HomeMy WebLinkAboutOrdinance 7246 ORDINANCE NO,
ORDINANCE ACCEFrING IMPROVEMEtraS ON A PORTION OF NORTH CO,WRCE STREET
AND PORTIONS OF SUNDRY o,rHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE' COUrRACT WITH
AUSTIN ROAD COMPANY FOR LIU. CONSTRUCTION OF
SAID IMP—RUVE'M-E—N'-T"S—'F--U-I-,"1:—f-�'C'-O'—MP 1,C Z E`-D'ANT` PERFORMED; DIRECTING THE
ISSUANCE, EXECUTTON AND DELI'flRY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSNSNTS LEVIED AFTER, GIVING EFFECT TO SUNDRY CREDITS
PEREIN AUTHORIZED AND AULOWED AGAINST SOME C(F SAID ASSESSMENTS;
DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE
BY CO?i'ING' THE CAPTION OF SAM 114 Tfffi MrWAJTE BOOK OF' THE CITY
COUNCIL OF FORT WORTH, TEXL'3, A10 5`1 F,,"ILING THE COMPLETE ORDINANCE
IN APPROPRIATE ORDINANCE RECORDS Of' ISAID C1171f�, ANI) PROVIDING AN
EFFEECTIVE DA'YEa
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with Austin Road Cons for the making and construction of
A,uy.......___....................
certain street improvements on the hereinafter described portions of streets, avenues and
public places in said City, to-soit-
UNIT IA: NORTH COMMERCE STREET From Northeast 28th Street to Northeast 29th Street,
known and designated as Project No. 104-24000-238,
Unit IA.
UNIT 1-B: NORTHEAST 38TH STREET From 628' east of North Main Street to North Grove
Street, known and designated as Project No. I04-
24000-2:x'8, Unit 1B.
kHEREAS,-by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No. 7112 _, a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
4fflEREAS, the City Council of the City of Fort 'qorth, Texas, has, upon review,
found and determined that., in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 7112 , and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IN ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
Ii.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed andshall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates,, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
pr1ce.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and aft,--�r
the date of its passage.
PASSED AND APPROVED THIS day of 19
APPROVED AS TO FORM AND LEGALITY:
City Attorney
104-24000"235 UNIT TA, Diu r �� ? m. t7' t'° k�" 28,,17
a 4 V n � w. y
� M
" `"7l'',T to b6 i prow d by ccnr.dru,nctiuw7, ;�I,nft,.,hic.7. Wt tic concr,st
�mmt° on a four-inch thick crushed limestone° i7��xi a, bass, with savan.-ina h high conczft ,
curb and eighteen-inch wide, concrete, gtitttr can a forty foot roadway. Six-iuuGwch t,h,,iz con,
crete driveways will be constructed where specified.
RL00
Situ °777 77:77S S (XK" R
Begi ni Ng at tiie northwest cormir of Cc e:rc n and 377
F.F.F. Corporation 8-B 325° Fairemrant r71 .51 $4,715.75
700 E. Lancaster lord. $4n715.?5
76102
". .F. Corporation 7m'3 0.7' Pwve r nt 14.51 $ 735.66
.66
100 E. l nc.ns ,gar Ind.
76102°
F.F.F. Corporation 6 52.1' Pav aymmt $14.51 $ 7.55.97
100 E. 'Lancaster Ind. $ 755.97
76"102
F°.I'.r. Corporation 5 54.3' Pavelmnt $1:4.51 $ 787.89
170 F. Lancaster Ind. 16' Curb & 0nitnrr 4.19 67.04
7 102 $ 854.93
Killer fealty 4 56' Favement $14.51 $ 812.56
c/o H rold C. Miller Ind. 56' � urb & Gutter 4.19 234.64
'7060 Hardisty
76118 $1,047.d"'O
Miller Realty Co. 3 55.7' pnvewmt $14.51 $ 808.21
c/o Harold C. Miller Ind. 55.7' Clirlb & Gutter 4.19 233.38
7060 H rdicty
76118 $1,041.59
PROJECT NO. 104-24000-938 1 T IA' WACIIH C(,XTERCE SIN.EET ,"R()14 IV 28TH STREET TO Nh 21'Y,('1j
S, I Cont iniaed-
BLOCK
OIWNER LOT 111111:1±71'.1 FROINIY1,('E 1'4"^IT3 AMOUNT ASSESSIENI,
S OUTH SIDE ST(XKWiR,DS SUBDIVISION
............
