1 W 11L1uuCX 20, Bu1.,1nL1.'11aa3 1J,4rm.715 11.1,.. 1.. ADDITION (STATION
EAST SIDE OF STREET�i��T BAIL1's"ti. 'S IXI' M' ry.'F.k'"w1 �,�1D)1 7wu�)N
X1'1°n e P. Leonard, Jr. 8.0 of 20 Sao No ACC MIS
c/o Leonard T,,'nterprises So 1A No twnwNesuuati„ivu°u';
200 Houston 1a 1:!ree Corner uu
76102 Lot 1
,ua1a'„.8' 1;"�Jswv �.nt $14. �4,240.67
." �m .
nwl�± �aumwuuuunua� W�n,a;1. �'�a.'14gx~,m �� 234.0'
EntmpHses 14,474.72
200 11custon Street
76102
1 1'LLE.,1`'1 STREET IM711SECTS
14711I1. '°',1” S X11'2 911" REE"-I„
M E. Shields, Jr. Residue 19 481 Psvr urcue n ` $14.S9 $ 714.72
I' D Box 9047 of 12 23' Curb .96 2 2.W,"M
72107 $ 736.80
Wm H. ShIs de, Jr. 9-A 19 1,22' Pavement 114. 9 $2,709.98
2.2. M9047 1un1. 182' Curb 96 17 4.72
76107 424 q. pmt . Drive .63 351 .92
$3,236.62
COST TO PROPERTY Y u,W2HI,3 1121 221v112 ""1"2 1111 T 2 8,440.14
COST TO w:"ROb'E R 1 u" DVRNY,W", - Tn x,'71`5, IA,
1 B 6. 1-C $105,703.04
COST TO CITY 111.. FORT W' 'M°'H, S '1"- `[IR11 2 �442-8111 4,_ w
1n1ST7.114AT'1,, 1.a1"NS 1'111C:M O!1, �, 1. 14 .. 11sa,r11 I-A TH II 2 112f,965.43
r1
UNIT 4. FOCH s,rRFET Frotm Cu.] lean Street to Shamirock Avenue,
kmown and desigInated as Project No. 104--
21+1000,L8 5, Un'L t 4.
ul�U'r 5- WLRBERLY STREET Froun C,.ro ll.len Stt'eet to Shamrock, Averme,
Immin and designated as Project No. 104--
24000 11859 Unit 5.
U" IT 6: 1,1 L Uk R ST RE ET Frcmr, WiTuberty Street to Foch Str,eet,
known and designated as ProJect No. 104-
24000-185, Unit 6.
UNIT 7: T'ILLAR STREET Fnxn Vacek, Street to Rupert Street,
known and desl�,�,nated as Pro3ect No. 104-
24000--]J35� U'nit 7.
City of Fort Worth, Texas
'UNIt Mayor and Council Communication
60MA DATE REFERENCE SUBJECT: Final Payment — Assessment PAGE
• NUMBER
3/8/71 FP-792 Paving at Various Locations in I of 2
Bail
Industrial Addition
Final Council action on the project described below is requested.
Project Description
Name: Assessment' Paving in Bailey's Industrial Addition,
Project Number_104-24000-185
Contractor: J, L. Bertram,Construction and Engirrear-ing, Inc,
Contract Awarded: May 18, 1970 (M&C C-1737)
Work Order Issued: August 12, 1970 (Partial Work Order,' Units 1, 3
and 6)
September 1, 1970 (Partial Work Order, Units 4
and 5)
October 28, 1970 (Full Work Order)
Work Order Effective: August 21., 1970
Working Time Bid: 150 Working Days
Working Time Used: 77 Working Days
Additional Information on Work Orders: The three month delay between the
contract award and the partial work order was due to a delay in making the
necessary utility adjustments. After issuance of the first partial work order,
as utilities were cleared, additional partial work orders were issued to allow
the contractor to continue work.
Project Cost and financLi�&
Original Bid Price: $224,963.15
Change Order No. 1: + 1,732,00 (88 L.F. 18" RCCP, 2 ea. 5' Inlets on
Unit 1; A.R. 1-15, 2;3.1, 9/16/70)
Change Order No. 2: + 1,050.00 (60 L.F. 18" RCCP, 1 ea. 5' Inlets on
Unit 1; A.R. 1-15, 2.3.1, 10/5/70)
Adjusted Bid Price: $227,745.15
Final Construction Cost: $225,969.47
Penalty for Deficient
Paving Thickness: 56.95 (113.89 S.Y. @ 5.72" Thickness)
Final Contract Cost: $225,912.52
Partial Payments Previously Made: 5 Amount: $207,696.57
Final Payment Due: $ 18,215.95
Sufficient funds are available for the final payment to be made from Project
Account Number 104-240G,0-185.
Deviation from Bid Price: The final cost of this project is $1,832.63 less
than the adjusted bid price. This cost difference is attributed to minor
variations between quantities estimated in the contract documents and
quantities actually measured and used at the job site.
DATE REFERENCE SUSJECT Kift4l Payment - Assessment PAGE
NUMBER
Paving at Various Locations in 2 f
3/8/71 FP-792 Bailey's Industrial Addition
Compliance with _Sp�eL ications
During testing on this project 65 corings were made with the following
results:
Exceeds Even with Under Specs But Below
Specs Specs Within Tolerance Tolerance
Paving 45 13 5 2
Sub-grade 29 36 0 0
On the entire project the average thickness of the reinforced concrete paving
is 6.24 inches as compared to the 6.00 inches specified, and the average
thickness of the lime stabilized sub-grade is 6.09 inches as compared to the
6.00 inches specified. Tests made during construction show that materials
used were in compliance with contract specifications.
As noted under, "Project Cost and Financing" the contractor has
paid a $56.95 penalty for the deficient paving thickness shown
by these two corings.
Recommendations
It is recommended that the project 'described above be accepted by the adoption
of an ordinance and that final payment of $18,215.95 be authorized to
J. L. Bertram Construction and Engineering, Inc.
HDPI:ms
SUBMITTED BY: DISPOSITION�,BYCOUNCIL: PROCESSED BY
4E!r-APPROVED ❑ OTHER (DESCRIBE)
CITY SECRETARY
DATE
CITY MANAGER