miller Realty co. 2 53.6' Pavement $'14.51 $ "777.74
c/o 1],-ii,old C. Miller 53.6' (3,urb & Gutter 4-.1.9 224.58
2060 Hardisty $1,002.32
761.1.8
Mill,er Realty Co. 1. 1,82.3 ' Pavement $14.51. $2,6145.17
c/o Ilarold C. mi'ller Yi_vf. '182.3' Curb & Glutl"er 4.19 7'63.84
7060 liardisty
761,18 $3,409.01
DTF,' 29th Street intersects,
11()RIII SIDE If. C. JOBE SURVEY.mm
Miller Realty Go. a e t 9 1,00' Pavement $14.51, 1,1,451.00
c/o .1-faro7_d C. Miller' 100' Curb EL Gut ter 4.19 4 1,9.00
7060 Ifardisty
76118 $1�870.1)0
1701U WGRTH ST(KKYARIXII) CaMPANY ADDITION
miller Realty Co. 1M 11 724' Paveim,,nt $14_51. $W,505.24
c/o flar,old C. Miller Irxd 464 ' 13urb & Gut.ter 4 .19 1,944 .16
7060 [,fardisty 338 Isq. Ft. I)rivevmy 1.33 449.54
76118 $12,89 8.94
TOVQ, COSI' TO P110PE1'1TY 0W1TE17S. . .. ... .. . . . . . .. . . . . . . _ .._$28p331_37
TOMNI, CCGT TO 1'1177Y O' FQET WORTH. . .. . . .. . . .. . .. . . . . . . .. . .$ 4,879.29
T(IfIAL C0FTS".V1iIJCT'r,0N COS'17, UNIT TA. .. . . . .. . .. . .. ... . . .. . ...S,313�211.0.66
PROHCT NO. '104-24,000-238 mi'lli" TB* IT E 387,11, °3'111EEI FROm 6281 ms t,,, oiv i�. �IIIAIN STIkEET TO NORM
ddn Lcl 2 ME E IE
T)ijll;-e7went cane a six-inch thick 'I i7me stabilized stibgrade with seven-inch high, concrete curb arid
eighteen-inc,li wide concrete gutter on na florLy foot roadwa3„. Six--incl-i thicR concrete driveways
and four-foot wide ccmcrete sidewalk will be c:onstructed ;jherc Specified.
BLOCE,
OWER LOT Z(11 ING FRON,MCE RATE ASSESSRENT
NORTH S IDE V-,,NC()R ADDITION
Beginning i1,a a point 628' east of 'P,% Main S tree t
Tandy Corporation 2 1, 457 ' Pavement $15,65 $7,152.05
2727 W. 7th Street 457 ' Curb m,i Gutter 4.22 1,928.54
761,07 '382 ' Sidewalk 3.82 1,459.24
Attn: William 1,1. Miche'ro 282 Sq. Driveway 1.33 375.06
$10,91.4.89
Tandy Corporation 3 1, 35' Paveup-nt $15.65 $ 547.75
2727 14. 7th St�reet 35' Curb & Cutter 4.22 147.70
✓6107 35' Sidewalk 3.82 133�70
A,t tit: wiuliam ji. Michero $ 829.15
N or th Grove Street intersects
S OIYPII SIDE HIVEY
Tandy Corpora tion Trac t 3 510' Paveu!ent �15,65 $7,981.50
7.727 W. 7th Street YT-171 217' Curb & Gutter 4.22 915.74
76107 . vw 1,33 567.91$ 9,464.15
Attri: William I'l. Michero
1"d"rIA1, (',(YST '],'() 1111U.)PERT7" OWNEM3.. .. .. . .... . .. . . . . ...$ 21,208.19
TCY.Ml, C(Y:3�7' TO ("ITY C)F FORT WORTH.. . . .. . ... .. . . . . . .$ 79,750.9c)
TOTAL CaRSITCUCTION C(Y.-,'r, W41.1' IB.. . .. .. ... ... . .. ..$100,9 59.09
ALL UNIVS T OTA L COST TO PROPERTY CMNERS.. ... . ... ... .. .. . .. . .$ 49,539.36
TOTA 1, COST TO CITY OF FORT �4ORTII. . . .. .. ... . .......$ 849630.L9
TOTAL CONS'LlItUCTION (1305 T. ..... .. .. .. .. .. . .. . .. .. .. .$131+,169.75
UK City of Fort Wai,-th, Texas
mum
It
Mayor and Coune *1 Communication
DATE- REFERENCE susjE.cT-Yina, 1 Payment-Assessment Paving at PAGE
NUMBER Two Locations North Side, Reconstruction
920/75 FP-1110 Two Existing Streets and Monterrey Drive I of 2
Storm Drains
Final Council action an the Project described below is requested.
Project Description
Name: Assessment Paving at Two Locations North Side, Reconstruction of
Two Existing Streets and Monterrey Drive Storm Drains
Contractor: Austin Road Company
Contract Awarded: December 16, 1974 (M&C C-2973)
Work Order Issued: December 26, 1974
Work Order Effective: January 13, 1975
Work Began: January 13, 1975
Date of Final Inspection and Approval: August 18, 1975
Working Time Bid: 180 Working Days
Working Time Used: 1.15 Working Days
Project Cost and Financing
Original Bid Price: $205,521.03
Change Order, No. 1: $1,334A0 (A.R. 1-15, 2.3.1)
Change Order No. 2: $10,803.97 "MC C-3117)
Revised Bid Price: $31.7,659A0
Final Contract Cost: $316,728,18
Partial Payments Previously Made: 7, Amount: $286,206.38
Final Payment Due: $30,521.80
VATE REFERENCE SUBJECT: i i,rvil Payment-Assessment Paving at PAGE
NUMBER Two Locations North Side, Reconstruction 2 2
10/20/75 FP-11i0 Two Exist Streets and Monterrey Drive
Storm Drains
Final payment to be made from Project Numbers 104-24000-238 (Assessment Paving
at 2 Locations') , 104-27000-165 (Reconstruction of Two Existing Streets) and
104-28000-739 (Monterrey Drive Storm Drain') ,,
Deviation from bid price: The final total contract cost of the three projects
is $930.92 under the revised bid price, Vhich resulted due to deviation between
quantities estimated in the contract documents and quantities measured and used
in the field. However, due to a considerable overrun in the ReconstVction of
Stadium Drive and Monterrey Drive, Project No. 104-27000-165, which fe"sulted
from the removal and replacement of more than estimated curb, gutter and
driveways in order to provide adequate drainage, a deficit of $6,900.00 exists.
A bond fund transfer is required to balance the account.
Compliance with Specifications
Tests made during construction show materials used and required thicknesses
are in compliance with contract specifications.,
Recommendations
It is recommended that
1) A bond fund transfer be approved in the amount of $6,900.00 from
Reconstruction Unspecified, 104-27000-901 to Reconstruction of Stadium
Drive and Monterrey Drive, 104-27000-165 and
2) The project described be accepted by adoption of an ordinance and final
payment of $30,521.80 be made to Austin Road Company.
RNL:vm
--------------
SUBMITTED BY: DISPOSITION,,,BY COUNCIL: PROOESSE Y
0 OTHER (DESCRIBE)
C 77
V CITY SECRETARY
DATE
CITY MANAGER